fbpx
Wikipedia

Pakistan Railways

Pakistan Railways (reporting mark PR) (Urdu: پاکستان ریلویز) is the national, state-owned railway company of Pakistan. Founded in 1861 (under British India or Indian Railways) and headquartered in Lahore, it owns 7,791 kilometres (4,841 miles) of track across Pakistan, stretching from Torkham to Karachi, offering both freight and passenger services.

Pakistan Railways
Pakistan Railways headquarters, Lahore
Native name
پاکستان ریلویز
TypeState-owned enterprise
IndustryRail transport
PredecessorNorth Western State Railway
Founded1861 (162 years ago) (1861)
Headquarters,
Pakistan
Area served
Pakistan
Key people
Services
Revenue Rs. 48.65 billion (US$210 million)[1] (2021–22)
Rs. -45 billion (US$−200 million)[2] (2018–19)
OwnerGovernment of Pakistan (1947-Present)
Number of employees
72,078[3] (2016-17)
ParentMinistry of Railways
Divisions6
Subsidiaries1
Website
  • www.pakrail.gov.pk

In 2014, the Ministry of Railways launched Pakistan Railways Vision 2026, which seeks to increase PR's share in Pakistan's transportation sector from 4% to 20%, using the Rs. 886.68 billion (US$3.9 billion) China–Pakistan Economic Corridor rail upgrade. The plan includes building new locomotives, development and improvement of current rail infrastructure, an increase in average train speed, improved on-time performance and expansion of passenger services. The first phase of the project was completed in 2017, and the second phase is scheduled for completion by 2021. Among them is the ML-1 project, which will be completed in three phases at a cost of Rs. 1.11 trillion (US$4.9 billion).[4] Until October 2022, these projects have not started construction or tendering.

Pakistan Railways is an active member of the International Union of Railways. In the 2018/19 financial year, Pakistan Railways carried 70 million passengers.[5]

History

In 1855, during the British Raj, several railway companies began laying track and operating in Sindh and Punjab. The country's railway system was originally a patchwork of local rail lines operated by small, private companies, including the Scinde Railway, Punjab Railway, Delhi Railway and Indus Flotilla. In 1870, the four companies combined to form the Scinde, Punjab & Delhi Railway. Several other rail lines were soon built, including the Indus Valley State Railway, Punjab Northern State Railway, Sind–Sagar Railway, Sind–Pishin State Railway, Trans–Baluchistan Railway and Kandahar State Railway. These six companies merged with the Scinde, Punjab & Delhi Railway to form the North Western State Railway in 1880. Between 1880 and 1947, the North Western State Railway expanded throughout Punjab and Sindh. Locomotives were standardised following a report from the Locomotive Committee on Standard Locomotives for Indian Railways, published in 1910.[6]

Following independence in 1947, most of the North Western State Railway infrastructure was in Pakistani territory and was renamed the Pakistan Western Railway. In East Bengal, the portion of the Assam Bengal Railway in Pakistani territory was renamed the Pakistan Eastern Railway. The country adopted 8,122 km (5,047 mi) of the North Western State Railway; 6,880 km (4,280 mi) was 1,676 mm (5 ft 6 in), 506 kilometres (314 mi) was 1,000 mm (3 ft 3+38 in) metre gauge, and 736 kilometres (457 mi) was 762 mm (2 ft 6 in) narrow gauge.

In 1954, a branch line was extended from the Karachi–Peshawar Railway Line to Mardan and Charsada. Two years later, the Jacobabad-Kashmore metre-gauge line was converted to 1,676 mm (5 ft 6 in) broad gauge. The Kot Adu-Kashmore section of the Kotri–Attock Railway Line was built from 1969 to 1973, providing an alternate route from Karachi to northern Pakistan. In 1974, Pakistan Western Railways was renamed Pakistan Railways. In February 2006, the 126-kilometre (78 mi) Hyderabad–Khokhrapar Branch Line was converted to 1,676 mm (5 ft 6 in). All narrow-gauge tracks in the country were converted to 1,676 mm (5 ft 6 in) or dismantled during 2000s. On 8 January 2016, the Lodhran–Raiwind Branch Line double-rail project was completed.

Structure

Pakistan Railways is a state-owned enterprise under the Ministry of Railways (MoR) of the government of Pakistan, tasked with and primarily responsible for planning, administrating and establishing passenger rail service and regulating railway companies and industries. Pakistan Railways policy and development are administered by the ministry.[7] From 1947 to 1959, the Pakistan Western Railway and Pakistan Eastern Railway were administered by the Railway Division of the Ministry of Communications, headed by the Director General of Railways (DG Railways) in the ministry. In 1959, an ordinance was passed by Parliament outlining the need for a semi-autonomous railway board. The board was conceived in accordance with the principal powers of the central government as stipulated in the Railways Act IX of 1890. After the first session of the third national assembly, President Ayub Khan issued Presidential Order 33 on 9 June 1962. The order directed the transfer of control of both railways (PWR and PER) from the central government to the provincial governments of West Pakistan and East Pakistan, respectively.[8] When PO 33 came into effect on 1 July 1962, railway boards were established by both provinces (repealing the Railway Board Ordinance of 1959).[9]

The presidential order also reinstated the separation convention whereby railway finances were separated from general finances beginning with fiscal year 1961-62, giving each board greater autonomy. In 1974, the Ministry of Railways was created to administer planning, policy-making, technical advice and management of the railway. In 1982 the Ministry of Railways was merged with the Railway Board by a presidential order, resulting in the federal ministry.

Railway Board

The Railway Board, in existence from 1959 to 2000, was modified with an executive committee from 2000 and 2014. The Railway Board was reconstituted on 20 February 2015. The Board members are:

Units and divisions

Pakistan Railways has three functional units: operations, manufacturing and welfare and special initiatives. The operations unit is divided into three main departments. The Infrastructure Department oversees civil engineering, signaling, telecommunications, design and the directorate of property. The Mechanical Engineering Department oversees mechanical engineering, purchasing, stores and electrical engineering, and the Traffic Department oversees passenger facilities, operations, marketing and the directorate of information technology. Several smaller departments, including personnel, railway police, planning, legal affairs, public relations and the Pakistan Railways Academy, are also part of the operations unit. The railway has eight territorial operating divisions: Karachi, Lahore, Multan, Peshawar, Quetta, Rawalpindi, Sukkur and Gwadar. Gawadar Division is not yet operational. In addition to these 8 divisions, one division is non operating division which is Mughulpura Division, Lahore. This division is, primarily, engaged with maintenance of rolling stock.

Pakistan Railways Divisions

The Railways has 8 Regional Operating Divisions:

  1. Pakistan Railways Karachi Division
  2. Pakistan Railways Sukkur Division
  3. Pakistan Railways Multan Division
  4. Pakistan Railways Lahore Division
  5. Pakistan Railways Rawalpindi Division
  6. Pakistan Railways Peshawar Division
  7. Pakistan Railways Quetta Division
  8. Pakistan Railways Gwadar Division, -, it is not active yet

Rolling stock

 
A Pakistan Railways diesel locomotive

Pakistan Railways has 190 working diesel-electric locomotives. The average life of the fleet is 25 years, and they are serviced at the Pakistan Locomotive Factory.[10]

In January 2016, the railway ordered 800 hopper wagons from Jinan Railway Vehicles Equipment. The first 205 wagons will be built in China, and the remaining 595 wagons will be assembled at the Moghalpura Railway Workshops in Pakistan. The wagons will carry coal to power stations in Karachi and Qadirabad.[11]

Manufacturing

The Pakistan Locomotive Factory was built in Risalpur in 1993 at a cost of Rs. 228.4 million (US$1.0 million). The factory's capacity is 150 coaches per year on a single-shift basis.[12]

The Moghalpura Railway Workshops, on the Lahore–Wagah Branch Line at Moghalpura Junction railway station (MGPR) in Lahore, are one of several rolling-stock repair sites. The workshop complex emerged at its present site in 1904 to manufacture, repair and overhaul passenger coaches and freight wagons for the North Western State Railway. In 1947, it was the only state-of-the-art workshop for Pakistan Railways.[13]

The railway owns five concrete sleeper factories in Sukkur, Khanewal, Kohat, Shahinabad and Kotri. The first factory was established in Sukkur in 1967, and the other four factories were opened between 1979 and 1981.[citation needed]

Network

Lines

The Pakistan Railways network is divided into main lines and branch lines. The Karachi-Peshawar line is the main north-south line, and the Rohri-Chaman line is the main east-west line.

Main lines

Branch lines

Tracks

 
Tracks at Rawalpindi station

Pakistan Railways owns 11,881 kilometres (7,383 mi) of track. All are 1,676 mm (5 ft 6 in) (broad gauge), except for some industrial lines.

The broad-gauge track axle load limit is 22.86 tonnes, except for the Rohri-Chaman Line (limit 17.78 tonnes) and Quetta-Taftan Line (limit 17.27 tonnes). The maximum speed on most lines is 120 kilometres per hour (75 mph), but upgraded sections of the Karachi-Peshawar Line allow speeds up to 130 kilometres per hour (81 mph). Work is in progress to upgrade all main lines to 160 kilometres per hour (99 mph).[14]

Electrification

The Lahore-Khanewal line was electrified at 25 kV AC, but electric service had ceased by 2011. The theft of overhead wire was cited as a reason.[15][16]

Rail links with adjacent countries

Service

Passenger service

Passenger traffic is 50 percent of total annual revenue; in 1999-2000, this amounted to Rs. 4.8 billion (US$21 million). Pakistan Railways carried 52.2 million passengers in 2016 and operates 28 mail, express and passenger trains. The railway carries a daily average of 178,000 people, and provides special trains for Eid ul Fitr, Eid ul Azha, Independence Day and Raiwind Ijtema. It set up a website[26] during the early 2000s to provide travelers with up-to-date information about seat availability, departures and arrivals. Online ticket purchase was added to the website in 2016, with reservations confirmed by SMS. Wi-Fi service is included on the Green Line Express.[citation needed]

2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018
Passengers (millions)[3] 72.8 81.4 83.8 79.9 82.5 74.9 64.9 41.0 41.9 47.6 48.5 50.9 52.2 52.4 60.0

Classes

Pakistan Railways has several classes of travel. Depending on the route, some trains have one class. Fares for the classes vary, with unreserved seating the least expensive. The following table lists the classes and codes:[27]

Class Code
AC Sleeper ACSL
AC Parlour PC
AC Business ACLZ
AC Standard ACL
First Class Sleeper ISL
Economy Class EC
Second Class SEC

Freight service

Pakistan Railways was the predominant mode of freight transportation from coastal ports to the interior. At their peak, between 1955 and 1960, PR handled 73 percent of the country's freight traffic (compared to less than four percent in 2015). The Freight Business Unit operates over 200 freight stations, including the Port of Karachi and Bin Qasim Port, and several dry ports in Pakistan's four provinces. With 12,000 employees, the unit generates revenue from the movement of agricultural, industrial and imported products such as petroleum oil and lubricants, wheat, coal, fertilizer, rock phosphate, cement and sugar from the ports to the interior.

On 14 August 2009, Prime Minister Yousuf Raza Gilani launched a freight train between Islamabad and Istanbul via Tehran. The first train carried 20 containers with a capacity of 750 t (738 long tons; 827 short tons),[20] and made the 6,500 km (4,000 mi) trip from Islamabad to Tehran and Istanbul in two weeks.[21][25][28] In 2015, freight carried by Pakistan Railways increased significantly to 3.3 million tons.

On February 22, 2020 the first cargo train bound for Afghanistan left Karachi, Pakistan with a load of containers. Pakistan Railways Chairman Habib-ur-Rehman Gilani inaugurated the train on Saturday which departed from the Pakistan International Container Terminal in Karachi with 35 containers on board for the country’s southwest Chaman city bordering Afghanistan. From there, the goods will be shifted across the border via road, the Nation reported[29]

2011 2012 2013 2014 2015 2016 2017
Freight carried
(million tonnes)[30]
1.75 0.40 0.42 1.09 3.30 4.77 5.63

Heritage

 
Khyber train safari at Shahgai station

In Ghangha Pur, a 2 ft (610 mm) narrow gauge horse-drawn tramway is operational.[31] It was first opened in 1898, closed in 1998, and re-opened in 2010.[32]

The Khyber train safari is a steam operated train between Peshawar and Attock Khurd. It was first opened in 1925, suspended in 1982, reopened in 1996 as Khyber steam safari, suspended again in 2006 and finally reopened in 2015 with present name.[33][34][35]

Accidents

Train accidents are common in Pakistan.[36]

  • Sukkur rail disaster: Occurred on 4 January 1990 in the village of Sangi, near Sukkur in Sindh Province. In Pakistan's worst rail disaster, 307 people were killed.[37] The Bahauddin Zakaria Express, on an 800-kilometre (500 mi) overnight run from Multan to Karachi, carried many more passengers in its 16 carriages than its 1,408-seat capacity. The train was supposed to pass through the village of Sangi, but incorrectly-set points sent it into a siding and it struck an empty 67-car freight train at a speed of at least 56 km/h (35 mph).
  • Ghotki rail crash: In PR's worst accident in recent years, three passenger trains collided on 13 July 2005. Thirteen carriages derailed, and over 120 people were killed. The Karachi Express struck the rear of the Quetta Express while it was stopped at a station near Ghotki, and the Tezgam (travelling in the opposite direction) struck several of the derailed carriages. According to officials, the conductor of the Karachi Express misread a signal.[38]
  • Super Parcel Express: On 21 August 2005, the upcountry Super Parcels Express derailed while crossing the Malir Bridge near Landhi in Karachi Division. Eight bogies were seriously damaged when an axle broke due to overloading, and rail traffic was suspended for 24 hours; all trains were terminated and turned around at Landhi.
  • Mehrabpur derailment: The Karachi Express, from Karachi to Lahore, derailed near the town of Mehrabpur in Sindh on 19 December 2007. At about 2:25 a.m. local time, fourteen of the train's sixteen carriages left the tracks; some were mangled by the crash, and others slid down an embankment into water. Sabotage and terrorism were ruled out as reasons for the derailment, with officials blaming faulty track.[39]
  • 2011 Bolan Mail Derail On July 29, 2011 Five bogies of the Bolan Mail were derailed while railway track of 300 feet was damaged as unidentified miscreants destroyed the track in Dera Allahyar area here on Friday. Police told the media that the incident happened at the Marri Farm when the train was going to Quetta from Karachi.
  • 2012 Bolan Mail Collide With Engine Nov 16, 2012 The driver of Bolan Mail was injured when the train accidentally collided with another engine near Kotri Railway Station on Friday morning. Bolan Mail had a clear signal to run on the up-track due to which it bumped into the already halted engine on the same track that was scheduled to travel to Karachi from Quetta.
  • 2015 Bolan Mail Derail June 17, 2015 On Five bogies of the Quetta-bound Bolan Mail derailed near Madeji due to cracks in a dyke of Dadu Canal on Tuesday. Several passengers were injured when the bogies of the train derailed near Madeji in Shikarpur district of Sindh due to cracks in embankment of Dadu Canal and the gushing out water weakened the rail track, making a hole beneath it, which resulted in the accident. The rescue teams rushed to the place of the incident and launched relief operations. They reached the area and started helping the passengers. DS Railways said five additional bogies had been attached with the Akbar Bugti Express for the victim passengers of Bolan Mail. He said the Railways provided alternative transport facility to the victims so as they could reach their destinations. He said the affected portion of the railway track could only be repaired when the breach in the dyke was repaired. He said eight passengers were injured in the incident.
  • 2015 Gujranwala derailment: On 2 July 2015, three carriages of a special train fell into a canal and another derailed near Gujranwala. Nineteen people were killed.
  • Aab-e-Gum derailment: On 17 November 2015, the Jaffar Express derailed at Aab-e-Gum in Balochistan. Twenty people were killed.
  • Karachi rail crash: The Bahauddin Zakaria Express collided with the Fareed Express (parked at the Landhi railway station) on 3 November 2016, killing 21 people.
  • 2017 Mehr Express Derailment On December 23, 2017 Multan-bound Mehr Express collided Friday night with a trailer truck carrying sugarcane produce here near the city's Shah Alam area, rescue officials said. At least four people — three passengers and the train driver — were injured during the accident, with an emergency medical aid team dispatched immediately. Peshawar-to-Karachi Khushhal Khan Khattak Express was delayed due to tracks being closed off after the collision.
  • 2018 Khushal Khan Khattak Express Derailment On September 17, 2018 Twenty-one passengers were injured when seven coaches as well as the locomotive of Peshawer-bound Khushal Khan Khattak Express Derailed in a hilly area between the Massan Railway Station and Sawan Bridge, about 45 km from here, on Sunday morning.Rescue 1122 said one of the 21 passengers was admitted to the Kalabagh tehsil headquarters hospital with critical injuries.A railways press release said 20 passengers were injured, with four of them admitted to the Mianwali DHQ hospital.
  • 2019 Nasirabad Rail Derailment March 17, 2019 The railway track near Nasirabad was blown up and five bogies of Jaffar Express derailed killing at least five persons on Sunday.The train was going to Quetta. Eight persons sustained injuries in the incident. The rescue teams reached the spot and started shifting the victims to the hospital. The explosion damaged the railway track as well and the locomotion of other trains is also affected. The authorities have started interrogating the matter. The security personnel and police rounded up the area and started the investigation. Moreover, it has been learnt that railway officials are trying to reinstate the track as soon as possible.
  • Sadiqabad rail crash (Walhaar): On 11 July 2019, Akbar Express hit a parked cargo train at the Walhaar Railway Station. 21 people were killed and 100 injured. Minister for Railways Sheikh Rashid Ahmad also expressed grief over the loss of precious lives caused by the accident. He announced compensation of Rs2 million for the families of the deceased and Rs1.5 million each for the injured.
  • Rahimyar Khan: On 31 October 2019 at least 75 people died after a fire broke out in Tezgam Express – travelling from Karachi to Rawalpindi – after a gas canister reportedly exploded on board as the train was passing through Rahim Yar Khan. The fire started after passengers started cooking on the train, and the resulting inferno destroyed three economy-class carriages of the train. A witness claimed that the fire could not be attributed to the gas cylinder blast since all the cylinders were emptied at the station. Many of the victims died when they jumped from the moving train to escape the inferno.
  • 2020 Sheikhupura level crossing accident: On 3 July 2020, at least 20 people died and ten others were injured mostly members of the Pakistani Sikh community in Shah Hussain Express collided with a bus near Sachcha Sauda railway station in Sheikhupura District.
  • 2020 Balochistan Train Accident Freight Train Collision Between 22 Wheeler Truck Between Wali Khan And Sheikh Wasil Railway Station Quetta Pakistan
  • 2021 Ghotki rail crash: On 7 June 2021, at least 62 people died and 200 others were injured so far in a collision between Millat Express and Sir Syed Express.[40]
  • 2022 Jaffar Express At Bomb Blast Derailment On Six passengers injured as bomb blast derails January 19, 2022 Pakistan Railways officials said that Jaffar Express left for Rawalpindi from Quetta and when it reached near Sibi a powerful bomb blast took place that derailed four carriages of the train.
  • 2022 Bolan Mail Rail Crash : On 25 April 2022 Four injured as Bolan Mail collides with goods train in Balochistan. Levies sources said that Bolan Mail, which was on its way from Karachi to Quetta, collided with a goods train in Peeru Kunri Post area of Kachhi.According to them, three boogies of the train derailed from the track. The injured passengers were rushed to a nearby hospital for medical treatment.

Future

New lines

New rail lines have been proposed by Pakistan Railways to connect Gwadar Port to Central Asia, including:

Breaks of gauge

Track-doubling project

Over 1,409 kilometres (876 mi) of tracks have been doubled since the track-doubling project began in the 1990s. Sections of the Karachi–Peshawar Line were first doubled, since it was the country's busiest and longest line.

Karachi–Peshawar Line

Rohri–Chaman Line

Lahore–Wagah branch line

Restructuring

In March 2010, the Pakistani government announced plans to privatise Pakistan Railways and split it into four businesses focusing on passenger operations, freight, infrastructure and manufacturing.[41] In February 2010, "Unbundling" was proposed the previous month, with activities being outsourced, privatised, or operated separately. However, complete privatisation has been ruled out.[42]

Public-private partnership

Pakistan Railways has faced financial and management crisis, and has met with private operators. Several trains are a public-private partnership. The Pakistan Business Express Train made its first run on 3 February 2012, and the Shalimar Express resumed operation on 25 February of that year.

China-Pakistan Economic Corridor

China is involved in the development of Pakistan Railways, and has been increasing its stake in Pakistan's communications sector. Freight and passenger service make up 50 percent of the railway's total revenue. Pakistan Railways carries 65 million passengers annually and operates 228 mail, express and passenger trains daily. It introduced new mail and express trains between major terminals from 2003 to 2005. The railway has entered developmental agreements with Chinese rail companies. In 2001, Pakistan Railways signed a $91.89 million contract with China National Machinery Import and Export Corporation to manufacture 175 high-speed passenger coaches. The project was funded by Exim Bank of China on a supplier-credit basis. Forty passenger coaches have been received, and 105 were scheduled to be assembled in Pakistan Railways' carriage factory. The coaches are in use on Pakistan Railways' Rawalpindi-Lahore-Karachi, Lahore-Faisalabad and Rawalpindi-Quetta mail and express trains. The manufacturing kits for the remaining 30 coaches have been received, and 12 are assembled. The technology transfer for the coaches was obtained from China's Chang Chun Car Company.

Pakistan Railways purchased 69 locomotives, 15 of which are in use by the railway, as part of a 2003 agreement with China. The remaining 54 are scheduled to be built at Pakistan Railways' locomotive factory. The Chinese locomotives are 37 percent less expensive than European locomotives.[citation needed] Although some Pakistani observers have criticised faulty locomotives purchased by Pakistan Railways from Dongfang Electric of China, the railway decided to purchase 45 more 2,000-3,000-horsepower locomotives from Dongfang. The company is willing to redesign the 30 delivered locomotives, strengthening their underframes and reducing their weight below 140 tons each. The Beijing Research and Design Institute is committed to provide 300 rail cars to Pakistan Railways.[citation needed]

According to a 2004 agreement with China National Machinery and Equipment Group, the Chinese company would begin the construction of Corridor 1 of a light-rail mass-transit system in Karachi which is intended to serve four million commuters. The project, costing about $568 million, would take four-and-a-half years to complete. The contract, awarded on a build–operate–transfer basis, consists of five corridors. Pakistan signed a series of agreements with China to expand the capability of its railway system. Under an agreement with China Railway, a Chinese company would provide 1,300 freight cars to Pakistan Railways; 420 would be manufactured in China, and the remaining 880 would be produced at the Moghalpura Railway Workshops in Lahore. In another project, 450 passenger coaches would be rehabilitated at an estimated cost of Rs2.14 billion. This would include air-conditioning 40 coaches, converting 10 power vans and providing 100 high-speed bogies; 30 would be imported from China, and 70 would be manufactured domestically on a transfer-of-technology basis. In a separate agreement, 175 new passenger coaches are being purchased from China.

As part of a $100 million agreement signed by Pakistan and China in November 2001, China is to export 69 locomotives to Pakistan to modernize the country's rail fleet. The new engines consume less fuel than older models, and cost less to maintain. The first 15 engines would be manufactured in China, and the remainder would be assembled in Pakistan with Chinese parts and technology. For a Rs7.2 billion project Sindh laying 78,000 tons of rails, China delivered 64,000 tons to Pakistan Railways.

Main Railway Line-1 (ML-1)

The ML-1 railway line project is one of the biggest projects not only of CPEC Phase-II ($6.8 billion) but of Pakistan’s recent history in terms of logistics and communications. Since the partition of British Indian Empire into India and Pakistan this is the single biggest expansion of railway system. It spans a total distance of 1,872 km from Karachi to Peshawar. It covers 184 railway stations and carries over 75% of country's cargo and passengers.[43]

This will be a kind of revolution in terms of communications and industry. After being upgraded, the railway line will be installed with a computer-based signaling and control system – reducing the epidemic of railway accidents that has been seen across Pakistan. It follows all the international safety procedures and protocols to ensure safe operations of Pakistan Railway.[44]

Karakoram Railway

Pakistan awarded a Rs72 million (US$1.2 million) contract to an international consortium to conduct a feasibility study for establishing a rail link with China to improve trade between the countries. The study will cover a 750-kilometre (470 mi) section between Havellian and the 4,730-metre-high (15,520 ft) Khunjerab Pass over Mansehra District and the Karakoram Highway. Havellian is already linked with the Pakistani rail network; China would lay about 350 kilometres (220 mi) of track in China from Kashgar to the Khunjerab Pass, linking Pakistan with China's rail network (largely along the Karakoram Highway). By expanding its stake in Pakistan's rail sector, China can utilise the country's advantageous geographic position at the confluence of South, Central and West Asia. During the first week of February 2007, Pakistan Railways and Dongfang Electric signed an agreement to establish a rail link between Havellian and Khunjerab. The route from Havellian and Khunjerab will probably include tunnels.[45] The pre-feasibility study was completed in July 2011.[46]

Gwadar link

As part of the development plan for its transport and communications network, Pakistan Railways has completed a feasibility study of the Chaman-Kandahar section for laying track between Pakistan and Turkmenistan through Afghanistan. A feasibility study for cost, engineering and design for the construction of a rail link from Gwadar to the existing rail network in Mastung district in Balochistan has been finalised. The link to the port of Gwadar will open underdeveloped areas of Balochistan to development. The chief aim of the venture is to connect the Central Asian republics with Pakistan Railways' network through Afghanistan.

China will benefit from Gwadar's accessible international trade routes to the Central Asian republics and China's Xinjiang border region. By extending its east-west railway from the Chinese border city of Kashgar to Peshawar in Pakistan's northwest, Beijing can trade freight to and from Gwadar along the shortest route (from Karachi to Peshawar). Pakistan's rail network could also supply oil from the Persian Gulf to Xinjiang and give China rail access to Iran.

See also

References

  1. ^ Imaduddin (2 October 2022). "Pakistan Railways achieves highest revenue of Rs 54.59bn". Daily Times.
  2. ^ "Railways suffers loss of Rs45b in 2018-19". The Express Tribune. 14 December 2020. Retrieved 14 December 2020.
  3. ^ a b (PDF). Ministry of Railways (GOP). 2018. p. 3. Archived from the original (PDF) on 2 July 2019. Retrieved 2 July 2019.
  4. ^ Hasnain, Khalid (21 April 2021). "Railway project sent to Chinese bank for approval of $6bn loan". DAWN.COM. Retrieved 4 June 2021.
  5. ^ "Pakistan Railways achieves record income in 2018-19". International Railway Journal. 20 August 2019. Retrieved 20 August 2019.
  6. ^ "Pakistan Railways steam locomotive | Science Museum Group Collection". collection.sciencemuseumgroup.org.uk. Retrieved 25 June 2021.
  7. ^ "Government of Pakistan Ministry of Railways". Retrieved 6 January 2018.
  8. ^ . Bangladesh Railway. Archived from the original on 15 November 2007. Retrieved 18 July 2014.
  9. ^ International Development Association (31 August 1962). Report no. TO-339a: Appraisal of the Pakistan Railways Project (PDF) (Restricted internal report). Department of Technical Operations, International Bank for Reconstruction and Development, International Development Association. p. 2.
  10. ^ . Archived from the original on 8 October 2018. Retrieved 7 January 2017.
  11. ^ Barrow, Keith (14 January 2016). "Pakistan Railways orders 800 wagons from CRRC".
  12. ^ "Carriage factory rehabilitates 690 coaches". www.pakistantoday.com.pk.
  13. ^ Siddiqui, Zaheer Mahmood (9 September 2016). "Footprints: Inside the Mughalpura Workshops".
  14. ^ "Upgradation of ML-1 would escalate train's speed by 160 km/h: Saad Rafique - Pakistan - Dunya News".
  15. ^ "The forgotten electric locomotives of Pakistan". 23 July 2015.
  16. ^ "Pakistan Railways: Electrical locomotives wrapped up - The Express Tribune". 28 February 2011.
  17. ^ "Govt considers railway links with central Asia".
  18. ^ Dr John Stubbs (1 January 2007). . Railway Gazette International. Archived from the original on 21 December 2010.
  19. ^ Associated Press of Pakistan. . Archived from the original on 27 September 2007. Retrieved 28 June 2007.
  20. ^ a b . Pakistan Times. 15 August 2009. Archived from the original on 19 July 2011. Retrieved 15 August 2009.
  21. ^ a b "Leading News Resource of Pakistan". Daily Times. Retrieved 15 August 2009.
  22. ^ Baseer Ahmed (24 January 2016). "Pakistan pursuing revival of train service between Pakistan, Turkey via Iran".
  23. ^ . www.thaishipper.com. Archived from the original on 5 October 2017. Retrieved 22 September 2009.
  24. ^ "Pakistan | PM launches trial phase of Pak-Turkey train service". Dawn.Com. Retrieved 15 August 2009.
  25. ^ a b "Pakistan–Turkey rail trial starts". BBC News. 14 August 2009. Retrieved 16 August 2009.
  26. ^ "Pakistan Railway".
  27. ^ "Train Classes". www.pakrail.gov.pk.
  28. ^ "Pakistan Plans Passenger Rail Between Pakistan, Iran and Turkey". railway-technology.com. 5 August 2009.
  29. ^ "Pakistan inaugurates Afghan transit cargo train service". Railpage. Retrieved 24 February 2020.
  30. ^ https://www.pakrail.gov.pk/images/yearbook/ybbt.pdf[bare URL PDF]
  31. ^ (PDF). Blickpunkt Straßenbahn. 24 January 2017. Archived from the original (PDF) on 16 February 2017. Retrieved 16 February 2017.
  32. ^ "Ghora Tram: Historic Horse Tram Returns to Gangapur". pakistaniat.com. 9 March 2010.
  33. ^ http://kptourism.com/trainsafari/[bare URL]
  34. ^ . Archived from the original on 30 September 2017. Retrieved 30 June 2020.
  35. ^ "Another direction: Khyber Steam Safari train resumes its magic after 2007". 2 December 2012.
  36. ^ "A timeline of major train accidents in the past two decades". Dawn.com. 9 June 2021.
  37. ^ "Chronology of world train disasters". The Guardian. London. 2 August 1999.
  38. ^ "World's worst rail disasters". BBC. 13 July 2005. Retrieved 12 August 2007.
  39. ^ Aziz, Abdul: Sabotage unlikely in train crash, Dawn, 20 December 2007.
  40. ^ "Ghotki train crash resulted from broken joint of track: report | SAMAA". Samaa TV. 8 June 2021. Retrieved 8 June 2021.
  41. ^ "Four-way split proposed for Pakistan Railways". Railway Gazette International. 2010. Retrieved 20 May 2010.
  42. ^ "Railway Gazette: Unbundling of Pakistan Railways proposed". Retrieved 27 February 2011.
  43. ^ "ML-1 to turn Pakistan into a global business hub". www.thenews.com.pk. Retrieved 4 June 2021.
  44. ^ "Why Main Railway Line-1 is Important for Pakistan! -". Global Village Space. 12 May 2021. Retrieved 4 June 2021.
  45. ^ China-Pakistan rail link on horizon, Asia Times Online, 24 February 2007.
  46. ^ Pre-feasibility for 411 mile rail link between Pakistan’s town of Havelian and Khunjerab completed, Pamir Times, 3 July 2011.

External links

  • Official website of Pakistan Railways 1 February 2021 at the Wayback Machine
  • Pakistan Ministry of Railways

pakistan, railways, reporting, mark, urdu, پاکستان, ریلویز, national, state, owned, railway, company, pakistan, founded, 1861, under, british, india, indian, railways, headquartered, lahore, owns, kilometres, miles, track, across, pakistan, stretching, from, t. Pakistan Railways reporting mark PR Urdu پاکستان ریلویز is the national state owned railway company of Pakistan Founded in 1861 under British India or Indian Railways and headquartered in Lahore it owns 7 791 kilometres 4 841 miles of track across Pakistan stretching from Torkham to Karachi offering both freight and passenger services Pakistan RailwaysPakistan Railways headquarters LahoreNative nameپاکستان ریلویزTypeState owned enterpriseIndustryRail transportPredecessorNorth Western State RailwayFounded1861 162 years ago 1861 HeadquartersLahore PakistanArea servedPakistanKey peopleKhawaja Saad Rafique Minister for Railways Zafar Zaman Ranjha Federal Secretary for Railways amp Chairman of the Board Farrukh Taimur Ghilzai CEO Sr General Manager ServicesRail transportCargo transportParcel carrierCateringRevenueRs 48 65 billion US 210 million 1 2021 22 Net incomeRs 45 billion US 200 million 2 2018 19 OwnerGovernment of Pakistan 1947 Present Number of employees72 078 3 2016 17 ParentMinistry of RailwaysDivisions6Subsidiaries1Websitewww wbr pakrail wbr gov wbr pkIn 2014 the Ministry of Railways launched Pakistan Railways Vision 2026 which seeks to increase PR s share in Pakistan s transportation sector from 4 to 20 using the Rs 886 68 billion US 3 9 billion China Pakistan Economic Corridor rail upgrade The plan includes building new locomotives development and improvement of current rail infrastructure an increase in average train speed improved on time performance and expansion of passenger services The first phase of the project was completed in 2017 and the second phase is scheduled for completion by 2021 Among them is the ML 1 project which will be completed in three phases at a cost of Rs 1 11 trillion US 4 9 billion 4 Until October 2022 these projects have not started construction or tendering Pakistan Railways is an active member of the International Union of Railways In the 2018 19 financial year Pakistan Railways carried 70 million passengers 5 Contents 1 History 2 Structure 2 1 Railway Board 2 2 Units and divisions 2 3 Pakistan Railways Divisions 3 Rolling stock 4 Manufacturing 5 Network 5 1 Lines 5 1 1 Main lines 5 1 2 Branch lines 5 2 Tracks 5 3 Electrification 5 4 Rail links with adjacent countries 6 Service 6 1 Passenger service 6 1 1 Classes 6 2 Freight service 6 3 Heritage 7 Accidents 8 Future 8 1 New lines 8 2 Breaks of gauge 8 3 Track doubling project 8 3 1 Karachi Peshawar Line 8 3 2 Rohri Chaman Line 8 3 3 Lahore Wagah branch line 8 4 Restructuring 8 5 Public private partnership 8 6 China Pakistan Economic Corridor 8 6 1 Karakoram Railway 8 6 2 Gwadar link 9 See also 10 References 11 External linksHistory EditMain article History of rail transport in Pakistan In 1855 during the British Raj several railway companies began laying track and operating in Sindh and Punjab The country s railway system was originally a patchwork of local rail lines operated by small private companies including the Scinde Railway Punjab Railway Delhi Railway and Indus Flotilla In 1870 the four companies combined to form the Scinde Punjab amp Delhi Railway Several other rail lines were soon built including the Indus Valley State Railway Punjab Northern State Railway Sind Sagar Railway Sind Pishin State Railway Trans Baluchistan Railway and Kandahar State Railway These six companies merged with the Scinde Punjab amp Delhi Railway to form the North Western State Railway in 1880 Between 1880 and 1947 the North Western State Railway expanded throughout Punjab and Sindh Locomotives were standardised following a report from the Locomotive Committee on Standard Locomotives for Indian Railways published in 1910 6 Following independence in 1947 most of the North Western State Railway infrastructure was in Pakistani territory and was renamed the Pakistan Western Railway In East Bengal the portion of the Assam Bengal Railway in Pakistani territory was renamed the Pakistan Eastern Railway The country adopted 8 122 km 5 047 mi of the North Western State Railway 6 880 km 4 280 mi was 1 676 mm 5 ft 6 in 506 kilometres 314 mi was 1 000 mm 3 ft 3 3 8 in metre gauge and 736 kilometres 457 mi was 762 mm 2 ft 6 in narrow gauge In 1954 a branch line was extended from the Karachi Peshawar Railway Line to Mardan and Charsada Two years later the Jacobabad Kashmore metre gauge line was converted to 1 676 mm 5 ft 6 in broad gauge The Kot Adu Kashmore section of the Kotri Attock Railway Line was built from 1969 to 1973 providing an alternate route from Karachi to northern Pakistan In 1974 Pakistan Western Railways was renamed Pakistan Railways In February 2006 the 126 kilometre 78 mi Hyderabad Khokhrapar Branch Line was converted to 1 676 mm 5 ft 6 in All narrow gauge tracks in the country were converted to 1 676 mm 5 ft 6 in or dismantled during 2000s On 8 January 2016 the Lodhran Raiwind Branch Line double rail project was completed An 1890s map of the North Western State Railway North Western State Railway bridge over the Indus River at Attock in 1895 A 1932 steam locomotive in a museum Golra Sharif Railway Museum and station in IslamabadStructure EditMain article Ministry of Railways Pakistan Pakistan Railways is a state owned enterprise under the Ministry of Railways MoR of the government of Pakistan tasked with and primarily responsible for planning administrating and establishing passenger rail service and regulating railway companies and industries Pakistan Railways policy and development are administered by the ministry 7 From 1947 to 1959 the Pakistan Western Railway and Pakistan Eastern Railway were administered by the Railway Division of the Ministry of Communications headed by the Director General of Railways DG Railways in the ministry In 1959 an ordinance was passed by Parliament outlining the need for a semi autonomous railway board The board was conceived in accordance with the principal powers of the central government as stipulated in the Railways Act IX of 1890 After the first session of the third national assembly President Ayub Khan issued Presidential Order 33 on 9 June 1962 The order directed the transfer of control of both railways PWR and PER from the central government to the provincial governments of West Pakistan and East Pakistan respectively 8 When PO 33 came into effect on 1 July 1962 railway boards were established by both provinces repealing the Railway Board Ordinance of 1959 9 The presidential order also reinstated the separation convention whereby railway finances were separated from general finances beginning with fiscal year 1961 62 giving each board greater autonomy In 1974 the Ministry of Railways was created to administer planning policy making technical advice and management of the railway In 1982 the Ministry of Railways was merged with the Railway Board by a presidential order resulting in the federal ministry Railway Board Edit The Railway Board in existence from 1959 to 2000 was modified with an executive committee from 2000 and 2014 The Railway Board was reconstituted on 20 February 2015 The Board members are Federal Secretary Railways Chairman of Board Federal Secretary Communications Finance Secretary of Pakistan Planning and Development Secretary of Pakistan General Manager Railways Operations General Manager Railways Manufacturing and Services Member Finance Ministry of RailwaysUnits and divisions Edit Pakistan Railways has three functional units operations manufacturing and welfare and special initiatives The operations unit is divided into three main departments The Infrastructure Department oversees civil engineering signaling telecommunications design and the directorate of property The Mechanical Engineering Department oversees mechanical engineering purchasing stores and electrical engineering and the Traffic Department oversees passenger facilities operations marketing and the directorate of information technology Several smaller departments including personnel railway police planning legal affairs public relations and the Pakistan Railways Academy are also part of the operations unit The railway has eight territorial operating divisions Karachi Lahore Multan Peshawar Quetta Rawalpindi Sukkur and Gwadar Gawadar Division is not yet operational In addition to these 8 divisions one division is non operating division which is Mughulpura Division Lahore This division is primarily engaged with maintenance of rolling stock Pakistan Railways Divisions Edit The Railways has 8 Regional Operating Divisions Pakistan Railways Karachi Division Pakistan Railways Sukkur Division Pakistan Railways Multan Division Pakistan Railways Lahore Division Pakistan Railways Rawalpindi Division Pakistan Railways Peshawar Division Pakistan Railways Quetta Division Pakistan Railways Gwadar Division it is not active yetRolling stock EditMain article Locomotives of Pakistan A Pakistan Railways diesel locomotive Pakistan Railways has 190 working diesel electric locomotives The average life of the fleet is 25 years and they are serviced at the Pakistan Locomotive Factory 10 In January 2016 the railway ordered 800 hopper wagons from Jinan Railway Vehicles Equipment The first 205 wagons will be built in China and the remaining 595 wagons will be assembled at the Moghalpura Railway Workshops in Pakistan The wagons will carry coal to power stations in Karachi and Qadirabad 11 Manufacturing EditMain article Pakistan Locomotive Factory The Pakistan Locomotive Factory was built in Risalpur in 1993 at a cost of Rs 228 4 million US 1 0 million The factory s capacity is 150 coaches per year on a single shift basis 12 The Moghalpura Railway Workshops on the Lahore Wagah Branch Line at Moghalpura Junction railway station MGPR in Lahore are one of several rolling stock repair sites The workshop complex emerged at its present site in 1904 to manufacture repair and overhaul passenger coaches and freight wagons for the North Western State Railway In 1947 it was the only state of the art workshop for Pakistan Railways 13 The railway owns five concrete sleeper factories in Sukkur Khanewal Kohat Shahinabad and Kotri The first factory was established in Sukkur in 1967 and the other four factories were opened between 1979 and 1981 citation needed Network EditMain article Railway lines in Pakistan Lines Edit The Pakistan Railways network is divided into main lines and branch lines The Karachi Peshawar line is the main north south line and the Rohri Chaman line is the main east west line Main lines Edit Main Line 1 ML 1 Karachi Peshawar Line Main Line 2 ML 2 Kotri Attock Line Main Line 3 ML 3 Rohri Chaman Line Main Line 4 ML 4 Quetta Taftan Line Main Line 5 ML 5 Taxila Khunjerab LineBranch lines Edit Hyderabad Badin Branch Line Hyderabad Khokhrapar Branch Line Bahawalnagar Fort Abbas Branch Line Samasata Amruka Branch Line Sher Shah Kot Addu Branch Line Lodhran Khanewal Branch Line Lodhran Raiwind Branch Line Khanewal Wazirabad Branch Line Shorkot Sheikhupura Branch Line Shorkot Lalamusa Branch Line Golra Sharif Kohat Branch Line Nowshera Dargai Railway Bannu Tank Branch Line Daud Khel Lakki Marwat Branch Line Malakwal Khushab Branch Line Sangla Hill Kundian Branch Line Lahore Wagah Branch Line Shahdara Bagh Sangla Hill Branch Line Shahdara Bagh Chak Amru Branch Line Wazirabad Narowal Branch Line Jaranwala Lyallpur Branch Line uprooted in 1941 Tracks Edit Tracks at Rawalpindi station Pakistan Railways owns 11 881 kilometres 7 383 mi of track All are 1 676 mm 5 ft 6 in broad gauge except for some industrial lines The broad gauge track axle load limit is 22 86 tonnes except for the Rohri Chaman Line limit 17 78 tonnes and Quetta Taftan Line limit 17 27 tonnes The maximum speed on most lines is 120 kilometres per hour 75 mph but upgraded sections of the Karachi Peshawar Line allow speeds up to 130 kilometres per hour 81 mph Work is in progress to upgrade all main lines to 160 kilometres per hour 99 mph 14 Electrification Edit The Lahore Khanewal line was electrified at 25 kV AC but electric service had ceased by 2011 The theft of overhead wire was cited as a reason 15 16 Rail links with adjacent countries Edit Iran Pakistan Railways is connected to the Islamic Republic of Iran Railways at Zahedan where a break of gauge exists between the 1 676 mm 5 ft 6 in Quetta Taftan Railway Line and the 1 435 mm 4 ft 8 1 2 in Kerman Zahedan line The link was completed on 18 May 2007 Afghanistan Presently there is no rail link to Afghanistan but Pakistan Railways has proposed to help build an Afghan rail network in three phases Phase one would stretch from the Chaman to Spin Boldak as an extension of the Rohri Chaman Line Phase two would extend the line from Spin Boldak to Kandahar Phase three would run from Kandahar to Herat and Khushka Turkmenistan linking the 1 676 mm 5 ft 6 in with the Central Asian 1 520 mm 4 ft 11 27 32 in It is unknown where the break of gauge station would be 17 Another proposal would extend the Karachi Peshawar Line to Kabul via Jalalabad Turkmenistan via Afghanistan Proposed avoiding the intervening 1 435 mm 4 ft 8 1 2 in gauge 18 China There is no present rail link with China On 28 February 2007 contracts were awarded for feasibility studies on the Taxila Khunjerab Line extending it from Havelian via the Khunjerab Pass to the Chinese railhead at Kashgar a distance of about 750 kilometres 470 mi 19 Turkey The completion of the Pakistan Iran link has made it possible in principle to run trains between Pakistan and Turkey via Iran A container train trial service was begun by Prime Minister Yousuf Raza Gilani between Islamabad and Istanbul on 14 August 2009 The first train carried 20 containers with a capacity of about 750 t 738 long tons 827 short tons 20 and was scheduled to travel 6 500 km 4 000 mi from Islamabad through Tehran to Istanbul 21 22 An Istanbul Tehran Islamabad passenger rail service has also been proposed 23 In 2009 Minister for Railways Ghulam Ahmad Bilour expressed the hope that after the container train trial a passenger train would be introduced 24 There are also hopes that the route would link Europe and Central Asia and carry passengers 25 India Two rail links to India exist the Thar Express from Jodhpur Rajasthan to Karachi and the Samjhauta Express from Delhi to Lahore Service EditPassenger service Edit Passenger traffic is 50 percent of total annual revenue in 1999 2000 this amounted to Rs 4 8 billion US 21 million Pakistan Railways carried 52 2 million passengers in 2016 and operates 28 mail express and passenger trains The railway carries a daily average of 178 000 people and provides special trains for Eid ul Fitr Eid ul Azha Independence Day and Raiwind Ijtema It set up a website 26 during the early 2000s to provide travelers with up to date information about seat availability departures and arrivals Online ticket purchase was added to the website in 2016 with reservations confirmed by SMS Wi Fi service is included on the Green Line Express citation needed 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018Passengers millions 3 72 8 81 4 83 8 79 9 82 5 74 9 64 9 41 0 41 9 47 6 48 5 50 9 52 2 52 4 60 0Classes Edit Pakistan Railways has several classes of travel Depending on the route some trains have one class Fares for the classes vary with unreserved seating the least expensive The following table lists the classes and codes 27 Class CodeAC Sleeper ACSLAC Parlour PCAC Business ACLZAC Standard ACLFirst Class Sleeper ISLEconomy Class ECSecond Class SECFreight service EditPakistan Railways was the predominant mode of freight transportation from coastal ports to the interior At their peak between 1955 and 1960 PR handled 73 percent of the country s freight traffic compared to less than four percent in 2015 The Freight Business Unit operates over 200 freight stations including the Port of Karachi and Bin Qasim Port and several dry ports in Pakistan s four provinces With 12 000 employees the unit generates revenue from the movement of agricultural industrial and imported products such as petroleum oil and lubricants wheat coal fertilizer rock phosphate cement and sugar from the ports to the interior Wikinews has related news Pakistan to Turkey container train service launchedOn 14 August 2009 Prime Minister Yousuf Raza Gilani launched a freight train between Islamabad and Istanbul via Tehran The first train carried 20 containers with a capacity of 750 t 738 long tons 827 short tons 20 and made the 6 500 km 4 000 mi trip from Islamabad to Tehran and Istanbul in two weeks 21 25 28 In 2015 freight carried by Pakistan Railways increased significantly to 3 3 million tons On February 22 2020 the first cargo train bound for Afghanistan left Karachi Pakistan with a load of containers Pakistan Railways Chairman Habib ur Rehman Gilani inaugurated the train on Saturday which departed from the Pakistan International Container Terminal in Karachi with 35 containers on board for the country s southwest Chaman city bordering Afghanistan From there the goods will be shifted across the border via road the Nation reported 29 2011 2012 2013 2014 2015 2016 2017Freight carried million tonnes 30 1 75 0 40 0 42 1 09 3 30 4 77 5 63Heritage Edit Khyber train safari at Shahgai station In Ghangha Pur a 2 ft 610 mm narrow gauge horse drawn tramway is operational 31 It was first opened in 1898 closed in 1998 and re opened in 2010 32 The Khyber train safari is a steam operated train between Peshawar and Attock Khurd It was first opened in 1925 suspended in 1982 reopened in 1996 as Khyber steam safari suspended again in 2006 and finally reopened in 2015 with present name 33 34 35 Accidents EditTrain accidents are common in Pakistan 36 Sukkur rail disaster Occurred on 4 January 1990 in the village of Sangi near Sukkur in Sindh Province In Pakistan s worst rail disaster 307 people were killed 37 The Bahauddin Zakaria Express on an 800 kilometre 500 mi overnight run from Multan to Karachi carried many more passengers in its 16 carriages than its 1 408 seat capacity The train was supposed to pass through the village of Sangi but incorrectly set points sent it into a siding and it struck an empty 67 car freight train at a speed of at least 56 km h 35 mph Ghotki rail crash In PR s worst accident in recent years three passenger trains collided on 13 July 2005 Thirteen carriages derailed and over 120 people were killed The Karachi Express struck the rear of the Quetta Express while it was stopped at a station near Ghotki and the Tezgam travelling in the opposite direction struck several of the derailed carriages According to officials the conductor of the Karachi Express misread a signal 38 Wikinews has related news Train crash in southern Pakistan kills more than a hundred Super Parcel Express On 21 August 2005 the upcountry Super Parcels Express derailed while crossing the Malir Bridge near Landhi in Karachi Division Eight bogies were seriously damaged when an axle broke due to overloading and rail traffic was suspended for 24 hours all trains were terminated and turned around at Landhi Mehrabpur derailment The Karachi Express from Karachi to Lahore derailed near the town of Mehrabpur in Sindh on 19 December 2007 At about 2 25 a m local time fourteen of the train s sixteen carriages left the tracks some were mangled by the crash and others slid down an embankment into water Sabotage and terrorism were ruled out as reasons for the derailment with officials blaming faulty track 39 2011 Bolan Mail Derail On July 29 2011 Five bogies of the Bolan Mail were derailed while railway track of 300 feet was damaged as unidentified miscreants destroyed the track in Dera Allahyar area here on Friday Police told the media that the incident happened at the Marri Farm when the train was going to Quetta from Karachi 2012 Bolan Mail Collide With Engine Nov 16 2012 The driver of Bolan Mail was injured when the train accidentally collided with another engine near Kotri Railway Station on Friday morning Bolan Mail had a clear signal to run on the up track due to which it bumped into the already halted engine on the same track that was scheduled to travel to Karachi from Quetta 2015 Bolan Mail Derail June 17 2015 On Five bogies of the Quetta bound Bolan Mail derailed near Madeji due to cracks in a dyke of Dadu Canal on Tuesday Several passengers were injured when the bogies of the train derailed near Madeji in Shikarpur district of Sindh due to cracks in embankment of Dadu Canal and the gushing out water weakened the rail track making a hole beneath it which resulted in the accident The rescue teams rushed to the place of the incident and launched relief operations They reached the area and started helping the passengers DS Railways said five additional bogies had been attached with the Akbar Bugti Express for the victim passengers of Bolan Mail He said the Railways provided alternative transport facility to the victims so as they could reach their destinations He said the affected portion of the railway track could only be repaired when the breach in the dyke was repaired He said eight passengers were injured in the incident 2015 Gujranwala derailment On 2 July 2015 three carriages of a special train fell into a canal and another derailed near Gujranwala Nineteen people were killed Aab e Gum derailment On 17 November 2015 the Jaffar Express derailed at Aab e Gum in Balochistan Twenty people were killed Karachi rail crash The Bahauddin Zakaria Express collided with the Fareed Express parked at the Landhi railway station on 3 November 2016 killing 21 people 2017 Mehr Express Derailment On December 23 2017 Multan bound Mehr Express collided Friday night with a trailer truck carrying sugarcane produce here near the city s Shah Alam area rescue officials said At least four people three passengers and the train driver were injured during the accident with an emergency medical aid team dispatched immediately Peshawar to Karachi Khushhal Khan Khattak Express was delayed due to tracks being closed off after the collision 2018 Khushal Khan Khattak Express Derailment On September 17 2018 Twenty one passengers were injured when seven coaches as well as the locomotive of Peshawer bound Khushal Khan Khattak Express Derailed in a hilly area between the Massan Railway Station and Sawan Bridge about 45 km from here on Sunday morning Rescue 1122 said one of the 21 passengers was admitted to the Kalabagh tehsil headquarters hospital with critical injuries A railways press release said 20 passengers were injured with four of them admitted to the Mianwali DHQ hospital 2019 Nasirabad Rail Derailment March 17 2019 The railway track near Nasirabad was blown up and five bogies of Jaffar Express derailed killing at least five persons on Sunday The train was going to Quetta Eight persons sustained injuries in the incident The rescue teams reached the spot and started shifting the victims to the hospital The explosion damaged the railway track as well and the locomotion of other trains is also affected The authorities have started interrogating the matter The security personnel and police rounded up the area and started the investigation Moreover it has been learnt that railway officials are trying to reinstate the track as soon as possible Sadiqabad rail crash Walhaar On 11 July 2019 Akbar Express hit a parked cargo train at the Walhaar Railway Station 21 people were killed and 100 injured Minister for Railways Sheikh Rashid Ahmad also expressed grief over the loss of precious lives caused by the accident He announced compensation of Rs2 million for the families of the deceased and Rs1 5 million each for the injured Rahimyar Khan On 31 October 2019 at least 75 people died after a fire broke out in Tezgam Express travelling from Karachi to Rawalpindi after a gas canister reportedly exploded on board as the train was passing through Rahim Yar Khan The fire started after passengers started cooking on the train and the resulting inferno destroyed three economy class carriages of the train A witness claimed that the fire could not be attributed to the gas cylinder blast since all the cylinders were emptied at the station Many of the victims died when they jumped from the moving train to escape the inferno 2020 Sheikhupura level crossing accident On 3 July 2020 at least 20 people died and ten others were injured mostly members of the Pakistani Sikh community in Shah Hussain Express collided with a bus near Sachcha Sauda railway station in Sheikhupura District 2020 Balochistan Train Accident Freight Train Collision Between 22 Wheeler Truck Between Wali Khan And Sheikh Wasil Railway Station Quetta Pakistan 2021 Ghotki rail crash On 7 June 2021 at least 62 people died and 200 others were injured so far in a collision between Millat Express and Sir Syed Express 40 2022 Jaffar Express At Bomb Blast Derailment On Six passengers injured as bomb blast derails January 19 2022 Pakistan Railways officials said that Jaffar Express left for Rawalpindi from Quetta and when it reached near Sibi a powerful bomb blast took place that derailed four carriages of the train 2022 Bolan Mail Rail Crash On 25 April 2022 Four injured as Bolan Mail collides with goods train in Balochistan Levies sources said that Bolan Mail which was on its way from Karachi to Quetta collided with a goods train in Peeru Kunri Post area of Kachhi According to them three boogies of the train derailed from the track The injured passengers were rushed to a nearby hospital for medical treatment Future EditNew lines Edit New rail lines have been proposed by Pakistan Railways to connect Gwadar Port to Central Asia including Karachi Gwadar Railway Line Makran Railway Gwadar Mastung Branch Line Basima Jacobabad Branch Line Bostan Zhob Dera Ismail Khan Branch Line Islamabad Muzaffarabad Branch Line Jhang Sadar Risalewala Branch Line citation needed Breaks of gauge Edit In Pakistan 1 676 mm 5 ft 6 in 1 435 mm 4 ft 8 1 2 in at Gwadar Port Outside Pakistan 1 676 mm 5 ft 6 in 1 520 mm 4 ft 11 27 32 in at Mazar i Sharif Afghanistan and 1 676 mm 5 ft 6 in 1 435 mm 4 ft 8 1 2 in at Kashgar ChinaTrack doubling project Edit Over 1 409 kilometres 876 mi of tracks have been doubled since the track doubling project began in the 1990s Sections of the Karachi Peshawar Line were first doubled since it was the country s busiest and longest line Karachi Peshawar Line Edit Kiamari Lodhran Junction 843 kilometres 524 mi Lodhran Junction Sher Shah Junction 72 kilometres 45 mi Sher Shah Junction Multan Cantonment 15 kilometres 9 3 mi Multan Cantonment Khanewal Junction 49 kilometres 30 mi Khanewal Junction Sahiwal 119 kilometres 74 mi Sahiwal Okara 103 kilometres 64 mi Bhoe Asal Raiwind Junction 23 kilometres 14 mi Raiwind Junction Shahdara Bagh Junction 46 kilometres 29 mi Chaklala Golra Sharif Junction 19 kilometres 12 mi Rohri Chaman Line Edit Aab e Gum Kolpur 37 kilometres 23 mi Gulistan Chaman 60 kilometres 37 mi Lahore Wagah branch line Edit Lahore Junction Wagah 23 kilometres 14 mi Restructuring Edit In March 2010 the Pakistani government announced plans to privatise Pakistan Railways and split it into four businesses focusing on passenger operations freight infrastructure and manufacturing 41 In February 2010 Unbundling was proposed the previous month with activities being outsourced privatised or operated separately However complete privatisation has been ruled out 42 Public private partnership Edit Pakistan Railways has faced financial and management crisis and has met with private operators Several trains are a public private partnership The Pakistan Business Express Train made its first run on 3 February 2012 and the Shalimar Express resumed operation on 25 February of that year China Pakistan Economic Corridor Edit This section has multiple issues Please help improve it or discuss these issues on the talk page Learn how and when to remove these template messages This section needs additional citations for verification Please help improve this article by adding citations to reliable sources Unsourced material may be challenged and removed July 2017 Learn how and when to remove this template message This section needs to be updated Please help update this article to reflect recent events or newly available information January 2018 Learn how and when to remove this template message China is involved in the development of Pakistan Railways and has been increasing its stake in Pakistan s communications sector Freight and passenger service make up 50 percent of the railway s total revenue Pakistan Railways carries 65 million passengers annually and operates 228 mail express and passenger trains daily It introduced new mail and express trains between major terminals from 2003 to 2005 The railway has entered developmental agreements with Chinese rail companies In 2001 Pakistan Railways signed a 91 89 million contract with China National Machinery Import and Export Corporation to manufacture 175 high speed passenger coaches The project was funded by Exim Bank of China on a supplier credit basis Forty passenger coaches have been received and 105 were scheduled to be assembled in Pakistan Railways carriage factory The coaches are in use on Pakistan Railways Rawalpindi Lahore Karachi Lahore Faisalabad and Rawalpindi Quetta mail and express trains The manufacturing kits for the remaining 30 coaches have been received and 12 are assembled The technology transfer for the coaches was obtained from China s Chang Chun Car Company Pakistan Railways purchased 69 locomotives 15 of which are in use by the railway as part of a 2003 agreement with China The remaining 54 are scheduled to be built at Pakistan Railways locomotive factory The Chinese locomotives are 37 percent less expensive than European locomotives citation needed Although some Pakistani observers have criticised faulty locomotives purchased by Pakistan Railways from Dongfang Electric of China the railway decided to purchase 45 more 2 000 3 000 horsepower locomotives from Dongfang The company is willing to redesign the 30 delivered locomotives strengthening their underframes and reducing their weight below 140 tons each The Beijing Research and Design Institute is committed to provide 300 rail cars to Pakistan Railways citation needed According to a 2004 agreement with China National Machinery and Equipment Group the Chinese company would begin the construction of Corridor 1 of a light rail mass transit system in Karachi which is intended to serve four million commuters The project costing about 568 million would take four and a half years to complete The contract awarded on a build operate transfer basis consists of five corridors Pakistan signed a series of agreements with China to expand the capability of its railway system Under an agreement with China Railway a Chinese company would provide 1 300 freight cars to Pakistan Railways 420 would be manufactured in China and the remaining 880 would be produced at the Moghalpura Railway Workshops in Lahore In another project 450 passenger coaches would be rehabilitated at an estimated cost of Rs2 14 billion This would include air conditioning 40 coaches converting 10 power vans and providing 100 high speed bogies 30 would be imported from China and 70 would be manufactured domestically on a transfer of technology basis In a separate agreement 175 new passenger coaches are being purchased from China As part of a 100 million agreement signed by Pakistan and China in November 2001 China is to export 69 locomotives to Pakistan to modernize the country s rail fleet The new engines consume less fuel than older models and cost less to maintain The first 15 engines would be manufactured in China and the remainder would be assembled in Pakistan with Chinese parts and technology For a Rs7 2 billion project Sindh laying 78 000 tons of rails China delivered 64 000 tons to Pakistan Railways Main Railway Line 1 ML 1 The ML 1 railway line project is one of the biggest projects not only of CPEC Phase II 6 8 billion but of Pakistan s recent history in terms of logistics and communications Since the partition of British Indian Empire into India and Pakistan this is the single biggest expansion of railway system It spans a total distance of 1 872 km from Karachi to Peshawar It covers 184 railway stations and carries over 75 of country s cargo and passengers 43 This will be a kind of revolution in terms of communications and industry After being upgraded the railway line will be installed with a computer based signaling and control system reducing the epidemic of railway accidents that has been seen across Pakistan It follows all the international safety procedures and protocols to ensure safe operations of Pakistan Railway 44 Karakoram Railway Edit Pakistan awarded a Rs72 million US 1 2 million contract to an international consortium to conduct a feasibility study for establishing a rail link with China to improve trade between the countries The study will cover a 750 kilometre 470 mi section between Havellian and the 4 730 metre high 15 520 ft Khunjerab Pass over Mansehra District and the Karakoram Highway Havellian is already linked with the Pakistani rail network China would lay about 350 kilometres 220 mi of track in China from Kashgar to the Khunjerab Pass linking Pakistan with China s rail network largely along the Karakoram Highway By expanding its stake in Pakistan s rail sector China can utilise the country s advantageous geographic position at the confluence of South Central and West Asia During the first week of February 2007 Pakistan Railways and Dongfang Electric signed an agreement to establish a rail link between Havellian and Khunjerab The route from Havellian and Khunjerab will probably include tunnels 45 The pre feasibility study was completed in July 2011 46 Gwadar link Edit As part of the development plan for its transport and communications network Pakistan Railways has completed a feasibility study of the Chaman Kandahar section for laying track between Pakistan and Turkmenistan through Afghanistan A feasibility study for cost engineering and design for the construction of a rail link from Gwadar to the existing rail network in Mastung district in Balochistan has been finalised The link to the port of Gwadar will open underdeveloped areas of Balochistan to development The chief aim of the venture is to connect the Central Asian republics with Pakistan Railways network through Afghanistan China will benefit from Gwadar s accessible international trade routes to the Central Asian republics and China s Xinjiang border region By extending its east west railway from the Chinese border city of Kashgar to Peshawar in Pakistan s northwest Beijing can trade freight to and from Gwadar along the shortest route from Karachi to Peshawar Pakistan s rail network could also supply oil from the Persian Gulf to Xinjiang and give China rail access to Iran See also Edit Trains portal Pakistan portalList of railway stations in Pakistan Railway lines in Pakistan List of named passenger trains of Pakistan Transport in PakistanReferences Edit Imaduddin 2 October 2022 Pakistan Railways achieves highest revenue of Rs 54 59bn Daily Times Railways suffers loss of Rs45b in 2018 19 The Express Tribune 14 December 2020 Retrieved 14 December 2020 a b Year Book 2017 18 PDF Ministry of Railways GOP 2018 p 3 Archived from the original PDF on 2 July 2019 Retrieved 2 July 2019 Hasnain Khalid 21 April 2021 Railway project sent to Chinese bank for approval of 6bn loan DAWN COM Retrieved 4 June 2021 Pakistan Railways achieves record income in 2018 19 International Railway Journal 20 August 2019 Retrieved 20 August 2019 Pakistan Railways steam locomotive Science Museum Group Collection collection sciencemuseumgroup org uk Retrieved 25 June 2021 Government of Pakistan Ministry of Railways Retrieved 6 January 2018 History Bangladesh Railway Archived from the original on 15 November 2007 Retrieved 18 July 2014 International Development Association 31 August 1962 Report no TO 339a Appraisal of the Pakistan Railways Project PDF Restricted internal report Department of Technical Operations International Bank for Reconstruction and Development International Development Association p 2 ACHIEVEMENTS AND PLANS Archived from the original on 8 October 2018 Retrieved 7 January 2017 Barrow Keith 14 January 2016 Pakistan Railways orders 800 wagons from CRRC Carriage factory rehabilitates 690 coaches www pakistantoday com pk Siddiqui Zaheer Mahmood 9 September 2016 Footprints Inside the Mughalpura Workshops Upgradation of ML 1 would escalate train s speed by 160 km h Saad Rafique Pakistan Dunya News The forgotten electric locomotives of Pakistan 23 July 2015 Pakistan Railways Electrical locomotives wrapped up The Express Tribune 28 February 2011 Govt considers railway links with central Asia Dr John Stubbs 1 January 2007 Closing the gap from Bam to Zahedan Railway Gazette International Archived from the original on 21 December 2010 Associated Press of Pakistan PR signs deal with foreign firm for pre feasibility study of Pakistan China rail link Archived from the original on 27 September 2007 Retrieved 28 June 2007 a b First container train service from Islamabad to Turkey begins Today Pakistan Times 15 August 2009 Archived from the original on 19 July 2011 Retrieved 15 August 2009 a b Leading News Resource of Pakistan Daily Times Retrieved 15 August 2009 Baseer Ahmed 24 January 2016 Pakistan pursuing revival of train service between Pakistan Turkey via Iran thaishipper com www thaishipper com Archived from the original on 5 October 2017 Retrieved 22 September 2009 Pakistan PM launches trial phase of Pak Turkey train service Dawn Com Retrieved 15 August 2009 a b Pakistan Turkey rail trial starts BBC News 14 August 2009 Retrieved 16 August 2009 Pakistan Railway Train Classes www pakrail gov pk Pakistan Plans Passenger Rail Between Pakistan Iran and Turkey railway technology com 5 August 2009 Pakistan inaugurates Afghan transit cargo train service Railpage Retrieved 24 February 2020 https www pakrail gov pk images yearbook ybbt pdf bare URL PDF Trams of the World 2017 PDF Blickpunkt Strassenbahn 24 January 2017 Archived from the original PDF on 16 February 2017 Retrieved 16 February 2017 Ghora Tram Historic Horse Tram Returns to Gangapur pakistaniat com 9 March 2010 http kptourism com trainsafari bare URL The Tourism Corporation Khyber Pakhtunkhwa will run a safari train from Peshawar to Attock Pakhtunkwa Find News Books Poetry and Places in Khyber Pakhtunkhwa Pakistan Archived from the original on 30 September 2017 Retrieved 30 June 2020 Another direction Khyber Steam Safari train resumes its magic after 2007 2 December 2012 A timeline of major train accidents in the past two decades Dawn com 9 June 2021 Chronology of world train disasters The Guardian London 2 August 1999 World s worst rail disasters BBC 13 July 2005 Retrieved 12 August 2007 Aziz Abdul Sabotage unlikely in train crash Dawn 20 December 2007 Ghotki train crash resulted from broken joint of track report SAMAA Samaa TV 8 June 2021 Retrieved 8 June 2021 Four way split proposed for Pakistan Railways Railway Gazette International 2010 Retrieved 20 May 2010 Railway Gazette Unbundling of Pakistan Railways proposed Retrieved 27 February 2011 ML 1 to turn Pakistan into a global business hub www thenews com pk Retrieved 4 June 2021 Why Main Railway Line 1 is Important for Pakistan Global Village Space 12 May 2021 Retrieved 4 June 2021 China Pakistan rail link on horizon Asia Times Online 24 February 2007 Pre feasibility for 411 mile rail link between Pakistan s town of Havelian and Khunjerab completed Pamir Times 3 July 2011 External links Edit Wikimedia Commons has media related to Pakistan Railways Official website of Pakistan Railways Archived 1 February 2021 at the Wayback Machine Pakistan Ministry of Railways Retrieved from https en wikipedia org w index php title Pakistan Railways amp oldid 1133023607, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.