The New York City Subway is a rapid transit system that serves four of the five boroughs of New York City, New York: the Bronx, Brooklyn, Manhattan, and Queens. Its operator is the New York City Transit Authority (NYCTA), which is controlled by the Metropolitan Transportation Authority (MTA) of New York. In 2016, an average of 5.66 million passengers used the system daily, making it the busiest rapid transit system in the United States and the seventh busiest in the world.[8][9]

New York City Subway R1 car at the 23rd Street station, on a holiday train special in December 2007
Annual passenger ridership
Year Passengers
1901 253,000,000
1905 448,000,000 +77.1%
1910 725,000,000 +61.8%
1915 830,000,000 +14.5%
1920 1,332,000,000 +60.5%
1925 1,681,000,000 +26.2%
1930 2,049,000,000 +21.9%
1935 1,817,000,000 −11.3%
1940 1,857,000,000 +2.2%
1945 1,941,000,000 +4.5%
1946 2,067,000,000 +6.5%
1950 1,681,000,000 −13.4%
1955 1,378,000,000 −18.0%
1960 1,345,000,000 −2.4%
1965 1,363,000,000 +1.3%
1970 1,258,000,000 −7.7%
1975 1,054,000,000 −16.2%
1980 1,009,000,000 −4.3%
1982 989,000,000 −2.0%
1985 1,010,000,000 +2.1%
1990 1,028,000,000 +1.8%
1995 1,093,000,000 +6.3%
2000 1,400,000,000 +28.1%
2005 1,450,000,000 +3.6%
2010 1,605,000,000 +10.7%
2011 1,640,000,000 +2.2%
2012 1,654,000,000 +0.1%
2013 1,708,000,000 +3.3%
2014 1,751,287,621 +2.6%
2015 1,762,565,419 +0.6%
2016 1,756,814,800 -0.3%
2017 1,727,366,607 -1.7%
2018 1,680,060,402 -2.7%
2019 1,697,787,002 +1.1%
2020 639,541,029 -62.3%
2021 759,976,721 +18.8%
2022 1,013,425,465 +33.3%
[1][2][3][4][5][6][7]

The first underground line opened on October 27, 1904,[10] almost 35 years after the opening of the first elevated line in New York City, which became the IRT Ninth Avenue Line.[11] By the time the first subway opened, the lines had been consolidated into two privately owned systems, the Brooklyn Rapid Transit Company (BRT, later Brooklyn–Manhattan Transit Corporation, BMT) and the Interborough Rapid Transit Company (IRT). After 1913, all lines built for the IRT and most lines for the BRT were built by the city and leased to the companies. The first line of the city-owned and operated Independent Subway System (IND) opened in 1932, intended to compete with the private systems and replace some of the elevated railways. It was required to be run "at cost", necessitating fares up to double the five-cent fare popular at the time.[12]

In 1940, the city took over running the previously privately operated systems. Some elevated lines closed immediately while others closed soon after. Integration was slow, but several connections were built between the IND and BMT, which now operate as one division called the B Division. Since IRT infrastructure is too small for B Division cars, it remains its own A Division.

The NYCTA, a public authority presided over by New York City, was created in 1953 to take over subway, bus, and streetcar operations from the city.[13] In 1968 the state-level MTA took control of the NYCTA, and in 1970 the city entered the New York City fiscal crisis. It closed many elevated subway lines that became too expensive to maintain. Graffiti, crime, and decrepitude became common. To stay solvent, the New York City Subway had to make many service cutbacks and defer necessary maintenance projects. In the 1980s an $18 billion financing program for the rehabilitation of the subway began.

The September 11 attacks resulted in service disruptions, particularly on the IRT Broadway–Seventh Avenue Line, which ran directly underneath the World Trade Center. Sections were crushed, requiring suspension of service on that line south of Chambers Street. By March 2002, seven of the closed stations had been rebuilt and reopened, and all but one on September 15, 2002, with full service along the line.[14][15]

Since the 2000s, expansions include the 7 Subway Extension that opened in September 2015,[16][17] and the Second Avenue Subway, the first phase of which opened on January 1, 2017.[18][19] However, at the same time, under-investment in the subway system led to a transit crisis that peaked in 2017.

Precursors edit

Steam railways edit

 
Charles Harvey demonstrating his elevated railroad design on Greenwich Street in 1867

Even though there was an earlier, underground railroad called the Atlantic Avenue Tunnel since 1844, it had no underground subway stops.[20][21][22] Construction of this tunnel, which was built mainly to create a grade-separated right of way for the Brooklyn and Jamaica Railroad (now the Long Island Rail Road's Atlantic Branch), began in May 1844, and the tunnel was open by December 1844. This led to South Ferry at the foot of Atlantic Avenue, where passengers could catch ferries to Manhattan.[23] This extension, running under Cobble Hill, was closed by 1861. The tunnel was reopened for tourism in 1982,[24] and closed again in 2010.[25][26]

The beginnings of the actual Subway came from various excursion railroads to Coney Island and elevated railroads in Manhattan and Brooklyn. At that time, New York County (Manhattan Island and part of the Bronx), Kings County (including the cities of Brooklyn and Williamsburg), and Queens County were separate municipal entities. Competing steam-powered elevated railroads were built over major avenues. The first elevated line was constructed from 1867 to 1870 by Charles Harvey and his West Side and Yonkers Patent Railway company along Greenwich Street and Ninth Avenue (although cable cars were the initial mode of transportation on that railway). More lines were built on Second, Third and Sixth Avenues. None of these structures remain today, but these lines later shared trackage with subway trains as part of the IRT system.[27]

In Kings County, elevated railroads were built by several companies over Lexington, Myrtle, Third and Fifth Avenues, Fulton Street and Broadway. These also later shared trackage with subway trains operated by the BRT and BMT. Most of these structures have been dismantled, but some have been rebuilt and upgraded. These lines were linked to Manhattan by various ferries and later the tracks along the Brooklyn Bridge (which originally had their own line and were later integrated into the BRT/BMT). Also in Kings County, six steam excursion railroads were built to various beaches in the southern part of the county; all but one (the Manhattan Beach Line) eventually fell under BMT control.[28]

Beach Pneumatic Transit edit

 
Beach Pneumatic Transit

The Beach Pneumatic Transit was the first attempt to build an underground public transit system in New York City. In 1869, Alfred Ely Beach and his Beach Pneumatic Transit Company of New York began constructing a pneumatic subway line beneath Broadway. Funneled through a company he set up, Beach put up $350,000 of his own money to bankroll the project.[29] Built in only 58 days,[30] its single tunnel, 312 feet (95 m) long, 8 feet (2.4 m) in diameter, was completed in 1870 and ran under Broadway from Warren Street to Murray Street.[31]

It remained little more than a curiosity, running only a single car on its one-block-long track to a dead-end at its terminus. Passengers would simply ride out and back, to see what the proposed subway might be like. During its first two weeks of operation, the Beach Pneumatic Transit sold over 11,000 rides, with 400,000 rides provided during its first year of operation.[32][33] Although the public showed initial approval, Beach was delayed in getting permission to expand it. By the time he finally gained permission in 1873, public and financial support had waned, and the subway was closed down.[34]

The final blow to the project was a stock market crash in 1873 which caused investors to withdraw support.[35] After the project was shut down, the tunnel entrance was sealed, and the station, built in part of the basement of the Rogers Peet Building, was reclaimed for other uses. The entire building was lost to fire in 1898.[36] In 1912, workers excavating for the present-day BMT Broadway Line dug into the old Beach tunnel; today, no part of this line remains as the tunnel was completely within the limits of the present day City Hall Station under Broadway.[37]

Beginnings and rapid expansion edit

The first subways edit

IRT edit

 
Political cartoon critical of IRT service in 1905. The IRT is labeled as the "Interborough Rattled Transit".

In 1898, New York, Kings and Richmond Counties, and parts of Queens and Westchester Counties and their constituent cities, towns, villages, and hamlets, were consolidated into the City of Greater New York. During this era the expanded City of New York resolved that it wanted the core of future rapid transit to be underground subways but realized that no private company was willing to put up the enormous capital required to build beneath the streets.[38][39]

Planning for the system began with the Rapid Transit Act, authorized by the New York State Legislature on May 22, 1894, which created the Board of Rapid Transit Railroad Commissioners. The act provided that the commission would lay out routes with the consent of property owners and local authorities, either build the system or sell a franchise for its construction, and lease the operation to a private firm. A line through Lafayette Street (then Elm Street)[40] to Union Square was considered, but at first a more costly route under lower Broadway was adopted. A legal battle with property owners along the route led to the courts denying permission to build through Broadway in 1896.[41]

The Elm Street route was chosen later that year, cutting west to Broadway via 42nd Street. This new plan, formally adopted on January 14, 1897, consisted of a line from City Hall north to Kingsbridge and a branch under Lenox Avenue and to Bronx Park, to have four tracks from City Hall to the junction at 103rd Street. The "awkward alignment...along Forty-Second Street", as the commission put it, was necessitated by objections to using Broadway south of 34th Street. Legal challenges were resolved in 1899.[41]

 
Subway construction in the Bowery, 1901
 
Tubes for subway line under Harlem River, being sunk, 1904

The city decided to issue rapid transit bonds outside of its regular bonded debt limit and build the subways itself; it contracted with the Interborough Rapid Transit Company (which by that time ran the elevated lines in Manhattan) to equip and operate the subways, sharing the profits with the city and guaranteeing a fixed five-cent fare.[42]

BRT edit

Starting in 1899, the Brooklyn Rapid Transit Company (BRT; 1896–1923) and Brooklyn–Manhattan Transit Corporation (BMT; 1923–1940) operated rapid transit lines in New York City — at first only elevated railways and later also subways.

The BRT was incorporated on January 18, 1896.[43] It took over the bankrupt Long Island Traction Company in early February,[44] acquiring the Brooklyn Heights Railroad and the lessee of the Brooklyn City Rail Road. It then acquired the Brooklyn, Queens County and Suburban Railroad.[45] The BRT took over the property of a number of surface railroads, the earliest of which, the Brooklyn, Bath and Coney Island Railroad or West End Line, opened for passenger service on October 9, 1863, between Fifth Avenue at 36th Street at the border of Brooklyn City and Bath Beach in the Town of Gravesend, New York. A short piece of surface route of this railroad, the BMT West End Line (today's D train) on the west side of the Coney Island Complex north of the Coney Island Creek, is the oldest existing piece of rapid transit right-of-way in New York City and in the U.S., having opened on June 8, 1864.[46]

On January 30, 1899, the Brooklyn Union Elevated Railroad was incorporated; it acquired the property of the bankrupt Brooklyn Elevated Railroad on February 17. The BRT gained control a month later, on March 25,[47] and leased the elevated company to the Brooklyn Heights Railroad, which was until then solely a street railway company. The other elevated company in Brooklyn, the Kings County Elevated Railway, was sold under foreclosure to the BRT on July 6, 1899.[48] Initially the surface and elevated railroad lines ran on steam power, but between 1893 and 1900 the lines were converted to run on electricity. An exception was the service on the Brooklyn Bridge. Trains were operated by cables from 1883 to 1896, when they were converted to electric power.[49]

 
Routes in 1897

By 1900, The BRT had acquired virtually all of the rapid transit and streetcar operations in its target area. Only the Coney Island and Brooklyn Railroad and the short Van Brunt Street and Erie Basin Railroad remained independent; the former was acquired in 1913 or 1914.[50] The incorporated lines were:

The BRT became bankrupt by 1918. The New York Consolidated Railroad and New York Municipal Railway were merged in June 1923, the same month that the BRT was reorganized as the Brooklyn–Manhattan Transit Corporation, to form the New York Rapid Transit Corporation.[59]

Contracts edit

Original IRT contracts edit

 
1906 IRT map

A contract, later known as Contract 1, was executed on February 21, 1900, between the commission and the Rapid Transit Construction Company, organized by John B. McDonald and funded by August Belmont, for the construction of the subway and a 50-year operating lease from the opening of the line. The project was divided into fifteen sections on which subcontractors submitted construction bids.[60]

Ground was broken in a ceremony at City Hall on March 24, celebrated at the time as "Tunnel Day".[61] A plan for an extension from City Hall to the Long Island Rail Road's Flatbush Avenue terminal station (now known as Atlantic Terminal) in Brooklyn was adopted on January 24, 1901, and Contract 2, giving a lease of 35 years, was executed between the commission and the Rapid Transit Construction Company on September 11, with construction beginning at State Street in Manhattan on November 8, 1902. Belmont incorporated the IRT in April 1902 as the operating company for both contracts; the IRT leased the Manhattan Railway Company, operator of the four elevated railway lines in Manhattan and the Bronx, on April 1, 1903. Operation of the subway began on October 27, 1904, with the opening of all stations from City Hall to 145th Street on the West Side Branch.[10][62]

Service was extended to 157th Street on November 12, 1904. The West Side Branch was extended northward to a temporary terminus of 221st Street and Broadway on March 12, 1906.[63] This extension was served by shuttle trains operating between 157th Street and 221st Street.[64] The original system as included in Contract 1 was completed on January 14, 1907, when trains started running across the Harlem Ship Canal on the Broadway Bridge to 225th Street,[63] meaning that 221st Street could be closed. Once the line was extended to 225th Street, the structure of the 221st Street was dismantled and was moved to 230th Street for a new temporary terminus. Service was extended to the temporary terminus at 230th Street on January 27, 1907. An extension of Contract 1 north to 242nd Street at Van Cortlandt Park was approved in 1906[65] and opened on August 1, 1908.[66]

The original plan had been to turn east on 230th Street to just west of Bailey Avenue, at the New York Central Railroad's Kings Bridge station.[67] When the line was extended to 242nd Street, the temporary platforms at 230th Street were dismantled, and were rumored to be brought to 242 Street to serve as the station's side platforms. There were two stations on the line that opened later; 191st Street and 207th Street. 191st Street was not open until January 14, 1911, because the elevators and other work had not yet been completed. 207th Street was completed in 1906, but since it was located in a sparsely occupied area, the station was opened in 1907.

The initial segment of the IRT White Plains Road Line opened on November 26, 1904, between East 180th Street and Jackson Avenue. Initially, trains on the line were served by elevated trains from the IRT Second Avenue Line and the IRT Third Avenue Line, with a connection running from the Third Avenue local tracks at Third Avenue and 149th Street to Westchester Avenue and Eagle Avenue. Once the connection to the IRT Lenox Avenue Line opened on July 10, 1905, trains from the newly opened IRT subway ran via the line.[68] Elevated service via this connection was resumed on October 1, 1907, when Second Avenue locals were extended to Freeman Street during rush hours.[69]

The line was then extended to Fulton Street on January 16, 1905,[70] to Wall Street on June 12, 1905,[71] and to Bowling Green and South Ferry on July 10, 1905.[72] In order to complete Contract 2, the subway had to be extended under the East River to reach Brooklyn. The tunnel was named the Joralemon Street Tunnel, which was the first underwater subway tunnel connecting Manhattan and Brooklyn, and it opened on January 9, 1908, extending the subway from Bowling Green to Borough Hall.[73] On May 1, 1908, the construction of Contract 2 was completed when the line was extended from Borough Hall to Atlantic Avenue near the Flatbush Avenue LIRR station.[74] When the IRT extension to Brooklyn opened, riders on the BRT's elevated and trolley lines over the Brooklyn Bridge began using the new subway.[75]

Electrification edit

 
The IRT main powerhouse in 1904

The subway system began during the war of the currents when Thomas Edison and his opponent, George Westinghouse, struggled over acceptance of direct current or alternating current as the standard way to deliver electricity. Alternating current became the standard for non-railroad purposes, but New York City Subway adopted direct current as more suitable for urban railroad purposes.[76]: 21  The companies built their own power stations to generate their DC. To this day, the New York City Transit Authority converts alternating current to 600 V DC third rail to power the trains, as do most transit railways around the world. (The A Division uses 625 V DC third rail.[77])

Triborough plan edit

 
An 1918 IRT map, after Contracts 1 and 2 were signed
 
An 1924 BMT map

After the statutory debt ceiling for the now-united city of New York had been raised, there were more plans for subway construction until 1908. The Triborough plan comprised three new lines:

The BRT lines were built to wider profiles because the BRT did not want to use IRT trackage, which was narrower by comparison and carried far fewer passengers per hour. The design was inspired by the cars built for the Cambridge subway (MBTA Red Line) which were designed after studies were conducted on the design and operation of a subway car that could carry the most passengers the most efficiently. The rolling stock, however, had to be the same track gauge so the trains could interoperate under the Dual Contracts. The Fourth Avenue and Sea Beach lines were opened on June 19, 1915, after years of delays for building of these lines and the Nassau Street Line. The first BRT section, however, had opened on September 16, 1908, from Essex Street across the Williamsburg Bridge, but using narrow-width cars.[78]

Until the completion of the Fourth Avenue Line, there was a tram across the Manhattan Bridge which did not connect to any tracks in the New York City Subway. The track was called "Manhattan Bridge Three Cent Line" because the fare was three cents. Along with the Brooklyn and North River Railroad, the two streetcar companies began operations on those tracks. When trackage was connected to the bridge in 1915, the trolleys were moved to the upper level roadways until 1929, when service was discontinued.[79]

Dual Contracts edit

The BRT, which just barely entered Manhattan via the Brooklyn Bridge, wanted the opportunity to compete with the IRT, and the IRT wanted to extend its Brooklyn line to compete with the BRT. This led to the city's agreement to contract for future subways with both the BRT and IRT.

The expansion of rapid transit was greatly facilitated by the signing of the Dual Contracts on March 19, 1913. Contract 3 was signed between the IRT and the city; the contract between the BRT and the city was Contract 4. The majority of the present-day subway system was either built or improved under these contracts.[42] The Astoria Line and Flushing Line were built at this time and were for some time operated by both companies. Under the terms of Contracts 3 and 4, the city would build new subway and elevated lines, rehabilitate and expand certain existing elevated lines, and lease them to the private companies for operation. The cost would be borne more-or-less equally by the city and the companies. The city's contribution was in cash raised by bond offerings, while the companies' contributions were variously by supplying cash, facilities, and equipment to run the lines.[42]

 
The track layout of Queensboro Plaza was complex because the Contracts necessitated two different types of rolling stock and two different fare control areas.

As part of the contracts, the two companies were to share lines in Queens: a short line to Astoria called the Astoria Line; and a longer line reaching initially to Corona, and eventually to Flushing, called the Corona Line. The lines operated jointly and began from Queensboro Plaza. The IRT accessed the station both from the 1907 Steinway Tunnel and an extension of the Second Avenue Elevated from Manhattan over the Queensboro Bridge. The BRT fed the Queens lines from a new tunnel from the 60th Street Tunnel to Manhattan. Technically the line was under IRT ownership, but the BRT/BMT was granted trackage rights in perpetuity, essentially making it theirs also.[80][81]

Both lines were built to IRT specifications. This meant that IRT passengers had a one-seat ride to Manhattan destinations, whereas BRT passengers had to make a change at Queensborough Plaza. This came to be important when service was extended for the 1939 World's Fair, as the IRT was able to offer direct express trains from Manhattan, and the BRT was not. This practice lasted well into the municipal ownership of the lines and was not ended until 1949.[80][81]

Several provisions were imposed on the companies: the fare was limited to five cents, and this led to financial troubles for the two companies after post-World War I inflation; the city had the right to "recapture" any of the lines it built and run them as its own; and the city was to share in the profits. This eventually led to their downfall and consolidation into city ownership in 1940.[80][81]

As part of the Dual Contracts, the operations of the original IRT system changed drastically. Instead of having trains go via Broadway, turn onto 42nd Street, and finally turn onto Park Avenue, there were two trunk lines connected by the 42nd Street Shuttle. The system was changed from a "Z" system to an "H" system. The first trunk line, the Lexington Avenue Line assumed the portion of the original IRT system south of Grand Central. The line was extended northward with a new station at Grand Central and turned onto Lexington Avenue, where the line remained as four tracks. The line had connections to the new IRT Pelham Line and IRT Jerome Avenue Line in the Bronx, in addition to a new connection to the IRT White Plains Road Line.[82]

The second trunk, the Broadway–Seventh Avenue Line assumed the portion of the original IRT system north of Times Square, and it extended southward with a new station at Times Square, running down Seventh Avenue, Varick Street and West Broadway. It was predicted that the subway extension would lead to the growth of the Lower West Side, and to neighborhoods such as Chelsea and Greenwich Village. South of Chambers Street, two branches were constructed. The first branch ran to the Battery via Greenwich Street, while the second branch turned eastward under Park Place and Beeckman Street and down William Street, running under the East River through a tunnel before running under Clark Street and Fulton Street until it reached a junction at Borough Hall with the existing Contract 2 IRT Brooklyn Line.[82]

 
A poster informing the public about the new Interborough Subway Service between Brooklyn and Manhattan, via the Clark Street Tunnel, 1919

On June 3, 1917, the first portion of the Broadway–Seventh Avenue Line south of Times Square–42nd Street, a shuttle to 34th Street–Penn Station, opened; a separate shuttle service, running between 42nd and 34th Streets, was created.[83] This short extension was opened even though the rest of the route was not yet completed in order to handle the mass of traffic to and from Pennsylvania Station. Only the northern part of the station was opened at this time, and piles of plaster, rails, and debris could be seen on the rest of the platforms.[84] This shuttle was extended south to South Ferry, with a shorter shuttle on the Brooklyn branch between Chambers Street and Wall Street, on July 1, 1918.[85]

The new portion of the Lexington Avenue Line from Grand Central to 125th Street opened on July 17, 1918.[86] Until the evening of August 1, 1918, it ran as a shuttle on the local tracks only, terminating at 42nd Street and at 167th Street on the IRT Jerome Avenue Line (where the connection from the elevated IRT Ninth Avenue Line merged). The new "H" system was implemented on August 1, 1918, joining the two halves of the Broadway–Seventh Avenue Line, and the two halves of the Lexington Avenue Line.[87]

An immediate result of the switch was the need to transfer using the 42nd Street Shuttle. The completion of the "H" system doubled the capacity of the IRT system.[82] The local tracks ran to South Ferry, while the express tracks used the Brooklyn Branch to Wall Street, extended into Brooklyn to Atlantic Avenue via the Clark Street Tunnel on April 15, 1919.[88]

The Dual Contracts resulted in the expansion of New York City; people moved to the newly built homes along the newly built subway lines. These homes were affordable, about the same cost as the houses in Brooklyn and Manhattan.[81]: 7  The Dual Contracts were the key to dispersion of the city's congested areas. They helped alleviate densely populated areas and probably helped save lives as people were no longer living in heavily diseased areas.[citation needed] The population in Manhattan below 59th Street decreased between the years of 1910 and 1920.[89] People were allowed to move to better parts at the same cost and could have a better and more comfortable life in the suburbs.[81]: 7 

Independent System edit

Mayor John F. Hylan was a strong advocate of public operation of the subway. He was fired from the BRT after working as a motorman for some time, and he wanted to avoid having to spend more money to recapture the IRT and BRT, so he tried to push the two operators out of business. To that end, Hylan had denied allocating money for the BRT by refusing to build new lines, refusing to raise fares (thereby putting the BRT in more debt), denied building permits so that some major building work lasted longer than planned, and even refused to build a new subway yard for the BRT. The Malbone Street Wreck in 1918 contributed to the losses incurred by the two companies, which led to the bankruptcy of the BRT in 1918. The BRT, however, was reorganized into the BMT. The IRT was almost bankrupt, but managed to complete the line to Flushing by 1928. Subsequently, Hylan drew up plans for a third subway network that would be city-built and -operated, in contrast to the existing subway lines, which were privately operated.[80]

On the other hand, New York City had grown to over five and a half million inhabitants and urgently needed new subway lines. The dual system could not keep pace with this ever-increasing ridership. So, a compromise solution was finally found that would allow Hylan's plans as well as the interests of private operators to be considered. However, the city's and Hylan's long-term goal was the unification and consolidation of the existing subway, with the city operating a unified subway system. The city, bolstered by political claims that the private companies were reaping profits at taxpayer expense, determined that it would build, equip and operate a new system itself, with private investment and without sharing the profits with private entities. This led to the building of the Independent City-Owned Subway (ICOS), sometimes called the Independent Subway System (ISS), the Independent City-Owned Rapid Transit Railroad, or simply The Eighth Avenue Subway after the location of its premier Manhattan mainline. After the city acquired the BMT and IRT in 1940, the Independent lines were dubbed the IND to follow the three-letter initialisms of the other systems.[90]

The original IND system, consisting of the Eighth Avenue mainline and the Sixth Avenue, Concourse, Culver, and Queens Boulevard branch lines, was entirely underground in the four boroughs that it served, with the exception of the Smith–Ninth Streets and Fourth Avenue stations on the Culver Viaduct over the Gowanus Canal in Gowanus, Brooklyn.[90]

Lines edit

As the first line neared completion, New York City offered it for private operation as a formality, knowing that no operator would meet its terms. Thus the city declared that it would operate it itself, formalizing a foregone conclusion. The first line opened without a formal ceremony. The trains began operating their regular schedules ahead of time, and all stations of the Eighth Avenue Line, from 207th Street in Inwood to Hudson Terminal (now World Trade Center), opened simultaneously at one minute after midnight on September 10, 1932.[91]

On January 1, 1936, a second trunk line—the Sixth Avenue Line—opened from West Fourth Street (where it splits from the Eighth Avenue Line) to East Broadway.[92][93][94] The new subway line's construction required the suspension of streetcars on the avenue. The city, wanting to save money by not having to underpin the IRT Sixth Avenue Line before the elevated line was closed, bought the line for $12.5 million and terminated operations on December 5, 1938.[95] To help compensate for the loss in service, service on the Ninth Avenue Elevated was increased.[96]

The first section of the Queens Boulevard Line, west from Roosevelt Avenue to 50th Street, opened on August 19, 1933.[97] E trains ran local to Hudson Terminal (today's World Trade Center) in Manhattan, while the GG (predecessor to current G service) ran as a shuttle service between Queens Plaza and Nassau Avenue on the IND Crosstown Line.[98][99][100][101][102] An extension east to Union Turnpike opened on December 31, 1936.[103][104]: 416–417 [105][97] The line was extended to Hillside Avenue and 178th Street, with a terminal station at 169th Street on April 24, 1937.[98][104][106][107] That day, express service began on the Queens Boulevard Line during rush hours, with E trains running express west of 71st–Continental Avenues, and GG trains taking over the local during rush hours.[100][108] The initial headway for express service was between three and five minutes.[109] 23rd Street–Ely Avenue station opened as an in-fill station on August 28, 1939.[110][111] Upon its extension into Jamaica, the line drew Manhattan-bound passengers away from the nearby BMT Jamaica Line subway and the Long Island Rail Road.[112]

On July 1, 1937, a third trunk line, the Crosstown Line, opened from Nassau Avenue to Bergen Street.[90] Two years later, on December 15, 1940, local service was begun along the entire IND Sixth Avenue line, including its core part through Midtown Manhattan.[90]

Meanwhile, on the East Side, the need for the IND Second Avenue Line had been evident since 1919, when the New York Public Service Commission launched a study at the behest of engineer Daniel L. Turner to determine what improvements were needed in the city's public transport system. The Great Depression resulted in soaring costs, and the expansion became unmanageable, so it was not built along with the other three IND trunk lines. Construction on the first phase of the IND was already behind schedule, and the city and state were no longer able to provide funding. A scaled-down proposal including a turnoff at 34th Street and a connection crosstown was postponed in 1931.[90]

Further revision of the plan and more studies followed. By 1939, construction had been postponed indefinitely, and Second Avenue was relegated to "proposed" status. The 1939 plan for subway expansion took the line not only into the Bronx (by now as a single line to Throggs Neck) but also south into Brooklyn, connecting to the stub of the IND Fulton Street Line at Court Street. Construction of the line resumed in 1972 but was ended during the 1975 fiscal crisis, and work was again restarted in 2007.[90]

Expansion plans edit

 
1939 expansion plans

Since the opening of the original New York City Subway line in 1904, various official and planning agencies have proposed numerous extensions to the subway system. One of the better known proposals was the "Second System," which was part of a plan by the Independent Subway to construct new subway lines in addition and take over existing subway lines and railroad right-of-ways. Though most of the routes proposed over the decades have never seen construction, discussion remains strong to develop some of these lines, to alleviate existing subway capacity constraints and overcrowding, the most notable being the Second Avenue Subway. Plans for new lines date back to the early 1910s.[113][114]

On August 28, 1922, Mayor John Francis Hylan announced that his new system would comprise 100 miles (160 km) of currently operating routes and another 100 miles of new routes, to be completed by December 31, 1925, and in competition with the IRT and BMT.[115][116]

In 1926, a loop subway service was planned to be built to New Jersey.[117]

The most grandiose plan, conceived in 1929, was to be part of the city-operated IND. By 1939, with unification planned, all three systems were included. As this grandiose expansion was not built, the subway system is only 70% of what it was planned to be. Magnificently engineered, almost entirely underground, with 670 feet (200 m) platforms and flying junctions throughout, the IND system tripled the city's rapid transit debt, contributing to the demise of plans for an ambitious expansion proposed before the first line of the first system was even opened.

After the IND Sixth Avenue Line was completed, only 28 new stations were built. Five stations were on the abandoned NYW&B-operated IRT Dyre Avenue Line, fourteen stations were on the abandoned LIRR Rockaway Beach Branch (now the IND Rockaway Line), six were on the Archer Avenue Lines and 63rd Street Lines (built as part of a 1968 plan), two stations (57th Street and Grand Street) were part of the Chrystie Street Connection, and the Harlem–148th Street terminal. Four MTA Capital Construction-funded stations (the 34th Street station on the 7 Subway Extension and the three stations on the Second Avenue Subway) have been constructed with up to 14 more planned. The city's subway construction costs are the highest in the world, which has slowed the pace of expansion.[118]

Unification edit

 
The IRT Second Avenue Line, being demolished shortly after unification, 1942

In June 1940, the IND's operator the New York City Board of Transportation took over the transportation assets of the IRT and BMT.[13] In June 1953, the New York City Transit Authority, a state agency incorporated for the benefit of the city, now known to the public as MTA New York City Transit, succeeded the BoT.[13][119] A combination of factors had this takeover coincide with the end of the major rapid transit building eras in New York City.[120] The city immediately began to eliminate what it considered redundancy in the system, closing several elevated lines including the IRT Ninth Avenue Line[121] and most of the IRT Second Avenue Line in Manhattan,[122] and the BMT Fifth and Third Avenue Lines and most of the BMT Fulton Street Line[123][124][125] in Brooklyn.

Division differences edit

Despite the unification, a distinction between the three systems survives in the service labels: IRT lines (now referred to as A Division) have numbers and BMT/IND (now collectively B Division) lines use letters.[126] There is also a physical and less widely noticed difference, as A Division cars are narrower than those of B Division by 18 inches (46 cm)[127] and shorter by 9 feet (2.7 m) to 24 feet (7.3 m).[127][128] Because the A Division lines are of lower capacity for a given capital investment, all new extensions and lines built between World War II and 2007[129][130][131] have been for the B Division. A Division cars can travel on B Division lines when necessary but are not used for passenger service on those lines because of the dangerously wide gap between the car and the station platform. This stems from the IRT and BRT's long-standing disagreement where the BRT intentionally built cars that were too wide for the IRT.[80]

 
The interior of an IRT Third Avenue Line car before the line's demolition in the 1950s.

The original IRT subway lines (those built before the Dual Contracts) were built to modified elevated line dimensions. Whereas the IRT lines were originally equipped with cars that were 47 feet (14 m) long, the cars designed for the IRT subway measure 51.3 feet (15.6 m) long. Both sets of lines did not permit cars wider than 9 feet (2.7 m). The clearances and curves on these lines are too narrow and too sharp for any IND or BMT equipment. The later extensions of the IRT, constituting the bulk of the IRT system, were built to wider dimensions, and so are of a profile that could support the use of IND/BMT sized equipment.[132][42]

B Division equipment could operate on much of A Division if station platforms were trimmed and trackside equipment moved, thus letting A Division service carry more passengers. However, there is virtually no chance of this happening because the older, narrower portions of A Division are centrally situated, such that it would be impossible to put together coherent through services. The most that can be reasonably hoped for is that some branch lines of Division A might be resized and attached to B Division lines. This was done with the BMT Astoria Line in Queens[132] which had formerly been dual-operated with normal IRT trains and special narrow BMT shuttles.[42]

Post-unification expansion and reorganization edit

New York hoped that the profits from the remaining formerly privately operated routes would support the expensive and deficit-ridden IND lines and simultaneously be able to repay the systems' debts, without having to increase the original fare of five cents. But during World War II, which gave a reprieve to the closure of most rail transit in the U.S., some closures continued, including the remainder of the IRT Second Avenue Line in Manhattan (1942)[122] and the surviving BMT elevated services over the Brooklyn Bridge (1944).[133] The Second World War also caused renewed inflation, which finally caused a fare increase to ten cents in 1947 and six years later to 15 cents.[80]

Ridership skyrocketted during the late 1940s, and on December 23, 1946, the system-wide record of 8,872,249 fares was set.[134]: 73 

Because the consolidation dragged in the first years after unification, some improvements in operational processes were rather slow, and soon the question of organization was raised. The outsourcing of subway operations to the Port Authority of New York and New Jersey was favored at one point. On June 15, 1953, the NYCTA was founded with the aim of ensuring a cost-covering and efficient operation in the subways.[80]

There was a need to overhaul rolling stock and infrastructure of the once-private routes, especially for the IRT, where nearly all of the infrastructure was aged. The oldest cars came there from the time the subway opened in 1904, and the oldest subway cars of BMT in 1953 dated from the system's first years, in 1913. Therefore, a total of 2,860 cars for the A Division were delivered between 1948 and 1965, which constituted the replacement of almost the entire prewar IRT fleet. On the B Division, 2,760 cars were ordered. Platforms were doubled in length systemwide. At some stations, gap fillers were installed because the station extensions were curved. Also in this period, the BMT replaced their signals. The Main Line R36 cars were the first equipment to be equipped with two-way radio as delivered standard equipment in 1965, with the first use of radio in the subway system on the IRT Lexington Avenue Line in May 1965. The first successful air conditioned train (R38) was placed into service in July 1967.[135]

In 1946, Mayor William O'Dwyer initiated a program to lengthen station platforms to accommodate ten-car trains. The first contract, which was completed in August 1946, extended the platforms at 125th Street, 207th Street, 215th Street, 225th Street, 231st Street and 238th Street on the IRT Broadway–Seventh Avenue Line for $423,000. Additional platform extensions were completed on the Broadway–Seventh Avenue Line in October 1946. On this date the platform extensions at 103rd Street, 110th Street, 116th Street, 137th Street, 145th Street, 157th Street, 168th Street, 181st Street, 191st Street and Dyckman Street were completed. This project cost $3.891 million. The platform extensions at the Hoyt Street station on the IRT Eastern Parkway Line opened in November 1946, being completed for $733,200. Stations along the IRT Lexington Avenue Line were next to receive the improvements.[136]

In January 1947, the 23rd Street, 28th Street and 33rd Street platform extensions were completed, costing $4.003 million. Work was subsequently completed at the Bleecker Street and Spring Street stations for $1.97 million. The $1.992 million contract to lengthen the platforms at the Canal Street and Worth Street stations to the south was completed in April 1947. In September 1947, a contract extending the platforms for stations in the Bronx was completed. The first stage of the plan was completed in June 1949, lengthening the platforms at Prospect Avenue, Jackson Avenue, Intervale Avenue, Simpson Street, Freeman Avenue, 174th Street and 177th Street on the IRT White Plains Road Line for $315,000. In September 1949, the Chairman of the Board of Transportation, William Reid, announced that the program to lengthen 32 IRT stations had been completed for $13.327 million. Reid also announced that the Board had created a five-year plan to lengthen all remaining BMT and IRT stations to accommodate ten-car trains.[136]

 
An A train on the IND Rockaway Line, opened in 1956 as one of two major expansions of the system in the mid-20th century

Only two new lines were opened in this era,[119] the IRT Dyre Avenue Line in 1941[137] and the IND Rockaway Line in 1956,[138][139][140][141] with an extension of the latter to Far Rockaway–Mott Avenue in 1958.[142] Both of these lines were rehabilitations of existing railroad rights-of-way rather than new construction. The former line was the City portion of the New York, Westchester and Boston Railway, an electrified commuter line closed in 1937,[137] and the latter a line obtained from the Long Island Rail Road.[143] While the latter is a long and substantial line, it consists mostly of a long right-of-way crossing Jamaica Bay with a single station on Broad Channel island and two branches on a peninsula that is only several city blocks wide.[144] For a time, the IND Rockaway Line was considered its own subway division.[90]

The 169th Street station on the IND Queens Boulevard Line provided an unsatisfactory terminal setup for a four track line, and this required the turning of F trains at Parsons Boulevard, and no storage facilities were provided at the station. Therefore, the line was going to be extended to 184th Place with a station at 179th Street with two island platforms, sufficient entrances and exits, and storage for four 10-car trains. The facilities would allow for the operation of express and local service to the station.[145][146] Construction on the extension started in 1946 with planned completion in 1949.[146] The extension was completed later than expected and opened on December 11, 1950.[147] This extension was delayed due to the Great Depression and World War II. Both E and F trains were extended to the new station.[147][148]

Decline edit

 
The Culver Ramp was completed in 1954
 
Soon after the Culver Ramp was completed, parts of the ex-BMT Culver Line were demolished. This is a stub to the former line

The originally planned IND system was built to the completion of its original plans after World War II ended, but the system then entered an era of deferred maintenance in which infrastructure was allowed to deteriorate. In 1951 a half-billion dollar bond issue was passed to build the Second Avenue Subway, but money from this issue was used for other priorities and the building of short connector lines, namely a ramp extending the IND Culver Line over the ex-BMT Culver Line at Ditmas and McDonald Avenues in Brooklyn (1954), allowing IND subway service to operate to Coney Island for the first time,[119] the 60th Street Tunnel Connection (1955), linking the BMT Broadway Line to the IND Queens Boulevard Line,[119] and the Chrystie Street Connection (1967), linking the BMT line via the Manhattan Bridge to the IND Sixth Avenue Line.[149]

By January 1955, the Port Authority of New York and New Jersey and the Triborough Bridge and Tunnel Authority could theoretically raise $1.25 billion effective immediately (equivalent to $14,217,000,000 in 2023). In his 1974 book The Power Broker, Robert A. Caro estimated that this amount of money could modernize both the Long Island Rail Road for $700 million and the Hudson & Manhattan Railroad for $500 million, with money left over to build the Second Avenue Subway as well as proposed extensions of subway lines in Queens and Brooklyn.[150]: 928–929  However, Robert Moses, the city's chief urban planner at the time, did not allow funding for most mass transit expansions in the New York City area,[150]: 930–933  instead building highways and parkways without any provisions for mass transit lines in the future.[150]: 939–958  Caro noted that the lack of attention to mass transit expansions and routine maintenance contributed to the decline of the subway: "When Robert Moses came to power in New York in 1934, the city's mass transportation system was probably the best in the world. When he left power in 1968 it was quite possibly the worst."[150]: 933 

Soon after, the city entered a fiscal crisis. Closures of elevated lines continued. These closures included the entire IRT Third Avenue Line in Manhattan (1955) and the Bronx (1973), as well as the BMT Lexington Avenue Line (1950), much of the remainder of the BMT Fulton Street Line (1956), the downtown Brooklyn part of the BMT Myrtle Avenue Line (1969), and the BMT Culver Shuttle (1975), all in Brooklyn, and the BMT Jamaica Line in Queens starting in 1977.[151] The BMT Archer Avenue Line was supposed to replace the BMT Jamaica Line's eastern end, but it was never completed to its full extent, and opened in 1988 as a stub-end line, terminating at Jamaica Center.[119]

 
Much of the BMT Myrtle Avenue Line in Brooklyn was demolished. Pictured is the remaining portion in 1974

Construction and maintenance of existing lines was deferred, and graffiti and crime were very common. Trains frequently broke down, were poorly maintained, and were often late, while ridership declined by the millions each year. As in all of the city, crime was rampant in the subway in the 1970s. Thefts, robberies, shootings and killings became more frequent. The rolling stock was very often painted with graffiti or vandalized both inside and outside. As the New York City Police Department was completely overwhelmed, the public reacted with unease, and the subway was deliberately avoided. Around 1980, the reliability of the vehicles was a tenth of their reliability in the 1960s, and 40 percent of the network required speed restrictions. Because there had been no further studies of the subway since 1975, one third of the fleet was out of use during rush hours due to serious technical defects. In addition, signs were fitted incorrectly, and spare parts were missing or were bought in too large quantities, could not be found, or could not be installed due to lack of repairmen.[151]

The New York City Subway tried to keep its budget balanced between spending and revenue, so deferred maintenance became more common, which drew a slow but steady decline of the system and rolling stock. Furthermore, the workers were consolidated into the Transport Workers Union in 1968. A pension was set up, and workers were allowed to retire after 20 years of service without any transitional period. About a third of the most highly experienced staff immediately retired, resulting in a large shortage of skilled workers.[151]

Rehabilitation started in the 1980s as part of a $18 billion financing program. Between 1985 and 1991 over 3,000 subway cars were overhauled and fitted with air conditioning to increase comfort, reliability and durability while deferring car purchases. The TA only replaced the oldest cars in each division, so it bought only 1,350 new vehicles. Increased patrols and fences around the train yards offered better protection against graffiti and vandalism.[152] At the same time, the TA began an extensive renovation of the routes. Within ten years the tracks were thereby renewed almost systemwide. The Williamsburg Bridge and the Manhattan Bridge, which had strong corrosion damage, were refurbished over the years.[152]

The renovation of the stations was initially limited to security measures, fresh paint, new lighting and signs, but the TA also tried to improve the service that had been neglected. This ranged from new uniforms and training for the staff to correct destination signs on the rolling stock. Some subway services were also adapted to the changing needs of customers.[152] Another stated goal was to reduce crime or at least an improvement in the subjective sense of security. At night, the railway police and members of the citizens' initiative Guardian Angels, formed in 1979, patrolled in the subway trains.[152] In the 1990s, the crime in the city and its subway declined significantly.

Late 1950s and early 1960s edit

In 1956, the NYCTA chairman, Charles Patterson, proposed removing the seats from the trains on the 42nd Street Shuttle to increase the passenger load.[153]

On May 1, 1957, a standard maximum interval of 20 minutes between trains was put into place during late nights, with the exception of the Rockaway lines where it was 24 minutes. Some lines had service run as infrequently as 30 minutes. Also on this date, BMT express service was extended to 57th Street from 42nd Street. Earlier in 1957, local service on the BMT Jamaica Line was extended to Crescent Street from Eastern Parkway, and rush hour service was increased to run every 5 minutes.[154]

Under a $100 million rebuilding program, increased and lengthened service was implemented during peak hours on the 1 train. Switching at a junction north of 96th Street, delayed service as trains from the Lenox Avenue Line which ran local switched from the express to the local, while trains from the Broadway Branch that ran express switched from the local to the express. This bottleneck was removed on February 6, 1959. All Broadway trains were locals, and all Lenox Avenue trains were expresses, eliminating the need to switch tracks. All 3 trains began to run express south of 96th Street on that date running to Brooklyn. 1 trains began to run between 242nd Street and South Ferry all times. Trains began to be branded as Hi-Speed Locals, being as fast as the old express service was with 8-car trains consisting of new R21s and R22s on the line.[155]

On November 15, 1962, the express platforms at Lexington Avenue–59th Street opened to reduce transfer congestion at Grand Central–42nd Street, and to allow transfers between the express trains and BMT trains to Queens. Even before the express platforms were added, this station was the busiest on the line.[156] Construction on the express station had begun on August 10, 1959.[157]

Program for Action edit

 
A Second Avenue Subway tunnel

In the mid-1960s, US$600,000,000 was made available to the Metropolitan Transportation Authority (MTA) of New York City for a large subway expansion proposed by then-Mayor John Lindsay. About $1.23 billion was spent to create three tunnels and a half-dozen holes as part of construction on the Second Avenue and 63rd Street Lines.[152][151] Construction for the lines stopped in 1975 because the city almost went bankrupt, yet none of the lines were done when federal payments were suspended in 1985.[158] The two-phase Program for Action was funded as follows:[159]

  • Phase I was to cost $1.6 billion and be completed over the span of a decade.[152]
  • Phase II came after Phase I and cost $1.3 billion. Phase II was composed of mostly extensions of existing lines and Phase I-built lines.[152]

The Program for Action also called for supplanting elevated structures with new subways. The eastern end of the BMT Jamaica Line was to be replaced with the BMT Archer Avenue Line, while the IRT Third Avenue Line was to be demolished to make way for a subway route parallel to the Metro-North tracks at Park Avenue.[152]

Deferred maintenance edit

Because the early subway systems competed with each other, they tended to cover the same areas of the city, leading to much overlapping service. The amount of service has actually decreased since the 1940s as many elevated railways were torn down, and finding funding for underground replacements has proven difficult. The subway's decline began in the 1960s and continued through the late 1980s.[152]

Graffiti edit

 
Fast food stands operated in stations until the 1980s
 
A typical graffiti-tagged car in 1979
 
A graffitied car on the IRT Lexington Avenue Line (1973)

In 1973, the city's graffiti epidemic surged so that nearly every subway car was tagged with graffiti.[160] It was worsened by the budgetary restraints on New York City, which limited its ability to remove graffiti and perform transit maintenance.[161] Mayor John Lindsay declared the first war on graffiti in 1972, but it would be a while before the city was able and willing to dedicate enough resources to that problem to start impacting the growing subculture.[161][162] The MTA tried rubbing the graffiti off with an acid solution, but maintaining the cars to keep them relatively graffiti-free was costing them around $1.3 million annually. In the winter of 1973, the car-washing program was stopped. Attempts to wash cars with an acid solution in September 1974 were detrimental to the fleets' upkeep.[152]

As graffiti became associated with crime, many demanded that the government take a more serious stance toward it, particularly after the popularization of the Fixing Broken Windows philosophy in 1982.[162][163][164] By the 1980s, increased police surveillance and implementation of increased security measures (razor wire, guard dogs) combined with continuous efforts to clean it up led to the weakening of the New York's graffiti subculture.[160]

An extensive car-washing program in the late 1980s ensured the elimination of graffiti throughout the system's rolling stock. In 1984 the NYCTA began a five-year program to eradicate graffiti. The years between 1985 and 1989 became known as the "die hard" era.[161] A last shot for the graffiti artists of this time was in the form of subway cars destined for the scrap yard.[161] With the increased security, the previous elaborate "burners" on the outside of cars were now marred with simplistic marker tags which often soaked through the paint.[119][161][162] By mid-1986 the NYCTA were winning their "war on graffiti". On May 10, 1989, the rolling stock was made 100% graffiti-free,[165] with the washing of the last train in the subway system that still had graffiti.[166][167] As the population of artists lowered so did the violence associated with graffiti crews and "bombing".[161]

Ridership and service cuts edit

Ridership in 1975 had decreased to a point last seen in 1918, with ridership decreasing by 25 million per year. The MTA reduced the length of trains during off-peak periods, and canceled work on several projects being built as part of the Program for Action, including the Second Avenue Subway and an LIRR line through the 63rd Street Tunnel to a Metropolitan Transportation Center in East Midtown, Manhattan. Ridership kept dropping rapidly, having decreased by 25 million passengers between June 30, 1976, and June 30, 1977; in the previous eight years, 327 million passengers had stopped using the subway.[152] The proportion of the fleet that was in service during the morning peak period was reduced, and train headways were increased: on four local services, trains were reduced from once every four minutes to once every five minutes.[152][168]

On May 27, 1975, the NYCTA announced that in September of that year 94 daily IRT trips would be discontinued, accounting for 4 percent of then-existing service on the IRT. The trips were to be discontinued to cut operating deficits. Express service on the 7 was to be discontinued between the hours of 9:30 a.m. and 3:30 p.m. and was to be replaced by more frequent local service.[169] During the same month, the NYCTA was considering making the A train a local at all times except rush hours, when it would remain an express.[170]

On December 17, 1975, the MTA announced that a 4.4 percent cutback of rush hour train service would take place on January 18, 1976. The cutbacks, the third of the year, trimmed 279 train runs from the previous 6,900. Service was most drastically reduced on the Lexington Avenue Line, with seven fewer southbound express trains during the morning rush hours. The cuts were the first of a three-phase program that was put in effect between January and July 1976. The cuts permitted a savings of $12.6 million a year for the NYCTA, which had an increasing deficit. Other subway services were changed or discontinued as part of the plan. On January 19, F trains were planned to stop running express in Brooklyn, and the GG was to be cut back to Smith–Ninth Streets.[171]

In April 1975 it was planned that all rush hour 1 trains would begin running to 242nd Street; these runs had previously terminated at 137th Street. During midday hours, trains on the 1 were to be shortened to five cars. In July, it was planned that the EE would be discontinued; N trains were to have been extended to Continental Avenue via the Queens Boulevard Line to replace it. Manhattan-bound N trains were to continue running express, while in the opposite direction they would run local. N trains would alternate between terminating at Whitehall Street or Coney Island during rush hours. CC trains, in July, were planned to be extended from Hudson Terminal to Rockaway Park replacing the E, which was to have been cut back to Hudson Terminal. The K was planned to be discontinued in July.[171]

The changes that were supposed to take place in July instead took effect on August 30. 215 more runs were eliminated on that date. In 1967 there were 8,200 daily trips, and on August 30, 1976, there were 6,337 daily trips.[168]

On December 14, 1976, the NYCTA proposed another package of service cuts. The cuts, planned to take effect in January 1977, would have eliminated service on the Bowling Green–South Ferry Shuttle, the Franklin Avenue Shuttle, and AA service, which would be replaced by the A during late nights. GG service would be truncated to Queens Plaza during late evenings and late nights. B and N service would have been cut back to shuttles, running between 36th Street and Coney Island on their respective lines. It was also proposed that during off-peak hours 10-car trains would be cut to eight, six or four car trains.[172]

In 1986, the NYCTA launched a study to determine whether to close 79 stations on 11 routes, spread across all four of the boroughs that the subway system served, due to low ridership and high repair costs.[173][174] Numerous figures, including New York City Council member Carol Greitzer, criticized the plans.[174][175]

Infrastructure edit

 
The BMT Sea Beach Line. Note the single express track; the other express track was removed in the 1980s due to deferred maintenance
 
The R46s, the newest cars in the system in 1976, broke down the most due to their cracked trucks

The subway had been gradually neglected since the 1940s, and its situation had been exacerbated by the low fare. On May 20, 1970, two people died at the Jackson Heights–Roosevelt Avenue station in the worst subway collision since the 1928 Times Square derailment. Following the 1970 accident, New York Magazine highlighted the subway system's condition in a lengthy expose.[176] Even though each of the approximately 7,200 subway cars were checked once every six weeks or 7,500 miles (12,100 km) of service, four or five dead motors were allowable in a peak-hour 10-car train, according to some transit workers' accounts. About 85.8% of trains were on schedule in 1970, with 1,142 equipment-related delays in April 1970.[176] However, issues such as broken lights, fans, and signs; defective doors, wheels, and brakes; and subway cars that often became uncoupled or "pulled apart", were still prevalent. One out of three IRT stations did not have running water in case of emergency. In addition, the system's staff were leaving in massive numbers, with 5,655 workers having retired or quit from early 1969 to mid-1970.[176]

The system also had many slow-speed areas because of obstacles that could cause derailments, and every subway car had graffiti; fleet availability during rush hours declined from 5,557 in 1976 to 5,025 in 1977, and to 4,900 in May 1978. Mean Distance Between Failures (MDBF) rates were at all time lows, as the MDBF rate system-wide was 6,000 miles by 1980. In 1979, 200 retired R16 cars were reactivated because the newest rolling stock in the system, the R46, had cracked trucks, and were only allowed to operate during rush hours while they were sent for rehabilitation.[152]

At the height of the transit crisis in 1983, on-time performance dropped below 50%.[177] Hundreds of trains never made it to their destination and in 1981, 325 train runs were abandoned on a typical day.[177] Additionally, cars caught fire 2,500 times every year.[177]

In December 1978 a New York Daily News article highlighted the worst parts of the subway. The Grand Central–42nd Street station was the worst underground station and the Middle Village–Metropolitan Avenue station was the worst elevated station. The subway cars in the worst condition were the R10s. The subway line with the worst signals was the IRT Broadway–Seventh Avenue Line, so the signals were upgraded in the 1980s. The BMT Sea Beach Line had the worst track; its infrastructure had not been upgraded since its opening in 1915.[151] Despite $800 million being allocated by the state in 1978, the TA had spent less than half of the $600 million allocated in 1967. The agency made some infrastructure improvements, though because they were not cosmetic improvements, the public still assumed that the subway had high crime, even during periods of decreased crime.[152]

Due to deferred maintenance, the condition of the subway system reached dangerous conditions in the early 1980s, and the TA considered abandoning the Archer Avenue and 63rd Street projects. Structural defects were found in elevated structures systemwide and on the Manhattan and Williamsburg Bridges, causing frequent closures or delays on many subway lines during the 1980s. Reroutes from both bridges were necessitated; while the Manhattan Bridge, between 1986 and 2004, had two of its four tracks closed at a time for construction, the Williamsburg Bridge needed a shutdown from April to June 1988 for emergency structural repairs to be made.[152] Federal funding for the repair of the BMT Jamaica Line was deferred throughout the 1980s due to the extremely bad state of the Williamsburg Bridge. Pigeon droppings corroded the bridge's steel, there were over 200 broken suspender cables, and concrete in the bridge began to come off and leave large holes.[152]

Due to low ridership and the increasing shabbiness of the subway, parts or most of several lines—the BMT Canarsie Line; the IND Crosstown Line; the IRT Jerome Avenue Line or IND Concourse Line north of 161st Street–Yankee Stadium; and the BMT Jamaica Line east of either Broadway Junction or Cypress Hills—were proposed for closure and abandonment in 1981. Other lines proposed for closure included the remaining part of the IND Culver Line, the BMT West End Line, the IRT Dyre Avenue Line, part of the IND Rockaway Line, part of the IRT White Plains Road Line, and the remaining part of the BMT Myrtle Avenue Line.[178] The BMT Jamaica Line was demolished, mainly as part of the Program for Action, but also due to low ridership.[152] Officials also proposed shutting the subway at night between midnight and 6 a.m. in order to reduce crime.[179] Off-peak train trips, as well as trips on the branches outside the city's core, were reduced sharply.[180]

Operations in 1981 had deteriorated so that:[181][182]

  • One day in January saw 13 of the fleet out of service, and the first two weeks had 500 canceled trips per day
  • A 10-minute trip in 1910 took 40 minutes in 1981.
  • The previous year, there had been 30 derailments.
  • The A Division's fleet of 2,637 cars had never been renovated, and MDBF rates were a quarter of that in 1970.
  • The newest fleet, the R44s and R46s, made up 14 of the B Division's fleet of 4,178 cars, and constantly broke down.[152]
  • Furthermore, a sample of 50 cars in 1980 showed that half had serious maintenance problems, such as a flammable undercoat of metal film, flattened wheels, burned out lights, and defective/missing emergency switches.[183]

In 1986, the MTA and Regional Plan Association again considered closing 26 miles (42 km) of above-ground lines to follow population shifts. They included the Jerome Avenue, Dyre Avenue, Franklin Avenue, Crosstown, and Rockaway lines, as well as parts of the Myrtle and Jamaica lines. The south end of the Culver Line and the north ends of the IRT Broadway–Seventh Avenue and White Plains Road Lines were also proposed for closure, as was all of the BMT Sea Beach Line. However, unlike the 1981 proposal, this plan called for a net expansion of the subway system, as 37 miles (60 km) of new underground and surface lines would also be built.[184][174] Numerous figures, including New York City Council member Carol Greitzer, criticized the 1986 plans.[174][175]

Crime edit

In the 1960s, mayor Robert Wagner ordered an increase in the Transit Police force from 1,219 to 3,100 officers. During the hours at which crimes most frequently occurred (between 8:00 p.m. and 4:00 a.m.), the officers went on patrol in all stations and trains. In response, crime rates decreased, as extensively reported by the press.[185] Due to another crime increase in the subway, the rear cars of subway consists were shut at night beginning in July 1974.[186]

However, during the subway's main era of decline following the city's 1976 fiscal crisis, there were daily reports of crime. Two hundred were arrested for possible subway crimes in the first two weeks of December 1977 under an operation dubbed "Subway Sweep".[151] Violence on the subway increased drastically in the last week of 1978, and six murders occurred in the first two months of 1979, compared to nine during the entire previous year. The IRT Lexington Avenue Line was known to frequent muggers, so in February 1979, Curtis Sliwa's Guardian Angels group began patrolling the 4 train during the night. By February 1980, there were 220 Guardian Angels across the system.[187]

To attract passengers, in September 1978 the TA introduced the "Train to the Plane", a premium-fare service that provided limited stops along Sixth Avenue in Manhattan from 57th Street to Howard Beach, where passengers could transfer to a shuttle bus to JFK Airport. The service was staffed by a transit police officer, and the additional fare was paid on board. This was discontinued in 1990 due to low ridership and the high cost of its operation.[188][189][190]

The increase of crime in the subway led to the firing of Transit Police Chief Sanford Garelik.[151] There were about 250 felonies (equivalent to 13,000 per year) occurring in the system every week by September 1979; some police officers had to stop patrolling quality of life crimes and look only for violent crimes. Among other problems included:

MTA police radios and New York City Police Department radios transmitted at different frequencies, so they could not coordinate with each other. Subway patrols were also adherent to tight schedules, and felons quickly knew when and where police would make patrols. Public morale of the MTA police was low at the time. so that by October 1979, additional decoy and undercover units were deployed in the subway.[151]

While daily felonies were nearly halved between 1979 and 1980, decreasing from 261 to 154, overall crime increased by 70% in the same period.[191] A series of window-smashing incidents on subway cars started in 1980 on the IRT Pelham Line and spread throughout the rest of the system, causing delays when damaged trains needed to be taken out of service.[192] Over a thousand pieces of damaged windows were replaced between January 27 and February 2, 1985.[193] Other actions included increasing the 60-cent fare to 65 cents to pay the salaries of additional transit police;[191] putting a subway-crimes court in the Times Square station; and stationing a police officer in each car during night hours.[194]

Richard Ravitch, chairman of the MTA, said that even he was scared of going on the subway.[195] Despite the MTA discussing methods to increase ridership, the 1982 figures fell to levels last seen in 1917.[196] Within less than ten years, the MTA had lost around 300 million passengers, mainly because of fears of crime. In July 1985, the Citizens Crime Commission of New York City published a study showing this trend, fearing the frequent robberies and generally bad circumstances.[197] As a result, the Fixing Broken Windows policy, which proposed to stop large-profile crimes by prosecuting quality of life crimes, was implemented.[163][198] Along this line of thinking, the MTA began a five-year program to eradicate graffiti from subway trains in 1984, and hired one of the original theorists of Broken Windows policing, George L. Kelling, as a consultant for the program in 1985.[199][200][201]

In the early afternoon of December 22, 1984, Bernhard Goetz shot four young African American men from the Bronx on a New York City Subway train. The incident got nationwide media coverage. That day, the men—Barry Allen, Troy Canty, Darrell Cabey (all 19), and James Ramseur (18)—boarded a downtown 2 train (Broadway – Seventh Avenue Line express) carrying screwdrivers, apparently on a mission to steal money from video arcade machines in Manhattan.[202] When the train arrived at the 14th Street station in Manhattan, 15 to 20 other passengers remained with them in R22 subway car 7657,[203][204] the seventh car of the ten-car train.[205][206]

At the 14th Street station, Goetz entered the car through the rearmost door, crossed the aisle, and took a seat on the long bench across from the door. After Canty asked Goetz how he was, Goetz replied affirmatively, at which point the four boys supposedly moved over to the left of Goetz, blocking Goetz off from the other passengers in the car. They then asked Goetz for money. He fired five shots, seriously wounding all four men. Nine days later he surrendered to police and was eventually charged with attempted murder, assault, reckless endangerment, and several firearms offenses. A jury found him not guilty of all charges except for one count of carrying an unlicensed firearm, for which he served eight months of a one-year sentence.[207]

The incident sparked a nationwide debate on race and crime in major cities, the legal limits of self-defense, and the extent to which the citizenry could rely on the police to secure their safety.[208] Although Goetz, dubbed the "Subway Vigilante" by New York City's press, came to symbolize New Yorkers' frustrations with the high crime rates of the 1980s, he was both praised and vilified in the media and public opinion. The incident has also been cited as a contributing factor to the groundswell movement against urban crime and disorder.[209]

In 1989, the Metropolitan Transportation Authority asked the transit police (then located within the NYCTA) to focus on minor offenses such as fare evasion. In the early nineties, the NYCTA adopted similar policing methods for Penn Station and Grand Central Terminal. In 1993, crime rates in the subway dropped, part of a larger decrease across the city.[210]

On April 2, 1995, the New York City Police Department and the Transit Police Department merged.[119]

Effects of the Program for Action edit

 
The IRT Third Avenue Line in the Bronx was a casualty of the Program for Action

Ironically, the Program for Action forced the closure of a large number of subway lines. The Bronx remnant of the IRT Third Avenue Line closed in 1973, to be provisionally replaced by a new subway under the Metro-North Railroad tracks on Park Avenue, one block to the west. The single-tracked Culver Shuttle between Ditmas Avenue and Ninth Avenue, once a three-tracked line, closed on May 11, 1975.[211][212][213][214] On August 27, 1976, the GG service was truncated from Church Avenue to Smith–Ninth Streets, while service was discontinued on the K and EE routes. On December 15, 1976, GG service at the other terminal was shortened to Queens Plaza. The BMT Jamaica Line was truncated from 168th Street to 121st Street between September 11, 1977, and the early 1980s, replaced by the BMT Archer Avenue Line in 1988.[152]

Debris falling from and on the tracks edit

Existing elevated structures posed a large danger; the New York Post published a story that featured debris that had fallen from the BMT Astoria Line. Debris from the IRT Pelham Line nearly killed a passerby, and debris from the BMT West End Line led to a lawsuit against the MTA. Concrete falling on the BMT Brighton Line near the Beverley Road station caused a months-long service disruption between November 1976 and February 1977.[152]

Fare evasion edit

Fare evasion seemed a small problem compared to the graffiti and crime; however, fare evasion was causing the NYCTA to lose revenue.[215] NYCTA's strategy for restoring riders' confidence took a two-pronged approach. In 1981, MTA's first capital program started system's physical restoration to a State-of-Good-Repair. Improving TA's image in riders' minds is as important as overcoming deferred maintenance. Prompt removal of graffiti [216] and prevention of blatant fare evasion would become central pillars of the strategy to assure customers that the subway is "fast, clean, and safe":[217]

Similarly, fare evasion was taken seriously. The NYCTA began formally measuring evasion in November 1988. When TA's Fare Abuse Task Force (FATF) was convened in January 1989, evasion was 3.9%. After a 15-cent fare increase to $1.15 in August 1990, a record 231,937 people per day, or 6.9%, didn't pay. The pandemonium continued through 1991.[218] To combat the mounting problem, FATF designated 305 "target stations" with most evaders for intensive enforcement and monitoring. Teams of uniformed and undercover police officers randomly conducted "mini-sweeps", swarming and arresting groups of evaders.[219] Special "mobile booking centers" in converted city buses allowed fast-track offender processing.[220] Fare abuse agents covered turnstiles in shifts and issued citations. Plainclothes surveyors collected data for five hours per week at target locations, predominantly during morning peak hours. In 1992, evasion began to show a steady and remarkable decline, dropping to about 2.7% in 1994.[221]

The dramatic decrease in evasion during this period coincided with a reinvigorated Transit Police, a 25% expansion of City police, and a general drop in crime in U.S. cities. In the city, crime rate decline begun in 1991 under Mayor David Dinkins and continued through next two decades under Mayors Rudolph Giuliani and Michael Bloomberg. Some observers credited the "broken windows" approach of law enforcement [222] where minor crimes like evasion are routinely prosecuted, and statistical crimefighting tools, whereas others have indicated different reasons for crime reduction.[223][224] Regardless of causality, evasion checks resulted in many arrests for outstanding warrants or weapons charges, likely contributing somewhat to public safety improvements. Arrests weren't the only way to combat evasions, and by the early 1990s NYCTA was examining methods to improve fare control passenger throughputs, reduce fare collection costs, and maintain control over evasions and general grime. The AFC system was being designed, and evasion-preventing capability was a key consideration.

TA's queuing studies concluded that purchasing tokens from clerks was not efficient. Preventing 'slug' use required sophisticated measures like tokens with metal alloy centers and electronic token verification devices. To provide better access control, the NYCTA experimented with floor-to-ceiling gates and "high wheel" turnstiles. Prototypes installed at 110th Street/Lexington Avenue station during a "target hardening" trial reduced evasions compared to nearby "control" stations.[225] However, controls consisting entirely of "high-wheels" created draconian, prison-like environments, with detrimental effects on station aesthetics. Compromises with more secure low-turnstile designs were difficult, as AFC did not prevent fare evasion.[226]

Production Automated Fare Collection (AFC) implementation began in 1994. New turnstiles, including unstaffed high wheels, and floor-to-ceiling service gates, featured lessons learned from trials. As AFC equipment was rolled out, evasion plummeted. Fare abuse agents, together with independent monitoring, were eliminated.

Rehabilitation and rising trend edit

 
The BMT Franklin Avenue Line (at Botanic Garden) in the 1970s was in a state of rapid degradation

Ridership increased 4% between 1978 and 1979, mainly because of the improving economy.[227] Numerous improvements were touted in a 1979 Daily News report, including air conditioning and closed-circuit television. As part of the Urban Mass Transit Act, $1.7 billion would be provided by the state and the Port Authority.[227] Aesthetics chairperson Phyllis Cerf Wagner announced a program called "Operation Facelift", which entailed aesthetic improvements such as repainting and relighting the platforms, quicker replacement processes for windows and doors, and expanding the number of seats on platforms.[227]

During the mid-1980s, reconstruction began. Stations were refurbished and rolling stock was repaired and replaced. "Neighborhood maps" for wayfinding were added in subway stations starting in 1985.[228] Maintenance of the subway began to improve: while 21 trains derailed while in passenger service during 1983, there were 15 such incidents in 1984 and three in 1985. "Red tag" areas, where trains reduced speed to 10 mph due to dangerous maintenance conditions, were almost entirely eliminated by 1986.[229] The 325 R62 cars had a MDBF rate of 50,000 miles, more than five times higher than the other fleet, with the newly overhauled World's Fair R36 equipment on the Flushing Line averaging over 30,000 miles in 1986–87.[230] The MDBF of many rolling stock increased from 6,000 miles in 1980 to 10,000 miles in September 1986, and hundreds cars were overhauled or cleaned of graffiti. Speedometers were also installed on existing and new rolling stock.[227]

On January 1, 1982, the MTA implemented the first of its five-year Capital Improvement programs to repair the existing system.[119] Scheduled Maintenance Services were formed to proactively replace components, and the MTA conducted general overhauls of the R26 through R46 fleets. Older equipment (any car classes with contract numbers below R32s on the B Division and R26s on the A Division) were retrofitted with air conditioning. The red tag areas were incrementally repaired and replaced with welded rail. At the end of the century, the MDBF rates for the entire system were at record highs and steadily increasing. The Franklin Avenue Shuttle, however, was worse in 1989 than it was in 1980, and necessitated a complete renovation by 1998, because the MTA planned to abandon the line by the end of the century.[227]

Projects during this time edit

 
Atlantic Avenue – Barclays Center transfer

Starting in the early 1970s, there were plans for improving the subway system. In 1976, the MTA proposed abandoning the Franklin Avenue Shuttle to save money, but dropped the plan due to community pushback.[90] The possibility of the discontinuation was revisited again in 1998, but again, fierce community opposition to it forced the MTA to rehabilitate the line.[231]

In 1977, the Linden Shops opened in Brooklyn, enabling the MTA to build track panels indoors throughout the year, among other objects.[90]

On January 16, 1978, the MTA opened three transfer stations:[90]

In April 1981, the following projects were considered by the MTA:[232]

In 1981, the MTA began installing welded rails on a few underground portions of the system.[90]

In June 1983, the following projects were considered by the MTA:[233][234]

  • The JFK Express would be extended to Rockaway Park–Beach 116th Street, and the $5 fare and the special guard would be eliminated, making it like any other subway line. Trains would be 8 cars long instead of 4 cars long, and the headway between trains would be 18 minutes, instead of 20 minutes.
  • During rush hours, the CC would terminate at Euclid Avenue, instead of serving the Rockaways.
  • B train service would run all day from Coney Island to 168th Street, instead of terminating at 57th Street during non-peak hours.
  • AA service, which operated during non-rush hours, would be eliminated.
  • A new shuttle service, named H, would run between 57th Street and World Trade Center.

On March 25, 1986, the Regional Plan Association (RPA) proposed several changes.[235] A major part of the plan was eliminating parts of the system and expanding the system to reflect population shifts. The plan called for eliminating 26 miles of elevated lines and building 17 miles of new subway lines, and 20 miles of new surface lines. The RPA also suggested buying new subway cars; implementing One Person Train Operation outside of rush hours; giving reduced fares to city residents using the Long Island Rail Road or Metro-North Railroad to travel to Midtown Manhattan; adding premium-fee express services; closing 10% of stations; and doubling off-peak services.[236] The RPA also suggested:[235]

In April 1986, the New York City Transit Authority began to study the possibility of eliminating sections of 11 subway lines because of low ridership. The segments are primarily located in low-income neighborhoods of the Bronx, Brooklyn and Queens, with a total of 79 stations, and 45 miles of track, for a total of 6.5 percent of the system. The lines were first identified in the first part of a three-year project, the Strategic Plan Initiative, which started in April 1985, by the MTA to evaluate the region's bus, subway, and commuter rail systems. The eleven segments all had low ridership, needed expensive rebuilding, and duplicated service on parallel lines. The lines being studied included the following lines:[236]

  • The IRT Broadway–Seventh Avenue Line from 215th Street to 242nd Street, which was duplicated by buses.
  • The IRT White Plains Road Line from East 180th Street to 241st Street, which was duplicated by buses.
  • The entire IRT Dyre Avenue Line, which was duplicated by buses.
  • The IRT Jerome Avenue Line from 167th Street to Woodlawn, which was paralleled by the IND Concourse Line.
  • The entire IND Rockaway Line south of Howard Beach, due to low ridership.
  • The IND Culver Line south of Avenue U, due to low ridership and duplication by buses.
  • The entire IND Crosstown Line, due to low ridership and duplication by buses.
  • The BMT Jamaica Line between Crescent Street and 121st Street, due to low ridership and duplication by buses.
  • The entire BMT Myrtle Avenue Line, which was duplicated by buses.
  • The entire BMT Sea Beach Line, which ran close to the BMT West End Line.
  • The entire BMT Franklin Avenue Line, due to major deterioration.
 
The Broadway – Lafayette Street station to the northbound IRT Lexington Avenue Line at Bleecker Street

By August 1989, the MTA was considering these projects:[237]

 
21st Street – Queensbridge, opened in October 1989

In December 1988, three transfers were opened between existing stations, and three brand-new stations were opened. They were:[238]

The new stations were Sutphin Boulevard – Archer Avenue – JFK Airport, Jamaica Center – Parsons/Archer, and Jamaica – Van Wyck.[119] Other service changes were implemented that day. Skip-stop service on the J/Z trains was also started on December 11, 1988. Additionally, IND Fulton Street Line express service was extended from weekdays only to all times except late nights. Discontinuous services on the B, D, and Q trains over the Manhattan Bridge were replaced by continuous services.

New subway cars were also purchased: the R62 and R62A fleets for the A Division and the R68 and R68A fleets for the B Division. The R62 in particular was the first New York City Subway car class built by a foreign manufacturer.[239] These were all delivered between 1983 and 1989. The R10, R14, R16, R17, R21, and R22 car classes all were retired with the deliveries of the R62/As and R68/As. On May 10, 1989, the last train with graffiti was taken out of service;[165] the subway has been mostly graffiti-free since this point.[166]

On October 29, 1989, the IND 63rd Street Line was opened. It was nicknamed the "tunnel to nowhere" due to its stub end at 21st Street–Queensbridge, and also due to the fact that the three-station extension lay dormant for over a decade after completion.[119][240] The 3.2 mile line included three new stations and cost a total of $868 million. The line was viewed as an enormous waste of money.[241]

Revitalization and recent history edit

1990s edit

Subway ridership increased through the 1990s. Throughout David Dinkins's mayoralty from 1989 to 1993, the city went from being in debt to having a $200 million surplus, which was achieved by raising taxes. However, Dinkins's tax plans were unpopular, and he lost the 1993 election to Rudy Giuliani.[104]: 360  Giuliani wanted to demonstrate that he could successfully run New York City without raising taxes, so he eliminated $400 million from the MTA's capital budget in 1994. He did not suggest any transit improvements, however.[242] State lawmakers also reduced MTA funding in the 1990s, which remained mostly unchanged through the 2000s.[242]

In 1998, a large portion of the New York City Subway system was nominated for addition to the National Register of Historic Places. The nomination encompassed 48 stations, 11 electrical substations, six signal towers, four station head houses, three buildings in storage yards, and one tunnel. The MTA supported the listing, which would increase the agency's chances of receiving more federal funding.[243]

September 11, 2001 edit

 
Cortlandt Street station was heavily damaged in the September 11 attacks and needed to be demolished.

The September 11 attacks resulted in service disruptions on lines running through Lower Manhattan. Tracks and stations under the World Trade Center were shut down within minutes of the first plane crash. All remaining New York City Subway service was suspended from 10:20am to 12:48pm.[244] Immediately after the attacks and more so after the collapses of the Twin Towers, many trains running in Lower Manhattan lost power and had to be evacuated through the tunnels. Some trains had power, but the signals did not, requiring special operating procedures to ensure safety.

The IRT Broadway–Seventh Avenue Line, which ran below the World Trade Center between Chambers Street and Rector Street was the most destroyed. Sections of the tunnel as well as Cortlandt Street were badly damaged and had to be rebuilt. Service was immediately suspended south of Chambers Street and then cut back to 14th Street. There was also subsequent flooding on the line south of 34th Street–Penn Station. After the flood was cleaned up, express service was able to resume on September 17 with 1 trains running between Van Cortlandt Park–242nd Street and 14th Street, making local stops north of and express stops south of 96th Street, while 2 and 3 trains made all stops in Manhattan (but bypassed all stations between Canal Street and Fulton Street until October 1). 1/9 skip-stop service was suspended.

After a few switching delays at 96th Street, service was changed on September 19. The 1 train resumed local service in Manhattan, but was extended to New Lots Avenue in Brooklyn (switching onto the express tracks at Chambers Street) to replace the 3, which now terminated at 14th Street as an express. The 2 train continued to make local stops in Manhattan and service between Chambers Street and South Ferry as well as skip-stop service remained suspended. Normal service on all four trains was restored September 15, 2002.[245][14] The Cortlandt Street station needed extensive reconstruction, and after a total rebuild costing $158 million, it reopened on September 8, 2018.[246][247]

Service on the BMT Broadway Line was also disrupted because the tracks from the Montague Street Tunnel run adjacent to the World Trade Center and there were concerns that train movements could cause unsafe settling of the debris pile. Cortlandt Street station, which sits under Church Street, sustained significant damage in the collapse of the towers. It was closed until September 15, 2002, for removal of debris, structural repairs, and restoration of the track beds, which had suffered flood damage in the aftermath of the collapse.

Starting September 17, 2001, the N and R service was suspended and respectively replaced by the M (which was extended to Coney Island–Stillwell Avenue via the BMT Montague Street Tunnel, BMT Fourth Avenue Line, and BMT Sea Beach Line) and the J (also extended via Fourth Avenue to Bay Ridge–95th Street). In Queens, the Q replaced the R while the W replaced the N. All service on the BMT Broadway Line ran local north of Canal Street except for the Q, which ran normally from 57th Street to Brighton Beach via Broadway and Brighton Express. J/Z skip-stop service was suspended at this time. Normal service on all seven trains resumed on October 28.

The only subway line running between Midtown and Lower Manhattan was the IRT Lexington Avenue Line, which was overcrowded before the attacks and at crush density until the BMT Broadway Line reopened. Wall Street was closed until September 21.

The IND Eighth Avenue Line, which has a stub terminal serving the E train under Five World Trade Center was not damaged, but covered in soot. E trains were extended to Euclid Avenue, Brooklyn, replacing the then suspended C train (the A and D trains replaced it as the local north of 59th Street–Columbus Circle on nights and weekends, respectively. The B train, which ran normally from 145th Street or Bedford Park Boulevard to 34th Street–Herald Square via Central Park West Local, also replaced C trains on weekdays). Service was cut back to Canal Street when C service resumed on September 21, but Chambers Street and Broadway–Nassau Street remained closed until October 1. World Trade Center remained closed until January 2002.[14][15]

Later 2000s edit

 
With many parts of the system approaching or exceeding 100 years of age, general deterioration can be seen in many subway stations.

Ridership increases edit

Generally, ridership kept rising as the subway system improved in its maintenance, cleanliness, frequency, and on-time ratio; ridership started to increase as graffiti and crime rates dropped heavily after 1989. From 1995 to 2005, ridership on city buses and subways grew by 36%, compared with a population gain in the city of 7%.[248] With dramatic increases in fuel prices in 2008, as well as increased tourism and residential growth, ridership on buses and subways grew 3.1% up to about 2.37 billion trips a year compared to 2007. This is the highest ridership since 1965.[249]

By 2013, ridership had reached 1.7 billion riders per year (despite closures related to Hurricane Sandy), a level not seen since 1949.[250] In April 2013, New York magazine reported that the system was more crowded than it had been in the previous 66 years.[251] The subway reached a daily ridership of 6 million for 29 days in 2014, and was expected to record a similar ridership level for 55 days in 2015; by comparison, in 2013, daily ridership never reached 6 million.[252]

Expansions edit

Several expansions started construction or were opened during the mayoralty of Michael Bloomberg from 2001 to 2013.[242] The IND 63rd Street Line's connection to the IND Queens Boulevard Line was first, opened on December 16, 2001. To serve the new connection, the F train was rerouted via the 63rd Street Line, and to replace the F along 53rd Street, a new V train was created–running between Forest Hills–71st Avenue and Second Avenue via the Queens Boulevard and Sixth Avenue local tracks. The G, to allow for room to operate the V, was cut back to Court Square. Two out-of-system transfers were put into place; the first was to allow F passengers to continue to have a free transfer to the Lexington Avenue Line, which was lost when the line was rerouted–the transfer connects the Lexington Avenue/59th Street station and the Lexington Avenue–63rd Street stations. The second one connected the Court Square station with the 45th Road–Court House Square station.[253][254][255]

In 2003, money was allocated for the construction of a new station at South Ferry, and in 2005, construction commenced on the new station.[256] Initially, the station's construction had been opposed because of the high cost and low perceived time savings.[257] The South Ferry loop station only accommodates the first five cars of a train, so that the rear five cars of a 10-car 1 train cannot load or unload.[258] Because of the curve at the station gap fillers are required, and as a result the new station was built as a two-track, full (10-car)-length island platform on a less severe curve, permitting the operation of a typical terminal station.[258][259] The MTA claimed that the new station saved four to six minutes of a passenger's trip time and increased the peak capacity of the 1 service to 24 trains per hour, as opposed to 16 to 17 trains per hour with the loop station.[258]

In the late 1990s and early 2000s, talk began to circulate about taking up the construction of the Second Avenue Subway. Most New Yorkers regarded these plans with cynicism, since citizens were promised the line since well before the Third Avenue elevated was torn down in 1955. Funds have been set aside and environmental impact reports have been completed. A tunnelling contract was awarded to the consortium of Schiavone/Shea/Skanska (S3) by the MTA on March 20, 2007.[260] This followed preliminary engineering and a final tunnel design completed by a joint venture between AECOM and Arup.[261][262] A ceremonial groundbreaking for the subway was held on April 12, 2007, and contractor work to prepare the project's initial construction site at 96th Street and Second Avenue began on April 23, 2007.[260][263]

 
7 Subway Extension construction in June 2011

In October 2007, the 7 Subway Extension construction contract was awarded, extending the IRT Flushing Line to 34th Street.[130] Groundbreaking began in June 2008 and the tunnels were completed by 2010. The project, which was the first one funded by the city in over 60 years,[264] was intended to aid redevelopment of Hell's Kitchen around the West Side Yard of the Long Island Rail Road.[265]

Budget cuts edit

The MTA faced a budget deficit of US$1.2 billion in 2009.[266] This resulted in fare increases (three times from 2008 to 2010)[267] and service reductions (including the elimination of two part-time subway services, the V and W). Several other routes were modified as a result of the deficit. The N was made a full-time local in Manhattan (in contrast to being a weekend local/weekday express before 2010), while the Q was extended nine stations north to Astoria–Ditmars Boulevard on weekdays, both to cover the discontinued W. The M was combined with the V, routing it over the Chrystie Street Connection, IND Sixth Avenue Line and IND Queens Boulevard Line to Forest Hills–71st Avenue on weekdays instead of via the BMT Fourth Avenue Line and BMT West End Line to Bay Parkway. The G was truncated to Court Square full-time. Construction headways on eleven routes were lengthened, and off-peak service on seven routes were lengthened.[268]

2010s and 2020s edit

Hurricane Sandy damage edit

 
The old South Ferry loop station closed between March 16, 2009, and April 4, 2013. It closed permanently in June 2017.
 
Hurricane Sandy caused serious damage to the IND Rockaway Line and isolated one part of the line from the rest of the system, requiring the NYCTA to truck in 20 subway cars to the line to provide some interim service in the Rockaways. This shows one of the cars being loaded onto a flatbed to be carried to the Rockaways.

On October 28, 2012, a full closure of the subway was ordered the day before the arrival of Hurricane Sandy. All services on the subway, the Long Island Rail Road and Metro-North were gradually shut down that evening.[269] The storm caused serious damage to the system, especially the IND Rockaway Line, which had many sections between Howard Beach–JFK Airport and Hammels Wye on the Rockaway Peninsula heavily damaged, leaving it essentially isolated from the rest of the system. This required the NYCTA to truck in 20 R32 subway cars to the line to provide some interim service, which was temporarily designated the H.[270][271] The H ran between Beach 90th Street and Far Rockaway–Mott Avenue, where passengers could transfer to a free shuttle bus.[272] The line reopened on May 30, 2013, with a new retaining wall along the line to prevent against future storm surges.[273][274][275]

Several of the system's tunnels under the East River were flooded by the storm surge.[276] The South Ferry station suffered serious water damage, and on April 4, 2013, the older loop-configured station reopened to provide temporary service.[277][278] The first tunnel to be repaired, the Greenpoint Tube under Newtown Creek, was fixed during a series of weekend closures in 2013 and a full closure during summer 2014.[279] The second tunnel, the Montague Street Tunnel, was closed completely from August 2013[280][281] to September 2014.[282][283][284]

Hurricane Sandy also damaged the Clark Street Tubes, necessitating a full closure on weekends between June 2017 and June 2018, thus affecting 2, 3, 4, and 5 service.[285] The new South Ferry station reopened on June 27, 2017, in time to accommodate the Clark Street closures.[286][287] A week after South Ferry reopened, the MTA closed the BMT Myrtle Avenue Line for ten months to rebuild two of the line's viaducts, the 310-foot-long (94 m) approaches to the line's junction with the BMT Jamaica Line and Fresh Pond Bridge over the Montauk Branch in Queens. This was in preparation for a reconstruction of the BMT Canarsie Line tunnels under the East River.[288][289][290][291]

The MTA also planned to completely close the BMT Canarsie Line west of Bedford Avenue for 18 months between early 2019 and mid-2020.[292][293][294] In April 2017, the shutdown was shortened to 15 months.[295] The closure was changed to a night and weekend shutdown in January 2019.[296][297][298]

Other rehabilitation projects included:

  • Covering over 3,200 openings at ground level. As of March 2019, there are 19 contracts in progress and 11 contracts pending.[299] In addition, a preventive measure, 68 subway entrances in Lower Manhattan are also receiving fabric plugs that are intended to keep flood water out.[300]: 44  In 2017, 3,000-pound (1,400 kg) waterproof doors and curtains were installed in 24 Lower Manhattan locations at a cost of $30,000 each.[301][302]
  • Adding flood mitigation measures, like barriers, to the Coney Island, 207th Street, and Lenox subway yards[299]: 44 
  • Adding flood mitigation measures to the IND Rockaway Line[299]: 44 
  • Rebuilding other tubes. As of March 2019, the Steinway, 53rd Street, Cranberry, and Joralemon tunnels had been repaired, in addition to the Crosstown, Montague Street, and Clark Street tunnels. The Rutgers Street Tunnel was pending repairs.[299]: 44 

Expansions open edit

Originally budgeted at $400 million, the new South Ferry station opened in 2009 at a total of $530 million, with most of the money being a grant from the Federal Transit Administration earmarked for World Trade Center reconstruction.[258] In January 2009, the opening was delayed because the tracks were too far from the edge of the platform. Other delays were attributed to leaks in the station.[303] The problem was corrected and the station opened on March 16, 2009. With the opening of the new station, a transfer was available to the Whitehall Street station with a new connecting passageway.[304]

 
The opening of the Second Avenue Subway at 86th Street

The 7 Subway Extension originally was expected to open in 2014,[305][306] but did not open until September 13, 2015.[307][308] According to The New York Times, the delay in the extension's opening was due to the installation of custom-made incline elevators that kept malfunctioning.[309] The Fulton Center building opened to the public on November 10, 2014, completing a decade-long refurbishment of the Fulton Street station in lower Manhattan.[310][311][312] It was controversially funded as part of the post-9/11 rebuilding project.[242] As part of the opening of the Second Avenue Subway, W service, which had not run since 2010, was restored on November 7, 2016.[313] On January 1, 2017, the Second Avenue Subway was opened.

2017 state of emergency edit

Underlying the fanfare of expansions, however, there was a gradual decline in maintenance of the subway, and consequently, fewer trains started arriving to their destinations on time. Maintenance spending declined before rising again from the 1990s to 2012, but on-time performance slowly eroded during that same time period. By 2017, only 65% of weekday trains reached their destinations on time, the lowest rate since the transit crisis of the 1970s.[242] In the summer of that year, the subway system was officially put in a state of emergency after a series of derailments,[314][315] track fires,[316][317] and overcrowding incidents.[316][318]

To solve the system's problems, the MTA officially announced the Genius Transit Challenge on June 28, 2017, where contestants could submit ideas to improve signals, communications infrastructure, or rolling stock.[319][320] On July 25, 2017, Chairman Joe Lhota announced a two-phase, $9 billion New York City Subway Action Plan to stabilize the subway system and to prevent the continuing decline of the system.[321][322][323][324] The first phase, costing $836 million, consisted of five categories of improvements; the $8 billion second phase would implement the winning proposals from the Genius Transit Challenge and fix more widespread problems.[322][323][324] Six winning submissions for the Genius Transit Challenge were announced in March 2018.[325]

In October 2017, city comptroller Scott Stringer released an analysis of the effect of subway delays on the economy and on commuters. The study found that based on a normal wait time of 5 minutes and an average wage of $34 per hour in 2016, "worst-case" subway delays of more than 20 minutes could cost up to $389 million annually in lost productivity.[326] By comparison, "mid-case" delays of between 10 and 20 minutes could cost $243.1 million per year, and "best-case" delays of between 5 and 10 minutes could cost $170.2 million per year.[327]

In November 2017, The New York Times published its investigation into the crisis. It found that the crisis had arisen as a result of financially unsound decisions by local and state politicians from both the Democratic and Republican parties. By this time, the subway's 65% average on-time performance was the lowest among all major cities' transit systems, and every non-shuttle subway route's on-time performance had declined in the previous ten years.[242]

Several improvements were made in response to the transit crisis. In the short term, signals, trains, and tracks were improved under the "Fast Forward" program.[328][329] Further, the MTA's 2020–2024 capital plan called for adding elevators and ramps to 66 subway stations and adding modern signaling systems to parts of six more physical lines, to be funded by congestion pricing in Manhattan.[330][331] Additionally, several other changes were proposed to improve service. For instance, in February 2019, several politicians wrote a letter to the MTA, asking the agency to consider splitting the R train in half to increase reliability.[332][333] In January 2020, Stringer sent a letter to NYCTA president Andy Byford stated that the "abundance" of shuttered entry points along subway routes was contributing to severe overcrowding and longer commute times, and requested that the MTA develop and publicize plans for restoring closed entry points.[334] The state of emergency ended on June 30, 2021, after previously being renewed 49 times.[335]

Planning of new lines edit

There are several lines under consideration. This includes a subway line under Utica Avenue in Brooklyn;[336][337] an outer-borough circumferential line, the Triboro RX;[338][339] a reuse of the northern part of the Rockaway Beach Branch;[340][341] and a line to LaGuardia Airport.[342]

In November 2016, the MTA requested that the Second Avenue Subway's Phase 2 project be entered into the Project Development phase under the Federal Transit Administration's New Starts program.[343] The FTA granted this request in late December 2016;[344] The line will eventually comprise four phases, running as far north as 125th Street in East Harlem during Phase 2, and south to Hanover Square in Lower Manhattan in Phases 3 and 4.[345] The MTA began soliciting bids in July 2023 for the first Phase 2 construction contract.[346][347]

COVID-19 pandemic and crime concerns edit

The spread of the COVID-19 pandemic to the New York City area in March 2020 resulted in mass closures of gathering spaces.[348] After the MTA recommended that only essential workers use the New York City Subway, ridership started to decrease.[349][350] Part-time services were temporarily suspended.[351] Starting on May 6, 2020, stations were closed overnight for cleaning, in what became the first planned overnight closure in the subway's history. The overnight closures were to be suspended once the pandemic was over, and bus service was added.[352] In early May 2021, Governor Cuomo announced that the overnight subway closures would end on May 17, 2021, with 24-hour service resuming on that date.[353][354]

In February 2021, the New York City Subway removed benches from several stations in an effort to reduce the number of homeless persons sleeping on them, which during the COVID-19 pandemic was considered to be unsanitary. This move drew considerable backlash from riders who alleged that the removal of the benches amounts to disenfranchising disabled people and senior citizens, as well as being unfair to homeless populations.[355][356]

Although ridership decreased by 40 percent from 2019 to 2022, the number of crimes in the system remained roughly the same, prompting riders to express concerns over increased crime.[357][358] There had been six murders in the subway in 2020; the following year, the subway recorded eight murders, the highest annual total in 25 years.[359] During the pandemic, the subway system experienced several high-profile incidents, including a January 2022 shoving death of a passenger in Times Square and an April 2022 mass shooting in Brooklyn.[358] As of October 2022, crime in the system had increased 40 percent from the previous year; the number of crimes recorded to date was roughly the same as in 2019, when ridership was much higher.[360][361] In response, governor Kathy Hochul and mayor Eric Adams announced a plan to increase police presence within the subway system.[362] Amid an increase in violent crimes in the subway system, Hochul deployed National Guard and New York State Police forces to the subway in March 2024, as part of Joint Task Force Empire Shield.[363]

Further upgrades and improvements edit

Several upgrades and improvements were announced in the early 2020s. The new OMNY fare-payment system was implemented across the subway between 2019 and 2020,[364][365] The MTA announced in 2022 that it would install platform screen doors at three stations,[366][367] and it reached a legal settlement the same year, agreeing to make 95 percent of subway and Staten Island Railway stations wheelchair-accessible by 2055.[368] Despite decreased ridership due to the COVID-19 pandemic, the MTA had balanced its budget by 2023 while also raising fares and increasing service on several subway routes.[369]

Incidents and accidents edit

Train accidents edit

Many train accidents have been recorded since 1918, when a train bound for South Ferry smashed into two trains halted near Jackson Avenue on the IRT White Plains Road Line in the Bronx.[370]

Only accidents that caused injuries, deaths, or significant damage are listed.

 
Aftermath of F train derailment in May 2014
 
The Malbone Street Wreck killed 97 people.
  • October 3, 1918: A collision at Jackson Avenue killed two and injured 18.[370][371]
  • November 1, 1918: The Malbone Street Wreck killed 97 and injured 200.[371][372]
  • August 6, 1927: Two bombs exploded at 28th Street (BMT Broadway Line) and 28th Street (IRT Lexington Avenue Line).[371]
  • August 24, 1928: A derailment in Times Square on a southbound express train on the IRT Broadway–Seventh Avenue Line killed 16[373] and injured 100.[371]
  • August 22, 1938: A collision at the 116th Street station (IRT Lexington Avenue Line) killed 2 and injured 51.[371][374]
  • September 26, 1957: A motorman and three passengers were killed at an accident at 231st Street.[371]
  • November 28, 1962: A crane fell in Coney Island, killing three.[371]
  • May 4, 1965: A crane fell on the IRT New Lots Line, killing one.[371]
  • December 29, 1969: A southbound train derailed near East 180th Street in the Bronx, injuring 48.[371]
  • February 27, 1970: A 6 train hit a bumper block at the Pelham Bay Park station, injuring 7.[375]
  • May 20, 1970: Two Brooklyn-bound GG trains crashed west of Roosevelt Avenue, killing 2 and injuring 77.[371]
  • July 17, 1970: A Manhattan-bound E train ran into an A train at Hoyt–Schermerhorn Streets, injuring 37.[376]
  • August 1, 1970: A fire in the tunnel near Bowling Green killed one and injured 50.[371]
  • May 27, 1971: A 7 train was stuck in the Steinway Tunnel and one person died of a heart attack.[377]
  • July 16, 1971: A fire took place south of 14th Street on the IRT Lexington Avenue Line, injuring 11.[378]
  • August 28, 1973: A 7 train was hit by falling concrete in the Steinway Tunnel, killing one and injuring 18.[379][371][380]
  • October 4, 1973: Three passengers were injured when a Lexington Avenue Express train derailed 900 feet south of the Bergen Street station.[381]
  • October 25, 1973: A fire in two train cars at Longwood Avenue led to a rear-end accident.[379][371]
  • December 1, 1974: Six people were injured as a Franklin Avenue Shuttle train consisting of R32s derailed at the same spot of the Malbone Street Wreck hitting the wall leaving a massive gash in the side of one of the cars.[382][383][384][385]
  • April 12, 1977: Two passengers were injured when an N train derailed between the Manhattan Bridge and DeKalb Avenue.[386]
  • June 30, 1978: Three people were injured when an L train derailed, with nine of the cars leaving the track, damaging the track and platform.[387]
  • December 13, 1978: A CC train derailed south of 59th Street Columbus Circle crashing into the tunnel wall, injuring 16 of 100 passengers.[388]
  • November 20, 1980: A 2 train derailed as it entered Chambers Street injuring 16 passengers.[389]
  • January 12, 1981: A D train derailed on the BMT Brighton Line near Kings Highway injuring 10 passengers.[390]
  • July 3, 1981: A motorman was killed and 135 passengers are injured as a Manhattan bound train plowed into the rear of a second train halted for a failed signal between Sutter Avenue and Utica Avenue.[391]
  • April 25, 1986: An out of service F train crashed into the bumper blocks at 179th Street, and the motorman died of a heart attack.[392][379][371]
  • July 26, 1990: A B train and an M train collided on the BMT West End Line, injuring 36 people.[371]
  • December 28, 1990: An electrical fire occurred in the Clark Street Tunnel, killing 2 and injuring 188.[393]
  • August 28, 1991: In a derailment at Union Square, five people were killed and more than 200 were injured when a southbound 4 train derailed due to a drunk motorman.[379][371][394]
  • October 7, 1993: Two L trains collided at the Graham Avenue station; 45 were injured.[371][394]
  • August 15, 1994: A southbound B train derailed near Ninth Avenue in Brooklyn, injuring 11.[379][371]
  • December 21, 1994: A bomb made by Edward Leary detonated in a subway car, injuring him and 47 others.[395]
  • February 9, 1995: An M train and a B train collided near the Ninth Avenue station. Seven people on the B train were injured, and the motorman of the M train was culpable.[371][394]
  • June 5, 1995: In a collision on the Williamsburg Bridge, a Manhattan-bound J train crashed into a stopped Manhattan-bound M train after passing a red light at high speed, killing one and injuring 50.[371][394]
  • August 23, 1995: A 6 train collided with another at Brooklyn Bridge–City Hall station, injuring 87.[371][394]
  • July 3, 1997: A Queens-bound A train derailed in Harlem, near the 135th Street station, injuring 15 people.[379]
  • July 14, 1997: The last car of a southbound 2 train derailed near Franklin Avenue, injuring four people.[379]
  • November 20, 1997: A Forest Hills-bound R train rear-ended a G train in a tunnel near the Steinway Street station, injuring 40, none seriously.[371]
  • April 12, 2000: A northbound 5 train derailed near 68th Street, injuring nine people.[379]
  • June 21, 2000: A southbound B train derailed just after leaving the DeKalb Avenue station in Brooklyn, injuring more than 80 people. Officials said the third car jumped off the track, pulling the second car along.[396][379]
  • May 2, 2014: A Manhattan-bound F train with 1,000 people on board derailed near 65th Street, injuring at least 19 people.[397][379]
  • September 10, 2015: A southbound G train with approximately 80 people on board derailed near Hoyt–Schermerhorn Streets, injuring at least five people.[398]
  • June 27, 2017: A southbound A train derailed then caught fire near 125th Street.[399] The derailment, caused by improperly secured replacement rails,[400] resulted in 39 minor injuries.[401]
  • March 27, 2020: A northbound 2 train caught fire in the Central Park North–110th Street station, killing the motorman and injuring at least 16 other people.[402][403] Since several other fires had been observed in nearby stations, the incident was investigated as a possible arson.[404][405]
  • September 20, 2020: A northbound A train derailed at 14th Street/Eighth Avenue station when a homeless man clamped wooden planks onto the roadbed causing the train to derail. Three passengers were injured.[406][407][408]
  • January 4, 2024: Two trains collided at the 96th Street station. Both trains derailed on impact, and 24 people were injured.[409][410]
  • January 10, 2024: A northbound F train derailed near the West Eighth Street–New York Aquarium station in Coney Island. All 37 passengers were evacuated.[411]

Additionally, in an accident recorded before 1918, a derailment happened on the Ninth Avenue Elevated in Manhattan on September 11, 1905, resulting in 13 deaths and 48 serious injuries.[412][413]

Other disasters edit

Other accidents in the history of the subway do not involve trains;[414][415][416] several people have been fatally electrocuted by the subway's third rails,[417][418] and yet others have been fatally pushed onto the tracks.[419][420] Fatal pushing incidents include the 2022 death of Michelle Go at the Times Square station.[421]

In 1960, a person nicknamed the Sunday Bomber set off a series of bombs in the New York City Subway during Sundays and holidays, killing one woman and injuring 51 other commuters.[422][423][424] The bomber also set off bombs in ferries.[425] On April 12, 2022, a mass shooting attack occurred on the N train, injuring at least 29 people.[426]

See also edit

References edit

  1. ^ "Annual Information Statement 2001 Appendix A The Related Entities" (PDF). Metropolitan Transportation Authority (MTA). 2001. Retrieved April 26, 2015.
  2. ^ Tunneling to the Future: The Story of the Great Subway Expansion That Saved New York (2001).
  3. ^ "Introduction to Subway Ridership". Metropolitan Transportation Authority (MTA). Retrieved April 18, 2016.
  4. ^ "Annual Subway Ridership (2017–2022)". Metropolitan Transportation Authority. 2022. Retrieved November 8, 2023.
  5. ^ "Subway and bus ridership for 2021". Metropolitan Transportation Authority (MTA). Retrieved October 28, 2022.
  6. ^ "Subway and bus ridership for 2022". Metropolitan Transportation Authority (MTA). Retrieved November 15, 2023.
  7. ^ Goldman, Ari (October 23, 1982). "RIDERSHIP OF SUBWAYS SINCE 1917". The New York Times. Retrieved June 5, 2017.
  8. ^ "Annual Subway Ridership (2017–2022)". Metropolitan Transportation Authority. 2022. Retrieved November 8, 2023.
  9. ^ "(New York City) Subways (Facts and Figures under title of Annual Subway Ridership)". MTA.info. Retrieved April 19, 2016.
  10. ^ a b "New York City subway opens – Oct 27, 1904". HISTORY.com. A&E Television Networks. 2009. Retrieved October 25, 2015.
  11. ^ "New York Elevated – Charles Harvey". Mid-Continent Railway Museum. April 8, 2006. Retrieved October 25, 2015.
  12. ^ Mark S. Feinman (2000). "History of the Independent Subway". nycsubway.org. Retrieved July 7, 2008.
  13. ^ a b c "New York City Transit – History and Chronology". mta.info. Metropolitan Transportation Authority. Retrieved May 14, 2014.
  14. ^ a b c Kennedy, Randy. "Tunnel Vision; With Station's Reopening, Even Commuters Smile", The New York Times, September 17, 2002. Retrieved October 6, 2007.
  15. ^ a b Brian Abbott. September 11: Three Years Later. March 14, 2016, at the Wayback Machine Several maps showing changes in lower Manhattan from July 2001 to September 2002.
  16. ^ "New York will have to wait till spring for No. 7 subway extension". Daily News. New York. December 15, 2014. Retrieved December 15, 2014.
  17. ^ Sill, Andrew (December 15, 2014). "Hudson Yards subway extension delayed again".
  18. ^ MTA.info—Second Avenue Subway Quarterly Report Q4 2013
  19. ^ The Launch Box—Fewer Than 1,000 Days to Go!
  20. ^ Hilger, James (March 23, 2009). "Notes from the Underground: The Secret Tunnels of Brooklyn". psfk.com. Retrieved April 8, 2009.[permanent dead link]
  21. ^ Citynoise: Oldest Subway Tunnel in the World March 3, 2016, at the Wayback Machine. Retrieved April 8, 2009.
  22. ^ . March 4, 2016. Archived from the original on June 25, 2014. Retrieved June 27, 2014.
  23. ^ "Events That Led To The Creation Of The Atlantic Avenue Tunnel" (PDF). Brooklyn Historic Railway Association. Retrieved October 29, 2009.
  24. ^ Multiple sources:
    • "The Atlantic Avenue Tunnel". Brooklynrail.net. Retrieved October 1, 2014.
    • "Urban Underground Passageways An Historical Overview" (PDF). Brooklynrail.net. Retrieved October 1, 2014.
    • . New York City Subway Transit Scenes. Archived from the original on February 6, 2007. Retrieved October 1, 2014.
    • . Archived from the original on April 18, 2009. Retrieved October 1, 2014.
    • . RapidTransit.net. Archived from the original on October 10, 2014. Retrieved October 1, 2014.
    • Joseph, Yonette (February 15, 2009). "The Tunnel Rats of Atlantic Avenue". The New York Times. Retrieved October 1, 2014.
    • "The New York Moon – Undertone – Music video in the tunnel". nymoon.com. Retrieved October 1, 2014.
  25. ^ adrianne (February 5, 2014). "Tunnel vision: how an obsessed explorer found and lost the world's oldest subway". The Verge.
  26. ^ "Brooklyn Underground Tunnel Tours Are Now Six Feet Under". NBC New York. December 18, 2010.
  27. ^ "Early Transit in New York". NYCSubway.org. Retrieved October 29, 2005.
  28. ^ "Early Transit in Brooklyn". NYCSubway.org. Retrieved October 1, 2014.
  29. ^ (MIT)
  30. ^ "Beach Pneumatic Transit". nycsubway.org.
  31. ^ Brennan, Joseph (2005). . Beach Pneumatic. Archived from the original on October 6, 2007. Retrieved January 17, 2008.
  32. ^ "The remarkable pneumatic people mover" on Damn Interesting
  33. ^ "The Secret Subway" (PBS)
  34. ^ Martin, Douglas (November 17, 1996). "Subway Planners' Lofty Ambitions Are Buried as Dead-End Curiosities". The New York Times. ISSN 0362-4331. Retrieved April 18, 2023.
  35. ^ "Beach Pneumatic Transit – The Interborough Rapid Transit subway" (plrog.org)
  36. ^ Barry, Keith (February 26, 2010). "Feb. 26, 1870: New York City Blows Subway Opportunity". Wired.
  37. ^ nycsubway.org—Beach Pneumatic Transit
  38. ^ Clifton Hood (2004). 722 Miles: The Building of the Subways and How They Transformed New York. Johns Hopkins University Press. ISBN 978-0801880544.
  39. ^ Hood, Clifton (1995). 722 Miles. The Johns Hopkins University Press; First Edition (September 1, 1995). p. 59. ISBN 978-0801852442.
  40. ^ "Lower Manhattan Necrology (continued) – Forgotten New York". forgotten-ny.com. September 3, 1999. Retrieved October 20, 2016.
  41. ^ a b James Blaine Walker, Fifty Years of Rapid Transit, 1864–1917, published 1918, pp. 139–161
  42. ^ a b c d e nycsubway.org — The Dual System of Rapid Transit (1912)
  43. ^ "L.I. Traction Reorganization". Brooklyn Daily Eagle. Brooklyn, NY. January 18, 1896. p. 1.
  44. ^ "Local Stocks and Bonds". Brooklyn Daily Eagle. Brooklyn, NY. February 9, 1896. p. 23.
  45. ^ "Rapid Transit Statement". Brooklyn Daily Eagle. Brooklyn, NY. August 26, 1898. p. 7.
  46. ^ The Third Rail Online – Gunther and His Railroad May 23, 2006, at the Wayback Machine
  47. ^ "Transit in Possession of Brooklyn Elevated". Brooklyn Daily Eagle. Brooklyn, NY. March 25, 1899. p. 1.
  48. ^ "To Run Road Next Week". Brooklyn Daily Eagle. Brooklyn, NY. July 7, 1899. p. 1.
  49. ^ "Early Rapid Transit in Brooklyn, 1878 to 1913", nycsubway.org
  50. ^ a b 1914 Moody's Manual: Brooklyn Rapid Transit Company September 27, 2007, at the Wayback Machine
  51. ^ a b "Local Stocks and Bonds". Brooklyn Daily Eagle. Brooklyn, NY. November 14, 1897. p. 31.
  52. ^ "Of the Nassau-Transit Railroad Consolidation Deal". Brooklyn Daily Eagle. Brooklyn, NY. November 6, 1898. p. 30.
  53. ^ a b "Flynn Enjoins Nassau Lease". Brooklyn Daily Eagle. Brooklyn, NY. April 4, 1899. p. 1.
  54. ^ "Local Stocks and Bonds". Brooklyn Daily Eagle. Brooklyn, NY. March 19, 1899. p. 35.
  55. ^ "Rapid Transit Company Gets Brighton Beach R.R.". Brooklyn Daily Eagle. Brooklyn, NY. March 21, 1899. p. 1.
  56. ^ "Local Stocks and Bonds". Brooklyn Daily Eagle. Brooklyn, NY. April 16, 1899. p. 57.
  57. ^ "L Merger Certificate". Brooklyn Daily Eagle. Brooklyn, NY. May 24, 1900. p. 1.
  58. ^ "Transit Co. Leases P.P. and C.I. Road". Brooklyn Daily Eagle. Brooklyn, NY. June 17, 1899. p. 1.
  59. ^ "Transit Truths". BMT-Lines.com. Retrieved May 14, 2014.
  60. ^ "nycsubway.org: Men Who Really Built the Subway (1904)". www.nycsubway.org. Retrieved February 3, 2023.
  61. ^ "Almanac: Building the New York City subway". www.cbsnews.com. March 24, 2019. Retrieved April 3, 2022.
  62. ^ Walker, James Blaine (January 1, 1918). Fifty Years of Rapid Transit, 1864–1917. Law Print. Company. pp. 162–191.
  63. ^ a b New York Times, Farthest North in Town by the Interborough, January 14, 1907, page 18
  64. ^ https://upload.wikimedia.org/wikipedia/commons/1/15/1906_IRT_map_north.png [bare URL image file]
  65. ^ James Blaine Walker, Fifty Years of Rapid Transit, 1864–1917, published 1918, p. 204
  66. ^ New York Times, Our First Subway Completed at Last, August 2, 1908, page 10
  67. ^ Burroughs and Company, the New York City Subway Souvenir, 1904
  68. ^ "DISCUSS SUBWAY SIGNS IN 18TH ST. STATION; Engineer Parsons and Mr. Hedley Inspect Advertising Scheme. BRONX VIADUCT WORKS WELL Delays There Only Those of Newness -Lenox Avenue Service Makes Fuss Below Ninety-sixth Street" (PDF). Retrieved September 4, 2016.
  69. ^ Kahn, Alan Paul; May, Jack (1973). Tracks of New York Number 3 Manhattan and Bronx Elevated Railroads 1920. New York City: Electric Railroaders' Association. Retrieved November 6, 2016.
  70. ^ "Subway at Fulton Street Busy" (PDF). The New York Times. January 17, 1905. Retrieved October 30, 2016.
  71. ^ Merritt, A. L. (1914). "The Remarkable Story of the Opening and Growth of the World's Greatest and Most Efficient Transportation System Ten Years of the Subway (1914)". nycsubway.org. Interborough Bulletin. Retrieved October 30, 2016.
  72. ^ "SUBWAY TRAINS RUNNING FROM BRONX TO BATTERY; West Farms and South Ferry Stations Open at Midnight. START WITHOUT A HITCH Bowling Green Station Also Opened – Lenox Avenue Locals Take City Hall Loop Hereafter" (PDF). The New York Times. July 10, 1905. Retrieved October 30, 2016.
  73. ^ "SUBWAY TO BROOKLYN OPENED FOR TRAFFIC; First Regular Passenger Train Went Under the East River Early This Morning. NOT A HITCH IN THE SERVICE Gov. Hughes and Brooklyn Officials to Join in a Formal Celebration of Event To-day. SUBWAY TO BROOKLYN OPENED TO TRAFFIC" (PDF). The New York Times. January 19, 1908. Retrieved October 30, 2016.
  74. ^ "BROOKLYN JOYFUL OVER NEW SUBWAY; Celebrates Opening of Extension with Big Parade and a Flow of Oratory. AN ODE TO AUGUST BELMONT Anonymous Poet Calls Him "the Brownie of the Caisson and Spade" – He Talks on Subways". The New York Times. May 2, 1908. p. 1. ISSN 0362-4331. Retrieved October 30, 2016.
  75. ^ "Another Centennial–Original Subway Extended To Fulton Street". New York Division Bulletin. 48 (1). New York Division, Electric Railroaders' Association. January 2005. Retrieved August 31, 2016 – via Issu.
  76. ^ Cudahy, Brian J. (2003). A Century of Subways: Celebrating 100 Years of New York's Underground Railways. New York: Fordham University Press. ISBN 9780823222957.
  77. ^ Wilson, Tracy (March 22, 2007). "How Subways Work". HowStuffWorks.com. Retrieved June 11, 2014.
  78. ^ "MAYOR RUNS A TRAIN OVER NEW BRIDGE" (PDF). The New York Times. September 17, 1908. p. 16. Retrieved October 30, 2016.
  79. ^ Feinman, Mark; Darlington, Peggy; Pirmann, David; Brennan, Joseph (2012). "BMT 4th Avenue Line". www.nycsubway.org. Retrieved October 30, 2016.
  80. ^ a b c d e f g Diehl, Lorraine (2004). The Tracks that Built New York City. New York. ISBN 9781400052271.{{cite book}}: CS1 maint: location missing publisher (link)
  81. ^ a b c d e Derrick, Peter (2001). Tunneling to the Future: The Story of the Great Subway Expansion that Saved New York. NYU Press. ISBN 978-0814719107.
  82. ^ a b c "THE SEVENTH AND LEXINGTON AVENUE SUBWAYS WILL REVIVE DORMANT SECTIONS; Change in Operation That Will Transform Original Four-Tracked Subway Into Two Four-Tracked Systems and Double Present Capacity of the Interborough. Change in Operation. Will Revive Dead Sections. Assessed Valuation. Inadequate Terminal Facilities. West Side Development. Residential Possibilities. Comparative Assessed Values" (PDF). The New York Times. March 10, 1918. Retrieved October 30, 2016.
  83. ^ "THREE NEW LINKS OF THE DUAL SUBWAY SYSTEM OPENED, INCLUDING A SHUTTLE SERVICE FROM TIMES SQUARE TO THIRTY-FOURTH STREET; Service on the Jerome Avenue Branch From 149th Street North to About 225th Street Began Yesterday Afternoon—The Event Celebrated by Bronx Citizens and Property Owners-- The Seventh Avenue Connection Opened This Morning". The New York Times. June 3, 1917. p. 33. ISSN 0362-4331. Retrieved October 30, 2016.
  84. ^ "OPEN SUBWAY SPUR TO 34TH STREET; Pennsylvania Station Now Accessible by Seventh AvenueLine from Times Square. RUN MADE IN TWO MINUTES Rush Work at Finish Leaves Pilesof Debris Still to be Cleared Up" (PDF). The New York Times. June 4, 1917. Retrieved October 30, 2016.
  85. ^ "OPEN NEW SUBWAY TO REGULAR TRAFFIC; First Train on Seventh Avenue Line Carries Mayor and Other Officials. TO SERVE LOWER WEST SIDE Whitney Predicts an Awakening of the District—New Extensions of Elevated Railroad Service. Present Service Tentative. Currents of Travel to Change" (PDF). The New York Times. July 2, 1918. Retrieved October 30, 2016.
  86. ^ "LEXINGTON AV. LINE TO BE OPENED TODAY; Subway Service to East Side of Harlem and the Bronx Expected to Relieve Congestion. BEGINS WITH LOCAL TRAINS Running of Express Trains to Await Opening of Seventh AvenueLine of H System" (PDF). The New York Times. July 17, 1918. p. 13. Retrieved October 30, 2016.
  87. ^ "OPEN NEW SUBWAY LINES TO TRAFFIC; CALLED A TRIUMPH; Great H System Put in Operation Marks an Era in Railroad Construction.NO HITCH IN THE PLANS But Public Gropes Blindly to Find the Way in Maze of New Stations.THOUSANDS GO ASTRAYLeaders in City's Life Hail Accomplishment of Great Task at Meeting at the Astor. Thousands Go Astray. OPEN NEW SUBWAY LINES TO TRAFFIC First Train Made Slow Time. Some Confusion Expected. Stations on the New Lines". The New York Times. August 2, 1918. p. 1. ISSN 0362-4331. Retrieved October 30, 2016.
  88. ^ "OPEN CLARK STREET LINE.; New Route Doubles Subway Service Between the Two Boroughs". The New York Times. April 16, 1919. ISSN 0362-4331. Retrieved October 30, 2016.
  89. ^ "LOWER MANHATTAN LOST IN POPULATION" (PDF). The New York Times. June 13, 1920. Retrieved October 30, 2016.
  90. ^ a b c d e f g h i j k "History of the Independent Subway". nycsubway.org. Retrieved April 23, 2015.
  91. ^ "Gay Midnight Crowd Rides First Trains in New Subway". The New York Times. September 10, 1932. p. 1. Retrieved October 30, 2016.
  92. ^ "Two Subway Links Start Wednesday". The New York Times. April 6, 1936. p. 23. Retrieved October 7, 2011.
  93. ^ "New Subway Link Opened by Mayor". The New York Times. April 9, 1936. p. 23. Retrieved October 7, 2011.
  94. ^ "Topics of The Times; They Meet Again For Sweeter Uses Many Car Dwellers Young Labor Unions". The New York Times. December 7, 1938. ISSN 0362-4331. Retrieved October 10, 2016.
  95. ^ "GAY CROWDS ON LAST RIDE AS SIXTH AVE. ELEVATED ENDS 60-YEAR EXISTENCE; 350 POLICE ON DUTY But the Noisy Revelers Strip Cars in Hunt for Souvenirs SUIT MAY DELAY RAZING Little Threat Seen to Plan, However-Jobless Workers to Press Their Protest Makes Only One Stop Entrances Are Boarded Up FINAL TRAINS RUN ON ELEVATED LINE Police Guard Structure". The New York Times. December 5, 1938. ISSN 0362-4331. Retrieved October 20, 2016.
  96. ^ a b Seyfried, Vincent F. (1995). . Vincent F. Seyfried. Archived from the original on September 23, 2016.
  97. ^ a b Kramer, Frederick A. (January 1, 1990). Building the Independent Subway. Quadrant Press. ISBN 978-0-915276-50-9.
  98. ^ Raskin, Joseph B. (2013). The Routes Not Taken: A Trip Through New York City's Unbuilt Subway System. New York, New York: Fordham University Press. doi:10.5422/fordham/9780823253692.001.0001. ISBN 978-0-82325-369-2.
  99. ^ a b "Independent Subway Services Beginning in 1932". thejoekorner.com. August 21, 2013. Retrieved August 2, 2015.
  100. ^ "TWO SUBWAY UNITS OPEN AT MIDNIGHT; Links in City-Owned System in Queens and Brooklyn to Have 15 Stations" (PDF). The New York Times. August 18, 1933. Retrieved November 7, 2015.
  101. ^ "New Queens Subway Service Will Be Launched Tonight; Tunnel From Manhattan Open to Jackson Heights; Service Will Eventually Be Extended Through To Jamaica". Long Island Daily Press. Old Fulton New York Postcards. August 18, 1933. p. 20. Retrieved July 27, 2016.
  102. ^ "Reproduction Poster of Extension to Union Turnpike – Kew Gardens". Flickr – Photo Sharing!. October 2015. Retrieved April 26, 2016.
  103. ^ a b c Roger P. Roess; Gene Sansone (August 23, 2012). The Wheels That Drove New York: A History of the New York City Transit System. Springer Science & Business Media. ISBN 978-3-642-30484-2.
  104. ^ "PWA Party Views New Subway Link: Queens Section to Be Opened Tomorrow Is Inspected by Tuttle and Others" (PDF). The New York Times. December 30, 1936. Retrieved June 27, 2015.
  105. ^ "Subway Link Opens Soon: City Line to Jamaica Will Start About April 24" (PDF). The New York Times. March 17, 1937. Retrieved June 27, 2015.
  106. ^ "Trial Run to Jamaica on Subway Tomorrow: Section From Kew Gardens to 169th Street Will Open to Public in Two Weeks" (PDF). The New York Times. April 9, 1937. Retrieved June 30, 2015.
  107. ^ Sparberg, Andrew J. (October 1, 2014). From a Nickel to a Token: The Journey from Board of Transportation to MTA. Fordham University Press. ISBN 978-0-8232-6190-1.
  108. ^ "TRANSIT LINK OPEN TODAY; 8th Ave. Line Extended to Jamaica—Celebration Arranged". The New York Times. April 24, 1937. ISSN 0362-4331. Retrieved August 4, 2016.
  109. ^ "Subway Station Opens Aug. 28" (PDF). The New York Times. August 5, 1939. Retrieved October 4, 2015.
  110. ^ "ELY SUBWAY STOP TO OPEN; Queens Station on City-Owned Line Begins Service Tomorrow" (PDF). The New York Times. August 26, 1939. Retrieved October 4, 2015.
  111. ^ "New Lines Shift City Travel". Brooklyn Daily Eagle. July 8, 1937. Retrieved July 9, 2015.
  112. ^ "A New Subway Line for New York City, The Triborough System: Its History (1910)". nycsubway.org. Retrieved March 25, 2014.
  113. ^ "The Dual System of Rapid Transit (1912)". nycsubway.org. Retrieved March 25, 2014.
  114. ^ "Two Subway Routes Adopted by City". The New York Times. August 4, 1923. p. 9.
  115. ^ "Plans Now Ready to Start Subways". The New York Times. March 12, 1924. p. 1.
  116. ^ nycsubway.org—Extensive Rapid Transit Plan Proposed for North Jersey (1926–1927)
  117. ^ Rosenthal, Brian M. (December 29, 2017). "The Most Expensive Mile of Subway Track on Earth". The New York Times. ISSN 0362-4331. Retrieved December 17, 2023.
  118. ^ a b c d e f g h i j . mta.info. Metropolitan Transportation Authority. October 19, 2002. Archived from the original on October 19, 2002. Retrieved September 18, 2016.
  119. ^ English, Jonathan (April 16, 2018). "Why New York City Stopped Building Subways – CityLab". Pocket. Retrieved May 13, 2019.
  120. ^ . MTA.info. October 26, 2011. Archived from the original on August 18, 2014. Retrieved October 28, 2011.
  121. ^ a b "Second Avenue El by Alexander Nobler Cohen -The Third Rail Online – July 2001". thethirdrail.net. Retrieved June 29, 2017.
  122. ^ B.M.T. 'El' Lines to Shift Service; City to Close 2 Sections This Week, The New York Times May 27, 1940, page 19
  123. ^ Broadway Junction Transportation Study (Part 1) (NYC.gov) March 4, 2016, at the Wayback Machine
  124. ^ New York Times, Last Train is Run on Fulton St. 'El', June 1, 1940
  125. ^ nycsubway.org—Subway FAQ: Letter, Number, and Color Designation Systems
  126. ^ a b "NYC Subway". Banksofthesusquehanna.com. Retrieved May 14, 2014.
  127. ^ Observed Customer Seating and Standing Behaviors and Seat Preferences Onboard Subway Cars in New York City August 24, 2014, at the Wayback Machine by Aaron Berkovich, Alex Lu, Brian Levine, and Alla V. Reddy.
  128. ^ (PDF). New York Construction. June 2008. p. 27. Archived from the original (PDF) on July 8, 2011. Retrieved February 28, 2010.
  129. ^ a b "Mayor Bloomberg and Governor Spitzer Announce Start of Construction on #7 Subway Extension" (Press release). New York City Mayor's Office. December 3, 2007. Retrieved February 28, 2010.
  130. ^ . Richard Dattner & Partners Architects. Archived from the original on March 15, 2012. Retrieved February 28, 2010.
  131. ^ a b "Direct Subway Runs to Flushing, Astoria". The New York Times. October 15, 1949. p. 17. Retrieved December 18, 2011.
  132. ^ Cudahy, Brian (2002). How We Got to Coney Island: The Development of Mass Transportation in Brooklyn and Kings County. Fordham University Press
  133. ^ Cunningham, Joseph; DeHart, Leonard O. (1993). A History of the New York City Subway System. J. Schmidt, R. Giglio, and K. Lang.
  134. ^ "New York City Transit Authority: Facts & Figures 1979", New York City Transit Authority, 1979., pg. 17 (PDF) http://www.laguardiawagnerarchive.lagcc.cuny.edu/pages/FileBrowser.aspx?LinkToFile=FILES_DOC/WAGNER_FILES/06.021.0058.060284.11.PDF
  135. ^ a b Crowell, Paul (September 15, 1949). "PLATFORMS ADDED AT 32 IRT STATIONS; City Pays Out $13,327,000 in Lengthening Local Stops to Take 10-Car Trains". The New York Times. ISSN 0362-4331. Retrieved April 4, 2018.
  136. ^ a b "Rail Line is Added to Subway System". The New York Times. May 16, 1941. p. 25. Retrieved October 4, 2011.
  137. ^ Freeman, Ira Henry (June 28, 1956). "Rockaway Trains to Operate Today" (PDF). The New York Times. Retrieved June 29, 2015.
  138. ^ "First Train On Rockaway Line Runs This Afternoon". Wave of Long Island. Old Fulton New York Postcards. June 28, 1956. pp. 1, 6.
  139. ^ "TA's New Line To Rockaways Begins Today: Fifty Piece Band To Play as Special Train Makes First Run". The Leader-Observer. Old Fulton New York Postcards. June 28, 1956. p. 1. Retrieved August 16, 2016.
  140. ^ "To Rockaways: Beach Trains In Operation". Greenpoint Weekly Star. Old Fulton New York Postcards. June 29, 1956. p. 2. Retrieved August 16, 2016.
  141. ^ "New Subway Unit Ready: Far Rockaway IND Terminal Will Be Opened Today" (PDF). The New York Times. January 16, 1958. Retrieved June 29, 2015.
  142. ^ "Fifty Years of Subway Service to the Rockaways". New York Division Bulletin. 49 (6). New York Division, Electric Railroaders' Association. June 2006. Retrieved August 31, 2016 – via Issuu.
  143. ^ "Subway Map" (PDF). Metropolitan Transportation Authority. September 2021. Retrieved September 17, 2021.
  144. ^ Report including analysis of operations of the New York City transit system for five years, ended June 30, 1945. New York City: Board of Transportation of the City of New York. 1945. hdl:2027/mdp.39015020928621.
  145. ^ a b Report for the three and one-half years ending June 30, 1949. New York City Board of Transportation. 1949. hdl:2027/mdp.39015023094926.
  146. ^ a b "New Subway Link Opening in Queens" (PDF). The New York Times. December 12, 1950. Retrieved June 30, 2015.
  147. ^ "Subway Extension In Queens Is Voted" (PDF). The New York Times. August 2, 1946. Retrieved June 30, 2015.
  148. ^ "Board of Transportation – 1951". Thejoekorner.com. Retrieved March 25, 2014.
  149. ^ a b c d Caro, Robert (1974). The Power Broker: Robert Moses and the Fall of New York. New York: Knopf. ISBN 978-0-394-48076-3. OCLC 834874.
  150. ^ a b c d e f g h Feinman, Mark. "The New York Transit Authority in the 1970s". nycsubway.org. Retrieved April 23, 2015.
  151. ^ a b c d e f g h i j k l m n o p q r s t Feinman, Mark. "The New York Transit Authority in the 1980s". nycsubway.org. Retrieved April 23, 2015.
  152. ^ "Seatless I.R.T. Shuttle Trains Proposed by Transit Board Head; SHUTTLE MAY RUN SEATLESS TRAINS" (PDF). The New York Times. Retrieved October 10, 2016.
  153. ^ Annual Report For The Year Ended June 30, 1957, New York City Transit Authority, October 1957, p. 9
  154. ^ "New Hi-Speed Locals 1959 New York City Transit Authority". Flickr – Photo Sharing!. June 15, 2016. Retrieved June 15, 2016.
  155. ^ * "IRT Will Open Express Station at Lexington and 59th Thursday", New York Times; November 9, 1962; page 37
    • "IRT Express Stop Opens at 59th St.", New York Times; November 16, 1962; page 22
  156. ^ "New 59th Street Express Station brochure". www.thejoekorner.com. New York City Transit Authority. November 15, 1962. Retrieved January 25, 2016.
  157. ^ Martin, Douglas (November 17, 1996). "Subway Planners' Lofty Ambitions Are Buried as Dead-End Curiosities". The New York Times. Retrieved June 27, 2015.
  158. ^ "1968 NYCTA Expansion Plans (Picture)". Second Avenue Sagas.
  159. ^ a b David Grazian, "Mix It Up", W W Norton & Co Inc, 2010, ISBN 0-393-92952-3, p.14
  160. ^ a b c d e f About New York City Graffiti, part 1
  161. ^ a b c "A History of Graffiti in Its Own Words". New York.
  162. ^ a b Kelling, George L. (2009). "How New York Became Safe: The Full Story". City Journal. Retrieved November 24, 2009.
  163. ^ Glazer, Nathan (1979), (PDF), National Affairs, no. 54, pp. 3–12, archived from the original (PDF) on October 17, 2015, retrieved November 24, 2009
  164. ^ a b Hays, Constance L. (May 10, 1989). "Transit Agency Says New York Subways Are Free of Graffiti". The New York Times. ISSN 0362-4331. Retrieved May 18, 2020.
  165. ^ a b . www.mta.info. Metropolitan Transportation Authority. May 12, 2014. Archived from the original on June 29, 2019. Retrieved October 30, 2016.
  166. ^ About New York City Graffiti, part 2
  167. ^ a b Burks, Edward C. (August 14, 1976). "215 More Daily Subway Runs Will Be Eliminated by Aug. 30". The New York Times. ISSN 0362-4331. Retrieved December 25, 2016 – via New York Times Archive.
  168. ^ Burks, Edward C. (May 28, 1975). "4 Per Cent Cut in IRT Subway Service Scheduled for September". The New York Times. ISSN 0362-4331. Retrieved December 25, 2016 – via New York Times Archive.
  169. ^ Burks, Edward C. (May 26, 1975). "The A Train, a Loser, May Cut Express Runs". The New York Times. ISSN 0362-4331. Retrieved December 25, 2016 – via New York Times Archive.
  170. ^ a b Burks, Edward C. (December 18, 1975). "Subways to Trim Service In Rush Hours on Jan. 18". The New York Times. ISSN 0362-4331. Retrieved December 25, 2016 – via New York Times Archive.
  171. ^ Saxon, Wolfgang (December 15, 1976). "$30 Million Cuts Proposed to Meet New York Transit Agency Shortage; Plan Emphasizes Curbs on Off-Hour Service Control Board Asked $42 Million Trim $30 MILLION IN CUTS IN TRANSIT PROPOSED". The New York Times. ISSN 0362-4331. Retrieved December 25, 2016 – via New York Times Archive.
  172. ^ Brooke, James (April 29, 1986). "Subway Aides to Weigh Cuts on 11 Routes". The New York Times. Retrieved January 25, 2024.
  173. ^ a b c d Gordy, Margaret (April 29, 1986). "MTA Studies Citywide Cuts in Subway Lines, Stations". Newsday. pp. 3, 27. Retrieved January 25, 2024.
  174. ^ a b Finder, Alan; Connelly, Mary (May 4, 1986). "The Region; On Shrinking The Subways". The New York Times. Retrieved January 25, 2024.
  175. ^ a b c Thomas R. Brooks (June 15, 1970). "Subway Roulette: The Game Is Getting Dangerous". New York. Retrieved July 23, 2015.
  176. ^ a b c Seamen, Mark; de Cerreño, Allison L. C.; English-Young, Seth. "From Rescue to Renaissance: The Achievements of the MTA Capital Program 1982 – 2004" (PDF). wagner.nyu.edu. NYU Rudin Center for transportation policy and management. Retrieved October 25, 2015.
  177. ^ Goldman, Ari L. (December 30, 1981). "Calls for Subway Service Cuts Rise as System Continues to Limp Along". The New York Times. ISSN 0362-4331. Retrieved February 12, 2018.
  178. ^ Cummings, Judith (July 16, 1981). "6-Hour Nightly Shutdown of Subways Is Proposed". The New York Times. ISSN 0362-4331. Retrieved February 12, 2018.
  179. ^ "Subway Service Shuffled to Cope In Repair 'Crisis'; Off-Peak Runs Will Be Cut for a Rush-Hour Reserve 'This Program Will Be Painful' Trouble-Shooters Added Subway Service Shuffled to Cope in a Repair 'Crisis'" (PDF). The New York Times. November 5, 1980. Retrieved February 12, 2018.
  180. ^ Edmonds, Richard (January 28, 1982). "City cites a rail improvement". New York Daily News. p. 23. Retrieved May 12, 2020 – via newspapers.com  .
  181. ^ Edmonds, Richard (January 25, 1981). "Source for all the bullets: Can We Save Our Subways". New York Daily News. pp. 7, 62 – via newspapers.com  .
  182. ^ Rosen, Richard (October 26, 1980). "Riding for a fall?". New York Daily News. p. 8. Retrieved May 12, 2020 – via newspapers.com  .
  183. ^ Brooke, James (April 29, 1986). "Subway Aides to Weigh Cuts on 11 Routes". The New York Times. ISSN 0362-4331. Retrieved February 17, 2018.
  184. ^ Chaiken, Jan M.; Lawless, M.; Stevenson, K.A. (1974). "The Impact of Police Activity on Crime". RAND Corporation.
  185. ^ Treaster, Joseph B. (July 31, 1974). "Rear Subway Cars To Be Shut at Night To Reduce Crimes". The New York Times.
history, york, city, subway, been, suggested, that, this, article, should, split, into, articles, titled, 1904, 1940, 1940, present, incidents, accidents, york, city, subway, discuss, march, 2024, york, city, subway, rapid, transit, system, that, serves, four,. It has been suggested that this article should be split into articles titled History of the New York City Subway 1904 1940 History of the New York City Subway 1940 present and Incidents and accidents on the New York City Subway discuss March 2024 The New York City Subway is a rapid transit system that serves four of the five boroughs of New York City New York the Bronx Brooklyn Manhattan and Queens Its operator is the New York City Transit Authority NYCTA which is controlled by the Metropolitan Transportation Authority MTA of New York In 2016 an average of 5 66 million passengers used the system daily making it the busiest rapid transit system in the United States and the seventh busiest in the world 8 9 New York City Subway R1 car at the 23rd Street station on a holiday train special in December 2007Annual passenger ridershipYear Passengers 1901 253 000 000 1905 448 000 000 77 1 1910 725 000 000 61 8 1915 830 000 000 14 5 1920 1 332 000 000 60 5 1925 1 681 000 000 26 2 1930 2 049 000 000 21 9 1935 1 817 000 000 11 3 1940 1 857 000 000 2 2 1945 1 941 000 000 4 5 1946 2 067 000 000 6 5 1950 1 681 000 000 13 4 1955 1 378 000 000 18 0 1960 1 345 000 000 2 4 1965 1 363 000 000 1 3 1970 1 258 000 000 7 7 1975 1 054 000 000 16 2 1980 1 009 000 000 4 3 1982 989 000 000 2 0 1985 1 010 000 000 2 1 1990 1 028 000 000 1 8 1995 1 093 000 000 6 3 2000 1 400 000 000 28 1 2005 1 450 000 000 3 6 2010 1 605 000 000 10 7 2011 1 640 000 000 2 2 2012 1 654 000 000 0 1 2013 1 708 000 000 3 3 2014 1 751 287 621 2 6 2015 1 762 565 419 0 6 2016 1 756 814 800 0 3 2017 1 727 366 607 1 7 2018 1 680 060 402 2 7 2019 1 697 787 002 1 1 2020 639 541 029 62 3 2021 759 976 721 18 8 2022 1 013 425 465 33 3 1 2 3 4 5 6 7 The first underground line opened on October 27 1904 10 almost 35 years after the opening of the first elevated line in New York City which became the IRT Ninth Avenue Line 11 By the time the first subway opened the lines had been consolidated into two privately owned systems the Brooklyn Rapid Transit Company BRT later Brooklyn Manhattan Transit Corporation BMT and the Interborough Rapid Transit Company IRT After 1913 all lines built for the IRT and most lines for the BRT were built by the city and leased to the companies The first line of the city owned and operated Independent Subway System IND opened in 1932 intended to compete with the private systems and replace some of the elevated railways It was required to be run at cost necessitating fares up to double the five cent fare popular at the time 12 In 1940 the city took over running the previously privately operated systems Some elevated lines closed immediately while others closed soon after Integration was slow but several connections were built between the IND and BMT which now operate as one division called the B Division Since IRT infrastructure is too small for B Division cars it remains its own A Division The NYCTA a public authority presided over by New York City was created in 1953 to take over subway bus and streetcar operations from the city 13 In 1968 the state level MTA took control of the NYCTA and in 1970 the city entered the New York City fiscal crisis It closed many elevated subway lines that became too expensive to maintain Graffiti crime and decrepitude became common To stay solvent the New York City Subway had to make many service cutbacks and defer necessary maintenance projects In the 1980s an 18 billion financing program for the rehabilitation of the subway began The September 11 attacks resulted in service disruptions particularly on the IRT Broadway Seventh Avenue Line which ran directly underneath the World Trade Center Sections were crushed requiring suspension of service on that line south of Chambers Street By March 2002 seven of the closed stations had been rebuilt and reopened and all but one on September 15 2002 with full service along the line 14 15 Since the 2000s expansions include the 7 Subway Extension that opened in September 2015 16 17 and the Second Avenue Subway the first phase of which opened on January 1 2017 18 19 However at the same time under investment in the subway system led to a transit crisis that peaked in 2017 Contents 1 Precursors 1 1 Steam railways 1 2 Beach Pneumatic Transit 2 Beginnings and rapid expansion 2 1 The first subways 2 1 1 IRT 2 1 2 BRT 2 2 Contracts 2 2 1 Original IRT contracts 2 2 2 Electrification 2 2 3 Triborough plan 2 2 4 Dual Contracts 2 3 Independent System 2 3 1 Lines 2 4 Expansion plans 3 Unification 3 1 Division differences 3 2 Post unification expansion and reorganization 4 Decline 4 1 Late 1950s and early 1960s 4 2 Program for Action 4 3 Deferred maintenance 4 3 1 Graffiti 4 3 2 Ridership and service cuts 4 3 3 Infrastructure 4 3 4 Crime 4 3 5 Effects of the Program for Action 4 3 6 Debris falling from and on the tracks 4 3 7 Fare evasion 4 4 Rehabilitation and rising trend 4 5 Projects during this time 5 Revitalization and recent history 5 1 1990s 5 2 September 11 2001 5 3 Later 2000s 5 3 1 Ridership increases 5 3 2 Expansions 5 3 3 Budget cuts 5 4 2010s and 2020s 5 4 1 Hurricane Sandy damage 5 4 2 Expansions open 5 4 3 2017 state of emergency 5 4 4 Planning of new lines 5 4 5 COVID 19 pandemic and crime concerns 5 4 6 Further upgrades and improvements 6 Incidents and accidents 6 1 Train accidents 6 2 Other disasters 7 See also 8 References 9 Further reading 10 External links 10 1 ArticlesPrecursors editSteam railways edit nbsp Charles Harvey demonstrating his elevated railroad design on Greenwich Street in 1867Even though there was an earlier underground railroad called the Atlantic Avenue Tunnel since 1844 it had no underground subway stops 20 21 22 Construction of this tunnel which was built mainly to create a grade separated right of way for the Brooklyn and Jamaica Railroad now the Long Island Rail Road s Atlantic Branch began in May 1844 and the tunnel was open by December 1844 This led to South Ferry at the foot of Atlantic Avenue where passengers could catch ferries to Manhattan 23 This extension running under Cobble Hill was closed by 1861 The tunnel was reopened for tourism in 1982 24 and closed again in 2010 25 26 The beginnings of the actual Subway came from various excursion railroads to Coney Island and elevated railroads in Manhattan and Brooklyn At that time New York County Manhattan Island and part of the Bronx Kings County including the cities of Brooklyn and Williamsburg and Queens County were separate municipal entities Competing steam powered elevated railroads were built over major avenues The first elevated line was constructed from 1867 to 1870 by Charles Harvey and his West Side and Yonkers Patent Railway company along Greenwich Street and Ninth Avenue although cable cars were the initial mode of transportation on that railway More lines were built on Second Third and Sixth Avenues None of these structures remain today but these lines later shared trackage with subway trains as part of the IRT system 27 In Kings County elevated railroads were built by several companies over Lexington Myrtle Third and Fifth Avenues Fulton Street and Broadway These also later shared trackage with subway trains operated by the BRT and BMT Most of these structures have been dismantled but some have been rebuilt and upgraded These lines were linked to Manhattan by various ferries and later the tracks along the Brooklyn Bridge which originally had their own line and were later integrated into the BRT BMT Also in Kings County six steam excursion railroads were built to various beaches in the southern part of the county all but one the Manhattan Beach Line eventually fell under BMT control 28 Beach Pneumatic Transit edit nbsp Beach Pneumatic TransitThe Beach Pneumatic Transit was the first attempt to build an underground public transit system in New York City In 1869 Alfred Ely Beach and his Beach Pneumatic Transit Company of New York began constructing a pneumatic subway line beneath Broadway Funneled through a company he set up Beach put up 350 000 of his own money to bankroll the project 29 Built in only 58 days 30 its single tunnel 312 feet 95 m long 8 feet 2 4 m in diameter was completed in 1870 and ran under Broadway from Warren Street to Murray Street 31 It remained little more than a curiosity running only a single car on its one block long track to a dead end at its terminus Passengers would simply ride out and back to see what the proposed subway might be like During its first two weeks of operation the Beach Pneumatic Transit sold over 11 000 rides with 400 000 rides provided during its first year of operation 32 33 Although the public showed initial approval Beach was delayed in getting permission to expand it By the time he finally gained permission in 1873 public and financial support had waned and the subway was closed down 34 The final blow to the project was a stock market crash in 1873 which caused investors to withdraw support 35 After the project was shut down the tunnel entrance was sealed and the station built in part of the basement of the Rogers Peet Building was reclaimed for other uses The entire building was lost to fire in 1898 36 In 1912 workers excavating for the present day BMT Broadway Line dug into the old Beach tunnel today no part of this line remains as the tunnel was completely within the limits of the present day City Hall Station under Broadway 37 Beginnings and rapid expansion editThe first subways edit IRT edit nbsp Political cartoon critical of IRT service in 1905 The IRT is labeled as the Interborough Rattled Transit Main article Early history of the IRT subway In 1898 New York Kings and Richmond Counties and parts of Queens and Westchester Counties and their constituent cities towns villages and hamlets were consolidated into the City of Greater New York During this era the expanded City of New York resolved that it wanted the core of future rapid transit to be underground subways but realized that no private company was willing to put up the enormous capital required to build beneath the streets 38 39 Planning for the system began with the Rapid Transit Act authorized by the New York State Legislature on May 22 1894 which created the Board of Rapid Transit Railroad Commissioners The act provided that the commission would lay out routes with the consent of property owners and local authorities either build the system or sell a franchise for its construction and lease the operation to a private firm A line through Lafayette Street then Elm Street 40 to Union Square was considered but at first a more costly route under lower Broadway was adopted A legal battle with property owners along the route led to the courts denying permission to build through Broadway in 1896 41 The Elm Street route was chosen later that year cutting west to Broadway via 42nd Street This new plan formally adopted on January 14 1897 consisted of a line from City Hall north to Kingsbridge and a branch under Lenox Avenue and to Bronx Park to have four tracks from City Hall to the junction at 103rd Street The awkward alignment along Forty Second Street as the commission put it was necessitated by objections to using Broadway south of 34th Street Legal challenges were resolved in 1899 41 nbsp Subway construction in the Bowery 1901 nbsp Tubes for subway line under Harlem River being sunk 1904The city decided to issue rapid transit bonds outside of its regular bonded debt limit and build the subways itself it contracted with the Interborough Rapid Transit Company which by that time ran the elevated lines in Manhattan to equip and operate the subways sharing the profits with the city and guaranteeing a fixed five cent fare 42 BRT edit Main article Rapid transit operations of the BRT and BMT Starting in 1899 the Brooklyn Rapid Transit Company BRT 1896 1923 and Brooklyn Manhattan Transit Corporation BMT 1923 1940 operated rapid transit lines in New York City at first only elevated railways and later also subways The BRT was incorporated on January 18 1896 43 It took over the bankrupt Long Island Traction Company in early February 44 acquiring the Brooklyn Heights Railroad and the lessee of the Brooklyn City Rail Road It then acquired the Brooklyn Queens County and Suburban Railroad 45 The BRT took over the property of a number of surface railroads the earliest of which the Brooklyn Bath and Coney Island Railroad or West End Line opened for passenger service on October 9 1863 between Fifth Avenue at 36th Street at the border of Brooklyn City and Bath Beach in the Town of Gravesend New York A short piece of surface route of this railroad the BMT West End Line today s D train on the west side of the Coney Island Complex north of the Coney Island Creek is the oldest existing piece of rapid transit right of way in New York City and in the U S having opened on June 8 1864 46 On January 30 1899 the Brooklyn Union Elevated Railroad was incorporated it acquired the property of the bankrupt Brooklyn Elevated Railroad on February 17 The BRT gained control a month later on March 25 47 and leased the elevated company to the Brooklyn Heights Railroad which was until then solely a street railway company The other elevated company in Brooklyn the Kings County Elevated Railway was sold under foreclosure to the BRT on July 6 1899 48 Initially the surface and elevated railroad lines ran on steam power but between 1893 and 1900 the lines were converted to run on electricity An exception was the service on the Brooklyn Bridge Trains were operated by cables from 1883 to 1896 when they were converted to electric power 49 nbsp Routes in 1897By 1900 The BRT had acquired virtually all of the rapid transit and streetcar operations in its target area Only the Coney Island and Brooklyn Railroad and the short Van Brunt Street and Erie Basin Railroad remained independent the former was acquired in 1913 or 1914 50 The incorporated lines were Sea Beach Railway acquired in November 1897 51 and leased to the BHRR Sea View Railroad Coney Island Elevated acquired in November 1897 51 and leased to the BHRR Nassau Electric Railroad lessee of the Atlantic Avenue Railroad Brooklyn Bath and West End Railroad Coney Island and Gravesend Railway and South Brooklyn Railway acquired in November 1898 52 and leased to the BHRR in April 1899 53 Brooklyn Elevated Railroad acquired in March 1899 54 and leased to the BHRR in April 1899 53 Brooklyn and Brighton Beach Railroad Brighton Beach Line acquired in March 1899 55 Kings County Elevated Railroad Fulton Street Line acquired in November 1899 50 56 and merged into the Brooklyn Union Elevated on May 24 1900 57 Prospect Park and Coney Island Railroad Culver Line leased to the BHRR on June 18 1899 58 The BRT became bankrupt by 1918 The New York Consolidated Railroad and New York Municipal Railway were merged in June 1923 the same month that the BRT was reorganized as the Brooklyn Manhattan Transit Corporation to form the New York Rapid Transit Corporation 59 Contracts edit Original IRT contracts edit nbsp 1906 IRT mapA contract later known as Contract 1 was executed on February 21 1900 between the commission and the Rapid Transit Construction Company organized by John B McDonald and funded by August Belmont for the construction of the subway and a 50 year operating lease from the opening of the line The project was divided into fifteen sections on which subcontractors submitted construction bids 60 Ground was broken in a ceremony at City Hall on March 24 celebrated at the time as Tunnel Day 61 A plan for an extension from City Hall to the Long Island Rail Road s Flatbush Avenue terminal station now known as Atlantic Terminal in Brooklyn was adopted on January 24 1901 and Contract 2 giving a lease of 35 years was executed between the commission and the Rapid Transit Construction Company on September 11 with construction beginning at State Street in Manhattan on November 8 1902 Belmont incorporated the IRT in April 1902 as the operating company for both contracts the IRT leased the Manhattan Railway Company operator of the four elevated railway lines in Manhattan and the Bronx on April 1 1903 Operation of the subway began on October 27 1904 with the opening of all stations from City Hall to 145th Street on the West Side Branch 10 62 Service was extended to 157th Street on November 12 1904 The West Side Branch was extended northward to a temporary terminus of 221st Street and Broadway on March 12 1906 63 This extension was served by shuttle trains operating between 157th Street and 221st Street 64 The original system as included in Contract 1 was completed on January 14 1907 when trains started running across the Harlem Ship Canal on the Broadway Bridge to 225th Street 63 meaning that 221st Street could be closed Once the line was extended to 225th Street the structure of the 221st Street was dismantled and was moved to 230th Street for a new temporary terminus Service was extended to the temporary terminus at 230th Street on January 27 1907 An extension of Contract 1 north to 242nd Street at Van Cortlandt Park was approved in 1906 65 and opened on August 1 1908 66 The original plan had been to turn east on 230th Street to just west of Bailey Avenue at the New York Central Railroad s Kings Bridge station 67 When the line was extended to 242nd Street the temporary platforms at 230th Street were dismantled and were rumored to be brought to 242 Street to serve as the station s side platforms There were two stations on the line that opened later 191st Street and 207th Street 191st Street was not open until January 14 1911 because the elevators and other work had not yet been completed 207th Street was completed in 1906 but since it was located in a sparsely occupied area the station was opened in 1907 The initial segment of the IRT White Plains Road Line opened on November 26 1904 between East 180th Street and Jackson Avenue Initially trains on the line were served by elevated trains from the IRT Second Avenue Line and the IRT Third Avenue Line with a connection running from the Third Avenue local tracks at Third Avenue and 149th Street to Westchester Avenue and Eagle Avenue Once the connection to the IRT Lenox Avenue Line opened on July 10 1905 trains from the newly opened IRT subway ran via the line 68 Elevated service via this connection was resumed on October 1 1907 when Second Avenue locals were extended to Freeman Street during rush hours 69 The line was then extended to Fulton Street on January 16 1905 70 to Wall Street on June 12 1905 71 and to Bowling Green and South Ferry on July 10 1905 72 In order to complete Contract 2 the subway had to be extended under the East River to reach Brooklyn The tunnel was named the Joralemon Street Tunnel which was the first underwater subway tunnel connecting Manhattan and Brooklyn and it opened on January 9 1908 extending the subway from Bowling Green to Borough Hall 73 On May 1 1908 the construction of Contract 2 was completed when the line was extended from Borough Hall to Atlantic Avenue near the Flatbush Avenue LIRR station 74 When the IRT extension to Brooklyn opened riders on the BRT s elevated and trolley lines over the Brooklyn Bridge began using the new subway 75 Electrification edit nbsp The IRT main powerhouse in 1904Further information Railway electrification system The subway system began during the war of the currents when Thomas Edison and his opponent George Westinghouse struggled over acceptance of direct current or alternating current as the standard way to deliver electricity Alternating current became the standard for non railroad purposes but New York City Subway adopted direct current as more suitable for urban railroad purposes 76 21 The companies built their own power stations to generate their DC To this day the New York City Transit Authority converts alternating current to 600 V DC third rail to power the trains as do most transit railways around the world The A Division uses 625 V DC third rail 77 Triborough plan edit nbsp An 1918 IRT map after Contracts 1 and 2 were signed nbsp An 1924 BMT mapAfter the statutory debt ceiling for the now united city of New York had been raised there were more plans for subway construction until 1908 The Triborough plan comprised three new lines An IRT line from South Ferry Whitehall Street in Manhattan with the IRT Lexington Avenue Line to Pelham Bay Park and Woodlawn in the Bronx The BRT Nassau Street Loop later the BMT Nassau Street Line The BRT s track went over the Brooklyn Manhattan and Williamsburg Bridges the Nassau Street Line was to connect to the Brooklyn Bridge but never did The connections to the other two bridges were built but with the 1967 opening of the Chrystie Street Connection the Manhattan Bridge connection was eliminated A BRT subway under Fourth Avenue in Brooklyn leading to Bay Ridge and Coney Island This corresponded to today s Fourth Avenue and Sea Beach lines The BRT lines were built to wider profiles because the BRT did not want to use IRT trackage which was narrower by comparison and carried far fewer passengers per hour The design was inspired by the cars built for the Cambridge subway MBTA Red Line which were designed after studies were conducted on the design and operation of a subway car that could carry the most passengers the most efficiently The rolling stock however had to be the same track gauge so the trains could interoperate under the Dual Contracts The Fourth Avenue and Sea Beach lines were opened on June 19 1915 after years of delays for building of these lines and the Nassau Street Line The first BRT section however had opened on September 16 1908 from Essex Street across the Williamsburg Bridge but using narrow width cars 78 Until the completion of the Fourth Avenue Line there was a tram across the Manhattan Bridge which did not connect to any tracks in the New York City Subway The track was called Manhattan Bridge Three Cent Line because the fare was three cents Along with the Brooklyn and North River Railroad the two streetcar companies began operations on those tracks When trackage was connected to the bridge in 1915 the trolleys were moved to the upper level roadways until 1929 when service was discontinued 79 Dual Contracts edit Main article Dual Contracts The BRT which just barely entered Manhattan via the Brooklyn Bridge wanted the opportunity to compete with the IRT and the IRT wanted to extend its Brooklyn line to compete with the BRT This led to the city s agreement to contract for future subways with both the BRT and IRT The expansion of rapid transit was greatly facilitated by the signing of the Dual Contracts on March 19 1913 Contract 3 was signed between the IRT and the city the contract between the BRT and the city was Contract 4 The majority of the present day subway system was either built or improved under these contracts 42 The Astoria Line and Flushing Line were built at this time and were for some time operated by both companies Under the terms of Contracts 3 and 4 the city would build new subway and elevated lines rehabilitate and expand certain existing elevated lines and lease them to the private companies for operation The cost would be borne more or less equally by the city and the companies The city s contribution was in cash raised by bond offerings while the companies contributions were variously by supplying cash facilities and equipment to run the lines 42 nbsp The track layout of Queensboro Plaza was complex because the Contracts necessitated two different types of rolling stock and two different fare control areas As part of the contracts the two companies were to share lines in Queens a short line to Astoria called the Astoria Line and a longer line reaching initially to Corona and eventually to Flushing called the Corona Line The lines operated jointly and began from Queensboro Plaza The IRT accessed the station both from the 1907 Steinway Tunnel and an extension of the Second Avenue Elevated from Manhattan over the Queensboro Bridge The BRT fed the Queens lines from a new tunnel from the 60th Street Tunnel to Manhattan Technically the line was under IRT ownership but the BRT BMT was granted trackage rights in perpetuity essentially making it theirs also 80 81 Both lines were built to IRT specifications This meant that IRT passengers had a one seat ride to Manhattan destinations whereas BRT passengers had to make a change at Queensborough Plaza This came to be important when service was extended for the 1939 World s Fair as the IRT was able to offer direct express trains from Manhattan and the BRT was not This practice lasted well into the municipal ownership of the lines and was not ended until 1949 80 81 Several provisions were imposed on the companies the fare was limited to five cents and this led to financial troubles for the two companies after post World War I inflation the city had the right to recapture any of the lines it built and run them as its own and the city was to share in the profits This eventually led to their downfall and consolidation into city ownership in 1940 80 81 As part of the Dual Contracts the operations of the original IRT system changed drastically Instead of having trains go via Broadway turn onto 42nd Street and finally turn onto Park Avenue there were two trunk lines connected by the 42nd Street Shuttle The system was changed from a Z system to an H system The first trunk line the Lexington Avenue Line assumed the portion of the original IRT system south of Grand Central The line was extended northward with a new station at Grand Central and turned onto Lexington Avenue where the line remained as four tracks The line had connections to the new IRT Pelham Line and IRT Jerome Avenue Line in the Bronx in addition to a new connection to the IRT White Plains Road Line 82 The second trunk the Broadway Seventh Avenue Line assumed the portion of the original IRT system north of Times Square and it extended southward with a new station at Times Square running down Seventh Avenue Varick Street and West Broadway It was predicted that the subway extension would lead to the growth of the Lower West Side and to neighborhoods such as Chelsea and Greenwich Village South of Chambers Street two branches were constructed The first branch ran to the Battery via Greenwich Street while the second branch turned eastward under Park Place and Beeckman Street and down William Street running under the East River through a tunnel before running under Clark Street and Fulton Street until it reached a junction at Borough Hall with the existing Contract 2 IRT Brooklyn Line 82 nbsp A poster informing the public about the new Interborough Subway Service between Brooklyn and Manhattan via the Clark Street Tunnel 1919On June 3 1917 the first portion of the Broadway Seventh Avenue Line south of Times Square 42nd Street a shuttle to 34th Street Penn Station opened a separate shuttle service running between 42nd and 34th Streets was created 83 This short extension was opened even though the rest of the route was not yet completed in order to handle the mass of traffic to and from Pennsylvania Station Only the northern part of the station was opened at this time and piles of plaster rails and debris could be seen on the rest of the platforms 84 This shuttle was extended south to South Ferry with a shorter shuttle on the Brooklyn branch between Chambers Street and Wall Street on July 1 1918 85 The new portion of the Lexington Avenue Line from Grand Central to 125th Street opened on July 17 1918 86 Until the evening of August 1 1918 it ran as a shuttle on the local tracks only terminating at 42nd Street and at 167th Street on the IRT Jerome Avenue Line where the connection from the elevated IRT Ninth Avenue Line merged The new H system was implemented on August 1 1918 joining the two halves of the Broadway Seventh Avenue Line and the two halves of the Lexington Avenue Line 87 An immediate result of the switch was the need to transfer using the 42nd Street Shuttle The completion of the H system doubled the capacity of the IRT system 82 The local tracks ran to South Ferry while the express tracks used the Brooklyn Branch to Wall Street extended into Brooklyn to Atlantic Avenue via the Clark Street Tunnel on April 15 1919 88 The Dual Contracts resulted in the expansion of New York City people moved to the newly built homes along the newly built subway lines These homes were affordable about the same cost as the houses in Brooklyn and Manhattan 81 7 The Dual Contracts were the key to dispersion of the city s congested areas They helped alleviate densely populated areas and probably helped save lives as people were no longer living in heavily diseased areas citation needed The population in Manhattan below 59th Street decreased between the years of 1910 and 1920 89 People were allowed to move to better parts at the same cost and could have a better and more comfortable life in the suburbs 81 7 Independent System edit Main article Independent Subway System Mayor John F Hylan was a strong advocate of public operation of the subway He was fired from the BRT after working as a motorman for some time and he wanted to avoid having to spend more money to recapture the IRT and BRT so he tried to push the two operators out of business To that end Hylan had denied allocating money for the BRT by refusing to build new lines refusing to raise fares thereby putting the BRT in more debt denied building permits so that some major building work lasted longer than planned and even refused to build a new subway yard for the BRT The Malbone Street Wreck in 1918 contributed to the losses incurred by the two companies which led to the bankruptcy of the BRT in 1918 The BRT however was reorganized into the BMT The IRT was almost bankrupt but managed to complete the line to Flushing by 1928 Subsequently Hylan drew up plans for a third subway network that would be city built and operated in contrast to the existing subway lines which were privately operated 80 On the other hand New York City had grown to over five and a half million inhabitants and urgently needed new subway lines The dual system could not keep pace with this ever increasing ridership So a compromise solution was finally found that would allow Hylan s plans as well as the interests of private operators to be considered However the city s and Hylan s long term goal was the unification and consolidation of the existing subway with the city operating a unified subway system The city bolstered by political claims that the private companies were reaping profits at taxpayer expense determined that it would build equip and operate a new system itself with private investment and without sharing the profits with private entities This led to the building of the Independent City Owned Subway ICOS sometimes called the Independent Subway System ISS the Independent City Owned Rapid Transit Railroad or simply The Eighth Avenue Subway after the location of its premier Manhattan mainline After the city acquired the BMT and IRT in 1940 the Independent lines were dubbed the IND to follow the three letter initialisms of the other systems 90 The original IND system consisting of the Eighth Avenue mainline and the Sixth Avenue Concourse Culver and Queens Boulevard branch lines was entirely underground in the four boroughs that it served with the exception of the Smith Ninth Streets and Fourth Avenue stations on the Culver Viaduct over the Gowanus Canal in Gowanus Brooklyn 90 Lines edit As the first line neared completion New York City offered it for private operation as a formality knowing that no operator would meet its terms Thus the city declared that it would operate it itself formalizing a foregone conclusion The first line opened without a formal ceremony The trains began operating their regular schedules ahead of time and all stations of the Eighth Avenue Line from 207th Street in Inwood to Hudson Terminal now World Trade Center opened simultaneously at one minute after midnight on September 10 1932 91 On January 1 1936 a second trunk line the Sixth Avenue Line opened from West Fourth Street where it splits from the Eighth Avenue Line to East Broadway 92 93 94 The new subway line s construction required the suspension of streetcars on the avenue The city wanting to save money by not having to underpin the IRT Sixth Avenue Line before the elevated line was closed bought the line for 12 5 million and terminated operations on December 5 1938 95 To help compensate for the loss in service service on the Ninth Avenue Elevated was increased 96 The first section of the Queens Boulevard Line west from Roosevelt Avenue to 50th Street opened on August 19 1933 97 E trains ran local to Hudson Terminal today s World Trade Center in Manhattan while the GG predecessor to current G service ran as a shuttle service between Queens Plaza and Nassau Avenue on the IND Crosstown Line 98 99 100 101 102 An extension east to Union Turnpike opened on December 31 1936 103 104 416 417 105 97 The line was extended to Hillside Avenue and 178th Street with a terminal station at 169th Street on April 24 1937 98 104 106 107 That day express service began on the Queens Boulevard Line during rush hours with E trains running express west of 71st Continental Avenues and GG trains taking over the local during rush hours 100 108 The initial headway for express service was between three and five minutes 109 23rd Street Ely Avenue station opened as an in fill station on August 28 1939 110 111 Upon its extension into Jamaica the line drew Manhattan bound passengers away from the nearby BMT Jamaica Line subway and the Long Island Rail Road 112 On July 1 1937 a third trunk line the Crosstown Line opened from Nassau Avenue to Bergen Street 90 Two years later on December 15 1940 local service was begun along the entire IND Sixth Avenue line including its core part through Midtown Manhattan 90 Meanwhile on the East Side the need for the IND Second Avenue Line had been evident since 1919 when the New York Public Service Commission launched a study at the behest of engineer Daniel L Turner to determine what improvements were needed in the city s public transport system The Great Depression resulted in soaring costs and the expansion became unmanageable so it was not built along with the other three IND trunk lines Construction on the first phase of the IND was already behind schedule and the city and state were no longer able to provide funding A scaled down proposal including a turnoff at 34th Street and a connection crosstown was postponed in 1931 90 Further revision of the plan and more studies followed By 1939 construction had been postponed indefinitely and Second Avenue was relegated to proposed status The 1939 plan for subway expansion took the line not only into the Bronx by now as a single line to Throggs Neck but also south into Brooklyn connecting to the stub of the IND Fulton Street Line at Court Street Construction of the line resumed in 1972 but was ended during the 1975 fiscal crisis and work was again restarted in 2007 90 Expansion plans edit nbsp 1929 expansion plans nbsp 1939 expansion plans Main article Proposed New York City Subway expansion Since the opening of the original New York City Subway line in 1904 various official and planning agencies have proposed numerous extensions to the subway system One of the better known proposals was the Second System which was part of a plan by the Independent Subway to construct new subway lines in addition and take over existing subway lines and railroad right of ways Though most of the routes proposed over the decades have never seen construction discussion remains strong to develop some of these lines to alleviate existing subway capacity constraints and overcrowding the most notable being the Second Avenue Subway Plans for new lines date back to the early 1910s 113 114 On August 28 1922 Mayor John Francis Hylan announced that his new system would comprise 100 miles 160 km of currently operating routes and another 100 miles of new routes to be completed by December 31 1925 and in competition with the IRT and BMT 115 116 In 1926 a loop subway service was planned to be built to New Jersey 117 The most grandiose plan conceived in 1929 was to be part of the city operated IND By 1939 with unification planned all three systems were included As this grandiose expansion was not built the subway system is only 70 of what it was planned to be Magnificently engineered almost entirely underground with 670 feet 200 m platforms and flying junctions throughout the IND system tripled the city s rapid transit debt contributing to the demise of plans for an ambitious expansion proposed before the first line of the first system was even opened After the IND Sixth Avenue Line was completed only 28 new stations were built Five stations were on the abandoned NYW amp B operated IRT Dyre Avenue Line fourteen stations were on the abandoned LIRR Rockaway Beach Branch now the IND Rockaway Line six were on the Archer Avenue Lines and 63rd Street Lines built as part of a 1968 plan two stations 57th Street and Grand Street were part of the Chrystie Street Connection and the Harlem 148th Street terminal Four MTA Capital Construction funded stations the 34th Street station on the 7 Subway Extension and the three stations on the Second Avenue Subway have been constructed with up to 14 more planned The city s subway construction costs are the highest in the world which has slowed the pace of expansion 118 Unification edit nbsp The IRT Second Avenue Line being demolished shortly after unification 1942In June 1940 the IND s operator the New York City Board of Transportation took over the transportation assets of the IRT and BMT 13 In June 1953 the New York City Transit Authority a state agency incorporated for the benefit of the city now known to the public as MTA New York City Transit succeeded the BoT 13 119 A combination of factors had this takeover coincide with the end of the major rapid transit building eras in New York City 120 The city immediately began to eliminate what it considered redundancy in the system closing several elevated lines including the IRT Ninth Avenue Line 121 and most of the IRT Second Avenue Line in Manhattan 122 and the BMT Fifth and Third Avenue Lines and most of the BMT Fulton Street Line 123 124 125 in Brooklyn Division differences edit Despite the unification a distinction between the three systems survives in the service labels IRT lines now referred to as A Division have numbers and BMT IND now collectively B Division lines use letters 126 There is also a physical and less widely noticed difference as A Division cars are narrower than those of B Division by 18 inches 46 cm 127 and shorter by 9 feet 2 7 m to 24 feet 7 3 m 127 128 Because the A Division lines are of lower capacity for a given capital investment all new extensions and lines built between World War II and 2007 129 130 131 have been for the B Division A Division cars can travel on B Division lines when necessary but are not used for passenger service on those lines because of the dangerously wide gap between the car and the station platform This stems from the IRT and BRT s long standing disagreement where the BRT intentionally built cars that were too wide for the IRT 80 nbsp The interior of an IRT Third Avenue Line car before the line s demolition in the 1950s The original IRT subway lines those built before the Dual Contracts were built to modified elevated line dimensions Whereas the IRT lines were originally equipped with cars that were 47 feet 14 m long the cars designed for the IRT subway measure 51 3 feet 15 6 m long Both sets of lines did not permit cars wider than 9 feet 2 7 m The clearances and curves on these lines are too narrow and too sharp for any IND or BMT equipment The later extensions of the IRT constituting the bulk of the IRT system were built to wider dimensions and so are of a profile that could support the use of IND BMT sized equipment 132 42 B Division equipment could operate on much of A Division if station platforms were trimmed and trackside equipment moved thus letting A Division service carry more passengers However there is virtually no chance of this happening because the older narrower portions of A Division are centrally situated such that it would be impossible to put together coherent through services The most that can be reasonably hoped for is that some branch lines of Division A might be resized and attached to B Division lines This was done with the BMT Astoria Line in Queens 132 which had formerly been dual operated with normal IRT trains and special narrow BMT shuttles 42 Post unification expansion and reorganization edit New York hoped that the profits from the remaining formerly privately operated routes would support the expensive and deficit ridden IND lines and simultaneously be able to repay the systems debts without having to increase the original fare of five cents But during World War II which gave a reprieve to the closure of most rail transit in the U S some closures continued including the remainder of the IRT Second Avenue Line in Manhattan 1942 122 and the surviving BMT elevated services over the Brooklyn Bridge 1944 133 The Second World War also caused renewed inflation which finally caused a fare increase to ten cents in 1947 and six years later to 15 cents 80 Ridership skyrocketted during the late 1940s and on December 23 1946 the system wide record of 8 872 249 fares was set 134 73 Because the consolidation dragged in the first years after unification some improvements in operational processes were rather slow and soon the question of organization was raised The outsourcing of subway operations to the Port Authority of New York and New Jersey was favored at one point On June 15 1953 the NYCTA was founded with the aim of ensuring a cost covering and efficient operation in the subways 80 There was a need to overhaul rolling stock and infrastructure of the once private routes especially for the IRT where nearly all of the infrastructure was aged The oldest cars came there from the time the subway opened in 1904 and the oldest subway cars of BMT in 1953 dated from the system s first years in 1913 Therefore a total of 2 860 cars for the A Division were delivered between 1948 and 1965 which constituted the replacement of almost the entire prewar IRT fleet On the B Division 2 760 cars were ordered Platforms were doubled in length systemwide At some stations gap fillers were installed because the station extensions were curved Also in this period the BMT replaced their signals The Main Line R36 cars were the first equipment to be equipped with two way radio as delivered standard equipment in 1965 with the first use of radio in the subway system on the IRT Lexington Avenue Line in May 1965 The first successful air conditioned train R38 was placed into service in July 1967 135 In 1946 Mayor William O Dwyer initiated a program to lengthen station platforms to accommodate ten car trains The first contract which was completed in August 1946 extended the platforms at 125th Street 207th Street 215th Street 225th Street 231st Street and 238th Street on the IRT Broadway Seventh Avenue Line for 423 000 Additional platform extensions were completed on the Broadway Seventh Avenue Line in October 1946 On this date the platform extensions at 103rd Street 110th Street 116th Street 137th Street 145th Street 157th Street 168th Street 181st Street 191st Street and Dyckman Street were completed This project cost 3 891 million The platform extensions at the Hoyt Street station on the IRT Eastern Parkway Line opened in November 1946 being completed for 733 200 Stations along the IRT Lexington Avenue Line were next to receive the improvements 136 In January 1947 the 23rd Street 28th Street and 33rd Street platform extensions were completed costing 4 003 million Work was subsequently completed at the Bleecker Street and Spring Street stations for 1 97 million The 1 992 million contract to lengthen the platforms at the Canal Street and Worth Street stations to the south was completed in April 1947 In September 1947 a contract extending the platforms for stations in the Bronx was completed The first stage of the plan was completed in June 1949 lengthening the platforms at Prospect Avenue Jackson Avenue Intervale Avenue Simpson Street Freeman Avenue 174th Street and 177th Street on the IRT White Plains Road Line for 315 000 In September 1949 the Chairman of the Board of Transportation William Reid announced that the program to lengthen 32 IRT stations had been completed for 13 327 million Reid also announced that the Board had created a five year plan to lengthen all remaining BMT and IRT stations to accommodate ten car trains 136 nbsp An A train on the IND Rockaway Line opened in 1956 as one of two major expansions of the system in the mid 20th centuryOnly two new lines were opened in this era 119 the IRT Dyre Avenue Line in 1941 137 and the IND Rockaway Line in 1956 138 139 140 141 with an extension of the latter to Far Rockaway Mott Avenue in 1958 142 Both of these lines were rehabilitations of existing railroad rights of way rather than new construction The former line was the City portion of the New York Westchester and Boston Railway an electrified commuter line closed in 1937 137 and the latter a line obtained from the Long Island Rail Road 143 While the latter is a long and substantial line it consists mostly of a long right of way crossing Jamaica Bay with a single station on Broad Channel island and two branches on a peninsula that is only several city blocks wide 144 For a time the IND Rockaway Line was considered its own subway division 90 The 169th Street station on the IND Queens Boulevard Line provided an unsatisfactory terminal setup for a four track line and this required the turning of F trains at Parsons Boulevard and no storage facilities were provided at the station Therefore the line was going to be extended to 184th Place with a station at 179th Street with two island platforms sufficient entrances and exits and storage for four 10 car trains The facilities would allow for the operation of express and local service to the station 145 146 Construction on the extension started in 1946 with planned completion in 1949 146 The extension was completed later than expected and opened on December 11 1950 147 This extension was delayed due to the Great Depression and World War II Both E and F trains were extended to the new station 147 148 Decline edit nbsp The Culver Ramp was completed in 1954 nbsp Soon after the Culver Ramp was completed parts of the ex BMT Culver Line were demolished This is a stub to the former lineThe originally planned IND system was built to the completion of its original plans after World War II ended but the system then entered an era of deferred maintenance in which infrastructure was allowed to deteriorate In 1951 a half billion dollar bond issue was passed to build the Second Avenue Subway but money from this issue was used for other priorities and the building of short connector lines namely a ramp extending the IND Culver Line over the ex BMT Culver Line at Ditmas and McDonald Avenues in Brooklyn 1954 allowing IND subway service to operate to Coney Island for the first time 119 the 60th Street Tunnel Connection 1955 linking the BMT Broadway Line to the IND Queens Boulevard Line 119 and the Chrystie Street Connection 1967 linking the BMT line via the Manhattan Bridge to the IND Sixth Avenue Line 149 By January 1955 the Port Authority of New York and New Jersey and the Triborough Bridge and Tunnel Authority could theoretically raise 1 25 billion effective immediately equivalent to 14 217 000 000 in 2023 In his 1974 book The Power Broker Robert A Caro estimated that this amount of money could modernize both the Long Island Rail Road for 700 million and the Hudson amp Manhattan Railroad for 500 million with money left over to build the Second Avenue Subway as well as proposed extensions of subway lines in Queens and Brooklyn 150 928 929 However Robert Moses the city s chief urban planner at the time did not allow funding for most mass transit expansions in the New York City area 150 930 933 instead building highways and parkways without any provisions for mass transit lines in the future 150 939 958 Caro noted that the lack of attention to mass transit expansions and routine maintenance contributed to the decline of the subway When Robert Moses came to power in New York in 1934 the city s mass transportation system was probably the best in the world When he left power in 1968 it was quite possibly the worst 150 933 Soon after the city entered a fiscal crisis Closures of elevated lines continued These closures included the entire IRT Third Avenue Line in Manhattan 1955 and the Bronx 1973 as well as the BMT Lexington Avenue Line 1950 much of the remainder of the BMT Fulton Street Line 1956 the downtown Brooklyn part of the BMT Myrtle Avenue Line 1969 and the BMT Culver Shuttle 1975 all in Brooklyn and the BMT Jamaica Line in Queens starting in 1977 151 The BMT Archer Avenue Line was supposed to replace the BMT Jamaica Line s eastern end but it was never completed to its full extent and opened in 1988 as a stub end line terminating at Jamaica Center 119 nbsp Much of the BMT Myrtle Avenue Line in Brooklyn was demolished Pictured is the remaining portion in 1974Construction and maintenance of existing lines was deferred and graffiti and crime were very common Trains frequently broke down were poorly maintained and were often late while ridership declined by the millions each year As in all of the city crime was rampant in the subway in the 1970s Thefts robberies shootings and killings became more frequent The rolling stock was very often painted with graffiti or vandalized both inside and outside As the New York City Police Department was completely overwhelmed the public reacted with unease and the subway was deliberately avoided Around 1980 the reliability of the vehicles was a tenth of their reliability in the 1960s and 40 percent of the network required speed restrictions Because there had been no further studies of the subway since 1975 one third of the fleet was out of use during rush hours due to serious technical defects In addition signs were fitted incorrectly and spare parts were missing or were bought in too large quantities could not be found or could not be installed due to lack of repairmen 151 The New York City Subway tried to keep its budget balanced between spending and revenue so deferred maintenance became more common which drew a slow but steady decline of the system and rolling stock Furthermore the workers were consolidated into the Transport Workers Union in 1968 A pension was set up and workers were allowed to retire after 20 years of service without any transitional period About a third of the most highly experienced staff immediately retired resulting in a large shortage of skilled workers 151 Rehabilitation started in the 1980s as part of a 18 billion financing program Between 1985 and 1991 over 3 000 subway cars were overhauled and fitted with air conditioning to increase comfort reliability and durability while deferring car purchases The TA only replaced the oldest cars in each division so it bought only 1 350 new vehicles Increased patrols and fences around the train yards offered better protection against graffiti and vandalism 152 At the same time the TA began an extensive renovation of the routes Within ten years the tracks were thereby renewed almost systemwide The Williamsburg Bridge and the Manhattan Bridge which had strong corrosion damage were refurbished over the years 152 The renovation of the stations was initially limited to security measures fresh paint new lighting and signs but the TA also tried to improve the service that had been neglected This ranged from new uniforms and training for the staff to correct destination signs on the rolling stock Some subway services were also adapted to the changing needs of customers 152 Another stated goal was to reduce crime or at least an improvement in the subjective sense of security At night the railway police and members of the citizens initiative Guardian Angels formed in 1979 patrolled in the subway trains 152 In the 1990s the crime in the city and its subway declined significantly Late 1950s and early 1960s edit In 1956 the NYCTA chairman Charles Patterson proposed removing the seats from the trains on the 42nd Street Shuttle to increase the passenger load 153 On May 1 1957 a standard maximum interval of 20 minutes between trains was put into place during late nights with the exception of the Rockaway lines where it was 24 minutes Some lines had service run as infrequently as 30 minutes Also on this date BMT express service was extended to 57th Street from 42nd Street Earlier in 1957 local service on the BMT Jamaica Line was extended to Crescent Street from Eastern Parkway and rush hour service was increased to run every 5 minutes 154 Under a 100 million rebuilding program increased and lengthened service was implemented during peak hours on the 1 train Switching at a junction north of 96th Street delayed service as trains from the Lenox Avenue Line which ran local switched from the express to the local while trains from the Broadway Branch that ran express switched from the local to the express This bottleneck was removed on February 6 1959 All Broadway trains were locals and all Lenox Avenue trains were expresses eliminating the need to switch tracks All 3 trains began to run express south of 96th Street on that date running to Brooklyn 1 trains began to run between 242nd Street and South Ferry all times Trains began to be branded as Hi Speed Locals being as fast as the old express service was with 8 car trains consisting of new R21s and R22s on the line 155 On November 15 1962 the express platforms at Lexington Avenue 59th Street opened to reduce transfer congestion at Grand Central 42nd Street and to allow transfers between the express trains and BMT trains to Queens Even before the express platforms were added this station was the busiest on the line 156 Construction on the express station had begun on August 10 1959 157 Program for Action edit nbsp A Second Avenue Subway tunnelMain article Program for Action In the mid 1960s US 600 000 000 was made available to the Metropolitan Transportation Authority MTA of New York City for a large subway expansion proposed by then Mayor John Lindsay About 1 23 billion was spent to create three tunnels and a half dozen holes as part of construction on the Second Avenue and 63rd Street Lines 152 151 Construction for the lines stopped in 1975 because the city almost went bankrupt yet none of the lines were done when federal payments were suspended in 1985 158 The two phase Program for Action was funded as follows 159 Phase I was to cost 1 6 billion and be completed over the span of a decade 152 Phase II came after Phase I and cost 1 3 billion Phase II was composed of mostly extensions of existing lines and Phase I built lines 152 The Program for Action also called for supplanting elevated structures with new subways The eastern end of the BMT Jamaica Line was to be replaced with the BMT Archer Avenue Line while the IRT Third Avenue Line was to be demolished to make way for a subway route parallel to the Metro North tracks at Park Avenue 152 Deferred maintenance edit Because the early subway systems competed with each other they tended to cover the same areas of the city leading to much overlapping service The amount of service has actually decreased since the 1940s as many elevated railways were torn down and finding funding for underground replacements has proven difficult The subway s decline began in the 1960s and continued through the late 1980s 152 Graffiti edit See also Graffiti in New York City nbsp Fast food stands operated in stations until the 1980s nbsp A typical graffiti tagged car in 1979 nbsp A graffitied car on the IRT Lexington Avenue Line 1973 In 1973 the city s graffiti epidemic surged so that nearly every subway car was tagged with graffiti 160 It was worsened by the budgetary restraints on New York City which limited its ability to remove graffiti and perform transit maintenance 161 Mayor John Lindsay declared the first war on graffiti in 1972 but it would be a while before the city was able and willing to dedicate enough resources to that problem to start impacting the growing subculture 161 162 The MTA tried rubbing the graffiti off with an acid solution but maintaining the cars to keep them relatively graffiti free was costing them around 1 3 million annually In the winter of 1973 the car washing program was stopped Attempts to wash cars with an acid solution in September 1974 were detrimental to the fleets upkeep 152 As graffiti became associated with crime many demanded that the government take a more serious stance toward it particularly after the popularization of the Fixing Broken Windows philosophy in 1982 162 163 164 By the 1980s increased police surveillance and implementation of increased security measures razor wire guard dogs combined with continuous efforts to clean it up led to the weakening of the New York s graffiti subculture 160 An extensive car washing program in the late 1980s ensured the elimination of graffiti throughout the system s rolling stock In 1984 the NYCTA began a five year program to eradicate graffiti The years between 1985 and 1989 became known as the die hard era 161 A last shot for the graffiti artists of this time was in the form of subway cars destined for the scrap yard 161 With the increased security the previous elaborate burners on the outside of cars were now marred with simplistic marker tags which often soaked through the paint 119 161 162 By mid 1986 the NYCTA were winning their war on graffiti On May 10 1989 the rolling stock was made 100 graffiti free 165 with the washing of the last train in the subway system that still had graffiti 166 167 As the population of artists lowered so did the violence associated with graffiti crews and bombing 161 Ridership and service cuts edit Ridership in 1975 had decreased to a point last seen in 1918 with ridership decreasing by 25 million per year The MTA reduced the length of trains during off peak periods and canceled work on several projects being built as part of the Program for Action including the Second Avenue Subway and an LIRR line through the 63rd Street Tunnel to a Metropolitan Transportation Center in East Midtown Manhattan Ridership kept dropping rapidly having decreased by 25 million passengers between June 30 1976 and June 30 1977 in the previous eight years 327 million passengers had stopped using the subway 152 The proportion of the fleet that was in service during the morning peak period was reduced and train headways were increased on four local services trains were reduced from once every four minutes to once every five minutes 152 168 On May 27 1975 the NYCTA announced that in September of that year 94 daily IRT trips would be discontinued accounting for 4 percent of then existing service on the IRT The trips were to be discontinued to cut operating deficits Express service on the 7 was to be discontinued between the hours of 9 30 a m and 3 30 p m and was to be replaced by more frequent local service 169 During the same month the NYCTA was considering making the A train a local at all times except rush hours when it would remain an express 170 On December 17 1975 the MTA announced that a 4 4 percent cutback of rush hour train service would take place on January 18 1976 The cutbacks the third of the year trimmed 279 train runs from the previous 6 900 Service was most drastically reduced on the Lexington Avenue Line with seven fewer southbound express trains during the morning rush hours The cuts were the first of a three phase program that was put in effect between January and July 1976 The cuts permitted a savings of 12 6 million a year for the NYCTA which had an increasing deficit Other subway services were changed or discontinued as part of the plan On January 19 F trains were planned to stop running express in Brooklyn and the GG was to be cut back to Smith Ninth Streets 171 In April 1975 it was planned that all rush hour 1 trains would begin running to 242nd Street these runs had previously terminated at 137th Street During midday hours trains on the 1 were to be shortened to five cars In July it was planned that the EE would be discontinued N trains were to have been extended to Continental Avenue via the Queens Boulevard Line to replace it Manhattan bound N trains were to continue running express while in the opposite direction they would run local N trains would alternate between terminating at Whitehall Street or Coney Island during rush hours CC trains in July were planned to be extended from Hudson Terminal to Rockaway Park replacing the E which was to have been cut back to Hudson Terminal The K was planned to be discontinued in July 171 The changes that were supposed to take place in July instead took effect on August 30 215 more runs were eliminated on that date In 1967 there were 8 200 daily trips and on August 30 1976 there were 6 337 daily trips 168 On December 14 1976 the NYCTA proposed another package of service cuts The cuts planned to take effect in January 1977 would have eliminated service on the Bowling Green South Ferry Shuttle the Franklin Avenue Shuttle and AA service which would be replaced by the A during late nights GG service would be truncated to Queens Plaza during late evenings and late nights B and N service would have been cut back to shuttles running between 36th Street and Coney Island on their respective lines It was also proposed that during off peak hours 10 car trains would be cut to eight six or four car trains 172 In 1986 the NYCTA launched a study to determine whether to close 79 stations on 11 routes spread across all four of the boroughs that the subway system served due to low ridership and high repair costs 173 174 Numerous figures including New York City Council member Carol Greitzer criticized the plans 174 175 Infrastructure edit nbsp The BMT Sea Beach Line Note the single express track the other express track was removed in the 1980s due to deferred maintenance nbsp The R46s the newest cars in the system in 1976 broke down the most due to their cracked trucksThe subway had been gradually neglected since the 1940s and its situation had been exacerbated by the low fare On May 20 1970 two people died at the Jackson Heights Roosevelt Avenue station in the worst subway collision since the 1928 Times Square derailment Following the 1970 accident New York Magazine highlighted the subway system s condition in a lengthy expose 176 Even though each of the approximately 7 200 subway cars were checked once every six weeks or 7 500 miles 12 100 km of service four or five dead motors were allowable in a peak hour 10 car train according to some transit workers accounts About 85 8 of trains were on schedule in 1970 with 1 142 equipment related delays in April 1970 176 However issues such as broken lights fans and signs defective doors wheels and brakes and subway cars that often became uncoupled or pulled apart were still prevalent One out of three IRT stations did not have running water in case of emergency In addition the system s staff were leaving in massive numbers with 5 655 workers having retired or quit from early 1969 to mid 1970 176 The system also had many slow speed areas because of obstacles that could cause derailments and every subway car had graffiti fleet availability during rush hours declined from 5 557 in 1976 to 5 025 in 1977 and to 4 900 in May 1978 Mean Distance Between Failures MDBF rates were at all time lows as the MDBF rate system wide was 6 000 miles by 1980 In 1979 200 retired R16 cars were reactivated because the newest rolling stock in the system the R46 had cracked trucks and were only allowed to operate during rush hours while they were sent for rehabilitation 152 At the height of the transit crisis in 1983 on time performance dropped below 50 177 Hundreds of trains never made it to their destination and in 1981 325 train runs were abandoned on a typical day 177 Additionally cars caught fire 2 500 times every year 177 In December 1978 a New York Daily News article highlighted the worst parts of the subway The Grand Central 42nd Street station was the worst underground station and the Middle Village Metropolitan Avenue station was the worst elevated station The subway cars in the worst condition were the R10s The subway line with the worst signals was the IRT Broadway Seventh Avenue Line so the signals were upgraded in the 1980s The BMT Sea Beach Line had the worst track its infrastructure had not been upgraded since its opening in 1915 151 Despite 800 million being allocated by the state in 1978 the TA had spent less than half of the 600 million allocated in 1967 The agency made some infrastructure improvements though because they were not cosmetic improvements the public still assumed that the subway had high crime even during periods of decreased crime 152 Due to deferred maintenance the condition of the subway system reached dangerous conditions in the early 1980s and the TA considered abandoning the Archer Avenue and 63rd Street projects Structural defects were found in elevated structures systemwide and on the Manhattan and Williamsburg Bridges causing frequent closures or delays on many subway lines during the 1980s Reroutes from both bridges were necessitated while the Manhattan Bridge between 1986 and 2004 had two of its four tracks closed at a time for construction the Williamsburg Bridge needed a shutdown from April to June 1988 for emergency structural repairs to be made 152 Federal funding for the repair of the BMT Jamaica Line was deferred throughout the 1980s due to the extremely bad state of the Williamsburg Bridge Pigeon droppings corroded the bridge s steel there were over 200 broken suspender cables and concrete in the bridge began to come off and leave large holes 152 Due to low ridership and the increasing shabbiness of the subway parts or most of several lines the BMT Canarsie Line the IND Crosstown Line the IRT Jerome Avenue Line or IND Concourse Line north of 161st Street Yankee Stadium and the BMT Jamaica Line east of either Broadway Junction or Cypress Hills were proposed for closure and abandonment in 1981 Other lines proposed for closure included the remaining part of the IND Culver Line the BMT West End Line the IRT Dyre Avenue Line part of the IND Rockaway Line part of the IRT White Plains Road Line and the remaining part of the BMT Myrtle Avenue Line 178 The BMT Jamaica Line was demolished mainly as part of the Program for Action but also due to low ridership 152 Officials also proposed shutting the subway at night between midnight and 6 a m in order to reduce crime 179 Off peak train trips as well as trips on the branches outside the city s core were reduced sharply 180 Operations in 1981 had deteriorated so that 181 182 One day in January saw 1 3 of the fleet out of service and the first two weeks had 500 canceled trips per day A 10 minute trip in 1910 took 40 minutes in 1981 The previous year there had been 30 derailments The A Division s fleet of 2 637 cars had never been renovated and MDBF rates were a quarter of that in 1970 The newest fleet the R44s and R46s made up 1 4 of the B Division s fleet of 4 178 cars and constantly broke down 152 Furthermore a sample of 50 cars in 1980 showed that half had serious maintenance problems such as a flammable undercoat of metal film flattened wheels burned out lights and defective missing emergency switches 183 In 1986 the MTA and Regional Plan Association again considered closing 26 miles 42 km of above ground lines to follow population shifts They included the Jerome Avenue Dyre Avenue Franklin Avenue Crosstown and Rockaway lines as well as parts of the Myrtle and Jamaica lines The south end of the Culver Line and the north ends of the IRT Broadway Seventh Avenue and White Plains Road Lines were also proposed for closure as was all of the BMT Sea Beach Line However unlike the 1981 proposal this plan called for a net expansion of the subway system as 37 miles 60 km of new underground and surface lines would also be built 184 174 Numerous figures including New York City Council member Carol Greitzer criticized the 1986 plans 174 175 Crime edit See also Crime in New York City In the 1960s mayor Robert Wagner ordered an increase in the Transit Police force from 1 219 to 3 100 officers During the hours at which crimes most frequently occurred between 8 00 p m and 4 00 a m the officers went on patrol in all stations and trains In response crime rates decreased as extensively reported by the press 185 Due to another crime increase in the subway the rear cars of subway consists were shut at night beginning in July 1974 186 However during the subway s main era of decline following the city s 1976 fiscal crisis there were daily reports of crime Two hundred were arrested for possible subway crimes in the first two weeks of December 1977 under an operation dubbed Subway Sweep 151 Violence on the subway increased drastically in the last week of 1978 and six murders occurred in the first two months of 1979 compared to nine during the entire previous year The IRT Lexington Avenue Line was known to frequent muggers so in February 1979 Curtis Sliwa s Guardian Angels group began patrolling the 4 train during the night By February 1980 there were 220 Guardian Angels across the system 187 To attract passengers in September 1978 the TA introduced the Train to the Plane a premium fare service that provided limited stops along Sixth Avenue in Manhattan from 57th Street to Howard Beach where passengers could transfer to a shuttle bus to JFK Airport The service was staffed by a transit police officer and the additional fare was paid on board This was discontinued in 1990 due to low ridership and the high cost of its operation 188 189 190 The increase of crime in the subway led to the firing of Transit Police Chief Sanford Garelik 151 There were about 250 felonies equivalent to 13 000 per year occurring in the system every week by September 1979 some police officers had to stop patrolling quality of life crimes and look only for violent crimes Among other problems included MTA police radios and New York City Police Department radios transmitted at different frequencies so they could not coordinate with each other Subway patrols were also adherent to tight schedules and felons quickly knew when and where police would make patrols Public morale of the MTA police was low at the time so that by October 1979 additional decoy and undercover units were deployed in the subway 151 While daily felonies were nearly halved between 1979 and 1980 decreasing from 261 to 154 overall crime increased by 70 in the same period 191 A series of window smashing incidents on subway cars started in 1980 on the IRT Pelham Line and spread throughout the rest of the system causing delays when damaged trains needed to be taken out of service 192 Over a thousand pieces of damaged windows were replaced between January 27 and February 2 1985 193 Other actions included increasing the 60 cent fare to 65 cents to pay the salaries of additional transit police 191 putting a subway crimes court in the Times Square station and stationing a police officer in each car during night hours 194 Richard Ravitch chairman of the MTA said that even he was scared of going on the subway 195 Despite the MTA discussing methods to increase ridership the 1982 figures fell to levels last seen in 1917 196 Within less than ten years the MTA had lost around 300 million passengers mainly because of fears of crime In July 1985 the Citizens Crime Commission of New York City published a study showing this trend fearing the frequent robberies and generally bad circumstances 197 As a result the Fixing Broken Windows policy which proposed to stop large profile crimes by prosecuting quality of life crimes was implemented 163 198 Along this line of thinking the MTA began a five year program to eradicate graffiti from subway trains in 1984 and hired one of the original theorists of Broken Windows policing George L Kelling as a consultant for the program in 1985 199 200 201 In the early afternoon of December 22 1984 Bernhard Goetz shot four young African American men from the Bronx on a New York City Subway train The incident got nationwide media coverage That day the men Barry Allen Troy Canty Darrell Cabey all 19 and James Ramseur 18 boarded a downtown 2 train Broadway Seventh Avenue Line express carrying screwdrivers apparently on a mission to steal money from video arcade machines in Manhattan 202 When the train arrived at the 14th Street station in Manhattan 15 to 20 other passengers remained with them in R22 subway car 7657 203 204 the seventh car of the ten car train 205 206 At the 14th Street station Goetz entered the car through the rearmost door crossed the aisle and took a seat on the long bench across from the door After Canty asked Goetz how he was Goetz replied affirmatively at which point the four boys supposedly moved over to the left of Goetz blocking Goetz off from the other passengers in the car They then asked Goetz for money He fired five shots seriously wounding all four men Nine days later he surrendered to police and was eventually charged with attempted murder assault reckless endangerment and several firearms offenses A jury found him not guilty of all charges except for one count of carrying an unlicensed firearm for which he served eight months of a one year sentence 207 The incident sparked a nationwide debate on race and crime in major cities the legal limits of self defense and the extent to which the citizenry could rely on the police to secure their safety 208 Although Goetz dubbed the Subway Vigilante by New York City s press came to symbolize New Yorkers frustrations with the high crime rates of the 1980s he was both praised and vilified in the media and public opinion The incident has also been cited as a contributing factor to the groundswell movement against urban crime and disorder 209 In 1989 the Metropolitan Transportation Authority asked the transit police then located within the NYCTA to focus on minor offenses such as fare evasion In the early nineties the NYCTA adopted similar policing methods for Penn Station and Grand Central Terminal In 1993 crime rates in the subway dropped part of a larger decrease across the city 210 On April 2 1995 the New York City Police Department and the Transit Police Department merged 119 Effects of the Program for Action edit nbsp The IRT Third Avenue Line in the Bronx was a casualty of the Program for ActionIronically the Program for Action forced the closure of a large number of subway lines The Bronx remnant of the IRT Third Avenue Line closed in 1973 to be provisionally replaced by a new subway under the Metro North Railroad tracks on Park Avenue one block to the west The single tracked Culver Shuttle between Ditmas Avenue and Ninth Avenue once a three tracked line closed on May 11 1975 211 212 213 214 On August 27 1976 the GG service was truncated from Church Avenue to Smith Ninth Streets while service was discontinued on the K and EE routes On December 15 1976 GG service at the other terminal was shortened to Queens Plaza The BMT Jamaica Line was truncated from 168th Street to 121st Street between September 11 1977 and the early 1980s replaced by the BMT Archer Avenue Line in 1988 152 Debris falling from and on the tracks edit Existing elevated structures posed a large danger the New York Post published a story that featured debris that had fallen from the BMT Astoria Line Debris from the IRT Pelham Line nearly killed a passerby and debris from the BMT West End Line led to a lawsuit against the MTA Concrete falling on the BMT Brighton Line near the Beverley Road station caused a months long service disruption between November 1976 and February 1977 152 Fare evasion edit See also New York City transit fares Fare evasion Fare evasion seemed a small problem compared to the graffiti and crime however fare evasion was causing the NYCTA to lose revenue 215 NYCTA s strategy for restoring riders confidence took a two pronged approach In 1981 MTA s first capital program started system s physical restoration to a State of Good Repair Improving TA s image in riders minds is as important as overcoming deferred maintenance Prompt removal of graffiti 216 and prevention of blatant fare evasion would become central pillars of the strategy to assure customers that the subway is fast clean and safe 217 Similarly fare evasion was taken seriously The NYCTA began formally measuring evasion in November 1988 When TA s Fare Abuse Task Force FATF was convened in January 1989 evasion was 3 9 After a 15 cent fare increase to 1 15 in August 1990 a record 231 937 people per day or 6 9 didn t pay The pandemonium continued through 1991 218 To combat the mounting problem FATF designated 305 target stations with most evaders for intensive enforcement and monitoring Teams of uniformed and undercover police officers randomly conducted mini sweeps swarming and arresting groups of evaders 219 Special mobile booking centers in converted city buses allowed fast track offender processing 220 Fare abuse agents covered turnstiles in shifts and issued citations Plainclothes surveyors collected data for five hours per week at target locations predominantly during morning peak hours In 1992 evasion began to show a steady and remarkable decline dropping to about 2 7 in 1994 221 The dramatic decrease in evasion during this period coincided with a reinvigorated Transit Police a 25 expansion of City police and a general drop in crime in U S cities In the city crime rate decline begun in 1991 under Mayor David Dinkins and continued through next two decades under Mayors Rudolph Giuliani and Michael Bloomberg Some observers credited the broken windows approach of law enforcement 222 where minor crimes like evasion are routinely prosecuted and statistical crimefighting tools whereas others have indicated different reasons for crime reduction 223 224 Regardless of causality evasion checks resulted in many arrests for outstanding warrants or weapons charges likely contributing somewhat to public safety improvements Arrests weren t the only way to combat evasions and by the early 1990s NYCTA was examining methods to improve fare control passenger throughputs reduce fare collection costs and maintain control over evasions and general grime The AFC system was being designed and evasion preventing capability was a key consideration TA s queuing studies concluded that purchasing tokens from clerks was not efficient Preventing slug use required sophisticated measures like tokens with metal alloy centers and electronic token verification devices To provide better access control the NYCTA experimented with floor to ceiling gates and high wheel turnstiles Prototypes installed at 110th Street Lexington Avenue station during a target hardening trial reduced evasions compared to nearby control stations 225 However controls consisting entirely of high wheels created draconian prison like environments with detrimental effects on station aesthetics Compromises with more secure low turnstile designs were difficult as AFC did not prevent fare evasion 226 Production Automated Fare Collection AFC implementation began in 1994 New turnstiles including unstaffed high wheels and floor to ceiling service gates featured lessons learned from trials As AFC equipment was rolled out evasion plummeted Fare abuse agents together with independent monitoring were eliminated Rehabilitation and rising trend edit nbsp The BMT Franklin Avenue Line at Botanic Garden in the 1970s was in a state of rapid degradationRidership increased 4 between 1978 and 1979 mainly because of the improving economy 227 Numerous improvements were touted in a 1979 Daily News report including air conditioning and closed circuit television As part of the Urban Mass Transit Act 1 7 billion would be provided by the state and the Port Authority 227 Aesthetics chairperson Phyllis Cerf Wagner announced a program called Operation Facelift which entailed aesthetic improvements such as repainting and relighting the platforms quicker replacement processes for windows and doors and expanding the number of seats on platforms 227 During the mid 1980s reconstruction began Stations were refurbished and rolling stock was repaired and replaced Neighborhood maps for wayfinding were added in subway stations starting in 1985 228 Maintenance of the subway began to improve while 21 trains derailed while in passenger service during 1983 there were 15 such incidents in 1984 and three in 1985 Red tag areas where trains reduced speed to 10 mph due to dangerous maintenance conditions were almost entirely eliminated by 1986 229 The 325 R62 cars had a MDBF rate of 50 000 miles more than five times higher than the other fleet with the newly overhauled World s Fair R36 equipment on the Flushing Line averaging over 30 000 miles in 1986 87 230 The MDBF of many rolling stock increased from 6 000 miles in 1980 to 10 000 miles in September 1986 and hundreds cars were overhauled or cleaned of graffiti Speedometers were also installed on existing and new rolling stock 227 On January 1 1982 the MTA implemented the first of its five year Capital Improvement programs to repair the existing system 119 Scheduled Maintenance Services were formed to proactively replace components and the MTA conducted general overhauls of the R26 through R46 fleets Older equipment any car classes with contract numbers below R32s on the B Division and R26s on the A Division were retrofitted with air conditioning The red tag areas were incrementally repaired and replaced with welded rail At the end of the century the MDBF rates for the entire system were at record highs and steadily increasing The Franklin Avenue Shuttle however was worse in 1989 than it was in 1980 and necessitated a complete renovation by 1998 because the MTA planned to abandon the line by the end of the century 227 Projects during this time edit nbsp Atlantic Avenue Barclays Center transferStarting in the early 1970s there were plans for improving the subway system In 1976 the MTA proposed abandoning the Franklin Avenue Shuttle to save money but dropped the plan due to community pushback 90 The possibility of the discontinuation was revisited again in 1998 but again fierce community opposition to it forced the MTA to rehabilitate the line 231 In 1977 the Linden Shops opened in Brooklyn enabling the MTA to build track panels indoors throughout the year among other objects 90 On January 16 1978 the MTA opened three transfer stations 90 Between the 14th Street station on the IRT Broadway Seventh Avenue Line and the previously connected stations on the BMT Canarsie Line and IND Sixth Avenue Line Between the IRT Lexington Avenue Line at Canal Street and the local platforms of the BMT Broadway Line Between the BMT Brighton Line the BMT Fourth Avenue Line and the IRT Eastern Parkway Line at Atlantic Avenue Barclays CenterIn April 1981 the following projects were considered by the MTA 232 Switching the northern ends of the N and RR trains Adding a T service via the BMT West End Line running between the Financial District and Bay Parkway Extending B trains to 168th Street and eliminating AA service Adding a K service via the Chrystie Street Connection from Canarsie to midtown Manhattan Adding a non stop express from 59th Street and the World Trade Center which was ultimately untenable because of capacity constraintsIn 1981 the MTA began installing welded rails on a few underground portions of the system 90 In June 1983 the following projects were considered by the MTA 233 234 The JFK Express would be extended to Rockaway Park Beach 116th Street and the 5 fare and the special guard would be eliminated making it like any other subway line Trains would be 8 cars long instead of 4 cars long and the headway between trains would be 18 minutes instead of 20 minutes During rush hours the CC would terminate at Euclid Avenue instead of serving the Rockaways B train service would run all day from Coney Island to 168th Street instead of terminating at 57th Street during non peak hours AA service which operated during non rush hours would be eliminated A new shuttle service named H would run between 57th Street and World Trade Center On March 25 1986 the Regional Plan Association RPA proposed several changes 235 A major part of the plan was eliminating parts of the system and expanding the system to reflect population shifts The plan called for eliminating 26 miles of elevated lines and building 17 miles of new subway lines and 20 miles of new surface lines The RPA also suggested buying new subway cars implementing One Person Train Operation outside of rush hours giving reduced fares to city residents using the Long Island Rail Road or Metro North Railroad to travel to Midtown Manhattan adding premium fee express services closing 10 of stations and doubling off peak services 236 The RPA also suggested 235 Extending the IND 63rd Street Line to southeast Queens Building the Second Avenue Subway Restoring the Rockaway Beach Branch Building a subway line under Jewel Avenue in Queens to branch off the IND Queens Boulevard Line Building a tunnel under the Hudson River to extend the IRT Flushing Line to New Jersey Complete the LIRR tunnel to Midtown Provide the East Side Access to Grand Central Terminal via the lower level of the 63rd Street Line at a cost of 1 4 billion to be completed in the early 2020s Purchase 500 new subway cars at a cost of 500 million In April 1986 the New York City Transit Authority began to study the possibility of eliminating sections of 11 subway lines because of low ridership The segments are primarily located in low income neighborhoods of the Bronx Brooklyn and Queens with a total of 79 stations and 45 miles of track for a total of 6 5 percent of the system The lines were first identified in the first part of a three year project the Strategic Plan Initiative which started in April 1985 by the MTA to evaluate the region s bus subway and commuter rail systems The eleven segments all had low ridership needed expensive rebuilding and duplicated service on parallel lines The lines being studied included the following lines 236 The IRT Broadway Seventh Avenue Line from 215th Street to 242nd Street which was duplicated by buses The IRT White Plains Road Line from East 180th Street to 241st Street which was duplicated by buses The entire IRT Dyre Avenue Line which was duplicated by buses The IRT Jerome Avenue Line from 167th Street to Woodlawn which was paralleled by the IND Concourse Line The entire IND Rockaway Line south of Howard Beach due to low ridership The IND Culver Line south of Avenue U due to low ridership and duplication by buses The entire IND Crosstown Line due to low ridership and duplication by buses The BMT Jamaica Line between Crescent Street and 121st Street due to low ridership and duplication by buses The entire BMT Myrtle Avenue Line which was duplicated by buses The entire BMT Sea Beach Line which ran close to the BMT West End Line The entire BMT Franklin Avenue Line due to major deterioration nbsp The Broadway Lafayette Street station to the northbound IRT Lexington Avenue Line at Bleecker StreetBy August 1989 the MTA was considering these projects 237 Connecting the IND 63rd Street Line to the IND Queens Boulevard Line Adding signals to the Queens Boulevard Line s express tracks so that trains could operate in both directions and adding 250 subway cars Completing the Second Avenue Subway A 1 25 miles 2 01 km connection from Parkside Avenue on the BMT Brighton Line to Seventh Avenue on the IND Culver Line due to the Manhattan Bridge subway closures 700 subway cars for the IRT Three storage yards two in Brooklyn and one in Queens Expanding the terminal tracks at Flatbush Avenue Brooklyn College station Building a 10 car platform for South Ferry station IRT Broadway Seventh Avenue Line Building transfer stations The Broadway Lafayette Street station to the northbound IRT Lexington Avenue Line at Bleecker Street done in September 2012 A connection between the South Ferry Bowling Green and Whitehall Street stations done between South Ferry and Whitehall Street in March 2009 Botanic Garden on the Franklin Avenue Shuttle with the Franklin Avenue station on the IRT Eastern Parkway Line done in 1999 Closing the Hewes Street and Lorimer Street stations on the BMT Jamaica Line and building a new intermediate station that connected with Broadway on the IND Crosstown Line nbsp 21st Street Queensbridge opened in October 1989In December 1988 three transfers were opened between existing stations and three brand new stations were opened They were 238 Lexington Avenue 53rd Street and 51st Street stations Long Island City Court Square and 23rd Street Ely Avenue stations now known as Court Square and Court Square 23rd Street respectively 42nd Street Port Authority Bus Terminal and Times Square 42nd Street stationsThe new stations were Sutphin Boulevard Archer Avenue JFK Airport Jamaica Center Parsons Archer and Jamaica Van Wyck 119 Other service changes were implemented that day Skip stop service on the J Z trains was also started on December 11 1988 Additionally IND Fulton Street Line express service was extended from weekdays only to all times except late nights Discontinuous services on the B D and Q trains over the Manhattan Bridge were replaced by continuous services New subway cars were also purchased the R62 and R62A fleets for the A Division and the R68 and R68A fleets for the B Division The R62 in particular was the first New York City Subway car class built by a foreign manufacturer 239 These were all delivered between 1983 and 1989 The R10 R14 R16 R17 R21 and R22 car classes all were retired with the deliveries of the R62 As and R68 As On May 10 1989 the last train with graffiti was taken out of service 165 the subway has been mostly graffiti free since this point 166 On October 29 1989 the IND 63rd Street Line was opened It was nicknamed the tunnel to nowhere due to its stub end at 21st Street Queensbridge and also due to the fact that the three station extension lay dormant for over a decade after completion 119 240 The 3 2 mile line included three new stations and cost a total of 868 million The line was viewed as an enormous waste of money 241 Revitalization and recent history edit1990s edit Subway ridership increased through the 1990s Throughout David Dinkins s mayoralty from 1989 to 1993 the city went from being in debt to having a 200 million surplus which was achieved by raising taxes However Dinkins s tax plans were unpopular and he lost the 1993 election to Rudy Giuliani 104 360 Giuliani wanted to demonstrate that he could successfully run New York City without raising taxes so he eliminated 400 million from the MTA s capital budget in 1994 He did not suggest any transit improvements however 242 State lawmakers also reduced MTA funding in the 1990s which remained mostly unchanged through the 2000s 242 In 1998 a large portion of the New York City Subway system was nominated for addition to the National Register of Historic Places The nomination encompassed 48 stations 11 electrical substations six signal towers four station head houses three buildings in storage yards and one tunnel The MTA supported the listing which would increase the agency s chances of receiving more federal funding 243 September 11 2001 edit nbsp Cortlandt Street station was heavily damaged in the September 11 attacks and needed to be demolished Main article Closings and cancellations following the September 11 attacks New York City Subway The September 11 attacks resulted in service disruptions on lines running through Lower Manhattan Tracks and stations under the World Trade Center were shut down within minutes of the first plane crash All remaining New York City Subway service was suspended from 10 20am to 12 48pm 244 Immediately after the attacks and more so after the collapses of the Twin Towers many trains running in Lower Manhattan lost power and had to be evacuated through the tunnels Some trains had power but the signals did not requiring special operating procedures to ensure safety The IRT Broadway Seventh Avenue Line which ran below the World Trade Center between Chambers Street and Rector Street was the most destroyed Sections of the tunnel as well as Cortlandt Street were badly damaged and had to be rebuilt Service was immediately suspended south of Chambers Street and then cut back to 14th Street There was also subsequent flooding on the line south of 34th Street Penn Station After the flood was cleaned up express service was able to resume on September 17 with 1 trains running between Van Cortlandt Park 242nd Street and 14th Street making local stops north of and express stops south of 96th Street while 2 and 3 trains made all stops in Manhattan but bypassed all stations between Canal Street and Fulton Street until October 1 1 9 skip stop service was suspended After a few switching delays at 96th Street service was changed on September 19 The 1 train resumed local service in Manhattan but was extended to New Lots Avenue in Brooklyn switching onto the express tracks at Chambers Street to replace the 3 which now terminated at 14th Street as an express The 2 train continued to make local stops in Manhattan and service between Chambers Street and South Ferry as well as skip stop service remained suspended Normal service on all four trains was restored September 15 2002 245 14 The Cortlandt Street station needed extensive reconstruction and after a total rebuild costing 158 million it reopened on September 8 2018 246 247 Service on the BMT Broadway Line was also disrupted because the tracks from the Montague Street Tunnel run adjacent to the World Trade Center and there were concerns that train movements could cause unsafe settling of the debris pile Cortlandt Street station which sits under Church Street sustained significant damage in the collapse of the towers It was closed until September 15 2002 for removal of debris structural repairs and restoration of the track beds which had suffered flood damage in the aftermath of the collapse Starting September 17 2001 the N and R service was suspended and respectively replaced by the M which was extended to Coney Island Stillwell Avenue via the BMT Montague Street Tunnel BMT Fourth Avenue Line and BMT Sea Beach Line and the J also extended via Fourth Avenue to Bay Ridge 95th Street In Queens the Q replaced the R while the W replaced the N All service on the BMT Broadway Line ran local north of Canal Street except for the Q which ran normally from 57th Street to Brighton Beach via Broadway and Brighton Express J Z skip stop service was suspended at this time Normal service on all seven trains resumed on October 28 The only subway line running between Midtown and Lower Manhattan was the IRT Lexington Avenue Line which was overcrowded before the attacks and at crush density until the BMT Broadway Line reopened Wall Street was closed until September 21 The IND Eighth Avenue Line which has a stub terminal serving the E train under Five World Trade Center was not damaged but covered in soot E trains were extended to Euclid Avenue Brooklyn replacing the then suspended C train the A and D trains replaced it as the local north of 59th Street Columbus Circle on nights and weekends respectively The B train which ran normally from 145th Street or Bedford Park Boulevard to 34th Street Herald Square via Central Park West Local also replaced C trains on weekdays Service was cut back to Canal Street when C service resumed on September 21 but Chambers Street and Broadway Nassau Street remained closed until October 1 World Trade Center remained closed until January 2002 14 15 Later 2000s edit nbsp With many parts of the system approaching or exceeding 100 years of age general deterioration can be seen in many subway stations Ridership increases edit Generally ridership kept rising as the subway system improved in its maintenance cleanliness frequency and on time ratio ridership started to increase as graffiti and crime rates dropped heavily after 1989 From 1995 to 2005 ridership on city buses and subways grew by 36 compared with a population gain in the city of 7 248 With dramatic increases in fuel prices in 2008 as well as increased tourism and residential growth ridership on buses and subways grew 3 1 up to about 2 37 billion trips a year compared to 2007 This is the highest ridership since 1965 249 By 2013 ridership had reached 1 7 billion riders per year despite closures related to Hurricane Sandy a level not seen since 1949 250 In April 2013 New York magazine reported that the system was more crowded than it had been in the previous 66 years 251 The subway reached a daily ridership of 6 million for 29 days in 2014 and was expected to record a similar ridership level for 55 days in 2015 by comparison in 2013 daily ridership never reached 6 million 252 Expansions edit Several expansions started construction or were opened during the mayoralty of Michael Bloomberg from 2001 to 2013 242 The IND 63rd Street Line s connection to the IND Queens Boulevard Line was first opened on December 16 2001 To serve the new connection the F train was rerouted via the 63rd Street Line and to replace the F along 53rd Street a new V train was created running between Forest Hills 71st Avenue and Second Avenue via the Queens Boulevard and Sixth Avenue local tracks The G to allow for room to operate the V was cut back to Court Square Two out of system transfers were put into place the first was to allow F passengers to continue to have a free transfer to the Lexington Avenue Line which was lost when the line was rerouted the transfer connects the Lexington Avenue 59th Street station and the Lexington Avenue 63rd Street stations The second one connected the Court Square station with the 45th Road Court House Square station 253 254 255 In 2003 money was allocated for the construction of a new station at South Ferry and in 2005 construction commenced on the new station 256 Initially the station s construction had been opposed because of the high cost and low perceived time savings 257 The South Ferry loop station only accommodates the first five cars of a train so that the rear five cars of a 10 car 1 train cannot load or unload 258 Because of the curve at the station gap fillers are required and as a result the new station was built as a two track full 10 car length island platform on a less severe curve permitting the operation of a typical terminal station 258 259 The MTA claimed that the new station saved four to six minutes of a passenger s trip time and increased the peak capacity of the 1 service to 24 trains per hour as opposed to 16 to 17 trains per hour with the loop station 258 In the late 1990s and early 2000s talk began to circulate about taking up the construction of the Second Avenue Subway Most New Yorkers regarded these plans with cynicism since citizens were promised the line since well before the Third Avenue elevated was torn down in 1955 Funds have been set aside and environmental impact reports have been completed A tunnelling contract was awarded to the consortium of Schiavone Shea Skanska S3 by the MTA on March 20 2007 260 This followed preliminary engineering and a final tunnel design completed by a joint venture between AECOM and Arup 261 262 A ceremonial groundbreaking for the subway was held on April 12 2007 and contractor work to prepare the project s initial construction site at 96th Street and Second Avenue began on April 23 2007 260 263 nbsp 7 Subway Extension construction in June 2011In October 2007 the 7 Subway Extension construction contract was awarded extending the IRT Flushing Line to 34th Street 130 Groundbreaking began in June 2008 and the tunnels were completed by 2010 The project which was the first one funded by the city in over 60 years 264 was intended to aid redevelopment of Hell s Kitchen around the West Side Yard of the Long Island Rail Road 265 Budget cuts edit The MTA faced a budget deficit of US 1 2 billion in 2009 266 This resulted in fare increases three times from 2008 to 2010 267 and service reductions including the elimination of two part time subway services the V and W Several other routes were modified as a result of the deficit The N was made a full time local in Manhattan in contrast to being a weekend local weekday express before 2010 while the Q was extended nine stations north to Astoria Ditmars Boulevard on weekdays both to cover the discontinued W The M was combined with the V routing it over the Chrystie Street Connection IND Sixth Avenue Line and IND Queens Boulevard Line to Forest Hills 71st Avenue on weekdays instead of via the BMT Fourth Avenue Line and BMT West End Line to Bay Parkway The G was truncated to Court Square full time Construction headways on eleven routes were lengthened and off peak service on seven routes were lengthened 268 2010s and 2020s edit Hurricane Sandy damage edit nbsp The old South Ferry loop station closed between March 16 2009 and April 4 2013 It closed permanently in June 2017 nbsp Hurricane Sandy caused serious damage to the IND Rockaway Line and isolated one part of the line from the rest of the system requiring the NYCTA to truck in 20 subway cars to the line to provide some interim service in the Rockaways This shows one of the cars being loaded onto a flatbed to be carried to the Rockaways On October 28 2012 a full closure of the subway was ordered the day before the arrival of Hurricane Sandy All services on the subway the Long Island Rail Road and Metro North were gradually shut down that evening 269 The storm caused serious damage to the system especially the IND Rockaway Line which had many sections between Howard Beach JFK Airport and Hammels Wye on the Rockaway Peninsula heavily damaged leaving it essentially isolated from the rest of the system This required the NYCTA to truck in 20 R32 subway cars to the line to provide some interim service which was temporarily designated the H 270 271 The H ran between Beach 90th Street and Far Rockaway Mott Avenue where passengers could transfer to a free shuttle bus 272 The line reopened on May 30 2013 with a new retaining wall along the line to prevent against future storm surges 273 274 275 Several of the system s tunnels under the East River were flooded by the storm surge 276 The South Ferry station suffered serious water damage and on April 4 2013 the older loop configured station reopened to provide temporary service 277 278 The first tunnel to be repaired the Greenpoint Tube under Newtown Creek was fixed during a series of weekend closures in 2013 and a full closure during summer 2014 279 The second tunnel the Montague Street Tunnel was closed completely from August 2013 280 281 to September 2014 282 283 284 Hurricane Sandy also damaged the Clark Street Tubes necessitating a full closure on weekends between June 2017 and June 2018 thus affecting 2 3 4 and 5 service 285 The new South Ferry station reopened on June 27 2017 in time to accommodate the Clark Street closures 286 287 A week after South Ferry reopened the MTA closed the BMT Myrtle Avenue Line for ten months to rebuild two of the line s viaducts the 310 foot long 94 m approaches to the line s junction with the BMT Jamaica Line and Fresh Pond Bridge over the Montauk Branch in Queens This was in preparation for a reconstruction of the BMT Canarsie Line tunnels under the East River 288 289 290 291 The MTA also planned to completely close the BMT Canarsie Line west of Bedford Avenue for 18 months between early 2019 and mid 2020 292 293 294 In April 2017 the shutdown was shortened to 15 months 295 The closure was changed to a night and weekend shutdown in January 2019 296 297 298 Other rehabilitation projects included Covering over 3 200 openings at ground level As of March 2019 update there are 19 contracts in progress and 11 contracts pending 299 In addition a preventive measure 68 subway entrances in Lower Manhattan are also receiving fabric plugs that are intended to keep flood water out 300 44 In 2017 3 000 pound 1 400 kg waterproof doors and curtains were installed in 24 Lower Manhattan locations at a cost of 30 000 each 301 302 Adding flood mitigation measures like barriers to the Coney Island 207th Street and Lenox subway yards 299 44 Adding flood mitigation measures to the IND Rockaway Line 299 44 Rebuilding other tubes As of March 2019 update the Steinway 53rd Street Cranberry and Joralemon tunnels had been repaired in addition to the Crosstown Montague Street and Clark Street tunnels The Rutgers Street Tunnel was pending repairs 299 44 Expansions open edit Originally budgeted at 400 million the new South Ferry station opened in 2009 at a total of 530 million with most of the money being a grant from the Federal Transit Administration earmarked for World Trade Center reconstruction 258 In January 2009 the opening was delayed because the tracks were too far from the edge of the platform Other delays were attributed to leaks in the station 303 The problem was corrected and the station opened on March 16 2009 With the opening of the new station a transfer was available to the Whitehall Street station with a new connecting passageway 304 nbsp The opening of the Second Avenue Subway at 86th StreetThe 7 Subway Extension originally was expected to open in 2014 305 306 but did not open until September 13 2015 307 308 According to The New York Times the delay in the extension s opening was due to the installation of custom made incline elevators that kept malfunctioning 309 The Fulton Center building opened to the public on November 10 2014 completing a decade long refurbishment of the Fulton Street station in lower Manhattan 310 311 312 It was controversially funded as part of the post 9 11 rebuilding project 242 As part of the opening of the Second Avenue Subway W service which had not run since 2010 was restored on November 7 2016 313 On January 1 2017 the Second Avenue Subway was opened 2017 state of emergency edit Main article 2017 New York City transit crisis Underlying the fanfare of expansions however there was a gradual decline in maintenance of the subway and consequently fewer trains started arriving to their destinations on time Maintenance spending declined before rising again from the 1990s to 2012 but on time performance slowly eroded during that same time period By 2017 only 65 of weekday trains reached their destinations on time the lowest rate since the transit crisis of the 1970s 242 In the summer of that year the subway system was officially put in a state of emergency after a series of derailments 314 315 track fires 316 317 and overcrowding incidents 316 318 To solve the system s problems the MTA officially announced the Genius Transit Challenge on June 28 2017 where contestants could submit ideas to improve signals communications infrastructure or rolling stock 319 320 On July 25 2017 Chairman Joe Lhota announced a two phase 9 billion New York City Subway Action Plan to stabilize the subway system and to prevent the continuing decline of the system 321 322 323 324 The first phase costing 836 million consisted of five categories of improvements the 8 billion second phase would implement the winning proposals from the Genius Transit Challenge and fix more widespread problems 322 323 324 Six winning submissions for the Genius Transit Challenge were announced in March 2018 325 In October 2017 city comptroller Scott Stringer released an analysis of the effect of subway delays on the economy and on commuters The study found that based on a normal wait time of 5 minutes and an average wage of 34 per hour in 2016 worst case subway delays of more than 20 minutes could cost up to 389 million annually in lost productivity 326 By comparison mid case delays of between 10 and 20 minutes could cost 243 1 million per year and best case delays of between 5 and 10 minutes could cost 170 2 million per year 327 In November 2017 The New York Times published its investigation into the crisis It found that the crisis had arisen as a result of financially unsound decisions by local and state politicians from both the Democratic and Republican parties By this time the subway s 65 average on time performance was the lowest among all major cities transit systems and every non shuttle subway route s on time performance had declined in the previous ten years 242 Several improvements were made in response to the transit crisis In the short term signals trains and tracks were improved under the Fast Forward program 328 329 Further the MTA s 2020 2024 capital plan called for adding elevators and ramps to 66 subway stations and adding modern signaling systems to parts of six more physical lines to be funded by congestion pricing in Manhattan 330 331 Additionally several other changes were proposed to improve service For instance in February 2019 several politicians wrote a letter to the MTA asking the agency to consider splitting the R train in half to increase reliability 332 333 In January 2020 Stringer sent a letter to NYCTA president Andy Byford stated that the abundance of shuttered entry points along subway routes was contributing to severe overcrowding and longer commute times and requested that the MTA develop and publicize plans for restoring closed entry points 334 The state of emergency ended on June 30 2021 after previously being renewed 49 times 335 Planning of new lines edit There are several lines under consideration This includes a subway line under Utica Avenue in Brooklyn 336 337 an outer borough circumferential line the Triboro RX 338 339 a reuse of the northern part of the Rockaway Beach Branch 340 341 and a line to LaGuardia Airport 342 In November 2016 the MTA requested that the Second Avenue Subway s Phase 2 project be entered into the Project Development phase under the Federal Transit Administration s New Starts program 343 The FTA granted this request in late December 2016 344 The line will eventually comprise four phases running as far north as 125th Street in East Harlem during Phase 2 and south to Hanover Square in Lower Manhattan in Phases 3 and 4 345 The MTA began soliciting bids in July 2023 for the first Phase 2 construction contract 346 347 COVID 19 pandemic and crime concerns edit Main article COVID 19 pandemic in New York City The spread of the COVID 19 pandemic to the New York City area in March 2020 resulted in mass closures of gathering spaces 348 After the MTA recommended that only essential workers use the New York City Subway ridership started to decrease 349 350 Part time services were temporarily suspended 351 Starting on May 6 2020 stations were closed overnight for cleaning in what became the first planned overnight closure in the subway s history The overnight closures were to be suspended once the pandemic was over and bus service was added 352 In early May 2021 Governor Cuomo announced that the overnight subway closures would end on May 17 2021 with 24 hour service resuming on that date 353 354 In February 2021 the New York City Subway removed benches from several stations in an effort to reduce the number of homeless persons sleeping on them which during the COVID 19 pandemic was considered to be unsanitary This move drew considerable backlash from riders who alleged that the removal of the benches amounts to disenfranchising disabled people and senior citizens as well as being unfair to homeless populations 355 356 Although ridership decreased by 40 percent from 2019 to 2022 the number of crimes in the system remained roughly the same prompting riders to express concerns over increased crime 357 358 There had been six murders in the subway in 2020 the following year the subway recorded eight murders the highest annual total in 25 years 359 During the pandemic the subway system experienced several high profile incidents including a January 2022 shoving death of a passenger in Times Square and an April 2022 mass shooting in Brooklyn 358 As of October 2022 update crime in the system had increased 40 percent from the previous year the number of crimes recorded to date was roughly the same as in 2019 when ridership was much higher 360 361 In response governor Kathy Hochul and mayor Eric Adams announced a plan to increase police presence within the subway system 362 Amid an increase in violent crimes in the subway system Hochul deployed National Guard and New York State Police forces to the subway in March 2024 as part of Joint Task Force Empire Shield 363 Further upgrades and improvements edit Several upgrades and improvements were announced in the early 2020s The new OMNY fare payment system was implemented across the subway between 2019 and 2020 364 365 The MTA announced in 2022 that it would install platform screen doors at three stations 366 367 and it reached a legal settlement the same year agreeing to make 95 percent of subway and Staten Island Railway stations wheelchair accessible by 2055 368 Despite decreased ridership due to the COVID 19 pandemic the MTA had balanced its budget by 2023 while also raising fares and increasing service on several subway routes 369 Incidents and accidents editTrain accidents edit Many train accidents have been recorded since 1918 when a train bound for South Ferry smashed into two trains halted near Jackson Avenue on the IRT White Plains Road Line in the Bronx 370 Only accidents that caused injuries deaths or significant damage are listed nbsp Aftermath of F train derailment in May 2014 nbsp The Malbone Street Wreck killed 97 people October 3 1918 A collision at Jackson Avenue killed two and injured 18 370 371 November 1 1918 The Malbone Street Wreck killed 97 and injured 200 371 372 August 6 1927 Two bombs exploded at 28th Street BMT Broadway Line and 28th Street IRT Lexington Avenue Line 371 August 24 1928 A derailment in Times Square on a southbound express train on the IRT Broadway Seventh Avenue Line killed 16 373 and injured 100 371 August 22 1938 A collision at the 116th Street station IRT Lexington Avenue Line killed 2 and injured 51 371 374 September 26 1957 A motorman and three passengers were killed at an accident at 231st Street 371 November 28 1962 A crane fell in Coney Island killing three 371 May 4 1965 A crane fell on the IRT New Lots Line killing one 371 December 29 1969 A southbound train derailed near East 180th Street in the Bronx injuring 48 371 February 27 1970 A 6 train hit a bumper block at the Pelham Bay Park station injuring 7 375 May 20 1970 Two Brooklyn bound GG trains crashed west of Roosevelt Avenue killing 2 and injuring 77 371 July 17 1970 A Manhattan bound E train ran into an A train at Hoyt Schermerhorn Streets injuring 37 376 August 1 1970 A fire in the tunnel near Bowling Green killed one and injured 50 371 May 27 1971 A 7 train was stuck in the Steinway Tunnel and one person died of a heart attack 377 July 16 1971 A fire took place south of 14th Street on the IRT Lexington Avenue Line injuring 11 378 August 28 1973 A 7 train was hit by falling concrete in the Steinway Tunnel killing one and injuring 18 379 371 380 October 4 1973 Three passengers were injured when a Lexington Avenue Express train derailed 900 feet south of the Bergen Street station 381 October 25 1973 A fire in two train cars at Longwood Avenue led to a rear end accident 379 371 December 1 1974 Six people were injured as a Franklin Avenue Shuttle train consisting of R32s derailed at the same spot of the Malbone Street Wreck hitting the wall leaving a massive gash in the side of one of the cars 382 383 384 385 April 12 1977 Two passengers were injured when an N train derailed between the Manhattan Bridge and DeKalb Avenue 386 June 30 1978 Three people were injured when an L train derailed with nine of the cars leaving the track damaging the track and platform 387 December 13 1978 A CC train derailed south of 59th Street Columbus Circle crashing into the tunnel wall injuring 16 of 100 passengers 388 November 20 1980 A 2 train derailed as it entered Chambers Street injuring 16 passengers 389 January 12 1981 A D train derailed on the BMT Brighton Line near Kings Highway injuring 10 passengers 390 July 3 1981 A motorman was killed and 135 passengers are injured as a Manhattan bound train plowed into the rear of a second train halted for a failed signal between Sutter Avenue and Utica Avenue 391 April 25 1986 An out of service F train crashed into the bumper blocks at 179th Street and the motorman died of a heart attack 392 379 371 July 26 1990 A B train and an M train collided on the BMT West End Line injuring 36 people 371 December 28 1990 An electrical fire occurred in the Clark Street Tunnel killing 2 and injuring 188 393 August 28 1991 In a derailment at Union Square five people were killed and more than 200 were injured when a southbound 4 train derailed due to a drunk motorman 379 371 394 October 7 1993 Two L trains collided at the Graham Avenue station 45 were injured 371 394 August 15 1994 A southbound B train derailed near Ninth Avenue in Brooklyn injuring 11 379 371 December 21 1994 A bomb made by Edward Leary detonated in a subway car injuring him and 47 others 395 February 9 1995 An M train and a B train collided near the Ninth Avenue station Seven people on the B train were injured and the motorman of the M train was culpable 371 394 June 5 1995 In a collision on the Williamsburg Bridge a Manhattan bound J train crashed into a stopped Manhattan bound M train after passing a red light at high speed killing one and injuring 50 371 394 August 23 1995 A 6 train collided with another at Brooklyn Bridge City Hall station injuring 87 371 394 July 3 1997 A Queens bound A train derailed in Harlem near the 135th Street station injuring 15 people 379 July 14 1997 The last car of a southbound 2 train derailed near Franklin Avenue injuring four people 379 November 20 1997 A Forest Hills bound R train rear ended a G train in a tunnel near the Steinway Street station injuring 40 none seriously 371 April 12 2000 A northbound 5 train derailed near 68th Street injuring nine people 379 June 21 2000 A southbound B train derailed just after leaving the DeKalb Avenue station in Brooklyn injuring more than 80 people Officials said the third car jumped off the track pulling the second car along 396 379 May 2 2014 A Manhattan bound F train with 1 000 people on board derailed near 65th Street injuring at least 19 people 397 379 September 10 2015 A southbound G train with approximately 80 people on board derailed near Hoyt Schermerhorn Streets injuring at least five people 398 June 27 2017 A southbound A train derailed then caught fire near 125th Street 399 The derailment caused by improperly secured replacement rails 400 resulted in 39 minor injuries 401 March 27 2020 A northbound 2 train caught fire in the Central Park North 110th Street station killing the motorman and injuring at least 16 other people 402 403 Since several other fires had been observed in nearby stations the incident was investigated as a possible arson 404 405 September 20 2020 A northbound A train derailed at 14th Street Eighth Avenue station when a homeless man clamped wooden planks onto the roadbed causing the train to derail Three passengers were injured 406 407 408 January 4 2024 Two trains collided at the 96th Street station Both trains derailed on impact and 24 people were injured 409 410 January 10 2024 A northbound F train derailed near the West Eighth Street New York Aquarium station in Coney Island All 37 passengers were evacuated 411 Additionally in an accident recorded before 1918 a derailment happened on the Ninth Avenue Elevated in Manhattan on September 11 1905 resulting in 13 deaths and 48 serious injuries 412 413 Other disasters edit Other accidents in the history of the subway do not involve trains 414 415 416 several people have been fatally electrocuted by the subway s third rails 417 418 and yet others have been fatally pushed onto the tracks 419 420 Fatal pushing incidents include the 2022 death of Michelle Go at the Times Square station 421 In 1960 a person nicknamed the Sunday Bomber set off a series of bombs in the New York City Subway during Sundays and holidays killing one woman and injuring 51 other commuters 422 423 424 The bomber also set off bombs in ferries 425 On April 12 2022 a mass shooting attack occurred on the N train injuring at least 29 people 426 See also editHistory of New York City transportation Beach Pneumatic TransitReferences edit Annual Information Statement 2001 Appendix A The Related Entities PDF Metropolitan Transportation Authority MTA 2001 Retrieved April 26 2015 Tunneling to the Future The Story of the Great Subway Expansion That Saved New York 2001 Introduction to Subway Ridership Metropolitan Transportation Authority MTA Retrieved April 18 2016 Annual Subway Ridership 2017 2022 Metropolitan Transportation Authority 2022 Retrieved November 8 2023 Subway and bus ridership for 2021 Metropolitan Transportation Authority MTA Retrieved October 28 2022 Subway and bus ridership for 2022 Metropolitan Transportation Authority MTA Retrieved November 15 2023 Goldman Ari October 23 1982 RIDERSHIP OF SUBWAYS SINCE 1917 The New York Times Retrieved June 5 2017 Annual Subway Ridership 2017 2022 Metropolitan Transportation Authority 2022 Retrieved November 8 2023 New York City Subways Facts and Figures under title of Annual Subway Ridership MTA info Retrieved April 19 2016 a b New York City subway opens Oct 27 1904 HISTORY com A amp E Television Networks 2009 Retrieved October 25 2015 New York Elevated Charles Harvey Mid Continent Railway Museum April 8 2006 Retrieved October 25 2015 Mark S Feinman 2000 History of the Independent Subway nycsubway org Retrieved July 7 2008 a b c New York City Transit History and Chronology mta info Metropolitan Transportation Authority Retrieved May 14 2014 a b c Kennedy Randy Tunnel Vision With Station s Reopening Even Commuters Smile The New York Times September 17 2002 Retrieved October 6 2007 a b Brian Abbott September 11 Three Years Later Archived March 14 2016 at the Wayback Machine Several maps showing changes in lower Manhattan from July 2001 to September 2002 New York will have to wait till spring for No 7 subway extension Daily News New York December 15 2014 Retrieved December 15 2014 Sill Andrew December 15 2014 Hudson Yards subway extension delayed again MTA info Second Avenue Subway Quarterly Report Q4 2013 The Launch Box Fewer Than 1 000 Days to Go Hilger James March 23 2009 Notes from the Underground The Secret Tunnels of Brooklyn psfk com Retrieved April 8 2009 permanent dead link Citynoise Oldest Subway Tunnel in the World Archived March 3 2016 at the Wayback Machine Retrieved April 8 2009 Atlantic Av Tunnel March 4 2016 Archived from the original on June 25 2014 Retrieved June 27 2014 Events That Led To The Creation Of The Atlantic Avenue Tunnel PDF Brooklyn Historic Railway Association Retrieved October 29 2009 Multiple sources The Atlantic Avenue Tunnel Brooklynrail net Retrieved October 1 2014 Urban Underground Passageways An Historical Overview PDF Brooklynrail net Retrieved October 1 2014 The Atlantic Avenue Tunnel New York City Subway Transit Scenes Archived from the original on February 6 2007 Retrieved October 1 2014 Brooklyn Historic Railway Association and Atlantic Avenue Tunnel Archived from the original on April 18 2009 Retrieved October 1 2014 Cobble Hill Atlantic Avenue Tunnel History RapidTransit net Archived from the original on October 10 2014 Retrieved October 1 2014 Joseph Yonette February 15 2009 The Tunnel Rats of Atlantic Avenue The New York Times Retrieved October 1 2014 The New York Moon Undertone Music video in the tunnel nymoon com Retrieved October 1 2014 adrianne February 5 2014 Tunnel vision how an obsessed explorer found and lost the world s oldest subway The Verge Brooklyn Underground Tunnel Tours Are Now Six Feet Under NBC New York December 18 2010 Early Transit in New York NYCSubway org Retrieved October 29 2005 Early Transit in Brooklyn NYCSubway org Retrieved October 1 2014 Inventor of the Week Alfred Beach MIT Beach Pneumatic Transit nycsubway org Brennan Joseph 2005 They found the tube in excellent condition Beach Pneumatic Archived from the original on October 6 2007 Retrieved January 17 2008 The remarkable pneumatic people mover on Damn Interesting The Secret Subway PBS Martin Douglas November 17 1996 Subway Planners Lofty Ambitions Are Buried as Dead End Curiosities The New York Times ISSN 0362 4331 Retrieved April 18 2023 Beach Pneumatic Transit The Interborough Rapid Transit subway plrog org Barry Keith February 26 2010 Feb 26 1870 New York City Blows Subway Opportunity Wired nycsubway org Beach Pneumatic Transit Clifton Hood 2004 722 Miles The Building of the Subways and How They Transformed New York Johns Hopkins University Press ISBN 978 0801880544 Hood Clifton 1995 722 Miles The Johns Hopkins University Press First Edition September 1 1995 p 59 ISBN 978 0801852442 Lower Manhattan Necrology continued Forgotten New York forgotten ny com September 3 1999 Retrieved October 20 2016 a b James Blaine Walker Fifty Years of Rapid Transit 1864 1917 published 1918 pp 139 161 a b c d e nycsubway org The Dual System of Rapid Transit 1912 L I Traction Reorganization Brooklyn Daily Eagle Brooklyn NY January 18 1896 p 1 Local Stocks and Bonds Brooklyn Daily Eagle Brooklyn NY February 9 1896 p 23 Rapid Transit Statement Brooklyn Daily Eagle Brooklyn NY August 26 1898 p 7 The Third Rail Online Gunther and His Railroad Archived May 23 2006 at the Wayback Machine Transit in Possession of Brooklyn Elevated Brooklyn Daily Eagle Brooklyn NY March 25 1899 p 1 To Run Road Next Week Brooklyn Daily Eagle Brooklyn NY July 7 1899 p 1 Early Rapid Transit in Brooklyn 1878 to 1913 nycsubway org a b 1914 Moody s Manual Brooklyn Rapid Transit Company Archived September 27 2007 at the Wayback Machine a b Local Stocks and Bonds Brooklyn Daily Eagle Brooklyn NY November 14 1897 p 31 Of the Nassau Transit Railroad Consolidation Deal Brooklyn Daily Eagle Brooklyn NY November 6 1898 p 30 a b Flynn Enjoins Nassau Lease Brooklyn Daily Eagle Brooklyn NY April 4 1899 p 1 Local Stocks and Bonds Brooklyn Daily Eagle Brooklyn NY March 19 1899 p 35 Rapid Transit Company Gets Brighton Beach R R Brooklyn Daily Eagle Brooklyn NY March 21 1899 p 1 Local Stocks and Bonds Brooklyn Daily Eagle Brooklyn NY April 16 1899 p 57 L Merger Certificate Brooklyn Daily Eagle Brooklyn NY May 24 1900 p 1 Transit Co Leases P P and C I Road Brooklyn Daily Eagle Brooklyn NY June 17 1899 p 1 Transit Truths BMT Lines com Retrieved May 14 2014 nycsubway org Men Who Really Built the Subway 1904 www nycsubway org Retrieved February 3 2023 Almanac Building the New York City subway www cbsnews com March 24 2019 Retrieved April 3 2022 Walker James Blaine January 1 1918 Fifty Years of Rapid Transit 1864 1917 Law Print Company pp 162 191 a b New York Times Farthest North in Town by the Interborough January 14 1907 page 18 https upload wikimedia org wikipedia commons 1 15 1906 IRT map north png bare URL image file James Blaine Walker Fifty Years of Rapid Transit 1864 1917 published 1918 p 204 New York Times Our First Subway Completed at Last August 2 1908 page 10 Burroughs and Company the New York City Subway Souvenir 1904 DISCUSS SUBWAY SIGNS IN 18TH ST STATION Engineer Parsons and Mr Hedley Inspect Advertising Scheme BRONX VIADUCT WORKS WELL Delays There Only Those of Newness Lenox Avenue Service Makes Fuss Below Ninety sixth Street PDF Retrieved September 4 2016 Kahn Alan Paul May Jack 1973 Tracks of New York Number 3 Manhattan and Bronx Elevated Railroads 1920 New York City Electric Railroaders Association Retrieved November 6 2016 Subway at Fulton Street Busy PDF The New York Times January 17 1905 Retrieved October 30 2016 Merritt A L 1914 The Remarkable Story of the Opening and Growth of the World s Greatest and Most Efficient Transportation System Ten Years of the Subway 1914 nycsubway org Interborough Bulletin Retrieved October 30 2016 SUBWAY TRAINS RUNNING FROM BRONX TO BATTERY West Farms and South Ferry Stations Open at Midnight START WITHOUT A HITCH Bowling Green Station Also Opened Lenox Avenue Locals Take City Hall Loop Hereafter PDF The New York Times July 10 1905 Retrieved October 30 2016 SUBWAY TO BROOKLYN OPENED FOR TRAFFIC First Regular Passenger Train Went Under the East River Early This Morning NOT A HITCH IN THE SERVICE Gov Hughes and Brooklyn Officials to Join in a Formal Celebration of Event To day SUBWAY TO BROOKLYN OPENED TO TRAFFIC PDF The New York Times January 19 1908 Retrieved October 30 2016 BROOKLYN JOYFUL OVER NEW SUBWAY Celebrates Opening of Extension with Big Parade and a Flow of Oratory AN ODE TO AUGUST BELMONT Anonymous Poet Calls Him the Brownie of the Caisson and Spade He Talks on Subways The New York Times May 2 1908 p 1 ISSN 0362 4331 Retrieved October 30 2016 Another Centennial Original Subway Extended To Fulton Street New York Division Bulletin 48 1 New York Division Electric Railroaders Association January 2005 Retrieved August 31 2016 via Issu Cudahy Brian J 2003 A Century of Subways Celebrating 100 Years of New York s Underground Railways New York Fordham University Press ISBN 9780823222957 Wilson Tracy March 22 2007 How Subways Work HowStuffWorks com Retrieved June 11 2014 MAYOR RUNS A TRAIN OVER NEW BRIDGE PDF The New York Times September 17 1908 p 16 Retrieved October 30 2016 Feinman Mark Darlington Peggy Pirmann David Brennan Joseph 2012 BMT 4th Avenue Line www nycsubway org Retrieved October 30 2016 a b c d e f g Diehl Lorraine 2004 The Tracks that Built New York City New York ISBN 9781400052271 a href Template Cite book html title Template Cite book cite book a CS1 maint location missing publisher link a b c d e Derrick Peter 2001 Tunneling to the Future The Story of the Great Subway Expansion that Saved New York NYU Press ISBN 978 0814719107 a b c THE SEVENTH AND LEXINGTON AVENUE SUBWAYS WILL REVIVE DORMANT SECTIONS Change in Operation That Will Transform Original Four Tracked Subway Into Two Four Tracked Systems and Double Present Capacity of the Interborough Change in Operation Will Revive Dead Sections Assessed Valuation Inadequate Terminal Facilities West Side Development Residential Possibilities Comparative Assessed Values PDF The New York Times March 10 1918 Retrieved October 30 2016 THREE NEW LINKS OF THE DUAL SUBWAY SYSTEM OPENED INCLUDING A SHUTTLE SERVICE FROM TIMES SQUARE TO THIRTY FOURTH STREET Service on the Jerome Avenue Branch From 149th Street North to About 225th Street Began Yesterday Afternoon The Event Celebrated by Bronx Citizens and Property Owners The Seventh Avenue Connection Opened This Morning The New York Times June 3 1917 p 33 ISSN 0362 4331 Retrieved October 30 2016 OPEN SUBWAY SPUR TO 34TH STREET Pennsylvania Station Now Accessible by Seventh AvenueLine from Times Square RUN MADE IN TWO MINUTES Rush Work at Finish Leaves Pilesof Debris Still to be Cleared Up PDF The New York Times June 4 1917 Retrieved October 30 2016 OPEN NEW SUBWAY TO REGULAR TRAFFIC First Train on Seventh Avenue Line Carries Mayor and Other Officials TO SERVE LOWER WEST SIDE Whitney Predicts an Awakening of the District New Extensions of Elevated Railroad Service Present Service Tentative Currents of Travel to Change PDF The New York Times July 2 1918 Retrieved October 30 2016 LEXINGTON AV LINE TO BE OPENED TODAY Subway Service to East Side of Harlem and the Bronx Expected to Relieve Congestion BEGINS WITH LOCAL TRAINS Running of Express Trains to Await Opening of Seventh AvenueLine of H System PDF The New York Times July 17 1918 p 13 Retrieved October 30 2016 OPEN NEW SUBWAY LINES TO TRAFFIC CALLED A TRIUMPH Great H System Put in Operation Marks an Era in Railroad Construction NO HITCH IN THE PLANS But Public Gropes Blindly to Find the Way in Maze of New Stations THOUSANDS GO ASTRAYLeaders in City s Life Hail Accomplishment of Great Task at Meeting at the Astor Thousands Go Astray OPEN NEW SUBWAY LINES TO TRAFFIC First Train Made Slow Time Some Confusion Expected Stations on the New Lines The New York Times August 2 1918 p 1 ISSN 0362 4331 Retrieved October 30 2016 OPEN CLARK STREET LINE New Route Doubles Subway Service Between the Two Boroughs The New York Times April 16 1919 ISSN 0362 4331 Retrieved October 30 2016 LOWER MANHATTAN LOST IN POPULATION PDF The New York Times June 13 1920 Retrieved October 30 2016 a b c d e f g h i j k History of the Independent Subway nycsubway org Retrieved April 23 2015 Gay Midnight Crowd Rides First Trains in New Subway The New York Times September 10 1932 p 1 Retrieved October 30 2016 LaGuardia Opens New Subway Link The New York Times January 2 1936 p 1 Retrieved October 7 2011 Two Subway Links Start Wednesday The New York Times April 6 1936 p 23 Retrieved October 7 2011 New Subway Link Opened by Mayor The New York Times April 9 1936 p 23 Retrieved October 7 2011 Topics of The Times They Meet Again For Sweeter Uses Many Car Dwellers Young Labor Unions The New York Times December 7 1938 ISSN 0362 4331 Retrieved October 10 2016 GAY CROWDS ON LAST RIDE AS SIXTH AVE ELEVATED ENDS 60 YEAR EXISTENCE 350 POLICE ON DUTY But the Noisy Revelers Strip Cars in Hunt for Souvenirs SUIT MAY DELAY RAZING Little Threat Seen to Plan However Jobless Workers to Press Their Protest Makes Only One Stop Entrances Are Boarded Up FINAL TRAINS RUN ON ELEVATED LINE Police Guard Structure The New York Times December 5 1938 ISSN 0362 4331 Retrieved October 20 2016 a b Seyfried Vincent F 1995 Elmhurst from town seat to mega suburb Vincent F Seyfried Archived from the original on September 23 2016 a b Kramer Frederick A January 1 1990 Building the Independent Subway Quadrant Press ISBN 978 0 915276 50 9 Raskin Joseph B 2013 The Routes Not Taken A Trip Through New York City s Unbuilt Subway System New York New York Fordham University Press doi 10 5422 fordham 9780823253692 001 0001 ISBN 978 0 82325 369 2 a b Independent Subway Services Beginning in 1932 thejoekorner com August 21 2013 Retrieved August 2 2015 TWO SUBWAY UNITS OPEN AT MIDNIGHT Links in City Owned System in Queens and Brooklyn to Have 15 Stations PDF The New York Times August 18 1933 Retrieved November 7 2015 New Queens Subway Service Will Be Launched Tonight Tunnel From Manhattan Open to Jackson Heights Service Will Eventually Be Extended Through To Jamaica Long Island Daily Press Old Fulton New York Postcards August 18 1933 p 20 Retrieved July 27 2016 Reproduction Poster of Extension to Union Turnpike Kew Gardens Flickr Photo Sharing October 2015 Retrieved April 26 2016 a b c Roger P Roess Gene Sansone August 23 2012 The Wheels That Drove New York A History of the New York City Transit System Springer Science amp Business Media ISBN 978 3 642 30484 2 PWA Party Views New Subway Link Queens Section to Be Opened Tomorrow Is Inspected by Tuttle and Others PDF The New York Times December 30 1936 Retrieved June 27 2015 Subway Link Opens Soon City Line to Jamaica Will Start About April 24 PDF The New York Times March 17 1937 Retrieved June 27 2015 Trial Run to Jamaica on Subway Tomorrow Section From Kew Gardens to 169th Street Will Open to Public in Two Weeks PDF The New York Times April 9 1937 Retrieved June 30 2015 Sparberg Andrew J October 1 2014 From a Nickel to a Token The Journey from Board of Transportation to MTA Fordham University Press ISBN 978 0 8232 6190 1 TRANSIT LINK OPEN TODAY 8th Ave Line Extended to Jamaica Celebration Arranged The New York Times April 24 1937 ISSN 0362 4331 Retrieved August 4 2016 Subway Station Opens Aug 28 PDF The New York Times August 5 1939 Retrieved October 4 2015 ELY SUBWAY STOP TO OPEN Queens Station on City Owned Line Begins Service Tomorrow PDF The New York Times August 26 1939 Retrieved October 4 2015 New Lines Shift City Travel Brooklyn Daily Eagle July 8 1937 Retrieved July 9 2015 A New Subway Line for New York City The Triborough System Its History 1910 nycsubway org Retrieved March 25 2014 The Dual System of Rapid Transit 1912 nycsubway org Retrieved March 25 2014 Two Subway Routes Adopted by City The New York Times August 4 1923 p 9 Plans Now Ready to Start Subways The New York Times March 12 1924 p 1 nycsubway org Extensive Rapid Transit Plan Proposed for North Jersey 1926 1927 Rosenthal Brian M December 29 2017 The Most Expensive Mile of Subway Track on Earth The New York Times ISSN 0362 4331 Retrieved December 17 2023 a b c d e f g h i j About NYC Transit History mta info Metropolitan Transportation Authority October 19 2002 Archived from the original on October 19 2002 Retrieved September 18 2016 English Jonathan April 16 2018 Why New York City Stopped Building Subways CityLab Pocket Retrieved May 13 2019 Remembering the 9th Avenue El MTA info October 26 2011 Archived from the original on August 18 2014 Retrieved October 28 2011 a b Second Avenue El by Alexander Nobler Cohen The Third Rail Online July 2001 thethirdrail net Retrieved June 29 2017 B M T El Lines to Shift Service City to Close 2 Sections This Week The New York Times May 27 1940 page 19 Broadway Junction Transportation Study Part 1 NYC gov Archived March 4 2016 at the Wayback Machine New York Times Last Train is Run on Fulton St El June 1 1940 nycsubway org Subway FAQ Letter Number and Color Designation Systems a b NYC Subway Banksofthesusquehanna com Retrieved May 14 2014 Observed Customer Seating and Standing Behaviors and Seat Preferences Onboard Subway Cars in New York City Archived August 24 2014 at the Wayback Machine by Aaron Berkovich Alex Lu Brian Levine and Alla V Reddy Top New York Projects PDF New York Construction June 2008 p 27 Archived from the original PDF on July 8 2011 Retrieved February 28 2010 a b Mayor Bloomberg and Governor Spitzer Announce Start of Construction on 7 Subway Extension Press release New York City Mayor s Office December 3 2007 Retrieved February 28 2010 No 7 Subway Line Extension Richard Dattner amp Partners Architects Archived from the original on March 15 2012 Retrieved February 28 2010 a b Direct Subway Runs to Flushing Astoria The New York Times October 15 1949 p 17 Retrieved December 18 2011 Cudahy Brian 2002 How We Got to Coney Island The Development of Mass Transportation in Brooklyn and Kings County Fordham University Press Cunningham Joseph DeHart Leonard O 1993 A History of the New York City Subway System J Schmidt R Giglio and K Lang New York City Transit Authority Facts amp Figures 1979 New York City Transit Authority 1979 pg 17 PDF http www laguardiawagnerarchive lagcc cuny edu pages FileBrowser aspx LinkToFile FILES DOC WAGNER FILES 06 021 0058 060284 11 PDF a b Crowell Paul September 15 1949 PLATFORMS ADDED AT 32 IRT STATIONS City Pays Out 13 327 000 in Lengthening Local Stops to Take 10 Car Trains The New York Times ISSN 0362 4331 Retrieved April 4 2018 a b Rail Line is Added to Subway System The New York Times May 16 1941 p 25 Retrieved October 4 2011 Freeman Ira Henry June 28 1956 Rockaway Trains to Operate Today PDF The New York Times Retrieved June 29 2015 First Train On Rockaway Line Runs This Afternoon Wave of Long Island Old Fulton New York Postcards June 28 1956 pp 1 6 TA s New Line To Rockaways Begins Today Fifty Piece Band To Play as Special Train Makes First Run The Leader Observer Old Fulton New York Postcards June 28 1956 p 1 Retrieved August 16 2016 To Rockaways Beach Trains In Operation Greenpoint Weekly Star Old Fulton New York Postcards June 29 1956 p 2 Retrieved August 16 2016 New Subway Unit Ready Far Rockaway IND Terminal Will Be Opened Today PDF The New York Times January 16 1958 Retrieved June 29 2015 Fifty Years of Subway Service to the Rockaways New York Division Bulletin 49 6 New York Division Electric Railroaders Association June 2006 Retrieved August 31 2016 via Issuu Subway Map PDF Metropolitan Transportation Authority September 2021 Retrieved September 17 2021 Report including analysis of operations of the New York City transit system for five years ended June 30 1945 New York City Board of Transportation of the City of New York 1945 hdl 2027 mdp 39015020928621 a b Report for the three and one half years ending June 30 1949 New York City Board of Transportation 1949 hdl 2027 mdp 39015023094926 a b New Subway Link Opening in Queens PDF The New York Times December 12 1950 Retrieved June 30 2015 Subway Extension In Queens Is Voted PDF The New York Times August 2 1946 Retrieved June 30 2015 Board of Transportation 1951 Thejoekorner com Retrieved March 25 2014 a b c d Caro Robert 1974 The Power Broker Robert Moses and the Fall of New York New York Knopf ISBN 978 0 394 48076 3 OCLC 834874 a b c d e f g h Feinman Mark The New York Transit Authority in the 1970s nycsubway org Retrieved April 23 2015 a b c d e f g h i j k l m n o p q r s t Feinman Mark The New York Transit Authority in the 1980s nycsubway org Retrieved April 23 2015 Seatless I R T Shuttle Trains Proposed by Transit Board Head SHUTTLE MAY RUN SEATLESS TRAINS PDF The New York Times Retrieved October 10 2016 Annual Report For The Year Ended June 30 1957 New York City Transit Authority October 1957 p 9 New Hi Speed Locals 1959 New York City Transit Authority Flickr Photo Sharing June 15 2016 Retrieved June 15 2016 IRT Will Open Express Station at Lexington and 59th Thursday New York Times November 9 1962 page 37 IRT Express Stop Opens at 59th St New York Times November 16 1962 page 22 New 59th Street Express Station brochure www thejoekorner com New York City Transit Authority November 15 1962 Retrieved January 25 2016 Martin Douglas November 17 1996 Subway Planners Lofty Ambitions Are Buried as Dead End Curiosities The New York Times Retrieved June 27 2015 1968 NYCTA Expansion Plans Picture Second Avenue Sagas a b David Grazian Mix It Up W W Norton amp Co Inc 2010 ISBN 0 393 92952 3 p 14 a b c d e f About New York City Graffiti part 1 a b c A History of Graffiti in Its Own Words New York a b Kelling George L 2009 How New York Became Safe The Full Story City Journal Retrieved November 24 2009 Glazer Nathan 1979 On Subway Graffiti in New York PDF National Affairs no 54 pp 3 12 archived from the original PDF on October 17 2015 retrieved November 24 2009 a b Hays Constance L May 10 1989 Transit Agency Says New York Subways Are Free of Graffiti The New York Times ISSN 0362 4331 Retrieved May 18 2020 a b MTA news Twenty Five Years Ago Today NYCT Subways Became Graffiti Free www mta info Metropolitan Transportation Authority May 12 2014 Archived from the original on June 29 2019 Retrieved October 30 2016 About New York City Graffiti part 2 a b Burks Edward C August 14 1976 215 More Daily Subway Runs Will Be Eliminated by Aug 30 The New York Times ISSN 0362 4331 Retrieved December 25 2016 via New York Times Archive Burks Edward C May 28 1975 4 Per Cent Cut in IRT Subway Service Scheduled for September The New York Times ISSN 0362 4331 Retrieved December 25 2016 via New York Times Archive Burks Edward C May 26 1975 The A Train a Loser May Cut Express Runs The New York Times ISSN 0362 4331 Retrieved December 25 2016 via New York Times Archive a b Burks Edward C December 18 1975 Subways to Trim Service In Rush Hours on Jan 18 The New York Times ISSN 0362 4331 Retrieved December 25 2016 via New York Times Archive Saxon Wolfgang December 15 1976 30 Million Cuts Proposed to Meet New York Transit Agency Shortage Plan Emphasizes Curbs on Off Hour Service Control Board Asked 42 Million Trim 30 MILLION IN CUTS IN TRANSIT PROPOSED The New York Times ISSN 0362 4331 Retrieved December 25 2016 via New York Times Archive Brooke James April 29 1986 Subway Aides to Weigh Cuts on 11 Routes The New York Times Retrieved January 25 2024 a b c d Gordy Margaret April 29 1986 MTA Studies Citywide Cuts in Subway Lines Stations Newsday pp 3 27 Retrieved January 25 2024 a b Finder Alan Connelly Mary May 4 1986 The Region On Shrinking The Subways The New York Times Retrieved January 25 2024 a b c Thomas R Brooks June 15 1970 Subway Roulette The Game Is Getting Dangerous New York Retrieved July 23 2015 a b c Seamen Mark de Cerreno Allison L C English Young Seth From Rescue to Renaissance The Achievements of the MTA Capital Program 1982 2004 PDF wagner nyu edu NYU Rudin Center for transportation policy and management Retrieved October 25 2015 Goldman Ari L December 30 1981 Calls for Subway Service Cuts Rise as System Continues to Limp Along The New York Times ISSN 0362 4331 Retrieved February 12 2018 Cummings Judith July 16 1981 6 Hour Nightly Shutdown of Subways Is Proposed The New York Times ISSN 0362 4331 Retrieved February 12 2018 Subway Service Shuffled to Cope In Repair Crisis Off Peak Runs Will Be Cut for a Rush Hour Reserve This Program Will Be Painful Trouble Shooters Added Subway Service Shuffled to Cope in a Repair Crisis PDF The New York Times November 5 1980 Retrieved February 12 2018 Edmonds Richard January 28 1982 City cites a rail improvement New York Daily News p 23 Retrieved May 12 2020 via newspapers com nbsp Edmonds Richard January 25 1981 Source for all the bullets Can We Save Our Subways New York Daily News pp 7 62 via newspapers com nbsp Rosen Richard October 26 1980 Riding for a fall New York Daily News p 8 Retrieved May 12 2020 via newspapers com nbsp Brooke James April 29 1986 Subway Aides to Weigh Cuts on 11 Routes The New York Times ISSN 0362 4331 Retrieved February 17 2018 Chaiken Jan M Lawless M Stevenson K A 1974 The Impact of Police Activity on Crime RAND Corporation Treaster Joseph B July 31 1974 Rear Subway Cars To Be Shut at Night To Reduce Crimes The New York Times a, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.