The Steinway Tunnel is a pair of tubes carrying the IRT Flushing Line (7 and <7>​ trains) of the New York City Subway under the East River between 42nd Street in Manhattan and 51st Avenue in Long Island City, Queens, in New York City. It was originally designed and built as an interurban trolley tunnel (with a narrow loading gauge and height), with stations near the current Hunters Point Avenue and Grand Central stations.

Steinway Tunnel
A view of one of the tubes in the Steinway Tunnel in February 2013
Overview
LineIRT Flushing Line (7 and <7>​ trains)
LocationEast River between Manhattan and Queens in New York City
SystemNew York City Subway
Operation
OpenedJune 13, 1915; 107 years ago (June 13, 1915)[1]
OperatorMetropolitan Transportation Authority
Technical
Length1.3 miles (2.1 km)
No. of tracks2

Planning for the tunnel began in 1885 but construction did not start until 1892 due to a lack of funds. The Steinway Tunnel was named for William Steinway, who provided the funding to start the initial construction. Steinway died in 1896 before the tunnel was completed, and the project sat dormant for several years, before the Interborough Rapid Transit Company (IRT) acquired the tunnel. The IRT resumed work in 1905 and completed the tubes in 1907 and was briefly opened for trolley service that September. Due to legal disputes, the tubes closed within a week and did not reopen for another eight years.[2] After the Dual Contracts were signed in 1913, the IRT began converting the tubes to subway use, and the tubes opened as part of the Flushing Line in 1915. In subsequent years, specific rolling stock were ordered to navigate the narrow dimensions of the tubes, and the tunnel suffered from numerous floods and fires.

Initial work

The East River Tunnel Railroad Company was founded on February 22, 1885, to construct a railroad tunnel crossing the East River. Its objective was to connect the Long Island Rail Road (LIRR)'s tracks in Long Island City and the New York Central & Hudson River Railroad's tracks in the City of New York in the same tunnel.[3] At that time period, movement through the New York metropolitan area was hampered by many large bodies of water such as the East River; there were no crossings across these water bodies, except for ferry service, which was not always possible or practical. In addition, plans to build the Blackwell's Island Bridge (later the Queensboro Bridge) were stagnant at the time.[4] The East River Tunnel Railroad Company soon dissolved, and on July 22, 1887, Walter S. Gurnee and Malcolm W. Niven founded the New York and Long Island Railroad Company (NY&LIRR), which began planning for the tunnel shortly afterward.[4][5]: 163 

The tunnel was to begin on the New York side near the Hudson River docks in Manhattan, from there it would go east along 42nd Street to Grand Central and carry straight on under the East River. In Long Island City, the tunnel portals were to be between 5th Street (now 49th Avenue) and 4th Street (now 50th Avenue). It would go under Jackson Avenue and finally Thomson Avenue, intersecting LIRR tracks at Hunterspoint Avenue. The total cost of the 5.6-mile (9.0 km) tunnel was to be US$11.7 million.[5]: 163 [4] The estimated total cost exceeded the financial capabilities of the company by far. In July 1891, piano maker William Steinway, a major landowner in Astoria, Queens, started to fund the tunnel.[5]: 164  He became a major shareholder and became the new chairman of the company, so the tunnel was named after him.[4] Steinway advised the company to utilize electricity to power the tunnel, believing that the construction of the tunnel would increase real-estate values within the vicinity.[4][6]

The route was finalized in the City of New York in 1890 and in Long Island City by 1891.[4] Construction was started on June 7, 1892, as a NY&LIRR project, and the bottom of the tunnel shaft was reached in December of the same year.[5]: 163  However, soon after the start of construction, there were many complications. The project was difficult due to complex geological formations beneath the river, and there were frequent blowouts and floods.[5]: 164–165  Construction was curtailed following an accident on December 28, 1892, during an attempt to heat frozen dynamite from an 85-foot (26 m) shaft at the corner of Vernon Boulevard, Jackson Avenue and 50th Avenue. An uncontrolled explosion killed five and injured fifty, and heavily damaged numerous surrounding houses.[5]: 164–165 [7] Due to high compensation claims, the company was financially ruined, and attempts to raise additional funds failed because of the stock market crash of 1893.[5]: 164–165 [2] Work was stopped as a result, and it was boarded up. Investors refused to fund the tunnel because they feared that it was unsafe.[5]: 165  Attempts to resume construction were occasionally made until Steinway died in 1896.[4]

The Belmont era

 
The Steinway Tunnel's Queens portals at left; to the right are the East River Tunnels' portals

In 1900, the Interborough Rapid Transit Company (IRT), headed by August Belmont Jr., was awarded the contract for construction and operation of the city's subway line and a few years later the IRT engineered a takeover of Manhattan's elevated railways, thus gaining a monopoly on the city's rapid transit services. In February 1902, the IRT bought the New York & Long Island Railroad and tram operators New York and Queens County Railway for a similar monopoly in Queens.[4][5]: 165 

The IRT prepared surveys and plans from scratch.[5]: 165  For the proposed tram service under the East River, the plans for the tunnel were modified for dedicated tram operation. The tunnel's trackbed was raised, the gradient increased, and the route shortened. The tunnel was to turn at a loop at the corner of 42nd Street and Park Avenue in Manhattan and go as far as Vernon Boulevard in Queens. There, the tram of the New York and Queens County Railway was to be connected via a ramp. These three underground stations were Lexington Avenue in Manhattan and Jackson Avenue and Van Alst Avenue in Queens. The total cost amounted to $8 million.[4] The city objected to the tunnel project multiple times and after several disasters nearly stopped it.[5]: 166–167 

The westernmost of the four shafts for the tunnel was in Manhattan and was numbered #1, while the easternmost shaft, in Queens, was numbered #4. Construction began on July 14, 1905, when shaft #4 was sunk; shaft #2 on the opposite shore was sunk by September 1. Shaft #3 was sunk in the Man-O-War Reef, a granite outcrop in the East River that was expanded and renamed Belmont Island.[4] Four workers were killed in a 1906 shaft accident under Belmont Island.[8] The tunnel was holed through on May 16, 1907, and was completed in September of that year, after 26 months of construction.[4][2] Buildings for the tunnel's construction had been erected on Belmont Island; these stayed up until at least 1918.[9]

Fifty tramcars were made available for operation through the tunnel. They possessed a 42-foot-5-inch (12.93 m)-long and 8-foot-11-inch (2.72 m)-wide all-steel superstructure with double-sided semi-open entrances at the ends. Power was drawn from an iron rail on the ceiling, to which the car roof's 11+38-inch (290 mm)-high pantograph would attach. The cars were also fitted with rod pantographs for street operation.[4]

The first trolley trip in the Steinway Tunnel was scheduled for September 20, 1907, but was postponed due to a power failure.[2] Shortly afterward,[a] trolley cars ran through the tunnel as part of a demonstration run.[5]: 168  On September 29, 1907, a short circuit on the overhead wires caused a small fire, and the tunnel was shut down.[2] Belmont did not have a franchise to operate a transit line. The concession to operate the tunnel had expired on January 1, 1907, and the city of New York was unwilling to renew the contract. [4] For the next five years, the tunnel, with trolley loops on both the Manhattan and Queens sides, remained unused.[2] In 1913, Belmont sold the tunnel to the city government after the IRT signed the Dual Contracts, which incorporated the Steinway Tunnel as part of the new Flushing subway line.[4][5]: 168 

Subway operation

 
Vernon Boulevard–Jackson Avenue station, one of three original subway stations in the Steinway Tunnel

Initially, the IRT intended to use the tunnel for trolleys;[5]: 165  however, it subsequently decided instead to use the tubes for a heavy-rail rapid transit line.[4] After the IRT measured the tubes, the company found that third rail installation could be possible with small modifications. Regular subway cars could not use the loops and the ramp because of the tight 50-foot (15 m) radius of the loops and the steep 6% incline. The roadbed and the rail were determined to be usable for subway service, but even so, the duct banks in the tunnel were replaced. The platforms could be easily extended, and it was also found that the tunnel's width corresponded to the width specifications of the existing IRT subway's car fleet.[4][10]

Work began in 1913,[5]: 1735  and the tubes were modified to accommodate IRT subway cars in 1914. The work included removing part of the tunnel walls on the Manhattan side and building a cavern to create a track crossover between the tubes.[2] The first IRT Steinway test train between Grand Central and Vernon Avenue (today's Vernon Boulevard–Jackson Avenue station) ran June 13, 1915,[1] with a regularly scheduled shuttle service beginning June 22.[11] The planned metro route was to go from Times Square through the tunnel over to Long Island City and from there continue towards Flushing. The IRT was to operate this line, with the trackage east of Queensboro Plaza to be shared by the Brooklyn Rapid Transit Company (later the Brooklyn–Manhattan Transit Corporation, or BMT).[4][12]

Meanwhile, the construction work continued on the planned route. To the east of the tunnel, the Hunters Point Avenue subway station went up to the level of the Hunterspoint Avenue LIRR station. Immediately east of it was a ramp up to the elevated subway towards Queensboro Plaza. Hunters Point Avenue opened on February 15, 1916, and on November 5 of the same year, it was extended to Queensboro Plaza. Because the line did not have track connections to the rest of the IRT network, a provisional maintenance workshop was operated at the tunnel ramp until 1928.[4] To the west, construction began in 1922. The tunnel was extended to Fifth Avenue on March 23, 1926,[13] and Times Square on March 14, 1927.[4][14] When Belmont modified the IRT Flushing Line to extend to Times Square and to Flushing, it was found that the loops could not be used for the extensions. The loops on the Queens side of the tunnel were obliterated in the wake of new construction. The loop on the Manhattan side, however, is intact and occupied by maintenance rooms, although the ceiling third rail still exists in the loop. The line from Times Square to Flushing was completed in 1928, when the station at Flushing opened.[4][15]

Since the tunnel ramps towards Queens were significantly steeper than normal IRT specifications, with a gradient of 4%, special rolling stock had to be procured for the Steinway Tunnel line. The "Steinway"-type subway car had the same dimensions as an ordinary subway cars of the IRT, but included modified gear boxes. Initially, twelve single-car consists were approved for the original shuttle.[4] Because of additional construction to the route, another 126 cars were added to the fleet.[16] The 50 "World's Fair"-type cars, used for the 1939 New York World's Fair, used the same type of gear boxes.[4] With the 1948 introduction of four-motor subway cars of types R12 and R14, the need for a special drive was gone, as the Steinway Tunnel could now be driven by conventional railcars.[4] In 1949, BMT services stopped operating on the Flushing Line east of Queensboro Plaza, and the IRT was assigned exclusive operation of the line.[17]

In subsequent years, the tubes of the Steinway Tunnel were difficult to maintain: they were prone to flooding, and the tube walls were much narrower than other tunnels in the subway system, with almost no clearance on each side of the train.[18] After a train got stuck in the tunnel in 1971, a passenger died of a heart attack.[19] A fire broke out on a train in the tunnel in 1973, killing one passenger and trapping over a thousand in the middle of the tunnel, after the collapse of an archway.[20] In 1991, the tubes were flooded to 8 feet (2.4 m) after a water main broke on the Manhattan side.[21] The next year, an electrical fire in the tunnel melted several feet of steel rail, although the tunnel's exhaust fans were working properly.[22] After Hurricane Sandy-related storm surges flooded the tunnel in 2012, the tubes were rebuilt in a $29 million project that took place between 2013 and April 2016.[23][24] To protect the tunnel from future flooding, two retaining walls will be installed on either side of the tunnel portal in Queens, and flex gates would be installed to prevent water from entering the tunnel.[25] The project is estimated to cost $15 million, and work was scheduled to begin in May 2021.[26]

References

Notes

  1. ^ The New York Times cites September 21 as the date of the first trolley run.[2] while author Clifton Hood cites September 24.[5]: 168 

Citations

  1. ^ a b "First Subway Car in Steinway Tunnel" (PDF). The New York Times. June 14, 1915. p. 15. Retrieved July 2, 2010.
  2. ^ a b c d e f g h Burks, Edward C. (September 2, 1973). "The Ill‐Starred History Of an Old Subway Tunnel". The New York Times. ISSN 0362-4331. Retrieved April 8, 2020.
  3. ^ "Tunnel Under the East River" (PDF). The New York Times. February 22, 1885. ISSN 0362-4331. Retrieved January 9, 2018.
  4. ^ a b c d e f g h i j k l m n o p q r s t u v w Rogoff, David (1960). "The Steinway Tunnels". Electric Railroads. No. 29. Electric Railroaders' Association.
  5. ^ a b c d e f g h i j k l m n o p Hood, Clifton (2004). 722 Miles: The Building of the Subways and How They Transformed New York (Centennial ed.). Baltimore: Johns Hopkins University Press. pp. 163–168. ISBN 978-0-8018-8054-4. Retrieved August 26, 2009.
  6. ^ "Rapid-Transit Systems; One Plan or Parts of Several May Be Adopted. the Availability and Utility of a Roomy Tunnel – Speed, Light, and Cleanliness Obtainable by the Use of Electricity" (PDF). The New York Times. December 28, 1890. ISSN 0362-4331. Retrieved January 9, 2018.
  7. ^ "Want the Blame Placed.; Strong Feeling Over Long Island City's Disaster" (PDF). The New York Times. December 30, 1892. ISSN 0362-4331. Retrieved January 9, 2018.
  8. ^ "Four Lose Their Lives in Tunnel Disaster". Los Angeles Herald. January 17, 1906. Retrieved December 20, 2018 – via California Digital Newspaper Collection.
  9. ^ New York (N.Y.) (1918). The City Record: Official Journal. p. 3540. Retrieved May 26, 2020.
  10. ^ New Subways For New York: The Dual System of Rapid Transit Chapter 2: Interborough Routes and Stations. New York State Public Service Commission. 1913.
  11. ^ "Queensboro Tunnel Officially Opened" (PDF). The New York Times. June 23, 1915. p. 22. Retrieved July 2, 2010.
  12. ^ New Subways For New York: The Dual System of Rapid Transit Chapter 1: Dual System of Rapid Transit. New York State Public Service Commission. 1913.
  13. ^ "Fifth Av. Station of Subway Opened" (PDF). The New York Times. March 23, 1926. p. 29.
  14. ^ "New Queens Subway Opened to Times Sq" (PDF). The New York Times. March 15, 1927. p. 1.
  15. ^ "Flushing Line Opens Jan. 21" (PDF). The New York Times. January 12, 1928. p. 12.
  16. ^ Sansone, Greg (2004). New York Subways: An Illustrated History of New York City's Transit Cars (Centennial ed.). Baltimore: Johns Hopkins University Press. p. 84. ISBN 9780801879227.
  17. ^ "Direct Subway Runs To Flushing, Astoria" (PDF). The New York Times. October 15, 1949. ISSN 0362-4331. Retrieved October 7, 2017.
  18. ^ Donohue, Pete (March 21, 2011). "Ancient Steinway Tunnel is No. 1 headache for No. 7 train". New York Daily News. Retrieved April 8, 2020.
  19. ^ Prial, Frank J. (May 28, 1971). "Hazards Cited in Rescuing Stranded IRT Passengers". The New York Times. ISSN 0362-4331. Retrieved December 25, 2016.
  20. ^ Montgomery, Paul L. (August 29, 1973). "1,000 Trapped in an IRT Tunnel Accident". The New York Times. ISSN 0362-4331. Retrieved April 8, 2020.
  21. ^ Sims, Calvin (October 19, 1991). "A Day After the Deluge, It's Back to 'Normal'". The New York Times. ISSN 0362-4331. Retrieved April 8, 2020.
  22. ^ Treaster, Joseph B. (March 24, 1992). "East River Tunnel Fire Stops No. 7 Subway". The New York Times. ISSN 0362-4331. Retrieved April 8, 2020.
  23. ^ Sneider, Julie (November 2016). "Rail Insider-Hurricane Sandy: Four years later, New York City Transit is still fixing, fortifying the rail system. Information For Rail Career Professionals From Progressive Railroading Magazine". Progressive Railroading. Retrieved April 8, 2020.
  24. ^ "MTA Spends $774M on New Technology to Increase Train Service, Reliability on 7 Line". mta.info. Metropolitan Transportation Authority. February 24, 2017. Retrieved May 21, 2020.
  25. ^ "Eye on the Future MTA Contract Solicitations Information About Contracts that Will Be Advertised for Professional Services, Construction, and Equipment Procurement December 2019 – November 2020" (PDF). mta.info. Metropolitan Transportation Authority. December 2019. Retrieved May 21, 2020.
  26. ^ "ET070308 Mitigation: Steinway Portal". mta.info. Metropolitan Transportation Authority. 2020. Retrieved May 21, 2020.

Further reading

  • IRT Corona/Flushing Line from nycsubway.org.
  • Anastasio, Joe (September 4, 2012). "Grand Central Trolley Loop". ltvsquad.com. Retrieved July 31, 2015.
  • Cudahy, Brian J. (1995). Under the Sidewalks of New York, the story of the greatest subway system in the world (2nd ed.). New York: Fordham University Press. ISBN 0823216187. isbn:0823216187.
  • Baard, Erik; Jackson, Thomas; Melnick, Richard (2005). "The East River". Greater Astoria Historical Society. Charleston: Arcadia Publishing. ISBN 073853787X.

steinway, tunnel, pair, tubes, carrying, flushing, line, trains, york, city, subway, under, east, river, between, 42nd, street, manhattan, 51st, avenue, long, island, city, queens, york, city, originally, designed, built, interurban, trolley, tunnel, with, nar. The Steinway Tunnel is a pair of tubes carrying the IRT Flushing Line 7 and lt 7 gt trains of the New York City Subway under the East River between 42nd Street in Manhattan and 51st Avenue in Long Island City Queens in New York City It was originally designed and built as an interurban trolley tunnel with a narrow loading gauge and height with stations near the current Hunters Point Avenue and Grand Central stations Steinway TunnelA view of one of the tubes in the Steinway Tunnel in February 2013OverviewLineIRT Flushing Line 7 and lt 7 gt trains LocationEast River between Manhattan and Queens in New York CitySystemNew York City SubwayOperationOpenedJune 13 1915 107 years ago June 13 1915 1 OperatorMetropolitan Transportation AuthorityTechnicalLength1 3 miles 2 1 km No of tracks2Planning for the tunnel began in 1885 but construction did not start until 1892 due to a lack of funds The Steinway Tunnel was named for William Steinway who provided the funding to start the initial construction Steinway died in 1896 before the tunnel was completed and the project sat dormant for several years before the Interborough Rapid Transit Company IRT acquired the tunnel The IRT resumed work in 1905 and completed the tubes in 1907 and was briefly opened for trolley service that September Due to legal disputes the tubes closed within a week and did not reopen for another eight years 2 After the Dual Contracts were signed in 1913 the IRT began converting the tubes to subway use and the tubes opened as part of the Flushing Line in 1915 In subsequent years specific rolling stock were ordered to navigate the narrow dimensions of the tubes and the tunnel suffered from numerous floods and fires Contents 1 Initial work 2 The Belmont era 3 Subway operation 4 References 4 1 Notes 4 2 Citations 5 Further readingInitial work EditThe East River Tunnel Railroad Company was founded on February 22 1885 to construct a railroad tunnel crossing the East River Its objective was to connect the Long Island Rail Road LIRR s tracks in Long Island City and the New York Central amp Hudson River Railroad s tracks in the City of New York in the same tunnel 3 At that time period movement through the New York metropolitan area was hampered by many large bodies of water such as the East River there were no crossings across these water bodies except for ferry service which was not always possible or practical In addition plans to build the Blackwell s Island Bridge later the Queensboro Bridge were stagnant at the time 4 The East River Tunnel Railroad Company soon dissolved and on July 22 1887 Walter S Gurnee and Malcolm W Niven founded the New York and Long Island Railroad Company NY amp LIRR which began planning for the tunnel shortly afterward 4 5 163 The tunnel was to begin on the New York side near the Hudson River docks in Manhattan from there it would go east along 42nd Street to Grand Central and carry straight on under the East River In Long Island City the tunnel portals were to be between 5th Street now 49th Avenue and 4th Street now 50th Avenue It would go under Jackson Avenue and finally Thomson Avenue intersecting LIRR tracks at Hunterspoint Avenue The total cost of the 5 6 mile 9 0 km tunnel was to be US 11 7 million 5 163 4 The estimated total cost exceeded the financial capabilities of the company by far In July 1891 piano maker William Steinway a major landowner in Astoria Queens started to fund the tunnel 5 164 He became a major shareholder and became the new chairman of the company so the tunnel was named after him 4 Steinway advised the company to utilize electricity to power the tunnel believing that the construction of the tunnel would increase real estate values within the vicinity 4 6 The route was finalized in the City of New York in 1890 and in Long Island City by 1891 4 Construction was started on June 7 1892 as a NY amp LIRR project and the bottom of the tunnel shaft was reached in December of the same year 5 163 However soon after the start of construction there were many complications The project was difficult due to complex geological formations beneath the river and there were frequent blowouts and floods 5 164 165 Construction was curtailed following an accident on December 28 1892 during an attempt to heat frozen dynamite from an 85 foot 26 m shaft at the corner of Vernon Boulevard Jackson Avenue and 50th Avenue An uncontrolled explosion killed five and injured fifty and heavily damaged numerous surrounding houses 5 164 165 7 Due to high compensation claims the company was financially ruined and attempts to raise additional funds failed because of the stock market crash of 1893 5 164 165 2 Work was stopped as a result and it was boarded up Investors refused to fund the tunnel because they feared that it was unsafe 5 165 Attempts to resume construction were occasionally made until Steinway died in 1896 4 The Belmont era Edit The Steinway Tunnel s Queens portals at left to the right are the East River Tunnels portals In 1900 the Interborough Rapid Transit Company IRT headed by August Belmont Jr was awarded the contract for construction and operation of the city s subway line and a few years later the IRT engineered a takeover of Manhattan s elevated railways thus gaining a monopoly on the city s rapid transit services In February 1902 the IRT bought the New York amp Long Island Railroad and tram operators New York and Queens County Railway for a similar monopoly in Queens 4 5 165 The IRT prepared surveys and plans from scratch 5 165 For the proposed tram service under the East River the plans for the tunnel were modified for dedicated tram operation The tunnel s trackbed was raised the gradient increased and the route shortened The tunnel was to turn at a loop at the corner of 42nd Street and Park Avenue in Manhattan and go as far as Vernon Boulevard in Queens There the tram of the New York and Queens County Railway was to be connected via a ramp These three underground stations were Lexington Avenue in Manhattan and Jackson Avenue and Van Alst Avenue in Queens The total cost amounted to 8 million 4 The city objected to the tunnel project multiple times and after several disasters nearly stopped it 5 166 167 The westernmost of the four shafts for the tunnel was in Manhattan and was numbered 1 while the easternmost shaft in Queens was numbered 4 Construction began on July 14 1905 when shaft 4 was sunk shaft 2 on the opposite shore was sunk by September 1 Shaft 3 was sunk in the Man O War Reef a granite outcrop in the East River that was expanded and renamed Belmont Island 4 Four workers were killed in a 1906 shaft accident under Belmont Island 8 The tunnel was holed through on May 16 1907 and was completed in September of that year after 26 months of construction 4 2 Buildings for the tunnel s construction had been erected on Belmont Island these stayed up until at least 1918 9 Fifty tramcars were made available for operation through the tunnel They possessed a 42 foot 5 inch 12 93 m long and 8 foot 11 inch 2 72 m wide all steel superstructure with double sided semi open entrances at the ends Power was drawn from an iron rail on the ceiling to which the car roof s 11 3 8 inch 290 mm high pantograph would attach The cars were also fitted with rod pantographs for street operation 4 The first trolley trip in the Steinway Tunnel was scheduled for September 20 1907 but was postponed due to a power failure 2 Shortly afterward a trolley cars ran through the tunnel as part of a demonstration run 5 168 On September 29 1907 a short circuit on the overhead wires caused a small fire and the tunnel was shut down 2 Belmont did not have a franchise to operate a transit line The concession to operate the tunnel had expired on January 1 1907 and the city of New York was unwilling to renew the contract 4 For the next five years the tunnel with trolley loops on both the Manhattan and Queens sides remained unused 2 In 1913 Belmont sold the tunnel to the city government after the IRT signed the Dual Contracts which incorporated the Steinway Tunnel as part of the new Flushing subway line 4 5 168 Subway operation Edit Vernon Boulevard Jackson Avenue station one of three original subway stations in the Steinway Tunnel Initially the IRT intended to use the tunnel for trolleys 5 165 however it subsequently decided instead to use the tubes for a heavy rail rapid transit line 4 After the IRT measured the tubes the company found that third rail installation could be possible with small modifications Regular subway cars could not use the loops and the ramp because of the tight 50 foot 15 m radius of the loops and the steep 6 incline The roadbed and the rail were determined to be usable for subway service but even so the duct banks in the tunnel were replaced The platforms could be easily extended and it was also found that the tunnel s width corresponded to the width specifications of the existing IRT subway s car fleet 4 10 Work began in 1913 5 1735 and the tubes were modified to accommodate IRT subway cars in 1914 The work included removing part of the tunnel walls on the Manhattan side and building a cavern to create a track crossover between the tubes 2 The first IRT Steinway test train between Grand Central and Vernon Avenue today s Vernon Boulevard Jackson Avenue station ran June 13 1915 1 with a regularly scheduled shuttle service beginning June 22 11 The planned metro route was to go from Times Square through the tunnel over to Long Island City and from there continue towards Flushing The IRT was to operate this line with the trackage east of Queensboro Plaza to be shared by the Brooklyn Rapid Transit Company later the Brooklyn Manhattan Transit Corporation or BMT 4 12 Meanwhile the construction work continued on the planned route To the east of the tunnel the Hunters Point Avenue subway station went up to the level of the Hunterspoint Avenue LIRR station Immediately east of it was a ramp up to the elevated subway towards Queensboro Plaza Hunters Point Avenue opened on February 15 1916 and on November 5 of the same year it was extended to Queensboro Plaza Because the line did not have track connections to the rest of the IRT network a provisional maintenance workshop was operated at the tunnel ramp until 1928 4 To the west construction began in 1922 The tunnel was extended to Fifth Avenue on March 23 1926 13 and Times Square on March 14 1927 4 14 When Belmont modified the IRT Flushing Line to extend to Times Square and to Flushing it was found that the loops could not be used for the extensions The loops on the Queens side of the tunnel were obliterated in the wake of new construction The loop on the Manhattan side however is intact and occupied by maintenance rooms although the ceiling third rail still exists in the loop The line from Times Square to Flushing was completed in 1928 when the station at Flushing opened 4 15 Since the tunnel ramps towards Queens were significantly steeper than normal IRT specifications with a gradient of 4 special rolling stock had to be procured for the Steinway Tunnel line The Steinway type subway car had the same dimensions as an ordinary subway cars of the IRT but included modified gear boxes Initially twelve single car consists were approved for the original shuttle 4 Because of additional construction to the route another 126 cars were added to the fleet 16 The 50 World s Fair type cars used for the 1939 New York World s Fair used the same type of gear boxes 4 With the 1948 introduction of four motor subway cars of types R12 and R14 the need for a special drive was gone as the Steinway Tunnel could now be driven by conventional railcars 4 In 1949 BMT services stopped operating on the Flushing Line east of Queensboro Plaza and the IRT was assigned exclusive operation of the line 17 In subsequent years the tubes of the Steinway Tunnel were difficult to maintain they were prone to flooding and the tube walls were much narrower than other tunnels in the subway system with almost no clearance on each side of the train 18 After a train got stuck in the tunnel in 1971 a passenger died of a heart attack 19 A fire broke out on a train in the tunnel in 1973 killing one passenger and trapping over a thousand in the middle of the tunnel after the collapse of an archway 20 In 1991 the tubes were flooded to 8 feet 2 4 m after a water main broke on the Manhattan side 21 The next year an electrical fire in the tunnel melted several feet of steel rail although the tunnel s exhaust fans were working properly 22 After Hurricane Sandy related storm surges flooded the tunnel in 2012 the tubes were rebuilt in a 29 million project that took place between 2013 and April 2016 23 24 To protect the tunnel from future flooding two retaining walls will be installed on either side of the tunnel portal in Queens and flex gates would be installed to prevent water from entering the tunnel 25 The project is estimated to cost 15 million and work was scheduled to begin in May 2021 26 References EditNotes Edit The New York Times cites September 21 as the date of the first trolley run 2 while author Clifton Hood cites September 24 5 168 Citations Edit a b First Subway Car in Steinway Tunnel PDF The New York Times June 14 1915 p 15 Retrieved July 2 2010 a b c d e f g h Burks Edward C September 2 1973 The Ill Starred History Of an Old Subway Tunnel The New York Times ISSN 0362 4331 Retrieved April 8 2020 Tunnel Under the East River PDF The New York Times February 22 1885 ISSN 0362 4331 Retrieved January 9 2018 a b c d e f g h i j k l m n o p q r s t u v w Rogoff David 1960 The Steinway Tunnels Electric Railroads No 29 Electric Railroaders Association a b c d e f g h i j k l m n o p Hood Clifton 2004 722 Miles The Building of the Subways and How They Transformed New York Centennial ed Baltimore Johns Hopkins University Press pp 163 168 ISBN 978 0 8018 8054 4 Retrieved August 26 2009 Rapid Transit Systems One Plan or Parts of Several May Be Adopted the Availability and Utility of a Roomy Tunnel Speed Light and Cleanliness Obtainable by the Use of Electricity PDF The New York Times December 28 1890 ISSN 0362 4331 Retrieved January 9 2018 Want the Blame Placed Strong Feeling Over Long Island City s Disaster PDF The New York Times December 30 1892 ISSN 0362 4331 Retrieved January 9 2018 Four Lose Their Lives in Tunnel Disaster Los Angeles Herald January 17 1906 Retrieved December 20 2018 via California Digital Newspaper Collection New York N Y 1918 The City Record Official Journal p 3540 Retrieved May 26 2020 New Subways For New York The Dual System of Rapid Transit Chapter 2 Interborough Routes and Stations New York State Public Service Commission 1913 Queensboro Tunnel Officially Opened PDF The New York Times June 23 1915 p 22 Retrieved July 2 2010 New Subways For New York The Dual System of Rapid Transit Chapter 1 Dual System of Rapid Transit New York State Public Service Commission 1913 Fifth Av Station of Subway Opened PDF The New York Times March 23 1926 p 29 New Queens Subway Opened to Times Sq PDF The New York Times March 15 1927 p 1 Flushing Line Opens Jan 21 PDF The New York Times January 12 1928 p 12 Sansone Greg 2004 New York Subways An Illustrated History of New York City s Transit Cars Centennial ed Baltimore Johns Hopkins University Press p 84 ISBN 9780801879227 Direct Subway Runs To Flushing Astoria PDF The New York Times October 15 1949 ISSN 0362 4331 Retrieved October 7 2017 Donohue Pete March 21 2011 Ancient Steinway Tunnel is No 1 headache for No 7 train New York Daily News Retrieved April 8 2020 Prial Frank J May 28 1971 Hazards Cited in Rescuing Stranded IRT Passengers The New York Times ISSN 0362 4331 Retrieved December 25 2016 Montgomery Paul L August 29 1973 1 000 Trapped in an IRT Tunnel Accident The New York Times ISSN 0362 4331 Retrieved April 8 2020 Sims Calvin October 19 1991 A Day After the Deluge It s Back to Normal The New York Times ISSN 0362 4331 Retrieved April 8 2020 Treaster Joseph B March 24 1992 East River Tunnel Fire Stops No 7 Subway The New York Times ISSN 0362 4331 Retrieved April 8 2020 Sneider Julie November 2016 Rail Insider Hurricane Sandy Four years later New York City Transit is still fixing fortifying the rail system Information For Rail Career Professionals From Progressive Railroading Magazine Progressive Railroading Retrieved April 8 2020 MTA Spends 774M on New Technology to Increase Train Service Reliability on 7 Line mta info Metropolitan Transportation Authority February 24 2017 Retrieved May 21 2020 Eye on the Future MTA Contract Solicitations Information About Contracts that Will Be Advertised for Professional Services Construction and Equipment Procurement December 2019 November 2020 PDF mta info Metropolitan Transportation Authority December 2019 Retrieved May 21 2020 ET070308 Mitigation Steinway Portal mta info Metropolitan Transportation Authority 2020 Retrieved May 21 2020 Further reading Edit Wikimedia Commons has media related to Steinway Tunnel IRT Corona Flushing Line from nycsubway org Anastasio Joe September 4 2012 Grand Central Trolley Loop ltvsquad com Retrieved July 31 2015 Cudahy Brian J 1995 Under the Sidewalks of New York the story of the greatest subway system in the world 2nd ed New York Fordham University Press ISBN 0823216187 isbn 0823216187 Baard Erik Jackson Thomas Melnick Richard 2005 The East River Greater Astoria Historical Society Charleston Arcadia Publishing ISBN 073853787X Retrieved from https en wikipedia org w index php title Steinway Tunnel amp oldid 1124147399, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.