The Trans-Asian Railway (TAR) is a project to create an integrated freight railway network across Europe and Asia. The project is of the United Nations Economic and Social Commission for Asia and the Pacific (UNESCAP).

The project was initiated in the 1950s, with the objective of providing a continuous 8,750 miles (14,080 km) rail link between Singapore and Istanbul, Turkey, with possible further connections to Europe and Africa. At the time shipping and air travel were not as well developed, and the project promised to significantly reduce shipping times and costs between Europe and Asia. Progress in developing the TAR was hindered by political and economic obstacles throughout the 1960s, 1970s and early 1980s. By the 1990s, the end of the Cold War and normalisation of relations between some countries improved the prospects for creating a rail network across the Asian continent.[citation needed]

The TAR was seen as a way to accommodate the huge increases in international trade between Eurasian nations and facilitate the increased movements of goods between countries. It was also seen as a way to improve the economies and accessibility of landlocked countries like Laos, Afghanistan, Mongolia, and the Central Asian republics.

Much of the railway network already exists as part of the Eurasian Land Bridge, although significant gaps remain. A big challenge is the differences in rail gauge across Eurasia. Four major rail gauges (which measures the distance between rails) are in use across the continent: most of Europe, as well as Turkey, Iran, China, and the Koreas use the 1,435 mm (4 ft 8+12 in) gauge, known as Standard gauge; Russia and the former Soviet republics use a 1,520 mm (4 ft 11+2732 in) gauge; Finland uses a 1,524 mm (5 ft) gauge, both known as Russian gauge; the railways in India, Pakistan, Bangladesh and Sri Lanka use the 1,676 mm (5 ft 6 in) gauge, known as Indian gauge; and most of Southeast Asia has 1,000 mm (3 ft 3+38 in) metre gauge. For the most part the TAR would not change national gauges; mechanized transfer facilities would be built to transload shipping containers from train to train at the breaks of gauge.[citation needed]

Routes edit

By 2001, four corridors had been studied:

 
Connections in Southeast Asia, built (black), projected (yellow) and yet to open (red).

Agreement edit

The Trans-Asian Railway Network Agreement is an agreement signed on 10 November 2006, by seventeen Asian nations as part of a United Nations Economic and Social Commission for Asia and the Pacific (UNESCAP) effort to build a transcontinental railway network between Europe and Pacific ports in China.[2] The plan has sometimes been called the "Iron Silk Road" in reference to the historical Silk Road trade routes.[3] UNESCAP's Transport & Tourism Division began work on the initiative in 1992 when it launched the Asian Land Transport Infrastructure Development project.[4]

The agreement formally came into force on 11 June 2009.[5]

Network edit

The Trans-Asian Railway system will consist of four main railway routes. The existing Trans-Siberian railway, which connects Moscow to Vladivostok, will be used for a portion of the network in Russia.[citation needed] Another corridor to be included will connect China to Korea, Mongolia, Russia and Kazakhstan.[6] In 2003, the president of Kazakhstan proposed building a standard gauge link from Dostyk (on the Chinese border) to Gorgan in Iran; it has not yet been built.[7]

Standards edit

 
Map of the world's railways showing the different gauges in use.
  Meter gauge (1,000 mm)
  Cape gauge (1,067 mm)
  Standard gauge (1,435 mm)
  Russian gauge (1,520 mm)
      Five foot gauge (1,524 mm)
  Irish gauge (1,600 mm)
  Iberian gauge (1,668 mm)
  Indian gauge (1,676 mm)

Complicating the plan is the differences in rail gauges currently in use across the continent. While China, Iran, Laos and Turkey use 1,435 mm (4 ft 8+12 in) standard gauge tracks, tracks of Russia and Central Asia are gauged at 1,520 mm (4 ft 11+2732 in). In South Asia, India's and Pakistan's tracks are gauged at 1,676 mm (5 ft 6 in). In South East Asia, the tracks of Myanmar, Thailand, Vietnam and Malaysia are 1,000 mm (3 ft 3+38 in) metre gauge with some dual gauge tracks near the China–Vietnam border and within Bangladesh, and tracks in Indonesia and Japan are mostly 1,067 mm (3 ft 6 in) gauge.[4] This leads to time-consuming interchanges or transloading to handle the break of gauge at main connecting points in the network.

Other standards to consider include allowing for interoperability:

Participating nations edit

Transportation and railway ministers from forty one nations participated in the week-long conference[9] held in Busan, South Korea, where the agreement was formulated. The proposed 80,900-km railway network will originate from the Pacific seaboard of Asia and end on the doorsteps of Europe. The agreement's cosigners included the following participating countries:[2]

The 28 countries that did not sign the agreement at the conference had until 31 December 2007, to join and ratify the agreement.[10]

On 5 May 2007, officials in Bangladesh announced that the nation will sign on to the agreement at an upcoming meeting in New York City. The plan for the network includes three lines between India and Myanmar that traverse Bangladesh.[11] India made a similar announcement on 17 May 2007. As part of the agreement, India will build and rehabilitate rail links with neighboring Myanmar in projects that are estimated to cost more than 29.41 billion (US$730 million).[12] Bangladesh finally signed the agreement on 10 November 2007.[13]

India's Look-East connectivity policy has resulted in the launch of several connectivity projects with China and ASEAN nations.

Progress edit

The Northern Corridor was in operation as early as the 1960s, although at first only for Soviet Union-China trade. The Southern corridor has progressively opened up after 2000. Successes so far include:

Northern Line edit

  • Rail link from China to Kazakhstan (Turkestan–Siberia Railway and Lanxin railway, with break-of-gauge) has been completed since 1990, allowing cargo services such as Yiwu–London and Chongqing–Xinjiang–Europe lines
  • Second link from China to Kazakhstan (line ZhetigenKhorgos, completed in December 2011).
  • Direct freight service between Germany and China through Russia and Mongolia or Kazakhstan, operating from the first decade of the 2000s (transloading of container at break-of-gauge).

Southern Line edit

Southeast Asia edit

North–South Transport Corridor edit

  • Agreement in 2014 between Iran, Azerbaijan and Russia on completing the north–south corridor.[16] The missing link is Astara–Rasht, 167 km. On 7 January 2017, it was announced that construction on this section would start in 2017.[17]

See also edit

References edit

  1. ^ Trans-Asian rail connectivity: South Asian perspective, Daily Pioneer, 14 September 2021.
  2. ^ a b . VietNamNet. 11 November 2006. Archived from the original on 2 February 2008. Retrieved 15 November 2006.
  3. ^ "'Iron Silk Road' UN Treaty" (Press release). UNESCAP (reprinted by National Union of Rail, Maritime & Transport Workers [RMT] Bristol Rail Branch). 6 October 2006. Retrieved 15 November 2006.
  4. ^ a b Chartier, Pierre, UNESCAP (1 November 2005). "Trans-Asian Railway network nears agreement". Railway Gazette International. Retrieved 15 November 2006.{{cite web}}: CS1 maint: multiple names: authors list (link)
  5. ^ "Trans-Asian Railway Network Agreement comes into force". Railway Gazette International. 11 June 2009.
  6. ^ . Interfax China. 7 November 2006. Archived from the original on 28 September 2007. Retrieved 15 November 2006.
  7. ^ Kanat K Zhangaskin (1 August 2004). "Trans-Kazakhstan link will complete standard-gauge transcontinental artery". Railway Gazette International.
  8. ^ Adapter piece
  9. ^ . The Rising Nepal. 13 November 2006. Archived from the original on 28 September 2007. Retrieved 15 November 2006.
  10. ^ "TRANS-ASIA RAILWAY NETWORK AGREEMENT: Dhaka fails to sign deal for lack of cabinet approval". World Prout Assembly. 7 November 2006. Archived from the original on 27 September 2007. Retrieved 15 November 2006.
  11. ^ . 6 May 2007. Archived from the original on 29 September 2007. Retrieved 7 May 2007.
  12. ^ "India to join the Trans-Asian railway network". 17 May 2007. Retrieved 17 May 2007.
  13. ^ . 10 November 2007. Archived from the original on 12 November 2007. Retrieved 12 November 2007.
  14. ^ "Connecting China and Europe". Railway Gazette International. 25 April 2011. Retrieved 17 May 2011.
  15. ^ "Bangladesh-Myanmar rail connectivity". The Daily Star. 21 April 2016. Retrieved 8 April 2022.
  16. ^ Caspian corridor agreement
  17. ^ "'Construction of Rasht-Astara railway to be launched this year'".

External links edit

  • The Trans-Asian Railway 20 October 2020 at the Wayback Machine
  • streamlinesupplychain
  • Rail links between India and China
  • Future Southeast Asia – A map of proposed railways in Southeast Asia
  • Adapter piece

trans, asian, railway, confused, with, asian, railway, trans, asian, railway, project, create, integrated, freight, railway, network, across, europe, asia, project, united, nations, economic, social, commission, asia, pacific, unescap, project, initiated, 1950. Not to be confused with Pan Asian railway The Trans Asian Railway TAR is a project to create an integrated freight railway network across Europe and Asia The project is of the United Nations Economic and Social Commission for Asia and the Pacific UNESCAP The project was initiated in the 1950s with the objective of providing a continuous 8 750 miles 14 080 km rail link between Singapore and Istanbul Turkey with possible further connections to Europe and Africa At the time shipping and air travel were not as well developed and the project promised to significantly reduce shipping times and costs between Europe and Asia Progress in developing the TAR was hindered by political and economic obstacles throughout the 1960s 1970s and early 1980s By the 1990s the end of the Cold War and normalisation of relations between some countries improved the prospects for creating a rail network across the Asian continent citation needed The TAR was seen as a way to accommodate the huge increases in international trade between Eurasian nations and facilitate the increased movements of goods between countries It was also seen as a way to improve the economies and accessibility of landlocked countries like Laos Afghanistan Mongolia and the Central Asian republics Much of the railway network already exists as part of the Eurasian Land Bridge although significant gaps remain A big challenge is the differences in rail gauge across Eurasia Four major rail gauges which measures the distance between rails are in use across the continent most of Europe as well as Turkey Iran China and the Koreas use the 1 435 mm 4 ft 8 1 2 in gauge known as Standard gauge Russia and the former Soviet republics use a 1 520 mm 4 ft 11 27 32 in gauge Finland uses a 1 524 mm 5 ft gauge both known as Russian gauge the railways in India Pakistan Bangladesh and Sri Lanka use the 1 676 mm 5 ft 6 in gauge known as Indian gauge and most of Southeast Asia has 1 000 mm 3 ft 3 3 8 in metre gauge For the most part the TAR would not change national gauges mechanized transfer facilities would be built to transload shipping containers from train to train at the breaks of gauge citation needed Contents 1 Routes 2 Agreement 2 1 Network 2 1 1 Standards 2 2 Participating nations 3 Progress 3 1 Northern Line 3 2 Southern Line 3 3 Southeast Asia 3 4 North South Transport Corridor 4 See also 5 References 6 External linksRoutes editBy 2001 four corridors had been studied The Northern Corridor will link Europe and Northeast Asia via Germany Poland Belarus Russia Kazakhstan Mongolia China North Korea and South Korea with breaks of gauge at the Polish Belarusian border 1 435 mm or 4 ft 8 1 2 in to 1 520 mm or 4 ft 11 27 32 in the Kazakhstan Chinese border and the Mongolian Chinese border both 1 520 mm to 1 435 mm The 5 750 miles 9 250 km Trans Siberian Railway covers much of this route and currently carries large amounts of freight from East Asia to Moscow and on to the rest of Europe Due to political problems with North Korea freight from South Korea must currently be shipped by sea to the port of Vladivostok to access the route citation needed The Southern Corridor also called ITI DKD Y Istanbul Tehran Islamabad Delhi Kolkata Dhaka Yangon citation needed will go from Europe to Southeast Asia connecting Turkey Iran Pakistan India Bangladesh Myanmar and Thailand with links to China s Yunnan Province and via the Southeast Asian corridor to Malaysia and Singapore Gaps exist between Imphal Moreh in India and to Tamu Kalay also called Kale and Kalemyo in Myanmar between Chittagong Cox s Bazar in Bangladesh to Myanmar and between Myanmar and Thailand The section in eastern Iran between Bam and Zahedan has been completed Breaks of gauge occur or will occur at the Iran Pakistan border 1 435 mm or 4 ft 8 1 2 in to 1 676 mm or 5 ft 6 in the India Myanmar border 1 676 mm to 1 000 mm or 3 ft 3 3 8 in and to China 1 000 mm to 1 435 mm 1 nbsp Connections in Southeast Asia built black projected yellow and yet to open red A Southeast Asian network this primarily consists of the Kunming Singapore Railway citation needed The North South Corridor will link Northern Europe to the Persian Gulf The main route starts in Helsinki Finland and continues through Russia to the Caspian Sea where it splits into three routes a western route through Azerbaijan Armenia and western Iran a central route across the Caspian Sea to Iran via rail ferry and an eastern route through Kazakhstan Uzbekistan and Turkmenistan to eastern Iran The routes converge in the Iran s capital of Tehran and continue to the Iranian port of Bandar Abbas citation needed Agreement editThe Trans Asian Railway Network Agreement is an agreement signed on 10 November 2006 by seventeen Asian nations as part of a United Nations Economic and Social Commission for Asia and the Pacific UNESCAP effort to build a transcontinental railway network between Europe and Pacific ports in China 2 The plan has sometimes been called the Iron Silk Road in reference to the historical Silk Road trade routes 3 UNESCAP s Transport amp Tourism Division began work on the initiative in 1992 when it launched the Asian Land Transport Infrastructure Development project 4 The agreement formally came into force on 11 June 2009 5 Network edit The Trans Asian Railway system will consist of four main railway routes The existing Trans Siberian railway which connects Moscow to Vladivostok will be used for a portion of the network in Russia citation needed Another corridor to be included will connect China to Korea Mongolia Russia and Kazakhstan 6 In 2003 the president of Kazakhstan proposed building a standard gauge link from Dostyk on the Chinese border to Gorgan in Iran it has not yet been built 7 Standards edit nbsp Map of the world s railways showing the different gauges in use Meter gauge 1 000 mm Cape gauge 1 067 mm Standard gauge 1 435 mm Russian gauge 1 520 mm Five foot gauge 1 524 mm Irish gauge 1 600 mm Iberian gauge 1 668 mm Indian gauge 1 676 mm Complicating the plan is the differences in rail gauges currently in use across the continent While China Iran Laos and Turkey use 1 435 mm 4 ft 8 1 2 in standard gauge tracks tracks of Russia and Central Asia are gauged at 1 520 mm 4 ft 11 27 32 in In South Asia India s and Pakistan s tracks are gauged at 1 676 mm 5 ft 6 in In South East Asia the tracks of Myanmar Thailand Vietnam and Malaysia are 1 000 mm 3 ft 3 3 8 in metre gauge with some dual gauge tracks near the China Vietnam border and within Bangladesh and tracks in Indonesia and Japan are mostly 1 067 mm 3 ft 6 in gauge 4 This leads to time consuming interchanges or transloading to handle the break of gauge at main connecting points in the network Other standards to consider include allowing for interoperability Railway electrification 25 kV AC the world standard for new long distance and heavy duty construction since the 1950s Couplings buffers and chains Alliance or SA3 Some dual couplings and adapters 8 or barrier vehicles are possible Brakes air with or without electronically controlled pneumatic brakes ECP Loading gauge and structure gauge able to take tallest possible shipping container Possible double stacking Signalling systems where signals are electronic not physically visible and must be read by equipment in the locomotives or where the train must interact in different ways with the infrastructure Electromagnetic interference where radio waves noise from electric motors can interact with different signalling systems Rules and regulations Language including Seaspeak Break of gauge devices such as dual gauge Train on Train piggybacking or variable gauge axles Participating nations edit Transportation and railway ministers from forty one nations participated in the week long conference 9 held in Busan South Korea where the agreement was formulated The proposed 80 900 km railway network will originate from the Pacific seaboard of Asia and end on the doorsteps of Europe The agreement s cosigners included the following participating countries 2 nbsp Afghanistan nbsp Armenia nbsp Azerbaijan nbsp Bangladesh nbsp Belarus nbsp Bhutan nbsp Brunei nbsp Cambodia nbsp China nbsp India nbsp Indonesia nbsp Iran nbsp Kazakhstan nbsp Laos nbsp Mongolia nbsp Nepal nbsp Pakistan nbsp South Korea nbsp Russia nbsp Sri Lanka nbsp Tajikistan nbsp Thailand nbsp Turkey nbsp Turkmenistan nbsp Uzbekistan The 28 countries that did not sign the agreement at the conference had until 31 December 2007 to join and ratify the agreement 10 On 5 May 2007 officials in Bangladesh announced that the nation will sign on to the agreement at an upcoming meeting in New York City The plan for the network includes three lines between India and Myanmar that traverse Bangladesh 11 India made a similar announcement on 17 May 2007 As part of the agreement India will build and rehabilitate rail links with neighboring Myanmar in projects that are estimated to cost more than 29 41 billion US 730 million 12 Bangladesh finally signed the agreement on 10 November 2007 13 India s Look East connectivity policy has resulted in the launch of several connectivity projects with China and ASEAN nations Progress editThe Northern Corridor was in operation as early as the 1960s although at first only for Soviet Union China trade The Southern corridor has progressively opened up after 2000 Successes so far include Northern Line edit Rail link from China to Kazakhstan Turkestan Siberia Railway and Lanxin railway with break of gauge has been completed since 1990 allowing cargo services such as Yiwu London and Chongqing Xinjiang Europe lines Second link from China to Kazakhstan line Zhetigen Khorgos completed in December 2011 Direct freight service between Germany and China through Russia and Mongolia or Kazakhstan operating from the first decade of the 2000s transloading of container at break of gauge Southern Line edit The Eurasia Marmaray Tunnel connecting European Turkey and Asian Turkey opened in 2013 At that time the tunnel was isolated from rail network but finally got connected with the completion of Marmaray project in 2019 The first international freight train transporting magnesite and connecting Cukurhisar in Tepebasi Eskisehir to Austria ran through the tunnel last week of October 2019 Before this there was a freight train ferry there A train ferry across Lake Van from 1970s allowing rail services between Turkey and Iran Link from Iran to Central Asia Trans Caspian railway branch Tejen Sarakhs Mashhad completed in 1996 Link from Iran to Herat in Afghanistan completed 2013 citation needed Iran Pakistan A Bam Zahedan link with a break of gauge at Zahedan Pakistan railway uses broad gauge 1 676 mm 5 ft 6 in and Iran railway uses standard gauge 1 435 mm 4 ft 8 1 2 in In August 2009 a goods train carrying containers traveled from Islamabad Pakistan to Istanbul Turkey by April 2011 trains were running regularly 14 In 2016 Bangladesh decided to connect to the network with a rail line from Dohazari to Gundum near Myanmar border 15 Southeast Asia edit The Boten Vientiane railway opened in December 2021 completing the Central section of the line and forming a near through train connection from Kunming to Singapore with a break of gauge in Vientiane North South Transport Corridor edit Agreement in 2014 between Iran Azerbaijan and Russia on completing the north south corridor 16 The missing link is Astara Rasht 167 km On 7 January 2017 it was announced that construction on this section would start in 2017 17 See also edit nbsp Railways portal nbsp Asia portalTransAfricaRail African Union of Railways Asian Highway Network Bandhan Express Cosmopolitan Railway Greater East Asia Railroad Intercontinental and transoceanic fixed links International Union of Railways Japan Korea Undersea Tunnel Gyeongui Line Kosice Vienna broad gauge line Maitree Express Northern East West Freight Corridor One Belt One Road Transcontinental railroad Transmountain railroad International North South Transport CorridorReferences edit Trans Asian rail connectivity South Asian perspective Daily Pioneer 14 September 2021 a b Countries sign agreement on Trans Asian railway plan VietNamNet 11 November 2006 Archived from the original on 2 February 2008 Retrieved 15 November 2006 Iron Silk Road UN Treaty Press release UNESCAP reprinted by National Union of Rail Maritime amp Transport Workers RMT Bristol Rail Branch 6 October 2006 Retrieved 15 November 2006 a b Chartier Pierre UNESCAP 1 November 2005 Trans Asian Railway network nears agreement Railway Gazette International Retrieved 15 November 2006 a href Template Cite web html title Template Cite web cite web a CS1 maint multiple names authors list link Trans Asian Railway Network Agreement comes into force Railway Gazette International 11 June 2009 Trans Asian rail network agreement to be signed on Nov 10 Interfax China 7 November 2006 Archived from the original on 28 September 2007 Retrieved 15 November 2006 Kanat K Zhangaskin 1 August 2004 Trans Kazakhstan link will complete standard gauge transcontinental artery Railway Gazette International Adapter piece Nepal signs deal to build trans Asian railway network The Rising Nepal 13 November 2006 Archived from the original on 28 September 2007 Retrieved 15 November 2006 TRANS ASIA RAILWAY NETWORK AGREEMENT Dhaka fails to sign deal for lack of cabinet approval World Prout Assembly 7 November 2006 Archived from the original on 27 September 2007 Retrieved 15 November 2006 Bangladesh To Join 8 750 Mile Trans Asian Railway Network 6 May 2007 Archived from the original on 29 September 2007 Retrieved 7 May 2007 India to join the Trans Asian railway network 17 May 2007 Retrieved 17 May 2007 Bangladesh joins Trans Asian Railway Network Agreement 10 November 2007 Archived from the original on 12 November 2007 Retrieved 12 November 2007 Connecting China and Europe Railway Gazette International 25 April 2011 Retrieved 17 May 2011 Bangladesh Myanmar rail connectivity The Daily Star 21 April 2016 Retrieved 8 April 2022 Caspian corridor agreement Construction of Rasht Astara railway to be launched this year External links editThe Trans Asian Railway Archived 20 October 2020 at the Wayback Machine streamlinesupplychain Rail links between India and China Future Southeast Asia A map of proposed railways in Southeast Asia Adapter piece Retrieved from https en wikipedia org w index php title Trans Asian railway amp oldid 1180660285, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.