fbpx
Wikipedia

Shenzhen Metro

The Shenzhen Metro (simplified Chinese: 深圳地铁; traditional Chinese: 深圳地鐵; pinyin: Shēnzhèn Dìtiě) is the rapid transit system for the city of Shenzhen in Guangdong province, China. The Line 8 Extension - which opened on 27 December 2023 - put the network at 555.43 kilometres (345.13 miles) of trackage. It currently operates on 16 lines with 373 stations.[6] Despite having only opened on 28 December 2004, the Shenzhen Metro is the 5th longest metro system in China and 6th longest in the world. By 2035, the network is planned to comprise of 8 express and 24 non-express lines totaling 1,142 kilometres (710 miles) of trackage.

Shenzhen Metro
Overview
LocaleShenzhen
Transit typeRapid transit
Number of lines16:
1 2 3 4 5 6 6B 7 8 9 10 11 12 14 16 20
Number of stations373[a][1]
Daily ridership5.99 million (2021)[2]
8.4223 million (December 31, 2021 Record)[3]
Annual ridership1.8775 billion (2018)[4]
WebsiteSZMC (Shenzhen Metro Group)
MTR Corporation (Shenzhen) (Chinese only)
Operation
Began operation28 December 2004; 19 years ago (2004-12-28)
Operator(s)
Technical
System length555.43 km (345.13 mi)[5]
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification1,500 V DC overhead catenary or third rail
Top speed
  • 80 km/h (50 mph) (Lines 1, 2, 4, 5, 7, 8, 9, 10, 12, 16)
  • 90 km/h (56 mph) (Line 3)
  • 100 km/h (62 mph) (Line 6)
  • 120 km/h (75 mph) (Lines 11, 14, 20, Line 6 Branch)
System map

Shenzhen Metro
Simplified Chinese深圳地铁
Traditional Chinese深圳地鐵
Transcriptions
Standard Mandarin
Hanyu PinyinShēnzhèn Dìtiě
Yue: Cantonese
Yale RomanizationSàmján Dèihtít
JyutpingSam1zan3 Dei6tit3

Current system edit

Currently the network has 555.43 kilometres (345.13 miles) of route, operating on 16 lines with 373 stations.[7] Line 1, Line 4 and Line 10 run to the border crossings between the Shenzhen Special Economic Zone and the Hong Kong Special Administrative Region at Luohu/Lo Wu and Futian Checkpoint/Lok Ma Chau, where riders can transfer to Hong Kong's MTR East Rail line for travel onwards to Hong Kong.

 
The network map before the extension to Xiaomeisha in Line 8 on 27 December 2023.
Line Terminals
(District)
Service patterns Commencement Latest
extension
Length
km
Stations Operator
011 Luohu
(Luohu)
Airport East
(Bao'an)
LuohuAirport East
Partial: LuohuZhuzilin
2004 2011 41.04 30  
Shenzhen Metro Group
022 Chiwan
(Nanshan)
Liantang
(Luohu)
ChiwanLiantang
Rush Hour: WanxiaLiantang
Partial: HouhaiLiantang
2010 2020 39.6[8] 32
033 Futian Bonded Area
(Futian)
Shuanglong
(Longgang)
Futian Bonded AreaShuanglong
Rush Hour: HuaxinTangkeng
Partial: Futian Bonded AreaTangkeng
2010 2020 43.65 31
044 Futian Checkpoint
(Futian)
Niuhu
(Longhua)
Futian CheckpointNiuhu
AM Rush Hour: Futian CheckpointXikeng
2004 2020 31.3[9] 23  
MTR Corporation (Shenzhen)
055 Chiwan
(Nanshan)
Huangbeiling
(Luohu)
ChiwanHuangbeiling
Rush Hour: QianhaiwanHuangbeiling
Partial: ChanglingpiChiwan
ChanglingpiHuangbeiling
2011 2019 47.393[10] 34  
Shenzhen Metro Group
066 Science Museum
(Futian)
Songgang
(Bao'an)
Science MuseumSonggang
Partial: SonggangFenghuang Town/Science MuseumFenghuang Town
2020 49.4[11] 27
6B

6B

Guangming
(Guangming)
SIAT
(Guangming)
GuangmingSIAT 2022 6.13 4
07

7

Xili Lake
(Nanshan)
Tai'an
(Luohu)
Xili LakeTai'an
Partial: Antuo HillTai'an/XiliTai'an
2016 30.173[12] 27
8 Liantang
(Luohu)
Xiaomeisha
(Yantian)
Liantang ↔ Xiaomeisha 2020 2023 20.38 11
09

9

Qianwan
(Nanshan)
Wenjin
(Luohu)
QianwanWenjin
Partial: Shenzhen Bay ParkWenjin
2016 2019 36.18 32
10

10

Futian Checkpoint
(Futian)
Shuangyong Street
(Longgang)
Futian CheckpointShuangyong Street
Partial: Futian CheckpointGankeng
2020 29.3[11] 24
11

11

Gangxia North
(Futian)
Bitou
(Bao'an)
Gangxia NorthBitou
Partial: FutianBitou
2016 2022 53.14 19
12

12

Zuopaotai East
(Nanshan)
Waterlands Resort East
(Bao'an)
Zuopaotai East ↔ Waterlands Resort East
Partial: Zuopaotai East ↔ Huangtian
2022 40.54 33
14

14

Gangxia North
(Futian)
Shatian
(Pingshan)
Gangxia NorthShatian 2022 50.3 18
16

16

Universiade
(Longgang)
Tianxin
(Pingshan)
UniversiadeTianxin 2022 29.2 24
2020 Airport North
(Bao'an)
Convention & Exhibition City
(Bao'an)
Airport NorthConvention & Exhibition City 2021 8.43 5
Total 555 373

Line 1 edit

 
Airport East station of line 1

Line 1, formerly known as Luobao line, runs westward from Luohu to Airport East. Trains operate every 2 minutes during peak hours and every 4 minutes at other times. The line is operated by SZMC (Shenzhen Metro Group). Line 1's color is green.

Line 2 edit

 
Xianhu Road station of line 2

Line 2, formerly known as Shekou line, runs from Chiwan to Liantang. Line 2 is connected with Line 8 at Liantang station. The line is operated by SZMC (Shenzhen Metro Group). Line 2's color is orange, the same as Line 8.

Line 3 edit

 
Yitian station of line 3

Line 3, formerly known as Longgang line, runs from Futian Bonded Area to Shuanlong in Longgang, in the north-east part of the city. Construction began on 26 December 2005.[15] The line is operated by Shenzhen Metro Line 3 Operations, which has been a subsidiary of SZMC (Shenzhen Metro Group) since 11 April 2011 when an 80% stake was transferred to SZMC. Line 3's color is sky blue.

Line 4 edit

 
Mission Hills station of line 4

Line 4, formerly known as Longhua line, runs northward from Futian Checkpoint to Niuhu. Trains operate every 2.5 minutes at peak hours and every 6 minutes during off-peak hours. Stations from Futian Checkpoint to Shangmeilin Station are underground. The line has been operated by MTR Corporation (Shenzhen), a subsidiary of MTR Corporation, since 1 July 2010. Line 4's color is red.

Line 5 edit

 
Qianwan Park station of line 5

Line 5, formerly known as Huanzhong line, runs from Chiwan in the west to Huangbeiling in the east. Construction began in May 2009 and the line opened on 22 June 2011.[17] Line 5 required a total investment of 20.6 billion RMB. The line is operated by SZMC (Shenzhen Metro Group). Line 5's color is purple.

Line 6 edit

 
Guangming Street station of line 6

Line 6, formerly known as Guangming line, runs from Songgang in the north to Science Museum in the south, with a length of 49.4 km (30.7 mi) and a total of 27 stations. Construction began in August 2015 and the line opened on 18 August 2020. The line is operated by SZMC (Shenzhen Metro Group). Line 6's color is mint green.

Line 6 Branch edit

 
SIAT station of line 6B

Line 6 Branch, also known as Branch Line 6, runs from Guangming to SIAT in the north. The line opened on 28 November 2022. Line 6 Branch's color is teal.

Line 7 edit

 
Huanggang Checkpoint station of line 7

Line 7, formerly known as Xili line of the Shenzhen Metro, opened on 28 October 2016, with a length of 30.137 km (18.726 mi)[12] and a total of 27 stations. It connects the Xili Lake to Tai'an. The line travels East–West across Shenzhen in a "V" shape. The line is operated by SZMC (Shenzhen Metro Group). Line 7's color is navy blue.

Line 8 edit

 
Yantian Port West station of line 8

Line 8, formerly known as Yantian line of the Shenzhen Metro, opened on 28 October 2020, with a length of 20.377 km (12.662 mi)[12] and a total of 11 stations. It connects the eastern suburbs of Liantang to Yantian Road, then towards the beach resorts at Dameisha and Xiaomeisha. However, this line serves as the extension of Line 2 in actual operation. The line is operated by SZMC (Shenzhen Metro Group). Line 8's color is orange, the same as Line 2.

Line 9 edit

 
Menghai station of line 9

Line 9, formerly known as Meilin line or Neihuan line of the Shenzhen Metro, opened on 28 October 2016. The line runs eastward from Qianwan to Wenjin. It has 10 transfer stations. The line is 36.18 km (22.48 mi) long, running through the districts of Nanshan, Futian and Luohu. The line is operated by SZMC (Shenzhen Metro Group). Line 9's color is grey brown.

Line 10 edit

 
Huawei station of line 10

Line 10 formerly known as Bantian line, runs from Futian Checkpoint in the south to Shuangyong Street in the north, with a length of 29.3 km (18.2 mi) and a total of 24 stations. Construction began in September 2015 and the line opened on 18 August 2020. The line is operated by SZMC (Shenzhen Metro Group). Line 10's color is pink.

Line 11 edit

 
Nanshan station of line 11

Line 11, also known as the Airport Express, runs from Bitou in the northwest to Gangxia North in the city centre via Shenzhen Bao'an International Airport. Construction began in April 2012 and the line opened on 28 June 2016. Line 11 runs at a higher speed of 120 km/h (75 mph), however, the current line speed is limited to 80 km/h (50 mph). The line is operated by SZMC (Shenzhen Metro Group). Line 11's color is maroon.

Line 12 edit

 
Zhongwu South station of line 12

Line 12, also known as Nanbao Line, runs from Zuopaotai East in the southwest to Waterlands Resort East in the northwest. Construction began in 2018 and the line opened on 28 November 2022. Line 12's color is light purple.

Line 14 edit

 
Silian station of line 14

Line 14, also known as the Eastern Express, runs from Gangxia North in the city centre to Shatian in the northeast. Construction began in 2018 and the line opened on 28 October 2022. The line is operated by SZMC (Shenzhen Metro Group). Line 14's color is yellow.

Line 16 edit

 
Universiade station of line 16

Line 16, also known as Longping Line, runs from Universiade in the centre of Longgang to Tianxin in the northeast. Construction began in 2018 and the line opened on 28 December 2022. The line is operated by SZMC (Shenzhen Metro Group). Line 16's color is dark blue.

Line 20 edit

 
Shenzhen World station of line 20

Line 20, formerly known as Fuyong line, runs from Airport North in the north-west to Convention & Exhibition City near Shenzhen World. Construction began in September 2016 and the line opened on 28 December 2021. Line 20 runs at the same top speed as line 11, at 120 km/h (75 mph). The line is operated by SZMC (Shenzhen Metro Group). Line 20's color is light blue.

  1. ^ Liantang station is regarded as a non-interchange station

History edit

 
Evolution of the Shenzhen metro

Early planning edit

In late 1983, Party Secretary of Shenzhen Mayor Liang Xiang led a team to Singapore to study its mass transit system. Upon returning it was decided that 30 metres (98 ft 5 in) on each side of Shennan Avenue should be protected as a green belt, and to set aside a 16-metre (52 ft 6 in) wide median reserved for a light rail or light metro line.[19] In 1984, the "Shenzhen Special Economic Zone Master Plan (1985–2000)" pointed out that, with the growing population and traffic in Shenzhen, a light metro system would not have sufficient capacity to meet future demand. Instead the report proposed a heavy rail subway line to be built along Shennan Avenue.[20] The project was finally approved by the Central Planning Department in 1992.[21]

In August 1992, during and re-feasibility and rail network planning, The Shenzhen Municipal Government decided to move from building a light metro line to a heavy rail subway line. The rapid growth of Shenzhen City made a lower capacity light metro line impractical.[22] In 1994, Shenzhen organized the preparation of the "Shenzhen urban rail network master plan" to be incorporated into the "Shenzhen City Master Plan (1996–2010)".[23] The city's vision for an urban rail network would consists of nine lines. Of the nine transit lines, three of them would be commuter rail lines upgraded from existing national mainline railways. The total length of the proposed network would be about 270 km (170 mi). The three upgraded commuter rail lines would overlap the Guangzhou–Shenzhen railway, Pinghu–Nanshan railway and Pingyan railway.[23] This plan established the basic framework for the Shenzhen Metro network.[24]

Construction suspended and restarted edit

In December 1995, the State Council issued the "moratorium on approval of urban rapid transit projects" to suspend approval of rail transit projects in all Chinese cities except Beijing, Shanghai, and Guangzhou. The Shenzhen Metro project was postponed.[25] In 1996, prior to the handover of Hong Kong, authorities attempted to restart construction by renaming the project "The Luohu, Huanggang / Lok Ma Chau border crossing passenger rail connection project", stressing that the project is designed to meet the potential growing demand for cross-border passenger traffic after the handover.[23]

In 1997, Shenzhen reapplied its Subway plans to the State Planning Commission, and received approval in May 1998.[22] The project was renamed the "Shenzhen Metro first phase".[26] In July 1998, SZMC (Shenzhen Metro Group). was formally established.[26] By April 1999, the subway project feasibility study report has been approved by the state.

Phase I (1998–2004) edit

Construction of the first sections of Line 1 and Line 4 began in 1999. The grand opening of the Shenzhen Metro system occurred at 5:00 pm on Tuesday, December 28, 2004. This made Shenzhen the seventh city in mainland China to have a subway after Beijing, Tianjin, Shanghai, Guangzhou, Dalian and Wuhan.

Initially the trains operated at 15-minute frequencies and consisted of Line 1 services between Luohu and Shijie Zhi Chuang (now Window of the World) and the Line 4 services between Fumin and Shaonian Gong (now Children's Palace). Initially the English names of the stations were rendered in Hanyu Pinyin, but some of the names were changed to English translation with American spelling in mid-2011.

The Futian Checkpoint station opened on 28 June 2007 using the name Huanggang.[27]

Date Opened Line Termini Length
in km
Stations
28 December 2004
  Line 1
– phase 1
Luohu Window of the World 17.4 15
  Line 4
– phase 1 (initial section)
Fumin Children's Palace 3.4 4
28 June 2007
  Line 4
– phase 1 (extension)
Futian Checkpoint Fumin 1.1 1

Name changes edit

On April 23, 2008, Shenzhen Municipal Planning Bureau announced that it would change the nomenclature of Shenzhen's subway lines according to the "2007 Urban Rail Transit Plan Scheme". Instead of using numbers as the lines official designation, as typically used in other mainland Chinese metro systems, lines would be given Chinese names more akin to the Hong Kong MTR.[28] In 2010, the Scheme was reviewed and adjusted with new routes and names in addition to newly proposed lines. On 23 October 2013, the SZMC (Shenzhen Metro Group) decided that current operational lines will have their number and names combined, while future lines will only be numbered.[29] Due to the change in the construction order of several lines, some numerical names have been reviewed in order to prevent big jump between numbers. By 2016, only numerical names are used.

Lines currently in operation:

Original No. 2007 Scheme 2010 Scheme Current name
Line 1 Luobao Line Luobao Line (Line 1) Line 1
Line 2 Shekou Line Shekou Line (Line 2) Line 2
Line 3 Longgang Line Longgang Line (Line 3) Line 3
Line 4 Longhua Line Longhua Line (Line 4) Line 4
Line 5 Huanzhong Line Huanzhong Line (Line 5) Line 5
Line 7 Xili Line Xili Line (Line 7) Line 7
Line 8 Yantian Line Yantian Line (Line 8) Line 2 Extension (Line 8 Phase 1)
Line 9 Neihuan Line Meilin Line (Line 9) Line 9
Line 16 Pinghu Line Bantian Line (Line 16/Line 10) Line 10
Line 11 Airport Line Airport Line (Line 11) Line 11
Line 10 Bao'an Line Nanbao Line (Line 10/Line 12) Line 12
Line 14 Eastern Express Eastern Express (Line 14) Line 14
Line 12 Pingshan Line Longping Line (Line 12/Line 16) Line 16
- - Fuyong Line (Line 20) Line 20 (International Expo Conveyance Project)

Lines under construction:

Original No. 2007 Scheme 2010 Scheme Current Name
Line 15 Shiyan Line Shiyan Line (Line 15/Line 13) Line 13

Phase II (2007–2011) edit

From 2004 to 2007, there was a lack of official government interest and attention to expanding the subway after completion of Phase 1 with little or no active projects.[30] Subway construction speed was ridiculed as "earthworm speed".[31] On 17 January 2007 Shenzhen won the right to host the 2011 Universiade. In the bid Shenzhen committed to complete 155 km (96 mi) of subway lines before the games.[30] The mayor of Shenzhen at the time, Xu Zongheng, sharply criticized the speed and efficiency of Shenzhen's subway construction procedures and calls for reform.[32] Subsequently, the Shenzhen municipal government and various departments signed a liability form, requiring Phase II subway expansion to be completed in time for the Universiade.[33] Shenzhen Metro increased to over a hundred operating metro stations in June 2011, just before the Shenzhen Universiade games. In the span of two weeks, the network expanded from 64 km (40 mi) to 177 km (110 mi). This expansion increased rail transit's share of total public transit trips from 6% to 29% in 2014.[34][35][36][37]

Date Opened Line Termini Length
in km
Stations
28 September 2009
  Line 1
– phase 2 (trial)
Window of the World Shenzhen University 3.39 3
28 December 2010
  Line 2
– phase 1
Chiwan Window of the World 15.1 12
  Line 3
– phase 1 (elevated section)
Shuanglong Caopu 25.6 16
15 June 2011
  Line 1
– phase 2
Shenzhen University Airport East 23.6 12
16 June 2011
  Line 4
– phase 2 (first north extension)
Children's Palace Qinghu 15.9 10
22 June 2011
  Line 5
– phase 1
Qianhaiwan Huangbeiling 40.0 27
28 June 2011
  Line 2
– phase 2 (first east extension)
Window of the World Xinxiu 20.65 17
  Line 3
- phase 1 (underground section) & phase 2 (first south extension)
Caopu Yitian 16.52 14

Phase III (2012–2023) edit

In 2010, the Shenzhen Urban Planning and Land Resources Committee proposed a building program (Phase III) between 2011 and 2020. In 2011 this plan was approved by the NDRC. Phase III formally commenced in May 2011 with an expected cost of 125.6 billion yuan. It will cover Lines 6, 7, 8, 9, and 11 and will extend the length of the Shenzhen Metro to 348 kilometres (216 mi) and 10 lines.[38][39] In June 2011, the Shenzhen Urban Planning and Land Resources Commission started gather public input on Phase III station names.[40] On June 28, 2016, Line 11 opened being the first subway line in Shenzhen with 8 car trains and 120 km/h (75 mph) maximum service speed and the first in China with a First Class service. Lines 7 and 9 followed on October 28, 2016. South extension of Line 5 opened on 28 September 2019 and west extension of Line 9 opened on 8 December 2019. Line 6 and Line 10 opened on 18 August 2020 bringing the length of the Shenzhen Metro to 382.1 km (237.4 mi) and the fourth longest in China. Second east extension of Line 2, second south extension of Line 3, second north extension of Line 4 and phase 1 of Line 8 opened on 28 October 2020 bringing the length of the Shenzhen Metro to 411 km (255 mi).

Date Opened Line Termini Length
in km
Stations
28 June 2016 – phase 1 Futian Bitou 51.936 18
28 October 2016
  Line 7
– phase 1
Tai'an Xili Lake 30.173 28
  Line 9
– phase 1
Wenjin Hongshuwan South 25.38 22
28 September 2019
  Line 5
– phase 2
Qianhaiwan Chiwan 7.65[41] 7
8 December 2019
  Line 9
– phase 2
Hongshuwan South Qianwan 10.79[42] 10
18 August 2020
  Line 6
– phase 1 & 2
Science Museum Songgang 49.4[43] 27
Futian Checkpoint Shuangyong Street 29.3[43] 24
28 October 2020
  Line 2
– phase 3 (second east extension)
Xinxiu Liantang 3.82 3
  Line 3
– phase 3 (second south extension)
Yitian Futian Bonded Area 1.5 1
  Line 4
– phase 3 (second north extension)
Qinghu Niuhu 10.791[44] 8
  Line 8 (through operation to Line 2)
– phase 1
Liantang Yantian Road 12.367[45] 7
27 December 2023
  Line 8 (through operation to Line 2)
– phase 2
Yantian Road Xiaomeisha 8.01 4

Phase IV (2017–2025) edit

With the shortening of the Phase III implementation period,[46] a number of lines (Lines 16 and 12) planned in 2007's Phase III moved into the next phase.[47] By 2016, it was determined that Phase IV will have an implementation period between 2017 and 2022 and consist of 274 km (170 mi) of new subway.[48] Lines 13 and 14 which originally had a long term 2030 completion deadline were moved into Phase IV expansion. In addition, a branch line of Line 6 will connect with the neighboring Dongguan Rail Transit system.[49] Lines 12, 13, 14, and 16 and branch of Line 6 was approved by the NDRC in July 2017 and started construction in January 2018.[50][37]

Date Opened Line Termini Length
in km
Stations
28 October 2022 - phase 1 Gangxia North Shatian 50.3[37] 17[37]
28 November 2022 - phase 1 Guangming SIAT 6.13[37] 4[37]
- phase 1 Zuopaotai East Waterlands Resort East 40.54[37] 33[37]
28 December 2022 - phase 1 Universiade Tianxin 29.2[37] 24[37]

Phase IV revised expansion (2020–2025) edit

The first phase of Line 20 was fast tracked from Phase IV to provide a shuttle between Line 11 and a new International Convention Center, now called Convention & Exhibition City. The construction started in September 2016, but as for early 2019, the construction is paused because the Development and Reform Commission did not approve the project. The Phase IV revised plan approved by the NDRC on March 26, 2020, approved the first Phase of Line 20 allowing for construction to continue. The line eventually opened on 28 December 2021. Futian to Gangxia North in the first section of Phase 2 of Line 11 opened on 28 October 2022.

 
A map with fourth phase lines.


Date Opened Line Termini Length
in km
Stations
28 December 2021 - phase 1 Airport North Convention & Exhibition City 8.43 5
28 October 2022 - phase 2 (trial) Futian Gangxia North 1.6 1

Future expansion edit

Phase IV expansion edit

Expected opening Line Section Terminals Length
in km
Stations
28 October 2024[51][52] 13 Phase 1 South Shenzhen Bay Checkpoint Hi-Tech Central 22.45 7
2025 13 Phase 1 North Hi-Tech Central Shangwu 9

Phase IV Revised Expansion edit

The Phase IV revised plan approved by the NDRC on March 26, 2020, added a number of extension projects.[53]

Expected opening Line Section Terminals Length
in km
Stations
2024 3 Phase 4 Shuanglong Pingdi Liulian 9.35 7
7 Phase 2 Xili Lake Xuefu Hospital 2.45 2
2025 6B South extension Guangmingcheng Guangming 4.9 3
8 Phase 3 Xiaomeisha Xichong 4.26 1
11 Phase 2 Gangxia North Hongling South 4.39 3
12 Phase 2 Waterlands Resort East Songgang 8.16 5
13 Phase 2 Shangwu Gongming North 18.8 11
16 Phase 2 Universiade Xikeng 9.53 8
2026 13 South extension Shenzhen Bay Checkpoint Dongjiaotou 4.47 3

Miscellaneous edit

Line 5 west extension is part of Phase II expansion.

Expected opening Line Section Terminals Length
in km
Stations Phase
2025 5 West extension Huangbeiling Grand Theater 2.87 3 II

Phase V (2023-2028) edit

In the Shenzhen Metro 2007 masterplan proposed four more lines (Lines 13, 14, 15 and 16) which have a planned completion target of 2030.[54] In 2016, all aforementioned lines but Line 15 were designated as part of the Phase IV expansion, moving the completion date forward from 2030 to 2022. In 2012, four further lines Qiannan (Line 17), Pinghu (Line 18), Pingshan (Line 19) and Fuyong (Line 20) where unveiled, making the total planned length of the Shenzhen Metro to 720 km (447 mi) spread out over 20 lines. The first phase of Line 20 was fast-tracked and included in the Phase III revised expansion with a completion date of 2018. This leaves Line 15, 17-19 and the rest of Line 20 available for the next phase (Phase V) of subway expansion. In September 2022, the Shenzhen municipal government confirmed the projects proposed to be included in its phase V expansion. A total of 227 km (141 mi) of new lines are proposed.[55]

On March 31, 2023, the Bureau of Housing and Urban Rural Development of Shenzhen Metro Municipality will open the bidding for the fifth phase planning of Shenzhen Metro Metro, including Line 15, Line 17 Phase I, Line 19 Phase I, Line 20 Phase II (Airport East—Baishizhou), Line 22 Phase I, Line 25 Phase I, Line 27 Phase I, Line 29 Phase I and Line 32 Phase I, This means that these 9 lines have been approved with an investment amount of 191.1 billion yuan. However, Line 18 Phase I, Line 21 Phase I, Line 10 East Extension (Shenzhen Section) and Metro Line 11 North Extension (Shenzhen Section), which were previously proposed to be included in the fifth phase plan of Shenzhen Metro, were not included in this announcement.[56]

In June 2023, the Fifth Phase Construction Plan of Shenzhen Urban Rail Transit (2023-2028) has been approved for a total of 11 construction projects, including Line 15, Line 17 Phase I, Line 19 Phase I, Line 20 Phase II (Airport East—Baishizhou), Line 22 Phase I, Line 25 Phase I, Line 27 Phase I, Line 29 Phase I, Line 32 Phase I, Line 10 East Extension (Shenzhen Section) and Metro Line 11 North Extension (Shenzhen Section).[57] On 28 June 2023, Shenzhen Metro Line 15 started construction, followed by Line 17 Phase I and Line 20 Phase II on 10 October 2023, Line 22 Phase I on 2 January 2024 and Line 25 on 26 February 2024. Other construction projects will start in 2024.

Line Section Terminals Length
in km
Stations
10 East extension Shuangyong Street Huanggekeng 9.8 (2.9 in Shenzhen) 5 (1)[a]
11 North extension Bitou Chang'an 3.7 (0.8 in Shenzhen) 1 (0)[b]
14 West extension Gangxia North Xiangmihu West 1
15 Loop Line 32.2 24
17 Phase 1 Luohu West Shanglilang 18.8 18
19 Phase 1 Nantangwei Julong 12.5 12
20 Phase 2 Airport North Baishizhou 24.9 11
20 Phase 2.5 Baishizhou Futian Convention & Exhibition Centre 3
22 Phase 1 Shangsha Liguang 34.2 21
25 Phase 1 Shilong Jihua Hospital 16.2 14
27 Phase 1 Songpingcun Gangtou West 23.2 19
29 Phase 1 Hongshuwan South Xingdong 11.3 10
32 Phase 1 Xichong Kuichong East 9.5 5
Total 196.3 140
  1. ^ Only the connecting tunnel to the Dongguan boundary will be built, including the station reservation at Huanggekeng for future operation
  2. ^ Only the connecting tunnel to the Dongguan boundary will be built, Chang'an is located in Dongguan so it will not be built

Long-term plan edit

Aside from the set masterplan, at the 12th Guangdong Provincial People's Congress in January 2014,[58] it was proposed to extend Line 4 beyond the planned Phase III terminus at the Songyuan Bus Terminal in Guanlan. The proposal wanted to further extend this line to reach the future planned Dongguan Metro Line 4 at Tangxia station. This proposal aims to shorten the distance between the two cities in residents' minds, boost tourism industries in both cities and expand housing options. It would also allow for direct connection between Hong Kong and Dongguan. As the area in the proposed area is less developed, the cost in building the line is expected to be lower, with a feasibility study yet to be conducted. In addition to metro lines, 5 Pearl River Delta Rapid Transit lines connecting neighboring urban centers in the Pearl River Delta such as Dongguan, Huizhou, Foshan and Guangzhou, totaling 146 km (91 mi), have also been revealed.[59] In 2016, an even more ambitious masterplan, expanding the previously planned 20 lines to 32, was unveiled. The new plan envisions a 1,142 km (710 mi) subway network to be completed by 2030. This will allow for travel between the central and suburban districts to be shortened to 45 minutes and for public transit to make up more than 70% of all motorized trips in Shenzhen.[60]

Ridership edit

Annual Ridership
Yearmillion riders±% p.a.
2005[61] 58—    
2006[62] 90+55.17%
2007[63] 118+31.11%
2008[64] 136+15.25%
2009[65] 138+1.47%
2010[66] 163+18.12%
2011[67] 460+182.21%
2012[68] 781+69.78%
2013[69] 914+17.03%
2014[34]1,037+13.46%
2015[70] 1,122+8.20%
2016[71]1,297+15.60%
2017[72]1,654+27.53%
2018[73]1,878+13.54%
20192,018+7.45%
20201,623−19.57%
20212,178+34.20%
20221,751−19.61%

Since the opening of the first phase in 2004, there has been a steady growth in passenger traffic. In 2009 and 2010, passenger traffic soared with major openings of new phase 2 lines, with a three-fold increase in passenger traffic in 2010.[74] On 12 July 2019 it set a new record for its peak ridership at 6.63 million.[2]

July is the busiest month of the year for the Shenzhen Metro, accounting for 9.3% of annual passenger traffic, while January is the least busy month, accounting for only 6.7%. This is caused by Shenzhen's large migrant worker population.[75]

Fares and tickets edit

Metro rides are priced according to distance travelled, and fares vary from 2 RMB to 14 RMB.[76] Since December 2010 fares are based on a usage fee (2 RMB) + a distance fee. The distance fee is 1 RMB for each 4 km (2.5 mi) from 4 km (2.5 mi) to 12 km (7.5 mi); after that 1 RMB for each 6 km (3.7 mi) from 12 km (7.5 mi) to 24 km (15 mi) and finally 1 RMB for every 8 km (5.0 mi) over 24 km (15 mi) distance.[77] For passengers who wish to ride on business coach in line 11, they have to pay 3 times the amount of price that calculated by the regulations above.

Distance (km) Fares (RMB)[78]
0~12 1+1/per 4 km (2.5 mi)
12~24 5+1/per 6 km (3.7 mi)
over 24 7+1/per 8 km (5.0 mi)

Children under the height of 120 cm (3 ft 11 in) or aged below 6 may ride for free when accompanied by an adult.[79] The metro also offers free rides to senior citizens over the age of 65, the physically disabled and military personnel. Tickets for children between 120 cm (3 ft 11 in) and 150 cm (4 ft 11 in), or aged between 6 and 14 years, or middle school students, are half priced.

Metro fares can be paid for with single-ride tokens, multiple-ride Shenzhen Tong cards or 1- day passes.[80]

Tokens edit

 
Shenzhen Metro RFID Token

When using cash, a RFID token (NXP Mifare Classic) is purchased and used for a single, non-returnable journey. There are two different types of tokens, with green tokens for Standard Class, and yellow tokens used for Business Class which is only available on Line 11. All ticket vending machines offer both English and Chinese interface. The purchaser touches a station name to calculate the fare. After payment, a green token is dispensed, which must be scanned at the entrance station and deposited at the exit station. A penalty applies should a token be lost. Purchasers of green tokens cannot ride Business Class on Line 11 directly. Instead, they must get off at any transfer stations with Line 11 and purchase a separate yellow token.

Note that as of 2015, many machines accept only 5 or 10 RMB notes. The token(s) are only valid at the station where issued. Passengers are unable to buy an extra token for return journey prior to departure. Baggage X-Ray machines are located at each station, and may be staffed during peak hours.

Shenzhen Tong cards edit

Shenzhen Tong is a pre-paid currency card similar to Oyster Card system in London and the Octopus card system used in Hong Kong. The multiple fare card stores credit purchased at stations. The card can be used by waving it in front of the card reader located at all entrances and exits to the subway system. Riders who pay for metro fare with a card receive a 5% discount. Since 1 March 2008, riders who pay for a bus fare with a card and then a subway fare within 90 minutes receive an additional 0.4 RMB discount on the subway fare. Card users pay a distance based fare.

Since 30 June 2011, cards containing both a Shenzhen Tong and Hong Kong Octopus chip have been available in both Shenzhen and Hong Kong. There are plans to further integrate the two systems, and for a new card which will be accepted all over Guangdong province and China's two SARs.[81][82]

Unlike Hong Kong Octopus Cards, Shenzhen Tong cards cannot be sold back to the stations or have faults dealt with by SZMC. Instead, the customer must go to the offices of Shenzhen Tong. Students studying in Shenzhen can use the Shenzhen Tong to receive a 50% discount.

Note that discounts are not applicable for people who ride Business Class carriages on Line 11.

Metro cards can also be used on Shenzhen's public bus system.

Metro 1-day passes edit

Metro 1-day pass is a smart card that allowed the card holder have unlimited access of the metro system in 24 continuous hours. Passengers can purchase a 1-day pass for RMB 25 in the service center in any metro station. The pass will be activated and the passenger will have 24 continuous hour for unlimited access after the first entrance. When the pass expired, the pass is no longer available for entering a station but able to exiting a station and finish a journey in 27.5 hours. The 1-day passes are not applicable for Business Class carriages on Line 11.

Station facilities, amenities and services edit

Some stations have toilets (free of charge), and public telephones. SZMC also operates luggage storage facilities in the concourse above Luohu Station. Mobile phone service is available throughout the system provided by China Mobile, China Telecom, and China Unicom.[83]

Like the Hong Kong MTR, Guangzhou, and Foshan metros, station announcements are in Mandarin, Cantonese and English. Some announcements, such as train arrival, are in Mandarin and English only. Cantonese, an important local language, is chosen for the local Cantonese population as well as Cantonese speakers in Guangdong, Hong Kong and Macau.

The stations of Line 6 and Line 10 are the first metro stations in China to have 5G coverage.[84]

Equipment edit

 
Bombardier rolling stock on Line 1
 
CRRC Nanjing Puzhen rolling stock on Line 4
 
CRRC Zhuzhou rolling stock on Line 11 (Business Class)

Rolling stock edit

Line 1 edit

Line 2 edit

Line 3 edit

Line 4 edit

Line 5 edit

Line 6 edit

Line 6 Branch edit

Line 7 edit

Line 8 edit

  • 24 Zhuzhou Electric Locomotive Works Type A 6-car sets, traction units by CRRC Times Electric (258–281[801–824])

Line 9 edit

Line 10 edit

Line 11 edit

Line 12 edit

Line 14 edit

Line 16 edit

Line 20 edit

Signalling system edit

On Line 1 and Line 4, Siemens supplied 7 (Phase 1) and 6 (Phase 2) LZB 700 M continuous automatic control systems; 7 (Phase 1) and 6 (Phase 2) electronic Sicas ESTT interlockings; the Vicos OC 501 operations control system with 2 operations control centers, fall-back level with Vicos OC 101 and RTU (FEP), 230 (Phase 1) and 240 (Phase 2) FTG S track vacancy detection units.[85]

Line 2 and Line 5 use Casco CBTC system with 2.4 GHz frequencies, and so the system has suffered frequent problems with interference from consumer Wi-Fi equipment.[86] By the end of November 2012, CASCO solved the problem on Lines 2 and 5 by switching to their standard solution with frequency diversity on 2 different channels.

Accidents and incidents edit

  • 4 April 2011 – One worker was killed and four others injured on April 4 when a manually controlled chain hoist broke loose in a Line 5 tunnel in Longgang district. A preliminary investigation by district safety authorities found mechanical failure was to blame.[87]
  • 5 September 2012 – Service was suspended on Line 4 for several hours due to power outage.[88]
  • 9 September 2013 – Three passengers abandoned in Line 1 tunnel after train door opens.[89]
  • 17 February 2014 – Passenger passes out at Shuiwan station on Line 2 and dies after no help or CPR is provided for 50 minutes.[90]
  • 25 June 2015 – Worker killed during tunnel collapse in Line 7 construction.[91]
  • 19 April 2017 – Scaffolding for a metro station collapsed during the construction of the Line 8 on Yantian Rd, killing a worker and injuring three.[92]
  • 11 May 2017 – During the construction of the extension of Line 3 heavy rains caused a partial cave in at an excavation pit for a station on the southern extension of Line 3, killing 2 workers and injuring another.[93]
  • 30 October 2017 – A section of Line 9 tunnel near Shenzhen Bay Park station was damaged by unauthorized community drilling works above ground. While the damage was soon repaired, the line continued to operate at a lowered safety speed of 45 km/h for a week.[94]
  • 6 December 2017 – Unauthorized drilling works for an adjacent bouldering site damaged the tunnel between Houhai and Hongshuwan South station of Line 11, causing sections of tunnel to make contact with a train and the driver to sustain minor injuries. The service of the line was disrupted for 12 hours while the line operated on modified routes, until the damage was fully repaired.[95]
  • 23 December 2017 – A Line 11 train killed a suicidal man lying on the rails between Bihaiwan and Airport, disrupting the service for 80 minutes.[96]
  • 5–7 July 2018 – Over a span of three days, at least seven incidents occurred, where power cables were accidentally cut at various construction sites of Shenzhen Metro, causing blackouts in large areas.[97]
  • 10 July 2018 – During the construction of Line 10, workers accidentally dug up the pipes of Shenzhen Buji Water Supply Co., Ltd., disrupting water distribution system. The Shenzhen Economic and Information Commission warned and penalized the contractor responsible.[98]
  • 9–12 April 2020 – Service between Futian and Xinxiu on Line 2 was suspended due to geographic movement caused by the construction of Line 14.[99]

Network Map edit

 


Connections edit

Pingshan Center station on Line 14 connects to Line 1 of the Pingshan Shyshuttle. This 8.5 km monorail line opened on 28 December 2022 with 11 stations, all in Pingshan district. Two of the stations will eventually connect to Line 16 stations.

See also edit

References edit

  1. ^ "Shenzhen Metro". exploremetro. Retrieved May 27, 2014.
  2. ^ a b "深圳市轨道交通线网密度全国第一 公共交通客运分担率超60%". 粤港澳大湾区门户网. April 1, 2022.
  3. ^ "创历史新高!跨年夜,深圳市地铁全网总客运量达842.23万人次".
  4. ^ "创历史新高!21日深圳地铁总客流量达646.9万人次". stnn.cc. July 21, 2018.
  5. ^ "深圳地铁16号线28日开通运营 城市轨道交通线网规模达559公里". =16号线开通。至此,深圳地铁全网里程达547公里,车站369座。
  6. ^ "深圳地铁16号线今日开通运营".
  7. ^ "深圳地铁16号线今日开通运营". www.163.com. Retrieved December 28, 2022.
  8. ^ "深圳地铁8号线开始铺设轨道,盐田2020年进入地铁时代_深圳新闻网".
  9. ^ "开通倒计时!4 号线三期工程试运行紧锣密鼓进行全线行车组织、服务时间、车厢温度同步优化调整" (PDF).
  10. ^ "约起!深圳地铁5号线二期9月28日开通". 5号线运营总里程将延长至47.393公里
  11. ^ a b "刚刚,深圳地铁6号线10号线正式开通!你要先打卡哪条线?". August 18, 2020.
  12. ^ a b c "深圳地铁7、9号线试运营 轨道网络规模居国内第三". October 28, 2016.
  13. ^ Shenzhen Metro Line 1, from Luohu to Airport East was put into a trial operation
  14. ^ photo of ongoing construction in Shekou September 25, 2013, at the Wayback Machine
  15. ^ (Chinese) Wang, Xiaoqing (王晓晴) and Qiu, Gang (邱刚), "深圳地铁3号线动工 2009年建成通车" southcn.com December 27, 2005
  16. ^ (Chinese) 深圳地铁3号线规划线路图 August 21, 2008
  17. ^ (Chinese) September 19, 2008
  18. ^ Colston, Paul (January 6, 2022). "Shenzhen World now connected by Metro Line 20". Exhibition World. from the original on February 2, 2022. Retrieved October 23, 2023.
  19. ^ 彭森 (August 21, 2005). "从7米到140米——深南大道的宽度之谜" (in Simplified Chinese). 深圳晚报.
  20. ^ 深圳经济特区总体规划简介[J]. 城市规划,1986,06:9–14.
  21. ^ 深圳市地铁有限公司 (2007). 深圳地铁一期工程建设与管理实践.上册 (in Simplified Chinese). 北京: 人民交通出版社. ISBN 978-7-114-06262-9.
  22. ^ a b "深圳地铁十年始获"出生证"" (in Simplified Chinese). 深圳新闻网. June 22, 2011.
  23. ^ a b c 张家识 (1999). "深圳地铁一期工程建设前期工作回顾". In 陈锡贤 (ed.). 地下铁道文集:中国土木工程学会隧道及地下工程分会地下铁道专业委员会第十三届学术交流会论文选 (in Simplified Chinese). 深圳: 海天出版社. ISBN 7-80615-959-2.
  24. ^ (in Simplified Chinese). 深圳特区报. June 25, 2011. Archived from the original on September 14, 2014.
  25. ^ . 深圳特区报. April 10, 2010. Archived from the original on January 6, 2016.
  26. ^ a b (in Simplified Chinese). 深圳新闻网. Archived from the original on September 24, 2015.
  27. ^ (in Simplified Chinese). Archived from the original on September 30, 2007. Retrieved July 1, 2007.
  28. ^ (in Simplified Chinese). Archived from the original on March 27, 2013. Retrieved November 22, 2012.
  29. ^ "New Line Naming Scheme". Shenzhen Metro Group Official Weibo. Shenzhen Metro Group. Retrieved October 23, 2013.
  30. ^ a b "地铁不如期完工,我主动请求处分". 南方日报. February 1, 2007.
  31. ^ "网友声讨"进度慢",市长强调"拖不起",地铁建设"蚯蚓速度"". 南方日报. January 19, 2007.
  32. ^ ""地铁不如期完工,我主动请求处分"_新闻中心_新浪网". news.sina.com.cn. Retrieved October 30, 2016.
  33. ^ "2011年5地铁贯通深圳-搜狐新闻". news.sohu.com. Retrieved October 30, 2016.
  34. ^ a b "2014年度全市交通运输运营主要概况及分析" (in Simplified Chinese). Retrieved January 16, 2015.
  35. ^ (in Simplified Chinese). Archived from the original on September 23, 2013.
  36. ^ SZMC, Curstomer Service Center. "Shenzhen metro - Update - August 2017". www.szmc.net. SZMC. Retrieved August 29, 2017.
  37. ^ a b c d e f g h i j L_104026. "深圳5条地铁线路同时开工 2022年底建成通车--深圳频道--人民网". sz.people.com.cn. Retrieved February 8, 2018.{{cite web}}: CS1 maint: numeric names: authors list (link)
  38. ^ "City to spend 48b yuan on 3 Metro lines". Shenzhen Daily. Retrieved July 28, 2012.
  39. ^ "The Shenzhen urban rail transportation recent construction plan approval (2011–2016)". National Development and Reform Commission. Retrieved August 27, 2012.
  40. ^ . Shenzhen Urban Planning and Land Resources Committee. Archived from the original on September 19, 2012. Retrieved August 27, 2012.
  41. ^ "历经四年多的建设 地铁5号线二期工程今年9月底正式开通!". June 17, 2019.
  42. ^ "深圳地铁5号线南延线和9号线西延线具备通车条件啦!". November 21, 2018.
  43. ^ a b "刚刚,深圳地铁6号线10号线正式开通!你要先打卡哪条线?". August 18, 2020.
  44. ^ "地铁4号线北延线明年年底通车 清湖至松元厦区间隧道提前贯通". June 22, 2019.
  45. ^ "深圳地铁8号线开始铺设轨道,盐田2020年进入地铁时代". August 1, 2019.
  46. ^ . 南方都市报. Archived from the original on December 3, 2012. Retrieved August 27, 2012.
  47. ^ . Shenzhen Urban Planning and Land Resources Committee. Archived from the original on November 29, 2012. Retrieved August 27, 2012.
  48. ^ . www.sutpc.com. Archived from the original on April 23, 2015.
  49. ^ "深圳地铁四期规划来了!新增5条线,与东莞地铁对接方案出炉 - 市场 -深圳乐居网". sz.house.sina.com.cn. Retrieved January 4, 2017.
  50. ^ "国家发展改革委关于深圳市城市轨道交通第四期建设规划(2017-2022年)的批复". July 7, 2017.
  51. ^ 有我有料 (December 21, 2023). "地铁官方发公告!深圳地铁13号线通车稳了". qq (in Simplified Chinese). from the original on January 27, 2024. Retrieved February 18, 2024.
  52. ^ 李嘉耀; 鲁力 (January 26, 2024). "深圳地铁13号线分两段通车,南段7站有望年内开通". southcn+. from the original on January 27, 2024. Retrieved February 18, 2024.
  53. ^ "国家发展改革委关于调整深圳市城市轨道交通第四期建设规划方案的批复". March 26, 2020. Retrieved April 26, 2020.
  54. ^ . Shenzhen Urban Planning and Land Resources Committee. Archived from the original on February 22, 2014. Retrieved November 21, 2012.
  55. ^ "深圳市城市轨道交通第五期建设规划(2023-2028年)环境影响评价第二次公示-通知公告-深圳市发展和改革委员会网站". fgw.sz.gov.cn. Retrieved September 18, 2022.
  56. ^ "深圳地铁五期9条线路公示!". www.thepaper.cn. Retrieved April 2, 2023.
  57. ^ "深圳轨道交通五期开建 两条延伸至东莞 预计2028年全部建成通车". www.sznews.com. Retrieved June 27, 2023.
  58. ^ "Dongguan Metro connection called for". Shenzhen Daily. Retrieved January 22, 2014.
  59. ^ "Four more Metro lines planned". Shenzhen Daily. Retrieved November 21, 2012.
  60. ^ "关于地铁2号线东延线、地铁3号线西延线线站位初步方案" (PDF).
  61. ^ 深圳市统计局. "2005年度12月份深圳统计月报:运输邮电:地铁客流量1-12月累计" (in Simplified Chinese). Archived from the original on January 25, 2013.
  62. ^ 深圳市统计局 (December 2, 2008). "深圳市2006年国民经济和社会发展统计公报" (in Simplified Chinese).
  63. ^ 深圳市统计局 (December 2, 2008). "深圳市2007年国民经济和社会发展统计公报" (in Simplified Chinese).
  64. ^ 深圳市统计局 (March 24, 2009). "深圳市2008年国民经济和社会发展统计公报" (in Simplified Chinese).
  65. ^ 深圳市统计局 (April 27, 2010). "深圳市2009年国民经济和社会发展统计公报" (in Simplified Chinese).
  66. ^ 深圳市统计局 (April 28, 2011). "深圳市2010年国民经济和社会发展统计公报" (in Simplified Chinese).
  67. ^ 深圳市统计局. "2011年度12月份深圳统计月报:运输邮电:地铁客流量1-12月累计" (in Simplified Chinese). Archived from the original on December 4, 2012.
  68. ^ (in Simplified Chinese). 深圳商报. January 10, 2013. Archived from the original on March 4, 2016.
  69. ^ "深圳市2013年国民经济和社会发展统计公报" (in Simplified Chinese). 深圳市统计局. April 8, 2014.
  70. ^ 深圳市交通运输委员会 (January 19, 2016). "2015年12月交通运输运营指标统计月报".
  71. ^ (in Simplified Chinese). 深圳市交通运输委员会. February 6, 2017. Archived from the original on February 11, 2017.
  72. ^ "2017年交通运输运营指标统计年报" (in Simplified Chinese). 深圳市交通运输委员会. January 23, 2018.
  73. ^ 2018年12月交通运输运营指标统计月报 (in Simplified Chinese). 深圳市交通运输委员会. January 18, 2019.
  74. ^ 杨丽,杨德明 (2012). "深圳市城市轨道交通网络化客流变化研究". 现代城市轨道交通 (in Simplified Chinese). 6.
  75. ^ 陈煜 (2011). "深圳地铁运营对轨道交通客流预测的启示". 铁道工程学报 (in Simplified Chinese). 8.
  76. ^ (Chinese) fare information
  77. ^ New Metro fares announced
  78. ^ Business coach fears is three times as matching normal coach fears.
  79. ^ (Chinese) SZMC fare policy
  80. ^ types of tickets
  81. ^ One smartcard to rule them all: Guangdong, HK team up to offer unified travel card | The Nanfang
  82. ^ Guangdong and Hong Kong Linked by One Transportation Card _Life of Guangzhou
  83. ^ "features". southcn.com. Retrieved August 27, 2012.
  84. ^ "官方回应深圳一地铁站命名华为:报批时并未禁止企业名命名" [Official response to the naming of a Shenzhen subway station: Huawei was not prohibited from naming the company]. August 26, 2020.
  85. ^ . Archived from the original on February 4, 2009. Retrieved July 6, 2008.
  86. ^ "Pocket Wi-Fi hotspots paralyse Chinese metro lines."
  87. ^ "Accidents on Metro expansion hurt Shenzhen". South China Morning Post. April 23, 2011. Retrieved February 15, 2018.
  88. ^ Ruixi, Zhao (September 7, 2012). "深圳地铁发生史上最严重事故 龙华线断电6小时". people.com.cn. Retrieved February 15, 2018.
  89. ^ "Passengers abandoned in Shenzhen metro tunnel after train door opens". South China Morning Post. Retrieved May 5, 2018.
  90. ^ "外企女经理地铁口晕倒后死亡 卧地长达50分钟". news.sina.com.cn. Retrieved May 5, 2018.
  91. ^ "Shenzhen Metro Tunnel Collapses... for the 4th Time This Year | The Nanfang". The Nanfang. June 26, 2015. Retrieved May 5, 2018.
  92. ^ "深圳在建地铁倒塌1死3伤 乘坐地铁前这一点你不能不知". JRJ.com. April 20, 2017. Retrieved February 15, 2018.
  93. ^ "深圳地铁工地发生坍塌事故 2人遇难1人被困". Sina.com. May 11, 2017. Retrieved February 15, 2018.
  94. ^ "深圳地铁9号线隧道被打穿 目前已限速". SZNews.com. October 30, 2017. Retrieved February 15, 2018.
  95. ^ "解读 这是什么鬼?深圳地铁隧道竟被凿穿,罪魁祸首竟然是它!". Sohu. December 6, 2017. Retrieved February 15, 2018.
  96. ^ "深圳地铁碾压事件:1人身亡死者翻越护栏俯卧轨道被碾_新闻频道_中华网". china.com. December 24, 2017. Retrieved April 1, 2018.
  97. ^ "施工3天挖断7根电缆 深圳地铁:已对施工单位顶格处罚". CNR. July 12, 2018. Retrieved July 13, 2018.
  98. ^ "深圳地铁施工三天挖断七条电缆 又挖爆供水主管道". Zaobao. July 12, 2018. Retrieved July 13, 2018.
  99. ^ "深圳地铁2号线遇地质突变 部分站点临时停运-中新网". www.chinanews.com. Retrieved April 13, 2020.

External links edit

  • SZMC (Shenzhen Metro Group) official website (in English)
  • MTR Corporation (Shenzhen) official website (Chinese only)

shenzhen, metro, simplified, chinese, 深圳地铁, traditional, chinese, 深圳地鐵, pinyin, shēnzhèn, dìtiě, rapid, transit, system, city, shenzhen, guangdong, province, china, line, extension, which, opened, december, 2023, network, kilometres, miles, trackage, currently. The Shenzhen Metro simplified Chinese 深圳地铁 traditional Chinese 深圳地鐵 pinyin Shenzhen Ditie is the rapid transit system for the city of Shenzhen in Guangdong province China The Line 8 Extension which opened on 27 December 2023 put the network at 555 43 kilometres 345 13 miles of trackage It currently operates on 16 lines with 373 stations 6 Despite having only opened on 28 December 2004 the Shenzhen Metro is the 5th longest metro system in China and 6th longest in the world By 2035 the network is planned to comprise of 8 express and 24 non express lines totaling 1 142 kilometres 710 miles of trackage Shenzhen MetroOverviewLocaleShenzhenTransit typeRapid transitNumber of lines16 1 2 3 4 5 6 6B 7 8 9 10 11 12 14 16 20Number of stations373 a 1 Daily ridership5 99 million 2021 2 8 4223 million December 31 2021 Record 3 Annual ridership1 8775 billion 2018 4 WebsiteSZMC Shenzhen Metro Group MTR Corporation Shenzhen Chinese only OperationBegan operation28 December 2004 19 years ago 2004 12 28 Operator s SZMC Shenzhen Metro Group MTR Corporation Shenzhen TechnicalSystem length555 43 km 345 13 mi 5 Track gauge1 435 mm 4 ft 8 1 2 in standard gaugeElectrification1 500 V DC overhead catenary or third railTop speed80 km h 50 mph Lines 1 2 4 5 7 8 9 10 12 16 90 km h 56 mph Line 3 100 km h 62 mph Line 6 120 km h 75 mph Lines 11 14 20 Line 6 Branch System mapShenzhen MetroSimplified Chinese深圳地铁Traditional Chinese深圳地鐵TranscriptionsStandard MandarinHanyu PinyinShenzhen DitieYue CantoneseYale RomanizationSamjan DeihtitJyutpingSam1zan3 Dei6tit3 Contents 1 Current system 1 1 Line 1 1 2 Line 2 1 3 Line 3 1 4 Line 4 1 5 Line 5 1 6 Line 6 1 7 Line 6 Branch 1 8 Line 7 1 9 Line 8 1 10 Line 9 1 11 Line 10 1 12 Line 11 1 13 Line 12 1 14 Line 14 1 15 Line 16 1 16 Line 20 2 History 2 1 Early planning 2 2 Construction suspended and restarted 2 3 Phase I 1998 2004 2 4 Name changes 2 5 Phase II 2007 2011 2 6 Phase III 2012 2023 2 7 Phase IV 2017 2025 2 8 Phase IV revised expansion 2020 2025 3 Future expansion 3 1 Phase IV expansion 3 2 Phase IV Revised Expansion 3 3 Miscellaneous 3 4 Phase V 2023 2028 3 5 Long term plan 4 Ridership 5 Fares and tickets 5 1 Tokens 5 2 Shenzhen Tong cards 5 3 Metro 1 day passes 6 Station facilities amenities and services 7 Equipment 7 1 Rolling stock 7 1 1 Line 1 7 1 2 Line 2 7 1 3 Line 3 7 1 4 Line 4 7 1 5 Line 5 7 1 6 Line 6 7 1 7 Line 6 Branch 7 1 8 Line 7 7 1 9 Line 8 7 1 10 Line 9 7 1 11 Line 10 7 1 12 Line 11 7 1 13 Line 12 7 1 14 Line 14 7 1 15 Line 16 7 1 16 Line 20 7 2 Signalling system 8 Accidents and incidents 9 Network Map 10 Connections 11 See also 12 References 13 External linksCurrent system editCurrently the network has 555 43 kilometres 345 13 miles of route operating on 16 lines with 373 stations 7 Line 1 Line 4 and Line 10 run to the border crossings between the Shenzhen Special Economic Zone and the Hong Kong Special Administrative Region at Luohu Lo Wu and Futian Checkpoint Lok Ma Chau where riders can transfer to Hong Kong s MTR East Rail line for travel onwards to Hong Kong nbsp The network map before the extension to Xiaomeisha in Line 8 on 27 December 2023 Line Terminals District Service patterns Commencement Latestextension Lengthkm Stations Operator01 1 Luohu Luohu Airport East Bao an Luohu Airport EastPartial Luohu Zhuzilin 2004 2011 41 04 30 nbsp Shenzhen Metro Group02 2 Chiwan Nanshan Liantang Luohu Chiwan LiantangRush Hour Wanxia LiantangPartial Houhai Liantang 2010 2020 39 6 8 3203 3 Futian Bonded Area Futian Shuanglong Longgang Futian Bonded Area ShuanglongRush Hour Huaxin TangkengPartial Futian Bonded Area Tangkeng 2010 2020 43 65 3104 4 Futian Checkpoint Futian Niuhu Longhua Futian Checkpoint NiuhuAM Rush Hour Futian Checkpoint Xikeng 2004 2020 31 3 9 23 nbsp MTR Corporation Shenzhen 05 5 Chiwan Nanshan Huangbeiling Luohu Chiwan HuangbeilingRush Hour Qianhaiwan HuangbeilingPartial Changlingpi ChiwanChanglingpi Huangbeiling 2011 2019 47 393 10 34 nbsp Shenzhen Metro Group06 6 Science Museum Futian Songgang Bao an Science Museum SonggangPartial Songgang Fenghuang Town Science Museum Fenghuang Town 2020 49 4 11 276B 6B Guangming Guangming SIAT Guangming Guangming SIAT 2022 6 13 407 7 Xili Lake Nanshan Tai an Luohu Xili Lake Tai anPartial Antuo Hill Tai an Xili Tai an 2016 30 173 12 278 Liantang Luohu Xiaomeisha Yantian Liantang Xiaomeisha 2020 2023 20 38 1109 9 Qianwan Nanshan Wenjin Luohu Qianwan WenjinPartial Shenzhen Bay Park Wenjin 2016 2019 36 18 3210 10 Futian Checkpoint Futian Shuangyong Street Longgang Futian Checkpoint Shuangyong StreetPartial Futian Checkpoint Gankeng 2020 29 3 11 2411 11 Gangxia North Futian Bitou Bao an Gangxia North BitouPartial Futian Bitou 2016 2022 53 14 1912 12 Zuopaotai East Nanshan Waterlands Resort East Bao an Zuopaotai East Waterlands Resort EastPartial Zuopaotai East Huangtian 2022 40 54 3314 14 Gangxia North Futian Shatian Pingshan Gangxia North Shatian 2022 50 3 1816 16 Universiade Longgang Tianxin Pingshan Universiade Tianxin 2022 29 2 2420 20 Airport North Bao an Convention amp Exhibition City Bao an Airport North Convention amp Exhibition City 2021 8 43 5Total 555 373Line 1 edit nbsp Airport East station of line 1Main article Line 1 Shenzhen Metro Line 1 formerly known as Luobao line runs westward from Luohu to Airport East Trains operate every 2 minutes during peak hours and every 4 minutes at other times The line is operated by SZMC Shenzhen Metro Group Line 1 s color is green 28 December 2004 Luohu Window of the World 28 September 2009 Window of the World Shenzhen University 15 June 2011 Shenzhen University Airport East 13 Line 2 edit nbsp Xianhu Road station of line 2Main article Line 2 Shenzhen Metro Line 2 formerly known as Shekou line runs from Chiwan to Liantang Line 2 is connected with Line 8 at Liantang station The line is operated by SZMC Shenzhen Metro Group Line 2 s color is orange the same as Line 8 28 December 2010 Chiwan Window of the World 14 28 June 2011 Window of the World Xinxiu 28 October 2020 Xinxiu LiantangLine 3 edit nbsp Yitian station of line 3Main article Line 3 Shenzhen Metro Line 3 formerly known as Longgang line runs from Futian Bonded Area to Shuanlong in Longgang in the north east part of the city Construction began on 26 December 2005 15 The line is operated by Shenzhen Metro Line 3 Operations which has been a subsidiary of SZMC Shenzhen Metro Group since 11 April 2011 when an 80 stake was transferred to SZMC Line 3 s color is sky blue 28 December 2010 Caopu Shuanglong 28 June 2011 Yitian Caopu 16 28 October 2020 Futian Bonded Area YitianLine 4 edit nbsp Mission Hills station of line 4Main article Line 4 Shenzhen Metro Line 4 formerly known as Longhua line runs northward from Futian Checkpoint to Niuhu Trains operate every 2 5 minutes at peak hours and every 6 minutes during off peak hours Stations from Futian Checkpoint to Shangmeilin Station are underground The line has been operated by MTR Corporation Shenzhen a subsidiary of MTR Corporation since 1 July 2010 Line 4 s color is red 28 December 2004 Fumin Children s Palace 28 June 2007 Futian Checkpoint Fumin 16 June 2011 Children s Palace Qinghu 28 October 2020 Qinghu NiuhuLine 5 edit nbsp Qianwan Park station of line 5Main article Line 5 Shenzhen Metro Line 5 formerly known as Huanzhong line runs from Chiwan in the west to Huangbeiling in the east Construction began in May 2009 and the line opened on 22 June 2011 17 Line 5 required a total investment of 20 6 billion RMB The line is operated by SZMC Shenzhen Metro Group Line 5 s color is purple 22 June 2011 Qianhaiwan Huangbeiling 28 September 2019 Qianhaiwan ChiwanLine 6 edit nbsp Guangming Street station of line 6Main article Line 6 Shenzhen Metro Line 6 formerly known as Guangming line runs from Songgang in the north to Science Museum in the south with a length of 49 4 km 30 7 mi and a total of 27 stations Construction began in August 2015 and the line opened on 18 August 2020 The line is operated by SZMC Shenzhen Metro Group Line 6 s color is mint green 18 August 2020 Science Museum SonggangLine 6 Branch edit nbsp SIAT station of line 6BMain article Line 6 Branch Shenzhen Metro Line 6 Branch also known as Branch Line 6 runs from Guangming to SIAT in the north The line opened on 28 November 2022 Line 6 Branch s color is teal 28 November 2022 Guangming SIATLine 7 edit nbsp Huanggang Checkpoint station of line 7Main article Line 7 Shenzhen Metro Line 7 formerly known as Xili line of the Shenzhen Metro opened on 28 October 2016 with a length of 30 137 km 18 726 mi 12 and a total of 27 stations It connects the Xili Lake to Tai an The line travels East West across Shenzhen in a V shape The line is operated by SZMC Shenzhen Metro Group Line 7 s color is navy blue 28 October 2016 Xili Lake Tai anLine 8 edit nbsp Yantian Port West station of line 8Main article Line 8 Shenzhen Metro Line 8 formerly known as Yantian line of the Shenzhen Metro opened on 28 October 2020 with a length of 20 377 km 12 662 mi 12 and a total of 11 stations It connects the eastern suburbs of Liantang to Yantian Road then towards the beach resorts at Dameisha and Xiaomeisha However this line serves as the extension of Line 2 in actual operation The line is operated by SZMC Shenzhen Metro Group Line 8 s color is orange the same as Line 2 28 October 2020 Liantang Yantian Road 27 December 2023 Yantian Road XiaomeishaLine 9 edit nbsp Menghai station of line 9Main article Line 9 Shenzhen Metro Line 9 formerly known as Meilin line or Neihuan line of the Shenzhen Metro opened on 28 October 2016 The line runs eastward from Qianwan to Wenjin It has 10 transfer stations The line is 36 18 km 22 48 mi long running through the districts of Nanshan Futian and Luohu The line is operated by SZMC Shenzhen Metro Group Line 9 s color is grey brown 28 October 2016 Hongshuwan South Wenjin 8 December 2019 Qianwan Hongshuwan SouthLine 10 edit nbsp Huawei station of line 10Main article Line 10 Shenzhen Metro Line 10 formerly known as Bantian line runs from Futian Checkpoint in the south to Shuangyong Street in the north with a length of 29 3 km 18 2 mi and a total of 24 stations Construction began in September 2015 and the line opened on 18 August 2020 The line is operated by SZMC Shenzhen Metro Group Line 10 s color is pink 18 August 2020 Futian Checkpoint Shuangyong StreetLine 11 edit nbsp Nanshan station of line 11Main article Line 11 Shenzhen Metro Line 11 also known as the Airport Express runs from Bitou in the northwest to Gangxia North in the city centre via Shenzhen Bao an International Airport Construction began in April 2012 and the line opened on 28 June 2016 Line 11 runs at a higher speed of 120 km h 75 mph however the current line speed is limited to 80 km h 50 mph The line is operated by SZMC Shenzhen Metro Group Line 11 s color is maroon 28 June 2016 Bitou Futian 28 October 2022 Futian Gangxia NorthLine 12 edit nbsp Zhongwu South station of line 12Main article Line 12 Shenzhen Metro Line 12 also known as Nanbao Line runs from Zuopaotai East in the southwest to Waterlands Resort East in the northwest Construction began in 2018 and the line opened on 28 November 2022 Line 12 s color is light purple 28 November 2022 Zuopaotai East Waterlands Resort EastLine 14 edit nbsp Silian station of line 14Main article Line 14 Shenzhen Metro Line 14 also known as the Eastern Express runs from Gangxia North in the city centre to Shatian in the northeast Construction began in 2018 and the line opened on 28 October 2022 The line is operated by SZMC Shenzhen Metro Group Line 14 s color is yellow 28 October 2022 Gangxia North Shatian Line 16 edit nbsp Universiade station of line 16Main article Line 16 Shenzhen Metro Line 16 also known as Longping Line runs from Universiade in the centre of Longgang to Tianxin in the northeast Construction began in 2018 and the line opened on 28 December 2022 The line is operated by SZMC Shenzhen Metro Group Line 16 s color is dark blue 28 December 2022 Universiade Tianxin Line 20 edit nbsp Shenzhen World station of line 20Main article Line 20 Shenzhen Metro Line 20 formerly known as Fuyong line runs from Airport North in the north west to Convention amp Exhibition City near Shenzhen World Construction began in September 2016 and the line opened on 28 December 2021 Line 20 runs at the same top speed as line 11 at 120 km h 75 mph The line is operated by SZMC Shenzhen Metro Group Line 20 s color is light blue 28 December 2021 Airport North Convention amp Exhibition City 18 Liantang station is regarded as a non interchange stationHistory edit nbsp Evolution of the Shenzhen metroEarly planning edit In late 1983 Party Secretary of Shenzhen Mayor Liang Xiang led a team to Singapore to study its mass transit system Upon returning it was decided that 30 metres 98 ft 5 in on each side of Shennan Avenue should be protected as a green belt and to set aside a 16 metre 52 ft 6 in wide median reserved for a light rail or light metro line 19 In 1984 the Shenzhen Special Economic Zone Master Plan 1985 2000 pointed out that with the growing population and traffic in Shenzhen a light metro system would not have sufficient capacity to meet future demand Instead the report proposed a heavy rail subway line to be built along Shennan Avenue 20 The project was finally approved by the Central Planning Department in 1992 21 In August 1992 during and re feasibility and rail network planning The Shenzhen Municipal Government decided to move from building a light metro line to a heavy rail subway line The rapid growth of Shenzhen City made a lower capacity light metro line impractical 22 In 1994 Shenzhen organized the preparation of the Shenzhen urban rail network master plan to be incorporated into the Shenzhen City Master Plan 1996 2010 23 The city s vision for an urban rail network would consists of nine lines Of the nine transit lines three of them would be commuter rail lines upgraded from existing national mainline railways The total length of the proposed network would be about 270 km 170 mi The three upgraded commuter rail lines would overlap the Guangzhou Shenzhen railway Pinghu Nanshan railway and Pingyan railway 23 This plan established the basic framework for the Shenzhen Metro network 24 Construction suspended and restarted edit In December 1995 the State Council issued the moratorium on approval of urban rapid transit projects to suspend approval of rail transit projects in all Chinese cities except Beijing Shanghai and Guangzhou The Shenzhen Metro project was postponed 25 In 1996 prior to the handover of Hong Kong authorities attempted to restart construction by renaming the project The Luohu Huanggang Lok Ma Chau border crossing passenger rail connection project stressing that the project is designed to meet the potential growing demand for cross border passenger traffic after the handover 23 In 1997 Shenzhen reapplied its Subway plans to the State Planning Commission and received approval in May 1998 22 The project was renamed the Shenzhen Metro first phase 26 In July 1998 SZMC Shenzhen Metro Group was formally established 26 By April 1999 the subway project feasibility study report has been approved by the state Phase I 1998 2004 edit Construction of the first sections of Line 1 and Line 4 began in 1999 The grand opening of the Shenzhen Metro system occurred at 5 00 pm on Tuesday December 28 2004 This made Shenzhen the seventh city in mainland China to have a subway after Beijing Tianjin Shanghai Guangzhou Dalian and Wuhan Initially the trains operated at 15 minute frequencies and consisted of Line 1 services between Luohu and Shijie Zhi Chuang now Window of the World and the Line 4 services between Fumin and Shaonian Gong now Children s Palace Initially the English names of the stations were rendered in Hanyu Pinyin but some of the names were changed to English translation with American spelling in mid 2011 The Futian Checkpoint station opened on 28 June 2007 using the name Huanggang 27 Date Opened Line Termini Lengthin km Stations28 December 2004 Line 1 phase 1 Luohu Window of the World 17 4 15 Line 4 phase 1 initial section Fumin Children s Palace 3 4 428 June 2007 Line 4 phase 1 extension Futian Checkpoint Fumin 1 1 1Name changes edit On April 23 2008 Shenzhen Municipal Planning Bureau announced that it would change the nomenclature of Shenzhen s subway lines according to the 2007 Urban Rail Transit Plan Scheme Instead of using numbers as the lines official designation as typically used in other mainland Chinese metro systems lines would be given Chinese names more akin to the Hong Kong MTR 28 In 2010 the Scheme was reviewed and adjusted with new routes and names in addition to newly proposed lines On 23 October 2013 the SZMC Shenzhen Metro Group decided that current operational lines will have their number and names combined while future lines will only be numbered 29 Due to the change in the construction order of several lines some numerical names have been reviewed in order to prevent big jump between numbers By 2016 only numerical names are used Lines currently in operation Original No 2007 Scheme 2010 Scheme Current nameLine 1 Luobao Line Luobao Line Line 1 Line 1Line 2 Shekou Line Shekou Line Line 2 Line 2Line 3 Longgang Line Longgang Line Line 3 Line 3Line 4 Longhua Line Longhua Line Line 4 Line 4Line 5 Huanzhong Line Huanzhong Line Line 5 Line 5Line 7 Xili Line Xili Line Line 7 Line 7Line 8 Yantian Line Yantian Line Line 8 Line 2 Extension Line 8 Phase 1 Line 9 Neihuan Line Meilin Line Line 9 Line 9Line 16 Pinghu Line Bantian Line Line 16 Line 10 Line 10Line 11 Airport Line Airport Line Line 11 Line 11Line 10 Bao an Line Nanbao Line Line 10 Line 12 Line 12Line 14 Eastern Express Eastern Express Line 14 Line 14Line 12 Pingshan Line Longping Line Line 12 Line 16 Line 16 Fuyong Line Line 20 Line 20 International Expo Conveyance Project Lines under construction Original No 2007 Scheme 2010 Scheme Current NameLine 15 Shiyan Line Shiyan Line Line 15 Line 13 Line 13Phase II 2007 2011 edit From 2004 to 2007 there was a lack of official government interest and attention to expanding the subway after completion of Phase 1 with little or no active projects 30 Subway construction speed was ridiculed as earthworm speed 31 On 17 January 2007 Shenzhen won the right to host the 2011 Universiade In the bid Shenzhen committed to complete 155 km 96 mi of subway lines before the games 30 The mayor of Shenzhen at the time Xu Zongheng sharply criticized the speed and efficiency of Shenzhen s subway construction procedures and calls for reform 32 Subsequently the Shenzhen municipal government and various departments signed a liability form requiring Phase II subway expansion to be completed in time for the Universiade 33 Shenzhen Metro increased to over a hundred operating metro stations in June 2011 just before the Shenzhen Universiade games In the span of two weeks the network expanded from 64 km 40 mi to 177 km 110 mi This expansion increased rail transit s share of total public transit trips from 6 to 29 in 2014 34 35 36 37 Date Opened Line Termini Lengthin km Stations28 September 2009 Line 1 phase 2 trial Window of the World Shenzhen University 3 39 328 December 2010 Line 2 phase 1 Chiwan Window of the World 15 1 12 Line 3 phase 1 elevated section Shuanglong Caopu 25 6 1615 June 2011 Line 1 phase 2 Shenzhen University Airport East 23 6 1216 June 2011 Line 4 phase 2 first north extension Children s Palace Qinghu 15 9 1022 June 2011 Line 5 phase 1 Qianhaiwan Huangbeiling 40 0 2728 June 2011 Line 2 phase 2 first east extension Window of the World Xinxiu 20 65 17 Line 3 phase 1 underground section amp phase 2 first south extension Caopu Yitian 16 52 14Phase III 2012 2023 edit In 2010 the Shenzhen Urban Planning and Land Resources Committee proposed a building program Phase III between 2011 and 2020 In 2011 this plan was approved by the NDRC Phase III formally commenced in May 2011 with an expected cost of 125 6 billion yuan It will cover Lines 6 7 8 9 and 11 and will extend the length of the Shenzhen Metro to 348 kilometres 216 mi and 10 lines 38 39 In June 2011 the Shenzhen Urban Planning and Land Resources Commission started gather public input on Phase III station names 40 On June 28 2016 Line 11 opened being the first subway line in Shenzhen with 8 car trains and 120 km h 75 mph maximum service speed and the first in China with a First Class service Lines 7 and 9 followed on October 28 2016 South extension of Line 5 opened on 28 September 2019 and west extension of Line 9 opened on 8 December 2019 Line 6 and Line 10 opened on 18 August 2020 bringing the length of the Shenzhen Metro to 382 1 km 237 4 mi and the fourth longest in China Second east extension of Line 2 second south extension of Line 3 second north extension of Line 4 and phase 1 of Line 8 opened on 28 October 2020 bringing the length of the Shenzhen Metro to 411 km 255 mi Date Opened Line Termini Lengthin km Stations28 June 2016 Line 11 phase 1 Futian Bitou 51 936 1828 October 2016 Line 7 phase 1 Tai an Xili Lake 30 173 28 Line 9 phase 1 Wenjin Hongshuwan South 25 38 2228 September 2019 Line 5 phase 2 Qianhaiwan Chiwan 7 65 41 78 December 2019 Line 9 phase 2 Hongshuwan South Qianwan 10 79 42 1018 August 2020 Line 6 phase 1 amp 2 Science Museum Songgang 49 4 43 27 Line 10 Futian Checkpoint Shuangyong Street 29 3 43 2428 October 2020 Line 2 phase 3 second east extension Xinxiu Liantang 3 82 3 Line 3 phase 3 second south extension Yitian Futian Bonded Area 1 5 1 Line 4 phase 3 second north extension Qinghu Niuhu 10 791 44 8 Line 8 through operation to Line 2 phase 1 Liantang Yantian Road 12 367 45 727 December 2023 Line 8 through operation to Line 2 phase 2 Yantian Road Xiaomeisha 8 01 4Phase IV 2017 2025 edit With the shortening of the Phase III implementation period 46 a number of lines Lines 16 and 12 planned in 2007 s Phase III moved into the next phase 47 By 2016 it was determined that Phase IV will have an implementation period between 2017 and 2022 and consist of 274 km 170 mi of new subway 48 Lines 13 and 14 which originally had a long term 2030 completion deadline were moved into Phase IV expansion In addition a branch line of Line 6 will connect with the neighboring Dongguan Rail Transit system 49 Lines 12 13 14 and 16 and branch of Line 6 was approved by the NDRC in July 2017 and started construction in January 2018 50 37 Date Opened Line Termini Lengthin km Stations28 October 2022 Line 14 phase 1 Gangxia North Shatian 50 3 37 17 37 28 November 2022 Line 6 Branch phase 1 Guangming SIAT 6 13 37 4 37 Line 12 phase 1 Zuopaotai East Waterlands Resort East 40 54 37 33 37 28 December 2022 Line 16 phase 1 Universiade Tianxin 29 2 37 24 37 Phase IV revised expansion 2020 2025 edit The first phase of Line 20 was fast tracked from Phase IV to provide a shuttle between Line 11 and a new International Convention Center now called Convention amp Exhibition City The construction started in September 2016 but as for early 2019 the construction is paused because the Development and Reform Commission did not approve the project The Phase IV revised plan approved by the NDRC on March 26 2020 approved the first Phase of Line 20 allowing for construction to continue The line eventually opened on 28 December 2021 Futian to Gangxia North in the first section of Phase 2 of Line 11 opened on 28 October 2022 nbsp A map with fourth phase lines Date Opened Line Termini Lengthin km Stations28 December 2021 Line 20 phase 1 Airport North Convention amp Exhibition City 8 43 528 October 2022 Line 11 phase 2 trial Futian Gangxia North 1 6 1Future expansion editPhase IV expansion edit Expected opening Line Section Terminals Lengthin km Stations28 October 2024 51 52 13 Phase 1 South Shenzhen Bay Checkpoint Hi Tech Central 22 45 72025 13 Phase 1 North Hi Tech Central Shangwu 9Phase IV Revised Expansion edit The Phase IV revised plan approved by the NDRC on March 26 2020 added a number of extension projects 53 Expected opening Line Section Terminals Lengthin km Stations2024 3 Phase 4 Shuanglong Pingdi Liulian 9 35 77 Phase 2 Xili Lake Xuefu Hospital 2 45 22025 6B South extension Guangmingcheng Guangming 4 9 38 Phase 3 Xiaomeisha Xichong 4 26 111 Phase 2 Gangxia North Hongling South 4 39 312 Phase 2 Waterlands Resort East Songgang 8 16 513 Phase 2 Shangwu Gongming North 18 8 1116 Phase 2 Universiade Xikeng 9 53 82026 13 South extension Shenzhen Bay Checkpoint Dongjiaotou 4 47 3 Miscellaneous edit Line 5 west extension is part of Phase II expansion Expected opening Line Section Terminals Lengthin km Stations Phase2025 5 West extension Huangbeiling Grand Theater 2 87 3 II Phase V 2023 2028 edit In the Shenzhen Metro 2007 masterplan proposed four more lines Lines 13 14 15 and 16 which have a planned completion target of 2030 54 In 2016 all aforementioned lines but Line 15 were designated as part of the Phase IV expansion moving the completion date forward from 2030 to 2022 In 2012 four further lines Qiannan Line 17 Pinghu Line 18 Pingshan Line 19 and Fuyong Line 20 where unveiled making the total planned length of the Shenzhen Metro to 720 km 447 mi spread out over 20 lines The first phase of Line 20 was fast tracked and included in the Phase III revised expansion with a completion date of 2018 This leaves Line 15 17 19 and the rest of Line 20 available for the next phase Phase V of subway expansion In September 2022 the Shenzhen municipal government confirmed the projects proposed to be included in its phase V expansion A total of 227 km 141 mi of new lines are proposed 55 On March 31 2023 the Bureau of Housing and Urban Rural Development of Shenzhen Metro Municipality will open the bidding for the fifth phase planning of Shenzhen Metro Metro including Line 15 Line 17 Phase I Line 19 Phase I Line 20 Phase II Airport East Baishizhou Line 22 Phase I Line 25 Phase I Line 27 Phase I Line 29 Phase I and Line 32 Phase I This means that these 9 lines have been approved with an investment amount of 191 1 billion yuan However Line 18 Phase I Line 21 Phase I Line 10 East Extension Shenzhen Section and Metro Line 11 North Extension Shenzhen Section which were previously proposed to be included in the fifth phase plan of Shenzhen Metro were not included in this announcement 56 In June 2023 the Fifth Phase Construction Plan of Shenzhen Urban Rail Transit 2023 2028 has been approved for a total of 11 construction projects including Line 15 Line 17 Phase I Line 19 Phase I Line 20 Phase II Airport East Baishizhou Line 22 Phase I Line 25 Phase I Line 27 Phase I Line 29 Phase I Line 32 Phase I Line 10 East Extension Shenzhen Section and Metro Line 11 North Extension Shenzhen Section 57 On 28 June 2023 Shenzhen Metro Line 15 started construction followed by Line 17 Phase I and Line 20 Phase II on 10 October 2023 Line 22 Phase I on 2 January 2024 and Line 25 on 26 February 2024 Other construction projects will start in 2024 Line Section Terminals Lengthin km Stations10 East extension Shuangyong Street Huanggekeng 9 8 2 9 in Shenzhen 5 1 a 11 North extension Bitou Chang an 3 7 0 8 in Shenzhen 1 0 b 14 West extension Gangxia North Xiangmihu West 115 Loop Line 32 2 2417 Phase 1 Luohu West Shanglilang 18 8 1819 Phase 1 Nantangwei Julong 12 5 1220 Phase 2 Airport North Baishizhou 24 9 1120 Phase 2 5 Baishizhou Futian Convention amp Exhibition Centre 322 Phase 1 Shangsha Liguang 34 2 2125 Phase 1 Shilong Jihua Hospital 16 2 1427 Phase 1 Songpingcun Gangtou West 23 2 1929 Phase 1 Hongshuwan South Xingdong 11 3 1032 Phase 1 Xichong Kuichong East 9 5 5Total 196 3 140 Only the connecting tunnel to the Dongguan boundary will be built including the station reservation at Huanggekeng for future operation Only the connecting tunnel to the Dongguan boundary will be built Chang an is located in Dongguan so it will not be built Long term plan edit Aside from the set masterplan at the 12th Guangdong Provincial People s Congress in January 2014 58 it was proposed to extend Line 4 beyond the planned Phase III terminus at the Songyuan Bus Terminal in Guanlan The proposal wanted to further extend this line to reach the future planned Dongguan Metro Line 4 at Tangxia station This proposal aims to shorten the distance between the two cities in residents minds boost tourism industries in both cities and expand housing options It would also allow for direct connection between Hong Kong and Dongguan As the area in the proposed area is less developed the cost in building the line is expected to be lower with a feasibility study yet to be conducted In addition to metro lines 5 Pearl River Delta Rapid Transit lines connecting neighboring urban centers in the Pearl River Delta such as Dongguan Huizhou Foshan and Guangzhou totaling 146 km 91 mi have also been revealed 59 In 2016 an even more ambitious masterplan expanding the previously planned 20 lines to 32 was unveiled The new plan envisions a 1 142 km 710 mi subway network to be completed by 2030 This will allow for travel between the central and suburban districts to be shortened to 45 minutes and for public transit to make up more than 70 of all motorized trips in Shenzhen 60 Ridership editAnnual RidershipYearmillion riders p a 2005 61 58 2006 62 90 55 17 2007 63 118 31 11 2008 64 136 15 25 2009 65 138 1 47 2010 66 163 18 12 2011 67 460 182 21 2012 68 781 69 78 2013 69 914 17 03 2014 34 1 037 13 46 2015 70 1 122 8 20 2016 71 1 297 15 60 2017 72 1 654 27 53 2018 73 1 878 13 54 20192 018 7 45 20201 623 19 57 20212 178 34 20 20221 751 19 61 Since the opening of the first phase in 2004 there has been a steady growth in passenger traffic In 2009 and 2010 passenger traffic soared with major openings of new phase 2 lines with a three fold increase in passenger traffic in 2010 74 On 12 July 2019 it set a new record for its peak ridership at 6 63 million 2 July is the busiest month of the year for the Shenzhen Metro accounting for 9 3 of annual passenger traffic while January is the least busy month accounting for only 6 7 This is caused by Shenzhen s large migrant worker population 75 Fares and tickets editMetro rides are priced according to distance travelled and fares vary from 2 RMB to 14 RMB 76 Since December 2010 fares are based on a usage fee 2 RMB a distance fee The distance fee is 1 RMB for each 4 km 2 5 mi from 4 km 2 5 mi to 12 km 7 5 mi after that 1 RMB for each 6 km 3 7 mi from 12 km 7 5 mi to 24 km 15 mi and finally 1 RMB for every 8 km 5 0 mi over 24 km 15 mi distance 77 For passengers who wish to ride on business coach in line 11 they have to pay 3 times the amount of price that calculated by the regulations above Distance km Fares RMB 78 0 12 1 1 per 4 km 2 5 mi 12 24 5 1 per 6 km 3 7 mi over 24 7 1 per 8 km 5 0 mi Children under the height of 120 cm 3 ft 11 in or aged below 6 may ride for free when accompanied by an adult 79 The metro also offers free rides to senior citizens over the age of 65 the physically disabled and military personnel Tickets for children between 120 cm 3 ft 11 in and 150 cm 4 ft 11 in or aged between 6 and 14 years or middle school students are half priced Metro fares can be paid for with single ride tokens multiple ride Shenzhen Tong cards or 1 day passes 80 Tokens edit nbsp Shenzhen Metro RFID TokenWhen using cash a RFID token NXP Mifare Classic is purchased and used for a single non returnable journey There are two different types of tokens with green tokens for Standard Class and yellow tokens used for Business Class which is only available on Line 11 All ticket vending machines offer both English and Chinese interface The purchaser touches a station name to calculate the fare After payment a green token is dispensed which must be scanned at the entrance station and deposited at the exit station A penalty applies should a token be lost Purchasers of green tokens cannot ride Business Class on Line 11 directly Instead they must get off at any transfer stations with Line 11 and purchase a separate yellow token Note that as of 2015 many machines accept only 5 or 10 RMB notes The token s are only valid at the station where issued Passengers are unable to buy an extra token for return journey prior to departure Baggage X Ray machines are located at each station and may be staffed during peak hours Shenzhen Tong cards edit Main article Shenzhen Tong Shenzhen Tong is a pre paid currency card similar to Oyster Card system in London and the Octopus card system used in Hong Kong The multiple fare card stores credit purchased at stations The card can be used by waving it in front of the card reader located at all entrances and exits to the subway system Riders who pay for metro fare with a card receive a 5 discount Since 1 March 2008 riders who pay for a bus fare with a card and then a subway fare within 90 minutes receive an additional 0 4 RMB discount on the subway fare Card users pay a distance based fare Since 30 June 2011 cards containing both a Shenzhen Tong and Hong Kong Octopus chip have been available in both Shenzhen and Hong Kong There are plans to further integrate the two systems and for a new card which will be accepted all over Guangdong province and China s two SARs 81 82 Unlike Hong Kong Octopus Cards Shenzhen Tong cards cannot be sold back to the stations or have faults dealt with by SZMC Instead the customer must go to the offices of Shenzhen Tong Students studying in Shenzhen can use the Shenzhen Tong to receive a 50 discount Note that discounts are not applicable for people who ride Business Class carriages on Line 11 Metro cards can also be used on Shenzhen s public bus system Metro 1 day passes edit Metro 1 day pass is a smart card that allowed the card holder have unlimited access of the metro system in 24 continuous hours Passengers can purchase a 1 day pass for RMB 25 in the service center in any metro station The pass will be activated and the passenger will have 24 continuous hour for unlimited access after the first entrance When the pass expired the pass is no longer available for entering a station but able to exiting a station and finish a journey in 27 5 hours The 1 day passes are not applicable for Business Class carriages on Line 11 Station facilities amenities and services editSome stations have toilets free of charge and public telephones SZMC also operates luggage storage facilities in the concourse above Luohu Station Mobile phone service is available throughout the system provided by China Mobile China Telecom and China Unicom 83 Like the Hong Kong MTR Guangzhou and Foshan metros station announcements are in Mandarin Cantonese and English Some announcements such as train arrival are in Mandarin and English only Cantonese an important local language is chosen for the local Cantonese population as well as Cantonese speakers in Guangdong Hong Kong and Macau The stations of Line 6 and Line 10 are the first metro stations in China to have 5G coverage 84 Equipment edit nbsp Bombardier rolling stock on Line 1 nbsp CRRC Nanjing Puzhen rolling stock on Line 4 nbsp CRRC Zhuzhou rolling stock on Line 11 Business Class Rolling stock edit Line 1 edit 22 Bombardier Transportation Movia 456 6 car sets 101 122 4 Changchun Railway Vehicles Type A 6 car sets traction units by Bombardier Transportation 123 126 26 Zhuzhou Electric Locomotive Works Type A 6 car sets traction units by Siemens 127 152 33 Zhuzhou Electric Locomotive Works Type A 6 car sets traction units by CSR Times Electric 153 185 Line 2 edit 35 Changchun Railway Vehicles Type A 6 car sets traction units by Bombardier Transportation 201 235 17 Changchun Railway Vehicles Type A 6 car sets traction units by Bombardier Transportation 236 239 241 252 by CRRC Qingdao Sifang 240 5 Zhuzhou Electric Locomotive Works Type A 6 car sets traction units by CRRC Times Electric 253 257 Line 3 edit 43 Changchun Railway Vehicles Type B 6 car sets traction units by Hyundai Rotem 301 343 Some trains now use CRRC Times Electric traction units after have a maintenance in Changchun 33 Nanjing Puzhen Rolling Stock Works Type B 6 car sets traction units by Hyundai Rotem 344 376 Line 4 edit 52 Nanjing Puzhen Rolling Stock Works Type A 6 car sets 401 452 Line 5 edit 22 Zhuzhou Electric Locomotive Works Type A 6 car sets traction units by Siemens 501 522 8 Zhuzhou Electric Locomotive Works Type A 6 car sets traction units by CSR Times Electric 523 530 21 Changchun Railway Vehicles Type A 6 car sets traction units by Bombardier Transportation 531 551 6 Zhuzhou Electric Locomotive Works Type A 6 car sets traction units by CRRC Times Electric 552 557 Line 6 edit 51 Nanjing Puzhen Rolling Stock Works Type A 6 car sets 601 651 Line 6 Branch edit 9 Nanjing Puzhen Rolling Stock Works Type B 6 car sets 6Z01 6Z09 Line 7 edit 41 Changchun Railway Vehicles Type A 6 car sets traction units by Bombardier Transportation 701 741 Line 8 edit 24 Zhuzhou Electric Locomotive Works Type A 6 car sets traction units by CRRC Times Electric 258 281 801 824 Line 9 edit 29 Changchun Railway Vehicles Type A 6 car sets traction units by CRRC Times Electric 901 929 22 Changchun Railway Vehicles Type A 6 car sets traction units by INVT 930 951 Line 10 edit 35 Changchun Railway Vehicles Type A 8 car sets 1001 1035 Line 11 edit 33 Zhuzhou Electric Locomotive Works Type A 8 car sets 1101 1133 Line 12 edit 56 Nanjing Puzhen Rolling Stock Works Type A 6 car sets 1201 1256 Line 14 edit 44 Changchun Railway Vehicles Type A 8 car sets 1401 1444 Line 16 edit 32 Zhuzhou Electric Locomotive Works Type A 6 car sets 1601 1632 Line 20 edit 9 Changchun Railway Vehicles Type A 8 car sets 2001 2009 Signalling system edit On Line 1 and Line 4 Siemens supplied 7 Phase 1 and 6 Phase 2 LZB 700 M continuous automatic control systems 7 Phase 1 and 6 Phase 2 electronic Sicas ESTT interlockings the Vicos OC 501 operations control system with 2 operations control centers fall back level with Vicos OC 101 and RTU FEP 230 Phase 1 and 240 Phase 2 FTG S track vacancy detection units 85 Line 2 and Line 5 use Casco CBTC system with 2 4 GHz frequencies and so the system has suffered frequent problems with interference from consumer Wi Fi equipment 86 By the end of November 2012 CASCO solved the problem on Lines 2 and 5 by switching to their standard solution with frequency diversity on 2 different channels Accidents and incidents edit4 April 2011 One worker was killed and four others injured on April 4 when a manually controlled chain hoist broke loose in a Line 5 tunnel in Longgang district A preliminary investigation by district safety authorities found mechanical failure was to blame 87 5 September 2012 Service was suspended on Line 4 for several hours due to power outage 88 9 September 2013 Three passengers abandoned in Line 1 tunnel after train door opens 89 17 February 2014 Passenger passes out at Shuiwan station on Line 2 and dies after no help or CPR is provided for 50 minutes 90 25 June 2015 Worker killed during tunnel collapse in Line 7 construction 91 19 April 2017 Scaffolding for a metro station collapsed during the construction of the Line 8 on Yantian Rd killing a worker and injuring three 92 11 May 2017 During the construction of the extension of Line 3 heavy rains caused a partial cave in at an excavation pit for a station on the southern extension of Line 3 killing 2 workers and injuring another 93 30 October 2017 A section of Line 9 tunnel near Shenzhen Bay Park station was damaged by unauthorized community drilling works above ground While the damage was soon repaired the line continued to operate at a lowered safety speed of 45 km h for a week 94 6 December 2017 Unauthorized drilling works for an adjacent bouldering site damaged the tunnel between Houhai and Hongshuwan South station of Line 11 causing sections of tunnel to make contact with a train and the driver to sustain minor injuries The service of the line was disrupted for 12 hours while the line operated on modified routes until the damage was fully repaired 95 23 December 2017 A Line 11 train killed a suicidal man lying on the rails between Bihaiwan and Airport disrupting the service for 80 minutes 96 5 7 July 2018 Over a span of three days at least seven incidents occurred where power cables were accidentally cut at various construction sites of Shenzhen Metro causing blackouts in large areas 97 10 July 2018 During the construction of Line 10 workers accidentally dug up the pipes of Shenzhen Buji Water Supply Co Ltd disrupting water distribution system The Shenzhen Economic and Information Commission warned and penalized the contractor responsible 98 9 12 April 2020 Service between Futian and Xinxiu on Line 2 was suspended due to geographic movement caused by the construction of Line 14 99 Network Map edit nbsp Connections editPingshan Center station on Line 14 connects to Line 1 of the Pingshan Shyshuttle This 8 5 km monorail line opened on 28 December 2022 with 11 stations all in Pingshan district Two of the stations will eventually connect to Line 16 stations See also editList of Shenzhen Metro stations List of rapid transit systems Dongguan Rail Transit Foshan Metro Guangzhou Metro Hong Kong MTRReferences edit Shenzhen Metro exploremetro Retrieved May 27 2014 a b 深圳市轨道交通线网密度全国第一 公共交通客运分担率超60 粤港澳大湾区门户网 April 1 2022 创历史新高 跨年夜 深圳市地铁全网总客运量达842 23万人次 创历史新高 21日深圳地铁总客流量达646 9万人次 stnn cc July 21 2018 深圳地铁16号线28日开通运营 城市轨道交通线网规模达559公里 16号线开通 至此 深圳地铁全网里程达547公里 车站369座 深圳地铁16号线今日开通运营 深圳地铁16号线今日开通运营 www 163 com Retrieved December 28 2022 深圳地铁8号线开始铺设轨道 盐田2020年进入地铁时代 深圳新闻网 开通倒计时 4 号线三期工程试运行紧锣密鼓进行全线行车组织 服务时间 车厢温度同步优化调整 PDF 约起 深圳地铁5号线二期9月28日开通 5号线运营总里程将延长至47 393公里 a b 刚刚 深圳地铁6号线10号线正式开通 你要先打卡哪条线 August 18 2020 a b c 深圳地铁7 9号线试运营 轨道网络规模居国内第三 October 28 2016 Shenzhen Metro Line 1 from Luohu to Airport East was put into a trial operation photo of ongoing construction in Shekou Archived September 25 2013 at the Wayback Machine Chinese Wang Xiaoqing 王晓晴 and Qiu Gang 邱刚 深圳地铁3号线动工 2009年建成通车 southcn com December 27 2005 Chinese 深圳地铁3号线规划线路图 August 21 2008 Chinese Wang Xiaoqing 王晓晴 深圳地铁5号线全面开工 Xinhua September 19 2008 Colston Paul January 6 2022 Shenzhen World now connected by Metro Line 20 Exhibition World Archived from the original on February 2 2022 Retrieved October 23 2023 彭森 August 21 2005 从7米到140米 深南大道的宽度之谜 in Simplified Chinese 深圳晚报 深圳经济特区总体规划简介 J 城市规划 1986 06 9 14 深圳市地铁有限公司 2007 深圳地铁一期工程建设与管理实践 上册 in Simplified Chinese 北京 人民交通出版社 ISBN 978 7 114 06262 9 a b 深圳地铁十年始获 出生证 in Simplified Chinese 深圳新闻网 June 22 2011 a b c 张家识 1999 深圳地铁一期工程建设前期工作回顾 In 陈锡贤 ed 地下铁道文集 中国土木工程学会隧道及地下工程分会地下铁道专业委员会第十三届学术交流会论文选 in Simplified Chinese 深圳 海天出版社 ISBN 7 80615 959 2 深圳地铁网络框架15年前基本敲定 in Simplified Chinese 深圳特区报 June 25 2011 Archived from the original on September 14 2014 深圳地铁 十年怀胎 终圆梦 深圳特区报 April 10 2010 Archived from the original on January 6 2016 a b 深圳地鐵一期工程主要里程碑時間 in Simplified Chinese 深圳新闻网 Archived from the original on September 24 2015 深圳地铁皇岗站正式开通 in Simplified Chinese Archived from the original on September 30 2007 Retrieved July 1 2007 關於我市近期建設地鐵線路及站點命名的通告 in Simplified Chinese Archived from the original on March 27 2013 Retrieved November 22 2012 New Line Naming Scheme Shenzhen Metro Group Official Weibo Shenzhen Metro Group Retrieved October 23 2013 a b 地铁不如期完工 我主动请求处分 南方日报 February 1 2007 网友声讨 进度慢 市长强调 拖不起 地铁建设 蚯蚓速度 南方日报 January 19 2007 地铁不如期完工 我主动请求处分 新闻中心 新浪网 news sina com cn Retrieved October 30 2016 2011年5地铁贯通深圳 搜狐新闻 news sohu com Retrieved October 30 2016 a b 2014年度全市交通运输运营主要概况及分析 in Simplified Chinese Retrieved January 16 2015 深圳 2011年地铁达177公里 长过香港地铁 星岛网讯 in Simplified Chinese Archived from the original on September 23 2013 SZMC Curstomer Service Center Shenzhen metro Update August 2017 www szmc net SZMC Retrieved August 29 2017 a b c d e f g h i j L 104026 深圳5条地铁线路同时开工 2022年底建成通车 深圳频道 人民网 sz people com cn Retrieved February 8 2018 a href Template Cite web html title Template Cite web cite web a CS1 maint numeric names authors list link City to spend 48b yuan on 3 Metro lines Shenzhen Daily Retrieved July 28 2012 The Shenzhen urban rail transportation recent construction plan approval 2011 2016 National Development and Reform Commission Retrieved August 27 2012 Public notice draft Shenzhen Urban Planning and Land Resources Committee Archived from the original on September 19 2012 Retrieved August 27 2012 历经四年多的建设 地铁5号线二期工程今年9月底正式开通 June 17 2019 深圳地铁5号线南延线和9号线西延线具备通车条件啦 November 21 2018 a b 刚刚 深圳地铁6号线10号线正式开通 你要先打卡哪条线 August 18 2020 地铁4号线北延线明年年底通车 清湖至松元厦区间隧道提前贯通 June 22 2019 深圳地铁8号线开始铺设轨道 盐田2020年进入地铁时代 August 1 2019 未来五年深圳再建五条地铁 南方都市报 Archived from the original on December 3 2012 Retrieved August 27 2012 轨道交通近期建设规划方案 Shenzhen Urban Planning and Land Resources Committee Archived from the original on November 29 2012 Retrieved August 27 2012 查看项目公示 深圳市城市交通规划设计研究中心 www sutpc com Archived from the original on April 23 2015 深圳地铁四期规划来了 新增5条线 与东莞地铁对接方案出炉 市场 深圳乐居网 sz house sina com cn Retrieved January 4 2017 国家发展改革委关于深圳市城市轨道交通第四期建设规划 2017 2022年 的批复 July 7 2017 有我有料 December 21 2023 地铁官方发公告 深圳地铁13号线通车稳了 qq in Simplified Chinese Archived from the original on January 27 2024 Retrieved February 18 2024 李嘉耀 鲁力 January 26 2024 深圳地铁13号线分两段通车 南段7站有望年内开通 southcn Archived from the original on January 27 2024 Retrieved February 18 2024 国家发展改革委关于调整深圳市城市轨道交通第四期建设规划方案的批复 March 26 2020 Retrieved April 26 2020 轨道线网规划方案 Shenzhen Urban Planning and Land Resources Committee Archived from the original on February 22 2014 Retrieved November 21 2012 深圳市城市轨道交通第五期建设规划 2023 2028年 环境影响评价第二次公示 通知公告 深圳市发展和改革委员会网站 fgw sz gov cn Retrieved September 18 2022 深圳地铁五期9条线路公示 www thepaper cn Retrieved April 2 2023 深圳轨道交通五期开建 两条延伸至东莞 预计2028年全部建成通车 www sznews com Retrieved June 27 2023 Dongguan Metro connection called for Shenzhen Daily Retrieved January 22 2014 Four more Metro lines planned Shenzhen Daily Retrieved November 21 2012 关于地铁2号线东延线 地铁3号线西延线线站位初步方案 PDF 深圳市统计局 2005年度12月份深圳统计月报 运输邮电 地铁客流量1 12月累计 in Simplified Chinese Archived from the original on January 25 2013 深圳市统计局 December 2 2008 深圳市2006年国民经济和社会发展统计公报 in Simplified Chinese 深圳市统计局 December 2 2008 深圳市2007年国民经济和社会发展统计公报 in Simplified Chinese 深圳市统计局 March 24 2009 深圳市2008年国民经济和社会发展统计公报 in Simplified Chinese 深圳市统计局 April 27 2010 深圳市2009年国民经济和社会发展统计公报 in Simplified Chinese 深圳市统计局 April 28 2011 深圳市2010年国民经济和社会发展统计公报 in Simplified Chinese 深圳市统计局 2011年度12月份深圳统计月报 运输邮电 地铁客流量1 12月累计 in Simplified Chinese Archived from the original on December 4 2012 深圳地铁客流量 去年猛增近七成 in Simplified Chinese 深圳商报 January 10 2013 Archived from the original on March 4 2016 深圳市2013年国民经济和社会发展统计公报 in Simplified Chinese 深圳市统计局 April 8 2014 深圳市交通运输委员会 January 19 2016 2015年12月交通运输运营指标统计月报 2016年交通运输运营指标统计年报 in Simplified Chinese 深圳市交通运输委员会 February 6 2017 Archived from the original on February 11 2017 2017年交通运输运营指标统计年报 in Simplified Chinese 深圳市交通运输委员会 January 23 2018 2018年12月交通运输运营指标统计月报 in Simplified Chinese 深圳市交通运输委员会 January 18 2019 杨丽 杨德明 2012 深圳市城市轨道交通网络化客流变化研究 现代城市轨道交通 in Simplified Chinese 6 陈煜 2011 深圳地铁运营对轨道交通客流预测的启示 铁道工程学报 in Simplified Chinese 8 Chinese fare information New Metro fares announced Business coach fears is three times as matching normal coach fears Chinese SZMC fare policy types of tickets One smartcard to rule them all Guangdong HK team up to offer unified travel card The Nanfang Guangdong and Hong Kong Linked by One Transportation Card Life of Guangzhou features southcn com Retrieved August 27 2012 官方回应深圳一地铁站命名华为 报批时并未禁止企业名命名 Official response to the naming of a Shenzhen subway station Huawei was not prohibited from naming the company August 26 2020 Metro Lines 1 and 4 Shenzhen China Archived from the original on February 4 2009 Retrieved July 6 2008 Pocket Wi Fi hotspots paralyse Chinese metro lines Accidents on Metro expansion hurt Shenzhen South China Morning Post April 23 2011 Retrieved February 15 2018 Ruixi Zhao September 7 2012 深圳地铁发生史上最严重事故 龙华线断电6小时 people com cn Retrieved February 15 2018 Passengers abandoned in Shenzhen metro tunnel after train door opens South China Morning Post Retrieved May 5 2018 外企女经理地铁口晕倒后死亡 卧地长达50分钟 news sina com cn Retrieved May 5 2018 Shenzhen Metro Tunnel Collapses for the 4th Time This Year The Nanfang The Nanfang June 26 2015 Retrieved May 5 2018 深圳在建地铁倒塌1死3伤 乘坐地铁前这一点你不能不知 JRJ com April 20 2017 Retrieved February 15 2018 深圳地铁工地发生坍塌事故 2人遇难1人被困 Sina com May 11 2017 Retrieved February 15 2018 深圳地铁9号线隧道被打穿 目前已限速 SZNews com October 30 2017 Retrieved February 15 2018 解读 这是什么鬼 深圳地铁隧道竟被凿穿 罪魁祸首竟然是它 Sohu December 6 2017 Retrieved February 15 2018 深圳地铁碾压事件 1人身亡死者翻越护栏俯卧轨道被碾 新闻频道 中华网 china com December 24 2017 Retrieved April 1 2018 施工3天挖断7根电缆 深圳地铁 已对施工单位顶格处罚 CNR July 12 2018 Retrieved July 13 2018 深圳地铁施工三天挖断七条电缆 又挖爆供水主管道 Zaobao July 12 2018 Retrieved July 13 2018 深圳地铁2号线遇地质突变 部分站点临时停运 中新网 www chinanews com Retrieved April 13 2020 External links edit nbsp Wikimedia Commons has media related to Shenzhen Metro category SZMC Shenzhen Metro Group official website in English MTR Corporation Shenzhen official website Chinese only Retrieved from https en wikipedia org w index php title Shenzhen Metro amp oldid 1216606571, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.