Line 6 (Shenzhen Metro)

Line 6 (simplified Chinese: 六号线; traditional Chinese: 六號線; pinyin: Liùhào Xiàn), also known as the Guangming line (simplified Chinese: 光明线; traditional Chinese: 光明線; pinyin: Guāngmíng Xiàn) of the Shenzhen Metro is in operation. Line 6 is part of the Phase III expansion of the Shenzhen Metro with a construction time frame scheduled for 2015–2019.[3]

Line 6
Overview
StatusIn operation
LocaleShenzhen, China
Termini
Stations27
Color on map     Aquamarine (#3abca8)
Service
TypeRapid transit
SystemShenzhen Metro
Operator(s)SZMC (Shenzhen Metro Group)
Depot(s)Changzhen depot
Minle Stabling Yard
Rolling stockCRRC Puzhen (601-651)(6 cars, type A)
History
Opened18 August 2020; 3 years ago (2020-08-18)[1]
Technical
Line length49.4 km (30.7 mi)[2]
Number of tracksDouble-track
CharacterUnderground and elevated
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification1,500 V DC third rail (overhead lines with same voltage installed in depot)
Operating speed100 km/h (62 mph)
SignallingUrbalis 888 CBTC Moving block
Route map

Songgang
Xitou
Songgang Park
Shutianpu
Heshuikou
Gongming Square
13
to Gongming North
 
Honghuashan
Loucun
Science Park
6B
to SIAT
 
Guangming
6B
to Guangmingcheng
 
Guangming Street
Fenghuang Town
Changzhen Depot
Changzhen
Shangwu
13
to Shenzhen Bay Checkpoint
 
Guantian
Yangtai Mountain East
Yuanfen
4
to Niuhu
 
Shangfen
Hongshan
Shenzhen North
4 5
Meilinguan
Minle Stabling Yard
Hanling
9
to Qianwan
 
Yinhu
9
to Wenjin
 
Bagualing
Sports Center
Tongxinling
Science Museum

The first phase of Line 6 has a length of 37.6 km (23.4 mi) and a total of 20 stations.[2] It connects Songgang to Shenzhen North station. The southern extension has a length of 11.8 km (7.3 mi) and 7 stations,[2] from Shenzhen North station to Science Museum station. Construction of the first phase started in 2012,[4] with both the original line and south extension opened on 18 August 2020.[1][5][6] It is the second metro line in Shenzhen with an operating speed of over 100 km/h (62 mph). Guangming station (formerly known as Cuihu) will have provision for interchange with Dongguan Rail Transit Line 1 which is also under construction.[7][8] It is envisioned to serve as an interchange with Line 1 and Line 4 of the Dongguan Rail Transit system.

History edit

Line 6 had a planning history of over 20 years with major design changes along the way. In the 1994 "Shenzhen Urban Passenger Transport Master Plan", Line 6 was a metro line proposed to start from Bao'an International Airport to Songgang, with a line length of about 15 km (9.3 mi). It was envisioned as an extension of the still under planning Line 1 to connect the industrial and manufacturing centers of the then Bao'an County with the Bao'an Airport and the Special Economic Zones of Shenzhen. At the time Bao'an was not part of the Shenzhen Special Economic Zone, the purpose of Line 6 was to promote the development into Bao'an's western corridor and the northern industrial hinterland by extending the reach of the Shenzhen Metro.[9]

In the 2001, Line 6 was proposed to be extended south to Xixiang Subdistrict and east to Gongming Subdistrict creating a 37.5 km (23.3 mi) long line with 16 stations. At that point the alignment of Line 6 bears more resemblance to today's Line 11. By 2003, Line 6 was again redesigned into a 51.8 km (32.2 mi), 15 station, commuter railway in a "∩" shape connecting the Airport with Longhua District via Songgang. With the eastern leg of the "∩" replacing one of the then proposed Line 4 branches, the other which remained a section of Line 4 heading to Qinghu.[10] In 2003, The line was again redesigned back into a metro line from Shenzhen North Railway Station to Songgang with a length of 37.2 km (23.1 mi), and 19 stations with a branch line north to Dongguan. This is the first incarnation of Line 6 that resembles it's alignment today.[11]

In 2011, an additional station, Cuihu (formerly called Lilin), was added between the Guangming Center station and Guangming North station. This was done in anticipation for interchange with Dongguan Rail Transit Line 1 which will now take over the branch line to Dongguan.[12] In order to promote better transport integration and economic development between Dongguan and Shenzhen with the relevant departments of the two cities working together in rail transit planning.[13] During the construction of Line 4 in 2007 to 2011, Shangtang Station reserved space for extra platforms and tracks for cross-platform interchange with Line 6. The station was to be rearranged to accommodate Line 6 when it was being constructed. In addition, Line 4's Longhua depot had supports built with decks designed for Line 6 to run over it. In 2012, Line 6 north of Shenzhen North Station was realigned one block east, dropping the plan to use all these provisions.[14]

On April 10, 2012, Longhua District government held a symposium rail transit construction and the Shenzhen Urban Planning and Land Resources Committee issued the "Shenzhen rail transit planning (revision)".[15] This revised Phase III plan showed that Line 6 will extend further south into central Shenzhen with six new stations, and an additional length of 11.5 kilometers. The Shenzhen Metro Phase III approved by the National Development and Reform Commission does not include the south extension of Line 6. However, in order to reduce the need for passengers heading to the city center to transfer into the already overcrowded Line 4, approval for the southern extension of Line 6 parallel to Line 4 was fast tracked. This extension will improve connectivity, by providing a direct line between Guangming and the city center, and provide relief for the congested Line 4 heading to and from Shenzhen North Station.[12]

Construction edit

In 2010 the Shenzhen government and MTR Corporation signed a memorandum of cooperation on the construction operation of Line 6 for 30 years under the BOT procurement strategy, similar to Line 4.[16][17] Funding was approved in April 2013 and construction of the first phase from Shenzhen North Station to Songgang officially started on August 25, 2015, with completion by June 2020.[3] However, due to later negotiation failures between the two parties, Shenzhen Metro Corporation took over the project themselves without the BOT contract as planned.

A notable feature of the project is the section of Line 6 that crosses over Line 4 between Hongshan and Shangtang stations. The angle between the alignments of the two lines is only 11.3°. This means there is significant overlap between the elevated structures of both lines and Line 6 will need to span 100 meters in length order to cross over Line 4. This will be done with a large cable-stayed bridge supported by a single 92 meter high main pier and a bridge length of 140 meters. Making it the first cable-stayed bridge for a metro line for the Shenzhen Metro.[18]

Construction of the Shenzhen section of Dongguan Rail Transit Line 1 started in 2018 as part of Shenzhen Metro's Phase IV expansion known as the "Line 6 branch line project".[7]

Service routes edit

Stations edit

  • M - main line services (Before 11:00 PM)
  • S1 - Short line services 1 (From 11:00 PM to 11:30 PM)
  • S2 - Short line services 2 (From 11:00 PM to 11:30 PM)
M S1 S2 Station name Connections Nearby bus stops Distance
km
Location
English Chinese
Songgang 松岗 11  12  Bao'an
Xitou 溪头
Songgang Park 松岗公园
Shutianpu 薯田埔 Guangming
Heshuikou 合水口
Gongming Square 公明广场  13 
Honghuashan 红花山
Loucun 楼村
Science Park 科学公园
Guangming 光明 6B
Guangming Street 光明大街
Fenghuang Town 凤凰城  13 
Changzhen 长圳
Shangwu 上屋  13  Bao'an
Guantian 官田
Yangtai Mountain East 阳台山东 Longhua
Yuanfen 元芬
Shangfen 上芬
Hongshan 红山 4
Shenzhen North 深圳北站 4 5   IOQ
Meilinguan 梅林关 4 (via Minle)
Hanling 翰岭 Futian
Yinhu 银湖 9 Luohu
Bagualing 八卦岭 7 Futian
Sports Center 体育中心
Tongxinling 通新岭 3
Science Museum 科学馆 1

Branch edit

Despite being nominally the branch of Line 6, it is actually a separate line, whose color, train type and train numbers are all separated from those of the main line. The section from Shenzhen Institute of Advanced Technology to Guangming opened on 28 November 2022,[19] and the section from Guangming to Guangmingcheng is expected to be opened in 2025.[20]

Rolling stock edit

 
Line 6 train
Type Date of manufacture Series Sets Serial number Assembly Notes
Type A 2019–2020 A-size stock 51 0601-0651 Tc+Mp+M+M+Mp+Tc Manufactured by CRRC Nanjing Puzhen

References edit

  1. ^ a b "官宣!深圳地铁6、10号线8月18日开通初期运营". Shenzhen Metro. 2020-08-16.
  2. ^ a b c "地铁6号线全线贯通 明年年中光明通地铁". 2019-08-30.
  3. ^ a b . sztqb.sznews.com. Archived from the original on 2016-12-20. Retrieved 2016-12-11.
  4. ^ Sasin, Jasmin (11 May 2011). "New Metro Lines to Start Construction in September". Shenzhen Standard. Retrieved 23 January 2014.
  5. ^ "地铁6号线项目连续梁顶推成功 预计在2020年6月开通". 2018-10-10.
  6. ^ . wb.sznews.com (in Simplified Chinese). 31 December 2014. Archived from the original on 3 March 2016. Retrieved 11 June 2016.
  7. ^ a b . 中山大学. Archived from the original on 2018-06-21. Retrieved 2018-07-15.
  8. ^ 黄淳. . news.sznews.com. Archived from the original on 2013-12-13. Retrieved 2016-12-11.
  9. ^ Liu Wen (刘文). 香港地铁建设和运营管理研究及对深圳地铁的借鉴. 国际性城市成功管理经验研究. 深圳市涉外培训领导小组. 2000: 97.
  10. ^ 深圳城市轨道交通近中期发展综合规划.
  11. ^ Zhu Qibiao (朱启标). . www.szpl.gov.cn. Archived from the original on 2015-08-01. Retrieved 2016-12-11.
  12. ^ a b . barb.sznews.com. Archived from the original on 2013-12-20. Retrieved 2016-12-11.
  13. ^ . szsb.sznews.com. Archived from the original on 2017-08-10. Retrieved 2016-12-11.
  14. ^ Liu Shixiong (刘世雄); Chen Fugui (陈福贵) (2013). 深圳地铁6号线运营成本测算研究. 现代城市轨道交通 [Modern Urban Rail Transit] (1).
  15. ^ . www.szpl.gov.cn. Archived from the original on 2012-11-28. Retrieved 2016-12-12.
  16. ^ 港铁参与建设地铁6号线---深圳商报多媒体数字报刊平台. szsb.sznews.com. Retrieved 2016-12-11.
  17. ^ 港鐵簡訊 (PDF). MTR Shenzhen.
  18. ^ . www.cutv.com. Archived from the original on 2015-09-23. Retrieved 2016-12-11.
  19. ^ 杨洪权. 深圳:下月起将陆续新开通5条地铁线. news.dayoo.com. Retrieved 2022-09-15.
  20. ^ 深圳地铁四期调整路线五个项目开工 预计2025年陆续通车

line, shenzhen, metro, branch, line, line, branch, shenzhen, metro, line, simplified, chinese, 六号线, traditional, chinese, 六號線, pinyin, liùhào, xiàn, also, known, guangming, line, simplified, chinese, 光明线, traditional, chinese, 光明線, pinyin, guāngmíng, xiàn, she. For the branch of Line 6 see Line 6 Branch Shenzhen Metro Line 6 simplified Chinese 六号线 traditional Chinese 六號線 pinyin Liuhao Xian also known as the Guangming line simplified Chinese 光明线 traditional Chinese 光明線 pinyin Guangming Xian of the Shenzhen Metro is in operation Line 6 is part of the Phase III expansion of the Shenzhen Metro with a construction time frame scheduled for 2015 2019 3 Line 6Guangming stationOverviewStatusIn operationLocaleShenzhen ChinaTerminiScience MuseumSonggangStations27Color on map Aquamarine 3abca8 ServiceTypeRapid transitSystemShenzhen MetroOperator s SZMC Shenzhen Metro Group Depot s Changzhen depotMinle Stabling YardRolling stockCRRC Puzhen 601 651 6 cars type A HistoryOpened18 August 2020 3 years ago 2020 08 18 1 TechnicalLine length49 4 km 30 7 mi 2 Number of tracksDouble trackCharacterUnderground and elevatedTrack gauge1 435 mm 4 ft 8 1 2 in standard gaugeElectrification1 500 V DC third rail overhead lines with same voltage installed in depot Operating speed100 km h 62 mph SignallingUrbalis 888 CBTC Moving blockRoute mapLegend 12 to Zuopaotai East Songgang 11 12 11 to Futianto Bitou Xitou Songgang Park Shutianpu Heshuikou Gongming Square 13 13 to Gongming North Honghuashan Loucun Science Park 6B to SIAT Guangming 6B 6B to Guangmingcheng Guangming Street Fenghuang Town 13 Changzhen Depot Changzhen Shangwu 13 13 to Shenzhen Bay Checkpoint Guantian Yangtai Mountain East Yuanfen 4 to Niuhu Shangfen Hongshan 4 Guangshengang 5 to Chiwanto Huangbeiling Pingnan Railway Shenzhen North 4 5 Guangshengang Xiashen 4 to Futian Checkpoint Meilinguan Minle Stabling Yard 10 to Shuangyong Street 10 to Futian Checkpoint Hanling 9 to Qianwan Yinhu 9 9 to Wenjin 14 to Gangxia Northto Shatian 7 to Xili Laketo Tai an Bagualing 7 Sports Center Tongxinling 3 3 to Futian Bonded Areato Shuanglong 2 to Chiwanto Yantian Road 1 to Airport Eastto Luohu Science Museum 1 This diagram viewtalkedit The first phase of Line 6 has a length of 37 6 km 23 4 mi and a total of 20 stations 2 It connects Songgang to Shenzhen North station The southern extension has a length of 11 8 km 7 3 mi and 7 stations 2 from Shenzhen North station to Science Museum station Construction of the first phase started in 2012 4 with both the original line and south extension opened on 18 August 2020 1 5 6 It is the second metro line in Shenzhen with an operating speed of over 100 km h 62 mph Guangming station formerly known as Cuihu will have provision for interchange with Dongguan Rail Transit Line 1 which is also under construction 7 8 It is envisioned to serve as an interchange with Line 1 and Line 4 of the Dongguan Rail Transit system Contents 1 History 2 Construction 3 Service routes 4 Stations 4 1 Branch 5 Rolling stock 6 ReferencesHistory editLine 6 had a planning history of over 20 years with major design changes along the way In the 1994 Shenzhen Urban Passenger Transport Master Plan Line 6 was a metro line proposed to start from Bao an International Airport to Songgang with a line length of about 15 km 9 3 mi It was envisioned as an extension of the still under planning Line 1 to connect the industrial and manufacturing centers of the then Bao an County with the Bao an Airport and the Special Economic Zones of Shenzhen At the time Bao an was not part of the Shenzhen Special Economic Zone the purpose of Line 6 was to promote the development into Bao an s western corridor and the northern industrial hinterland by extending the reach of the Shenzhen Metro 9 In the 2001 Line 6 was proposed to be extended south to Xixiang Subdistrict and east to Gongming Subdistrict creating a 37 5 km 23 3 mi long line with 16 stations At that point the alignment of Line 6 bears more resemblance to today s Line 11 By 2003 Line 6 was again redesigned into a 51 8 km 32 2 mi 15 station commuter railway in a shape connecting the Airport with Longhua District via Songgang With the eastern leg of the replacing one of the then proposed Line 4 branches the other which remained a section of Line 4 heading to Qinghu 10 In 2003 The line was again redesigned back into a metro line from Shenzhen North Railway Station to Songgang with a length of 37 2 km 23 1 mi and 19 stations with a branch line north to Dongguan This is the first incarnation of Line 6 that resembles it s alignment today 11 In 2011 an additional station Cuihu formerly called Lilin was added between the Guangming Center station and Guangming North station This was done in anticipation for interchange with Dongguan Rail Transit Line 1 which will now take over the branch line to Dongguan 12 In order to promote better transport integration and economic development between Dongguan and Shenzhen with the relevant departments of the two cities working together in rail transit planning 13 During the construction of Line 4 in 2007 to 2011 Shangtang Station reserved space for extra platforms and tracks for cross platform interchange with Line 6 The station was to be rearranged to accommodate Line 6 when it was being constructed In addition Line 4 s Longhua depot had supports built with decks designed for Line 6 to run over it In 2012 Line 6 north of Shenzhen North Station was realigned one block east dropping the plan to use all these provisions 14 On April 10 2012 Longhua District government held a symposium rail transit construction and the Shenzhen Urban Planning and Land Resources Committee issued the Shenzhen rail transit planning revision 15 This revised Phase III plan showed that Line 6 will extend further south into central Shenzhen with six new stations and an additional length of 11 5 kilometers The Shenzhen Metro Phase III approved by the National Development and Reform Commission does not include the south extension of Line 6 However in order to reduce the need for passengers heading to the city center to transfer into the already overcrowded Line 4 approval for the southern extension of Line 6 parallel to Line 4 was fast tracked This extension will improve connectivity by providing a direct line between Guangming and the city center and provide relief for the congested Line 4 heading to and from Shenzhen North Station 12 Construction editIn 2010 the Shenzhen government and MTR Corporation signed a memorandum of cooperation on the construction operation of Line 6 for 30 years under the BOT procurement strategy similar to Line 4 16 17 Funding was approved in April 2013 and construction of the first phase from Shenzhen North Station to Songgang officially started on August 25 2015 with completion by June 2020 3 However due to later negotiation failures between the two parties Shenzhen Metro Corporation took over the project themselves without the BOT contract as planned A notable feature of the project is the section of Line 6 that crosses over Line 4 between Hongshan and Shangtang stations The angle between the alignments of the two lines is only 11 3 This means there is significant overlap between the elevated structures of both lines and Line 6 will need to span 100 meters in length order to cross over Line 4 This will be done with a large cable stayed bridge supported by a single 92 meter high main pier and a bridge length of 140 meters Making it the first cable stayed bridge for a metro line for the Shenzhen Metro 18 Construction of the Shenzhen section of Dongguan Rail Transit Line 1 started in 2018 as part of Shenzhen Metro s Phase IV expansion known as the Line 6 branch line project 7 Service routes editScience Museum Songgang Before 11 00 PM Science Museum Yangtai Mountain East Working days peak hours only Science Museum Changzhen From 11 00 PM to 11 30 PM Songgang Meilinguan From 11 00 PM to 11 30 PM Stations editM main line services Before 11 00 PM S1 Short line services 1 From 11 00 PM to 11 30 PM S2 Short line services 2 From 11 00 PM to 11 30 PM M S1 S2 Station name Connections Nearby bus stops Distancekm Location English Chinese Songgang 松岗 11 12 Bao an Xitou 溪头 Songgang Park 松岗公园 Shutianpu 薯田埔 Guangming Heshuikou 合水口 Gongming Square 公明广场 13 Honghuashan 红花山 Loucun 楼村 Science Park 科学公园 Guangming 光明 6B Guangming Street 光明大街 Fenghuang Town 凤凰城 13 Changzhen 长圳 Shangwu 上屋 13 Bao an Guantian 官田 Yangtai Mountain East 阳台山东 Longhua Yuanfen 元芬 Shangfen 上芬 Hongshan 红山 4 Shenzhen North 深圳北站 4 5 nbsp IOQ Meilinguan 梅林关 4 via Minle Hanling 翰岭 Futian Yinhu 银湖 9 Luohu Bagualing 八卦岭 7 Futian Sports Center 体育中心 Tongxinling 通新岭 3 Science Museum 科学馆 1 Branch edit Main article Line 6 Branch Shenzhen Metro Despite being nominally the branch of Line 6 it is actually a separate line whose color train type and train numbers are all separated from those of the main line The section from Shenzhen Institute of Advanced Technology to Guangming opened on 28 November 2022 19 and the section from Guangming to Guangmingcheng is expected to be opened in 2025 20 Rolling stock edit nbsp Line 6 train Type Date of manufacture Series Sets Serial number Assembly Notes Type A 2019 2020 A size stock 51 0601 0651 Tc Mp M M Mp Tc Manufactured by CRRC Nanjing PuzhenReferences edit a b 官宣 深圳地铁6 10号线8月18日开通初期运营 Shenzhen Metro 2020 08 16 a b c 地铁6号线全线贯通 明年年中光明通地铁 2019 08 30 a b 地铁6号线主体工程开工 深圳特区报 sztqb sznews com Archived from the original on 2016 12 20 Retrieved 2016 12 11 Sasin Jasmin 11 May 2011 New Metro Lines to Start Construction in September Shenzhen Standard Retrieved 23 January 2014 地铁6号线项目连续梁顶推成功 预计在2020年6月开通 2018 10 10 地铁6号线10号线预计2019年通车 深圳晚报 wb sznews com in Simplified Chinese 31 December 2014 Archived from the original on 3 March 2016 Retrieved 11 June 2016 a b 大手笔 明日深圳5条新地铁齐开工 6号线直通中大深圳校区 中山大学 Archived from the original on 2018 06 21 Retrieved 2018 07 15 黄淳 深莞惠城际轨道联网指日可待 焦点新闻 深圳新闻网 news sznews com Archived from the original on 2013 12 13 Retrieved 2016 12 11 Liu Wen 刘文 香港地铁建设和运营管理研究及对深圳地铁的借鉴 国际性城市成功管理经验研究 深圳市涉外培训领导小组 2000 97 深圳城市轨道交通近中期发展综合规划 Zhu Qibiao 朱启标 深圳市规划和国土资源委员会 www szpl gov cn Archived from the original on 2015 08 01 Retrieved 2016 12 11 a b 地铁6号线拟直通市中心 宝安日报多媒体数字报刊平台 barb sznews com Archived from the original on 2013 12 20 Retrieved 2016 12 11 规划建设区域轨道交通网络 深圳商报多媒体数字报刊平台 szsb sznews com Archived from the original on 2017 08 10 Retrieved 2016 12 11 Liu Shixiong 刘世雄 Chen Fugui 陈福贵 2013 深圳地铁6号线运营成本测算研究 现代城市轨道交通 Modern Urban Rail Transit 1 深圳市规划和国土资源委员会 www szpl gov cn Archived from the original on 2012 11 28 Retrieved 2016 12 12 港铁参与建设地铁6号线 深圳商报多媒体数字报刊平台 szsb sznews com Retrieved 2016 12 11 港鐵簡訊 PDF MTR Shenzhen 地铁6号线 打入第一根试桩 第一现场 城市联合网络电视台 www cutv com Archived from the original on 2015 09 23 Retrieved 2016 12 11 杨洪权 深圳 下月起将陆续新开通5条地铁线 news dayoo com Retrieved 2022 09 15 深圳地铁四期调整路线五个项目开工 预计2025年陆续通车 Retrieved from https en wikipedia org w index php title Line 6 Shenzhen Metro amp oldid 1198787054, wikipedia, wiki, book, books, library,