fbpx
Wikipedia

Line 20 (Shenzhen Metro)

Line 20 is a rapid transit line in the Shenzhen Metro system. The line connects Airport North with the Convention & Exhibition City.[2][3]

Line 20
Overview
Other name(s)Fuyong line
(福永线; 福永線; Fúyǒng xiàn; fuk1 wing5 sin3)
Native name二十号线; 二十號線; Èrshí hào xiàn; ji6 sap6 hou6 sin3
StatusOperational
OwnerShenzhen Metro Group
LocaleShenzhen, China
Termini
Stations5 (Phase 1)
Color on map     Cyan (#88dbdf)
Service
TypeRapid transit
SystemShenzhen Metro
Operator(s)SZMC (Shenzhen Metro Group)
Rolling stockCRRC Changchun (2001-2009) (Type A, 8 cars)
History
Opened28 December 2021; 13 months ago (2021-12-28)
Technical
Line length8.43 km (5.24 mi) (Phase 1)[1]
Number of tracksDouble-track
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification1,500 V DC (overhead lines)
Route map

Convention & Exhibition City
12 to Waterlands Resort East
Shenzhen World North
Shenzhen World
12 to Zuopaotai East
Shenzhen World South
Airport North Depot (Line 20)
Airport North Stabling Yard (Line 11)
Airport North
Future extension

Construction started on 24 November 2016.[2] The National Development and Reform Commission approved the project in March 2020.[4] It opened on 28 December 2021,[5] after being delayed since 2018.[2]

Stations

Station name[6] Connections Nearby bus stops Distance
km
Location
English Chinese
Convention & Exhibition City 会展城 0.0 0.0 Bao'an
Shenzhen World North 国展北 12 1.6 1.6
Shenzhen World 国展 12 0.8 2.4
Shenzhen World South 国展南 1.3 3.7
Airport North 机场北 11   SZX 4.4 8.1

Phase 2

  • The under planning Phase 2 of Line 20 will add 14 stations from Airport North to Futian Exhibition Center. The line is 34 km in length.
Station name Connections Location
English Chinese
Airport East 机场东 1 12 Bao'an
Hangcheng Hospital 航城医院
Hangcheng 航城
Xixiang Park 西乡公园  15 
Shangchuan 1st Road 上川一路
Xin'an Old Town 新安老城
Zhongshan Park West 中山公园西 Nanshan
Nantou Ancient City 南头古城 12
Shenzhen University 深大 1  13 
Hi-Tech Park 高新园 1  27 
Baishizhou 白石洲 1  29 
Zhuzilin 竹子林 1 Futian
Xiangmihu West 香蜜湖西  22 
Futian Exhibition Center 福田会展

Rolling stock

Line 20 will use 9 sets of Size A subway trains in eight car sets (no. 2001–2009) with a maximum speed of 120 km/h (75 mph). It's the first time that Shenzhen Metro use automatic train operation. The GoA4 construction standard is applied to Phase I of Shenzhen Metro Line 20, which can fully achieve the automatic operation of unattended trains after opening, and the trains can also automatically sleep, wake up and conduct self inspection. In addition, the train also has more than ten functions, such as train stop control, door platform door alignment isolation, etc.[7]

Type Date of manufacture Series Sets Serial number Assembly Notes
Type A 2020 - 2021 A-size stock 9 2001-2009 Tc+Mp+M+Mp+M+M+Mp+Tc Manufactured by CRRC Changchun Railway Vehicles

References

  1. ^ "深圳地铁四期建设规划调整方案获批". 2020-04-11.
  2. ^ a b c "深圳市地铁20号线全线开工". 2016-11-24.
  3. ^ "深圳国际会展中心配套市政项目总体设计专家评审会顺利召开". www.mp.weixin.qq.com. Retrieved 2016-07-08.
  4. ^ "国家发展改革委关于调整深圳市城市轨道交通第四期建设规划方案的批复". 2020-03-26. Retrieved 2020-04-26.
  5. ^ "铁建南方领导到20号线检查工作". 铁建南方.
  6. ^ "市规划和自然资源局关于深圳市城市轨道交通20号线交通详细规划(草案)的公示". 2021-11-22.
  7. ^ "无人驾驶!20号线一期首列车本月抵深,通车时间为……". 2021-04-15.

line, shenzhen, metro, line, rapid, transit, line, shenzhen, metro, system, line, connects, airport, north, with, convention, exhibition, city, line, 20overviewother, name, fuyong, line, 福永线, 福永線, fúyǒng, xiàn, fuk1, wing5, sin3, native, name二十号线, 二十號線, Èrshí,. Line 20 is a rapid transit line in the Shenzhen Metro system The line connects Airport North with the Convention amp Exhibition City 2 3 Line 20OverviewOther name s Fuyong line 福永线 福永線 Fuyǒng xian fuk1 wing5 sin3 Native name二十号线 二十號線 Ershi hao xian ji6 sap6 hou6 sin3StatusOperationalOwnerShenzhen Metro GroupLocaleShenzhen ChinaTerminiAirport NorthConvention amp Exhibition CityStations5 Phase 1 Color on map Cyan 88dbdf ServiceTypeRapid transitSystemShenzhen MetroOperator s SZMC Shenzhen Metro Group Rolling stockCRRC Changchun 2001 2009 Type A 8 cars HistoryOpened28 December 2021 13 months ago 2021 12 28 TechnicalLine length8 43 km 5 24 mi Phase 1 1 Number of tracksDouble trackCharacterUndergroundTrack gauge1 435 mm 4 ft 8 1 2 in standard gaugeElectrification1 500 V DC overhead lines Route mapLegendConvention amp Exhibition City12 to Waterlands Resort EastShenzhen World North 12Shenzhen World 1212 to Zuopaotai EastShenzhen World South11 to BitouAirport North Depot Line 20 Airport North Stabling Yard Line 11 Airport North 1111 to Gangxia NorthFuture extensionThis diagram viewtalkeditConstruction started on 24 November 2016 2 The National Development and Reform Commission approved the project in March 2020 4 It opened on 28 December 2021 5 after being delayed since 2018 2 Contents 1 Stations 1 1 Phase 2 2 Rolling stock 3 ReferencesStations EditStation name 6 Connections Nearby bus stops Distancekm LocationEnglish ChineseConvention amp Exhibition City 会展城 0 0 0 0 Bao anShenzhen World North 国展北 12 1 6 1 6Shenzhen World 国展 12 0 8 2 4Shenzhen World South 国展南 1 3 3 7Airport North 机场北 11 SZX 4 4 8 1Phase 2 Edit The under planning Phase 2 of Line 20 will add 14 stations from Airport North to Futian Exhibition Center The line is 34 km in length Station name Connections LocationEnglish ChineseAirport East 机场东 1 12 Bao anHangcheng Hospital 航城医院Hangcheng 航城Xixiang Park 西乡公园 15 Shangchuan 1st Road 上川一路Xin an Old Town 新安老城Zhongshan Park West 中山公园西 NanshanNantou Ancient City 南头古城 12Shenzhen University 深大 1 13 Hi Tech Park 高新园 1 27 Baishizhou 白石洲 1 29 Zhuzilin 竹子林 1 FutianXiangmihu West 香蜜湖西 22 Futian Exhibition Center 福田会展Rolling stock EditLine 20 will use 9 sets of Size A subway trains in eight car sets no 2001 2009 with a maximum speed of 120 km h 75 mph It s the first time that Shenzhen Metro use automatic train operation The GoA4 construction standard is applied to Phase I of Shenzhen Metro Line 20 which can fully achieve the automatic operation of unattended trains after opening and the trains can also automatically sleep wake up and conduct self inspection In addition the train also has more than ten functions such as train stop control door platform door alignment isolation etc 7 Type Date of manufacture Series Sets Serial number Assembly NotesType A 2020 2021 A size stock 9 2001 2009 Tc Mp M Mp M M Mp Tc Manufactured by CRRC Changchun Railway VehiclesReferences Edit 深圳地铁四期建设规划调整方案获批 2020 04 11 a b c 深圳市地铁20号线全线开工 2016 11 24 深圳国际会展中心配套市政项目总体设计专家评审会顺利召开 www mp weixin qq com Retrieved 2016 07 08 国家发展改革委关于调整深圳市城市轨道交通第四期建设规划方案的批复 2020 03 26 Retrieved 2020 04 26 铁建南方领导到20号线检查工作 铁建南方 市规划和自然资源局关于深圳市城市轨道交通20号线交通详细规划 草案 的公示 2021 11 22 无人驾驶 20号线一期首列车本月抵深 通车时间为 2021 04 15 Retrieved from https en wikipedia org w index php title Line 20 Shenzhen Metro amp oldid 1130896319, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.