fbpx
Wikipedia

Line 11 (Shenzhen Metro)

Shenzhen Metro Line 11 opened on 28 June 2016.[3] Line 11 has a length of 53.5 km (33.2 mi)[1] and a total of 19 stations. It connects the CBDs of Futian, Nanshan and Qianhai to Shenzhen Bao'an International Airport and onward to Fuyong, Shajing and Songgang suburban areas. It serves as both a regional express line from the west coast of Shenzhen to the city core area and an airport rail link.[4] Compared with the other lines of Shenzhen Metro, Line 11 has a longer spacing between stops for a higher speed service. Trains of Line 11 were designed to run at 120 km/h (75 mph), up to 50% faster than other lines,[5] but currently limited to 80 km/h (50 mph) in some sections for infrastructure, tunnel wind pressure, track geometry issues and noise reasons.[6] Construction of Line 11 started in April 2012 and test running begun at the end of March 2016. Trains run at a 4-minute frequency between Futian and Airport North, 8-minute frequency for full length trains during morning rush hours, 5-minute interval for full length during evening rush hours, and 6-minute interval for non-peak hours. Currently it takes slightly more than half an hour to travel from Futian to the Airport. Line 11's color is violet.[7]

Line 11
Overview
Other name(s)Airport line
(机场线; 機場綫; Jīchǎng xiàn; Chi1-chʻang3 hsien4)
Native name十一号线; 十一號綫; Shíyī hào xiàn
StatusOperational
LocaleShenzhen, China
Termini
Stations19
Color on map     Tyrian purple (#6a1d44)
Service
TypeRapid transit
SystemShenzhen Metro
Operator(s)SZMC (Shenzhen Metro Group)
Depot(s)Songgang depot
Airport North stabling yard
Rolling stockCRRC Zhuzhou (1101-1133)(8A)
History
Opened28 June 2016; 7 years ago (2016-06-28)
Last extension28 October 2022; 11 months ago (2022-10-28)
Technical
Line length53.5 km (33.2 mi)[1][2]
Number of tracksDouble-track
CharacterUnderground and elevated
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
ElectrificationOverhead lines (1500 volts)
Operating speed120 km/h (75 mph) designed, currently limited to 80 km/h (50 mph)
SignallingUrbalis 888 CBTC Moving block
Route map

Future extension to Dongguan
Songgang Depot
Bitou
Songgang
Houting
Shajing
Ma'an Hill
Tangwei
Qiaotou
12 to Waterlands Resort East
Fuyong
Airport North Stabling Yard
Airport North
Airport
Bihaiwan
Bao'an
Qianhaiwan
5 to Chiwan
Nanshan
2 to Chiwan
Houhai
13
to Shenzhen Bay Checkpoint
to Shangwu
Hongshuwan South
9 to Wenjin
Chegongmiao
1 7 9
1 to Luohu
Futian
2 3
Gangxia North
Phase 2 remaining section
(Under Construction)
Fuxin Stabling Yard
The Eighth Affiliated Hospital
of Sun Yat-sen University
Huaqiang South
Hongling South

History Edit

In 2007, the "Shenzhen City Rail Transit Construction Plan (2011 to 2020)" was publicly announced for the first time, which included the plans for Line 11.[4] The plan calls for an express metro line running along the western coast of Shenzhen with through services to Dongguan, Guangzhou and beyond via the Guangzhou–Shenzhen intercity railway which was then envisioned to be an intercity metro line.[8] In December 2008, a ground breaking ceremony was held for the project, attended by Party Secretary Wang Yang and Governor Huang Huahua.[9] However, design changes started immediately after due to disagreements on how to integrate the metro project with the intercity line. Subsequently, the project was postponed.[10]

In July 2010, China Railway Minister Liu Zhijun and Guangdong Executive Vice Governor Zhu Xiaodan held talks to speed up railway construction in Guangdong. The result was a new plan to construct a Pearl River Delta Metropolitan Region intercity railway network. The Guangzhou–Shenzhen intercity railway was redesigned from a rapid transit line to a regional rail line and will no longer enter the central area of Shenzhen. Instead the Guangzhou–Shenzhen intercity railway shall terminate at Airport station with interchange for Line 11 but no through services.[11]

Timeline Edit

Segment Commencement Length Station(s) Name
Bitou — Futian 28 June 2016 51.936 km (32.27 mi)[1] 18 Phase 1
Futian — Gangxia North 28 October 2022 1.6 km (0.99 mi)[2] 1 Phase 2 (Initial Section)

Service routes Edit

Stations Edit

Service
routes
Station name Connections Nearby bus stops Distance
km
Location
English Chinese
Bitou 碧头 长安26 656 M495 0.00 0.00 Bao'an
Songgang 松岗 6  12  656 B641 M255 M291 M490 M512 1.90 1.90
Houting 后亭 652 656 779 782 B774 B867 B895 M442 2.30 4.20
Shajing 沙井 639 656 780 782 B716 B776 B894 M284 M333 M387 M397 2.40 6.60
Ma'an Hill 马安山 782 M284 M387 M397 1.75 8.35
Tangwei 塘尾 327 866 868区间2 B893 M237 M251 M252 M367 M387 1.75 10.10
Qiaotou 桥头 866 868区间2 B876 B892 M291 M310 M387 1.70 11.80
Fuyong 福永 12 338 639 866 868区间2 B898 M251 M252 M291 M310 M351 M387 M472 M514 1.75 13.55
Airport North 机场北 20 2.65 16.20
Airport 机场   SZX 330/Airport 1(机场1)330B 330C 790 E16 E21 M416 M371 M387 M387区间 M416 Airport 2(机场2) Airport 4(机场4) Airport 6(机场6) Airport 7(机场7) Airport 8(机场8) Airport 9(机场9) Airport 10(机场10) 3.65 19.85
Bihaiwan 碧海湾 320 718 797 B847 B887 B910 M200 M473 7.00 26.85
Bao'an 宝安 631 797 B630 B828 E15 M200 M210 M376 M473 M507 3.40 30.25
Qianhaiwan 前海湾 1 5 2.70 32.95 Nanshan
Nanshan 南山 12 58 74 79 204 331 332 337 369 382 390 B682 M206 M222 M241 M242 M347 M370 M371 M463 M483 M506 N4 Peak-time 12(高峰12) European City Line 4.20 37.15
Houhai 后海 2  13  M299 M429 M467 M474 M483 M493 N24 Peak-time 10(高峰10) 1.90 39.05
Hongshuwan South 红树湾南 9  29  3.25 42.30
Chegongmiao 车公庙 1 7 9 21 26 28 79 101 113 123 202 204 209 213 222 223 234 303 324 326 338 365 372 M191 M372 M391 M392 M413 M414 M435 M447 M448 M500 N4 N6 Peak-time 18(高峰18) Peak-time 62(高峰62) Peak-time 119(高峰119) 5.75 48.05 Futian
Futian 福田 2 3   Futian 32 101 113 123 204 223 234 327 330/Airport 1(机场1) B613 E18 E28 K204 M221 M413 N4 Peak-time 15(高峰15) Peak-time 18(高峰18) Peak-time 38(高峰38) Peak-time 49(高峰49) Peak-time 62(高峰62) Peak-time 119(高峰119) 3.10 51.93
Gangxia North 岗厦北 2 10 14 1.60[2] 53.53
The Eighth Affiliated Hospital of Sun Yat-sen University 中大八院
Huaqiang South 华强南 7
Hongling South 红岭南 9
1 2  5  (via Grand Theater)
Luohu

Future Development Edit

Line 11 is planned to have an east extension to Hongling South.[12] The one-station extension from Futian to Gangxia North opened on 28 October 2022 and the remaining 3 stations are currently under construction.

Additional proposals include a northern extension into Chang'an, Dongguan with transfers to Dongguan Rail Transit.

Rolling stock Edit

The airport line will use 33 sets of Size A subway trains in eight car sets (no. 1101–1133) with a maximum speed of 120 km/h (75 mph), including two six standard class carriages and two Business Class carriages. On 4 July 2015, the first train completed eight months of commissioning work,[13] and 10 trains have been delivered from CRRC Zhuzhou as of March 2016. The maximum train capacity is 2564 people.

Business Class Edit

Business Class has transverse seating and curtains[14] for comfort and luggage racks for airport passengers.[15] To ride Business Class passengers have to pay a premium for their ticket, similar to First Class on the MTR East Rail line. Business Class carriages are marked by dark grey floor tiles and yellow panels above the platform screen doors. Standard class carriages are marked by light grey floor tiles and white panels above the doors.[16]

Type Date of manufacture Series Sets Serial number Assembly Notes
Type A 2015 – 2016 A-size stock 33 1101-1133 Tc+Mp+M+Mp+M+M+Mp+Tc Manufactured by CRRC Zhuzhou Electric Locomotive Works

Fares Edit

Two kinds of fares are charged on Line 11. In standard class, the fare is equivalent to other metro lines. Business Class is three times as expensive as standard class. Standard class fares range between 2 and 10 yuan, with Business Class ranging between 6 and 30 yuan. Because of the possibility of transfers, this makes the maximum possible fare on the Shenzhen Metro 35 yuan. Business Class can be accessed through placing the Shenzhen Tong on a validator or through purchasing a yellow token (standard tokens are green).[17] 11% of passengers travel by Business Class.[18]

References Edit

  1. ^ a b c "深圳地铁11号线全网普通票最高14元". 2016-06-24.
  2. ^ a b c ""两线三枢纽"开通!深圳首条地铁14号线今日正式迎客". 2022-10-28. 11号线福田至岗厦北区间,线段全长1.6公里
  3. ^ Wang Nian (王念). . news.dayoo.com. Archived from the original on 2016-06-28. Retrieved 2016-06-28.
  4. ^ a b (in Chinese). 深圳市规划和国土资源委员会. July 9, 2007. Archived from the original on October 31, 2017. Retrieved December 22, 2012.
  5. ^ "Sina Visitor System" 深圳地铁11号线动态新闻. weibo.com. Retrieved 2016-06-11.
  6. ^ . 智富时代-2018年4期. Archived from the original on 2019-07-03. Retrieved 2019-07-03.
  7. ^ "Sina Visitor System" #新线online# #深圳地铁11号线#. www.weibo.com. Retrieved 2016-06-11.
  8. ^ . February 21, 2008. Archived from the original on February 2, 2014. Retrieved December 22, 2012.
  9. ^ . news.sznews.com. Archived from the original on 2009-02-08. Retrieved 2016-12-11.
  10. ^ . sztqb.sznews.com. Archived from the original on 2012-08-23. Retrieved 2016-12-11.
  11. ^ "【图文】珠三角城际轨道交通线网技术标准调整情况_百度文库". wenku.baidu.com. Retrieved 2016-12-11.
  12. ^ . sz.winshang.com. Archived from the original on 2016-04-22. Retrieved 2016-12-11.
  13. ^ "Sina Visitor System" #新线online# #深圳地铁11号线#. www.weibo.com. Retrieved 2016-06-11.
  14. ^ "Sina Visitor System" #新线online# #深圳地铁11号线#. www.weibo.com. Retrieved 2016-06-11.
  15. ^ . 深圳特区报. April 24, 2012. Archived from the original on February 2, 2014. Retrieved December 26, 2012.
  16. ^ "Sina Visitor System" 新线直击 | 这个"庙"好特别. www.weibo.com. Retrieved 2016-06-11.
  17. ^ "新线直击 | 商务车厢乘车指引get√".
  18. ^ CCTV English (2016-08-21), Business class in Shenzhen metro draws controversy, retrieved 2017-02-18

line, shenzhen, metro, shenzhen, metro, line, opened, june, 2016, line, length, total, stations, connects, cbds, futian, nanshan, qianhai, shenzhen, international, airport, onward, fuyong, shajing, songgang, suburban, areas, serves, both, regional, express, li. Shenzhen Metro Line 11 opened on 28 June 2016 3 Line 11 has a length of 53 5 km 33 2 mi 1 and a total of 19 stations It connects the CBDs of Futian Nanshan and Qianhai to Shenzhen Bao an International Airport and onward to Fuyong Shajing and Songgang suburban areas It serves as both a regional express line from the west coast of Shenzhen to the city core area and an airport rail link 4 Compared with the other lines of Shenzhen Metro Line 11 has a longer spacing between stops for a higher speed service Trains of Line 11 were designed to run at 120 km h 75 mph up to 50 faster than other lines 5 but currently limited to 80 km h 50 mph in some sections for infrastructure tunnel wind pressure track geometry issues and noise reasons 6 Construction of Line 11 started in April 2012 and test running begun at the end of March 2016 Trains run at a 4 minute frequency between Futian and Airport North 8 minute frequency for full length trains during morning rush hours 5 minute interval for full length during evening rush hours and 6 minute interval for non peak hours Currently it takes slightly more than half an hour to travel from Futian to the Airport Line 11 s color is violet 7 Line 11OverviewOther name s Airport line 机场线 機場綫 Jichǎng xian Chi1 chʻang3 hsien4 Native name十一号线 十一號綫 Shiyi hao xianStatusOperationalLocaleShenzhen ChinaTerminiBitouGangxia NorthStations19Color on map Tyrian purple 6a1d44 ServiceTypeRapid transitSystemShenzhen MetroOperator s SZMC Shenzhen Metro Group Depot s Songgang depotAirport North stabling yardRolling stockCRRC Zhuzhou 1101 1133 8A HistoryOpened28 June 2016 7 years ago 2016 06 28 Last extension28 October 2022 11 months ago 2022 10 28 TechnicalLine length53 5 km 33 2 mi 1 2 Number of tracksDouble trackCharacterUnderground and elevatedTrack gauge1 435 mm 4 ft 8 1 2 in standard gaugeElectrificationOverhead lines 1500 volts Operating speed120 km h 75 mph designed currently limited to 80 km h 50 mph SignallingUrbalis 888 CBTC Moving blockRoute mapLegendFuture extension to DongguanSonggang DepotBitouSonggang 66 to Science MuseumHoutingShajingMa an HillTangweiQiaotou12 to Waterlands Resort EastFuyong 12Airport North Stabling Yard20 to Convention amp Exhibition CityAirport North 20AirportBihaiwanBao an5 to Huangbeiling1 to Airport EastQianhaiwan 1 55 to ChiwanNanshan 1212 to Zuopaotai East9 to Qianwan2 to ChiwanHouhai 2 1313 to Shenzhen Bay Checkpointto ShangwuHongshuwan South 99 to WenjinChegongmiao 1 7 97 91 to LuohuFutian 2 33 to Futian Bonded Areato ShuanglongGuangshengang HSR4 to Futian Checkpointto NiuhuGangxia North 2 10 1410 to Futian Checkpointto Shuangyong StreetPhase 2 remaining section Under Construction 2 to Yantian Road14 to ShatianFuxin Stabling YardThe Eighth Affiliated Hospitalof Sun Yat sen University7 to Xili Laketo Tai anHuaqiang South 79 to Wenjinto QianwanHongling South 9This diagram viewtalkedit Contents 1 History 1 1 Timeline 2 Service routes 3 Stations 3 1 Future Development 4 Rolling stock 4 1 Business Class 5 Fares 6 ReferencesHistory EditIn 2007 the Shenzhen City Rail Transit Construction Plan 2011 to 2020 was publicly announced for the first time which included the plans for Line 11 4 The plan calls for an express metro line running along the western coast of Shenzhen with through services to Dongguan Guangzhou and beyond via the Guangzhou Shenzhen intercity railway which was then envisioned to be an intercity metro line 8 In December 2008 a ground breaking ceremony was held for the project attended by Party Secretary Wang Yang and Governor Huang Huahua 9 However design changes started immediately after due to disagreements on how to integrate the metro project with the intercity line Subsequently the project was postponed 10 In July 2010 China Railway Minister Liu Zhijun and Guangdong Executive Vice Governor Zhu Xiaodan held talks to speed up railway construction in Guangdong The result was a new plan to construct a Pearl River Delta Metropolitan Region intercity railway network The Guangzhou Shenzhen intercity railway was redesigned from a rapid transit line to a regional rail line and will no longer enter the central area of Shenzhen Instead the Guangzhou Shenzhen intercity railway shall terminate at Airport station with interchange for Line 11 but no through services 11 Timeline Edit Segment Commencement Length Station s NameBitou Futian 28 June 2016 51 936 km 32 27 mi 1 18 Phase 1Futian Gangxia North 28 October 2022 1 6 km 0 99 mi 2 1 Phase 2 Initial Section Service routes EditGangxia North Bitou Futian Songgang Bitou Gangxia North Airport North Monday Friday AM peak hours only Stations EditServiceroutes Station name Connections Nearby bus stops Distancekm LocationEnglish Chinese Bitou 碧头 长安26 656 M495 0 00 0 00 Bao an Songgang 松岗 6 12 656 B641 M255 M291 M490 M512 1 90 1 90 Houting 后亭 652 656 779 782 B774 B867 B895 M442 2 30 4 20 Shajing 沙井 639 656 780 782 B716 B776 B894 M284 M333 M387 M397 2 40 6 60 Ma an Hill 马安山 782 M284 M387 M397 1 75 8 35 Tangwei 塘尾 327 866 868区间2 B893 M237 M251 M252 M367 M387 1 75 10 10 Qiaotou 桥头 866 868区间2 B876 B892 M291 M310 M387 1 70 11 80 Fuyong 福永 12 338 639 866 868区间2 B898 M251 M252 M291 M310 M351 M387 M472 M514 1 75 13 55 Airport North 机场北 20 2 65 16 20 Airport 机场 nbsp SZX 330 Airport 1 机场1 330B 330C 790 E16 E21 M416 M371 M387 M387区间 M416 Airport 2 机场2 Airport 4 机场4 Airport 6 机场6 Airport 7 机场7 Airport 8 机场8 Airport 9 机场9 Airport 10 机场10 3 65 19 85 Bihaiwan 碧海湾 320 718 797 B847 B887 B910 M200 M473 7 00 26 85 Bao an 宝安 631 797 B630 B828 E15 M200 M210 M376 M473 M507 3 40 30 25 Qianhaiwan 前海湾 1 5 2 70 32 95 Nanshan Nanshan 南山 12 58 74 79 204 331 332 337 369 382 390 B682 M206 M222 M241 M242 M347 M370 M371 M463 M483 M506 N4 Peak time 12 高峰12 European City Line 4 20 37 15 Houhai 后海 2 13 M299 M429 M467 M474 M483 M493 N24 Peak time 10 高峰10 1 90 39 05 Hongshuwan South 红树湾南 9 29 3 25 42 30 Chegongmiao 车公庙 1 7 9 21 26 28 79 101 113 123 202 204 209 213 222 223 234 303 324 326 338 365 372 M191 M372 M391 M392 M413 M414 M435 M447 M448 M500 N4 N6 Peak time 18 高峰18 Peak time 62 高峰62 Peak time 119 高峰119 5 75 48 05 Futian Futian 福田 2 3 nbsp Futian 32 101 113 123 204 223 234 327 330 Airport 1 机场1 B613 E18 E28 K204 M221 M413 N4 Peak time 15 高峰15 Peak time 18 高峰18 Peak time 38 高峰38 Peak time 49 高峰49 Peak time 62 高峰62 Peak time 119 高峰119 3 10 51 93 Gangxia North 岗厦北 2 10 14 1 60 2 53 53The Eighth Affiliated Hospital of Sun Yat sen University 中大八院Huaqiang South 华强南 7Hongling South 红岭南 9 1 2 5 via Grand Theater LuohuFuture Development Edit Line 11 is planned to have an east extension to Hongling South 12 The one station extension from Futian to Gangxia North opened on 28 October 2022 and the remaining 3 stations are currently under construction Additional proposals include a northern extension into Chang an Dongguan with transfers to Dongguan Rail Transit Rolling stock EditThe airport line will use 33 sets of Size A subway trains in eight car sets no 1101 1133 with a maximum speed of 120 km h 75 mph including two six standard class carriages and two Business Class carriages On 4 July 2015 the first train completed eight months of commissioning work 13 and 10 trains have been delivered from CRRC Zhuzhou as of March 2016 The maximum train capacity is 2564 people nbsp A Line 11 train nbsp The interior of a Business Class carriageBusiness Class Edit Business Class has transverse seating and curtains 14 for comfort and luggage racks for airport passengers 15 To ride Business Class passengers have to pay a premium for their ticket similar to First Class on the MTR East Rail line Business Class carriages are marked by dark grey floor tiles and yellow panels above the platform screen doors Standard class carriages are marked by light grey floor tiles and white panels above the doors 16 Type Date of manufacture Series Sets Serial number Assembly NotesType A 2015 2016 A size stock 33 1101 1133 Tc Mp M Mp M M Mp Tc Manufactured by CRRC Zhuzhou Electric Locomotive WorksFares EditTwo kinds of fares are charged on Line 11 In standard class the fare is equivalent to other metro lines Business Class is three times as expensive as standard class Standard class fares range between 2 and 10 yuan with Business Class ranging between 6 and 30 yuan Because of the possibility of transfers this makes the maximum possible fare on the Shenzhen Metro 35 yuan Business Class can be accessed through placing the Shenzhen Tong on a validator or through purchasing a yellow token standard tokens are green 17 11 of passengers travel by Business Class 18 References Edit a b c 深圳地铁11号线全网普通票最高14元 2016 06 24 a b c 两线三枢纽 开通 深圳首条地铁14号线今日正式迎客 2022 10 28 11号线福田至岗厦北区间 线段全长1 6公里 Wang Nian 王念 深圳地铁11号线28日起试运营 11点后可购票体验 广州日报大洋网 news dayoo com Archived from the original on 2016 06 28 Retrieved 2016 06 28 a b 轨道交通近期建设线路线站位初步方案 in Chinese 深圳市规划和国土资源委员会 July 9 2007 Archived from the original on October 31 2017 Retrieved December 22 2012 Sina Visitor System 深圳地铁11号线动态新闻 weibo com Retrieved 2016 06 11 关于深圳地铁11号线轨道弹条问题的分析 智富时代 2018年4期 Archived from the original on 2019 07 03 Retrieved 2019 07 03 Sina Visitor System 新线online 深圳地铁11号线 www weibo com Retrieved 2016 06 11 深圳市轨道交通规划简要报告 3 February 21 2008 Archived from the original on February 2 2014 Retrieved December 22 2012 穗莞深城际轨道干线在深圳开工全程1小时 深圳新闻网 news sznews com Archived from the original on 2009 02 08 Retrieved 2016 12 11 深莞惠交通运输一体化提速 深圳特区报 sztqb sznews com Archived from the original on 2012 08 23 Retrieved 2016 12 11 图文 珠三角城际轨道交通线网技术标准调整情况 百度文库 wenku baidu com Retrieved 2016 12 11 深圳东莞地铁实现无缝接驳 四条接驳线路初定 新闻中心 赢商网 sz winshang com Archived from the original on 2016 04 22 Retrieved 2016 12 11 Sina Visitor System 新线online 深圳地铁11号线 www weibo com Retrieved 2016 06 11 Sina Visitor System 新线online 深圳地铁11号线 www weibo com Retrieved 2016 06 11 11号线从中心区到机场不超半小时 深圳特区报 April 24 2012 Archived from the original on February 2 2014 Retrieved December 26 2012 Sina Visitor System 新线直击 这个 庙 好特别 www weibo com Retrieved 2016 06 11 新线直击 商务车厢乘车指引get CCTV English 2016 08 21 Business class in Shenzhen metro draws controversy retrieved 2017 02 18 Retrieved from https en wikipedia org w index php title Line 11 Shenzhen Metro amp oldid 1178999325, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.