fbpx
Wikipedia

Line 8 (Shenzhen Metro)

Line 8 of the Shenzhen Metro (also known as the Yantian line) is an East-West line with 11 stations from Liantang to Xiaomeisha. It opened on 28 October 2020 between Liantang and Yantian Road, with a length of 12.367 km (7.7 mi) and a total of 7 stations.[2] Line 8 is the first line to serve Yantian District. Line 8 merges into Line 2 at Liantang station, with trains on Line 8 continuing service to Chiwan station.

Line 8
Overview
StatusOperational
LocaleShenzhen, China
Termini
Stations11
Color on map     Orange (#db6d1c)
Service
TypeRapid transit
SystemShenzhen Metro
Operator(s)SZMC (Shenzhen Metro Group)
Depot(s)Wangji Lake stabling yard
Rolling stockTrains service in Line 2
CRRC Zhuzhou (258–281[801–824]) (6A)
History
Opened28 October 2020; 3 years ago (2020-10-28)[1]
Technical
Line length12.367 km (7.7 mi)[2]
Number of tracksDouble-track
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification1,500 V DC (Overhead lines)
Operating speed80 km/h (50 mph)
SignallingUrbalis 888 CBTC Moving block
Route map

Shekou West Depot
Chiwan
Shekou Port
Sea World
12 to Waterlands Resort East
Shuiwan
Dongjiaotou
Wanxia
Houhai Stabling Yard
Haiyue
Dengliang
Houhai
13 to Shangwu
Keyuan
Hongshuwan
Window of the World
connection to Line 1
Qiaocheng North
Shenkang
connection to Line 7
Antuo Hill
Qiaoxiang
Xiangmi
Xiangmei North
Jingtian
Lianhua West
Futian
3 11
Civic Center
Gangxia North
Huaqiang North
Yannan
Grand Theater
1 to Luohu
Hubei
Huangbeiling
Xinxiu
Liantang Checkpoint
Xianhu Road
Liantang
2/8
Wutong Mountain South
Shatoujiao
Haishan
Yantian Port West
Wangji Lake Stabling Yard
Shenwai Senior Campus
Yantian Road
Honganwei
Yantianxu
Dameisha
Xiaomeisha
Line 8 Phase III
(Under Construction)
Xichong Depot
Xichong

Phase 2 opened on 27 December 2023, which extended the line from Yantian Road to Xiaomeisha.[3]

Timeline edit

Segment Commencement Length Station(s) Name
Liantang — Yantian Road 28 October 2020 12.367 km (7.68 mi) 7 Phase 1
Yantian Road — Xiaomeisha 27 December 2023 7.96 km (4.95 mi) 4 Phase 2

Service routes edit

Stations edit

Service
routes
Station name Connections Distance Location
English Chinese
^ Trains continue to Chiwan station via Line 2 ^
Liantang 莲塘 2 (through service) 0 0 Luohu
Wutong Mountain South 梧桐山南 1.46 1.46
Shatoujiao 沙头角 4.32 5.78 Yantian
Haishan 海山 1.57 7.35
Yantian Port West 盐田港西 1.24 8.59
Shenwai Senior Campus 深外高中 2.68 11.27
Yantian Road 盐田路 1.41 12.68
Hong'anwei 洪安围 1.10 13.78
Yantianxu 盐田墟 1.14 14.92
Dameisha 大梅沙 3.58 18.50
Xiaomeisha 小梅沙 2.14 20.64

Phase 3 edit

Phase 3 is under construction. It will extend the line from Xiaomeisha to Xichong and will open in 2025.

Station name Connections Location
English Chinese
Xichong 溪涌  32  (planned through service) Dapeng New District

Rolling stock edit

Type Date of manufacture Series Sets Serial number Assembly Notes
Type A 2019–2020 Type A stock 24 258–281[801-824] Tc+Mp+M+M+Mp+Tc Manufactured by CRRC Zhuzhou Electric Locomotive Works

Notes edit

References edit

  1. ^ "深圳地铁8号线将于2020年10月28日正式投入运营". 2019-08-13.
  2. ^ a b "深圳地铁8号线开始铺设轨道,盐田2020年进入地铁时代". 2019-08-01.
  3. ^ "深圳地铁8号线二期开通日期". citys114. 2023-03-13. Retrieved 2023-04-23.

line, shenzhen, metro, line, shenzhen, metro, also, known, yantian, line, east, west, line, with, stations, from, liantang, xiaomeisha, opened, october, 2020, between, liantang, yantian, road, with, length, total, stations, line, first, line, serve, yantian, d. Line 8 of the Shenzhen Metro also known as the Yantian line is an East West line with 11 stations from Liantang to Xiaomeisha It opened on 28 October 2020 between Liantang and Yantian Road with a length of 12 367 km 7 7 mi and a total of 7 stations 2 Line 8 is the first line to serve Yantian District Line 8 merges into Line 2 at Liantang station with trains on Line 8 continuing service to Chiwan station Line 8Shenwai Senior Campus stationOverviewStatusOperationalLocaleShenzhen ChinaTerminiLiantangXiaomeishaStations11Color on map Orange db6d1c ServiceTypeRapid transitSystemShenzhen MetroOperator s SZMC Shenzhen Metro Group Depot s Wangji Lake stabling yardRolling stockTrains service in Line 2CRRC Zhuzhou 258 281 801 824 6A HistoryOpened28 October 2020 3 years ago 2020 10 28 1 TechnicalLine length12 367 km 7 7 mi 2 Number of tracksDouble trackCharacterUndergroundTrack gauge1 435 mm 4 ft 8 1 2 in standard gaugeElectrification1 500 V DC Overhead lines Operating speed80 km h 50 mph SignallingUrbalis 888 CBTC Moving blockRoute mapLegend 5 to Huangbeiling Shekou West Depot Chiwan 5 12 to Zuopaotai East Shekou Port Sea World 12 12 to Waterlands Resort East Shuiwan Dongjiaotou 13 Wanxia Houhai Stabling Yard Haiyue Dengliang Houhai 11 13 11 to Bitou 13 to Shangwu Keyuan 13 9 to Qianwan 9 to Wenjin Hongshuwan 1 to Luohuto Airport East Window of the World 1 connection to Line 1 Qiaocheng North Shenkang connection to Line 7 Antuo Hill 7 7 to Tai anto Xili Lake Qiaoxiang Xiangmi Xiangmei North Jingtian 9 9 to Qianwanto Wenjin Lianhua West Futian 3 11 3 to Futian Bonded Areato Shuanglong Guangshenggang HSR 4 to Futian Checkpointto Niuhu Civic Center 4 10 to Futian Checkpointto Shuangyong Street Gangxia North 10 11 14 11 to Hongling South 14 to Shatian Huaqiang North 7 7 to Xili Laketo Tai an Yannan 6 to Science Museumto Songgang 1 to Airport East 9 to Wenjinto Qianwan Grand Theater 1 5 1 to Luohu Hubei Huangbeiling 5 5 to Chiwan Xinxiu Liantang Checkpoint Xianhu Road Liantang 2 8 Wutong Mountain South Shatoujiao Haishan Yantian Port West Wangji Lake Stabling Yard Shenwai Senior Campus Yantian Road Honganwei Yantianxu Dameisha Xiaomeisha Line 8 Phase III Under Construction Xichong Depot Xichong This diagram viewtalkedit Phase 2 opened on 27 December 2023 which extended the line from Yantian Road to Xiaomeisha 3 Contents 1 Timeline 2 Service routes 3 Stations 3 1 Phase 3 4 Rolling stock 5 Notes 6 ReferencesTimeline editSegment Commencement Length Station s Name Liantang Yantian Road 28 October 2020 12 367 km 7 68 mi 7 Phase 1 Yantian Road Xiaomeisha 27 December 2023 7 96 km 4 95 mi 4 Phase 2Service routes editLiantang Xiaomeisha trains continue service on Line 2 after Liantang Stations editServiceroutes Station name Connections Distance Location English Chinese Trains continue to Chiwan station via Line 2 Liantang 莲塘 2 through service 0 0 Luohu Wutong Mountain South 梧桐山南 1 46 1 46 Shatoujiao 沙头角 4 32 5 78 Yantian Haishan 海山 1 57 7 35 Yantian Port West 盐田港西 1 24 8 59 Shenwai Senior Campus 深外高中 2 68 11 27 Yantian Road 盐田路 1 41 12 68 Hong anwei 洪安围 1 10 13 78 Yantianxu 盐田墟 1 14 14 92 Dameisha 大梅沙 3 58 18 50 Xiaomeisha 小梅沙 2 14 20 64 Phase 3 edit Phase 3 is under construction It will extend the line from Xiaomeisha to Xichong and will open in 2025 Station name Connections Location English Chinese Xichong 溪涌 32 planned through service Dapeng New DistrictRolling stock editType Date of manufacture Series Sets Serial number Assembly Notes Type A 2019 2020 Type A stock 24 258 281 801 824 Tc Mp M M Mp Tc Manufactured by CRRC Zhuzhou Electric Locomotive WorksNotes editReferences edit 深圳地铁8号线将于2020年10月28日正式投入运营 2019 08 13 a b 深圳地铁8号线开始铺设轨道 盐田2020年进入地铁时代 2019 08 01 深圳地铁8号线二期开通日期 citys114 2023 03 13 Retrieved 2023 04 23 Retrieved from https en wikipedia org w index php title Line 8 Shenzhen Metro amp oldid 1199854172, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.