fbpx
Wikipedia

Florida's Turnpike

Florida's Turnpike, designated as unsigned State Road 91 (SR 91), is a toll road in the U.S. state of Florida, maintained by Florida's Turnpike Enterprise (FTE). Spanning approximately 309 miles (497 km) along a northwest–southeast axis, the turnpike is in two sections. The SR 91 mainline runs roughly 265 miles (426 km), from its southern terminus at an interchange with Interstate 95 (I-95) in Miami Gardens to an interchange with I-75 in Wildwood at its northern terminus. The Homestead Extension of Florida's Turnpike (abbreviated HEFT and designated as unsigned SR 821) continues from the southern end of the mainline for another 48 miles (77 km) to US Highway 1 (US 1) in Florida City. The slogan for the road is "The Less Stressway". The mainline opened in stages between 1957 and 1964, while the extension was completed in 1974. The turnpike runs through Miami, Fort Lauderdale, and West Palm Beach, where it parallels I-95, and through Orlando, where it crosses I-4.[2]

Florida's Turnpike

  • State Road 91
  • Ronald Reagan Turnpike
  • Sunshine State Parkway (formerly)
Florida's Turnpike highlighted in red
Route information
Maintained by Florida's Turnpike Enterprise
Length264.666 mi[1] (425.939 km)
308.757 mi (496.896 km) including Homestead Extension
ExistedJanuary 25, 1957–present
Major junctions
South end I-95 / US 441 / SR 9 / SR 826 in Miami Gardens
Major intersections
North end I-75 near Wildwood
Location
CountryUnited States
StateFlorida
CountiesMiami-Dade, Broward, Palm Beach, Martin, St. Lucie, Indian River, Okeechobee, Osceola, Orange, Lake, Sumter
Highway system
SR 90SR 91 US 92

Route description

Miami to Ft. Pierce

The main section of Florida's Turnpike begins at the northern end of the Golden Glades Interchange in Miami Gardens as a six-lane highway, and passes through the Golden Glades Toll Barrier, a cashless toll point, similar to the ones on the HEFT. About 2 miles (3 km) north of the toll gantry, it passes by Hard Rock Stadium, home to the Miami Dolphins of the National Football League, to the west before intersecting with the northern end of the HEFT at the Miami-Dade/Broward County line 4 miles (6 km) from Golden Glades, continuing the HEFT's mile marker. The highway goes through the inland suburbs of Miramar, Hollywood, and Davie, with an exit at Hollywood Boulevard (SR 820) at mile 50, and passing west of the Seminole Hard Rock Hotel & Casino Hollywood just south the Griffin Road (SR 818) interchange (exit 53). In Davie, about 8 miles (13 km) north of the Homestead Extension interchange, it intersects with I-595, providing direct access to Alligator Alley and Ft. Lauderdale International Airport. After two more interchanges, one with Sunrise Boulevard (SR 838) in Plantation and Commercial Boulevard (SR 870) in Tamarac, it crosses the Cypress Creek Toll Plaza in North Lauderdale, the second on the mainline. Just 1 mile (1.6 km) north of the toll plaza, it intersects with the Pompano Beach Service Plaza, the first of seven full-service plazas on the mainline, and where the Turnpike's operations center is located. Still in Pompano Beach, it has a northbound-only exit (and southbound-only entrance) at Atlantic Boulevard (SR 814), followed by full interchanges with Coconut Creek Parkway/Dr. Martin Luther King Jr. Boulevard (County Road 912) (exit 67) and Sample Road (SR 834) (exit 69). It then enters Deerfield Beach with an interchange with the Sawgrass Expressway in Coconut Creek (exit 71), the final interchange in Broward County. The Turnpike then enters Palm Beach County, with one interchange each in Boca Raton (Glades Road, exit 75), Delray Beach (Atlantic Avenue, exit 81) and Boynton Beach (Boynton Beach Boulevard, exit 86).[3][4][5]

The turnpike narrows to a four-lane highway as it goes through a less developed portion of Palm Beach County, crossing interchanges with Lake Worth Road, followed by the Lake Worth/West Palm Beach Service Plaza at mile marker 94. In West Palm Beach, the highway has interchanges with US 98/SR 80 (Southern Boulevard), a SunPass-only interchange at Jog Road, followed by an interchange at Okeechobee Boulevard (exit 99) that heads directly into downtown West Palm Beach. North of the interchange, the highway enters stretch of sparse development between this point and Port St. Lucie, intersecting with the Beeline Highway, another SunPass only interchange before leaving West Palm Beach. Just north of the SR 786 interchange in Palm Beach Gardens (exit 109), I-95 parallels the Turnpike to the east for about 20 miles (32 km), with I-95 visible from the turnpike as it has an interchange with SR 706 (exit 116) in Jupiter and into Martin County. It breaks off as it crosses the Thomas B. Manuel Bridge over the St. Lucie Canal,[6] crossing I-95 without an interchange just south of the SR 714 interchange, the only exit in Martin County. I-95 heads west towards the western fringes of St. Lucie County development, while the turnpike takes a path through the central areas of the county. The turnpike has two interchanges in Port St. Lucie, one at Becker Road (exit 138), the third SunPass-only exit, and SR 716 (exit 142), followed by the Port St. Lucie-Fort Pierce service plaza at mile marker 144. The turnpike intersects I-95 one last time just south of SR 70 (exit 152) in Fort Pierce, as I-95 continues to head up the east coast of Florida and the turnpike curves inland towards Orlando.[3][5]

Ft. Pierce to Wildwood

North of the SR 70 interchange, the turnpike enters a rural area, with cattle farms and orange groves lining the road for most of the section between Fort Pierce and Kissimmee, with only one interchange: SR 60 in Yeehaw Junction (exit 193). There are two service plazas in this area, one at Fort Drum at mile marker 184 and the other, Canoe Creek, at mile marker 229. Between Fort Pierce and Yeehaw Junction, the turnpike travels in a nearly east-west direction heading inland, with a 40.5-mile (65.2 km) gap between the two exits, the second longest of any US expressway.[7] Between Yeehaw Junction and Kissimmee, the turnpike, returning to a north-northwest direction towards Orlando, has a 48.9-mile (78.7 km) (47 miles (76 km) southbound) stretch without an exit, the longest of any US expressway.[7] Exit 240 located at Kissimmee Park Road, a partial interchange featuring a northbound on- and southbound off-ramp only, is named for Senator N. Ray Carroll, longtime Osceola County banker, citrus grower and cattle rancher.[3][5][8] After interchanges with US 192/US 441 (exit 242 northbound, exit 244 southbound) and the Osceola Parkway (exit 249), the turnpike enters Orange County and Orlando, expanding to eight lanes north of the latter interchange and quickly intersecting SR 417 (Central Florida GreeneWay) (exit 251). Exit 254 in Sky Lake is a massive combined interchange with both US 17/US 92/US 441 (Orange Blossom Trail) and SR 528 (Beachline Expressway), which combines a series of partial cloverleaf interchanges with access ramps from side roads. The turnpike then intersects with Consulate Drive (exit 255), a southbound-only, SunPass-only interchange.[3][5]

 
Florida's Turnpike southbound at the interchange with SR 429 in Ocoee, Exit 267A

After passing the I-4 interchange (exit 259) near many of Orlando's theme parks, connecting directly with the I-4 express lanes to and from the east along I-4, the Turnpike moves in a northwest direction, first passing by the Turkey Lake Service Plaza at mile marker 263, where the FDOT district headquarters of the Turnpike are located. The Turnpike has the next two interchanges with Orlando area tollways, SR 408 (East-West Expressway) at exit 265 and SR 429 (Western Expressway) at exit 267A, where in between the two exits, the turnpike expands to become a twelve-lane highway, and reverting to an eight-lane highway north of the SR 429 interchange. The last two Orange County interchanges are with SR 50 five miles apart at exit 267B and 272, with the turnpike becoming a four-lane highway north of exit 272, and staying that way for the rest of its northward journey. The Turnpike then enters Lake County, heading in a northwestern direction, where hilly countryside becomes a part of the terrain for the remainder of the expressway while intersecting with Hancock Road (exit 278) in Minneola, an electronic toll interchange. At mile 285, it has a northbound exit/southbound entrance with US 27, followed by the Leesburg electronic toll gantry at mile 288, and a southbound exit/northbound entrance with US 27 at mile 289. The last interchange in Lake County is with County Road 470 (exit 296), which does not provide cash.[3][5]

 
Northern terminus at I-75 near Wildwood

At mile marker 299, the turnpike passes through the final service plaza, the Okahumpka service plaza. Between US 301 (exit 304) and the northern terminus (mile 309) there is no toll. The turnpike ends with an interchange with I-75 in Wildwood, about 20 miles (32 km) south of Ocala.[3][5] Exit 307 at SR 44 provides access to southbound I-75 through that interstate's exit 329, while northbound I-75 travelers (and bidirectional SR 44 travelers) can access the turnpike at this exit.

Tolls

Tolls on the turnpike are an average of 6.7 cents per mile (4.2 ¢/km) for cars and other two-axle vehicles using SunPass.[9] A trip on the entire turnpike (not including the Homestead Extension) would cost $22.59 with Toll-by-Plate, and $17.45 with SunPass.[10]

The turnpike was originally entirely on the ticket system, but due to congestion in the Miami and Orlando metro areas, a coin system was implemented from the Three Lakes toll plaza north to the terminus at I-75, and from Lantana south to I-95, in the 1990s.[11] In 2015, the portion between the Golden Glades toll barrier and I-595 in Davie was converted to a cashless toll system.[12] Additional projects to convert the turnpike to an electronic collection system were completed between I-595 and Lantana in 2019, and from SR 429 north to I-75 in Wildwood in 2020.

The final stretch of the turnpike to use the ticket system ran between what are now electronic toll gantries at Lantana (mile 89.4 in Palm Beach County) and Three Lakes (mile 236.5 in Osceola County). This section was converted to a cashless system on November 8, 2021,[13] removing the final cash-based toll collections and converting the entire length of the turnpike to electronic toll collection.

The SunPass electronic toll collection system, in use since 1999, has become the primary method of paying tolls on the turnpike, with 80% of customers using the electronic tolling as of October 2009.[14][15][16] SunPass can be used on most Florida toll roads, in conjunction with other electronic toll collection systems in Florida (E-Pass and LeeWay). SunPass users benefit from an average of a 25% discount on tolls and access to SunPass-only exit ramps.[17] SunPass transponders are available at the gift shop and gas stations at all service plazas, as well as Walgreens, Publix, and CVS stores statewide.[18] Since 2021, E-ZPass, which is used primarily in the Midwest and Northeast U.S., has also been accepted on Florida's Turnpike.[19]

As the Turnpike and its system of roads are primary routes for emergency evacuations, tolls may be suspended, in cooperation with the state's emergency operations center and county governments, when a state or national emergency, most common being a hurricane watch, warrant rapid movement of the population.[20]

Services

Service plazas

 
Turkey Lake Plaza before its 2012 reconstruction

Eight service plazas are located along the turnpike, spaced about 45 miles (72 km) apart. All eight plazas are open 24 hours a day and located on the center median of the turnpike for access from both directions and offer gasoline, diesel fuel, internet access, travel and tourism info and tickets, picnic areas, TV news, gift shops offering Florida Lottery, family-friendly restrooms, and pay phones. A convenience store/gas station is located at the Snapper Creek plaza on the Homestead Extension of the turnpike, while the remaining seven are full-service plazas, featuring a selection of franchised fast food restaurants. Three of the service plazas (Pompano, Port St. Lucie/Fort Pierce, Turkey Lake) also provide E85 ethanol.[21] The Turkey Lake plaza also has a Tesla Supercharger for Tesla electric vehicles.[22] Superchargers are also located at Ft. Drum plaza, and Canoe Creek and Okahumpa are scheduled to open Superchargers in 2021/22.[23]

The operation of Sunshine State Parkway gas stations and service centers was originally bid out under separate contracts, and as a result, differing petroleum brands operated concurrently along the parkway, with varying levels of service and pricing.[24] This practice was discontinued in 1995 when all service center operations were combined to improve supply and continuity of service; with Martin Petroleum, a Florida corporation, operating the stations with Citgo brand fuel at its stations.[25][26] Since then, the Venezuelan government, under President Hugo Chávez, nationalized Citgo, and in 2006, political controversy resulted in a movement to remove the brand from the turnpike.[27]

In 2009, Areas U.S.A. signed a 30-year contract for operation of food and retail concessions, taking over operations from Martin Petroleum and HMSHost. Florida Turnpike Services, L.L.C., Areas' partner, replaced the Citgo brand with Shell, the current brand for gas stations along the turnpike. Many of the restaurant brands were also changed over,[28] with Dunkin' Donuts replacing Starbucks locations as well as KFC, Pizza Hut, Villa Pizza and Wendy's replacing most Popeyes and Burger King locations.[29][30] The reconstruction and renovation of six of the service plazas began on November 1, 2010, to be completed in 2012. The Okahumpka and Ft. Pierce plazas will begin reconstruction when the other plaza projects are complete. Total renovation costs are estimated at $160 million.[31]

Intelligent transportation systems

Florida's Turnpike Enterprise operates with intelligent transportation systems (ITS), used to detect and manage incidents on their roadways. The ITS are managed by two traffic management centers (TMCs), one in Pompano Beach and the other in Ocoee, operated by Florida's Turnpike Enterprise 24 hours a day, seven days a week. The system, consisting of closed-circuit television traffic cameras, dynamic message signs, highway advisory radio, and radar vehicle detection system, allow the TMC to see anything from congestion to crashes, to disabled vehicles that may pose a threat to the Turnpike's motorists. When necessary, the TMC will activate the dynamic message signs and highway advisory radio stations to alert motorists of the potential situation, as well as AMBER/Silver Alerts.[32][33]

Road Rangers

Road Rangers, also known as the State Farm Safety Patrol, offers free roadside assistance on Florida's Turnpike mainline and Homestead Extension.[34] Utility and tow trucks patrol 12 designated zones looking for stranded motorists to provide services such as fuel, tire changes, and use of a cellular phone; and also watching out for crashes and road debris.[35] The Traffic Management Center dispatches them to accidents, debris removal, disabled vehicles, or anything that may potentially affect the traveling public; they also assist the Florida Highway Patrol with traffic maintenance during incidents involving blockage of lanes.

History

Planning

 
Looking northbound at Florida's Turnpike as seen from the shoulder of Old County Road 50 near Clermont, at mile 276

In the years following World War II, Florida was experiencing unprecedented growth in population and tourism, along with a revitalized citrus industry recovering from a harsh freeze early in the decade; the increased traffic load quickly burdened the state's highway system. South Florida businessman and accounting firm owner Charles B. Costar was concerned that a trip down the east coast of Florida would take days on the available road network, passing through every small beachside town and siphoning off the traffic before visitors reached South Florida. After driving on the Pennsylvania Turnpike during a vacation there, he envisioned a similar high-speed turnpike in Florida. In 1953, Costar led a lobbying group that resulted in the state legislature creating the "Florida Turnpike Act", which Governor Dan McCarty signed into law on July 11, 1953, as well as the Florida State Turnpike Authority, which had the ability to plan, design, and construct bond-financed toll roads, in whose creation Costar was instrumental, to be repaid through the collection of tolls from Turnpike customers.[14]

Thomas B. Manuel, known as the "Father of the Turnpike", served as chairman of the Florida State Turnpike Authority from January 1955 to January 1961. Manuel debated with state legislature members opposed to tollways, emphasizing the need for a good highway system in a tourism-driven state. During the 1955 legislative session, many small-county legislators and others opposed to the Parkway formed a "kill the 'Pike'" coalition; Manuel won over the legislators at his headquarters in the Floridan Hotel near the capitol. Only four votes against the turnpike were entered at the end of the session's roll call, and the Legislature granted permission to build with a $70 million bond issue in June 1955. A Turnpike bridge in Stuart bears his name to honor his contributions.[14]

Construction

Construction on the Parkway began on July 4, 1955, starting at what is now the Golden Glades Interchange.[36] In October 1956, all work on the Sunshine State Parkway north of Ft. Pierce was abandoned and plans for a state-long turnpike were shelved due to passage of the National Interstate and Defense Highways Act, which provided for construction of limited-access highways in the corridors that had been under study for the Parkway Extension. One was Interstate 95, which was slated to connect Jacksonville with Miami in a similar alignment to the planned Sunshine State Parkway Coastal Route. This resulted in completion of a truncated 110-mile (180 km) highway that ran from Miami to Fort Pierce, opening on January 25, 1957.[14]

In January 1959, Governor LeRoy Collins, favoring a Parkway extension from Fort Pierce to Orlando, stated that building the Parkway north of Orlando would be unnecessary due to the interstate highway system. In late May 1959, the board authorized a study for the Parkway Extension to Orlando, and connecting the Interstate routes in Florida. In 1961, Governor Collins approved the sale of $80 million in bonds to finance the parkway extension from Fort Pierce to Wildwood, adding another 156 miles (251 km) of roadway and shifting Interstate 75's route 6 miles (10 km) eastward from its original alignment. The extension was opened in three stages: a 61-mile (98 km) section between Yeehaw Junction and Orlando opened on July 17, 1963, a section linking Fort Pierce and Yeehaw Junction opened on November 22, 1963, and the section between Orlando and the northern terminus of I-75 opened on July 24, 1964, completing the mainline.[2][14]

I-95 realignment

The Bureau of Public Roads approved an Interstate 95 alignment that used 41 miles (66 km) of the Turnpike from PGA Boulevard (SR 786) in Palm Beach Gardens north to SR 70 in Ft. Pierce in the 1950s.[37][38] In the mid-1960s, the State Road Department authorized traffic counts be conducted to determine if the separation of Interstate 95 from the Turnpike was feasible, with arguments that using a concurrent alignment was costing Florida money for federal highway funding, but not without the concern of losing toll revenue.[39] Over time, the interstate adopted a route closer to U.S. Route 1, including parallel between Stuart and Palm Beach Gardens, with the turnpike being removed from the I-95 alignment in 1973, and I-95 being completed in 1987.[40][41]

Reckless spending

With the St. Petersburg Times in 1963, a team led by Martin Waldron wrote a total of 150,000 words as part of the newspaper's coverage of unchecked spending by the Florida Turnpike Authority that led to estimated costs quadrupling from initial estimates of $100 million.[42] Waldron received a tip about excessive spending by John Hammer, chairman of the Florida Turnpike Authority, which included expensive hotels and meals, corsages for his secretary and overcharging for a chartered plane.[43] His coverage earned the newspaper the Pulitzer Prize for Public Service in 1964, the first for the newspaper, and led to changes in the way the state of Florida managed highway construction projects.[42][44]

System expansion

With Florida still growing in population in the 1960s, preliminary studies began for expanding portions of the Turnpike to six lanes in South Florida and additional north–south highways in that area. Dade County and the State Road Department developed a plan for the West Dade Expressway (now known as the Homestead Extension of Florida's Turnpike), beginning at the Turnpike near the Dade County/Broward County line, turning westward and southward, and terminating at Florida City in southern Dade County. In 1967, the Florida State Turnpike Authority was authorized to perform engineering and feasibility studies on the West Dade Expressway and the Bee Line Connector extension, now known as the Martin Andersen Beachline Expressway. The results of the studies came in December 1968, but due to an uncertain bond market and an unknown future for the toll authority, decisions on the roads were delayed.[14]

The Florida Department of Transportation was created in July 1969, with the Florida State Turnpike Authority becoming a part of the new FDOT. Soon after, FDOT and Orange and Dade County officials agreed the Bee Line Connector and Homestead Extension of Florida's Turnpike would be financed by revenue bond issues as extensions of Florida's Turnpike. The Beeline Expressway opened in 1973 and the Homestead Extension opened in 1974 as a part of the Turnpike mainline.[14]

Later changes

 
Florida's Turnpike looking southbound from the US 441 overpass, two miles north of the Yeehaw Junction exit

From its opening in January 1957 to April 12, 1968, the road was known as the Sunshine State Parkway (SSP). On April 12, 1968, the road was renamed to its current name of Florida's Turnpike, to identify that the toll road was located in Florida and to avoid confusion from other Florida landmarks such as the Sunshine Skyway Bridge.[14][45] The Sunshine State Parkway moniker was commonly used for the next decade, and remnants of the name can be seen on several Turnpike maintenance buildings.[46][47]

On September 1, 1971, the Turnpike switched from a sequential exit numbering system to a hybrid numbering system, where adjacent exit numbers differed by 4 south of SR 60 (exit 60 at the time) and 5 north of SR 60.[48][49]

Between 1974 and 1986, the turnpike experienced little change other than maintenance as the original bonds on the road were being paid off.[14] During this period, the turnpike experienced the first of five toll hikes on February 15, 1979, when the cost of a trip from Golden Glades to Wildwood increased to $5.90 from $4.80, the road's original toll.[50]

In 1988, the Office of Florida's Turnpike was formed, with $220 million worth of revenue bonds being sold in April 1989 to renovate the toll plazas, service centers and improve the road with the reduction of urban congestion. Fifteen new interchanges were planned in the early 1990s, with four of them opened by July 1991.[14] Also during this time, sections of the turnpike were converted from a ticket system to a coin system due to urban congestion, with several mainline toll plazas being built. The section between the Golden Glades Plaza and Lantana was converted in 1990, with the opening of the Cypress Creek and Lantana toll plazas. Coin baskets were installed in 1994 after years of delays.[51][52][53] The portion north of Kissimmee was converted on August 20, 1995, with the addition of the Three Lakes toll plaza and the Wildwood toll plaza at mile 304 being replaced by the Leesburg toll barrier on July 7, 1995.[54][55][56]

The improvements also came with a series of toll hikes between 1989 and 1993 to make the toll rates more uniform six cents per mile (3.7 ¢/km) throughout the turnpike's length. The first one was enacted on April 1, 1989, which raised the rate to $9.95.[57] The second one, on July 1, 1991, affected only the section north of Lantana, raising the trip's cost to $12.35.[58][59] The last one took effect on July 11, 1993, increasing the trip's cost to $14.40.[60]

In 1989, the Turnpike switched its exit numbering system to the mile-log system, starting from the south end of the Homestead Extension, 13 years before Florida's interstates integrated it into their system.[48][61][62]

Because he "was one of America's most beloved presidents and a true world leader", as the Legislature put it, Florida's Turnpike was designated by the Florida Legislature in 1998 as the Ronald Reagan Turnpike, with 20 signs throughout the turnpike showing the designation.[63]

In April 1999, SunPass was introduced to the public, with SunPass-only interchanges and lanes being introduced throughout the 2000s.[14] A toll hike took effect on March 7, 2004, increasing the toll rate for non SunPass users to $18.20, with SunPass users still using the 1993 toll rates.[64][65]

The HEFT ceased cash toll collections on February 19, 2011, becoming an exclusive electronic toll road, a move announced in November 2009. The staffed toll plazas were converted into electronic toll gantries, and the only ways to pay are either by SunPass transponders or a "toll-by-plate" program.[66][67] The Turnpike mainline began its conversion to a cashless toll road with the Golden Glades toll barrier being converted into a toll gantry on January 25, 2014, and no longer accepts cash.[68][69] The portion south of I-595 was converted on August 29, 2015.

Between 2005 and 2012, the Turnpike spent $380 million doubling the number of lanes from SR 528 to the northernmost interchange with SR 50 west of Winter Garden (exit 272). Most of the section was expanded from four to eight lanes, with the section between SR 408 and SR 429 being expanded from six to twelve lanes. The portion between SR 528 and Interstate 4 opened in 2008, with the portion between I-4 and SR 408 being finished in 2010, SR 408 to Beulah Road (at the north end of the SR 429 interchange) opened in March 2011, and the portion between Beulah Road and SR 50 (exit 272) was completed in 2012.[70]

In 2007, legislation was passed in Florida to index toll rates across the state to the national Consumer price index (CPI), to be enacted by the end of June 2012. As a result, the toll rates on roads on Florida's Turnpike Enterprise were raised on June 24, 2012, an increase of 11.7% to reflect the previous five years. The legislation allows for SunPass rates to be raised slightly each year, with cash rates going up every five years, with SunPass rates staying about a quarter cheaper than cash rates.[71][72] In keeping with the legislation, SunPass and toll-by-plate rates were raised again on July 1, 2013 by 2.1%, with cash toll rates projected to stay the same through at least 2014.[71][73] Toll rate increases were scheduled for every five years, and mid-2017 was the next scheduled date for such an increase. However, a combination of a low inflation rate and problems within the relevant state authorities caused multiple cancellations and changes in schedule for the next increase.[74][75] The final projected date for an increase in tolls was eventually set for October 29, 2017.[citation needed]

The Turnpike Enterprise and OOCEA (now CFX) agreed to build a partial interchange between SR 417 and Florida's Turnpike in the late 2000s, after negotiations dating back to a 1991 field study.[76][77] The interchange is being built in two phases. The first phase, built by CFX, added ramps from southbound SR 417 to southbound Florida's Turnpike and from northbound Florida's Turnpike to northbound SR 417. Construction on the first phase began in September 2013 and opened on January 26, 2015. The second phase, completing the interchange, was built by the Turnpike Enterprise. After a series of delays, construction began in 2017 and the completed interchange was fully opened on May 21, 2021.[78] As part of the project, the turnpike mainline was widened from four to eight lanes between Osceola Parkway (exit 249) and the Beachline Expressway (SR 528, exit 255).

Future

 
Florida's Turnpike looking northbound from the overpass on Canoe Creek Road, with the Canoe Creek service plaza visible

Plans are in the works to widen the Turnpike from the Lake Worth Road interchange (exit 93) to the State Road 70 exit (exit 152)[79][80] and from SR 50 (exit 272) to U.S. 27 (northbound exit 285)[81] from four to eight lanes. In Miami-Dade County, several widening projects including new express lanes are underway.

Reconstruction of the northern end of the Turnpike at its junction with Interstate 75 improved the traffic merge pattern between I-75 and SR 44 with new flyover ramps and additional traffic lanes.[82][83] The northbound off-ramp to SR 44 was completed on September 19, 2019, while southbound on-ramp construction was completed in early November 2019, and the project overall was completed in early January 2020.[84]

The Turnpike Enterprise is also studying a possible developer-funded future interchange at County Road 468 (mile marker 300, servicing The Villages and Lady Lake). This project is neither funded nor scheduled for construction at this time.[85]

There has been discussion of creating a northern extension. [86]

Exit list

North of the HEFT–Mainline interchange, the mainline continues the mileage from mile 47 from the HEFT. The spur of the mainline south of the HEFT to the Golden Glades Interchange assumes an alternate numbering system that suffixes an X to each exit number.[61]

CountyLocationmi[1][87][88]kmOld exitNew exitDestinationsNotes
Miami-DadeMiami Gardens0.0000.00000  
 
   I-95 (SR 9 north / SR 9A south) / SR 826 west (Palmetto Expressway) / US 441 (SR 7) – Port of Miami, Miami International Airport
Golden Glades Interchange; exit 12A on I-95
0.3000.483 
 
SR 826 east – Beaches
Southbound exit and northbound entrance
0.5000.805Miami Gardens Toll Gantry
2.4433.93222X  NW 199th Street (CR 854) – StadiumSouthbound exit and northbound entrance ETC
Miami-DadeBroward
county line
MiramarMiami Gardens line3.765
47.856
6.059
77.017
44X 
 
Florida's Turnpike Extension south (SR 821) – Homestead
Transition from HEFT to Mainline; no exit number southbound
BrowardHollywood50.34681.024849  SR 820 (Hollywood / Pines Boulevards)Signed as exits 49A (west) and 49B (east) southbound, respectively; southbound exit and northbound entrance ETC
Davie54.17787.18953  SR 818 (Griffin Road)Southbound exit and northbound entrance ETC
DaviePlantation line55.92189.9961254    
 
  I-595 (SR 862) / SR 84 / US 441 (SR 7) to I-95 – Port Everglades, Fort Lauderdale–Hollywood International Airport
Exit 8 on I-595
55.92189.99654X 
 
 
 
 
 
 
I-595 Express west to I-75 / SR 869 – Miami, Naples, Coral Springs
Tolled lanes; open peak-direction only
Plantation59.28495.4081658  SR 838 (Sunrise Boulevard)Northbound exit and southbound entrance ETC; signed as exit 58A (east) and exit 58B (west) northbound
Tamarac63.011101.4062062  SR 870 (Commercial Boulevard)Northbound exit and southbound entrance ETC
North Lauderdale64.500103.803Cypress Creek Toll Gantry
Coconut Creek66.000106.217Pompano Beach Service Plaza and Operations Center
Coconut CreekPompano Beach
city line
66.432106.91266  SR 814 (Atlantic Boulevard)Northbound exit and southbound entrance
67.577108.7552467 
 
Coconut Creek Parkway (CR 912 west) / M.L. King Boulevard – Broward Community College
Southbound exit and northbound entrance ETC
69.588111.9912669  SR 834 (Sample Road)Trumpet interchange; southbound exit and northbound entrance ETC
Coconut Creek71.736115.44871 
 
SR 869 south (Sawgrass Expressway) – Coral Springs
ETC interchange; exit 21 on SR 869
Palm Beach76.086122.4492875  SR 808 (Glades Road)Northbound exit and southbound entrance ETC
82.003131.9713281  SR 806 (Atlantic Avenue)Northbound exit and southbound entrance ETC
87.143140.24386  SR 804 (Boynton Beach Boulevard)Northbound exit and southbound entrance ETC
Boynton Beach89.400143.875Lantana Toll Gantry
93.303150.1573693  SR 802 (Lake Worth Road)
94.500152.083West Palm Beach Service Plaza
95.916154.362Forest Hill Boulevard Toll Gantry
97.655157.16097    US 98 / SR 80 (Southern Boulevard)Access to Palm Beach International Airport
98.470158.472Belvedere Road Toll Gantry
99.594160.28198Jog RoadNorthbound exit and southbound entrance; opened 2007[89]
100.463161.6804099  SR 704 (Okeechobee Boulevard)
104.000167.37245th Street Toll Gantry
Palm Beach Gardens106.814171.900107  SR 710 (Beeline Highway)Opened 2006[90]
108.371174.406Palm Beach Gardens Toll Gantry
109.662176.48444109   SR 786 (PGA Boulevard)Access to Palm Beach Gardens Medical Center
112.871181.648Jupiter Toll Gantry
Jupiter116.537187.54848116   SR 706 / I-95 – Jupiter, Okeechobee, Daytona Beach, West Palm Beach
MartinSt. Lucie River131.487211.608Thomas B. Manuel Bridge
132.547213.314Stuart Toll Gantry
Palm City134.660216.71452133  SR 714 – Stuart
137.594221.436Becker Road Toll Gantry
St. LuciePort St. Lucie138.413222.754138Becker Road – Port St. Lucie, Palm CityOpened 2007[91]
141.393227.550Port St. Lucie Toll Gantry
143.321230.65354142 
 
  SR 716 east (Port St. Lucie Blvd.) – Port St. Lucie
Access to St. Lucie Medical Center to the east and Tradition Medical Center to the west
145.300233.838Port St. Lucie / Fort Pierce Service Plaza
149.698240.916Midway Road Toll Gantry
Fort Pierce152.915246.09356152   
 
SR 70 / SR 713 to I-95 – Fort Pierce, Vero Beach, Okeechobee
154.000247.839Fort Pierce Toll Gantry
Indian River
No major junctions
Okeechobee185.100297.890Fort Drum Service Plaza
Indian River
No major junctions
OsceolaYeehaw Junction193.182310.89660193   US 441 / SR 60 – Yeehaw Junction
230.200370.471Canoe Creek Service Plaza
St. Cloud236.500380.610Three Lakes Toll Gantry
239.493385.427240  CR 525 / Kissimmee Park RoadSouthbound exit and northbound entrance; ETC interchange; opened 2007[92]
Nolte RoadProposed interchange; will be tolled southbound exit and northbound entrance; will replace Kissimmee Park Road exit[citation needed]
65242    US 192 / US 441 – Kissimmee, St. Cloud, Walt Disney World ResortNorthbound exit only (opened in 1995); access to St. Cloud Hospital
244.613393.66665244    US 192 / US 441 – Kissimmee, St. Cloud, Walt Disney World ResortNo northbound exit; ETC interchange; access to St. Cloud Hospital
KissimmeeBuenaventura Lakes line248.841400.471249  Osceola Parkway (CR 522) – Walt Disney World ResortSouthbound exit and northbound entrance ETC; opened in 1995
OrangeOrlando250.750403.543251   SR 417 (Central Florida GreeneWay) – Tampa, Daytona BeachSR 417 exit 12; southbound exit and northbound entrance ETC. Northbound exit ramp to SR 417 north opened 2015; interchange opened fully on May 21, 2021. To Orlando International Airport.[93][94][95][96]
Taft Vineland RoadProposed interchange[citation needed]
255.366410.97270254      SR 528 (Beachline Expressway) / US 17 / US 92 / US 441 (Orange Blossom Trail) – Orlando International AirportSouthbound exit and northbound entrance ETC; exit 4 on SR 528
256.040412.056255Consulate DriveSouthbound exit only; ETC interchange; opened 2004[97]
257  
 
SR 482 (Sand Lake Road) to CR 423 (S John Young Pkwy)
Proposed interchange; will be tolled southbound exit and northbound entrance[citation needed]
259.697417.94275259  I-4 (SR 400) – Orlando, Tampa, Daytona BeachSouthbound exit and northbound entrance ETC; exit 77 on I-4
 
 
 
I-4 Express east
Northbound exit and southbound entrance
263.700424.384Turkey Lake Service Plaza and Enterprise Headquarters
Gotha266.020428.118265 
 
SR 408 east (East–West Expressway) – Orlando, Titusville
Western end of SR 408
Ocoee267.886431.12180267B   SR 50 – OcoeeAccess to Health Central
268.033431.357267A  SR 429 (Western Expressway) – Apopka, TampaSR 429 exit 22
Oakland273.005439.359272  SR 50 – Winter Garden, ClermontNorthbound exit and southbound entrance ETC; opened 1993[98]
LakeMinneola278MinneolaAccess via Hancock Road; northbound exit and southbound entrance ETC;
opened 2017[99]
Groveland285.810459.96785285   US 27 (SR 25) / SR 19 – Leesburg, ClermontNorthbound exit and southbound entrance; ETC interchange
288.000463.491Clermont Toll Gantry
289.052465.184289  
 
US 27 (SR 25) to SR 19 – Tavares, Clermont
Southbound exit and northbound entrance; ETC interchange
Leesburg296.607477.343296  CR 470 – LeesburgSouthbound exit and northbound entrance ETC; opened 2005[100]
SumterWildwood300.200483.125Okahumpka Service Plaza
305.368491.44290304  US 301 – Wildwood
308.753496.890307  SR 44 – Inverness, WildwoodSingle northbound ramp that merges with I-75 exit 329; southbound ramp from SR 44 to Turnpike
308.757496.896 
 
I-75 north (SR 93) – Ocala
Exit 328 on I-75; access to northbound I-75 and access from southbound I-75
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

See also

References

  1. ^ a b (PDF). Florida Department of Transportation. November 24, 2008. pp. 12–13. Archived from the original (PDF) on February 8, 2012. Retrieved July 27, 2009.
  2. ^ a b . Florida Department of Transportation. Archived from the original on September 22, 2010. Retrieved August 11, 2009.
  3. ^ a b c d e f Google (April 16, 2010). "overview map of Florida's Turnpike from Golden Glades Spur" (Map). Google Maps. Google. Retrieved April 16, 2010.
  4. ^ Google (April 16, 2010). "overview map of Florida's Turnpike and Homestead Extension" (Map). Google Maps. Google. Retrieved April 16, 2010.
  5. ^ a b c d e f (PDF) (Map). Florida Department of Transportation. Archived from the original (PDF) on March 28, 2014. Retrieved January 7, 2014.
  6. ^ "Traffic". The Palm Beach Post. June 24, 2003. p. 2B.
  7. ^ a b "Top 16 longest gaps between Interstate exits". USA Today. August 15, 2011. Retrieved July 11, 2012.
  8. ^ Florida Senate (2006). "SB 2240". Retrieved May 5, 2010.
  9. ^ . Florida Department of Transportation. Archived from the original on December 26, 2013. Retrieved January 7, 2014.
  10. ^ "Florida Turnpike Toll Calculator v3.1". Florida Department of Transportation. Retrieved January 7, 2014.
  11. ^ Brockman, Belinda (August 17, 1990). "New Turnpike Toll Booths Open Sunday". Palm Beach Post. p. 1B.
  12. ^ "Turnpike going cashless at Griffin, Hollywood exits at end of August". St. Petersburg Times. July 20, 2015. Retrieved November 2, 2015.
  13. ^ Florida's Turnpike Enterprise. "Cash Will No Longer Be Accepted on Florida's Turnpike Mainline" (PDF).
  14. ^ a b c d e f g h i j k (PDF). Florida Department of Transportation. 2007. Archived from the original (PDF) on September 22, 2010. Retrieved July 31, 2009.
  15. ^ (PDF). Tampa Tribune. January 27, 2007. Archived from the original (PDF) on January 6, 2009. Retrieved August 11, 2009.
  16. ^ Turnbell, Michael (October 26, 2009). "Florida's Turnpike to go cashless as it switches to electronic tolling". South Florida Sun-Sentinel. Retrieved November 28, 2009.
  17. ^ . Florida Department of Transportation. Archived from the original on July 3, 2009. Retrieved August 11, 2009.
  18. ^ . Florida Department of Transportation. Archived from the original on December 30, 2009. Retrieved August 11, 2009.
  19. ^ "Florida toll roads announce partnership with E-ZPass, used in 16 states". Tampa Bay Times. May 28, 2021. Retrieved August 12, 2021.
  20. ^ . Florida Department of Transportation. Archived from the original on June 16, 2009. Retrieved August 1, 2009.
  21. ^ "Service Plazas". Florida's Turnpike Enterprise. Retrieved July 31, 2009.
  22. ^ "Turkey Lake Supercharger – Tesla". www.teslamotors.com.
  23. ^ "Find Us | Tesla". Find Us | Tesla. Retrieved August 22, 2021.
  24. ^ "State Seeks Gas Guarantee For Turnpike". St. Petersburg Times. June 29, 1973. p. 2B.
  25. ^ "Turnpike pumpers to pay less". Ocala Star-Banner. May 20, 1995. p. 6B.
  26. ^ Roy, Roger (May 20, 1995). "State Drives Deal to Keep Turnpike Gas in Line". Orlando Sentinel. p. D1.
  27. ^ "Citgo bedeviled by fiery speech". St. Petersburg Times. September 26, 2006. Retrieved July 31, 2009.
  28. ^ . Florida's Turnpike Enterprise. June 7, 2006. Archived from the original on June 7, 2006.
  29. ^ Chardy, Alfonso (June 3, 2009). "Turnpike Starbucks must hit road". Miami Herald. p. 3B.
  30. ^ . Florida Department of Transportation. Fall 2003. Archived from the original on November 25, 2007. Retrieved July 31, 2009.
  31. ^ "New look for turnpike plazas: A $160 million facelift". Palm Beach Post. June 4, 2009. Retrieved July 31, 2009.
  32. ^ . Florida Department of Transportation. Archived from the original on July 9, 2009. Retrieved August 11, 2009.
  33. ^ . Florida Department of Transportation. Archived from the original on May 25, 2009. Retrieved August 11, 2009.
  34. ^ "State Farm Safety Patrol". Florida's Turnpike. Retrieved May 31, 2021.
  35. ^ "Florida Road Rangers". Incident Response. Retrieved May 31, 2021.
  36. ^ "Collins Signals Go on Miami Turnpike". The Miami News. July 5, 1955. Retrieved July 17, 2012.
  37. ^ "Squabbles unnecessary". Boca Raton News. May 10, 1973. p. 4A.
  38. ^ "Free Roads Vs. Toll: A Secret Stall?". St. Petersburg Times. April 21, 1963. p. 1D.
  39. ^ "Toll-Free I-95 In State Still A Long Way Off". St. Petersburg Times. November 11, 1967. p. 3B.
  40. ^ "I-95 'Missing Link' Okayed". Lakeland Ledger. April 19, 1973. p. 4A.
  41. ^ "Gap in I-95 to Close Saturday". Miami Herald. December 13, 1987. p. 1A.
  42. ^ a b Staff (May 28, 1981). "Martin O. Waldron Is Dead at 56; Reporting Led to a Pulitzer Prize". The New York Times. Retrieved July 13, 2010.
  43. ^ Staff (May 15, 1964). . Time. p. 88. Archived from the original on December 13, 2011. Retrieved July 13, 2010.
  44. ^ . Times Publishing Company. Archived from the original on June 22, 2010. Retrieved July 13, 2010.
  45. ^ "Parkway Name Changed to Protect Its Identity". St. Petersburg Times. April 13, 1968.
  46. ^ "Help Speed I-95". Palm Beach Post. August 29, 1978.
  47. ^ Mitgang, Lee (March 6, 1981). "States are eyeing higher speed limits". The Free Lance-Star.
  48. ^ a b Madigan, Nick (March 1, 1989). "State's Exit Amnesia Has Inns In An Uproar". Palm Beach Post. p. 1A.
  49. ^ Williams, Verve (September 13, 1971). "Turnpike in numbers game by changing the exits". The Miami News. p. 1A.
  50. ^ "Hike In Toll Could Backfire On DOT". Ocala Star-Banner. February 14, 1979. p. 4A.
  51. ^ Crowley, Brian E. (July 27, 1985). "Approval Expected for Turnpike Plans". The Palm Beach Post. p. 1A.
  52. ^ Pierce, Rick & Ellis, Elaine A. (August 21, 1990). "Turnpike fares well under coin system traffic flow smooth on workday debut". Sun-Sentinel. p. 8B.
  53. ^ Pierce, Rick & Chabot, Lucy (August 17, 1993). "Turnpike Coin Baskets Delayed Until February". Sun-Sentinel. p. 1A.
  54. ^ "Turnpike converts to coin system". Sarasota Herald-Tribune. August 19, 1995. p. 6B.
  55. ^ Coole, Terri (February 12, 1993). "Turnpike Exchange: Coins, not tickets a new toll plaza south of Leesburg, when complete, will mean a pay-as-you-go system on the highway's northern section". Orlando Sentinel. p. 1.
  56. ^ "Toll Plaza at Wildwood shuts down". Orlando Sentinel. July 7, 1995. p. 2.
  57. ^ "Turnpike tolls nearly double". Gainesville Sun. March 31, 1989. p. 1A.
  58. ^ Douthat, Bill (May 31, 1991). "Turnpike Tolls To Jump 30%". The Palm Beach Post. p. 1A.
  59. ^ O'Neal, Donna (July 1, 1991). "Laws raise fees, boost protection". Lakeland Ledger. p. 3B.
  60. ^ "Florida Turnpike tolls to increase today". Ocala Star-Banner. July 11, 1993. p. 4B.
  61. ^ a b . Florida Department of Transportation. Archived from the original on August 15, 2009. Retrieved August 11, 2009.
  62. ^ "Florida's Interstate Exit Numbers". Florida Department of Transportation. Retrieved August 11, 2009.
  63. ^ . Florida Department of Transportation. Archived from the original on September 22, 2010. Retrieved March 29, 2010.
  64. ^ McGinness, Chuck (January 8, 2004). "Plan To Hike Toll On Turnpike Rapped". The Palm Beach Post. p. 7B.
  65. ^ Turnbell, Michael (March 6, 2004). "Drivers Dash To Get SunPass Before Toll Increases Kick In". Sun-Sentinel. p. 1B.
  66. ^ Turnbell, Michael (February 14, 2011). "Turnpike to stop taking cash on Homestead Extension Feb. 19". Sun-Sentinel.
  67. ^ . St. Petersburg Times. November 19, 2009. Archived from the original on June 7, 2011. Retrieved November 28, 2009.
  68. ^ Turnbell, Michael (August 3, 2013). "Sawgrass Expressway going cashless in 2014". South Florida Sun Sentinel. Retrieved January 6, 2014.
  69. ^ Turnbell, Michael (January 12, 2014). "Golden Glades going cashless on Jan. 25". South Florida Sun Sentinel. Retrieved January 15, 2014.
  70. ^ Florida's Turnpike Enterprise Tentative Five-Year Work Program Overview 2012 (Report). Florida Department of Transportation.
  71. ^ a b . Florida Department of Transportation. Archived from the original on September 26, 2013. Retrieved September 18, 2013.
  72. ^ Turnbell, Michael (June 7, 2012). "Tolls on Turnpike, Sawgrass, Alligator Alley going up on June 24". South Florida Sun Sentinel. Retrieved January 6, 2014.
  73. ^ Turnbell, Michael (June 28, 2013). "Tolls go up July 1 on turnpike, state toll roads". South Florida Sun Sentinel. Retrieved January 7, 2014.
  74. ^ Lincoff, Nina (March 25, 2016). "Will Road Tolls Go Up in 2016?". South Florida Business Journal. Retrieved October 22, 2017.
  75. ^ Spear, Kevin (February 7, 2017). "Central Florida Toll-Road Agency May Kill Planned Toll Hike". Orlando Sentinel. Retrieved October 22, 2017.
  76. ^ (PDF). Archived from the original (PDF) on November 5, 2012.
  77. ^ . Archived from the original on February 13, 2015.
  78. ^ Florida's Turnpike Enterprise. "Florida's Turnpike Enterprise Opens New Ramps at Central Florida GreeneWay/SR 417 Interchange in Orlando" (PDF).
  79. ^ "Turnpike plans widening in Palm Beach County". South Florida Business Journal. February 13, 2007. Retrieved August 1, 2009.
  80. ^ . Florida's Turnpike Enterprise. Archived from the original on July 27, 2009. Retrieved August 11, 2009.
  81. ^ Comas, Martin E. "Good news for Orlando commuters from south Lake — turnpike to be widened to eight lanes". Orlando Sentinel. Retrieved May 28, 2018.
  82. ^ "Wildwood Interchange at Turnpike & I-75 (Milepost 309)" (PDF). Florida's Turnpike Enterprise.
  83. ^ "Turnpike/I-75 interchange in line for $68.5M upgrade". Orlando Sentinel. Retrieved May 28, 2018.
  84. ^ NEW TRAFFIC PATTERN Northbound Florida's Turnpike and Northbound I-75 Exit Ramps to SR 44 to Open in a New Location the Morning of Thursday, September 19 (Florida Turnpike Enterprise Newsletter; September 18, 2019)
  85. ^ . Florida's Turnpike Enterprise. Archived from the original on September 22, 2010. Retrieved March 24, 2010.
  86. ^ "The Florida DOT's latest 'Billionaire Boulevard' plan has rural FL outraged - Florida Phoenix". November 18, 2021.
  87. ^ FDOT straight line diagrams March 6, 2014, at the Wayback Machine, accessed March 2014
  88. ^ Google (December 30, 2015). "Florida's Turnpike" (Map). Google Maps. Google. Retrieved December 30, 2015.
  89. ^ (PDF) (Press release). Florida Department of Transportation. September 10, 2007. Archived from the original (PDF) on September 23, 2010. Retrieved May 5, 2010.
  90. ^ (PDF) (Press release). Florida Department of Transportation. July 26, 2006. Archived from the original (PDF) on September 23, 2010. Retrieved May 5, 2010.
  91. ^ Lane, Teresa (May 12, 2007). "$19 Million Turnpike Ramps Open". The Palm Beach Post. p. 1B.
  92. ^ Hamburg, Jay (January 6, 2007). "Turnpike link eases commute in Kissimmee". Orlando Sentinel. p. 1B.
  93. ^ Dan Tracy, New interchange opens Monday between SR 417 and Turnpike, Orlando Sentinel, January 23, 2015
  94. ^ . oocea.com. Central Florida Expressway Authority. January 23, 2013. Archived from the original on August 19, 2014. Retrieved August 18, 2014.
  95. ^ (PDF). floridasturnpike.com. Florida Department of Transportation. July 2013. Archived from the original (PDF) on June 11, 2014. Retrieved August 18, 2014.
  96. ^ Richardson, Matthew (January 17, 2014). "How RS&H won design deal for SR 417/Florida's Turnpike interchange". bizjournals.com. Orlando Business Journal. Retrieved August 18, 2014.
  97. ^ "Casselberry Road Extension Will Make Shortcut Official". Orlando Sentinel. July 25, 2004. p. 18K.
  98. ^ Coole, Terri (May 1, 1993). "Harried Commuters bask in opening of a new interchange". Orlando Sentinel. p. 1.
  99. ^ "Florida's Turnpike Enterprise Opens New Minneola Interchange" (Press release). Florida Department of Transportation. June 10, 2017. Retrieved September 7, 2017.
  100. ^ "Turnpike Interchange Opens". Orlando Sentinel. January 22, 2005. p. 3B.

External links

Route map:

KML is from Wikidata
  • Official site
  • Florida's Turnpike Map, 1964

florida, turnpike, designated, unsigned, state, road, toll, road, state, florida, maintained, enterprise, spanning, approximately, miles, along, northwest, southeast, axis, turnpike, sections, mainline, runs, roughly, miles, from, southern, terminus, interchan. Florida s Turnpike designated as unsigned State Road 91 SR 91 is a toll road in the U S state of Florida maintained by Florida s Turnpike Enterprise FTE Spanning approximately 309 miles 497 km along a northwest southeast axis the turnpike is in two sections The SR 91 mainline runs roughly 265 miles 426 km from its southern terminus at an interchange with Interstate 95 I 95 in Miami Gardens to an interchange with I 75 in Wildwood at its northern terminus The Homestead Extension of Florida s Turnpike abbreviated HEFT and designated as unsigned SR 821 continues from the southern end of the mainline for another 48 miles 77 km to US Highway 1 US 1 in Florida City The slogan for the road is The Less Stressway The mainline opened in stages between 1957 and 1964 while the extension was completed in 1974 The turnpike runs through Miami Fort Lauderdale and West Palm Beach where it parallels I 95 and through Orlando where it crosses I 4 2 Florida s TurnpikeState Road 91 Ronald Reagan Turnpike Sunshine State Parkway formerly Florida s Turnpike highlighted in redRoute informationMaintained by Florida s Turnpike EnterpriseLength264 666 mi 1 425 939 km 308 757 mi 496 896 km including Homestead ExtensionExistedJanuary 25 1957 presentMajor junctionsSouth endI 95 US 441 SR 9 SR 826 in Miami GardensMajor intersectionsFlorida s Turnpike Extension in Miramar I 595 US 441 SR 84 in Davie SR 869 in Coconut Creek US 98 SR 80 near West Palm Beach SR 417 in Orlando US 17 US 92 US 441 SR 528 in Orlando I 4 in Orlando SR 408 in Gotha SR 429 in Ocoee US 27 SR 19 in GrovelandNorth endI 75 near WildwoodLocationCountryUnited StatesStateFloridaCountiesMiami Dade Broward Palm Beach Martin St Lucie Indian River Okeechobee Osceola Orange Lake SumterHighway systemFlorida State Highway SystemInterstate US State Former Pre 1945 Toll Scenic SR 90SR 91 US 92 Contents 1 Route description 1 1 Miami to Ft Pierce 1 2 Ft Pierce to Wildwood 2 Tolls 3 Services 3 1 Service plazas 3 2 Intelligent transportation systems 3 3 Road Rangers 4 History 4 1 Planning 4 2 Construction 4 2 1 I 95 realignment 4 3 Reckless spending 4 4 System expansion 4 5 Later changes 5 Future 6 Exit list 7 See also 8 References 9 External linksRoute description EditFor route info regarding exits 1 through 47 of Florida s Turnpike see Homestead Extension of Florida s Turnpike Miami to Ft Pierce Edit The main section of Florida s Turnpike begins at the northern end of the Golden Glades Interchange in Miami Gardens as a six lane highway and passes through the Golden Glades Toll Barrier a cashless toll point similar to the ones on the HEFT About 2 miles 3 km north of the toll gantry it passes by Hard Rock Stadium home to the Miami Dolphins of the National Football League to the west before intersecting with the northern end of the HEFT at the Miami Dade Broward County line 4 miles 6 km from Golden Glades continuing the HEFT s mile marker The highway goes through the inland suburbs of Miramar Hollywood and Davie with an exit at Hollywood Boulevard SR 820 at mile 50 and passing west of the Seminole Hard Rock Hotel amp Casino Hollywood just south the Griffin Road SR 818 interchange exit 53 In Davie about 8 miles 13 km north of the Homestead Extension interchange it intersects with I 595 providing direct access to Alligator Alley and Ft Lauderdale International Airport After two more interchanges one with Sunrise Boulevard SR 838 in Plantation and Commercial Boulevard SR 870 in Tamarac it crosses the Cypress Creek Toll Plaza in North Lauderdale the second on the mainline Just 1 mile 1 6 km north of the toll plaza it intersects with the Pompano Beach Service Plaza the first of seven full service plazas on the mainline and where the Turnpike s operations center is located Still in Pompano Beach it has a northbound only exit and southbound only entrance at Atlantic Boulevard SR 814 followed by full interchanges with Coconut Creek Parkway Dr Martin Luther King Jr Boulevard County Road 912 exit 67 and Sample Road SR 834 exit 69 It then enters Deerfield Beach with an interchange with the Sawgrass Expressway in Coconut Creek exit 71 the final interchange in Broward County The Turnpike then enters Palm Beach County with one interchange each in Boca Raton Glades Road exit 75 Delray Beach Atlantic Avenue exit 81 and Boynton Beach Boynton Beach Boulevard exit 86 3 4 5 The turnpike narrows to a four lane highway as it goes through a less developed portion of Palm Beach County crossing interchanges with Lake Worth Road followed by the Lake Worth West Palm Beach Service Plaza at mile marker 94 In West Palm Beach the highway has interchanges with US 98 SR 80 Southern Boulevard a SunPass only interchange at Jog Road followed by an interchange at Okeechobee Boulevard exit 99 that heads directly into downtown West Palm Beach North of the interchange the highway enters stretch of sparse development between this point and Port St Lucie intersecting with the Beeline Highway another SunPass only interchange before leaving West Palm Beach Just north of the SR 786 interchange in Palm Beach Gardens exit 109 I 95 parallels the Turnpike to the east for about 20 miles 32 km with I 95 visible from the turnpike as it has an interchange with SR 706 exit 116 in Jupiter and into Martin County It breaks off as it crosses the Thomas B Manuel Bridge over the St Lucie Canal 6 crossing I 95 without an interchange just south of the SR 714 interchange the only exit in Martin County I 95 heads west towards the western fringes of St Lucie County development while the turnpike takes a path through the central areas of the county The turnpike has two interchanges in Port St Lucie one at Becker Road exit 138 the third SunPass only exit and SR 716 exit 142 followed by the Port St Lucie Fort Pierce service plaza at mile marker 144 The turnpike intersects I 95 one last time just south of SR 70 exit 152 in Fort Pierce as I 95 continues to head up the east coast of Florida and the turnpike curves inland towards Orlando 3 5 Ft Pierce to Wildwood Edit North of the SR 70 interchange the turnpike enters a rural area with cattle farms and orange groves lining the road for most of the section between Fort Pierce and Kissimmee with only one interchange SR 60 in Yeehaw Junction exit 193 There are two service plazas in this area one at Fort Drum at mile marker 184 and the other Canoe Creek at mile marker 229 Between Fort Pierce and Yeehaw Junction the turnpike travels in a nearly east west direction heading inland with a 40 5 mile 65 2 km gap between the two exits the second longest of any US expressway 7 Between Yeehaw Junction and Kissimmee the turnpike returning to a north northwest direction towards Orlando has a 48 9 mile 78 7 km 47 miles 76 km southbound stretch without an exit the longest of any US expressway 7 Exit 240 located at Kissimmee Park Road a partial interchange featuring a northbound on and southbound off ramp only is named for Senator N Ray Carroll longtime Osceola County banker citrus grower and cattle rancher 3 5 8 After interchanges with US 192 US 441 exit 242 northbound exit 244 southbound and the Osceola Parkway exit 249 the turnpike enters Orange County and Orlando expanding to eight lanes north of the latter interchange and quickly intersecting SR 417 Central Florida GreeneWay exit 251 Exit 254 in Sky Lake is a massive combined interchange with both US 17 US 92 US 441 Orange Blossom Trail and SR 528 Beachline Expressway which combines a series of partial cloverleaf interchanges with access ramps from side roads The turnpike then intersects with Consulate Drive exit 255 a southbound only SunPass only interchange 3 5 Florida s Turnpike southbound at the interchange with SR 429 in Ocoee Exit 267A After passing the I 4 interchange exit 259 near many of Orlando s theme parks connecting directly with the I 4 express lanes to and from the east along I 4 the Turnpike moves in a northwest direction first passing by the Turkey Lake Service Plaza at mile marker 263 where the FDOT district headquarters of the Turnpike are located The Turnpike has the next two interchanges with Orlando area tollways SR 408 East West Expressway at exit 265 and SR 429 Western Expressway at exit 267A where in between the two exits the turnpike expands to become a twelve lane highway and reverting to an eight lane highway north of the SR 429 interchange The last two Orange County interchanges are with SR 50 five miles apart at exit 267B and 272 with the turnpike becoming a four lane highway north of exit 272 and staying that way for the rest of its northward journey The Turnpike then enters Lake County heading in a northwestern direction where hilly countryside becomes a part of the terrain for the remainder of the expressway while intersecting with Hancock Road exit 278 in Minneola an electronic toll interchange At mile 285 it has a northbound exit southbound entrance with US 27 followed by the Leesburg electronic toll gantry at mile 288 and a southbound exit northbound entrance with US 27 at mile 289 The last interchange in Lake County is with County Road 470 exit 296 which does not provide cash 3 5 Northern terminus at I 75 near Wildwood At mile marker 299 the turnpike passes through the final service plaza the Okahumpka service plaza Between US 301 exit 304 and the northern terminus mile 309 there is no toll The turnpike ends with an interchange with I 75 in Wildwood about 20 miles 32 km south of Ocala 3 5 Exit 307 at SR 44 provides access to southbound I 75 through that interstate s exit 329 while northbound I 75 travelers and bidirectional SR 44 travelers can access the turnpike at this exit Tolls EditTolls on the turnpike are an average of 6 7 cents per mile 4 2 km for cars and other two axle vehicles using SunPass 9 A trip on the entire turnpike not including the Homestead Extension would cost 22 59 with Toll by Plate and 17 45 with SunPass 10 The turnpike was originally entirely on the ticket system but due to congestion in the Miami and Orlando metro areas a coin system was implemented from the Three Lakes toll plaza north to the terminus at I 75 and from Lantana south to I 95 in the 1990s 11 In 2015 the portion between the Golden Glades toll barrier and I 595 in Davie was converted to a cashless toll system 12 Additional projects to convert the turnpike to an electronic collection system were completed between I 595 and Lantana in 2019 and from SR 429 north to I 75 in Wildwood in 2020 The final stretch of the turnpike to use the ticket system ran between what are now electronic toll gantries at Lantana mile 89 4 in Palm Beach County and Three Lakes mile 236 5 in Osceola County This section was converted to a cashless system on November 8 2021 13 removing the final cash based toll collections and converting the entire length of the turnpike to electronic toll collection The SunPass electronic toll collection system in use since 1999 has become the primary method of paying tolls on the turnpike with 80 of customers using the electronic tolling as of October 2009 update 14 15 16 SunPass can be used on most Florida toll roads in conjunction with other electronic toll collection systems in Florida E Pass and LeeWay SunPass users benefit from an average of a 25 discount on tolls and access to SunPass only exit ramps 17 SunPass transponders are available at the gift shop and gas stations at all service plazas as well as Walgreens Publix and CVS stores statewide 18 Since 2021 E ZPass which is used primarily in the Midwest and Northeast U S has also been accepted on Florida s Turnpike 19 As the Turnpike and its system of roads are primary routes for emergency evacuations tolls may be suspended in cooperation with the state s emergency operations center and county governments when a state or national emergency most common being a hurricane watch warrant rapid movement of the population 20 Services EditService plazas Edit Turkey Lake Plaza before its 2012 reconstruction Eight service plazas are located along the turnpike spaced about 45 miles 72 km apart All eight plazas are open 24 hours a day and located on the center median of the turnpike for access from both directions and offer gasoline diesel fuel internet access travel and tourism info and tickets picnic areas TV news gift shops offering Florida Lottery family friendly restrooms and pay phones A convenience store gas station is located at the Snapper Creek plaza on the Homestead Extension of the turnpike while the remaining seven are full service plazas featuring a selection of franchised fast food restaurants Three of the service plazas Pompano Port St Lucie Fort Pierce Turkey Lake also provide E85 ethanol 21 The Turkey Lake plaza also has a Tesla Supercharger for Tesla electric vehicles 22 Superchargers are also located at Ft Drum plaza and Canoe Creek and Okahumpa are scheduled to open Superchargers in 2021 22 23 The operation of Sunshine State Parkway gas stations and service centers was originally bid out under separate contracts and as a result differing petroleum brands operated concurrently along the parkway with varying levels of service and pricing 24 This practice was discontinued in 1995 when all service center operations were combined to improve supply and continuity of service with Martin Petroleum a Florida corporation operating the stations with Citgo brand fuel at its stations 25 26 Since then the Venezuelan government under President Hugo Chavez nationalized Citgo and in 2006 political controversy resulted in a movement to remove the brand from the turnpike 27 In 2009 Areas U S A signed a 30 year contract for operation of food and retail concessions taking over operations from Martin Petroleum and HMSHost Florida Turnpike Services L L C Areas partner replaced the Citgo brand with Shell the current brand for gas stations along the turnpike Many of the restaurant brands were also changed over 28 with Dunkin Donuts replacing Starbucks locations as well as KFC Pizza Hut Villa Pizza and Wendy s replacing most Popeyes and Burger King locations 29 30 The reconstruction and renovation of six of the service plazas began on November 1 2010 to be completed in 2012 The Okahumpka and Ft Pierce plazas will begin reconstruction when the other plaza projects are complete Total renovation costs are estimated at 160 million 31 Intelligent transportation systems Edit Florida s Turnpike Enterprise operates with intelligent transportation systems ITS used to detect and manage incidents on their roadways The ITS are managed by two traffic management centers TMCs one in Pompano Beach and the other in Ocoee operated by Florida s Turnpike Enterprise 24 hours a day seven days a week The system consisting of closed circuit television traffic cameras dynamic message signs highway advisory radio and radar vehicle detection system allow the TMC to see anything from congestion to crashes to disabled vehicles that may pose a threat to the Turnpike s motorists When necessary the TMC will activate the dynamic message signs and highway advisory radio stations to alert motorists of the potential situation as well as AMBER Silver Alerts 32 33 Road Rangers Edit Road Rangers also known as the State Farm Safety Patrol offers free roadside assistance on Florida s Turnpike mainline and Homestead Extension 34 Utility and tow trucks patrol 12 designated zones looking for stranded motorists to provide services such as fuel tire changes and use of a cellular phone and also watching out for crashes and road debris 35 The Traffic Management Center dispatches them to accidents debris removal disabled vehicles or anything that may potentially affect the traveling public they also assist the Florida Highway Patrol with traffic maintenance during incidents involving blockage of lanes History EditPlanning Edit Looking northbound at Florida s Turnpike as seen from the shoulder of Old County Road 50 near Clermont at mile 276 In the years following World War II Florida was experiencing unprecedented growth in population and tourism along with a revitalized citrus industry recovering from a harsh freeze early in the decade the increased traffic load quickly burdened the state s highway system South Florida businessman and accounting firm owner Charles B Costar was concerned that a trip down the east coast of Florida would take days on the available road network passing through every small beachside town and siphoning off the traffic before visitors reached South Florida After driving on the Pennsylvania Turnpike during a vacation there he envisioned a similar high speed turnpike in Florida In 1953 Costar led a lobbying group that resulted in the state legislature creating the Florida Turnpike Act which Governor Dan McCarty signed into law on July 11 1953 as well as the Florida State Turnpike Authority which had the ability to plan design and construct bond financed toll roads in whose creation Costar was instrumental to be repaid through the collection of tolls from Turnpike customers 14 Thomas B Manuel known as the Father of the Turnpike served as chairman of the Florida State Turnpike Authority from January 1955 to January 1961 Manuel debated with state legislature members opposed to tollways emphasizing the need for a good highway system in a tourism driven state During the 1955 legislative session many small county legislators and others opposed to the Parkway formed a kill the Pike coalition Manuel won over the legislators at his headquarters in the Floridan Hotel near the capitol Only four votes against the turnpike were entered at the end of the session s roll call and the Legislature granted permission to build with a 70 million bond issue in June 1955 A Turnpike bridge in Stuart bears his name to honor his contributions 14 Construction Edit Construction on the Parkway began on July 4 1955 starting at what is now the Golden Glades Interchange 36 In October 1956 all work on the Sunshine State Parkway north of Ft Pierce was abandoned and plans for a state long turnpike were shelved due to passage of the National Interstate and Defense Highways Act which provided for construction of limited access highways in the corridors that had been under study for the Parkway Extension One was Interstate 95 which was slated to connect Jacksonville with Miami in a similar alignment to the planned Sunshine State Parkway Coastal Route This resulted in completion of a truncated 110 mile 180 km highway that ran from Miami to Fort Pierce opening on January 25 1957 14 In January 1959 Governor LeRoy Collins favoring a Parkway extension from Fort Pierce to Orlando stated that building the Parkway north of Orlando would be unnecessary due to the interstate highway system In late May 1959 the board authorized a study for the Parkway Extension to Orlando and connecting the Interstate routes in Florida In 1961 Governor Collins approved the sale of 80 million in bonds to finance the parkway extension from Fort Pierce to Wildwood adding another 156 miles 251 km of roadway and shifting Interstate 75 s route 6 miles 10 km eastward from its original alignment The extension was opened in three stages a 61 mile 98 km section between Yeehaw Junction and Orlando opened on July 17 1963 a section linking Fort Pierce and Yeehaw Junction opened on November 22 1963 and the section between Orlando and the northern terminus of I 75 opened on July 24 1964 completing the mainline 2 14 I 95 realignment Edit The Bureau of Public Roads approved an Interstate 95 alignment that used 41 miles 66 km of the Turnpike from PGA Boulevard SR 786 in Palm Beach Gardens north to SR 70 in Ft Pierce in the 1950s 37 38 In the mid 1960s the State Road Department authorized traffic counts be conducted to determine if the separation of Interstate 95 from the Turnpike was feasible with arguments that using a concurrent alignment was costing Florida money for federal highway funding but not without the concern of losing toll revenue 39 Over time the interstate adopted a route closer to U S Route 1 including parallel between Stuart and Palm Beach Gardens with the turnpike being removed from the I 95 alignment in 1973 and I 95 being completed in 1987 40 41 Reckless spending Edit With the St Petersburg Times in 1963 a team led by Martin Waldron wrote a total of 150 000 words as part of the newspaper s coverage of unchecked spending by the Florida Turnpike Authority that led to estimated costs quadrupling from initial estimates of 100 million 42 Waldron received a tip about excessive spending by John Hammer chairman of the Florida Turnpike Authority which included expensive hotels and meals corsages for his secretary and overcharging for a chartered plane 43 His coverage earned the newspaper the Pulitzer Prize for Public Service in 1964 the first for the newspaper and led to changes in the way the state of Florida managed highway construction projects 42 44 System expansion Edit With Florida still growing in population in the 1960s preliminary studies began for expanding portions of the Turnpike to six lanes in South Florida and additional north south highways in that area Dade County and the State Road Department developed a plan for the West Dade Expressway now known as the Homestead Extension of Florida s Turnpike beginning at the Turnpike near the Dade County Broward County line turning westward and southward and terminating at Florida City in southern Dade County In 1967 the Florida State Turnpike Authority was authorized to perform engineering and feasibility studies on the West Dade Expressway and the Bee Line Connector extension now known as the Martin Andersen Beachline Expressway The results of the studies came in December 1968 but due to an uncertain bond market and an unknown future for the toll authority decisions on the roads were delayed 14 The Florida Department of Transportation was created in July 1969 with the Florida State Turnpike Authority becoming a part of the new FDOT Soon after FDOT and Orange and Dade County officials agreed the Bee Line Connector and Homestead Extension of Florida s Turnpike would be financed by revenue bond issues as extensions of Florida s Turnpike The Beeline Expressway opened in 1973 and the Homestead Extension opened in 1974 as a part of the Turnpike mainline 14 Later changes Edit Florida s Turnpike looking southbound from the US 441 overpass two miles north of the Yeehaw Junction exit From its opening in January 1957 to April 12 1968 the road was known as the Sunshine State Parkway SSP On April 12 1968 the road was renamed to its current name of Florida s Turnpike to identify that the toll road was located in Florida and to avoid confusion from other Florida landmarks such as the Sunshine Skyway Bridge 14 45 The Sunshine State Parkway moniker was commonly used for the next decade and remnants of the name can be seen on several Turnpike maintenance buildings 46 47 On September 1 1971 the Turnpike switched from a sequential exit numbering system to a hybrid numbering system where adjacent exit numbers differed by 4 south of SR 60 exit 60 at the time and 5 north of SR 60 48 49 Between 1974 and 1986 the turnpike experienced little change other than maintenance as the original bonds on the road were being paid off 14 During this period the turnpike experienced the first of five toll hikes on February 15 1979 when the cost of a trip from Golden Glades to Wildwood increased to 5 90 from 4 80 the road s original toll 50 In 1988 the Office of Florida s Turnpike was formed with 220 million worth of revenue bonds being sold in April 1989 to renovate the toll plazas service centers and improve the road with the reduction of urban congestion Fifteen new interchanges were planned in the early 1990s with four of them opened by July 1991 14 Also during this time sections of the turnpike were converted from a ticket system to a coin system due to urban congestion with several mainline toll plazas being built The section between the Golden Glades Plaza and Lantana was converted in 1990 with the opening of the Cypress Creek and Lantana toll plazas Coin baskets were installed in 1994 after years of delays 51 52 53 The portion north of Kissimmee was converted on August 20 1995 with the addition of the Three Lakes toll plaza and the Wildwood toll plaza at mile 304 being replaced by the Leesburg toll barrier on July 7 1995 54 55 56 The improvements also came with a series of toll hikes between 1989 and 1993 to make the toll rates more uniform six cents per mile 3 7 km throughout the turnpike s length The first one was enacted on April 1 1989 which raised the rate to 9 95 57 The second one on July 1 1991 affected only the section north of Lantana raising the trip s cost to 12 35 58 59 The last one took effect on July 11 1993 increasing the trip s cost to 14 40 60 In 1989 the Turnpike switched its exit numbering system to the mile log system starting from the south end of the Homestead Extension 13 years before Florida s interstates integrated it into their system 48 61 62 Because he was one of America s most beloved presidents and a true world leader as the Legislature put it Florida s Turnpike was designated by the Florida Legislature in 1998 as the Ronald Reagan Turnpike with 20 signs throughout the turnpike showing the designation 63 In April 1999 SunPass was introduced to the public with SunPass only interchanges and lanes being introduced throughout the 2000s 14 A toll hike took effect on March 7 2004 increasing the toll rate for non SunPass users to 18 20 with SunPass users still using the 1993 toll rates 64 65 The HEFT ceased cash toll collections on February 19 2011 becoming an exclusive electronic toll road a move announced in November 2009 The staffed toll plazas were converted into electronic toll gantries and the only ways to pay are either by SunPass transponders or a toll by plate program 66 67 The Turnpike mainline began its conversion to a cashless toll road with the Golden Glades toll barrier being converted into a toll gantry on January 25 2014 and no longer accepts cash 68 69 The portion south of I 595 was converted on August 29 2015 Between 2005 and 2012 the Turnpike spent 380 million doubling the number of lanes from SR 528 to the northernmost interchange with SR 50 west of Winter Garden exit 272 Most of the section was expanded from four to eight lanes with the section between SR 408 and SR 429 being expanded from six to twelve lanes The portion between SR 528 and Interstate 4 opened in 2008 with the portion between I 4 and SR 408 being finished in 2010 SR 408 to Beulah Road at the north end of the SR 429 interchange opened in March 2011 and the portion between Beulah Road and SR 50 exit 272 was completed in 2012 70 In 2007 legislation was passed in Florida to index toll rates across the state to the national Consumer price index CPI to be enacted by the end of June 2012 As a result the toll rates on roads on Florida s Turnpike Enterprise were raised on June 24 2012 an increase of 11 7 to reflect the previous five years The legislation allows for SunPass rates to be raised slightly each year with cash rates going up every five years with SunPass rates staying about a quarter cheaper than cash rates 71 72 In keeping with the legislation SunPass and toll by plate rates were raised again on July 1 2013 by 2 1 with cash toll rates projected to stay the same through at least 2014 71 73 Toll rate increases were scheduled for every five years and mid 2017 was the next scheduled date for such an increase However a combination of a low inflation rate and problems within the relevant state authorities caused multiple cancellations and changes in schedule for the next increase 74 75 The final projected date for an increase in tolls was eventually set for October 29 2017 citation needed The Turnpike Enterprise and OOCEA now CFX agreed to build a partial interchange between SR 417 and Florida s Turnpike in the late 2000s after negotiations dating back to a 1991 field study 76 77 The interchange is being built in two phases The first phase built by CFX added ramps from southbound SR 417 to southbound Florida s Turnpike and from northbound Florida s Turnpike to northbound SR 417 Construction on the first phase began in September 2013 and opened on January 26 2015 The second phase completing the interchange was built by the Turnpike Enterprise After a series of delays construction began in 2017 and the completed interchange was fully opened on May 21 2021 78 As part of the project the turnpike mainline was widened from four to eight lanes between Osceola Parkway exit 249 and the Beachline Expressway SR 528 exit 255 Future Edit Florida s Turnpike looking northbound from the overpass on Canoe Creek Road with the Canoe Creek service plaza visible Plans are in the works to widen the Turnpike from the Lake Worth Road interchange exit 93 to the State Road 70 exit exit 152 79 80 and from SR 50 exit 272 to U S 27 northbound exit 285 81 from four to eight lanes In Miami Dade County several widening projects including new express lanes are underway Reconstruction of the northern end of the Turnpike at its junction with Interstate 75 improved the traffic merge pattern between I 75 and SR 44 with new flyover ramps and additional traffic lanes 82 83 The northbound off ramp to SR 44 was completed on September 19 2019 while southbound on ramp construction was completed in early November 2019 and the project overall was completed in early January 2020 84 The Turnpike Enterprise is also studying a possible developer funded future interchange at County Road 468 mile marker 300 servicing The Villages and Lady Lake This project is neither funded nor scheduled for construction at this time 85 There has been discussion of creating a northern extension 86 Exit list EditNorth of the HEFT Mainline interchange the mainline continues the mileage from mile 47 from the HEFT The spur of the mainline south of the HEFT to the Golden Glades Interchange assumes an alternate numbering system that suffixes an X to each exit number 61 CountyLocationmi 1 87 88 kmOld exitNew exitDestinationsNotesMiami DadeMiami Gardens0 0000 00000 I 95 SR 9 north SR 9A south SR 826 west Palmetto Expressway US 441 SR 7 Port of Miami Miami International AirportGolden Glades Interchange exit 12A on I 950 3000 483 SR 826 east BeachesSouthbound exit and northbound entrance0 5000 805Miami Gardens Toll Gantry2 4433 93222X NW 199th Street CR 854 StadiumSouthbound exit and northbound entrance ETCMiami Dade Browardcounty lineMiramar Miami Gardens line3 76547 8566 05977 01744X Florida s Turnpike Extension south SR 821 HomesteadTransition from HEFT to Mainline no exit number southboundBrowardHollywood50 34681 024849 SR 820 Hollywood Pines Boulevards Signed as exits 49A west and 49B east southbound respectively southbound exit and northbound entrance ETCDavie54 17787 189 53 SR 818 Griffin Road Southbound exit and northbound entrance ETCDavie Plantation line55 92189 9961254 I 595 SR 862 SR 84 US 441 SR 7 to I 95 Port Everglades Fort Lauderdale Hollywood International AirportExit 8 on I 59555 92189 996 54X I 595 Express west to I 75 SR 869 Miami Naples Coral SpringsTolled lanes open peak direction onlyPlantation59 28495 4081658 SR 838 Sunrise Boulevard Northbound exit and southbound entrance ETC signed as exit 58A east and exit 58B west northboundTamarac63 011101 4062062 SR 870 Commercial Boulevard Northbound exit and southbound entrance ETCNorth Lauderdale64 500103 803Cypress Creek Toll GantryCoconut Creek66 000106 217Pompano Beach Service Plaza and Operations CenterCoconut Creek Pompano Beachcity line66 432106 912 66 SR 814 Atlantic Boulevard Northbound exit and southbound entrance67 577108 7552467 Coconut Creek Parkway CR 912 west M L King Boulevard Broward Community CollegeSouthbound exit and northbound entrance ETC69 588111 9912669 SR 834 Sample Road Trumpet interchange southbound exit and northbound entrance ETCCoconut Creek71 736115 448 71 SR 869 south Sawgrass Expressway Coral SpringsETC interchange exit 21 on SR 869Palm Beach 76 086122 4492875 SR 808 Glades Road Northbound exit and southbound entrance ETC 82 003131 9713281 SR 806 Atlantic Avenue Northbound exit and southbound entrance ETC 87 143140 243 86 SR 804 Boynton Beach Boulevard Northbound exit and southbound entrance ETCBoynton Beach89 400143 875Lantana Toll Gantry 93 303150 1573693 SR 802 Lake Worth Road 94 500152 083West Palm Beach Service Plaza 95 916154 362Forest Hill Boulevard Toll Gantry 97 655157 160 97 US 98 SR 80 Southern Boulevard Access to Palm Beach International Airport 98 470158 472Belvedere Road Toll Gantry 99 594160 281 98Jog RoadNorthbound exit and southbound entrance opened 2007 89 100 463161 6804099 SR 704 Okeechobee Boulevard 104 000167 37245th Street Toll GantryPalm Beach Gardens106 814171 900 107 SR 710 Beeline Highway Opened 2006 90 108 371174 406Palm Beach Gardens Toll Gantry109 662176 48444109 SR 786 PGA Boulevard Access to Palm Beach Gardens Medical Center 112 871181 648Jupiter Toll GantryJupiter116 537187 54848116 SR 706 I 95 Jupiter Okeechobee Daytona Beach West Palm BeachMartinSt Lucie River131 487211 608Thomas B Manuel Bridge 132 547213 314Stuart Toll GantryPalm City134 660216 71452133 SR 714 Stuart 137 594221 436Becker Road Toll GantrySt LuciePort St Lucie138 413222 754 138Becker Road Port St Lucie Palm CityOpened 2007 91 141 393227 550Port St Lucie Toll Gantry143 321230 65354142 SR 716 east Port St Lucie Blvd Port St LucieAccess to St Lucie Medical Center to the east and Tradition Medical Center to the west145 300233 838Port St Lucie Fort Pierce Service Plaza 149 698240 916Midway Road Toll GantryFort Pierce152 915246 09356152 SR 70 SR 713 to I 95 Fort Pierce Vero Beach Okeechobee 154 000247 839Fort Pierce Toll GantryIndian River No major junctionsOkeechobee 185 100297 890Fort Drum Service PlazaIndian River No major junctionsOsceolaYeehaw Junction193 182310 89660193 US 441 SR 60 Yeehaw Junction 230 200370 471Canoe Creek Service PlazaSt Cloud236 500380 610Three Lakes Toll Gantry239 493385 427 240 CR 525 Kissimmee Park RoadSouthbound exit and northbound entrance ETC interchange opened 2007 92 Nolte RoadProposed interchange will be tolled southbound exit and northbound entrance will replace Kissimmee Park Road exit citation needed 65242 US 192 US 441 Kissimmee St Cloud Walt Disney World ResortNorthbound exit only opened in 1995 access to St Cloud Hospital244 613393 66665244 US 192 US 441 Kissimmee St Cloud Walt Disney World ResortNo northbound exit ETC interchange access to St Cloud HospitalKissimmee Buenaventura Lakes line248 841400 471 249 Osceola Parkway CR 522 Walt Disney World ResortSouthbound exit and northbound entrance ETC opened in 1995OrangeOrlando250 750403 543 251 SR 417 Central Florida GreeneWay Tampa Daytona BeachSR 417 exit 12 southbound exit and northbound entrance ETC Northbound exit ramp to SR 417 north opened 2015 interchange opened fully on May 21 2021 To Orlando International Airport 93 94 95 96 Taft Vineland RoadProposed interchange citation needed 255 366410 97270254 SR 528 Beachline Expressway US 17 US 92 US 441 Orange Blossom Trail Orlando International AirportSouthbound exit and northbound entrance ETC exit 4 on SR 528256 040412 056 255Consulate DriveSouthbound exit only ETC interchange opened 2004 97 257 SR 482 Sand Lake Road to CR 423 S John Young Pkwy Proposed interchange will be tolled southbound exit and northbound entrance citation needed 259 697417 94275259 I 4 SR 400 Orlando Tampa Daytona BeachSouthbound exit and northbound entrance ETC exit 77 on I 4 I 4 Express eastNorthbound exit and southbound entrance263 700424 384Turkey Lake Service Plaza and Enterprise HeadquartersGotha266 020428 118 265 SR 408 east East West Expressway Orlando TitusvilleWestern end of SR 408Ocoee267 886431 12180267B SR 50 OcoeeAccess to Health Central268 033431 357 267A SR 429 Western Expressway Apopka TampaSR 429 exit 22Oakland273 005439 359 272 SR 50 Winter Garden ClermontNorthbound exit and southbound entrance ETC opened 1993 98 LakeMinneola 278MinneolaAccess via Hancock Road northbound exit and southbound entrance ETC opened 2017 99 Groveland285 810459 96785285 US 27 SR 25 SR 19 Leesburg ClermontNorthbound exit and southbound entrance ETC interchange 288 000463 491Clermont Toll Gantry 289 052465 184 289 US 27 SR 25 to SR 19 Tavares ClermontSouthbound exit and northbound entrance ETC interchangeLeesburg296 607477 343 296 CR 470 LeesburgSouthbound exit and northbound entrance ETC opened 2005 100 SumterWildwood300 200483 125Okahumpka Service Plaza305 368491 44290304 US 301 Wildwood308 753496 890 307 SR 44 Inverness WildwoodSingle northbound ramp that merges with I 75 exit 329 southbound ramp from SR 44 to Turnpike 308 757496 896 I 75 north SR 93 OcalaExit 328 on I 75 access to northbound I 75 and access from southbound I 751 000 mi 1 609 km 1 000 km 0 621 mi Electronic toll collection Incomplete access Route transition UnopenedSee also EditHomestead Extension of Florida s Turnpike Florida s Turnpike Enterprise List of toll roads in FloridaReferences Edit a b Florida Department of Transportation Interchange Report PDF Florida Department of Transportation November 24 2008 pp 12 13 Archived from the original PDF on February 8 2012 Retrieved July 27 2009 a b System Description Florida Department of Transportation Archived from the original on September 22 2010 Retrieved August 11 2009 a b c d e f Google April 16 2010 overview map of Florida s Turnpike from Golden Glades Spur Map Google Maps Google Retrieved April 16 2010 Google April 16 2010 overview map of Florida s Turnpike and Homestead Extension Map Google Maps Google Retrieved April 16 2010 a b c d e f Florida s Turnpike System Mainline Map PDF Map Florida Department of Transportation Archived from the original PDF on March 28 2014 Retrieved January 7 2014 Traffic The Palm Beach Post June 24 2003 p 2B a b Top 16 longest gaps between Interstate exits USA Today August 15 2011 Retrieved July 11 2012 Florida Senate 2006 SB 2240 Retrieved May 5 2010 Frequently Asked Questions Florida Department of Transportation Archived from the original on December 26 2013 Retrieved January 7 2014 Florida Turnpike Toll Calculator v3 1 Florida Department of Transportation Retrieved January 7 2014 Brockman Belinda August 17 1990 New Turnpike Toll Booths Open Sunday Palm Beach Post p 1B Turnpike going cashless at Griffin Hollywood exits at end of August St Petersburg Times July 20 2015 Retrieved November 2 2015 Florida s Turnpike Enterprise Cash Will No Longer Be Accepted on Florida s Turnpike Mainline PDF a b c d e f g h i j k Florida s Turnpike 50 Year Celebration PDF Florida Department of Transportation 2007 Archived from the original PDF on September 22 2010 Retrieved July 31 2009 SunPass Sales Show Tolls Are Ticket To Travel PDF Tampa Tribune January 27 2007 Archived from the original PDF on January 6 2009 Retrieved August 11 2009 Turnbell Michael October 26 2009 Florida s Turnpike to go cashless as it switches to electronic tolling South Florida Sun Sentinel Retrieved November 28 2009 SunPass Roads and Bridges Florida Department of Transportation Archived from the original on July 3 2009 Retrieved August 11 2009 Turnpike Sales Locations Florida Department of Transportation Archived from the original on December 30 2009 Retrieved August 11 2009 Florida toll roads announce partnership with E ZPass used in 16 states Tampa Bay Times May 28 2021 Retrieved August 12 2021 Hurricane evacuations Providing a safe escape Florida Department of Transportation Archived from the original on June 16 2009 Retrieved August 1 2009 Service Plazas Florida s Turnpike Enterprise Retrieved July 31 2009 Turkey Lake Supercharger Tesla www teslamotors com Find Us Tesla Find Us Tesla Retrieved August 22 2021 State Seeks Gas Guarantee For Turnpike St Petersburg Times June 29 1973 p 2B Turnpike pumpers to pay less Ocala Star Banner May 20 1995 p 6B Roy Roger May 20 1995 State Drives Deal to Keep Turnpike Gas in Line Orlando Sentinel p D1 Citgo bedeviled by fiery speech St Petersburg Times September 26 2006 Retrieved July 31 2009 Service Plazas Florida s Turnpike Enterprise June 7 2006 Archived from the original on June 7 2006 Chardy Alfonso June 3 2009 Turnpike Starbucks must hit road Miami Herald p 3B Sun Passages Major service plaza upgrades are driving smiles Florida Department of Transportation Fall 2003 Archived from the original on November 25 2007 Retrieved July 31 2009 New look for turnpike plazas A 160 million facelift Palm Beach Post June 4 2009 Retrieved July 31 2009 Traffic Management Center Florida Department of Transportation Archived from the original on July 9 2009 Retrieved August 11 2009 Dynamic Message Signs Florida Department of Transportation Archived from the original on May 25 2009 Retrieved August 11 2009 State Farm Safety Patrol Florida s Turnpike Retrieved May 31 2021 Florida Road Rangers Incident Response Retrieved May 31 2021 Collins Signals Go on Miami Turnpike The Miami News July 5 1955 Retrieved July 17 2012 Squabbles unnecessary Boca Raton News May 10 1973 p 4A Free Roads Vs Toll A Secret Stall St Petersburg Times April 21 1963 p 1D Toll Free I 95 In State Still A Long Way Off St Petersburg Times November 11 1967 p 3B I 95 Missing Link Okayed Lakeland Ledger April 19 1973 p 4A Gap in I 95 to Close Saturday Miami Herald December 13 1987 p 1A a b Staff May 28 1981 Martin O Waldron Is Dead at 56 Reporting Led to a Pulitzer Prize The New York Times Retrieved July 13 2010 Staff May 15 1964 Prizes Just Doing the Job Time p 88 Archived from the original on December 13 2011 Retrieved July 13 2010 Pulitzer Prize for Public Service Times Publishing Company Archived from the original on June 22 2010 Retrieved July 13 2010 Parkway Name Changed to Protect Its Identity St Petersburg Times April 13 1968 Help Speed I 95 Palm Beach Post August 29 1978 Mitgang Lee March 6 1981 States are eyeing higher speed limits The Free Lance Star a b Madigan Nick March 1 1989 State s Exit Amnesia Has Inns In An Uproar Palm Beach Post p 1A Williams Verve September 13 1971 Turnpike in numbers game by changing the exits The Miami News p 1A Hike In Toll Could Backfire On DOT Ocala Star Banner February 14 1979 p 4A Crowley Brian E July 27 1985 Approval Expected for Turnpike Plans The Palm Beach Post p 1A Pierce Rick amp Ellis Elaine A August 21 1990 Turnpike fares well under coin system traffic flow smooth on workday debut Sun Sentinel p 8B Pierce Rick amp Chabot Lucy August 17 1993 Turnpike Coin Baskets Delayed Until February Sun Sentinel p 1A Turnpike converts to coin system Sarasota Herald Tribune August 19 1995 p 6B Coole Terri February 12 1993 Turnpike Exchange Coins not tickets a new toll plaza south of Leesburg when complete will mean a pay as you go system on the highway s northern section Orlando Sentinel p 1 Toll Plaza at Wildwood shuts down Orlando Sentinel July 7 1995 p 2 Turnpike tolls nearly double Gainesville Sun March 31 1989 p 1A Douthat Bill May 31 1991 Turnpike Tolls To Jump 30 The Palm Beach Post p 1A O Neal Donna July 1 1991 Laws raise fees boost protection Lakeland Ledger p 3B Florida Turnpike tolls to increase today Ocala Star Banner July 11 1993 p 4B a b Interchanges and Mileage Florida Department of Transportation Archived from the original on August 15 2009 Retrieved August 11 2009 Florida s Interstate Exit Numbers Florida Department of Transportation Retrieved August 11 2009 Designation of the Florida s Turnpike as part of the Ronald Reagan Turnpike System Florida Department of Transportation Archived from the original on September 22 2010 Retrieved March 29 2010 McGinness Chuck January 8 2004 Plan To Hike Toll On Turnpike Rapped The Palm Beach Post p 7B Turnbell Michael March 6 2004 Drivers Dash To Get SunPass Before Toll Increases Kick In Sun Sentinel p 1B Turnbell Michael February 14 2011 Turnpike to stop taking cash on Homestead Extension Feb 19 Sun Sentinel Tolls go electronic on 47 mile stretch of Florida Turnpike St Petersburg Times November 19 2009 Archived from the original on June 7 2011 Retrieved November 28 2009 Turnbell Michael August 3 2013 Sawgrass Expressway going cashless in 2014 South Florida Sun Sentinel Retrieved January 6 2014 Turnbell Michael January 12 2014 Golden Glades going cashless on Jan 25 South Florida Sun Sentinel Retrieved January 15 2014 Florida s Turnpike Enterprise Tentative Five Year Work Program Overview 2012 Report Florida Department of Transportation a b Traveler Information Toll Rates Florida Department of Transportation Archived from the original on September 26 2013 Retrieved September 18 2013 Turnbell Michael June 7 2012 Tolls on Turnpike Sawgrass Alligator Alley going up on June 24 South Florida Sun Sentinel Retrieved January 6 2014 Turnbell Michael June 28 2013 Tolls go up July 1 on turnpike state toll roads South Florida Sun Sentinel Retrieved January 7 2014 Lincoff Nina March 25 2016 Will Road Tolls Go Up in 2016 South Florida Business Journal Retrieved October 22 2017 Spear Kevin February 7 2017 Central Florida Toll Road Agency May Kill Planned Toll Hike Orlando Sentinel Retrieved October 22 2017 SR417 SR91 INTERCHANGE NEW CONSTRUCTION PDF Archived from the original PDF on November 5 2012 Opened Sr 417 Florida s Turnpike Partial Interchange Archived from the original on February 13 2015 Florida s Turnpike Enterprise Florida s Turnpike Enterprise Opens New Ramps at Central Florida GreeneWay SR 417 Interchange in Orlando PDF Turnpike plans widening in Palm Beach County South Florida Business Journal February 13 2007 Retrieved August 1 2009 Current Construction Projects Florida s Turnpike Enterprise Archived from the original on July 27 2009 Retrieved August 11 2009 Comas Martin E Good news for Orlando commuters from south Lake turnpike to be widened to eight lanes Orlando Sentinel Retrieved May 28 2018 Wildwood Interchange at Turnpike amp I 75 Milepost 309 PDF Florida s Turnpike Enterprise Turnpike I 75 interchange in line for 68 5M upgrade Orlando Sentinel Retrieved May 28 2018 NEW TRAFFIC PATTERN Northbound Florida s Turnpike and Northbound I 75 Exit Ramps to SR 44 to Open in a New Location the Morning of Thursday September 19 Florida Turnpike Enterprise Newsletter September 18 2019 Construction Future Projects Florida s Turnpike Enterprise Archived from the original on September 22 2010 Retrieved March 24 2010 The Florida DOT s latest Billionaire Boulevard plan has rural FL outraged Florida Phoenix November 18 2021 FDOT straight line diagrams Archived March 6 2014 at the Wayback Machine accessed March 2014 Google December 30 2015 Florida s Turnpike Map Google Maps Google Retrieved December 30 2015 Florida s Turnpike Opens New SunPass Only Partial Interchange Jog Road Exit 98 PDF Press release Florida Department of Transportation September 10 2007 Archived from the original PDF on September 23 2010 Retrieved May 5 2010 Florida s Turnpike opens new SunPass only interchange at State Road 710 Beeline Highway Thursday July 27 PDF Press release Florida Department of Transportation July 26 2006 Archived from the original PDF on September 23 2010 Retrieved May 5 2010 Lane Teresa May 12 2007 19 Million Turnpike Ramps Open The Palm Beach Post p 1B Hamburg Jay January 6 2007 Turnpike link eases commute in Kissimmee Orlando Sentinel p 1B Dan Tracy New interchange opens Monday between SR 417 and Turnpike Orlando Sentinel January 23 2015 SR417 Florida s Turnpike Partial Interchange oocea com Central Florida Expressway Authority January 23 2013 Archived from the original on August 19 2014 Retrieved August 18 2014 New Interchange at Florida s Turnpike amp SR 417 MP 251 PDF floridasturnpike com Florida Department of Transportation July 2013 Archived from the original PDF on June 11 2014 Retrieved August 18 2014 Richardson Matthew January 17 2014 How RS amp H won design deal for SR 417 Florida s Turnpike interchange bizjournals com Orlando Business Journal Retrieved August 18 2014 Casselberry Road Extension Will Make Shortcut Official Orlando Sentinel July 25 2004 p 18K Coole Terri May 1 1993 Harried Commuters bask in opening of a new interchange Orlando Sentinel p 1 Florida s Turnpike Enterprise Opens New Minneola Interchange Press release Florida Department of Transportation June 10 2017 Retrieved September 7 2017 Turnpike Interchange Opens Orlando Sentinel January 22 2005 p 3B External links EditRoute map KML file edit help Template Attached KML Florida s TurnpikeKML is from Wikidata Official site Florida s Turnpike Map 1964 Wikimedia Commons has media related to Florida s Turnpike Retrieved from https en wikipedia org w index php title Florida 27s Turnpike amp oldid 1129794152, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.