fbpx
Wikipedia

TWA Flight Center

The TWA Flight Center, also known as the Trans World Flight Center, is an airport terminal and hotel complex at New York City's John F. Kennedy International Airport (JFK). The original terminal building, or head house, operated as a terminal from 1962 to 2001 and was adaptively repurposed in 2017 as part of the TWA Hotel. The head house is partially encircled by a replacement terminal building completed in 2008, and flanked by two buildings added for the hotel. The replacement terminal is home to JetBlue's JFK operations. The head house and terminal are collectively known as Terminal 5 or T5.

Trans World Airlines Flight Center
New York City Landmark No. 1915, 1916
The terminal's head house in 2010
LocationTerminal 5, John F. Kennedy International Airport
New York City, United States
Coordinates40°38′45″N 73°46′39″W / 40.64583°N 73.77750°W / 40.64583; -73.77750
Area17.6 acres (7.1 ha)
ArchitectEero Saarinen and Associates
Architectural styleFuturist, Neo-futurist, Googie, Fantastic
NRHP reference No.05000994[1]
NYCL No.1915, 1916
Significant dates
Added to NRHPSeptember 7, 2005
Designated NYCLJuly 19, 1994

The TWA Flight Center, designed for Trans World Airlines by Eero Saarinen and Associates, was erected between 1959 and 1962; it operated as an air terminal until 2001. It has a prominent wing-shaped thin shell roof supported by four "Y"-shaped piers. An open three-level space with tall windows originally offered views of departing and arriving jets. Two tube-shaped red-carpeted departure-arrival corridors extended outward from the terminal, connecting to the gates; these would be demolished for the 2008 addition. Roche-Dinkeloo, a successor firm to Saarinen's company, designed an expansion in 1970. Its design received much critical acclaim; the interior and the exterior of the head house became New York City designated landmarks in 1994, and it was added to the National Register of Historic Places in 2005.

The encircling Terminal 5 addition, designed by Gensler, was built between 2005 and 2008. It consists of the 26 active gates at Terminal 5, as well as numerous restaurants and stores. The TWA Hotel was constructed between 2015 and 2019; its development entailed renovating the disused head house and adding two adjacent buildings.

Architecture edit

The head house of the TWA Flight Center, designed by Eero Saarinen and his associates, is a pioneering example of thin-shell construction, consisting of a reinforced concrete shell roof supported at the corners.[2] The design incorporates elements of the Futurist, Neo-futurist, Googie and Fantastic architectural styles.[3] It is located at the middle of a curve in one of JFK Airport's service roads, in front of the elevated AirTrain JFK people mover.[4] The key collaborators from the Saarinen office included Kevin Roche, Cesar Pelli, Norman Pettula, and Edward Saad. Warren Platner was largely responsible for the interiors.[5] To engineer the roof, Saarinen collaborated with Charles S. Whitney and Boyd G. Anderson of the firm Ammann & Whitney.[2][6][a] The general contractor was Grove Shepherd Wilson & Kruge. Arup was the structural engineer; Jaros, Baum & Bolles provided MEP engineering; and Langan was the civil engineer on the project.[7][8]

The Terminal 5 (also known as T5) addition, which is connected to the TWA Flight Center, is a 625,000-square-foot (58,100 m2) facility designed by Gensler. It contains 26 gates that can accommodate 250 flights per day,[9] and 20 million passengers annually.[10]

Form edit

 
Components of JFK T5:
  •   Original 1962 Saarinen terminal (TWA Flight Center)
  •   2008 Gensler-designed terminal

The form of the TWA Flight Center's head house is designed to relate to its small wedge-shaped site, with walkways and gates placed at acute angles.[11] Saarinen described the head house form as being like the "Leonardo da Vinci flying machine", according to his associate Kevin Roche.[12] Radiating out from the head house are two departure-arrival passenger tubes extending southeast and northeast.[13][b] The TWA Flight Center was one of the first to use enclosed passenger jetways, which extended from "gate structures" at the end of each tube. In the original plans, aircraft would be available via the "Flight Wing", a single-story building that passengers would have to walk to at ground level. The jetways removed the need for passengers to walk on the ground and sheltered passengers from inclement weather.[11][15][16]

The current JetBlue terminal and the TWA Hotel buildings are located east of the original head house. The terminal's entry hall is composed of two arms that wrap around the TWA Flight Center's head house in a crescent shape. The two passenger tubes from the original design were retained, but the original gate structures were destroyed.[17][18] T5 contains 26 gates.[9]

Exterior edit

Roof edit

 
Exterior view as seen in 2006

The TWA Flight Center's head house is a two-story structure.[4] The roof's thin concrete shell was designed to span a wide space using as little material as possible.[3] The roof is composed of four concrete shells: two upward-slanting shells at the edges, which resemble wings, and two smaller shells slanting downward toward the front and back of the structure.[19] The upward-slanting shells reach up to 75 feet (23 m) above ground level. The rooftop shells converge at the center, where each of the four shells supports the others. Four "Y"-shaped piers support the roof, facing the front and back;[4][13][20] these measure 51 feet (16 m) tall by 315 feet (96 m) long.[19] Skylights are placed within the gaps between each shell.[13][21] The building's main entrance is on the land side, where the roof projects over a sidewalk (formerly a driveway) with a scupper.[13][21]

The roof concrete varies in thickness from 7 inches (180 mm) at the edges to 40 inches (1,000 mm) at the convergence of the four shells. The roof weighs 6,000 short tons (5,400 t) in total.[22][23] The roof shells are cantilevered by up to 80 feet (24 m) and contain steel reinforcement to accommodate the roof's weight.[23]

Facade edit

The main portion of the head house's facade is made of large green-tinted glass walls.[4][13] These glass walls were coated with a dark purple mylar film before 2005.[4] Single-story wings extend outward from the main terminal to the north and south and contain several door openings within the concave walls. Inside these wings are maintenance areas.[21]

Interior edit

Original head house edit

Though the head house is two stories tall, it contains an intermediate level, joined to the lower level by a central staircase and to the upper level by four peripheral staircases.[24][25] Ceramic tiles line the walls and floors.[21][25] The TWA Flight Center incorporated many innovations upon its completion, including closed circuit television, a central public address system, baggage carousels, electromechanical split-flap display schedule board and baggage scales, and gates that were somewhat distant from the main terminal.[11][15][26][27] The intermediate level contains an area facing east, where passengers could originally see the tarmac.[28] By the early 1990s, to comply with the Americans with Disabilities Act of 1990, a switchback ramp had been added between the lower level and the intermediate level.[29]

The ticket counter and baggage claim areas were placed at ground level, on the other side of the curbside canopy, to maximize convenience for passengers.[11] A sculpted marble information desk rose from the floor as a single slab.[21][14] There are also mechanical, service, and office areas in a partial basement under the intermediate level, as well as a tunnel that led to Flight Wing 1.[28]

A concrete balcony on the upper floor spans the central staircase from the lower floor to the intermediate level.[25][28] The TWA operated its Ambassador Club on the northern (left) portion of the upper floor.[25][30] Three restaurants were located on the southern (right) portion of the upper floor: the Constellation Club, Lisbon Lounge, and Paris Café.[31][25] There were also offices on the upper level, north and south of the public areas.[28]

 
Curving staircase and balcony inside the head house
 
A footbridge spans the upper floor
 
Ambassador Club
 
Union News restaurants coffee shop by Raymond Loewy in 1962

Terminal 5 and TWA Hotel edit

Terminal 5 has a 55,000-square-foot (5,100 m2) retail area with 22 food and drink concessions, 35 stores,[9] free wireless Internet access, a children's play area, and a 1,500-space parking garage.[32][33] As the first airline terminal at JFK designed after the September 11, 2001, attacks,[34][35] T5 contains 20 security lanes, one of the largest checkpoints in a U.S. airline terminal.[36]

Two buildings, north and south of the newer T5 structure, encircle the original head house to the east. These buildings are part of the TWA Hotel, which has 512 guest rooms, 40,000 square feet (3,700 m2) feet of meeting space, and an observation deck of 10,000 square feet (930 m2).[37][38][39] The hotel is outside the sterile area of Terminal 5, meaning that visitors can only access the hotel before going through T5 security or after arrival at T5.[32] The hotel's decorations, replicas of the original furnishings, include brass lighting, walnut-accented furnishings, and rotary phones. The hallways contain red carpeting, evocative of the color of the furniture in the original TWA lounge. The rooms also contain modern amenities such as blackout curtains and multiple-pane soundproof windows.[40][41]

Passageways edit

 
A passageway from the head house

The two passageways leading from the head house are completely enclosed and cross a service roadway that serves T5 and the TWA Hotel.[25][28] The passageway leading southeast was called Flight Tube 2, while the passageway leading northeast was called Flight Tube 1.[4] These tubes are covered in concrete, with an elliptical cross section as well as indirect lighting.[13] Original plans called for the passageways to be designed as bridges with glass ceilings; each passage would have two moving walkways, one in each direction, with a stationary hallway in between.[19] As a cost-saving measure, the passageways were ultimately not designed with moving walkways.[16]

The tubes originally led to Flight Wings 1 and 2. The passages were 6 feet (1.8 m) higher at the flight wings than at the head houses. Flight Tube 1 was about 232 feet (71 m) long while Flight Tube 2 was 272 feet (83 m) long.[28] Following the opening of the TWA Hotel, the tubes connect the head house to additional rooms in the hotel, as well as to T5.[42][43]

Flight wings edit

 
 
Floor plans for the passenger sections of Flight Wings 1 (top) and 2 (bottom)

Flight Tube 2 connected to Flight Wing 2, from the 1962 Saarinen design, while Flight Tube 1 connected to Flight Wing 1, from a 1967–1970 expansion designed by successor firm Roche-Dinkeloo.[4][17] Both sections were characterized as being "violin"-shaped, with jetways extending outward from the end of each wing.[4] The flight wings had a base made of concrete and plaster, as well as a passenger concourse cantilevered above the base.[28]

Flight Wing 2, shaped like a multi-sided polygon, was the smaller of the two structures, with seven gates;[44] it contained utilitarian decor as well as a small flight operation center above the passenger area.[45][46] Two bridges led to departure lounges (labeled gates 39 and 42), which could both fit 100 passengers; these had a red-and-oyster color scheme with furnishings.[14][45] Flight Wing 1 was much larger than Flight Wing 2, having been built to accommodate Boeing 747 jumbo jets, and had 10 gates. Flight Wing 1 contained four levels, which served passengers, Federal Inspection Services, and operations; there were also baggage claim carousels in Flight Wing 1's basement, connected to the head house via people mover.[44] Both flight wings were demolished with the construction of T5 in the 2000s.[47]

History edit

 
Early site model showing satellite passenger piers, pictured in 1957

New York International Airport, also known as Idlewild Airport, began construction in 1943 on the site of the Idlewild Beach Golf Course in southern Queens,[48] and had been operating since 1948 with a single terminal building and a control tower.[49][50] The following year, Transcontinental and Western Airlines (TWA) signed a lease with the Port of New York Authority (later the Port Authority of New York and New Jersey, or PANYNJ), which operated Idlewild Airport.[51][52] TWA had begun flying internationally in 1946 from New York's LaGuardia Airport with flights to Paris, London, Rome, Athens, Cairo, Lisbon, and Madrid.[52][53] In 1950, as both a domestic and international carrier, the former Transcontinental and Western Airlines changed its name to Trans World Airlines.[54][53] By 1954, Idlewild had the highest volume of international air traffic of any airport globally.[49][55]

Development edit

In 1955, the "Terminal City" master plan was developed for Idlewild Airport. All of the major airlines, including TWA, would build their own terminals, while smaller airlines would be served from an International Arrivals Building.[56][57][58] When the locations of each airline's terminal was announced, TWA and Pan Am were each assigned a spot on one side of the International Airlines Building.[52][59] TWA's hangar was on the opposite side of its assigned lot.[52] Under the leadership of TWA president Ralph S. Damon, TWA hired Eero Saarinen and his Detroit-based firm to design the TWA Flight Center.[52][60][61] Even though Saarinen's firm was simultaneously working on 15 other projects, he agreed to take the commission.[61] A writer for Interiors magazine described TWA as having "vision and confidence" for the project.[52][62]

Planning and design edit

 
Construction photo showing self-supporting thin-shell construction in 1962

Eero Saarinen's wife Aline recalled that her husband saw most other air terminals as being ugly, shoddy, and inconvenient.[6][63] Saarinen wanted the new terminal to have a practical purpose and not only "interpret the sensation of flying",[64][65] but also "express the drama and specialness and excitement of travel".[66] Damon sought for "the spirit of flight" to be encapsulated in the design.[59] Saarinen's firm started researching other airports to collect data, and they also visited Grand Central Terminal, the United States' busiest railroad station, to observe passenger circulation patterns. The team found that passengers within Grand Central Terminal often traveled in curving paths, even though the terminal itself was rectangular.[61] TWA anticipated that at peak hours, the terminal would accommodate a thousand passengers, with two thousand departures and arrivals per hour.[6] Additionally, TWA needed fourteen positions at the terminal for large jets.[12][67][68]

The Saarinen team started devising designs for the terminal's form in February 1956.[12][68] Although the site assigned to TWA was not the airline's first choice for an Idlewild terminal, the design team took advantage of the site to design a highly visible terminal.[11] One of Saarinen's original designs was sketched on the back of a restaurant menu, when he and Aline were eating dinner with Time magazine's associate editor Cranston Jones.[69] Unhappy with initial designs, Saarinen asked TWA for more time and took an additional year to resolve the design.[3] Roche said that one initial design had called for an oval shell upon four piers, but that Saarinen had rejected that plan as awkward.[70][19] Furthermore, engineer Abba Tor had warned that a single slab of concrete might crack.[71]

Saarinen's team first created 3D models of the planned terminal, then drew sketches of the structure; this contrasted with the design processes of more traditional buildings, in which architects drew sketches before creating their 3D models.[66] Saarinen's team created several wire, cardboard, and clay models of the terminal's roof,[7][11][70] constructed at various scales.[19] One early model for the terminal was based on Jørn Utzon's winning proposal for the Sydney Opera House's architectural design competition, for which Saarinen had been one of the judges.[66] Saarinen had originally envisioned the roof as a single shell, but he refined the design twice before ultimately devising the plan with four shells.[72] The final model for the shell may have been inspired by one of Saarinen's breakfasts, a grapefruit that he pushed down at the center.[19][20][72] During another discussion, Roche used a saw to bisect one of the models, creating the inspiration for the roof's four shells.[19][20] In creating the TWA Flight Center's roof, Saarinen may also have been inspired by Minoru Yamasaki's design for St. Louis Lambert International Airport's main terminal, his father Eliel Saarinen's design for Helsinki Central Station; and McKim, Mead & White's design for the original New York Penn Station.[73]

The interior was modeled next; since the space was to be symmetrical, Saarinen's team only created drawings for half the interior.[19] Roche said the area around the center staircase was remodeled at least ten times.[74] In addition to around 130 possible plans created by the Saarinen office for the terminal, contractors provided hundreds of their own drawings. Cross-sections and contour maps were also devised. The drawings took some 5,500 man-hours to produce, and they were accurate to about 18 inch (3.2 mm).[7][19] Saarinen's team had devised 600 sketches of the building, but only 200 of these sketches were used in the final design.[8] The resulting plan was characterized as providing a "smooth and luxurious switch from ground transportation to planes".[12][59]

Final plans and construction edit

By November 1957, TWA had announced a design with a projected cost of $12 million (equivalent to $96 million in 2022).[11][67][75] Aline Saarinen worked with TWA to coordinate marketing activities centered on the terminal from the building announcement to its completion in 1962.[76] The plans were revised in 1958 after Saarinen's original design was determined to be too expensive.[77] Though both flight wings had been included in the original plan, only Flight Wing 2 was initially built as a cost-saving measure; the other wing was not completed until 1970.[16][78] The passageways were to have a glazed roof and moving walkways in the original plan, but these features were absent in the final construction, and two "arms" flanking the head house had been removed.[16]

Construction began in June 1959,[67][79] involving 14 engineers and 150 workers.[79] A grid was devised to manage the steel-pipe scaffolding at the construction site, and 5,500 supports were used in the scaffolding.[79][80][81][c] The contractors also prefabricated 27 different wedge shapes, creating 2,500 wedges in total.[19] Grove Shepherd Wilson & Kruge constructed the shells to the specifications outlined in Saarinen's contour maps, which were precise to intervals of 1 foot (0.30 m).[8][79][80] Although the project employed carpenters with "no special skill", the procedures were precise enough that they allowed for a maximum deviation of only 0.25 inches (6.4 mm) from the plan.[23][80] The roof was poured as a single form starting on August 31, 1960;[79][82] the work took 120 hours.[83] The "Y"-shaped piers required hundreds of additional drawings to fabricate.[19] By the middle of that year, the contractors were partially relying on computer calculations to complete the project.[8]

By the end of 1960, the roof was fully supported by the four "Y"-shaped piers, and the scaffolding was removed.[67][81] By April 1961, when only the concrete vaults had been completed, Saarinen remarked that "If anything happened and they had to stop work right now and just leave it in this state, I think it would make a beautiful ruin, like the Baths of Caracalla".[23][84] Saarinen died later that year while undergoing surgery.[85] His associates, principal designer Kevin Roche and John Dinkeloo formed Roche-Dinkeloo, which worked to complete the building.[86]

Original terminal edit

 
Exterior view of the terminal, seen from the land side

By March 1962, the incomplete TWA terminal was being used by passengers to get to planes.[87][88] The unfinished terminal building was also used for a fundraising benefit that April.[89] The completed terminal was dedicated on May 28, 1962.[90][91][92] Most other major U.S. airlines had completed their Idlewild terminals sooner: after the opening of the International Arrivals Building in 1957, United Airlines and Eastern Air Lines opened their own terminals in 1959, followed by American Airlines and Pan American World Airways (Worldport) in 1960, and Northwest Airlines and TWA in 1962.[56][93] The National Airlines Sundrome would be last, in 1969.[93] The airport's name was changed to John F. Kennedy International Airport in 1963.[94] Despite being finished relatively late compared to other terminals at JFK Airport, the TWA Flight Center incorporated many novel features for its time, which influenced the design of other airport terminals.[26][27]

The terminal as completed had seven aircraft positions, six of which were available from Flight Wing 2; the other boarding position was available from a temporary structure attached to Flight Tube 1.[15][88] As with many terminals designed before the advent of jumbo jets, increased passenger traffic and security issues, the design proved difficult to update as air travel evolved; terminal gates close to the street made centralized ticketing and security checkpoints difficult.[31][95] International flights at JFK during the 1960s were routed through the International Arrivals Building, and the structure attached to Flight Tube 1 was functionally inadequate.[95] By 1967, TWA announced that it would build Flight Wing 1 on the northwest to accommodate wide-body aircraft, hiring Roche-Dinkeloo to design the $20 million expansion.[96][97] Work started in 1968,[95] and the concrete shell was finished by that December.[98] Flight Wing 1 opened on February 25, 1970,[99] but the wing was not dedicated until March 20, when international passengers could pass through the terminal directly.[100] With the addition of Flight Wing 1 came the expansion of the ticketing counter in the head house. The baggage handling area was expanded, and the new addition was connected to the basement of Flight Wing 1.[44]

By 1979, TWA had built a traffic island with a canopy to provide shelter for passengers waiting for ground transport.[101] The shelter, constructed by firm Witthoefft & Rudolf, won the Albert S. Bard Award for architectural excellence.[102] A wooden walkway, intended as a temporary structure, was built in the 1980s to connect to the Sundrome when TWA expanded its operations there. By 1992, the TWA Flight Center was in "tawdry condition", with parts of the structure appearing actively deteriorated.[103] The PANYNJ considered demolishing the building,[26][43] but the New York City Landmarks Preservation Commission (LPC) hosted public hearings in 1993 to determine whether to protect the TWA Flight Center,[104] and the LPC designated the terminal as an exterior and interior landmark in 1994.[26][43] Instead, the PANYNJ started considering plans for what would become the T5 expansion.[43] Elastomeric coating was added to the roof in 1999 to prevent leakage.[21]

TWA deteriorated financially during the 1990s, and after it eliminated many routes in 1996, moved most of its New York operations to the TWA Flight Center.[105] TWA eventually sold its assets to American Airlines in October 2001.[18] For three months, American Airlines still operated flights out of the TWA Flight Center.[106] American Airlines ceased flight operations at the terminal in December 2001 and allowed its lease inherited from TWA to expire in January 2002.[106][107] By then, airport officials saw the terminal as functionally outdated.[108] As a bi-state agency, the PANYNJ could legally bypass the LPC designation and demolish parts of the terminal.[108][109] Preservationists expressed concern over the fact that the terminal could be significantly modified.[110]

Abandonment and preservation edit

 
Departures board in the head house

After preservationists raised concerns, the PANYNJ proposed an alternative that would preserve the tubes and build a new structure east of the existing building. The PANYNJ still wished to destroy one or both of the flight wings.[108][109] By August 2001, the PANYNJ presented its first proposal, which entailed converting the head house into a restaurant or conference center, while encircling the existing building with one or possibly two new terminals. The concept received opposition from the Municipal Art Society (MAS), as well as architects Philip Johnson and Robert A.M. Stern.[111] The opposition suggested the building, which brought passengers into immediate view of the sky and aircraft beyond, would be "strangled" if wrapped by another terminal, and that wrapping the Saarinen head house with another terminal would not preserve the spirit of the building but would mummify it "like flies in amber."[111] Philip Johnson, speaking at the 2001 presentation, said of the proposal:

This building represents a new idea in 20th-century architecture, and yet we are willing to strangle it by enclosing it within another building. Imagine, tying a bird's wings up. This will make the building invisible. If you're going to strangle a building to death, you might as well tear it down.[111]

By late 2002, there was still no agreement on the usage of the TWA Flight Center, except that the head house and passageways would be preserved.[106] The following year, the PANYNJ and JetBlue agreed on a plan that would include reopening the TWA Flight Center and constructing a new 26-gate Terminal 5 behind the TWA Flight Center. At the time, JetBlue was operating out of the adjacent Terminal 6, the Sundrome, and was the airport's fastest growing carrier.[112] The PANYNJ and JetBlue came to an agreement on the construction of the new terminal itself in August 2004.[113]

In the time that the TWA Flight Center stood disused, it was utilized for brief events. Shortly after its closure, the head house was used for the filming of the 2002 film Catch Me If You Can.[114] In 2004, the dormant head house briefly hosted an art exhibition called Terminal 5,[115] featuring the work of 19 artists from 10 countries.[31] The theme of the show featured work, lectures, and temporary installations drawing inspiration from the terminal's architecture; it was supposed to have run from October 1, 2004, to January 31, 2005.[31] The show closed abruptly after the building itself was vandalized during its opening gala.[116][117] The building was added to the National Register of Historic Places in 2005.[1][18]

Later use edit

New JetBlue terminal edit

In December 2005, the PANYNJ began construction of the T5 facility behind and partially encircling Saarinen's head house.[18] Peripheral portions of the head house were demolished to make space for a larger 26-gate facility designed by Gensler.[9] Originally, there were also tentative plans to renovate one of the departure lounges, known as The Trumpet.[118] During the construction of T5, The Trumpet was lifted and moved 1,500 ft (460 m)[119] at a cost of $895,000,[118] only to be later demolished when the project's budget prioritized renovating the head house.[18] The head house was renovated to remove asbestos and replace deteriorated sections of the facility. The head house was planned to be used as an approach to the new T5 facility, and both buildings would be collectively known as Terminal 5.[120]

T5 reopened on October 22, 2008,[9][121] with JetBlue using an abstraction of the Saarinen terminal's gull-wing shape as the official logo for the event, an abstraction of the new terminal floor plan for the signage[18] and counting down the reopening via Twitter.[33] At the time of the T5 opening, JetBlue and PANYNJ had yet to complete renovation of the original Saarinen head house, and the building had stood empty while they decided what its future role should be. Early proposals included a conference center, an aviation museum, and a restaurant,[118] or a place to check in for flights departing from the newer JetBlue T5 building.[122]

Conversion of head house into hotel edit

 
Front view of the TWA Hotel

In April 2015, The Wall Street Journal reported that JetBlue and its partner, a hotel developer, were negotiating for the rights to turn the head house into a hotel.[123] Three months later, state governor Andrew Cuomo confirmed that the Saarinen building would become part of the TWA Hotel, a new on-site hotel for airport passengers.[124] Construction began in December 2016.[125] The structures on either side of the head house were demolished, though the head house was retained,[126] and additional structures were built.[127] During the head house's conversion into a hotel, many original details, such as the custom ceramic floor tiles and the 486 variously-shaped window panels, were replaced with replicas of the originals.[41][128] The departure board from the original construction was also restored. The hotel opened on May 15, 2019.[129]

Impact edit

TWA had wanted a structure "represent[ing] a daring departure from conventional air terminal concepts".[27] Under TWA president Damon's guidance, Saarinen had designed the terminal as "a building that starts your flight with your first glimpse of it and increases your anticipation after you arrive".[52][60] As such, Saarinen had used similar design features on the interior and exterior.[110] He said, "We wanted passengers passing through the building to experience a fully-designed environment in which each part arises from another and everything belongs to the same formal world."[130]

Reception edit

Contemporary reviews edit

Shortly after the plans for the TWA Flight Center were announced in 1957, The New York Times described the plan as "hav[ing] a startling effect" for first-time visitors, but "not so revolutionary" inside.[131] Another newspaper said the TWA terminal was "planned to combine the functional realities of a jet-age air terminal with the aesthetic drama of flight".[132] Many contemporary media compared the terminal to "a bird in flight".[23][84] Architectural Forum (which praised the terminal) and Architectural Review (which criticized it) both characterized the design as a "concrete bird".[23] Saarinen said the building's resemblance to a bird was a coincidence,[23][84][133] despite privately describing the structure as a "Leonardo da Vinci flying machine".[133] The architect Robert Venturi said that Saarinen's designs evolved "from vocabulary rather than from function" and that, at the time, many of Saarinen's peers still adhered to the philosophy of form following function.[133]

Even when the TWA Flight Center was under construction, it was often discussed in the architectural media, and the Museum of Modern Art ran an exhibit on the building in 1959.[134] The completion of the terminal prompted a large amount of architectural commentary, most of it positive.[78][134] While the TWA terminal's design had several critics and skeptics, it was still described as being appropriate in the context of the Jet Age.[79][88] Architect Robert A. M. Stern called the head house a symbolic "Grand Central of the jet age".[135] Ada Louise Huxtable, architecture critic for The New York Times, saw the TWA Flight Center as a bright spot in the "mediocrity" of JFK Airport.[88][136] The interior was also praised. Critic Edgar Kaufmann Jr. in 1962 called the interior "one of the few major works of American architecture in recent years that reaches its full stature as an interior".[25][62][137] Ken Macrorie of The Reporter compared the tarmac-facing waiting room to a railroad hub's waiting area and alluded to the similarities with the city's original Pennsylvania Station.[14][138]

One major critic of the design was historian Vincent Scully, who disliked Saarinen's use of "whammo shapes" at the TWA Flight Center and Dulles International Airport.[23][78] British critic Reyner Banham questioned the practicality of the terminal's design, which did not clearly link "function and symbol", but he said that the TWA terminal was no worse than any other airport terminal.[78][139] Italian engineer and architect Pier Luigi Nervi was also skeptical of the design, saying that the structure was "too heavy and elaborate for the problem it seeks to solve".[78][140]

Retrospective reviews edit

Adulation for the original design continued through the 1990s, long after its completion.[137][141] Progressive Architecture magazine stated in 1992 that the terminal "represented a high point not only in the design of air terminals, but in the exercise of corporate responsibility".[103] Two years later, New York Times critic Herbert Muschamp called the TWA Flight Center "the most dynamically modeled space of its era".[142] In a 2005 book about Saarinen's work, Jayne Merkel said "the building did for TWA what the Saint Louis Arch [...] would eventually do for Saint Louis".[59] According to Merkel, it was not until the Port Authority proposed demolishing the terminal for T5 that "the full impact of the building was revealed".[134]

When the newer T5 was announced in 2005, JFK Airport's vice president of redevelopment described the planned structure as "a very practical, very efficient building".[17] T5 was also described as "hyper-efficient"[34] and a "monument to human throughput",[122] and a reviewer said T5 "might be the [...] best" terminal at JFK Airport.[32]

Awards and landmark designations edit

When the terminal was completed, it received numerous accolades and awards, including from the Queens Center of Commerce[143] and the New York Concrete Industrial Board.[144] Architectural Forum included the TWA Flight Center and the Pepsi-Cola Building as part of a 1962 exhibition of ten of the "world's most significant modern buildings".[145] The American Institute of Architects gave the terminal an Award of Merit in 1963, and it was featured in magazines printed internationally.[79] In addition, Saarinen won the AIA Gold Medal posthumously in 1962.[146]

The New York City Landmarks Preservation Commission held public hearings on the possibility of designating the TWA Flight Center's exterior and interior as official city landmarks in 1993.[147][148] The head house's exterior and interior were designated as landmarks on July 19, 1994,[13][26][149] though the exterior designation excluded the gate structure attached to the northeastern tube.[150] The Municipal Art Society nominated the facility to the National Trust for Historic Preservation's list of the 11 Most Endangered Places in America in 2004, after the terminal's closure.[115] On September 7, 2005, the National Park Service listed the TWA Flight Center on the National Register of Historic Places.[18][1]

See also edit

References edit

Notes edit

  1. ^ Saarinen worked with the same team in executing the Kresge Auditorium (1953–1955) and the main terminal at Dulles International Airport (1958–1962).[2]
  2. ^ In its reports about the TWA Flight Center head house, the New York City Landmarks Preservation Commission uses modified cardinal directions for convenience.[14] In this article, the precise cardinal directions are used.
  3. ^ Merkel 2005, p. 209, gives a different figure, saying that up to 1,800 supports "were made up of 5,000 tubular scaffold frames".

Citations edit

  1. ^ a b c "National Register of Historic Places 2005 Weekly Lists" (PDF). National Register of Historic Places, National Park Service. 2005. p. 242. (PDF) from the original on September 1, 2020. Retrieved July 2, 2020.
  2. ^ a b c Whitehead, Rob (2014). "Saarinen's shells: The evolution of engineering influence". Iowa State University Digital Repository. p. 84. from the original on January 6, 2018. Retrieved November 4, 2018.
  3. ^ a b c Makovsky, Paul (September 19, 2005). "Reconsidering Eero". Metropolis Magazine. from the original on July 1, 2020. Retrieved July 1, 2020.
  4. ^ a b c d e f g h National Park Service 2005, p. 3.
  5. ^ Saarinen, Eero (2006). Eero Saarinen: Shaping the Future. Yale University Press. p. 199. ISBN 978-0-9724881-2-9. from the original on July 14, 2020. Retrieved July 1, 2020.
  6. ^ a b c Landmarks Preservation Commission 1994, p. 5.
  7. ^ a b c Architectural Forum 1960, p. 119.
  8. ^ a b c d Román 2003, p. 53.
  9. ^ a b c d e "Mayor Bloomberg, Port Authority and Jetblue Cut Ribbon on New $875 Million Terminal at JFK Airport". Media-Newswire.com. September 23, 2008. from the original on July 3, 2020. Retrieved July 1, 2020.
  10. ^ . Architectural Record. August 10, 2004. Archived from the original on February 14, 2009. Retrieved July 1, 2020.
  11. ^ a b c d e f g Landmarks Preservation Commission 1994, p. 6.
  12. ^ a b c d Roche 1958, p. 79.
  13. ^ a b c d e f g Landmarks Preservation Commission 1994, p. 8.
  14. ^ a b c d Landmarks Preservation Commission Interior 1994, p. 8.
  15. ^ a b c Stoff, Joshua (2009). John F. Kennedy International Airport. Images of Aviation. Arcadia Publishing. p. 75. ISBN 978-0-7385-6468-5. from the original on August 4, 2022. Retrieved July 1, 2020.
  16. ^ a b c d National Park Service 2005, p. 23.
  17. ^ a b c Blum, Andrew (July 21, 2005). "JetBlue's Terminal Takes Wing". Business Week, Innovation. from the original on July 2, 2020. Retrieved July 1, 2020.
  18. ^ a b c d e f g Dunlap, David W. (February 21, 2008). "Saarinen Terminal to Reopen at Kennedy Airport". City Room. The New York Times. from the original on July 4, 2020. Retrieved July 1, 2020.
  19. ^ a b c d e f g h i j k Merkel 2005, p. 209.
  20. ^ a b c Leubkeman, Christopher Hart. "Form Swallows Function" in Progressive Architecture 1992, p. 108.
  21. ^ a b c d e f National Park Service 2005, p. 4.
  22. ^ Architectural Forum 1960, p. 122.
  23. ^ a b c d e f g h Merkel 2005, p. 210.
  24. ^ National Park Service 2005, pp. 4–5.
  25. ^ a b c d e f g Landmarks Preservation Commission Interior 1994, p. 7.
  26. ^ a b c d e Dunlap, David W. (July 20, 1994). "T.W.A.'s Hub Is Declared A Landmark". The New York Times. ISSN 0362-4331. from the original on March 27, 2022. Retrieved May 26, 2010.
  27. ^ a b c National Park Service 2005, p. 8.
  28. ^ a b c d e f g National Park Service 2005, p. 5.
  29. ^ Progressive Architecture 1992, pp. 92–93.
  30. ^ Roche 1958, p. 81.
  31. ^ a b c d "Now Boarding: Destination, JFK". The Architects Newspaper. September 21, 2004. from the original on July 1, 2020. Retrieved July 1, 2020.
  32. ^ a b c Cheslaw, Louis (January 31, 2020). "JFK's Terminal 5 Is Actually a Decent Place to Hang Out". Condé Nast Traveler. from the original on July 15, 2020. Retrieved July 1, 2020.
  33. ^ a b Maynard, Micheline (October 22, 2008). "JetBlue Twitters its New Terminal". The Lede. The New York Times. from the original on May 25, 2009. Retrieved May 26, 2010.
  34. ^ a b van Dyk, Deirdre (August 5, 2008). "Where JetBlue Put Its Millions". Time Magazine. from the original on July 23, 2014. Retrieved May 26, 2010.
  35. ^ Hart, Sara (December 1, 2008). "Prepared for Takeoff". Architects Online. from the original on July 2, 2020. Retrieved July 1, 2020.
  36. ^ Dunlap, David W. (March 11, 2008). "An Airline Terminal for a Security-Wary Era". The New York Times. ISSN 0362-4331. from the original on July 1, 2020. Retrieved July 1, 2020.
  37. ^ Gannon, Devin (September 29, 2017). "New details about JFK's TWA Hotel revealed, on track to open in 18 months". 6sqft. from the original on July 11, 2019. Retrieved December 26, 2017.
  38. ^ Plitt, Amy (September 29, 2017). "TWA Hotel unveils new renderings, retro-themed sales lounge". Curbed NY. from the original on December 26, 2017. Retrieved December 26, 2017.
  39. ^ Matthews, Karen (October 12, 2017). "Hotel at iconic TWA terminal will evoke glamour of jet age". USA Today. Associated Press. from the original on December 23, 2017. Retrieved December 22, 2017.
  40. ^ Brown, Genevieve Shaw (April 17, 2018). "Step inside the brand new TWA hotel at JFK airport in New York City". ABC News. from the original on April 18, 2018. Retrieved April 18, 2018.
  41. ^ a b Plitt, Amy (April 17, 2018). "TWA Hotel's rooms will combine the best of '60s style: first look". Curbed NY. from the original on April 19, 2018. Retrieved April 18, 2018.
  42. ^ Jacobs, Karrie (May 29, 2019). "The Seductive Fantasy of Saarinen's TWA Terminal". Architect Magazine. from the original on January 15, 2021. Retrieved July 2, 2020.
  43. ^ a b c d Firshein, Sarah (July 23, 2019). "How the TWA Terminal, a midcentury icon, became one of NYC's coolest new hotels". Curbed NY. from the original on October 6, 2020. Retrieved July 2, 2020.
  44. ^ a b c National Park Service 2005, p. 27.
  45. ^ a b National Park Service 2005, pp. 5–6.
  46. ^ Landmarks Preservation Commission Interior 1994, p. 6.
  47. ^ "JetBlue Takes 5 at JFK" (PDF). Airliners. January–February 2009. p. 25. (PDF) from the original on November 27, 2021. Retrieved August 28, 2020.
  48. ^ Young, Marguerite (November 7, 1943). "New York City begins construction of mammoth airport". The Miami News. NEA. p. 1C. Retrieved August 30, 2015.[permanent dead link]
  49. ^ a b "Idlewild Airport Officially Opened; Six Foreign Flag Carriers and Two Others Will Not Begin Operations for a Week". The New York Times. July 1, 1948. ISSN 0362-4331. from the original on January 3, 2019. Retrieved July 1, 2020.
  50. ^ Landmarks Preservation Commission 1994, p. 3.
  51. ^ "Twa to Use Idlewild, Dewey Praises Move". The New York Times. September 7, 1949. ISSN 0362-4331. from the original on July 2, 2020. Retrieved July 1, 2020.
  52. ^ a b c d e f g Landmarks Preservation Commission 1994, p. 4.
  53. ^ a b "TWA History". TWA Museum. from the original on December 15, 2020. Retrieved November 1, 2018.
  54. ^ "'Trans World Airlines' Made Corporate Name". The New York Times. April 28, 1950. ISSN 0362-4331. from the original on July 2, 2020. Retrieved July 1, 2020.
  55. ^ Hudson, Edward (December 6, 1955). "New Structures Rise at Idlewild; Makeshift Buildings Giving Way as Airport Undergoes a Construction Boom". The New York Times. ISSN 0362-4331. from the original on July 1, 2020. Retrieved July 1, 2020.
  56. ^ a b National Park Service 2005, p. 16.
  57. ^ Gordon, Alastair (2014). Naked Airport: A Cultural History of the World's Most Revolutionary Structure. University of Chicago Press. ISBN 978-1-4668-6911-0.
  58. ^ Pearman, Hugh (2004). Airports: A Century of Architecture. Laurence King Publishing. ISBN 978-1-85669-356-1. Retrieved August 30, 2015.
  59. ^ a b c d Merkel 2005, p. 205.
  60. ^ a b Scullin, George (1968). International Airport: The Story of Kennedy Airport and U.S. Commercial Aviation. Little, Brown. p. 154. from the original on August 1, 2020. Retrieved July 1, 2020.
  61. ^ a b c Román 2003, p. 43.
  62. ^ a b Kaufmann, Edgar Jr. (July 1962). "Inside Eero Saarinen's TWA Building". Interiors. Vol. 121. p. 87.
  63. ^ "Dream of Eero Saarinen a Tribute to His Memory". Aviation News. Vol. 4. May 25, 1962. p. 2.
  64. ^ National Park Service 2005, p. 9.
  65. ^ "Saarinen's Twa Flight Center" (PDF). Architectural Record. July 1962. p. 129. (PDF) from the original on July 16, 2020. Retrieved July 2, 2020.
  66. ^ a b c Román 2003, p. 46.
  67. ^ a b c d National Park Service 2005, p. 22.
  68. ^ a b Merkel 2005, p. 206.
  69. ^ Román 2003, pp. 43–46.
  70. ^ a b Roche 1958, p. 80.
  71. ^ Dunlap, David W. (February 17, 2017). "Abba Tor, Who Engineered T.W.A. Terminal at Kennedy Airport, Dies at 93". The New York Times. ISSN 0362-4331. from the original on July 3, 2020. Retrieved July 3, 2020.
  72. ^ a b Román 2003, p. 50.
  73. ^ Román 2003, pp. 50–52.
  74. ^ Roche 1958, p. 82.
  75. ^ Hudson, Edward (November 13, 1957). "Bold Design is Set for Air Terminal; Trans World Airlines Plan a Terminal at Idlewild". The New York Times. ISSN 0362-4331. from the original on July 2, 2020. Retrieved July 1, 2020.
  76. ^ Ringli, Kornel (March 22, 2013). "Eero Saarinens TWA-Terminal in New York: Beflügelter Mythos" [Eero Saarinen's TWA Terminal in New York: Inspired Myth] (in Swiss High German). from the original on November 1, 2018. Retrieved July 1, 2020 – via NZZ.
  77. ^ "T.W.A. Restudying Terminal Design; Original Plans for Futuristic Unit at Idlewild Found to Be Too Expensive". The New York Times. October 11, 1958. ISSN 0362-4331. from the original on July 2, 2020. Retrieved July 1, 2020.
  78. ^ a b c d e Román 2003, p. 60.
  79. ^ a b c d e f g Landmarks Preservation Commission 1994, p. 7.
  80. ^ a b c Architectural Forum 1960, p. 120.
  81. ^ a b "T.W.A.'s Terminal Standing on Own; 5,500 Supports Removed". The New York Times. December 8, 1960. ISSN 0362-4331. from the original on July 1, 2020. Retrieved July 1, 2020.
  82. ^ "T.W.A. Roof Going Up; Concrete-Pouring at Idlewild to Be Done About Sept. 15". The New York Times. August 30, 1960. ISSN 0362-4331. from the original on July 1, 2020. Retrieved July 1, 2020.
  83. ^ Landmarks Preservation Commission 1994, p. 11.
  84. ^ a b c Saarinen, Eero; Saarinen, Aline B. (1962). Eero Saarinen on His Work: A Selection of Buildings Dating from 1947 to 1964 with Statements by the Architect. Yale University Press. p. 60. from the original on February 3, 2022. Retrieved February 3, 2022.
  85. ^ "Eero Saarinen, 51, Architect, is Dead; Versatile Designer Created Terminal for T.W.A. Here and Embassies for U.S." The New York Times. September 2, 1961. ISSN 0362-4331. from the original on July 12, 2021. Retrieved July 1, 2020.
  86. ^ Dameron, Amanda (November 17, 2017). "Kevin Roche on How He Got His Start—Nodding Off in an Interview With Eero Saarinen". Dwell. from the original on November 1, 2018. Retrieved November 1, 2018.
  87. ^ Hudson, Edward (April 22, 1962). "Unfinished T.W.A. Terminal Is an Elegant Causeway; Travelers Use It to Get to Planes in Building's Wing". The New York Times. ISSN 0362-4331. from the original on July 2, 2020. Retrieved July 1, 2020.
  88. ^ a b c d National Park Service 2005, p. 24.
  89. ^ "Fete at Airport Held to Assist Travelers Aid; Around the World Ball at New Flight Center of T.W.A. Is Benefit". The New York Times. May 23, 1962. ISSN 0362-4331. from the original on July 2, 2020. Retrieved July 1, 2020.
  90. ^ Klimek, Chris (August 18, 2008). "Saarinen exhibit at National Building Museum". Washington Examiner. from the original on July 1, 2020. Retrieved July 1, 2020.
  91. ^ Risen, Clay (November 7, 2004). "Saarinen rising: A much-maligned modernist finally gets his due". The Boston Globe. from the original on July 1, 2020. Retrieved July 1, 2020.
  92. ^ "Javits Asks More to Lure Tourists; At T.W.A. Center, He Urges Funds for Travel Agency". The New York Times. May 29, 1962. ISSN 0362-4331. from the original on July 1, 2020. Retrieved July 1, 2020.
  93. ^ a b Dunlap, David W. (October 26, 1997). "A 'New' Kennedy Airport Takes Wing". The New York Times. ISSN 0362-4331. from the original on June 18, 2013. Retrieved July 1, 2020.
  94. ^ "The Light That Does Not Fail". The New York Times. December 29, 1963. ISSN 0362-4331. from the original on November 1, 2018. Retrieved July 1, 2020.
  95. ^ a b c National Park Service 2005, p. 26.
  96. ^ National Park Service 2005, p. 17.
  97. ^ "Notes From the Field of Travel: Flight Wing One at Kennedy". The New York Times. June 4, 1967. ISSN 0362-4331. from the original on July 3, 2020. Retrieved July 2, 2020.
  98. ^ "T.W.A. Terminal for Jumbo Jets Near Completion". The New York Times. December 15, 1968. ISSN 0362-4331. from the original on July 3, 2020. Retrieved July 2, 2020.
  99. ^ Hudson, Edward (February 26, 1970). "Mishap on T.W.A. 747 Inaugural: Film Projector Fails". The New York Times. ISSN 0362-4331. from the original on July 4, 2020. Retrieved July 2, 2020.
  100. ^ Hudson, Edward (March 20, 1970). "T.W.A. Dedicates Huge Terminal at Kennedy". The New York Times. ISSN 0362-4331. from the original on July 4, 2020. Retrieved July 2, 2020.
  101. ^ Blumenthal, Ralph (May 20, 1979). "At Kennedy, It Looks Like Another Frustrating Summer". The New York Times. ISSN 0362-4331. from the original on July 3, 2020. Retrieved July 2, 2020.
  102. ^ Goldberger, Paul (June 18, 1979). "Architecture: 4 Honor Buildings". The New York Times. ISSN 0362-4331. from the original on July 3, 2020. Retrieved July 2, 2020.
  103. ^ a b Progressive Architecture 1992, p. 96.
  104. ^ Dunlap, David W. (June 20, 1993). "Postings; Landmarking Enters the Jet Age". The New York Times. ISSN 0362-4331. from the original on April 21, 2021. Retrieved April 21, 2021.
  105. ^ Bryant, Adam (December 24, 1996). "T.W.A. Plans Cutbacks at Kennedy Hub". The New York Times. ISSN 0362-4331. from the original on July 4, 2020. Retrieved July 2, 2020.
  106. ^ a b c Dunlap, David W. (November 28, 2002). "Blocks; Unusual Planning Duel Over Kennedy Terminal". The New York Times. ISSN 0362-4331. from the original on July 2, 2020. Retrieved July 2, 2020.
  107. ^ National Park Service 2005, p. 28.
  108. ^ a b c "Terminated". Journal-News. April 5, 2001. p. 3. from the original on August 4, 2022. Retrieved July 3, 2020 – via newspapers.com  .
  109. ^ a b Kennedy, Randy (April 4, 2001). "Airport Growth Squeezes the Landmark T.W.A. Terminal". The New York Times. ISSN 0362-4331. from the original on July 3, 2020. Retrieved July 2, 2020.
  110. ^ a b Román 2003, p. 67.
  111. ^ a b c Dunlap, David W. (August 14, 2001). "Planning a Nest of Concrete for a Landmark of Flight". The New York Times. ISSN 0362-4331. from the original on July 1, 2020. Retrieved July 1, 2020.
  112. ^ Kilgannon, Corey (October 19, 2003). "J.F.K. Project Would Reopen Famed Terminal". The New York Times. ISSN 0362-4331. from the original on July 2, 2020. Retrieved July 2, 2020.
  113. ^ Lueck, Thomas J. (August 5, 2004). "JetBlue to Build New Terminal At Kennedy". The New York Times. ISSN 0362-4331. from the original on July 2, 2020. Retrieved July 2, 2020.
  114. ^ Kinetz, Erika (January 19, 2003). "Neighborhood Report: Kennedy Airport; An Airport Landmark, When It Was Young". The New York Times. ISSN 0362-4331. from the original on July 2, 2020. Retrieved July 2, 2020.
  115. ^ a b . Municipal Art Society. February 9, 2004. Archived from the original on August 12, 2009.
  116. ^ Vogel, Carol (October 7, 2004). "Port Authority Shuts Art Exhibit in Aftermath of Rowdy Party". The New York Times. ISSN 0362-4331. from the original on July 28, 2020. Retrieved July 1, 2020.
  117. ^ Czarnecki, John E. (October 11, 2004). . Architectural Record. Archived from the original on August 27, 2005. Retrieved July 1, 2020.
  118. ^ a b c Foster, Margaret (March 27, 2008). . Preservationnation.org. Archived from the original on March 13, 2009.
  119. ^ Walton, Krista (April 23, 2007). "Saarinen's TWA Trumpet To Move". National Trust for Historic Preservation. from the original on July 21, 2016. Retrieved June 1, 2020.
  120. ^ Dunlap, David W. (February 22, 2008). "Renovated T.W.A. Terminal to Reopen as JetBlue Portal". The New York Times. ISSN 0362-4331. from the original on July 3, 2020. Retrieved July 3, 2020.
  121. ^ Maynard, Micheline (October 22, 2008). "JetBlue Twitters its New Terminal". The Lede. The New York Times. from the original on August 4, 2022. Retrieved July 1, 2020.
  122. ^ a b Russell, James S. (October 22, 2008). "JetBlue's New Terminal at JFK Offers Huge Capacity, No Charm". Bloomberg.com. from the original on August 18, 2017. Retrieved July 1, 2020 – via Wired.
  123. ^ Mann, Craig Karmin and Ted (April 14, 2015). "JetBlue Wants to Turn Former TWA Terminal Into Hotel". Wall Street Journal. ISSN 0099-9660. from the original on September 27, 2020. Retrieved July 1, 2020.
  124. ^ Governor's Press Office (July 27, 2015). "Governor Cuomo Unveils Vision for Transformative Redesign of LaGuardia Airport" (Press release). State of New York. from the original on August 29, 2015. Retrieved August 18, 2015.
  125. ^ Plitt, Amy (December 15, 2016). "TWA Terminal hotel celebrates groundbreaking with a new rendering". Curbed NY. from the original on December 26, 2017. Retrieved December 26, 2017.
  126. ^ Peterson, Barbara (August 3, 2016). "TWA Terminal Hotel Construction Begins at JFK". Conde Nast Traveler. from the original on November 18, 2016. Retrieved November 17, 2016.
  127. ^ (PDF). TWA Hotel. Archived from the original (PDF) on November 7, 2017. Retrieved November 7, 2017.
  128. ^ Grabar, Henry (May 1, 2017). "Jet-Age Chic". The Atlantic. from the original on December 26, 2017. Retrieved December 26, 2017.
  129. ^ "Up, up and away at the TWA Hotel". CBS News. May 12, 2019. from the original on May 15, 2019. Retrieved May 14, 2019.
  130. ^ Gössel, Peter (2001). Architecture in the twentieth century. Taschen. p. 250. ISBN 978-3-8228-1162-7. OCLC 48467235. from the original on August 4, 2022. Retrieved August 28, 2020.
  131. ^ Hudson, Edward (November 17, 1957). "Aviation: Unusual Terminal for Idlewild; Startling Effect". The New York Times. ISSN 0362-4331. from the original on July 1, 2020. Retrieved July 1, 2020.
  132. ^ "Face to the Future". The Sun and the Erie County Independent. December 5, 1957. p. 8. from the original on August 4, 2022. Retrieved July 1, 2020 – via newspapers.com  .
  133. ^ a b c Román 2003, p. 61.
  134. ^ a b c Merkel 2005, p. 213.
  135. ^ Muschamp, Herbert (November 6, 1994). "Architecture View; Stay of Execution for a Dazzling Airline Terminal". The New York Times. ISSN 0362-4331. from the original on June 3, 2013. Retrieved May 26, 2010.
  136. ^ Huxtable, Ada Louise (November 25, 1962). "Idlewild: Distressing Monument to Air Age; Paradox". The New York Times. ISSN 0362-4331. from the original on July 3, 2020. Retrieved July 1, 2020.
  137. ^ a b National Park Service 2005, p. 25.
  138. ^ Macrorie, Ken (September 13, 1962). "Arriving and Departing". The Reporter. Vol. 27. pp. 52–55.
  139. ^ Banham, Reyner (1975). Age of the Masters: A Personal View of Modern Architecture. Icon editions. Harper & Row. p. 125. ISBN 978-0-06-430369-9. OCLC 1831115.
  140. ^ Architectural Forum 1960, p. 122.
  141. ^ National Park Service 2005, p. 10.
  142. ^ Muschamp, Herbert (November 6, 1994). "Architecture View; Stay of Execution for a Dazzling Airline Terminal". The New York Times. ISSN 0362-4331. from the original on December 14, 2019. Retrieved July 2, 2020.
  143. ^ "T.W.A. Terminal at Idlewild Wins Top Design Award". The New York Times. December 2, 1962. ISSN 0362-4331. from the original on July 1, 2020. Retrieved July 1, 2020.
  144. ^ "3 Floors Leased at 128 W. 36th St". The New York Times. November 19, 1962. ISSN 0362-4331. from the original on July 4, 2020. Retrieved July 1, 2020.
  145. ^ "Prize Buildings in Photo Exhibit; 2 City Structures Included in 10 Modern Choices Church Is Cited" (PDF). The New York Times. April 21, 1962. p. 42. ISSN 0362-4331. Retrieved April 21, 2021.
  146. ^ Solomon, Nancy (2008). Architecture INTL: Celebrating the Past, Designing the Future. HarperCollins. p. 236. ISBN 978-1-58471-162-9. from the original on August 4, 2022. Retrieved July 1, 2020.
  147. ^ Dunlap, David W. (June 20, 1993). "Postings; Landmarking Enters the Jet Age". The New York Times. ISSN 0362-4331. from the original on April 21, 2021. Retrieved April 21, 2021.
  148. ^ Landmarks Preservation Commission 1994, p. 2; Landmarks Preservation Commission Interior 1994, p. 2.
  149. ^ Landmarks Preservation Commission Interior 1994, p. 1.
  150. ^ Landmarks Preservation Commission 1994, p. 13.

Sources edit

  • "Landmarks: TWA Terminal" (PDF). Progressive Architecture. May 1992.
  • Merkel, Jayne (2005). Eero Saarinen. London New York: Phaidon. ISBN 978-0-7148-6592-8. OCLC 57750853.
  • Roche, Kevin (January 1958). "TWA's Graceful New Terminal" (PDF). Architectural Forum. Vol. 108. pp. 79–83.
  • Román, Antonio (2003). Eero Saarinen: an Architecture of Multiplicity. New York: Princeton Architectural Press. ISBN 1-56898-340-9. OCLC 50644049.
  • "Shaping a two-acre sculpture" (PDF). Architectural Forum. Vol. 113. August 1960. pp. 118–123.
  • "Trans World Airlines Flight Center" (PDF). National Register of Historic Places, National Park Service. September 7, 2005.
  • "Trans World Airlines Flight Center (Now TWA Terminal A) at New York International Airport" (PDF). New York City Landmarks Preservation Commission. July 9, 1994.
  • "Trans World Airlines Flight Center (Now TWA Terminal A) at New York International Airport Interior" (PDF). New York City Landmarks Preservation Commission. July 9, 1994.

External links edit

External images
  TWA Flight Center: c. 1962, Departure & Arrival Board
  TWA Flight Center: c. 1962, Departure & Arrival Corridor
  TWA Flight Center: c. 1962, Interior View
  •   Media related to TWA Flight Center at Wikimedia Commons
  • Historic American Buildings Survey (HABS) No. NY-6371, "Trans World Airlines Flight Center, John F. Kennedy International Airport, Jamaica Bay, Queens (subdivision), Queens, NY", 32 measured drawings
  • 1962 Saarinen head house with 2008 Gensler-designed Jetblue Terminal

flight, center, also, known, trans, world, flight, center, airport, terminal, hotel, complex, york, city, john, kennedy, international, airport, original, terminal, building, head, house, operated, terminal, from, 1962, 2001, adaptively, repurposed, 2017, part. The TWA Flight Center also known as the Trans World Flight Center is an airport terminal and hotel complex at New York City s John F Kennedy International Airport JFK The original terminal building or head house operated as a terminal from 1962 to 2001 and was adaptively repurposed in 2017 as part of the TWA Hotel The head house is partially encircled by a replacement terminal building completed in 2008 and flanked by two buildings added for the hotel The replacement terminal is home to JetBlue s JFK operations The head house and terminal are collectively known as Terminal 5 or T5 Trans World Airlines Flight CenterU S National Register of Historic PlacesNew York City Landmark No 1915 1916The terminal s head house in 2010LocationTerminal 5 John F Kennedy International AirportNew York City United StatesCoordinates40 38 45 N 73 46 39 W 40 64583 N 73 77750 W 40 64583 73 77750Area17 6 acres 7 1 ha ArchitectEero Saarinen and AssociatesArchitectural styleFuturist Neo futurist Googie FantasticNRHP reference No 05000994 1 NYCL No 1915 1916Significant datesAdded to NRHPSeptember 7 2005Designated NYCLJuly 19 1994The TWA Flight Center designed for Trans World Airlines by Eero Saarinen and Associates was erected between 1959 and 1962 it operated as an air terminal until 2001 It has a prominent wing shaped thin shell roof supported by four Y shaped piers An open three level space with tall windows originally offered views of departing and arriving jets Two tube shaped red carpeted departure arrival corridors extended outward from the terminal connecting to the gates these would be demolished for the 2008 addition Roche Dinkeloo a successor firm to Saarinen s company designed an expansion in 1970 Its design received much critical acclaim the interior and the exterior of the head house became New York City designated landmarks in 1994 and it was added to the National Register of Historic Places in 2005 The encircling Terminal 5 addition designed by Gensler was built between 2005 and 2008 It consists of the 26 active gates at Terminal 5 as well as numerous restaurants and stores The TWA Hotel was constructed between 2015 and 2019 its development entailed renovating the disused head house and adding two adjacent buildings Contents 1 Architecture 1 1 Form 1 2 Exterior 1 2 1 Roof 1 2 2 Facade 1 3 Interior 1 3 1 Original head house 1 3 2 Terminal 5 and TWA Hotel 1 3 3 Passageways 1 3 4 Flight wings 2 History 2 1 Development 2 1 1 Planning and design 2 1 2 Final plans and construction 2 2 Original terminal 2 3 Abandonment and preservation 2 4 Later use 2 4 1 New JetBlue terminal 2 4 2 Conversion of head house into hotel 3 Impact 3 1 Reception 3 1 1 Contemporary reviews 3 1 2 Retrospective reviews 3 2 Awards and landmark designations 4 See also 5 References 5 1 Notes 5 2 Citations 5 3 Sources 6 External linksArchitecture editThe head house of the TWA Flight Center designed by Eero Saarinen and his associates is a pioneering example of thin shell construction consisting of a reinforced concrete shell roof supported at the corners 2 The design incorporates elements of the Futurist Neo futurist Googie and Fantastic architectural styles 3 It is located at the middle of a curve in one of JFK Airport s service roads in front of the elevated AirTrain JFK people mover 4 The key collaborators from the Saarinen office included Kevin Roche Cesar Pelli Norman Pettula and Edward Saad Warren Platner was largely responsible for the interiors 5 To engineer the roof Saarinen collaborated with Charles S Whitney and Boyd G Anderson of the firm Ammann amp Whitney 2 6 a The general contractor was Grove Shepherd Wilson amp Kruge Arup was the structural engineer Jaros Baum amp Bolles provided MEP engineering and Langan was the civil engineer on the project 7 8 The Terminal 5 also known as T5 addition which is connected to the TWA Flight Center is a 625 000 square foot 58 100 m2 facility designed by Gensler It contains 26 gates that can accommodate 250 flights per day 9 and 20 million passengers annually 10 Form edit nbsp Components of JFK T5 Original 1962 Saarinen terminal TWA Flight Center 2008 Gensler designed terminalThe form of the TWA Flight Center s head house is designed to relate to its small wedge shaped site with walkways and gates placed at acute angles 11 Saarinen described the head house form as being like the Leonardo da Vinci flying machine according to his associate Kevin Roche 12 Radiating out from the head house are two departure arrival passenger tubes extending southeast and northeast 13 b The TWA Flight Center was one of the first to use enclosed passenger jetways which extended from gate structures at the end of each tube In the original plans aircraft would be available via the Flight Wing a single story building that passengers would have to walk to at ground level The jetways removed the need for passengers to walk on the ground and sheltered passengers from inclement weather 11 15 16 The current JetBlue terminal and the TWA Hotel buildings are located east of the original head house The terminal s entry hall is composed of two arms that wrap around the TWA Flight Center s head house in a crescent shape The two passenger tubes from the original design were retained but the original gate structures were destroyed 17 18 T5 contains 26 gates 9 Exterior edit Roof edit nbsp Exterior view as seen in 2006The TWA Flight Center s head house is a two story structure 4 The roof s thin concrete shell was designed to span a wide space using as little material as possible 3 The roof is composed of four concrete shells two upward slanting shells at the edges which resemble wings and two smaller shells slanting downward toward the front and back of the structure 19 The upward slanting shells reach up to 75 feet 23 m above ground level The rooftop shells converge at the center where each of the four shells supports the others Four Y shaped piers support the roof facing the front and back 4 13 20 these measure 51 feet 16 m tall by 315 feet 96 m long 19 Skylights are placed within the gaps between each shell 13 21 The building s main entrance is on the land side where the roof projects over a sidewalk formerly a driveway with a scupper 13 21 The roof concrete varies in thickness from 7 inches 180 mm at the edges to 40 inches 1 000 mm at the convergence of the four shells The roof weighs 6 000 short tons 5 400 t in total 22 23 The roof shells are cantilevered by up to 80 feet 24 m and contain steel reinforcement to accommodate the roof s weight 23 Facade edit The main portion of the head house s facade is made of large green tinted glass walls 4 13 These glass walls were coated with a dark purple mylar film before 2005 4 Single story wings extend outward from the main terminal to the north and south and contain several door openings within the concave walls Inside these wings are maintenance areas 21 Interior edit Original head house edit Though the head house is two stories tall it contains an intermediate level joined to the lower level by a central staircase and to the upper level by four peripheral staircases 24 25 Ceramic tiles line the walls and floors 21 25 The TWA Flight Center incorporated many innovations upon its completion including closed circuit television a central public address system baggage carousels electromechanical split flap display schedule board and baggage scales and gates that were somewhat distant from the main terminal 11 15 26 27 The intermediate level contains an area facing east where passengers could originally see the tarmac 28 By the early 1990s to comply with the Americans with Disabilities Act of 1990 a switchback ramp had been added between the lower level and the intermediate level 29 The ticket counter and baggage claim areas were placed at ground level on the other side of the curbside canopy to maximize convenience for passengers 11 A sculpted marble information desk rose from the floor as a single slab 21 14 There are also mechanical service and office areas in a partial basement under the intermediate level as well as a tunnel that led to Flight Wing 1 28 A concrete balcony on the upper floor spans the central staircase from the lower floor to the intermediate level 25 28 The TWA operated its Ambassador Club on the northern left portion of the upper floor 25 30 Three restaurants were located on the southern right portion of the upper floor the Constellation Club Lisbon Lounge and Paris Cafe 31 25 There were also offices on the upper level north and south of the public areas 28 nbsp Curving staircase and balcony inside the head house nbsp A footbridge spans the upper floor nbsp Ambassador Club nbsp Union News restaurants coffee shop by Raymond Loewy in 1962 Terminal 5 and TWA Hotel edit Terminal 5 has a 55 000 square foot 5 100 m2 retail area with 22 food and drink concessions 35 stores 9 free wireless Internet access a children s play area and a 1 500 space parking garage 32 33 As the first airline terminal at JFK designed after the September 11 2001 attacks 34 35 T5 contains 20 security lanes one of the largest checkpoints in a U S airline terminal 36 Two buildings north and south of the newer T5 structure encircle the original head house to the east These buildings are part of the TWA Hotel which has 512 guest rooms 40 000 square feet 3 700 m2 feet of meeting space and an observation deck of 10 000 square feet 930 m2 37 38 39 The hotel is outside the sterile area of Terminal 5 meaning that visitors can only access the hotel before going through T5 security or after arrival at T5 32 The hotel s decorations replicas of the original furnishings include brass lighting walnut accented furnishings and rotary phones The hallways contain red carpeting evocative of the color of the furniture in the original TWA lounge The rooms also contain modern amenities such as blackout curtains and multiple pane soundproof windows 40 41 Passageways edit nbsp A passageway from the head houseThe two passageways leading from the head house are completely enclosed and cross a service roadway that serves T5 and the TWA Hotel 25 28 The passageway leading southeast was called Flight Tube 2 while the passageway leading northeast was called Flight Tube 1 4 These tubes are covered in concrete with an elliptical cross section as well as indirect lighting 13 Original plans called for the passageways to be designed as bridges with glass ceilings each passage would have two moving walkways one in each direction with a stationary hallway in between 19 As a cost saving measure the passageways were ultimately not designed with moving walkways 16 The tubes originally led to Flight Wings 1 and 2 The passages were 6 feet 1 8 m higher at the flight wings than at the head houses Flight Tube 1 was about 232 feet 71 m long while Flight Tube 2 was 272 feet 83 m long 28 Following the opening of the TWA Hotel the tubes connect the head house to additional rooms in the hotel as well as to T5 42 43 Flight wings edit nbsp nbsp Floor plans for the passenger sections of Flight Wings 1 top and 2 bottom Flight Tube 2 connected to Flight Wing 2 from the 1962 Saarinen design while Flight Tube 1 connected to Flight Wing 1 from a 1967 1970 expansion designed by successor firm Roche Dinkeloo 4 17 Both sections were characterized as being violin shaped with jetways extending outward from the end of each wing 4 The flight wings had a base made of concrete and plaster as well as a passenger concourse cantilevered above the base 28 Flight Wing 2 shaped like a multi sided polygon was the smaller of the two structures with seven gates 44 it contained utilitarian decor as well as a small flight operation center above the passenger area 45 46 Two bridges led to departure lounges labeled gates 39 and 42 which could both fit 100 passengers these had a red and oyster color scheme with furnishings 14 45 Flight Wing 1 was much larger than Flight Wing 2 having been built to accommodate Boeing 747 jumbo jets and had 10 gates Flight Wing 1 contained four levels which served passengers Federal Inspection Services and operations there were also baggage claim carousels in Flight Wing 1 s basement connected to the head house via people mover 44 Both flight wings were demolished with the construction of T5 in the 2000s 47 History edit nbsp Early site model showing satellite passenger piers pictured in 1957New York International Airport also known as Idlewild Airport began construction in 1943 on the site of the Idlewild Beach Golf Course in southern Queens 48 and had been operating since 1948 with a single terminal building and a control tower 49 50 The following year Transcontinental and Western Airlines TWA signed a lease with the Port of New York Authority later the Port Authority of New York and New Jersey or PANYNJ which operated Idlewild Airport 51 52 TWA had begun flying internationally in 1946 from New York s LaGuardia Airport with flights to Paris London Rome Athens Cairo Lisbon and Madrid 52 53 In 1950 as both a domestic and international carrier the former Transcontinental and Western Airlines changed its name to Trans World Airlines 54 53 By 1954 Idlewild had the highest volume of international air traffic of any airport globally 49 55 Development edit In 1955 the Terminal City master plan was developed for Idlewild Airport All of the major airlines including TWA would build their own terminals while smaller airlines would be served from an International Arrivals Building 56 57 58 When the locations of each airline s terminal was announced TWA and Pan Am were each assigned a spot on one side of the International Airlines Building 52 59 TWA s hangar was on the opposite side of its assigned lot 52 Under the leadership of TWA president Ralph S Damon TWA hired Eero Saarinen and his Detroit based firm to design the TWA Flight Center 52 60 61 Even though Saarinen s firm was simultaneously working on 15 other projects he agreed to take the commission 61 A writer for Interiors magazine described TWA as having vision and confidence for the project 52 62 Planning and design edit nbsp Construction photo showing self supporting thin shell construction in 1962Eero Saarinen s wife Aline recalled that her husband saw most other air terminals as being ugly shoddy and inconvenient 6 63 Saarinen wanted the new terminal to have a practical purpose and not only interpret the sensation of flying 64 65 but also express the drama and specialness and excitement of travel 66 Damon sought for the spirit of flight to be encapsulated in the design 59 Saarinen s firm started researching other airports to collect data and they also visited Grand Central Terminal the United States busiest railroad station to observe passenger circulation patterns The team found that passengers within Grand Central Terminal often traveled in curving paths even though the terminal itself was rectangular 61 TWA anticipated that at peak hours the terminal would accommodate a thousand passengers with two thousand departures and arrivals per hour 6 Additionally TWA needed fourteen positions at the terminal for large jets 12 67 68 The Saarinen team started devising designs for the terminal s form in February 1956 12 68 Although the site assigned to TWA was not the airline s first choice for an Idlewild terminal the design team took advantage of the site to design a highly visible terminal 11 One of Saarinen s original designs was sketched on the back of a restaurant menu when he and Aline were eating dinner with Time magazine s associate editor Cranston Jones 69 Unhappy with initial designs Saarinen asked TWA for more time and took an additional year to resolve the design 3 Roche said that one initial design had called for an oval shell upon four piers but that Saarinen had rejected that plan as awkward 70 19 Furthermore engineer Abba Tor had warned that a single slab of concrete might crack 71 Saarinen s team first created 3D models of the planned terminal then drew sketches of the structure this contrasted with the design processes of more traditional buildings in which architects drew sketches before creating their 3D models 66 Saarinen s team created several wire cardboard and clay models of the terminal s roof 7 11 70 constructed at various scales 19 One early model for the terminal was based on Jorn Utzon s winning proposal for the Sydney Opera House s architectural design competition for which Saarinen had been one of the judges 66 Saarinen had originally envisioned the roof as a single shell but he refined the design twice before ultimately devising the plan with four shells 72 The final model for the shell may have been inspired by one of Saarinen s breakfasts a grapefruit that he pushed down at the center 19 20 72 During another discussion Roche used a saw to bisect one of the models creating the inspiration for the roof s four shells 19 20 In creating the TWA Flight Center s roof Saarinen may also have been inspired by Minoru Yamasaki s design for St Louis Lambert International Airport s main terminal his father Eliel Saarinen s design for Helsinki Central Station and McKim Mead amp White s design for the original New York Penn Station 73 The interior was modeled next since the space was to be symmetrical Saarinen s team only created drawings for half the interior 19 Roche said the area around the center staircase was remodeled at least ten times 74 In addition to around 130 possible plans created by the Saarinen office for the terminal contractors provided hundreds of their own drawings Cross sections and contour maps were also devised The drawings took some 5 500 man hours to produce and they were accurate to about 1 8 inch 3 2 mm 7 19 Saarinen s team had devised 600 sketches of the building but only 200 of these sketches were used in the final design 8 The resulting plan was characterized as providing a smooth and luxurious switch from ground transportation to planes 12 59 Final plans and construction edit By November 1957 TWA had announced a design with a projected cost of 12 million equivalent to 96 million in 2022 11 67 75 Aline Saarinen worked with TWA to coordinate marketing activities centered on the terminal from the building announcement to its completion in 1962 76 The plans were revised in 1958 after Saarinen s original design was determined to be too expensive 77 Though both flight wings had been included in the original plan only Flight Wing 2 was initially built as a cost saving measure the other wing was not completed until 1970 16 78 The passageways were to have a glazed roof and moving walkways in the original plan but these features were absent in the final construction and two arms flanking the head house had been removed 16 Construction began in June 1959 67 79 involving 14 engineers and 150 workers 79 A grid was devised to manage the steel pipe scaffolding at the construction site and 5 500 supports were used in the scaffolding 79 80 81 c The contractors also prefabricated 27 different wedge shapes creating 2 500 wedges in total 19 Grove Shepherd Wilson amp Kruge constructed the shells to the specifications outlined in Saarinen s contour maps which were precise to intervals of 1 foot 0 30 m 8 79 80 Although the project employed carpenters with no special skill the procedures were precise enough that they allowed for a maximum deviation of only 0 25 inches 6 4 mm from the plan 23 80 The roof was poured as a single form starting on August 31 1960 79 82 the work took 120 hours 83 The Y shaped piers required hundreds of additional drawings to fabricate 19 By the middle of that year the contractors were partially relying on computer calculations to complete the project 8 By the end of 1960 the roof was fully supported by the four Y shaped piers and the scaffolding was removed 67 81 By April 1961 when only the concrete vaults had been completed Saarinen remarked that If anything happened and they had to stop work right now and just leave it in this state I think it would make a beautiful ruin like the Baths of Caracalla 23 84 Saarinen died later that year while undergoing surgery 85 His associates principal designer Kevin Roche and John Dinkeloo formed Roche Dinkeloo which worked to complete the building 86 Original terminal edit nbsp Exterior view of the terminal seen from the land sideBy March 1962 the incomplete TWA terminal was being used by passengers to get to planes 87 88 The unfinished terminal building was also used for a fundraising benefit that April 89 The completed terminal was dedicated on May 28 1962 90 91 92 Most other major U S airlines had completed their Idlewild terminals sooner after the opening of the International Arrivals Building in 1957 United Airlines and Eastern Air Lines opened their own terminals in 1959 followed by American Airlines and Pan American World Airways Worldport in 1960 and Northwest Airlines and TWA in 1962 56 93 The National Airlines Sundrome would be last in 1969 93 The airport s name was changed to John F Kennedy International Airport in 1963 94 Despite being finished relatively late compared to other terminals at JFK Airport the TWA Flight Center incorporated many novel features for its time which influenced the design of other airport terminals 26 27 The terminal as completed had seven aircraft positions six of which were available from Flight Wing 2 the other boarding position was available from a temporary structure attached to Flight Tube 1 15 88 As with many terminals designed before the advent of jumbo jets increased passenger traffic and security issues the design proved difficult to update as air travel evolved terminal gates close to the street made centralized ticketing and security checkpoints difficult 31 95 International flights at JFK during the 1960s were routed through the International Arrivals Building and the structure attached to Flight Tube 1 was functionally inadequate 95 By 1967 TWA announced that it would build Flight Wing 1 on the northwest to accommodate wide body aircraft hiring Roche Dinkeloo to design the 20 million expansion 96 97 Work started in 1968 95 and the concrete shell was finished by that December 98 Flight Wing 1 opened on February 25 1970 99 but the wing was not dedicated until March 20 when international passengers could pass through the terminal directly 100 With the addition of Flight Wing 1 came the expansion of the ticketing counter in the head house The baggage handling area was expanded and the new addition was connected to the basement of Flight Wing 1 44 By 1979 TWA had built a traffic island with a canopy to provide shelter for passengers waiting for ground transport 101 The shelter constructed by firm Witthoefft amp Rudolf won the Albert S Bard Award for architectural excellence 102 A wooden walkway intended as a temporary structure was built in the 1980s to connect to the Sundrome when TWA expanded its operations there By 1992 the TWA Flight Center was in tawdry condition with parts of the structure appearing actively deteriorated 103 The PANYNJ considered demolishing the building 26 43 but the New York City Landmarks Preservation Commission LPC hosted public hearings in 1993 to determine whether to protect the TWA Flight Center 104 and the LPC designated the terminal as an exterior and interior landmark in 1994 26 43 Instead the PANYNJ started considering plans for what would become the T5 expansion 43 Elastomeric coating was added to the roof in 1999 to prevent leakage 21 TWA deteriorated financially during the 1990s and after it eliminated many routes in 1996 moved most of its New York operations to the TWA Flight Center 105 TWA eventually sold its assets to American Airlines in October 2001 18 For three months American Airlines still operated flights out of the TWA Flight Center 106 American Airlines ceased flight operations at the terminal in December 2001 and allowed its lease inherited from TWA to expire in January 2002 106 107 By then airport officials saw the terminal as functionally outdated 108 As a bi state agency the PANYNJ could legally bypass the LPC designation and demolish parts of the terminal 108 109 Preservationists expressed concern over the fact that the terminal could be significantly modified 110 Abandonment and preservation edit nbsp Departures board in the head houseAfter preservationists raised concerns the PANYNJ proposed an alternative that would preserve the tubes and build a new structure east of the existing building The PANYNJ still wished to destroy one or both of the flight wings 108 109 By August 2001 the PANYNJ presented its first proposal which entailed converting the head house into a restaurant or conference center while encircling the existing building with one or possibly two new terminals The concept received opposition from the Municipal Art Society MAS as well as architects Philip Johnson and Robert A M Stern 111 The opposition suggested the building which brought passengers into immediate view of the sky and aircraft beyond would be strangled if wrapped by another terminal and that wrapping the Saarinen head house with another terminal would not preserve the spirit of the building but would mummify it like flies in amber 111 Philip Johnson speaking at the 2001 presentation said of the proposal This building represents a new idea in 20th century architecture and yet we are willing to strangle it by enclosing it within another building Imagine tying a bird s wings up This will make the building invisible If you re going to strangle a building to death you might as well tear it down 111 By late 2002 there was still no agreement on the usage of the TWA Flight Center except that the head house and passageways would be preserved 106 The following year the PANYNJ and JetBlue agreed on a plan that would include reopening the TWA Flight Center and constructing a new 26 gate Terminal 5 behind the TWA Flight Center At the time JetBlue was operating out of the adjacent Terminal 6 the Sundrome and was the airport s fastest growing carrier 112 The PANYNJ and JetBlue came to an agreement on the construction of the new terminal itself in August 2004 113 In the time that the TWA Flight Center stood disused it was utilized for brief events Shortly after its closure the head house was used for the filming of the 2002 film Catch Me If You Can 114 In 2004 the dormant head house briefly hosted an art exhibition called Terminal 5 115 featuring the work of 19 artists from 10 countries 31 The theme of the show featured work lectures and temporary installations drawing inspiration from the terminal s architecture it was supposed to have run from October 1 2004 to January 31 2005 31 The show closed abruptly after the building itself was vandalized during its opening gala 116 117 The building was added to the National Register of Historic Places in 2005 1 18 Later use edit New JetBlue terminal edit In December 2005 the PANYNJ began construction of the T5 facility behind and partially encircling Saarinen s head house 18 Peripheral portions of the head house were demolished to make space for a larger 26 gate facility designed by Gensler 9 Originally there were also tentative plans to renovate one of the departure lounges known as The Trumpet 118 During the construction of T5 The Trumpet was lifted and moved 1 500 ft 460 m 119 at a cost of 895 000 118 only to be later demolished when the project s budget prioritized renovating the head house 18 The head house was renovated to remove asbestos and replace deteriorated sections of the facility The head house was planned to be used as an approach to the new T5 facility and both buildings would be collectively known as Terminal 5 120 T5 reopened on October 22 2008 9 121 with JetBlue using an abstraction of the Saarinen terminal s gull wing shape as the official logo for the event an abstraction of the new terminal floor plan for the signage 18 and counting down the reopening via Twitter 33 At the time of the T5 opening JetBlue and PANYNJ had yet to complete renovation of the original Saarinen head house and the building had stood empty while they decided what its future role should be Early proposals included a conference center an aviation museum and a restaurant 118 or a place to check in for flights departing from the newer JetBlue T5 building 122 Conversion of head house into hotel edit nbsp Front view of the TWA HotelIn April 2015 The Wall Street Journal reported that JetBlue and its partner a hotel developer were negotiating for the rights to turn the head house into a hotel 123 Three months later state governor Andrew Cuomo confirmed that the Saarinen building would become part of the TWA Hotel a new on site hotel for airport passengers 124 Construction began in December 2016 125 The structures on either side of the head house were demolished though the head house was retained 126 and additional structures were built 127 During the head house s conversion into a hotel many original details such as the custom ceramic floor tiles and the 486 variously shaped window panels were replaced with replicas of the originals 41 128 The departure board from the original construction was also restored The hotel opened on May 15 2019 129 Impact editTWA had wanted a structure represent ing a daring departure from conventional air terminal concepts 27 Under TWA president Damon s guidance Saarinen had designed the terminal as a building that starts your flight with your first glimpse of it and increases your anticipation after you arrive 52 60 As such Saarinen had used similar design features on the interior and exterior 110 He said We wanted passengers passing through the building to experience a fully designed environment in which each part arises from another and everything belongs to the same formal world 130 Reception edit Contemporary reviews edit Shortly after the plans for the TWA Flight Center were announced in 1957 The New York Times described the plan as hav ing a startling effect for first time visitors but not so revolutionary inside 131 Another newspaper said the TWA terminal was planned to combine the functional realities of a jet age air terminal with the aesthetic drama of flight 132 Many contemporary media compared the terminal to a bird in flight 23 84 Architectural Forum which praised the terminal and Architectural Review which criticized it both characterized the design as a concrete bird 23 Saarinen said the building s resemblance to a bird was a coincidence 23 84 133 despite privately describing the structure as a Leonardo da Vinci flying machine 133 The architect Robert Venturi said that Saarinen s designs evolved from vocabulary rather than from function and that at the time many of Saarinen s peers still adhered to the philosophy of form following function 133 Even when the TWA Flight Center was under construction it was often discussed in the architectural media and the Museum of Modern Art ran an exhibit on the building in 1959 134 The completion of the terminal prompted a large amount of architectural commentary most of it positive 78 134 While the TWA terminal s design had several critics and skeptics it was still described as being appropriate in the context of the Jet Age 79 88 Architect Robert A M Stern called the head house a symbolic Grand Central of the jet age 135 Ada Louise Huxtable architecture critic for The New York Times saw the TWA Flight Center as a bright spot in the mediocrity of JFK Airport 88 136 The interior was also praised Critic Edgar Kaufmann Jr in 1962 called the interior one of the few major works of American architecture in recent years that reaches its full stature as an interior 25 62 137 Ken Macrorie of The Reporter compared the tarmac facing waiting room to a railroad hub s waiting area and alluded to the similarities with the city s original Pennsylvania Station 14 138 One major critic of the design was historian Vincent Scully who disliked Saarinen s use of whammo shapes at the TWA Flight Center and Dulles International Airport 23 78 British critic Reyner Banham questioned the practicality of the terminal s design which did not clearly link function and symbol but he said that the TWA terminal was no worse than any other airport terminal 78 139 Italian engineer and architect Pier Luigi Nervi was also skeptical of the design saying that the structure was too heavy and elaborate for the problem it seeks to solve 78 140 Retrospective reviews edit Adulation for the original design continued through the 1990s long after its completion 137 141 Progressive Architecture magazine stated in 1992 that the terminal represented a high point not only in the design of air terminals but in the exercise of corporate responsibility 103 Two years later New York Times critic Herbert Muschamp called the TWA Flight Center the most dynamically modeled space of its era 142 In a 2005 book about Saarinen s work Jayne Merkel said the building did for TWA what the Saint Louis Arch would eventually do for Saint Louis 59 According to Merkel it was not until the Port Authority proposed demolishing the terminal for T5 that the full impact of the building was revealed 134 When the newer T5 was announced in 2005 JFK Airport s vice president of redevelopment described the planned structure as a very practical very efficient building 17 T5 was also described as hyper efficient 34 and a monument to human throughput 122 and a reviewer said T5 might be the best terminal at JFK Airport 32 Awards and landmark designations edit When the terminal was completed it received numerous accolades and awards including from the Queens Center of Commerce 143 and the New York Concrete Industrial Board 144 Architectural Forum included the TWA Flight Center and the Pepsi Cola Building as part of a 1962 exhibition of ten of the world s most significant modern buildings 145 The American Institute of Architects gave the terminal an Award of Merit in 1963 and it was featured in magazines printed internationally 79 In addition Saarinen won the AIA Gold Medal posthumously in 1962 146 The New York City Landmarks Preservation Commission held public hearings on the possibility of designating the TWA Flight Center s exterior and interior as official city landmarks in 1993 147 148 The head house s exterior and interior were designated as landmarks on July 19 1994 13 26 149 though the exterior designation excluded the gate structure attached to the northeastern tube 150 The Municipal Art Society nominated the facility to the National Trust for Historic Preservation s list of the 11 Most Endangered Places in America in 2004 after the terminal s closure 115 On September 7 2005 the National Park Service listed the TWA Flight Center on the National Register of Historic Places 18 1 See also editList of thin shell structures List of New York City Designated Landmarks in Queens National Register of Historic Places listings in QueensReferences editNotes edit Saarinen worked with the same team in executing the Kresge Auditorium 1953 1955 and the main terminal at Dulles International Airport 1958 1962 2 In its reports about the TWA Flight Center head house the New York City Landmarks Preservation Commission uses modified cardinal directions for convenience 14 In this article the precise cardinal directions are used Merkel 2005 p 209 gives a different figure saying that up to 1 800 supports were made up of 5 000 tubular scaffold frames Citations edit a b c National Register of Historic Places 2005 Weekly Lists PDF National Register of Historic Places National Park Service 2005 p 242 Archived PDF from the original on September 1 2020 Retrieved July 2 2020 a b c Whitehead Rob 2014 Saarinen s shells The evolution of engineering influence Iowa State University Digital Repository p 84 Archived from the original on January 6 2018 Retrieved November 4 2018 a b c Makovsky Paul September 19 2005 Reconsidering Eero Metropolis Magazine Archived from the original on July 1 2020 Retrieved July 1 2020 a b c d e f g h National Park Service 2005 p 3 Saarinen Eero 2006 Eero Saarinen Shaping the Future Yale University Press p 199 ISBN 978 0 9724881 2 9 Archived from the original on July 14 2020 Retrieved July 1 2020 a b c Landmarks Preservation Commission 1994 p 5 a b c Architectural Forum 1960 p 119 a b c d Roman 2003 p 53 a b c d e Mayor Bloomberg Port Authority and Jetblue Cut Ribbon on New 875 Million Terminal at JFK Airport Media Newswire com September 23 2008 Archived from the original on July 3 2020 Retrieved July 1 2020 Gensler Designing Jet Blue Terminal at JFK Airport Architectural Record August 10 2004 Archived from the original on February 14 2009 Retrieved July 1 2020 a b c d e f g Landmarks Preservation Commission 1994 p 6 a b c d Roche 1958 p 79 a b c d e f g Landmarks Preservation Commission 1994 p 8 a b c d Landmarks Preservation Commission Interior 1994 p 8 a b c Stoff Joshua 2009 John F Kennedy International Airport Images of Aviation Arcadia Publishing p 75 ISBN 978 0 7385 6468 5 Archived from the original on August 4 2022 Retrieved July 1 2020 a b c d National Park Service 2005 p 23 a b c Blum Andrew July 21 2005 JetBlue s Terminal Takes Wing Business Week Innovation Archived from the original on July 2 2020 Retrieved July 1 2020 a b c d e f g Dunlap David W February 21 2008 Saarinen Terminal to Reopen at Kennedy Airport City Room The New York Times Archived from the original on July 4 2020 Retrieved July 1 2020 a b c d e f g h i j k Merkel 2005 p 209 a b c Leubkeman Christopher Hart Form Swallows Function in Progressive Architecture 1992 p 108 a b c d e f National Park Service 2005 p 4 Architectural Forum 1960 p 122 a b c d e f g h Merkel 2005 p 210 National Park Service 2005 pp 4 5 a b c d e f g Landmarks Preservation Commission Interior 1994 p 7 a b c d e Dunlap David W July 20 1994 T W A s Hub Is Declared A Landmark The New York Times ISSN 0362 4331 Archived from the original on March 27 2022 Retrieved May 26 2010 a b c National Park Service 2005 p 8 a b c d e f g National Park Service 2005 p 5 Progressive Architecture 1992 pp 92 93 Roche 1958 p 81 a b c d Now Boarding Destination JFK The Architects Newspaper September 21 2004 Archived from the original on July 1 2020 Retrieved July 1 2020 a b c Cheslaw Louis January 31 2020 JFK s Terminal 5 Is Actually a Decent Place to Hang Out Conde Nast Traveler Archived from the original on July 15 2020 Retrieved July 1 2020 a b Maynard Micheline October 22 2008 JetBlue Twitters its New Terminal The Lede The New York Times Archived from the original on May 25 2009 Retrieved May 26 2010 a b van Dyk Deirdre August 5 2008 Where JetBlue Put Its Millions Time Magazine Archived from the original on July 23 2014 Retrieved May 26 2010 Hart Sara December 1 2008 Prepared for Takeoff Architects Online Archived from the original on July 2 2020 Retrieved July 1 2020 Dunlap David W March 11 2008 An Airline Terminal for a Security Wary Era The New York Times ISSN 0362 4331 Archived from the original on July 1 2020 Retrieved July 1 2020 Gannon Devin September 29 2017 New details about JFK s TWA Hotel revealed on track to open in 18 months 6sqft Archived from the original on July 11 2019 Retrieved December 26 2017 Plitt Amy September 29 2017 TWA Hotel unveils new renderings retro themed sales lounge Curbed NY Archived from the original on December 26 2017 Retrieved December 26 2017 Matthews Karen October 12 2017 Hotel at iconic TWA terminal will evoke glamour of jet age USA Today Associated Press Archived from the original on December 23 2017 Retrieved December 22 2017 Brown Genevieve Shaw April 17 2018 Step inside the brand new TWA hotel at JFK airport in New York City ABC News Archived from the original on April 18 2018 Retrieved April 18 2018 a b Plitt Amy April 17 2018 TWA Hotel s rooms will combine the best of 60s style first look Curbed NY Archived from the original on April 19 2018 Retrieved April 18 2018 Jacobs Karrie May 29 2019 The Seductive Fantasy of Saarinen s TWA Terminal Architect Magazine Archived from the original on January 15 2021 Retrieved July 2 2020 a b c d Firshein Sarah July 23 2019 How the TWA Terminal a midcentury icon became one of NYC s coolest new hotels Curbed NY Archived from the original on October 6 2020 Retrieved July 2 2020 a b c National Park Service 2005 p 27 a b National Park Service 2005 pp 5 6 Landmarks Preservation Commission Interior 1994 p 6 JetBlue Takes 5 at JFK PDF Airliners January February 2009 p 25 Archived PDF from the original on November 27 2021 Retrieved August 28 2020 Young Marguerite November 7 1943 New York City begins construction of mammoth airport The Miami News NEA p 1C Retrieved August 30 2015 permanent dead link a b Idlewild Airport Officially Opened Six Foreign Flag Carriers and Two Others Will Not Begin Operations for a Week The New York Times July 1 1948 ISSN 0362 4331 Archived from the original on January 3 2019 Retrieved July 1 2020 Landmarks Preservation Commission 1994 p 3 Twa to Use Idlewild Dewey Praises Move The New York Times September 7 1949 ISSN 0362 4331 Archived from the original on July 2 2020 Retrieved July 1 2020 a b c d e f g Landmarks Preservation Commission 1994 p 4 a b TWA History TWA Museum Archived from the original on December 15 2020 Retrieved November 1 2018 Trans World Airlines Made Corporate Name The New York Times April 28 1950 ISSN 0362 4331 Archived from the original on July 2 2020 Retrieved July 1 2020 Hudson Edward December 6 1955 New Structures Rise at Idlewild Makeshift Buildings Giving Way as Airport Undergoes a Construction Boom The New York Times ISSN 0362 4331 Archived from the original on July 1 2020 Retrieved July 1 2020 a b National Park Service 2005 p 16 Gordon Alastair 2014 Naked Airport A Cultural History of the World s Most Revolutionary Structure University of Chicago Press ISBN 978 1 4668 6911 0 Pearman Hugh 2004 Airports A Century of Architecture Laurence King Publishing ISBN 978 1 85669 356 1 Retrieved August 30 2015 a b c d Merkel 2005 p 205 a b Scullin George 1968 International Airport The Story of Kennedy Airport and U S Commercial Aviation Little Brown p 154 Archived from the original on August 1 2020 Retrieved July 1 2020 a b c Roman 2003 p 43 a b Kaufmann Edgar Jr July 1962 Inside Eero Saarinen s TWA Building Interiors Vol 121 p 87 Dream of Eero Saarinen a Tribute to His Memory Aviation News Vol 4 May 25 1962 p 2 National Park Service 2005 p 9 Saarinen s Twa Flight Center PDF Architectural Record July 1962 p 129 Archived PDF from the original on July 16 2020 Retrieved July 2 2020 a b c Roman 2003 p 46 a b c d National Park Service 2005 p 22 a b Merkel 2005 p 206 Roman 2003 pp 43 46 a b Roche 1958 p 80 Dunlap David W February 17 2017 Abba Tor Who Engineered T W A Terminal at Kennedy Airport Dies at 93 The New York Times ISSN 0362 4331 Archived from the original on July 3 2020 Retrieved July 3 2020 a b Roman 2003 p 50 Roman 2003 pp 50 52 Roche 1958 p 82 Hudson Edward November 13 1957 Bold Design is Set for Air Terminal Trans World Airlines Plan a Terminal at Idlewild The New York Times ISSN 0362 4331 Archived from the original on July 2 2020 Retrieved July 1 2020 Ringli Kornel March 22 2013 Eero Saarinens TWA Terminal in New York Beflugelter Mythos Eero Saarinen s TWA Terminal in New York Inspired Myth in Swiss High German Archived from the original on November 1 2018 Retrieved July 1 2020 via NZZ T W A Restudying Terminal Design Original Plans for Futuristic Unit at Idlewild Found to Be Too Expensive The New York Times October 11 1958 ISSN 0362 4331 Archived from the original on July 2 2020 Retrieved July 1 2020 a b c d e Roman 2003 p 60 a b c d e f g Landmarks Preservation Commission 1994 p 7 a b c Architectural Forum 1960 p 120 a b T W A s Terminal Standing on Own 5 500 Supports Removed The New York Times December 8 1960 ISSN 0362 4331 Archived from the original on July 1 2020 Retrieved July 1 2020 T W A Roof Going Up Concrete Pouring at Idlewild to Be Done About Sept 15 The New York Times August 30 1960 ISSN 0362 4331 Archived from the original on July 1 2020 Retrieved July 1 2020 Landmarks Preservation Commission 1994 p 11 a b c Saarinen Eero Saarinen Aline B 1962 Eero Saarinen on His Work A Selection of Buildings Dating from 1947 to 1964 with Statements by the Architect Yale University Press p 60 Archived from the original on February 3 2022 Retrieved February 3 2022 Eero Saarinen 51 Architect is Dead Versatile Designer Created Terminal for T W A Here and Embassies for U S The New York Times September 2 1961 ISSN 0362 4331 Archived from the original on July 12 2021 Retrieved July 1 2020 Dameron Amanda November 17 2017 Kevin Roche on How He Got His Start Nodding Off in an Interview With Eero Saarinen Dwell Archived from the original on November 1 2018 Retrieved November 1 2018 Hudson Edward April 22 1962 Unfinished T W A Terminal Is an Elegant Causeway Travelers Use It to Get to Planes in Building s Wing The New York Times ISSN 0362 4331 Archived from the original on July 2 2020 Retrieved July 1 2020 a b c d National Park Service 2005 p 24 Fete at Airport Held to Assist Travelers Aid Around the World Ball at New Flight Center of T W A Is Benefit The New York Times May 23 1962 ISSN 0362 4331 Archived from the original on July 2 2020 Retrieved July 1 2020 Klimek Chris August 18 2008 Saarinen exhibit at National Building Museum Washington Examiner Archived from the original on July 1 2020 Retrieved July 1 2020 Risen Clay November 7 2004 Saarinen rising A much maligned modernist finally gets his due The Boston Globe Archived from the original on July 1 2020 Retrieved July 1 2020 Javits Asks More to Lure Tourists At T W A Center He Urges Funds for Travel Agency The New York Times May 29 1962 ISSN 0362 4331 Archived from the original on July 1 2020 Retrieved July 1 2020 a b Dunlap David W October 26 1997 A New Kennedy Airport Takes Wing The New York Times ISSN 0362 4331 Archived from the original on June 18 2013 Retrieved July 1 2020 The Light That Does Not Fail The New York Times December 29 1963 ISSN 0362 4331 Archived from the original on November 1 2018 Retrieved July 1 2020 a b c National Park Service 2005 p 26 National Park Service 2005 p 17 Notes From the Field of Travel Flight Wing One at Kennedy The New York Times June 4 1967 ISSN 0362 4331 Archived from the original on July 3 2020 Retrieved July 2 2020 T W A Terminal for Jumbo Jets Near Completion The New York Times December 15 1968 ISSN 0362 4331 Archived from the original on July 3 2020 Retrieved July 2 2020 Hudson Edward February 26 1970 Mishap on T W A 747 Inaugural Film Projector Fails The New York Times ISSN 0362 4331 Archived from the original on July 4 2020 Retrieved July 2 2020 Hudson Edward March 20 1970 T W A Dedicates Huge Terminal at Kennedy The New York Times ISSN 0362 4331 Archived from the original on July 4 2020 Retrieved July 2 2020 Blumenthal Ralph May 20 1979 At Kennedy It Looks Like Another Frustrating Summer The New York Times ISSN 0362 4331 Archived from the original on July 3 2020 Retrieved July 2 2020 Goldberger Paul June 18 1979 Architecture 4 Honor Buildings The New York Times ISSN 0362 4331 Archived from the original on July 3 2020 Retrieved July 2 2020 a b Progressive Architecture 1992 p 96 Dunlap David W June 20 1993 Postings Landmarking Enters the Jet Age The New York Times ISSN 0362 4331 Archived from the original on April 21 2021 Retrieved April 21 2021 Bryant Adam December 24 1996 T W A Plans Cutbacks at Kennedy Hub The New York Times ISSN 0362 4331 Archived from the original on July 4 2020 Retrieved July 2 2020 a b c Dunlap David W November 28 2002 Blocks Unusual Planning Duel Over Kennedy Terminal The New York Times ISSN 0362 4331 Archived from the original on July 2 2020 Retrieved July 2 2020 National Park Service 2005 p 28 a b c Terminated Journal News April 5 2001 p 3 Archived from the original on August 4 2022 Retrieved July 3 2020 via newspapers com nbsp a b Kennedy Randy April 4 2001 Airport Growth Squeezes the Landmark T W A Terminal The New York Times ISSN 0362 4331 Archived from the original on July 3 2020 Retrieved July 2 2020 a b Roman 2003 p 67 a b c Dunlap David W August 14 2001 Planning a Nest of Concrete for a Landmark of Flight The New York Times ISSN 0362 4331 Archived from the original on July 1 2020 Retrieved July 1 2020 Kilgannon Corey October 19 2003 J F K Project Would Reopen Famed Terminal The New York Times ISSN 0362 4331 Archived from the original on July 2 2020 Retrieved July 2 2020 Lueck Thomas J August 5 2004 JetBlue to Build New Terminal At Kennedy The New York Times ISSN 0362 4331 Archived from the original on July 2 2020 Retrieved July 2 2020 Kinetz Erika January 19 2003 Neighborhood Report Kennedy Airport An Airport Landmark When It Was Young The New York Times ISSN 0362 4331 Archived from the original on July 2 2020 Retrieved July 2 2020 a b TWA Terminal Named as One of the Nation s Most Endangered Places Municipal Art Society February 9 2004 Archived from the original on August 12 2009 Vogel Carol October 7 2004 Port Authority Shuts Art Exhibit in Aftermath of Rowdy Party The New York Times ISSN 0362 4331 Archived from the original on July 28 2020 Retrieved July 1 2020 Czarnecki John E October 11 2004 Art Exhibition at JFK Airport s TWA Terminal Abruptly Shut Down Architectural Record Archived from the original on August 27 2005 Retrieved July 1 2020 a b c Foster Margaret March 27 2008 Moved Once Saarinen s TWA Trumpet To Fall Preservationnation org Archived from the original on March 13 2009 Walton Krista April 23 2007 Saarinen s TWA Trumpet To Move National Trust for Historic Preservation Archived from the original on July 21 2016 Retrieved June 1 2020 Dunlap David W February 22 2008 Renovated T W A Terminal to Reopen as JetBlue Portal The New York Times ISSN 0362 4331 Archived from the original on July 3 2020 Retrieved July 3 2020 Maynard Micheline October 22 2008 JetBlue Twitters its New Terminal The Lede The New York Times Archived from the original on August 4 2022 Retrieved July 1 2020 a b Russell James S October 22 2008 JetBlue s New Terminal at JFK Offers Huge Capacity No Charm Bloomberg com Archived from the original on August 18 2017 Retrieved July 1 2020 via Wired Mann Craig Karmin and Ted April 14 2015 JetBlue Wants to Turn Former TWA Terminal Into Hotel Wall Street Journal ISSN 0099 9660 Archived from the original on September 27 2020 Retrieved July 1 2020 Governor s Press Office July 27 2015 Governor Cuomo Unveils Vision for Transformative Redesign of LaGuardia Airport Press release State of New York Archived from the original on August 29 2015 Retrieved August 18 2015 Plitt Amy December 15 2016 TWA Terminal hotel celebrates groundbreaking with a new rendering Curbed NY Archived from the original on December 26 2017 Retrieved December 26 2017 Peterson Barbara August 3 2016 TWA Terminal Hotel Construction Begins at JFK Conde Nast Traveler Archived from the original on November 18 2016 Retrieved November 17 2016 Fact Sheet for MCR Development s TWA Hotel at JFK Airport PDF TWA Hotel Archived from the original PDF on November 7 2017 Retrieved November 7 2017 Grabar Henry May 1 2017 Jet Age Chic The Atlantic Archived from the original on December 26 2017 Retrieved December 26 2017 Up up and away at the TWA Hotel CBS News May 12 2019 Archived from the original on May 15 2019 Retrieved May 14 2019 Gossel Peter 2001 Architecture in the twentieth century Taschen p 250 ISBN 978 3 8228 1162 7 OCLC 48467235 Archived from the original on August 4 2022 Retrieved August 28 2020 Hudson Edward November 17 1957 Aviation Unusual Terminal for Idlewild Startling Effect The New York Times ISSN 0362 4331 Archived from the original on July 1 2020 Retrieved July 1 2020 Face to the Future The Sun and the Erie County Independent December 5 1957 p 8 Archived from the original on August 4 2022 Retrieved July 1 2020 via newspapers com nbsp a b c Roman 2003 p 61 a b c Merkel 2005 p 213 Muschamp Herbert November 6 1994 Architecture View Stay of Execution for a Dazzling Airline Terminal The New York Times ISSN 0362 4331 Archived from the original on June 3 2013 Retrieved May 26 2010 Huxtable Ada Louise November 25 1962 Idlewild Distressing Monument to Air Age Paradox The New York Times ISSN 0362 4331 Archived from the original on July 3 2020 Retrieved July 1 2020 a b National Park Service 2005 p 25 Macrorie Ken September 13 1962 Arriving and Departing The Reporter Vol 27 pp 52 55 Banham Reyner 1975 Age of the Masters A Personal View of Modern Architecture Icon editions Harper amp Row p 125 ISBN 978 0 06 430369 9 OCLC 1831115 Architectural Forum 1960 p 122 National Park Service 2005 p 10 Muschamp Herbert November 6 1994 Architecture View Stay of Execution for a Dazzling Airline Terminal The New York Times ISSN 0362 4331 Archived from the original on December 14 2019 Retrieved July 2 2020 T W A Terminal at Idlewild Wins Top Design Award The New York Times December 2 1962 ISSN 0362 4331 Archived from the original on July 1 2020 Retrieved July 1 2020 3 Floors Leased at 128 W 36th St The New York Times November 19 1962 ISSN 0362 4331 Archived from the original on July 4 2020 Retrieved July 1 2020 Prize Buildings in Photo Exhibit 2 City Structures Included in 10 Modern Choices Church Is Cited PDF The New York Times April 21 1962 p 42 ISSN 0362 4331 Retrieved April 21 2021 Solomon Nancy 2008 Architecture INTL Celebrating the Past Designing the Future HarperCollins p 236 ISBN 978 1 58471 162 9 Archived from the original on August 4 2022 Retrieved July 1 2020 Dunlap David W June 20 1993 Postings Landmarking Enters the Jet Age The New York Times ISSN 0362 4331 Archived from the original on April 21 2021 Retrieved April 21 2021 Landmarks Preservation Commission 1994 p 2 Landmarks Preservation Commission Interior 1994 p 2 Landmarks Preservation Commission Interior 1994 p 1 Landmarks Preservation Commission 1994 p 13 Sources edit Landmarks TWA Terminal PDF Progressive Architecture May 1992 Merkel Jayne 2005 Eero Saarinen London New York Phaidon ISBN 978 0 7148 6592 8 OCLC 57750853 Roche Kevin January 1958 TWA s Graceful New Terminal PDF Architectural Forum Vol 108 pp 79 83 Roman Antonio 2003 Eero Saarinen an Architecture of Multiplicity New York Princeton Architectural Press ISBN 1 56898 340 9 OCLC 50644049 Shaping a two acre sculpture PDF Architectural Forum Vol 113 August 1960 pp 118 123 Trans World Airlines Flight Center PDF National Register of Historic Places National Park Service September 7 2005 Trans World Airlines Flight Center Now TWA Terminal A at New York International Airport PDF New York City Landmarks Preservation Commission July 9 1994 Trans World Airlines Flight Center Now TWA Terminal A at New York International Airport Interior PDF New York City Landmarks Preservation Commission July 9 1994 External links editExternal images nbsp TWA Flight Center c 1962 Departure amp Arrival Board nbsp TWA Flight Center c 1962 Departure amp Arrival Corridor nbsp TWA Flight Center c 1962 Interior View nbsp Media related to TWA Flight Center at Wikimedia Commons Historic American Buildings Survey HABS No NY 6371 Trans World Airlines Flight Center John F Kennedy International Airport Jamaica Bay Queens subdivision Queens NY 32 measured drawings 1962 Saarinen head house with 2008 Gensler designed Jetblue Terminal Portals nbsp New York City nbsp Aviation nbsp Architecture Retrieved from https en wikipedia org w index php title TWA Flight Center amp oldid 1188964703, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.