fbpx
Wikipedia

PNR Metro Commuter Line

The PNR Metro Commuter Line is a commuter rail line operated by the Philippine National Railways. It was first inaugurated as the Metro Manila Commuter Service in 1970, and originally served the North Main Line and the South Main Lines, as well as the defunct Carmona and Guadalupe branch lines. Since then, it adopted several names such as Metrotrak[5] and Metrotren,[6] before adopting its present name in the late 2000s. The line is also nicknamed the Orange Line due to its designation in the 1970s.

PNR Metro Commuter Line
Overview
StatusOperational
OwnerGovernment of the Philippines
LocaleMetro Manila
Termini
Stations36
Websitepnr.gov.ph
Service
TypeCommuter rail
Services2
Operator(s)Philippine National Railways
Depot(s)Tutuban
Caloocan
Rolling stockRefer to Rolling stock section below
Daily ridership18,000 (March 2022)[1]
History
OpenedApril 6, 1970; 52 years ago (April 6, 1970)
Closed1997; 26 years ago (1997) (Caloocan–Meycauayan)
Reopened2018; 5 years ago (2018) (SolisGovernor Pascual)[c]
Technical
Line length75.7 km (47.0 mi)
Track length107.2 km (66.6 mi)
Number of tracksDouble-track (Governor PascualSucat)
Single-track (SucatIRRI)
CharacterAt-grade
Track gauge1,067 mm (3 ft 6 in)
ElectrificationNone
Operating speed20–40 km/h (12–25 mph)
SignallingMitsui ABS (1977–2009)[2]
None (2009–present)[3]
PT Len SiLSafe 4000 CBI (starting 2023)[4]
Average inter-station distance2.1 km (1.3 mi)
Route map

Governor Pascual
Caloocan
Caloocan Depot
10th Avenue
5th Avenue
Solis
Tutuban Railyard &
Tayuman Locomotive Shed
Tutuban
Blumentritt
Laon Laan
España
Estero de Valencia
Santa Mesa
Estero de Pandacan
Pandacan
Estero de Pandacan
Paco
San Andres
Vito Cruz
Buendia
Dela Rosa
Pasay Road
Estero de Tripa de Gallina
EDSA
Estero de Tripa de Gallina
Nichols
 MMS 
FTI
 MMS 
Bicutan
Sucat
Sucat River
Alabang
Bayanan Creek
Poblacion River
Muntinlupa
Magdaong River
Tunasan
Tunasan River
San Isidro River
San Pedro
Carmona
Pacita Main Gate
Golden City 1
Biñan
Biñan River
Silang-Santa Rosa River
Santa Rosa
Golden City 2
Cabuyao River delta
Cabuyao
Gulod
Cabuyao River delta
Mamatid
Banlic
Calamba
Pansol
Masili
Dampalit Creek
Los Baños
Anos Creek
College
IRRI

The present line has 36 stations serving Metro Manila and Laguna. It is divided into two sections which meet in Tutuban station in Tondo, Manila. The Metro North Commuter section runs from Tutuban to Governor Pascual station in Malabon and is colored light green in the system map of PNR. On the other hand, the Metro South Commuter section which runs from Tutuban to IRRI station in Los Baños, Laguna and is colored orange. Some stations connect to LRT Lines 1 and 2, and MRT Line 3.

History

Manila Railroad local trains and Meralco Tranvias

 
A map of the Manila Railroad Company's local train network.

The Manila Railroad Company, which preceded PNR, operated various local trains between Manila and its neighboring provinces. Trains from Tutuban will lead to Naic in Cavite, Pagsanjan in Laguna, Montalban in Rizal, and Bulacan during the 1920s.[7]

The Manila Electric Railroad and Light Company (Meralco) also operated electrified Tranvia services in what is now Metro Manila.[8] The 100 km (62 mi) tram system reached Malabon to the north, Pasig to the east, and Libertad (now part of Pasay) to the south, making it one of the longest in Asia in 1924.[9] Both systems were heavily damaged during the Battle of Manila in World War II.[9]

PNR commuter services

Metro Manila Commuter Service (1970–89)

The Metro Manila Commuter Service started on April 6, 1970, which started at Manila North Harbor and ended in Biñan, Laguna. During this decade, more stations were opened although some were either closed or relocated. In 1976, the commuter system peaked and extended as far north as San Fernando, Pampanga,[10] Guadalupe (located in Mandaluyong on the other side of Pasig River) to the east, and College to the south.[11] There were also services in the now-defunct Carmona branch line.[12]

Metrotrak then Metrotren (1989–2009)

In 1990, the system was undergoing renovations under the working title Metrotrak.[5] By May of that year, the system was inaugurated as Metrotren to distinguish it from the LRT Line 1, then named "Metrorail".[6] However, the Metrotren system eventually suffered neglect due to lack of funding and maintenance. Plans for expansion and rehabilitation such as the Manila–Clark rapid railway project and Guadalupe line revival was also never realized.[13]

Post-Metrotren and Metro Commuter

 
Tracks on the Metro South Commuter section near Blumentritt station in Tondo, Manila

The Arroyo administration attempted to modernize the PNR system by rebuilding the lines and purchasing new rolling stock. PNR purchased 6 brand new diesel multiple units from South Korea and became its first order in 35 years.[14] The government was also interested in reviving the Manila to Malolos NorthRail project. However, the line stopped construction in 2011 and only pillars were built.[15] The succeeding Aquino administration rebuilt the stations along the line to accommodate high-floor trains. PNR also acquired second-hand multiple units from Japan as stopgap measures to its train fleet, ending the Metrotren era.[16] However, services were further suspended to Santa Rosa in 2014,[17] and to Alabang in 2015 due to safety issues and accidents on the line.[18] The North Main Line has also been closed.[19]

The Duterte administration, Department of Transportation Secretary Arthur Tugade, and PNR General Manager Junn Magno, all promised to revive and modernize the PNR and its commuter line.[20] In 2017, the Department of Science and Technology announced its first Filipino-designed train and started trial services between Alabang and Calamba in 2018.[21]

For the present network, Magno announced the purchase of 3 diesel-hydraulic locomotives, 15 coaches, and 6 sets of diesel multiple units from Indonesian rolling stock manufacturer PT Industri Kereta Api or INKA. The INKA trainsets and 5 of the Hyundai Rotem DMUs will comprise a 14-train fleet that will replace the aging PNR 900 class as well as the second-hand rolling stock acquired by the Aquino administration, as these trainsets will be transferred to the Bicol Region for the Bicol Commuter services after 2020.[22] The present line will also be rebuilt during and after the construction of the North–South Commuter Railway as it will serve as an alternate transport mode to the NSCR.[23] It will be eventually envisioned to revisit and reactivate once abandoned lines and stations in the north that was once operated by PNR.

Planned closure

On February 16, 2023, DOTr announced the suspension of operations of the PNR system, along with the Metro Commuter services, to give way for the construction of the North–South Commuter Railway. The northern section of the line is expected to close by May 2023, while the entire line will be closed by October 2023.[24]

Route

 
Map of PNR Metro Commuter Line services.

The existing operational Metro Commuter Line is predominantly aligned and shares the path of the PNR South Main Line or SouthRail which uses a dedicated right of way of its own. It terminates at Calamba Station despite having rails further towards Legazpi, Albay, but few trains stop at Sta. Rosa and Calamba Stations further to the south. Inter-provincial services such as the Bicol Express and Mayon Limited are not running as of 2015, but plans to revive the services have been presented.

Legend
  • Trains stop at stations marked "●".
  • Trains pass those marked "|".
  • Only morning and evening trains stop at stations marked "◇".
  • Morning and evening trains stopping only on Sundays at stations marked "X".
  • Evening southbound trains only load at stations marked "♦".
  • Morning and evening trains only unload at stations marked "♠".
  • For AA-LA-IRRI, some trains stop at stations marked ∆, while all trains stop at stations marked ✓
  •   closed stations
  • MSC (TU-LA) — Metro South Commuter (Tutuban to Calamba)
  • MSC (TU-IRRI) — Metro South Commuter (Tutuban to IRRI)
  • MSC (AA-LA-IRRI) — Metro South Commuter (Alabang-Calamba- IRRI)
  • MNC (TU-GP) — Metro North Commuter (Tutuban to Governor Pascual)
  • MNC (GP-FTI) — Metro North Commuter (Governor Pascual to FTI)
  • SS (TU-SU) — Shuttle Service (Tutuban to Sucat)
  • SS (SA-SU) — Shuttle Service (Santa Mesa to Sucat)
  • PT — Premiere Train
Name Distance (km) Services Transfers Location
Between stations From Tutuban From Governor Pascual Metro Commuter Shuttle PT
MSC
(TU-LA)
MSC
(TU-IRRI)
MSC
(AA-LA-IRRI)
MNC
(TU-GP)
MNC
(GP-BIC)
SS
(TU-SU)
SS
(SA-SU)
Valenzuela none Valenzuela
Governor Pascual 1.300 6.400 0.000 Malabon
Caloocan 0.800 5.100 1.300 Caloocan
10th Avenue 1.460 4.300 2.100
5th Avenue 1.380 2.840 3.560
Solis 1.460 1.460 4.940 Manila
Tutuban 0.000 X     Tutuban
Blumentritt 2.730 2.730 5.530     Blumentritt
Laon Laan 1.090 3.820 6.620 none
España 0.700 4.520 7.320
Santa Mesa 1.970 6.490 9.290     Pureza
Pandacan 1.470 7.960 10.760 none
Paco 1.500 9.460 12.260
San Andres 0.960 10.420 13.220
Vito Cruz 0.600 11.020 13.820
Buendia 1.260 12.280 Makati
Dela Rosa 0.120 12.400 15.200
Pasay Road 0.940 13.220 16.140
EDSA 1.080 14.300 17.220   3 Magallanes
Nichols 3.600 17.900 20.820 none Taguig
FTI 0.700 18.600 21.520
Bicutan 2.300 20.900 23.820 Parañaque
Sucat 4.120 25.020 Muntinlupa
Alabang 3.673 28.693
Muntinlupa 3.320 32.013
Tunasan
San Pedro 3.361 35.374 San Pedro,
Laguna
Pacita Main Gate 2.176 37.550
Golden City 1 1.170 38.720 Biñan,
Laguna
Biñan 1.044 39.764
Santa Rosa 4.042 43.806 Santa Rosa,
Laguna
Golden City 2 1.954 45.760
Cabuyao 1.660 47.420 Cabuyao,
Laguna
Mamatid 5.530 52.950
Banlic 1.850 54.800
Calamba 1.338 56.138 Calamba,
Laguna
Pansol 4.490 60.628
Masili 1.899 62.257
Los Baños 2.382 64.909 Los Baños,
Laguna
College 2.172 67.081
IRRI 2.253 69.334
Stations in italics are either under construction, not yet operational, or have been closed.

The line is open from 4:29 a.m. PHT (UTC+8) until 9:42 p.m. on a daily basis. It operates almost every day of the year unless otherwise announced. Special schedules via the social media pages of the PNR and also in newspapers and other mass media. During Holy Week, a public holiday in the Philippines, the line is closed for annual maintenance, owing to fewer commuters and traffic around the metro. Normal operation resumes on Easter Sunday.[25]

Existing infrastructure

Station layout

All stations are presently at-grade, with most stations using a side platform layout. Most have only basic amenities, platforms and ticket booths. Rehabilitated stations along the Metro Manila line have been fitted with ramps for passengers using wheelchairs. Several stations have extended platforms, having an upper platform catering to DMU services, and a lower platform for regular locomotive-hauled services. As of August 2017, most of the stations are being extended and equipped with platform-length roofing, better ticketing office, and restrooms.

Signalling

An automatic block signalling system by Mitsui was employed in the line as stated in a 1977 magazine by the International Railway Journal.[2] However, a presentation published in 2015 by the Department of Transportation and Communications stated that there is no signalling in the line.[3]

On November 16, 2021, PNR published the bidding documents for the design, installation, and commissioning of the signalling, interlocking, and level crossing systems for the 29-kilometer (18 mi) Metro South Commuter section between Tutuban and Alabang.[26] The contract was awarded to PT Len Railway Systems of Indonesia in April 2022, and the contract was signed on May 19. PT Len Railway Systems will supply their SiLSafe 4000 computer-based interlocking system. The project is expected to be completed within 16 months after the contract signing, or until September 2023.[4]

Communications

Prior to the uprade, the communications system backbone consisted of VHF radios, augmented with land and mobile phones. It was a localized system with no repeater stations.[3] From 2020 to 2022, the communications system was digitalized and computerized. In 2020, the PNR tapped Hytera to upgrade the system's communication system to a two-way radio system. The TETRA digital radio system, which is currently being used in the line, enables faster coordination in depot personnel and has a network management system, allowing tasks to be centralized and handled seamlessly. The upgrade was completed in February 2022.[27]

Tracks

The tracks are built to the 1,067 mm (3 ft 6 in) narrow gauge. The existing tracks are ballasted, with the rails laid on wooden and concrete railroad ties. The existing tracks consist of 37-kilogram-per-meter (75 lb/yd) rails.[28]

Rolling stock

The PNR Metro Commuter Line has always used diesel-powered rolling stock since the services were opened in 1970. In 1976, PNR was able to expand its commuter and regional services when it bought 60 CMC railcars which remained in service until 2004.[29] These commuter trainsets however deteriorated in the 1990s and ordered second-hand 12 series coaches in their stead. The 12 series cars were hauled by PNR's diesel locomotives which were previously used in its intercity and freight services. There were no new orders until 2009 when PNR ordered the Hyundai Rotem DMUs, followed by second-hand multiple units and coaches from Japan.

PNR later ordered 2 new trains from Indonesian manufacturer PT INKA on January 22, 2018,[30] followed by an order of 7 more trains on May 28, increasing the total trains ordered to 9.[22] The DOST Hybrid Electric Train also entered trial service the same year. The agency then commenced the refurbishment of its entire fleet the following year, which introduced polycarbonate windows that can resist stoning as well as a new livery.

Locomotives:

Railroad cars:

Multiple units:

Active

Locomotives
Class Image Type Maximum speed Number built Number in service Year Remarks
mph km/h
900   DEL 64 103 21 6 1973, 1979, & 1991
Originally a class of 21 locomotives, 6 are active, 1 is inactive, 2 are under rehabilitation, 4 were stored in Caloocan Workshop, and 8 were scrapped.
2500   43 1 1965, 1966, 1976, & 1979 Originally a class of 43 locomotives, 1 unit is active and was repainted in orange in late 2020.
9000   DHL 75 120 3 1 2019–2020 The latest locomotive of PNR.[22]
Coaches
Class Image Type Maximum speed Number built Number in service Formation Year Remarks
mph km/h
203 series   HEP 60 100 40 units (8 sets) 20 units (4 sets) 5 1982–1986 Former JR East electric multiple units acquired in 2011.
  C
8300   C 75 120 15 units (3 sets) 5 units (1 set) 5 2019–2020 The latest passenger coaches of PNR.[22]
Multiple Units
Class Image Type Maximum speed Number built Number in service Formation Year Remarks
mph km/h
Hyundai Rotem   DMU 50 80 18 units (6 sets) 6 units (2 sets) 3 2009 Servicing the Metro North Commuter.
8000   60 100 6 units (2 sets) 3 units (1 set) 3 2018–2019 These units are derived from the Indonesian K3 coaches, which also includes the 8300 class of locomotive-hauled railcars. The 8000 class service the Metro North Commuter while the 8100 class service the Metro South Commuter.
8100   16 units (4 sets) 12 units (3 sets) 4 2019–2020

Former

Locomotives
Class Image Type Maximum speed Number built Year Remarks
mph km/h
5000   DEL 64 103 10 1991 Originally a class of 10 units, 6 were stored in Caloocan Workshop, 2 are inactive, & 2 are active. 5007 is used as a work train, while 5009 is used as a Bicol Commuter hauler.[31]
Coaches
Class Image Type Maximum speed Number built Formation Built Remarks
mph km/h
7A/12 (ja)   C 60 100 30 4-6 1970–77 Acquired 1999 to replace some of the CMC fleet. Decommissioned by 2012 after the 203 series-derived coaches have replaced them.
Multiple Units
Class Image Type Maximum speed Units Formation Built Remarks
mph km/h
Nikkō DMU 26 2-3 c. 1974 Initially arranged in two-car trainsets, the class served commuter trains in the 1970s.[32] Transferred to Peñafrancia Express intercity services between Manila and Naga.[33] Has since been decommissioned in 2004.[34]
CMC   59 95 60 2–10 1976 Last units were retired in 2004 with some units transferred to PNR's maintenance equipment. Most of them have been scrapped in 2009.
KiHa 52   59[35] 95[35] 7 3-4 1963–1966 3 units were painted in Orange, while 4 units were painted in Blue livery. 3 orange sets were used for MSC service from 2013 to 2014 and 2017. 1 unit (Kiha 122) was used for MNC operations from 2018 to 2019 then in 2020, it was refurbished as a rescue train.[36]
KiHa 350   59 95 6 2 1960s 2 units (1 set) is used as a Bicol Commuter train.

Services

 
Passenger entrance at PNR Tutuban Station

Current

Metro South Commuter

The Metro South Commuter (also known as MSC) is the main and only train service currently being offered by PNR that run along the Metro Commuter Line. The trains that are currently being used for this service are the 900 and 2500 class diesel-electric locomotives, ex-Joban Line 203 series EMUs donated by JR East, the South Korean Hyundai Rotem DMUs, the PT INKA 8000 class DMUs, INKA 8100 class DMUs, and the INKA CC300 locomotives and 8300 class coaches. The 8000 class DMUs occasionally perform MSC trips when the Hyundai Rotem DMUs occupy the Metro North Commuter trips. The trips are reduced upon announcements. On December 2, 2014, the new Calamba Station was inaugurated. Later that night, the MSC1907 was extended up to the said station. The MSC1937 was also extended, but only up to Santa Rosa Station.

As of March 2022, regular MSC services run between Tutuban and Alabang, while some morning and evening trips operate until Calamba.[37]

Metro North Commuter

On August 1, 2018, Philippine National Railways reinstated commuter train services to Caloocan station, as preparation for the Tutuban-Malolos railway, the first section of the North–South Commuter Railway line that will end at Clark in Pampanga. The line was reopened after the line was repaired due to water intrusion. According to claims by the Department of Transportation, it will be the most efficient way of travel between Caloocan and Makati. Services will continue operating until the completion of the Tutuban-Malolos Railway, after which the line will be mostly dedicated to cargo hauling.[38] Originally running from 10th Avenue to Dela Rosa, it was upgraded into the Caloocan-FTI shuttle service on September 10 (officially called the Sangangdaan-FTI shuttle service). On December 3, 2018, it was again extended to Acacia/Governor Pascual station, with plans to extend the service up to Valenzuela railway station, and poised to carry 120,000 passengers daily if completed.[23]

Trains servicing the Metro North Commuter service from Governor Pascual to FTI and vice versa usually stop at limited stations. Since 2019, trains servicing the MNC services now stop at all stations.

The trains used in this service are the INKA 8000 class and Hyundai Rotem diesel multiple units.

Past

Prior to the establishment of the PNR Metro Commuter Line, the Manila Railroad had several local train services in the 1950s and 1960s. According to a timetable that was effected on August 16, 1954, local trains on the South Main Line from Manila reached Lucena station in Quezon province.[39] In the 1960s, local trains also reached San Fernando, Pampanga on the North Main Line. Services on the South Main Line were also added in the province of Laguna, and reached San Pablo and Santa Cruz, Laguna.[40]

Caloocan–Meycauayan section

After the intercity section of the North Main Line was closed in the 1980s, then-president Corazon Aquino inaugurated the resumption of commuter rail services to Meycauayan in Bulacan on May 10, 1990. It was part of the Metrotren program initiated by then-Department of Transportations and Communications secretary Oscar Orbos to revitalize Metro Manila's public transport infrastructure due to worsening car traffic in the metropolis.[41] The line was closed in the midst of the 1997 Asian financial crisis.[42] There were plans to revitalize the entire line and extend it to Laoag.

A section of the line was opened in 2018 from Solis to Governor Pascual. This section eventually became the PNR Metro North Commuter. The network shall extend again to Valenzuela City once a bridge crossing the Tullahan River has been constructed. However, the North–South Commuter Railway will serve as the primary commuter rail service to Bulacan and neighboring Ilocos Norte, with the PNR Metro North Commuter allotted as an alternative to the NSCR.

Carmona Line

A spur line towards Carmona was opened on April 1, 1973, to serve the residents of the San Pedro–Carmona Resettlement Project. On September 11, 1976, two Rail Commuter services were designated on the line and were named after indigenous flora. The service from Carmona to Manila was called Ilang-Ilang while the returning service was called Sampaguita.[43] The Carmona services ended by early 2005.[44] The closure coincided with court cases filed in 1996 against the Philippine National Railways by private corporations that owned some of the right-of-way and was ruled out in 2008, as PNR continued to own the tracks.[45] Parts of the line remain intact, and plans to reopen the line are underway.[46]

Shuttle Service

The Shuttle Service was introduced on January 27, 2014. This service uses Hyundai Rotem DMUs and JR KiHa 52. There are 4 routes of the Shuttle Service, where trains stop at all stations along the routes.

  1. TutubanSucat
  2. SucatTutuban
  3. Sta. MesaSucat
  4. SucatSta. Mesa

This train service was removed last May 23, 2014 to give way to maintenance servicing of the rolling stock. Another reason was the 3 consecutive weeks of delays and cancellations of some train trips. The service officially returned to the line on August 1, 2018, this time, to serve from the 10th Avenue railway station up to the Dela Rosa station using a JR KiHa 350 DMU. An additional service was opened on September 10 and operated from the reopened Caloocan station to FTI station. It is now the PNR Metro North Commuter.

Premiere Train

The Premiere Train was a special MSC service that operates from Monday to Friday, except holidays. The train being used in this special service was the KiHa 59 "Kogane" train set, which is also from Japan. The train used to stop at selected stations only, namely Tutuban, Blumentritt, España, Sta. Mesa, Buendia, Pasay Road, EDSA (flagstop), Sucat, Alabang, San Pedro, Biñan, and Santa Rosa. The service had 4 trips: MSC501, MSC702, MSC1555, and MSC1802.

It was first opened in March 2014, but it only ran from Tutuban to Santa Rosa. In May 2014, Kogane was replaced by 203 series EMU coaches due to high passenger demand. The service now stops at all stations and ran from Mondays to Saturday.

It was then extended to Mamatid, then to Calamba.

The service was suspended in December 2014 due to the inauguration of the station building of Calamba, and due to the repairs of the trainset being used for this service.

IRRI services (Metro South Commuter)

Tutuban/Dela Rosa-IRRI

On December 1, 2019, Train services to the International Rice Research Institute inside the campus of the University of the Philippines Los Baños were started. Five new stations were added to the route: Pansol and Masili in Calamba Laguna, and Los Baños, college and IRRI in the neighboring town of Los Baños.[47]

The service uses the Kogane train set previously used for Premiere Train Services. The service originates from Tutuban exclusively on Sundays, while it starts from Dela Rosa from Monday to Saturday. The train only loads a limited number of passengers in Dela Rosa, FTI, Bicutan, Sucat and Alabang Stations when going southbound, but unloading in stations in between like Nichols and EDSA are allowed.[48]

The service ended in 2020 following the COVID-19 pandemic.

Alabang-Calamba-IRRI

On December 16, 2019, Regular Commuter services between Alabang, Calamba and IRRI were launched. The service uses Kiha-350 DMUs and runs the full route thrice daily from both endpoints and twice from the Calamba-IRRI segment. The service ended in 2020 following the COVID-19 pandemic.[49]

Fares and ticketing

The PNR Metro Commuter Line uses a distance-based fare system. Currently, the rail operator charges 1.07 per kilometer. The minimum fare is ₱15.00. Fares are rounded up in multiples of ₱5.00.[50] Fares are 20-percent lower for passengers of non-air-conditioned trains.[51] Additionally, senior citizens and persons with disability are also given 20-percent discount.[51]

PNR issues paper tickets manually. Passengers caught without tickets, or short-ticketed, are charged the farthest distance fare of the service.[51]

Expansion and reconstruction plans

North–South Commuter Railway

The North–South Commuter Railway will be a train line connecting the northern and southern boundaries of Mega Manila. Once fully operational by 2025, it will connect New Clark City in Capas, Tarlac to the north and Calamba, Laguna to the south.[52][53] The line will initially have 34 stations, expandable to 41 by 2030, and expand northward to Tarlac City and southward to Batangas City by 2040. The line will have commuter rail services as well as an airport limited express service connecting Clark International Airport with Alabang station.[54]

It will be a double-track line with direct current electrification through overhead lines. The line will also be built in the wider 1,435 mm (4 ft 8+12 in) standard gauge compared to the 1,067 mm (3 ft 6 in) narrow gauge being used by PNR.[55] The NSCR North which will be between Tutuban and New Clark City will be fully elevated and will have both embankment and viaduct sections. while the NSCR South will feature a mix of elevated sections through viaducts, as well as an at-grade and underground section between EDSA and FTI stations. The maximum speed on the line will be up to 120 kilometers per hour (75 mph) for commuter trains and 160 kilometers per hour (99 mph) for the airport express trains.[54] The project costs ₱777.5 billion (US$15 billion) and is one of the flagship projects of the Build! Build! Build! Infrastructure Plan.

On July 16, 2019, PNR ordered 104 EM10000 class train cars from the Japan Transport Engineering Company (J-TREC) along with Sumitomo Corporation, which will be arranged into 8-car electric multiple units.[56] This is the first order out of a total of 464 EMU cars. J-TREC and Sumitomo were again awarded on January 14, 2022, for the procurement of 304 train cars (38 sets) in a separate contract.[57] An order of 56 cars (7 sets) for the airport express train are being procured as of 2022.[58]

In November 2021, PNR planned to relocate its present tracks while the NSCR South is being constructed. This was to ensure that the Metro Commuter services would remain business as usual. The line was planned to be upgraded from the present 35-kilogram (77 lb) and 50-kilogram (110 lb) rails to the UIC60 standard but would have been reduced from double-track to single-track with passing sidings as the NSCR will become the primary passenger rail corridor up to Calamba station. As part of the project, 13 new bridges were to be constructed and the line would have remained using the existing narrow-gauge track, though allowances for future conversion to standard-gauge and reintroduction of double-tracking were incorporated into the designs. The upgrades were expected to increase the maximum design speed to 80 km/h (50 mph).[59] However, on August 17, 2022, PNR cancelled the procurement for these projects due to these being "no longer feasible".[60]

Metro North Commuter restoration

Metro North Commuter services have been restored in 2018, and there are plans to further extend the line north to Valenzuela station from its present terminus in Governor Pascual station in neighboring Malabon. A new bridge crossing the Tullahan River will also be built to connect the two stations. The expansion aims to reduce traffic congestion between Valenzuela and Makati. Although these services are planned to be superseded by the North–South Commuter Railway, the present line will continue serving passenger trains and will also serve freight trains in the future,[23] as the North Long Haul line. Under the revitalized plans to reach Ilocos and its old terminus in La Union, it will be funded through Public-Private Partnership.[61]

Integration with intercity services

The intercity section of the PNR South Main Line will be rebuilt under the PNR South Long Haul project. A new 639 km (397 mi) line will connect Metro Manila with the Bicol Region.[62] The entire section will also be built in standard gauge, similar to the NSCR but there will be no electrification. The line will also traverse the present Metro Commuter Line, initially from Calamba station by Phase 1, Sucat station by Phase 4, and eventually to Tutuban station.[63] Since the intercity services will traverse the narrow-gauge line, there will be a dual gauge network between these stations and IRRI station.

Incidents and accidents

The PNR Metro Commuter Line has been prone to numerous incidents, including stoning incidents,[64] people being run over by trains (including even fatal ones),[65] and trains colliding with vehicles.[66]

  • On May 19, 2014, a cigarette vendor died while six others were hurt when a PNR train from Tutuban Station collided with a jeepney across the railroad tracks along G. Tuazon Street in Sampaloc, Manila at around 4:30 p.m. The jeepney was dragged around 50 meters (160 ft) from the site of the collision. The driver of the jeepney was allegedly drunk when the collision happened.[66]
  • On April 29, 2015, a Hyundai Rotem DMU derailed between EDSA railway station and Nichols railway station. There were 80 reported injuries, mostly minor cases.[67][68] The incident was caused by missing parts of the railtracks that were stolen.[69] This, however, prompted PNR operations to be suspended on May 5, 2015, to conduct safety tests by PNR and TÜV Rheinland.[70] The operations of the PNR resumed on July 23, 2015.[18]
  • On January 12, 2016, a PNR Metro South Commuter Line train from Alabang collided with a jeepney at the Pedro Gil Street crossing near Paco station in Paco, Manila. One person died from head injuries and six were injured.[71][72]
  • On July 7, 2017, five people, including a pregnant woman, was hurt when an ambulance was hit by a train (a PNR 900 class locomotive and a 203 series EMU) near Blumentritt Station in Manila. The ambulance, which came from Barangay 167 Ilano in Caloocan, was on its way to a hospital to bring the pregnant woman when the accident occurred.[73]
  • On January 14, 2018, a passenger in a 203 series trainset forced a train door open while the train was moving.[74][75]
  • On October 11, 2019, an old woman got run over by a train, causing injuries to her hands and legs.[76]
  • Fourteen stoning incidents were reported from December 2 to 21, 2019, including a stoning incident in one 8000 class train.[64]
  • On December 28, 2019, an 8000 class was obstructed between España and Sta. Mesa stations.[77][78]
  • On January 1, 2020, a windshield of a Hyundai Rotem DMU was shattered due to a stoning incident while performing an MNC Trip at Caloocan.[79] The glass window was replaced with polycarbonate the day after the incident. It was also found that a group of minors were the ones who did the crime.[80]
  • In February 2020, a window in a KiHa 59 series (Kogane) trainset shattered due to a stoning incident.[81]
  • On February 16, 2020, a 203 series trainset was involved in a stone-throwing incident. It damaged a door window and injured one passenger.[81]
  • On June 3, 2020, a Hyundai Rotem DMU rammed a car at Abad Santos Railroad Crossing in Tondo, Manila. The crossing barrier was not down when the accident happened. The train dragged the car for about 10 meters.[82]
  • On August 28, 2020, an engineer got run over by an 8100 class train near Paco station. The engineer died after the incident.[83]
  • On August 22, 2021, three teenagers died after they got run over by a train in Santa Mesa, Manila.[65]
  • On September 2, 2021, a Hyundai Rotem DMU train rammed a blue car at the Piy Margal Railroad Crossing in Manila despite early warning by the crossing keepers. No injuries were reported. The PNR management is yet to release a statement about the absence of barriers at the railroad crossing,[84] particularly at the southbound lane.
  • On April 12, 2022, a 9-to-12-year-old child died after being run over by 921 hauling a 203 series EMU train at the intersection of Antipolo Street and Ipil Street in Santa Cruz, Manila.[85]
  • On September 25, 2022, a DMU train collided with a crane while performing a MNC service in Sta. Mesa, Manila, causing three injuries and damages to the front cab of the train.[86]
  • On February 11, 2023, a motorcycle rider suddenly crossed the railroad crossing in Tayuman, Manila when a DEL class locomotive is about to cross the railroad crossing.[87]

Notes

  1. ^ Metro North Commuter only.
  2. ^ a b c Metro South Commuter only.
  3. ^ Opened in sections from August 1, 2018 to December 3, 2018.

References

  1. ^ Rita, Joviland (March 15, 2022). "PNR still has low ridership amid limited face-to-face classes". GMA News. Retrieved March 15, 2022.
  2. ^ a b "Philippines investment should boost rail business". International Railway Journal. 1977.
  3. ^ a b c Presentation for Pre-Qualification Conference (PDF). NORTH-SOUTH RAILWAY PROJECT SOUTH LINE (Report). Department of Transportation (Philippines). August 20, 2015. Retrieved March 8, 2022.
  4. ^ a b "PT LRS Ekspor Teknologi Persinyalan SiLSafe 4000 ke Filipina" [PT LRS Exports SiLSafe 4000 Signaling Technology to the Philippines]. Kompas.com (in Indonesian). May 19, 2022. Retrieved May 20, 2022.
  5. ^ a b "MetroTrak". Philippine Journal. Philippine News Agency. January 4, 1990. Retrieved July 22, 2020.
  6. ^ a b "Metrotren inaugural". Manila Chronicle. May 11, 1990. Retrieved July 22, 2020.
  7. ^ Orbon, Glenn; Dungca, Joana (2015). "The Philippine Railway System". Movement Systems.
  8. ^ . meralco.com.ph. Meralco. October 11, 2004. Archived from the original on September 18, 2009. Retrieved May 28, 2020.
  9. ^ a b Gamble, Adrian (March 10, 2017). "Manila's Long-Lost 'Tranvias' Once the Envy of Asia". skyrisecities.com. Skyrise Cities. from the original on June 21, 2020. Retrieved June 21, 2020.
  10. ^ "PNR Schedule effective September 11, 1976". www.flickr.com. Retrieved July 23, 2020.
  11. ^ "Old PNR stations". Reddit. Retrieved July 23, 2020.
  12. ^ "Carmona's Commuter Train". Times Journal. April 1973. Retrieved July 23, 2020.
  13. ^ "Off track: Northrail timeline". ABS-CBN News. July 15, 2008. Retrieved July 23, 2020.
  14. ^ "Ballast Train in Tayuman". May 25, 2009. Retrieved July 23, 2020.
  15. ^ "Philippines: China-funded Northrail project derailed". Financial Times. Retrieved July 23, 2020.
  16. ^ Montecillo, Paolo (September 26, 2011). "PNR gets old trains from Japan". Retrieved July 23, 2020.
  17. ^ Macaraig, Ayee (May 6, 2014). "Senate panel: Extend PNR, improve services". Rappler. Retrieved July 23, 2020.
  18. ^ a b Corrales, Nestor (July 23, 2015). "PNR resumes Tutuban-Alabang train operations". Philippine Daily Inquirer. Retrieved July 23, 2020.
  19. ^ Camus, Miguel (July 16, 2015). "Gov't rolls out P171-B railway project". Philippine Daily Inquirer. Retrieved July 23, 2020.
  20. ^ de Vera, Ben (April 10, 2017). "Infrastructure spending up 42.8% in 2016". Retrieved July 23, 2020.
  21. ^ Uy, Jocelyn (July 20, 2016). "PNR tracks sought for test runs". Philippine Daily Inquirer. Retrieved July 23, 2020.
  22. ^ a b c d Valdez, Denise (May 30, 2018). "PNR buys 7 new train sets from Indonesia". BusinessWorld. Retrieved July 21, 2020.
  23. ^ a b c Parrocha, Azer (August 14, 2019). "Completed railway assets to ease traffic by 25%: DOTr". Philippine News Agency.
  24. ^ Yu, Lance Spencer (February 17, 2023). "PNR to close some routes starting May for North-South Railway construction". Rappler. Retrieved February 17, 2023.
  25. ^ Doctor, Mel Matthew (April 10, 2022). "No MRT3, LRT2 ops on April 13–17, PNR on April 14–16 for Holy Week —DOTr". GMA News. Retrieved April 17, 2022.
  26. ^ Procurement of Level Crossing, Signaling and Interlock (PDF) (Report). Philippine National Railways. November 16, 2021. Retrieved May 23, 2022.
  27. ^ "Ramping Up Philippine's National Railways". ASEAN Technology & Security Magazine. February 24, 2022. Retrieved March 7, 2022.
  28. ^ North-South Railway Project – South Line Project Information Memorandum (PDF) (Report). Department of Transportation and Communications. August 2015. Retrieved March 7, 2022.
  29. ^ "PNR Commuter Trains". Times Journal. October 29, 1976. Retrieved July 23, 2020.
  30. ^ "DOTr- PNR Signs Contract To Acquire 2 New Trainsets from Indonesia" (Press release). Department of Transportation. January 22, 2018. Retrieved January 3, 2022.
  31. ^ DEL 5009 Hauling KiHa 350 Set #3, retrieved March 15, 2022
  32. ^ "1974 1125 PNR Guadalupe Station". Flickr. November 21, 2011. Retrieved July 27, 2020.
  33. ^ "1986 0210 PNR Nikko Train_Legazpi station". Flickr. August 12, 2016. Retrieved July 27, 2020.
  34. ^ Peadon, Brad. "April 2020". Philippine National Railways Rolling Stock Update. Philippine Railways Historical Society. 3.
  35. ^ a b Okada, Seiichi (1996). "キハ20系車両のあゆみ(国鉄編)". Railway Pictorial (in Japanese). Electric Vehicle Study Group (605): 10–17.
  36. ^ DEL DMU KIHA TRAIN SCENE RSM CALOOCAN SHOP. July 5, 2021. Retrieved March 9, 2022.
  37. ^ "Maps and Timetables". Philippine National Railways. Retrieved October 3, 2022.
  38. ^ "IN PHOTOS:After 20 years, PNR reopens Caloocan-Makati Line". The Philippine Star. August 1, 2018. Retrieved August 5, 2018.
  39. ^ "New MRR Train Time Schedule". Manila Chronicle. August 14, 1954. Retrieved March 21, 2021.
  40. ^ "MRR Time Schedule". Philippine Herald. July 18, 1960. Retrieved March 21, 2021.
  41. ^ "Metrotren Inaugural". Manila Chronicle. May 11, 1990. Retrieved March 21, 2021.
  42. ^ URBAN / TRANSPORTATION DEVELOPMENT CONDITION IN ADJOINING AREAS (PDF). METRO MANILA URBAN TRANSPORTATION INTEGRATION STUDY (Report). Vol. Technical Report No. 3. Japan International Cooperation Agency. March 31, 1999. Retrieved March 21, 2021.
  43. ^ "PNR Schedule Effective September 11, 1976". Times Journal. September 11, 1976. Retrieved March 21, 2021.
  44. ^ "フィリピン国鉄(PNR)南方線 カルモナ支線". TTCN Philrail (in Japanese). March 31, 2007. Retrieved March 21, 2021.
  45. ^ "Forfom Development Corporation vs. Philippine National Railways (G.R. No. 124795)". The Lawphil Project. Arellano University School of Law. December 10, 2008. Retrieved March 21, 2021.
  46. ^ "LOOK: The Philippine National Railways (PNR) Rail Police and PNR Incident Response Teams (IRT), in coordination with PNP Laguna and PNP Cavite, are now inspecting the PNR Carmona Line branch". Facebook. Department of Transportation (Philippines). August 18, 2018.
  47. ^ https://facebook.com/story.php?story_fbid=1564617300358612&id=134752476678442[user-generated source]
  48. ^ https://facebook.com/story.php?story_fbid=10159183855685299&id=605395298[user-generated source]
  49. ^ Alabang-Calamba-IRRI timetable. Philippine National Railways.
  50. ^ Yee, Jovic (June 18, 2017). "Deferred in 2015, PNR fare hike takes effect July 1". Philippine Daily Inquirer. Retrieved March 7, 2022.
  51. ^ a b c Philippine National Railways. "Fares & Tickets - Manila (Tutuban) Station". Philippine National Railways. Retrieved March 7, 2022.
  52. ^ Dela Paz, Chrissie (September 13, 2017). "NEDA Board approves Manila subway, longest railway". Rappler. Retrieved September 15, 2017.
  53. ^ Leyco, Chino S. (September 13, 2017). "NEDA Board approves big infra projects". Manila Bulletin. Retrieved September 15, 2017.
  54. ^ a b Department of Transportation The Republic of the Philippines (October 2018). "FEASIBILITY STUDY ON THE NORTH SOUTH RAILWAY PROJECT-SOUTH LINE (COMMUTER)(NORTH-SOUTH COMMUTER RAILWAY EXTENSION PROJECT) IN THE REPUBLIC OF THE PHILIPPINES" (PDF). jica.go.jp.
  55. ^ "Philippines approves standard gauge for all new lines". www.railwaypro.com. August 10, 2016. Retrieved July 12, 2020.
  56. ^ Lopez, Melissa Luz (July 16, 2019). "DOTr taps Japan bullet train supplier for Tutuban-Malolos railway". CNN Philippines. Retrieved July 18, 2019.
  57. ^ "Notice of Award of Contract Package NS-02: Rolling Stock – Commuter Trainsets" (PDF). Department of Transportation (Philippines). January 14, 2022. Retrieved January 24, 2022.
  58. ^ Burroughs, David (October 17, 2019). "Five bids received for PNR Clark Phase 2 section of Manila of NSCR". International Rail Journal. Retrieved July 30, 2020.
  59. ^ DESIGN AND BUILD OF PNR TRACK RELOCATION WORKS INCLUDING POCKET TRACKS, STATIONS, RCC BOX CULVERTS & OTHER CIVIL WORKS – SOLIS TO SUCAT (TRP-4A) (PDF) (Report). Philippine National Railways. November 16, 2021. Retrieved November 18, 2021.
  60. ^ Balinbin, Arjay L. (August 23, 2022). "PNR cancels bids for 3 projects after finding them 'non-feasible'". BusinessWorld. Retrieved August 25, 2022.
  61. ^ "Privatization process for EDSA busway starts". The Philippine STAR.
  62. ^ "Bicol Airport to open, PNR South on track". Manila Standard. January 7, 2020. Retrieved July 30, 2020.
  63. ^ "South rail to start in Q2—Salceda". Manila Standard Business. November 21, 2019. Retrieved July 30, 2020.
  64. ^ a b Panganiban-Perez, Tina (December 26, 2019). "Trains damaged in 14 stone-throwing incidents in December 2019, says PNR". GMA News. Retrieved December 30, 2021.
  65. ^ a b Cayabyab, Marc Jayson (August 24, 2021). "PNR train mangles 3 teens". The Philippine Star. Retrieved December 30, 2021.
  66. ^ a b Balagtas See, Aie (May 20, 2014). "1 dead, 6 hurt as train hits jeepney". Philippine Star. Retrieved January 19, 2022.
  67. ^ Mangunay, Kristine Felisse (April 30, 2015). "80 injured as PNR train derails in Taguig City". Philippine Daily Inquirer. Retrieved January 19, 2022.
  68. ^ Batallones, Jeck (April 29, 2015). "PNR train derailed; 50 hurt". ABS-CBN News. Retrieved December 25, 2018.
  69. ^ EXCL: Pagnanakaw ng riles, sinisi sa pagkadiskaril ng PNR. YouTube. ABS-CBN News. May 24, 2015. Retrieved May 11, 2021.
  70. ^ "Operations of Philippine National Railways (PNR) will not Continue Effective on May 5, 2015". onlinefilipinoworkers.com. May 6, 2015. Retrieved May 11, 2021.
  71. ^ Balagtas-See, Aie (January 15, 2016). "Raps on vs jeepney hit by train". Inquirer.net. Philippine Daily Inquirer. Retrieved January 19, 2022.
  72. ^ Adel, Rosette (January 12, 2016). "1 killed, 6 injured in PNR-jeep collision in Paco". Philippine Star. Retrieved January 19, 2022.
  73. ^ Takumi, Rie (July 7, 2017). "Pregnant woman, 4 others hurt as PNR train hits ambulance in Manila". GMA News. Retrieved January 19, 2022.
  74. ^ Ramirez, Robertzon (January 17, 2018). "Commuter forces open PNR train's doors". The Philippine Star. Retrieved January 18, 2022.
  75. ^ External video of incident. January 14, 2018. Retrieved January 18, 2022.
  76. ^ Ganibe, Dexter (October 11, 2019). "Lola, pinutulan ng kamay, binti matapos masagasaan ng PNR tren". ABS-CBN News. Retrieved December 30, 2021.
  77. ^ SONA: Yero, gulong at iba pang basurang puwedeng makasira sa tren ng... (YouTube). December 30, 2019. Retrieved December 30, 2021.
  78. ^ "DOTr appeals to the public to report PNR stone-throwing incidents". CNN Philippines. December 28, 2019. Retrieved December 31, 2021.
  79. ^ "Another PNR train damaged in New Year's Day stone-throwing incident". Coconuts Manila. January 2, 2020. Retrieved May 11, 2021.
  80. ^ Marquez, Consuelo (January 4, 2020). "PNR tags minor as person of interest in stoning of trains". INQUIRER.net. Retrieved March 4, 2021.
  81. ^ a b Tren ng PNR, binato na naman; ilang pasahero, galit na. YouTube. February 22, 2020. Retrieved December 31, 2021.
  82. ^ 24 Oras: Kotse, nasalpok at nakaladkad nang halos 10 metro ng PNR train. YouTube. June 3, 2020. Retrieved June 11, 2021.
  83. ^ GMA News (August 29, 2020). Engineer, patay nang masagasaan ng tren ng PNR (Facebook Watch) (in Filipino). Retrieved December 28, 2021.
  84. ^ Santos, Jamil (September 3, 2021). "Doctor survives after train hits, drags her SUV in Manila". GMA News. Retrieved September 4, 2021.
  85. ^ Doctor, Mel Matthew (April 18, 2022). "Body of child run over by train in Manila yet to be claimed from mortuary". GMA News. Retrieved April 19, 2022.
  86. ^ Santos, Pat C. (September 27, 2022). "PNR loses train in crane mishap". Daily Tribune. Retrieved September 29, 2022.
  87. ^ KAMOTE RIDER spotted 🎥 Incident happened at Tayuman crossing, February 11, 2023. | By Philippine Train Enthusiasts and Railfans Club | Facebook, retrieved February 12, 2023

External links

  • The PNR Metro Commuter Line – Timetables

metro, commuter, line, chilean, commuter, rail, system, also, known, metrotren, metrotrén, commuter, rail, line, operated, philippine, national, railways, first, inaugurated, metro, manila, commuter, service, 1970, originally, served, north, main, line, south,. For the Chilean commuter rail system also known as Metrotren see Metrotren The PNR Metro Commuter Line is a commuter rail line operated by the Philippine National Railways It was first inaugurated as the Metro Manila Commuter Service in 1970 and originally served the North Main Line and the South Main Lines as well as the defunct Carmona and Guadalupe branch lines Since then it adopted several names such as Metrotrak 5 and Metrotren 6 before adopting its present name in the late 2000s The line is also nicknamed the Orange Line due to its designation in the 1970s PNR Metro Commuter LineA PNR 9000 class and 8300 class train at Alabang stationOverviewStatusOperationalOwnerGovernment of the PhilippinesLocaleMetro ManilaTerminiTutubanGovernor Pascual a Alabang b Calamba b IRRI b Stations36Websitepnr gov phServiceTypeCommuter railServices2Operator s Philippine National RailwaysDepot s TutubanCaloocanRolling stockRefer to Rolling stock section belowDaily ridership18 000 March 2022 1 HistoryOpenedApril 6 1970 52 years ago April 6 1970 Closed1997 26 years ago 1997 Caloocan Meycauayan Reopened2018 5 years ago 2018 Solis Governor Pascual c TechnicalLine length75 7 km 47 0 mi Track length107 2 km 66 6 mi Number of tracksDouble track Governor Pascual Sucat Single track Sucat IRRI CharacterAt gradeTrack gauge1 067 mm 3 ft 6 in ElectrificationNoneOperating speed20 40 km h 12 25 mph SignallingMitsui ABS 1977 2009 2 None 2009 present 3 PT Len SiLSafe 4000 CBI starting 2023 4 Average inter station distance2 1 km 1 3 mi Route mapLegendGovernor PascualMalabonCaloocanCaloocanCaloocan Depot10th Avenue5th AvenueCaloocanManilaEstero de Sunog ApogSolisTutuban Railyard amp Tayuman Locomotive ShedTutubanBlumentrittLaon LaanEspana 8Estero de ValenciaSanta MesaPasig RiverEstero de PandacanPandacanEstero de PandacanPacoSan AndresVito CruzManilaMakatiBuendiaDela RosaPasay RoadEstero de Tripa de GallinaEDSA 3Estero de Tripa de Gallina MakatiTaguigNichols MMS FTI MMS TaguigParanaqueBicutanParanaqueMuntinlupaSucatSucat RiverMangangate RiverAlabangBayanan CreekPoblacion RiverMuntinlupaMagdaong RiverTunasanMuntinlupa Tunasan River San PedroSan Isidro RiverSan PedroSan PedroCarmonaCarmonaPacita Main GateSan PedroBinanGolden City 1BinanBinan RiverBinanSanta RosaSilang Santa Rosa RiverSanta RosaGolden City 2Santa RosaCabuyaoCabuyao River deltaCabuyaoGulodCabuyao River deltaMamatidBanlicCabuyaoCalambaSan Cristobal RiverSan Juan RiverCalambaPansolMasiliCalambaLos BanosDampalit CreekLos BanosAnos CreekCollegeMolawin RiverIRRIThis diagram viewtalkeditThe present line has 36 stations serving Metro Manila and Laguna It is divided into two sections which meet in Tutuban station in Tondo Manila The Metro North Commuter section runs from Tutuban to Governor Pascual station in Malabon and is colored light green in the system map of PNR On the other hand the Metro South Commuter section which runs from Tutuban to IRRI station in Los Banos Laguna and is colored orange Some stations connect to LRT Lines 1 and 2 and MRT Line 3 Contents 1 History 1 1 Manila Railroad local trains and Meralco Tranvias 1 2 PNR commuter services 1 2 1 Metro Manila Commuter Service 1970 89 1 2 2 Metrotrak then Metrotren 1989 2009 1 2 3 Post Metrotren and Metro Commuter 1 3 Planned closure 2 Route 3 Existing infrastructure 3 1 Station layout 3 2 Signalling 3 3 Communications 3 4 Tracks 4 Rolling stock 4 1 Active 4 2 Former 5 Services 5 1 Current 5 1 1 Metro South Commuter 5 1 2 Metro North Commuter 5 2 Past 5 2 1 Caloocan Meycauayan section 5 2 2 Carmona Line 5 2 3 Shuttle Service 5 2 4 Premiere Train 5 2 5 IRRI services Metro South Commuter 5 2 5 1 Tutuban Dela Rosa IRRI 5 2 5 2 Alabang Calamba IRRI 6 Fares and ticketing 7 Expansion and reconstruction plans 7 1 North South Commuter Railway 7 2 Metro North Commuter restoration 7 3 Integration with intercity services 8 Incidents and accidents 9 Notes 10 References 11 External linksHistory EditManila Railroad local trains and Meralco Tranvias Edit A map of the Manila Railroad Company s local train network The Manila Railroad Company which preceded PNR operated various local trains between Manila and its neighboring provinces Trains from Tutuban will lead to Naic in Cavite Pagsanjan in Laguna Montalban in Rizal and Bulacan during the 1920s 7 The Manila Electric Railroad and Light Company Meralco also operated electrified Tranvia services in what is now Metro Manila 8 The 100 km 62 mi tram system reached Malabon to the north Pasig to the east and Libertad now part of Pasay to the south making it one of the longest in Asia in 1924 9 Both systems were heavily damaged during the Battle of Manila in World War II 9 PNR commuter services Edit Metro Manila Commuter Service 1970 89 Edit The Metro Manila Commuter Service started on April 6 1970 which started at Manila North Harbor and ended in Binan Laguna During this decade more stations were opened although some were either closed or relocated In 1976 the commuter system peaked and extended as far north as San Fernando Pampanga 10 Guadalupe located in Mandaluyong on the other side of Pasig River to the east and College to the south 11 There were also services in the now defunct Carmona branch line 12 Metrotrak then Metrotren 1989 2009 Edit In 1990 the system was undergoing renovations under the working title Metrotrak 5 By May of that year the system was inaugurated as Metrotren to distinguish it from the LRT Line 1 then named Metrorail 6 However the Metrotren system eventually suffered neglect due to lack of funding and maintenance Plans for expansion and rehabilitation such as the Manila Clark rapid railway project and Guadalupe line revival was also never realized 13 Post Metrotren and Metro Commuter Edit Tracks on the Metro South Commuter section near Blumentritt station in Tondo Manila The Arroyo administration attempted to modernize the PNR system by rebuilding the lines and purchasing new rolling stock PNR purchased 6 brand new diesel multiple units from South Korea and became its first order in 35 years 14 The government was also interested in reviving the Manila to Malolos NorthRail project However the line stopped construction in 2011 and only pillars were built 15 The succeeding Aquino administration rebuilt the stations along the line to accommodate high floor trains PNR also acquired second hand multiple units from Japan as stopgap measures to its train fleet ending the Metrotren era 16 However services were further suspended to Santa Rosa in 2014 17 and to Alabang in 2015 due to safety issues and accidents on the line 18 The North Main Line has also been closed 19 The Duterte administration Department of Transportation Secretary Arthur Tugade and PNR General Manager Junn Magno all promised to revive and modernize the PNR and its commuter line 20 In 2017 the Department of Science and Technology announced its first Filipino designed train and started trial services between Alabang and Calamba in 2018 21 For the present network Magno announced the purchase of 3 diesel hydraulic locomotives 15 coaches and 6 sets of diesel multiple units from Indonesian rolling stock manufacturer PT Industri Kereta Api or INKA The INKA trainsets and 5 of the Hyundai Rotem DMUs will comprise a 14 train fleet that will replace the aging PNR 900 class as well as the second hand rolling stock acquired by the Aquino administration as these trainsets will be transferred to the Bicol Region for the Bicol Commuter services after 2020 22 The present line will also be rebuilt during and after the construction of the North South Commuter Railway as it will serve as an alternate transport mode to the NSCR 23 It will be eventually envisioned to revisit and reactivate once abandoned lines and stations in the north that was once operated by PNR Planned closure Edit On February 16 2023 DOTr announced the suspension of operations of the PNR system along with the Metro Commuter services to give way for the construction of the North South Commuter Railway The northern section of the line is expected to close by May 2023 while the entire line will be closed by October 2023 24 Route Edit Map of PNR Metro Commuter Line services The existing operational Metro Commuter Line is predominantly aligned and shares the path of the PNR South Main Line or SouthRail which uses a dedicated right of way of its own It terminates at Calamba Station despite having rails further towards Legazpi Albay but few trains stop at Sta Rosa and Calamba Stations further to the south Inter provincial services such as the Bicol Express and Mayon Limited are not running as of 2015 but plans to revive the services have been presented LegendTrains stop at stations marked Trains pass those marked Only morning and evening trains stop at stations marked Morning and evening trains stopping only on Sundays at stations marked X Evening southbound trains only load at stations marked Morning and evening trains only unload at stations marked For AA LA IRRI some trains stop at stations marked while all trains stop at stations marked closed stations MSC TU LA Metro South Commuter Tutuban to Calamba MSC TU IRRI Metro South Commuter Tutuban to IRRI MSC AA LA IRRI Metro South Commuter Alabang Calamba IRRI MNC TU GP Metro North Commuter Tutuban to Governor Pascual MNC GP FTI Metro North Commuter Governor Pascual to FTI SS TU SU Shuttle Service Tutuban to Sucat SS SA SU Shuttle Service Santa Mesa to Sucat PT Premiere TrainName Distance km Services Transfers LocationBetween stations From Tutuban From Governor Pascual Metro Commuter Shuttle PTMSC TU LA MSC TU IRRI MSC AA LA IRRI MNC TU GP MNC GP BIC SS TU SU SS SA SU Valenzuela none ValenzuelaGovernor Pascual 1 300 6 400 0 000 MalabonCaloocan 0 800 5 100 1 300 Caloocan10th Avenue 1 460 4 300 2 100 5th Avenue 1 380 2 840 3 560 Solis 1 460 1 460 4 940 ManilaTutuban 0 000 X TutubanBlumentritt 2 730 2 730 5 530 BlumentrittLaon Laan 1 090 3 820 6 620 noneEspana 0 700 4 520 7 320 Santa Mesa 1 970 6 490 9 290 PurezaPandacan 1 470 7 960 10 760 nonePaco 1 500 9 460 12 260 San Andres 0 960 10 420 13 220 Vito Cruz 0 600 11 020 13 820 Buendia 1 260 12 280 MakatiDela Rosa 0 120 12 400 15 200 Pasay Road 0 940 13 220 16 140 EDSA 1 080 14 300 17 220 3 MagallanesNichols 3 600 17 900 20 820 none TaguigFTI 0 700 18 600 21 520 Bicutan 2 300 20 900 23 820 ParanaqueSucat 4 120 25 020 MuntinlupaAlabang 3 673 28 693 Muntinlupa 3 320 32 013 Tunasan San Pedro 3 361 35 374 San Pedro LagunaPacita Main Gate 2 176 37 550 Golden City 1 1 170 38 720 Binan LagunaBinan 1 044 39 764 Santa Rosa 4 042 43 806 Santa Rosa LagunaGolden City 2 1 954 45 760 Cabuyao 1 660 47 420 Cabuyao LagunaMamatid 5 530 52 950 Banlic 1 850 54 800 Calamba 1 338 56 138 Calamba LagunaPansol 4 490 60 628 Masili 1 899 62 257 Los Banos 2 382 64 909 Los Banos LagunaCollege 2 172 67 081 IRRI 2 253 69 334 Stations in italics are either under construction not yet operational or have been closed The line is open from 4 29 a m PHT UTC 8 until 9 42 p m on a daily basis It operates almost every day of the year unless otherwise announced Special schedules via the social media pages of the PNR and also in newspapers and other mass media During Holy Week a public holiday in the Philippines the line is closed for annual maintenance owing to fewer commuters and traffic around the metro Normal operation resumes on Easter Sunday 25 Existing infrastructure EditStation layout Edit All stations are presently at grade with most stations using a side platform layout Most have only basic amenities platforms and ticket booths Rehabilitated stations along the Metro Manila line have been fitted with ramps for passengers using wheelchairs Several stations have extended platforms having an upper platform catering to DMU services and a lower platform for regular locomotive hauled services As of August 2017 most of the stations are being extended and equipped with platform length roofing better ticketing office and restrooms Signalling Edit An automatic block signalling system by Mitsui was employed in the line as stated in a 1977 magazine by the International Railway Journal 2 However a presentation published in 2015 by the Department of Transportation and Communications stated that there is no signalling in the line 3 On November 16 2021 PNR published the bidding documents for the design installation and commissioning of the signalling interlocking and level crossing systems for the 29 kilometer 18 mi Metro South Commuter section between Tutuban and Alabang 26 The contract was awarded to PT Len Railway Systems of Indonesia in April 2022 and the contract was signed on May 19 PT Len Railway Systems will supply their SiLSafe 4000 computer based interlocking system The project is expected to be completed within 16 months after the contract signing or until September 2023 4 Communications Edit Prior to the uprade the communications system backbone consisted of VHF radios augmented with land and mobile phones It was a localized system with no repeater stations 3 From 2020 to 2022 the communications system was digitalized and computerized In 2020 the PNR tapped Hytera to upgrade the system s communication system to a two way radio system The TETRA digital radio system which is currently being used in the line enables faster coordination in depot personnel and has a network management system allowing tasks to be centralized and handled seamlessly The upgrade was completed in February 2022 27 Tracks Edit The tracks are built to the 1 067 mm 3 ft 6 in narrow gauge The existing tracks are ballasted with the rails laid on wooden and concrete railroad ties The existing tracks consist of 37 kilogram per meter 75 lb yd rails 28 Rolling stock EditMain article List of Philippine National Railways rolling stock The PNR Metro Commuter Line has always used diesel powered rolling stock since the services were opened in 1970 In 1976 PNR was able to expand its commuter and regional services when it bought 60 CMC railcars which remained in service until 2004 29 These commuter trainsets however deteriorated in the 1990s and ordered second hand 12 series coaches in their stead The 12 series cars were hauled by PNR s diesel locomotives which were previously used in its intercity and freight services There were no new orders until 2009 when PNR ordered the Hyundai Rotem DMUs followed by second hand multiple units and coaches from Japan PNR later ordered 2 new trains from Indonesian manufacturer PT INKA on January 22 2018 30 followed by an order of 7 more trains on May 28 increasing the total trains ordered to 9 22 The DOST Hybrid Electric Train also entered trial service the same year The agency then commenced the refurbishment of its entire fleet the following year which introduced polycarbonate windows that can resist stoning as well as a new livery Locomotives DEL Diesel electric DHL Diesel hydraulic Railroad cars C Coach HEP Head end power car S Sleeping car Multiple units BEMU Battery electric multiple unit DMU Diesel multiple unitActive Edit LocomotivesClass Image Type Maximum speed Number built Number in service Year Remarksmph km h900 DEL 64 103 21 6 1973 1979 amp 1991Originally a class of 21 locomotives 6 are active 1 is inactive 2 are under rehabilitation 4 were stored in Caloocan Workshop and 8 were scrapped 2500 43 1 1965 1966 1976 amp 1979 Originally a class of 43 locomotives 1 unit is active and was repainted in orange in late 2020 9000 DHL 75 120 3 1 2019 2020 The latest locomotive of PNR 22 CoachesClass Image Type Maximum speed Number built Number in service Formation Year Remarksmph km h203 series HEP 60 100 40 units 8 sets 20 units 4 sets 5 1982 1986 Former JR East electric multiple units acquired in 2011 C8300 C 75 120 15 units 3 sets 5 units 1 set 5 2019 2020 The latest passenger coaches of PNR 22 Multiple UnitsClass Image Type Maximum speed Number built Number in service Formation Year Remarksmph km hHyundai Rotem DMU 50 80 18 units 6 sets 6 units 2 sets 3 2009 Servicing the Metro North Commuter 8000 60 100 6 units 2 sets 3 units 1 set 3 2018 2019 These units are derived from the Indonesian K3 coaches which also includes the 8300 class of locomotive hauled railcars The 8000 class service the Metro North Commuter while the 8100 class service the Metro South Commuter 8100 16 units 4 sets 12 units 3 sets 4 2019 2020Former Edit LocomotivesClass Image Type Maximum speed Number built Year Remarksmph km h5000 DEL 64 103 10 1991 Originally a class of 10 units 6 were stored in Caloocan Workshop 2 are inactive amp 2 are active 5007 is used as a work train while 5009 is used as a Bicol Commuter hauler 31 CoachesClass Image Type Maximum speed Number built Formation Built Remarksmph km h7A 12 ja C 60 100 30 4 6 1970 77 Acquired 1999 to replace some of the CMC fleet Decommissioned by 2012 after the 203 series derived coaches have replaced them Multiple UnitsClass Image Type Maximum speed Units Formation Built Remarksmph km hNikkō DMU 26 2 3 c 1974 Initially arranged in two car trainsets the class served commuter trains in the 1970s 32 Transferred to Penafrancia Express intercity services between Manila and Naga 33 Has since been decommissioned in 2004 34 CMC 59 95 60 2 10 1976 Last units were retired in 2004 with some units transferred to PNR s maintenance equipment Most of them have been scrapped in 2009 KiHa 52 59 35 95 35 7 3 4 1963 1966 3 units were painted in Orange while 4 units were painted in Blue livery 3 orange sets were used for MSC service from 2013 to 2014 and 2017 1 unit Kiha 122 was used for MNC operations from 2018 to 2019 then in 2020 it was refurbished as a rescue train 36 KiHa 350 59 95 6 2 1960s 2 units 1 set is used as a Bicol Commuter train Services Edit Passenger entrance at PNR Tutuban Station Current Edit Metro South Commuter Edit The Metro South Commuter also known as MSC is the main and only train service currently being offered by PNR that run along the Metro Commuter Line The trains that are currently being used for this service are the 900 and 2500 class diesel electric locomotives ex Joban Line 203 series EMUs donated by JR East the South Korean Hyundai Rotem DMUs the PT INKA 8000 class DMUs INKA 8100 class DMUs and the INKA CC300 locomotives and 8300 class coaches The 8000 class DMUs occasionally perform MSC trips when the Hyundai Rotem DMUs occupy the Metro North Commuter trips The trips are reduced upon announcements On December 2 2014 the new Calamba Station was inaugurated Later that night the MSC1907 was extended up to the said station The MSC1937 was also extended but only up to Santa Rosa Station As of March 2022 regular MSC services run between Tutuban and Alabang while some morning and evening trips operate until Calamba 37 Metro North Commuter Edit On August 1 2018 Philippine National Railways reinstated commuter train services to Caloocan station as preparation for the Tutuban Malolos railway the first section of the North South Commuter Railway line that will end at Clark in Pampanga The line was reopened after the line was repaired due to water intrusion According to claims by the Department of Transportation it will be the most efficient way of travel between Caloocan and Makati Services will continue operating until the completion of the Tutuban Malolos Railway after which the line will be mostly dedicated to cargo hauling 38 Originally running from 10th Avenue to Dela Rosa it was upgraded into the Caloocan FTI shuttle service on September 10 officially called the Sangangdaan FTI shuttle service On December 3 2018 it was again extended to Acacia Governor Pascual station with plans to extend the service up to Valenzuela railway station and poised to carry 120 000 passengers daily if completed 23 Trains servicing the Metro North Commuter service from Governor Pascual to FTI and vice versa usually stop at limited stations Since 2019 trains servicing the MNC services now stop at all stations The trains used in this service are the INKA 8000 class and Hyundai Rotem diesel multiple units Past Edit Prior to the establishment of the PNR Metro Commuter Line the Manila Railroad had several local train services in the 1950s and 1960s According to a timetable that was effected on August 16 1954 local trains on the South Main Line from Manila reached Lucena station in Quezon province 39 In the 1960s local trains also reached San Fernando Pampanga on the North Main Line Services on the South Main Line were also added in the province of Laguna and reached San Pablo and Santa Cruz Laguna 40 Caloocan Meycauayan section Edit After the intercity section of the North Main Line was closed in the 1980s then president Corazon Aquino inaugurated the resumption of commuter rail services to Meycauayan in Bulacan on May 10 1990 It was part of the Metrotren program initiated by then Department of Transportations and Communications secretary Oscar Orbos to revitalize Metro Manila s public transport infrastructure due to worsening car traffic in the metropolis 41 The line was closed in the midst of the 1997 Asian financial crisis 42 There were plans to revitalize the entire line and extend it to Laoag A section of the line was opened in 2018 from Solis to Governor Pascual This section eventually became the PNR Metro North Commuter The network shall extend again to Valenzuela City once a bridge crossing the Tullahan River has been constructed However the North South Commuter Railway will serve as the primary commuter rail service to Bulacan and neighboring Ilocos Norte with the PNR Metro North Commuter allotted as an alternative to the NSCR Carmona Line Edit A spur line towards Carmona was opened on April 1 1973 to serve the residents of the San Pedro Carmona Resettlement Project On September 11 1976 two Rail Commuter services were designated on the line and were named after indigenous flora The service from Carmona to Manila was called Ilang Ilang while the returning service was called Sampaguita 43 The Carmona services ended by early 2005 44 The closure coincided with court cases filed in 1996 against the Philippine National Railways by private corporations that owned some of the right of way and was ruled out in 2008 as PNR continued to own the tracks 45 Parts of the line remain intact and plans to reopen the line are underway 46 Shuttle Service Edit The Shuttle Service was introduced on January 27 2014 This service uses Hyundai Rotem DMUs and JR KiHa 52 There are 4 routes of the Shuttle Service where trains stop at all stations along the routes Tutuban Sucat Sucat Tutuban Sta Mesa Sucat Sucat Sta MesaThis train service was removed last May 23 2014 to give way to maintenance servicing of the rolling stock Another reason was the 3 consecutive weeks of delays and cancellations of some train trips The service officially returned to the line on August 1 2018 this time to serve from the 10th Avenue railway station up to the Dela Rosa station using a JR KiHa 350 DMU An additional service was opened on September 10 and operated from the reopened Caloocan station to FTI station It is now the PNR Metro North Commuter Premiere Train Edit The Premiere Train was a special MSC service that operates from Monday to Friday except holidays The train being used in this special service was the KiHa 59 Kogane train set which is also from Japan The train used to stop at selected stations only namely Tutuban Blumentritt Espana Sta Mesa Buendia Pasay Road EDSA flagstop Sucat Alabang San Pedro Binan and Santa Rosa The service had 4 trips MSC501 MSC702 MSC1555 and MSC1802 It was first opened in March 2014 but it only ran from Tutuban to Santa Rosa In May 2014 Kogane was replaced by 203 series EMU coaches due to high passenger demand The service now stops at all stations and ran from Mondays to Saturday It was then extended to Mamatid then to Calamba The service was suspended in December 2014 due to the inauguration of the station building of Calamba and due to the repairs of the trainset being used for this service IRRI services Metro South Commuter Edit Tutuban Dela Rosa IRRI Edit On December 1 2019 Train services to the International Rice Research Institute inside the campus of the University of the Philippines Los Banos were started Five new stations were added to the route Pansol and Masili in Calamba Laguna and Los Banos college and IRRI in the neighboring town of Los Banos 47 The service uses the Kogane train set previously used for Premiere Train Services The service originates from Tutuban exclusively on Sundays while it starts from Dela Rosa from Monday to Saturday The train only loads a limited number of passengers in Dela Rosa FTI Bicutan Sucat and Alabang Stations when going southbound but unloading in stations in between like Nichols and EDSA are allowed 48 The service ended in 2020 following the COVID 19 pandemic Alabang Calamba IRRI Edit On December 16 2019 Regular Commuter services between Alabang Calamba and IRRI were launched The service uses Kiha 350 DMUs and runs the full route thrice daily from both endpoints and twice from the Calamba IRRI segment The service ended in 2020 following the COVID 19 pandemic 49 Fares and ticketing EditThe PNR Metro Commuter Line uses a distance based fare system Currently the rail operator charges 1 07 per kilometer The minimum fare is 15 00 Fares are rounded up in multiples of 5 00 50 Fares are 20 percent lower for passengers of non air conditioned trains 51 Additionally senior citizens and persons with disability are also given 20 percent discount 51 PNR issues paper tickets manually Passengers caught without tickets or short ticketed are charged the farthest distance fare of the service 51 Expansion and reconstruction plans EditNorth South Commuter Railway Edit Main article North South Commuter Railway The North South Commuter Railway will be a train line connecting the northern and southern boundaries of Mega Manila Once fully operational by 2025 it will connect New Clark City in Capas Tarlac to the north and Calamba Laguna to the south 52 53 The line will initially have 34 stations expandable to 41 by 2030 and expand northward to Tarlac City and southward to Batangas City by 2040 The line will have commuter rail services as well as an airport limited express service connecting Clark International Airport with Alabang station 54 It will be a double track line with direct current electrification through overhead lines The line will also be built in the wider 1 435 mm 4 ft 8 1 2 in standard gauge compared to the 1 067 mm 3 ft 6 in narrow gauge being used by PNR 55 The NSCR North which will be between Tutuban and New Clark City will be fully elevated and will have both embankment and viaduct sections while the NSCR South will feature a mix of elevated sections through viaducts as well as an at grade and underground section between EDSA and FTI stations The maximum speed on the line will be up to 120 kilometers per hour 75 mph for commuter trains and 160 kilometers per hour 99 mph for the airport express trains 54 The project costs 777 5 billion US 15 billion and is one of the flagship projects of the Build Build Build Infrastructure Plan On July 16 2019 PNR ordered 104 EM10000 class train cars from the Japan Transport Engineering Company J TREC along with Sumitomo Corporation which will be arranged into 8 car electric multiple units 56 This is the first order out of a total of 464 EMU cars J TREC and Sumitomo were again awarded on January 14 2022 for the procurement of 304 train cars 38 sets in a separate contract 57 An order of 56 cars 7 sets for the airport express train are being procured as of 2022 58 In November 2021 PNR planned to relocate its present tracks while the NSCR South is being constructed This was to ensure that the Metro Commuter services would remain business as usual The line was planned to be upgraded from the present 35 kilogram 77 lb and 50 kilogram 110 lb rails to the UIC60 standard but would have been reduced from double track to single track with passing sidings as the NSCR will become the primary passenger rail corridor up to Calamba station As part of the project 13 new bridges were to be constructed and the line would have remained using the existing narrow gauge track though allowances for future conversion to standard gauge and reintroduction of double tracking were incorporated into the designs The upgrades were expected to increase the maximum design speed to 80 km h 50 mph 59 However on August 17 2022 PNR cancelled the procurement for these projects due to these being no longer feasible 60 Metro North Commuter restoration Edit Metro North Commuter services have been restored in 2018 and there are plans to further extend the line north to Valenzuela station from its present terminus in Governor Pascual station in neighboring Malabon A new bridge crossing the Tullahan River will also be built to connect the two stations The expansion aims to reduce traffic congestion between Valenzuela and Makati Although these services are planned to be superseded by the North South Commuter Railway the present line will continue serving passenger trains and will also serve freight trains in the future 23 as the North Long Haul line Under the revitalized plans to reach Ilocos and its old terminus in La Union it will be funded through Public Private Partnership 61 Integration with intercity services Edit The intercity section of the PNR South Main Line will be rebuilt under the PNR South Long Haul project A new 639 km 397 mi line will connect Metro Manila with the Bicol Region 62 The entire section will also be built in standard gauge similar to the NSCR but there will be no electrification The line will also traverse the present Metro Commuter Line initially from Calamba station by Phase 1 Sucat station by Phase 4 and eventually to Tutuban station 63 Since the intercity services will traverse the narrow gauge line there will be a dual gauge network between these stations and IRRI station Incidents and accidents EditFurther information List of rail accidents in the Philippines The PNR Metro Commuter Line has been prone to numerous incidents including stoning incidents 64 people being run over by trains including even fatal ones 65 and trains colliding with vehicles 66 On May 19 2014 a cigarette vendor died while six others were hurt when a PNR train from Tutuban Station collided with a jeepney across the railroad tracks along G Tuazon Street in Sampaloc Manila at around 4 30 p m The jeepney was dragged around 50 meters 160 ft from the site of the collision The driver of the jeepney was allegedly drunk when the collision happened 66 On April 29 2015 a Hyundai Rotem DMU derailed between EDSA railway station and Nichols railway station There were 80 reported injuries mostly minor cases 67 68 The incident was caused by missing parts of the railtracks that were stolen 69 This however prompted PNR operations to be suspended on May 5 2015 to conduct safety tests by PNR and TUV Rheinland 70 The operations of the PNR resumed on July 23 2015 18 On January 12 2016 a PNR Metro South Commuter Line train from Alabang collided with a jeepney at the Pedro Gil Street crossing near Paco station in Paco Manila One person died from head injuries and six were injured 71 72 On July 7 2017 five people including a pregnant woman was hurt when an ambulance was hit by a train a PNR 900 class locomotive and a 203 series EMU near Blumentritt Station in Manila The ambulance which came from Barangay 167 Ilano in Caloocan was on its way to a hospital to bring the pregnant woman when the accident occurred 73 On January 14 2018 a passenger in a 203 series trainset forced a train door open while the train was moving 74 75 On October 11 2019 an old woman got run over by a train causing injuries to her hands and legs 76 Fourteen stoning incidents were reported from December 2 to 21 2019 including a stoning incident in one 8000 class train 64 On December 28 2019 an 8000 class was obstructed between Espana and Sta Mesa stations 77 78 On January 1 2020 a windshield of a Hyundai Rotem DMU was shattered due to a stoning incident while performing an MNC Trip at Caloocan 79 The glass window was replaced with polycarbonate the day after the incident It was also found that a group of minors were the ones who did the crime 80 In February 2020 a window in a KiHa 59 series Kogane trainset shattered due to a stoning incident 81 On February 16 2020 a 203 series trainset was involved in a stone throwing incident It damaged a door window and injured one passenger 81 On June 3 2020 a Hyundai Rotem DMU rammed a car at Abad Santos Railroad Crossing in Tondo Manila The crossing barrier was not down when the accident happened The train dragged the car for about 10 meters 82 On August 28 2020 an engineer got run over by an 8100 class train near Paco station The engineer died after the incident 83 On August 22 2021 three teenagers died after they got run over by a train in Santa Mesa Manila 65 On September 2 2021 a Hyundai Rotem DMU train rammed a blue car at the Piy Margal Railroad Crossing in Manila despite early warning by the crossing keepers No injuries were reported The PNR management is yet to release a statement about the absence of barriers at the railroad crossing 84 particularly at the southbound lane On April 12 2022 a 9 to 12 year old child died after being run over by 921 hauling a 203 series EMU train at the intersection of Antipolo Street and Ipil Street in Santa Cruz Manila 85 On September 25 2022 a DMU train collided with a crane while performing a MNC service in Sta Mesa Manila causing three injuries and damages to the front cab of the train 86 On February 11 2023 a motorcycle rider suddenly crossed the railroad crossing in Tayuman Manila when a DEL class locomotive is about to cross the railroad crossing 87 Notes Edit Metro North Commuter only a b c Metro South Commuter only Opened in sections from August 1 2018 to December 3 2018 References Edit Rita Joviland March 15 2022 PNR still has low ridership amid limited face to face classes GMA News Retrieved March 15 2022 a b Philippines investment should boost rail business International Railway Journal 1977 a b c Presentation for Pre Qualification Conference PDF NORTH SOUTH RAILWAY PROJECT SOUTH LINE Report Department of Transportation Philippines August 20 2015 Retrieved March 8 2022 a b PT LRS Ekspor Teknologi Persinyalan SiLSafe 4000 ke Filipina PT LRS Exports SiLSafe 4000 Signaling Technology to the Philippines Kompas com in Indonesian May 19 2022 Retrieved May 20 2022 a b MetroTrak Philippine Journal Philippine News Agency January 4 1990 Retrieved July 22 2020 a b Metrotren inaugural Manila Chronicle May 11 1990 Retrieved July 22 2020 Orbon Glenn Dungca Joana 2015 The Philippine Railway System Movement Systems 100 Years with Meralco meralco com ph Meralco October 11 2004 Archived from the original on September 18 2009 Retrieved May 28 2020 a b Gamble Adrian March 10 2017 Manila s Long Lost Tranvias Once the Envy of Asia skyrisecities com Skyrise Cities Archived from the original on June 21 2020 Retrieved June 21 2020 PNR Schedule effective September 11 1976 www flickr com Retrieved July 23 2020 Old PNR stations Reddit Retrieved July 23 2020 Carmona s Commuter Train Times Journal April 1973 Retrieved July 23 2020 Off track Northrail timeline ABS CBN News July 15 2008 Retrieved July 23 2020 Ballast Train in Tayuman May 25 2009 Retrieved July 23 2020 Philippines China funded Northrail project derailed Financial Times Retrieved July 23 2020 Montecillo Paolo September 26 2011 PNR gets old trains from Japan Retrieved July 23 2020 Macaraig Ayee May 6 2014 Senate panel Extend PNR improve services Rappler Retrieved July 23 2020 a b Corrales Nestor July 23 2015 PNR resumes Tutuban Alabang train operations Philippine Daily Inquirer Retrieved July 23 2020 Camus Miguel July 16 2015 Gov t rolls out P171 B railway project Philippine Daily Inquirer Retrieved July 23 2020 de Vera Ben April 10 2017 Infrastructure spending up 42 8 in 2016 Retrieved July 23 2020 Uy Jocelyn July 20 2016 PNR tracks sought for test runs Philippine Daily Inquirer Retrieved July 23 2020 a b c d Valdez Denise May 30 2018 PNR buys 7 new train sets from Indonesia BusinessWorld Retrieved July 21 2020 a b c Parrocha Azer August 14 2019 Completed railway assets to ease traffic by 25 DOTr Philippine News Agency Yu Lance Spencer February 17 2023 PNR to close some routes starting May for North South Railway construction Rappler Retrieved February 17 2023 Doctor Mel Matthew April 10 2022 No MRT3 LRT2 ops on April 13 17 PNR on April 14 16 for Holy Week DOTr GMA News Retrieved April 17 2022 Procurement of Level Crossing Signaling and Interlock PDF Report Philippine National Railways November 16 2021 Retrieved May 23 2022 Ramping Up Philippine s National Railways ASEAN Technology amp Security Magazine February 24 2022 Retrieved March 7 2022 North South Railway Project South Line Project Information Memorandum PDF Report Department of Transportation and Communications August 2015 Retrieved March 7 2022 PNR Commuter Trains Times Journal October 29 1976 Retrieved July 23 2020 DOTr PNR Signs Contract To Acquire 2 New Trainsets from Indonesia Press release Department of Transportation January 22 2018 Retrieved January 3 2022 DEL 5009 Hauling KiHa 350 Set 3 retrieved March 15 2022 1974 1125 PNR Guadalupe Station Flickr November 21 2011 Retrieved July 27 2020 1986 0210 PNR Nikko Train Legazpi station Flickr August 12 2016 Retrieved July 27 2020 Peadon Brad April 2020 Philippine National Railways Rolling Stock Update Philippine Railways Historical Society 3 a b Okada Seiichi 1996 キハ20系車両のあゆみ 国鉄編 Railway Pictorial in Japanese Electric Vehicle Study Group 605 10 17 DEL DMU KIHA TRAIN SCENE RSM CALOOCAN SHOP July 5 2021 Retrieved March 9 2022 Maps and Timetables Philippine National Railways Retrieved October 3 2022 IN PHOTOS After 20 years PNR reopens Caloocan Makati Line The Philippine Star August 1 2018 Retrieved August 5 2018 New MRR Train Time Schedule Manila Chronicle August 14 1954 Retrieved March 21 2021 MRR Time Schedule Philippine Herald July 18 1960 Retrieved March 21 2021 Metrotren Inaugural Manila Chronicle May 11 1990 Retrieved March 21 2021 URBAN TRANSPORTATION DEVELOPMENT CONDITION IN ADJOINING AREAS PDF METRO MANILA URBAN TRANSPORTATION INTEGRATION STUDY Report Vol Technical Report No 3 Japan International Cooperation Agency March 31 1999 Retrieved March 21 2021 PNR Schedule Effective September 11 1976 Times Journal September 11 1976 Retrieved March 21 2021 フィリピン国鉄 PNR 南方線 カルモナ支線 TTCN Philrail in Japanese March 31 2007 Retrieved March 21 2021 Forfom Development Corporation vs Philippine National Railways G R No 124795 The Lawphil Project Arellano University School of Law December 10 2008 Retrieved March 21 2021 LOOK The Philippine National Railways PNR Rail Police and PNR Incident Response Teams IRT in coordination with PNP Laguna and PNP Cavite are now inspecting the PNR Carmona Line branch Facebook Department of Transportation Philippines August 18 2018 https facebook com story php story fbid 1564617300358612 amp id 134752476678442 user generated source https facebook com story php story fbid 10159183855685299 amp id 605395298 user generated source Alabang Calamba IRRI timetable Philippine National Railways Yee Jovic June 18 2017 Deferred in 2015 PNR fare hike takes effect July 1 Philippine Daily Inquirer Retrieved March 7 2022 a b c Philippine National Railways Fares amp Tickets Manila Tutuban Station Philippine National Railways Retrieved March 7 2022 Dela Paz Chrissie September 13 2017 NEDA Board approves Manila subway longest railway Rappler Retrieved September 15 2017 Leyco Chino S September 13 2017 NEDA Board approves big infra projects Manila Bulletin Retrieved September 15 2017 a b Department of Transportation The Republic of the Philippines October 2018 FEASIBILITY STUDY ON THE NORTH SOUTH RAILWAY PROJECT SOUTH LINE COMMUTER NORTH SOUTH COMMUTER RAILWAY EXTENSION PROJECT IN THE REPUBLIC OF THE PHILIPPINES PDF jica go jp Philippines approves standard gauge for all new lines www railwaypro com August 10 2016 Retrieved July 12 2020 Lopez Melissa Luz July 16 2019 DOTr taps Japan bullet train supplier for Tutuban Malolos railway CNN Philippines Retrieved July 18 2019 Notice of Award of Contract Package NS 02 Rolling Stock Commuter Trainsets PDF Department of Transportation Philippines January 14 2022 Retrieved January 24 2022 Burroughs David October 17 2019 Five bids received for PNR Clark Phase 2 section of Manila of NSCR International Rail Journal Retrieved July 30 2020 DESIGN AND BUILD OF PNR TRACK RELOCATION WORKS INCLUDING POCKET TRACKS STATIONS RCC BOX CULVERTS amp OTHER CIVIL WORKS SOLIS TO SUCAT TRP 4A PDF Report Philippine National Railways November 16 2021 Retrieved November 18 2021 Balinbin Arjay L August 23 2022 PNR cancels bids for 3 projects after finding them non feasible BusinessWorld Retrieved August 25 2022 Privatization process for EDSA busway starts The Philippine STAR Bicol Airport to open PNR South on track Manila Standard January 7 2020 Retrieved July 30 2020 South rail to start in Q2 Salceda Manila Standard Business November 21 2019 Retrieved July 30 2020 a b Panganiban Perez Tina December 26 2019 Trains damaged in 14 stone throwing incidents in December 2019 says PNR GMA News Retrieved December 30 2021 a b Cayabyab Marc Jayson August 24 2021 PNR train mangles 3 teens The Philippine Star Retrieved December 30 2021 a b Balagtas See Aie May 20 2014 1 dead 6 hurt as train hits jeepney Philippine Star Retrieved January 19 2022 Mangunay Kristine Felisse April 30 2015 80 injured as PNR train derails in Taguig City Philippine Daily Inquirer Retrieved January 19 2022 Batallones Jeck April 29 2015 PNR train derailed 50 hurt ABS CBN News Retrieved December 25 2018 EXCL Pagnanakaw ng riles sinisi sa pagkadiskaril ng PNR YouTube ABS CBN News May 24 2015 Retrieved May 11 2021 Operations of Philippine National Railways PNR will not Continue Effective on May 5 2015 onlinefilipinoworkers com May 6 2015 Retrieved May 11 2021 Balagtas See Aie January 15 2016 Raps on vs jeepney hit by train Inquirer net Philippine Daily Inquirer Retrieved January 19 2022 Adel Rosette January 12 2016 1 killed 6 injured in PNR jeep collision in Paco Philippine Star Retrieved January 19 2022 Takumi Rie July 7 2017 Pregnant woman 4 others hurt as PNR train hits ambulance in Manila GMA News Retrieved January 19 2022 Ramirez Robertzon January 17 2018 Commuter forces open PNR train s doors The Philippine Star Retrieved January 18 2022 External video of incident January 14 2018 Retrieved January 18 2022 Ganibe Dexter October 11 2019 Lola pinutulan ng kamay binti matapos masagasaan ng PNR tren ABS CBN News Retrieved December 30 2021 SONA Yero gulong at iba pang basurang puwedeng makasira sa tren ng YouTube December 30 2019 Retrieved December 30 2021 DOTr appeals to the public to report PNR stone throwing incidents CNN Philippines December 28 2019 Retrieved December 31 2021 Another PNR train damaged in New Year s Day stone throwing incident Coconuts Manila January 2 2020 Retrieved May 11 2021 Marquez Consuelo January 4 2020 PNR tags minor as person of interest in stoning of trains INQUIRER net Retrieved March 4 2021 a b Tren ng PNR binato na naman ilang pasahero galit na YouTube February 22 2020 Retrieved December 31 2021 24 Oras Kotse nasalpok at nakaladkad nang halos 10 metro ng PNR train YouTube June 3 2020 Retrieved June 11 2021 GMA News August 29 2020 Engineer patay nang masagasaan ng tren ng PNR Facebook Watch in Filipino Retrieved December 28 2021 Santos Jamil September 3 2021 Doctor survives after train hits drags her SUV in Manila GMA News Retrieved September 4 2021 Doctor Mel Matthew April 18 2022 Body of child run over by train in Manila yet to be claimed from mortuary GMA News Retrieved April 19 2022 Santos Pat C September 27 2022 PNR loses train in crane mishap Daily Tribune Retrieved September 29 2022 KAMOTE RIDER spotted Incident happened at Tayuman crossing February 11 2023 By Philippine Train Enthusiasts and Railfans Club Facebook retrieved February 12 2023External links EditThe PNR Metro Commuter Line Timetables Wikimedia Commons has media related to PNR Metro Commuter Line Retrieved from https en wikipedia org w index php title PNR Metro Commuter Line amp oldid 1139833890, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.