The Trans–Haryana Expressway or the Ambala–Narnaul Expressway (NH-152D) is a 227-km long, 6-lane wide access-controlled expressway, connecting the cities of Ambala and Narnaul in the state of Haryana.[2] The expressway connects Gangheri village (on NH-152) in Kurukshetra district (near Ismailabad) with Surana village on Narnaul Bypass (NH-148B) in Mahendragarh district. It passes via Kaul, Pundri, Assandh, Dhatrath, Kalanaur, Charkhi Dadri and Kanina. It will reduce the distance from Chandigarh to Delhi, Narnaul, and Jaipur, thus decongesting NH-44 and NH-48.[3]

Trans–Haryana Expressway
Ambala–Narnaul Expressway
Trans–Haryana Expressway in red
Route information
Maintained by National Highways Authority of India (NHAI)
Length227 km (141 mi)
Existed1 August 2022[1]–present
Major junctions
North endGhangheri village, Kurukshetra district, Haryana
South endSurana village, Mahendragarh district, Haryana
Location
CountryIndia
StatesHaryana
Highway system

The alignment intersects with 15 National Highways, including NH-9, and several State Highways, including SH6, SH9, SH8, SH11, SH12, SH14, SH10, SH16A, SH20, SH24 and SH26.[4] The area around the expressway is being developed as an industrial corridor, named as the Ambala-Kotputli Economic Corridor. Construction was started in July 2020, and was completed and opened for traffic on 1 August 2022.[5] The industrial corridor consists of four road projects, which have:

  • 39-km section of NH-152 from Ambala to Ismailabad
  • 227-km long Ambala-Narnaul Expressway
  • 14-km section of Narnaul Bypass
  • 30-km section of NH-148B from Narnaul Bypass to Paniyala Mor (NH-48).

Details

Costing 5,108 crore, it will have 70 metre right of way, 122 bridges and underpasses and 1,36,000 trees would be planted on either sides is being developed by the National Highways Authority of India (NHAI) under Bharatmala project.[6][4] Grenfield alignment will reduce the Ismailabad to Narnaul distance by 35 km from the existing 265 km route to 230 km new route.[7] Construction will create 1,500 full-time jobs for 3 years and 120 ongoing jobs will be created for the Toll Plaza staff.[4] To reduce the environmental impact the fly ash will be used from the Tau Devilal Thermal Power Plant at Panipat, Indira Gandhi Super Thermal Power Project at Jhajjar and Rajiv Gandhi Thermal Power Station at Hisar.[4]

Route alignment

It passes through the areas lying in the following 8 districts of Haryana:[8]

1. Kurukshetra district

  • Gangheri, NH152D will interchange with the exiting NH152 (Ambala-Pehowa) at Gangheri which is 8 km south of Ismailabad and 8 km north of Pehowa
  • Pehowa, interchange with SH6 (Pehowa to Kurukshetra-Yamunanagar) east of Pehowa

2. Kaithal district

  • Kaul, interchange with SH9 (Pehowa to Karnal) at Dhand just north of Kaul
  • Pundri, interchange with SH8 (Kaithal to Karnal) 3 km east of Pundri

3. Karnal district

4. Jind district

  • Jind city,
    • northeast: interchange with SH12 (Jind to Assand-Karnal) 25 km northeast of Jind near Badhana-Popran
    • northeast: interchange with Delhi-Amritsar-Katra Expressway west of village Ratoli
    • east: interchange with SH14 (Jind to Panipat) 15 km east of Jind at Jamni near Pilu Khera
    • southeast: interchange with SH11 (Jind to Gohana-Sonipat) 15 km east of Jind
    • Kila zafargarh, interchange with NH352 (Jind-Julana to Lakhan Majra-Rohtak) 4 km south of Julana

5. Rohtak District

6. Bhiwani district

  • Baund Kalan, 20 km east of Bhiwani
  • Sanwar, 20 km southeast of Bhiwani

7. Charkhi Dadri district

8. Mahendragarh district

Inter-connectivity

Narnaul-Alwar Expressway

Paniyala–Barodameo Expressway, 86.5 km long 6-lane access-controlled greenfield expressway from Paniyala (south of Narnaul) to Mator, Alwar and Barodameo, will connect the southern end of the Trans-Haryana Expressway to the Delhi-Mumbai Expressway at Barodameo. In October 2022, 29 bids were received for the construction of expressway, tender will be awarded by 31st December 2022, after which construction will take 2 years by end of 2024).[10] There are plans to extend the expressway from Barodameo through the following:

  • To Jhansi and Vishakhapattanam port:
    Bardameo-Jhansi Expressway from Bardameo-Kherli-Suroth-Khurdiya Nayagaon-Golari/Saipur to Kailaras-Bhitarwar-Bhagour-Sijwaha-Jhansi.

Regional Circular Expressway-2

Regional Circular Expressway-3 (CRE3)[11] will intersect with Trans-Haryana Expressway in two places, between Mahendragarh-Kanina and between Rajound-Assandh.

History

Construction

The NHAI has divided the construction work of 227 km long Ambala–Narnaul Expressway into 8 packages. Package-1 is a Joint Venture (JV) of JiangXi Construction Engineering, Ceigall India and Shiv Build India; Package-4 is a JV of JiangXi Construction Engineering and Shiv Build India and Package-7 is a JV of Gawar Construction and Shivalaya Construction Company. The list of contractors is as follows:

Sr. No Package Length in km Contractor
1. Ismailabad (Kurukshetra)–Dhand (Kaithal) 23 JiangXi – Ceigall – Shiv Build JV
2. Dhand (Kaithal)–Rajound (Kaithal) 33 Gawar Construction
3. Rajound (Kaithal)–Kheri (Jind) 24 Galfar Engineering & Contracting
4. Kheri (Jind)–Julana (Jind) 28 JiangXi – Shiv Build JV
5. Julana (Jind)–Kharkara (Rohtak) 23 Gawar Construction
6. Kharkara (Rohtak)–Charkhi Dadri 34 Gawar Construction
7. Charkhi DadriKanina (Mahendragarh) 35 Gawar – Shivalaya JV
8. Kanina (Mahendragarh)–Narnaul 27 Gawar Construction

Construction progress

  • Dec 2018: The required 1,826 hectares of land has been acquired at the cost of ₹529.29 crores.
  • Mar 2021: An under-construction flyover of Package-2 collapsed at Dulyani near Pundri, Kaithal.[15]
  • Mar 2022: About 95% construction work on the expressway is completed.
  • Aug 2022: The expressway underwent a trial run for two days, and was opened for traffic on 1 August.[16]

See also

References

  1. ^ PTI (1 August 2022). "Haryana: Six Lane Ambala - Narnaul Expressway Opened For Public, To Ease Traffic In Delhi NCR". Swarajya. Retrieved 1 August 2022.
  2. ^ "न्यू इस्माइलाबाद से नारनौल तक बनेगा 230 किलोमीटर लंबा फोरलेन हाइवे". Dainik Jagran (in Hindi). 5 July 2018. Retrieved 1 August 2022.
  3. ^ "Delhi to Chandigarh in 2 hours by 2023". Times of India. 16 July 2020.
  4. ^ a b c d Pre-feasibility report
  5. ^ PTI (1 August 2022). "Haryana: Six Lane Ambala - Narnaul Expressway Opened For Public, To Ease Traffic In Delhi NCR". Swarajya. Retrieved 1 August 2022.{{cite web}}: CS1 maint: url-status (link)
  6. ^ New NH to be constructed, Daily Pioneer, 11 December 2018.
  7. ^ Better connectivity: Government to build five new greenfield road corridors, The New Indian Express, 20 July 2018.
  8. ^ "Eight districts to be connected by Ismailabad-Narnaul Highway". Dainik Bhaskar. 20 May 2020.
  9. ^ Cargo Airport to boost the real estate market of Bhiwadi, Business Standard, 10 October 2018
  10. ^ 29 Bidders for Paniyala – Barodameo Expressway's Work in Rajasthan, The Metro Guy, 2 oct 2022.
  11. ^ Draft NCR Regional plan 2041, NCR planning board accessed, 6 dec 2022.
  12. ^ "Shri Gadkari inaugurates and lays foundation stones of new economic corridor projects worth about Rs 20,000 crore in Haryana". Press Information Bureau. 14 July 2020.
  13. ^ "Gadkari inaugurate, lays foundation stone for 11 National Highway projects worth 20,000 crores in Haryana". The Hindu. 14 July 2020.
  14. ^ "Ambala-Narnaul-Kotputli corridor will be connected with Delhi-Vadodara-Mumbai Expressway". Dainik Jagran. 9 September 2020.
  15. ^ "Under-construction flyover on expressway collapses near Kaithal". Times of India. 1 March 2021.
  16. ^ PTI (1 August 2022). "Haryana: Six Lane Ambala - Narnaul Expressway Opened For Public, To Ease Traffic In Delhi NCR". Swarajya. Retrieved 1 August 2022.{{cite web}}: CS1 maint: url-status (link)

8. Mahendergarh district

 Sehlang Diversion cut Approved by Shri Nitin Gadkari. Please add this interchange 

External links

  • Pre-feasibility report

trans, haryana, expressway, ambala, narnaul, expressway, 152d, long, lane, wide, access, controlled, expressway, connecting, cities, ambala, narnaul, state, haryana, expressway, connects, gangheri, village, kurukshetra, district, near, ismailabad, with, surana. The Trans Haryana Expressway or the Ambala Narnaul Expressway NH 152D is a 227 km long 6 lane wide access controlled expressway connecting the cities of Ambala and Narnaul in the state of Haryana 2 The expressway connects Gangheri village on NH 152 in Kurukshetra district near Ismailabad with Surana village on Narnaul Bypass NH 148B in Mahendragarh district It passes via Kaul Pundri Assandh Dhatrath Kalanaur Charkhi Dadri and Kanina It will reduce the distance from Chandigarh to Delhi Narnaul and Jaipur thus decongesting NH 44 and NH 48 3 Trans Haryana ExpresswayAmbala Narnaul ExpresswayTrans Haryana Expressway in redRoute informationMaintained by National Highways Authority of India NHAI Length227 km 141 mi Existed1 August 2022 1 presentMajor junctionsNorth endGhangheri village Kurukshetra district HaryanaSouth endSurana village Mahendragarh district HaryanaLocationCountryIndiaStatesHaryanaHighway systemRoads in IndiaExpressways National State AsianThe alignment intersects with 15 National Highways including NH 9 and several State Highways including SH6 SH9 SH8 SH11 SH12 SH14 SH10 SH16A SH20 SH24 and SH26 4 The area around the expressway is being developed as an industrial corridor named as the Ambala Kotputli Economic Corridor Construction was started in July 2020 and was completed and opened for traffic on 1 August 2022 5 The industrial corridor consists of four road projects which have 39 km section of NH 152 from Ambala to Ismailabad 227 km long Ambala Narnaul Expressway 14 km section of Narnaul Bypass 30 km section of NH 148B from Narnaul Bypass to Paniyala Mor NH 48 Contents 1 Details 2 Route alignment 3 Inter connectivity 3 1 Narnaul Alwar Expressway 3 2 Regional Circular Expressway 2 4 History 4 1 Construction 4 2 Construction progress 5 See also 6 References 7 External linksDetails EditCosting 5 108 crore it will have 70 metre right of way 122 bridges and underpasses and 1 36 000 trees would be planted on either sides is being developed by the National Highways Authority of India NHAI under Bharatmala project 6 4 Grenfield alignment will reduce the Ismailabad to Narnaul distance by 35 km from the existing 265 km route to 230 km new route 7 Construction will create 1 500 full time jobs for 3 years and 120 ongoing jobs will be created for the Toll Plaza staff 4 To reduce the environmental impact the fly ash will be used from the Tau Devilal Thermal Power Plant at Panipat Indira Gandhi Super Thermal Power Project at Jhajjar and Rajiv Gandhi Thermal Power Station at Hisar 4 Route alignment EditIt passes through the areas lying in the following 8 districts of Haryana 8 1 Kurukshetra district Gangheri NH152D will interchange with the exiting NH152 Ambala Pehowa at Gangheri which is 8 km south of Ismailabad and 8 km north of Pehowa Pehowa interchange with SH6 Pehowa to Kurukshetra Yamunanagar east of Pehowa2 Kaithal district Kaul interchange with SH9 Pehowa to Karnal at Dhand just north of Kaul Pundri interchange with SH8 Kaithal to Karnal 3 km east of Pundri3 Karnal district4 Jind district Jind city northeast interchange with SH12 Jind to Assand Karnal 25 km northeast of Jind near Badhana Popran northeast interchange with Delhi Amritsar Katra Expressway west of village Ratoli east interchange with SH14 Jind to Panipat 15 km east of Jind at Jamni near Pilu Khera southeast interchange with SH11 Jind to Gohana Sonipat 15 km east of Jind Kila zafargarh interchange with NH352 Jind Julana to Lakhan Majra Rohtak 4 km south of Julana5 Rohtak District Maham city northeast interchange with SH16A Bhiwani Maham to Lakhan Majra Gohana Panipat 8 km northeast of Meham and 7 km southwest of Lakhan Majra east interchange with NH9 Delhi Hisar Sirsa 10 km east of Meham at Kharkara and 15 km west of Rohtak Kalanaur interchange with NH709 Bhiwani to Rohtak 6 Bhiwani district Baund Kalan 20 km east of Bhiwani Sanwar 20 km southeast of Bhiwani7 Charkhi Dadri district Charkhi Dadri city east interchange with NH334B Loharu Charkhi Dadri to Jhajjar 5 km east of Charkhi Dadri8 Mahendragarh district Sehlang interchange with Major District Road MDR near Baghot village west interchange with SH24 Mahendragarh Kanina Rewari at Buchawas 10 km east of Mahendragarh and 9 km west of Kanina Optional extension spur from NH152D at Mahendragarh to Bhiwadi Airport at Kotkasim via Delhi Alwar RRTS at Pali and Bawal NH48 Delhi Jaipur Expressway and beyond to Delhi Mumbai Expressway at Ferozepur Jhirka and Western Peripheral Expressway at Palwal then to Noida International Airport and Yamuna Expressway at Jewar and finally to Ganga Expressway via Khurja Bareilly NCR Counter Magnet City Tanakpur starting point of Indian route of Kailash Manasarovar Yatra Narnaul interchange with NH148B Narnaul to Kotputli and terminate at Narnaul bypass The NH148B former SH129 and SH17 connects Kotputli 45 km south of Narnaul to Bhatinda via Narnaul Bhiwani Hansi Barwala Tohana Jakhal At Kotputli the NH148B meets the Delhi Jaipur Expressway NH48 Together NH148B and NH48 will connect the Hisar Airport to the proposed cargo aerocity of Bhiwadi Airport at Kotkasim 9 Inter connectivity EditNarnaul Alwar Expressway Edit Paniyala Barodameo Expressway 86 5 km long 6 lane access controlled greenfield expressway from Paniyala south of Narnaul to Mator Alwar and Barodameo will connect the southern end of the Trans Haryana Expressway to the Delhi Mumbai Expressway at Barodameo In October 2022 29 bids were received for the construction of expressway tender will be awarded by 31st December 2022 after which construction will take 2 years by end of 2024 10 There are plans to extend the expressway from Barodameo through the following To Kalapani amp Mount Kailash Bardameo to Vrindavan via Deeg Govardhan Yamuna Expressway and Bareilly Tanakpur Gunji Kalapani territory To Nepal Nagar east of Bardameo to Bharatpur Achhnera Agra Yamuna Expressway and Farrukhabad Sitapur Nepalganj To Jhansi and Vishakhapattanam port Bardameo Jhansi Expressway from Bardameo Kherli Suroth Khurdiya Nayagaon Golari Saipur to Kailaras Bhitarwar Bhagour Sijwaha Jhansi Regional Circular Expressway 2 Edit Regional Circular Expressway 3 CRE3 11 will intersect with Trans Haryana Expressway in two places between Mahendragarh Kanina and between Rajound Assandh History EditConstruction Edit The NHAI has divided the construction work of 227 km long Ambala Narnaul Expressway into 8 packages Package 1 is a Joint Venture JV of JiangXi Construction Engineering Ceigall India and Shiv Build India Package 4 is a JV of JiangXi Construction Engineering and Shiv Build India and Package 7 is a JV of Gawar Construction and Shivalaya Construction Company The list of contractors is as follows Sr No Package Length in km Contractor1 Ismailabad Kurukshetra Dhand Kaithal 23 JiangXi Ceigall Shiv Build JV2 Dhand Kaithal Rajound Kaithal 33 Gawar Construction3 Rajound Kaithal Kheri Jind 24 Galfar Engineering amp Contracting4 Kheri Jind Julana Jind 28 JiangXi Shiv Build JV5 Julana Jind Kharkara Rohtak 23 Gawar Construction6 Kharkara Rohtak Charkhi Dadri 34 Gawar Construction7 Charkhi Dadri Kanina Mahendragarh 35 Gawar Shivalaya JV8 Kanina Mahendragarh Narnaul 27 Gawar ConstructionConstruction progress Edit Dec 2018 The required 1 826 hectares of land has been acquired at the cost of 529 29 crores Jul 2020 Union Minister Nitin Gadkari laid the foundation stone for the expressway on 14 July 2020 via video conferencing 12 13 Sep 2020 The expressway will be connected with the under construction Delhi Mumbai Expressway 14 Mar 2021 An under construction flyover of Package 2 collapsed at Dulyani near Pundri Kaithal 15 Mar 2022 About 95 construction work on the expressway is completed Aug 2022 The expressway underwent a trial run for two days and was opened for traffic on 1 August 16 See also EditList of highways in Haryana Delhi Jaipur Expressway Delhi Mumbai Expressway Delhi Amritsar Katra Expressway Haryana Roadways Haryana Tourism Railway in HaryanaReferences Edit PTI 1 August 2022 Haryana Six Lane Ambala Narnaul Expressway Opened For Public To Ease Traffic In Delhi NCR Swarajya Retrieved 1 August 2022 न य इस म इल ब द स न रन ल तक बन ग 230 क ल म टर ल ब फ रल न ह इव Dainik Jagran in Hindi 5 July 2018 Retrieved 1 August 2022 Delhi to Chandigarh in 2 hours by 2023 Times of India 16 July 2020 a b c d Pre feasibility report PTI 1 August 2022 Haryana Six Lane Ambala Narnaul Expressway Opened For Public To Ease Traffic In Delhi NCR Swarajya Retrieved 1 August 2022 a href Template Cite web html title Template Cite web cite web a CS1 maint url status link New NH to be constructed Daily Pioneer 11 December 2018 Better connectivity Government to build five new greenfield road corridors The New Indian Express 20 July 2018 Eight districts to be connected by Ismailabad Narnaul Highway Dainik Bhaskar 20 May 2020 Cargo Airport to boost the real estate market of Bhiwadi Business Standard 10 October 2018 29 Bidders for Paniyala Barodameo Expressway s Work in Rajasthan The Metro Guy 2 oct 2022 Draft NCR Regional plan 2041 NCR planning board accessed 6 dec 2022 Shri Gadkari inaugurates and lays foundation stones of new economic corridor projects worth about Rs 20 000 crore in Haryana Press Information Bureau 14 July 2020 Gadkari inaugurate lays foundation stone for 11 National Highway projects worth 20 000 crores in Haryana The Hindu 14 July 2020 Ambala Narnaul Kotputli corridor will be connected with Delhi Vadodara Mumbai Expressway Dainik Jagran 9 September 2020 Under construction flyover on expressway collapses near Kaithal Times of India 1 March 2021 PTI 1 August 2022 Haryana Six Lane Ambala Narnaul Expressway Opened For Public To Ease Traffic In Delhi NCR Swarajya Retrieved 1 August 2022 a href Template Cite web html title Template Cite web cite web a CS1 maint url status link 8 Mahendergarh districtSehlang Diversion cut Approved by Shri Nitin Gadkari Please add this interchangeExternal links EditPre feasibility report Retrieved from https en wikipedia org w index php title Trans Haryana Expressway amp oldid 1129688608, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.