fbpx
Wikipedia

Flytoget

The Airport Express Train (Norwegian: Flytoget) is a Norwegian high-speed airport railway service connecting Oslo Airport to Oslo Central Station in nineteen minutes.[4] Run by Flytoget AS (formerly NSB Gardermobanen AS), it operates on the high-speed Gardermoen Line using sixteen GMB Class 71 electric trains. Normal service frequency is once every ten minutes, with five of the services each hour continuing westwards beyond Oslo Central. The extended services serve nine stops within Greater Oslo and take up to 60 minutes.

Flytoget AS
TypeState owned
IndustryRail transport
Founded24 November 1992[1]
FounderNorges Statsbaner[2]
HeadquartersOslo, Norway[1]
Area served
Greater Oslo
Key people
Philipp Engedal (CEO)
Endre Skjørestad (Chair)[3]
ProductsAirport rail link
RevenueNOK 689 million (2007)[3]
NOK 192 million (2007)[3]
NOK 182 million (2007)[3]
Number of employees
265 (2007)[3]
ParentNorwegian Ministry of Trade and Industry[3]
Websiteflytoget.no
Previous logo

Flytoget transported 5.4 million passengers in 2007,[3] a 34-percent market share of airport ground transport.[5] The service, which has a top speed of 210 kilometres per hour (130 mph), is the only high-speed rail service in Norway. Construction started in 1994 and high-speed trains began serving Gardermoen Airport from the date of its opening on 8 October 1998, although full operation using the 14.5-kilometre-long (9.0 mi) Romerike Tunnel had to wait another ten and a half months after severe leaks caused by the tunnel's construction led to the partial depletion of two lakes.

Formed in 1992 as a subsidiary of Norwegian State Railways, the company has been owned since 2001 by the Norwegian Ministry of Trade and Industry.

History

Decision for a new airport connection

When the Parliament of Norway on 8 October 1992 decided to build a new central airport for Eastern Norway, they also decided that the main mode of ground transport should be by rail. While the previous airport, Oslo Airport, Fornebu, was located just outside the city limits, the new airport, Oslo Airport, Gardermoen, would be located 50 kilometres (31 mi) north of the city, outside the reach of existing public transport. The principle of the airport construction was that it was not to be footed by the tax payers; the entire airport would be built with borrowed money through Oslo Lufthavn AS, a subsidiary of the Norwegian Airport Administration. The same principle was chosen for the airport rail link—the Norwegian State Railways (NSB) creating the limited company subsidiary NSB Gardermobanen AS, founded on 24 November 1992, to perform the construction of the line. It would be able to charge train operators using the line, channeling the payments to cover down payments and interest of the debt used to build the railway. Profit margin was estimated to 7.5%.[2]

Construction

Oslo Airport, Gardermoen, is not on the Trunk Line that runs north from Oslo. With heavy traffic and many small stops until Lillestrøm, and continuing north as single track,[6] the Trunk Line would have to be supplemented by a parallel double track from Oslo, with a new route north of Kløfta to Eidsvoll, the 16 kilometres (10 mi) north of the airport allowing trains operating on the Dovre Line to Lillehammer and Trondheim to access the airport. The 64-kilometre (40 mi) line was named the Gardermo Line.[7]

The Gardermo Line was the second attempt to build high-speed rail in Norway, after the 35-kilometre (22 mi) line from Ski to Moss on the Østfold Line. But no operation speeds exceeding 160 kilometres per hour (99 mph) are achieved there due to short distances and limitations to rolling stock, making Gardermobanen the first real high-speed railway line in Norway. Due to the domination of single track in Norway, the opening of the Gardermo Line increased the total length of double track in the kingdom by two-thirds.[7]

Construction started in 1994.[2] An agreement for purchase of sixteen three-car electric multiple units was signed with Adtranz on 23 February 1995. Parliament decided on 1 October 1996 that the construction company would also operate the new train service. The trains were delivered between 19 September 1997 and 30 January 1998,[8] costing NOK 1.4 billion.[2]

Challenges

 
Lake Lutvann was partially drained due to construction problems during the digging of the Romerike Tunnel

The greatest challenge was the need to build the 14,580-metre (47,830 ft) Romerike railway tunnel – Norway's longest – beneath the geologically highly unstable Østmarka area between Etterstad, close to Oslo Central Station, and Lillestrøm.[6] During construction, in 1997, the water level in some lakes above the tunnel, including Lutvann and Nordre Puttjern, sank dramatically. After the leaks were discovered on 3 February 1997, sanctions were imposed by the Norwegian Water Resources and Energy Directorate requiring the elimination of all leakages. At its worst, the tunnel was leaking 3,000 litres (660 imp gal) of water per minute.[9]

Rhoca-Gil sealant was used in an attempt to fix the leaks, but failed to work properly. Not only did it not polymerise, and therefore failed to staunch the leaks, but it also poisoned its surroundings with acrylamide. Manual fixing with concrete became necessary; the fixing and cleaning up of the toxin delayed the building of the tunnel by one year.[9] Further complications arose due to conflicts between NSB Gardermobanen and the construction company, Scandinavian Rock Group, with the latter at one instance stopping work for three weeks while the parties quarrelled in court.[10]

Reports have shown a lack of inspection and reporting procedures during incidents that should have been addressed – but were never taken seriously – in 1995. Construction of the tunnel caused damage to around sixty houses and an evaluation by the Ministry of Transport and Communications showed that NOK 500 million was spent on fixing the leaks and claimed that this was to a large extent an unnecessary expenditure which more efficient engineering procedures would have avoided. The report also criticised the administrative planning and organisation of the overall construction of the railway.[9]

Airport Express Trains began operating as soon as the new airport (and the Lillestrøm to Gardermoen stretch of the new high-speed line) opened on 8 October 1998; however, for more than ten months they had to use the old Hovedbane (Trunk Line) between Oslo S and Lillestrøm, which restricted their frequency to just two trains per hour. Regular operations at full capacity, using the Romerike Tunnel, did not commence until 22 August 1999.[2]

Reorganisation

 
A Class 71 unit beside a Class 70 unit at Asker Station

Estimates for the project costs were NOK 4.3 billion, ±20%, but by completion they had ended at NOK 7.7 billion, of which NOK 1.3 billion were related to the leakages. The rest of the line had a cost exceedings of NOK 0.4 billion. The company had acquired financial costs of NOK 0.9 billion, so the company owed NOK 10.0 billion by 1999, including money spent on the new trains.[2]

The first steps of organisational restructure were taken 29 June 2000, when the CEO of NSB, Osmund Ueland, was fired due to several incidents related to the operations of NSB—not just the Gardermo Line.[11] Einar Enger took over as new CEO on 26 February 2001.[12]

The debt in NSB Gardermobanen had become unmanageable, and in April 2000 parliament accepted that it would not be possible to make the Gardermo Line—with the current structure—the profitable venture predicted in 1992. From 1 January 2001, the company changed name to Flytoget AS, retaining ownership of the trains and operations and kept as a subsidiary of NSB. The tracks and infrastructure were transferred to the Norwegian National Rail Administration (Jernbaneverket), who owns the rest of the Norwegian railway network. All debt was restored and covered by the state, and a vehicle excise duty was implemented on the Gardermo Line to cover the management and maintenance of the line, to be paid by all users.[2]

On 9 December 2002, parliament decided that Flytoget AS would become a separate railway company from 1 January 2003, owned directly by the Ministry of Transport and Communications.[2] One year later the ownership was transferred to the Ministry of Trade and Industry as part of a cleanup of political overhaul between the departments.[13] As part of the process, a new CEO, Thomas Havnegjerde, was appointed in June 2002,[14] and in January 2003 the new Chair, Endre Skjørestad—who took over the position form NSB's director Einar Enger.[15] Havnegjerde announced on 6 August 2008 that he would retire from his job before the end of the year.[16] He was replaced by Linda Bernander Silseth on 10 November 2008.[17] On 30 August 2009, two of three services to Asker were extended to Drammen.[18] This followed upgrades to the Drammen Line, including the Lieråsen Tunnel, and a new parking lot at Drammen Station, in total costing NOK 20 million.[19][20]

Operations

Airport Express Train
 
 
0:00
Oslo Airport, Gardermoen
(6 pr. hour)
 
0:12
Lillestrøm
(3 pr. hour)
 
Romerike Tunnel
(14,580 m)
 
 
0:19
Oslo S
(6 pr. hour)
 
Oslo Tunnel
(3,632 m)
 
 
0:22
Nationaltheatret
(5 pr. hour)
 
 
0:26
Skøyen
(5 pr. hour)
 
0:30
Lysaker
(5 pr. hour)
 
 
 
 
0:33
Stabekk
(2 pr. hour)
 
Bærum Tunnel
(5.446 m)
 
0:39
Sandvika
(3 pr. hour)
 
Tanum Tunnel
(3,590 m)
 
Skaugum Tunnel
(3,790 m)
 
0:45
Asker
(3 pr. hour)
 
Lieråsen Tunnel
(10,732 m)
 
1:00
Drammen
(3 pr. hour)

Departures operate every ten minutes from Oslo Central Station (Oslo S) to the airport - i.e. six trains pr. hour. Half of the trains originate in Drammen, making five intermediate stops before Oslo S, and again at Lillestrøm. One starts from Oslo S and go directly to Gardermoen without intermediate stops. Two start from Stabekk and calls at Lysaker, Skøyen, Nationaltheateret and Oslo S. On Saturdays, Sunday mornings and in most of July, Flytoget does not operate the direct trains from Oslo S or Stabekk — only the 20-minute headway all-stop trains.[21] While the services northeast from Oslo S to the airport use the high-speed Gardermo Line, those westwards towards Asker use the Drammen Line built in 1870–72[6] and the Asker Line; so while the 48 kilometres (30 mi) from Oslo S to the airport can be done in 19 minutes, the 24 kilometres (15 mi) from Asker to Oslo S takes 26 minutes. The latter does however include stops at five stations: Nationaltheatret, Skøyen, Lysaker, Sandvika and Asker.[21]

Service From To Trains pr. hour
FLY1 Drammen Oslo Airport, Gardermoen 3
FLY2 Stabekk/Oslo S Oslo Airport, Gardermoen 3

Competition is offered from other means of ground transport and by Vy who operate trains from and to the airport. This includes one hourly departure with line R12 of the Oslo Commuter Rail north to Eidsvoll and south to Oslo, Drammen and Kongsberg;[22] two regional trains (line RE10 and RE11) hourly north to Eidsvoll and Lillehammer and south to Drammen and Vestfold;[23] and five daily express trains to Dombås and Trondheim calling Oslo Airport Station, including one night train (although the express trains to Trondheim do not accept passengers only travelling between Oslo and Gardermoen).[24]

The price of a ticket to Oslo is NOK 180, though higher if departing from Sandvika, Asker and Drammen. Reduced fares with 50% discount are offered to senior citizens, children, youth under 21 years, students, benefit recipients and military personnel.[25] Flytoget tickets are not valid on Vy trains, and vice versa. Vy tickets are generally cheaper, though not for some groups with reduced fare; for instance students are granted a greater discount with Flytoget than with Vy.[25][26] Ticket can either be bought at vending machines or as e-tickets; there is no seat reservation.[27]

Flytoget transported 5.4 million passengers in 2007,[3] a 34% market share of airport ground transport.[5] Flytoget boasts a high service quality, with 96% of departures arriving within 3 minutes of schedule and only 0.4% of departures canceled.[4] Part of this is due to the airport express trains receiving priority over other trains in the limited capacity around Oslo.[13] Flytoget was announced to have the most satisfied, and the fourth most loyal customers of all Norwegian companies in 2008, by the customer satisfaction survey conducted by the Norwegian School of Management.[28] The same year Flytoget was declared the best place of work in Norway by Great Place to Work.[29] During the 2007 recruitment half of the newly educated train divers chose Flytoget over Vy, mostly due to higher wages.[30]

Stations

Station Distance[31] Time[21] Fare[25] Reduced fare[25]
  Oslo Airport 0.00 km 0 min n/a n/a
  Lillestrøm 30.90 km 12 min NOK 140 NOK 70
  Oslo Central Station 48.07 km 19 / 22 min NOK 180 NOK 90
  Nationaltheatret 49.50 km 27 min NOK 180 NOK 90
  Skøyen 52.43 km 32 min NOK 180 NOK 90
  Lysaker 55.07 km 34 min NOK 180 NOK 90
  Stabekk 57.06 km 32 min NOK 180 NOK 90
  Sandvika 62.24 km 42 min NOK 210 NOK 105
  Asker 71.93 km 48 min NOK 210 NOK 105
  Drammen 100.96 km 60 min NOK 260 NOK 130

Incidents

 
Train awaiting departure from Oslo Airport Station

Several deaths have taken place on the route, but only one due to an accident. In 1999, an employee of the National Rail Administration was killed by a train because it was operating at 160 kilometres per hour (99 mph) instead of the temporarily reduced limit of 80 kilometres per hour (50 mph); Flytoget was fined for not informing the engineer of the speed limit reduction.[32] Several other deaths on the line have been classified as suicides, and so are not in the accident statistics;[33][34] they do however cause delays on all services for hours after the incident takes place.[35]

In 2000–01, Flytoget experienced three derailments with empty trains at Gardermoen; one caused by the engineer falling asleep and two by the train passing a red light.[36][37][38][39] No more such accidents occurred after automatic Train Control was installed in 2001.[40]

Delays have been experienced many times by travelers due to technical problems on the infrastructure. In particular the old line west of Oslo causes much delay,[41] and the National Rail Administration performed during 2008 a NOK 100 million upgrade to the Oslo Tunnel to ensure better performance.[42] But problems also incur on the new sections, regularly delaying service or capacity, and forcing Flytoget to operate fewer departures.[43][44] In total 96% of departures arrived within 3 minutes of schedule and 0.4% of departures were canceled in 2007.[4]

Pickpocketing has been a problem since the start; even the Chief of Police in Oslo has been robbed on the train.[45][46] The train has also been the target of sabotage,[47] and embezzlement for NOK 1 million by an employed ticket salesman, who found a way to print two tickets with the system only charging for one, by turning off and on the ticket printer.[48]

When Al Gore came to Oslo to receive his Nobel Peace Prize on 7 December 2007, he used the Airport Express Train to make his journey as environmentally friendly as possible.[49] The company has initiated a program to ensure better diet for the employees; this had made several lose weight and has reduced the level of sick leave from 12 to 8%.[50] In 2005–07, a program to reduce the energy use of the trains through smarter operation reduced energy consumption by 15%.[51]

During the 2010 volcano air travel disruption, the Gardermoen airport was closed for a period, and the Flytoget trains were used by NSB instead, to give extra train capacity for long-distance routes.[52]

Rolling stock

Class 71

 
A Class 71 Airport Express Train ready for departure from Oslo S
 
Interior of the Class 71 Airport Express Train

The company operates sixteen Class 71 three-car electric multiple units delivered in 1997–98, and built domestically by Adtranz at Strømmen based on carbodies built in Adtranz factory in Kalmar. They are based on the Swedish X2 operated by SJ in their X 2000 intercity service, and developed by Kalmar Verkstad during the 1980s. The Class 71 are nearly identical to the NSB Class 73, save the 71-series lacking one car and tilting mechanism, and a different interior. Both have chosen to not use the original locomotive design, instead installing one powered bogie in each car. The 71-series is built for a maximum operating speed of 210 kilometres per hour (130 mph), but has achieved higher speeds in test runs.[8]

Among the features are pressure-tight cabins to allow comfortable travel through tunnels at high speeds, and step-free access to the cars. Instead, steps are inside the trains; this has been criticized to be in non-conformance with public accessibility policy.[53] The multiple units can only operate in fixed sets of three cars, but up to three sets can be run in multiple. Flytoget regularly uses double sets to create six-car trains.[8] In 2008–09, all units will be refit with an additional middle car by Bombardier Transportation, increasing capacity by 40% to 244 seats.[54]

Unlike the Class 71, the sister trains in service with NSB were prone to trouble, having to operate on hundred-year-old infrastructure on cross-mountain services; the Class 71 has more lenient operating conditions thanks to better infrastructure. The only incident to ground all the BM71 trains occurred on the 17 June 2000 at Nelaug when a Class 73 train operated by NSB derailed because of stress on the axle. Unlike the NSB trains, the airport express trains were back in service the next day,[55] while the 73-series had to wait another month.[56] On 24 January 2004 a unit had to be taken out of service due to smoke from a stressed bearing—within days the bearings were replaced on all units.[57]

Class 78

 
Class 78 train at the Velim railway test circuit

Flytoget purchased eight new 4-car CAF Oaris EMUs from the Spanish manufacturer CAF.[58] They started operation in June 2021. Even though the EMU's maximum speed is 245 kilometres per hour (152 mph), the infrastructure limits the speed to 210 kilometres per hour (130 mph). The trainsets delivered to Flytoget were withdrawn from service after 19 days of operation due to discovery of cracks in the chassis.[59]

Future

New tracks

There are plans to build two more tracks from Lysaker to Oslo Central Station, including a new tunnel under central Oslo.[60] This project is not decided.

References

  1. ^ a b Brønnøysund Register Centre. "Nøkkelopplysninger Flytoget AS" (in Norwegian). Retrieved 2008-05-20.
  2. ^ a b c d e f g h Flytoget AS. . Archived from the original on 2011-07-07. Retrieved 2008-05-24.
  3. ^ a b c d e f g h Flytoget AS (2008). (PDF) (in Norwegian). Archived from the original (PDF) on 2011-07-21. Retrieved 2008-09-13.
  4. ^ a b c Flytoget AS. . Archived from the original on 2007-11-17. Retrieved 2008-05-24.
  5. ^ a b Flytoget AS (2007-10-21). (in Norwegian). Archived from the original on 2009-07-03. Retrieved 2008-09-13.
  6. ^ a b c Norwegian National Rail Administration (2008). (PDF). p. 45. Archived from the original (PDF) on December 17, 2008. Retrieved 2008-09-13.
  7. ^ a b Norwegian National Rail Administration (2008). (PDF). p. 6. Archived from the original (PDF) on December 17, 2008. Retrieved 2008-09-13.
  8. ^ a b c Aspenberg, Nils Carl (2001). Elektrolok i Norge (in Norwegian). Oslo: Baneforlaget. ISBN 82-91448-42-6.
  9. ^ a b c Norwegian Ministry of Transport and Communications (1999). (in Norwegian). Archived from the original on 2012-03-29. Retrieved 2008-09-13.
  10. ^ Aftenposten (1997-04-14). "NSB og SRG barket sammen i namsretten" (in Norwegian).[permanent dead link]
  11. ^ Norsk Telegrambyrå (2000-06-29). "Ueland fikk sparken i NSB" (in Norwegian). Verdens Gang. Retrieved 2008-09-13.
  12. ^ Verdens Gang (2001-02-26). "Ny mann på nytt spor?" (in Norwegian). Retrieved 2008-09-13.
  13. ^ a b Boarding (2004-02-12). (in Norwegian). Archived from the original on 2009-07-03. Retrieved 2008-09-13.
  14. ^ Flytoget. . Archived from the original on 2008-05-27. Retrieved 2008-05-24.
  15. ^ Boarding (2003-01-23). . Archived from the original on 2009-07-03. Retrieved 2008-09-13.
  16. ^ Lorentzen, Magdalena (2008-08-06). "Toppsjef begynneri barnehage" (in Norwegian). NA24. Retrieved 2008-09-14.
  17. ^ Flytoget (2008-10-24). "Linda Bernander Silseth ny administrerende direktør i Flytoget" (in Norwegian). Retrieved 2008-05-24.[dead link]
  18. ^ Flytoget (2009-06-23). (in Norwegian). Archived from the original on 2009-09-07. Retrieved 2009-08-29.
  19. ^ Norwegian Ministry of Transport and Communications (2007-03-27). "Flytoget- til Drammen frå juni 2008" (in Norwegian). Retrieved 2008-09-13.
  20. ^ Norwegian National Rail Administration (2007-03-23). (in Norwegian). Archived from the original on August 11, 2007. Retrieved 2008-09-13.
  21. ^ a b c Flytoget AS (2008-01-06). (PDF). Archived from the original (PDF) on 2020-01-24. Retrieved 2008-09-13.
  22. ^ NSB (2008-01-06). (PDF). Archived from the original (PDF) on 2009-10-07. Retrieved 2008-09-13.
  23. ^ Norges Statsbaner (2008-01-06). (PDF). Archived from the original (PDF) on 2011-06-12. Retrieved 2008-09-13.
  24. ^ Norges Statsbaner (2008-01-06). (PDF). Archived from the original (PDF) on 2011-06-12. Retrieved 2008-09-13.
  25. ^ a b c d Flytoget AS. . Archived from the original on 2010-07-04. Retrieved 2009-08-29.
  26. ^ Norges Statsbaner. (in Norwegian). Archived from the original on October 22, 2007. Retrieved 2008-05-24.
  27. ^ Flytoget AS. . Archived from the original on 2008-04-21. Retrieved 2008-05-24.
  28. ^ Norwegian School of Management. (2008-05-07). "Flytoget vinner kundetilfredshetsprisen 2008" (in Norwegian). Retrieved 2008-09-13.
  29. ^ Great Place to Work (2008). (in Norwegian). Archived from the original on 2008-12-04. Retrieved 2008-09-13.
  30. ^ Aftenposten (2007-08-31). . Archived from the original on 2007-11-06. Retrieved 2008-06-30.
  31. ^ Norwegian National Rail Administration. "Stasjonsoversikt Kongsberg – Oslo – Eidsvoll from Oslo Airport" (in Norwegian). Archived from the original on 2008-02-08. Retrieved 2008-05-24.
  32. ^ Norsk Telegrambyrå (2001-02-21). (in Norwegian). Verdens Gang. Archived from the original on 2011-06-11. Retrieved 2008-06-30.
  33. ^ Norwegian Railway Inspectorate. "Ulykkesstatisktikk 2002" (PDF) (in Norwegian). p. 4. Retrieved 2008-06-30.[permanent dead link]
  34. ^ Verdens Gang (2001-01-26). (in Norwegian). Archived from the original on 2011-06-11. Retrieved 2008-06-30.
  35. ^ Ihlebæk, Jostein; Holm, Per Annar (2007-12-04). (in Norwegian). Aftenposten. p. 4. Archived from the original on 2011-06-04. Retrieved 2008-06-30.
  36. ^ Norwegian Railway Inspectorate. "Ulykkesstatisktikk 2000" (in Norwegian). Retrieved 2008-06-30.[dead link]
  37. ^ Norsk Telegrambyrå (2001-01-03). (in Norwegian). Verdens Gang. Archived from the original on 2011-06-11. Retrieved 2008-06-30.
  38. ^ Verdens Gang (2000-06-20). (in Norwegian). Archived from the original on 2011-06-11. Retrieved 2008-06-30.
  39. ^ Verdens Gang (2000-06-14). (in Norwegian). Archived from the original on 2011-06-11. Retrieved 2008-06-30.
  40. ^ Norwegian Railway Inspectorate. "Ulykkesstatisktikk 2001" (in Norwegian). Retrieved 2008-06-30.[dead link]
  41. ^ Tonstad, Hans Marius (2008-01-08). (in Norwegian). Aftenposten. Archived from the original on March 9, 2008. Retrieved 2008-06-30.
  42. ^ Norwegian National Rail Administration (2008-05-15). (in Norwegian). Archived from the original on May 19, 2008. Retrieved 2008-06-30.
  43. ^ Norsk Telegrambyrå (2008-03-14). "Feil forsinker flytogene" (in Norwegian). Verdens Gang. Retrieved 2008-06-30.
  44. ^ Norsk Telegrambyrå (2001-03-22). "Flytoget fast i tunnel i én time i Oslo" (in Norwegian). Verdens Gang. Retrieved 2008-06-30.
  45. ^ Verdens Gang (1998-12-12). "Velstelte tyver på flytoget" (in Norwegian). Retrieved 2008-06-30.
  46. ^ Norsk Telegrambyrå (2007-05-25). "Oslos politimester rundstjålet" (in Norwegian). Verdens Gang. Retrieved 2008-06-30.
  47. ^ Norsk Telegrambyrå (2003-10-27). "Livsfarlig sabotasje mot flytog" (in Norwegian). Verdens Gang. Retrieved 2008-06-30.
  48. ^ Verdens Gang (2001-08-17). "Svindlet Flytoget med printer-triks" (in Norwegian). Retrieved 2008-06-30.
  49. ^ Hauge, Linus (2007-12-07). (in Norwegian). Dagsavisen. Archived from the original on February 6, 2008. Retrieved 2008-06-30.
  50. ^ Sandberg, Tor (2008-06-26). (in Norwegian). Dagsavisen. Archived from the original on July 3, 2009. Retrieved 2008-06-30.
  51. ^ Aftenposten (2007-10-18). (in Norwegian). Archived from the original on 2007-10-13. Retrieved 2007-06-30.
  52. ^ Flytog på strekningen Oslo - Halden April 18, 2010, at the Wayback Machine
  53. ^ Norwegian State Council on Disability. "Langt igjen til universell utforming" (in Norwegian). Archived from the original on 2007-05-28. Retrieved 2007-06-19.
  54. ^ Flytoget AS. (in Norwegian). Archived from the original on 2009-07-03. Retrieved 2007-06-19.
  55. ^ Norsk Telegrambyrå (2000-06-18). (in Norwegian). Verdens Gang. Archived from the original on 2011-06-12. Retrieved 2008-09-13.
  56. ^ Norsk Telegrambyrå (2000-07-13). (in Norwegian). Verdens Gang. Archived from the original on 2011-06-12. Retrieved 2008-09-13.
  57. ^ Norsk Telegrambyrå (2005-01-31). (in Norwegian). Verdens Gang. Archived from the original on 2011-06-11. Retrieved 2007-06-30.
  58. ^ CAF (2015-05-01). "OARIS FLYTOGET". CAF. Retrieved 2015-12-30.
  59. ^ "Crack causes Flytoget to withdraw brand new CAF fleet from traffic". Retrieved 31 August 2021.
  60. ^ Jernbaneverket (2015-08-13). (in Norwegian). Archived from the original on 2016-01-25. Retrieved 2016-01-19.

External links

  Media related to Flytoget at Wikimedia Commons

  • Official website

flytoget, airport, express, train, norwegian, norwegian, high, speed, airport, railway, service, connecting, oslo, airport, oslo, central, station, nineteen, minutes, formerly, gardermobanen, operates, high, speed, gardermoen, line, using, sixteen, class, elec. The Airport Express Train Norwegian Flytoget is a Norwegian high speed airport railway service connecting Oslo Airport to Oslo Central Station in nineteen minutes 4 Run by Flytoget AS formerly NSB Gardermobanen AS it operates on the high speed Gardermoen Line using sixteen GMB Class 71 electric trains Normal service frequency is once every ten minutes with five of the services each hour continuing westwards beyond Oslo Central The extended services serve nine stops within Greater Oslo and take up to 60 minutes Flytoget ASTypeState ownedIndustryRail transportFounded24 November 1992 1 FounderNorges Statsbaner 2 HeadquartersOslo Norway 1 Area servedGreater OsloKey peoplePhilipp Engedal CEO Endre Skjorestad Chair 3 ProductsAirport rail linkRevenueNOK 689 million 2007 3 Operating incomeNOK 192 million 2007 3 Net incomeNOK 182 million 2007 3 Number of employees265 2007 3 ParentNorwegian Ministry of Trade and Industry 3 Websiteflytoget noPrevious logo Flytoget transported 5 4 million passengers in 2007 3 a 34 percent market share of airport ground transport 5 The service which has a top speed of 210 kilometres per hour 130 mph is the only high speed rail service in Norway Construction started in 1994 and high speed trains began serving Gardermoen Airport from the date of its opening on 8 October 1998 although full operation using the 14 5 kilometre long 9 0 mi Romerike Tunnel had to wait another ten and a half months after severe leaks caused by the tunnel s construction led to the partial depletion of two lakes Formed in 1992 as a subsidiary of Norwegian State Railways the company has been owned since 2001 by the Norwegian Ministry of Trade and Industry Contents 1 History 1 1 Decision for a new airport connection 1 2 Construction 1 3 Challenges 1 4 Reorganisation 2 Operations 2 1 Stations 2 2 Incidents 3 Rolling stock 3 1 Class 71 3 2 Class 78 4 Future 4 1 New tracks 5 References 6 External linksHistory EditDecision for a new airport connection Edit When the Parliament of Norway on 8 October 1992 decided to build a new central airport for Eastern Norway they also decided that the main mode of ground transport should be by rail While the previous airport Oslo Airport Fornebu was located just outside the city limits the new airport Oslo Airport Gardermoen would be located 50 kilometres 31 mi north of the city outside the reach of existing public transport The principle of the airport construction was that it was not to be footed by the tax payers the entire airport would be built with borrowed money through Oslo Lufthavn AS a subsidiary of the Norwegian Airport Administration The same principle was chosen for the airport rail link the Norwegian State Railways NSB creating the limited company subsidiary NSB Gardermobanen AS founded on 24 November 1992 to perform the construction of the line It would be able to charge train operators using the line channeling the payments to cover down payments and interest of the debt used to build the railway Profit margin was estimated to 7 5 2 Construction Edit Main article Gardermoen Line Oslo Airport Gardermoen is not on the Trunk Line that runs north from Oslo With heavy traffic and many small stops until Lillestrom and continuing north as single track 6 the Trunk Line would have to be supplemented by a parallel double track from Oslo with a new route north of Klofta to Eidsvoll the 16 kilometres 10 mi north of the airport allowing trains operating on the Dovre Line to Lillehammer and Trondheim to access the airport The 64 kilometre 40 mi line was named the Gardermo Line 7 The Gardermo Line was the second attempt to build high speed rail in Norway after the 35 kilometre 22 mi line from Ski to Moss on the Ostfold Line But no operation speeds exceeding 160 kilometres per hour 99 mph are achieved there due to short distances and limitations to rolling stock making Gardermobanen the first real high speed railway line in Norway Due to the domination of single track in Norway the opening of the Gardermo Line increased the total length of double track in the kingdom by two thirds 7 Construction started in 1994 2 An agreement for purchase of sixteen three car electric multiple units was signed with Adtranz on 23 February 1995 Parliament decided on 1 October 1996 that the construction company would also operate the new train service The trains were delivered between 19 September 1997 and 30 January 1998 8 costing NOK 1 4 billion 2 Challenges Edit Main article Romerike Tunnel Lake Lutvann was partially drained due to construction problems during the digging of the Romerike Tunnel The greatest challenge was the need to build the 14 580 metre 47 830 ft Romerike railway tunnel Norway s longest beneath the geologically highly unstable Ostmarka area between Etterstad close to Oslo Central Station and Lillestrom 6 During construction in 1997 the water level in some lakes above the tunnel including Lutvann and Nordre Puttjern sank dramatically After the leaks were discovered on 3 February 1997 sanctions were imposed by the Norwegian Water Resources and Energy Directorate requiring the elimination of all leakages At its worst the tunnel was leaking 3 000 litres 660 imp gal of water per minute 9 Rhoca Gil sealant was used in an attempt to fix the leaks but failed to work properly Not only did it not polymerise and therefore failed to staunch the leaks but it also poisoned its surroundings with acrylamide Manual fixing with concrete became necessary the fixing and cleaning up of the toxin delayed the building of the tunnel by one year 9 Further complications arose due to conflicts between NSB Gardermobanen and the construction company Scandinavian Rock Group with the latter at one instance stopping work for three weeks while the parties quarrelled in court 10 Reports have shown a lack of inspection and reporting procedures during incidents that should have been addressed but were never taken seriously in 1995 Construction of the tunnel caused damage to around sixty houses and an evaluation by the Ministry of Transport and Communications showed that NOK 500 million was spent on fixing the leaks and claimed that this was to a large extent an unnecessary expenditure which more efficient engineering procedures would have avoided The report also criticised the administrative planning and organisation of the overall construction of the railway 9 Airport Express Trains began operating as soon as the new airport and the Lillestrom to Gardermoen stretch of the new high speed line opened on 8 October 1998 however for more than ten months they had to use the old Hovedbane Trunk Line between Oslo S and Lillestrom which restricted their frequency to just two trains per hour Regular operations at full capacity using the Romerike Tunnel did not commence until 22 August 1999 2 Reorganisation Edit A Class 71 unit beside a Class 70 unit at Asker Station Estimates for the project costs were NOK 4 3 billion 20 but by completion they had ended at NOK 7 7 billion of which NOK 1 3 billion were related to the leakages The rest of the line had a cost exceedings of NOK 0 4 billion The company had acquired financial costs of NOK 0 9 billion so the company owed NOK 10 0 billion by 1999 including money spent on the new trains 2 The first steps of organisational restructure were taken 29 June 2000 when the CEO of NSB Osmund Ueland was fired due to several incidents related to the operations of NSB not just the Gardermo Line 11 Einar Enger took over as new CEO on 26 February 2001 12 The debt in NSB Gardermobanen had become unmanageable and in April 2000 parliament accepted that it would not be possible to make the Gardermo Line with the current structure the profitable venture predicted in 1992 From 1 January 2001 the company changed name to Flytoget AS retaining ownership of the trains and operations and kept as a subsidiary of NSB The tracks and infrastructure were transferred to the Norwegian National Rail Administration Jernbaneverket who owns the rest of the Norwegian railway network All debt was restored and covered by the state and a vehicle excise duty was implemented on the Gardermo Line to cover the management and maintenance of the line to be paid by all users 2 On 9 December 2002 parliament decided that Flytoget AS would become a separate railway company from 1 January 2003 owned directly by the Ministry of Transport and Communications 2 One year later the ownership was transferred to the Ministry of Trade and Industry as part of a cleanup of political overhaul between the departments 13 As part of the process a new CEO Thomas Havnegjerde was appointed in June 2002 14 and in January 2003 the new Chair Endre Skjorestad who took over the position form NSB s director Einar Enger 15 Havnegjerde announced on 6 August 2008 that he would retire from his job before the end of the year 16 He was replaced by Linda Bernander Silseth on 10 November 2008 17 On 30 August 2009 two of three services to Asker were extended to Drammen 18 This followed upgrades to the Drammen Line including the Lierasen Tunnel and a new parking lot at Drammen Station in total costing NOK 20 million 19 20 Operations EditvteAirport Express TrainLegend 0 00 Oslo Airport Gardermoen 6 pr hour 0 12 Lillestrom 3 pr hour Romerike Tunnel 14 580 m 0 19 Oslo S 6 pr hour Oslo Tunnel 3 632 m 0 22 Nationaltheatret 5 pr hour 0 26 Skoyen 5 pr hour 0 30 Lysaker 5 pr hour 0 33 Stabekk 2 pr hour Baerum Tunnel 5 446 m 0 39 Sandvika 3 pr hour Tanum Tunnel 3 590 m Skaugum Tunnel 3 790 m 0 45 Asker 3 pr hour Lierasen Tunnel 10 732 m 1 00 Drammen 3 pr hour Departures operate every ten minutes from Oslo Central Station Oslo S to the airport i e six trains pr hour Half of the trains originate in Drammen making five intermediate stops before Oslo S and again at Lillestrom One starts from Oslo S and go directly to Gardermoen without intermediate stops Two start from Stabekk and calls at Lysaker Skoyen Nationaltheateret and Oslo S On Saturdays Sunday mornings and in most of July Flytoget does not operate the direct trains from Oslo S or Stabekk only the 20 minute headway all stop trains 21 While the services northeast from Oslo S to the airport use the high speed Gardermo Line those westwards towards Asker use the Drammen Line built in 1870 72 6 and the Asker Line so while the 48 kilometres 30 mi from Oslo S to the airport can be done in 19 minutes the 24 kilometres 15 mi from Asker to Oslo S takes 26 minutes The latter does however include stops at five stations Nationaltheatret Skoyen Lysaker Sandvika and Asker 21 Service From To Trains pr hourFLY1 Drammen Oslo Airport Gardermoen 3FLY2 Stabekk Oslo S Oslo Airport Gardermoen 3Competition is offered from other means of ground transport and by Vy who operate trains from and to the airport This includes one hourly departure with line R12 of the Oslo Commuter Rail north to Eidsvoll and south to Oslo Drammen and Kongsberg 22 two regional trains line RE10 and RE11 hourly north to Eidsvoll and Lillehammer and south to Drammen and Vestfold 23 and five daily express trains to Dombas and Trondheim calling Oslo Airport Station including one night train although the express trains to Trondheim do not accept passengers only travelling between Oslo and Gardermoen 24 The price of a ticket to Oslo is NOK 180 though higher if departing from Sandvika Asker and Drammen Reduced fares with 50 discount are offered to senior citizens children youth under 21 years students benefit recipients and military personnel 25 Flytoget tickets are not valid on Vy trains and vice versa Vy tickets are generally cheaper though not for some groups with reduced fare for instance students are granted a greater discount with Flytoget than with Vy 25 26 Ticket can either be bought at vending machines or as e tickets there is no seat reservation 27 Flytoget transported 5 4 million passengers in 2007 3 a 34 market share of airport ground transport 5 Flytoget boasts a high service quality with 96 of departures arriving within 3 minutes of schedule and only 0 4 of departures canceled 4 Part of this is due to the airport express trains receiving priority over other trains in the limited capacity around Oslo 13 Flytoget was announced to have the most satisfied and the fourth most loyal customers of all Norwegian companies in 2008 by the customer satisfaction survey conducted by the Norwegian School of Management 28 The same year Flytoget was declared the best place of work in Norway by Great Place to Work 29 During the 2007 recruitment half of the newly educated train divers chose Flytoget over Vy mostly due to higher wages 30 Stations Edit Station Distance 31 Time 21 Fare 25 Reduced fare 25 Oslo Airport 0 00 km 0 min n a n a Lillestrom 30 90 km 12 min NOK 140 NOK 70 Oslo Central Station 48 07 km 19 22 min NOK 180 NOK 90 Nationaltheatret 49 50 km 27 min NOK 180 NOK 90 Skoyen 52 43 km 32 min NOK 180 NOK 90 Lysaker 55 07 km 34 min NOK 180 NOK 90 Stabekk 57 06 km 32 min NOK 180 NOK 90 Sandvika 62 24 km 42 min NOK 210 NOK 105 Asker 71 93 km 48 min NOK 210 NOK 105 Drammen 100 96 km 60 min NOK 260 NOK 130Incidents Edit Train awaiting departure from Oslo Airport Station Several deaths have taken place on the route but only one due to an accident In 1999 an employee of the National Rail Administration was killed by a train because it was operating at 160 kilometres per hour 99 mph instead of the temporarily reduced limit of 80 kilometres per hour 50 mph Flytoget was fined for not informing the engineer of the speed limit reduction 32 Several other deaths on the line have been classified as suicides and so are not in the accident statistics 33 34 they do however cause delays on all services for hours after the incident takes place 35 In 2000 01 Flytoget experienced three derailments with empty trains at Gardermoen one caused by the engineer falling asleep and two by the train passing a red light 36 37 38 39 No more such accidents occurred after automatic Train Control was installed in 2001 40 Delays have been experienced many times by travelers due to technical problems on the infrastructure In particular the old line west of Oslo causes much delay 41 and the National Rail Administration performed during 2008 a NOK 100 million upgrade to the Oslo Tunnel to ensure better performance 42 But problems also incur on the new sections regularly delaying service or capacity and forcing Flytoget to operate fewer departures 43 44 In total 96 of departures arrived within 3 minutes of schedule and 0 4 of departures were canceled in 2007 4 Pickpocketing has been a problem since the start even the Chief of Police in Oslo has been robbed on the train 45 46 The train has also been the target of sabotage 47 and embezzlement for NOK 1 million by an employed ticket salesman who found a way to print two tickets with the system only charging for one by turning off and on the ticket printer 48 When Al Gore came to Oslo to receive his Nobel Peace Prize on 7 December 2007 he used the Airport Express Train to make his journey as environmentally friendly as possible 49 The company has initiated a program to ensure better diet for the employees this had made several lose weight and has reduced the level of sick leave from 12 to 8 50 In 2005 07 a program to reduce the energy use of the trains through smarter operation reduced energy consumption by 15 51 During the 2010 volcano air travel disruption the Gardermoen airport was closed for a period and the Flytoget trains were used by NSB instead to give extra train capacity for long distance routes 52 Rolling stock EditClass 71 Edit A Class 71 Airport Express Train ready for departure from Oslo S Interior of the Class 71 Airport Express Train Main article GMB Class 71 The company operates sixteen Class 71 three car electric multiple units delivered in 1997 98 and built domestically by Adtranz at Strommen based on carbodies built in Adtranz factory in Kalmar They are based on the Swedish X2 operated by SJ in their X 2000 intercity service and developed by Kalmar Verkstad during the 1980s The Class 71 are nearly identical to the NSB Class 73 save the 71 series lacking one car and tilting mechanism and a different interior Both have chosen to not use the original locomotive design instead installing one powered bogie in each car The 71 series is built for a maximum operating speed of 210 kilometres per hour 130 mph but has achieved higher speeds in test runs 8 Among the features are pressure tight cabins to allow comfortable travel through tunnels at high speeds and step free access to the cars Instead steps are inside the trains this has been criticized to be in non conformance with public accessibility policy 53 The multiple units can only operate in fixed sets of three cars but up to three sets can be run in multiple Flytoget regularly uses double sets to create six car trains 8 In 2008 09 all units will be refit with an additional middle car by Bombardier Transportation increasing capacity by 40 to 244 seats 54 Unlike the Class 71 the sister trains in service with NSB were prone to trouble having to operate on hundred year old infrastructure on cross mountain services the Class 71 has more lenient operating conditions thanks to better infrastructure The only incident to ground all the BM71 trains occurred on the 17 June 2000 at Nelaug when a Class 73 train operated by NSB derailed because of stress on the axle Unlike the NSB trains the airport express trains were back in service the next day 55 while the 73 series had to wait another month 56 On 24 January 2004 a unit had to be taken out of service due to smoke from a stressed bearing within days the bearings were replaced on all units 57 Class 78 Edit Class 78 train at the Velim railway test circuit Flytoget purchased eight new 4 car CAF Oaris EMUs from the Spanish manufacturer CAF 58 They started operation in June 2021 Even though the EMU s maximum speed is 245 kilometres per hour 152 mph the infrastructure limits the speed to 210 kilometres per hour 130 mph The trainsets delivered to Flytoget were withdrawn from service after 19 days of operation due to discovery of cracks in the chassis 59 Future EditNew tracks Edit There are plans to build two more tracks from Lysaker to Oslo Central Station including a new tunnel under central Oslo 60 This project is not decided References Edit a b Bronnoysund Register Centre Nokkelopplysninger Flytoget AS in Norwegian Retrieved 2008 05 20 a b c d e f g h Flytoget AS History Archived from the original on 2011 07 07 Retrieved 2008 05 24 a b c d e f g h Flytoget AS 2008 Annual Report 2007 PDF in Norwegian Archived from the original PDF on 2011 07 21 Retrieved 2008 09 13 a b c Flytoget AS About Flytoget the Airport Express Train Archived from the original on 2007 11 17 Retrieved 2008 05 24 a b Flytoget AS 2007 10 21 Rekordresultat gir utbytte in Norwegian Archived from the original on 2009 07 03 Retrieved 2008 09 13 a b c Norwegian National Rail Administration 2008 Jernbanestatistikk 2007 PDF p 45 Archived from the original PDF on December 17 2008 Retrieved 2008 09 13 a b Norwegian National Rail Administration 2008 Jernbanestatistikk 2007 PDF p 6 Archived from the original PDF on December 17 2008 Retrieved 2008 09 13 a b c Aspenberg Nils Carl 2001 Elektrolok i Norge in Norwegian Oslo Baneforlaget ISBN 82 91448 42 6 a b c Norwegian Ministry of Transport and Communications 1999 Saerskilt om Romeriksporten in Norwegian Archived from the original on 2012 03 29 Retrieved 2008 09 13 Aftenposten 1997 04 14 NSB og SRG barket sammen i namsretten in Norwegian permanent dead link Norsk Telegrambyra 2000 06 29 Ueland fikk sparken i NSB in Norwegian Verdens Gang Retrieved 2008 09 13 Verdens Gang 2001 02 26 Ny mann pa nytt spor in Norwegian Retrieved 2008 09 13 a b Boarding 2004 02 12 Flytoget til Naerings og handelsdepartementet in Norwegian Archived from the original on 2009 07 03 Retrieved 2008 09 13 Flytoget About the Organisation Archived from the original on 2008 05 27 Retrieved 2008 05 24 Boarding 2003 01 23 Endre Skjorestad ny styreleder Archived from the original on 2009 07 03 Retrieved 2008 09 13 Lorentzen Magdalena 2008 08 06 Toppsjef begynneri barnehage in Norwegian NA24 Retrieved 2008 09 14 Flytoget 2008 10 24 Linda Bernander Silseth ny administrerende direktor i Flytoget in Norwegian Retrieved 2008 05 24 dead link Flytoget 2009 06 23 2 Flytog i timen fra Drammen in Norwegian Archived from the original on 2009 09 07 Retrieved 2009 08 29 Norwegian Ministry of Transport and Communications 2007 03 27 Flytoget til Drammen fra juni 2008 in Norwegian Retrieved 2008 09 13 Norwegian National Rail Administration 2007 03 23 Flytoget til Drammen in Norwegian Archived from the original on August 11 2007 Retrieved 2008 09 13 a b c Flytoget AS 2008 01 06 From Oslo Airport PDF Archived from the original PDF on 2020 01 24 Retrieved 2008 09 13 NSB 2008 01 06 Kongsberg Eidsvoll PDF Archived from the original PDF on 2009 10 07 Retrieved 2008 09 13 Norges Statsbaner 2008 01 06 Skien Lillehammer PDF Archived from the original PDF on 2011 06 12 Retrieved 2008 09 13 Norges Statsbaner 2008 01 06 Oslo Trondheim PDF Archived from the original PDF on 2011 06 12 Retrieved 2008 09 13 a b c d Flytoget AS Fares Archived from the original on 2010 07 04 Retrieved 2009 08 29 Norges Statsbaner Studentrabatt in Norwegian Archived from the original on October 22 2007 Retrieved 2008 05 24 Flytoget AS Tickets Archived from the original on 2008 04 21 Retrieved 2008 05 24 Norwegian School of Management 2008 05 07 Flytoget vinner kundetilfredshetsprisen 2008 in Norwegian Retrieved 2008 09 13 Great Place to Work 2008 Norges Beste Arbeidsplasser 2008 in Norwegian Archived from the original on 2008 12 04 Retrieved 2008 09 13 Aftenposten 2007 08 31 Halve kullet gikk til Flytoget Archived from the original on 2007 11 06 Retrieved 2008 06 30 Norwegian National Rail Administration Stasjonsoversikt Kongsberg Oslo Eidsvoll from Oslo Airport in Norwegian Archived from the original on 2008 02 08 Retrieved 2008 05 24 Norsk Telegrambyra 2001 02 21 Flytoget botelagt etter dodsulykke in Norwegian Verdens Gang Archived from the original on 2011 06 11 Retrieved 2008 06 30 Norwegian Railway Inspectorate Ulykkesstatisktikk 2002 PDF in Norwegian p 4 Retrieved 2008 06 30 permanent dead link Verdens Gang 2001 01 26 Satt i skinnegangen da toget kom in Norwegian Archived from the original on 2011 06 11 Retrieved 2008 06 30 Ihlebaek Jostein Holm Per Annar 2007 12 04 Fullt tog kaos pa Romerike in Norwegian Aftenposten p 4 Archived from the original on 2011 06 04 Retrieved 2008 06 30 Norwegian Railway Inspectorate Ulykkesstatisktikk 2000 in Norwegian Retrieved 2008 06 30 dead link Norsk Telegrambyra 2001 01 03 Flytoget sporet av in Norwegian Verdens Gang Archived from the original on 2011 06 11 Retrieved 2008 06 30 Verdens Gang 2000 06 20 Sovnet kraesjet flytoget in Norwegian Archived from the original on 2011 06 11 Retrieved 2008 06 30 Verdens Gang 2000 06 14 Flytoget kjorte mot stoppsignal in Norwegian Archived from the original on 2011 06 11 Retrieved 2008 06 30 Norwegian Railway Inspectorate Ulykkesstatisktikk 2001 in Norwegian Retrieved 2008 06 30 dead link Tonstad Hans Marius 2008 01 08 Ny stans for flytoget in Norwegian Aftenposten Archived from the original on March 9 2008 Retrieved 2008 06 30 Norwegian National Rail Administration 2008 05 15 100 millioner sikrer full fart pa oppgradering av Oslotunnelen in Norwegian Archived from the original on May 19 2008 Retrieved 2008 06 30 Norsk Telegrambyra 2008 03 14 Feil forsinker flytogene in Norwegian Verdens Gang Retrieved 2008 06 30 Norsk Telegrambyra 2001 03 22 Flytoget fast i tunnel i en time i Oslo in Norwegian Verdens Gang Retrieved 2008 06 30 Verdens Gang 1998 12 12 Velstelte tyver pa flytoget in Norwegian Retrieved 2008 06 30 Norsk Telegrambyra 2007 05 25 Oslos politimester rundstjalet in Norwegian Verdens Gang Retrieved 2008 06 30 Norsk Telegrambyra 2003 10 27 Livsfarlig sabotasje mot flytog in Norwegian Verdens Gang Retrieved 2008 06 30 Verdens Gang 2001 08 17 Svindlet Flytoget med printer triks in Norwegian Retrieved 2008 06 30 Hauge Linus 2007 12 07 Optimistisk Gore haper pa ny klimaavtale i 2010 in Norwegian Dagsavisen Archived from the original on February 6 2008 Retrieved 2008 06 30 Sandberg Tor 2008 06 26 Flytoget slanker staben in Norwegian Dagsavisen Archived from the original on July 3 2009 Retrieved 2008 06 30 Aftenposten 2007 10 18 Energi pa banen in Norwegian Archived from the original on 2007 10 13 Retrieved 2007 06 30 Flytog pa strekningen Oslo Halden Archived April 18 2010 at the Wayback Machine Norwegian State Council on Disability Langt igjen til universell utforming in Norwegian Archived from the original on 2007 05 28 Retrieved 2007 06 19 Flytoget AS Flytoget inngar kontrakt med Bombardier Transportation om kjop av nye mellomvogner in Norwegian Archived from the original on 2009 07 03 Retrieved 2007 06 19 Norsk Telegrambyra 2000 06 18 Utmatting arsak til avsporing in Norwegian Verdens Gang Archived from the original on 2011 06 12 Retrieved 2008 09 13 Norsk Telegrambyra 2000 07 13 Signatur endelig i drift in Norwegian Verdens Gang Archived from the original on 2011 06 12 Retrieved 2008 09 13 Norsk Telegrambyra 2005 01 31 Ma skifte alle hjullagre i Flytogene in Norwegian Verdens Gang Archived from the original on 2011 06 11 Retrieved 2007 06 30 CAF 2015 05 01 OARIS FLYTOGET CAF Retrieved 2015 12 30 Crack causes Flytoget to withdraw brand new CAF fleet from traffic Retrieved 31 August 2021 Jernbaneverket 2015 08 13 KVU Oslo Navet in Norwegian Archived from the original on 2016 01 25 Retrieved 2016 01 19 External links Edit Companies portal Media related to Flytoget at Wikimedia Commons Official website Retrieved from https en wikipedia org w index php title Flytoget amp oldid 1141706649, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.