China is one of the world's largest producers of nuclear power. The country ranks third in the world both in total nuclear power capacity installed and electricity generated, accounting for around one tenth of global nuclear power generated. As of February 2023, China has 55 plants with 57GW in operation, 22 under construction with 24 GW and more than 70 planned with 88GW. About 5% of electricity in the country is due to nuclear energy.[7] These plants generated 417 TWh of electricity in 2022 [8] This is versus the September 2022 numbers of 53 nuclear reactors, with a total capacity of 55.6 gigawatt (GW).[9] In 2019, nuclear power had contributed 4.9% of the total Chinese electricity production, with 348.1 TWh.[2]

Taishan Nuclear Power Plant Unit 1 & 2 are two 1750 MWe class EPR reactors.
100
200
300
400
500
2014
2016
2019
2022
Nuclear energy generation in China (TWh)[1][2][3][4][5]
1
2
3
4
5
1999
2005
2010
2015
2022
Nuclear power share of total electricity in China (%)[6][1][2]

Nuclear power has been looked into as an alternative to coal due to increasing concerns about air quality, climate change and fossil fuel shortages.[10][11] The China General Nuclear Power Group has articulated the goal of 200 GW by 2035, produced by 150 additional reactors.[12][13]

China has two major nuclear power companies, the China National Nuclear Corporation operating mainly in north-east China, and the China General Nuclear Power Group (formerly known as China Guangdong Nuclear Power Group) operating mainly in south-east China.[14]

China aims to maximize self-reliance on nuclear reactor technology manufacturing and design, although international cooperation and technology transfer are also encouraged. Advanced pressurized water reactors such as the Hualong One are the mainstream technology in the near future, and the Hualong One is also planned to be exported.[15][16] China plans to build as many as thirty nuclear power reactors in countries involved in the Belt and Road Initiative by 2030.[17][18][19] By mid-century fast neutron reactors are seen as the main technology, with a planned 1400 GW capacity by 2100.[20][21][22] China is also involved in the development of nuclear fusion reactors through its participation in the ITER project, having constructed an experimental nuclear fusion reactor known as EAST located in Hefei,[23] as well as research and development into the thorium fuel cycle as a potential alternative means of nuclear fission.[24]

History Edit

1950–1958 Edit

In the Cold War, the initial motivation of developing nuclear power for Beijing was largely due to security purposes.[25] Between 1950 and 1958, Chinese nuclear power construction heavily relied on cooperation with the USSR.[26] The first initiative was launched with the establishment of the China-Soviet Union Nonferrous Metals and Rare Metals Corporation and the first central atomic research facility, the Institute of Atomic Energy of the Chinese Academy of Sciences in Beijing.[27] In February 1955, a chemical separation plant for the production of weapons-grade U-235 and plutonium was created with Soviet aid in Xinjiang and in April the Changchun Institute of Atomic Energy was established.[26] Several months later, on April 29, 1955, the Sino-Soviet Atomic Cooperation Treaty was signed.[28] The China National Nuclear Corporation (CNNC) was also established in 1955. In addition to the cooperation with the USSR, China has started to learn nuclear technology by sending students to the USSR.[26] In December 1958, nuclear power development had become the top priority project in the Draft Twelve Year Plan for Development of Science and Technology.[26]

1959–1963 Edit

The second phase is characterized by the aim of having completely self-sufficient in nuclear power development.[26] In June 1959, the USSR officially ended any forms of nuclear aid to China, withdrawing Soviet technicians.[29] China suffered but continued nuclear power development by massive research and input. In order to rapidly strengthen its atomic energy industry, the Central Committee decided that China must dedicate further resources exclusively to nuclear-related activities.[30] Consequently, the Institute of Atomic Energy created branch institutes of research organizations in every province, major city, and autonomous region.[26] By the end of 1963, China has built more than forty chemical separation plants for the extraction of uranium and thorium.[26] In the year between 1961 and 1962, China accomplished significant achievements in nuclear development which consolidates future applications. From 1959 to 1963, a gaseous diffusion plant utilizing a large 300 MW reactor was under construction at Lanzhou.[31] It was estimated that the Chinese invested over $1.5 billion in the construction of this plant.[26]

1964–Present Edit

 
Qinshan Nuclear Power Plant, located in Zhejiang China

After the explosive progress in the 1950s, Chinese nuclear development slowed down possibly because of Cultural Revolution so only one nuclear test took place in 1970.[26] On 8 February 1970, China issued its first nuclear power plan, and the 728 Institute (now called Shanghai Nuclear Engineering Research and Design Institute)[32] was founded.

The first independently designed and built nuclear power plant, Qinshan Nuclear Power Plant, was constructed in 1984 and successfully connected to the grid on December 15, 1991.[33][34] The reactor is of type CNP-300.

Along with Chinese economic reform, China continued to demand expansion of its electricity sectors.[35] As part of China's tenth Five-Year Plan (2001–2005), a key part of energy policy is to "guarantee energy security, optimize energy mix, improve energy efficiency, protect the ecological environment.”[35] The nuclear safety plan of 2013 stated that beyond 2016 only Generation III plants would be started, and until then only a very few Generation II+ plants would be started.[36]

In 2014, China still planned to have 58 GW of capacity by 2020.[37] However, due to reevaluation following the Fukushima Daiichi nuclear disaster in Japan, few plants commenced construction from 2015, and this target was not met.[38]

In 2019, China had a new target of 200 GWe of nuclear generating capacity by 2035, which is 7.7% out of predicted total electricity generating capacity of 2600 GWe.[2] By the end of December 2020, the total number of nuclear power units in operation on the Chinese mainland reached 49, with a total installed capacity of 51 GWe, ranking third in the world in terms of installed capacity and second in the world in terms of power generation in 2020; with 16 nuclear power units under construction, the number of units under construction and installed capacity have ranked first in the world for many years.[33] By 2035, nuclear power is planned to account for 10% of electricity generation.[39]

Safety and regulation Edit

The National Nuclear Safety Administration (NNSA), under the China Atomic Energy Authority (CAEA), is the licensing and regulatory body which also maintains international agreements regarding safety. It was set up in 1984 and reports to the State Council directly. In relation to the AP1000, NNSA works closely with the US Nuclear Regulatory Commission. China has been a member of the International Atomic Energy Agency (IAEA) since 1984.[39]

China has requested and hosted 12 Operational Safety Review Team (OSART) missions from IAEA teams to October 2011, and each plant generally has one external safety review each year, either OSART, WANO peer review, or CNEA peer review (with the Research Institute for Nuclear Power Operations).[40]

Following the Fukushima Daiichi nuclear disaster in Japan, China announced on 16 March 2011, that all nuclear plant approvals were being frozen, and that 'full safety checks' of existing reactors would be made.[41][42] Although Zhang Lijun, Vice Minister of Environmental Protection, has indicated that China's overall nuclear energy strategy would continue,[42] some commentators have suggested that additional safety-related costs and public opinion could cause a rethink in favor of an expanded renewable energy program.[42][43]

China's current methods for storing spent nuclear fuel (SNF) are only sustainable until the mid-2020s, and a policy to handle SNF needs to be developed.[44]

In 2017, new laws strengthened the powers of the National Nuclear Safety Administration, creating new "institutional mechanisms", a clearer "division of labour" and more disclosure of information.[45]

IAEA Director General Rafael Grossi made his first official visit in May 2023, signing several agreements with China's nuclear regulator, the China Atomic Energy Authority. Grossi said "China is one of the IAEA’s most important partners and a global leader in nuclear energy".[39]

Reactor technologies Edit

Imported technology Edit

CANDU reactors Edit

In 1998 construction of two AECL 728 MW CANDU-6 reactors at Qinshan Nuclear Power Plant started. The first went online in 2002, the second in 2003. CANDU reactors can use low grade reprocessed uranium from conventional reactors as fuel, thereby reducing China's stock of spent nuclear fuel.[46]

VVER Edit

 
The first two VVER-1000 units at Tianwan Nuclear Power Plant

Russia's Atomstroyexport was general contractor and equipment provider for the Tianwan AES-91 power plants using the V-428 version of the well-proven VVER-1000 reactor of 1060 MWe capacity, with construction started in 1999. Two further Tianwan units started in 2012 use the same version of the VVER-1000 reactor.

On 7 March 2019, China National Nuclear Corporation (CNNC) and Atomstroyexport signed the detailed contract for the construction of four VVER-1200s, two each at the Tianwan Nuclear Power Plant and the Xudabao Nuclear Power Plant. Construction will start in May 2021, and commercial operation of all the units is expected between 2026 and 2028.[47]

EPR Edit

In 2007, negotiations started with the French company Areva concerning the EPR third generation reactors. Two Areva 1660 MWe EPR reactors were built at Taishan, with construction started in 2009.

AP1000 Edit

 
Sanmen Nuclear Power Station, located in Zhejiang China

The Westinghouse AP1000 was planned to be the main basis of China's move to Generation III technology In July 2018, the first of four AP1000 reactors was connected to the grid.[48]

Following Westinghouse's bankruptcy in 2017, it was decided in 2019 to build the Hualong One rather than the AP1000 at Zhangzhou.[49]

Chinese developments Edit

CNP / ACP series Edit

The CNP Generation II nuclear reactors (and Generation III successor ACP) were a series of nuclear reactors developed by China National Nuclear Corporation (CNNC), and are predecessors of the more current Hualong One design.

The CNP series of Generation II reactors started with the CNP-300 pressurized water reactor, was the first reactor design developed domestically in China. The first unit began operation at Qinshan Nuclear Power Plant in 1991.

A larger version of the reactor, the CNP-600 was developed based on both the CNP-300[50] and the M310 reactor design used in Daya Bay Nuclear Power Plant.[51][52] It was installed at Changjiang Nuclear Power Plant, with two units operational from 2015 and 2016, respectively. A Generation III ACP-600 successor was also developed but none were built.

A three loop, 1000-MW version of the CNP reactor, the CNP-1000, was under development since the 1990s with the help of vendors Westinghouse and Framatome (now AREVA). 4 units of the CNP-1000 were later built at Fuqing NPP. Further work on the CNP-1000 was stopped in favour of the ACP-1000.

In 2013, China announced that it had independently developed the Generation III ACP-1000, with Chinese authorities claiming full intellectual property rights over the design. As a result of the success of the Hualong One project, no ACP-1000 reactors have been built to date. CNNC had originally planned to use the ACP-1000 in Fuqing reactor 5 and 6 but switched over to the Hualong One.[53]

CPR-1000 / ACPR-1000 Edit

The CPR-1000 was a Generation II reactor developed by China General Nuclear Power Group (CGN). It is the most numerous reactor type in China, with 22 units operational. This reactor type is a Chinese development of the French 900 MWe three cooling loop design imported in the 1990s, with most of the components now built in China. Intellectual property rights are retained by Areva, which affects CPR-1000 overseas sales potential.[10]

China's first CPR-1000 nuclear power plant, Ling Ao-3, was connected to the grid on 15 July 2010.[54] The design has been progressively built with increasing levels of Chinese components. Shu Guogang, GM of China Guangdong Nuclear Power Project said, "We built 55 percent of Ling Ao Phase 2, 70 percent of Hongyanhe, 80 percent of Ningde and 90 percent of Yangjiang Station."[citation needed]

In 2010, the China Guangdong Nuclear Power Corporation announced the ACPR1000 design, a further design evolution of the CPR-1000 to a Generation III level, which would also replace intellectual property right limited components. CGNPC aimed to be able to independently market the ACPR1000 for export by 2013.[55] A number of ACPR1000 are under construction in China, but for export this design was superseded by the Hualong One.

Hualong One Edit

 
Active and passive cooling systems of the HPR1000 (Hualong One)</ref>[56]
Red line − active systems
Green line − passive systems
IRWST − in-containment refuelling water storage tank

Hualong One is jointly developed by the China National Nuclear Corporation (CNNC) and China General Nuclear Power Group (CGN), based on the three-loop ACP1000 of CNNC and ACPR1000 of CGN, which in turn are based on the French M310.[citation needed]

Since 2011, CNNC has been progressively merging its ACP-1000 nuclear power station design[citation needed] with the CGN ACPR-1000 design, while allowing some differences, under direction of the Chinese nuclear regulator. Both are three-loop designs originally based on the same French M310 design used in Daya Bay with 157 fuel assemblies, but went through different development processes (CNNC's ACP-1000 has a more domestic design with 177 fuel assemblies while CGN's ACPR-1000 is a closer copy with 157 fuel assemblies).[40] In early 2014, it was announced that the merged design was moving from preliminary design to detailed design. Power output will be 1150 MWe, with a 60-year design life, and would use a combination of passive and active safety systems with a double containment. CNNC's 177 fuel assembly design was retained.

After the merger, both companies retain their own supply chain and their versions of the Hualong One will differ slightly (units built by CGN will retain some features from the ACPR1000) but the design is considered to be standardised. Some 85% of its components will be made domestically.[57]

The Hualong One power output will be 1170 MWe gross, 1090 MWe net, with a 60-year design life, and would use a combination of passive and active safety systems with a double containment.[56] It has a 177 assembly core design with an 18-month refuelling cycle. The power plant's utilisation rate is as high as 90%. CNNC has said its active and passive safety systems, double-layer containment and other technologies meet the highest international safety standards.[58]

The Hualong One is now largely seen as the replacement for all previous Chinese nuclear reactor designs, and has been exported overseas.

Hualong Two Edit

CNNC plans to start building a follow-on version, named Hualong Two, by 2024. It will be a more economical version using similar technology, reducing build time from 5 years to 4, and reducing costs by around a fourth from 17,000 yuan per kW to 13,000 yuan per kW.[59][60]

CAP1400 (Guohe One) Edit

In September 2020, China's State Power Investment Corporation launched a design based on the Westinghouse AP1000 for more widespread deployment consideration. It was given the name Guohe One.[61]

As of 2023, the construction of six CAP1000 are permitted by the State Council, Haiyang 3 & 4, Lianjiang 1 & 2, and Sanmen 3 & 4.[62][63] Officially construction of Sanmen 3 started in June 2022, and of Haiyang 3 in July 2022.

Generation IV reactors Edit

 
Control room of HTR-10 reactor at Tshinghua University

China is developing several generation IV reactor designs. The HTR-PM, a HTGR, is under construction. The HTR-PM is a descendant of the AVR reactor, and it is partly based on the earlier Chinese HTR-10 reactor. A sodium-cooled fast reactor, the CFR-600, is also under construction.

ACP100 small modular reactor Edit

In July 2019, China National Nuclear Corporation announced it would start building a demonstration ACP100 small modular reactor (SMR) on the north-west side of the existing Changjiang Nuclear Power Plant by the end of the year.[64] Design of the ACP100 started in 2010 and it was the first SMR project to pass an independent safety assessment by International Atomic Energy Agency in 2016. It is also referred to as Linglong One and is a fully integrated reactor module with an internal coolant system, with a 2-year refuelling interval, producing 385 MWt and about 125 MWe, and incorporates passive safety features, and can be installed underground.[65][66]

Nuclear power plants Edit

class=notpageimage|
Nuclear power plants in China (view)
  Active plants
  Under construction plants
  Firmly planned plants
 
The relative lack of water available for cooling reactors west of the Heihe–Tengchong Line (the area shown in yellow) is seen as a limiting factor for the development of traditional forms of nuclear power there.

Most nuclear power plants in China are located on the coast and generally use seawater for cooling a direct once-through cycle. The New York Times has reported that China is placing many of its nuclear plants near large cities, and there is a concern that tens of millions of people could be exposed to radiation in the event of an accident.[14] China's neighboring Daya Bay and Lingao nuclear plants have around 28 million people within a 75-kilometre radius that covers Hong Kong.[67]

Future projects Edit

Following the Fukushima accident and consequent pause in approvals for new plants, the target adopted by the State Council in October 2012 became 60 GWe by 2020, with 30 GWe under construction. In 2015, the target for nuclear capacity on line in 2030 was 150 GWe, providing almost 10% of electricity, and 240 GWe in 2050 providing 15%.

However, from 2016 to 2018, there was a further hiatus in the new build programme, with no new approvals for at least two years, causing the programme to slow sharply. Delays in the Chinese builds of AP1000 and EPR reactors, together with the bankruptcy in the U.S. of Westinghouse, the designer of the AP1000, have created uncertainties about the future direction. Also, some regions of China now have excess generation capacity, and it has become less certain to what extent electricity prices can economically sustain nuclear new build while the Chinese government is gradually liberalising the generation sector.[68][69]

In 2018, a Nuclear Engineering International journal analysis suggests a below-plan capacity of 90 GWe is plausible for 2030.[70] As of 2023, China had 52 GW of operational nuclear power, with 21 GW under construction (see Table below)

Bloomberg News reported that the 2020 National People's Congress supported future building of 6 to 8 reactors a year, which Bloomberg considered likely to be dominated by the domestic Hualong One design.[71] In 2019, China had a new target of 200 GWe of nuclear generating capacity by 2035, which is 7.7% out of predicted total electricity generating capacity of 2600 GWe.[2]

The role of the IPPs Edit

The first major successful profitable commercial project was the Daya Bay Nuclear Plant, which is 25% owned by CLP Group of Hong Kong and exports 70% of its electricity to Hong Kong. Such imports supply 20% of Hong Kong's electricity.

In order to access the capital needed to meet the 2020 target of 80GW, China has begun to grant equity in nuclear projects to China's Big Five power corporations:

Like the two nuclear companies China National Nuclear Corporation and China Guangdong Nuclear Power Group (CGNPG) the Big Five are State-owned "Central Enterprises" (中央企业) administered by SASAC. However, unlike the two nuclear companies, they have listed subsidiaries in Hong Kong and a broad portfolio of thermal, hydro and wind.

Summary of nuclear power plants Edit

Summary table of nuclear power plants in China[72][6]
Nuclear power plant operational reactors reactors under construction reactors planned total
units net capacity
(MW)
units net capacity
(MW)
units net capacity
(MW)
units net capacity
(MW)
Bailong 6 6,600 6 6,600
Changjiang 2 1,202 3 2,400 5 3,602
CEFR 1 20 1 20
Daya Bay (Dayawan) 2 1,888 2 1,888
Fangchenggang 3 3,090 1 1,090 2 2,200 6 6,380
Fangjiashan 2 2,024 2 2,024
Fuqing 6 6,000 6 6,000
Haiyang 2 2,300 2 2,300 2 2,300 6 6,900
Hongyanhe 6 6,366 6 6,366
Huizhou/Taipingling 2 2,232 2 2,200 4 4,432
Ling Ao 4 3,914 4 3,914
Lufeng (Shanwei) 2 2,200 4 5,500 6 6,600
Ningde 4 4,072 2 2,200 6 6,272
Pengze 2 2,200 2 2,200
Qinshan 7 4,110 7 4,110
San'ao[73] 2 2,200 4 4,400 6 6,600
Sanmen 2 2,314 2 2,314 4 4,628
Shidao Bay (Shidaowan) 1 200 2 2,800 3 3,000
Taishan 2 3,320 2 3,320
Taohuajiang 4 4,400 4 4,400
Tianwan 6 6,080 2 2,200 8 8,280
Xianning 2 2,200 2 2,200
Xiapu 2 1,000 2 1,000
Xudabao 2 2,200 2 2,300 4 4,500
Yangjiang 6 6,120 6 6,120
Zhangzhou 2 2,200 4 4,400 6 6,600
Total 55 53,020 24 25,136 41 47,100 120 121,000

Where multiple reactors are operational/under construction/planned at a given site, the capacity given is to be understood for all reactors at this site applicable to the given column, not a per reactor figure.

Fuel cycle Edit

China is evaluating the construction of a high level waste (HLW) repository in the Gobi Desert, probably constructed near Beishan starting around 2041.[74]

Starting in about the 2010s, China has been making serious efforts towards nuclear reprocessing.[75] While those plants are ostensibly civilian in nature, there is concern as to the Dual Use applicability of the technology[76] with media articles headlined "China nuclear reprocessing to create stockpiles of weapons-level materials: Experts"[77][78][79] China has also pioneered the use of a reprocessed uranium / depleted uranium mixture "natural uranium equivalent" in its Pressurized Heavy Water Reactors at Qinshan Nuclear Power Plant.[80] Unlike the similar "DUPIC" process ("direct use of spent PWR fuel in CANDU") pioneered in South Korea, this process separately recovers the reactor grade plutonium for other uses, fueling the heavy water reactor with the uranium content of the spent fuel alone.[81]

Companies Edit

Research Edit

 
Daya Bay Reactor Neutrino Experiment

In January 2011, the Chinese Academy of Sciences began the TMSR research and development project to create reactors which, among other advances, will be air-cooled. A small prototype reactor of this type, the TMSR-LF1, is planned.[82] The LF1 will be sited in Gansu province,[83] in an industrial park in Minqin County.[84]

In February 2019, China's State Power Investment Corporation (SPIC) signed a cooperation agreement with the Baishan municipal government in Jilin province for the Baishan Nuclear Energy Heating Demonstration Project, which would use a China National Nuclear Corporation DHR-400 (District Heating Reactor 400 MWt).[85][86]

Public opposition Edit

China experienced civil protest over its ambitious plans to build more nuclear power plants following the Fukushima nuclear disaster. There has been "inter-provincial squabble" over a nuclear power plant being built near the southern bank of the Yangtze River. The plant in the centre of the controversy is located in Pengze county in Jiangxi and across the river the government of Wangjiang county in Anhui wants the project shelved.[87]

More than 1,000 people protested in Jiangmen City Hall in July 2013 to demand authorities abandon a planned uranium-processing facility that was designed as a major supplier to nuclear power stations. The Heshan Nuclear Power Industry Park was to be equipped with facilities for uranium conversion and enrichment as well as the manufacturing of fuel pellets, rods and finished assemblies. Protesters feared the plant would adversely affect their health, and the health of future generations. As the weekend protest continued, Chinese officials announced the state-run project's cancellation.[88]

By 2014, concerns about public opposition caused Chinese regulators to develop public and media support programmes, and developers to begin outreach programmes including site tours and visitor centres.[89]

In 2020, Bloomberg News reported that public opposition had stopped nuclear power construction on inland river sites, and caused the cancellation of a nuclear fuel plant in Guangdong in 2013.[71]

See also Edit

References Edit

  1. ^ a b . xinhuanet.com. Archived from the original on 2 May 2019. Retrieved 2 May 2019.
  2. ^ a b c d e "China's nuclear power output jumps 18% year on year". World Nuclear News. 24 February 2020.
  3. ^ "2020 electricity & other energy statistics (preliminary)". China Energy Portal | 中国能源门户. 22 January 2021. Retrieved 19 May 2021.
  4. ^ "2019 detailed electricity statistics (update of Jan 2021)". China Energy Portal | 中国能源门户. 20 January 2021. Retrieved 19 May 2021.
  5. ^ "中国电力企业联合会网-中国最大的行业门户网站". www.cec.org.cn. Retrieved 5 January 2022.
  6. ^ a b International Atomic Energy Agency (2022). "Power Reactor Information System (PRIS): China, People's Republic of". IAEA. Retrieved 25 May 2023.
  7. ^ "How Long Will It Take for China's Nuclear Power to Replace Coal?". Forbes.
  8. ^ "PRIS - Country Details".
  9. ^ "Nation pushes nuclear power to ensure supply, reach carbon goals".
  10. ^ a b "Nuclear Power in China". World Nuclear Association. 2 July 2010. from the original on 12 February 2013. Retrieved 18 July 2010.
  11. ^ . Fjnews.66163.com. 7 March 2008. Archived from the original on 7 July 2011. Retrieved 24 September 2013.
  12. ^ Murtaugh, Dan; Krystal, Chia (2 November 2021). "China's Climate Goals Hinge on a $440 Billion Nuclear Buildout". Bloomberg. Retrieved 31 July 2022.
  13. ^ "China's Climate Goals Hinge on a $440 Billion Nuclear Buildout". Bloomberg.com. Retrieved 5 November 2021.
  14. ^ a b Keith Bradsher (15 December 2009). "Nuclear Power Expansion in China Stirs Concerns". New York Times. from the original on 19 July 2016. Retrieved 21 January 2010.
  15. ^ "Chinese firms join forces to market Hualong One abroad". World Nuclear News. 31 December 2015. from the original on 6 February 2016. Retrieved 6 February 2016.
  16. ^ "Hualong One joint venture officially launched". World Nuclear News. 17 March 2016. from the original on 18 March 2016. Retrieved 17 March 2016.
  17. ^ "The trade war we want China to win: China's nuclear exports can challenge Russian dominance". Atlantic Council. 26 February 2020. Retrieved 30 September 2021.
  18. ^ "China could build 30 'Belt and Road' nuclear reactors by 2030: official". Reuters. 20 June 2019. Retrieved 30 September 2021.
  19. ^ Turner, Ben (23 July 2021). "China to activate world's first 'clean' nuclear reactor in September". livescience.com. Retrieved 30 September 2021.
  20. ^ Brook, Barry (27 November 2011). "Summary of China's fast reactor programme". Brave New Climate. from the original on 20 April 2016. Retrieved 13 April 2016.
  21. ^ "Fast Reactor Technology Development for Sustainable Supply of Nuclear Energy in China – China International Nuclear Symposium November 23–25, 2010, Beijing" (PDF). XU MI – China Institute of Atomic Energy. (PDF) from the original on 28 September 2016.
  22. ^ (PDF). Archived from the original (PDF) on 22 April 2016.
  23. ^ "China to build world's first "artificial sun" experimental device". People's Daily Online. 21 January 2006. from the original on 5 June 2011. Retrieved 22 March 2011.
  24. ^ Ambrose Evans-Pritchard, 20 March 2011, Safe nuclear does exist, and China is leading the way with thorium 25 March 2018 at the Wayback Machine, Telegraph UK
  25. ^ Chari, P. R. (1978). "China's Nuclear Posture: An Evaluation". Asian Survey. 18 (8): 817–828. doi:10.2307/2643560. ISSN 0004-4687. JSTOR 2643560.
  26. ^ a b c d e f g h i Minor, Michael S. (1976). "China's Nuclear Development Program". Asian Survey. 16 (6): 571–579. doi:10.2307/2643520. ISSN 0004-4687. JSTOR 2643520.
  27. ^ "Milstone". China Institute of Atomic Energy. Retrieved 17 February 2022.
  28. ^ "Russian-Chinese Science and Technology Diplomacy and Practice". China Institute of International Studies. Retrieved 17 February 2022.
  29. ^ "Letter to the Central Committee of the Chinese Communist Party on Not Giving China Samples of Nuclear Weapons and Technical Information". Wilson Center.
  30. ^ "Chinese Communist Party Central Committee Decision With Respect To Several Issues Concerning Strengthening Atomic Energy Industrial Infrastructure". Wilson Center.
  31. ^ Albright, David. "Chinese Military Plutonium and Highly Enriched Uranium Inventories" (PDF). Institute for Science and International Security.
  32. ^ . Archived from the original on 16 February 2015. Retrieved 16 February 2015.
  33. ^ a b "China Nuclear Power". Shanghai Nuclear Office.
  34. ^ Daogang Lu (North China Electric Power University) (May 2010). "The Current Status of Chinese Nuclear Power Industry and Its Future". e-Journal of Advanced Maintenance. Japan Society of Maintenology. 2 (1). from the original on 22 July 2011. Retrieved 14 August 2010.
  35. ^ a b Kadak, Andrew C. (2006). "Nuclear Power: "Made in China"". The Brown Journal of World Affairs. 13 (1): 77–90. ISSN 1080-0786. JSTOR 24590645.
  36. ^ Yun Zhou (31 July 2013). "China: The next few years are crucial for nuclear industry growth". Ux Consulting. Nuclear Engineering International. from the original on 21 September 2013. Retrieved 8 August 2013.
  37. ^ "Start-up nearing for Chinese units". World Nuclear News. 25 March 2014. from the original on 3 April 2014. Retrieved 31 March 2014.
  38. ^ "Can China Meet Its Nuclear Power Goals?". from the original on 22 May 2018. Retrieved 21 May 2018.
  39. ^ a b c "Agreements signed during first official visit to China by IAEA's Grossi". Nuclear Engineering International. 25 May 2023. Retrieved 28 May 2023.
  40. ^ a b . World Nuclear Association. October 2013. Archived from the original on 3 November 2013. Retrieved 25 October 2013.
  41. ^ "China freezes nuclear plant approvals". CNN. 16 March 2011. from the original on 28 June 2011. Retrieved 28 May 2023.
  42. ^ a b c Will China's nuclear nerves fuel a boom in green energy? 21 March 2011 at the Wayback Machine Channel 4, published 17 March 2011. Retrieved 17 March 2011
  43. ^ China’s Nuclear Energy Program Post-Fukushima 18 March 2011 at the Wayback Machine China Bystander, published 16 March 2011. Retrieved 17 March 2011
  44. ^ Rob Forrest (2 June 2014). (PDF). CISAC, Stanford University. Archived from the original (PDF) on 14 December 2014. Retrieved 14 December 2014.
  45. ^ Stanway, David (1 September 2017). "China's legislature passes nuclear safety law". Reuters. from the original on 1 September 2017. Retrieved 1 September 2017.
  46. ^ . Archived from the original on 22 June 2017. Retrieved 21 June 2017.
  47. ^ "AtomStroyExport unveils schedule for China projects". World Nuclear News. 3 April 2019. from the original on 3 April 2019. Retrieved 3 April 2019.
  48. ^ "First AP1000 unit begins generating power". from the original on 10 July 2018. Retrieved 11 July 2018.
  49. ^ "Permits issued for construction of new Chinese plant". World Nuclear News. 15 October 2019. from the original on 15 October 2019. Retrieved 15 October 2019.
  50. ^ Biello, David (29 March 2011). "China forges ahead with nuclear energy". Nature. doi:10.1038/news.2011.194. Retrieved 28 May 2018.
  51. ^ "China's commercial reactors" (PDF). Nuclear Engineering International. Retrieved 29 May 2018.
  52. ^ (IAEA), International Atomic Energy Agency. "- Nuclear Power – IAEA". www.iaea.org. Retrieved 29 May 2018.
  53. ^ "Chinese reactor design evolution - Nuclear Engineering International".
  54. ^ . Nuclear Engineering International. 16 July 2010. Archived from the original on 13 June 2011. Retrieved 17 July 2010.
  55. ^ "China prepares to export reactors". World Nuclear News. 25 November 2010. from the original on 30 December 2010. Retrieved 18 December 2010.
  56. ^ a b Ji Xing; Daiyong Song; Yuxiang Wu (March 2016). "HPR1000: Advanced Pressurized Water Reactor with Active and Passive Safety". Engineering. 2 (1): 79–87. doi:10.1016/J.ENG.2016.01.017.
  57. ^ "Chinese reactor design passes safety review - World Nuclear News".
  58. ^ "China to begin construction of Hualong Two in 2024 - Nuclear Engineering International".
  59. ^ "China to begin construction of Hualong Two in 2024". Nuclear Engineering International. 15 April 2021. Retrieved 2 February 2022.
  60. ^ Xu, Muyu; Singh, Shivani (14 April 2021). "China to start building Hualong Two nuclear reactor in 2024". Reuters. Retrieved 28 May 2023 – via nasdaq.com.
  61. ^ "China launches CAP1400 reactor design". World Nuclear News. 29 September 2020. Retrieved 29 September 2020.
  62. ^ "China approves construction of six new reactors". www.world-nuclear-news.org. Retrieved 23 April 2022.
  63. ^ "Approval for four new reactors in south China". www.world-nuclear-news.org. Retrieved 20 September 2022.
  64. ^ "CNNC launches demonstration SMR project". World Nuclear News. 22 July 2019. from the original on 22 July 2019. Retrieved 22 July 2019.
  65. ^ "Specific Design Consideration of ACP100 for Application in the Middle East and North Africa Region" (PDF). CNNC. 2 October 2017. Retrieved 22 July 2019.
  66. ^ "China approves construction of demonstration ACP100 – Nuclear Engineering International". www.neimagazine.com. Retrieved 28 October 2021.
  67. ^ Declan Butler (21 April 2011). "Reactors, residents and risk". Nature. 472 (7344): 400–1. doi:10.1038/472400a. PMID 21525903. S2CID 4371109. from the original on 24 April 2011. Retrieved 22 April 2011.
  68. ^ Kidd, Steve (10 August 2017). "Nuclear in China – why the slowdown?". Nuclear Engineering International. from the original on 30 December 2017. Retrieved 30 December 2017.
  69. ^ David Stanway, Geert De Clercq (15 January 2018). . Times of Oman. Archived from the original on 13 February 2018. Retrieved 12 February 2018.
  70. ^ Kidd, Steve (1 August 2018). "Nuclear in China – where is it heading now?". Nuclear Engineering International. from the original on 15 September 2018. Retrieved 15 September 2018.
  71. ^ a b "China to Dominate Nuclear as Beijing Bets on Homegrown Reactors". Bloomberg News. 1 June 2020. Retrieved 4 June 2020.
  72. ^ "China Nuclear Power | Chinese Nuclear Energy – World Nuclear Association". www.world-nuclear.org. from the original on 8 February 2016. Retrieved 15 June 2018.
  73. ^ "Construction of new Chinese power plant begins : New Nuclear – World Nuclear News". www.world-nuclear-news.org. Retrieved 5 January 2021.
  74. ^ Tony Vince (8 March 2013). "Rock solid ambitions". Nuclear Engineering International. from the original on 26 January 2016. Retrieved 9 March 2013.
  75. ^ "China able to reprocess nuclear fuel". cbc. Associated Press. 3 January 2011. Retrieved 28 May 2023.
  76. ^ "Pinpointing China's new plutonium reprocessing plant". 5 May 2020.
  77. ^ "China nuclear reprocessing to create stockpiles of weapons-level materials: Experts". The Economic Times.
  78. ^ "UPDATE 1-China nuclear reprocessing to create stockpiles of weapons-level materials -experts". Reuters. 25 March 2021.
  79. ^ "China nuclear reprocessing to create stockpiles of weapons-level materials -experts". www.nasdaq.com.
  80. ^ "Current Issues: New Uranium Conversion/Enrichment and Nuclear Fuel Plant Projects - Asia".
  81. ^ "China's Nuclear Fuel Cycle - World Nuclear Association".
  82. ^ Dai Zhimin; Zou Yang; Chen Kun (4 November 2016). "Thorium Molten Salt Reactors (TMSR) Development in China" (PDF). International Atomic Energy Agency. (PDF) from the original on 8 July 2018. Retrieved 7 July 2018.
  83. ^ "中科院与甘肃省签署钍基熔盐堆核能系统项目战略合作框架协议----中国科学院". from the original on 8 July 2018. Retrieved 7 July 2018.
  84. ^ "甘肃省公示第四代核能钍基熔盐堆实验平台选址:拟落地武威 _ 东方财富网". finance.eastmoney.com. Retrieved 6 November 2022.
  85. ^ "China signs agreement for nuclear heating demonstration project". Nuclear Engineering International. 14 March 2019. Retrieved 18 March 2019.
  86. ^ "CNNC completes design of district heating reactor". World Nuclear News. 7 September 2018. from the original on 24 March 2019. Retrieved 18 March 2019.
  87. ^ . msn.com. 17 February 2012. Archived from the original on 28 September 2013. Retrieved 26 February 2012.
  88. ^ Calum MacLeod (16 July 2013). "Protesters win environmental battle in China". USA TODAY. from the original on 12 June 2015. Retrieved 6 September 2017.
  89. ^ Lucy Hornby (26 May 2014). "People power holds key to China's nuclear plans". Financial Times. from the original on 29 May 2014. Retrieved 26 May 2014.

External links Edit

  • Nuclear power in China – World Nuclear Association
  • Brief Overview of Chinese NPP Development, Shanghai Nuclear Engineering Research and Design Institute, 23 June 2011
  • Steve Kidd (1 May 2013). "Nuclear in China – now back on track?". Nuclear Engineering International.
  • Caroline Peachey (22 May 2014). "Chinese reactor design evolution". Nuclear Engineering International. Retrieved 23 May 2014.
  • M.V. Ramana, Eri Saikawa (December 2011). "Choosing a standard reactor: International competition and domestic politics in Chinese nuclear policy" (PDF). Energy. Elsevier. 36 (12): 6779–6789. doi:10.1016/j.energy.2011.10.022. Retrieved 11 October 2013.

nuclear, power, china, china, world, largest, producers, nuclear, power, country, ranks, third, world, both, total, nuclear, power, capacity, installed, electricity, generated, accounting, around, tenth, global, nuclear, power, generated, february, 2023, china. China is one of the world s largest producers of nuclear power The country ranks third in the world both in total nuclear power capacity installed and electricity generated accounting for around one tenth of global nuclear power generated As of February 2023 China has 55 plants with 57GW in operation 22 under construction with 24 GW and more than 70 planned with 88GW About 5 of electricity in the country is due to nuclear energy 7 These plants generated 417 TWh of electricity in 2022 8 This is versus the September 2022 numbers of 53 nuclear reactors with a total capacity of 55 6 gigawatt GW 9 In 2019 nuclear power had contributed 4 9 of the total Chinese electricity production with 348 1 TWh 2 Taishan Nuclear Power Plant Unit 1 amp 2 are two 1750 MWe class EPR reactors 100 200 300 400 500 2014 2016 2019 2022Nuclear energy generation in China TWh 1 2 3 4 5 1 2 3 4 5 1999 2005 2010 2015 2022Nuclear power share of total electricity in China 6 1 2 Nuclear power has been looked into as an alternative to coal due to increasing concerns about air quality climate change and fossil fuel shortages 10 11 The China General Nuclear Power Group has articulated the goal of 200 GW by 2035 produced by 150 additional reactors 12 13 China has two major nuclear power companies the China National Nuclear Corporation operating mainly in north east China and the China General Nuclear Power Group formerly known as China Guangdong Nuclear Power Group operating mainly in south east China 14 China aims to maximize self reliance on nuclear reactor technology manufacturing and design although international cooperation and technology transfer are also encouraged Advanced pressurized water reactors such as the Hualong One are the mainstream technology in the near future and the Hualong One is also planned to be exported 15 16 China plans to build as many as thirty nuclear power reactors in countries involved in the Belt and Road Initiative by 2030 17 18 19 By mid century fast neutron reactors are seen as the main technology with a planned 1400 GW capacity by 2100 20 21 22 China is also involved in the development of nuclear fusion reactors through its participation in the ITER project having constructed an experimental nuclear fusion reactor known as EAST located in Hefei 23 as well as research and development into the thorium fuel cycle as a potential alternative means of nuclear fission 24 Contents 1 History 1 1 1950 1958 1 2 1959 1963 1 3 1964 Present 2 Safety and regulation 3 Reactor technologies 3 1 Imported technology 3 1 1 CANDU reactors 3 1 2 VVER 3 1 3 EPR 3 1 4 AP1000 3 2 Chinese developments 3 2 1 CNP ACP series 3 2 2 CPR 1000 ACPR 1000 3 2 3 Hualong One 3 2 4 Hualong Two 3 2 5 CAP1400 Guohe One 3 2 6 Generation IV reactors 3 2 7 ACP100 small modular reactor 4 Nuclear power plants 4 1 Future projects 4 2 The role of the IPPs 4 3 Summary of nuclear power plants 5 Fuel cycle 6 Companies 7 Research 8 Public opposition 9 See also 10 References 11 External linksHistory EditThis section needs expansion You can help by adding to it July 2010 1950 1958 Edit In the Cold War the initial motivation of developing nuclear power for Beijing was largely due to security purposes 25 Between 1950 and 1958 Chinese nuclear power construction heavily relied on cooperation with the USSR 26 The first initiative was launched with the establishment of the China Soviet Union Nonferrous Metals and Rare Metals Corporation and the first central atomic research facility the Institute of Atomic Energy of the Chinese Academy of Sciences in Beijing 27 In February 1955 a chemical separation plant for the production of weapons grade U 235 and plutonium was created with Soviet aid in Xinjiang and in April the Changchun Institute of Atomic Energy was established 26 Several months later on April 29 1955 the Sino Soviet Atomic Cooperation Treaty was signed 28 The China National Nuclear Corporation CNNC was also established in 1955 In addition to the cooperation with the USSR China has started to learn nuclear technology by sending students to the USSR 26 In December 1958 nuclear power development had become the top priority project in the Draft Twelve Year Plan for Development of Science and Technology 26 1959 1963 Edit The second phase is characterized by the aim of having completely self sufficient in nuclear power development 26 In June 1959 the USSR officially ended any forms of nuclear aid to China withdrawing Soviet technicians 29 China suffered but continued nuclear power development by massive research and input In order to rapidly strengthen its atomic energy industry the Central Committee decided that China must dedicate further resources exclusively to nuclear related activities 30 Consequently the Institute of Atomic Energy created branch institutes of research organizations in every province major city and autonomous region 26 By the end of 1963 China has built more than forty chemical separation plants for the extraction of uranium and thorium 26 In the year between 1961 and 1962 China accomplished significant achievements in nuclear development which consolidates future applications From 1959 to 1963 a gaseous diffusion plant utilizing a large 300 MW reactor was under construction at Lanzhou 31 It was estimated that the Chinese invested over 1 5 billion in the construction of this plant 26 1964 Present Edit nbsp Qinshan Nuclear Power Plant located in Zhejiang ChinaAfter the explosive progress in the 1950s Chinese nuclear development slowed down possibly because of Cultural Revolution so only one nuclear test took place in 1970 26 On 8 February 1970 China issued its first nuclear power plan and the 728 Institute now called Shanghai Nuclear Engineering Research and Design Institute 32 was founded The first independently designed and built nuclear power plant Qinshan Nuclear Power Plant was constructed in 1984 and successfully connected to the grid on December 15 1991 33 34 The reactor is of type CNP 300 Along with Chinese economic reform China continued to demand expansion of its electricity sectors 35 As part of China s tenth Five Year Plan 2001 2005 a key part of energy policy is to guarantee energy security optimize energy mix improve energy efficiency protect the ecological environment 35 The nuclear safety plan of 2013 stated that beyond 2016 only Generation III plants would be started and until then only a very few Generation II plants would be started 36 In 2014 China still planned to have 58 GW of capacity by 2020 37 However due to reevaluation following the Fukushima Daiichi nuclear disaster in Japan few plants commenced construction from 2015 and this target was not met 38 In 2019 China had a new target of 200 GWe of nuclear generating capacity by 2035 which is 7 7 out of predicted total electricity generating capacity of 2600 GWe 2 By the end of December 2020 the total number of nuclear power units in operation on the Chinese mainland reached 49 with a total installed capacity of 51 GWe ranking third in the world in terms of installed capacity and second in the world in terms of power generation in 2020 with 16 nuclear power units under construction the number of units under construction and installed capacity have ranked first in the world for many years 33 By 2035 nuclear power is planned to account for 10 of electricity generation 39 Safety and regulation EditThe National Nuclear Safety Administration NNSA under the China Atomic Energy Authority CAEA is the licensing and regulatory body which also maintains international agreements regarding safety It was set up in 1984 and reports to the State Council directly In relation to the AP1000 NNSA works closely with the US Nuclear Regulatory Commission China has been a member of the International Atomic Energy Agency IAEA since 1984 39 China has requested and hosted 12 Operational Safety Review Team OSART missions from IAEA teams to October 2011 and each plant generally has one external safety review each year either OSART WANO peer review or CNEA peer review with the Research Institute for Nuclear Power Operations 40 Following the Fukushima Daiichi nuclear disaster in Japan China announced on 16 March 2011 that all nuclear plant approvals were being frozen and that full safety checks of existing reactors would be made 41 42 Although Zhang Lijun Vice Minister of Environmental Protection has indicated that China s overall nuclear energy strategy would continue 42 some commentators have suggested that additional safety related costs and public opinion could cause a rethink in favor of an expanded renewable energy program 42 43 China s current methods for storing spent nuclear fuel SNF are only sustainable until the mid 2020s and a policy to handle SNF needs to be developed 44 In 2017 new laws strengthened the powers of the National Nuclear Safety Administration creating new institutional mechanisms a clearer division of labour and more disclosure of information 45 IAEA Director General Rafael Grossi made his first official visit in May 2023 signing several agreements with China s nuclear regulator the China Atomic Energy Authority Grossi said China is one of the IAEA s most important partners and a global leader in nuclear energy 39 Reactor technologies EditImported technology Edit CANDU reactors Edit In 1998 construction of two AECL 728 MW CANDU 6 reactors at Qinshan Nuclear Power Plant started The first went online in 2002 the second in 2003 CANDU reactors can use low grade reprocessed uranium from conventional reactors as fuel thereby reducing China s stock of spent nuclear fuel 46 VVER Edit nbsp The first two VVER 1000 units at Tianwan Nuclear Power PlantRussia s Atomstroyexport was general contractor and equipment provider for the Tianwan AES 91 power plants using the V 428 version of the well proven VVER 1000 reactor of 1060 MWe capacity with construction started in 1999 Two further Tianwan units started in 2012 use the same version of the VVER 1000 reactor On 7 March 2019 China National Nuclear Corporation CNNC and Atomstroyexport signed the detailed contract for the construction of four VVER 1200s two each at the Tianwan Nuclear Power Plant and the Xudabao Nuclear Power Plant Construction will start in May 2021 and commercial operation of all the units is expected between 2026 and 2028 47 EPR Edit In 2007 negotiations started with the French company Areva concerning the EPR third generation reactors Two Areva 1660 MWe EPR reactors were built at Taishan with construction started in 2009 AP1000 Edit nbsp Sanmen Nuclear Power Station located in Zhejiang ChinaThe Westinghouse AP1000 was planned to be the main basis of China s move to Generation III technology In July 2018 the first of four AP1000 reactors was connected to the grid 48 Following Westinghouse s bankruptcy in 2017 it was decided in 2019 to build the Hualong One rather than the AP1000 at Zhangzhou 49 Chinese developments Edit CNP ACP series Edit Main article CNP ACP nuclear reactors The CNP Generation II nuclear reactors and Generation III successor ACP were a series of nuclear reactors developed by China National Nuclear Corporation CNNC and are predecessors of the more current Hualong One design The CNP series of Generation II reactors started with the CNP 300 pressurized water reactor was the first reactor design developed domestically in China The first unit began operation at Qinshan Nuclear Power Plant in 1991 A larger version of the reactor the CNP 600 was developed based on both the CNP 300 50 and the M310 reactor design used in Daya Bay Nuclear Power Plant 51 52 It was installed at Changjiang Nuclear Power Plant with two units operational from 2015 and 2016 respectively A Generation III ACP 600 successor was also developed but none were built A three loop 1000 MW version of the CNP reactor the CNP 1000 was under development since the 1990s with the help of vendors Westinghouse and Framatome now AREVA 4 units of the CNP 1000 were later built at Fuqing NPP Further work on the CNP 1000 was stopped in favour of the ACP 1000 In 2013 China announced that it had independently developed the Generation III ACP 1000 with Chinese authorities claiming full intellectual property rights over the design As a result of the success of the Hualong One project no ACP 1000 reactors have been built to date CNNC had originally planned to use the ACP 1000 in Fuqing reactor 5 and 6 but switched over to the Hualong One 53 CPR 1000 ACPR 1000 Edit Main article CPR 1000 The CPR 1000 was a Generation II reactor developed by China General Nuclear Power Group CGN It is the most numerous reactor type in China with 22 units operational This reactor type is a Chinese development of the French 900 MWe three cooling loop design imported in the 1990s with most of the components now built in China Intellectual property rights are retained by Areva which affects CPR 1000 overseas sales potential 10 China s first CPR 1000 nuclear power plant Ling Ao 3 was connected to the grid on 15 July 2010 54 The design has been progressively built with increasing levels of Chinese components Shu Guogang GM of China Guangdong Nuclear Power Project said We built 55 percent of Ling Ao Phase 2 70 percent of Hongyanhe 80 percent of Ningde and 90 percent of Yangjiang Station citation needed In 2010 the China Guangdong Nuclear Power Corporation announced the ACPR1000 design a further design evolution of the CPR 1000 to a Generation III level which would also replace intellectual property right limited components CGNPC aimed to be able to independently market the ACPR1000 for export by 2013 55 A number of ACPR1000 are under construction in China but for export this design was superseded by the Hualong One Hualong One Edit Main article Hualong One nbsp Active and passive cooling systems of the HPR1000 Hualong One lt ref gt 56 Red line active systemsGreen line passive systemsIRWST in containment refuelling water storage tankHualong One is jointly developed by the China National Nuclear Corporation CNNC and China General Nuclear Power Group CGN based on the three loop ACP1000 of CNNC and ACPR1000 of CGN which in turn are based on the French M310 citation needed Since 2011 CNNC has been progressively merging its ACP 1000 nuclear power station design citation needed with the CGN ACPR 1000 design while allowing some differences under direction of the Chinese nuclear regulator Both are three loop designs originally based on the same French M310 design used in Daya Bay with 157 fuel assemblies but went through different development processes CNNC s ACP 1000 has a more domestic design with 177 fuel assemblies while CGN s ACPR 1000 is a closer copy with 157 fuel assemblies 40 In early 2014 it was announced that the merged design was moving from preliminary design to detailed design Power output will be 1150 MWe with a 60 year design life and would use a combination of passive and active safety systems with a double containment CNNC s 177 fuel assembly design was retained After the merger both companies retain their own supply chain and their versions of the Hualong One will differ slightly units built by CGN will retain some features from the ACPR1000 but the design is considered to be standardised Some 85 of its components will be made domestically 57 The Hualong One power output will be 1170 MWe gross 1090 MWe net with a 60 year design life and would use a combination of passive and active safety systems with a double containment 56 It has a 177 assembly core design with an 18 month refuelling cycle The power plant s utilisation rate is as high as 90 CNNC has said its active and passive safety systems double layer containment and other technologies meet the highest international safety standards 58 The Hualong One is now largely seen as the replacement for all previous Chinese nuclear reactor designs and has been exported overseas Hualong Two Edit CNNC plans to start building a follow on version named Hualong Two by 2024 It will be a more economical version using similar technology reducing build time from 5 years to 4 and reducing costs by around a fourth from 17 000 yuan per kW to 13 000 yuan per kW 59 60 CAP1400 Guohe One Edit Main article State Nuclear Power Technology Corporation CAP1400 Guohe One In September 2020 China s State Power Investment Corporation launched a design based on the Westinghouse AP1000 for more widespread deployment consideration It was given the name Guohe One 61 As of 2023 update the construction of six CAP1000 are permitted by the State Council Haiyang 3 amp 4 Lianjiang 1 amp 2 and Sanmen 3 amp 4 62 63 Officially construction of Sanmen 3 started in June 2022 and of Haiyang 3 in July 2022 Generation IV reactors Edit nbsp Control room of HTR 10 reactor at Tshinghua UniversityChina is developing several generation IV reactor designs The HTR PM a HTGR is under construction The HTR PM is a descendant of the AVR reactor and it is partly based on the earlier Chinese HTR 10 reactor A sodium cooled fast reactor the CFR 600 is also under construction ACP100 small modular reactor Edit In July 2019 China National Nuclear Corporation announced it would start building a demonstration ACP100 small modular reactor SMR on the north west side of the existing Changjiang Nuclear Power Plant by the end of the year 64 Design of the ACP100 started in 2010 and it was the first SMR project to pass an independent safety assessment by International Atomic Energy Agency in 2016 It is also referred to as Linglong One and is a fully integrated reactor module with an internal coolant system with a 2 year refuelling interval producing 385 MWt and about 125 MWe and incorporates passive safety features and can be installed underground 65 66 Nuclear power plants Edit nbsp nbsp Changjiang nbsp Daya Bay nbsp Fangchenggang nbsp Fangjiashan nbsp Fuqing nbsp Bailong nbsp Haixing nbsp Haiyang nbsp Hongshiding nbsp Hongyanhe nbsp HTTR nbsp Lianjiang nbsp Ling Ao nbsp Lufeng nbsp Ningde nbsp Pengze nbsp Qinshan nbsp San ao nbsp Sanmen nbsp Shidaowan nbsp Taipingling nbsp Taohuajiang nbsp Tianwan nbsp Taishan nbsp Wuhu nbsp Xianning nbsp Xiaomoshan nbsp Xiapu nbsp Xudabao nbsp Yangjiang nbsp Zhangzhouclass notpageimage Nuclear power plants in China view nbsp Active plants nbsp Under construction plants nbsp Firmly planned plants nbsp The relative lack of water available for cooling reactors west of the Heihe Tengchong Line the area shown in yellow is seen as a limiting factor for the development of traditional forms of nuclear power there Most nuclear power plants in China are located on the coast and generally use seawater for cooling a direct once through cycle The New York Times has reported that China is placing many of its nuclear plants near large cities and there is a concern that tens of millions of people could be exposed to radiation in the event of an accident 14 China s neighboring Daya Bay and Lingao nuclear plants have around 28 million people within a 75 kilometre radius that covers Hong Kong 67 Future projects Edit Following the Fukushima accident and consequent pause in approvals for new plants the target adopted by the State Council in October 2012 became 60 GWe by 2020 with 30 GWe under construction In 2015 the target for nuclear capacity on line in 2030 was 150 GWe providing almost 10 of electricity and 240 GWe in 2050 providing 15 However from 2016 to 2018 there was a further hiatus in the new build programme with no new approvals for at least two years causing the programme to slow sharply Delays in the Chinese builds of AP1000 and EPR reactors together with the bankruptcy in the U S of Westinghouse the designer of the AP1000 have created uncertainties about the future direction Also some regions of China now have excess generation capacity and it has become less certain to what extent electricity prices can economically sustain nuclear new build while the Chinese government is gradually liberalising the generation sector 68 69 In 2018 a Nuclear Engineering International journal analysis suggests a below plan capacity of 90 GWe is plausible for 2030 70 As of 2023 update China had 52 GW of operational nuclear power with 21 GW under construction see Table below Bloomberg News reported that the 2020 National People s Congress supported future building of 6 to 8 reactors a year which Bloomberg considered likely to be dominated by the domestic Hualong One design 71 In 2019 China had a new target of 200 GWe of nuclear generating capacity by 2035 which is 7 7 out of predicted total electricity generating capacity of 2600 GWe 2 The role of the IPPs Edit The first major successful profitable commercial project was the Daya Bay Nuclear Plant which is 25 owned by CLP Group of Hong Kong and exports 70 of its electricity to Hong Kong Such imports supply 20 of Hong Kong s electricity In order to access the capital needed to meet the 2020 target of 80GW China has begun to grant equity in nuclear projects to China s Big Five power corporations Huaneng Group Huadian Group Fujian Fuqing nuclear power project II and III Datang Group China Power Investment Group Jiangxi Pengze Nuclear Guodian GroupLike the two nuclear companies China National Nuclear Corporation and China Guangdong Nuclear Power Group CGNPG the Big Five are State owned Central Enterprises 中央企业 administered by SASAC However unlike the two nuclear companies they have listed subsidiaries in Hong Kong and a broad portfolio of thermal hydro and wind Summary of nuclear power plants Edit For details about each reactor see List of commercial nuclear reactors China Summary table of nuclear power plants in China 72 6 Nuclear power plant operational reactors reactors under construction reactors planned totalunits net capacity MW units net capacity MW units net capacity MW units net capacity MW Bailong 6 6 600 6 6 600Changjiang 2 1 202 3 2 400 5 3 602CEFR 1 20 1 20Daya Bay Dayawan 2 1 888 2 1 888Fangchenggang 3 3 090 1 1 090 2 2 200 6 6 380Fangjiashan 2 2 024 2 2 024Fuqing 6 6 000 6 6 000Haiyang 2 2 300 2 2 300 2 2 300 6 6 900Hongyanhe 6 6 366 6 6 366Huizhou Taipingling 2 2 232 2 2 200 4 4 432Ling Ao 4 3 914 4 3 914Lufeng Shanwei 2 2 200 4 5 500 6 6 600Ningde 4 4 072 2 2 200 6 6 272Pengze 2 2 200 2 2 200Qinshan 7 4 110 7 4 110San ao 73 2 2 200 4 4 400 6 6 600Sanmen 2 2 314 2 2 314 4 4 628Shidao Bay Shidaowan 1 200 2 2 800 3 3 000Taishan 2 3 320 2 3 320Taohuajiang 4 4 400 4 4 400Tianwan 6 6 080 2 2 200 8 8 280Xianning 2 2 200 2 2 200Xiapu 2 1 000 2 1 000Xudabao 2 2 200 2 2 300 4 4 500Yangjiang 6 6 120 6 6 120Zhangzhou 2 2 200 4 4 400 6 6 600Total 55 53 020 24 25 136 41 47 100 120 121 000Where multiple reactors are operational under construction planned at a given site the capacity given is to be understood for all reactors at this site applicable to the given column not a per reactor figure Fuel cycle EditThis section needs expansion You can help by adding to it July 2018 China is evaluating the construction of a high level waste HLW repository in the Gobi Desert probably constructed near Beishan starting around 2041 74 Starting in about the 2010s China has been making serious efforts towards nuclear reprocessing 75 While those plants are ostensibly civilian in nature there is concern as to the Dual Use applicability of the technology 76 with media articles headlined China nuclear reprocessing to create stockpiles of weapons level materials Experts 77 78 79 China has also pioneered the use of a reprocessed uranium depleted uranium mixture natural uranium equivalent in its Pressurized Heavy Water Reactors at Qinshan Nuclear Power Plant 80 Unlike the similar DUPIC process direct use of spent PWR fuel in CANDU pioneered in South Korea this process separately recovers the reactor grade plutonium for other uses fueling the heavy water reactor with the uranium content of the spent fuel alone 81 Companies EditThis section needs expansion You can help by adding to it April 2018 China National Nuclear Corporation China General Nuclear Power Group State Nuclear Power Technology Corporation China Nuclear International Uranium CorporationResearch Edit nbsp Daya Bay Reactor Neutrino ExperimentIn January 2011 the Chinese Academy of Sciences began the TMSR research and development project to create reactors which among other advances will be air cooled A small prototype reactor of this type the TMSR LF1 is planned 82 The LF1 will be sited in Gansu province 83 in an industrial park in Minqin County 84 In February 2019 China s State Power Investment Corporation SPIC signed a cooperation agreement with the Baishan municipal government in Jilin province for the Baishan Nuclear Energy Heating Demonstration Project which would use a China National Nuclear Corporation DHR 400 District Heating Reactor 400 MWt 85 86 Public opposition EditChina experienced civil protest over its ambitious plans to build more nuclear power plants following the Fukushima nuclear disaster There has been inter provincial squabble over a nuclear power plant being built near the southern bank of the Yangtze River The plant in the centre of the controversy is located in Pengze county in Jiangxi and across the river the government of Wangjiang county in Anhui wants the project shelved 87 More than 1 000 people protested in Jiangmen City Hall in July 2013 to demand authorities abandon a planned uranium processing facility that was designed as a major supplier to nuclear power stations The Heshan Nuclear Power Industry Park was to be equipped with facilities for uranium conversion and enrichment as well as the manufacturing of fuel pellets rods and finished assemblies Protesters feared the plant would adversely affect their health and the health of future generations As the weekend protest continued Chinese officials announced the state run project s cancellation 88 By 2014 concerns about public opposition caused Chinese regulators to develop public and media support programmes and developers to begin outreach programmes including site tours and visitor centres 89 In 2020 Bloomberg News reported that public opposition had stopped nuclear power construction on inland river sites and caused the cancellation of a nuclear fuel plant in Guangdong in 2013 71 See also Edit nbsp China portal nbsp Energy portal nbsp Nuclear technology portal nbsp Wikimedia Commons has media related to Nuclear power in China Electricity sector in China Energy policy of China List of commercial nuclear reactors China Nuclear power by country Nuclear energy policy Strategic uranium reservesReferences Edit a b China s nuclear power generation rises in 2018 Xinhua English news cn xinhuanet com Archived from the original on 2 May 2019 Retrieved 2 May 2019 a b c d e China s nuclear power output jumps 18 year on year World Nuclear News 24 February 2020 2020 electricity amp other energy statistics preliminary China Energy Portal 中国能源门户 22 January 2021 Retrieved 19 May 2021 2019 detailed electricity statistics update of Jan 2021 China Energy Portal 中国能源门户 20 January 2021 Retrieved 19 May 2021 中国电力企业联合会网 中国最大的行业门户网站 www cec org cn Retrieved 5 January 2022 a b International Atomic Energy Agency 2022 Power Reactor Information System PRIS China People s Republic of IAEA Retrieved 25 May 2023 How Long Will It Take for China s Nuclear Power to Replace Coal Forbes PRIS Country Details Nation pushes nuclear power to ensure supply reach carbon goals a b Nuclear Power in China World Nuclear Association 2 July 2010 Archived from the original on 12 February 2013 Retrieved 18 July 2010 宁德 宁德核电站在福鼎开工 图 福建之窗 66163 com Fjnews 66163 com 7 March 2008 Archived from the original on 7 July 2011 Retrieved 24 September 2013 Murtaugh Dan Krystal Chia 2 November 2021 China s Climate Goals Hinge on a 440 Billion Nuclear Buildout Bloomberg Retrieved 31 July 2022 China s Climate Goals Hinge on a 440 Billion Nuclear Buildout Bloomberg com Retrieved 5 November 2021 a b Keith Bradsher 15 December 2009 Nuclear Power Expansion in China Stirs Concerns New York Times Archived from the original on 19 July 2016 Retrieved 21 January 2010 Chinese firms join forces to market Hualong One abroad World Nuclear News 31 December 2015 Archived from the original on 6 February 2016 Retrieved 6 February 2016 Hualong One joint venture officially launched World Nuclear News 17 March 2016 Archived from the original on 18 March 2016 Retrieved 17 March 2016 The trade war we want China to win China s nuclear exports can challenge Russian dominance Atlantic Council 26 February 2020 Retrieved 30 September 2021 China could build 30 Belt and Road nuclear reactors by 2030 official Reuters 20 June 2019 Retrieved 30 September 2021 Turner Ben 23 July 2021 China to activate world s first clean nuclear reactor in September livescience com Retrieved 30 September 2021 Brook Barry 27 November 2011 Summary of China s fast reactor programme Brave New Climate Archived from the original on 20 April 2016 Retrieved 13 April 2016 Fast Reactor Technology Development for Sustainable Supply of Nuclear Energy in China China International Nuclear Symposium November 23 25 2010 Beijing PDF XU MI China Institute of Atomic Energy Archived PDF from the original on 28 September 2016 PACIFIC NUCLEAR COUNCIL PNC 2nd QUARTER 2015 MEETING Thursday April 23 2015 Beijing CHINA Meeting Minutes Final PDF Archived from the original PDF on 22 April 2016 China to build world s first artificial sun experimental device People s Daily Online 21 January 2006 Archived from the original on 5 June 2011 Retrieved 22 March 2011 Ambrose Evans Pritchard 20 March 2011 Safe nuclear does exist and China is leading the way with thorium Archived 25 March 2018 at the Wayback Machine Telegraph UK Chari P R 1978 China s Nuclear Posture An Evaluation Asian Survey 18 8 817 828 doi 10 2307 2643560 ISSN 0004 4687 JSTOR 2643560 a b c d e f g h i Minor Michael S 1976 China s Nuclear Development Program Asian Survey 16 6 571 579 doi 10 2307 2643520 ISSN 0004 4687 JSTOR 2643520 Milstone China Institute of Atomic Energy Retrieved 17 February 2022 Russian Chinese Science and Technology Diplomacy and Practice China Institute of International Studies Retrieved 17 February 2022 Letter to the Central Committee of the Chinese Communist Party on Not Giving China Samples of Nuclear Weapons and Technical Information Wilson Center Chinese Communist Party Central Committee Decision With Respect To Several Issues Concerning Strengthening Atomic Energy Industrial Infrastructure Wilson Center Albright David Chinese Military Plutonium and Highly Enriched Uranium Inventories PDF Institute for Science and International Security Institute Profile Archived from the original on 16 February 2015 Retrieved 16 February 2015 a b China Nuclear Power Shanghai Nuclear Office Daogang Lu North China Electric Power University May 2010 The Current Status of Chinese Nuclear Power Industry and Its Future e Journal of Advanced Maintenance Japan Society of Maintenology 2 1 Archived from the original on 22 July 2011 Retrieved 14 August 2010 a b Kadak Andrew C 2006 Nuclear Power Made in China The Brown Journal of World Affairs 13 1 77 90 ISSN 1080 0786 JSTOR 24590645 Yun Zhou 31 July 2013 China The next few years are crucial for nuclear industry growth Ux Consulting Nuclear Engineering International Archived from the original on 21 September 2013 Retrieved 8 August 2013 Start up nearing for Chinese units World Nuclear News 25 March 2014 Archived from the original on 3 April 2014 Retrieved 31 March 2014 Can China Meet Its Nuclear Power Goals Archived from the original on 22 May 2018 Retrieved 21 May 2018 a b c Agreements signed during first official visit to China by IAEA s Grossi Nuclear Engineering International 25 May 2023 Retrieved 28 May 2023 a b Nuclear Power in China World Nuclear Association October 2013 Archived from the original on 3 November 2013 Retrieved 25 October 2013 China freezes nuclear plant approvals CNN 16 March 2011 Archived from the original on 28 June 2011 Retrieved 28 May 2023 a b c Will China s nuclear nerves fuel a boom in green energy Archived 21 March 2011 at the Wayback Machine Channel 4 published 17 March 2011 Retrieved 17 March 2011 China s Nuclear Energy Program Post Fukushima Archived 18 March 2011 at the Wayback Machine China Bystander published 16 March 2011 Retrieved 17 March 2011 Rob Forrest 2 June 2014 China s Nuclear Program and Spent Fuel Storage PDF CISAC Stanford University Archived from the original PDF on 14 December 2014 Retrieved 14 December 2014 Stanway David 1 September 2017 China s legislature passes nuclear safety law Reuters Archived from the original on 1 September 2017 Retrieved 1 September 2017 Third Qinshan Nuclear Power Station Archived from the original on 22 June 2017 Retrieved 21 June 2017 AtomStroyExport unveils schedule for China projects World Nuclear News 3 April 2019 Archived from the original on 3 April 2019 Retrieved 3 April 2019 First AP1000 unit begins generating power Archived from the original on 10 July 2018 Retrieved 11 July 2018 Permits issued for construction of new Chinese plant World Nuclear News 15 October 2019 Archived from the original on 15 October 2019 Retrieved 15 October 2019 Biello David 29 March 2011 China forges ahead with nuclear energy Nature doi 10 1038 news 2011 194 Retrieved 28 May 2018 China s commercial reactors PDF Nuclear Engineering International Retrieved 29 May 2018 IAEA International Atomic Energy Agency Nuclear Power IAEA www iaea org Retrieved 29 May 2018 Chinese reactor design evolution Nuclear Engineering International First power at China s Ling Ao Nuclear Engineering International 16 July 2010 Archived from the original on 13 June 2011 Retrieved 17 July 2010 China prepares to export reactors World Nuclear News 25 November 2010 Archived from the original on 30 December 2010 Retrieved 18 December 2010 a b Ji Xing Daiyong Song Yuxiang Wu March 2016 HPR1000 Advanced Pressurized Water Reactor with Active and Passive Safety Engineering 2 1 79 87 doi 10 1016 J ENG 2016 01 017 Chinese reactor design passes safety review World Nuclear News China to begin construction of Hualong Two in 2024 Nuclear Engineering International China to begin construction of Hualong Two in 2024 Nuclear Engineering International 15 April 2021 Retrieved 2 February 2022 Xu Muyu Singh Shivani 14 April 2021 China to start building Hualong Two nuclear reactor in 2024 Reuters Retrieved 28 May 2023 via nasdaq com China launches CAP1400 reactor design World Nuclear News 29 September 2020 Retrieved 29 September 2020 China approves construction of six new reactors www world nuclear news org Retrieved 23 April 2022 Approval for four new reactors in south China www world nuclear news org Retrieved 20 September 2022 CNNC launches demonstration SMR project World Nuclear News 22 July 2019 Archived from the original on 22 July 2019 Retrieved 22 July 2019 Specific Design Consideration of ACP100 for Application in the Middle East and North Africa Region PDF CNNC 2 October 2017 Retrieved 22 July 2019 China approves construction of demonstration ACP100 Nuclear Engineering International www neimagazine com Retrieved 28 October 2021 Declan Butler 21 April 2011 Reactors residents and risk Nature 472 7344 400 1 doi 10 1038 472400a PMID 21525903 S2CID 4371109 Archived from the original on 24 April 2011 Retrieved 22 April 2011 Kidd Steve 10 August 2017 Nuclear in China why the slowdown Nuclear Engineering International Archived from the original on 30 December 2017 Retrieved 30 December 2017 David Stanway Geert De Clercq 15 January 2018 So close yet so far China deal elusive for France s Areva Times of Oman Archived from the original on 13 February 2018 Retrieved 12 February 2018 Kidd Steve 1 August 2018 Nuclear in China where is it heading now Nuclear Engineering International Archived from the original on 15 September 2018 Retrieved 15 September 2018 a b China to Dominate Nuclear as Beijing Bets on Homegrown Reactors Bloomberg News 1 June 2020 Retrieved 4 June 2020 China Nuclear Power Chinese Nuclear Energy World Nuclear Association www world nuclear org Archived from the original on 8 February 2016 Retrieved 15 June 2018 Construction of new Chinese power plant begins New Nuclear World Nuclear News www world nuclear news org Retrieved 5 January 2021 Tony Vince 8 March 2013 Rock solid ambitions Nuclear Engineering International Archived from the original on 26 January 2016 Retrieved 9 March 2013 China able to reprocess nuclear fuel cbc Associated Press 3 January 2011 Retrieved 28 May 2023 Pinpointing China s new plutonium reprocessing plant 5 May 2020 China nuclear reprocessing to create stockpiles of weapons level materials Experts The Economic Times UPDATE 1 China nuclear reprocessing to create stockpiles of weapons level materials experts Reuters 25 March 2021 China nuclear reprocessing to create stockpiles of weapons level materials experts www nasdaq com Current Issues New Uranium Conversion Enrichment and Nuclear Fuel Plant Projects Asia China s Nuclear Fuel Cycle World Nuclear Association Dai Zhimin Zou Yang Chen Kun 4 November 2016 Thorium Molten Salt Reactors TMSR Development in China PDF International Atomic Energy Agency Archived PDF from the original on 8 July 2018 Retrieved 7 July 2018 中科院与甘肃省签署钍基熔盐堆核能系统项目战略合作框架协议 中国科学院 Archived from the original on 8 July 2018 Retrieved 7 July 2018 甘肃省公示第四代核能钍基熔盐堆实验平台选址 拟落地武威 东方财富网 finance eastmoney com Retrieved 6 November 2022 China signs agreement for nuclear heating demonstration project Nuclear Engineering International 14 March 2019 Retrieved 18 March 2019 CNNC completes design of district heating reactor World Nuclear News 7 September 2018 Archived from the original on 24 March 2019 Retrieved 18 March 2019 China faces civic protests over new nuclear power plants msn com 17 February 2012 Archived from the original on 28 September 2013 Retrieved 26 February 2012 Calum MacLeod 16 July 2013 Protesters win environmental battle in China USA TODAY Archived from the original on 12 June 2015 Retrieved 6 September 2017 Lucy Hornby 26 May 2014 People power holds key to China s nuclear plans Financial Times Archived from the original on 29 May 2014 Retrieved 26 May 2014 External links EditNuclear power in China World Nuclear Association Maps of Nuclear Power Reactors China Brief Overview of Chinese NPP Development Shanghai Nuclear Engineering Research and Design Institute 23 June 2011 Steve Kidd 1 May 2013 Nuclear in China now back on track Nuclear Engineering International Caroline Peachey 22 May 2014 Chinese reactor design evolution Nuclear Engineering International Retrieved 23 May 2014 M V Ramana Eri Saikawa December 2011 Choosing a standard reactor International competition and domestic politics in Chinese nuclear policy PDF Energy Elsevier 36 12 6779 6789 doi 10 1016 j energy 2011 10 022 Retrieved 11 October 2013 Retrieved from https en wikipedia org w index php title Nuclear power in China amp oldid 1179495167, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.