fbpx
Wikipedia

Hongyanhe Nuclear Power Plant

The Hongyanhe Nuclear Power Plant (红沿河核电站) is located in Donggang Town, Wafangdian in Liaoning Province of China. The site is within the Prefecture-level city of Dalian, 104 kilometres (65 mi) north of Dalian City proper. The first unit started commercial operations in June 2013.[1]

Hongyanhe Nuclear Power Plant
Official name红沿河核电站
CountryChina
LocationDonggangzhen, Wafangdian, Dalian, Liaoning
Coordinates39°47′45″N 121°28′50″E / 39.79583°N 121.48056°E / 39.79583; 121.48056
StatusOperational
Construction beganAugust 18, 2007 (2007-08-18)
Commission date
  • Unit 1: February 17, 2013 (2013-02-17)
  • Unit 2: November 23, 2013 (2013-11-23)
  • Unit 3: March 23, 2015 (2015-03-23)
  • Unit 4: April 1, 2016 (2016-04-01)
  • Unit 5: June 25, 2021 (2021-06-25)
  • Unit 6: May 2, 2022 (2022-05-02)
Owner(s)Liaoning Hongyanhe Nuclear Power Company Ltd.
Operator(s)Liaoning Hongyanhe Nuclear Power Company Ltd.
Nuclear power station
Reactor typePWR
Thermal capacity
  • 6 × 2,905 MWt
  • 17,430 MWt (Total)
Power generation
Units operational6 × 1,061 MWe
Make and model
Nameplate capacity6,710 MWe
(6,366 MWe net)

Phase I consists of four CPR-1000 reactors, which is a design developed by China from the Framatome-designed PWRs at the Daya Bay Nuclear Power Plant.[2]

Phase II is the first construction of two ACPR1000 reactors,[3] further development of the CPR-1000. This reactor will include a core catcher and double containment as additional safety measures.[4]

Progress edit

The project was approved by the National Development and Reform Commission in April 2006, and projected to cost 23 billion Renminbi for the first two units. The cost will be shared between the China Power Investment Corporation, the China General Nuclear Power Group and two Liaoning companies.[citation needed] Liaoning Hongyanhe Nuclear Power Co., Ltd., a joint venture, is managing the construction and will be the operator of the plant once it goes online. The operator is a 45–45–10 joint venture of China Power Investment Corporation (now State Power Investment Corporation), China General Nuclear Power Group and Dalian Construction Investment Group.[5]

Construction started in summer of 2006 with excavation of two large holes that will have the reactors put in them and a containment built around them.[6] 'First concrete' for the first unit was poured in August 2007. 'Ground breaking' ceremony was held on 28 July 2010 for starting the work of two 1000 MWe CPR-1000 pressurized water reactors of phase II.[7]

On 17 February 2013 Hongyanhe 1 was connected to the grid, having started criticality testing on 16 January 2013.[8] It began commercial operation on 6 June.[1]

On 23 November 2013 Hongyanhe 2 was connected to the grid.[9]

Hongyanhe 4 achieved first criticality on 5 March 2016, was connected to the grid on 1 April 2016, and entered commercial operation on 20 September 2016.[10]

The Hongyanhe Nuclear Power Station reached full operational capacity on 24 June 2022 with total installed capacity of 6,710 MW.[11]

Reactor Data edit

The Hongyanhe Nuclear Power Plant consists of 6 operational reactors.

Unit Type / Model Net el.
power
Gross el.
power
Thermal
power
Construction
start
First
criticality
Grid
connection
Operation
start
Notes
Phase I
Hongyanhe 1 PWR / CPR-1000 1061 MW 1119 MW 2905 MW 2007-7-18 2013-1-16 2013-2-17 2013-6-6 [12]
Hongyanhe 2 PWR / CPR-1000 1061 MW 1119 MW 2905 MW 2008-3-28 2013-10-24 2013-11-23 2014-5-13 [13]
Hongyanhe 3 PWR / CPR-1000 1061 MW 1119 MW 2905 MW 2009-3-7 2014-10-27 2015-3-23 2015-8-16 [14][15]
Hongyanhe 4 PWR / CPR-1000 1061 MW 1119 MW 2905 MW 2009-8-15 2016-3-5 2016-4-1 2016-6-8 [10][16]
Phase II
Hongyanhe 5 PWR / ACPR1000 1061 MW 1119 MW 2905 MW 2015-3-29 2021-06-13 2021-06-25 2021-7-31 [17][18][19][20]
Hongyanhe 6 PWR / ACPR1000 1061 MW 1119 MW 2905 MW 2015-6-24 2022-04-21 2022-05-02 2022-06-23 [21][19][22]

References edit

  1. ^ a b "Hongyanhe 1 enters commercial operation". World Nuclear News. World Nuclear Association. 7 June 2013. Retrieved 16 June 2013.
  2. ^ . World Nuclear News. World Nuclear Association (WNA). 24 November 2008. Archived from the original on 25 January 2012. Retrieved 11 January 2010.
  3. ^ "Yangjiang 1 commercial operation makes site China's sixth working NPP". Nuclear Engineering International. 28 March 2014. Retrieved 29 March 2014.
  4. ^ Yun Zhou (31 July 2013). "China: The next few years are crucial for nuclear industry growth". Ux Consulting. Nuclear Engineering International. Retrieved 8 August 2013.
  5. ^ Global Offering (PDF). CGN Power. 27 November 2014. pp. 106–107. Retrieved 1 July 2018 – via Hong Kong Exchanges and Clearing website.
  6. ^ "Construction Starts on Hongyanhe Nuclear Power Plant". Xinhua News Agency. 1 July 2006. Retrieved 8 February 2010.
  7. ^ "Work on Phase II of Hongyanhe plant begins". World Nuclear News. 29 July 2010. Retrieved 22 January 2013.
  8. ^ "China's Hongyanhe nuclear plant starts operation". Nuclear Engineering International. 18 February 2013. Retrieved 18 February 2013.
  9. ^ "New Chinese nuclear grid connection". World Nuclear News. 26 November 2013. Retrieved 1 December 2013.
  10. ^ a b "Fourth Hongyanhe unit enters commercial operation". World Nuclear News. 20 September 2016. Retrieved 20 September 2016.
  11. ^ "NE China nuclear power plant fully operational".
  12. ^ "Hongyanhe 1". Power Reactor Information System (PRIS). International Atomic Energy Agency (IAEA). 21 January 2013. Retrieved 22 January 2013.
  13. ^ "Hongyanhe 2". PRIS. IAEA. 30 March 2015. Retrieved 30 March 2015.
  14. ^ . World Nuclear News. WNA. 2 July 2009. Archived from the original on 4 March 2012. Retrieved 13 November 2009.
  15. ^ "Hongyanhe 3". PRIS. IAEA. 30 March 2015. Retrieved 30 March 2015.
  16. ^ "Hongyanhe 4". PRIS. IAEA. 19 September 2016. Retrieved 20 September 2016.
  17. ^ "Construction starts on Hongyanhe 5". World Nuclear News. 30 March 2015. Retrieved 30 March 2015.
  18. ^ "Hongyanhe 5". PRIS. IAEA. 22 April 2015. Retrieved 22 April 2015.
  19. ^ a b "Hongyanhe 5 enters commissioning phase". World Nuclear News. 13 November 2020.
  20. ^ "Fifth Hongyanhe unit connected to the grid". World Nuclear News. 25 June 2021. Retrieved 29 June 2021.
  21. ^ "Work starts on sixth Hongyanhe unit". World Nuclear News. 24 July 2015. Retrieved 24 July 2015.
  22. ^ "Hongyanhe 6". PRIS. IAEA.

hongyanhe, nuclear, power, plant, 红沿河核电站, located, donggang, town, wafangdian, liaoning, province, china, site, within, prefecture, level, city, dalian, kilometres, north, dalian, city, proper, first, unit, started, commercial, operations, june, 2013, official. The Hongyanhe Nuclear Power Plant 红沿河核电站 is located in Donggang Town Wafangdian in Liaoning Province of China The site is within the Prefecture level city of Dalian 104 kilometres 65 mi north of Dalian City proper The first unit started commercial operations in June 2013 1 Hongyanhe Nuclear Power PlantOfficial name红沿河核电站CountryChinaLocationDonggangzhen Wafangdian Dalian LiaoningCoordinates39 47 45 N 121 28 50 E 39 79583 N 121 48056 E 39 79583 121 48056StatusOperationalConstruction beganAugust 18 2007 2007 08 18 Commission dateUnit 1 February 17 2013 2013 02 17 Unit 2 November 23 2013 2013 11 23 Unit 3 March 23 2015 2015 03 23 Unit 4 April 1 2016 2016 04 01 Unit 5 June 25 2021 2021 06 25 Unit 6 May 2 2022 2022 05 02 Owner s Liaoning Hongyanhe Nuclear Power Company Ltd Operator s Liaoning Hongyanhe Nuclear Power Company Ltd Nuclear power stationReactor typePWRThermal capacity6 2 905 MWt 17 430 MWt Total Power generationUnits operational6 1 061 MWeMake and modelCPR 1000 Units 1 4 ACPR 1000 Units 5 6 Nameplate capacity6 710 MWe 6 366 MWe net edit on Wikidata Phase I consists of four CPR 1000 reactors which is a design developed by China from the Framatome designed PWRs at the Daya Bay Nuclear Power Plant 2 Phase II is the first construction of two ACPR1000 reactors 3 further development of the CPR 1000 This reactor will include a core catcher and double containment as additional safety measures 4 Progress editThe project was approved by the National Development and Reform Commission in April 2006 and projected to cost 23 billion Renminbi for the first two units The cost will be shared between the China Power Investment Corporation the China General Nuclear Power Group and two Liaoning companies citation needed Liaoning Hongyanhe Nuclear Power Co Ltd a joint venture is managing the construction and will be the operator of the plant once it goes online The operator is a 45 45 10 joint venture of China Power Investment Corporation now State Power Investment Corporation China General Nuclear Power Group and Dalian Construction Investment Group 5 Construction started in summer of 2006 with excavation of two large holes that will have the reactors put in them and a containment built around them 6 First concrete for the first unit was poured in August 2007 Ground breaking ceremony was held on 28 July 2010 for starting the work of two 1000 MWe CPR 1000 pressurized water reactors of phase II 7 On 17 February 2013 Hongyanhe 1 was connected to the grid having started criticality testing on 16 January 2013 8 It began commercial operation on 6 June 1 On 23 November 2013 Hongyanhe 2 was connected to the grid 9 Hongyanhe 4 achieved first criticality on 5 March 2016 was connected to the grid on 1 April 2016 and entered commercial operation on 20 September 2016 10 The Hongyanhe Nuclear Power Station reached full operational capacity on 24 June 2022 with total installed capacity of 6 710 MW 11 Reactor Data editThe Hongyanhe Nuclear Power Plant consists of 6 operational reactors Unit Type Model Net el power Gross el power Thermal power Construction start First criticality Grid connection Operation start Notes Phase I Hongyanhe 1 PWR CPR 1000 1061 MW 1119 MW 2905 MW 2007 7 18 2013 1 16 2013 2 17 2013 6 6 12 Hongyanhe 2 PWR CPR 1000 1061 MW 1119 MW 2905 MW 2008 3 28 2013 10 24 2013 11 23 2014 5 13 13 Hongyanhe 3 PWR CPR 1000 1061 MW 1119 MW 2905 MW 2009 3 7 2014 10 27 2015 3 23 2015 8 16 14 15 Hongyanhe 4 PWR CPR 1000 1061 MW 1119 MW 2905 MW 2009 8 15 2016 3 5 2016 4 1 2016 6 8 10 16 Phase II Hongyanhe 5 PWR ACPR1000 1061 MW 1119 MW 2905 MW 2015 3 29 2021 06 13 2021 06 25 2021 7 31 17 18 19 20 Hongyanhe 6 PWR ACPR1000 1061 MW 1119 MW 2905 MW 2015 6 24 2022 04 21 2022 05 02 2022 06 23 21 19 22 References edit a b Hongyanhe 1 enters commercial operation World Nuclear News World Nuclear Association 7 June 2013 Retrieved 16 June 2013 Construction gets under way at Chinese sites World Nuclear News World Nuclear Association WNA 24 November 2008 Archived from the original on 25 January 2012 Retrieved 11 January 2010 Yangjiang 1 commercial operation makes site China s sixth working NPP Nuclear Engineering International 28 March 2014 Retrieved 29 March 2014 Yun Zhou 31 July 2013 China The next few years are crucial for nuclear industry growth Ux Consulting Nuclear Engineering International Retrieved 8 August 2013 Global Offering PDF CGN Power 27 November 2014 pp 106 107 Retrieved 1 July 2018 via Hong Kong Exchanges and Clearing website Construction Starts on Hongyanhe Nuclear Power Plant Xinhua News Agency 1 July 2006 Retrieved 8 February 2010 Work on Phase II of Hongyanhe plant begins World Nuclear News 29 July 2010 Retrieved 22 January 2013 China s Hongyanhe nuclear plant starts operation Nuclear Engineering International 18 February 2013 Retrieved 18 February 2013 New Chinese nuclear grid connection World Nuclear News 26 November 2013 Retrieved 1 December 2013 a b Fourth Hongyanhe unit enters commercial operation World Nuclear News 20 September 2016 Retrieved 20 September 2016 NE China nuclear power plant fully operational Hongyanhe 1 Power Reactor Information System PRIS International Atomic Energy Agency IAEA 21 January 2013 Retrieved 22 January 2013 Hongyanhe 2 PRIS IAEA 30 March 2015 Retrieved 30 March 2015 Orders for Chinese program World Nuclear News WNA 2 July 2009 Archived from the original on 4 March 2012 Retrieved 13 November 2009 Hongyanhe 3 PRIS IAEA 30 March 2015 Retrieved 30 March 2015 Hongyanhe 4 PRIS IAEA 19 September 2016 Retrieved 20 September 2016 Construction starts on Hongyanhe 5 World Nuclear News 30 March 2015 Retrieved 30 March 2015 Hongyanhe 5 PRIS IAEA 22 April 2015 Retrieved 22 April 2015 a b Hongyanhe 5 enters commissioning phase World Nuclear News 13 November 2020 Fifth Hongyanhe unit connected to the grid World Nuclear News 25 June 2021 Retrieved 29 June 2021 Work starts on sixth Hongyanhe unit World Nuclear News 24 July 2015 Retrieved 24 July 2015 Hongyanhe 6 PRIS IAEA nbsp China portal nbsp Energy portal nbsp Nuclear technology portal Retrieved from https en wikipedia org w index php title Hongyanhe Nuclear Power Plant amp oldid 1166519352, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.