The Fuqing Nuclear Power Plant (simplified Chinese: 福清核电站; traditional Chinese: 福清核電站; pinyin: Fúqīng Hédiànzhàn) is a nuclear power plant in Fuqing, Fujian Province, China. The plant is located on the coast of Xinghua Bay, near Qianxue Village, Sanshan Town.[1] The station has four 1,089 megawatt (MW) CPR-1000 pressurized water reactors (PWRs).[2] The CPR-1000 is an advanced PWR design developed by China from the Areva-designed PWRs at the Daya Bay Nuclear Power Plant.[3] The plant was jointly constructed and is operated by China National Nuclear Corporation (51%), China Huadian Corp. (39%) and the Fujian Investment & Development Co Ltd. (10%).

Fuqing Nuclear Power Plant
Official name福清核电站
CountryChina
LocationQianxue, Fuqing, Fujian
Coordinates25°26′45″N 119°26′50″E / 25.44583°N 119.44722°E / 25.44583; 119.44722
StatusOperational
Construction beganNovember 21, 2008 (2008-11-21)
Commission date
  • Unit 1: August 20, 2014 (2014-08-20)
  • Unit 2: August 6, 2015 (2015-08-06)
  • Unit 3: September 7, 2016 (2016-09-07)
  • Unit 4: July 29, 2017 (2017-07-29)
  • Unit 5: November 27, 2020 (2020-11-27)
  • Unit 6: January 1, 2022 (2022-01-01)
Owner(s)Fujian Fuqing Nuclear Co.
Operator(s)China National Nuclear Corporation (CNNC)
Nuclear power station
Reactor typePWR
Thermal capacity
  • 4 × 2,905 MWt
  • 2 × 3,060 MWt
Power generation
Units operational
  • 4 × 1,000 MWe
  • 2 × 1,075 MWe
Make and model
Nameplate capacity6,656 MWe
(6,120 MWe net)
Annual net output2021: 39,394.32 GWh (141,819.6 TJ) (Units 1-5 only)
External links
Websitewww.cnnp.com.cn/cnnp/cydwzd62/fjfqhdyxgs/1101192/index.html

Construction of the first unit began on 21 November 2008[2] and was completed in 2014. First concrete for Unit 2 was poured on 17 June 2009[4] and the unit was started in October 2015. First concrete for Unit 3 was poured on 31 December 2010. Construction of Unit 4 was to begin in 2011, but was delayed until November 2012 by China's nuclear safety review following the Fukushima nuclear disaster.

In November 2014 it was announced that units 5 and 6 would be of the Hualong One (updated CPR-1000) design, with unit 5 scheduled to be in operation about 2019.[5] The first concrete was poured for Fuqing 5 on 7 May 2015.[6] Unit 5 achieved criticality in October 2020, the first Hualong One reactor to reach the milestone.[7] The unit was connected to the grid the following month.[8] It began commercial operation on 30 January 2021.[9] Unit 6 achieved criticality in December 2021, was connected to the grid in January 2022,[10] and began commercial operation on 25 March 2022.[11]

Reactor data edit

The Fuqing Nuclear Power Plant consist of 6 operational reactors.

Unit Type / Model Net power Gross power Thermal power Start construction First criticality Grid connection Commercial operation Notes
Phase I
Fuqing 1 PWR / CNP-1000 1000MW 1089MW 2905MW 2008-11-21 2014-07-24 2014-08-20 2014-11-22 [3][12]
Fuqing 2 PWR / CNP-1000 1000MW 1089MW 2905MW 2009-6-18 2015-07-22 2015-08-06 2015-10-16 [4][13]
Phase II
Fuqing 3 PWR / CNP-1000 1000MW 1089MW 2905MW 2010-12-31 2016-07-03 2016-09-07 2016-10-24 [14][15][16]
Fuqing 4 PWR / CNP-1000 1000MW 1089MW 2905MW 2012-11-17 2017-07-16 2017-07-29 2017-09-17 [2][17]
Fuqing 5 PWR / HPR-1000 1060MW 1150MW 3060MW 2015-05-07 2020-10-21 2020-11-27 2021-01-30 [6][18]
Fuqing 6 PWR / HPR-1000 1060MW 1150MW 3060MW 2015-12-22 2021-12-13 2022-01-01 2022-03-25 [19][20]

See also edit

References edit

  1. ^ "Construction of Fuqing Nuclear Power Plant commences". People's Daily Online. 24 November 2008. Retrieved 2009-11-13.
  2. ^ a b c "Nuclear Power in China". Country Briefings. World Nuclear Association (WNA). October 2016. Retrieved 25 October 2016.
  3. ^ a b "Construction gets under way at Chinese sites". World Nuclear News. WNA. 24 November 2008. Retrieved 2009-11-13.
  4. ^ a b "Nuclear construction launch in China". World Nuclear News. WNA. 23 June 2009. Retrieved 2009-11-13.
  5. ^ "Hualong One deployment at Fuqing 5". World Nuclear News. 4 November 2014. Retrieved 9 March 2015.
  6. ^ a b "China starts building first Hualong One unit". World Nuclear News. 7 May 2015. Retrieved 7 May 2015.
  7. ^ "China's Fuqing 5 achieves criticality - Nuclear Engineering International". www.neimagazine.com. Retrieved 15 December 2020.
  8. ^ "World's first Hualong One unit connects to grid : New Nuclear - World Nuclear News". world-nuclear-news.org. Retrieved 15 December 2020.
  9. ^ "China's first Hualong One begins commercial operation". Nuclear Engineering International. 1 February 2021. Retrieved 1 February 2021.
  10. ^ "World's 3rd Nuclear Reactor with Hualong One Tech Connected to Grid_ News_ 福建省人民政府门户网站".
  11. ^ "Second Fuqing Hualong One enters commercial operation". world-nuclear-news.org. 25 March 2022. Retrieved 25 March 2022.
  12. ^ "Fuqing 1". PRIS. IAEA. 2021-04-25. Retrieved 2021-04-26.
  13. ^ "Fuqing 2". PRIS. IAEA. 2021-04-25. Retrieved 2021-04-26.
  14. ^ "Nuclear construction builds up". World Nuclear News. 4 January 2011. Retrieved 2011-01-11.
  15. ^ "Fuqing 3". PRIS. IAEA. 2021-04-25. Retrieved 2021-04-26.
  16. ^ "China's 37th reactor enters commercial operation". 2017-09-18. Retrieved 2017-09-25.
  17. ^ "Fuqing 4". PRIS. IAEA. 2021-04-25. Retrieved 2021-04-26.
  18. ^ "Fuqing 5". PRIS. IAEA. 2021-04-25. Retrieved 2021-04-26.
  19. ^ "Fuqing 6". PRIS. IAEA. 2021-04-25. Retrieved 2021-04-26.
  20. ^ "Third Hualong One unit connected to grid". World Nuclear News. World Nuclear Assn. 2022-01-04. Retrieved 2021-04-26.

fuqing, nuclear, power, plant, simplified, chinese, 福清核电站, traditional, chinese, 福清核電站, pinyin, fúqīng, hédiànzhàn, nuclear, power, plant, fuqing, fujian, province, china, plant, located, coast, xinghua, near, qianxue, village, sanshan, town, station, four, me. The Fuqing Nuclear Power Plant simplified Chinese 福清核电站 traditional Chinese 福清核電站 pinyin Fuqing Hedianzhan is a nuclear power plant in Fuqing Fujian Province China The plant is located on the coast of Xinghua Bay near Qianxue Village Sanshan Town 1 The station has four 1 089 megawatt MW CPR 1000 pressurized water reactors PWRs 2 The CPR 1000 is an advanced PWR design developed by China from the Areva designed PWRs at the Daya Bay Nuclear Power Plant 3 The plant was jointly constructed and is operated by China National Nuclear Corporation 51 China Huadian Corp 39 and the Fujian Investment amp Development Co Ltd 10 Fuqing Nuclear Power PlantOfficial name福清核电站CountryChinaLocationQianxue Fuqing FujianCoordinates25 26 45 N 119 26 50 E 25 44583 N 119 44722 E 25 44583 119 44722StatusOperationalConstruction beganNovember 21 2008 2008 11 21 Commission dateUnit 1 August 20 2014 2014 08 20 Unit 2 August 6 2015 2015 08 06 Unit 3 September 7 2016 2016 09 07 Unit 4 July 29 2017 2017 07 29 Unit 5 November 27 2020 2020 11 27 Unit 6 January 1 2022 2022 01 01 Owner s Fujian Fuqing Nuclear Co Operator s China National Nuclear Corporation CNNC Nuclear power stationReactor typePWRThermal capacity4 2 905 MWt 2 3 060 MWtPower generationUnits operational4 1 000 MWe 2 1 075 MWeMake and modelCNP 1000 Units 1 4 HPR 1000 Units 5 6 Nameplate capacity6 656 MWe 6 120 MWe net Annual net output2021 39 394 32 GWh 141 819 6 TJ Units 1 5 only External linksWebsitewww wbr cnnp wbr com wbr cn wbr cnnp wbr cydwzd62 wbr fjfqhdyxgs wbr 1101192 wbr index wbr html edit on Wikidata Construction of the first unit began on 21 November 2008 2 and was completed in 2014 First concrete for Unit 2 was poured on 17 June 2009 4 and the unit was started in October 2015 First concrete for Unit 3 was poured on 31 December 2010 Construction of Unit 4 was to begin in 2011 but was delayed until November 2012 by China s nuclear safety review following the Fukushima nuclear disaster In November 2014 it was announced that units 5 and 6 would be of the Hualong One updated CPR 1000 design with unit 5 scheduled to be in operation about 2019 5 The first concrete was poured for Fuqing 5 on 7 May 2015 6 Unit 5 achieved criticality in October 2020 the first Hualong One reactor to reach the milestone 7 The unit was connected to the grid the following month 8 It began commercial operation on 30 January 2021 9 Unit 6 achieved criticality in December 2021 was connected to the grid in January 2022 10 and began commercial operation on 25 March 2022 11 Reactor data editThe Fuqing Nuclear Power Plant consist of 6 operational reactors Unit Type Model Net power Gross power Thermal power Start construction First criticality Grid connection Commercial operation Notes Phase I Fuqing 1 PWR CNP 1000 1000MW 1089MW 2905MW 2008 11 21 2014 07 24 2014 08 20 2014 11 22 3 12 Fuqing 2 PWR CNP 1000 1000MW 1089MW 2905MW 2009 6 18 2015 07 22 2015 08 06 2015 10 16 4 13 Phase II Fuqing 3 PWR CNP 1000 1000MW 1089MW 2905MW 2010 12 31 2016 07 03 2016 09 07 2016 10 24 14 15 16 Fuqing 4 PWR CNP 1000 1000MW 1089MW 2905MW 2012 11 17 2017 07 16 2017 07 29 2017 09 17 2 17 Fuqing 5 PWR HPR 1000 1060MW 1150MW 3060MW 2015 05 07 2020 10 21 2020 11 27 2021 01 30 6 18 Fuqing 6 PWR HPR 1000 1060MW 1150MW 3060MW 2015 12 22 2021 12 13 2022 01 01 2022 03 25 19 20 See also edit nbsp China portal nbsp Energy portal nbsp Nuclear technology portal Nuclear power in China List of nuclear reactors ChinaReferences edit Construction of Fuqing Nuclear Power Plant commences People s Daily Online 24 November 2008 Retrieved 2009 11 13 a b c Nuclear Power in China Country Briefings World Nuclear Association WNA October 2016 Retrieved 25 October 2016 a b Construction gets under way at Chinese sites World Nuclear News WNA 24 November 2008 Retrieved 2009 11 13 a b Nuclear construction launch in China World Nuclear News WNA 23 June 2009 Retrieved 2009 11 13 Hualong One deployment at Fuqing 5 World Nuclear News 4 November 2014 Retrieved 9 March 2015 a b China starts building first Hualong One unit World Nuclear News 7 May 2015 Retrieved 7 May 2015 China s Fuqing 5 achieves criticality Nuclear Engineering International www neimagazine com Retrieved 15 December 2020 World s first Hualong One unit connects to grid New Nuclear World Nuclear News world nuclear news org Retrieved 15 December 2020 China s first Hualong One begins commercial operation Nuclear Engineering International 1 February 2021 Retrieved 1 February 2021 World s 3rd Nuclear Reactor with Hualong One Tech Connected to Grid News 福建省人民政府门户网站 Second Fuqing Hualong One enters commercial operation world nuclear news org 25 March 2022 Retrieved 25 March 2022 Fuqing 1 PRIS IAEA 2021 04 25 Retrieved 2021 04 26 Fuqing 2 PRIS IAEA 2021 04 25 Retrieved 2021 04 26 Nuclear construction builds up World Nuclear News 4 January 2011 Retrieved 2011 01 11 Fuqing 3 PRIS IAEA 2021 04 25 Retrieved 2021 04 26 China s 37th reactor enters commercial operation 2017 09 18 Retrieved 2017 09 25 Fuqing 4 PRIS IAEA 2021 04 25 Retrieved 2021 04 26 Fuqing 5 PRIS IAEA 2021 04 25 Retrieved 2021 04 26 Fuqing 6 PRIS IAEA 2021 04 25 Retrieved 2021 04 26 Third Hualong One unit connected to grid World Nuclear News World Nuclear Assn 2022 01 04 Retrieved 2021 04 26 Retrieved from https en wikipedia org w index php title Fuqing Nuclear Power Plant amp oldid 1176463493, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.