Generation III reactor

Generation III reactors, or Gen III reactors, are a class of nuclear reactors designed to succeed Generation II reactors, incorporating evolutionary improvements in design. These include improved fuel technology, higher thermal efficiency, significantly enhanced safety systems (including passive nuclear safety), and standardized designs intended to reduce maintenance and capital costs. They are promoted by the Generation IV International Forum (GIF).

Model of the Toshiba ABWR, which became the first operational Generation III reactor in 1996

The first Generation III reactors to begin operation were Kashiwazaki 6 and 7 advanced boiling water reactors (ABWRs) in 1996 and 1997. From 2012, both have been shut down due to a less permissive political environment in the wake of the Fukushima nuclear accident. Due to the prolonged period of stagnation in the construction of new reactors and the continued (albeit declining) popularity of Generation II/II+ designs in new construction, relatively few third generation reactors have been built.

Overview edit

The older Gen II reactors comprise the vast majority of current nuclear reactors. Gen III reactors are so-called advanced light-water reactors (LWRs). Gen III+ reactors are labeled as "evolutionary designs". Though the distinction between Gen II and III reactors is arbitrary, few Gen III reactors have reached the commercial stage as of 2022. The Generation IV International Forum calls Gen IV reactors "revolutionary designs". These are concepts for which no concrete prognoses for realization existed at the time.[1]

The improvements in reactor technology in third generation reactors are intended to result in a longer operational life (designed for 60 years of operation, extendable to 100+ years of operation prior to complete overhaul and reactor pressure vessel replacement) compared with currently used Generation II reactors (designed for 40 years of operation, extendable to 60+ years of operation prior to complete overhaul and pressure vessel replacement).[2][3]

The core damage frequencies for these reactors are designed to be lower than for Generation II reactors – 60 core damage events for the European Pressurized Reactor (EPR) and 3 core damage events for the Economic Simplified Boiling Water Reactor (ESBWR)[4] per 100 million reactor-years are significantly lower than the 1,000 core damage events per 100 million reactor-years for BWR/4 Generation II reactors.[4]

The third generation EPR reactor was also designed to use uranium more efficiently than older Generation II reactors, using approximately 17% less per unit of electricity generated than these older reactor technologies.[5] An independent analysis conducted by environmental scientist Barry Brook on the greater efficiency and therefore lower material needs of Gen III reactors, corroborates this finding.[6]

Developments edit

 
EPR core catching room designed to catch the corium in case of a meltdown. Some Generation III reactors include a core catcher in their design.

Gen III+ reactor designs are an evolutionary development of Gen III reactors, offering improvements in safety over Gen III reactor designs. Manufacturers began development of Gen III+ systems in the 1990s by building on the operating experience of the American, Japanese, and Western European light-water reactor.[citation needed]

The nuclear industry began to promote a nuclear renaissance suggesting that Gen III+ designs should solve three key problems: safety, cost and buildability. Construction costs of US$1,000/kW were forecast, a level that would make nuclear competitive with gas, and construction times of four years or less were expected. However, these estimates proved over-optimistic.[citation needed]

A notable improvement of Gen III+ systems over second-generation designs is the incorporation in some designs of passive safety features that do not require active controls or operator intervention but instead rely on gravity or natural convection to mitigate the impact of abnormal events.[citation needed]

 
Kakrapar Atomic Power Station Unit 3 and 4 under construction. India's first Generation III+ reactor

Generation III+ reactors incorporate extra safety features to avoid the kind of disaster suffered at Fukushima in 2011. Generation III+ designs, passive safety, also known as passive cooling, requires no sustained operator action or electronic feedback to shut down the plant safely in the event of an emergency. Many of the Generation III+ nuclear reactors have a core catcher. If the fuel cladding and reactor vessel systems and associated piping become molten, corium will fall into a core catcher which holds the molten material and has the ability to cool it. This, in turn protects the final barrier, the containment building. As an example, Rosatom installed a 200-tonne core catcher in the VVER reactor as the first large piece of equipment in the reactor building of Rooppur 1, describing it as "a unique protection system".[7][8] In 2017, Rosatom has started commercial operations of the NVNPP-2 Unit 1 VVER-1200 reactor in central Russia, marking the world's first full start-up of a generation III+ reactor.[9]

First reactors edit

 
Novovoronezh Nuclear Power Plant II with the first Generation III+ nuclear reactor in the world

The first Generation III reactors were built in Japan, in the form of advanced boiling water reactors. On 5 August 2016, a Generation III+ VVER-1200/392M reactor became operational (first grid connection) at Novovoronezh Nuclear Power Plant II in Russia,[10] which was the first operational Generation III+ reactor.[11]

Several other Generation III+ reactors are under late-stage construction in Europe, China, India, and the United States. The next Generation III+ reactors to come online were an AREVA EPR reactor at the Taishan Nuclear Power Station (first grid connection on 2018-06-29) and a Westinghouse AP1000 reactor at the Sanmen Nuclear Power Station (first grid connection on 2018-06-30) in China.[12]

In the United States, reactor designs are certified by the Nuclear Regulatory Commission (NRC). As of August 2020, the commission has approved seven new designs, and is considering one more design as well as renewal of an expired certification.[13]

Response and criticism edit

Proponents of nuclear power and some who have historically been critical have acknowledged that third generation reactors as a whole are safer than older reactors.[citation needed]

Edwin Lyman, a senior staff scientist at the Union of Concerned Scientists, has challenged specific cost-saving design choices made for two Generation III reactors, both the AP1000 and ESBWR. Lyman, John Ma (a senior structural engineer at the NRC), and Arnold Gundersen (an anti-nuclear consultant) are concerned about what they perceive as weaknesses in the steel containment vessel and the concrete shield building around the AP1000 in that its containment vessel does not have sufficient safety margins in the event of a direct airplane strike.[14][15] Other engineers do not agree with these concerns, and claim the containment building is more than sufficient in safety margins and factors of safety.[15][16]

The Union of Concerned Scientists in 2008 referred to the EPR as the only new reactor design under consideration in the United States that "...appears to have the potential to be significantly safer and more secure against attack than today's reactors."[17]: 7 

There have also been issues in fabricating the precision parts necessary to maintain safe operation of these reactors, with cost overruns, broken parts, and extremely fine steel tolerances causing issues with new reactors under construction in France at the Flamanville Nuclear Power Plant.[18]

Lists of Generation III reactors edit

Generation III reactors currently operational or under construction edit

Developer(s) Reactor name(s) Type MWe (net) MWe (gross) MWth Notes
General Electric, Toshiba, Hitachi ABWR;
US-ABWR
BWR 1350 1420 3926 In operation at Kashiwazaki since 1996. NRC certified in 1997.[17]
KEPCO APR-1400 PWR 1383 1455 3983 In operation at Kori since Jan 2016.
CGNPG ACPR-1000 1061 1119 2905 Improved version of the CPR-1000. The first reactor came online in 2018 at Yangjiang-5.
CGNPG, CNNC Hualong One (HPR-1000) 1090 1170 3050 In part a merger of the Chinese ACPR-1000 and ACP-1000 designs, but ultimately an incrementally developed improvement on the prior CNP-1000 and CP-1000 designs.[19] It was initially intended to be named the "ACC-1000", but was ultimately named as the "Hualong One" or "HPR-1000". Fangchenggang Units 3–6 will be the first to utilize the HPR-1000 design, with Units 3 & 4 currently under construction as of 2017.[20]
OKBM Afrikantov VVER-1000/428 990 1060 3000 First version of the AES-91 design, designed and used for Tianwan Units 1 & 2, which came online in 2007.
VVER-1000/428M 1050 1126 3000 Another version of the AES-91 design, also designed and used for Tianwan (this time for Units 3 & 4, which came online in 2017 and 2018, respectively).
VVER-1000/412 917 1000 3000 First constructed AES-92 design, used for the Kudankulam.

Generation III designs not adopted or built yet edit

Developer(s) Reactor name(s) Type MWe (net) MWe (gross) MWth Notes
General Electric, Hitachi ABWR-II BWR 1638 1717 4960 Improved version of the ABWR. Uncertain development status.
Mitsubishi APWR;
US-APWR;
EU-APWR;
APWR+
PWR 1600 1700 4451 Two units planned at Tsuruga cancelled in 2011. US NRC licensing for two units planned at Comanche Peak was suspended in 2013. The original APWR and the updated US-APWR/EU-APWR (also known as the APWR+) differ significantly in their design characteristics, with the APWR+ having higher efficiency and electrical output.
Westinghouse AP600 600 619 ? NRC certified in 1999.[17] Evolved into the larger AP1000 design.[21]
Combustion Engineering System 80+ 1350 1400 ? NRC certified in 1997.[17] Provided a basis for the Korean APR-1400.[22]
OKBM Afrikantov VVER-1000/466(B) 1011 1060 3000 This was the first AES-92 design to be developed, originally intended to be built at the proposed Belene Nuclear Power Plant, but construction was later halted.
Candu Energy Inc. EC6 PHWR ? 750 2084 The EC6 (Enhanced CANDU 6) is an evolutionary upgrade of previous CANDU designs. Like other CANDU designs, it is capable of using unenriched natural uranium as fuel.
AFCR ? 740 2084 The Advanced Fuel CANDU Reactor is a modified EC6 design that has been optimized for extreme fuel flexibility with the ability to handle numerous potential reprocessed fuel blends and even thorium. It is currently undergoing late-stage development as part of a joint venture between SNC-Lavalin, CNNC, and Shanghai Electric.
Various (see MKER Article.) MKER BWR 1000 ? 2085 A Development of the RBMK nuclear power reactor. Fixes all of the RBMK reactor's design errors and flaws and adds a full containment building and Passive nuclear safety features such as a passive core cooling system. The physical prototype of the MKER-1000 is the 5th unit of the Kursk Nuclear Power Plant. The construction of Kursk 5 was cancelled in 2012 and a VVER-TOI whose construction is ongoing since 2018 is being built instead as of 2018.[23][24][25](see RBMK article)

Lists of Generation III+ reactors edit

Generation III+ reactors currently operational or under construction edit

Developer(s) Reactor name(s) Type MWe (net) MWe (gross) MWth First grid connection Notes
Westinghouse, Toshiba AP1000 PWR 1117 1250 3400 2018-06-30 Sanmen[26][27] NRC certified Dec 2005.[17]
SNPTC, Westinghouse CAP1400 1400 1500 4058 The first Chinese co-developed and upsized "native" version/derivative of the AP1000. Westinghouse's co-development agreement gives China the IP rights for all co-developed plants >1350 MWe. First two units currently under construction at Shidao Bay. The CAP1400 is planned to be followed by a CAP1700 and/or a CAP2100 design if the cooling systems can be scaled up by far enough.
Areva EPR 1660 1750 4590 2018-06-29 Taishan[28]
OKB Gidropress VVER-1200/392M 1114 1180 3200 2016-08-05 Novovoronezh II[29][30] The VVER-1200 series is also known as the AES-2006/MIR-1200 design. This particular model was the original reference model used for the VVER-TOI project.
VVER-1200/491 1085 1199 3200 2018-03-09 Leningrad II[31]
VVER-1200/509 1114 1200 3200 Under construction in Akkuyu NPP, as Akkuyu 1 & 2. Grid connections due 2023[32] & 2024.[33]
VVER-1200/523 1080 1200 3200 2.4 GWe Rooppur Nuclear Power Plant of Bangladesh is under construction.The two units of VVER- 1200/523 generating 2.4 GWe are planned to be operational in 2023 and 2024.[34]
VVER-1200/513 ? 1200 3200 Standardized version of the VVER-1200 based in part on the VVER-1300/510 design (which is the current reference design for the VVER-TOI project). First unit expected to be completed by 2022 at Akkuyu, as Akkuyu 3.[35][needs update]
VVER-1300/510 1115 1255 3300 The VVER-1300 design is also known as the AES-2010 design, and is sometimes mistakenly designated as the VVER-TOI design. The VVER-1300/510 is based on the VVER-1200/392M that was originally used as the reference design for the VVER-TOI project, although the VVER-1300/510 now serves that role (which has led to confusion between the VVER-TOI plant design and the VVER-1300/510 reactor design). Multiple units are currently planned for construction at several Russian nuclear plants. First units under construction at Kursk Nuclear Power Plant.[36][37]
BARC IPHWR-700 PHWR 630 700 2166 2021 Successor of indigenous 540MWe PHWR with increased output and additional safety features. Under construction and due to come online in 2020. Unit 3 at Kakrapar Atomic Power Station achieved first criticality on 22 July 2020. The Unit 3 was connected to the grid on 10 January 2021.[38]

Generation III+ designs not adopted or built yet edit

Developer(s) Reactor name(s) Type MWe (net) MWe (gross) MWth Notes
Toshiba EU-ABWR BWR ? 1600 4300 Updated version of the ABWR designed to meet EU guidelines, increase reactor output, and improve design generation to III+.
Areva Kerena 1250 1290 3370 Previously known as the SWR-1000. Based on German BWR designs, mainly that of Gundremmingen units B/C. Co-developed by Areva and E.ON.
General Electric, Hitachi ESBWR 1520 1600 4500 Based on the unreleased SBWR design which in turn was based on the ABWR. Being considered for North Anna-3. Eschews the use of recirculation pumps entirely in favor of a design completely reliant on natural circulation (which is very unusual for a boiling water reactor design).
KEPCO APR+ PWR 1505 1560 4290 APR-1400 successor with increased output and additional safety features.
Areva, Mitsubishi ATMEA1 1150 ? 3150 Proposed Sinop plant did not proceed
OKB Gidropress VVER-600/498 ? 600 1600 Essentially a scaled-down VVER-1200. Commercial deployment planned by 2030 at Kola.
Candu Energy Inc. ACR-1000 PHWR 1085 1165 3200 The Advanced CANDU Reactor is a hybrid CANDU design that retains the heavy water moderator but replaces the heavy water coolant with conventional light water coolant, significantly reducing heavy water costs compared to traditional CANDU designs but losing the characteristic CANDU capability of using unenriched natural uranium as fuel.
BARC IPWR-900 PWR 900 ? 2700 India's first light water reactor, a Gen 3+ design based on the CLWR-B1 reactor of Arihant-class submarine.

See also edit

References edit

  1. ^ (PDF). January 2014. Archived from the original (PDF) on 25 June 2014.
  2. ^ "New material promises 120-year reactor lives". www.world-nuclear-news.org. Retrieved 8 June 2017.
  3. ^ "Advanced Nuclear Power Reactors | Generation III+ Nuclear Reactors - World Nuclear Association". www.world-nuclear.org. Retrieved 8 June 2017.
  4. ^ a b "Next-generation nuclear energy: The ESBWR" (PDF).
  5. ^ Forsythe, Jan (18 February 2009). 3 R's of Nuclear Power: Reading, Recycling, and Reprocessing: ...Making a Better Tomorrow for Little Joe. AuthorHouse. ISBN 9781438967318 – via Google Books.
  6. ^ "Fuel use for Gen III+ nuclear power". 26 October 2011.
  7. ^ "Gen III reactor design". Power Engineering. 6 April 2011. Retrieved 24 August 2020.
  8. ^ "Core catcher installation under way at Rooppur 1". World Nuclear News. Retrieved 5 June 2019.
  9. ^ "Russia completes world's first Gen III+ reactor; China to start up five reactors in 2017". Nuclear Energy Insider. 8 February 2017. Retrieved 10 July 2019.
  10. ^ Russian Federation Reactors, PRIS IAEA, 21 October 2022
  11. ^ "В России запустили не имеющий аналогов в мире атомный энергоблок". ТАСС.
  12. ^ People's Republic of China reactors, PRIS IAEA, 21 October 2022
  13. ^ "Design Certification Applications for New Reactors, update August 2020". U.S. Nuclear Regulatory Commission.
  14. ^ Adam Piore (June 2011). "Nuclear energy: Planning for the Black Swan". Scientific American. {{cite web}}: Missing or empty |url= (help)
  15. ^ a b Matthew L. Wald. Critics Challenge Safety of New Reactor Design New York Times, 22 April 2010.
  16. ^ "Sunday Dialogue: Nuclear Energy, Pro and Con". New York Times. 25 February 2012.
  17. ^ a b c d e (PDF). Union of Concerned Scientists. December 2007. Archived from the original (PDF) on 11 June 2014. Retrieved 1 October 2008.
  18. ^ "Flaw found in French nuclear reactor - BBC News". BBC News. 9 July 2015. Retrieved 29 October 2015.
  19. ^ Xing, Ji; Song, Daiyong; Wu, Yuxiang (1 March 2016). "HPR1000: Advanced Pressurized Water Reactor with Active and Passive Safety". Engineering. 2 (1): 79–87. doi:10.1016/J.ENG.2016.01.017.
  20. ^ "China's progress continues". Nuclear Engineering International. 11 August 2015. Retrieved 30 October 2015.
  21. ^ . Archived from the original on 2 January 2009.
  22. ^ "New Reactor Designs". Archived from the original on 11 December 2012. Retrieved 9 January 2009.
  23. ^ "Russia's Nuclear Fuel Cycle | Russian Nuclear Fuel Cycle - World Nuclear Association". world-nuclear.org.
  24. ^ "Blogging About the Unthinkable: The Future of Water-Cooled Graphite Reactors?". 21 April 2008.
  25. ^ "Реакторная установка МКЭР - 1500". reactors.narod.ru.
  26. ^ "First Westinghouse AP1000 Plant Sanmen 1 Begins Synchronization to Electrical Grid". Retrieved 2 July 2018.
  27. ^ SANMEN-2 PRIS database (accessed Nov 2021)
  28. ^ "China's Taishan 1 reactor connected to grid - World Nuclear News". www.world-nuclear-news.org.
  29. ^ "В России запустили не имеющий аналогов в мире атомный энергоблок".
  30. ^ "First VVER-1200 reactor enters commercial operation - World Nuclear News". www.world-nuclear-news.org. Retrieved 10 July 2019.
  31. ^ "Leningrad II-1 starts pilot operation". World Nuclear News. 9 March 2018. Retrieved 10 March 2018.
  32. ^ "Akkuyu 1". Power Reactor Information System (PRIS). International Atomic Energy Agency (IAEA). 24 September 2020. Retrieved 25 September 2020.
  33. ^ "Akkuyu 2". PRIS. IAEA. 24 September 2020. Retrieved 25 September 2020.
  34. ^ "Rooppur Nuclear Power Plant, Ishwardi". Power Technology.
  35. ^ "Akkuyu 3". Nuclear Engineering International. 11 March 2021.
  36. ^ "Bellona's experts oppose building a second nuclear power plant in Russia's Kursk Region". Bellona.org. 22 May 2015.
  37. ^ "На Курской АЭС-2 началось сооружение новых блоков". www.atominfo.ru.
  38. ^ "Unit 3 of Kakrapar nuclear plant synchronised to grid". Live Mint. 11 January 2021. Retrieved 30 September 2021.

External links edit

generation, reactor, reactors, class, nuclear, reactors, designed, succeed, generation, reactors, incorporating, evolutionary, improvements, design, these, include, improved, fuel, technology, higher, thermal, efficiency, significantly, enhanced, safety, syste. Generation III reactors or Gen III reactors are a class of nuclear reactors designed to succeed Generation II reactors incorporating evolutionary improvements in design These include improved fuel technology higher thermal efficiency significantly enhanced safety systems including passive nuclear safety and standardized designs intended to reduce maintenance and capital costs They are promoted by the Generation IV International Forum GIF Model of the Toshiba ABWR which became the first operational Generation III reactor in 1996 The first Generation III reactors to begin operation were Kashiwazaki 6 and 7 advanced boiling water reactors ABWRs in 1996 and 1997 From 2012 both have been shut down due to a less permissive political environment in the wake of the Fukushima nuclear accident Due to the prolonged period of stagnation in the construction of new reactors and the continued albeit declining popularity of Generation II II designs in new construction relatively few third generation reactors have been built Contents 1 Overview 2 Developments 2 1 First reactors 3 Response and criticism 4 Lists of Generation III reactors 4 1 Generation III reactors currently operational or under construction 4 2 Generation III designs not adopted or built yet 5 Lists of Generation III reactors 5 1 Generation III reactors currently operational or under construction 5 2 Generation III designs not adopted or built yet 6 See also 7 References 8 External linksOverview editThe older Gen II reactors comprise the vast majority of current nuclear reactors Gen III reactors are so called advanced light water reactors LWRs Gen III reactors are labeled as evolutionary designs Though the distinction between Gen II and III reactors is arbitrary few Gen III reactors have reached the commercial stage as of 2022 The Generation IV International Forum calls Gen IV reactors revolutionary designs These are concepts for which no concrete prognoses for realization existed at the time 1 The improvements in reactor technology in third generation reactors are intended to result in a longer operational life designed for 60 years of operation extendable to 100 years of operation prior to complete overhaul and reactor pressure vessel replacement compared with currently used Generation II reactors designed for 40 years of operation extendable to 60 years of operation prior to complete overhaul and pressure vessel replacement 2 3 The core damage frequencies for these reactors are designed to be lower than for Generation II reactors 60 core damage events for the European Pressurized Reactor EPR and 3 core damage events for the Economic Simplified Boiling Water Reactor ESBWR 4 per 100 million reactor years are significantly lower than the 1 000 core damage events per 100 million reactor years for BWR 4 Generation II reactors 4 The third generation EPR reactor was also designed to use uranium more efficiently than older Generation II reactors using approximately 17 less per unit of electricity generated than these older reactor technologies 5 An independent analysis conducted by environmental scientist Barry Brook on the greater efficiency and therefore lower material needs of Gen III reactors corroborates this finding 6 Developments edit nbsp EPR core catching room designed to catch the corium in case of a meltdown Some Generation III reactors include a core catcher in their design Gen III reactor designs are an evolutionary development of Gen III reactors offering improvements in safety over Gen III reactor designs Manufacturers began development of Gen III systems in the 1990s by building on the operating experience of the American Japanese and Western European light water reactor citation needed The nuclear industry began to promote a nuclear renaissance suggesting that Gen III designs should solve three key problems safety cost and buildability Construction costs of US 1 000 kW were forecast a level that would make nuclear competitive with gas and construction times of four years or less were expected However these estimates proved over optimistic citation needed A notable improvement of Gen III systems over second generation designs is the incorporation in some designs of passive safety features that do not require active controls or operator intervention but instead rely on gravity or natural convection to mitigate the impact of abnormal events citation needed nbsp Kakrapar Atomic Power Station Unit 3 and 4 under construction India s first Generation III reactorGeneration III reactors incorporate extra safety features to avoid the kind of disaster suffered at Fukushima in 2011 Generation III designs passive safety also known as passive cooling requires no sustained operator action or electronic feedback to shut down the plant safely in the event of an emergency Many of the Generation III nuclear reactors have a core catcher If the fuel cladding and reactor vessel systems and associated piping become molten corium will fall into a core catcher which holds the molten material and has the ability to cool it This in turn protects the final barrier the containment building As an example Rosatom installed a 200 tonne core catcher in the VVER reactor as the first large piece of equipment in the reactor building of Rooppur 1 describing it as a unique protection system 7 8 In 2017 Rosatom has started commercial operations of the NVNPP 2 Unit 1 VVER 1200 reactor in central Russia marking the world s first full start up of a generation III reactor 9 First reactors edit nbsp Novovoronezh Nuclear Power Plant II with the first Generation III nuclear reactor in the worldThe first Generation III reactors were built in Japan in the form of advanced boiling water reactors On 5 August 2016 a Generation III VVER 1200 392M reactor became operational first grid connection at Novovoronezh Nuclear Power Plant II in Russia 10 which was the first operational Generation III reactor 11 Several other Generation III reactors are under late stage construction in Europe China India and the United States The next Generation III reactors to come online were an AREVA EPR reactor at the Taishan Nuclear Power Station first grid connection on 2018 06 29 and a Westinghouse AP1000 reactor at the Sanmen Nuclear Power Station first grid connection on 2018 06 30 in China 12 In the United States reactor designs are certified by the Nuclear Regulatory Commission NRC As of August 2020 update the commission has approved seven new designs and is considering one more design as well as renewal of an expired certification 13 Response and criticism editProponents of nuclear power and some who have historically been critical have acknowledged that third generation reactors as a whole are safer than older reactors citation needed Edwin Lyman a senior staff scientist at the Union of Concerned Scientists has challenged specific cost saving design choices made for two Generation III reactors both the AP1000 and ESBWR Lyman John Ma a senior structural engineer at the NRC and Arnold Gundersen an anti nuclear consultant are concerned about what they perceive as weaknesses in the steel containment vessel and the concrete shield building around the AP1000 in that its containment vessel does not have sufficient safety margins in the event of a direct airplane strike 14 15 Other engineers do not agree with these concerns and claim the containment building is more than sufficient in safety margins and factors of safety 15 16 The Union of Concerned Scientists in 2008 referred to the EPR as the only new reactor design under consideration in the United States that appears to have the potential to be significantly safer and more secure against attack than today s reactors 17 7 There have also been issues in fabricating the precision parts necessary to maintain safe operation of these reactors with cost overruns broken parts and extremely fine steel tolerances causing issues with new reactors under construction in France at the Flamanville Nuclear Power Plant 18 Lists of Generation III reactors editGeneration III reactors currently operational or under construction edit Developer s Reactor name s Type MWe net MWe gross MWth NotesGeneral Electric Toshiba Hitachi ABWR US ABWR BWR 1350 1420 3926 In operation at Kashiwazaki since 1996 NRC certified in 1997 17 KEPCO APR 1400 PWR 1383 1455 3983 In operation at Kori since Jan 2016 CGNPG ACPR 1000 1061 1119 2905 Improved version of the CPR 1000 The first reactor came online in 2018 at Yangjiang 5 CGNPG CNNC Hualong One HPR 1000 1090 1170 3050 In part a merger of the Chinese ACPR 1000 and ACP 1000 designs but ultimately an incrementally developed improvement on the prior CNP 1000 and CP 1000 designs 19 It was initially intended to be named the ACC 1000 but was ultimately named as the Hualong One or HPR 1000 Fangchenggang Units 3 6 will be the first to utilize the HPR 1000 design with Units 3 amp 4 currently under construction as of 2017 update 20 OKBM Afrikantov VVER 1000 428 990 1060 3000 First version of the AES 91 design designed and used for Tianwan Units 1 amp 2 which came online in 2007 VVER 1000 428M 1050 1126 3000 Another version of the AES 91 design also designed and used for Tianwan this time for Units 3 amp 4 which came online in 2017 and 2018 respectively VVER 1000 412 917 1000 3000 First constructed AES 92 design used for the Kudankulam Generation III designs not adopted or built yet edit Developer s Reactor name s Type MWe net MWe gross MWth NotesGeneral Electric Hitachi ABWR II BWR 1638 1717 4960 Improved version of the ABWR Uncertain development status Mitsubishi APWR US APWR EU APWR APWR PWR 1600 1700 4451 Two units planned at Tsuruga cancelled in 2011 US NRC licensing for two units planned at Comanche Peak was suspended in 2013 The original APWR and the updated US APWR EU APWR also known as the APWR differ significantly in their design characteristics with the APWR having higher efficiency and electrical output Westinghouse AP600 600 619 NRC certified in 1999 17 Evolved into the larger AP1000 design 21 Combustion Engineering System 80 1350 1400 NRC certified in 1997 17 Provided a basis for the Korean APR 1400 22 OKBM Afrikantov VVER 1000 466 B 1011 1060 3000 This was the first AES 92 design to be developed originally intended to be built at the proposed Belene Nuclear Power Plant but construction was later halted Candu Energy Inc EC6 PHWR 750 2084 The EC6 Enhanced CANDU 6 is an evolutionary upgrade of previous CANDU designs Like other CANDU designs it is capable of using unenriched natural uranium as fuel AFCR 740 2084 The Advanced Fuel CANDU Reactor is a modified EC6 design that has been optimized for extreme fuel flexibility with the ability to handle numerous potential reprocessed fuel blends and even thorium It is currently undergoing late stage development as part of a joint venture between SNC Lavalin CNNC and Shanghai Electric Various see MKER Article MKER BWR 1000 2085 A Development of the RBMK nuclear power reactor Fixes all of the RBMK reactor s design errors and flaws and adds a full containment building and Passive nuclear safety features such as a passive core cooling system The physical prototype of the MKER 1000 is the 5th unit of the Kursk Nuclear Power Plant The construction of Kursk 5 was cancelled in 2012 and a VVER TOI whose construction is ongoing since 2018 is being built instead as of 2018 23 24 25 see RBMK article Lists of Generation III reactors editGeneration III reactors currently operational or under construction edit Developer s Reactor name s Type MWe net MWe gross MWth First grid connection NotesWestinghouse Toshiba AP1000 PWR 1117 1250 3400 2018 06 30 Sanmen 26 27 NRC certified Dec 2005 17 SNPTC Westinghouse CAP1400 1400 1500 4058 The first Chinese co developed and upsized native version derivative of the AP1000 Westinghouse s co development agreement gives China the IP rights for all co developed plants gt 1350 MWe First two units currently under construction at Shidao Bay The CAP1400 is planned to be followed by a CAP1700 and or a CAP2100 design if the cooling systems can be scaled up by far enough Areva EPR 1660 1750 4590 2018 06 29 Taishan 28 OKB Gidropress VVER 1200 392M 1114 1180 3200 2016 08 05 Novovoronezh II 29 30 The VVER 1200 series is also known as the AES 2006 MIR 1200 design This particular model was the original reference model used for the VVER TOI project VVER 1200 491 1085 1199 3200 2018 03 09 Leningrad II 31 VVER 1200 509 1114 1200 3200 Under construction in Akkuyu NPP as Akkuyu 1 amp 2 Grid connections due 2023 32 amp 2024 33 VVER 1200 523 1080 1200 3200 2 4 GWe Rooppur Nuclear Power Plant of Bangladesh is under construction The two units of VVER 1200 523 generating 2 4 GWe are planned to be operational in 2023 and 2024 34 VVER 1200 513 1200 3200 Standardized version of the VVER 1200 based in part on the VVER 1300 510 design which is the current reference design for the VVER TOI project First unit expected to be completed by 2022 at Akkuyu as Akkuyu 3 35 needs update VVER 1300 510 1115 1255 3300 The VVER 1300 design is also known as the AES 2010 design and is sometimes mistakenly designated as the VVER TOI design The VVER 1300 510 is based on the VVER 1200 392M that was originally used as the reference design for the VVER TOI project although the VVER 1300 510 now serves that role which has led to confusion between the VVER TOI plant design and the VVER 1300 510 reactor design Multiple units are currently planned for construction at several Russian nuclear plants First units under construction at Kursk Nuclear Power Plant 36 37 BARC IPHWR 700 PHWR 630 700 2166 2021 Successor of indigenous 540MWe PHWR with increased output and additional safety features Under construction and due to come online in 2020 Unit 3 at Kakrapar Atomic Power Station achieved first criticality on 22 July 2020 The Unit 3 was connected to the grid on 10 January 2021 38 Generation III designs not adopted or built yet edit Developer s Reactor name s Type MWe net MWe gross MWth NotesToshiba EU ABWR BWR 1600 4300 Updated version of the ABWR designed to meet EU guidelines increase reactor output and improve design generation to III Areva Kerena 1250 1290 3370 Previously known as the SWR 1000 Based on German BWR designs mainly that of Gundremmingen units B C Co developed by Areva and E ON General Electric Hitachi ESBWR 1520 1600 4500 Based on the unreleased SBWR design which in turn was based on the ABWR Being considered for North Anna 3 Eschews the use of recirculation pumps entirely in favor of a design completely reliant on natural circulation which is very unusual for a boiling water reactor design KEPCO APR PWR 1505 1560 4290 APR 1400 successor with increased output and additional safety features Areva Mitsubishi ATMEA1 1150 3150 Proposed Sinop plant did not proceedOKB Gidropress VVER 600 498 600 1600 Essentially a scaled down VVER 1200 Commercial deployment planned by 2030 at Kola Candu Energy Inc ACR 1000 PHWR 1085 1165 3200 The Advanced CANDU Reactor is a hybrid CANDU design that retains the heavy water moderator but replaces the heavy water coolant with conventional light water coolant significantly reducing heavy water costs compared to traditional CANDU designs but losing the characteristic CANDU capability of using unenriched natural uranium as fuel BARC IPWR 900 PWR 900 2700 India s first light water reactor a Gen 3 design based on the CLWR B1 reactor of Arihant class submarine See also edit nbsp Nuclear technology portalGeneration II reactor Generation IV reactor List of reactor typesReferences edit Technology Roadmap Update for Generation IV Nuclear Energy Systems PDF January 2014 Archived from the original PDF on 25 June 2014 New material promises 120 year reactor lives www world nuclear news org Retrieved 8 June 2017 Advanced Nuclear Power Reactors Generation III Nuclear Reactors World Nuclear Association www world nuclear org Retrieved 8 June 2017 a b Next generation nuclear energy The ESBWR PDF Forsythe Jan 18 February 2009 3 R s of Nuclear Power Reading Recycling and Reprocessing Making a Better Tomorrow for Little Joe AuthorHouse ISBN 9781438967318 via Google Books Fuel use for Gen III nuclear power 26 October 2011 Gen III reactor design Power Engineering 6 April 2011 Retrieved 24 August 2020 Core catcher installation under way at Rooppur 1 World Nuclear News Retrieved 5 June 2019 Russia completes world s first Gen III reactor China to start up five reactors in 2017 Nuclear Energy Insider 8 February 2017 Retrieved 10 July 2019 Russian Federation Reactors PRIS IAEA 21 October 2022 V Rossii zapustili ne imeyushij analogov v mire atomnyj energoblok TASS People s Republic of China reactors PRIS IAEA 21 October 2022 Design Certification Applications for New Reactors update August 2020 U S Nuclear Regulatory Commission Adam Piore June 2011 Nuclear energy Planning for the Black Swan Scientific American a href Template Cite web html title Template Cite web cite web a Missing or empty url help a b Matthew L Wald Critics Challenge Safety of New Reactor Design New York Times 22 April 2010 Sunday Dialogue Nuclear Energy Pro and Con New York Times 25 February 2012 a b c d e Nuclear Power in a warming world PDF Union of Concerned Scientists December 2007 Archived from the original PDF on 11 June 2014 Retrieved 1 October 2008 Flaw found in French nuclear reactor BBC News BBC News 9 July 2015 Retrieved 29 October 2015 Xing Ji Song Daiyong Wu Yuxiang 1 March 2016 HPR1000 Advanced Pressurized Water Reactor with Active and Passive Safety Engineering 2 1 79 87 doi 10 1016 J ENG 2016 01 017 China s progress continues Nuclear Engineering International 11 August 2015 Retrieved 30 October 2015 New Commercial Reactor Designs Archived from the original on 2 January 2009 New Reactor Designs Archived from the original on 11 December 2012 Retrieved 9 January 2009 Russia s Nuclear Fuel Cycle Russian Nuclear Fuel Cycle World Nuclear Association world nuclear org Blogging About the Unthinkable The Future of Water Cooled Graphite Reactors 21 April 2008 Reaktornaya ustanovka MKER 1500 reactors narod ru First Westinghouse AP1000 Plant Sanmen 1 Begins Synchronization to Electrical Grid Retrieved 2 July 2018 SANMEN 2 PRIS database accessed Nov 2021 China s Taishan 1 reactor connected to grid World Nuclear News www world nuclear news org V Rossii zapustili ne imeyushij analogov v mire atomnyj energoblok First VVER 1200 reactor enters commercial operation World Nuclear News www world nuclear news org Retrieved 10 July 2019 Leningrad II 1 starts pilot operation World Nuclear News 9 March 2018 Retrieved 10 March 2018 Akkuyu 1 Power Reactor Information System PRIS International Atomic Energy Agency IAEA 24 September 2020 Retrieved 25 September 2020 Akkuyu 2 PRIS IAEA 24 September 2020 Retrieved 25 September 2020 Rooppur Nuclear Power Plant Ishwardi Power Technology Akkuyu 3 Nuclear Engineering International 11 March 2021 Bellona s experts oppose building a second nuclear power plant in Russia s Kursk Region Bellona org 22 May 2015 Na Kurskoj AES 2 nachalos sooruzhenie novyh blokov www atominfo ru Unit 3 of Kakrapar nuclear plant synchronised to grid Live Mint 11 January 2021 Retrieved 30 September 2021 External links editNuclear Reactors Knowledge Base IAEA Advanced Nuclear Power Reactors Archived 6 February 2010 at the Wayback Machine World Nuclear Association May 2008 Retrieved from https en wikipedia org w index php title Generation III reactor amp oldid 1207539256, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.