fbpx
Wikipedia

North–South railway (Vietnam)

The North–South railway (Vietnamese: Đường sắt Bắc–Nam, French: Chemin de fer Nord-Sud) is the principal railway line serving the country of Vietnam. It is a single-track metre gauge line connecting the capital Hanoi in the north to Ho Chi Minh City in the south, for a total length of 1,726 km (1,072 mi). Trains travelling this line are sometimes referred to as the Reunification Express (referring to the Reunification of Vietnam), although no particular train carries this name officially.[1] The line was established during French colonial rule, and was completed over a period of nearly forty years, from 1899 to 1936.[2] As of 2005, 191 of Vietnam's 278 railway stations were located along the North–South line.[3][4]

North–South railway
The North - South railway line through Quang Nam
Overview
StatusOperational
OwnerVietnam Railways
LocaleVietnam
Termini
Stations175
Websitehttps://dsvn.vn/
Service
Type
SystemVietnam Railways
Services16 trains per day (80-85 trains per day for holidays, Tết)
Route numberĐSBN
Operator(s)Vietnam Railways
Depot(s)Hanoi
Vinh
Dong Hoi
Da Nang
Dieu Tri station
Nha Trang
Binh Thuan
Saigon
Rolling stockD9E, D13E, D19E, D20E
History
Opened1936
Built byFrench Colonial Administration
Technical
Line length1,726 km (1,072 mi)
Number of tracksSingle-track railway
CharacterAt-grade
Track gauge1,000 mm (3 ft 3+38 in) metre gauge
Minimum radius≥800m/≥400m
ElectrificationNo
Operating speed100 km/h (62 mph)
SignallingETCS Level 2
Maximum incline≤6‰/≤9‰
Route map

0,000
5
Giáp Bát
9
Văn Điển
to Hà Đông
18
Thường Tín
26
Chợ Tía
30
Vạn Điểm
34
Phú Xuyên
border
45
Đồng Văn
56
Phủ Lý
67
Bình Lục
73
Cầu Họ
81
Đặng Xá
0,087
94
Trình Xuyên
101
Núi Gôi
108
Cát Đằng
115
Ninh Bình
121
Cầu Yên
125
Ghềnh
134
Đồng Giao
142
Bỉm Sơn
153
Đò Lèn
161
Nghĩa Trang
0,176
188
Yên Thái
197
Minh Khôi
207
Thị Long
219
Văn Trai
229
Khoa Trường
238
Trường Lâm
245
Hoàng Mai
Hoàng Mai River
261
Cầu Giát
for Thái Hoà
Lạch Vạn River
272
Yên Lý
279
Chợ Sy
292
Mỹ Lý
Cua Lo River
309
Quán Hành
0,319
330
Yên Xuân
338
Yên Trung
345
Đức Lạc
352
Yên Duệ
358
Hòa Duyệt
370
Thanh Luyện
381
Chu Lễ
386
Hương Phố
397
Phúc Trạch
405
La Khê
409
Tân Ấp
Tân Ấp–Xóm Cục Railway
415
Đồng Chuối
426
Kim Lũ
437
Đồng Lê
450
Ngọc Lâm
453
Minh Cam
459
Lạc Sơn
468
Lệ Sơn
482
Minh Lệ
Côn River
489
Ngân Sơn
499
Thọ Lộc
511
Phúc Tự
0,522
529
Lệ Kỳ
539
Long Đại
551
Mỹ Đức
558
Phú Hòa
565
Mỹ Trạch
572
Thượng Lâm
588
Sa Lung
592
Vĩnh Thủy
599
Tiên An
609
Hà Thanh
622
Đông Hà
634
Quảng Trị
643
Diên Sanh
652
Mỹ Chanh
660
Phò Trạch
670
Hiền Sỹ
678
Văn Xá
684
An Hoa
0,688
691
An Cựu
699
Hương Thuỷ
702
Phù Bài
708
Nong
715
Truồi
724
Đá Bạc
729
Cầu Hai
732
Nước Ngọt
742
Thừa Lưu
755
Lăng Cô
761
Hải Vân Bắc
766
Hải Vân
772
Hải Vân Nam
776
Liên Chiểu
777
Kim Liên
788
Thanh Khê
0,791
794
Liên Trì
799
Phong Lệ
Cam Le River
804
Lệ Trạch
814
Nông Sơn
819
Gò Nổi
820
Chiêm Sơn
825
Trà Kiệu
842
Phú Cang
857
An Mỹ
865
Tam Kỳ
928
Quảng Ngãi
1,096
Diêu Trì
1,315
1,408
Tháp Chàm
1,455
Vĩnh Hảo
1,551
Mương Mán
Phan Thiết
1,697
1,707
Dĩ An
1,711
Sóng Thần
1,713
Thủ Đức
1,718
Bình Triệu
1,722
Gò Vấp
1,726
Saigon

From World War II through to the Vietnam War, the entire North–South railway sustained major damage from bombings and sabotage.[5] Owing to this damage, and to a subsequent lack of capital investment and maintenance, much of the infrastructure along the North–South railway remains outdated or in poor condition; in turn, lack of infrastructure development has been found to be a root cause for railway accidents along the line, including collisions at level crossings and derailments. Recent rehabilitation projects, supported by official development assistance, have improved the safety and efficiency of the line. As of 2007, 85% of the network's passenger volume and 60% of its cargo volume was transported along the line.[6] The national railway company, Vietnam Railways, owns and operates the line.

Overview edit

 
A train stops at Huế station on North-South railway

For the most part, this 1,726 km (1,072 mi) long metre gauge line follows the coastline of Vietnam, beginning in Ha Noi, passing through the provinces of Hà Nam, Nam Đinh, Ninh Bình, Thanh Hóa, Nghệ An (Vinh), Hà Tĩnh, Quảng Bình (Đồng Hới), Quảng Trị (Đông Hà), Thừa Thiên–Huế (Huế), Da Nang, Quảng Nam, Quảng Ngãi, Bình Định, Phú Yên, Khánh Hòa (Nha Trang), Ninh Thuận, Bình Thuận (Phan Thiết), Đồng Nai and Binh Dương, before coming to an end in Ho Chi Minh City.[6][7] Trains taking this route pass through a number of areas recognized for their beauty, such as the Hải Vân Pass and Lăng Cô Peninsula near Huế, and Vân Phong Bay near Nha Trang. Typical journeys from one end of the line to the other last about 30 hours.[8] Passengers arriving in Hanoi are able to transfer to several other railway lines, leading to Haiphong, Hạ Long Bay, Thái Nguyên, Lào Cai, Lạng Sơn and the People's Republic of China.

As of 2007, 85% of the network's passenger traffic and 60% of its cargo traffic was transported along the North–South line, corresponding to 3,960.6 million person-km and 2,329.5 million ton-km, respectively.[nb 1] These proportions are only slightly different from those recorded in the early 1990s; 1993 figures reported 82% of passenger traffic and 66% of cargo traffic along the line.[6]

Passenger service edit

Daily passenger service is provided along the entire North–South railway by state railway company Vietnam Railways. Express service links Hanoi and Ho Chi Minh City, making stops at major stations; local service is also provided along shorter portions of the line, such as from Hanoi to Vinh, Vinh to Đồng Hới, Vinh to Quy Nhon, and so on. The following trains run regularly along the line (each line represents a pair of trains, one southbound and the other northbound):[9]

Train Type From To Length Notes
SE1/SE2 Express Hanoi Ho Chi Minh City 34 hrs, 40 mins Stops at Nam Định, Thanh Hóa, Vinh, Đồng Hới, Dong Ha, Huế, Lang Co, Da Nang, Tam Ky, Quảng Ngãi, Dieu Tri, Tuy Hòa, Nha Trang, Thap Cham, Muong Man
SE3/SE4 Express Hanoi Ho Chi Minh City 29 hrs, 30 mins Stops at Vinh, Đồng Hới, Huế, Da Nang, Dieu Tri, Nha Trang
SE5/SE6 Express Hanoi Ho Chi Minh City 32 hrs Stops at Phủ Lý, Nam Định, Ninh Bình, Thanh Hóa, Vinh, Đồng Hới, Huế, Da Nang, Quảng Ngãi, Dieu Tri, Nha Trang, Thap Cham, Muong Man, Bien Hoa
TN1/TN2 Local Hanoi Ho Chi Minh City 40 hrs, 50 mins
TN3/TN4 Local Hanoi Ho Chi Minh City 40 hrs, 45 mins
TN5/TN6 Local Hanoi Ho Chi Minh City 40 hrs, 10 mins
TN7/TN8 Local Hanoi Ho Chi Minh City 40 hrs, 25 mins
NA1/NA2 Local Hanoi Vinh
NA3/NA4 Local Hanoi Vinh
TH1/TH2 Local Giap Bat Thanh Hóa
VD31/VD32 Local Vinh Đồng Hới OUT OF SERVICES
DH41/DH42 Local Đồng Hới Huế OUT OF SERVICES
VQ1/VQ2 Local Vinh Quy Nhon

Freight service edit

Vietnam Railways provides daily freight transport, mainly between Hanoi and Ho Chi Minh City; freight service ending at Da Nang is also offered. The following trains run regularly along the line (each line represents a pair of trains, one southbound and the other northbound):[10]

Train From To Notes
GS1/GS2 Giáp Bát (Hanoi) Sóng Thần (HCMC) 4-day itinerary
SBN1/SBN2 Giáp Bát (Hanoi) Sóng Thần (HCMC) 4-day itinerary
HBN1/HBN2 Giáp Bát (Hanoi) Sóng Thần (HCMC)
HBN3/HBN4 Giáp Bát (Hanoi) Sóng Thần (HCMC)
ASY1/ASY2 Giáp Bát (Hanoi) Sóng Thần (HCMC)
AH1/AH2 Giáp Bát (Hanoi) Sóng Thần (HCMC)
HSD1/HSD2 Da Nang Ho Chi Minh City
HSK1/HSK2 Kim Lien (Da Nang) Sóng Thần (HCMC)
4 digits number Giáp Bát (Hanoi) Sóng Thần (HCMC)

History edit

 
The progressive construction of Vietnam's railway system, 1881–1966.

In 1895, outgoing Governor-General of French Indochina Jean Marie de Lanessan, convinced of the necessity of building railways to connect the different parts of Indochina, urged his successors to give priority to the construction of a north–south railway connecting Hanoi and Saigon, calling it "the backbone of Indochina" from which all other routes would radiate.[nb 2] It was Paul Doumer, who was appointed as Governor-General in 1897, who put de Lanessan's call into action. Soon after his appointment, Doumer submitted an overarching proposal for railway development in Indochina, including plans for what would eventually become the Yunnan–Vietnam Railway and the North–South railway. The French government approved the construction of the entire Yunnan line and several sections of the North–South line, approving a loan of 200 million francs within the following year. Work began swiftly thereafter, with the Phu Lang Thuong—Lạng Sơn line being upgraded and extended from Hanoi to the Chinese border at Dong Dang by 1902, and the first section of the Yunnan line between Hanoi and Haiphong opening in the same year.[11][12][13]

Construction of the first sections of the North–South railway itself began in 1899, and lasted over thirty years, with individual sections completed serially. The first section to be laid down was the Hanoi–Vinh section, built from 1899 to 1905. Next to be built was the Nha Trang–Saigon section from 1905 to 1913; the Saigon–Tan Linh portion was opened in 1908, followed by the Tan Linh–Nha Trang portion in 1913. During this time, tracks were also laid around the city of Huế, leading south to Tourane, and north to Đông Hà. The Huế–Tourane section opened in 1906, and the Huế–Dong Ha line opened in 1908. The Vinh-Huế section was constructed from 1913 to 1927, and finally, the remaining Huế–Nha Trang section was constructed from 1930 to 1936.[2][6][11] On 2 October 1936, the entire 1,726 km (1,072 mi) Hanoi–Saigon link was formally put into full operation.

As elsewhere in the world, the railways were the sites of active union and labor organization.[14]

The first journeys from end to end of the newly completed line, dubbed the Transindochinois ("Trans-Indochinese"), generally took about 60 hours, or two days and three nights.[15] This decreased to about 40 hours by the late 1930s, with trains travelling at an average speed of 43 km/h (27 mph).[5] Trains were generally pulled by French Pacific or Mikado locomotives, and included dining cars and sleeping cars (voitures-couchettes).[12]

Wartime edit

After the Japanese invasion of French Indochina during World War II, Japanese forces used the Vietnamese railway system extensively, inviting sabotage by the Viet Minh as well as American bombing from the air. Following the exit of the Japanese at the end of the war, efforts were made to repair the seriously damaged North–South line.

Shortly after World War II ended, however, the First Indochina War began, and the Viet Minh's sabotage of the rail system continued, this time against the armies of the French Union.[5] In response, the French began using the armed armoured train La Rafale as both a cargo-carrier and a mobile surveillance unit.[16][17] In February 1951 the first Rafale was in service on the Saigon-Nha Trang section of the North–South line.[18][19] Use of the Rafale failed to deter the Viet Minh guerrillas, however, who continued sabotaging the line, making off with its rails under cover of night and creating a 300 km (190 mi) rail network between Ninh Hoa and Da Nang, in a Viet Minh-controlled area.[5] In 1953, the guerrillas attacked La Rafale itself, mining and destroying stone bridges as they passed by.[20] In 1954, following the signature of Geneva Accords, Vietnam was temporarily divided into two parts: the communist North and anti-communist South. The North–South railway was bisected accordingly at Hiền Lương Bridge, a bridge over the Bến Hải River in Quảng Trị Province.[2]

 
A repair crew installs new railway tracks in South Vietnam.

Throughout the Vietnam War, the North–South railway was a target of bombardments and sabotage by both North Vietnamese and South Vietnamese forces. The South, supported with the United States, reconstructed the track between Saigon and Huế in the late 1950s, a distance of 1,041 km (647 mi). Nevertheless, a relentless campaign of intense bombing and sabotage by the Viet Cong and North Vietnamese regular units resulted in the South Vietnamese railway system being unable to carry significant tonnages. 795 attacks were launched between 1961 and 1964 alone, eventually forcing the South to abandon many large sections of the track.[5] The U.S. Army operating in South Vietnam had considerable interest in the North–South line because of the potential it offered in the bulk movement of cargo at low rates. The system was used to support the Military Assistance Command, Vietnam, construction program and transported hundreds of thousands of tons of rock and gravel to air base and highway sites.[21]

In North Vietnam, American bombing of railways was concentrated on key targets such as railway bridges, both along the North–South railway and along the lines north of Hanoi, such as the Hanoi–Lào Cai and Hanoi–Dong Dang lines. Operation Rolling Thunder was the first large-scale bombing campaign carried out by the U.S. Air Force, taking place from March 2, 1965 until November 1, 1968, when US President Lyndon B. Johnson temporarily called off air raids. Large-scale air raids resumed from May 9 to October 23, 1972, for Operation Linebacker, and again from December 18–29, 1972, for Operation Linebacker II, with fewer target restrictions than Rolling Thunder.

 
Thanh Hóa Bridge, damaged by smart bombs.

A particularly difficult target for the U.S. Air Force was the Thanh Hóa Bridge, a well-defended combined road/rail bridge in Thanh Hóa Province. One of the first attacks on the bridge took place on April 3–4, 1965. Despite dropping 239 tons of bombs on the bridge during the raid, the bridge remained serviceable; additionally, three American F-105 aircraft were shot down during the raid.[22][23] The U.S. Navy also conducted Alpha strikes on the bridge. Several times, traffic over the bridge was interrupted, but every time, the North Vietnamese dutifully repaired the damage. The bridge was eventually destroyed by laser-guided smart bombs during separate raids on April 27 and May 13, 1972, as part of Operation Linebacker.

After the Fall of Saigon on 30 April 1975, the Communist government of the newly unified Vietnam took control of the former South Vietnamese railway. Heavily damaged, the war-torn North–South railway line was nevertheless restored and returned to service on 31 December 1976, promoted as a symbol of Vietnamese unity. In the short time between the surrender of the South and the reopening of the line, 1334 bridges, 27 tunnels, 158 stations and 1370 switches had been repaired.[5] Other railway lines that once existed, such as the Da Lat–Thap Cham Railway, were dismantled during this period to provide materials for the repair of the main line.[24]

Accidents and incidents edit

On 10 March 2015 D19E locomotive No. 968 was written off in an accident near Dien Sanh when it was hauling a passenger train that was in collision with a lorry on a level crossing.

On 7 August 2023, rocks collapsed at km 455 in Quang Binh in a tunnel, leading to massive delays (up to 16 hours 26 minutes). This happened during maintenance of the tunnel.[25]

Stations edit

List of stations edit

This abridged list includes all major stations[nb 3] with timetabled services. As of 2005, there were 278 stations on the Vietnamese railway network,[4] of which 191 were located along the North–South line.[3]

Km Station Region Province City/Dist./Ward Opened Notes Photo
0 Hanoi Red River Delta  Hanoi Hoan Kiem District, Hanoi 1902[26] Interchange for Hanoi–Haiphong, Hanoi–Thái Nguyên, Hanoi–Lào Cai, Hanoi–Đồng Đăng lines  
5 Giáp Bát Red River Delta Hanoi Hoang Mai District, Hanoi Freight station
 
56 Phủ Lý Red River Delta Hà Nam Hai Ba Trung Ward, Phủ Lý  
87 Nam Định Red River Delta Nam Định Nam Định Photo
115 Ninh Bình Red River Delta Ninh Bình Thanh Binh Ward, Ninh Bình  
176 Thanh Hóa North Central Coast Thanh Hóa Tan Son Ward, Thanh Hóa  
319 Vinh North Central Coast Nghệ An Lê Lợi Ward, Vinh 1905[27]  
522 Đồng Hới North Central Coast Quảng Bình Nam Ly Ward, Đồng Hới  
622 Đông Hà North Central Coast Quảng Trị Đông Hà
 
688 Huế North Central Coast Thua Thiên-Huế Huế 1906[28]  
777 Kim Lien South Central Coast Da Nang Freight station
791 Đà Nẵng South Central Coast Da Nang Thanh Khe District 1902[29]  
865 Tam Kỳ South Central Coast Quảng Nam An Xuan Ward, Tam Ky  
928 Quảng Ngãi South Central Coast Quảng Ngãi Quang Phu Ward, Quảng Ngãi  
1096 Diêu Trì South Central Coast Bình Định Diêu Trì, Tuy Phước District For Quy Nhơn  
1096* Quy Nhơn South Central Coast Bình Định Quy Nhơn  
1198 Tuy Hòa South Central Coast Phú Yên Ward 2, Tuy Hòa  
1315 Nha Trang South Central Coast Khánh Hòa Phuoc Tan Ward - Nha Trang 1936  
1408 Tháp Chàm  South Central Coast Ninh Thuận My Huong Ward, Phan Rang – Tháp Chàm Interchange for Da Lat–Thap Cham line[nb 4]  
1551 Bình Thuận South Central Coast Bình Thuận Muong Man For Phan Thiết  
1697 Biên Hòa Southeast Đồng Nai Trung Dung Ward, Biên Hòa
 
1711 Sóng Thần Southeast Ho Chi Minh City An Binh, Di An District Freight station Photo
1726 Sai Gon Southeast Ho Chi Minh City  Ward 9, District 3 1983[nb 5]  

Infrastructure edit

 
Tracks at a level crossing near Mỹ Sơn

Most of Vietnam's railway infrastructure—including bridges, rail trucks, track beds, rolling stock, signals and communication equipment, and maintenance facilities—has suffered severe deterioration, mainly due to damage inflicted during the Vietnam War and a subsequent lack of capital investment and maintenance. More recently, rehabilitation projects sustained by official development assistance have allowed some of the most critical pieces of infrastructure along the line to be replaced, although much work still remains to be done.[6] Complicating rehabilitation work is seasonal flooding, which, depending on its severity, may cause significant infrastructure damage. For instance, heavy rains falling on Vietnam's north central coast in October 2010 swept away several sections of track in Hà Tĩnh and Quảng Bình provinces; the flooding of many of the nearby provincial roads, which remained several metres underwater, prevented repair crews from reaching the affected sections for weeks.[30][31][32]

Tracks edit

The North–South railway line uses metre gauge, as was commonly used on local railways in France around the time of its construction.[7][33]

Bridges edit

 
Long Biên Bridge, a famous railway bridge in Vietnam in Hanoi.

Vietnam Railways reports the number of railway bridges along the North–South line to be 1,300, totalling about 28,000 m (92,000 ft), or about 63% of the national total. Considering both standard rail bridges and combined bridges, the total length along the North–South line is about 36,000 m (118,000 ft).[6][7] Many railway bridges are severely worn from age and have damage dating from the Vietnam War, despite temporary restoration following the war. As of 2007, 278 bridges requiring major rehabilitation remain along the North–South Railway line.[6]

Tunnels edit

A Vietnam Railways train passes through a tunnel north of Quy Nhơn.

There are 27 railway tunnels along the North–South line, amounting to a total length of 8,335 m (27,346 ft).[7] Certain tunnels are inadequately drained and suffer from deterioration in the tunnel lining, causing water leaks that necessitate reductions in speed.[2]

Signalling edit

The North–South railway line uses a semi-automatic block system, which allows individual signals to work either as automatic signals or manual signals.[7] According to a joint Japanese-Vietnamese evaluation team, the recent installation of additional auto-signal systems at key crossings along the line has contributed to a decline in railway accidents.[6]

Communications edit

Since 1998, microband Asynchronous Transfer Mode technology has been used along the North–South railway line to send television signals; 64 kbit/s transmission lines are leased from the Vietnam Post and Telecommunications Corporation (VPTC). Along some sections of the line—for example, from Hanoi to Vinh and from Nha Trang to Ho Chi Minh City—a fiber-optic network has been deployed; Vietnam Railways intends to extend the network along the remaining distance from Vinh to Nha Trang. A switching system featuring digital exchanges is in place, connected via the existing transmission system and the public telephone network. As the modernization of the telecommunication system progresses, manual exchanges are gradually being replaced with digital exchanges.[4][7]

Safety edit

 
An unprotected level crossing in Da Nang.

Along the North–South railway line, 3,650 level crossings were counted, 3,000 (or 82%) of which had no barriers, alarm systems or guards.[34] As a result, accidents involving vehicles and pedestrians have occurred. A researcher from Villanova University noted "There are numerous safety issues with level crossings...usually, an accident occurs every day."[35] Many rail bridges and tunnels have suffered deterioration since the 1970s, requiring trains passing over or through them to reduce speeds as low as 15 kilometres per hour (9.3 mph).[2] In addition, the center of the country is subject to violent annual flooding and bridges are often swept away, causing lengthy closures.[6]

Along with recent efforts aimed at infrastructure rehabilitation, the recent adoption of safety measures by Vietnam Railways has led to a decline in railway accidents. These measures include: public awareness campaigns on railway safety in the media; construction of fences and safety barriers at critical level crossings in major cities; mobilization of volunteers for traffic control at train stations and level crossings, especially during holiday seasons; the installation of additional auto-signal systems; and the construction of flyovers and underpasses to redirect traffic.[6]

Infrastructure rehabilitation edit

The condition of railway infrastructure in Vietnam, although improving, is still poor enough overall to require rehabilitation. Rail transport only became a national priority for the Vietnamese government around the mid-1990s, at which point most of the railway network was severely degraded, having received only temporary repair from damages suffered during decades of war.[6][36]

 
Railroad workers in Da Nang.

From 1994 to 2005, a major bridge rehabilitation project took place on the North–South railway line, with the Pacific Consultants International Group and Japan Transportation Consultants providing consultancy services. The overall project cost was JPY 11,020 million, or 18% less than the budgeted cost. The overall results of the project included a reduction in running hours from one end of the line to the other (from 36 hours in 1994 to 29 hours in 2007); an increase of speed limits on rehabilitated bridges (from 15 to 30 km/h (9.3 to 18.6 mph) to 60 to 80 km/h (37 to 50 mph), which contributed to the reduction in running hours; and a reduction in the number of railway accidents throughout the line.[6]

In 2007, Vietnam Railways awarded an additional VND 150 billion (US$9.5 million) five-year contract for consultancy services to Japan Transportation Consultants, the Pacific Consultants International Group, and the Japan Railway Technical Service (Jarts), regarding a VND 2.47 trillion project to further improve bridge and railway safety on the North–South line. The project's goals include the refurbishment of 44 bridges and 37.6 km (23.4 mi) of railway tracks, the building of two new railway bridges and a new railway station at Ninh Bình, and the purchase of 23 track machines. The project was expected to be completed in 2010.[37]

Development edit

 
Japanese Shinkansen technology has been suggested for use on the proposed North–South Express Railway. (Photo: Taiwan High Speed Rail)

North–South Express Railway edit

National railway company Vietnam Railways has proposed a high-speed rail link between Hanoi and Ho Chi Minh City, capable of running at 300 to 350 km/h (186 to 217 mph). Funding of the $56 billion line would mainly come from the Vietnamese government; reports suggest Japanese development aid could be made available in stages, conditioned on the adoption of Shinkansen technology.[38][39] Once completed, the high-speed rail line would allow trains to complete the Hanoi-Ho Chi Minh City journey in approximately 6 hours.[40] Vietnam's National Assembly rejected the existing plan for the line in June 2010, and asked for further study of the project.[41]

Gallery edit

See also edit

Notes and references edit

Notes
  1. ^ Transport statistics for rail transport in 2007 report a traffic volume of 4,659.5 million person-km for passenger rail traffic and 3,882.5 million ton-km for freight rail traffic. Volume of freight traffic by type of transport, Volume of passengers traffic by type of transport. General Statistics Office of Vietnam.
  2. ^ "De la voie principale s'étendant ainsi de la frontière de Chine à Saïgon et représentant en quelque sorte l'épine dorsale de l'Indo-Chine, toutes les autres routes ou voies ferrées partent naturellement pour s'enfoncer en toutes directions jusqu'aux limites du pays, les unes pénétrant du côté de la Chine, les autres vers le Mékong, à travers le Laos." (La Colonisation française en Indo-Chine. Jean Marie Antoine de Lanessan. 1895. p.329.)
  3. ^ For the purpose of this list, major stations are defined as stations at which SE5/SE6-class passenger trains make regular stops lasting two or more minutes. Freight terminals have also been included. See Passenger Transport Business 2011-06-29 at the Wayback Machine and Vận tải hàng hoá (Cargo transport) 2011-06-04 at the Wayback Machine (Vietnam Railways), as well as the official Vietnam Railways timetable (Page 1 2011-06-29 at the Wayback Machine, Page 2 2011-06-29 at the Wayback Machine, Page 3 2011-06-29 at the Wayback Machine, Page 4 2011-06-29 at the Wayback Machine, Page 5 2011-06-29 at the Wayback Machine (in Vietnamese)).
  4. ^ Defunct or partially defunct line.
  5. ^ The original Saigon Station, located at Bến Thành Market, was built in 1881. (. Archived from the original on 2011-06-29. Retrieved 2010-07-22.) The station currently in use as "Saigon Railway Station", located in Ho Chi Minh City's District 3, was originally known as Hoa Hung Depot, and was used mainly as a freight station; it was converted for use as a passenger station in 1983. ( (in Vietnamese). Archived from the original on 2010-05-05. Retrieved 2010-06-30.)
References
  1. ^ "Train travel in Vietnam". Seat61. Retrieved 22 June 2010.
  2. ^ a b c d e (PDF). November 2006. Archived from the original (PDF) on 2011-06-07. Retrieved 2010-06-27.
  3. ^ a b "Các ga trên tuyến đường sắt Thống Nhất" (Railway stations on the North–South railway), Page 1 2011-01-13 at the Wayback Machine–Page 2 2011-01-13 at the Wayback Machine (in Vietnamese)
  4. ^ a b c . Vietnam Railways. Archived from the original on 2010-04-14. Retrieved 2010-06-24.
  5. ^ a b c d e f Nick Ray; Yu-Mei Balasingamchow; Iain Stewart (2009). Vietnam. Lonely Planet. ISBN 9781742203898. Retrieved 2010-07-23.
  6. ^ a b c d e f g h i j k l "Hanoi-Ho Chi Minh City Railway Bridge Rehabilitation Project" (PDF). Japan International Cooperation Agency. 2007. Retrieved 2010-06-30.
  7. ^ a b c d e f . Vietnam Railways. Archived from the original on 2010-04-18. Retrieved 2010-06-29.
  8. ^ . Vietnam Railways. Archived from the original on 2008-05-10. Retrieved 2008-05-10. Check the timetable from Ha Noi to Sai Gon (or vice versa) to see journey times.
  9. ^ Passenger Transport Business 2011-06-29 at the Wayback Machine. Vietnam Railways.
  10. ^ Vận tải hàng hoá (Cargo transport) 2011-06-04 at the Wayback Machine. Vietnam Railways.
  11. ^ a b Les chemins de fer de l'Indochine française. Arnaud Georges. In: Annales de Géographie. 1924, t. 33, n°185. pp. 501-503.
  12. ^ a b "Indian Mail: International". Retrieved 2010-06-28.
  13. ^ (in Vietnamese). Archived from the original on 2010-12-14. Retrieved 2010-06-30.
  14. ^ David Del Testa, "Vietnamese railway workers during the revolutionary high tide." South East Asia Research, Volume 19, Number 4, December 2011, pp. 787-816(30)
  15. ^ Hoàng Cơ Thụy. Việt sử khảo luận. Paris: Nam Á, 2002. p.1495.
  16. ^ Le 5e Régiment du Génie d'hier et d'aujourd'hui : l'aventure des Sapeurs de chemins de fer, Lavauzelle, 1997, p. 73
  17. ^ L’audace du rail : les trains blindés du Sud-Annam in Revue historique des armées #234, Alexis Neviaski, 2004, quoted in the French Defense Ministry archives 2008-12-16 at the Wayback Machine
  18. ^ French Defense Ministry archives ECPAD website 2007-09-30 at the Wayback Machine
  19. ^ French Defense Ministry archives ECPAD website 2007-09-27 at the Wayback Machine
  20. ^ French Defense Ministry archives ECPAD website 2007-09-27 at the Wayback Machine
  21. ^ Vietnam Studies: Logistic Support 2015-08-20 at the Wayback Machine by Lieutenant General Joseph M. Heiser, Jr. (1991). Chapter 6.
  22. ^ Ronald Bruce Frankum (2005). Like rolling thunder: the air war in Vietnam, 1964-1975. Vol. 3. Rowman & Littlefield. ISBN 978-0742543027. {{cite book}}: |work= ignored (help)
  23. ^ Time
  24. ^ "A Brief History of Dalat Railroad". Viet Nam Air Force Model Aircraft of Minnesota. 2007-10-07. Retrieved 2008-03-14.
  25. ^ News, VietNamNet. "Báo VietnamNet". VietNamNet News (in Vietnamese). Retrieved 2023-08-10. {{cite web}}: |last= has generic name (help)
  26. ^ (in Vietnamese). Archived from the original on 2010-12-14. Retrieved 2010-06-30.
  27. ^ (in Vietnamese). Archived from the original on 2010-12-14. Retrieved 2010-06-30.
  28. ^ "100 năm ga Huế (100 years of Hue Railway Station)" (in Vietnamese). 2006-12-16. Retrieved 2010-07-20.
  29. ^ (in Vietnamese). Archived from the original on 2010-03-30. Retrieved 2010-06-30.
  30. ^ . VOVNews. 2010-10-28. Archived from the original on 2010-10-29. Retrieved 2010-10-31.
  31. ^ "Massive floods kill 26 in Vietnam; 9 missing". 2010-10-05. Retrieved 2010-10-31.
  32. ^ "Photo of the Day: Vietnam Floods Claim North-South Railway". 2010-10-22. Retrieved 2010-10-31.
  33. ^ de Dieuleveult, Alain; Harouy, Michel (1988). Quand les petits trains faisaient la Manche ("When small trains crossed the Channel") (in French). Le Mans: Éditions Cénomane. ISBN 978-2-905596-29-1.
  34. ^ Unsafe rail crossing kill 300 2010-08-20 at the Wayback Machine
  35. ^ A.Maria Toyoda (2007-08-17). "Report to JBIC on Expert Evaluation Mission to Northern Vietnam and the Philippines: Refocusing on Infrastructure" (PDF). Retrieved 2010-07-20.
  36. ^ Evaluation of development activities - 2009/1[permanent dead link]. Ministry for the Economy, Industry and Employment. Government of France. April 2009.
  37. ^ "Vietnam to upgrade trunk route". International Railway Journal. September 2005. Retrieved 2010-07-22.
  38. ^ "The hare and the tortoise". Railway Gazette International. 2009-09-21.
  39. ^ "Vietnam to build high-speed rail with Japan aid". Reuters. Reuters News. 2006-07-20. Retrieved 2006-07-20.
  40. ^ "Vietnamese legislators reject $56B bullet train in rare move against Communist leaders". Metro News Vancouver. Associated Press. 2010-06-21. Retrieved 2010-06-21.[permanent dead link]
  41. ^ . VietNamNet Bridge. 2010-06-21. Archived from the original on 2010-06-28. Retrieved 2010-06-21.
Bibliography

  This article incorporates public domain material from websites or documents of the United States Army Center of Military History.

  • Hulot, Frédéric. Les chemins de fer de la France d'outre-mer, tome 1 l'Indochine, le Yunnan. La Régordane. 1990.
  • Heiser, Joseph M. Jr. (1991). Logistic Support. Washington, D. C.: United States Army Center of Military History.

External links edit

  • Ministry of Transport, Vietnam

north, south, railway, vietnam, proposed, high, speed, railway, north, south, express, railway, vietnam, north, south, railway, vietnamese, Đường, sắt, bắc, french, chemin, nord, principal, railway, line, serving, country, vietnam, single, track, metre, gauge,. For the proposed high speed railway see North South Express Railway Vietnam The North South railway Vietnamese Đường sắt Bắc Nam French Chemin de fer Nord Sud is the principal railway line serving the country of Vietnam It is a single track metre gauge line connecting the capital Hanoi in the north to Ho Chi Minh City in the south for a total length of 1 726 km 1 072 mi Trains travelling this line are sometimes referred to as the Reunification Express referring to the Reunification of Vietnam although no particular train carries this name officially 1 The line was established during French colonial rule and was completed over a period of nearly forty years from 1899 to 1936 2 As of 2005 191 of Vietnam s 278 railway stations were located along the North South line 3 4 North South railwayThe North South railway line through Quang NamOverviewStatusOperationalOwnerVietnam RailwaysLocaleVietnamTerminiHanoiSaigonStations175Websitehttps dsvn vn ServiceTypeInter city railRegional railFreight railSystemVietnam RailwaysServices16 trains per day 80 85 trains per day for holidays Tết Route numberĐSBNOperator s Vietnam RailwaysDepot s Hanoi Vinh Dong Hoi Da Nang Dieu Tri station Nha Trang Binh Thuan SaigonRolling stockD9E D13E D19E D20EHistoryOpened1936Built byFrench Colonial AdministrationTechnicalLine length1 726 km 1 072 mi Number of tracksSingle track railwayCharacterAt gradeTrack gauge1 000 mm 3 ft 3 3 8 in metre gaugeMinimum radius 800m 400mElectrificationNoOperating speed100 km h 62 mph SignallingETCS Level 2Maximum incline 6 9 Route mapLegendkm0 00 0 Hanoi5 Giap Bat9 Văn Điểnto Ha Đong18 Thường Tin26 Chợ Tia30 Vạn Điểm34 Phu XuyenHanoiHa Nam border45 Đồng Văn56 Phủ Ly67 Binh LụcHa NamNam Định border73 Cầu Họ81 Đặng Xa0 0 87 Nam Định94 Trinh Xuyen101 Nui Goi108 Cat ĐằngNam ĐịnhNinh Binh border115 Ninh Binh121 Cầu Yen125 Ghềnh134 Đồng GiaoNinh BinhThanh Hoa border142 Bỉm Sơn153 Đo Len161 Nghĩa TrangMa River0 176 Thanh Hoa188 Yen Thai197 Minh Khoi207 Thị Long219 Văn Trai229 Khoa Trường238 Trường LamThanh HoaNghệ An border245 Hoang MaiHoang Mai River261 Cầu Giatfor Thai HoaLạch Vạn River272 Yen Ly279 Chợ Sy292 Mỹ LyCua Lo River309 Quan Hanh0 319 Vinh330 Yen XuanCả River338 Yen Trung345 Đức Lạc352 Yen Duệ358 Hoa Duyệt370 Thanh Luyện381 Chu Lễ386 Hương Phố397 Phuc TrạchHa TĩnhQuảng Binh border405 La Khe409 Tan ẤpTan Ấp Xom Cục Railway415 Đồng Chuối426 Kim Lũ437 Đồng Le450 Ngọc Lam453 Minh Cam459 Lạc Sơn468 Lệ Sơn482 Minh LệCon River489 Ngan Sơn499 Thọ Lộc511 Phuc Tự0 522 Đồng Hới529 Lệ Kỳ539 Long ĐạiLong Đại River551 Mỹ Đức558 Phu Hoa565 Mỹ Trạch572 Thượng LamQuảng BinhQuảng Trị border588 Sa Lung592 Vĩnh Thủy599 Tien AnBến Hải River609 Ha Thanh622 Đong HaThạch Han River634 Quảng Trị643 Dien Sanh652 Mỹ ChanhQuảng TrịThừa Thien Huế border660 Pho Trạch670 Hiền Sỹ678 Văn Xa684 An HoaPerfume River0 688 Huế691 An Cựu699 Hương Thuỷ702 Phu Bai708 Nong715 Truồi724 Đa Bạc729 Cầu Hai732 Nước Ngọt742 Thừa Lưu755 Lăng CoThừa Thien HuếDa Nang borderHải Van Pass761 Hải Van Bắc766 Hải Van772 Hải Van Nam776 Lien Chiểu777 Kim LienCu Đe River788 Thanh Khe0 791 Đa Nẵng794 Lien Tri799 Phong LệCam Le River804 Lệ TrạchĐa NẵngQuảng Nam border814 Nong SơnThu Bồn River819 Go Nổi820 Chiem Sơn825 Tra Kiệu842 Phu Cang857 An Mỹ865 Tam Kỳ928 Quảng Ngai1 096 Dieu Tri0 000 Quy Nhơn1 198 Tuy HoaĐa Rằng River1 315 Nha Trang1 408 Thap Cham to Đa Lạt1 455 Vĩnh Hảo1 551 Mương ManPhan Thiết1 697 Bien HoaĐồng Nai River1 707 Dĩ An1 711 Song Thần1 713 Thủ Đức1 718 Binh TriệuSaigon River1 722 Go Vấp1 726 SaigonThis diagram viewtalkeditFrom World War II through to the Vietnam War the entire North South railway sustained major damage from bombings and sabotage 5 Owing to this damage and to a subsequent lack of capital investment and maintenance much of the infrastructure along the North South railway remains outdated or in poor condition in turn lack of infrastructure development has been found to be a root cause for railway accidents along the line including collisions at level crossings and derailments Recent rehabilitation projects supported by official development assistance have improved the safety and efficiency of the line As of 2007 85 of the network s passenger volume and 60 of its cargo volume was transported along the line 6 The national railway company Vietnam Railways owns and operates the line Contents 1 Overview 1 1 Passenger service 1 2 Freight service 2 History 2 1 Wartime 2 2 Accidents and incidents 3 Stations 3 1 List of stations 4 Infrastructure 4 1 Tracks 4 2 Bridges 4 3 Tunnels 4 4 Signalling 4 5 Communications 5 Safety 5 1 Infrastructure rehabilitation 6 Development 6 1 North South Express Railway 7 Gallery 8 See also 9 Notes and references 10 External linksOverview edit nbsp A train stops at Huế station on North South railwayFor the most part this 1 726 km 1 072 mi long metre gauge line follows the coastline of Vietnam beginning in Ha Noi passing through the provinces of Ha Nam Nam Đinh Ninh Binh Thanh Hoa Nghệ An Vinh Ha Tĩnh Quảng Binh Đồng Hới Quảng Trị Đong Ha Thừa Thien Huế Huế Da Nang Quảng Nam Quảng Ngai Binh Định Phu Yen Khanh Hoa Nha Trang Ninh Thuận Binh Thuận Phan Thiết Đồng Nai and Binh Dương before coming to an end in Ho Chi Minh City 6 7 Trains taking this route pass through a number of areas recognized for their beauty such as the Hải Van Pass and Lăng Co Peninsula near Huế and Van Phong Bay near Nha Trang Typical journeys from one end of the line to the other last about 30 hours 8 Passengers arriving in Hanoi are able to transfer to several other railway lines leading to Haiphong Hạ Long Bay Thai Nguyen Lao Cai Lạng Sơn and the People s Republic of China As of 2007 85 of the network s passenger traffic and 60 of its cargo traffic was transported along the North South line corresponding to 3 960 6 million person km and 2 329 5 million ton km respectively nb 1 These proportions are only slightly different from those recorded in the early 1990s 1993 figures reported 82 of passenger traffic and 66 of cargo traffic along the line 6 Passenger service edit Daily passenger service is provided along the entire North South railway by state railway company Vietnam Railways Express service links Hanoi and Ho Chi Minh City making stops at major stations local service is also provided along shorter portions of the line such as from Hanoi to Vinh Vinh to Đồng Hới Vinh to Quy Nhon and so on The following trains run regularly along the line each line represents a pair of trains one southbound and the other northbound 9 Train Type From To Length NotesSE1 SE2 Express Hanoi Ho Chi Minh City 34 hrs 40 mins Stops at Nam Định Thanh Hoa Vinh Đồng Hới Dong Ha Huế Lang Co Da Nang Tam Ky Quảng Ngai Dieu Tri Tuy Hoa Nha Trang Thap Cham Muong ManSE3 SE4 Express Hanoi Ho Chi Minh City 29 hrs 30 mins Stops at Vinh Đồng Hới Huế Da Nang Dieu Tri Nha TrangSE5 SE6 Express Hanoi Ho Chi Minh City 32 hrs Stops at Phủ Ly Nam Định Ninh Binh Thanh Hoa Vinh Đồng Hới Huế Da Nang Quảng Ngai Dieu Tri Nha Trang Thap Cham Muong Man Bien HoaTN1 TN2 Local Hanoi Ho Chi Minh City 40 hrs 50 minsTN3 TN4 Local Hanoi Ho Chi Minh City 40 hrs 45 minsTN5 TN6 Local Hanoi Ho Chi Minh City 40 hrs 10 minsTN7 TN8 Local Hanoi Ho Chi Minh City 40 hrs 25 minsNA1 NA2 Local Hanoi VinhNA3 NA4 Local Hanoi VinhTH1 TH2 Local Giap Bat Thanh HoaVD31 VD32 Local Vinh Đồng Hới OUT OF SERVICESDH41 DH42 Local Đồng Hới Huế OUT OF SERVICESVQ1 VQ2 Local Vinh Quy NhonFreight service edit Vietnam Railways provides daily freight transport mainly between Hanoi and Ho Chi Minh City freight service ending at Da Nang is also offered The following trains run regularly along the line each line represents a pair of trains one southbound and the other northbound 10 Train From To NotesGS1 GS2 Giap Bat Hanoi Song Thần HCMC 4 day itinerarySBN1 SBN2 Giap Bat Hanoi Song Thần HCMC 4 day itineraryHBN1 HBN2 Giap Bat Hanoi Song Thần HCMC HBN3 HBN4 Giap Bat Hanoi Song Thần HCMC ASY1 ASY2 Giap Bat Hanoi Song Thần HCMC AH1 AH2 Giap Bat Hanoi Song Thần HCMC HSD1 HSD2 Da Nang Ho Chi Minh CityHSK1 HSK2 Kim Lien Da Nang Song Thần HCMC 4 digits number Giap Bat Hanoi Song Thần HCMC History edit nbsp The progressive construction of Vietnam s railway system 1881 1966 In 1895 outgoing Governor General of French Indochina Jean Marie de Lanessan convinced of the necessity of building railways to connect the different parts of Indochina urged his successors to give priority to the construction of a north south railway connecting Hanoi and Saigon calling it the backbone of Indochina from which all other routes would radiate nb 2 It was Paul Doumer who was appointed as Governor General in 1897 who put de Lanessan s call into action Soon after his appointment Doumer submitted an overarching proposal for railway development in Indochina including plans for what would eventually become the Yunnan Vietnam Railway and the North South railway The French government approved the construction of the entire Yunnan line and several sections of the North South line approving a loan of 200 million francs within the following year Work began swiftly thereafter with the Phu Lang Thuong Lạng Sơn line being upgraded and extended from Hanoi to the Chinese border at Dong Dang by 1902 and the first section of the Yunnan line between Hanoi and Haiphong opening in the same year 11 12 13 Construction of the first sections of the North South railway itself began in 1899 and lasted over thirty years with individual sections completed serially The first section to be laid down was the Hanoi Vinh section built from 1899 to 1905 Next to be built was the Nha Trang Saigon section from 1905 to 1913 the Saigon Tan Linh portion was opened in 1908 followed by the Tan Linh Nha Trang portion in 1913 During this time tracks were also laid around the city of Huế leading south to Tourane and north to Đong Ha The Huế Tourane section opened in 1906 and the Huế Dong Ha line opened in 1908 The Vinh Huế section was constructed from 1913 to 1927 and finally the remaining Huế Nha Trang section was constructed from 1930 to 1936 2 6 11 On 2 October 1936 the entire 1 726 km 1 072 mi Hanoi Saigon link was formally put into full operation As elsewhere in the world the railways were the sites of active union and labor organization 14 The first journeys from end to end of the newly completed line dubbed the Transindochinois Trans Indochinese generally took about 60 hours or two days and three nights 15 This decreased to about 40 hours by the late 1930s with trains travelling at an average speed of 43 km h 27 mph 5 Trains were generally pulled by French Pacific or Mikado locomotives and included dining cars and sleeping cars voitures couchettes 12 Wartime edit See also First Indochina War Operation Rolling Thunder Operation Linebacker and Operation Linebacker II After the Japanese invasion of French Indochina during World War II Japanese forces used the Vietnamese railway system extensively inviting sabotage by the Viet Minh as well as American bombing from the air Following the exit of the Japanese at the end of the war efforts were made to repair the seriously damaged North South line Shortly after World War II ended however the First Indochina War began and the Viet Minh s sabotage of the rail system continued this time against the armies of the French Union 5 In response the French began using the armed armoured train La Rafale as both a cargo carrier and a mobile surveillance unit 16 17 In February 1951 the first Rafale was in service on the Saigon Nha Trang section of the North South line 18 19 Use of the Rafale failed to deter the Viet Minh guerrillas however who continued sabotaging the line making off with its rails under cover of night and creating a 300 km 190 mi rail network between Ninh Hoa and Da Nang in a Viet Minh controlled area 5 In 1953 the guerrillas attacked La Rafale itself mining and destroying stone bridges as they passed by 20 In 1954 following the signature of Geneva Accords Vietnam was temporarily divided into two parts the communist North and anti communist South The North South railway was bisected accordingly at Hiền Lương Bridge a bridge over the Bến Hải River in Quảng Trị Province 2 nbsp A repair crew installs new railway tracks in South Vietnam Throughout the Vietnam War the North South railway was a target of bombardments and sabotage by both North Vietnamese and South Vietnamese forces The South supported with the United States reconstructed the track between Saigon and Huế in the late 1950s a distance of 1 041 km 647 mi Nevertheless a relentless campaign of intense bombing and sabotage by the Viet Cong and North Vietnamese regular units resulted in the South Vietnamese railway system being unable to carry significant tonnages 795 attacks were launched between 1961 and 1964 alone eventually forcing the South to abandon many large sections of the track 5 The U S Army operating in South Vietnam had considerable interest in the North South line because of the potential it offered in the bulk movement of cargo at low rates The system was used to support the Military Assistance Command Vietnam construction program and transported hundreds of thousands of tons of rock and gravel to air base and highway sites 21 In North Vietnam American bombing of railways was concentrated on key targets such as railway bridges both along the North South railway and along the lines north of Hanoi such as the Hanoi Lao Cai and Hanoi Dong Dang lines Operation Rolling Thunder was the first large scale bombing campaign carried out by the U S Air Force taking place from March 2 1965 until November 1 1968 when US President Lyndon B Johnson temporarily called off air raids Large scale air raids resumed from May 9 to October 23 1972 for Operation Linebacker and again from December 18 29 1972 for Operation Linebacker II with fewer target restrictions than Rolling Thunder nbsp Thanh Hoa Bridge damaged by smart bombs A particularly difficult target for the U S Air Force was the Thanh Hoa Bridge a well defended combined road rail bridge in Thanh Hoa Province One of the first attacks on the bridge took place on April 3 4 1965 Despite dropping 239 tons of bombs on the bridge during the raid the bridge remained serviceable additionally three American F 105 aircraft were shot down during the raid 22 23 The U S Navy also conducted Alpha strikes on the bridge Several times traffic over the bridge was interrupted but every time the North Vietnamese dutifully repaired the damage The bridge was eventually destroyed by laser guided smart bombs during separate raids on April 27 and May 13 1972 as part of Operation Linebacker After the Fall of Saigon on 30 April 1975 the Communist government of the newly unified Vietnam took control of the former South Vietnamese railway Heavily damaged the war torn North South railway line was nevertheless restored and returned to service on 31 December 1976 promoted as a symbol of Vietnamese unity In the short time between the surrender of the South and the reopening of the line 1334 bridges 27 tunnels 158 stations and 1370 switches had been repaired 5 Other railway lines that once existed such as the Da Lat Thap Cham Railway were dismantled during this period to provide materials for the repair of the main line 24 Accidents and incidents edit Main article Dien Sanh train crash On 10 March 2015 D19E locomotive No 968 was written off in an accident near Dien Sanh when it was hauling a passenger train that was in collision with a lorry on a level crossing On 7 August 2023 rocks collapsed at km 455 in Quang Binh in a tunnel leading to massive delays up to 16 hours 26 minutes This happened during maintenance of the tunnel 25 Stations editList of stations edit This abridged list includes all major stations nb 3 with timetabled services As of 2005 there were 278 stations on the Vietnamese railway network 4 of which 191 were located along the North South line 3 Km Station Region Province City Dist Ward Opened Notes Photo0 Hanoi Red River Delta Hanoi Hoan Kiem District Hanoi 1902 26 Interchange for Hanoi Haiphong Hanoi Thai Nguyen Hanoi Lao Cai Hanoi Đồng Đăng lines nbsp 5 Giap Bat Red River Delta Hanoi Hoang Mai District Hanoi Freight station nbsp 56 Phủ Ly Red River Delta Ha Nam Hai Ba Trung Ward Phủ Ly nbsp 87 Nam Định Red River Delta Nam Định Nam Định Photo115 Ninh Binh Red River Delta Ninh Binh Thanh Binh Ward Ninh Binh nbsp 176 Thanh Hoa North Central Coast Thanh Hoa Tan Son Ward Thanh Hoa nbsp 319 Vinh North Central Coast Nghệ An Le Lợi Ward Vinh 1905 27 nbsp 522 Đồng Hới North Central Coast Quảng Binh Nam Ly Ward Đồng Hới nbsp 622 Đong Ha North Central Coast Quảng Trị Đong Ha nbsp 688 Huế North Central Coast Thua Thien Huế Huế 1906 28 nbsp 777 Kim Lien South Central Coast Da Nang Freight station791 Đa Nẵng South Central Coast Da Nang Thanh Khe District 1902 29 nbsp 865 Tam Kỳ South Central Coast Quảng Nam An Xuan Ward Tam Ky nbsp 928 Quảng Ngai South Central Coast Quảng Ngai Quang Phu Ward Quảng Ngai nbsp 1096 Dieu Tri South Central Coast Binh Định Dieu Tri Tuy Phước District For Quy Nhơn nbsp 1096 Quy Nhơn South Central Coast Binh Định Quy Nhơn nbsp 1198 Tuy Hoa South Central Coast Phu Yen Ward 2 Tuy Hoa nbsp 1315 Nha Trang South Central Coast Khanh Hoa Phuoc Tan Ward Nha Trang 1936 nbsp 1408 Thap Cham South Central Coast Ninh Thuận My Huong Ward Phan Rang Thap Cham Interchange for Da Lat Thap Cham line nb 4 nbsp 1551 Binh Thuận South Central Coast Binh Thuận Muong Man For Phan Thiết nbsp 1697 Bien Hoa Southeast Đồng Nai Trung Dung Ward Bien Hoa nbsp 1711 Song Thần Southeast Ho Chi Minh City An Binh Di An District Freight station Photo1726 Sai Gon Southeast Ho Chi Minh City Ward 9 District 3 1983 nb 5 nbsp Infrastructure edit nbsp Tracks at a level crossing near Mỹ SơnMost of Vietnam s railway infrastructure including bridges rail trucks track beds rolling stock signals and communication equipment and maintenance facilities has suffered severe deterioration mainly due to damage inflicted during the Vietnam War and a subsequent lack of capital investment and maintenance More recently rehabilitation projects sustained by official development assistance have allowed some of the most critical pieces of infrastructure along the line to be replaced although much work still remains to be done 6 Complicating rehabilitation work is seasonal flooding which depending on its severity may cause significant infrastructure damage For instance heavy rains falling on Vietnam s north central coast in October 2010 swept away several sections of track in Ha Tĩnh and Quảng Binh provinces the flooding of many of the nearby provincial roads which remained several metres underwater prevented repair crews from reaching the affected sections for weeks 30 31 32 Tracks edit The North South railway line uses metre gauge as was commonly used on local railways in France around the time of its construction 7 33 Bridges edit nbsp Long Bien Bridge a famous railway bridge in Vietnam in Hanoi Vietnam Railways reports the number of railway bridges along the North South line to be 1 300 totalling about 28 000 m 92 000 ft or about 63 of the national total Considering both standard rail bridges and combined bridges the total length along the North South line is about 36 000 m 118 000 ft 6 7 Many railway bridges are severely worn from age and have damage dating from the Vietnam War despite temporary restoration following the war As of 2007 278 bridges requiring major rehabilitation remain along the North South Railway line 6 Tunnels edit source source source source source source A Vietnam Railways train passes through a tunnel north of Quy Nhơn There are 27 railway tunnels along the North South line amounting to a total length of 8 335 m 27 346 ft 7 Certain tunnels are inadequately drained and suffer from deterioration in the tunnel lining causing water leaks that necessitate reductions in speed 2 Signalling edit The North South railway line uses a semi automatic block system which allows individual signals to work either as automatic signals or manual signals 7 According to a joint Japanese Vietnamese evaluation team the recent installation of additional auto signal systems at key crossings along the line has contributed to a decline in railway accidents 6 Communications edit Since 1998 microband Asynchronous Transfer Mode technology has been used along the North South railway line to send television signals 64 kbit s transmission lines are leased from the Vietnam Post and Telecommunications Corporation VPTC Along some sections of the line for example from Hanoi to Vinh and from Nha Trang to Ho Chi Minh City a fiber optic network has been deployed Vietnam Railways intends to extend the network along the remaining distance from Vinh to Nha Trang A switching system featuring digital exchanges is in place connected via the existing transmission system and the public telephone network As the modernization of the telecommunication system progresses manual exchanges are gradually being replaced with digital exchanges 4 7 Safety editMain article Railway accidents in Vietnam nbsp An unprotected level crossing in Da Nang Along the North South railway line 3 650 level crossings were counted 3 000 or 82 of which had no barriers alarm systems or guards 34 As a result accidents involving vehicles and pedestrians have occurred A researcher from Villanova University noted There are numerous safety issues with level crossings usually an accident occurs every day 35 Many rail bridges and tunnels have suffered deterioration since the 1970s requiring trains passing over or through them to reduce speeds as low as 15 kilometres per hour 9 3 mph 2 In addition the center of the country is subject to violent annual flooding and bridges are often swept away causing lengthy closures 6 Along with recent efforts aimed at infrastructure rehabilitation the recent adoption of safety measures by Vietnam Railways has led to a decline in railway accidents These measures include public awareness campaigns on railway safety in the media construction of fences and safety barriers at critical level crossings in major cities mobilization of volunteers for traffic control at train stations and level crossings especially during holiday seasons the installation of additional auto signal systems and the construction of flyovers and underpasses to redirect traffic 6 Infrastructure rehabilitation edit The condition of railway infrastructure in Vietnam although improving is still poor enough overall to require rehabilitation Rail transport only became a national priority for the Vietnamese government around the mid 1990s at which point most of the railway network was severely degraded having received only temporary repair from damages suffered during decades of war 6 36 nbsp Railroad workers in Da Nang From 1994 to 2005 a major bridge rehabilitation project took place on the North South railway line with the Pacific Consultants International Group and Japan Transportation Consultants providing consultancy services The overall project cost was JPY 11 020 million or 18 less than the budgeted cost The overall results of the project included a reduction in running hours from one end of the line to the other from 36 hours in 1994 to 29 hours in 2007 an increase of speed limits on rehabilitated bridges from 15 to 30 km h 9 3 to 18 6 mph to 60 to 80 km h 37 to 50 mph which contributed to the reduction in running hours and a reduction in the number of railway accidents throughout the line 6 In 2007 Vietnam Railways awarded an additional VND 150 billion US 9 5 million five year contract for consultancy services to Japan Transportation Consultants the Pacific Consultants International Group and the Japan Railway Technical Service Jarts regarding a VND 2 47 trillion project to further improve bridge and railway safety on the North South line The project s goals include the refurbishment of 44 bridges and 37 6 km 23 4 mi of railway tracks the building of two new railway bridges and a new railway station at Ninh Binh and the purchase of 23 track machines The project was expected to be completed in 2010 37 Development edit nbsp Japanese Shinkansen technology has been suggested for use on the proposed North South Express Railway Photo Taiwan High Speed Rail North South Express Railway edit Main article North South Express Railway Vietnam National railway company Vietnam Railways has proposed a high speed rail link between Hanoi and Ho Chi Minh City capable of running at 300 to 350 km h 186 to 217 mph Funding of the 56 billion line would mainly come from the Vietnamese government reports suggest Japanese development aid could be made available in stages conditioned on the adoption of Shinkansen technology 38 39 Once completed the high speed rail line would allow trains to complete the Hanoi Ho Chi Minh City journey in approximately 6 hours 40 Vietnam s National Assembly rejected the existing plan for the line in June 2010 and asked for further study of the project 41 Gallery edit nbsp Travelling from Hội An to Hanoi nbsp Travelling northward from Ho Chi Minh City to Da Nang nbsp A passenger observes the scenery from her seat nbsp Railway tracks in Hanoi nbsp Railway track beneath the Hai Van Pass See also edit nbsp Wikimedia Commons has media related to North South Railway Vietnam List of railway lines in Vietnam North South Express Railway Vietnam Vietnam RailwaysNotes and references editNotes Transport statistics for rail transport in 2007 report a traffic volume of 4 659 5 million person km for passenger rail traffic and 3 882 5 million ton km for freight rail traffic Volume of freight traffic by type of transport Volume of passengers traffic by type of transport General Statistics Office of Vietnam De la voie principale s etendant ainsi de la frontiere de Chine a Saigon et representant en quelque sorte l epine dorsale de l Indo Chine toutes les autres routes ou voies ferrees partent naturellement pour s enfoncer en toutes directions jusqu aux limites du pays les unes penetrant du cote de la Chine les autres vers le Mekong a travers le Laos La Colonisation francaise en Indo Chine Jean Marie Antoine de Lanessan 1895 p 329 For the purpose of this list major stations are defined as stations at which SE5 SE6 class passenger trains make regular stops lasting two or more minutes Freight terminals have also been included See Passenger Transport Business Archived 2011 06 29 at the Wayback Machine and Vận tải hang hoa Cargo transport Archived 2011 06 04 at the Wayback Machine Vietnam Railways as well as the official Vietnam Railways timetable Page 1 Archived 2011 06 29 at the Wayback Machine Page 2 Archived 2011 06 29 at the Wayback Machine Page 3 Archived 2011 06 29 at the Wayback Machine Page 4 Archived 2011 06 29 at the Wayback Machine Page 5 Archived 2011 06 29 at the Wayback Machine in Vietnamese Defunct or partially defunct line The original Saigon Station located at Bến Thanh Market was built in 1881 120 Year History of Vietnam Railways Archived from the original on 2011 06 29 Retrieved 2010 07 22 The station currently in use as Saigon Railway Station located in Ho Chi Minh City s District 3 was originally known as Hoa Hung Depot and was used mainly as a freight station it was converted for use as a passenger station in 1983 Ga Sai Gon in Vietnamese Archived from the original on 2010 05 05 Retrieved 2010 06 30 References Train travel in Vietnam Seat61 Retrieved 22 June 2010 a b c d e Proposed Loan and Administration of Loan from Agence Francaise de Developpement Yen Vien Lao Cai Railway Upgrading Project PDF November 2006 Archived from the original PDF on 2011 06 07 Retrieved 2010 06 27 a b Cac ga tren tuyến đường sắt Thống Nhất Railway stations on the North South railway Page 1 Archived 2011 01 13 at the Wayback Machine Page 2 Archived 2011 01 13 at the Wayback Machine in Vietnamese a b c Infrastructure Maintenance and Construction Vietnam Railways Archived from the original on 2010 04 14 Retrieved 2010 06 24 a b c d e f Nick Ray Yu Mei Balasingamchow Iain Stewart 2009 Vietnam Lonely Planet ISBN 9781742203898 Retrieved 2010 07 23 a b c d e f g h i j k l Hanoi Ho Chi Minh City Railway Bridge Rehabilitation Project PDF Japan International Cooperation Agency 2007 Retrieved 2010 06 30 a b c d e f Railway Network Vietnam Railways Archived from the original on 2010 04 18 Retrieved 2010 06 29 Vietnam Railways Website English Vietnam Railways Archived from the original on 2008 05 10 Retrieved 2008 05 10 Check the timetable from Ha Noi to Sai Gon or vice versa to see journey times Passenger Transport Business Archived 2011 06 29 at the Wayback Machine Vietnam Railways Vận tải hang hoa Cargo transport Archived 2011 06 04 at the Wayback Machine Vietnam Railways a b Les chemins de fer de l Indochine francaise Arnaud Georges In Annales de Geographie 1924 t 33 n 185 pp 501 503 a b Indian Mail International Retrieved 2010 06 28 Ga Hải Phong in Vietnamese Archived from the original on 2010 12 14 Retrieved 2010 06 30 David Del Testa Vietnamese railway workers during the revolutionary high tide South East Asia Research Volume 19 Number 4 December 2011 pp 787 816 30 Hoang Cơ Thụy Việt sử khảo luận Paris Nam A 2002 p 1495 Le 5e Regiment du Genie d hier et d aujourd hui l aventure des Sapeurs de chemins de fer Lavauzelle 1997 p 73 L audace du rail les trains blindes du Sud Annam in Revue historique des armees 234 Alexis Neviaski 2004 quoted in the French Defense Ministry archives Archived 2008 12 16 at the Wayback Machine French Defense Ministry archives ECPAD website Archived 2007 09 30 at the Wayback Machine French Defense Ministry archives ECPAD website Archived 2007 09 27 at the Wayback Machine French Defense Ministry archives ECPAD website Archived 2007 09 27 at the Wayback Machine Vietnam Studies Logistic Support Archived 2015 08 20 at the Wayback Machine by Lieutenant General Joseph M Heiser Jr 1991 Chapter 6 Ronald Bruce Frankum 2005 Like rolling thunder the air war in Vietnam 1964 1975 Vol 3 Rowman amp Littlefield ISBN 978 0742543027 a href Template Cite book html title Template Cite book cite book a work ignored help Time magazine Time A Brief History of Dalat Railroad Viet Nam Air Force Model Aircraft of Minnesota 2007 10 07 Retrieved 2008 03 14 News VietNamNet Bao VietnamNet VietNamNet News in Vietnamese Retrieved 2023 08 10 a href Template Cite web html title Template Cite web cite web a last has generic name help Ga Ha Nội ngay ấy bay giờ in Vietnamese Archived from the original on 2010 12 14 Retrieved 2010 06 30 Ga Vinh truyền thống va hiện đại in Vietnamese Archived from the original on 2010 12 14 Retrieved 2010 06 30 100 năm ga Huế 100 years of Hue Railway Station in Vietnamese 2006 12 16 Retrieved 2010 07 20 Ga Đa Nẵng in Vietnamese Archived from the original on 2010 03 30 Retrieved 2010 06 30 North South railway reopens on October 28 VOVNews 2010 10 28 Archived from the original on 2010 10 29 Retrieved 2010 10 31 Massive floods kill 26 in Vietnam 9 missing 2010 10 05 Retrieved 2010 10 31 Photo of the Day Vietnam Floods Claim North South Railway 2010 10 22 Retrieved 2010 10 31 de Dieuleveult Alain Harouy Michel 1988 Quand les petits trains faisaient la Manche When small trains crossed the Channel in French Le Mans Editions Cenomane ISBN 978 2 905596 29 1 Unsafe rail crossing kill 300 Archived 2010 08 20 at the Wayback Machine A Maria Toyoda 2007 08 17 Report to JBIC on Expert Evaluation Mission to Northern Vietnam and the Philippines Refocusing on Infrastructure PDF Retrieved 2010 07 20 Evaluation of development activities 2009 1 permanent dead link Ministry for the Economy Industry and Employment Government of France April 2009 Vietnam to upgrade trunk route International Railway Journal September 2005 Retrieved 2010 07 22 The hare and the tortoise Railway Gazette International 2009 09 21 Vietnam to build high speed rail with Japan aid Reuters Reuters News 2006 07 20 Retrieved 2006 07 20 Vietnamese legislators reject 56B bullet train in rare move against Communist leaders Metro News Vancouver Associated Press 2010 06 21 Retrieved 2010 06 21 permanent dead link National Assembly rejects express railway project VietNamNet Bridge 2010 06 21 Archived from the original on 2010 06 28 Retrieved 2010 06 21 Bibliography nbsp This article incorporates public domain material from websites or documents of the United States Army Center of Military History Hulot Frederic Les chemins de fer de la France d outre mer tome 1 l Indochine le Yunnan La Regordane 1990 Heiser Joseph M Jr 1991 Logistic Support Washington D C United States Army Center of Military History External links editOfficial Website of Vietnam Railways Ministry of Transport Vietnam Retrieved from https en wikipedia org w index php title North South railway Vietnam amp oldid 1187425876, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.