fbpx
Wikipedia

MRTC 3000 class

The MRTC 3000 class or ČKD Tatra RT8D5M LRV, also known as Tatra Train, is a class of high-floor light rail vehicles built by Czech tram manufacturer ČKD Tatra. It is currently used on the Manila MRT Line 3 and were the last vehicles made by ČKD Tatra before it was taken over by Siemens.

MRTC 3000 class
ČKD Tatra RT8D5M LRV
A MRTC 3000 Class Train passing the Ortigas Interchange (March 2021)
3000 class (RT8D5M) interior, post-second refurbishment
In service1999–present
ManufacturerČKD Tatra
DesignerPatrik Kotas (cs)
Built atPrague, Czech Republic
Family nameTatra KT8D5
Constructed1995 (prototype)
1997–1999
Entered serviceDecember 15, 1999
Refurbished2008–2009, 2016–2017, 2019–2023
Number built73 vehicles and 1 prototype
Number in service54 vehicles (18 sets)
Number scrapped1 prototype
Formation3 cars per trainset
Design codeRT8D5M
Fleet numbers001–073 (original)
3001–3073 (current)
Capacity1,182 passengers (394 per LRV)
Operator(s)Department of Transportation
Depot(s)North Avenue
Line(s) servedMRT Line 3
Specifications
Car body constructionLow alloy high tensile steel (body shell)
Aluminum sheets (ceiling)
Train length95.16 m (312 ft 2 in)
Car length31.72 m (104 ft 1 in)[a]
Width2.5 m (8 ft 2 in)
Height3.65 m (12 ft 0 in) (from top of rail)
3.73 m (12 ft 3 in) (pantograph locked down)
Floor height925 mm (3 ft 0.4 in)
Platform height900 mm (2 ft 11 in)
EntryLevel[b]
Doors5 per side; double-leaf plug-type; 861 mm / 1,255 mm × 1,900 mm (2 ft 9.9 in / 4 ft 1.4 in × 6 ft 2.8 in)
Articulated sections3 per LRV
Wheel diameter700 mm (27.56 in) (new)
595 mm (23.43 in) (worn)
Wheelbase1.9 m (6 ft 3 in) (per bogie)
'7.5 m (24 ft 7 in) (bogie centers)
22.5 m (73 ft 10 in) (total)
Maximum speed65 km/h (40 mph)
Weight46.8 t (103,000 lb) (empty)
Axle load9 t (20,000 lb)
Traction systemČKD Trakce TV14Z IGBT chopper
Traction motorsČKD Trakce TE026A01-4 DC shunt-winding motor
Power output64.5 kW (86.5 hp) per motor
516 kW (692 hp) per LRV
TransmissionCardan drive (7:42 gear ratio)
Acceleration1.03 m/s2 (3.4 ft/s2)
Deceleration1.01 m/s2 (3.3 ft/s2) (service)
1.58 m/s2 (5.2 ft/s2) (emergency)
Auxiliaries3 × 480 V AC static converter
2 × 24 V DC batteries
HVACThermo King roof-mounted air-conditioning units; 3 units per LRV
Electric system(s)750 V DC overhead wire
Current collector(s)Single-arm pantograph
UIC classificationBo′+Bo′+Bo′+Bo′
Wheels driven16/16 per LRV
BogiesInside-frame type
Minimum turning radius20 m (66 ft)
Braking system(s)Dynamic (regenerative and rheostatic)
Mechanical disc
Electromagnetic track brake
Safety system(s)Bombardier EBICAB 900 ATP
Coupling systemScharfenberg
Multiple workingWithin type
Headlight typeLED lamp
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
SeatingLongitudinal
Notes/references
References:[1][2][3][4][5][6][7][8][9][10][11]

ČKD Tatra RT8D5M LRVs are owned by Metro Rail Transit Corporation (MRTC), and operated by the Department of Transportation (DOTr) thru DOTr MRT-3.

Purchase Edit

The Manila MRT Line 3 construction began in 1996 when the then-Department of Transportation and Communications (DOTC; later the Department of Transportation) entered into a build-lease-transfer agreement with the Metro Rail Transit Corporation (MRTC). MRTC signed a contract with ČKD Tatra in 1997 to supply the trains for the line.[12]

Aside from a prototype, 73 light rail cars are produced by ČKD in two batches; 49 were produced in 1998 and the other 24 were completed the following year.[13] The first train was flown into Manila via plane while the remaining trains were transported by sea.[14] The fleet also happens to be the last produced by ČKD before it was taken over by Siemens.[15]

Design and specifications Edit

 
A scale model drawing of the MRTC 3000 class in a 3-car formation

The LRV design is a one-way eight-axle motorized car consisting of three articulated cars, which are connected to each other by the joint and the cover.[16] It is largely a high-platform only version of the Tatra KT8D5.

Car body Edit

The car body is made of low-alloy high-tensile steel, while the ceiling is made of aluminum sheets.[17]

Unlike the prototype 0029, these cars have rounded "foreheads" or beveled large windows at both ends.[18]

The trains wear a livery consisting of royal blue, red, and white. Under the "Metrostar Express" branding, the white portion contains the brand logo and lettering on the sides. However, since 2012, the branding has since been unused.[19] The trains also usually wore wrap ads—unlike the LRTA 1200 class which wear ads as a whole trainset, the 3000 class are seen to wear wrap ads per car.

Each light rail vehicle has three roof-mounted air-conditioning units manufactured by Thermo King. In total, there are nine air-conditioning units in a three-car train set.

LRV 044 used to have experimental door lights above the doors in 2017. However, the lights were removed when Sumitomo refurbished and renumbered LRV 044 as 3044 in 2021.

Interior Edit

Each train car has a capacity of 74 seated passengers and 320 standing passengers. Under crush loading conditions, each car can carry 394 commuters at any one time. A 3-car trainset can carry 1,182 passengers.[17] Seats are longitudinal-type.

Each car has five double leaf, electronically operated, plug-sliding doors. The three center doors have an open width of 1,255 mm (4 ft 1.4 in) while the two end doors at 861 mm (2 ft 9.9 in). The doors have a height of 1,900 mm (6 ft 3 in).

The Passenger Assist Railway Display System (PARDS), a passenger information system powered by LCD screens installed near the ceiling of the train that shows news, advertisements, current train location, arrivals and station layouts, are already installed inside the trains. However, as of 2022, the LCD screens remain switched off. PARDS is also installed on trains on LRT lines 1 and 2.[20]

Prototype RT8D5 0029 Edit

In March 1995 the first three-car tram was tested in Prague under the number 0029 as a prototype.[4] It was a development of the Tatra KT8D5; 0029 retained its control, proportions, the front and rear sections, and unlike the later production vehicles, designed for bidirectional operation. Prototype 0029 remained in Prague and it was used in October to November 1998 together with the Tatra T5A5 prototype, tram no. 0013, and the T3 no. 6663 for various crash tests in the main workshop in Hostivař before being eventually scrapped.[18][21]

Mechanical Edit

Each LRV has inside-frame bogies, consisting of four motorized bogies. The primary suspension is a steel spring and the secondary suspension is a wound-up steel spring.[22] Scharfenberg couplers are present in the ends of the light rail vehicles.

Electrical Edit

The electrical and traction systems of the RT8D5M trains are supplied by ČKD Trakce. The propulsion is controlled by choppers with IGBT thyristors.[23] The traction motors consist of eight DC series-wound/wave armature winding self ventilated motors. The traction motors have a Class H insulation class for the rotor and a Class F insulation class for the stator. The motors comply with IEC 349 standards. Each motor has a power output of 64.5 kilowatts (86.5 horsepower). The motors are rated with a voltage of 375 volts, a current of 190 amps, and a speed of 1946 revolutions per minute (rpm) with a maximum speed of 4350 rpm.[24][25]

The auxiliaries include three 480-volt AC static converters and two 24-volt DC batteries.[26][3]

Signaling and safety equipment Edit

The trains are equipped with the EBICAB 900 Automatic Train Protection (ATP) system.[9] Some onboard signaling equipment consist of vehicle logic units (VLUs), driver panels, and antennas.[27] The original VLUs were manufactured by Bombardier Transportation (acquired by Alstom in 2021). The VLUs are the primary automatic safety devices for the trains.[28]

In 2017, it was revealed that the original VLUs were stolen and replaced with unauthorized parts.[29] An audit report by Bombardier Transportation showed that 99% of the trains were using fake parts.[30] According to the inventory conducted in all cars, the other cars were equipped with ABB, ABB Daimler-Benz or DaimlerChrysler-branded VLUs.[28]

The EBICAB 900 ATP system is integrated with the CITYFLO 250 signaling solution of the MRT Line 3 supplied by Bombardier Transportation.

Operations Edit

The trains run at a maximum design speed of 65 kilometers per hour (40.4 mph), and run through standard gauge rail tracks.[5] The RT8D5M operates as built on the high-speed city rail system with high platforms and in tropical conditions.[3][15] The vehicles are mainly operated in sets of three, and operations with four-car trainsets were first planned in 2016.[31] The trains have been in use since the opening of the line in 1999 and has undergone two refurbishments.

On March 9, 2022, a four-car 3000 class trainset underwent a dynamic test run on the main line for the first time.[32] Two four-car trains were deployed on March 28,[33] subsequently increased to four by April 18.

Refurbishments Edit

First refurbishment (2008–2009) Edit

In 2008, during the line's first general overhaul, the trains were first refurbished by Sumitomo Corporation, Mitsubishi Heavy Industries and TES Philippines Inc. (TESP). The aging air-conditioning units of the trains since 1999 were replaced with new ones.[34] The interior and exterior of the trains were also refurbished. Sumitomo Corporation, along with MHI and TESP refurbished 73 light rail vehicles (LRVs) from 2008 to 2009.[35]

Second refurbishment (2016–2017, 2019–2023) Edit

 
Train cars of the 3000 class with a BURI-refurbished light rail vehicle on the left (December 2021)
 
A 3000 class train car after its second refurbishment by Sumitomo (November 2021)

43 light rail vehicles were planned to be overhauled under the maintenance of Busan Universal Rail, Inc. The refurbished cars underwent a body repaint and installation of new air-conditioning units from Thermo King. The refurbishment commenced in 2016. However, due to service interruptions in 2017 that attributed to the poor maintenance of BURI, the Department of Transportation terminated its contract with BURI on November 6, 2017, with only three LRVs refurbished.[36]

The plan to refurbish the trains were again announced in December 2018 as part of the line's rehabilitation project, which includes the refurbishment of the entire fleet of 72 light rail vehicles. It began on May 1, 2019, and was carried out by Sumitomo Corporation, Mitsubishi Heavy Industries and TES Philippines Inc. (TESP). On October 29, 2020, the first newly overhauled train underwent a test run at a speed of 50 kilometers per hour (31 mph).[37] Initially expected to be completed in May 2023, the refurbishment of all 72 light rail vehicles (LRVs) was completed three months ahead of schedule on February 2, 2023.[38]

The rehabilitation project of the LRVs consists of the installation of new choppers, traction motors, wheels, pantographs, air conditioning units from Thermo King (a replacement program for the air conditioning units began as early as 2018); the repainting of the train's exteriors and interiors; and the fitting of new lighting installations throughout the trains.[39] SKD Trade, a. s., the company that produces spare parts for trains made by ČKD Tatra, became part of the overhaul project and provided spare parts for the trains.[40] Meanwhile, 120 new Thermo King air conditioning units were ordered for 40 LRVs.[41] The installation of the new air-conditioning units on all trains were completed on June 18, 2021.[42]

Incidents Edit

 
Passengers unloading from a 3000 class train in 2014 due to a service incident.
  • On November 3, 2012, a train from the Araneta Center-Cubao Station caught fire as it approached GMA-Kamuning Station, causing passengers to scramble to the exits, and having two women injured. The train caught fire due to electrical short-circuit technical failure.[43]
  • On March 26, 2014, at 10:50 am, a southbound train at Guadalupe Station suddenly stopped due to the train driver not observing the red light status at the Guadalupe Station and accelerated southbound without getting prior clearance from the Control Center, causing the automatic train protection system to activate the emergency brakes, resulting in 10 injuries.[2]
  • On August 13, 2014, a southbound train heading to Taft Avenue station derailed and overshot to the streets. The train first stopped after leaving Magallanes station due to a technical problem. Later on, the train broke down altogether, another train was used to push the stalled train. During this process, however, the first train got detached from the rails and overshot towards Taft Avenue, breaking the concrete barriers and falling to the street below. At least 38 people were injured. The accident was blamed on 2 train drivers and 2 control personnel for failing to follow the proper coordination procedures and protocol.[44][45] The A and B sections of the involved train car were loaded sideways onto two flatbed trucks, while the C section of the car was towed to the depot using a hi-rail truck. The train car is still stored at the line's depot in North Avenue as of June 2020.[46] There are currently no news about actions to be taken at the damaged trainset, and was noticeably excluded from train refurbishments.
  • On September 2, 2014, a train continued with one of its doors left open after a train door failed to close at the Guadalupe station. The passengers were then evacuated after the train arrived at Boni station.[47]
  • On September 18, 2017, at 6:00 am, a seat inside 3000 class LRV no. 066 caught fire at the Santolan-Annapolis station with no injuries reported.[48]
  • On November 16, 2017, at 11:30 am, at least 140 passengers were evacuated from a "detached train" coach between the railway lines of Buendia and Ayala Avenue Stations.[49]
  • On January 26, 2018, a train caught fire between the Araneta Center-Cubao and GMA-Kamuning stations. Partial operations were implemented, and the situation normalized at 2:46 pm.[50]
  • On August 7, 2018, an aircon leak caused "rain" inside a train and caused passengers inside to open their umbrellas. The train was removed from service to fix the air conditioning unit and the train involved in the incident returned to service the following day.[51]
  • On November 4, 2019, at 4:08 pm, a train suddenly emitted smoke while on the northbound track of the line. Around 530 passengers were unloaded. Around two hours after the incident, the operation of the line was back to normal.[52] The fire was caused by a short-circuit in the traction motor.[53]
  • On May 12, 2021, 3000 class LRV 015 was vandalized by an unidentified culprit near Taft Avenue station. Investigations were conducted and initial reports state that the culprit had cut the perimeter fence near Taft Avenue station, which may have caused the vandalism.[54] The vandalized train was cleaned and returned to service on May 18, 2021.[55]
  • On October 9, 2021, at 9:12 p.m., 3000 class LRV 032 caught fire near the Guadalupe station. A provisional service was implemented between North Avenue and Shaw Boulevard station, and the site of the incident was declared fire out at 9:51 p.m. As a result of the incident, 8 passengers sustained minor injuries.[56][57] Normal operations resumed the following day.[58]
  • On November 21, 2021, at 6:51 a.m., a window in a 3000 class LRV was damaged due to a stoning incident, injuring one passenger.[59] The suspect was later identified as a garbage collector and was subsequently arrested and charged.[60]

See also Edit

Notes Edit

  1. ^ 30.3 meters (99 ft 5 in) without couplers
  2. ^ Despite the floor height and platform height difference of 25 mm (0.98 in).

References Edit

  1. ^ . skd.cz. Archived from the original on March 3, 2018. Retrieved October 31, 2020.
  2. ^ a b Fernandez, Amanda (March 26, 2014). "10 passengers hurt as MRT train makes sudden stop". GMA News Online. Retrieved November 21, 2021.
  3. ^ a b c SKD (2000). [Catalog sheet of tram car RT8D5M]. Archived from the original on December 12, 2009. Retrieved May 24, 2020.
  4. ^ a b SKD (2000). [Total deliveries of trams in the years 1952 to 2000]. SKD. Archived from the original on October 4, 2008. Retrieved May 24, 2020.
  5. ^ a b DOTr-MRT Line 3. . dotcmrt3.gov.ph. GOV PH. Archived from the original on December 21, 2015. Retrieved May 24, 2020.
  6. ^ R. Vodička 2008, p. 13.
  7. ^ DOTC 2016, p. 4-6.
  8. ^ DOTC 2015, p. 64, 68.
  9. ^ a b DOTC 2013, p. 88.
  10. ^ DOTC 2013, p. 232.
  11. ^ 1993 CKD Tatra LRT-3 Ad. ČKD Tatra. 1993. Retrieved December 16, 2022.
  12. ^ "About". dotrmrt3.gov.ph. Retrieved October 24, 2021.
  13. ^ SKD (1999). [Tram deliveries in 1991–1999]. SKD. Archived from the original on May 24, 2020. Retrieved May 24, 2020.
  14. ^ Railway Technology (May 2, 2000). Manila Light Rail Extension operated by Metro Transit Corporation, Philippines (Report). Verdict Media Limited. from the original on May 19, 2020. Retrieved May 24, 2020.
  15. ^ . Czech Trams. Archived from the original on February 26, 2018. Retrieved February 25, 2018.
  16. ^ a b DOTC 2016, p. 6.
  17. ^ a b Pražské tramvaje (2001). "RT8D5M". prazketramvaje.cz. ISSN 1801-9994. from the original on January 19, 2019. Retrieved May 24, 2020.
  18. ^ MRT-3 Brands Through the Years. July 28, 2021. Retrieved April 5, 2022.
  19. ^ "Passenger information system to be installed in LRT, MRT". BusinessWorld. March 27, 2019. Retrieved December 12, 2020.
  20. ^ SKD (1997). Crash testy vozu RT8D5M ev.č.0029 "Manila" [Crash test documentation of RT8D5M prototype car 0029 for Manila] (Video) (in Czech). Prague, Czech Republic: Prazketramvaje. Retrieved May 24, 2020.
  21. ^ DOTC 2016, p. 5.
  22. ^ DOTC 2016, p. 4.
  23. ^ DOTC 2015, p. 66.
  24. ^ DOTC 2015, p. 68.
  25. ^ DOTC 2013, p. 85.
  26. ^ DOTC 2013, p. 249.
  27. ^ a b Garcia, Patrick; Quismorio, Ellson (January 29, 2018). "Nograles wants deeper probe on VLU mess after MRT 3 fire". Manila Bulletin. Retrieved January 18, 2022.
  28. ^ Marcelo, Patrizia Paola C. (September 21, 2017). "Busan Rail files graft case vs DoTR official". BusinessWorld. Retrieved January 18, 2022.
  29. ^ "Tugade, DOTr refuse to reveal Bombardier report showing 99% of MRT-3 trains using fake parts: Kaya pala MRTirik araw-araw!". Politiko. January 28, 2018. Retrieved January 18, 2022.
  30. ^ DOTC 2016, p. 50.
  31. ^ Dela Cruz, Raymond Carl (March 11, 2022). "MRT eyes 4-car train setup after successful 'dynamic testing'". Philippine News Agency. Retrieved March 28, 2022.
  32. ^ Recuenco, Aaron (March 28, 2022). "MRT-3 starts month-long free ride, deploys 4-car train set". Manila Bulletin. Retrieved March 28, 2022.
  33. ^ Pateña, Aerol John (August 8, 2018). "DOTr apologizes over MRT aircon leak". Philippine News Agency. Retrieved August 7, 2021. It said the ACUs were last replaced in 2008 as part of the system's first general overhaul eight years after it started operating in 2000.
  34. ^ Photo of MRT-3 ČKD Tatra RT8D5M light rail vehicle (LRV) being refurbished during the first round of general overhaul works under Sumitomo-TESP between years 2008 and 2009. July 22, 2021. Retrieved November 8, 2021.
  35. ^ Orellana, Faye (January 25, 2018). "DOTr blames former maintenance provider BURI for MRT-3 woes". Philippine Daily Inquirer. Retrieved August 7, 2021.
  36. ^ Dela Cruz, Raymond Carl (October 29, 2020). "MRT-3 conducts test runs on overhauled train at 50 kph". Philippine News Agency. Retrieved November 8, 2021.
  37. ^ Abadilla, Emmie V. (February 3, 2023). "MRT-3 completes overhaul of coaches". Manila Bulletin. Retrieved February 3, 2023.
  38. ^ Mercurio, Richmond (May 2, 2019). "MRT-3 rehab underway with return of Sumitomo". The Philippine Star. Retrieved February 26, 2021.
  39. ^ "CZECH REPUBLIC - PARTNER FOR MRT 3 IMPROVEMENT". Facebook. September 7, 2021.
  40. ^ Rodriguez, Mia (January 2, 2020). "Get Ready for a Chiller MRT-3 Ride in 2020". spot.ph. Retrieved January 9, 2022.
  41. ^ Rosales, Clara (June 18, 2021). "MRT-3 Rides Grow Cooler As All Trains Get New Aircon Units". reportr.world. Retrieved January 9, 2022.
  42. ^ Geronimo, Gian (November 3, 2012). "MRT train coach catches fire near Kamuning Station". GMA News Online. Retrieved September 6, 2019.
  43. ^ Pineda, Mj Lising (August 13, 2014). . Buhaykolehiyo. Archived from the original on October 25, 2014.
  44. ^ Camus, Miguel R. (August 19, 2014). "DOTC: Human error blamed for MRT-3 train accident; 4 train workers face raps". Inquirer.net. Retrieved June 6, 2020.
  45. ^ Photo of LRV 003 at North Avenue depot. June 18, 2020. Retrieved April 5, 2022.
  46. ^ Hegina, Aries Joseph (September 3, 2014). "MRT train continues run with one of its doors open". Philippine Daily Inquirer. Retrieved November 30, 2021.
  47. ^ "MRT operations temporarily stopped after seat catches fire". Rappler. September 18, 2017. Retrieved November 5, 2021.
  48. ^ Lagrimas, Nicole-Anne (November 16, 2017). "Up to 140 riders evacuated from 'detached train'". GMA News Online. Retrieved November 16, 2017.
  49. ^ "MRT emits smoke – again". Rappler. January 26, 2018. Retrieved January 18, 2022.
  50. ^ Rey, Aika (August 8, 2018). "Aircon leak causes 'rain' inside MRT3". Rappler. Retrieved July 8, 2021.
  51. ^ Galvez, Daphne (November 4, 2019). "MRT-3 resumes normal ops from North to Taft stations after train emits smoke". Inquirer.net. Retrieved January 17, 2022.
  52. ^ de Guzman, Robie (November 7, 2019). "MRT-3 says train smoke emission due to short circuit in traction motor". UNTV News. Retrieved January 17, 2022.
  53. ^ Manabat, Jacque (May 13, 2021). "MRT management looking for witnesses after train vandalism". ABS-CBN News. Retrieved May 13, 2021.
  54. ^ "Malinis na at napapatakbo na sa mainline ang isang train car o bagon ng MRT-3 na matatandaang ginawan ng bandalismo noong ika-12 ng Mayo 2021". Facebook. Retrieved May 25, 2021.
  55. ^ JUST IN: Bagon ng MRT-3 malapit sa Guadalupe station (NB), nagliyab (16:9) (Facebook Watch). GMA News. October 9, 2021. Retrieved October 9, 2021.
  56. ^ Fernandez, Daniza (October 10, 2021). "MRT-3 fire injures 8 passengers". Philippine Daily Inquirer. Retrieved October 10, 2021.
  57. ^ Montemayor, Ma. Teresa (October 10, 2021). "MRT-3 resumes full operation after fire". Philippine News Agency. Retrieved October 10, 2021.
  58. ^ "One hurt after unidentified suspect hurls stone at MRT3 train coach". GMA News and Public Affairs. November 21, 2021. Retrieved November 21, 2021.
  59. ^ "Suspek sa pambabato sa MRT3 na ikinasugat ng 1 pasahero, arestado". GMA News (in Filipino). November 21, 2021. Retrieved November 21, 2021.

Further reading Edit

  • Vodička, Radek (2008). Změna konstrukce stávající Kuželové převodovky tramvaje [The modification of the construction of the existing bevel gearbox of tram] (PDF) (Thesis). p. 13. (PDF) from the original on May 24, 2020. Retrieved May 24, 2020.
  • Department of Transportation and Communications (March 2016). Specifications (PDF). MRT–3 Capacity Expansion Project Lot 2: Upgrade of Ancillary Systems (Rebid) (Report). Vol. 2. Retrieved May 31, 2020.
  • Department of Transportation and Communications (March 2013). MRT3 System Temporary Maintenance Provider – One (1) Year (PDF) (Report). Retrieved February 16, 2022.
  • Official DOTC MRT3 Website October 15, 2016, at the Wayback Machine
  • Pražské tramvaje (2001). RT8D5M (Text and image gallery) (in Czech). Prague. ISSN 1801-9994. from the original on January 19, 2019. Retrieved May 24, 2020.
  • Department of Transportation and Communications (January 23, 2015). Procurement of Supply and Delivery of Sixty (60) Units Traction Motor (PDF) (Report). (PDF) from the original on December 28, 2021. Retrieved December 28, 2021.
  • Website of the tram manufacturer, ČKD

mrtc, 3000, class, Čkd, tatra, rt8d5m, also, known, tatra, train, class, high, floor, light, rail, vehicles, built, czech, tram, manufacturer, Čkd, tatra, currently, used, manila, line, were, last, vehicles, made, Čkd, tatra, before, taken, over, siemens, Čkd,. The MRTC 3000 class or CKD Tatra RT8D5M LRV also known as Tatra Train is a class of high floor light rail vehicles built by Czech tram manufacturer CKD Tatra It is currently used on the Manila MRT Line 3 and were the last vehicles made by CKD Tatra before it was taken over by Siemens MRTC 3000 classCKD Tatra RT8D5M LRVA MRTC 3000 Class Train passing the Ortigas Interchange March 2021 3000 class RT8D5M interior post second refurbishmentIn service1999 presentManufacturerCKD TatraDesignerPatrik Kotas cs Built atPrague Czech RepublicFamily nameTatra KT8D5Constructed1995 prototype 1997 1999Entered serviceDecember 15 1999Refurbished2008 2009 2016 2017 2019 2023Number built73 vehicles and 1 prototypeNumber in service54 vehicles 18 sets Number scrapped1 prototypeFormation3 cars per trainsetDesign codeRT8D5MFleet numbers001 073 original 3001 3073 current Capacity1 182 passengers 394 per LRV Operator s Department of TransportationDepot s North AvenueLine s servedMRT Line 3SpecificationsCar body constructionLow alloy high tensile steel body shell Aluminum sheets ceiling Train length95 16 m 312 ft 2 in Car length31 72 m 104 ft 1 in a Width2 5 m 8 ft 2 in Height3 65 m 12 ft 0 in from top of rail 3 73 m 12 ft 3 in pantograph locked down Floor height925 mm 3 ft 0 4 in Platform height900 mm 2 ft 11 in EntryLevel b Doors5 per side double leaf plug type 861 mm 1 255 mm 1 900 mm 2 ft 9 9 in 4 ft 1 4 in 6 ft 2 8 in Articulated sections3 per LRVWheel diameter700 mm 27 56 in new 595 mm 23 43 in worn Wheelbase1 9 m 6 ft 3 in per bogie 7 5 m 24 ft 7 in bogie centers 22 5 m 73 ft 10 in total Maximum speed65 km h 40 mph Weight46 8 t 103 000 lb empty Axle load9 t 20 000 lb Traction systemCKD Trakce TV14Z IGBT chopperTraction motorsCKD Trakce TE026A01 4 DC shunt winding motorPower output64 5 kW 86 5 hp per motor516 kW 692 hp per LRVTransmissionCardan drive 7 42 gear ratio Acceleration1 03 m s2 3 4 ft s2 Deceleration1 01 m s2 3 3 ft s2 service 1 58 m s2 5 2 ft s2 emergency Auxiliaries3 480 V AC static converter2 24 V DC batteriesHVACThermo King roof mounted air conditioning units 3 units per LRVElectric system s 750 V DC overhead wireCurrent collector s Single arm pantographUIC classificationBo Bo Bo Bo Wheels driven16 16 per LRVBogiesInside frame typeMinimum turning radius20 m 66 ft Braking system s Dynamic regenerative and rheostatic Mechanical discElectromagnetic track brakeSafety system s Bombardier EBICAB 900 ATPCoupling systemScharfenbergMultiple workingWithin typeHeadlight typeLED lampTrack gauge1 435 mm 4 ft 8 1 2 in standard gaugeSeatingLongitudinalNotes referencesReferences 1 2 3 4 5 6 7 8 9 10 11 CKD Tatra RT8D5M LRVs are owned by Metro Rail Transit Corporation MRTC and operated by the Department of Transportation DOTr thru DOTr MRT 3 Contents 1 Purchase 2 Design and specifications 2 1 Car body 2 2 Interior 2 3 Prototype RT8D5 0029 2 4 Mechanical 2 5 Electrical 2 6 Signaling and safety equipment 3 Operations 3 1 Refurbishments 3 1 1 First refurbishment 2008 2009 3 1 2 Second refurbishment 2016 2017 2019 2023 4 Incidents 5 See also 6 Notes 7 References 8 Further readingPurchase EditThe Manila MRT Line 3 construction began in 1996 when the then Department of Transportation and Communications DOTC later the Department of Transportation entered into a build lease transfer agreement with the Metro Rail Transit Corporation MRTC MRTC signed a contract with CKD Tatra in 1997 to supply the trains for the line 12 Aside from a prototype 73 light rail cars are produced by CKD in two batches 49 were produced in 1998 and the other 24 were completed the following year 13 The first train was flown into Manila via plane while the remaining trains were transported by sea 14 The fleet also happens to be the last produced by CKD before it was taken over by Siemens 15 Design and specifications Edit nbsp A scale model drawing of the MRTC 3000 class in a 3 car formationThe LRV design is a one way eight axle motorized car consisting of three articulated cars which are connected to each other by the joint and the cover 16 It is largely a high platform only version of the Tatra KT8D5 Car body Edit The car body is made of low alloy high tensile steel while the ceiling is made of aluminum sheets 17 Unlike the prototype 0029 these cars have rounded foreheads or beveled large windows at both ends 18 The trains wear a livery consisting of royal blue red and white Under the Metrostar Express branding the white portion contains the brand logo and lettering on the sides However since 2012 the branding has since been unused 19 The trains also usually wore wrap ads unlike the LRTA 1200 class which wear ads as a whole trainset the 3000 class are seen to wear wrap ads per car Each light rail vehicle has three roof mounted air conditioning units manufactured by Thermo King In total there are nine air conditioning units in a three car train set LRV 044 used to have experimental door lights above the doors in 2017 However the lights were removed when Sumitomo refurbished and renumbered LRV 044 as 3044 in 2021 nbsp A 3000 class trainset at North Avenue station Notice the door lights above the doors in LRV 044 July 2018 nbsp A 3000 class LRV with Cebu Pacific wrap advertising December 2022 nbsp Roof mounted trainsets cooling systems and a single arm pantograph of the 3000 class April 2022 nbsp A 3000 class RT8D5M train passing at the Ortigas Interchange October 2022 Interior Edit Each train car has a capacity of 74 seated passengers and 320 standing passengers Under crush loading conditions each car can carry 394 commuters at any one time A 3 car trainset can carry 1 182 passengers 17 Seats are longitudinal type Each car has five double leaf electronically operated plug sliding doors The three center doors have an open width of 1 255 mm 4 ft 1 4 in while the two end doors at 861 mm 2 ft 9 9 in The doors have a height of 1 900 mm 6 ft 3 in The Passenger Assist Railway Display System PARDS a passenger information system powered by LCD screens installed near the ceiling of the train that shows news advertisements current train location arrivals and station layouts are already installed inside the trains However as of 2022 the LCD screens remain switched off PARDS is also installed on trains on LRT lines 1 and 2 20 nbsp System map of the MRT 3 above the doors with two mounted lights below the map nbsp The Passenger Assist Railway Display System LCD monitor screen inside the 3000 class Prototype RT8D5 0029 Edit In March 1995 the first three car tram was tested in Prague under the number 0029 as a prototype 4 It was a development of the Tatra KT8D5 0029 retained its control proportions the front and rear sections and unlike the later production vehicles designed for bidirectional operation Prototype 0029 remained in Prague and it was used in October to November 1998 together with the Tatra T5A5 prototype tram no 0013 and the T3 no 6663 for various crash tests in the main workshop in Hostivar before being eventually scrapped 18 21 Mechanical Edit Each LRV has inside frame bogies consisting of four motorized bogies The primary suspension is a steel spring and the secondary suspension is a wound up steel spring 22 Scharfenberg couplers are present in the ends of the light rail vehicles nbsp Scharfenberg couplers of the 3000 class February 2022 nbsp A close up view of the couplers February 2022 nbsp The bogie of the 3000 class April 2022 Electrical Edit The electrical and traction systems of the RT8D5M trains are supplied by CKD Trakce The propulsion is controlled by choppers with IGBT thyristors 23 The traction motors consist of eight DC series wound wave armature winding self ventilated motors The traction motors have a Class H insulation class for the rotor and a Class F insulation class for the stator The motors comply with IEC 349 standards Each motor has a power output of 64 5 kilowatts 86 5 horsepower The motors are rated with a voltage of 375 volts a current of 190 amps and a speed of 1946 revolutions per minute rpm with a maximum speed of 4350 rpm 24 25 The auxiliaries include three 480 volt AC static converters and two 24 volt DC batteries 26 3 Signaling and safety equipment Edit The trains are equipped with the EBICAB 900 Automatic Train Protection ATP system 9 Some onboard signaling equipment consist of vehicle logic units VLUs driver panels and antennas 27 The original VLUs were manufactured by Bombardier Transportation acquired by Alstom in 2021 The VLUs are the primary automatic safety devices for the trains 28 In 2017 it was revealed that the original VLUs were stolen and replaced with unauthorized parts 29 An audit report by Bombardier Transportation showed that 99 of the trains were using fake parts 30 According to the inventory conducted in all cars the other cars were equipped with ABB ABB Daimler Benz or DaimlerChrysler branded VLUs 28 The EBICAB 900 ATP system is integrated with the CITYFLO 250 signaling solution of the MRT Line 3 supplied by Bombardier Transportation Operations EditThe trains run at a maximum design speed of 65 kilometers per hour 40 4 mph and run through standard gauge rail tracks 5 The RT8D5M operates as built on the high speed city rail system with high platforms and in tropical conditions 3 15 The vehicles are mainly operated in sets of three and operations with four car trainsets were first planned in 2016 31 The trains have been in use since the opening of the line in 1999 and has undergone two refurbishments On March 9 2022 a four car 3000 class trainset underwent a dynamic test run on the main line for the first time 32 Two four car trains were deployed on March 28 33 subsequently increased to four by April 18 Refurbishments Edit First refurbishment 2008 2009 Edit In 2008 during the line s first general overhaul the trains were first refurbished by Sumitomo Corporation Mitsubishi Heavy Industries and TES Philippines Inc TESP The aging air conditioning units of the trains since 1999 were replaced with new ones 34 The interior and exterior of the trains were also refurbished Sumitomo Corporation along with MHI and TESP refurbished 73 light rail vehicles LRVs from 2008 to 2009 35 Second refurbishment 2016 2017 2019 2023 Edit nbsp Train cars of the 3000 class with a BURI refurbished light rail vehicle on the left December 2021 nbsp A 3000 class train car after its second refurbishment by Sumitomo November 2021 43 light rail vehicles were planned to be overhauled under the maintenance of Busan Universal Rail Inc The refurbished cars underwent a body repaint and installation of new air conditioning units from Thermo King The refurbishment commenced in 2016 However due to service interruptions in 2017 that attributed to the poor maintenance of BURI the Department of Transportation terminated its contract with BURI on November 6 2017 with only three LRVs refurbished 36 The plan to refurbish the trains were again announced in December 2018 as part of the line s rehabilitation project which includes the refurbishment of the entire fleet of 72 light rail vehicles It began on May 1 2019 and was carried out by Sumitomo Corporation Mitsubishi Heavy Industries and TES Philippines Inc TESP On October 29 2020 the first newly overhauled train underwent a test run at a speed of 50 kilometers per hour 31 mph 37 Initially expected to be completed in May 2023 the refurbishment of all 72 light rail vehicles LRVs was completed three months ahead of schedule on February 2 2023 38 The rehabilitation project of the LRVs consists of the installation of new choppers traction motors wheels pantographs air conditioning units from Thermo King a replacement program for the air conditioning units began as early as 2018 the repainting of the train s exteriors and interiors and the fitting of new lighting installations throughout the trains 39 SKD Trade a s the company that produces spare parts for trains made by CKD Tatra became part of the overhaul project and provided spare parts for the trains 40 Meanwhile 120 new Thermo King air conditioning units were ordered for 40 LRVs 41 The installation of the new air conditioning units on all trains were completed on June 18 2021 42 Incidents Edit nbsp Passengers unloading from a 3000 class train in 2014 due to a service incident On November 3 2012 a train from the Araneta Center Cubao Station caught fire as it approached GMA Kamuning Station causing passengers to scramble to the exits and having two women injured The train caught fire due to electrical short circuit technical failure 43 On March 26 2014 at 10 50 am a southbound train at Guadalupe Station suddenly stopped due to the train driver not observing the red light status at the Guadalupe Station and accelerated southbound without getting prior clearance from the Control Center causing the automatic train protection system to activate the emergency brakes resulting in 10 injuries 2 On August 13 2014 a southbound train heading to Taft Avenue station derailed and overshot to the streets The train first stopped after leaving Magallanes station due to a technical problem Later on the train broke down altogether another train was used to push the stalled train During this process however the first train got detached from the rails and overshot towards Taft Avenue breaking the concrete barriers and falling to the street below At least 38 people were injured The accident was blamed on 2 train drivers and 2 control personnel for failing to follow the proper coordination procedures and protocol 44 45 The A and B sections of the involved train car were loaded sideways onto two flatbed trucks while the C section of the car was towed to the depot using a hi rail truck The train car is still stored at the line s depot in North Avenue as of June 2020 46 There are currently no news about actions to be taken at the damaged trainset and was noticeably excluded from train refurbishments On September 2 2014 a train continued with one of its doors left open after a train door failed to close at the Guadalupe station The passengers were then evacuated after the train arrived at Boni station 47 On September 18 2017 at 6 00 am a seat inside 3000 class LRV no 066 caught fire at the Santolan Annapolis station with no injuries reported 48 On November 16 2017 at 11 30 am at least 140 passengers were evacuated from a detached train coach between the railway lines of Buendia and Ayala Avenue Stations 49 On January 26 2018 a train caught fire between the Araneta Center Cubao and GMA Kamuning stations Partial operations were implemented and the situation normalized at 2 46 pm 50 On August 7 2018 an aircon leak caused rain inside a train and caused passengers inside to open their umbrellas The train was removed from service to fix the air conditioning unit and the train involved in the incident returned to service the following day 51 On November 4 2019 at 4 08 pm a train suddenly emitted smoke while on the northbound track of the line Around 530 passengers were unloaded Around two hours after the incident the operation of the line was back to normal 52 The fire was caused by a short circuit in the traction motor 53 On May 12 2021 3000 class LRV 015 was vandalized by an unidentified culprit near Taft Avenue station Investigations were conducted and initial reports state that the culprit had cut the perimeter fence near Taft Avenue station which may have caused the vandalism 54 The vandalized train was cleaned and returned to service on May 18 2021 55 On October 9 2021 at 9 12 p m 3000 class LRV 032 caught fire near the Guadalupe station A provisional service was implemented between North Avenue and Shaw Boulevard station and the site of the incident was declared fire out at 9 51 p m As a result of the incident 8 passengers sustained minor injuries 56 57 Normal operations resumed the following day 58 On November 21 2021 at 6 51 a m a window in a 3000 class LRV was damaged due to a stoning incident injuring one passenger 59 The suspect was later identified as a garbage collector and was subsequently arrested and charged 60 See also EditMRT Line 3 Metro Manila Metro Rail Transit Corporation MRTC 3100 classNotes Edit 30 3 meters 99 ft 5 in without couplers Despite the floor height and platform height difference of 25 mm 0 98 in References Edit Tramcar RT8D5M Model Basic Features skd cz Archived from the original on March 3 2018 Retrieved October 31 2020 a b Fernandez Amanda March 26 2014 10 passengers hurt as MRT train makes sudden stop GMA News Online Retrieved November 21 2021 a b c SKD 2000 Katalogovy list tramvajoveho vozu RT8D5M Catalog sheet of tram car RT8D5M Archived from the original on December 12 2009 Retrieved May 24 2020 a b SKD 2000 Celkove dodavky tramvaji v letech 1952 az 2000 Total deliveries of trams in the years 1952 to 2000 SKD Archived from the original on October 4 2008 Retrieved May 24 2020 a b DOTr MRT Line 3 About the MRT 3 dotcmrt3 gov ph GOV PH Archived from the original on December 21 2015 Retrieved May 24 2020 R Vodicka 2008 p 13 DOTC 2016 p 4 6 DOTC 2015 p 64 68 a b DOTC 2013 p 88 DOTC 2013 p 232 1993 CKD Tatra LRT 3 Ad CKD Tatra 1993 Retrieved December 16 2022 About dotrmrt3 gov ph Retrieved October 24 2021 SKD 1999 Dodavky tramvaji v letech 1991 1999 Tram deliveries in 1991 1999 SKD Archived from the original on May 24 2020 Retrieved May 24 2020 Railway Technology May 2 2000 Manila Light Rail Extension operated by Metro Transit Corporation Philippines Report Verdict Media Limited Archived from the original on May 19 2020 Retrieved May 24 2020 a b the most popular tram in the world PCC part 3 Czechoslovakia Krakow public transport Archived from the original on November 16 2019 Retrieved February 25 2018 Tatra RT8D5 In Czech Czech Trams Archived from the original on February 26 2018 Retrieved February 25 2018 a b DOTC 2016 p 6 a b Prazske tramvaje 2001 RT8D5M prazketramvaje cz ISSN 1801 9994 Archived from the original on January 19 2019 Retrieved May 24 2020 MRT 3 Brands Through the Years July 28 2021 Retrieved April 5 2022 Passenger information system to be installed in LRT MRT BusinessWorld March 27 2019 Retrieved December 12 2020 SKD 1997 Crash testy vozu RT8D5M ev c 0029 Manila Crash test documentation of RT8D5M prototype car 0029 for Manila Video in Czech Prague Czech Republic Prazketramvaje Retrieved May 24 2020 DOTC 2016 p 5 DOTC 2016 p 4 DOTC 2015 p 66 DOTC 2015 p 68 DOTC 2013 p 85 DOTC 2013 p 249 a b Garcia Patrick Quismorio Ellson January 29 2018 Nograles wants deeper probe on VLU mess after MRT 3 fire Manila Bulletin Retrieved January 18 2022 Marcelo Patrizia Paola C September 21 2017 Busan Rail files graft case vs DoTR official BusinessWorld Retrieved January 18 2022 Tugade DOTr refuse to reveal Bombardier report showing 99 of MRT 3 trains using fake parts Kaya pala MRTirik araw araw Politiko January 28 2018 Retrieved January 18 2022 DOTC 2016 p 50 Dela Cruz Raymond Carl March 11 2022 MRT eyes 4 car train setup after successful dynamic testing Philippine News Agency Retrieved March 28 2022 Recuenco Aaron March 28 2022 MRT 3 starts month long free ride deploys 4 car train set Manila Bulletin Retrieved March 28 2022 Patena Aerol John August 8 2018 DOTr apologizes over MRT aircon leak Philippine News Agency Retrieved August 7 2021 It said the ACUs were last replaced in 2008 as part of the system s first general overhaul eight years after it started operating in 2000 Photo of MRT 3 CKD Tatra RT8D5M light rail vehicle LRV being refurbished during the first round of general overhaul works under Sumitomo TESP between years 2008 and 2009 July 22 2021 Retrieved November 8 2021 Orellana Faye January 25 2018 DOTr blames former maintenance provider BURI for MRT 3 woes Philippine Daily Inquirer Retrieved August 7 2021 Dela Cruz Raymond Carl October 29 2020 MRT 3 conducts test runs on overhauled train at 50 kph Philippine News Agency Retrieved November 8 2021 Abadilla Emmie V February 3 2023 MRT 3 completes overhaul of coaches Manila Bulletin Retrieved February 3 2023 Mercurio Richmond May 2 2019 MRT 3 rehab underway with return of Sumitomo The Philippine Star Retrieved February 26 2021 CZECH REPUBLIC PARTNER FOR MRT 3 IMPROVEMENT Facebook September 7 2021 Rodriguez Mia January 2 2020 Get Ready for a Chiller MRT 3 Ride in 2020 spot ph Retrieved January 9 2022 Rosales Clara June 18 2021 MRT 3 Rides Grow Cooler As All Trains Get New Aircon Units reportr world Retrieved January 9 2022 Geronimo Gian November 3 2012 MRT train coach catches fire near Kamuning Station GMA News Online Retrieved September 6 2019 Pineda Mj Lising August 13 2014 MRT 3 Gets Derailed Buhaykolehiyo Archived from the original on October 25 2014 Camus Miguel R August 19 2014 DOTC Human error blamed for MRT 3 train accident 4 train workers face raps Inquirer net Retrieved June 6 2020 Photo of LRV 003 at North Avenue depot June 18 2020 Retrieved April 5 2022 Hegina Aries Joseph September 3 2014 MRT train continues run with one of its doors open Philippine Daily Inquirer Retrieved November 30 2021 MRT operations temporarily stopped after seat catches fire Rappler September 18 2017 Retrieved November 5 2021 Lagrimas Nicole Anne November 16 2017 Up to 140 riders evacuated from detached train GMA News Online Retrieved November 16 2017 MRT emits smoke again Rappler January 26 2018 Retrieved January 18 2022 Rey Aika August 8 2018 Aircon leak causes rain inside MRT3 Rappler Retrieved July 8 2021 Galvez Daphne November 4 2019 MRT 3 resumes normal ops from North to Taft stations after train emits smoke Inquirer net Retrieved January 17 2022 de Guzman Robie November 7 2019 MRT 3 says train smoke emission due to short circuit in traction motor UNTV News Retrieved January 17 2022 Manabat Jacque May 13 2021 MRT management looking for witnesses after train vandalism ABS CBN News Retrieved May 13 2021 Malinis na at napapatakbo na sa mainline ang isang train car o bagon ng MRT 3 na matatandaang ginawan ng bandalismo noong ika 12 ng Mayo 2021 Facebook Retrieved May 25 2021 JUST IN Bagon ng MRT 3 malapit sa Guadalupe station NB nagliyab 16 9 Facebook Watch GMA News October 9 2021 Retrieved October 9 2021 Fernandez Daniza October 10 2021 MRT 3 fire injures 8 passengers Philippine Daily Inquirer Retrieved October 10 2021 Montemayor Ma Teresa October 10 2021 MRT 3 resumes full operation after fire Philippine News Agency Retrieved October 10 2021 One hurt after unidentified suspect hurls stone at MRT3 train coach GMA News and Public Affairs November 21 2021 Retrieved November 21 2021 Suspek sa pambabato sa MRT3 na ikinasugat ng 1 pasahero arestado GMA News in Filipino November 21 2021 Retrieved November 21 2021 Further reading Edit nbsp Wikimedia Commons has media related to MRTC Class 3000 Vodicka Radek 2008 Zmena konstrukce stavajici Kuzelove prevodovky tramvaje The modification of the construction of the existing bevel gearbox of tram PDF Thesis p 13 Archived PDF from the original on May 24 2020 Retrieved May 24 2020 Department of Transportation and Communications March 2016 Specifications PDF MRT 3 Capacity Expansion Project Lot 2 Upgrade of Ancillary Systems Rebid Report Vol 2 Retrieved May 31 2020 Department of Transportation and Communications March 2013 MRT3 System Temporary Maintenance Provider One 1 Year PDF Report Retrieved February 16 2022 Official DOTC MRT3 Website Archived October 15 2016 at the Wayback Machine Prazske tramvaje 2001 RT8D5M Text and image gallery in Czech Prague ISSN 1801 9994 Archived from the original on January 19 2019 Retrieved May 24 2020 Department of Transportation and Communications January 23 2015 Procurement of Supply and Delivery of Sixty 60 Units Traction Motor PDF Report Archived PDF from the original on December 28 2021 Retrieved December 28 2021 Website of the tram manufacturer CKD Retrieved from https en wikipedia org w index php title MRTC 3000 class amp oldid 1178905444, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.