Stuttgart–Hattingen railway

The Stuttgart–Hattingen railway, also known as the Gäu Railway[2] (German: Gäubahn, IPA: [ˈɡɔɪbaːn]) is a 148.5-kilometer-long railway in the southern part of the state of Baden-Württemberg in Germany, running from Stuttgart to Hattingen. The Royal Württemberg State Railways (Königlich Württembergischen Staats-Eisenbahnen or K.W.St.E.) and the Baden State Railways (Badische Staatseisenbahnen) constructed the majority of this line between the years 1866 and 1879. However, the line in its present form was not completed until the Deutsche Reichsbahn finished construction on the connection between Tuttlingen and Hattingen in 1934. Today the partially single-track, fully electrified line features the high-speed Intercity-Express (ICE) service, with its tilting train technology, traveling from Stuttgart to Zurich. In addition, a multitude of local train services of numerous railway companies are on offer. The Gäu Railway is also a significant line in the North-South freight service system.

Stuttgart–Hattingen railway
Overview
Other name(s)Gäu Railway
Native nameGäubahn
OwnerDeutsche Bahn
Line number
  • 4860 (Stuttgart–Horb)
  • 4600 (Horb–Tuttlingen)
  • 4661 (Tuttlingen–Hattingen)
  • 4250 (Hattingen–Singen)
LocaleBaden-Württemberg, Germany
Termini
Service
Route number740
Operator(s)DB Netz
Technical
Line length148.5 km (92.3 mi)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification15 kV/16.7 Hz AC overhead catenary
Operating speed140 km/h (87 mph)
Route map

Stuttgart Hauptbahnhof
(until 1922)
0.0
Stuttgart Hbf
(from 1922)
2.9
Viaduct via the old Nordbahnhof (112 m)
freight connection turnoff to Stuttgart-Feuerbach
old layout until 1922
4.5
Kriegsberg tunnel (579 m)
8.6
Stuttgart West
(closed 29 Sep 1985)
8.9
Hasenberg tunnel (258 m)
9.4
Stuttgart-Heslach
(closed 29 May 1960)
11.1
Wildpark
(closed 28 May 1961)
14.1
Stuttgart Österfeld
S-Bahn stop only
14.7
Nesenbach Viaduct (111 m)
Filder Railway from Stuttgart-Möhringen
15.6
16.7
Stuttgart-Rohr
Rohr Curve (planned)
17.6
Berghau Tunnel (200 m)
20.0
former Kaufwald Tunnel (150 m)
(until 1958/59)
20.6
Mönchsbrunnen
24.5
Goldberg
25.9
Böblingen, terminus of S 60
437 m
freight traffic to industrial park Hulb
27.8
Hulb
31.2
Ehningen (b Böblingen)
29.4
Würm (92 m)
34.8
Gärtringen
37.6
Nufringen
41.6
Herrenberg, terminus of S 1
431 m
46.2
Gäufelden
used to be Nebringen
former night fighter airfield and
KZ-Außenlager Hailfingen-Tailfingen
50.7
Bondorf (b Herrenberg)
54.8
Ergenzingen
57.2
Eutingen im Gäu, terminus of S 41
476 m
Hochdorf (b Horb)
511 m
connecting curve (since 1933)
58.5
Eutingen (Württ)
(until 1933
63.3
Mühlen Tunnel (309 m)
66.9
Neckar (148 m)
67.2
Horb am Neckar
69.4
80.3
81.6
Horb Rbf
85.6
Dettingen (Horb)
87.3
Neckarhausen
90.3
Fischingen (Sulz am Neckar)
94.4
Sulz (Neckar)
94.7
Sulz tunnel (297 m)
99.7
Grünholz
103.4
Oberndorf-Aistaig
105.5
Oberndorf (Neckar)
108.9
Altoberndorf
111.5
Epfendorf
115.3
Talhausen-Herrenzimmern
116.9
Talhausen
117.3
Neckar (53 m)
117.4
Hohenstein Tunnel (103 m)
118.8
Neckar (57 m)
120.0
Tierstein Tunnel (654 m)
120.8
Neckar (48 m)
120.8
Bernburg Tunnel (269 m)
121.1
Neckar (41 m)
122.3
Au Tunnel (114 m)
123.4
Rottweil
123.8
Neckar (53 m)
124.5
Rottweil-Göllsdorf
125.8
Rottweil Saline
Balingen–Rottweil railway (until 1971)
129.4
Rottweil-Neufra
130.2
Neufra (b Rottweil)
131.8
Neuhaus
134.2
Aldingen (b Spaichingen)
136.4
Hofen (b Spaichingen)
136.8
Spaichingen Mitte
138.4
Spaichingen
670 m
139.9
Balgheim
143.5
Rietheim (Württemberg)
684 m
145.3
Weilheim (Württemberg)
Wurmlingen
147.2
Wurmlingen Nord
148.0
Wurmlingen Mitte
was Wurmlingen Ort
150.4
Tuttlingen Schulen
150.6
Danube (38 m)
151.2
0.0
Tuttlingen
649 m
Hattingen (Baden) connecting curve
(since 1934)
Tuttlingen Gänsäcker
153.7
Danube
154.3
Möhringen Bahnhof
652 m
Möhringen Rathaus
Immendingen Mitte
161.0
Immendingen
658 m
8.2
Hattingen (Baden)
696 m
Source: German railway atlas[1]

Route details

 
Stuttgart Hauptbahnhof, starting point of the Gäu Railway, and capital of the state of Baden-Württemberg

The Gäubahn steadily ascends from Stuttgart Hbf in a continuous loop around the city center, which, due to its superb views of the basin of the Stuttgart valley, lent the name "Panoramabahn" to this section, and counts as one of the most beautiful city center railways in Germany. From the city it heads in a southwesterly direction, and runs alongside the nature park Schönbuch between Böblingen und Herrenberg. From there, the line runs through the eponymous Gäu to Eutingen. The route then descends into the Neckar valley and brushes up against some of the easternmost parts of the Black Forest, until it leaves the Neckar valley near Rottweil, and follows the Prim valley. Between Rottweil and Tuttlingen, the Gäubahn then traverses the Baar region at the foot of the Heuberg. Near Balgheim, the line then exits the Prim valley, and follows the Faulenbach and Elta to Tuttlingen, where it crosses the Danube.

 
The Gäubahn crosses the Danube near Tuttlingen
 
The station in Singen am Hohentwiel, the terminus of the Gäubahn

Until its end, the Gäubahn now takes a southerly direction. Near Hattingen, the line meets up with the Black Forest Railway (Schwarzwaldbahn), crosses the volcanic landscape of the Hegau, travels parallel to the Aach river for part of the way, and passes by the Hohentwiel shortly before its terminus in Singen. Near Spaichingen and Hattingen, the line crosses the main European watershed between the Rhine and Danube rivers.

The Gäu Railway is a main line railway, 148.5 kilometers in length. The entire route is electrified and is constructed to be used by the ICE tilting train technology. The line features twin tracks between Stuttgart and Horb and has a total of four tracks between the stations Stuttgart-Österfeld and Stuttgart-Rohr, a 3.5-kilometer-long section. The Gäu Railway and Nagold Valley Railway share tracks between Eutingen und Horb.

The line crosses six districts of the state of Baden-Württemberg, plus the district of Stuttgart, and is part of 5 public transport associations. In the Stuttgart area, and in the district of Böblingen, namely between Stuttgart Hbf and Bondorf, the line is part of the transport-and-tariff association Stuttgart (Verkehrs- und Tarifverbund Stuttgart (VVS)). The station in Ergenzingen is the only station in the district of Tübingen, and is part of the Neckar-Alb-Donau transport association (Verkehrsverbund Neckar-Alb-Donau (NALDO)). Between Eutingen and the industrial station at Neckarhausen, the route traverses the district of Freudenstadt, and its transport association (Verkehrs-Gemeinschaft Landkreis Freudenstadt (VGS)). From Sulz am Neckar to Rottweil-Neufra, the Gäubahn crosses the district of Rottweil, and the transport association (Verkehrsverbund Rottweil (VVR)). Traveling from Aldingen to Tuttlingen, the line then makes its way through the district of Tuttlingen, and its transport association (Verkehrsverbund Tuttlingen (TUTicket)) to Hattigen.

History

History of the name Gäubahn and Overview

 
Overview of the construction history of the Gäubahn
 
The Gäubahn between Stuttgart and Freudenstadt

The Gäu line from Stuttgart to Singen was originally cobbled together using a collection of sections of smaller railways, and these only combined in 1934 to become the line as it is today. The term Gäubahn was initially used as the name of the railway running from Stuttgart via Eutingen im Gäu to Freudenstadt, which largely travels through the Gäu, and which was put into service in 1879. Only in the section from Stuttgart to Eutingen do the two identically named lines share tracks. However, the section between Eutingen and Freudenstadt is also called the Gäubahn today.

Before 1934, the name Gäubahn was used for the section Stuttgart-Eutingen, which became an important part of north-south train connections, as well as the name for the section of the Nagold Valley Railway (Nagoldtalbahn) between Eutingen and Horb am Neckar, and for the section of the Upper Neckar Railway (Obere Neckarbahn) between Horb, via Tuttlingen, to Immendingen. Therefore, by 1934 the name Gäubahn was synonymous for the railway sections between Stuttgart and Immendingen, on the border between Württemberg and Baden.

In 1934, the name started to be used in yet another form: When the connection between Tuttlingen and Hattingen was completed, this line then connected the Gäu line to the section of the Black Forest line between Hattingen and Singen, forming a contiguous railway between Stuttgart and the Swiss border near Singen. This entire railway then adopted the term Gäubahn. The section of railway running between Tuttlingen and Immendingen, which had been replaced on the Gäubahn by the new section Tuttlingen-Hattingen, was assigned exclusively to the Danube Valley Railway (Donautalbahn, see Tuttlingen–Inzigkofen railway).

The full length of the Gäubahn traversed the territory of all three of the states in the German southwest in the late 19th century. The section between Hattingen and Singen, which is shared with the Black Forest line, runs through Baden, and was built by the Baden State Railways. Between Tuttlingen and Stuttgart, the line travels through lands in Württemberg, and was constructed by the Royal Württemberg State Railways. In addition, the area claimed by the Province of Hohenzollern reached to the Neckar near Dettingen and Horb, which made the Prussian province an adjacent owner. It was the two former railway companies, however, who built the Gäu line.

Construction of the Singen–Hattingen and Horb–Tuttlingen sections (1866–1869)

The first parts of the line were built at its southern end in Singen, far removed from the eponymous Gäu, by the Baden State Railways. The railway engineer Robert Gerwig, who hailed from Baden, was in the planning stages of a railway, which would cross the Black Forest from Offenburg to Singen, and which would become the Schwarzwaldbahn (Baden). At the time, a connection to Württemberg was not considered. The first part of that line, between Singen and Engen, which was topographically without real challenges, was opened for service on 6 September 1866. The extension of that section to Donaueschingen proved to be technically much more complex, and the construction of the ascending part of the line between Engen and Donaueschingen was not completed until 15 June 1868. The section between Engen and Hattingen is shared with the Gäubahn.

 
A Württemberg F type steam locomotive in Stuttgart-Heslach prior to 1900
 
The station in Spaichingen, which opened in 1869

In Württemberg, the Royal Württemberg State Railways had started in the late 1850s to build a line that paralleled the Neckar river, and connected with the Fils Valley Railway in Plochingen. This line, which was dubbed the Upper Neckar Railway, reached Reutlingen in 1859, Rottenburg am Neckar in 1861, and Horb am Neckar in 1866. Extending this route to Rottweil did not present any real technical hurdles, but was politically sensitive, because the areas around Fischingen, Neckarhausen, and Dettingen belonged to the Province of Hohenzollern, which meant that the agreement of Prussia was required to continue construction. The treaty between Prussia and Württemberg of March 1865 solved the issues around the extension of construction through Prussian territory. On 8 October 1867, service was started from Horb in Württemberg to the border town of Talhausen in Hohenzollern. On 23 July 1868, the crews of the Royal Württemberg State Railways reached Rottweil, back in Württemberg.

Württemberg had signed a treaty with Baden as early as 1865, which allowed it to connect to the then-under-construction Schwarzwaldbahn (Baden), and thereby the rail net of the Grand Duchy of Baden. The state therefore constructed not only the Rottweil–Villingen line, but also a line from Rottweil via Spaichingen to Tuttlingen, which opened on 15 July 1869. From Tuttlingen, the Royal Württemberg State Railways extended construction to the border town of Immendingen in Baden, which was done on 26 July 1870, and which meant that the connection to the Black Forest Railway (Baden) had been successfully completed. Starting in 1870, it was then possible to leave the capital in Stuttgart, and to travel by rail via Plochingen, Reutlingen, Horb, Rottweil, and Tuttlingen to Immendingen on Württemberg-owned tracks, and then to connect on to Singen, the Baden-Swiss border near Schaffhausen, and the western edge of Lake Constance (Bodensee). Two trains made the daily trip between Stuttgart and Tuttlingen, and an additional train traveled between Stuttgart and Rottweil only. Connections to Immendingen were initially only possible via Rottweil or Tuttlingen. The primary locomotive on this trip at the time was the Württemberg F class of steam locomotive, which took between 7 and 8 hours to cover the distance.

Construction of the Eutingen–Horb and Horb–Stuttgart sections (1874–1879)

 
The former Stuttgart Centralbahnhof, the starting point of construction of the Gäubahn in the direction of Freudenstadt
 
The construction of the Gäubahn around Eutingen

The big disadvantage of this traffic routing was the fact that the tracks would follow the Neckar valley in a lengthy loop, which would make travel times quite a bit longer. However, the Royal Württemberg State Railways did not pursue a more direct connection between Horb and Stuttgart, primarily due to engineering issues to do with the grade between the two points.

The partial section between Eutingen and the connection point to the Obere Neckarbahn in Horb was already completed by 1 June 1874. The aim of this construction was not the connection between Horb, via the Gäu and Böblingen, to Stuttgart, but was done to complete the Nagold Valley Railway from Pforzheim to Horb. This line had been started in 1868, and its connection to Horb meant the establishment of Horb as an important railway node. In 1874, the parts of the full Gäubahn Stuttgart–Singen consisted of the sections Eutingen–Tuttlingen and Hattingen–Singen, while the sections Eutingen–Stuttgart and Tuttlingen–Hattingen were still missing.

On 22 March 1873, the state of Württemberg legislated the creation of a railway between Stuttgart, via Herrenberg and Eutingen, to Freudenstadt, closing the gap between Stuttgart and Eutingen. In the discussions prior to the passage of this law, the term Gäubahn was used for the first time to label the section Stuttgart-Freudenstadt, and the term would later become the name for the entire line between Stuttgart and Singen. In November of the same year, construction on the technically challenging railway began in Stuttgart, led by the Württemberg engineer Georg Morlok. The track routing was quite complex, having to conquer steep grades and incorporating many tunnels. Much of the labor recruited by Morlok came from Italy.

Construction went well: During the winter 1877/78, the line had already reached Herrenberg. On 20 August 1879, after a trial run from Stuttgart to Freudenstadt, the Royal Württemberg State Railways officially opened this section on 2 September 1879, in the presence of chief engineer Georg Morlok, the president of Württemberg Hermann von Mittnacht, the mayor of Stuttgart Gottlob Friedrich von Hack, and many other dignitaries. The construction of this section shortened the distance between Stuttgart via Horb and Tuttlingen to Immendingen by 35 kilometers, and cut the trip time by 1 to 2 hours.

From regional to long-distance railway (1879–1919)

 
The station at Immendingen, which was the terminus of the Gäubahn for some time
 
The station at Oberndorf in 1895

The Gäubahn Stuttgart–Tuttlingen–Immendingen was primarily of regional importance at this time. The terminus of all long-distance travel was Immendingen. However, by the end of the 19th century trip times were becoming quite a bit shorter, to the point where the trip between Tuttlingen and Stuttgart had been cut down to only 3 hours in 1897, 4 to 5 hours less than in the 1870s. Starting in 1900, 3 daily express long-distance trains traversed the line, some of the time from Stuttgart via Immendingen all the way to Zurich. This trip did still require that passengers change trains in Immendingen. Around the turn of the century, the Royal Württemberg State Railways mostly used the steam locomotives of the class Württemberg AD for their express service, which were in turn replaced by the class Württemberg C during World War I. The class Württemberg T 5 was used for regional service. The 9th of April 1917 saw what was probably the most famous passenger on this line, when the leader of the Russian Revolution, Vladimir Lenin, traveled from Zurich via Stuttgart to Petrograd in a special train.

The line also gained in importance in terms of freight service, and in 1897 the Royal Württemberg State Railways already carried 400,000 tonnes of freight on the Gäubahn. Initially, the freight was largely made up of agricultural goods from the rich agrarian area of the Gäu, but soon industrial areas sprang up alongside the railway, which then used the Gäubahn to transport their goods.

The Royal Württemberg State Railways started to lay a second track alongside the originally single-track railway on short sections of the line in the 1880s and 1890s. In 1886, the first section to be made into a twin-track line was the 4.4-kilometer-long piece between Horb am Neckar and Eutingen im Gäu, which was shared between the Gäubahn and Nagoldtalbahn. In 1895, the 8.6-kilometer-long section between Stuttgart Hauptbahnhof and Stuttgart Westbahnhof, which was closed in 1993, received a second track.

Extension and heyday of the Gäubahn (1919–1945)

 
The tower of Stuttgart Hauptbahnhof, which was opened in 1922

In the period between World War I and World War II, the transport infrastructure in Germany received numerous improvements. On 22 October 1922, the new main station in Stuttgart (Stuttgart Hauptbahnhof) was officially opened. This removed the chokepoint at the terminus of the Gäubahn and enabled the expansion of the capacity of rail traffic. Once the new station was open for service, the Deutsche Reichsbahn altered the route taken by the Gäubahn in the center of Stuttgart, which avoided the station Stuttgart Nordbahnhof.

In the 1920s, the Free People's State of Württemberg, as Württemberg was known during the Weimar Republic, undertook to expand the single-track lines constructed in the 19th century. The goal was to enable rail traffic from Berlin to Switzerland and Italy to utilize not just the railways in the neighboring territories of Baden and Bavaria, but also to use the Gäubahn, and therefore tracks owned by Württemberg. In addition, the Reichswehr had an interest in a high-capacity rail connection between Berlin and the southwestern border, which, particularly after the return of Alsace-Lorraine to France in 1918, was not as close to the French border as the Rhine Valley Railway from Mannheim to Basel, and would not be as easy to disrupt in the event of war. The occupation of the city of Offenburg by French troops in 1923 reinforced the desire for an effective and efficient Gäubahn.

On the 23 and 24 October 1927, the Free People's State of Württemberg and the Reichsbahn signed a contract, which set out the terms of the expansion of the Gäubahn. Württemberg provided the Reichsbahn with a credit line of 35 million Reichsmark, and the Reichsbahn agreed to expand the section between Stuttgart and Tuttlingen to be twin-tracked, and also to construct a single track connecting line to the station in Hattingen on the Black Forest Railway (Baden).

This construction phase began in 1928. On 15 May 1934 the Reichsbahn opened the 8.2 kilometer-long single-track connection between Tuttlingen and Hattingen. Until construction stopped due to World War II in 1941, the Reichsbahn was also able to complete the expansion of the line to twin tracks from Stuttgart to Tuttlingen, with the exception of a 2.3-kilometer-long piece near Oberndorf am Neckar. With the completion of the single-track connection to Hattingen and the now twin-track Black Forest Railway (Baden), an efficient railway between Stuttgart and Singen had been created. The trip via Immendingen, and the requisite train change at that station, were therefore eliminated. As part of the expansion of the line, the Reichsbahn also expanded the node stations in Rottweil and Horb am Neckar, and replaced the old station buildings in Tuttlingen and Eutingen with new construction.

 
The station in Tuttlingen, newly constructed in 1933

The expansions during the 1920s and 1930s resulted in great improvements in the service schedule on the Gäubahn. Express trains traveled from Berlin via Erfurt, Würzburg, Stuttgart, Zurich, and Milan all the way to Rome. The last peacetime schedule in 1939 showed 3 express trains from Berlin to Italy, even though not all of the trains continued from Milan to Rome. In addition there was express service between Berlin and Lucerne as well as between Stuttgart and Konstanz. Travel time between Stuttgart and Singen was cut to 2 hours and 41 minutes in 1933, and the regional and local service schedules also saw marked improvements.

As was true prior to the railway expansion, and since World War I, the Württemberg class C steam locomotives were used in express service. After the completion of the expansion, it was the Prussian P 10 which assumed the lead on these trains. The Württemberg class C was reassigned to manage the regional and local service traffic. The class Württemberg T 5 was also still seen, but was replaced by 1933 by the DRG Class 24. The Prussian P 8 had already been used since 1920 between Horb and Immendingen. For freight service, the Prussian G 12 as well as the Württemberg K were used. Starting in 1924, the Reichsbahn began to assign the Prussian G 10 to short-distance freight service, and between 1936 and 1938, the DRG Class 86 saw use in the same capacity.

During World War II, passenger service was reduced in favor of the rather more significant freight traffic. The Mauser arms manufacturer in Oberndorf am Neckar was an important user of the line during the war, and Axis partner Italy received coal shipments from Upper Silesia using freight trains on the Gäubahn. The line lost much of its military freight significance in the North-South corridor with the German attack on the Soviet Union, and many of the newer locomotives, especially the Prussian P 10, were relocated by the Reichsbahn to eastern Europe, while passenger trains on the Gäubahn again saw the use of the Württemberg C locomotive.

War damage, dismantlement, and electrification (1945–1990)

 
The Nesenbach viaduct in Stuttgart-Vaihingen, destroyed in April 1945, was rebuilt in 1946, and expanded into 4 tracks in 1982/83

Until February 1945, the Gäubahn did not suffer much damage during World War II, with the exception of aerial bombardment in 1944/45, which caused severe damage to the stations in Herrenberg, Horb am Neckar, Rottweil, Spaichingen, and Tuttlingen. This damage only disrupted traffic in the short term. In February 1945, Allied bomber wings destroyed a bridge in an attack on the town of Oberndorf, which was an important center in the German arms manufacturing industry. Even more significant was the damage caused by German troops in April 1945, when several bridges were blown up between Stuttgart and Böblingen, stopping train traffic altogether shortly before the end of the war. It was not until May 1946 that the railway was opened again for through traffic. Also in April 1945, American and French troops occupied southwestern Germany, which meant that the section of the Gäubahn between Bondorf and Stuttgart fell into the American zone of occupation, while the section between Ergenzingen and Singen was assigned to the French zone.

France insisted on its right to reparations, unlike the United States of America, and in 1946 dismantled the second track between Horb and Tuttlingen, which had only been laid a few years before. Ever since, the Gäubahn is twin-tracked only between Stuttgart and Horb, as well as between Hattingen and Singen. The border between the American and French zones was responsible for the lack of through-traffic between Stuttgart and Singen, which did not resume until 1948. Compared to the heyday of the Gäubahn at the end of the 1930s, the service schedule was severely reduced, and did not reach the same level as before the war until the end of the 1950s. The service to and from Berlin, for which the line had been expanded in the time between the wars, was not resumed by the Deutsche Bundesbahn, and the traffic corridor Berlin–Erfurt–Würzburg–Stuttgart–Zürich had lost its significance due to the separation of East Germany and West Germany.

 
DRG class 465, also known at ET 65, in Eutingen

Starting in the 1950s, the Bundesbahn extended some of the express trains between Zurich and Stuttgart to Hamburg. Also, express service was reinstated between Stuttgart and Italy, largely due to the influx of guest workers from Italy into Baden-Württemberg at the end of the decade. These trains primarily saw the use of the Prussian P 10 and the Prussian P 8. Between 1958 and the middle of the 1970s, diesel locomotives of the class DB Class V 100 and DB Class V 200 replaced the steam locomotives on the Gäubahn, with the DB Class V 200.1 being used for freight service. The Bundesbahn then electrified the section between Stuttgart and Böblingen in 1963, with the goal of reducing travel time in local service trains in the Stuttgart area. The section Böblingen–Horb was converted to electric operation in 1974, and electrification of the rest of the Gäubahn to Singen was completed in 1977, which meant that primarily electric locomotives were used on the railway after 1977. Also in 1977, the Bundesbahn decided to close numerous stations and halts to enable express-like travel, with higher speeds, even in local service trains.

 
The Gäubahn above ground, and the 8.5 kilometer-long tunnel of the Verbindungsbahn of the S-Bahn Stuttgart

After the section between Böblingen und Stuttgart was electrified in 1963, initially it was locomotives of the DRG class E 17, DB Class 141, DRG Class E 44, and DRB Class ET 55, which saw service. These were then replaced with DRG Class ET 25, DB Class ET 27, and DRG Class ET 65 by 1969. After 1974, and the electrification of the section Böblingen–Horb, the Bundesbahn used the DB Class E 10 for regional service on the northern Gäubahn-section, and used the same locomotive for express service after 1977. For freight service, the Bundesbahn initially relied on the DB Class E 50 and DRG Class E 93, switching to the DB Class 151 in the 1980s, then the DB Class E 40 starting in 1988; since 1993, it has been the DB Class 143 responsible for freight service.

In 1985, the section between Stuttgart and Böblingen was incorporated into the network of the Stuttgart S-Bahn. Since then, the S-Bahn travels from Stuttgart Hbf on the Verbindungsbahn (Stuttgart), which is entirely underground in the center of the city, and which meets up with the Gäubahn at the Stuttgart Österfeld station. The Verbindungsbahn cuts down the trip distance of the S-Bahn by 5.5 kilometers, and puts the University of Stuttgart into the rail network, while regional and long-distance trains still use the old Gäubahn route. The section between Stuttgart-Österfeld and Stuttgart-Rohr, 3.5 kilometers in length, was expanded at high expense into 4 tracks between 1982 and 1983.

New long-distance and local service (since 1990)

 
The Cisalpino in Singen in 2004

By 1991, the number of express trains on the Gäubahn increased to eight daily trains, with five of those continuing on past Zurich to the cities of Milan, Genoa, and Lecce or Naples. On the other hand, traffic to the north was largely eliminated; for example, just a single express trains traveled on to Nuremberg at the time. The trip between Stuttgart and Singen now took exactly two hours, and was made by locomotives of the DB Class 110 and DB Class 181. Starting in 1993, the Deutsche Bundesbahn, and, from 1994, the privatized Deutsche Bahn AG, attempted to shorten express trip times even further. To achieve this goal, the Gäubahn saw test drives of the Italian Pendolino, as well as the Swedish X 2000. Between 1993 and 1995, two trains of the service type EuroCity replaced some of the traditional express trains on the line. For a short time, TEE-RABe trains of the Swiss Federal Railways were in use, which cut the trip time between Stuttgart and Singen to 1 hour and 50 minutes.

 
The Seehas in Bahnhof Engen

On 1 March 1998, two tilting trains of the type ETR 470, owned by the Swiss firm Cisalpino AG, replaced some express service trains, since German tilting technology trains were not available for service yet. This replacement did not initially result in shorter trip times. In 1999, the DB AG radically altered long-distance traffic on the Gäubahn, and stopped, with one exception, using locomotive-powered trains altogether. For the first time, trains of the type DB AG Class 415 with tilting technology were used on the line, and these trains, together with the Cisalpino, made up the bulk of long-distance trains. This resulted in a trip time of 1 hour and 44 minutes between Stuttgart and Singen. The Cisalpini were responsible for the traffic between Stuttgart and Milan, while the ICE trains carried the load between Stuttgart and Zurich; the through traffic between Stuttgart via Genoa to Naples was eliminated. In 2005, the last locomotive-powered express train, the so-called IC Insubria, was also removed. One year later, in December 2006, the Cisalpino service was stopped, eliminating direct connections to Italy, and making the ICE the only long-distance carrier on the Gäubahn.

Alterations in local service were just as deep as in the case of long-distance travel. On 5 December 1992, the S1 line of the Stuttgart S-Bahn was expanded to Herrenberg, which improved local service between the Gäu and the state capital. In 1994, the Seehas started service on the Gäubahn. This service, which travels between Engen and Singen, was initially managed by the Swiss company Mittelthurgaubahn, due to the lack of suitable DB AG-trains. In 2003, a sizable improvement of local service came about with the establishment of the Ringzug service, which traverses the Gäubahn between Tuttlingen and Rottweil. A commonality between these new local service offerings is the addition of frequently stopping local trains to the express service offerings, which restarted service to the small communities on the Gäubahn. To accommodate this service, DB Station&Service reactivated many closed stations and halts, and built a number of new halts on the line.

Operations

Long-distance traffic

 
ICT-T in Tuttlingen

Long-distance service on the Gäubahn in 2009 involves 7 ICE-T trains between Stuttgart and Zurich, running every other hour. A single ICE extends northwards through Stuttgart to Frankfurt am Main. The InterCityExpress service stops at Stuttgart Hbf, Horb am Neckar, Rottweil, Tuttlingen, and Singen; Böblingen, which had been a stop on the long-distance routes for decades, is not served. Starting in December 2006, the 7-car ICE-T of class 411 replaced the 5-car configuration of the class 415, and this service is guaranteed until 2011. At that time, Deutsche Bahn AG will reconsider options in long-distance traffic on the Gäubahn.

Regional traffic

 
Regional-Express of type 425/426 in Tuttlingen

In addition to the ICE trains, Regional-Express (RE) trains traverse the Gäubahn between Stuttgart and Singen, also every other hour. Another set of Regional-Express trains serve the section between Stuttgart and Rottweil, and these trains are separated in Eutingen. Going south, the trains from Stuttgart are split into two halves, with one half traveling the Gäubahn Eutingen–Freudenstadt to Freudenstadt, and the other half continuing on to Rottweil. Going north, these two halves are combined in Eutingen for the trip into Stuttgart. Between the two RE-trains routes (Stuttgart-Singen and Stuttgart-Rottweil), the section between Stuttgart and Rottweil has hourly service. Regional service on the Gäubahn is provided by the Deutsche Bahn AG, which has a long-term contract for this service with the state of Baden-Württemberg until 2016.

In 2004, the DB AG changed the train configuration on the route Stuttgart-Singen from the locomotive-powered trains with Silberling coaches to the new DBAG Class 425 electrical multiple unit trains, which were occasionally replaced by locomotive-powered trains of the class 146, with double-decker coaches, starting in 2006. The use of the class 425 has been greatly reduced on the Stuttgart-Singen route, but those units are still the train of choice on the Stuttgart-Rottweil/Freudenstadt route. Once a day the DB AG still uses modernized Silberling coaches and a locomotive on the trip between Stuttgart and Singen.

 
S-Bahn train in Stuttgart-Österfeld

Starting on 16 March 2009, to last until 13 June 2009, the schedules for all traffic was slightly altered. This is due to the fact that since the end of 2008, by order of the German rail authority, tilting technology was not to be used on the Gäubahn. This meant a 10-minute delay for ICE traffic, and disrupted the synchronization of long-distance, regional, and local service schedules. In addition, trains using DB Class 120 locomotives, and Swiss Federal Railway coaches, replaced 4 of the ICE trains from Stuttgart to Zurich.[3]

 
Ringzug shuttle in Rottweil

The section between Stuttgart and Herrenberg is integrated into the Stuttgart S-Bahn network. The S 1 service runs from Herrenberg to Stuttgart-Österfeld, where the train leaves the Gäubahn and travels underground via the Verbindungsbahn to Stuttgart Hauptbahnhof. From there, the S 1 service utilizes the Fils Valley Railway as far as Plochingen, before branching off to Kirchheim unter Teck the terminus of the S 1 route. The DBAG Class 423 is used on this route. The S-Bahn is also managed by the Deutsche Bahn AG, and runs every 30 minutes, except at rush hour during the work week, where trains are available every 15 minutes. Between Herrenberg and Eutingen (some of these trains only go to Bondorf), DB AG also runs RegionalBahn trains every hour under the week, whose schedules are synchronized with the S-Bahn trains. In addition, during the work week a train owned by the Albtal-Verkehrs-Gesellschaft travels between Freudenstadt, Eutingen, and Herrenberg, where it connects to the S-Bahn.

On the section Rottweil-Tuttlingen, the Ringzug of the Hohenzollerische Landesbahn provides local service. The Stadler Regio-Shuttle RS1 travel on the Gäubahn at least hourly under the week, and every other hour on weekends. Between Engen and Singen service is provided every 30 minutes by the Seehas of the type Stadler FLIRT, which is today managed by SBB GmbH, a subsidiary of the Swiss Federal Railway. Every other hour, the RE-trains of the DB AG, which travel on the Black Forest Railway (Baden) between Karlsruhe and Konstanz, provide additional service between Engen and Singen, using double-decker coaches powered by class 146 locomotives.

Freight traffic

 
A freight train with a class 185 near Wurmlingen

The Gäubahn is again becoming a significant railway in terms of international freight traffic, particularly as an alternative to the heavily traveled Rhine Valley Railway, primarily as a transit route. With the exception of the connecting line to the industrial area of Böblingen-Hulb, no freight is processed for shipment directly on the line. Railion trains travel primarily from the large shunting station near Kornwestheim to St. Margrethen in Switzerland, and go around Stuttgart Hbf. This was accomplished until the 1970s via the Pragtunnel, Bahnhof Stuttgart-West, and a connection loop, but has been handled since the opening of the Stuttgart S-Bahn by running freight trains via the Rankbach Railway (Rankbachbahn) from Kornwestheim via Leonberg to Böblingen and the Gäubahn. Railion mostly utilizes the class 185 locomotives.

Operational challenges

 
Two Ringzug trains crossing at Aldingen station

Notwithstanding the sizable reductions in trip times in the last decades, the Gäubahn is still a comparatively slow line, largely due to the single-track section between Horb and Hattingen. Particularly in the section between Tuttlingen and Rottweil, the single track is used by ICE, Regional-Express, freight traffic, and the Ringzug, which leads to numerous times where Ringzug trains have to stop at the stations in Wurmlingen, Spaichingen, and Aldingen to await a train traveling in the opposite direction. Even ICE trains have to make a scheduled stop in the industrial station in Epfendorf to await oncoming traffic. In Stuttgart, the scheduled ICE service misses the important ICE connections to Berlin and Dortmund by a few minutes, which makes these ICE connections less attractive. The Gäubahn is also challenged by the modernized Bundesautobahn 81.

Plans for the future

Reestablishment of twin-track configuration

 
The station in Rottweil on this presently single-track section, which is supposed to become the start of a twin-track piece to Spaichingen

The reestablishment of the Gäubahn in a twin-track configuration has been a topic of discussion in every decade since its dismantlement. Today there are different plans in existence, which would expand the section between Horb and Hattingen at least partially. This expansion is part of both the federal traffic plan (Bundesverkehrswegeplan) as well as the general traffic plan (Generalverkehrsplan) of the state of Baden-Württemberg. In 2006 the Federal Transport Ministry published a comparative study, where benefits of the electrification of the Southern Railway, the electrification of the Buchloe–Lindau railway, and the expansion of the Gäubahn were studied. The latter finished this comparison clearly in third place, compared to the other two projects, which were given higher ratings in positive economic impact.

The Interior Ministry of Baden-Württemberg underwrote a new study, which was to find new suggestions for an economically feasible plan for Gäubahn-expansion. This study of March 2007 does not envision an expansion of the complete section between Tuttlingen and Horb, but suggests twin-track expansion work for the pieces Horb-Neckarhausen, Rottweil–Spaichingen, and Rietheim–Wurmlingen, and to leave the rest of the section as is. The study suggested a cost of 135 million Euros for the project, and assigned it an economic impact rating of 1.3, compared to the 0.6 rating of the earlier comparative study. This expansion would reduce the trip time by 9 minutes, and would result in the synchronization of the ICE connections to Berlin and Dortmund. In addition, the trip times of the Ringzug between Rottweil and Tuttlingen would be reduced from 41 to 32 minutes, without eliminating any of the present stops. The municipalities on the Gäubahn, collectively associated in the Interessenverband Gäu-Neckar-Bodensee-Bahn, declared their willingness in March 2008 to provide financing of 360,000 Euros in advance for the planning phase of this expansion to twin tracks. The study allocated a total of 10 million Euros for general activities to increase the travel speed, and another 10 million Euros for the twin-track expansion in the section between Horb and Neckarhausen, with a planned start to construction in 2012 or 2013. The timely expansion of the rest of the sections seems to be much less realistic in light of the expense of the Stuttgart 21 project.

Stuttgart 21

 
Project Stuttgart 21

The project Stuttgart 21 aims to eliminate the tunnel-rich and steep section of the Gäu line in the center of Stuttgart. The plans see trains on the line taking a new route, on new tracks, from Stuttgart Hbf in the direction of Stuttgart Airport, where they would meet the planned Wendlingen–Ulm high-speed railway. From the airport, the Gäu line trains going in the direction of Böblingen would take the existing S-Bahn tracks to Stuttgart-Rohr, and would connect to the existing Gäu line via a new Rohr loop. This new route would extend the distance to Böblingen by 4.4 kilometers and would lengthen the trip for a Regional-Express train by 5 minutes.

For regional and long-distance trains from the direction of Singen, this new route would shorten the trip to the airport, and would no longer require a change of trains. However, at this time the exact nature of how Gäu line trains would stop at the airport is undecided. The use of the new Filder station would require the construction of a connecting line underneath the exhibition center at a cost of €100 million. The present plans call for the use of the existing S-Bahn station at the airport, but the Transport Ministry has so far shown no willingness to permit the required lowering of the tracks.

One additional use of the present Gäu line tracks is their ability to serve as an alternate route in case of the blockage of the S-Bahn tunnel between Stuttgart-Rohr and Stuttgart Hbf. This capability would no longer exist if this section was eliminated.

Local operations

The district of Rottweil explored the possibility between June and October 2008 of expanding Ringzug operations from Rottweil to Horb on the Gäubahn. As a result of an expansion, the Regional-Express halts in Sulz am Neckar and Oberndorf am Neckar would be eliminated. These plans failed when the towns of Sulz and Oberndorf expressed their opposition. In addition, as a result of the reactivation of the Rankbach Railway for the Stuttgart S-Bahn, the districts of Calw and Böblingen underwrote a study in July 2008 to explore the expansion of the S 1 line to Eutingen and Nagold.

See also

References

Footnotes

  1. ^ Eisenbahnatlas Deutschland [German railway atlas]. Schweers + Wall. 2009. pp. 94, 103, 111, 168. ISBN 978-3-89494-139-0.
  2. ^ "Stuttgart Region in Europe". Region Stuttgart. Retrieved 16 March 2011.
  3. ^ "DB passt Fahrpläne für Fernverkehrslinie Stuttgart-Zürich an – Längere Fahrzeit auf der Gäubahn jetzt in Auskunfts- und Buchungssysteme eingearbeitet" [DB fits timetables for Stuttgart-Zurich long-distance service - Longer journey time on Gäubahn now incorporated into information and booking systems]. Bahnonline.ch. 18 March 2009. Retrieved 24 March 2009.

Sources

  • Fladt-Stähle, Georg (2005). "Stuttgarter Balkon. 125 Jahre Gäubahn". Lok Magazin (281): 84–91. ISSN 0458-1822.
  • Leute, Richard (1983). "Die Geschichte der Eisenbahn im Raum Tuttlingen". Tuttlinger Heimatblätter (46): 46–62.
  • Scharf, Hans-Wolfgang; Wollny, Burkhard (1992). Die Gäubahn von Stuttgart nach Singen. Freiburg im Breisgau: EK-Verlag. ISBN 3-88255-701-X.
  • von Meißner, Frank (2004). "Magistrale im Verkehrsschatten: Die Gäubahn Stuttgart–Singen". Eisenbahn-Kurier (9): 36–41. ISSN 0170-5288.
  • von Meissner, Frank (2005). "Was wird aus dem Gäubahn-Fernverkehr? Die letzten Tage des IC Insubria". Eisenbahn-Kurier (11): 48–50. ISSN 0170-5288.
  • Wedler, Jürgen; Böttcher, Karl-Heinz (1985). Der Tunnel. Verbindungsbahn der S-Bahn Stuttgart. Dokumentation ihrer Entstehung. Kohlhammer, Stuttgart: BD Stuttgart. ISBN 3-925565-01-9.
  • Gaßebner, Jürgen; Jacobson, Claus-Jürgen (1999). Bahnanlagen aus der Luft. Baden-Württemberg. Stuttgart: Transpress-Verlag. ISBN 3-613-71098-6.

stuttgart, hattingen, railway, this, article, includes, list, general, references, lacks, sufficient, corresponding, inline, citations, please, help, improve, this, article, introducing, more, precise, citations, october, 2017, learn, when, remove, this, templ. This article includes a list of general references but it lacks sufficient corresponding inline citations Please help to improve this article by introducing more precise citations October 2017 Learn how and when to remove this template message The Stuttgart Hattingen railway also known as the Gau Railway 2 German Gaubahn IPA ˈɡɔɪbaːn is a 148 5 kilometer long railway in the southern part of the state of Baden Wurttemberg in Germany running from Stuttgart to Hattingen The Royal Wurttemberg State Railways Koniglich Wurttembergischen Staats Eisenbahnen or K W St E and the Baden State Railways Badische Staatseisenbahnen constructed the majority of this line between the years 1866 and 1879 However the line in its present form was not completed until the Deutsche Reichsbahn finished construction on the connection between Tuttlingen and Hattingen in 1934 Today the partially single track fully electrified line features the high speed Intercity Express ICE service with its tilting train technology traveling from Stuttgart to Zurich In addition a multitude of local train services of numerous railway companies are on offer The Gau Railway is also a significant line in the North South freight service system Stuttgart Hattingen railwayOverviewOther name s Gau RailwayNative nameGaubahnOwnerDeutsche BahnLine number4860 Stuttgart Horb 4600 Horb Tuttlingen 4661 Tuttlingen Hattingen 4250 Hattingen Singen LocaleBaden Wurttemberg GermanyTerminiStuttgartHattingen Baden ServiceRoute number740Operator s DB NetzTechnicalLine length148 5 km 92 3 mi Track gauge1 435 mm 4 ft 8 1 2 in standard gaugeElectrification15 kV 16 7 Hz AC overhead catenaryOperating speed140 km h 87 mph Route mapLegendStuttgart Hauptbahnhof until 1922 0 0 Stuttgart Hbf from 1922 Connecting line of the Stuttgart S BahnFils Valley RailwayFranconia Railway2 9 Viaduct via the old Nordbahnhof 112 m freight connection turnoff to Stuttgart Feuerbachold layout until 19224 5 Kriegsberg tunnel 579 m 8 6 Stuttgart West closed 29 Sep 1985 8 9 Hasenberg tunnel 258 m 9 4 Stuttgart Heslach closed 29 May 1960 11 1 Wildpark closed 28 May 1961 Connecting line of the Stuttgart S BahnS 1 S 2 S 314 1 Stuttgart Osterfeld S Bahn stop only14 7 Nesenbach Viaduct 111 m Stadtbahn StuttgartFilder Railway from Stuttgart Mohringen15 6 Stuttgart Vaihingentransit to Stadtbahn Stuttgart16 7 Stuttgart Rohrto Filderstadt S 2 S 3Rohr Curve planned 17 6 Berghau Tunnel 200 m 20 0 former Kaufwald Tunnel 150 m until 1958 59 20 6 Monchsbrunnen24 5 GoldbergRankbach Railway from Renningen S 6025 9 Boblingen terminus of S 60 437 mSchonbuch Railway to Dettenhausenfreight traffic to industrial park Hulb27 8 Hulb31 2 Ehningen b Boblingen 29 4 Wurm 92 m 34 8 Gartringen37 6 Nufringen41 6 Herrenberg terminus of S 1 431 mAmmer Valley Railway to Tubingen46 2 Gaufelden used to be Nebringenformer night fighter airfield andKZ Aussenlager Hailfingen Tailfingen50 7 Bondorf b Herrenberg 54 8 Ergenzingen57 2 Eutingen im Gau terminus of S 41 476 mNagold Valley Railway to Pforzheimfrom FreudenstadtHochdorf b Horb 511 mconnecting curve since 1933 58 5 Eutingen Wurtt until 193363 3 Muhlen Tunnel 309 m from Tubingen66 9 Neckar 148 m 67 2 Horb am Neckar69 480 381 6 Horb Rbf85 6 Dettingen Horb 87 3 Neckarhausen90 3 Fischingen Sulz am Neckar 94 4 Sulz Neckar 94 7 Sulz tunnel 297 m 99 7 Grunholz103 4 Oberndorf Aistaig105 5 Oberndorf Neckar 108 9 Altoberndorf111 5 Epfendorf115 3 Talhausen Herrenzimmern116 9 Talhausen117 3 Neckar 53 m 117 4 Hohenstein Tunnel 103 m 118 8 Neckar 57 m 120 0 Tierstein Tunnel 654 m 120 8 Neckar 48 m 120 8 Bernburg Tunnel 269 m 121 1 Neckar 41 m 122 3 Au Tunnel 114 m 123 4 Rottweil123 8 Neckar 53 m 124 5 Rottweil Gollsdorf125 8 Rottweil SalineBalingen Rottweil railway until 1971 Rottweil Villingen railway129 4 Rottweil Neufra130 2 Neufra b Rottweil 131 8 Neuhaus134 2 Aldingen b Spaichingen 136 4 Hofen b Spaichingen 136 8 Spaichingen Mitte138 4 Spaichingen 670 mHeuberg Railway to Reichenbach until 1966 139 9 Balgheim143 5 Rietheim Wurttemberg 684 m145 3 Weilheim Wurttemberg Wurmlingen147 2 Wurmlingen Nord148 0 Wurmlingen Mitte was Wurmlingen Ort150 4 Tuttlingen Schulen150 6 Danube 38 m from Sigmaringen151 20 0 Tuttlingen 649 mHattingen Baden connecting curve since 1934 Tuttlingen Gansacker153 7 Danube154 3 Mohringen Bahnhof 652 mMohringen RathausImmendingen MitteBlack Forest Railway161 0 Immendingen 658 mto Offenburg8 2 Hattingen Baden 696 mto SingenSource German railway atlas 1 Contents 1 Route details 2 History 2 1 History of the name Gaubahn and Overview 2 2 Construction of the Singen Hattingen and Horb Tuttlingen sections 1866 1869 2 3 Construction of the Eutingen Horb and Horb Stuttgart sections 1874 1879 2 4 From regional to long distance railway 1879 1919 2 5 Extension and heyday of the Gaubahn 1919 1945 2 6 War damage dismantlement and electrification 1945 1990 2 7 New long distance and local service since 1990 3 Operations 3 1 Long distance traffic 3 2 Regional traffic 3 3 Freight traffic 3 4 Operational challenges 4 Plans for the future 4 1 Reestablishment of twin track configuration 4 2 Stuttgart 21 4 3 Local operations 5 See also 6 References 6 1 Footnotes 6 2 SourcesRoute details Edit Stuttgart Hauptbahnhof starting point of the Gau Railway and capital of the state of Baden Wurttemberg The Gaubahn steadily ascends from Stuttgart Hbf in a continuous loop around the city center which due to its superb views of the basin of the Stuttgart valley lent the name Panoramabahn to this section and counts as one of the most beautiful city center railways in Germany From the city it heads in a southwesterly direction and runs alongside the nature park Schonbuch between Boblingen und Herrenberg From there the line runs through the eponymous Gau to Eutingen The route then descends into the Neckar valley and brushes up against some of the easternmost parts of the Black Forest until it leaves the Neckar valley near Rottweil and follows the Prim valley Between Rottweil and Tuttlingen the Gaubahn then traverses the Baar region at the foot of the Heuberg Near Balgheim the line then exits the Prim valley and follows the Faulenbach and Elta to Tuttlingen where it crosses the Danube The Gaubahn crosses the Danube near Tuttlingen The station in Singen am Hohentwiel the terminus of the Gaubahn Until its end the Gaubahn now takes a southerly direction Near Hattingen the line meets up with the Black Forest Railway Schwarzwaldbahn crosses the volcanic landscape of the Hegau travels parallel to the Aach river for part of the way and passes by the Hohentwiel shortly before its terminus in Singen Near Spaichingen and Hattingen the line crosses the main European watershed between the Rhine and Danube rivers The Gau Railway is a main line railway 148 5 kilometers in length The entire route is electrified and is constructed to be used by the ICE tilting train technology The line features twin tracks between Stuttgart and Horb and has a total of four tracks between the stations Stuttgart Osterfeld and Stuttgart Rohr a 3 5 kilometer long section The Gau Railway and Nagold Valley Railway share tracks between Eutingen und Horb The line crosses six districts of the state of Baden Wurttemberg plus the district of Stuttgart and is part of 5 public transport associations In the Stuttgart area and in the district of Boblingen namely between Stuttgart Hbf and Bondorf the line is part of the transport and tariff association Stuttgart Verkehrs und Tarifverbund Stuttgart VVS The station in Ergenzingen is the only station in the district of Tubingen and is part of the Neckar Alb Donau transport association Verkehrsverbund Neckar Alb Donau NALDO Between Eutingen and the industrial station at Neckarhausen the route traverses the district of Freudenstadt and its transport association Verkehrs Gemeinschaft Landkreis Freudenstadt VGS From Sulz am Neckar to Rottweil Neufra the Gaubahn crosses the district of Rottweil and the transport association Verkehrsverbund Rottweil VVR Traveling from Aldingen to Tuttlingen the line then makes its way through the district of Tuttlingen and its transport association Verkehrsverbund Tuttlingen TUTicket to Hattigen History EditHistory of the name Gaubahn and Overview Edit Overview of the construction history of the Gaubahn The Gaubahn between Stuttgart and Freudenstadt The Gau line from Stuttgart to Singen was originally cobbled together using a collection of sections of smaller railways and these only combined in 1934 to become the line as it is today The term Gaubahn was initially used as the name of the railway running from Stuttgart via Eutingen im Gau to Freudenstadt which largely travels through the Gau and which was put into service in 1879 Only in the section from Stuttgart to Eutingen do the two identically named lines share tracks However the section between Eutingen and Freudenstadt is also called the Gaubahn today Before 1934 the name Gaubahn was used for the section Stuttgart Eutingen which became an important part of north south train connections as well as the name for the section of the Nagold Valley Railway Nagoldtalbahn between Eutingen and Horb am Neckar and for the section of the Upper Neckar Railway Obere Neckarbahn between Horb via Tuttlingen to Immendingen Therefore by 1934 the name Gaubahn was synonymous for the railway sections between Stuttgart and Immendingen on the border between Wurttemberg and Baden In 1934 the name started to be used in yet another form When the connection between Tuttlingen and Hattingen was completed this line then connected the Gau line to the section of the Black Forest line between Hattingen and Singen forming a contiguous railway between Stuttgart and the Swiss border near Singen This entire railway then adopted the term Gaubahn The section of railway running between Tuttlingen and Immendingen which had been replaced on the Gaubahn by the new section Tuttlingen Hattingen was assigned exclusively to the Danube Valley Railway Donautalbahn see Tuttlingen Inzigkofen railway The full length of the Gaubahn traversed the territory of all three of the states in the German southwest in the late 19th century The section between Hattingen and Singen which is shared with the Black Forest line runs through Baden and was built by the Baden State Railways Between Tuttlingen and Stuttgart the line travels through lands in Wurttemberg and was constructed by the Royal Wurttemberg State Railways In addition the area claimed by the Province of Hohenzollern reached to the Neckar near Dettingen and Horb which made the Prussian province an adjacent owner It was the two former railway companies however who built the Gau line Construction of the Singen Hattingen and Horb Tuttlingen sections 1866 1869 Edit The first parts of the line were built at its southern end in Singen far removed from the eponymous Gau by the Baden State Railways The railway engineer Robert Gerwig who hailed from Baden was in the planning stages of a railway which would cross the Black Forest from Offenburg to Singen and which would become the Schwarzwaldbahn Baden At the time a connection to Wurttemberg was not considered The first part of that line between Singen and Engen which was topographically without real challenges was opened for service on 6 September 1866 The extension of that section to Donaueschingen proved to be technically much more complex and the construction of the ascending part of the line between Engen and Donaueschingen was not completed until 15 June 1868 The section between Engen and Hattingen is shared with the Gaubahn A Wurttemberg F type steam locomotive in Stuttgart Heslach prior to 1900 The station in Spaichingen which opened in 1869 In Wurttemberg the Royal Wurttemberg State Railways had started in the late 1850s to build a line that paralleled the Neckar river and connected with the Fils Valley Railway in Plochingen This line which was dubbed the Upper Neckar Railway reached Reutlingen in 1859 Rottenburg am Neckar in 1861 and Horb am Neckar in 1866 Extending this route to Rottweil did not present any real technical hurdles but was politically sensitive because the areas around Fischingen Neckarhausen and Dettingen belonged to the Province of Hohenzollern which meant that the agreement of Prussia was required to continue construction The treaty between Prussia and Wurttemberg of March 1865 solved the issues around the extension of construction through Prussian territory On 8 October 1867 service was started from Horb in Wurttemberg to the border town of Talhausen in Hohenzollern On 23 July 1868 the crews of the Royal Wurttemberg State Railways reached Rottweil back in Wurttemberg Wurttemberg had signed a treaty with Baden as early as 1865 which allowed it to connect to the then under construction Schwarzwaldbahn Baden and thereby the rail net of the Grand Duchy of Baden The state therefore constructed not only the Rottweil Villingen line but also a line from Rottweil via Spaichingen to Tuttlingen which opened on 15 July 1869 From Tuttlingen the Royal Wurttemberg State Railways extended construction to the border town of Immendingen in Baden which was done on 26 July 1870 and which meant that the connection to the Black Forest Railway Baden had been successfully completed Starting in 1870 it was then possible to leave the capital in Stuttgart and to travel by rail via Plochingen Reutlingen Horb Rottweil and Tuttlingen to Immendingen on Wurttemberg owned tracks and then to connect on to Singen the Baden Swiss border near Schaffhausen and the western edge of Lake Constance Bodensee Two trains made the daily trip between Stuttgart and Tuttlingen and an additional train traveled between Stuttgart and Rottweil only Connections to Immendingen were initially only possible via Rottweil or Tuttlingen The primary locomotive on this trip at the time was the Wurttemberg F class of steam locomotive which took between 7 and 8 hours to cover the distance Construction of the Eutingen Horb and Horb Stuttgart sections 1874 1879 Edit The former Stuttgart Centralbahnhof the starting point of construction of the Gaubahn in the direction of Freudenstadt The construction of the Gaubahn around Eutingen The big disadvantage of this traffic routing was the fact that the tracks would follow the Neckar valley in a lengthy loop which would make travel times quite a bit longer However the Royal Wurttemberg State Railways did not pursue a more direct connection between Horb and Stuttgart primarily due to engineering issues to do with the grade between the two points The partial section between Eutingen and the connection point to the Obere Neckarbahn in Horb was already completed by 1 June 1874 The aim of this construction was not the connection between Horb via the Gau and Boblingen to Stuttgart but was done to complete the Nagold Valley Railway from Pforzheim to Horb This line had been started in 1868 and its connection to Horb meant the establishment of Horb as an important railway node In 1874 the parts of the full Gaubahn Stuttgart Singen consisted of the sections Eutingen Tuttlingen and Hattingen Singen while the sections Eutingen Stuttgart and Tuttlingen Hattingen were still missing On 22 March 1873 the state of Wurttemberg legislated the creation of a railway between Stuttgart via Herrenberg and Eutingen to Freudenstadt closing the gap between Stuttgart and Eutingen In the discussions prior to the passage of this law the term Gaubahn was used for the first time to label the section Stuttgart Freudenstadt and the term would later become the name for the entire line between Stuttgart and Singen In November of the same year construction on the technically challenging railway began in Stuttgart led by the Wurttemberg engineer Georg Morlok The track routing was quite complex having to conquer steep grades and incorporating many tunnels Much of the labor recruited by Morlok came from Italy Construction went well During the winter 1877 78 the line had already reached Herrenberg On 20 August 1879 after a trial run from Stuttgart to Freudenstadt the Royal Wurttemberg State Railways officially opened this section on 2 September 1879 in the presence of chief engineer Georg Morlok the president of Wurttemberg Hermann von Mittnacht the mayor of Stuttgart Gottlob Friedrich von Hack and many other dignitaries The construction of this section shortened the distance between Stuttgart via Horb and Tuttlingen to Immendingen by 35 kilometers and cut the trip time by 1 to 2 hours From regional to long distance railway 1879 1919 Edit The station at Immendingen which was the terminus of the Gaubahn for some time The station at Oberndorf in 1895 The Gaubahn Stuttgart Tuttlingen Immendingen was primarily of regional importance at this time The terminus of all long distance travel was Immendingen However by the end of the 19th century trip times were becoming quite a bit shorter to the point where the trip between Tuttlingen and Stuttgart had been cut down to only 3 hours in 1897 4 to 5 hours less than in the 1870s Starting in 1900 3 daily express long distance trains traversed the line some of the time from Stuttgart via Immendingen all the way to Zurich This trip did still require that passengers change trains in Immendingen Around the turn of the century the Royal Wurttemberg State Railways mostly used the steam locomotives of the class Wurttemberg AD for their express service which were in turn replaced by the class Wurttemberg C during World War I The class Wurttemberg T 5 was used for regional service The 9th of April 1917 saw what was probably the most famous passenger on this line when the leader of the Russian Revolution Vladimir Lenin traveled from Zurich via Stuttgart to Petrograd in a special train The line also gained in importance in terms of freight service and in 1897 the Royal Wurttemberg State Railways already carried 400 000 tonnes of freight on the Gaubahn Initially the freight was largely made up of agricultural goods from the rich agrarian area of the Gau but soon industrial areas sprang up alongside the railway which then used the Gaubahn to transport their goods The Royal Wurttemberg State Railways started to lay a second track alongside the originally single track railway on short sections of the line in the 1880s and 1890s In 1886 the first section to be made into a twin track line was the 4 4 kilometer long piece between Horb am Neckar and Eutingen im Gau which was shared between the Gaubahn and Nagoldtalbahn In 1895 the 8 6 kilometer long section between Stuttgart Hauptbahnhof and Stuttgart Westbahnhof which was closed in 1993 received a second track Extension and heyday of the Gaubahn 1919 1945 Edit The tower of Stuttgart Hauptbahnhof which was opened in 1922 In the period between World War I and World War II the transport infrastructure in Germany received numerous improvements On 22 October 1922 the new main station in Stuttgart Stuttgart Hauptbahnhof was officially opened This removed the chokepoint at the terminus of the Gaubahn and enabled the expansion of the capacity of rail traffic Once the new station was open for service the Deutsche Reichsbahn altered the route taken by the Gaubahn in the center of Stuttgart which avoided the station Stuttgart Nordbahnhof In the 1920s the Free People s State of Wurttemberg as Wurttemberg was known during the Weimar Republic undertook to expand the single track lines constructed in the 19th century The goal was to enable rail traffic from Berlin to Switzerland and Italy to utilize not just the railways in the neighboring territories of Baden and Bavaria but also to use the Gaubahn and therefore tracks owned by Wurttemberg In addition the Reichswehr had an interest in a high capacity rail connection between Berlin and the southwestern border which particularly after the return of Alsace Lorraine to France in 1918 was not as close to the French border as the Rhine Valley Railway from Mannheim to Basel and would not be as easy to disrupt in the event of war The occupation of the city of Offenburg by French troops in 1923 reinforced the desire for an effective and efficient Gaubahn On the 23 and 24 October 1927 the Free People s State of Wurttemberg and the Reichsbahn signed a contract which set out the terms of the expansion of the Gaubahn Wurttemberg provided the Reichsbahn with a credit line of 35 million Reichsmark and the Reichsbahn agreed to expand the section between Stuttgart and Tuttlingen to be twin tracked and also to construct a single track connecting line to the station in Hattingen on the Black Forest Railway Baden This construction phase began in 1928 On 15 May 1934 the Reichsbahn opened the 8 2 kilometer long single track connection between Tuttlingen and Hattingen Until construction stopped due to World War II in 1941 the Reichsbahn was also able to complete the expansion of the line to twin tracks from Stuttgart to Tuttlingen with the exception of a 2 3 kilometer long piece near Oberndorf am Neckar With the completion of the single track connection to Hattingen and the now twin track Black Forest Railway Baden an efficient railway between Stuttgart and Singen had been created The trip via Immendingen and the requisite train change at that station were therefore eliminated As part of the expansion of the line the Reichsbahn also expanded the node stations in Rottweil and Horb am Neckar and replaced the old station buildings in Tuttlingen and Eutingen with new construction The station in Tuttlingen newly constructed in 1933 The expansions during the 1920s and 1930s resulted in great improvements in the service schedule on the Gaubahn Express trains traveled from Berlin via Erfurt Wurzburg Stuttgart Zurich and Milan all the way to Rome The last peacetime schedule in 1939 showed 3 express trains from Berlin to Italy even though not all of the trains continued from Milan to Rome In addition there was express service between Berlin and Lucerne as well as between Stuttgart and Konstanz Travel time between Stuttgart and Singen was cut to 2 hours and 41 minutes in 1933 and the regional and local service schedules also saw marked improvements As was true prior to the railway expansion and since World War I the Wurttemberg class C steam locomotives were used in express service After the completion of the expansion it was the Prussian P 10 which assumed the lead on these trains The Wurttemberg class C was reassigned to manage the regional and local service traffic The class Wurttemberg T 5 was also still seen but was replaced by 1933 by the DRG Class 24 The Prussian P 8 had already been used since 1920 between Horb and Immendingen For freight service the Prussian G 12 as well as the Wurttemberg K were used Starting in 1924 the Reichsbahn began to assign the Prussian G 10 to short distance freight service and between 1936 and 1938 the DRG Class 86 saw use in the same capacity During World War II passenger service was reduced in favor of the rather more significant freight traffic The Mauser arms manufacturer in Oberndorf am Neckar was an important user of the line during the war and Axis partner Italy received coal shipments from Upper Silesia using freight trains on the Gaubahn The line lost much of its military freight significance in the North South corridor with the German attack on the Soviet Union and many of the newer locomotives especially the Prussian P 10 were relocated by the Reichsbahn to eastern Europe while passenger trains on the Gaubahn again saw the use of the Wurttemberg C locomotive War damage dismantlement and electrification 1945 1990 Edit The Nesenbach viaduct in Stuttgart Vaihingen destroyed in April 1945 was rebuilt in 1946 and expanded into 4 tracks in 1982 83 Until February 1945 the Gaubahn did not suffer much damage during World War II with the exception of aerial bombardment in 1944 45 which caused severe damage to the stations in Herrenberg Horb am Neckar Rottweil Spaichingen and Tuttlingen This damage only disrupted traffic in the short term In February 1945 Allied bomber wings destroyed a bridge in an attack on the town of Oberndorf which was an important center in the German arms manufacturing industry Even more significant was the damage caused by German troops in April 1945 when several bridges were blown up between Stuttgart and Boblingen stopping train traffic altogether shortly before the end of the war It was not until May 1946 that the railway was opened again for through traffic Also in April 1945 American and French troops occupied southwestern Germany which meant that the section of the Gaubahn between Bondorf and Stuttgart fell into the American zone of occupation while the section between Ergenzingen and Singen was assigned to the French zone France insisted on its right to reparations unlike the United States of America and in 1946 dismantled the second track between Horb and Tuttlingen which had only been laid a few years before Ever since the Gaubahn is twin tracked only between Stuttgart and Horb as well as between Hattingen and Singen The border between the American and French zones was responsible for the lack of through traffic between Stuttgart and Singen which did not resume until 1948 Compared to the heyday of the Gaubahn at the end of the 1930s the service schedule was severely reduced and did not reach the same level as before the war until the end of the 1950s The service to and from Berlin for which the line had been expanded in the time between the wars was not resumed by the Deutsche Bundesbahn and the traffic corridor Berlin Erfurt Wurzburg Stuttgart Zurich had lost its significance due to the separation of East Germany and West Germany DRG class 465 also known at ET 65 in Eutingen Starting in the 1950s the Bundesbahn extended some of the express trains between Zurich and Stuttgart to Hamburg Also express service was reinstated between Stuttgart and Italy largely due to the influx of guest workers from Italy into Baden Wurttemberg at the end of the decade These trains primarily saw the use of the Prussian P 10 and the Prussian P 8 Between 1958 and the middle of the 1970s diesel locomotives of the class DB Class V 100 and DB Class V 200 replaced the steam locomotives on the Gaubahn with the DB Class V 200 1 being used for freight service The Bundesbahn then electrified the section between Stuttgart and Boblingen in 1963 with the goal of reducing travel time in local service trains in the Stuttgart area The section Boblingen Horb was converted to electric operation in 1974 and electrification of the rest of the Gaubahn to Singen was completed in 1977 which meant that primarily electric locomotives were used on the railway after 1977 Also in 1977 the Bundesbahn decided to close numerous stations and halts to enable express like travel with higher speeds even in local service trains The Gaubahn above ground and the 8 5 kilometer long tunnel of the Verbindungsbahn of the S Bahn Stuttgart After the section between Boblingen und Stuttgart was electrified in 1963 initially it was locomotives of the DRG class E 17 DB Class 141 DRG Class E 44 and DRB Class ET 55 which saw service These were then replaced with DRG Class ET 25 DB Class ET 27 and DRG Class ET 65 by 1969 After 1974 and the electrification of the section Boblingen Horb the Bundesbahn used the DB Class E 10 for regional service on the northern Gaubahn section and used the same locomotive for express service after 1977 For freight service the Bundesbahn initially relied on the DB Class E 50 and DRG Class E 93 switching to the DB Class 151 in the 1980s then the DB Class E 40 starting in 1988 since 1993 it has been the DB Class 143 responsible for freight service In 1985 the section between Stuttgart and Boblingen was incorporated into the network of the Stuttgart S Bahn Since then the S Bahn travels from Stuttgart Hbf on the Verbindungsbahn Stuttgart which is entirely underground in the center of the city and which meets up with the Gaubahn at the Stuttgart Osterfeld station The Verbindungsbahn cuts down the trip distance of the S Bahn by 5 5 kilometers and puts the University of Stuttgart into the rail network while regional and long distance trains still use the old Gaubahn route The section between Stuttgart Osterfeld and Stuttgart Rohr 3 5 kilometers in length was expanded at high expense into 4 tracks between 1982 and 1983 New long distance and local service since 1990 Edit The Cisalpino in Singen in 2004 By 1991 the number of express trains on the Gaubahn increased to eight daily trains with five of those continuing on past Zurich to the cities of Milan Genoa and Lecce or Naples On the other hand traffic to the north was largely eliminated for example just a single express trains traveled on to Nuremberg at the time The trip between Stuttgart and Singen now took exactly two hours and was made by locomotives of the DB Class 110 and DB Class 181 Starting in 1993 the Deutsche Bundesbahn and from 1994 the privatized Deutsche Bahn AG attempted to shorten express trip times even further To achieve this goal the Gaubahn saw test drives of the Italian Pendolino as well as the Swedish X 2000 Between 1993 and 1995 two trains of the service type EuroCity replaced some of the traditional express trains on the line For a short time TEE RABe trains of the Swiss Federal Railways were in use which cut the trip time between Stuttgart and Singen to 1 hour and 50 minutes The Seehas in Bahnhof Engen On 1 March 1998 two tilting trains of the type ETR 470 owned by the Swiss firm Cisalpino AG replaced some express service trains since German tilting technology trains were not available for service yet This replacement did not initially result in shorter trip times In 1999 the DB AG radically altered long distance traffic on the Gaubahn and stopped with one exception using locomotive powered trains altogether For the first time trains of the type DB AG Class 415 with tilting technology were used on the line and these trains together with the Cisalpino made up the bulk of long distance trains This resulted in a trip time of 1 hour and 44 minutes between Stuttgart and Singen The Cisalpini were responsible for the traffic between Stuttgart and Milan while the ICE trains carried the load between Stuttgart and Zurich the through traffic between Stuttgart via Genoa to Naples was eliminated In 2005 the last locomotive powered express train the so called IC Insubria was also removed One year later in December 2006 the Cisalpino service was stopped eliminating direct connections to Italy and making the ICE the only long distance carrier on the Gaubahn Alterations in local service were just as deep as in the case of long distance travel On 5 December 1992 the S1 line of the Stuttgart S Bahn was expanded to Herrenberg which improved local service between the Gau and the state capital In 1994 the Seehas started service on the Gaubahn This service which travels between Engen and Singen was initially managed by the Swiss company Mittelthurgaubahn due to the lack of suitable DB AG trains In 2003 a sizable improvement of local service came about with the establishment of the Ringzug service which traverses the Gaubahn between Tuttlingen and Rottweil A commonality between these new local service offerings is the addition of frequently stopping local trains to the express service offerings which restarted service to the small communities on the Gaubahn To accommodate this service DB Station amp Service reactivated many closed stations and halts and built a number of new halts on the line Operations EditLong distance traffic Edit ICT T in Tuttlingen Long distance service on the Gaubahn in 2009 involves 7 ICE T trains between Stuttgart and Zurich running every other hour A single ICE extends northwards through Stuttgart to Frankfurt am Main The InterCityExpress service stops at Stuttgart Hbf Horb am Neckar Rottweil Tuttlingen and Singen Boblingen which had been a stop on the long distance routes for decades is not served Starting in December 2006 the 7 car ICE T of class 411 replaced the 5 car configuration of the class 415 and this service is guaranteed until 2011 At that time Deutsche Bahn AG will reconsider options in long distance traffic on the Gaubahn Regional traffic Edit Regional Express of type 425 426 in Tuttlingen In addition to the ICE trains Regional Express RE trains traverse the Gaubahn between Stuttgart and Singen also every other hour Another set of Regional Express trains serve the section between Stuttgart and Rottweil and these trains are separated in Eutingen Going south the trains from Stuttgart are split into two halves with one half traveling the Gaubahn Eutingen Freudenstadt to Freudenstadt and the other half continuing on to Rottweil Going north these two halves are combined in Eutingen for the trip into Stuttgart Between the two RE trains routes Stuttgart Singen and Stuttgart Rottweil the section between Stuttgart and Rottweil has hourly service Regional service on the Gaubahn is provided by the Deutsche Bahn AG which has a long term contract for this service with the state of Baden Wurttemberg until 2016 In 2004 the DB AG changed the train configuration on the route Stuttgart Singen from the locomotive powered trains with Silberling coaches to the new DBAG Class 425 electrical multiple unit trains which were occasionally replaced by locomotive powered trains of the class 146 with double decker coaches starting in 2006 The use of the class 425 has been greatly reduced on the Stuttgart Singen route but those units are still the train of choice on the Stuttgart Rottweil Freudenstadt route Once a day the DB AG still uses modernized Silberling coaches and a locomotive on the trip between Stuttgart and Singen S Bahn train in Stuttgart Osterfeld Starting on 16 March 2009 to last until 13 June 2009 the schedules for all traffic was slightly altered This is due to the fact that since the end of 2008 by order of the German rail authority tilting technology was not to be used on the Gaubahn This meant a 10 minute delay for ICE traffic and disrupted the synchronization of long distance regional and local service schedules In addition trains using DB Class 120 locomotives and Swiss Federal Railway coaches replaced 4 of the ICE trains from Stuttgart to Zurich 3 Ringzug shuttle in Rottweil The section between Stuttgart and Herrenberg is integrated into the Stuttgart S Bahn network The S 1 service runs from Herrenberg to Stuttgart Osterfeld where the train leaves the Gaubahn and travels underground via the Verbindungsbahn to Stuttgart Hauptbahnhof From there the S 1 service utilizes the Fils Valley Railway as far as Plochingen before branching off to Kirchheim unter Teck the terminus of the S 1 route The DBAG Class 423 is used on this route The S Bahn is also managed by the Deutsche Bahn AG and runs every 30 minutes except at rush hour during the work week where trains are available every 15 minutes Between Herrenberg and Eutingen some of these trains only go to Bondorf DB AG also runs RegionalBahn trains every hour under the week whose schedules are synchronized with the S Bahn trains In addition during the work week a train owned by the Albtal Verkehrs Gesellschaft travels between Freudenstadt Eutingen and Herrenberg where it connects to the S Bahn On the section Rottweil Tuttlingen the Ringzug of the Hohenzollerische Landesbahn provides local service The Stadler Regio Shuttle RS1 travel on the Gaubahn at least hourly under the week and every other hour on weekends Between Engen and Singen service is provided every 30 minutes by the Seehas of the type Stadler FLIRT which is today managed by SBB GmbH a subsidiary of the Swiss Federal Railway Every other hour the RE trains of the DB AG which travel on the Black Forest Railway Baden between Karlsruhe and Konstanz provide additional service between Engen and Singen using double decker coaches powered by class 146 locomotives Freight traffic Edit A freight train with a class 185 near Wurmlingen The Gaubahn is again becoming a significant railway in terms of international freight traffic particularly as an alternative to the heavily traveled Rhine Valley Railway primarily as a transit route With the exception of the connecting line to the industrial area of Boblingen Hulb no freight is processed for shipment directly on the line Railion trains travel primarily from the large shunting station near Kornwestheim to St Margrethen in Switzerland and go around Stuttgart Hbf This was accomplished until the 1970s via the Pragtunnel Bahnhof Stuttgart West and a connection loop but has been handled since the opening of the Stuttgart S Bahn by running freight trains via the Rankbach Railway Rankbachbahn from Kornwestheim via Leonberg to Boblingen and the Gaubahn Railion mostly utilizes the class 185 locomotives Operational challenges Edit Two Ringzug trains crossing at Aldingen station Notwithstanding the sizable reductions in trip times in the last decades the Gaubahn is still a comparatively slow line largely due to the single track section between Horb and Hattingen Particularly in the section between Tuttlingen and Rottweil the single track is used by ICE Regional Express freight traffic and the Ringzug which leads to numerous times where Ringzug trains have to stop at the stations in Wurmlingen Spaichingen and Aldingen to await a train traveling in the opposite direction Even ICE trains have to make a scheduled stop in the industrial station in Epfendorf to await oncoming traffic In Stuttgart the scheduled ICE service misses the important ICE connections to Berlin and Dortmund by a few minutes which makes these ICE connections less attractive The Gaubahn is also challenged by the modernized Bundesautobahn 81 Plans for the future EditReestablishment of twin track configuration Edit The station in Rottweil on this presently single track section which is supposed to become the start of a twin track piece to Spaichingen The reestablishment of the Gaubahn in a twin track configuration has been a topic of discussion in every decade since its dismantlement Today there are different plans in existence which would expand the section between Horb and Hattingen at least partially This expansion is part of both the federal traffic plan Bundesverkehrswegeplan as well as the general traffic plan Generalverkehrsplan of the state of Baden Wurttemberg In 2006 the Federal Transport Ministry published a comparative study where benefits of the electrification of the Southern Railway the electrification of the Buchloe Lindau railway and the expansion of the Gaubahn were studied The latter finished this comparison clearly in third place compared to the other two projects which were given higher ratings in positive economic impact The Interior Ministry of Baden Wurttemberg underwrote a new study which was to find new suggestions for an economically feasible plan for Gaubahn expansion This study of March 2007 does not envision an expansion of the complete section between Tuttlingen and Horb but suggests twin track expansion work for the pieces Horb Neckarhausen Rottweil Spaichingen and Rietheim Wurmlingen and to leave the rest of the section as is The study suggested a cost of 135 million Euros for the project and assigned it an economic impact rating of 1 3 compared to the 0 6 rating of the earlier comparative study This expansion would reduce the trip time by 9 minutes and would result in the synchronization of the ICE connections to Berlin and Dortmund In addition the trip times of the Ringzug between Rottweil and Tuttlingen would be reduced from 41 to 32 minutes without eliminating any of the present stops The municipalities on the Gaubahn collectively associated in the Interessenverband Gau Neckar Bodensee Bahn declared their willingness in March 2008 to provide financing of 360 000 Euros in advance for the planning phase of this expansion to twin tracks The study allocated a total of 10 million Euros for general activities to increase the travel speed and another 10 million Euros for the twin track expansion in the section between Horb and Neckarhausen with a planned start to construction in 2012 or 2013 The timely expansion of the rest of the sections seems to be much less realistic in light of the expense of the Stuttgart 21 project Stuttgart 21 Edit Project Stuttgart 21 The project Stuttgart 21 aims to eliminate the tunnel rich and steep section of the Gau line in the center of Stuttgart The plans see trains on the line taking a new route on new tracks from Stuttgart Hbf in the direction of Stuttgart Airport where they would meet the planned Wendlingen Ulm high speed railway From the airport the Gau line trains going in the direction of Boblingen would take the existing S Bahn tracks to Stuttgart Rohr and would connect to the existing Gau line via a new Rohr loop This new route would extend the distance to Boblingen by 4 4 kilometers and would lengthen the trip for a Regional Express train by 5 minutes For regional and long distance trains from the direction of Singen this new route would shorten the trip to the airport and would no longer require a change of trains However at this time the exact nature of how Gau line trains would stop at the airport is undecided The use of the new Filder station would require the construction of a connecting line underneath the exhibition center at a cost of 100 million The present plans call for the use of the existing S Bahn station at the airport but the Transport Ministry has so far shown no willingness to permit the required lowering of the tracks One additional use of the present Gau line tracks is their ability to serve as an alternate route in case of the blockage of the S Bahn tunnel between Stuttgart Rohr and Stuttgart Hbf This capability would no longer exist if this section was eliminated Local operations Edit The district of Rottweil explored the possibility between June and October 2008 of expanding Ringzug operations from Rottweil to Horb on the Gaubahn As a result of an expansion the Regional Express halts in Sulz am Neckar and Oberndorf am Neckar would be eliminated These plans failed when the towns of Sulz and Oberndorf expressed their opposition In addition as a result of the reactivation of the Rankbach Railway for the Stuttgart S Bahn the districts of Calw and Boblingen underwrote a study in July 2008 to explore the expansion of the S 1 line to Eutingen and Nagold See also EditHistory of the railway in WurttembergReferences EditFootnotes Edit Eisenbahnatlas Deutschland German railway atlas Schweers Wall 2009 pp 94 103 111 168 ISBN 978 3 89494 139 0 Stuttgart Region in Europe Region Stuttgart Retrieved 16 March 2011 DB passt Fahrplane fur Fernverkehrslinie Stuttgart Zurich an Langere Fahrzeit auf der Gaubahn jetzt in Auskunfts und Buchungssysteme eingearbeitet DB fits timetables for Stuttgart Zurich long distance service Longer journey time on Gaubahn now incorporated into information and booking systems Bahnonline ch 18 March 2009 Retrieved 24 March 2009 Sources Edit Fladt Stahle Georg 2005 Stuttgarter Balkon 125 Jahre Gaubahn Lok Magazin 281 84 91 ISSN 0458 1822 Leute Richard 1983 Die Geschichte der Eisenbahn im Raum Tuttlingen Tuttlinger Heimatblatter 46 46 62 Scharf Hans Wolfgang Wollny Burkhard 1992 Die Gaubahn von Stuttgart nach Singen Freiburg im Breisgau EK Verlag ISBN 3 88255 701 X von Meissner Frank 2004 Magistrale im Verkehrsschatten Die Gaubahn Stuttgart Singen Eisenbahn Kurier 9 36 41 ISSN 0170 5288 von Meissner Frank 2005 Was wird aus dem Gaubahn Fernverkehr Die letzten Tage des IC Insubria Eisenbahn Kurier 11 48 50 ISSN 0170 5288 Wedler Jurgen Bottcher Karl Heinz 1985 Der Tunnel Verbindungsbahn der S Bahn Stuttgart Dokumentation ihrer Entstehung Kohlhammer Stuttgart BD Stuttgart ISBN 3 925565 01 9 Gassebner Jurgen Jacobson Claus Jurgen 1999 Bahnanlagen aus der Luft Baden Wurttemberg Stuttgart Transpress Verlag ISBN 3 613 71098 6 Retrieved from https en wikipedia org w index php title Stuttgart Hattingen railway amp oldid 1097988835, wikipedia, wiki, book, books, library,