fbpx
Wikipedia

Stuttgart Hauptbahnhof

Stuttgart Hauptbahnhof (German pronunciation: [ˈʃtʊtɡaʁt ˈhaʊ̯ptbaːnˌhoːf]; English: Stuttgart central station) is the primary railway station in the city of Stuttgart, the state capital of Baden-Württemberg, in southwestern Germany. It is the largest regional and long-distance railway station in Stuttgart, the main node of the Stuttgart S-Bahn network, and, together with the station at Charlottenplatz, it is the main node of the Stuttgart Stadtbahn.

Stuttgart Hauptbahnhof
Terminal station
Station building (2018)
General information
LocationStuttgart, Baden-Württemberg
Germany
Coordinates48°47′02″N 9°10′54″E / 48.78389°N 9.18167°E / 48.78389; 9.18167Coordinates: 48°47′02″N 9°10′54″E / 48.78389°N 9.18167°E / 48.78389; 9.18167
Owned byDeutsche Bahn
Operated by
Line(s)
Platforms22 (16 above ground terminal, 2 S-Bahn, 4 U-Bahn)[1][2]
Connections
Construction
ArchitectPaul Bonatz and Friedrich Eugen Scholer
Other information
Station code6071[3]
DS100 codeTS[4]
IBNR8000096
Category1[3]
IATA codeZWS
Fare zone: 1[5]
Websitewww.bahnhof.de
History
Opened23 October 1922; 100 years ago (1922-10-23)
Electrified15 May 1933; 89 years ago (1933-05-15)
Passengers
220,000 daily[6]
Services
Preceding station DB Fernverkehr Following station
Mannheim Hbf Ulm Hbf
towards München Hbf
Mannheim Hbf Terminus
Heidelberg
Mannheim Hbf Ulm Hbf
towards München Hbf
Vaihingen (Enz)
towards Köln Hbf
Terminus
Bruchsal Ulm Hbf
towards München Hbf
Karlsruhe Hbf
towards Paris Est
Mannheim Hbf
towards München Hbf
Ulm Hbf
Vaihingen (Enz)
towards Hamburg
Terminus
Heidelberg Ulm Hbf
Vaihingen (Enz) Aalen
towards München Hbf
Heidelberg Ulm Hbf
Mannheim Hbf Terminus
Terminus Böblingen
Preceding station Following station
Heidelberg Hbf
towards Berlin Hbf
FLX 10 Terminus
Preceding station Following station
Vaihingen (Enz) IRE 1 Schorndorf
towards Aalen Hbf
Terminus RE 8 Ludwigsburg
RE 90 Stuttgart-Bad Cannstatt
MEX 13 Stuttgart-Bad Cannstatt
towards Crailsheim
MEX 16 Stuttgart-Bad Cannstatt
towards Ulm Hbf
Preceding station DB Regio Baden-Württemberg Following station
Terminus IRE 6 Reutlingen Hbf
towards Aulendorf
Böblingen
towards Konstanz
RE 4 Terminus
Terminus RE 5 Esslingen (Neckar)
Böblingen
towards Rottweil
RE 14a Terminus
Böblingen RE 14b
Terminus RB 19 Stuttgart-Bad Cannstatt
towards Crailsheim
Preceding station SWEG Bahn Stuttgart Following station
Stuttgart-Bad Cannstatt RE 12 Ludwigsburg
Ludwigsburg RE 17b Terminus
Ludwigsburg
towards Karlsruhe Hbf or Bad Wildbad
RB 17a
Ludwigsburg
towards Bruchsal
RB 17c
Stuttgart-Bad Cannstatt RB 18 Ludwigsburg
towards Osterburken
Preceding station Stuttgart S-Bahn Following station
Stadtmitte
towards Herrenberg
S 1 Bad Cannstatt
Stadtmitte
towards Filderstadt
S 2 Bad Cannstatt
towards Schorndorf
Stadtmitte S 3 Bad Cannstatt
towards Backnang
Stadtmitte S 4 Nord
towards Backnang
S 5 Nord
S 6 Nord
S 60 Nord
towards Böblingen
Location
Stuttgart
Location in Baden-Württemberg
Stuttgart
Location in Germany
Stuttgart
Location in Europe

Located at the northeastern end of the Königstraße, the main pedestrian zone of the city centre, the main line station is a terminus, whilst the subterranean S-Bahn and Stadtbahn stations are through-stations. The station is well known for its 12-storey tower with a large, rotating and illuminated Mercedes-Benz star insignia on top; the tower and station building are city landmarks.

Plans for the controversial Stuttgart 21 project to convert the main line terminus station into an underground through station include the demolition of the side wings of the building, together with the elimination of the platforms, tracks, and apron of the terminus station. The planned underground through station is configured at a 90-degree angle to the present station. The construction started in 2010 and is scheduled to end in 2025.

In November 2009, preservationists of the International Council on Monuments and Sites nominated the building for inclusion in UNESCO's World Cultural Heritage list, an occasion that opponents of the Stuttgart 21 project picked to urge the city and Deutsche Bahn to stop the project which implies demolition of parts of the complex designed by Paul Bonatz.[7]

History

 
The third building from the left in the picture shows the facade, with the entrance area under the arcades, the first Stuttgart central station, after a plan by the architect Karl Etzel Karl Etzel (about 1850)
 
Elevation of the station, after the first station reconstruction (1867), seen from Schlossstraße

First and second Centralbahnhof

Until 1922, the central station (Centralbahnhof or Zentralbahnhof) was located on the Schlosstrasse (the precise location of the former station is on what is today called the Bolzstrasse), near the Schlossplatz. The first station building, a terminus station with 4 tracks, was built by Karl Etzel for the opening of the Württemberg Central Railway (Zentralbahn), with its two branches to Ludwigsburg and Esslingen.

The wooden station hall was not unusual at the time and covered four tracks. The first train, arrived at the station from Canstatt on 26 September 1846. The first phase of railway construction in the Kingdom of Württemberg, with routes to Heilbronn, Bretten, Ulm, and Friedrichshafen, was completed by 1854.

Due to increasing railway traffic,[8] the first building was replaced by new construction at the same spot in the 1860s. Between 1863 and 1867, the engineers Klein, Georg Morlok, Carl Julius Abel and later city architect Adolf Wolff[9] created this second station, with 8 tracks, featuring a building with grandiose arches in the Renaissance Revival style. Parts of the façade of this building are now part of the Metropol, an events centre and cinema complex.

Sprickerhof through station

With a steadily increasing traffic volume and the connection of additional lines, the station had increasingly reached its capacity limits in the early 20th century.[8]

By 1905, there were three designs for the redevelopment of the station:[8]

  • the so-called Sprickerhofsche Durchgangsbahnhof (Sprickerhof through station),
  • a terminal station on Bolzstraße (then Schloßstraße), and
  • a terminal station on Schillerstraße.

The concept of Sprickerhof through station was introduced in 1901. The Gäu Railway and the line from Feuerbach were to run through the Kriegsberg (a hill to the northwest of the current station) to the central station in three parallel twin-track tunnels at a gradient of 1:100 from Wolframstraße in an arc with a radius of 300 metres. This would have run to Bahnhofstraße via Kriegsbergstraße and the tracks would have been in the area of the road to Ludwigsburg. The crossover tracks would have run into the tunnel for about 150 metres. The entrance building would have been built in the area of the main customs office. The above-ground areas between Schloßstraße and Schillerstraße would have been demolished for this project. A commission of external experts opposed the project.[8]

The current Hauptbahnhof

 
The station tower of the Hauptbahnhof in 2004
 
View from the station tower onto the platforms

The present Hauptbahnhof was built between 1914 and 1928 on the street now called Arnulf-Klett-Platz, only about 500 metres east of the former station.

In 1910, the Royal Württemberg State Railways (Königlich Württembergischen Staats-Eisenbahnen or K.W.St.E.) financed an architectural contest, which drew 70 participants. The competition was won by the architects Paul Bonatz and Friedrich Eugen Scholer with their plans for umbilicus sueviae—the Navel of Swabia.[10] After undergoing numerous changes, including moving the station tower from the main façade to the wing at the Schlossgarten, construction began in 1914 on Cannstatter Strasse. Changes to the plan also occurred in the construction phase.[10] Due to the route of the tracks to the old station, construction needed to be done in two phases, with the first stage, including tracks 9 to 16,[11] going into service on 22 October 1922. The tracks to the old station were cut at the same time.

As further construction of the new station was delayed for financial reasons, the city of Stuttgart loaned Deutsche Reichsbahn two million Reichsmark (equivalent in current values to €8.6 million) in 1925 and a further loan of 5 million Reichsmark (equivalent to €19.7 million) in 1927.[12] The second stage was completed in 1928 and the electrification of the 16 tracks was completed on 15 May 1933.

In the bombing of Stuttgart in the Second World War, the Hauptbahnhof was severely damaged several times, although from 1940 to 1942 a decoy target at Lauffen am Neckar diverted many raids. The reconstruction took several years. Stuttgart Hauptbahnhof has been listed as a cultural heritage site of special significance (under section 12 of the Baden-Württemberg heritage protection act) since 20 August 1987.

S-Bahn and Stadtbahn

A plan developed in the mid-1950s for a S-Bahn proposed a four-track station with two 175-metre-long island platforms under the Hauptbahnhof, which would be linked by two tracks towards the city centre and four towards Feuerbach/Bad Cannstatt.[13]

Between 1971 and 1978, an underground Hauptbahnhof station was built for the S-Bahn in the central Neckar area, which was a cut-and-cover construction under the main hall in the area of the small ticket hall. This station has two tracks and an island platform. The first S-Bahn services ran on 1 October 1978.

After four years of planning, construction commenced on a new central signalling centre of class SpDrL 60 at the Hauptbahnhof on 3 October 1973. The signalling infrastructure was gradually put into operation: first for the train depot on 1 and 2 October 1977, then for the passenger station and freight yard on 5 and 6 November 1977 respectively. The S-Bahn connecting line was opened as far as the former terminus at Schwabstraße on 1 October 1978.

A total of 95 stop signals, 93 distant signals, 583 shunting signals, 506 point machines, 530 track circuits and 169 axle counters were integrated into the track layout. The new signalling centre replaced twelve old signal boxes.[14] DM 68 million was spent on the signalling centre and its outdoor facilities.[15] Today, five to seven dispatchers work in the signalling centre.[16]

The underground Stadtbahn station, called Hauptbahnhof (Arnulf-Klett-Platz), in front of the station hall under Arnulf-Klett-Platz was opened to traffic on 9 April 1976. Today, ten Stuttgart Stadtbahn lines serve the station.

The S-Bahn station was used (as of 1993) by about 120,000 passengers per day. This included 55,000 transfers to long-distance, regional and Stadtbahn services, about 15,000 passengers transferring between the S-Bahn lines via Feuerbach and Bad Cannstatt and around 50,000 passengers entering or exiting at the station.[17] The Stadtbahn station was used by around 75,000 passengers a day.[18] In 2016, 140,000 passengers used the S-Bahn station each day. With the commissioning of Stuttgart 21, the volume is expected to decline by about 20 percent.[19] The S-Bahn station is called Stuttgart Hbf tief (deep) and is 20 m below the Hauptbahnhof.

Building

 
Station building in 2010
 
Large ticket hall from Königstraße in 1927

The station building consists of cubes nested symmetrically and asymmetrically. It is characterised by cubes of different size, dimension and design.[20] Concrete and steel were used during the construction of the station building and the rough-hewn Muschelkalk ("mussel chalk") blocks were laid as a facade over bricks. The Muschelkalk comes from the Trochitenkalk Formation of the Upper Muschelkalk from the Crailsheim area.[21] Inside, sandstone, tuff and brick dominate the walls. These are partly designed as flat wooden ceilings and partly designed as reinforced concrete structures. The pillars in the terminal station hall are made of exposed concrete.

The station is also integrated into the urban planning of the city of Stuttgart. The structure adapts to the sloping terrain (there is a difference in height of almost five metres between the tower and the north exit). The original plans called for a road leading directly to the building, but Bonatz eliminated this in favour of the Lautenschlagerstraße, as it is now known, which ends at the Kleine Schalterhalle (small ticket hall). The tracks for the local commuter traffic are behind this hall and the central exit is between the hall and the main building, which is useful for the control of passenger flow. Underneath the tracks area, three tunnels running at right angles to the tracks provide highly functional access points: the mail tunnel runs from the post office annex to the northwestern station area, a passenger tunnel eases the task of changing platforms and a third tunnel is meant for the transit of express freight.

The construction has some highly regarded features. The façade is made of limestone, which was covered with bricks; on the inside, sandstone, tuff, and bricks form the walls. The roof structures consist partly of flat wood and partly of reinforced concrete panels. The use of exposed concrete on the pillars lends a modern flair to the main hall. The structure features conservative elements, shown in the monumentality and the reserved decorations, as well as progressive elements, as shown by the flat roof structures, for example. The design is considered an important example of the Stuttgart School.

Christoph Ingenhoven, the architect of the new station, expressed the opinion that much of Bonatz's original visions, which tended towards "a knight's castle or Valhalla", can still be found in the current building.[22] The Stuttgart Regional Court, in its decision to permit the demolition of the side wings, stated that only the terminal train shed, the tower, the ticket halls and the portico were decisive for the architectural recognition of the work, but not the side wings.[20]

Tracks and platforms

 
View of the back of the station in March 2008
 
Railway tracks of the station including flying junctions

Since the existing tracks to the old station continued in use until the commissioning of the new one, the competition plan proposed, at the suggestion of the Generaldirektion der Staats-Eisenbahnen (General Headquarters of the State Railways), the building of a three-span train shed. This plan was later changed to low canopies over each platforms with slots above the tracks to allow smoke to escape and the roof supports were placed on the luggage platforms. Due to the shortage of materials after the First World War, the canopies planned for tracks 1 to 16 were not executed in steel, but in wood. After the destruction in the Second World War, new canopies were built on reinforced concrete bases. During the construction of the ramp for the Stuttgart S-Bahn from 1971 to 1974, tracks 1 to 3 were not available and a platform was built on track 1a as a replacement. In preparation for the Stuttgart 21 project, the platforms were extended towards the track apron from May 2010 and track 1a was removed in September 2010.

Services on lines S1 to S6 and S60 of the Stuttgart S-Bahn stop on two tracks (tracks 101 and 102) in the underground S-Bahn station (third basement). Southbound S-Bahn services towards Schwabstraße and the airport stop on track 101, while northbound services towards Bad Cannstatt and Stuttgart North stop on 102.

The track apron connects five tracks of the regional and long-distance traffic (one track towards the Gäu Railway and two tracks each towards Bad Cannstatt and Feuerbach) with the station tracks;[23] five further tracks connect the station with the storage facility at Rosenstein Park.[24] The set of tracks is protected as an object of cultural heritage under the Baden-Württemberg heritage act,[23] although this protection will be removed after the completion of Stuttgart 21.[25]

The necessary flying junctions were built according to plans by Karl Schaechterle between 1908 and 1914.[26] At the opening of the station, it had two dispatcher's signal boxes:[27] Signal box 1 provided routings for tracks 1 to 4 to and from the suburban tracks to Cannstatt and for tracks 4 to 7 to and from the suburban tracks to Feuerbach.[27] Signal box 2 provided routings for the tracks for long-distance traffic. Entry and exit of trains to the Gäu Railway and their exit to the mainline tracks to Feuerbach was possible from tracks 7 to 12. The entrance of trains from the long-distance tracks from Cannstatt was possible on tracks 8 to 13.[27] The entrance of long-distance services from Feuerbach and the exit of long-distance services to Cannstatt was possible on tracks 12 to 16.[27] In addition, there were other signal boxes for connecting to the storage yard (signal boxes 3 and 5) and the freight yard (signal box 4).[27]

In 1977, the signal boxes were replaced by a central signalling centre to the south of track 16.[28] Since then there have been standard routes to and from the S-Bahn tracks to Bad Cannstatt from tracks 1 to 6 as well as from and to the S-Bahn tunnel and Zuffenhausen from and to tracks 3 to 12.[29] Entrance from the mainline tracks from Zuffenhausen to tracks 3 to 16 is possible, as is exit towards Zuffenhausen from tracks 3 to 12.[29] Moves from the long-distance tracks from Bad Cannstatt can continue to tracks 12 to 16 and entrances from those tracks is possible to tracks 8 to 13 across the tracks.[29]

Altogether Stuttgart station has over 140 kilometres of railway tracks[6] and 385 sets of points[23] on 82 hectares of land.[6]

The aboveground platforms are 76 centimetres-high and usually 8.45 metres-wide[30] and have lengths varying between 326 metres (platforms 7,[29] 13 and 14) and 470 metres (platforms 8,[29] 15 and 16). The S-Bahn platform (tracks 101/102) is 96 centimetres high and 280 metres-long.[31]

The underground S-Bahn station is preceded by a 700-metre-long ramp on a 3.2 percent grade, which passes under the track and platform facilities of the main station over a length of around 500 metres.[32]

Station tower

 
Station tower (before 2010, seen from the Mittleren Schlossgarten)

The 56 metre-high station tower is a landmark of the city of Stuttgart[33] and marks the end of Königstraße.[20] It is founded on 288–290 piles with a length of between 10 and 11 metres.[34] It is disputed whether the piles are made of reinforced concrete[35] or oak,[36] but Deutsche Bahn refused to commission test bores, as according to a report the station tower stands on reinforced concrete piles and the resolution of the issue has no decisive importance for the construction of Stuttgart 21.[37] When completed in 1916, the tower only provided a restaurant on the top floor and a waiting room for King William II.[33][38] In 1926, the café run by Eugen Bürkle (with a boardroom, tea room, wine bar, dining room and rooftop restaurant) was advertised with the slogan "The most beautiful station restaurant rooms in Germany".[39] After the Second World War, when the tower suffered little damage, a rotating Mercedes star with a diameter of five metres was installed on the turret roof in 1952 and still marks the building's silhouette.[33] The advertising revenue was used for the reconstruction of the station. From 1955 to 1976, the station tower was used as a hotel and at times as accommodation for rail employees.[33][40] The Turmforum (tower forum) Stuttgart 21 project information display has been established on four levels since 1998.[33] The Stuttgart-Mitte registry office has carried out marriages in the conference room on level 9 since 2000.[40] In addition, a bistro and a viewing terrace (lift and entrance free) is located in the tower. The tower clock has a dial with a diameter of five and a half metres.

Terminal station hall

 
Terminal station hall in 2007, looking towards northern exit

The terminal station hall connects directly to the cross-platform hall at the end of platforms tracks 1 to 16. The terminal station hall was built with a reinforced concrete wall on the side near the platforms to reduce the effects of a possible brake failure.[41] The eight arches leading to the cross-platform hall are divided into three parts: at the top they each have a window forming a round arch, the middle parts that are at the level of the platform canopies are solid and are built to full width in their lower parts, while at the bottom of each arch there is a passage to the cross-platform hall, which originally had a platform gate.[23][42] A similar arrangement can be found on the opposite side, towards the city. The original ceiling was destroyed during the Second World War and the current ceiling was completed in 1950.[43]

Originally there were waiting rooms and restaurants, separated by class, between the small and large ticket halls on the side facing away from the tracks.[42] Some of the 40 shops and catering services that are now occupy the station were inserted in the terminal station hall, while the others are accessible from it. The building ends with an arcade to Arnulf-Klett-Platz.

 
Dovecote for feral pigeons

A raised wire cage has been erected in the hall as a dovecote that serves to limit the propagation of feral pigeons.

In the course of the Stuttgart 21 project, the passageways that now lead to the cross-platform hall are to be closed by a glass structure, but the basic tripartite division of the round arches is to be retained.[23] On the side facing the city, the wall panels in the middle of the arches are to be partially removed in order to illuminate the offices behind.[23] Two future staircases and three skylights are to be created for the distribution level below the aboveground station hall so that the station hall will remain "accessible and experienceable."[23] However, with the loss of its current function, it will also lose some of its significance.[23]

North exit

 
North and east side of the station building in February 2015, with the north exit in the centre of the picture

The north exit connects the terminal station hall with Friedrichstraße (the B 27); until 2012 it was the only barrier-free access to the station. Originally, the station forecourt, which had a pavilion in the centre, lay in front of the north exit;[38] it was later used as a parking area and included an access to the passage under Arnulf-Klett-Platz. From the summer of 2012 to October 2013,[44] the north exit was closed and the direct access to the Klett passage could not be used as the engineering building for the Stuttgart 21 project was being built there. The parking area, which had also not been available since summer 2012, has been partly usable since mid-2014. Barrier-free access was only possible via a detour during the construction of the engineering building: a new passage was created on the northwest side on the side of the platforms, about 100 metres from the former north exit, which currently serves as another barrier-free access to the station.

The arch above the north exit reflects the design of the remaining arches of the terminal station hall.

Small ticket hall

The small ticket hall is aligned with Lautenschlagerstraße and the Zeppelin building, also designed by Bonatz and Scholer.[45] The small ticket hall was originally designed for access to suburban services on tracks 1 to 6[46] and also offered access to the adjacent Reichsbahn Hotel (now the Intercity Hotel).[38] The small ticket hall is now occasionally used for events, otherwise it is empty.

Central exit

 
Central entrance to the platform hall with the coat of arms of the former Königstor (gate)

The central exit[42] connects the terminal station hall with Arnulf-Klett-Platz. It is recessed behind the pillars of the arcades.[38] In contrast to the clearly visible entrances, it is not visible from the outside.[47] A Württemberg coat of arms was installed above the exit during the demolition of Königstor (king's gate) at the end of Königstraße in 1922. From the central exit there is an access to the Klett passage, but it is not possible to cross the Arnulf-Klett-Platz above ground. As part of the Stuttgart 21 project, the staircase to the above ground station hall is to be divided into three parts and its middle section is to be demolished to provide a passage for direct access to the distribution level behind.[48]

Large ticket hall

 
Interior view of the large ticket hall in 2015

The large ticket hall acts as an avant-corps in the façade of the entrance building, while also being an independent building.[47] The arched opening to the city reinforces its monumentality and thus acts to give direction. It also reflects the motif of a city gate, which refers to the original location of the station in front of the city.[47] The spatial effect arises not only from the size of the hall, but also from its functionality for rail travellers.[23] The former Königstor, which had stood at the beginning of Unteren Königstraße since 1809 and actually fulfilled the function of a city gate, was perceived as a traffic obstacle after the construction of the station and was removed in 1922. Paul Bonatz rescued the shield of Königstor and had it mounted above the central entrance in the platform hall.

The large ticket hall was originally intended for long-distance traffic, which was handled on tracks 7 to 16.[46] It receives the traffic coming from the Königstraße, but it is not aligned with the axis of the Königstraße.[38] The interior of the hall has a vestibule character and the path to the station hall leads up a flight of steps.[47] The original staircase was removed in the 1970s and replaced by a new staircase and two escalators.[20] Around that time, the ground was broken to provide access to the Klett passage.[20]

DB's travel centre and the AIRail check-in desks are now located in the large ticket hall and Königstraße is connected to the hall via the underground Klett passage.

In the course of the Stuttgart 21 project, the wall of the large ticket hall facing the station is to be breached in order to make a direct access to the planned distribution level behind it.[23] The planned openings are to have the proportions of the arches above it.[23] The staircase to the platform area would be removed, otherwise the width of the passage would not be sufficient for the expected flows of people and the spatial separation from the main hall would inevitably be obliterated by the installation of additional stairs.[23] The main distribution system will be centered on the hub in the large ticket hall with the main pedestrian traffic flowing straight through.[23]

North wing

The approximately 20 metre-wide[49] north wing consisted of a cubic area for the railway postal service,[50] which was used by Deutsche Post until July 2010, and adjoining office space that were last used by the Intercity Hotel and the Federal Police.[51] With a length of 83 metres,[49] the north wing enclosed only part of the facilities on the platform, while the rest formed part of the freight yard,[52] which was abandoned in 1995.[53] The north wing was demolished in 2010 as part of the Stuttgart 21 project.[54]

Kurt-Georg-Kiesinger-Platz lies between the north wing and Heilbronner Straße. The new LBBW building lines on this square, while the remaining main building of the former Reichsbahndirektion Stuttgart (Reichsbahn railway division headquarters) building is on the other side of the street.

Schlossgarten wing

 
The Schlossgarten wing in September 2010

The Schlossgarten wing, also known as the South wing, continued the axis of the Königstraße and forms the side of the station on the Schlossgarten. The wing itself was 200 metres long[55][56] and together with the large ticket hall and the station tower formed a 277-metre-long facade[57] to the Schlossgarten. The façade was interrupted by the station tower and three 27-metre-wide avant-corps, which indicated the positions of the passenger subway and the former postal and express freight tunnels. The wing concealed the difference in height between the Mittlerer Schlossgarten (Central Palace Garden) and the railway facilities, while, during the steam era, it also protected the Schlossgarten from soot and noise from railway operations[58] and functioned as a facade preserving the view from the park.[59] The interior of the wing was used for rail services[47] and express freight operations.[29]

The Schlossgarten wing was demolished in the course of the Stuttgart 21 project from January 2012.[60] According to the architect Christoph Ingenhoven, it was "technically absolutely impossible" to save the wing[22] because the new underground concourse would cut it.[58]

Klett passage

 
Access to the Klett passage from Königstraße

Seven Stadtbahn lines pass through the lower S-Bahn station under the station forecourt (Arnulf-Klett-Platz) in the second basement. The Klett passage on level −1 is the access and distribution level for the long-distance and regional services on level +1, to the S-Bahn services on level −3, to the Stadtbahn services on level −2 and to Arnulf-Klett-Platz on level 0 and the city centre. In it is also a large shopping arcade.

Another part of the first basement level is used for an underground car park with 120 parking spaces, which also serves as a fallout shelter with 4,500 seats.[32] In a disaster or military emergency, part of the underground parking lot would be provided with beds (separated by pressure doors); the technical rooms, kitchen, sanitary installations, water and air conditioning for the bunker are located on the second basement level.

Other

The front of the building features a quote by Georg Wilhelm Friedrich Hegel in the form of a lit inscription—the quote reads … daß diese Furcht zu irren schon der Irrtum selbst ist.—loosely translated as "… that this fear of making a mistake is a mistake itself." The inscription is a work by the artist Joseph Kosuth from the early 1990s.

In the main hall, near the south exit, there is a DB Lounge for first-class passengers, bahn.comfort (a customer loyalty program) customers and first class and "Senator" AIRail passengers.

Schillerstraße (Arnulf-Klett-Platz) in front of the station is used by up to 50,000 vehicles a day.[61]

Operations

In 1994, Stuttgart Hauptbahnhof was the source of 49,400 passengers in regional traffic (excluding the S-Bahn) and 39,000 in long-distance traffic (ICE, IC, IR) each day.[62] With about 210,000 passengers per day, the station was the biggest in Baden-Wuerttemberg in 2005.[63] More than 12,000 people transferred daily between Stadtbahn and regional services in 2014.

According to DB data 164 long-distance trains, 426 regional trains (as of 2009)[6] and 650 S-Bahn trains (as of 2005) serve the station daily.

Long-distance connections

The most significant long-distance connections available at the Stuttgart Hauptbahnhof are listed here:

Connection Route Frequency
ICE 11 Hamburg-Altona – Berlin – Leipzig – Erfurt – Frankfurt – Mannheim – Stuttgart – Ulm – Augsburg – Munich every 2 hours
WiesbadenMainz – Mannheim – Stuttgart – Munich 1 train
ICE 15 StuttgartDarmstadt – Frankfurt – Erfurt – Halle – Berlin (runs Frankfurt–Berlin as an ICE-Sprinter) 1 train on Sat and Sun
ICE 22 (Kiel –) Hamburg – Hannover – Frankfurt – Mannheim – Stuttgart every 2 hours
ICE 26 Frankfurt – Heidelberg – VaihingenStuttgart 1 train in the evening
ICE 42 Dortmund – Duisburg – Cologne – Frankfurt Airport– Mannheim – Stuttgart – Ulm – Augsburg – Munich every 2 hours
ICE 45 Cologne – Wiesbaden – Mainz] – Mannheim – Heidelberg – Stuttgart 1 train pair
ICE 47 Dortmund – Duisburg – Cologne – Frankfurt Airport – Mannheim – Stuttgart individual services
ICE 60 Karlsruhe – Stuttgart – Ulm – Augsburg – Munich every 2 hours
ICE/TGV 83 Paris Est Strasbourg – Karlsruhe – Stuttgart (– Ulm – Augsburg – Munich) 5 train pairs daily
IC 30 (Kiel –) Hamburg – Dortmund – Duisburg – Cologne – Koblenz – Mannheim – Stuttgart every 2 hours
IC 32 (Berlin – Hannover –) Dortmund – Duisburg – Cologne – Koblenz – Mannheim – Stuttgart (– Ulm – Lindau – Innsbruck /– Nürtingen – Reutlingen – Tübingen)1 train to Tübingen in morning and evening Mon–Thu, Sat: 4 train pairs
Fri, Sun: 7 train pairs
IC 61 Karlsruhe – PforzheimStuttgartAalenNuremberg (– Augsburg – Munich) every 2 hours, one train to Leipzig
IC 62 Frankfurt – Darmstadt – Heidelberg  – Stuttgart – Ulm – Augsburg – Munich – Salzburg (– KlagenfurtGraz) 4 train pairs
IC 87 StuttgartSingenZürich hourly, every 2 hours to Zürich
RJ 90 Frankfurt – Mannheim – Stuttgart – Ulm – Munich – Salzburg – Vienna (– Budapest) 2 train pairs on weekends
FLX 10 Berlin Hbf – Berlin Südkreuz – Halle (Saale) – Erfurt – Gotha – Eisenach – Fulda – Frankfurt South – Darmstadt – Weinheim – Heidelberg – Stuttgart 1–2 train pairs

Regional connections

Route Frequency
IRE 1 Karlsruhe – Pforzheim – Mühlacker – Vaihingen – Stuttgart Hourly
Karlsruhe – Pforzheim – Mühlacker – Vaihingen – StuttgartSchorndorf – Schwäbisch Gmünd (– Aalen) Every two hours[64]
IRE 6 Stuttgart – Reutlingen – Tübingen – Hechingen – Albstadt-Ebingen – Sigmaringen – Aulendorf Every two hours (portions continuing from Tübingen to Rottenburg or Horb)
RE 5 Stuttgart – Esslingen – Plochingen – Göppingen – Geislingen – Ulm – Biberach – Friedrichshafen Stadt Lindau Hourly
RE 6 Stuttgart – Esslingen – Plochingen – Wendlingen – Nürtingen – Metzingen – Reutlingen – Tübingen Hourly (Half-hourly during the peak)
RE 8 Stuttgart – Ludwigsburg – Bietigheim – Heilbronn – Bad Friedrichshall Osterburken – Lauda – Würzburg Hourly[65]
RE 10 Stuttgart – Ludwigsburg – Bietigheim – Heilbronn Hourly[64][65]
RE 14a Stuttgart – Böblingen – Herrenberg – Eutingen – Horb – Rottweil Every two hours (runs together with RE14b to Eutingen, where train is split)
RE 14b Stuttgart – Böblingen – Herrenberg – Eutingen – Freudenstadt Every two hours (runs together with RE14a to Eutingen, where train is split)
RE 17b Stuttgart – Ludwigsburg – Bietigheim – Vaihingen – Mühlacker – Bretten – Bruchsal – Heidelberg Every two hours (runs on even hours together with RB 17a to Mühlacker, where train is split)
RE 19 Stuttgart – Waiblingen – Backnang – Gaildorf West – Schwäbisch Hall-Hessental (– Crailsheim) Every two hours (to Crailsheim during the peak)
RE 87 Stuttgart – Böblingen – Horb – Rottweil – Tuttlingen – Singen Every two hours
Stuttgart – Böblingen – Herrenberg – Horb – Rottweil – Tuttlingen – Singen (– Konstanz) Every two hours
RE 90 Stuttgart – Waiblingen – Backnang – Gaildorf West – Schwäbisch Hall-Hessental – Crailsheim – Ansbach – Nürnberg Every two hours[65]
RB 13 Stuttgart – Waiblingen – Schorndorf – Schwäbisch Gmünd – Aalen (– Ellwangen – Crailsheim) Every 30 mins (hourly to Ellwangen, every 2 hours to Crailsheim)
RB 16 Stuttgart – Esslingen – Plochingen – Göppingen – Geislingen – Ulm Hourly (half-hourly to Geislingen, hourly to Ulm)[65][64] (+ additional trains in the peak)
RB 17a Stuttgart – Ludwigsburg – Bietigheim – Vaihingen – Mühlacker – Pforzheim (– Bad Wildbad/Wilferdingen-Singen) Hourly (individual trains to Bad Wildbad or Wilferdingen-Singen,
runs together with RB 17b/c to Mühlacker, where train is split, additional trains at 6:09/6:47, 16:15/16:48 and 17:14/17:47)
RB 17c Stuttgart – Ludwigsburg – Bietigheim – Vaihingen – Mühlacker – Bretten – Bruchsal Every two hours (runs on odd hours together with RB 17a to Mühlacker, where train is split)
RB 18 Stuttgart – Ludwigsburg – Bietigheim – Heilbronn – Bad Friedrichshall – Osterburken Hourly[65]
RB 19 Stuttgart – Waiblingen – Backnang – Gaildorf West (– Schwäbisch Hall-Hessental – Crailsheim) Hourly (only Mon–Fri in the afternoon to Schwäbisch Hall, individual trains continue to Crailsheim)

In most cases, these connection start or end in Stuttgart. This means that for most connections that go through Stuttgart Hauptbahnhof, a change of trains is necessary. As part of the Stuttgart 21 project, with Stuttgart Hbf becoming a through-station, most regional connections would no longer require the change of trains.

Among the seven local regional lines starting in Stuttgart, the line to Tübingen, with an average of 32,100 passengers during the week, was the most used in 2014.[66]

S-Bahn connections

Line No. Route
S 1 Kirchheim unter TeckPlochingenEsslingenNeckarparkBad Cannstatt – Hauptbahnhof – SchwabstraßeVaihingenRohrBöblingenHerrenberg (additional trains on work days between Esslingen and Schwabstraße or Böblingen.)
S 11 Neckarpark – Bad Cannstatt – Hauptbahnhof (tief) Schwabstraße – Vaihingen – Rohr – Böblingen – Herrenberg
S 2 SchorndorfWeinstadtWaiblingen – Bad Cannstatt – Hauptbahnhof – Schwabstraße – Vaihingen – Rohr – Flughafen/MesseFilderstadt (additional trains on work days between Schorndorf and Vaihingen.)
S 3 BacknangWinnenden – Waiblingen – Bad Cannstatt – Hauptbahnhof – Vaihingen – Rohr – Flughafen/Messe (due to the opening of the new exhibition center, trains run to the airport on weekends; late evening traffic only goes to Vaihingen; additional trains on work days between Backnang and Vaihingen).
S 4 Backnang – Marbach – Ludwigsburg – Zuffenhausen – Hauptbahnhof – Schwabstraße
S 5 Schwabstraße – Hauptbahnhof – Zuffenhausen – Ludwigsburg – Bietigheim
S 6 Schwabstraße – Hauptbahnhof – Zuffenhausen – LeonbergWeil der Stadt
S 60 Schwabstraße – Hauptbahnhof – Zuffenhausen – Leonberg – RenningenMagstadtMaichingenSindelfingen – Böblingen

The abbreviation for the Hauptbahnhof S-Bahn station underground is TST.

The station is to be modernised between the end of 2019 and the end of 2020 at a cost of €9 million.[67]

Freight traffic

 
The station from the inside in 2004
 
A view of the tracks from the tower in 2005
 
The station as viewed from the west (bottom center)

In addition to the passenger station, there used to be a closed and already demolished freight station and small shunting station, which featured a marshaling hump with rail brakes. The freight yard was used until the 1980s.[68] The goods traffic was later completely shifted to the Kornwestheim marshalling yard; the decision to move was made independently of the Stuttgart 21 project.[69]

Stadtbahn

Under the Arnulf-Klett-Platz (the station forecourt), the largest and most important node of the Stadtbahn features these routes:

Line No. Route
  Killesberg – Hauptbahnhof – Degerloch – Möhringen – Leinfelden
  GerlingenWeilimdorfFeuerbach – Hauptbahnhof – Degerloch – Möhringen – Fasanenhof
  Mönchfeld – Zuffenhausen – Hauptbahnhof – Ruhbank/Fernsehturm – Heumaden – Ostfildern-Nellingen
  Hauptbahnhof – Vogelsang – Botnang
  Remseck – Halschlag – Budapester Platz – Hauptbahnhof – Degerloch – Möhringen – Dürrlewang
  Mühlhausen – Münster – Hauptbahnhof
  Stammheim – Zuffenhausen – Pragsattel – Hauptbahnhof – Eugensplatz – Ruhbank/Fernsehturm (– Heumaden)

In addition, in case of events at the NeckarPark and Cannstatter Wasen

Line No. Route
  Hauptbahnhof – Charlottenplatz-Mineralbäder – Cannstatter Wasen – NeckarPark (Stadion)

Noteworthy

The Hauptbahnhof has been assigned the IATA code ZWS, because the station is used by Lufthansa in the AIRail concept. Passengers may travel in ICE trains, which are also assigned flight numbers, to Frankfurt Airport in Frankfurt am Main, instead of using a short-distance flight. For this reason, Lufthansa has a check-in counter near the entrance from the Arnulf-Klett-Platz. Passengers were able to both check and receive their baggage at this counter until 2007; since then, only check-in is possible.

District of the city centre

Hauptbahnhof has also been the name of one of ten sub-districts of the district of Stuttgart-Mitte (central Stuttgart) since 2007. This district has only a few residential buildings, so its population was 287 in 2014. Previously it was called Klettplatz.

Stuttgart 21

As part of the Stuttgart 21 project, the two wings were demolished. There has been widespread resentment of the entire project to place the main lines underground, leading to significant protests, in particular in response to the felling of some 260 huge and old trees. More than 18,000 people have registered as Parkschützer (park guardians); about a thousand vowed to stay in the path of demolition crews while chaining themselves to the trees. The colourful resistance led to nearly daily demonstrations and became a major factor in the 2011 state elections.

The Stuttgart architect and Bonatz expert Matthias Roser initiated an international call for the preservation of the Hauptbahnhof, including the wings, and over 400 architects, building historians, monument conservators, art historians, and city planners, such as the Pritzker Architecture Prize recipients Richard Meier and David Chipperfield, joined this effort. This group viewed the Bonatz-designed building as one of the most significant railway station structures of the 20th century in Germany and Europe as a whole, and were opposed to any structural changes.

On 27 November 2011, a referendum on the project "Stuttgart 21" resulted in 58.8% voted in favor of the project, while 41.2% voted against it.[70]

In order to provide necessary space for the new station's construction—next to the main building, where the ends of the platforms used to be—the platforms had to be moved away from the building, and the track layout underwent significant changes. In the process, three trains derailed on different occasions in 2012.

Overview

 
Outline map of the Stuttgart 21 project

Stuttgart 21 is a transport and urban development project under construction for the complete reorganisation of the Stuttgart railway junction. The existing terminus is to be rotated by about 90° and converted into a through station with eight tracks. For this purpose, the approach track are being laid in tunnels from all directions. The aim is to increase the capacity of the station, to shorten transfer routes and to reduce maintenance costs.[71] During the debate surrounding the project, critics proposed several alternative plans, including the extensive refurbishment and the progressive redevelopment of the existing station under the concept of Kopfbahnhof 21 (terminus 21).

In the feasibility study submitted in 1995, the cost of the underground station (today's planning approval section 1.1, excluding the access tracks required by its new location) was estimated at DM 930 million (€476 million).[72] In 2009, the costs were estimated at €400 million.[73] According to the overall planner Ingenhoven, the calculated costs are less than ten percent above the original cost estimate (as of 2013).[74] Deutsche Bahn AG estimates that the expenditure of approximately €110 million will be required for the continued "third-party use" of the Bonatz building, which is not part of the Stuttgart 21 project.[75]

Planned measures

The station is covered by the planning approval for section 1.1 of the Stuttgart 21 project.[23] The application for planning approval of the first section of Stuttgart 21 was submitted on 31 October 2001.[76] The five-day hearing of objections closed on 11 April 2003 after more than 50 hours of debate. It was considered the largest and most complicated hearing in the history of the Stuttgart regional council.[77] Planning approval was granted by the Federal Railway Authority (Eisenbahn-Bundesamt) on 28 January 2005 and became final in June 2006.[78] The Bund für Umwelt und Naturschutz Deutschland (BUND) lodged a class action against the approval.[79] By mid-2015 there had been fourteen amendments to the plan, including fundamental changes such as the doubling of the groundwater extraction rate (seventh amendment of the plan), the installation of additional escape stairs (sixth amendment) and the shortening of the channel carrying the Nesenbach (stream) and the adoption of an open design for it (14th amendment).[80]

In July 2015, a further amendment to the plan was announced, which means that the smoke extraction building in Sängerstraße will remain unchanged externally, but will receive a significantly more efficient ventilation system.[81]

Pedestrian network

The four 420-metre-long island platforms will have a width of 10 metres and will be 1.60 metres wider than the platforms of the current terminus.[82]

The comfort of passenger movements resulting from the planned entrances, footbridges, stairs, lifts and platforms was examined in a pedestrian flow analysis. In the peak hour, the traffic quality is mainly in the range of quality level C ("limited speed selection") and partly in the range of quality level D ("clearly limited speed choice"), outside the peak hour, quality levels A and B (free or almost free flow of traffic) is achieved.[83]

Track layout

The station is to have eight platform tracks, which are to be connected at both ends of the station to four access tracks:

  • in the northwest to two tracks each towards Feuerbach and Bad Cannstatt.
  • in the southeast to two tracks each towards Flughafen/Messe/Ulm and Wangen/Obertürkheim/Untertürkheim.
 
Schematic track plan of the underground station (with eight tracks)

The two ends of the station are planned to be grade separated with flying junctions. From each of the four directions of approach, trains will be able to reach five of the eight platform tracks. The two middle platform tracks will be able to be used by trains from all four directions. The planned entry speed on the approach tracks is 60 km/h (outer tracks), 80 km/h and 100 km/h (island platform 4 and 5). Blocked paths would also be avoided by a flexible choice of approaches from the existing lines.[84] The number of sets of points (each outside the operations of the station) will decrease compared to the current terminus from 225 to 48.[85]

Already in the course of the "preliminary project" initiated in early 1995, the track plan of the planned underground station had been optimised for directional operation to such an extent that all platforms operating in each direction could be reached from all incoming tracks.[86] The plan for the northern end of the station had been changed compared to the plan submitted to the regional planning procedure after an anhydrite deposit was found in the geotechnical investigation. The nearest entrance and exit turnouts were shifted by about 150 metres towards the station. The transition from two twin-track tunnels to four single-track tunnels was also preferred.[87]

 
Longitudinal section of the underground station

The planned station hall measures 447 metres in length and 80.58 metres in width,[79] at a height of 10 to 12 metres.[10] The building will be founded on a 1.60 to 2.50 metre thick plate and anchored by 3,700 piles.[88] The base of the building will lie between 6 and 8 metres below the water table.[89] Between the lowest point of the foundations and the groundwater, according to the promoter, there would be a water-impermeable layer more than 35 metres thick.[88] The new station can only be built as cut and cover to avoid disturbances to the level of the groundwater.[90]

The planning approval section begins in the northwest at line-km -0.442. At this point, in the area of Jägerstraße 24, the connecting tunnels, which have been constructed using a mining method, open out into the station. The gradient initially drops from an altitude of 241 metres (at the railhead; ground altitude: 258 metres) to the south for 404 metres at 1.31 percent and then continues for another 459 metres at a gradient of 1.51 percent, before an inflection point (km +0.345, 230 metres above sea level at the railhead, 12 metres below ground level) at the southern end of the station from which the gradient rises to the end of the section at 0.41 percent. The section limit is at line-kilometre +0.432, in the Willy-Brandt-Platz area, at the junction with the connecting tunnels to be excavated by mining methods.[91]

According to the Deutsche Bahn information, a track gradient of up to 1.51 percent is required in the platform area due to several fixed points (Stadtbahn lines and groundwater streams), which is above the ruling limit for station tracks of 0.25 percent. Safe operations are still guaranteed by a bank in the middle of the platforms of 1.0 percent.[92] In March 2016, it was announced that the proof of sufficient security required for operations had not yet been provided. This also makes it unclear what operational restrictions will be required for the increased gradient.[93] Critics see significant risks from trains moving accidentally on this gradient.[94]

Station building

 
Planned construction measures in the station area
 
Around 280 trees are to be felled or moved in the station area

21 different changes will be made on the remaining part of the former station building, the so-called Bonatz-Bau (Bonatz building), in parallel with the Stuttgart 21 project. The function of the building will be maintained. The building's façades will be preserved using a new structural frame and modern building technology.[95] Construction on the Bonatz building is scheduled to begin in 2018 and be completed 2021.[95]

A hotel, restaurant and conference complex with 150 hotel rooms will be built in the above-ground part of the building on four levels. Levels +3 and +4 will be rebuilt, but set back from Schillerstraße so that they do not affect the overall impression of the building from that street.[95]

Straßburger Platz ("Strasbourg Square") is to be created on the roof of the through station at the current level of the railway tracks and the current platform hall (the so-called "level +1"). This area, delimited to the south by the Bonatz building and to the north by a new station building, will connect Kurt-Georg-Kiesinger-Platz with the Schlossgarten.[10] Daylight will reach the platforms through 27 4.30 metre-high "high-light eyes" (Lichtaugen).[96]

A distribution level with access from the station tower, Königsstraße, Königsallee (Cannstatter Straße) and the new city district is to be created below Straßburger Platz on level 0. The four platforms are to be arranged with eight platform tracks on the lower level ("level −1"). Access to the lower-lying, double-track S-Bahn station is planned below the new platform tracks. A new parking garage is to be built below the northern part of the station building and to the north of it, but underground.[10] Level −2 is to act as the S-Bahn level, including giving access to it.[97]

The entrance to the station building is to be built next to the existing entrances and will run through four 23 metres-wide and up to 10 metres-high glass-mesh shells. In total, more than 35 escalators and 15 so-called "panoramic" lifts are planned.[96]

The platforms are to be accessed via three distribution points (level 0) near two ticket halls and the Planetarium/Staatsgalerie. Each platform is to be accessed by three lifts, five escalators and five sets of stairs.[10] A new shortcut to the Staatsgalerie Stadtbahn stop is to be built at the eastern end.[84]

 
Schematic overview of platform access with bottlenecks

The main access to the platform level is to be provided by the middle pier (pier B), which is to be accessed via the large ticket hall and the new access to the station tower in the south and the Europaviertel ("European quarter", a new commercial development) in the north. Each of the four platforms is accessed from this ramp via a lift and two escalators and sets of stairs on each side.[98] Critics have noted that the passage is just 2.04 metres wide between the outer edge of the stairs and the platform edge at the point.

The western pier (pier A) is to be reached mainly via the new access at Kurt-Georg-Kiesinger-Platz and the small ticket hall. From this pier, each platform is accessed via a lift and an escalator and a set of stairs on each side.[98] The passage is 2.85 metres wide at its narrowest point.[98]

The eastern pier (pier C) is approached via the entrance from the Staatsgalerie, which can be reached by a pedestrian tunnel. An elevator as well as two escalators and two sets of stairs are planned at the exit to the Staatsgalerie. It has no access to piers A and B and thus no access to the Bonatz building. From the distribution level, each platform is connected by a lift and an escalator and a set of stairs to the west. The passage width between the stairs and the platform edge is 2.86 metres.[98]

After the commissioning of Stuttgart 21, an additional station building will be built on the opposite side of the new through station, which will serve as a station access from the north and will also accommodate operating rooms. Alteration of the Stadtbahn line under Heilbronner Straße was due from mid-2011 to mid-2014[99] and of the Staatsgalerie Stadtbahn station from February 2013.[100] Among the numerous other construction measures is the relocation of the Nesenbach (construction was originally planned for late 2011 to mid-2014,[99] but started in June 2015[101]) and the West[102] main drains.

Light and air conditioning

The rail infrastructure is designed as a zero-energy building: the air conditioning will be operated exclusively using geothermal energy, assisted by the cooling effect of incoming trains.[103] The temperature in the platform area should also not fall below ten degrees without artificial heating (at an external temperature of −20 degrees Celsius) or exceed 29 degrees.[104] The "high-light eyes" will also be able to be opened for ventilation and smoke extraction.[10] Experiments have shown that the station concourse will be lit naturally by the high-light eyes for up to 14 hours daily and will be able to cope during this period without artificial light. Floor lights at the edge of the platform will mark the edge of the platform next to the track bed.[10] On average, 5 percent of daylight would enter the interior, but under the high-light eyes, this proportion would rise to 10 to 15 percent.[104]

History

Planning

On the basis of "operational considerations", the station considered for the feasibility study at the beginning of 1995 provided for eight platforms with four 10-metre-wide and 420-metre-long island platforms. The tracks, which would be dedicated to operations in a particular direction, would have had connecting passages in the tunnels running from the platforms. To the northwest, two twin-track connecting tunnels were to run in parallel and after a sharp curve to the northeast would divide south of Mittnachtstrasse station (in the Wolframstraße area) into a branch towards Feuerbach and a branch towards Bad Cannstatt. To the southeast, four single-track tunnels were to be built directly to the turnout halls (two to Obertürkheim and Untertürkheim and two to the Airport). Under the design presented as an example, the Bonatz Building would have been preserved and an additional entrance would have been created in the side wing on Cannstatter Straße. The railway layout would be built at a gradient of up to 1.1 percent.[105] According to the feasibility study, the costs of the section including the station and the valley crossing, would amount to DM 928 million (DM 807 million plus 15 percent for planning costs, 1993 prices),[105] which on an inflation-adjusted basis would have amounted to €749 million.

The Synergiekonzept Stuttgart 21 ("synergy concept") presented at the end of 1995 provided for an eight-track through station with three island and two outer platforms. Traffic forecasts expected an increase to 70,400 long-distance and 53,100 regional passengers each day. The share of through traffic in total traffic in 2010 was projected to be around 50 percent for long-distance and just under 20 percent for regional services (54,000 and 13,000 passengers each day).[62] The plan was later modified so that four island platforms are now planned on the concourse.

A regional planning process (Raumordnungsverfahren) was carried out for the Stuttgart 21 project in 1996 and 1997. The through station solution favoured by Deutsche Bahn was examined as a proposed route with different suboptions. These included options with different platform positions, numbers of track and possibilities for further development.[106]

Other options, which deviated from the basic concept of a pure through station at the location of the existing terminus station, were mentioned in the spatial planning process, but were not examined to the same depth: the "lean" option provided for a continuation of the terminal station, while the "Kombi" option provided for the construction of a through station for long-distance traffic, but the terminal station would also be maintained. In addition, a Hauptbahnhof am Rosenstein (main station on Rosenstein ridge) option was considered, which would have involved abandonment of the current station. In addition, station locations in Bad Cannstatt and Untertürkheim were considered.[106]

On 28 February 1997, a Europe-wide architectural competition for the redesign of the station was announced.[107] The new station should be a "visible sign of pioneering mobility and a landmark for Stuttgart and its region".[10]

In a two-stage process, 19 participants out of 118 applicants who had initially submitted a concept were selected for a second round. A jury chaired by Klaus Humpert selected four equal winners in July 1997.[108] The four award-winning designs and six other designs were displayed in Stuttgart Hauptbahnhof from 11 August to 14 September 1997.[109] All four designs provided a station rotated by 90 degrees with daylight illumination.[108] On 4 November 1997, the design of the office of Ingenhoven, Overdiek, Kahlen and Partner[107] was finally chosen from the 126 submissions.[107]

Ingenhoven's concept at that time was to build the station underground at a cost of DM 350 million (equivalent to about €255 million) and to illuminate it with daylight from 27 light shafts, each 15 metres wide. The support structure of the station concourse was developed by Frei Otto.[110] The draft had been revised several times already in the competition.[111] Four designs were available in the final round.[107]

In 2005, the design received the MIPIM Future Project Award from the magazine Architectural Review as well as a Silver Award at the regional Holcim Awards[112] and a Golden Award in the global competition the following year.[113] In 2007, the design was awarded one of 58 International Architecture Awards from the Chicago Athenaeum.[114]

By 2006, the €2.8 billion estimated total cost of Stuttgart 21 included almost €800 million for the Hauptbahnhof.[115] The architect, Christoph Ingenhoven, received €36 million.[116]

A modified building design was presented at the end of August 2010.[96] Among other things, the size of the four entrances was reduced and routing and acoustics were revised.

Heiner Geißler, who was entrusted with the task of conciliating views in relation to the Stuttgart 21 project, suggested in his conciliatory appeal on 30 November 2010 that the safety of rail traffic, accessibility and fire safety of the through station should be improved. In addition to improvements to the track, a ninth and tenth platform track at the main station should also be investigated.[117]

On 23 April 2015, the Federal Railway Authority approved, among other things, the construction of two escape staircases per platform and changes to the shells surrounding the four direct entrances from the outside.[118] The planning amendment notice for the displacement of the evacuation staircases planned on the platforms to the ends of the station hall was delayed and is now expected in the summer of 2017.[119]

Ingenhoven reported that the cost of the station at the end of 2017 was "well below" €1 billion.[120]

Construction

 
Planned construction phases in the construction pits in the station area

With the symbolic start of construction on 2 February 2010 reconstruction work began on the track apron; these were necessary for the construction of the cross-platform concourse at the end of the platforms.[121]

The contract to demolish the north wing was awarded to Wolff & Müller on 18 May 2010.[citation needed] The establishment of the worksite began on 30 July 2010 under police protection[122] and the demolition of the facade of the north wing began on 25 August 2010.

 
Platform canopies with the glass panels removed (August 2012)
 
Additional concrete supports to stabilise the platform canopy block part of platform track 8 (December 2012)

Work on the demolition of the south wing began on 13 January 2012 with the gutting of the building.[citation needed] The exterior demolition of the building began on 30 January and was due to be completed in March 2012.[60][123] After a pillar of the platform canopy was damaged on 19 March, work was suspended for about three weeks.[124][125] After further damage due to gale-force gusts on 1 July 2012, platform 15/16 was blocked off again and work started on the upgrade of the glass panes on all platform canopies.[126]

The approximately 110-meter-wide excavation was due to be bridged by two ten-metre-wide bridges[127] by April 2014.[128] In addition direct access was to be provided to the cross-platform concourse from both sides. Access to the Europaviertel district on the north side has been possible since 21 October 2013[44] and on the south side[129] there has been access via the pedestrian walkways from the Mittlerer Schlossgarten since 24 January 2014. Both entrances are barrier-free.[44]

The repositioning of the cross-platform concourse was postponed several times. According to the planning status of March 2012, the cross-platform concourse was to be gradually advanced between July and December 2012.[130] At the end of June 2012, just over 50 of the 61 planned construction phases had been completed on the track apron. Platform tracks 1 and 2 were re-connected without completing the planned construction of the new S-Bahn tunnel in this area.[126] Construction of the new cross-platform concourse took place from late May 2013 to 22 October 2013 in 13 phases, requiring two platform tracks were blocked off. Deutsche Bahn reduced some train services during this period to reduce congestion of trains at the station.[131] The preliminary work and the commissioning of the cross platform, 120 metres north of its original location, should have taken 18 months to complete, but actually lasted 45 months.[44][128]

A two-storey underground engineering building of 1,800 square metres was built under the former parking lot at the northern exit at a planned cost of €7.6 million[132] between April 2012[133] and October 2013 (when the construction of the shell was completed)[44][134]

On 12 March 2012, the construction contract for the underground station, including the West, Cannstatter Straße and Nesenbach channels and the station access tunnel, was awarded to a consortium of the Züblin (manager) and Strabag companies.[135][136] The formal award took place on 24 March 2012.[137] The contract for the construction of the new central station was let for €323.4 million,[138] which was a sliding price under the contract.[135] The internal portion being built by Züblin amounts to around €300 million.[137] Groundwater management is not part of the scope of the contract.[139] The total contract value was €347.4 million in May 2016[140] and €364 million in August 2016.[141]

At the end of 2010, the lowest tender for the construction of the underground station amounted to about €360 million.[142] The first contract planned to be let in late 2011 was delayed over price negotiations.[143] Also technical questions led to delays.[139] In addition to successful negotiations, technical optimisations, such as a change in the type of concrete, would have contributed to savings, according to a media report.[144] Deutsche Bahn had calculated a price of €300 million based on its own data.[135]

 
Derailed carriage in the turnout area (9 October 2012)

In July, September and October 2012[145] trains derailed on the exit towards Feuerbach, which had been rebuilt in the course of the Stuttgart 21 project.[146] Following the latest derailment, platform tracks 8, 9 and 10 were blockaded.[147] In January 2013, Deutsche Bahn justified the derailments as being the result of "malfunctioning carriage buffers".[131] A short-term technical solution developed by DB was rejected by the Federal Railway Authority.[148] The suspension also led to far-reaching delays of S-Bahn and regional services.[149] On 22 January 2013, track 10 was conditionally released for service. Only multiple units and hauled trains could use it. According to Federal Railway Authority data, the unrestricted clearance of the track was not possible on the basis of documents that had been submitted.[131] According to Deutsche Bahn in December 2014, an end to these restrictions was not foreseeable.[150]

In March 2012, the beginning of civil engineering work was scheduled for early 2013.[133] The civil works on the excavation of the station began on 5 August 2014 at pit 16 in the Mittleren Schlossgarten.[151] A mid-2013 timetable for the excavation work in the Mittleren Schlossgarten was considered obsolete by mid-2014. Out of 14 construction stages planned so far, 7 had been realised and the work had been delayed by about five months.[152]

An already issued statistical proof of the safety of the station has not applied since 2014 due to changed legal requirements and a renewal is pending.[153] Civil engineering work at the station was stopped at the beginning of March 2015 because a permit from the Federal Railway Authority for the construction of additional escape staircases was missing. The work was thus eight months late compared with early projections.[154]

On 26 January 2016, one year later than scheduled under the August 2014 timetable, work began on casting the floor slab in the first excavation pit of the station, initially as the base plate in what is known as the Medienkanal (middle channel).[155]

 
Construction work in the middle part of the future platform hall (October 2017)

The concreting of the first roof stanchions was due to start in June 2017. The 28 columns are to be concreted two at a time.[156]

 
The former DB divisional headquarters set on pillars (December 2017)

In mid-2017, the building of the former Deutsche Bahndirektion (Deutsche Bahn divisional headquarters) was undermined and placed on a 1.3 m thick concrete slab. This rests in turn on some supports, between which the construction machinery and vehicles can operate. DB had sought the demolition and reconstruction of the building built in 1911–1912. The city of Stuttgart, however, insisted on its preservation.[157]

Groundwater management

The groundwater has been lowered by approximately seven metres by pumping for the construction of the excavations. The resulting funnel of lowered groundwater usually extends for several hundred metres. In order to reduce the disturbance, water is reintroduced (infiltration via injection well) in the vicinity of the construction excavations. The groundwater must be treated prior to being reintroduced to reduce possible pollution.[158]

The management of groundwater was originally expected to involve around three million cubic metres of groundwater. Following a change in the plan at the beginning of 2011, this figure doubled to 6.8 million cubic metres, necessitating an amendment to the license in relation to its scope and impact.[159][160]

The groundwater management was expected to start in January 2013.[130] On 25 June 2012, it was announced that a public hearing was required to consider Deutsche Bahn's proposal to double the groundwater withdrawal to 6.8 million cubic metres, delaying the construction work (according to media reports, to 2014). According to its own statements, Deutsche Bahn's planned to open excavation pits requiring less groundwater withdrawals in the spring of 2013 and thus comply with the planning approval decision (which stipulates lower withdrawal quantities).[161] According to a media report, however, the Federal Railway Authority and the Stuttgart Regional Council assumed that the construction work would not begin before 2014.[162] The Federal Railway Authority approved the increased groundwater abstraction on 22 September 2014.[163]

Future

 
Demolition work on the rear section of the former Deutsche Bahn divisional headquarters in Heilbronner Straße in August 2012
 
The state pavilion (here in March 2012) was located above the southern part of the planned station and was demolished in the course of construction in August 2012.
 
Fenced area for the construction of the planned station in the Mittleren Schlossgarten (June 2013)
 
Construction tracks being constructed in the Mittlerer Schlossgarten, on the grounds of the planned station (September 2013)

It is planned to successively carry out the construction of the valley crossing and the station in 25 subsections.[164] The shell of the station was expected to be completed by the end of 2017 (as of January 2011).[99] The Staatsgalerie Stadtbahn station is being relocated to the south side of the future station.[165] Preparatory measures started at the end of 2014, when completion was scheduled for 2019/2020 at the latest.[166]

The excavated material is transported via separate construction roads and a conveyor belt to a central logistics area at Stuttgart Nord station and transported from there on freight trains. The commissioning of the new station is scheduled for December 2021.

A traffic forecast for 2025 anticipates around 207,600 long-distance and regional passengers, including 118,800 from the direction of Feuerbach and Bad Cannstatt and 88,800 from the Filder Tunnel, Obertürkheim or Untertürkheim.[167] The accessibility of the Stuttgart Hauptbahnhof traffic cell by public transport from the Stuttgart region, based on weighted average traffic demand, should improve, according to a traffic forecast from 32 minutes (2010) to 31 minutes (2025).[168]

Stuttgarter Netz AG, a consortium of several private railway companies, intends to operate part of the existing terminal station. The company expects up to 100 trains to stop at the station every working day. Eight tracks of the terminal station, the access tracks from Bad Cannstatt, Feuerbach and Vaihingen and the existing signal box would be preserved for this purpose. Overall, a quarter of the existing area would be preserved. The calculated annual costs of €1.6 million are expected to be offset by revenue from train and station operations of €1.8 million. Among other things, secondary lines such as the Schönbuch and the Wieslauf Valley Railways would be connected with Stuttgart Hauptbahnhof.[169]

Rail operations

According to a simulation commissioned by the promoters, the optimum performance range of the through station lies between 42 and 51 trains per hour, while for an upgraded terminal station (the Kopfbahnhof 21 concept) it would be 28 to 38 trains per hour. The maximum flow will be 72 trains in the through station or 43 trains per hour in the terminal station.[170] In 2002, Deutsche Bahn estimated a capacity increase of 50 percent for the 8-track through station compared to the 16-track terminal station; with an upgrade of the approach tracks from Feuerbach, 125 percent more trains would be able to run during the peak.[85]

Critics doubt these claims.[171] Nahverkehrsgesellschaft Baden-Württemberg (a state agency that helps coordinate public transport operations) confirmed its opinion that the existing terminal station could already carry 50 trains and, with improved signalling technology, it would carry 56 trains an hour.[172]

References

Footnotes

  1. ^ "OpenRailwayMap" (Map). Map of Stuttgart Hauptbahnhof. Cartography by OpenStreetMap. OpenRailwayMap. 28 September 2014. Retrieved 19 October 2014.
  2. ^ "Lageplan Hauptbahnhof Stuttgart" (PDF) (orientation map) (in German). Deutsche Bahn AG. 2014. Retrieved 19 October 2014.
  3. ^ a b "Stationspreisliste 2023" [Station price list 2023] (PDF) (in German). DB Station&Service. 28 November 2022. Retrieved 14 December 2022.
  4. ^ Eisenbahnatlas Deutschland (German railway atlas) (2009/2010 ed.). Schweers + Wall. 2017. ISBN 978-3-89494-146-8.
  5. ^ "Tarifzoneneinteilung" (PDF). Verkehrs- und Tarifverbund Stuttgart. 1 April 2020. Retrieved 16 April 2020.
  6. ^ a b c d (in German). Deutsche Bahn. Archived from the original on 8 June 2010. Retrieved 10 June 2018.
  7. ^ "Bonatzbau soll Weltkulturerbe werden". Stuttgarter Nachrichten (in German). 11 November 2009. Retrieved 21 February 2012.
  8. ^ a b c d Kübler 1905.
  9. ^ "Kurztexte zur Denkmalpflege" (in German).
  10. ^ a b c d e f g h i Stuttgart 21: Talquerung mit Hauptbahnhof (in German). DB ProjektBau GmbH. (14 page brochure with situation in September 2005)
  11. ^ "K 412 IV DO 10735, 1 Plan Stuttgart Hbf: Empfangsgebäude 1.Bauabschnitt Lageplan Personenbahnhof" (in German). Landesarchiv Baden-Württemberg, Staatsarchiv Ludwigsburg. 1917. from the original on 25 March 2016. Retrieved 5 June 2018.
  12. ^ . Stuttgarter Zeitung (in German). 22 January 2008. Archived from the original on 25 March 2013. Retrieved 5 June 2018.
  13. ^ Lambert, Walter; Keckeisen, Willi (1956). "Stadtbahn Stuttgart". Die Bundesbahn (in German). 30 (21): 1159ff.
  14. ^ Zentralstellwerk Stuttgart Hauptbahnhof (in German). Standard Elektrik Lorenz. c. 1978. pp. 9, 12f., 15, 38. (40 page brochure)
  15. ^ Der Tunnel (in German). Stuttgart: Bundesbahndirektion Stuttgart. 1985. p. 218. ISBN 3-925565-01-9.
  16. ^ Isenberg, Michael (22 August 2013). "Turm steht wohl auf Eisenbetonpfählen". Stuttgarter Nachrichten (in German). p. 20.
  17. ^ Valleé, Dirk (1997). "Nachhaltige Leistungssteigerung im Stuttgarter S-Bahn-Netz". Der Nahverkehr (in German) (7/8): 35–41.
  18. ^ Schwarz, Konstantin (21 October 2015). "43000 Fahrgäste vom Umbau betroffen". Stuttgarter Nachrichten (in German). p. 16. from the original on 10 November 2017. Retrieved 7 June 2018.
  19. ^ "Bus und Bahn in der Region und die Nahverkehrsgesellschaft Baden-Württemberg". Stuttgarter Nachrichten (in German). Vol. 72, no. 24. 30 January 2016. p. 20.
  20. ^ a b c d e (in German). Stuttgart Regional Court. 20 May 2010. Archived from the original on 24 May 2010. Retrieved 7 June 2018.
  21. ^ Carlé, Walter (1980). Geologische Karte 1:25000 von Baden-Württemberg, Erläuterungen zu Blatt 6826 Crailsheim (in German). Stuttgart: Geologisches Landesamt Baden-Württemberg.
  22. ^ a b Bartetzko, Dieter (23 August 2010). "Der Geist will nicht in die Flasche zurück". FAZ.NET (in German). from the original on 1 September 2012. Retrieved 10 June 2018.
  23. ^ a b c d e f g h i j k l m n Planning approval 2005.
  24. ^ "Track plan for Stuttgart Hauptbahnhof" (PDF) (in German). DB Netze. (PDF) from the original on 4 March 2016. Retrieved 10 June 2018.
  25. ^ Planning approval 2005, p. 176.
  26. ^ Stiglat 2004, p. 358.
  27. ^ a b c d e Reichsbahnoberrat Rempis (1928). "Die Vollendung der Stellwerkanlage auf dem neuen Hauptbahnhof Stuttgart". Organ für die Fortschritte des Eisenbahnwesens (in German). 13 (Neue Folge 65).
  28. ^ Thieme, Thomas (20 August 2008). . Stuttgarter Zeitung (in German). Archived from the original on 3 July 2011. Retrieved 10 June 2018.
  29. ^ a b c d e f "K 412 IV DO 11687, 1 Plan Stuttgart Hbf: Bf. Stuttgart Hbf" (in German). Landesarchiv Baden-Württemberg, Staatsarchiv Ludwigsburg. 1 October 1978. Retrieved 10 June 2018.
  30. ^ Andriof, Udo (21 February 2011). "Umsteigen für Radfahrer" (in German). Direktzu Stuttgart 21. from the original on 21 March 2013. Retrieved 10 June 2018.
  31. ^ (in German). Deutsche Bahn. 20 April 2016. Archived from the original on 25 May 2016. Retrieved 11 June 2018.
  32. ^ a b Grüter, Rolf; Böttcher, Karl-Heinz (1976). "S-Bahn Stuttgart: Bauwerke der Tunnelstrecke Hauptbahnhof-Schwabstraße". Die Bundesbahn (in German) (5): 317–325. ISSN 0007-5876.
  33. ^ a b c d e (in German). Bahnprojekt Stuttgart-Ulm e. V. Archived from the original on 26 April 2012. Retrieved 11 June 2018.
  34. ^ "K 412 IV DO 10702, 1 Plan Stuttgart Hbf: Empfangsgebäude Turm Fundament und Pfähle" (in German). Landesarchiv Baden-Württemberg, Staatsarchiv Ludwigsburg. May 1914. Retrieved 11 June 2018.
  35. ^ Braun, Thomas (20 November 2010). "Expertenstreit um Risiken im Untergrund". Stuttgarter Zeitung (in German). from the original on 26 December 2016. Retrieved 11 June 2018.
  36. ^ Durchdenwald, Thomas (19 August 2013). "Bahnhofsturm steht offenbar auf Eichenpfählen". Stuttgarter Zeitung (in German). from the original on 27 April 2017. Retrieved 11 June 2018.
  37. ^ "Bahn hält Bohrungen für überflüssig". Stuttgarter Zeitung (in German). 21 August 2013. from the original on 15 February 2016. Retrieved 11 June 2018.
  38. ^ a b c d e Roser, Matthias. "Baubeschreibung und städtebauliche Einbindung" (in German). Arbeitsgemeinschaft Hauptbahnhof Stuttgart. from the original on 7 March 2016. Retrieved 11 June 2018.
  39. ^ "Der Stuttgarter Hauptbahnhof und die sehenswerten Gaststätten im Bahnhofsturm". Das Bunte Blatt (in German) (40): 649–650. 1926.
  40. ^ a b "Bahnhofsturm – Heiraten" (in German). Landeshauptstadt Stuttgart. Retrieved 11 June 2018.
  41. ^ Roser, Matthias. "Kopfbahnsteighalle" (in German). Arbeitsgemeinschaft Hauptbahnhof Stuttgart. Retrieved 11 June 2018.
  42. ^ a b c "K 412 IV DO 10888, 1 Plan Stuttgart Hbf: Empfangsgebäude Gesamt Grundriss auf Bahnsteighöhe" (in German). Landesarchiv Baden-Württemberg, Staatsarchiv Ludwigsburg. 1943. Retrieved 11 June 2018.
  43. ^ "K 412 IV DO 11007, 1 Plan Stuttgart Hbf: Empfangsgebäude Kopfbahnsteighalle Bauzeitenplan für Überdachung" (in German). Landesarchiv Baden-Württemberg, Staatsarchiv Ludwigsburg. 10 May 1950. Retrieved 11 June 2018.
  44. ^ a b c d e Heffner, Markus (21 October 2013). "Querbahnsteig für Stuttgart 21: Neue Wege in den Hauptbahnhof". Stuttgarter Zeitung (in German). from the original on 28 May 2017. Retrieved 13 June 2018.
  45. ^ Roser, Matthias. "Kleine Schalterhalle" (in German). Arbeitsgemeinschaft Hauptbahnhof Stuttgart. Retrieved 13 June 2018.
  46. ^ a b Jaeger, Falk (29 November 2009). "Seitenflügel ohne Aufprallschutz". Der Tagesspiegel (in German). from the original on 18 May 2017. Retrieved 13 June 2018.
  47. ^ a b c d e Seeger, Ulrike (May 2009). "Architektur der Wege – Neue Wege der Architekturinterpretation am Beispiel des Stuttgarter Hauptbahnhofs". Wolkenkuckucksheim (in German). Retrieved 14 June 2018.
  48. ^ Planning approval 2005, p. 64.
  49. ^ a b "Bonatz-Bau bleibt Empfangsgebäude für den Bahnhof" (PDF; 1.0 MiB). Dialog 21 (in German) (2): 3. September 2010. from the original on 3 December 2013.
  50. ^ Roser, Matthias. "Posttrakt" (in German). Arbeitsgemeinschaft Hauptbahnhof Stuttgart. Retrieved 13 June 2018.
  51. ^ Schwarz, Konstantin (26 July 2010). "Bahnhof zum Teilabriss bereit". Stuttgarter Nachrichten (in German). from the original on 25 July 2018. Retrieved 13 June 2018.
  52. ^ Amtlicher Plan der Landeshauptstadt Stuttgart (in German) (52 ed.). Stuttgart: Stadtmessungsamt. 1978.
  53. ^ Schuster, Wolfgang. "Das Bahnprojekt Stuttgart-Ulm" (PDF; 15.7 MiB) (in German). Landeshauptstadt Stuttgart. p. 16. Retrieved 14 June 2018.
  54. ^ (in German). Bahnprojekt Stuttgart-Ulm. 25 August 2010. Archived from the original on 25 September 2012. Retrieved 14 June 2018.
  55. ^ "K 412 IV DO 10891 Stuttgart Hbf: Empfangsgebäude Ludwigsburger Straße Grundriss 1. Obergeschoß über Bahnsteig" (in German). Landesarchiv Baden-Württemberg, Staatsarchiv Ludwigsburg. 1946. Retrieved 14 June 2018.
  56. ^ "K 412 IV DO 10892 Stuttgart Hbf: Empfangsgebäude Ludwigsburger Straße Grundriss 1. Obergeschoß über Bahnsteig" (in German). Landesarchiv Baden-Württemberg, Staatsarchiv Ludwigsburg. 1946. Retrieved 14 June 2018.
  57. ^ Roser, Matthias. "Schlossgartenflügel" (in German). Arbeitsgemeinschaft Hauptbahnhof Stuttgart. Retrieved 14 June 2018.
  58. ^ a b "21 Gute Gründe für Stuttgart 21" (PDF; 1,7 MiB) (in German). Bahnprojekt Stuttgart-Ulm. (PDF) from the original on 29 June 2017. Retrieved 14 June 2018.
  59. ^ John, Timo (31 July 2010). "Der Zug der Zeit". FAZ.NET (in German). from the original on 21 April 2017. Retrieved 14 June 2018.
  60. ^ a b (in German). Bahnprojekt Stuttgart-Ulm. 13 January 2012. Archived from the original on 21 March 2013. Retrieved 15 June 2018.
  61. ^ Nauke, Jörg (22 March 2017). "City-Verschönerung nur mit weniger Autos". Stuttgarter Zeitung (in German). Vol. 73, no. 68. p. 22. from the original on 22 March 2017. Retrieved 15 June 2018.
  62. ^ a b (PDF) (in German). Stuttgart: Deutsche Bahn AG, Geschäftsbereich Netz, Regionalbereich Stuttgart, Projekte. 1995. pp. 14 f. Archived from the original (PDF) on 2 December 2013. Retrieved 3 July 2018.
  63. ^ "Kleine Anfrage des Abg. Boris Palmer und Antwort des Ministeriums für Umwelt und Verkehr: Zustand der wichtigsten Bahnhöfe in Baden-Württemberg" (PDF) (in German) (Drucksache 13/4069). Landtag von Baden-Württemberg. 16 February 2005: 2. Retrieved 15 June 2018. {{cite journal}}: Cite journal requires |journal= (help)
  64. ^ a b c "Fahrplanwechsel bringt deutliche Verbesserungen im regionalen Schienenverkehr" (in German). Ministerium für Verkehr Baden-Württemberg. 9 December 2019.
  65. ^ a b c d e "Neues zum Fahrplanwechsel". VVS.de. Verkehrs- und Tarifverbund Stuttgart. 10 December 2019. Retrieved 29 December 2019.
  66. ^ Stortz, Oliver (11 July 2015). "Land der Bahnfahrer". Eßlinger Zeitung (in German). p. 6.
  67. ^ Rothenstein, Dirk (18 April 2018). "S-Bahn Stuttgart: Modern. Mobil. Für die Region" (PDF) (in German). DB Regio AG. pp. 24 f. from the original on 4 April 2018. Retrieved 17 June 2018.
  68. ^ (in German). Bahnprojekt Stuttgart-Ulm. Archived from the original on 26 April 2012. Retrieved 17 June 2018.
  69. ^ (PDF) (in German). Eisenbahn-Bundesamt Karlsruhe/Stuttgart. 18 January 2005. Archived from the original (PDF; 2.3 MiB) on 16 October 2012. Retrieved 17 June 2018.
  70. ^ "Bahnhofs-Neubau: S21-Gegner scheitern bei Referendum". Der Spiegel. 27 November 2011 – via www.spiegel.de.
  71. ^ (in German). Bahnprojekt Stuttgart-Ulm e. V. Archived from the original on 28 August 2012. Retrieved 18 June 2018.
  72. ^ Käfer, Armin (17 January 1995). "Fachleute: Unterirdischer Bahnhof in Stuttgart kann gebaut werden". Stuttgarter Zeitung (in German).
  73. ^ "Stuttgart 21 soll trotz Mehrkosten gebaut werden". Die Welt (in German). 11 December 2009. from the original on 27 September 2013. Retrieved 18 June 2018.
  74. ^ "Versaute Verhältnisse". Der Spiegel (in German). No. 24. 10 June 2013. pp. 118–12. ISSN 0038-7452.
  75. ^ "Aktueller Sachstand Stuttgart 21" (PDF; 95 KiB). Deutsche Bahn AG. 10 December 2009. p. 10. (PDF) from the original on 27 September 2013. (information bulletin (10 A4 pages)
  76. ^ "Unter der Lupe: Wie das Planfeststellungsverfahren funktioniert". Das Projekt Stuttgart 21. Begleitbuch zur Ausstellung im TurmForum Stuttgart 21 (in German). TurmForum Stuttgart 21 e. V. pp. 50 f.
  77. ^ Bury, Mathias (12 April 2003). "Bahn und Kritiker sehen sich bestätigt". Stuttgarter Zeitung (in German).
  78. ^ Marquart, Peter (26 September 2006). "Die Entwicklung des Projektplanung". Projekt Stuttgart 21 und NBS Wendlingen–Ulm: Die Berücksichtigung der Wasserwirtschaft in der Planung – eine Zwischenbilanz –. Tagungsband (in German). Regierungspräsidium Stuttgart. pp. 6–13.
  79. ^ a b Engel, Rainer (2005). (PDF). Der Fahrgast (in German) (2): 29–32. ISSN 1619-1072. Archived from the original (PDF) on 21 February 2007. Retrieved 19 June 2018.
  80. ^ "Pfa 1.1" (in German). Mediathek des Bahnprojekt Stuttgart-Ulm e.V. 23 April 2015. Retrieved 19 June 2018.
  81. ^ Schwarz, Konstantin (9 July 2015). "Neuer Plan für Neckarbrücke". Stuttgarter Nachrichten (in German). No. 155. p. 18. from the original on 10 July 2015. Retrieved 19 June 2018.
  82. ^ Kefer, Volker (29 December 2010). "Wie breit sind die Bahnsteige im Vergleich" (in German). Direktzu Stuttgart21. from the original on 22 April 2016. Retrieved 20 January 2018.
  83. ^ Hantel, Sven (24 July 2012). "24.07.2012 UTA Stuttgart 21, Foliensatz zur Präsentation im Stuttgarter Gemeinderat" (PDF; 115 KiB) (in German). DB Netze. p. 11. from the original on 23 September 2015. Retrieved 20 January 2018.
  84. ^ a b Martin, Ullrich (2009). "Stuttgart 21: Großprojekt europäischer Dimension". Deine Bahn (in German) (7): 6–13.
  85. ^ a b "Stuttgart 21 spezial: Der Planfeststellungsabschnitt 1.1 Talquerung mit Hauptbahnhof" (16-page brochure) (in German). Stuttgart: DBProjekte Süd GmbH. January 2002. p. 10. {{cite web}}: Missing or empty |url= (help)
  86. ^ Planning approval 2005, pp. 59–67.
  87. ^ Planfeststellungsunterlagen. Umgestaltung des Bahnknotens Stuttgart. Ausbau- und Neubaustrecke Stuttgart -Augsburg. Bereich Stuttgart - Wendlingen mit Flughafenanbindung. Abschnitt 1.5: Zuführung Feuerbach und Bad Cannstatt. Bau-km -4.0 -90.3 bis -0.4 -42.0 und -4.8 -64.4 bis -0.4 -42.0.
    Anlage 1: Erläuterungsbericht. Teil III: Beschreibung des Planfeststellungsbereiches
    . Document with situation as of 9 June 2006. Plan determined on 13 October 2009 by the Federal Railway Authority (Eisenbahn-Bundesamt), Karlsruhe/Stuttgart field office (file number 59160 PAP-PS21-PFA1.5) (in German). DB ProjektBau GmbH, Niederlassung Nordwest. 13 October 2009. pp. 26f.
  88. ^ a b "Hier sind doch keine Stümper am Werk". Dialog 21 (in German) (2). September 2010.
  89. ^ Isenberg, Michael (27 August 2010). "Ein Podium der Besserwisser". Stuttgarter Nachrichten (in German). No. 197. p. 16. from the original on 27 August 2010. Retrieved 20 June 2018.
  90. ^ Das Synergiekonzept Stuttgart 21. Die Ergebnisse des Vorprojekts (44-page brochure) (in German). Stuttgart: Deutsche Bahn AG, Geschäftsbereich Netz, Regionalbereich Stuttgart, Projekte. 1995. pp. 26f.
  91. ^ "Übersichtshöhenplan in Kilometrierungsachse Bau–km –1.5 bis Bau–km +1.5" [Overview altitude plan on kilometre axis, construction-km -1.5 to construction km +1.5 (planning status of 30 April 1999)]. Umgestaltung des Bahnknotens Stuttgart: Ausbau- und Neubaustrecke Stuttgart – Augsburg. Bereich Stuttgart–Wendlingen mit Flughafenanbindung. Planfeststellungsabschnitt 1.1 Talquerung mit Hauptbahnhof. Bau-km -0.4 -42.0 bis +0.4 +32.0 [Redesign of the Stuttgart railway node: Stuttgart–Augsburg upgraded and new line. Stuttgart–Wendlingen area with airport connection. Planning approval section 1.1: valley crossing with Hauptbahnhof. Construction-km -0.4 -42.0 to +0.4 +32.0.] (in German). DB Projekt Stuttgart 21. 24 August 2001. Annex 2.7, sheet 1 of 1.
  92. ^ Planfeststellungsbeschluss nach § 18 Abs. 1 Allgemeines Eisenbahngesetz (AEG) für den Umbau des Bahnknotens Stuttgart "Projekt Stuttgart 21" Planfeststellungsabschnitt 1.1 (Talquerung mit neuem Hauptbahnhof) von Bahn-km – 0,4- 42,0 bis Bahn-km + 0,4+32,0 in Stuttgart [Planning approval pursuant to § 18 para. 1, General Railway Act for the rebuilding of the Stuttgart railway node, planning determination for section 1.1 of the "Stuttgart 21 Project" (valley crossing and new Hauptbahnhof) from track-km – 0.4- 42.0 to track-km + 0.4+32.0 in Stuttgart] (in German). Stuttgart: Federal Railway Authority. 28 January 2005. p. 372 f.
  93. ^ "Stuttgart 21: Genehmigung für Gleisneigung nötig". Stuttgarter Nachrichten (in German). from the original on 15 March 2017. Retrieved 20 January 2018.
  94. ^ Andersen, Sven (2011). "Das Bahnsteiggleisgefälle in Stuttgart 21 im Blick der Vorschriften und der betrieblichen Praxis" (PDF). Eisenbahn-Revue International (in German) (6): 310–311. ISSN 1421-2811. (PDF) from the original on 22 August 2016. Retrieved 20 January 2018.
  95. ^ a b c "Hauptbahnhof Stuttgart (Bonatzbau): Modernisierung des Bonatzbaus sowie Neubau von unterirdischen Bahnhofsgebäuden und Vorplätzen" (in German). DB Station&Service AG. from the original on 25 September 2015. Retrieved 21 June 2018.
  96. ^ a b c "Neuer Stuttgarter Bahnhof komplett barrierefrei". Dialog 21 (in German) (2 ed.): 1. September 2010.
  97. ^ "Kurze Wege auf drei Ebenen: Schnelle Verkehrsströme im neuen Hauptbahnhof". Das Projekt Stuttgart 21. Begleitbuch zur Ausstellung im TurmForum Stuttgart 21 (in German). TurmForum Stuttgart 21 e. V. pp. 66–69.
  98. ^ a b c d Kefer, Volker (8 April 2011). "Breite und Anordnung von Treppen (und Aufzügen)" (in German). Direktzu Stuttgart 21. from the original on 18 May 2017. Retrieved 22 June 2018.
  99. ^ a b c "Was passiert wann?" (PDF). Dialog 21 (in German) (3): 3. January 2011. Retrieved 29 June 2018.
  100. ^ Schwarz, Konstantin (10 August 2012). "Juchtenkäfer bremst Stadtbahn-Bau aus". Stuttgarter Nachrichten (in German). No. 184. p. 18. from the original on 18 June 2015. Retrieved 22 June 2018.
  101. ^ (Press release) (in German). Kommunikationsbüro des Bahnprojekts Stuttgart-Ulm e.V. 22 May 2015. Archived from the original on 18 June 2015. Retrieved 22 June 2018.
  102. ^ "Erläuterungsbericht Teil I: Allgemeiner Teil" [Explanatory Report Part I: General Part]. Planfeststellungsunterlagen: Umgestaltung des Bahnknotens Stuttgart. Ausbau- und Neubaustrecke Stuttgart - Augsburg, Bereich Stuttgart - Wendlingen mit Flughafenanbindung: Abschnitt 1.1, Talquerung mit Hauptbahnhof. Bau-km -0.4 -42.0 bis +0.4 +32.0 [Planning approval documents: Redesign of the Stuttgart railway node: Stuttgart–Augsburg upgraded and new line, Stuttgart–Wendlingen area with airport connection. Planning approval section 1.1: valley crossing with Hauptbahnhof. Construction-km -0.4 -42.0 to +0.4 +32.0.] (planning document) (in German). DBProjekt GmbH, Stuttgart 21. 28 January 2005. pp. 9, 16.
  103. ^ (PDF) (in German). DB ProjektBau GmbH. Archived from the original (PDF; 5.2 MiB) on 22 November 2010. Retrieved 23 June 2018.
  104. ^ a b Feireiß, Kirstin; Commerell, Hans-Jürgen, eds. (1999). 'Hauptbahnhof Stuttgart (Catalog for an exhibition in the Galerie Aedes East, in Berlin from 22 June to 1 August 1999) (in German). Berlin. pp. 36, 40.
  105. ^ a b "Projekt "Stuttgart 21". Die Machbarkeitsstudie" (PDF; 14 MiB) (in German). Stuttgart: Deutsche Bahn AG, Geschäftsbereich Netz, Regionalbereich Stuttgart, Projekte. c. 1995. pp. 13, 16, 26, 32 f. (PDF) from the original on 24 August 2017. Retrieved 24 June 2018.
  106. ^ a b Projekt "Stuttgart 21": Das Raumordnungsverfahren (eight-page brochure) (in German). Stuttgart: DBProjekt GmbH Stuttgart 21. c. 1997. p. 1 f, 5.
  107. ^ a b c d Ingenhoven, Christoph. "Eine aus dem Ort heraus entwickelte Antwort: Realisierungswettbewerb zur Neugestaltung des Stuttgarter Hauptbahnhofs". Das Projekt Stuttgart 21. Begleitbuch zur Ausstellung im TurmForum Stuttgart 21 (in German). TurmForum Stuttgart 21 e. V. pp. 56–59.
  108. ^ a b "Ganz schön helle". Stuttgart 21. Das Projektmagazin (in German) (3): 7. July 1998.
  109. ^ "Hauptbahnhof Stuttgart". Bauwelt (in German) (1997 yearbook): 1658 f.
  110. ^ "Stuttgart Hbf entschieden". Eisenbahn-Revue International (in German) (1/2): 6. 1998. ISSN 1421-2811.
  111. ^ "Bahnhof verstehen". Süddeutsche Zeitung (in German). No. 257. 1997. p. 14. ISSN 0174-4917.
  112. ^ "Holcim Awards 2005 – Europe – Silver: Main Station, Stuttgart, Germany". Holcim Stiftung. from the original on 5 August 2007. Retrieved 24 June 2018.
  113. ^ . Holcim Stiftung. Archived from the original on 4 June 2007. Retrieved 24 June 2018.
  114. ^ "The International Architectural Awards 2007 Archive" (PDF). The Chicago Athenaeum: Museum of Architecture and Design. (PDF) from the original on 18 May 2016. Retrieved 24 June 2018.
  115. ^ Ohnewald, Michael (7 October 2006). "Alte Liebe rostet nicht". Stuttgarter Zeitung (in German). No. 232. p. 36.
  116. ^ "Versaute Verhältnisse". Der Spiegel (in German) (24): 118–124. 10 June 2013. ISSN 0038-7452. from the original on 1 October 2013. Retrieved 24 June 2018.
  117. ^ "Schlichtung Stuttgart 21 PLUS" (PDF; 82 KiB) (in German). 30 November 2010. p. 13. from the original on 13 August 2011. Retrieved 24 June 2018.
  118. ^ (PDF) (in German). Stuttgart: Eisenbahn-Bundesamt. 23 April 2015. Archived from the original (PDF) on 7 February 2016. Retrieved 24 June 2018.
  119. ^ Milankovic, Christian (1 June 2017). . Stuttgarter Zeitung (in German). Vol. 73. p. 2. Archived from the original on 4 June 2017. Retrieved 24 June 2018.
  120. ^ "Zehn Jahre hätten gereicht". Der Spiegel (in German) (51): 118–121. 16 December 2017.
  121. ^ (in German). Bahnprojekt Stuttgart–Ulm e. V. 2 February 2010. Archived from the original on 25 September 2012. Retrieved 25 January 2018.
  122. ^ "Abriss am Hauptbahnhof beginnt unter großem Polizeischutz". Stuttgarter Zeitung (in German). 30 July 2010. from the original on 10 December 2013. Retrieved 25 January 2018.
  123. ^ "Abriss des Südflügels hat begonnen". Handelsblatt (in German). 30 January 2012. from the original on 2 February 2012. Retrieved 25 January 2018.
  124. ^ Bock, Jürgen (4 April 2012). "Abriss des Südflügels ruht für Monate". Stuttgarter Nachrichten (in German). from the original on 6 April 2012. Retrieved 25 January 2018.
  125. ^ Bock, Jürgen (12 April 2012). "Südflügel-Abriss geht weiter". Stuttgarter Nachrichten (in German). from the original on 15 April 2012. Retrieved 25 January 2018.
  126. ^ a b "Stuttgart 21 – Aktuelle Entwicklungen". Bahn-Report (in German) (5): 67. 2012.
  127. ^ Nauke, Jörg (13 January 2011). "Ist der neue Bahnhof behindertengerecht?". Stuttgarter Zeitung (in German). from the original on 26 May 2011. Retrieved 25 January 2018.
  128. ^ a b Schwarz, Konstantin (25 May 2013). "Bahnsteigumbau: Im Hauptbahnhof wird es eng". Stuttgarter Nachrichten (in German). p. 17. from the original on 12 June 2013. Retrieved 26 January 2018.
  129. ^ . Stuttgarter Nachrichten (in German). 24 January 2014. Archived from the original on 7 April 2014. Retrieved 25 January 2018.
  130. ^ a b Heffner, Markus (6 March 2013). "Arbeiten am Tiefbahnhof beginnen 2013". Stuttgarter Zeitung (in German). No. 55. p. 19.
  131. ^ a b c Faltin, Thomas; Schulz-Braunschmidt, Wolfgang (24 January 2013). "Gleis 10 mit Auflagen wieder freigegeben". Stuttgarter Zeitung (in German). Vol. 69, no. 20. p. 9. from the original on 27 January 2013. Retrieved 26 June 2018.
  132. ^ "D-Stuttgart: Bauleistungen im Hochbau". Tenders Electronic Daily (in German) (Document 2012/S 185–303797). 26 September 2012.
  133. ^ a b Schwarz, Konstantin (6 March 2012). . Stuttgarter Nachrichten (in German). No. 55. p. 18. Archived from the original on 8 March 2012. Retrieved 26 June 2018.
  134. ^ "Stuttgarter Konzern reißt Nordflügel am Bonatzbau ab". Stuttgarter Nachrichten (in German). 22 May 2010. from the original on 23 May 2010. Retrieved 26 January 2018.
  135. ^ a b c Kefer, Volker (23 March 2012). "Stuttgart 21 und NBS Wendlingen-Ulm Unterlage für den Prüfungs- und Complianceausschuss (PCA) der DB und den Lenkungskreis (LK) S21" (PDF, 880 KiB) (in German). Berlin/Stuttgart. pp. 5, 22. (PDF) from the original on 20 October 2012. Retrieved 26 January 2018.
  136. ^ "DB vergibt Aufträge für Tunnelbauwerke und neuen Stuttgarter Tiefbahnhof von rund 800 Millionen Euro" (Press release) (in German). DB Mobility Logistics AG. 13 March 2012.
  137. ^ a b "Brücken ins Land". Bezug (in German) (2): 4–8. 2012.
  138. ^ "D-Stuttgart: Bau von Bahnhöfen". Tenders Electronic Daily (in German) (Document 2012/S 216–356149). 9 November 2012.
  139. ^ a b "Jede Generation muss Neues schaffen". Stuttgarter Zeitung (in German). 22 May 2012. p. 22.
  140. ^ "Deutschland-Stuttgart: Bau von Bahnhöfen". Tenders Electronic Daily (in German) (document 2016/S 092–164539). 13 May 2016. Retrieved 26 June 2018.
  141. ^ "Deutschland-Stuttgart: Bau von Bahnhöfen". Tenders Electronic Daily (in German) (Document 2016/S 156–283069). 15 August 2016. from the original on 26 June 2018. Retrieved 26 June 2018.
  142. ^ "Baufirmen kämpfen um Milliardenaufträge". Stuttgarter Nachrichten (in German). No. 282. 6 December 2010. p. 17. from the original on 8 December 2010. Retrieved 26 June 2018.
  143. ^ Isenberg, Michael (13 March 2012). "Züblin soll Tiefbahnhof bauen". Stuttgarter Nachrichten (in German). from the original on 15 March 2012. Retrieved 26 June 2018.
  144. ^ . Stuttgarter Zeitung (in German). 22 March 2012. Archived from the original on 24 March 2012. Retrieved 26 June 2018.
  145. ^ Müller, Rebecca (9 October 2012). "Testzug entgleist am Hauptbahnhof". Stuttgarter Zeitung (in German). from the original on 11 October 2012. Retrieved 26 June 2018.
  146. ^ (PDF) (in German). Bonn: Eisenbahn-Unfalluntersuchungsstelle des Bundes. 2013. pp. 20–24. Archived from the original (PDF) on 21 August 2016. Retrieved 26 June 2018.
  147. ^ "Drei Gleise bleiben bis auf Weiteres gesperrt". Stuttgarter Zeitung (in German). No. 236. 11 October 2012. p. 19. from the original on 12 October 2012. Retrieved 26 June 2018.
  148. ^ "Keine Lösung für gesperrtes Gleis 10". Stuttgarter Zeitung (in German). Vol. 68, no. 283. 6 December 2012. p. 23.
  149. ^ Schwarz, Konstantin (10 January 2013). "Bahn nimmt neu Anlauf für Notfahrplan". Stuttgarter Nachrichten (in German). p. 21.
  150. ^ Petersen, Michael (23 December 2014). "Das lange Warten auf die Pünktlichkeit". Stuttgarter Zeitung (in German). No. 296. p. 5.
  151. ^ Durchdenwald, Thomas (5 August 2014). "Bahn hebt erst Baugrube für den Tiefbahnhof aus". Stuttgarter Zeitung (in German). No. 178. p. 19. from the original on 7 August 2014. Retrieved 26 June 2018.
  152. ^ Milankovic, Christian (12 August 2015). "Bahn kämpft im S-21-Trog mit dem Zeitplan". Stuttgarter Zeitung (in German). No. 184. p. 19. from the original on 13 August 2015. Retrieved 26 June 2018.
  153. ^ Milankovic, Christian (20 October 2015). "Fehlende Genehmigungen bremsen die Bahn". Stuttgarter Zeitung (in German). Vol. 71, no. 242. from the original on 19 December 2015. Retrieved 26 June 2018.
  154. ^ Schwarz, Konstantin (20 March 2015). "Fluchttreppen im Bahnhof nur 30 Minuten sicher". Stuttgarter Nachrichten (in German). p. 17. from the original on 22 March 2015. Retrieved 26 June 2018.
  155. ^ Milankovic, Christian (27 January 2016). "Im Bahnhofstrog fließt der erste Beton". Stuttgarter Zeitung (in German). p. 19. from the original on 28 January 2016. Retrieved 27 June 2018.
  156. ^ (in German). Deutsche Bahn. 19 May 2017. Archived from the original on 1 December 2017. Retrieved 27 June 2018.
  157. ^ Milankovic, Christian (27 July 2017). "Ehemalige Bahndirektion ist nun unten ohne". Stuttgarter Zeitung (in German). from the original on 29 July 2017. Retrieved 27 June 2018.
  158. ^ "Schlichtungsverfahren zu Stuttgart 21" (PDF; 668 KiB) (Meeting record of 6th conciliation meeting) (in German). 20 November 2010. pp. 89ff. (PDF) from the original on 18 October 2011. Retrieved 28 June 2018.
  159. ^ (PDF) (in German). Gaßner, Siederer, Neusüß. Archived from the original (PDF) on 3 December 2013. Retrieved 28 June 2018.
  160. ^ (PDF) (Express application to the Administrative Court Stuttgart) (in German). BUND Baden-Württemberg. 20 June 2011. Archived from the original (PDF; 297 KiB) on 18 December 2011. Retrieved 28 June 2018.
  161. ^ Isenberg, Michael (2012). "Baustart des Tiefbahnhofs soll 2013 möglich sein". Stuttgarter Nachrichten (in German). No. 149. p. 20.
  162. ^ Nauke, Jörg; Braun, Thomas (29 June 2012). "Land bestätigt Zeitverzug beim Tiefbahnhof". Stuttgarter Zeitung (in German). No. 148. p. 23.
  163. ^ Bescheid gemäß (…) für die Vorhaben "Großprojekt Stuttgart 21: PFA 1.1, 7. PÄ, Planänderung Wasserrecht" (…) (in German). Stuttgart: Eisenbahn-Bundesamt. 22 September 2014.
  164. ^ "Stuttgart 21: Bautaktung PFA 1.1" (PDF; 1.2 MiB) (in German). Bahnprojekt Stuttgart–Ulm. June 2010. (PDF) from the original on 16 October 2012. Retrieved 28 June 2018.
  165. ^ Milankovic, Christian (26 August 2013). "Der nächste Stadtbahnumbau steht an". Stuttgarter Zeitung (in German). p. 15. from the original on 29 August 2013. Retrieved 29 June 2018.
  166. ^ "Stuttgart 21: Bisherige Trasse wird verlegt". Stuttgarter Zeitung (in German). from the original on 17 December 2014. Retrieved 29 June 2018.
  167. ^ "Anlage 4.1 zur Vorlage 190 / 2013; Klausur des Verkehrsausschusses am 8. Mai 2013" (PDF) (in German). Verband Region Stuttgart. 8 May 2013. pp. 2, 4. Retrieved 29 June 2018(the figure of 103,000 results from the increase of 2,600 passengers expected between 2010 and 2025 (page 4) and the expected load of 105,900 passengers in 2025 (page 2)){{cite web}}: CS1 maint: postscript (link)
  168. ^ (in German). Verband Region Stuttgart. 8 May 2013. p. 8. Archived from the original (PDF) on 3 October 2013. Retrieved 29 June 2018.
  169. ^ Milankovic, Christian (1 December 2015). "Privatbahner: 100 Züge täglich im Kopfbahnhof". Stuttgarter Zeitung (in German). Vol. 70, no. 278. p. 19. from the original on 4 December 2015. Retrieved 29 June 2018.
  170. ^ Martin, U; Dobeschinsky, H.; Breuer, P.; Haderer, M.; Sonnenberg, N. (2007). "Vergleich der Leistungsfähigkeiten und des Leistungsverhaltens des neuen Durchgangsbahnhofes (S21) und einer Variante umgestalteter Kopfbahnhof (K21) im Rahmen der Neugestaltung des Stuttgarter Hauptbahnhofes (Abschlussbericht)". Stuttgart 21 – Diskurs (in German). Stuttgart: Landeshauptstadt Stuttgart. pp. 2287–2369, especially 2330, 2332, 2337 f., 2341.
  171. ^ Engelhardt, Christoph M. (2011). "Stuttgart 21: Leistung von Durchgangs- und Kopfbahnhöfen". Eisenbahn-Revue International (in German) (6): 306–309. ISSN 1421-2811.
  172. ^ (Press release) (in German). Ministeriums für Verkehr und Infrastruktur in Baden-Württemberg. 22 November 2011. Archived from the original on 27 November 2011. Retrieved 29 June 2018.

Sources

  • Dostal, Michael; Estler, Thomas (2012). Stuttgart Hauptbahnhof: Geschichte eines Bahnhofs [Stuttgart Hauptbahnhof: History of a Station] (in German). Munich: GeraMond Verlag. ISBN 978-3-86245-141-8.
  • Hajdu, Rose; Seeger, Ulrike (2011). Hauptbahnhof Stuttgart – Ein Wahrzeichen in Bildern (in German). Ostfildern: Thorbecke Verlag. ISBN 978-3-7995-0879-7.
  • Hopfenzitz, Egon; Fischer, Klaus (1999). Chronik Stuttgarter Hauptbahnhof 1846 bis 1998 (in German). Stuttgart: DB Station&Service AG.
  • Kübler, Hugo (October 1905). "Sonder-Abdruck: Die Erweiterung des Hauptbahnhofs Stuttgart". Neues Tagblatt (in German). No. 253, 254, 255, 256. Stuttgart.
  • Mayer, Martin (24 January 1923). "Der neue Bahnhof in Stuttgart" (PDF). Zentralblatt der Bauverwaltung (in German). 43 (year book (7/8)): 37–43.
  • Räntzsch, Andreas M. (2005). Die Einbeziehung Stuttgarts in das moderne Verkehrswesen durch den Bau der Eisenbahn (in German). Hamburg: Verlag Dr. Kovač. pp. especially: 473–711. ISBN 3-8300-1958-0.
  • Roser, Matthias (2008). Der Stuttgarter Hauptbahnhof - Vom Kulturdenkmal zum Abrisskandidaten? (in German) (1 ed.). Stuttgart: Schmetterling Verlag. ISBN 978-3-89657-133-5.
  • Roser, Matthias (1987). Der Stuttgarter Hauptbahnhof – ein vergessenes Meisterwerk der Architektur (in German) (1 ed.). Stuttgart: Silberburg-Verlag. ISBN 3-925344-13-6.
  • Seidel, Kurt (1987). 65 Jahre Stuttgarter Hauptbahnhof 1922 bis 1987 (in German). Bundesbahndirektion Stuttgart.
  • Stiglat, Klaus (2004). Bauingenieure und ihr Werk (in German). Berlin: Ernst & Sohn. ISBN 3-433-01665-8.
  • Willhaus, Werner, ed. (2006). Verkehrsknoten Stuttgart (in German). Freiburg 2006: EK-Verlag. ISBN 978-3-88255-251-5.{{cite book}}: CS1 maint: location (link)
  • "Planfeststellungsbeschluss nach § 18 Abs. 1 Allgemeines Eisenbahngesetz (AEG) für den Umbau des Bahnknotens Stuttgart "Projekt Stuttgart 21" Planfeststellungsabschnitt 1.1 (Talquerung mit neuem Hauptbahnhof) von Bahn-km – 0,4- 42,0 bis Bahn-km + 0,4+32,0 in Stuttgart" [Planning decision under s.18.1 of the General Railway Act for the conversion of rail node of Stuttgart, project "Stuttgart 21", zoning Section 1.1 (valley crossing with a new main station) from rail-km -0.4 – 42.0 to rail-km + 0.4 + 32.0 in Stuttgart] (PDF; 2.3 MiB) (in German). Eisenbahn-Bundesamt Karlsruhe/Stuttgart. 18 January 2005. Retrieved 10 June 2018.

stuttgart, hauptbahnhof, german, pronunciation, ˈʃtʊtɡaʁt, ˈhaʊ, ptbaːnˌhoːf, english, stuttgart, central, station, primary, railway, station, city, stuttgart, state, capital, baden, württemberg, southwestern, germany, largest, regional, long, distance, railwa. Stuttgart Hauptbahnhof German pronunciation ˈʃtʊtɡaʁt ˈhaʊ ptbaːnˌhoːf English Stuttgart central station is the primary railway station in the city of Stuttgart the state capital of Baden Wurttemberg in southwestern Germany It is the largest regional and long distance railway station in Stuttgart the main node of the Stuttgart S Bahn network and together with the station at Charlottenplatz it is the main node of the Stuttgart Stadtbahn Stuttgart HauptbahnhofTerminal stationStation building 2018 General informationLocationStuttgart Baden WurttembergGermanyCoordinates48 47 02 N 9 10 54 E 48 78389 N 9 18167 E 48 78389 9 18167 Coordinates 48 47 02 N 9 10 54 E 48 78389 N 9 18167 E 48 78389 9 18167Owned byDeutsche BahnOperated byDB Netz DB Station amp ServiceLine s Fils Valley Railway KBS 750 790 1 Franconia Railway KBS 780 790 4 5 Gau Railway KBS 740 S Bahn connecting line KBS 790 1 6 Platforms22 16 above ground terminal 2 S Bahn 4 U Bahn 1 2 ConnectionsConstructionArchitectPaul Bonatz and Friedrich Eugen ScholerOther informationStation code6071 3 DS100 codeTS 4 IBNR8000096Category1 3 IATA codeZWSFare zone 1 5 Websitewww bahnhof deHistoryOpened23 October 1922 100 years ago 1922 10 23 Electrified15 May 1933 89 years ago 1933 05 15 Passengers220 000 daily 6 ServicesPreceding station DB Fernverkehr Following stationMannheim Hbftowards Hamburg Altona or Berlin Gesundbrunnen ICE 11 Ulm Hbftowards Munchen HbfMannheim Hbftowards Kiel Hbf Neumunster Hamburg Altona or Oldenburg Hbf ICE 22 TerminusHeidelbergtowards Kiel Hbf Neumunster Hamburg Altona or Oldenburg HbfMannheim Hbftowards Hamburg Altona Dortmund Hbf Wiesbaden Hbf or Koln Hbf ICE 42 Ulm Hbftowards Munchen HbfVaihingen Enz towards Koln Hbf ICE 45 TerminusBruchsaltowards Karlsruhe Hbf ICE 60 Ulm Hbftowards Munchen HbfKarlsruhe Hbftowards Paris Est ICE TGV 83Mannheim Hbftowards Munchen Hbf ICE RJX 90 Ulm Hbftowards Budapest KeletiVaihingen Enz towards Hamburg EC IC 30 TerminusHeidelbergtowards Berlin Hbf Ostseebad Binz Munster Hbf or Aachen Hbf IC 32 Ulm Hbftowards Klagenfurt Hbf Innsbruck Hbf Oberstdorf or Tubingen HbfVaihingen Enz towards Karlsruhe Hbf IC 61 Aalentowards Munchen HbfHeidelbergtowards Frankfurt Main Hbf or Saarbrucken Hbf IC 62 Ulm Hbftowards Graz Hbf or Klagenfurt HbfMannheim Hbftowards Frankfurt Main Hbf or Saarbrucken Hbf TerminusTerminus IC 87 Boblingentowards Stuttgart HbfPreceding station Following stationHeidelberg Hbftowards Berlin Hbf FLX 10 TerminusPreceding station Following stationVaihingen Enz towards Karlsruhe Hbf IRE 1 Schorndorftowards Aalen HbfTerminus RE 8 Ludwigsburgtowards Wurzburg HbfRE 90 Stuttgart Bad Cannstatttowards Nurnberg HbfMEX 13 Stuttgart Bad Cannstatttowards CrailsheimMEX 16 Stuttgart Bad Cannstatttowards Ulm HbfPreceding station DB Regio Baden Wurttemberg Following stationTerminus IRE 6 Reutlingen Hbftowards AulendorfBoblingentowards Konstanz RE 4 TerminusTerminus RE 5 Esslingen Neckar towards Lindau ReutinBoblingentowards Rottweil RE 14a TerminusBoblingentowards Freudenstadt Hbf RE 14bTerminus RB 19 Stuttgart Bad Cannstatttowards CrailsheimPreceding station SWEG Bahn Stuttgart Following stationStuttgart Bad Cannstatttowards Tubingen Hbf RE 12 Ludwigsburgtowards Mosbach NeckarelzLudwigsburgtowards Heidelberg Hbf RE 17b TerminusLudwigsburgtowards Karlsruhe Hbf or Bad Wildbad RB 17aLudwigsburgtowards Bruchsal RB 17cStuttgart Bad Cannstatttowards Tubingen Hbf RB 18 Ludwigsburgtowards OsterburkenPreceding station Stuttgart S Bahn Following stationStadtmittetowards Herrenberg S 1 Bad Cannstatttowards Kirchheim Teck Stadtmittetowards Filderstadt S 2 Bad Cannstatttowards SchorndorfStadtmittetowards Flughafen Messe S 3 Bad Cannstatttowards BacknangStadtmittetowards Schwabstrasse S 4 Nordtowards BacknangS 5 Nordtowards Bietigheim BissingenS 6 Nordtowards Weil der StadtS 60 Nordtowards BoblingenLocationStuttgartLocation in Baden WurttembergShow map of Baden WurttembergStuttgartLocation in GermanyShow map of GermanyStuttgartLocation in EuropeShow map of EuropeLocated at the northeastern end of the Konigstrasse the main pedestrian zone of the city centre the main line station is a terminus whilst the subterranean S Bahn and Stadtbahn stations are through stations The station is well known for its 12 storey tower with a large rotating and illuminated Mercedes Benz star insignia on top the tower and station building are city landmarks Plans for the controversial Stuttgart 21 project to convert the main line terminus station into an underground through station include the demolition of the side wings of the building together with the elimination of the platforms tracks and apron of the terminus station The planned underground through station is configured at a 90 degree angle to the present station The construction started in 2010 and is scheduled to end in 2025 In November 2009 preservationists of the International Council on Monuments and Sites nominated the building for inclusion in UNESCO s World Cultural Heritage list an occasion that opponents of the Stuttgart 21 project picked to urge the city and Deutsche Bahn to stop the project which implies demolition of parts of the complex designed by Paul Bonatz 7 Contents 1 History 1 1 First and second Centralbahnhof 1 2 Sprickerhof through station 1 3 The current Hauptbahnhof 1 4 S Bahn and Stadtbahn 2 Building 2 1 Tracks and platforms 2 2 Station tower 2 3 Terminal station hall 2 3 1 North exit 2 3 2 Small ticket hall 2 3 3 Central exit 2 3 4 Large ticket hall 2 4 North wing 2 5 Schlossgarten wing 2 6 Klett passage 2 7 Other 3 Operations 3 1 Long distance connections 3 2 Regional connections 3 3 S Bahn connections 3 4 Freight traffic 3 5 Stadtbahn 4 Noteworthy 4 1 District of the city centre 5 Stuttgart 21 5 1 Overview 5 2 Planned measures 5 2 1 Pedestrian network 5 2 2 Track layout 5 2 3 Station building 5 2 3 1 Light and air conditioning 5 3 History 5 3 1 Planning 5 3 2 Construction 5 4 Groundwater management 5 5 Future 5 6 Rail operations 6 References 6 1 Footnotes 6 2 SourcesHistory Edit The third building from the left in the picture shows the facade with the entrance area under the arcades the first Stuttgart central station after a plan by the architect Karl Etzel Karl Etzel about 1850 Elevation of the station after the first station reconstruction 1867 seen from Schlossstrasse First and second Centralbahnhof Edit Until 1922 the central station Centralbahnhof or Zentralbahnhof was located on the Schlosstrasse the precise location of the former station is on what is today called the Bolzstrasse near the Schlossplatz The first station building a terminus station with 4 tracks was built by Karl Etzel for the opening of the Wurttemberg Central Railway Zentralbahn with its two branches to Ludwigsburg and Esslingen The wooden station hall was not unusual at the time and covered four tracks The first train arrived at the station from Canstatt on 26 September 1846 The first phase of railway construction in the Kingdom of Wurttemberg with routes to Heilbronn Bretten Ulm and Friedrichshafen was completed by 1854 Due to increasing railway traffic 8 the first building was replaced by new construction at the same spot in the 1860s Between 1863 and 1867 the engineers Klein Georg Morlok Carl Julius Abel and later city architect Adolf Wolff 9 created this second station with 8 tracks featuring a building with grandiose arches in the Renaissance Revival style Parts of the facade of this building are now part of the Metropol an events centre and cinema complex Sprickerhof through station Edit With a steadily increasing traffic volume and the connection of additional lines the station had increasingly reached its capacity limits in the early 20th century 8 By 1905 there were three designs for the redevelopment of the station 8 the so called Sprickerhofsche Durchgangsbahnhof Sprickerhof through station a terminal station on Bolzstrasse then Schlossstrasse and a terminal station on Schillerstrasse The concept of Sprickerhof through station was introduced in 1901 The Gau Railway and the line from Feuerbach were to run through the Kriegsberg a hill to the northwest of the current station to the central station in three parallel twin track tunnels at a gradient of 1 100 from Wolframstrasse in an arc with a radius of 300 metres This would have run to Bahnhofstrasse via Kriegsbergstrasse and the tracks would have been in the area of the road to Ludwigsburg The crossover tracks would have run into the tunnel for about 150 metres The entrance building would have been built in the area of the main customs office The above ground areas between Schlossstrasse and Schillerstrasse would have been demolished for this project A commission of external experts opposed the project 8 The current Hauptbahnhof Edit The station tower of the Hauptbahnhof in 2004 View from the station tower onto the platforms The present Hauptbahnhof was built between 1914 and 1928 on the street now called Arnulf Klett Platz only about 500 metres east of the former station In 1910 the Royal Wurttemberg State Railways Koniglich Wurttembergischen Staats Eisenbahnen or K W St E financed an architectural contest which drew 70 participants The competition was won by the architects Paul Bonatz and Friedrich Eugen Scholer with their plans for umbilicus sueviae the Navel of Swabia 10 After undergoing numerous changes including moving the station tower from the main facade to the wing at the Schlossgarten construction began in 1914 on Cannstatter Strasse Changes to the plan also occurred in the construction phase 10 Due to the route of the tracks to the old station construction needed to be done in two phases with the first stage including tracks 9 to 16 11 going into service on 22 October 1922 The tracks to the old station were cut at the same time As further construction of the new station was delayed for financial reasons the city of Stuttgart loaned Deutsche Reichsbahn two million Reichsmark equivalent in current values to 8 6 million in 1925 and a further loan of 5 million Reichsmark equivalent to 19 7 million in 1927 12 The second stage was completed in 1928 and the electrification of the 16 tracks was completed on 15 May 1933 In the bombing of Stuttgart in the Second World War the Hauptbahnhof was severely damaged several times although from 1940 to 1942 a decoy target at Lauffen am Neckar diverted many raids The reconstruction took several years Stuttgart Hauptbahnhof has been listed as a cultural heritage site of special significance under section 12 of the Baden Wurttemberg heritage protection act since 20 August 1987 S Bahn and Stadtbahn Edit A plan developed in the mid 1950s for a S Bahn proposed a four track station with two 175 metre long island platforms under the Hauptbahnhof which would be linked by two tracks towards the city centre and four towards Feuerbach Bad Cannstatt 13 Between 1971 and 1978 an underground Hauptbahnhof station was built for the S Bahn in the central Neckar area which was a cut and cover construction under the main hall in the area of the small ticket hall This station has two tracks and an island platform The first S Bahn services ran on 1 October 1978 After four years of planning construction commenced on a new central signalling centre of class SpDrL 60 at the Hauptbahnhof on 3 October 1973 The signalling infrastructure was gradually put into operation first for the train depot on 1 and 2 October 1977 then for the passenger station and freight yard on 5 and 6 November 1977 respectively The S Bahn connecting line was opened as far as the former terminus at Schwabstrasse on 1 October 1978 A total of 95 stop signals 93 distant signals 583 shunting signals 506 point machines 530 track circuits and 169 axle counters were integrated into the track layout The new signalling centre replaced twelve old signal boxes 14 DM 68 million was spent on the signalling centre and its outdoor facilities 15 Today five to seven dispatchers work in the signalling centre 16 The underground Stadtbahn station called Hauptbahnhof Arnulf Klett Platz in front of the station hall under Arnulf Klett Platz was opened to traffic on 9 April 1976 Today ten Stuttgart Stadtbahn lines serve the station The S Bahn station was used as of 1993 by about 120 000 passengers per day This included 55 000 transfers to long distance regional and Stadtbahn services about 15 000 passengers transferring between the S Bahn lines via Feuerbach and Bad Cannstatt and around 50 000 passengers entering or exiting at the station 17 The Stadtbahn station was used by around 75 000 passengers a day 18 In 2016 140 000 passengers used the S Bahn station each day With the commissioning of Stuttgart 21 the volume is expected to decline by about 20 percent 19 The S Bahn station is called Stuttgart Hbf tief deep and is 20 m below the Hauptbahnhof Building Edit Station building in 2010 Large ticket hall from Konigstrasse in 1927 The station building consists of cubes nested symmetrically and asymmetrically It is characterised by cubes of different size dimension and design 20 Concrete and steel were used during the construction of the station building and the rough hewn Muschelkalk mussel chalk blocks were laid as a facade over bricks The Muschelkalk comes from the Trochitenkalk Formation of the Upper Muschelkalk from the Crailsheim area 21 Inside sandstone tuff and brick dominate the walls These are partly designed as flat wooden ceilings and partly designed as reinforced concrete structures The pillars in the terminal station hall are made of exposed concrete The station is also integrated into the urban planning of the city of Stuttgart The structure adapts to the sloping terrain there is a difference in height of almost five metres between the tower and the north exit The original plans called for a road leading directly to the building but Bonatz eliminated this in favour of the Lautenschlagerstrasse as it is now known which ends at the Kleine Schalterhalle small ticket hall The tracks for the local commuter traffic are behind this hall and the central exit is between the hall and the main building which is useful for the control of passenger flow Underneath the tracks area three tunnels running at right angles to the tracks provide highly functional access points the mail tunnel runs from the post office annex to the northwestern station area a passenger tunnel eases the task of changing platforms and a third tunnel is meant for the transit of express freight The construction has some highly regarded features The facade is made of limestone which was covered with bricks on the inside sandstone tuff and bricks form the walls The roof structures consist partly of flat wood and partly of reinforced concrete panels The use of exposed concrete on the pillars lends a modern flair to the main hall The structure features conservative elements shown in the monumentality and the reserved decorations as well as progressive elements as shown by the flat roof structures for example The design is considered an important example of the Stuttgart School Christoph Ingenhoven the architect of the new station expressed the opinion that much of Bonatz s original visions which tended towards a knight s castle or Valhalla can still be found in the current building 22 The Stuttgart Regional Court in its decision to permit the demolition of the side wings stated that only the terminal train shed the tower the ticket halls and the portico were decisive for the architectural recognition of the work but not the side wings 20 Tracks and platforms Edit View of the back of the station in March 2008 Railway tracks of the station including flying junctions Since the existing tracks to the old station continued in use until the commissioning of the new one the competition plan proposed at the suggestion of the Generaldirektion der Staats Eisenbahnen General Headquarters of the State Railways the building of a three span train shed This plan was later changed to low canopies over each platforms with slots above the tracks to allow smoke to escape and the roof supports were placed on the luggage platforms Due to the shortage of materials after the First World War the canopies planned for tracks 1 to 16 were not executed in steel but in wood After the destruction in the Second World War new canopies were built on reinforced concrete bases During the construction of the ramp for the Stuttgart S Bahn from 1971 to 1974 tracks 1 to 3 were not available and a platform was built on track 1a as a replacement In preparation for the Stuttgart 21 project the platforms were extended towards the track apron from May 2010 and track 1a was removed in September 2010 Services on lines S1 to S6 and S60 of the Stuttgart S Bahn stop on two tracks tracks 101 and 102 in the underground S Bahn station third basement Southbound S Bahn services towards Schwabstrasse and the airport stop on track 101 while northbound services towards Bad Cannstatt and Stuttgart North stop on 102 The track apron connects five tracks of the regional and long distance traffic one track towards the Gau Railway and two tracks each towards Bad Cannstatt and Feuerbach with the station tracks 23 five further tracks connect the station with the storage facility at Rosenstein Park 24 The set of tracks is protected as an object of cultural heritage under the Baden Wurttemberg heritage act 23 although this protection will be removed after the completion of Stuttgart 21 25 The necessary flying junctions were built according to plans by Karl Schaechterle between 1908 and 1914 26 At the opening of the station it had two dispatcher s signal boxes 27 Signal box 1 provided routings for tracks 1 to 4 to and from the suburban tracks to Cannstatt and for tracks 4 to 7 to and from the suburban tracks to Feuerbach 27 Signal box 2 provided routings for the tracks for long distance traffic Entry and exit of trains to the Gau Railway and their exit to the mainline tracks to Feuerbach was possible from tracks 7 to 12 The entrance of trains from the long distance tracks from Cannstatt was possible on tracks 8 to 13 27 The entrance of long distance services from Feuerbach and the exit of long distance services to Cannstatt was possible on tracks 12 to 16 27 In addition there were other signal boxes for connecting to the storage yard signal boxes 3 and 5 and the freight yard signal box 4 27 In 1977 the signal boxes were replaced by a central signalling centre to the south of track 16 28 Since then there have been standard routes to and from the S Bahn tracks to Bad Cannstatt from tracks 1 to 6 as well as from and to the S Bahn tunnel and Zuffenhausen from and to tracks 3 to 12 29 Entrance from the mainline tracks from Zuffenhausen to tracks 3 to 16 is possible as is exit towards Zuffenhausen from tracks 3 to 12 29 Moves from the long distance tracks from Bad Cannstatt can continue to tracks 12 to 16 and entrances from those tracks is possible to tracks 8 to 13 across the tracks 29 Altogether Stuttgart station has over 140 kilometres of railway tracks 6 and 385 sets of points 23 on 82 hectares of land 6 The aboveground platforms are 76 centimetres high and usually 8 45 metres wide 30 and have lengths varying between 326 metres platforms 7 29 13 and 14 and 470 metres platforms 8 29 15 and 16 The S Bahn platform tracks 101 102 is 96 centimetres high and 280 metres long 31 The underground S Bahn station is preceded by a 700 metre long ramp on a 3 2 percent grade which passes under the track and platform facilities of the main station over a length of around 500 metres 32 Station tower Edit Station tower before 2010 seen from the Mittleren Schlossgarten The 56 metre high station tower is a landmark of the city of Stuttgart 33 and marks the end of Konigstrasse 20 It is founded on 288 290 piles with a length of between 10 and 11 metres 34 It is disputed whether the piles are made of reinforced concrete 35 or oak 36 but Deutsche Bahn refused to commission test bores as according to a report the station tower stands on reinforced concrete piles and the resolution of the issue has no decisive importance for the construction of Stuttgart 21 37 When completed in 1916 the tower only provided a restaurant on the top floor and a waiting room for King William II 33 38 In 1926 the cafe run by Eugen Burkle with a boardroom tea room wine bar dining room and rooftop restaurant was advertised with the slogan The most beautiful station restaurant rooms in Germany 39 After the Second World War when the tower suffered little damage a rotating Mercedes star with a diameter of five metres was installed on the turret roof in 1952 and still marks the building s silhouette 33 The advertising revenue was used for the reconstruction of the station From 1955 to 1976 the station tower was used as a hotel and at times as accommodation for rail employees 33 40 The Turmforum tower forum Stuttgart 21 project information display has been established on four levels since 1998 33 The Stuttgart Mitte registry office has carried out marriages in the conference room on level 9 since 2000 40 In addition a bistro and a viewing terrace lift and entrance free is located in the tower The tower clock has a dial with a diameter of five and a half metres Terminal station hall Edit Terminal station hall in 2007 looking towards northern exit The terminal station hall connects directly to the cross platform hall at the end of platforms tracks 1 to 16 The terminal station hall was built with a reinforced concrete wall on the side near the platforms to reduce the effects of a possible brake failure 41 The eight arches leading to the cross platform hall are divided into three parts at the top they each have a window forming a round arch the middle parts that are at the level of the platform canopies are solid and are built to full width in their lower parts while at the bottom of each arch there is a passage to the cross platform hall which originally had a platform gate 23 42 A similar arrangement can be found on the opposite side towards the city The original ceiling was destroyed during the Second World War and the current ceiling was completed in 1950 43 Originally there were waiting rooms and restaurants separated by class between the small and large ticket halls on the side facing away from the tracks 42 Some of the 40 shops and catering services that are now occupy the station were inserted in the terminal station hall while the others are accessible from it The building ends with an arcade to Arnulf Klett Platz Dovecote for feral pigeons A raised wire cage has been erected in the hall as a dovecote that serves to limit the propagation of feral pigeons In the course of the Stuttgart 21 project the passageways that now lead to the cross platform hall are to be closed by a glass structure but the basic tripartite division of the round arches is to be retained 23 On the side facing the city the wall panels in the middle of the arches are to be partially removed in order to illuminate the offices behind 23 Two future staircases and three skylights are to be created for the distribution level below the aboveground station hall so that the station hall will remain accessible and experienceable 23 However with the loss of its current function it will also lose some of its significance 23 North exit Edit North and east side of the station building in February 2015 with the north exit in the centre of the picture The north exit connects the terminal station hall with Friedrichstrasse the B 27 until 2012 it was the only barrier free access to the station Originally the station forecourt which had a pavilion in the centre lay in front of the north exit 38 it was later used as a parking area and included an access to the passage under Arnulf Klett Platz From the summer of 2012 to October 2013 44 the north exit was closed and the direct access to the Klett passage could not be used as the engineering building for the Stuttgart 21 project was being built there The parking area which had also not been available since summer 2012 has been partly usable since mid 2014 Barrier free access was only possible via a detour during the construction of the engineering building a new passage was created on the northwest side on the side of the platforms about 100 metres from the former north exit which currently serves as another barrier free access to the station The arch above the north exit reflects the design of the remaining arches of the terminal station hall Small ticket hall Edit The small ticket hall is aligned with Lautenschlagerstrasse and the Zeppelin building also designed by Bonatz and Scholer 45 The small ticket hall was originally designed for access to suburban services on tracks 1 to 6 46 and also offered access to the adjacent Reichsbahn Hotel now the Intercity Hotel 38 The small ticket hall is now occasionally used for events otherwise it is empty Central exit Edit Central entrance to the platform hall with the coat of arms of the former Konigstor gate The central exit 42 connects the terminal station hall with Arnulf Klett Platz It is recessed behind the pillars of the arcades 38 In contrast to the clearly visible entrances it is not visible from the outside 47 A Wurttemberg coat of arms was installed above the exit during the demolition of Konigstor king s gate at the end of Konigstrasse in 1922 From the central exit there is an access to the Klett passage but it is not possible to cross the Arnulf Klett Platz above ground As part of the Stuttgart 21 project the staircase to the above ground station hall is to be divided into three parts and its middle section is to be demolished to provide a passage for direct access to the distribution level behind 48 Large ticket hall Edit Interior view of the large ticket hall in 2015 The large ticket hall acts as an avant corps in the facade of the entrance building while also being an independent building 47 The arched opening to the city reinforces its monumentality and thus acts to give direction It also reflects the motif of a city gate which refers to the original location of the station in front of the city 47 The spatial effect arises not only from the size of the hall but also from its functionality for rail travellers 23 The former Konigstor which had stood at the beginning of Unteren Konigstrasse since 1809 and actually fulfilled the function of a city gate was perceived as a traffic obstacle after the construction of the station and was removed in 1922 Paul Bonatz rescued the shield of Konigstor and had it mounted above the central entrance in the platform hall The large ticket hall was originally intended for long distance traffic which was handled on tracks 7 to 16 46 It receives the traffic coming from the Konigstrasse but it is not aligned with the axis of the Konigstrasse 38 The interior of the hall has a vestibule character and the path to the station hall leads up a flight of steps 47 The original staircase was removed in the 1970s and replaced by a new staircase and two escalators 20 Around that time the ground was broken to provide access to the Klett passage 20 DB s travel centre and the AIRail check in desks are now located in the large ticket hall and Konigstrasse is connected to the hall via the underground Klett passage In the course of the Stuttgart 21 project the wall of the large ticket hall facing the station is to be breached in order to make a direct access to the planned distribution level behind it 23 The planned openings are to have the proportions of the arches above it 23 The staircase to the platform area would be removed otherwise the width of the passage would not be sufficient for the expected flows of people and the spatial separation from the main hall would inevitably be obliterated by the installation of additional stairs 23 The main distribution system will be centered on the hub in the large ticket hall with the main pedestrian traffic flowing straight through 23 North wing Edit The approximately 20 metre wide 49 north wing consisted of a cubic area for the railway postal service 50 which was used by Deutsche Post until July 2010 and adjoining office space that were last used by the Intercity Hotel and the Federal Police 51 With a length of 83 metres 49 the north wing enclosed only part of the facilities on the platform while the rest formed part of the freight yard 52 which was abandoned in 1995 53 The north wing was demolished in 2010 as part of the Stuttgart 21 project 54 Kurt Georg Kiesinger Platz lies between the north wing and Heilbronner Strasse The new LBBW building lines on this square while the remaining main building of the former Reichsbahndirektion Stuttgart Reichsbahn railway division headquarters building is on the other side of the street Schlossgarten wing Edit The Schlossgarten wing in September 2010 The Schlossgarten wing also known as the South wing continued the axis of the Konigstrasse and forms the side of the station on the Schlossgarten The wing itself was 200 metres long 55 56 and together with the large ticket hall and the station tower formed a 277 metre long facade 57 to the Schlossgarten The facade was interrupted by the station tower and three 27 metre wide avant corps which indicated the positions of the passenger subway and the former postal and express freight tunnels The wing concealed the difference in height between the Mittlerer Schlossgarten Central Palace Garden and the railway facilities while during the steam era it also protected the Schlossgarten from soot and noise from railway operations 58 and functioned as a facade preserving the view from the park 59 The interior of the wing was used for rail services 47 and express freight operations 29 The Schlossgarten wing was demolished in the course of the Stuttgart 21 project from January 2012 60 According to the architect Christoph Ingenhoven it was technically absolutely impossible to save the wing 22 because the new underground concourse would cut it 58 Klett passage Edit Access to the Klett passage from Konigstrasse Seven Stadtbahn lines pass through the lower S Bahn station under the station forecourt Arnulf Klett Platz in the second basement The Klett passage on level 1 is the access and distribution level for the long distance and regional services on level 1 to the S Bahn services on level 3 to the Stadtbahn services on level 2 and to Arnulf Klett Platz on level 0 and the city centre In it is also a large shopping arcade Another part of the first basement level is used for an underground car park with 120 parking spaces which also serves as a fallout shelter with 4 500 seats 32 In a disaster or military emergency part of the underground parking lot would be provided with beds separated by pressure doors the technical rooms kitchen sanitary installations water and air conditioning for the bunker are located on the second basement level Other Edit The front of the building features a quote by Georg Wilhelm Friedrich Hegel in the form of a lit inscription the quote reads dass diese Furcht zu irren schon der Irrtum selbst ist loosely translated as that this fear of making a mistake is a mistake itself The inscription is a work by the artist Joseph Kosuth from the early 1990s In the main hall near the south exit there is a DB Lounge for first class passengers bahn comfort a customer loyalty program customers and first class and Senator AIRail passengers Schillerstrasse Arnulf Klett Platz in front of the station is used by up to 50 000 vehicles a day 61 Operations EditIn 1994 Stuttgart Hauptbahnhof was the source of 49 400 passengers in regional traffic excluding the S Bahn and 39 000 in long distance traffic ICE IC IR each day 62 With about 210 000 passengers per day the station was the biggest in Baden Wuerttemberg in 2005 63 More than 12 000 people transferred daily between Stadtbahn and regional services in 2014 According to DB data 164 long distance trains 426 regional trains as of 2009 6 and 650 S Bahn trains as of 2005 serve the station daily Long distance connections Edit The most significant long distance connections available at the Stuttgart Hauptbahnhof are listed here Connection Route FrequencyICE 11 Hamburg Altona Berlin Leipzig Erfurt Frankfurt Mannheim Stuttgart Ulm Augsburg Munich every 2 hoursWiesbaden Mainz Mannheim Stuttgart Munich 1 trainICE 15 Stuttgart Darmstadt Frankfurt Erfurt Halle Berlin runs Frankfurt Berlin as an ICE Sprinter 1 train on Sat and SunICE 22 Kiel Hamburg Hannover Frankfurt Mannheim Stuttgart every 2 hoursICE 26 Frankfurt Heidelberg Vaihingen Stuttgart 1 train in the eveningICE 42 Dortmund Duisburg Cologne Frankfurt Airport Mannheim Stuttgart Ulm Augsburg Munich every 2 hoursICE 45 Cologne Wiesbaden Mainz Mannheim Heidelberg Stuttgart 1 train pairICE 47 Dortmund Duisburg Cologne Frankfurt Airport Mannheim Stuttgart individual servicesICE 60 Karlsruhe Stuttgart Ulm Augsburg Munich every 2 hoursICE TGV 83 Paris Est Strasbourg Karlsruhe Stuttgart Ulm Augsburg Munich 5 train pairs dailyIC 30 Kiel Hamburg Dortmund Duisburg Cologne Koblenz Mannheim Stuttgart every 2 hoursIC 32 Berlin Hannover Dortmund Duisburg Cologne Koblenz Mannheim Stuttgart Ulm Lindau Innsbruck Nurtingen Reutlingen Tubingen 1 train to Tubingen in morning and evening Mon Thu Sat 4 train pairsFri Sun 7 train pairsIC 61 Karlsruhe Pforzheim Stuttgart Aalen Nuremberg Augsburg Munich every 2 hours one train to LeipzigIC 62 Frankfurt Darmstadt Heidelberg Stuttgart Ulm Augsburg Munich Salzburg Klagenfurt Graz 4 train pairsIC 87 Stuttgart Singen Zurich hourly every 2 hours to ZurichRJ 90 Frankfurt Mannheim Stuttgart Ulm Munich Salzburg Vienna Budapest 2 train pairs on weekendsFLX 10 Berlin Hbf Berlin Sudkreuz Halle Saale Erfurt Gotha Eisenach Fulda Frankfurt South Darmstadt Weinheim Heidelberg Stuttgart 1 2 train pairsRegional connections Edit Route FrequencyIRE 1 Karlsruhe Pforzheim Muhlacker Vaihingen Stuttgart HourlyKarlsruhe Pforzheim Muhlacker Vaihingen Stuttgart Schorndorf Schwabisch Gmund Aalen Every two hours 64 IRE 6 Stuttgart Reutlingen Tubingen Hechingen Albstadt Ebingen Sigmaringen Aulendorf Every two hours portions continuing from Tubingen to Rottenburg or Horb RE 5 Stuttgart Esslingen Plochingen Goppingen Geislingen Ulm Biberach Friedrichshafen Stadt Lindau HourlyRE 6 Stuttgart Esslingen Plochingen Wendlingen Nurtingen Metzingen Reutlingen Tubingen Hourly Half hourly during the peak RE 8 Stuttgart Ludwigsburg Bietigheim Heilbronn Bad Friedrichshall Osterburken Lauda Wurzburg Hourly 65 RE 10 Stuttgart Ludwigsburg Bietigheim Heilbronn Hourly 64 65 RE 14a Stuttgart Boblingen Herrenberg Eutingen Horb Rottweil Every two hours runs together with RE14b to Eutingen where train is split RE 14b Stuttgart Boblingen Herrenberg Eutingen Freudenstadt Every two hours runs together with RE14a to Eutingen where train is split RE 17b Stuttgart Ludwigsburg Bietigheim Vaihingen Muhlacker Bretten Bruchsal Heidelberg Every two hours runs on even hours together with RB 17a to Muhlacker where train is split RE 19 Stuttgart Waiblingen Backnang Gaildorf West Schwabisch Hall Hessental Crailsheim Every two hours to Crailsheim during the peak RE 87 Stuttgart Boblingen Horb Rottweil Tuttlingen Singen Every two hoursStuttgart Boblingen Herrenberg Horb Rottweil Tuttlingen Singen Konstanz Every two hoursRE 90 Stuttgart Waiblingen Backnang Gaildorf West Schwabisch Hall Hessental Crailsheim Ansbach Nurnberg Every two hours 65 RB 13 Stuttgart Waiblingen Schorndorf Schwabisch Gmund Aalen Ellwangen Crailsheim Every 30 mins hourly to Ellwangen every 2 hours to Crailsheim RB 16 Stuttgart Esslingen Plochingen Goppingen Geislingen Ulm Hourly half hourly to Geislingen hourly to Ulm 65 64 additional trains in the peak RB 17a Stuttgart Ludwigsburg Bietigheim Vaihingen Muhlacker Pforzheim Bad Wildbad Wilferdingen Singen Hourly individual trains to Bad Wildbad or Wilferdingen Singen runs together with RB 17b c to Muhlacker where train is split additional trains at 6 09 6 47 16 15 16 48 and 17 14 17 47 RB 17c Stuttgart Ludwigsburg Bietigheim Vaihingen Muhlacker Bretten Bruchsal Every two hours runs on odd hours together with RB 17a to Muhlacker where train is split RB 18 Stuttgart Ludwigsburg Bietigheim Heilbronn Bad Friedrichshall Osterburken Hourly 65 RB 19 Stuttgart Waiblingen Backnang Gaildorf West Schwabisch Hall Hessental Crailsheim Hourly only Mon Fri in the afternoon to Schwabisch Hall individual trains continue to Crailsheim In most cases these connection start or end in Stuttgart This means that for most connections that go through Stuttgart Hauptbahnhof a change of trains is necessary As part of the Stuttgart 21 project with Stuttgart Hbf becoming a through station most regional connections would no longer require the change of trains Among the seven local regional lines starting in Stuttgart the line to Tubingen with an average of 32 100 passengers during the week was the most used in 2014 66 S Bahn connections Edit Line No RouteS 1 Kirchheim unter Teck Plochingen Esslingen Neckarpark Bad Cannstatt Hauptbahnhof Schwabstrasse Vaihingen Rohr Boblingen Herrenberg additional trains on work days between Esslingen and Schwabstrasse or Boblingen S 11 Neckarpark Bad Cannstatt Hauptbahnhof tief Schwabstrasse Vaihingen Rohr Boblingen HerrenbergS 2 Schorndorf Weinstadt Waiblingen Bad Cannstatt Hauptbahnhof Schwabstrasse Vaihingen Rohr Flughafen Messe Filderstadt additional trains on work days between Schorndorf and Vaihingen S 3 Backnang Winnenden Waiblingen Bad Cannstatt Hauptbahnhof Vaihingen Rohr Flughafen Messe due to the opening of the new exhibition center trains run to the airport on weekends late evening traffic only goes to Vaihingen additional trains on work days between Backnang and Vaihingen S 4 Backnang Marbach Ludwigsburg Zuffenhausen Hauptbahnhof SchwabstrasseS 5 Schwabstrasse Hauptbahnhof Zuffenhausen Ludwigsburg BietigheimS 6 Schwabstrasse Hauptbahnhof Zuffenhausen Leonberg Weil der StadtS 60 Schwabstrasse Hauptbahnhof Zuffenhausen Leonberg Renningen Magstadt Maichingen Sindelfingen BoblingenThe abbreviation for the Hauptbahnhof S Bahn station underground is TST The station is to be modernised between the end of 2019 and the end of 2020 at a cost of 9 million 67 Freight traffic Edit The station from the inside in 2004 A view of the tracks from the tower in 2005 The station as viewed from the west bottom center In addition to the passenger station there used to be a closed and already demolished freight station and small shunting station which featured a marshaling hump with rail brakes The freight yard was used until the 1980s 68 The goods traffic was later completely shifted to the Kornwestheim marshalling yard the decision to move was made independently of the Stuttgart 21 project 69 Stadtbahn Edit Under the Arnulf Klett Platz the station forecourt the largest and most important node of the Stadtbahn features these routes Line No Route Killesberg Hauptbahnhof Degerloch Mohringen Leinfelden Gerlingen Weilimdorf Feuerbach Hauptbahnhof Degerloch Mohringen Fasanenhof Monchfeld Zuffenhausen Hauptbahnhof Ruhbank Fernsehturm Heumaden Ostfildern Nellingen Hauptbahnhof Vogelsang Botnang Remseck Halschlag Budapester Platz Hauptbahnhof Degerloch Mohringen Durrlewang Muhlhausen Munster Hauptbahnhof Stammheim Zuffenhausen Pragsattel Hauptbahnhof Eugensplatz Ruhbank Fernsehturm Heumaden In addition in case of events at the NeckarPark and Cannstatter Wasen Line No Route Hauptbahnhof Charlottenplatz Mineralbader Cannstatter Wasen NeckarPark Stadion Noteworthy EditThe Hauptbahnhof has been assigned the IATA code ZWS because the station is used by Lufthansa in the AIRail concept Passengers may travel in ICE trains which are also assigned flight numbers to Frankfurt Airport in Frankfurt am Main instead of using a short distance flight For this reason Lufthansa has a check in counter near the entrance from the Arnulf Klett Platz Passengers were able to both check and receive their baggage at this counter until 2007 since then only check in is possible District of the city centre Edit Hauptbahnhof has also been the name of one of ten sub districts of the district of Stuttgart Mitte central Stuttgart since 2007 This district has only a few residential buildings so its population was 287 in 2014 Previously it was called Klettplatz Stuttgart 21 EditMain article Stuttgart 21 As part of the Stuttgart 21 project the two wings were demolished There has been widespread resentment of the entire project to place the main lines underground leading to significant protests in particular in response to the felling of some 260 huge and old trees More than 18 000 people have registered as Parkschutzer park guardians about a thousand vowed to stay in the path of demolition crews while chaining themselves to the trees The colourful resistance led to nearly daily demonstrations and became a major factor in the 2011 state elections The Stuttgart architect and Bonatz expert Matthias Roser initiated an international call for the preservation of the Hauptbahnhof including the wings and over 400 architects building historians monument conservators art historians and city planners such as the Pritzker Architecture Prize recipients Richard Meier and David Chipperfield joined this effort This group viewed the Bonatz designed building as one of the most significant railway station structures of the 20th century in Germany and Europe as a whole and were opposed to any structural changes On 27 November 2011 a referendum on the project Stuttgart 21 resulted in 58 8 voted in favor of the project while 41 2 voted against it 70 In order to provide necessary space for the new station s construction next to the main building where the ends of the platforms used to be the platforms had to be moved away from the building and the track layout underwent significant changes In the process three trains derailed on different occasions in 2012 Overview Edit Outline map of the Stuttgart 21 project Stuttgart 21 is a transport and urban development project under construction for the complete reorganisation of the Stuttgart railway junction The existing terminus is to be rotated by about 90 and converted into a through station with eight tracks For this purpose the approach track are being laid in tunnels from all directions The aim is to increase the capacity of the station to shorten transfer routes and to reduce maintenance costs 71 During the debate surrounding the project critics proposed several alternative plans including the extensive refurbishment and the progressive redevelopment of the existing station under the concept of Kopfbahnhof 21 terminus 21 In the feasibility study submitted in 1995 the cost of the underground station today s planning approval section 1 1 excluding the access tracks required by its new location was estimated at DM 930 million 476 million 72 In 2009 the costs were estimated at 400 million 73 According to the overall planner Ingenhoven the calculated costs are less than ten percent above the original cost estimate as of 2013 74 Deutsche Bahn AG estimates that the expenditure of approximately 110 million will be required for the continued third party use of the Bonatz building which is not part of the Stuttgart 21 project 75 Planned measures Edit The station is covered by the planning approval for section 1 1 of the Stuttgart 21 project 23 The application for planning approval of the first section of Stuttgart 21 was submitted on 31 October 2001 76 The five day hearing of objections closed on 11 April 2003 after more than 50 hours of debate It was considered the largest and most complicated hearing in the history of the Stuttgart regional council 77 Planning approval was granted by the Federal Railway Authority Eisenbahn Bundesamt on 28 January 2005 and became final in June 2006 78 The Bund fur Umwelt und Naturschutz Deutschland BUND lodged a class action against the approval 79 By mid 2015 there had been fourteen amendments to the plan including fundamental changes such as the doubling of the groundwater extraction rate seventh amendment of the plan the installation of additional escape stairs sixth amendment and the shortening of the channel carrying the Nesenbach stream and the adoption of an open design for it 14th amendment 80 In July 2015 a further amendment to the plan was announced which means that the smoke extraction building in Sangerstrasse will remain unchanged externally but will receive a significantly more efficient ventilation system 81 Pedestrian network Edit The four 420 metre long island platforms will have a width of 10 metres and will be 1 60 metres wider than the platforms of the current terminus 82 The comfort of passenger movements resulting from the planned entrances footbridges stairs lifts and platforms was examined in a pedestrian flow analysis In the peak hour the traffic quality is mainly in the range of quality level C limited speed selection and partly in the range of quality level D clearly limited speed choice outside the peak hour quality levels A and B free or almost free flow of traffic is achieved 83 Track layout Edit The station is to have eight platform tracks which are to be connected at both ends of the station to four access tracks in the northwest to two tracks each towards Feuerbach and Bad Cannstatt in the southeast to two tracks each towards Flughafen Messe Ulm and Wangen Oberturkheim Unterturkheim Schematic track plan of the underground station with eight tracks The two ends of the station are planned to be grade separated with flying junctions From each of the four directions of approach trains will be able to reach five of the eight platform tracks The two middle platform tracks will be able to be used by trains from all four directions The planned entry speed on the approach tracks is 60 km h outer tracks 80 km h and 100 km h island platform 4 and 5 Blocked paths would also be avoided by a flexible choice of approaches from the existing lines 84 The number of sets of points each outside the operations of the station will decrease compared to the current terminus from 225 to 48 85 Already in the course of the preliminary project initiated in early 1995 the track plan of the planned underground station had been optimised for directional operation to such an extent that all platforms operating in each direction could be reached from all incoming tracks 86 The plan for the northern end of the station had been changed compared to the plan submitted to the regional planning procedure after an anhydrite deposit was found in the geotechnical investigation The nearest entrance and exit turnouts were shifted by about 150 metres towards the station The transition from two twin track tunnels to four single track tunnels was also preferred 87 Longitudinal section of the underground station The planned station hall measures 447 metres in length and 80 58 metres in width 79 at a height of 10 to 12 metres 10 The building will be founded on a 1 60 to 2 50 metre thick plate and anchored by 3 700 piles 88 The base of the building will lie between 6 and 8 metres below the water table 89 Between the lowest point of the foundations and the groundwater according to the promoter there would be a water impermeable layer more than 35 metres thick 88 The new station can only be built as cut and cover to avoid disturbances to the level of the groundwater 90 The planning approval section begins in the northwest at line km 0 442 At this point in the area of Jagerstrasse 24 the connecting tunnels which have been constructed using a mining method open out into the station The gradient initially drops from an altitude of 241 metres at the railhead ground altitude 258 metres to the south for 404 metres at 1 31 percent and then continues for another 459 metres at a gradient of 1 51 percent before an inflection point km 0 345 230 metres above sea level at the railhead 12 metres below ground level at the southern end of the station from which the gradient rises to the end of the section at 0 41 percent The section limit is at line kilometre 0 432 in the Willy Brandt Platz area at the junction with the connecting tunnels to be excavated by mining methods 91 According to the Deutsche Bahn information a track gradient of up to 1 51 percent is required in the platform area due to several fixed points Stadtbahn lines and groundwater streams which is above the ruling limit for station tracks of 0 25 percent Safe operations are still guaranteed by a bank in the middle of the platforms of 1 0 percent 92 In March 2016 it was announced that the proof of sufficient security required for operations had not yet been provided This also makes it unclear what operational restrictions will be required for the increased gradient 93 Critics see significant risks from trains moving accidentally on this gradient 94 Station building Edit Planned construction measures in the station area Around 280 trees are to be felled or moved in the station area 21 different changes will be made on the remaining part of the former station building the so called Bonatz Bau Bonatz building in parallel with the Stuttgart 21 project The function of the building will be maintained The building s facades will be preserved using a new structural frame and modern building technology 95 Construction on the Bonatz building is scheduled to begin in 2018 and be completed 2021 95 A hotel restaurant and conference complex with 150 hotel rooms will be built in the above ground part of the building on four levels Levels 3 and 4 will be rebuilt but set back from Schillerstrasse so that they do not affect the overall impression of the building from that street 95 Strassburger Platz Strasbourg Square is to be created on the roof of the through station at the current level of the railway tracks and the current platform hall the so called level 1 This area delimited to the south by the Bonatz building and to the north by a new station building will connect Kurt Georg Kiesinger Platz with the Schlossgarten 10 Daylight will reach the platforms through 27 4 30 metre high high light eyes Lichtaugen 96 A distribution level with access from the station tower Konigsstrasse Konigsallee Cannstatter Strasse and the new city district is to be created below Strassburger Platz on level 0 The four platforms are to be arranged with eight platform tracks on the lower level level 1 Access to the lower lying double track S Bahn station is planned below the new platform tracks A new parking garage is to be built below the northern part of the station building and to the north of it but underground 10 Level 2 is to act as the S Bahn level including giving access to it 97 The entrance to the station building is to be built next to the existing entrances and will run through four 23 metres wide and up to 10 metres high glass mesh shells In total more than 35 escalators and 15 so called panoramic lifts are planned 96 The platforms are to be accessed via three distribution points level 0 near two ticket halls and the Planetarium Staatsgalerie Each platform is to be accessed by three lifts five escalators and five sets of stairs 10 A new shortcut to the Staatsgalerie Stadtbahn stop is to be built at the eastern end 84 Schematic overview of platform access with bottlenecks The main access to the platform level is to be provided by the middle pier pier B which is to be accessed via the large ticket hall and the new access to the station tower in the south and the Europaviertel European quarter a new commercial development in the north Each of the four platforms is accessed from this ramp via a lift and two escalators and sets of stairs on each side 98 Critics have noted that the passage is just 2 04 metres wide between the outer edge of the stairs and the platform edge at the point The western pier pier A is to be reached mainly via the new access at Kurt Georg Kiesinger Platz and the small ticket hall From this pier each platform is accessed via a lift and an escalator and a set of stairs on each side 98 The passage is 2 85 metres wide at its narrowest point 98 The eastern pier pier C is approached via the entrance from the Staatsgalerie which can be reached by a pedestrian tunnel An elevator as well as two escalators and two sets of stairs are planned at the exit to the Staatsgalerie It has no access to piers A and B and thus no access to the Bonatz building From the distribution level each platform is connected by a lift and an escalator and a set of stairs to the west The passage width between the stairs and the platform edge is 2 86 metres 98 After the commissioning of Stuttgart 21 an additional station building will be built on the opposite side of the new through station which will serve as a station access from the north and will also accommodate operating rooms Alteration of the Stadtbahn line under Heilbronner Strasse was due from mid 2011 to mid 2014 99 and of the Staatsgalerie Stadtbahn station from February 2013 100 Among the numerous other construction measures is the relocation of the Nesenbach construction was originally planned for late 2011 to mid 2014 99 but started in June 2015 101 and the West 102 main drains Light and air conditioning Edit The rail infrastructure is designed as a zero energy building the air conditioning will be operated exclusively using geothermal energy assisted by the cooling effect of incoming trains 103 The temperature in the platform area should also not fall below ten degrees without artificial heating at an external temperature of 20 degrees Celsius or exceed 29 degrees 104 The high light eyes will also be able to be opened for ventilation and smoke extraction 10 Experiments have shown that the station concourse will be lit naturally by the high light eyes for up to 14 hours daily and will be able to cope during this period without artificial light Floor lights at the edge of the platform will mark the edge of the platform next to the track bed 10 On average 5 percent of daylight would enter the interior but under the high light eyes this proportion would rise to 10 to 15 percent 104 History Edit Planning Edit On the basis of operational considerations the station considered for the feasibility study at the beginning of 1995 provided for eight platforms with four 10 metre wide and 420 metre long island platforms The tracks which would be dedicated to operations in a particular direction would have had connecting passages in the tunnels running from the platforms To the northwest two twin track connecting tunnels were to run in parallel and after a sharp curve to the northeast would divide south of Mittnachtstrasse station in the Wolframstrasse area into a branch towards Feuerbach and a branch towards Bad Cannstatt To the southeast four single track tunnels were to be built directly to the turnout halls two to Oberturkheim and Unterturkheim and two to the Airport Under the design presented as an example the Bonatz Building would have been preserved and an additional entrance would have been created in the side wing on Cannstatter Strasse The railway layout would be built at a gradient of up to 1 1 percent 105 According to the feasibility study the costs of the section including the station and the valley crossing would amount to DM 928 million DM 807 million plus 15 percent for planning costs 1993 prices 105 which on an inflation adjusted basis would have amounted to 749 million The Synergiekonzept Stuttgart 21 synergy concept presented at the end of 1995 provided for an eight track through station with three island and two outer platforms Traffic forecasts expected an increase to 70 400 long distance and 53 100 regional passengers each day The share of through traffic in total traffic in 2010 was projected to be around 50 percent for long distance and just under 20 percent for regional services 54 000 and 13 000 passengers each day 62 The plan was later modified so that four island platforms are now planned on the concourse A regional planning process Raumordnungsverfahren was carried out for the Stuttgart 21 project in 1996 and 1997 The through station solution favoured by Deutsche Bahn was examined as a proposed route with different suboptions These included options with different platform positions numbers of track and possibilities for further development 106 Other options which deviated from the basic concept of a pure through station at the location of the existing terminus station were mentioned in the spatial planning process but were not examined to the same depth the lean option provided for a continuation of the terminal station while the Kombi option provided for the construction of a through station for long distance traffic but the terminal station would also be maintained In addition a Hauptbahnhof am Rosenstein main station on Rosenstein ridge option was considered which would have involved abandonment of the current station In addition station locations in Bad Cannstatt and Unterturkheim were considered 106 On 28 February 1997 a Europe wide architectural competition for the redesign of the station was announced 107 The new station should be a visible sign of pioneering mobility and a landmark for Stuttgart and its region 10 In a two stage process 19 participants out of 118 applicants who had initially submitted a concept were selected for a second round A jury chaired by Klaus Humpert selected four equal winners in July 1997 108 The four award winning designs and six other designs were displayed in Stuttgart Hauptbahnhof from 11 August to 14 September 1997 109 All four designs provided a station rotated by 90 degrees with daylight illumination 108 On 4 November 1997 the design of the office of Ingenhoven Overdiek Kahlen and Partner 107 was finally chosen from the 126 submissions 107 Ingenhoven s concept at that time was to build the station underground at a cost of DM 350 million equivalent to about 255 million and to illuminate it with daylight from 27 light shafts each 15 metres wide The support structure of the station concourse was developed by Frei Otto 110 The draft had been revised several times already in the competition 111 Four designs were available in the final round 107 In 2005 the design received the MIPIM Future Project Award from the magazine Architectural Review as well as a Silver Award at the regional Holcim Awards 112 and a Golden Award in the global competition the following year 113 In 2007 the design was awarded one of 58 International Architecture Awards from the Chicago Athenaeum 114 By 2006 the 2 8 billion estimated total cost of Stuttgart 21 included almost 800 million for the Hauptbahnhof 115 The architect Christoph Ingenhoven received 36 million 116 A modified building design was presented at the end of August 2010 96 Among other things the size of the four entrances was reduced and routing and acoustics were revised Heiner Geissler who was entrusted with the task of conciliating views in relation to the Stuttgart 21 project suggested in his conciliatory appeal on 30 November 2010 that the safety of rail traffic accessibility and fire safety of the through station should be improved In addition to improvements to the track a ninth and tenth platform track at the main station should also be investigated 117 On 23 April 2015 the Federal Railway Authority approved among other things the construction of two escape staircases per platform and changes to the shells surrounding the four direct entrances from the outside 118 The planning amendment notice for the displacement of the evacuation staircases planned on the platforms to the ends of the station hall was delayed and is now expected in the summer of 2017 119 Ingenhoven reported that the cost of the station at the end of 2017 was well below 1 billion 120 Construction Edit Planned construction phases in the construction pits in the station area With the symbolic start of construction on 2 February 2010 reconstruction work began on the track apron these were necessary for the construction of the cross platform concourse at the end of the platforms 121 The contract to demolish the north wing was awarded to Wolff amp Muller on 18 May 2010 citation needed The establishment of the worksite began on 30 July 2010 under police protection 122 and the demolition of the facade of the north wing began on 25 August 2010 Platform canopies with the glass panels removed August 2012 Additional concrete supports to stabilise the platform canopy block part of platform track 8 December 2012 Work on the demolition of the south wing began on 13 January 2012 with the gutting of the building citation needed The exterior demolition of the building began on 30 January and was due to be completed in March 2012 60 123 After a pillar of the platform canopy was damaged on 19 March work was suspended for about three weeks 124 125 After further damage due to gale force gusts on 1 July 2012 platform 15 16 was blocked off again and work started on the upgrade of the glass panes on all platform canopies 126 The approximately 110 meter wide excavation was due to be bridged by two ten metre wide bridges 127 by April 2014 128 In addition direct access was to be provided to the cross platform concourse from both sides Access to the Europaviertel district on the north side has been possible since 21 October 2013 44 and on the south side 129 there has been access via the pedestrian walkways from the Mittlerer Schlossgarten since 24 January 2014 Both entrances are barrier free 44 The repositioning of the cross platform concourse was postponed several times According to the planning status of March 2012 the cross platform concourse was to be gradually advanced between July and December 2012 130 At the end of June 2012 just over 50 of the 61 planned construction phases had been completed on the track apron Platform tracks 1 and 2 were re connected without completing the planned construction of the new S Bahn tunnel in this area 126 Construction of the new cross platform concourse took place from late May 2013 to 22 October 2013 in 13 phases requiring two platform tracks were blocked off Deutsche Bahn reduced some train services during this period to reduce congestion of trains at the station 131 The preliminary work and the commissioning of the cross platform 120 metres north of its original location should have taken 18 months to complete but actually lasted 45 months 44 128 A two storey underground engineering building of 1 800 square metres was built under the former parking lot at the northern exit at a planned cost of 7 6 million 132 between April 2012 133 and October 2013 when the construction of the shell was completed 44 134 On 12 March 2012 the construction contract for the underground station including the West Cannstatter Strasse and Nesenbach channels and the station access tunnel was awarded to a consortium of the Zublin manager and Strabag companies 135 136 The formal award took place on 24 March 2012 137 The contract for the construction of the new central station was let for 323 4 million 138 which was a sliding price under the contract 135 The internal portion being built by Zublin amounts to around 300 million 137 Groundwater management is not part of the scope of the contract 139 The total contract value was 347 4 million in May 2016 140 and 364 million in August 2016 141 At the end of 2010 the lowest tender for the construction of the underground station amounted to about 360 million 142 The first contract planned to be let in late 2011 was delayed over price negotiations 143 Also technical questions led to delays 139 In addition to successful negotiations technical optimisations such as a change in the type of concrete would have contributed to savings according to a media report 144 Deutsche Bahn had calculated a price of 300 million based on its own data 135 Derailed carriage in the turnout area 9 October 2012 In July September and October 2012 145 trains derailed on the exit towards Feuerbach which had been rebuilt in the course of the Stuttgart 21 project 146 Following the latest derailment platform tracks 8 9 and 10 were blockaded 147 In January 2013 Deutsche Bahn justified the derailments as being the result of malfunctioning carriage buffers 131 A short term technical solution developed by DB was rejected by the Federal Railway Authority 148 The suspension also led to far reaching delays of S Bahn and regional services 149 On 22 January 2013 track 10 was conditionally released for service Only multiple units and hauled trains could use it According to Federal Railway Authority data the unrestricted clearance of the track was not possible on the basis of documents that had been submitted 131 According to Deutsche Bahn in December 2014 an end to these restrictions was not foreseeable 150 In March 2012 the beginning of civil engineering work was scheduled for early 2013 133 The civil works on the excavation of the station began on 5 August 2014 at pit 16 in the Mittleren Schlossgarten 151 A mid 2013 timetable for the excavation work in the Mittleren Schlossgarten was considered obsolete by mid 2014 Out of 14 construction stages planned so far 7 had been realised and the work had been delayed by about five months 152 An already issued statistical proof of the safety of the station has not applied since 2014 due to changed legal requirements and a renewal is pending 153 Civil engineering work at the station was stopped at the beginning of March 2015 because a permit from the Federal Railway Authority for the construction of additional escape staircases was missing The work was thus eight months late compared with early projections 154 On 26 January 2016 one year later than scheduled under the August 2014 timetable work began on casting the floor slab in the first excavation pit of the station initially as the base plate in what is known as the Medienkanal middle channel 155 Construction work in the middle part of the future platform hall October 2017 The concreting of the first roof stanchions was due to start in June 2017 The 28 columns are to be concreted two at a time 156 The former DB divisional headquarters set on pillars December 2017 In mid 2017 the building of the former Deutsche Bahndirektion Deutsche Bahn divisional headquarters was undermined and placed on a 1 3 m thick concrete slab This rests in turn on some supports between which the construction machinery and vehicles can operate DB had sought the demolition and reconstruction of the building built in 1911 1912 The city of Stuttgart however insisted on its preservation 157 Groundwater management Edit The groundwater has been lowered by approximately seven metres by pumping for the construction of the excavations The resulting funnel of lowered groundwater usually extends for several hundred metres In order to reduce the disturbance water is reintroduced infiltration via injection well in the vicinity of the construction excavations The groundwater must be treated prior to being reintroduced to reduce possible pollution 158 The management of groundwater was originally expected to involve around three million cubic metres of groundwater Following a change in the plan at the beginning of 2011 this figure doubled to 6 8 million cubic metres necessitating an amendment to the license in relation to its scope and impact 159 160 The groundwater management was expected to start in January 2013 130 On 25 June 2012 it was announced that a public hearing was required to consider Deutsche Bahn s proposal to double the groundwater withdrawal to 6 8 million cubic metres delaying the construction work according to media reports to 2014 According to its own statements Deutsche Bahn s planned to open excavation pits requiring less groundwater withdrawals in the spring of 2013 and thus comply with the planning approval decision which stipulates lower withdrawal quantities 161 According to a media report however the Federal Railway Authority and the Stuttgart Regional Council assumed that the construction work would not begin before 2014 162 The Federal Railway Authority approved the increased groundwater abstraction on 22 September 2014 163 Future Edit Demolition work on the rear section of the former Deutsche Bahn divisional headquarters in Heilbronner Strasse in August 2012 The state pavilion here in March 2012 was located above the southern part of the planned station and was demolished in the course of construction in August 2012 Fenced area for the construction of the planned station in the Mittleren Schlossgarten June 2013 Construction tracks being constructed in the Mittlerer Schlossgarten on the grounds of the planned station September 2013 It is planned to successively carry out the construction of the valley crossing and the station in 25 subsections 164 The shell of the station was expected to be completed by the end of 2017 as of January 2011 99 The Staatsgalerie Stadtbahn station is being relocated to the south side of the future station 165 Preparatory measures started at the end of 2014 when completion was scheduled for 2019 2020 at the latest 166 The excavated material is transported via separate construction roads and a conveyor belt to a central logistics area at Stuttgart Nord station and transported from there on freight trains The commissioning of the new station is scheduled for December 2021 A traffic forecast for 2025 anticipates around 207 600 long distance and regional passengers including 118 800 from the direction of Feuerbach and Bad Cannstatt and 88 800 from the Filder Tunnel Oberturkheim or Unterturkheim 167 The accessibility of the Stuttgart Hauptbahnhof traffic cell by public transport from the Stuttgart region based on weighted average traffic demand should improve according to a traffic forecast from 32 minutes 2010 to 31 minutes 2025 168 Stuttgarter Netz AG a consortium of several private railway companies intends to operate part of the existing terminal station The company expects up to 100 trains to stop at the station every working day Eight tracks of the terminal station the access tracks from Bad Cannstatt Feuerbach and Vaihingen and the existing signal box would be preserved for this purpose Overall a quarter of the existing area would be preserved The calculated annual costs of 1 6 million are expected to be offset by revenue from train and station operations of 1 8 million Among other things secondary lines such as the Schonbuch and the Wieslauf Valley Railways would be connected with Stuttgart Hauptbahnhof 169 Rail operations Edit According to a simulation commissioned by the promoters the optimum performance range of the through station lies between 42 and 51 trains per hour while for an upgraded terminal station the Kopfbahnhof 21 concept it would be 28 to 38 trains per hour The maximum flow will be 72 trains in the through station or 43 trains per hour in the terminal station 170 In 2002 Deutsche Bahn estimated a capacity increase of 50 percent for the 8 track through station compared to the 16 track terminal station with an upgrade of the approach tracks from Feuerbach 125 percent more trains would be able to run during the peak 85 Critics doubt these claims 171 Nahverkehrsgesellschaft Baden Wurttemberg a state agency that helps coordinate public transport operations confirmed its opinion that the existing terminal station could already carry 50 trains and with improved signalling technology it would carry 56 trains an hour 172 References EditFootnotes Edit OpenRailwayMap Map Map of Stuttgart Hauptbahnhof Cartography by OpenStreetMap OpenRailwayMap 28 September 2014 Retrieved 19 October 2014 Lageplan Hauptbahnhof Stuttgart PDF orientation map in German Deutsche Bahn AG 2014 Retrieved 19 October 2014 a b Stationspreisliste 2023 Station price list 2023 PDF in German DB Station amp Service 28 November 2022 Retrieved 14 December 2022 Eisenbahnatlas Deutschland German railway atlas 2009 2010 ed Schweers Wall 2017 ISBN 978 3 89494 146 8 Tarifzoneneinteilung PDF Verkehrs und Tarifverbund Stuttgart 1 April 2020 Retrieved 16 April 2020 a b c d Stuttgart Hauptbahnhof 140 Kilometer Gleise auf 82 Hektar Grund in German Deutsche Bahn Archived from the original on 8 June 2010 Retrieved 10 June 2018 Bonatzbau soll Weltkulturerbe werden Stuttgarter Nachrichten in German 11 November 2009 Retrieved 21 February 2012 a b c d Kubler 1905 Kurztexte zur Denkmalpflege in German a b c d e f g h i Stuttgart 21 Talquerung mit Hauptbahnhof in German DB ProjektBau GmbH 14 page brochure with situation in September 2005 K 412 IV DO 10735 1 Plan Stuttgart Hbf Empfangsgebaude 1 Bauabschnitt Lageplan Personenbahnhof in German Landesarchiv Baden Wurttemberg Staatsarchiv Ludwigsburg 1917 Archived from the original on 25 March 2016 Retrieved 5 June 2018 Der Hauptbahnhof im Spiegel der Zeit 2 Stuttgarter Zeitung in German 22 January 2008 Archived from the original on 25 March 2013 Retrieved 5 June 2018 Lambert Walter Keckeisen Willi 1956 Stadtbahn Stuttgart Die Bundesbahn in German 30 21 1159ff Zentralstellwerk Stuttgart Hauptbahnhof in German Standard Elektrik Lorenz c 1978 pp 9 12f 15 38 40 page brochure Der Tunnel in German Stuttgart Bundesbahndirektion Stuttgart 1985 p 218 ISBN 3 925565 01 9 Isenberg Michael 22 August 2013 Turm steht wohl auf Eisenbetonpfahlen Stuttgarter Nachrichten in German p 20 Vallee Dirk 1997 Nachhaltige Leistungssteigerung im Stuttgarter S Bahn Netz Der Nahverkehr in German 7 8 35 41 Schwarz Konstantin 21 October 2015 43000 Fahrgaste vom Umbau betroffen Stuttgarter Nachrichten in German p 16 Archived from the original on 10 November 2017 Retrieved 7 June 2018 Bus und Bahn in der Region und die Nahverkehrsgesellschaft Baden Wurttemberg Stuttgarter Nachrichten in German Vol 72 no 24 30 January 2016 p 20 a b c d e Urteilsgrunde in Sachen Dubbers Deutsche Bahn in German Stuttgart Regional Court 20 May 2010 Archived from the original on 24 May 2010 Retrieved 7 June 2018 Carle Walter 1980 Geologische Karte 1 25000 von Baden Wurttemberg Erlauterungen zu Blatt 6826 Crailsheim in German Stuttgart Geologisches Landesamt Baden Wurttemberg a b Bartetzko Dieter 23 August 2010 Der Geist will nicht in die Flasche zuruck FAZ NET in German Archived from the original on 1 September 2012 Retrieved 10 June 2018 a b c d e f g h i j k l m n Planning approval 2005 Track plan for Stuttgart Hauptbahnhof PDF in German DB Netze Archived PDF from the original on 4 March 2016 Retrieved 10 June 2018 Planning approval 2005 p 176 Stiglat 2004 p 358 a b c d e Reichsbahnoberrat Rempis 1928 Die Vollendung der Stellwerkanlage auf dem neuen Hauptbahnhof Stuttgart Organ fur die Fortschritte des Eisenbahnwesens in German 13 Neue Folge 65 Thieme Thomas 20 August 2008 Stellwerk am Hauptbahnhof Die Herrscher uber Hunderte von Weichen und Signalen Stuttgarter Zeitung in German Archived from the original on 3 July 2011 Retrieved 10 June 2018 a b c d e f K 412 IV DO 11687 1 Plan Stuttgart Hbf Bf Stuttgart Hbf in German Landesarchiv Baden Wurttemberg Staatsarchiv Ludwigsburg 1 October 1978 Retrieved 10 June 2018 Andriof Udo 21 February 2011 Umsteigen fur Radfahrer in German Direktzu Stuttgart 21 Archived from the original on 21 March 2013 Retrieved 10 June 2018 Platform information Stuttgart Hbf in German Deutsche Bahn 20 April 2016 Archived from the original on 25 May 2016 Retrieved 11 June 2018 a b Gruter Rolf Bottcher Karl Heinz 1976 S Bahn Stuttgart Bauwerke der Tunnelstrecke Hauptbahnhof Schwabstrasse Die Bundesbahn in German 5 317 325 ISSN 0007 5876 a b c d e Turm Geschichte in German Bahnprojekt Stuttgart Ulm e V Archived from the original on 26 April 2012 Retrieved 11 June 2018 K 412 IV DO 10702 1 Plan Stuttgart Hbf Empfangsgebaude Turm Fundament und Pfahle in German Landesarchiv Baden Wurttemberg Staatsarchiv Ludwigsburg May 1914 Retrieved 11 June 2018 Braun Thomas 20 November 2010 Expertenstreit um Risiken im Untergrund Stuttgarter Zeitung in German Archived from the original on 26 December 2016 Retrieved 11 June 2018 Durchdenwald Thomas 19 August 2013 Bahnhofsturm steht offenbar auf Eichenpfahlen Stuttgarter Zeitung in German Archived from the original on 27 April 2017 Retrieved 11 June 2018 Bahn halt Bohrungen fur uberflussig Stuttgarter Zeitung in German 21 August 2013 Archived from the original on 15 February 2016 Retrieved 11 June 2018 a b c d e Roser Matthias Baubeschreibung und stadtebauliche Einbindung in German Arbeitsgemeinschaft Hauptbahnhof Stuttgart Archived from the original on 7 March 2016 Retrieved 11 June 2018 Der Stuttgarter Hauptbahnhof und die sehenswerten Gaststatten im Bahnhofsturm Das Bunte Blatt in German 40 649 650 1926 a b Bahnhofsturm Heiraten in German Landeshauptstadt Stuttgart Retrieved 11 June 2018 Roser Matthias Kopfbahnsteighalle in German Arbeitsgemeinschaft Hauptbahnhof Stuttgart Retrieved 11 June 2018 a b c K 412 IV DO 10888 1 Plan Stuttgart Hbf Empfangsgebaude Gesamt Grundriss auf Bahnsteighohe in German Landesarchiv Baden Wurttemberg Staatsarchiv Ludwigsburg 1943 Retrieved 11 June 2018 K 412 IV DO 11007 1 Plan Stuttgart Hbf Empfangsgebaude Kopfbahnsteighalle Bauzeitenplan fur Uberdachung in German Landesarchiv Baden Wurttemberg Staatsarchiv Ludwigsburg 10 May 1950 Retrieved 11 June 2018 a b c d e Heffner Markus 21 October 2013 Querbahnsteig fur Stuttgart 21 Neue Wege in den Hauptbahnhof Stuttgarter Zeitung in German Archived from the original on 28 May 2017 Retrieved 13 June 2018 Roser Matthias Kleine Schalterhalle in German Arbeitsgemeinschaft Hauptbahnhof Stuttgart Retrieved 13 June 2018 a b Jaeger Falk 29 November 2009 Seitenflugel ohne Aufprallschutz Der Tagesspiegel in German Archived from the original on 18 May 2017 Retrieved 13 June 2018 a b c d e Seeger Ulrike May 2009 Architektur der Wege Neue Wege der Architekturinterpretation am Beispiel des Stuttgarter Hauptbahnhofs Wolkenkuckucksheim in German Retrieved 14 June 2018 Planning approval 2005 p 64 a b Bonatz Bau bleibt Empfangsgebaude fur den Bahnhof PDF 1 0 MiB Dialog 21 in German 2 3 September 2010 Archived from the original on 3 December 2013 Roser Matthias Posttrakt in German Arbeitsgemeinschaft Hauptbahnhof Stuttgart Retrieved 13 June 2018 Schwarz Konstantin 26 July 2010 Bahnhof zum Teilabriss bereit Stuttgarter Nachrichten in German Archived from the original on 25 July 2018 Retrieved 13 June 2018 Amtlicher Plan der Landeshauptstadt Stuttgart in German 52 ed Stuttgart Stadtmessungsamt 1978 Schuster Wolfgang Das Bahnprojekt Stuttgart Ulm PDF 15 7 MiB in German Landeshauptstadt Stuttgart p 16 Retrieved 14 June 2018 Bagger beginnt mit dem Abtragen der Mauern des Nordflugels des Stuttgarter Hauptbahnhofs in German Bahnprojekt Stuttgart Ulm 25 August 2010 Archived from the original on 25 September 2012 Retrieved 14 June 2018 K 412 IV DO 10891 Stuttgart Hbf Empfangsgebaude Ludwigsburger Strasse Grundriss 1 Obergeschoss uber Bahnsteig in German Landesarchiv Baden Wurttemberg Staatsarchiv Ludwigsburg 1946 Retrieved 14 June 2018 K 412 IV DO 10892 Stuttgart Hbf Empfangsgebaude Ludwigsburger Strasse Grundriss 1 Obergeschoss uber Bahnsteig in German Landesarchiv Baden Wurttemberg Staatsarchiv Ludwigsburg 1946 Retrieved 14 June 2018 Roser Matthias Schlossgartenflugel in German Arbeitsgemeinschaft Hauptbahnhof Stuttgart Retrieved 14 June 2018 a b 21 Gute Grunde fur Stuttgart 21 PDF 1 7 MiB in German Bahnprojekt Stuttgart Ulm Archived PDF from the original on 29 June 2017 Retrieved 14 June 2018 John Timo 31 July 2010 Der Zug der Zeit FAZ NET in German Archived from the original on 21 April 2017 Retrieved 14 June 2018 a b Bahn setzt Baumassnahmen zu Stuttgart 21 fort in German Bahnprojekt Stuttgart Ulm 13 January 2012 Archived from the original on 21 March 2013 Retrieved 15 June 2018 Nauke Jorg 22 March 2017 City Verschonerung nur mit weniger Autos Stuttgarter Zeitung in German Vol 73 no 68 p 22 Archived from the original on 22 March 2017 Retrieved 15 June 2018 a b Das Synergiekonzept Stuttgart 21 Die Ergebnisse des Vorprojekts PDF in German Stuttgart Deutsche Bahn AG Geschaftsbereich Netz Regionalbereich Stuttgart Projekte 1995 pp 14 f Archived from the original PDF on 2 December 2013 Retrieved 3 July 2018 Kleine Anfrage des Abg Boris Palmer und Antwort des Ministeriums fur Umwelt und Verkehr Zustand der wichtigsten Bahnhofe in Baden Wurttemberg PDF in German Drucksache 13 4069 Landtag von Baden Wurttemberg 16 February 2005 2 Retrieved 15 June 2018 a href Template Cite journal html title Template Cite journal cite journal a Cite journal requires journal help a b c Fahrplanwechsel bringt deutliche Verbesserungen im regionalen Schienenverkehr in German Ministerium fur Verkehr Baden Wurttemberg 9 December 2019 a b c d e Neues zum Fahrplanwechsel VVS de Verkehrs und Tarifverbund Stuttgart 10 December 2019 Retrieved 29 December 2019 Stortz Oliver 11 July 2015 Land der Bahnfahrer Esslinger Zeitung in German p 6 Rothenstein Dirk 18 April 2018 S Bahn Stuttgart Modern Mobil Fur die Region PDF in German DB Regio AG pp 24 f Archived from the original on 4 April 2018 Retrieved 17 June 2018 Das Europaviertel in German Bahnprojekt Stuttgart Ulm Archived from the original on 26 April 2012 Retrieved 17 June 2018 Planfeststellungsbeschluss nach 18 Abs 1 Allgemeines Eisenbahngesetz AEG fur den Umbau des Bahnknotens Stuttgart Projekt Stuttgart 21 Planfeststellungsabschnitt 1 1 Talquerung mit neuem Hauptbahnhof von Bahn km 0 4 42 0 bis Bahn km 0 4 32 0 in Stuttgart PDF in German Eisenbahn Bundesamt Karlsruhe Stuttgart 18 January 2005 Archived from the original PDF 2 3 MiB on 16 October 2012 Retrieved 17 June 2018 Bahnhofs Neubau S21 Gegner scheitern bei Referendum Der Spiegel 27 November 2011 via www spiegel de Die Infrastruktur in German Bahnprojekt Stuttgart Ulm e V Archived from the original on 28 August 2012 Retrieved 18 June 2018 Kafer Armin 17 January 1995 Fachleute Unterirdischer Bahnhof in Stuttgart kann gebaut werden Stuttgarter Zeitung in German Stuttgart 21 soll trotz Mehrkosten gebaut werden Die Welt in German 11 December 2009 Archived from the original on 27 September 2013 Retrieved 18 June 2018 Versaute Verhaltnisse Der Spiegel in German No 24 10 June 2013 pp 118 12 ISSN 0038 7452 Aktueller Sachstand Stuttgart 21 PDF 95 KiB Deutsche Bahn AG 10 December 2009 p 10 Archived PDF from the original on 27 September 2013 information bulletin 10 A4 pages Unter der Lupe Wie das Planfeststellungsverfahren funktioniert Das Projekt Stuttgart 21 Begleitbuch zur Ausstellung im TurmForum Stuttgart 21 in German TurmForum Stuttgart 21 e V pp 50 f Bury Mathias 12 April 2003 Bahn und Kritiker sehen sich bestatigt Stuttgarter Zeitung in German Marquart Peter 26 September 2006 Die Entwicklung des Projektplanung Projekt Stuttgart 21 und NBS Wendlingen Ulm Die Berucksichtigung der Wasserwirtschaft in der Planung eine Zwischenbilanz Tagungsband in German Regierungsprasidium Stuttgart pp 6 13 a b Engel Rainer 2005 Ungebremst ins schwarze Loch PDF Der Fahrgast in German 2 29 32 ISSN 1619 1072 Archived from the original PDF on 21 February 2007 Retrieved 19 June 2018 Pfa 1 1 in German Mediathek des Bahnprojekt Stuttgart Ulm e V 23 April 2015 Retrieved 19 June 2018 Schwarz Konstantin 9 July 2015 Neuer Plan fur Neckarbrucke Stuttgarter Nachrichten in German No 155 p 18 Archived from the original on 10 July 2015 Retrieved 19 June 2018 Kefer Volker 29 December 2010 Wie breit sind die Bahnsteige im Vergleich in German Direktzu Stuttgart21 Archived from the original on 22 April 2016 Retrieved 20 January 2018 Hantel Sven 24 July 2012 24 07 2012 UTA Stuttgart 21 Foliensatz zur Prasentation im Stuttgarter Gemeinderat PDF 115 KiB in German DB Netze p 11 Archived from the original on 23 September 2015 Retrieved 20 January 2018 a b Martin Ullrich 2009 Stuttgart 21 Grossprojekt europaischer Dimension Deine Bahn in German 7 6 13 a b Stuttgart 21 spezial Der Planfeststellungsabschnitt 1 1 Talquerung mit Hauptbahnhof 16 page brochure in German Stuttgart DBProjekte Sud GmbH January 2002 p 10 a href Template Cite web html title Template Cite web cite web a Missing or empty url help Planning approval 2005 pp 59 67 Planfeststellungsunterlagen Umgestaltung des Bahnknotens Stuttgart Ausbau und Neubaustrecke Stuttgart Augsburg Bereich Stuttgart Wendlingen mit Flughafenanbindung Abschnitt 1 5 Zufuhrung Feuerbach und Bad Cannstatt Bau km 4 0 90 3 bis 0 4 42 0 und 4 8 64 4 bis 0 4 42 0 Anlage 1 Erlauterungsbericht Teil III Beschreibung des Planfeststellungsbereiches Document with situation as of 9 June 2006 Plan determined on 13 October 2009 by the Federal Railway Authority Eisenbahn Bundesamt Karlsruhe Stuttgart field office file number 59160 PAP PS21 PFA1 5 in German DB ProjektBau GmbH Niederlassung Nordwest 13 October 2009 pp 26f a b Hier sind doch keine Stumper am Werk Dialog 21 in German 2 September 2010 Isenberg Michael 27 August 2010 Ein Podium der Besserwisser Stuttgarter Nachrichten in German No 197 p 16 Archived from the original on 27 August 2010 Retrieved 20 June 2018 Das Synergiekonzept Stuttgart 21 Die Ergebnisse des Vorprojekts 44 page brochure in German Stuttgart Deutsche Bahn AG Geschaftsbereich Netz Regionalbereich Stuttgart Projekte 1995 pp 26f Ubersichtshohenplan in Kilometrierungsachse Bau km 1 5 bis Bau km 1 5 Overview altitude plan on kilometre axis construction km 1 5 to construction km 1 5 planning status of 30 April 1999 Umgestaltung des Bahnknotens Stuttgart Ausbau und Neubaustrecke Stuttgart Augsburg Bereich Stuttgart Wendlingen mit Flughafenanbindung Planfeststellungsabschnitt 1 1 Talquerung mit Hauptbahnhof Bau km 0 4 42 0 bis 0 4 32 0 Redesign of the Stuttgart railway node Stuttgart Augsburg upgraded and new line Stuttgart Wendlingen area with airport connection Planning approval section 1 1 valley crossing with Hauptbahnhof Construction km 0 4 42 0 to 0 4 32 0 in German DB Projekt Stuttgart 21 24 August 2001 Annex 2 7 sheet 1 of 1 Planfeststellungsbeschluss nach 18 Abs 1 Allgemeines Eisenbahngesetz AEG fur den Umbau des Bahnknotens Stuttgart Projekt Stuttgart 21 Planfeststellungsabschnitt 1 1 Talquerung mit neuem Hauptbahnhof von Bahn km 0 4 42 0 bis Bahn km 0 4 32 0 in Stuttgart Planning approval pursuant to 18 para 1 General Railway Act for the rebuilding of the Stuttgart railway node planning determination for section 1 1 of the Stuttgart 21 Project valley crossing and new Hauptbahnhof from track km 0 4 42 0 to track km 0 4 32 0 in Stuttgart in German Stuttgart Federal Railway Authority 28 January 2005 p 372 f Stuttgart 21 Genehmigung fur Gleisneigung notig Stuttgarter Nachrichten in German Archived from the original on 15 March 2017 Retrieved 20 January 2018 Andersen Sven 2011 Das Bahnsteiggleisgefalle in Stuttgart 21 im Blick der Vorschriften und der betrieblichen Praxis PDF Eisenbahn Revue International in German 6 310 311 ISSN 1421 2811 Archived PDF from the original on 22 August 2016 Retrieved 20 January 2018 a b c Hauptbahnhof Stuttgart Bonatzbau Modernisierung des Bonatzbaus sowie Neubau von unterirdischen Bahnhofsgebauden und Vorplatzen in German DB Station amp Service AG Archived from the original on 25 September 2015 Retrieved 21 June 2018 a b c Neuer Stuttgarter Bahnhof komplett barrierefrei Dialog 21 in German 2 ed 1 September 2010 Kurze Wege auf drei Ebenen Schnelle Verkehrsstrome im neuen Hauptbahnhof Das Projekt Stuttgart 21 Begleitbuch zur Ausstellung im TurmForum Stuttgart 21 in German TurmForum Stuttgart 21 e V pp 66 69 a b c d Kefer Volker 8 April 2011 Breite und Anordnung von Treppen und Aufzugen in German Direktzu Stuttgart 21 Archived from the original on 18 May 2017 Retrieved 22 June 2018 a b c Was passiert wann PDF Dialog 21 in German 3 3 January 2011 Retrieved 29 June 2018 Schwarz Konstantin 10 August 2012 Juchtenkafer bremst Stadtbahn Bau aus Stuttgarter Nachrichten in German No 184 p 18 Archived from the original on 18 June 2015 Retrieved 22 June 2018 Stuttgart 21 Baubeginn Nesenbachduker Press release in German Kommunikationsburo des Bahnprojekts Stuttgart Ulm e V 22 May 2015 Archived from the original on 18 June 2015 Retrieved 22 June 2018 Erlauterungsbericht Teil I Allgemeiner Teil Explanatory Report Part I General Part Planfeststellungsunterlagen Umgestaltung des Bahnknotens Stuttgart Ausbau und Neubaustrecke Stuttgart Augsburg Bereich Stuttgart Wendlingen mit Flughafenanbindung Abschnitt 1 1 Talquerung mit Hauptbahnhof Bau km 0 4 42 0 bis 0 4 32 0 Planning approval documents Redesign of the Stuttgart railway node Stuttgart Augsburg upgraded and new line Stuttgart Wendlingen area with airport connection Planning approval section 1 1 valley crossing with Hauptbahnhof Construction km 0 4 42 0 to 0 4 32 0 planning document in German DBProjekt GmbH Stuttgart 21 28 January 2005 pp 9 16 Neubauprojekt Stuttgart Ulm Neue Strecken neues Verkehrskonzept fur die Region Deutschland und Europa PDF in German DB ProjektBau GmbH Archived from the original PDF 5 2 MiB on 22 November 2010 Retrieved 23 June 2018 a b Feireiss Kirstin Commerell Hans Jurgen eds 1999 Hauptbahnhof Stuttgart Catalog for an exhibition in the Galerie Aedes East in Berlin from 22 June to 1 August 1999 in German Berlin pp 36 40 a b Projekt Stuttgart 21 Die Machbarkeitsstudie PDF 14 MiB in German Stuttgart Deutsche Bahn AG Geschaftsbereich Netz Regionalbereich Stuttgart Projekte c 1995 pp 13 16 26 32 f Archived PDF from the original on 24 August 2017 Retrieved 24 June 2018 a b Projekt Stuttgart 21 Das Raumordnungsverfahren eight page brochure in German Stuttgart DBProjekt GmbH Stuttgart 21 c 1997 p 1 f 5 a b c d Ingenhoven Christoph Eine aus dem Ort heraus entwickelte Antwort Realisierungswettbewerb zur Neugestaltung des Stuttgarter Hauptbahnhofs Das Projekt Stuttgart 21 Begleitbuch zur Ausstellung im TurmForum Stuttgart 21 in German TurmForum Stuttgart 21 e V pp 56 59 a b Ganz schon helle Stuttgart 21 Das Projektmagazin in German 3 7 July 1998 Hauptbahnhof Stuttgart Bauwelt in German 1997 yearbook 1658 f Stuttgart Hbf entschieden Eisenbahn Revue International in German 1 2 6 1998 ISSN 1421 2811 Bahnhof verstehen Suddeutsche Zeitung in German No 257 1997 p 14 ISSN 0174 4917 Holcim Awards 2005 Europe Silver Main Station Stuttgart Germany Holcim Stiftung Archived from the original on 5 August 2007 Retrieved 24 June 2018 Global Holcim Awards Gold 2006 Main Station Stuttgart Holcim Stiftung Archived from the original on 4 June 2007 Retrieved 24 June 2018 The International Architectural Awards 2007 Archive PDF The Chicago Athenaeum Museum of Architecture and Design Archived PDF from the original on 18 May 2016 Retrieved 24 June 2018 Ohnewald Michael 7 October 2006 Alte Liebe rostet nicht Stuttgarter Zeitung in German No 232 p 36 Versaute Verhaltnisse Der Spiegel in German 24 118 124 10 June 2013 ISSN 0038 7452 Archived from the original on 1 October 2013 Retrieved 24 June 2018 Schlichtung Stuttgart 21 PLUS PDF 82 KiB in German 30 November 2010 p 13 Archived from the original on 13 August 2011 Retrieved 24 June 2018 Bescheid zur Anderung des Planfeststellungsbeschlusses vom 28 Januar 2005 fur das Vorhaben Grossprojekt Stuttgart 21 PFA 1 1 6 PA Anderung Zugangsschalen Hbf Bahnsteigzugange und Ausfuhrung im Bereich der Lounge der Verkehrsstation sowie Entfall des Versorgungstunnels in Stuttgart Bahn km 0 442 bis 0 432 der Strecke 4813 PDF in German Stuttgart Eisenbahn Bundesamt 23 April 2015 Archived from the original PDF on 7 February 2016 Retrieved 24 June 2018 Milankovic Christian 1 June 2017 S 21 Unsicherheiten auch zur Halbzeit Stuttgarter Zeitung in German Vol 73 p 2 Archived from the original on 4 June 2017 Retrieved 24 June 2018 Zehn Jahre hatten gereicht Der Spiegel in German 51 118 121 16 December 2017 Jahrhundertprojekt Stuttgart 21 startet in German Bahnprojekt Stuttgart Ulm e V 2 February 2010 Archived from the original on 25 September 2012 Retrieved 25 January 2018 Abriss am Hauptbahnhof beginnt unter grossem Polizeischutz Stuttgarter Zeitung in German 30 July 2010 Archived from the original on 10 December 2013 Retrieved 25 January 2018 Abriss des Sudflugels hat begonnen Handelsblatt in German 30 January 2012 Archived from the original on 2 February 2012 Retrieved 25 January 2018 Bock Jurgen 4 April 2012 Abriss des Sudflugels ruht fur Monate Stuttgarter Nachrichten in German Archived from the original on 6 April 2012 Retrieved 25 January 2018 Bock Jurgen 12 April 2012 Sudflugel Abriss geht weiter Stuttgarter Nachrichten in German Archived from the original on 15 April 2012 Retrieved 25 January 2018 a b Stuttgart 21 Aktuelle Entwicklungen Bahn Report in German 5 67 2012 Nauke Jorg 13 January 2011 Ist der neue Bahnhof behindertengerecht Stuttgarter Zeitung in German Archived from the original on 26 May 2011 Retrieved 25 January 2018 a b Schwarz Konstantin 25 May 2013 Bahnsteigumbau Im Hauptbahnhof wird es eng Stuttgarter Nachrichten in German p 17 Archived from the original on 12 June 2013 Retrieved 26 January 2018 Steg verbindet Schlossgarten mit Querbahnsteig Stuttgarter Nachrichten in German 24 January 2014 Archived from the original on 7 April 2014 Retrieved 25 January 2018 a b Heffner Markus 6 March 2013 Arbeiten am Tiefbahnhof beginnen 2013 Stuttgarter Zeitung in German No 55 p 19 a b c Faltin Thomas Schulz Braunschmidt Wolfgang 24 January 2013 Gleis 10 mit Auflagen wieder freigegeben Stuttgarter Zeitung in German Vol 69 no 20 p 9 Archived from the original on 27 January 2013 Retrieved 26 June 2018 D Stuttgart Bauleistungen im Hochbau Tenders Electronic Daily in German Document 2012 S 185 303797 26 September 2012 a b Schwarz Konstantin 6 March 2012 Tiefbahnhof hat zwei Jahre Verspatung Stuttgarter Nachrichten in German No 55 p 18 Archived from the original on 8 March 2012 Retrieved 26 June 2018 Stuttgarter Konzern reisst Nordflugel am Bonatzbau ab Stuttgarter Nachrichten in German 22 May 2010 Archived from the original on 23 May 2010 Retrieved 26 January 2018 a b c Kefer Volker 23 March 2012 Stuttgart 21 und NBS Wendlingen Ulm Unterlage fur den Prufungs und Complianceausschuss PCA der DB und den Lenkungskreis LK S21 PDF 880 KiB in German Berlin Stuttgart pp 5 22 Archived PDF from the original on 20 October 2012 Retrieved 26 January 2018 DB vergibt Auftrage fur Tunnelbauwerke und neuen Stuttgarter Tiefbahnhof von rund 800 Millionen Euro Press release in German DB Mobility Logistics AG 13 March 2012 a b Brucken ins Land Bezug in German 2 4 8 2012 D Stuttgart Bau von Bahnhofen Tenders Electronic Daily in German Document 2012 S 216 356149 9 November 2012 a b Jede Generation muss Neues schaffen Stuttgarter Zeitung in German 22 May 2012 p 22 Deutschland Stuttgart Bau von Bahnhofen Tenders Electronic Daily in German document 2016 S 092 164539 13 May 2016 Retrieved 26 June 2018 Deutschland Stuttgart Bau von Bahnhofen Tenders Electronic Daily in German Document 2016 S 156 283069 15 August 2016 Archived from the original on 26 June 2018 Retrieved 26 June 2018 Baufirmen kampfen um Milliardenauftrage Stuttgarter Nachrichten in German No 282 6 December 2010 p 17 Archived from the original on 8 December 2010 Retrieved 26 June 2018 Isenberg Michael 13 March 2012 Zublin soll Tiefbahnhof bauen Stuttgarter Nachrichten in German Archived from the original on 15 March 2012 Retrieved 26 June 2018 Debatte uber Mehrkosten Stuttgarter Zeitung in German 22 March 2012 Archived from the original on 24 March 2012 Retrieved 26 June 2018 Muller Rebecca 9 October 2012 Testzug entgleist am Hauptbahnhof Stuttgarter Zeitung in German Archived from the original on 11 October 2012 Retrieved 26 June 2018 2012 Annual Report PDF in German Bonn Eisenbahn Unfalluntersuchungsstelle des Bundes 2013 pp 20 24 Archived from the original PDF on 21 August 2016 Retrieved 26 June 2018 Drei Gleise bleiben bis auf Weiteres gesperrt Stuttgarter Zeitung in German No 236 11 October 2012 p 19 Archived from the original on 12 October 2012 Retrieved 26 June 2018 Keine Losung fur gesperrtes Gleis 10 Stuttgarter Zeitung in German Vol 68 no 283 6 December 2012 p 23 Schwarz Konstantin 10 January 2013 Bahn nimmt neu Anlauf fur Notfahrplan Stuttgarter Nachrichten in German p 21 Petersen Michael 23 December 2014 Das lange Warten auf die Punktlichkeit Stuttgarter Zeitung in German No 296 p 5 Durchdenwald Thomas 5 August 2014 Bahn hebt erst Baugrube fur den Tiefbahnhof aus Stuttgarter Zeitung in German No 178 p 19 Archived from the original on 7 August 2014 Retrieved 26 June 2018 Milankovic Christian 12 August 2015 Bahn kampft im S 21 Trog mit dem Zeitplan Stuttgarter Zeitung in German No 184 p 19 Archived from the original on 13 August 2015 Retrieved 26 June 2018 Milankovic Christian 20 October 2015 Fehlende Genehmigungen bremsen die Bahn Stuttgarter Zeitung in German Vol 71 no 242 Archived from the original on 19 December 2015 Retrieved 26 June 2018 Schwarz Konstantin 20 March 2015 Fluchttreppen im Bahnhof nur 30 Minuten sicher Stuttgarter Nachrichten in German p 17 Archived from the original on 22 March 2015 Retrieved 26 June 2018 Milankovic Christian 27 January 2016 Im Bahnhofstrog fliesst der erste Beton Stuttgarter Zeitung in German p 19 Archived from the original on 28 January 2016 Retrieved 27 June 2018 Bau der ersten Kelchstutze Der Fuss der Kelchstutze ist fertig bewehrt in German Deutsche Bahn 19 May 2017 Archived from the original on 1 December 2017 Retrieved 27 June 2018 Milankovic Christian 27 July 2017 Ehemalige Bahndirektion ist nun unten ohne Stuttgarter Zeitung in German Archived from the original on 29 July 2017 Retrieved 27 June 2018 Schlichtungsverfahren zu Stuttgart 21 PDF 668 KiB Meeting record of 6th conciliation meeting in German 20 November 2010 pp 89ff Archived PDF from the original on 18 October 2011 Retrieved 28 June 2018 Zulassungsrechtliche Folgen des von der DB gestellten Antrags auf Verdoppelung der Grundwasserforder und entnahmemengen im Projekt Stuttgart 21 PDF in German Gassner Siederer Neususs Archived from the original PDF on 3 December 2013 Retrieved 28 June 2018 Antrag auf Erlass einer einstweiligen Anordnung PDF Express application to the Administrative Court Stuttgart in German BUND Baden Wurttemberg 20 June 2011 Archived from the original PDF 297 KiB on 18 December 2011 Retrieved 28 June 2018 Isenberg Michael 2012 Baustart des Tiefbahnhofs soll 2013 moglich sein Stuttgarter Nachrichten in German No 149 p 20 Nauke Jorg Braun Thomas 29 June 2012 Land bestatigt Zeitverzug beim Tiefbahnhof Stuttgarter Zeitung in German No 148 p 23 Bescheid gemass fur die Vorhaben Grossprojekt Stuttgart 21 PFA 1 1 7 PA Plananderung Wasserrecht in German Stuttgart Eisenbahn Bundesamt 22 September 2014 Stuttgart 21 Bautaktung PFA 1 1 PDF 1 2 MiB in German Bahnprojekt Stuttgart Ulm June 2010 Archived PDF from the original on 16 October 2012 Retrieved 28 June 2018 Milankovic Christian 26 August 2013 Der nachste Stadtbahnumbau steht an Stuttgarter Zeitung in German p 15 Archived from the original on 29 August 2013 Retrieved 29 June 2018 Stuttgart 21 Bisherige Trasse wird verlegt Stuttgarter Zeitung in German Archived from the original on 17 December 2014 Retrieved 29 June 2018 Anlage 4 1 zur Vorlage 190 2013 Klausur des Verkehrsausschusses am 8 Mai 2013 PDF in German Verband Region Stuttgart 8 May 2013 pp 2 4 Retrieved 29 June 2018 the figure of 103 000 results from the increase of 2 600 passengers expected between 2010 and 2025 page 4 and the expected load of 105 900 passengers in 2025 page 2 a href Template Cite web html title Template Cite web cite web a CS1 maint postscript link Sitzungsvorlage Nr 190 2013 Verkehrsausschuss am 8 Mai 2013 Fortschreibung des Regionalverkehrsplan Ergebnisse der Verkehrsprognose zum Bezugsszenario 2025 in German Verband Region Stuttgart 8 May 2013 p 8 Archived from the original PDF on 3 October 2013 Retrieved 29 June 2018 Milankovic Christian 1 December 2015 Privatbahner 100 Zuge taglich im Kopfbahnhof Stuttgarter Zeitung in German Vol 70 no 278 p 19 Archived from the original on 4 December 2015 Retrieved 29 June 2018 Martin U Dobeschinsky H Breuer P Haderer M Sonnenberg N 2007 Vergleich der Leistungsfahigkeiten und des Leistungsverhaltens des neuen Durchgangsbahnhofes S21 und einer Variante umgestalteter Kopfbahnhof K21 im Rahmen der Neugestaltung des Stuttgarter Hauptbahnhofes Abschlussbericht Stuttgart 21 Diskurs in German Stuttgart Landeshauptstadt Stuttgart pp 2287 2369 especially 2330 2332 2337 f 2341 Engelhardt Christoph M 2011 Stuttgart 21 Leistung von Durchgangs und Kopfbahnhofen Eisenbahn Revue International in German 6 306 309 ISSN 1421 2811 Kopfbahnhof konnte heute schon mehr Zuge abwickeln als S 21 Press release in German Ministeriums fur Verkehr und Infrastruktur in Baden Wurttemberg 22 November 2011 Archived from the original on 27 November 2011 Retrieved 29 June 2018 Sources Edit Dostal Michael Estler Thomas 2012 Stuttgart Hauptbahnhof Geschichte eines Bahnhofs Stuttgart Hauptbahnhof History of a Station in German Munich GeraMond Verlag ISBN 978 3 86245 141 8 Hajdu Rose Seeger Ulrike 2011 Hauptbahnhof Stuttgart Ein Wahrzeichen in Bildern in German Ostfildern Thorbecke Verlag ISBN 978 3 7995 0879 7 Hopfenzitz Egon Fischer Klaus 1999 Chronik Stuttgarter Hauptbahnhof 1846 bis 1998 in German Stuttgart DB Station amp Service AG Kubler Hugo October 1905 Sonder Abdruck Die Erweiterung des Hauptbahnhofs Stuttgart Neues Tagblatt in German No 253 254 255 256 Stuttgart Mayer Martin 24 January 1923 Der neue Bahnhof in Stuttgart PDF Zentralblatt der Bauverwaltung in German 43 year book 7 8 37 43 Rantzsch Andreas M 2005 Die Einbeziehung Stuttgarts in das moderne Verkehrswesen durch den Bau der Eisenbahn in German Hamburg Verlag Dr Kovac pp especially 473 711 ISBN 3 8300 1958 0 Roser Matthias 2008 Der Stuttgarter Hauptbahnhof Vom Kulturdenkmal zum Abrisskandidaten in German 1 ed Stuttgart Schmetterling Verlag ISBN 978 3 89657 133 5 Roser Matthias 1987 Der Stuttgarter Hauptbahnhof ein vergessenes Meisterwerk der Architektur in German 1 ed Stuttgart Silberburg Verlag ISBN 3 925344 13 6 Seidel Kurt 1987 65 Jahre Stuttgarter Hauptbahnhof 1922 bis 1987 in German Bundesbahndirektion Stuttgart Stiglat Klaus 2004 Bauingenieure und ihr Werk in German Berlin Ernst amp Sohn ISBN 3 433 01665 8 Willhaus Werner ed 2006 Verkehrsknoten Stuttgart in German Freiburg 2006 EK Verlag ISBN 978 3 88255 251 5 a href Template Cite book html title Template Cite book cite book a CS1 maint location link Planfeststellungsbeschluss nach 18 Abs 1 Allgemeines Eisenbahngesetz AEG fur den Umbau des Bahnknotens Stuttgart Projekt Stuttgart 21 Planfeststellungsabschnitt 1 1 Talquerung mit neuem Hauptbahnhof von Bahn km 0 4 42 0 bis Bahn km 0 4 32 0 in Stuttgart Planning decision under s 18 1 of the General Railway Act for the conversion of rail node of Stuttgart project Stuttgart 21 zoning Section 1 1 valley crossing with a new main station from rail km 0 4 42 0 to rail km 0 4 32 0 in Stuttgart PDF 2 3 MiB in German Eisenbahn Bundesamt Karlsruhe Stuttgart 18 January 2005 Retrieved 10 June 2018 Portals Transport Baden Wurttemberg Retrieved from https en wikipedia org w index php title Stuttgart Hauptbahnhof amp oldid 1134914186, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.