Communications-based train control (CBTC) is a railway signaling system that uses telecommunications between the train and track equipment for traffic management and infrastructure control. CBTC allows a train's position to be known more accurately than with traditional signaling systems. This makes railway traffic management safer and more efficient. Metros (and other railway systems) are able to reduce headways while maintaining or even improving safety.

CBTC deployment in Madrid Metro, Spain.
Santo Amaro station on Line 5 of the partially CBTC-enabled São Paulo Metro
Some of the top 30 world's busiest metros in terms of annual passenger rides[1] utilise a CBTC system.

A CBTC system is a "continuous, automatic train control system utilizing high-resolution train location determination, independent from track circuits; continuous, high-capacity, bidirectional train-to-wayside data communications; and trainborne and wayside processors capable of implementing automatic train protection (ATP) functions, as well as optional automatic train operation (ATO) and automatic train supervision (ATS) functions," as defined in the IEEE 1474 standard.[2]

Background and origin edit

The main objective of CBTC is to increase track capacity by reducing the time interval (headway) between trains.

Traditional signalling systems detect trains in discrete sections of the track called 'blocks', each protected by signals that prevent a train entering an occupied block. Since every block is a fixed section of track, these systems are referred to as fixed block systems.

In a moving block CBTC system the protected section for each train is a "block" that moves with and trails behind it, and provides continuous communication of the train's exact position via radio, inductive loop, etc.[3]

 
The SFO AirTrain in San Francisco Airport was the first radio-based CBTC system.

As a result, Bombardier opened the world's first radio-based CBTC system at San Francisco airport's automated people mover (APM) in February 2003.[4] A few months later, in June 2003, Alstom introduced the railway application of its radio technology on the Singapore North East line. CBTC has its origins in the loop-based systems developed by Alcatel SEL (now Thales) for the Bombardier Automated Rapid Transit (ART) systems in Canada during the mid-1980s.

These systems, which were also referred to as transmission-based train control (TBTC), made use of inductive loop transmission techniques for track to train communication, introducing an alternative to track circuit based communication. This technology, operating in the 30–60 kHz frequency range to communicate trains and wayside equipment, was widely adopted by the metro operators in spite of some electromagnetic compatibility (EMC) issues, as well as other installation and maintenance concerns (see SelTrac for further information regarding Transmission-Based-Train-Control).

As with new application of any technology, some problems arose at the beginning mainly due to compatibility and interoperability aspects.[5][6] However, there have been relevant improvements since then, and currently the reliability of the radio-based communication systems has grown significantly.

Moreover, it is important to highlight that not all the systems using radio communication technology are considered to be CBTC systems. So, for clarity and to keep in line with the state-of-the-art solutions for operator's requirements,[6] this article only covers the latest moving block principle based (either true moving block or virtual block, so not dependent on track-based detection of the trains)[2] CBTC solutions that make use of the radio communications.

Main features edit

CBTC and moving block edit

CBTC systems are modern railway signaling systems that can mainly be used in urban railway lines (either light or heavy) and APMs, although it could also be deployed on commuter lines. For main lines, a similar system might be the European Railway Traffic Management System ERTMS Level 3 (not yet fully defined [when?]). In the modern CBTC systems the trains continuously calculate and communicate their status via radio to the wayside equipment distributed along the line. This status includes, among other parameters, the exact position, speed, travel direction and braking distance.

This information allows calculation of the area potentially occupied by the train on the track. It also enables the wayside equipment to define the points on the line that must never be passed by the other trains on the same track. These points are communicated to make the trains automatically and continuously adjust their speed while maintaining the safety and comfort (jerk) requirements. So, the trains continuously receive information regarding the distance to the preceding train and are then able to adjust their safety distance accordingly.

 
The safety distance (safe-braking distance) between trains in fixed block and moving block signalling systems

From the signalling system perspective, the first figure shows the total occupancy of the leading train by including the whole blocks which the train is located on. This is due to the fact that it is impossible for the system to know exactly where the train actually is within these blocks. Therefore, the fixed block system only allows the following train to move up to the last unoccupied block's border.

In a moving block system as shown in the second figure, the train position and its braking curve is continuously calculated by the trains, and then communicated via radio to the wayside equipment. Thus, the wayside equipment is able to establish protected areas, each one called Limit of Movement Authority (LMA), up to the nearest obstacle (in the figure the tail of the train in front). Movement Authority (MA) is the permission for a train to move to a specific location within the constraints of the infrastructure and with supervision of speed.[7]

End of Authority is the location to which the train is permitted to proceed and where target speed is equal to zero. End of Movement is the location to which the train is permitted to proceed according to an MA. When transmitting an MA, it is the end of the last section given in the MA.[7]

It is important to mention that the occupancy calculated in these systems must include a safety margin for location uncertainty (in yellow in the figure) added to the length of the train. Both of them form what is usually called 'Footprint'. This safety margin depends on the accuracy of the odometry system in the train.

CBTC systems based on moving block allows the reduction of the safety distance between two consecutive trains. This distance is varying according to the continuous updates of the train location and speed, maintaining the safety requirements. This results in a reduced headway between consecutive trains and an increased transport capacity.

Grades of automation edit

Modern CBTC systems allow different levels of automation or Grades of Automation (GoA), as defined and classified in the IEC 62290–1.[8] In fact, CBTC is not a synonym for "driverless" or "automated trains" although it is considered as a basic enabler technology for this purpose.

There are four grades of automation available:

  • GoA 0 - On-sight, with no automation
  • GoA 1 - Manual, with a driver controlling all train operations.
  • GoA 2 - Semi-automatic Operation (STO), starting and stopping are automated, but a driver who sits in the cab operates the doors and drives in emergencies
  • GoA 3 - Driverless Train Operation (DTO), starting and stopping are automated, but a crew member operates the doors from within the train
  • GoA 4 - Unattended Train Operation (UTO), starting, stopping and doors are all automated, with no required crew member on board

Main applications edit

CBTC systems allow optimal use of the railway infrastructure as well as achieving maximum capacity and minimum headway between operating trains, while maintaining the safety requirements. These systems are suitable for the new highly demanding urban lines, but also to be overlaid on existing lines in order to improve their performance.[9]

Of course, in the case of upgrading existing lines the design, installation, test and commissioning stages are much more critical. This is mainly due to the challenge of deploying the overlying system without disrupting the revenue service.[10]

Main benefits edit

The evolution of the technology and the experience gained in operation over the last 30 years means that modern CBTC systems are more reliable and less prone to failure than older train control systems. CBTC systems normally have less wayside equipment and their diagnostic and monitoring tools have been improved, which makes them easier to implement and, more importantly, easier to maintain.[11]

CBTC technology is evolving, making use of the latest techniques and components to offer more compact systems and simpler architectures. For instance, with the advent of modern electronics it has been possible to build in redundancy so that single failures do not adversely impact operational availability.

Moreover, these systems offer complete flexibility in terms of operational schedules or timetables, enabling urban rail operators to respond to the specific traffic demand more swiftly and efficiently and to solve traffic congestion problems. In fact, automatic operation systems have the potential to significantly reduce the headway and improve the traffic capacity compared to manual driving systems.[12][13]

Finally, it is important to mention that the CBTC systems have proven to be more energy efficient than traditional manually driven systems.[11] The use of new functionalities, such as automatic driving strategies or a better adaptation of the transport offer to the actual demand, allows significant energy savings reducing the power consumption.

Risks edit

The primary risk of an electronic train control system is that if the communications link between any of the trains is disrupted then all or part of the system might have to enter a failsafe state until the problem is remedied. Depending on the severity of the communication loss, this state can range from vehicles temporarily reducing speed, coming to a halt or operating in a degraded mode until communications are re-established. If communication outage is permanent some sort of contingency operation must be implemented which may consist of manual operation using absolute block or, in the worst case, the substitution of an alternative form of transportation.[14]

As a result, high availability of CBTC systems is crucial for proper operation, especially if such systems are used to increase transport capacity and reduce headway. System redundancy and recovery mechanisms must then be thoroughly checked to achieve a high robustness in operation. With the increased availability of the CBTC system, there is also a need for extensive training and periodical refresh of system operators on the recovery procedures. In fact, one of the major system hazards in CBTC systems is the probability of human error and improper application of recovery procedures if the system becomes unavailable.

Communications failures can result from equipment malfunction, electromagnetic interference, weak signal strength or saturation of the communications medium.[15] In this case, an interruption can result in a service brake or emergency brake application as real time situational awareness is a critical safety requirement for CBTC and if these interruptions are frequent enough it could seriously impact service. This is the reason why, historically, CBTC systems first implemented radio communication systems in 2003, when the required technology was mature enough for critical applications.

In systems with poor line of sight or spectrum/bandwidth limitations a larger than anticipated number of transponders may be required to enhance the service. This is usually more of an issue with applying CBTC to existing transit systems in tunnels that were not designed from the outset to support it. An alternate method to improve system availability in tunnels is the use of leaky feeder cable that, while having higher initial costs (material + installation) achieves a more reliable radio link.

With the emerging services over open ISM radio bands (i.e. 2.4 GHz and 5.8 GHz) and the potential disruption over critical CBTC services, there is an increasing pressure in the international community (ref. report 676 of UITP organization, Reservation of a Frequency Spectrum for Critical Safety Applications dedicated to Urban Rail Systems) to reserve a frequency band specifically for radio-based urban rail systems. Such decision would help standardize CBTC systems across the market (a growing demand from most operators) and ensure availability for those critical systems.

As a CBTC system is required to have high availability and particularly, allow for a graceful degradation, a secondary method of signaling might be provided to ensure some level of non-degraded service upon partial or complete CBTC unavailability.[16] This is particularly relevant for brownfield implementations (lines with an already existing signalling system) where the infrastructure design cannot be controlled and coexistence with legacy systems is required, at least, temporarily.[17]

For example, the New York City Canarsie Line was outfitted with a backup automatic block signaling system capable of supporting 12 trains per hour (tph), compared with the 26 tph of the CBTC system. Although this is a rather common architecture for resignalling projects, it can negate some of the cost savings of CBTC if applied to new lines. This is still a key point in the CBTC development (and is still being discussed), since some providers and operators argue that a fully redundant architecture of the CBTC system may however achieve high availability values by itself.[17]

In principle, CBTC systems may be designed with centralized supervision systems in order to improve maintainability and reduce installation costs. If so, there is an increased risk of a single point of failure that could disrupt service over an entire system or line. Fixed block systems usually work with distributed logic that are normally more resistant to such outages. Therefore, a careful analysis of the benefits and risks of a given CBTC architecture (centralized vs. distributed) must be done during system design.

When CBTC is applied to systems that previously ran under complete human control with operators working on sight it may actually result in a reduction in capacity (albeit with an increase in safety). This is because CBTC operates with less positional certainty than human sight and also with greater margins for error as worst-case train parameters are applied for the design (e.g. guaranteed emergency brake rate vs. nominal brake rate). For instance, CBTC introduction in Philly's Center City trolley tunnel resulted initially in a marked increase in travel time and corresponding decrease in capacity when compared with the unprotected manual driving. This was the offset to finally eradicate vehicle collisions which on-sight driving cannot avoid and showcases the usual conflicts between operation and safety.

Architecture edit

 
The architecture of a CBTC system.

The typical architecture of a modern CBTC system comprises the following main subsystems:

  1. Wayside equipment, which includes the interlocking and the subsystems controlling every zone in the line or network (typically containing the wayside ATP and ATO functionalities). Depending on the suppliers, the architectures may be centralized or distributed. The control of the system is performed from a central command ATS, though local control subsystems may be also included as a fallback.
  2. CBTC onboard equipment, including ATP and ATO subsystems in the vehicles.
  3. Train to wayside communication subsystem, currently based on radio links.

Thus, although a CBTC architecture is always depending on the supplier and its technical approach, the following logical components may be found generally in a typical CBTC architecture:

  • Onboard ATP system. This subsystem is in charge of the continuous control of the train speed according to the safety profile, and applying the brake if it is necessary. It is also in charge of the communication with the wayside ATP subsystem in order to exchange the information needed for a safe operation (sending speed and braking distance, and receiving the limit of movement authority for a safe operation).
  • Onboard ATO system. It is responsible for the automatic control of the traction and braking effort in order to keep the train under the threshold established by the ATP subsystem. Its main task is either to facilitate the driver or attendant functions, or even to operate the train in a fully automatic mode while maintaining the traffic regulation targets and passenger comfort. It also allows the selection of different automatic driving strategies to adapt the runtime or even reduce the power consumption.
  • Wayside ATP system. This subsystem undertakes the management of all the communications with the trains in its area. Additionally, it calculates the limits of movement authority that every train must respect while operating in the mentioned area. This task is therefore critical for the operation safety.
  • Wayside ATO system. It is in charge of controlling the destination and regulation targets of every train. The wayside ATO functionality provides all the trains in the system with their destination as well as with other data such as the dwell time in the stations. Additionally, it may also perform auxiliary and non-safety related tasks including for instance alarm/event communication and management, or handling skip/hold station commands.
  • Communication system. The CBTC systems integrate a digital networked radio system by means of antennas or leaky feeder cable for the bi-directional communication between the track equipment and the trains. The 2,4GHz band is commonly used in these systems (same as WiFi), though other alternative frequencies such as 900 MHz (US), 5.8 GHz or other licensed bands may be used as well.
  • ATS system. The ATS system is commonly integrated within most of the CBTC solutions. Its main task is to act as the interface between the operator and the system, managing the traffic according to the specific regulation criteria. Other tasks may include the event and alarm management as well as acting as the interface with external systems.
  • Interlocking system. When needed as an independent subsystem (for instance as a fallback system), it will be in charge of the vital control of the trackside objects such as switches or signals, as well as other related functionality. In the case of simpler networks or lines, the functionality of the interlocking may be integrated into the wayside ATP system.

Projects edit

CBTC technology has been (and is being) successfully implemented for a variety of applications as shown in the figure below (mid 2011). They range from some implementations with short track, limited numbers of vehicles and few operating modes (such as the airport APMs in San Francisco or Washington), to complex overlays on existing railway networks carrying more than a million passengers each day and with more than 100 trains (such as lines 1 and 6 in Madrid Metro, line 3 in Shenzhen Metro, some lines in Paris Metro, New York City Subway and Beijing Subway, or the Sub-Surface network in London Underground).[18]

 
Radio-based CBTC moving block projects around the world. Projects are classified with colours depending on the supplier; those underlined are already into CBTC operation.[note 1]


Despite the difficulty, the table below tries to summarize and reference the main radio-based CBTC systems deployed around the world as well as those ongoing projects being developed. Besides, the table distinguishes between the implementations performed over existing and operative systems (brownfield) and those undertaken on completely new lines (Greenfield).

List edit

This list is sortable, and is initially sorted by year. Click on the   icon on the right side of the column header to change sort key and sort order.

Location/System Lines Supplier Solution Commissioning km No. of trains Type of Field Grade of Automation Notes
Toronto Subway 3
Thales
SelTrac
1985
6.4
7
Greenfield UTO With train attendants who monitor door status, and drive trains in the event of a disruption.
SkyTrain (Vancouver) Expo Line, Millennium Line, Canada Line
Thales
SelTrac
1986
85.4
20
Greenfield UTO
Detroit Detroit People Mover
Thales
SelTrac
1987
4.7
12
Greenfield UTO
London Docklands Light Railway
Thales
SelTrac
1987
38
149
Greenfield DTO
San Francisco Airport AirTrain
Bombardier
CITYFLO 650
2003
5
38
Greenfield UTO
Seattle-Tacoma Airport Satellite Transit System
Bombardier
CITYFLO 650
2003
3
22
Brownfield UTO
Singapore MRT North East line
Alstom
Urbalis 300
2003
20
43
Greenfield UTO with train attendants (Train captains) who drive trains in the event of a disruption.
Hong Kong MTR Tuen Ma line
Thales
SelTrac 2020 (Tuen Ma Line Phase 1)

2021 (Tuen Ma Line and former West Rail Line)

57
65
Greenfield (Tai Wai to Hung Hom section only)

Brownfield (other sections)

STO Existing sections were upgraded from SelTrac IS
Las Vegas Monorail
Thales
SelTrac
2004
6
36
Greenfield UTO
Wuhan Metro 1
Thales
SelTrac
2004
27
32
Greenfield STO
Dallas–Fort Worth Airport DFW Skylink
Bombardier
CITYFLO 650
2005
10
64
Greenfield UTO
Hong Kong MTR Disneyland Resort line
Thales
SelTrac
2005
3
3
Greenfield UTO
Lausanne Metro M2
Alstom
Urbalis 300
2008
6
18
Greenfield UTO
London Heathrow Airport Heathrow APM
Bombardier
CITYFLO 650
2008
1
9
Greenfield UTO
Madrid Metro    ,  
Bombardier
CITYFLO 650
2008
48
143
Brownfield STO
McCarran Airport McCarran Airport APM
Bombardier
CITYFLO 650
2008
2
10
Brownfield UTO
BTS Skytrain Silom Line, Sukhumvit Line (North section)
Bombardier
CITYFLO 450
2009
16.7
47
Brownfield (original line)
Greenfield (Taksin extension)
STO with train attendants who drive trains in the event of a disruption. These train attendants are on standby in the train.
Barcelona Metro    ,  
Siemens
Trainguard MT CBTC
2009
46
50
Greenfield UTO
Beijing Subway 4
Thales
SelTrac
2009
29
40
Greenfield STO
New York City Subway BMT Canarsie Line, IRT Flushing Line
Siemens
Trainguard MT CBTC
2009
17
69[note 2] Brownfield STO
Shanghai Metro 6, 7, 8, 9, 11
Thales
SelTrac
2009
238
267
Greenfield and Brownfield STO
Singapore MRT Circle line
Alstom
Urbalis 300
2009
35
64
Greenfield UTO with train attendants (Rovers) who drive trains in the event of a disruption. These train attendants are also on standby between Botanic Gardens and Caldecott stations.
Taipei Metro Neihu-Mucha
Bombardier
CITYFLO 650
2009
26
76
Greenfield and Brownfield UTO
Washington-Dulles Airport Dulles APM
Thales
SelTrac
2009
8
29
Greenfield UTO
Beijing Subway Daxing Line
Thales
SelTrac
2010
22
Greenfield STO
Beijing Subway 15
Nippon Signal
SPARCS
2010
41.4
28
Greenfield ATO
Guangzhou Metro Zhujiang New Town APM
Bombardier
CITYFLO 650
2010
4
19
Greenfield DTO
Guangzhou Metro 3
Thales
SelTrac
2010
67
40
Greenfield DTO
São Paulo Metro 1, 2, 3
Alstom
Urbalis
2010
62
142
Greenfield and Brownfield UTO CBTC operates in Lines 1 and 2 and it is being installed in Line 3
São Paulo Metro 4
Siemens
Trainguard MT CBTC
2010
13
29
Greenfield UTO First UTO line in Latin America
London Underground Jubilee line
Thales
SelTrac
2010
37
63
Brownfield STO
London Gatwick Airport Shuttle Transit APM
Bombardier
CITYFLO 650
2010
1
6
Brownfield UTO
Milan Metro 1
Alstom
Urbalis
2010
27
68
Brownfield STO
Philadelphia SEPTA SEPTA subway–surface trolley lines
Bombardier
CITYFLO 650
2010
8
115
STO
Shenyang Metro 1
Ansaldo STS
CBTC
2010
27
23
Greenfield STO
B&G Metro Busan-Gimhae Light Rail Transit
Thales
SelTrac
2011
23.5
25
Greenfield UTO
BTS Skytrain Sukhumvit Line (East section)
Bombardier
CITYFLO 450
2011
14.35
Brownfield (original line)
Greenfield (On Nut extension)
STO with train attendants who drive trains in the event of a disruption. These train attendants are on standby in the train.
Dubai Metro Red, Green
Thales
SelTrac
2011
70
85
Greenfield UTO
Madrid Metro     Extension MetroEste
Invensys
Sirius
2011
9
? Brownfield STO
Paris Métro 1
Siemens
Trainguard MT CBTC
2011
16
53
Brownfield DTO
Sacramento International Airport Sacramento APM
Bombardier
CITYFLO 650
2011
1
2
Greenfield UTO
Shenzhen Metro 3
Bombardier
CITYFLO 650
2011
42
43
STO
Shenzhen Metro 2, 5
Alstom
Urbalis 888
2010–2011
76
65
Greenfield STO
Shenyang Metro 2
Ansaldo STS
CBTC
2011
21.5
20
Greenfield STO
Xian Metro 2
Ansaldo STS
CBTC
2011
26.6
22
Greenfield STO
Yongin EverLine
Bombardier
CITYFLO 650
2011
19
30
UTO
Algiers Metro 1
Siemens
Trainguard MT CBTC
2012
9
14
Greenfield STO
Chongqing Metro 1, 6
Siemens
Trainguard MT CBTC
2011–2012
94
80
Greenfield STO
Guangzhou Metro 6
Alstom
Urbalis 888
2012
24
27
Greenfield ATO
Istanbul Metro M4
Thales
SelTrac
2012
21.7
Greenfield
M5 Bombardier CityFLO 650 Phase 1: 2017

Phase 2: 2018

16.9
21
Greenfield UTO
Ankara Metro M1 Ansaldo STS CBTC
2018
14.6
Brownfield STO
M2 Ansaldo STS CBTC
2014
16.5
Greenfield STO
M3 Ansaldo STS CBTC
2014
15.5
Greenfield STO
M4 Ansaldo STS CBTC
2017
9.2
Greenfield STO
Mexico City Metro  
Alstom
Urbalis
2012
25
30
Greenfield STO
 
Siemens
Trainguard MT CBTC
2022-2024
18
39
Brownfield DTO
New York City Subway IND Culver Line
Thales & Siemens
Various
2012
Greenfield A test track was retrofitted in 2012; the line's other tracks will be retrofitted by the early 2020s.
Phoenix Sky Harbor Airport PHX Sky Train
Bombardier
CITYFLO 650
2012
3
18
Greenfield UTO
Riyadh
Bombardier
CITYFLO 650
2012
4
12
Greenfield UTO
Metro Santiago 1
Alstom
Urbalis
2016
20
42
Greenfield and Brownfield DTO
São Paulo Commuter Lines 8, 10, 11
Invensys
Sirius
2012
107
136
Brownfield UTO
Tianjin Metro 2, 3
Bombardier
CITYFLO 650
2012
52
40
STO
Beijing Subway 8, 10
Siemens
Trainguard MT CBTC
2013
84
150
STO
Caracas Metro 1
Invensys
Sirius
2013
21
48
Brownfield
Kunming Metro 1, 2
Alstom
Urbalis 888
2013
42
38
Greenfield ATO
Málaga Metro    ,  
Alstom
Urbalis
2013
17
15
Greenfield ATO
Paris Métro 3, 5 Ansaldo STS / Siemens Inside RATP's
Ouragan project
2010, 2013
26
40
Brownfield STO
Paris Métro 13
Thales
SelTrac
2013
23
66
Brownfield STO
Toronto subway 1
Alstom
Urbalis 400
2017 to 2022
76.78[19] 65[19] Brownfield (Finch to Sheppard West)
Greenfield (Sheppard West to Vaughan)
STO CBTC active between Vaughan Metropolitan Centre and Eglinton stations as of October 2021.[20] The entire line is scheduled to be fully upgraded by 2022.[21][22]
Wuhan Metro 2, 4
Alstom
Urbalis 888
2013
60
45
Greenfield STO
Singapore MRT Downtown line
Invensys
Sirius
2013
42
92
Greenfield UTO with train attendants who drive trains in the event of a disruption.
Budapest Metro M2, M4
Siemens
Trainguard MT CBTC 2013 (M2)
2014 (M4)
17
41
Line M2: STO

Line M4: UTO

Dubai Metro Al Sufouh LRT
Alstom
Urbalis
2014
10
11
Greenfield STO
Edmonton Light Rail Transit Capital Line, Metro Line
Thales
SelTrac
2014
24 double track
94
Brownfield DTO
Helsinki Metro 1
Siemens
Trainguard MT CBTC
2014
35
45.5
Greenfield and Brownfield STO[23]
Hong Kong MTR Hong Kong APM
Thales
SelTrac
2014
4
14
Brownfield UTO
Incheon Subway 2
Thales
SelTrac
2014
29
37
Greenfield UTO
Jeddah Airport King Abdulaziz APM
Bombardier
CITYFLO 650
2014
2
6
Greenfield UTO
London Underground Northern line
Thales
SelTrac
2014
58
106
Brownfield STO
Salvador Metro 4 Thales[24] SelTrac
2014
33
29
Greenfield DTO
Massachusetts Bay Transportation Authority Ashmont–Mattapan High Speed Line
Argenia
SafeNet CBTC
2014
6
12
Greenfield STO
Munich Airport Munich Airport T2 APM
Bombardier
CITYFLO 650
2014
1
12
Greenfield UTO
Nanjing Metro Nanjing Airport Rail Link
Thales
SelTrac
2014
36
15
Greenfield STO
Shinbundang Line Dx Line
Thales
SelTrac
2014
30.5
12
Greenfield UTO
Ningbo Metro 1
Alstom
Urbalis 888
2014
21
22
Greenfield ATO
Panama Metro 1
Alstom
Urbalis
2014
13.7
17
Greenfield ATO
São Paulo Metro 15
Bombardier
CITYFLO 650
2014
14
27
Greenfield UTO
Shenzhen Metro 9
Thales Saic Transport
SelTrac
2014
25.38
Greenfield
Xian Metro 1
Siemens
Trainguard MT CBTC
2013–2014
25.4
80
Greenfield STO
Amsterdam Metro 50, 51, 52, 53, 54
Alstom
Urbalis
2015
62
85
Greenfield and Brownfield STO
Beijing Subway 1, 2, 6, 9, Fangshan Line, Airport Express
Alstom
Urbalis 888
From 2008 to 2015
159
240
Brownfield and Greenfield STO and DTO
BTS Skytrain Sukhumvit Line (East section)
Bombardier
CITYFLO 450
2015
1.7
Greenfield STO Samrong extension installation.
Chengdu Metro L4, L7
Alstom
Urbalis
2015
22.4
Greenfield ATO
Delhi Metro Line 7, Line 9
Bombardier
CITYFLO 650
2018 (Temp. Driver on Board) 2021 (Full ATO Operations)
||
55
|| || || ||
Nanjing Metro 2, 3, 10, 12
Siemens
Trainguard MT CBTC
From 2010 to 2015
137
140
Greenfield
São Paulo Metro 5
Bombardier
CITYFLO 650
2015
20
34
Brownfield & Greenfield UTO
Shanghai Metro 10, 12, 13, 16
Alstom
Urbalis 888
From 2010 to 2015
120
152
Greenfield UTO and STO
Taipei Metro Circular
Ansaldo STS
CBTC
2015
15
17
Greenfield UTO
Wuxi Metro 1, 2
Alstom
Urbalis
2015
58
46
Greenfield STO
Philadelphia SEPTA SEPTA Routes 101 and 102
Ansaldo STS
CBTC
2015
19.2
29
STO
Bangkok MRT Purple Line
Bombardier
CITYFLO 650
2015
23
21
Greenfield STO with train attendants who drive trains in the event of a disruption. These train attendants are on standby in the train.
Buenos Aires Underground  
Siemens
Trainguard MT CBTC
2016
8
20
? ?
Buenos Aires Underground  
Siemens
Trainguard MT CBTC
2016
4.5
18
TBD TBD
Hong Kong MTR South Island line
Alstom
Urbalis 400
2016
7
10
Greenfield UTO
Hyderabad Metro Rail L1, L2, L3
Thales
SelTrac
2016
72
57
Greenfield STO
Kochi Metro L1
Alstom
Urbalis 400
2016
26
25
Greenfield ATO
New York City Subway IRT Flushing Line
Thales
SelTrac
2016
17
46[note 3] Brownfield and Greenfield STO
Kuala Lumpur Metro (LRT) Line 3 & 4, Ampang and Sri Petaling lines
Thales
SelTrac
2016
45.1
50
Brownfield UTO
Kuala Lumpur Metro (LRT) Line 5, Kelana Jaya Line
Thales
SelTrac
2016
46.4
76
Brownfield UTO
Walt Disney World Walt Disney World Monorail System
Thales
SelTrac
2016
22
15
Brownfield UTO
Fuzhou Metro 1
Siemens
Trainguard MT CBTC
2016
24
28
Greenfield STO
Kuala Lumpur Metro (MRT) Line 9, Kajang Line
Bombardier
CITYFLO 650
2017
51
74
Greenfield UTO
Delhi Metro LIne-8 Nippon Signal SPARCS 2017 (Temp. Driver on Board)

2021 (Full ATO Operations)

Greenfeild UTO
Lille Metro 1
Alstom
Urbalis
2017
15
27
Brownfield UTO
Lucknow Metro L1
Alstom
Urbalis
2017
23
20
Greenfield ATO
New York City Subway IND Queens Boulevard Line Siemens/Thales Trainguard MT CBTC
2017–2022
[note 4]
21.9
[note 5]
309[note 6] Brownfield ATO Train conductors will be located aboard the train because other parts of the routes using the Queens Boulevard Line will not be equipped with CBTC.
Stockholm Metro Red line
Ansaldo STS
CBTC
2017
41
30
Brownfield STO->UTO
Taichung Metro Green
Alstom
Urbalis
2017
18
29
Greenfield UTO
Singapore MRT North South line
Thales
SelTrac
2017
45.3
198
Brownfield UTO[25] with train attendants (Train Captains) who drive trains in the event of a disruption. These train attendants are on standby in the train.
BTS Skytrain Sukhumvit Line (East section)
Bombardier
CITYFLO 450
2018
11
Greenfield STO Samut Prakarn extension installation.
Singapore MRT East West line
Thales
SelTrac
2018
57.2
198
Brownfield (original line)
Greenfield
(Tuas West Extension only)
UTO[25] with train attendants who drive trains in the event of a disruption. These train attendants are on standby in the train.
Copenhagen S-Train All lines
Siemens
Trainguard MT CBTC
2021
170
136
Brownfield STO
Doha Metro L1
Thales
SelTrac
2018
33
35
Greenfield ATO
New York City Subway IND Eighth Avenue Line Siemens/Thales Trainguard MT CBTC
2018–2024
[note 7]
9.3
Brownfield ATO Train conductors will be located aboard the train because other parts of the routes using the Eighth Avenue Line will not be equipped with CBTC.
Ottawa Light Rail Confederation Line
Thales
SelTrac
2018
12.5
34
Greenfield STO
Port Authority Trans-Hudson (PATH) All lines
Siemens
Trainguard MT CBTC
2018
22.2
50
Brownfield ATO
Rennes ART B
Siemens
Trainguard MT CBTC
2018
12
19
Greenfield UTO
Riyadh Metro L4, L5 and L6
Alstom
Urbalis
2018
64
69
Greenfield ATO
Sosawonsi Co. (Gyeonggi-do) Seohae Line
Siemens
Trainguard MT CBTC
2018
23.3
7
Greenfield
ATO
Bangkok MRT Blue Line
Siemens
Trainguard MT CBTC
2019
47
54
Brownfield & Greenfield STO with train attendants who drive trains in the event of a disruption.
BTS Skytrain Sukhumvit Line (North section)
Bombardier
CITYFLO 450
2019
17.8
24
Greenfield STO Phaholyothin extension installation.
Buenos Aires Underground  
TBD
TBD
2019
11
26
TBD TBD
Panama Metro 2
Alstom
Urbalis
2019
21
21
Greenfield ATO
Sydney Metro Metro North West Line
Alstom
Urbalis 400
2019
37
22
Brownfield UTO
Gimpo Gimpo Goldline
Nippon Signal
SPARCS
2019
23.63
23
Greenfield UTO
Jakarta MRT North–south line
Nippon Signal
SPARCS
2019
20.1
16
Greenfield STO
Fuzhou Metro 2
Siemens
Trainguard MT CBTC
2019
30
31
greenfield STO
Singapore MRT Thomson–East Coast line
Alstom
Urbalis 400
2020
43
91
Greenfield UTO
BTS Skytrain Gold Line
Bombardier
CITYFLO 650
2020
1.7
3
Greenfield UTO
Suvarnabhumi Airport APM MNTB to SAT-1
Siemens
Trainguard MT CBTC
2020
1
6
Greenfield UTO
Fuzhou Metro Line 1 Extension
Siemens
Trainguard MT CBTC
2020
29
28
Brownfield STO
Bucharest Metro Line M5 Alstom Urbalis 400 2020 6.9 13 STO To be fully operational after the delivery of the 13 Alstom Metropolis BM4 trains.
Bay Area Rapid Transit Berryessa/North San José–Richmond line, Berryessa/North San José–Daly City line, Antioch–SFO + Millbrae line, Richmond–Millbrae + SFO line, Dublin/Pleasanton–Daly City line
Hitachi Rail STS
CBTC
2030
211.5
Brownfield STO
Bangkok MRT Pink, Yellow
Bombardier
CITYFLO 650
2021
64.9
72
Greenfield UTO
Hong Kong MTR East Rail line
Siemens
Trainguard MT CBTC
2021
41.5
37
Brownfield STO
Kuala Lumpur Metro (MRT) Line 12, Putrajaya Line
Bombardier
CITYFLO 650
2021
52.2
Greenfield UTO
London Underground Metropolitan, District, Circle, Hammersmith & City
Thales
SelTrac
2021 to 2022
310
192
Brownfield STO
Baselland Transport (BLT) Line 19 Waldenburgerbahn
Stadler
CBTC
2022
13.2
10
Greenfield STO
São Paulo Metro 17
Thales
SelTrac
2022
17.7
24
Greenfield UTO under construction
São Paulo Metro Line 6
Nippon Signal
SPARCS
2023
15
24
Greenfield UTO under construction
Tokyo Tokyo Metro Marunouchi Line[26]
Mitsubishi
? 2023
27.4
53
Brownfield ?
Tokyo Tokyo Metro Hibiya Line ? ?
2023
20.3
42
Brownfield ?
Seoul Sillim Line
LTran-CX
2023
7.8
?
?
?
JR West Wakayama Line ? ?
2023
42.5
? Brownfield ?
Kuala Lumpur Metro (LRT) Line 11, Shah Alam Line
Thales
SelTrac
2024
36
Brownfield UTO
Guangzhou Metro Line 4, Line 5
Siemens
Trainguard MT CBTC ?
70
?
Guangzhou Metro Line 9
Thales
SelTrac
2017
20.1
11
Greenfield DTO
Marmaray Lines Commuter Lines
Invensys
Sirius ?
77
? Greenfield STO
Tokyo Jōban Line[27]
Thales
SelTrac
-2017
30
70
Brownfield STO The plan was abandoned because of its technical and cost problems;[28] the control system was replaced by ATACS.[28]
Hong Kong MTR Kwun Tong line, Tsuen Wan line, Island line, Tung Chung line, Tseung Kwan O line, Airport Express
Alstom-Thales
Advanced SelTrac Unknown
158
Brownfield STO & DTO Delayed from the initial commissioning date of 2019 due to a train crash while testing.
Santiago Metro Line 1 Bombardier CBTC 2012 20.4 ? Brownfield ATO (GoA 3)
Santiago Metro Line 6, Line 3 Thales CBTC 2017, 2019 respectively 15.4, 21.7 respectively 37 Greenfield UTO
Ahmedabad MEGA Nippon Signal SPARCS ?
39.259
96 coaches(Rolling Stock)
? ?
Lahore Orange Line Alstom- Casco Urabliss888 2020 27 27 (CRRC) Greenfield ATO(GOA3)
Melbourne Cranbourne line, Pakenham line, Sunbury line Bombardier CITYFLO 650 2023 115.8 70 Brownfield


Notes and references edit

Notes edit

  1. ^ Only radio-based projects using the moving block principle are shown.
  2. ^ This is the number of four-car train sets available. The BMT Canarsie Line runs trains with eight cars.
  3. ^ This is the number of eleven-car train sets available. The IRT Flushing Line runs trains with eleven cars, though they are not all linked together; they are arranged in five- and six-car sets.
  4. ^ Work being done in phases; the main phase between 50th Street and Kew Gardens–Union Turnpike will be completed in 2022
  5. ^ Includes a 1.48 km "express bypass" where non-stopping express trains take a different route than stopping local trains.
  6. ^ This is the number of four- and five- car sets to be equipped with CBTC; they will be linked up in sets of 8 or 10 cars each.
  7. ^ Work being done in phases; the first phase between 59th and High Streets and be completed in 2024.

References edit

  1. ^ Busiest Subways.[1] 2018-12-26 at the Wayback Machine Matt Rosenberg for About.com, Part of the New York Times Company. Accessed July 2012.
  2. ^ a b 1474.1–1999 – IEEE Standard for Communications-Based Train Control (CBTC) Performance and Functional Requirements.[2] (Accessed at January 14, 2019).
  3. ^ Digital radio shows great potential for Rail [3] Bruno Gillaumin, International Railway Journal, May 2001. Retrieved by findarticles.com in June 2011.
  4. ^ (Press release). Bombardier Transportation. MarketWired. March 29, 2018. Archived from the original on January 22, 2019. Retrieved January 22, 2019.
  5. ^ CBTC Projects. [4] 2015-06-14 at the Wayback Machine www.tsd.org/cbtc/projects, 2005. Accessed June 2011.
  6. ^ a b CBTC radios: What to do? Which way to go? [5] 2011-07-28 at the Wayback Machine Tom Sullivan, 2005. www.tsd.org. Accessed May 2011.
  7. ^ a b . ERTMS USERS GROUP. 2014. Archived from the original on 2018-12-21. Retrieved 2018-12-21.
  8. ^ IEC 62290-1, Railway applications – Urban guided transport management and command/control systems – Part 1: System principles and fundamental concepts.[6] IEC, 2006. Accessed February 2014
  9. ^ CITYFLO 650 Metro de Madrid, Solving the capacity challenge.[7] 2012-03-30 at the Wayback Machine Bombardier Transportation Rail Control Solutions, 2010. Accessed June 2011
  10. ^ Madrid's silent revolution.[8] in International Railway Journal, Keith Barrow, 2010. Accessed through goliath.ecnext.com in June 2011
  11. ^ a b Semi-automatic, driverless, and unattended operation of trains.[9] 2010-11-19 at the Wayback Machine IRSE-ITC, 2010. Accessed through www.irse-itc.net in June 2011
  12. ^ CBTC: más trenes en hora punta.[10][permanent dead link] Comunidad de Madrid, www.madrig.org, 2010. Accessed June 2011
  13. ^ How CBTC can Increase capacity – communications-based train control. [11] William J. Moore, Railway Age, 2001. Accessed through findarticles.com in June 2011
  14. ^ ETRMS Level 3 Risks and Benefits to UK Railways, pg 19 Transport Research Laboratory. Accessed December 2011
  15. ^ ETRMS Level 3 Risks and Benefits to UK Railways, Table 5 Transport Research Laboratory. Accessed December 2011
  16. ^ ETRMS Level 3 Risks and Benefits to UK Railways, pg 18 Transport Research Laboratory. Accessed December 2011
  17. ^ a b CBTC World Congress Presentations, Stockholm, November 2011 Global Transport Forum. Accessed December 2011
  18. ^ Bombardier to Deliver Major London Underground Signalling.[16] Press release, Bombardier Transportation Media Center, 2011. Accessed June 2011
  19. ^ a b "Service Summary" (PDF). Toronto Transit Commission.
  20. ^ Stuart Green [@TTCStuart] (October 2, 2021). "This weekend's scheduled #TTC subway closure is now over and full service has resumed. Crews have completed the work on this phase of the new Automatic Train Control signaling system on Line 1. ATC now operating Vaughan MC to Eglinton" (Tweet) – via Twitter.
  21. ^ Fox, Chris (2019-04-05). "New signal system is three years behind schedule and $98M over budget: report". CP24. Retrieved 2019-04-10.
  22. ^ "Modernizing the signal system: 2017 subway closures". Toronto Transit Commission. January 18, 2017. Retrieved January 23, 2017. [video position 1:56]Trains will be able to operate as frequently as every 1 minute and 55 seconds instead of the current limit of two and a half minutes. [2:19]When installation is completed along the entire line in 2019, it will allow for as much as 25% more capacity. [2:33]ATC will come online on all of Line 1 in phases by the end of 2019 starting with the portion of Line 1 between Spadina and Wilson stations and with the Line 1 extension into York Region that opens at the end of this year.
  23. ^ Helsinki Metro automation ambitions are scaled back. Urban Rail News Railway Gazette International 2012
  24. ^ "Thales awarded signalling contract for new Salvador metro". Thales Group. 2014-03-24. Retrieved 2019-05-09.
  25. ^ a b Cheng, Kenneth (2017-04-12). "Full-day signalling tests on North-South Line to start on Sunday". TODAY Online. Retrieved 2022-05-22.
  26. ^ 三菱電機、東京メトロ丸ノ内線に列車制御システム向け無線装置を納入 (in Japanese), Mynavi Corporation [ja], February 22, 2018
  27. ^ Briginshaw, David (January 8, 2014). "JR East selects Thales to design first Japanese CBTC". hollandco.com. Holland. Retrieved January 9, 2014.
  28. ^ a b 首都圏のICT列車制御、JR東が海外方式導入を断念-国産「ATACS」推進 (in Japanese). Nikkan Kogyo Shimbun. Retrieved 12 January 2018.

Further reading edit

  • Argenia Railway Technologies SafeNet CBTC
  • Metro Rail Communication Network Simulation

communications, based, train, control, cbtc, redirects, here, other, uses, cbtc, disambiguation, cbtc, railway, signaling, system, that, uses, telecommunications, between, train, track, equipment, traffic, management, infrastructure, control, cbtc, allows, tra. CBTC redirects here For other uses see CBTC disambiguation Communications based train control CBTC is a railway signaling system that uses telecommunications between the train and track equipment for traffic management and infrastructure control CBTC allows a train s position to be known more accurately than with traditional signaling systems This makes railway traffic management safer and more efficient Metros and other railway systems are able to reduce headways while maintaining or even improving safety CBTC deployment in Madrid Metro Spain Santo Amaro station on Line 5 of the partially CBTC enabled Sao Paulo MetroSome of the top 30 world s busiest metros in terms of annual passenger rides 1 utilise a CBTC system A CBTC system is a continuous automatic train control system utilizing high resolution train location determination independent from track circuits continuous high capacity bidirectional train to wayside data communications and trainborne and wayside processors capable of implementing automatic train protection ATP functions as well as optional automatic train operation ATO and automatic train supervision ATS functions as defined in the IEEE 1474 standard 2 Contents 1 Background and origin 2 Main features 2 1 CBTC and moving block 2 2 Grades of automation 2 3 Main applications 2 4 Main benefits 2 5 Risks 3 Architecture 4 Projects 4 1 List 5 Notes and references 5 1 Notes 5 2 References 5 3 Further readingBackground and origin editThe main objective of CBTC is to increase track capacity by reducing the time interval headway between trains Traditional signalling systems detect trains in discrete sections of the track called blocks each protected by signals that prevent a train entering an occupied block Since every block is a fixed section of track these systems are referred to as fixed block systems In a moving block CBTC system the protected section for each train is a block that moves with and trails behind it and provides continuous communication of the train s exact position via radio inductive loop etc 3 nbsp The SFO AirTrain in San Francisco Airport was the first radio based CBTC system As a result Bombardier opened the world s first radio based CBTC system at San Francisco airport s automated people mover APM in February 2003 4 A few months later in June 2003 Alstom introduced the railway application of its radio technology on the Singapore North East line CBTC has its origins in the loop based systems developed by Alcatel SEL now Thales for the Bombardier Automated Rapid Transit ART systems in Canada during the mid 1980s These systems which were also referred to as transmission based train control TBTC made use of inductive loop transmission techniques for track to train communication introducing an alternative to track circuit based communication This technology operating in the 30 60 kHz frequency range to communicate trains and wayside equipment was widely adopted by the metro operators in spite of some electromagnetic compatibility EMC issues as well as other installation and maintenance concerns see SelTrac for further information regarding Transmission Based Train Control As with new application of any technology some problems arose at the beginning mainly due to compatibility and interoperability aspects 5 6 However there have been relevant improvements since then and currently the reliability of the radio based communication systems has grown significantly Moreover it is important to highlight that not all the systems using radio communication technology are considered to be CBTC systems So for clarity and to keep in line with the state of the art solutions for operator s requirements 6 this article only covers the latest moving block principle based either true moving block or virtual block so not dependent on track based detection of the trains 2 CBTC solutions that make use of the radio communications Main features editCBTC and moving block edit CBTC systems are modern railway signaling systems that can mainly be used in urban railway lines either light or heavy and APMs although it could also be deployed on commuter lines For main lines a similar system might be the European Railway Traffic Management System ERTMS Level 3 not yet fully defined when In the modern CBTC systems the trains continuously calculate and communicate their status via radio to the wayside equipment distributed along the line This status includes among other parameters the exact position speed travel direction and braking distance This information allows calculation of the area potentially occupied by the train on the track It also enables the wayside equipment to define the points on the line that must never be passed by the other trains on the same track These points are communicated to make the trains automatically and continuously adjust their speed while maintaining the safety and comfort jerk requirements So the trains continuously receive information regarding the distance to the preceding train and are then able to adjust their safety distance accordingly nbsp The safety distance safe braking distance between trains in fixed block and moving block signalling systems From the signalling system perspective the first figure shows the total occupancy of the leading train by including the whole blocks which the train is located on This is due to the fact that it is impossible for the system to know exactly where the train actually is within these blocks Therefore the fixed block system only allows the following train to move up to the last unoccupied block s border In a moving block system as shown in the second figure the train position and its braking curve is continuously calculated by the trains and then communicated via radio to the wayside equipment Thus the wayside equipment is able to establish protected areas each one called Limit of Movement Authority LMA up to the nearest obstacle in the figure the tail of the train in front Movement Authority MA is the permission for a train to move to a specific location within the constraints of the infrastructure and with supervision of speed 7 End of Authority is the location to which the train is permitted to proceed and where target speed is equal to zero End of Movement is the location to which the train is permitted to proceed according to an MA When transmitting an MA it is the end of the last section given in the MA 7 It is important to mention that the occupancy calculated in these systems must include a safety margin for location uncertainty in yellow in the figure added to the length of the train Both of them form what is usually called Footprint This safety margin depends on the accuracy of the odometry system in the train CBTC systems based on moving block allows the reduction of the safety distance between two consecutive trains This distance is varying according to the continuous updates of the train location and speed maintaining the safety requirements This results in a reduced headway between consecutive trains and an increased transport capacity Grades of automation edit Modern CBTC systems allow different levels of automation or Grades of Automation GoA as defined and classified in the IEC 62290 1 8 In fact CBTC is not a synonym for driverless or automated trains although it is considered as a basic enabler technology for this purpose There are four grades of automation available GoA 0 On sight with no automation GoA 1 Manual with a driver controlling all train operations GoA 2 Semi automatic Operation STO starting and stopping are automated but a driver who sits in the cab operates the doors and drives in emergencies GoA 3 Driverless Train Operation DTO starting and stopping are automated but a crew member operates the doors from within the train GoA 4 Unattended Train Operation UTO starting stopping and doors are all automated with no required crew member on board Main applications edit CBTC systems allow optimal use of the railway infrastructure as well as achieving maximum capacity and minimum headway between operating trains while maintaining the safety requirements These systems are suitable for the new highly demanding urban lines but also to be overlaid on existing lines in order to improve their performance 9 Of course in the case of upgrading existing lines the design installation test and commissioning stages are much more critical This is mainly due to the challenge of deploying the overlying system without disrupting the revenue service 10 Main benefits edit The evolution of the technology and the experience gained in operation over the last 30 years means that modern CBTC systems are more reliable and less prone to failure than older train control systems CBTC systems normally have less wayside equipment and their diagnostic and monitoring tools have been improved which makes them easier to implement and more importantly easier to maintain 11 CBTC technology is evolving making use of the latest techniques and components to offer more compact systems and simpler architectures For instance with the advent of modern electronics it has been possible to build in redundancy so that single failures do not adversely impact operational availability Moreover these systems offer complete flexibility in terms of operational schedules or timetables enabling urban rail operators to respond to the specific traffic demand more swiftly and efficiently and to solve traffic congestion problems In fact automatic operation systems have the potential to significantly reduce the headway and improve the traffic capacity compared to manual driving systems 12 13 Finally it is important to mention that the CBTC systems have proven to be more energy efficient than traditional manually driven systems 11 The use of new functionalities such as automatic driving strategies or a better adaptation of the transport offer to the actual demand allows significant energy savings reducing the power consumption Risks edit The primary risk of an electronic train control system is that if the communications link between any of the trains is disrupted then all or part of the system might have to enter a failsafe state until the problem is remedied Depending on the severity of the communication loss this state can range from vehicles temporarily reducing speed coming to a halt or operating in a degraded mode until communications are re established If communication outage is permanent some sort of contingency operation must be implemented which may consist of manual operation using absolute block or in the worst case the substitution of an alternative form of transportation 14 As a result high availability of CBTC systems is crucial for proper operation especially if such systems are used to increase transport capacity and reduce headway System redundancy and recovery mechanisms must then be thoroughly checked to achieve a high robustness in operation With the increased availability of the CBTC system there is also a need for extensive training and periodical refresh of system operators on the recovery procedures In fact one of the major system hazards in CBTC systems is the probability of human error and improper application of recovery procedures if the system becomes unavailable Communications failures can result from equipment malfunction electromagnetic interference weak signal strength or saturation of the communications medium 15 In this case an interruption can result in a service brake or emergency brake application as real time situational awareness is a critical safety requirement for CBTC and if these interruptions are frequent enough it could seriously impact service This is the reason why historically CBTC systems first implemented radio communication systems in 2003 when the required technology was mature enough for critical applications In systems with poor line of sight or spectrum bandwidth limitations a larger than anticipated number of transponders may be required to enhance the service This is usually more of an issue with applying CBTC to existing transit systems in tunnels that were not designed from the outset to support it An alternate method to improve system availability in tunnels is the use of leaky feeder cable that while having higher initial costs material installation achieves a more reliable radio link With the emerging services over open ISM radio bands i e 2 4 GHz and 5 8 GHz and the potential disruption over critical CBTC services there is an increasing pressure in the international community ref report 676 of UITP organization Reservation of a Frequency Spectrum for Critical Safety Applications dedicated to Urban Rail Systems to reserve a frequency band specifically for radio based urban rail systems Such decision would help standardize CBTC systems across the market a growing demand from most operators and ensure availability for those critical systems As a CBTC system is required to have high availability and particularly allow for a graceful degradation a secondary method of signaling might be provided to ensure some level of non degraded service upon partial or complete CBTC unavailability 16 This is particularly relevant for brownfield implementations lines with an already existing signalling system where the infrastructure design cannot be controlled and coexistence with legacy systems is required at least temporarily 17 For example the New York City Canarsie Line was outfitted with a backup automatic block signaling system capable of supporting 12 trains per hour tph compared with the 26 tph of the CBTC system Although this is a rather common architecture for resignalling projects it can negate some of the cost savings of CBTC if applied to new lines This is still a key point in the CBTC development and is still being discussed since some providers and operators argue that a fully redundant architecture of the CBTC system may however achieve high availability values by itself 17 In principle CBTC systems may be designed with centralized supervision systems in order to improve maintainability and reduce installation costs If so there is an increased risk of a single point of failure that could disrupt service over an entire system or line Fixed block systems usually work with distributed logic that are normally more resistant to such outages Therefore a careful analysis of the benefits and risks of a given CBTC architecture centralized vs distributed must be done during system design When CBTC is applied to systems that previously ran under complete human control with operators working on sight it may actually result in a reduction in capacity albeit with an increase in safety This is because CBTC operates with less positional certainty than human sight and also with greater margins for error as worst case train parameters are applied for the design e g guaranteed emergency brake rate vs nominal brake rate For instance CBTC introduction in Philly s Center City trolley tunnel resulted initially in a marked increase in travel time and corresponding decrease in capacity when compared with the unprotected manual driving This was the offset to finally eradicate vehicle collisions which on sight driving cannot avoid and showcases the usual conflicts between operation and safety Architecture edit nbsp The architecture of a CBTC system The typical architecture of a modern CBTC system comprises the following main subsystems Wayside equipment which includes the interlocking and the subsystems controlling every zone in the line or network typically containing the wayside ATP and ATO functionalities Depending on the suppliers the architectures may be centralized or distributed The control of the system is performed from a central command ATS though local control subsystems may be also included as a fallback CBTC onboard equipment including ATP and ATO subsystems in the vehicles Train to wayside communication subsystem currently based on radio links Thus although a CBTC architecture is always depending on the supplier and its technical approach the following logical components may be found generally in a typical CBTC architecture Onboard ATP system This subsystem is in charge of the continuous control of the train speed according to the safety profile and applying the brake if it is necessary It is also in charge of the communication with the wayside ATP subsystem in order to exchange the information needed for a safe operation sending speed and braking distance and receiving the limit of movement authority for a safe operation Onboard ATO system It is responsible for the automatic control of the traction and braking effort in order to keep the train under the threshold established by the ATP subsystem Its main task is either to facilitate the driver or attendant functions or even to operate the train in a fully automatic mode while maintaining the traffic regulation targets and passenger comfort It also allows the selection of different automatic driving strategies to adapt the runtime or even reduce the power consumption Wayside ATP system This subsystem undertakes the management of all the communications with the trains in its area Additionally it calculates the limits of movement authority that every train must respect while operating in the mentioned area This task is therefore critical for the operation safety Wayside ATO system It is in charge of controlling the destination and regulation targets of every train The wayside ATO functionality provides all the trains in the system with their destination as well as with other data such as the dwell time in the stations Additionally it may also perform auxiliary and non safety related tasks including for instance alarm event communication and management or handling skip hold station commands Communication system The CBTC systems integrate a digital networked radio system by means of antennas or leaky feeder cable for the bi directional communication between the track equipment and the trains The 2 4GHz band is commonly used in these systems same as WiFi though other alternative frequencies such as 900 MHz US 5 8 GHz or other licensed bands may be used as well ATS system The ATS system is commonly integrated within most of the CBTC solutions Its main task is to act as the interface between the operator and the system managing the traffic according to the specific regulation criteria Other tasks may include the event and alarm management as well as acting as the interface with external systems Interlocking system When needed as an independent subsystem for instance as a fallback system it will be in charge of the vital control of the trackside objects such as switches or signals as well as other related functionality In the case of simpler networks or lines the functionality of the interlocking may be integrated into the wayside ATP system Projects editCBTC technology has been and is being successfully implemented for a variety of applications as shown in the figure below mid 2011 They range from some implementations with short track limited numbers of vehicles and few operating modes such as the airport APMs in San Francisco or Washington to complex overlays on existing railway networks carrying more than a million passengers each day and with more than 100 trains such as lines 1 and 6 in Madrid Metro line 3 in Shenzhen Metro some lines in Paris Metro New York City Subway and Beijing Subway or the Sub Surface network in London Underground 18 nbsp Radio based CBTC moving block projects around the world Projects are classified with colours depending on the supplier those underlined are already into CBTC operation note 1 Despite the difficulty the table below tries to summarize and reference the main radio based CBTC systems deployed around the world as well as those ongoing projects being developed Besides the table distinguishes between the implementations performed over existing and operative systems brownfield and those undertaken on completely new lines Greenfield List edit This section needs to be updated Please help update this article to reflect recent events or newly available information July 2018 This list is sortable and is initially sorted by year Click on the nbsp icon on the right side of the column header to change sort key and sort order Location System Lines Supplier Solution Commissioning km No of trains Type of Field Grade of Automation Notes Toronto Subway 3 Thales SelTrac 1985 6 4 7 Greenfield UTO With train attendants who monitor door status and drive trains in the event of a disruption SkyTrain Vancouver Expo Line Millennium Line Canada Line Thales SelTrac 1986 85 4 20 Greenfield UTO Detroit Detroit People Mover Thales SelTrac 1987 4 7 12 Greenfield UTO London Docklands Light Railway Thales SelTrac 1987 38 149 Greenfield DTO San Francisco Airport AirTrain Bombardier CITYFLO 650 2003 5 38 Greenfield UTO Seattle Tacoma Airport Satellite Transit System Bombardier CITYFLO 650 2003 3 22 Brownfield UTO Singapore MRT North East line Alstom Urbalis 300 2003 20 43 Greenfield UTO with train attendants Train captains who drive trains in the event of a disruption Hong Kong MTR Tuen Ma line Thales SelTrac 2020 Tuen Ma Line Phase 1 2021 Tuen Ma Line and former West Rail Line 57 65 Greenfield Tai Wai to Hung Hom section only Brownfield other sections STO Existing sections were upgraded from SelTrac IS Las Vegas Monorail Thales SelTrac 2004 6 36 Greenfield UTO Wuhan Metro 1 Thales SelTrac 2004 27 32 Greenfield STO Dallas Fort Worth Airport DFW Skylink Bombardier CITYFLO 650 2005 10 64 Greenfield UTO Hong Kong MTR Disneyland Resort line Thales SelTrac 2005 3 3 Greenfield UTO Lausanne Metro M2 Alstom Urbalis 300 2008 6 18 Greenfield UTO London Heathrow Airport Heathrow APM Bombardier CITYFLO 650 2008 1 9 Greenfield UTO Madrid Metro nbsp nbsp nbsp Bombardier CITYFLO 650 2008 48 143 Brownfield STO McCarran Airport McCarran Airport APM Bombardier CITYFLO 650 2008 2 10 Brownfield UTO BTS Skytrain Silom Line Sukhumvit Line North section Bombardier CITYFLO 450 2009 16 7 47 Brownfield original line Greenfield Taksin extension STO with train attendants who drive trains in the event of a disruption These train attendants are on standby in the train Barcelona Metro nbsp nbsp nbsp Siemens Trainguard MT CBTC 2009 46 50 Greenfield UTO Beijing Subway 4 Thales SelTrac 2009 29 40 Greenfield STO New York City Subway BMT Canarsie Line IRT Flushing Line Siemens Trainguard MT CBTC 2009 17 69 note 2 Brownfield STO Shanghai Metro 6 7 8 9 11 Thales SelTrac 2009 238 267 Greenfield and Brownfield STO Singapore MRT Circle line Alstom Urbalis 300 2009 35 64 Greenfield UTO with train attendants Rovers who drive trains in the event of a disruption These train attendants are also on standby between Botanic Gardens and Caldecott stations Taipei Metro Neihu Mucha Bombardier CITYFLO 650 2009 26 76 Greenfield and Brownfield UTO Washington Dulles Airport Dulles APM Thales SelTrac 2009 8 29 Greenfield UTO Beijing Subway Daxing Line Thales SelTrac 2010 22 Greenfield STO Beijing Subway 15 Nippon Signal SPARCS 2010 41 4 28 Greenfield ATO Guangzhou Metro Zhujiang New Town APM Bombardier CITYFLO 650 2010 4 19 Greenfield DTO Guangzhou Metro 3 Thales SelTrac 2010 67 40 Greenfield DTO Sao Paulo Metro 1 2 3 Alstom Urbalis 2010 62 142 Greenfield and Brownfield UTO CBTC operates in Lines 1 and 2 and it is being installed in Line 3 Sao Paulo Metro 4 Siemens Trainguard MT CBTC 2010 13 29 Greenfield UTO First UTO line in Latin America London Underground Jubilee line Thales SelTrac 2010 37 63 Brownfield STO London Gatwick Airport Shuttle Transit APM Bombardier CITYFLO 650 2010 1 6 Brownfield UTO Milan Metro 1 Alstom Urbalis 2010 27 68 Brownfield STO Philadelphia SEPTA SEPTA subway surface trolley lines Bombardier CITYFLO 650 2010 8 115 STO Shenyang Metro 1 Ansaldo STS CBTC 2010 27 23 Greenfield STO B amp G Metro Busan Gimhae Light Rail Transit Thales SelTrac 2011 23 5 25 Greenfield UTO BTS Skytrain Sukhumvit Line East section Bombardier CITYFLO 450 2011 14 35 Brownfield original line Greenfield On Nut extension STO with train attendants who drive trains in the event of a disruption These train attendants are on standby in the train Dubai Metro Red Green Thales SelTrac 2011 70 85 Greenfield UTO Madrid Metro nbsp nbsp Extension MetroEste Invensys Sirius 2011 9 Brownfield STO Paris Metro 1 Siemens Trainguard MT CBTC 2011 16 53 Brownfield DTO Sacramento International Airport Sacramento APM Bombardier CITYFLO 650 2011 1 2 Greenfield UTO Shenzhen Metro 3 Bombardier CITYFLO 650 2011 42 43 STO Shenzhen Metro 2 5 Alstom Urbalis 888 2010 2011 76 65 Greenfield STO Shenyang Metro 2 Ansaldo STS CBTC 2011 21 5 20 Greenfield STO Xian Metro 2 Ansaldo STS CBTC 2011 26 6 22 Greenfield STO Yongin EverLine Bombardier CITYFLO 650 2011 19 30 UTO Algiers Metro 1 Siemens Trainguard MT CBTC 2012 9 14 Greenfield STO Chongqing Metro 1 6 Siemens Trainguard MT CBTC 2011 2012 94 80 Greenfield STO Guangzhou Metro 6 Alstom Urbalis 888 2012 24 27 Greenfield ATO Istanbul Metro M4 Thales SelTrac 2012 21 7 Greenfield M5 Bombardier CityFLO 650 Phase 1 2017 Phase 2 2018 16 9 21 Greenfield UTO Ankara Metro M1 Ansaldo STS CBTC 2018 14 6 Brownfield STO M2 Ansaldo STS CBTC 2014 16 5 Greenfield STO M3 Ansaldo STS CBTC 2014 15 5 Greenfield STO M4 Ansaldo STS CBTC 2017 9 2 Greenfield STO Mexico City Metro nbsp Alstom Urbalis 2012 25 30 Greenfield STO nbsp Siemens Trainguard MT CBTC 2022 2024 18 39 Brownfield DTO New York City Subway IND Culver Line Thales amp Siemens Various 2012 Greenfield A test track was retrofitted in 2012 the line s other tracks will be retrofitted by the early 2020s Phoenix Sky Harbor Airport PHX Sky Train Bombardier CITYFLO 650 2012 3 18 Greenfield UTO Riyadh KAFD Monorail Bombardier CITYFLO 650 2012 4 12 Greenfield UTO Metro Santiago 1 Alstom Urbalis 2016 20 42 Greenfield and Brownfield DTO Sao Paulo Commuter Lines 8 10 11 Invensys Sirius 2012 107 136 Brownfield UTO Tianjin Metro 2 3 Bombardier CITYFLO 650 2012 52 40 STO Beijing Subway 8 10 Siemens Trainguard MT CBTC 2013 84 150 STO Caracas Metro 1 Invensys Sirius 2013 21 48 Brownfield Kunming Metro 1 2 Alstom Urbalis 888 2013 42 38 Greenfield ATO Malaga Metro nbsp nbsp nbsp Alstom Urbalis 2013 17 15 Greenfield ATO Paris Metro 3 5 Ansaldo STS Siemens Inside RATP sOuragan project 2010 2013 26 40 Brownfield STO Paris Metro 13 Thales SelTrac 2013 23 66 Brownfield STO Toronto subway 1 Alstom Urbalis 400 2017 to 2022 76 78 19 65 19 Brownfield Finch to Sheppard West Greenfield Sheppard West to Vaughan STO CBTC active between Vaughan Metropolitan Centre and Eglinton stations as of October 2021 20 The entire line is scheduled to be fully upgraded by 2022 21 22 Wuhan Metro 2 4 Alstom Urbalis 888 2013 60 45 Greenfield STO Singapore MRT Downtown line Invensys Sirius 2013 42 92 Greenfield UTO with train attendants who drive trains in the event of a disruption Budapest Metro M2 M4 Siemens Trainguard MT CBTC 2013 M2 2014 M4 17 41 Line M2 STO Line M4 UTO Dubai Metro Al Sufouh LRT Alstom Urbalis 2014 10 11 Greenfield STO Edmonton Light Rail Transit Capital Line Metro Line Thales SelTrac 2014 24 double track 94 Brownfield DTO Helsinki Metro 1 Siemens Trainguard MT CBTC 2014 35 45 5 Greenfield and Brownfield STO 23 Hong Kong MTR Hong Kong APM Thales SelTrac 2014 4 14 Brownfield UTO Incheon Subway 2 Thales SelTrac 2014 29 37 Greenfield UTO Jeddah Airport King Abdulaziz APM Bombardier CITYFLO 650 2014 2 6 Greenfield UTO London Underground Northern line Thales SelTrac 2014 58 106 Brownfield STO Salvador Metro 4 Thales 24 SelTrac 2014 33 29 Greenfield DTO Massachusetts Bay Transportation Authority Ashmont Mattapan High Speed Line Argenia SafeNet CBTC 2014 6 12 Greenfield STO Munich Airport Munich Airport T2 APM Bombardier CITYFLO 650 2014 1 12 Greenfield UTO Nanjing Metro Nanjing Airport Rail Link Thales SelTrac 2014 36 15 Greenfield STO Shinbundang Line Dx Line Thales SelTrac 2014 30 5 12 Greenfield UTO Ningbo Metro 1 Alstom Urbalis 888 2014 21 22 Greenfield ATO Panama Metro 1 Alstom Urbalis 2014 13 7 17 Greenfield ATO Sao Paulo Metro 15 Bombardier CITYFLO 650 2014 14 27 Greenfield UTO Shenzhen Metro 9 Thales Saic Transport SelTrac 2014 25 38 Greenfield Xian Metro 1 Siemens Trainguard MT CBTC 2013 2014 25 4 80 Greenfield STO Amsterdam Metro 50 51 52 53 54 Alstom Urbalis 2015 62 85 Greenfield and Brownfield STO Beijing Subway 1 2 6 9 Fangshan Line Airport Express Alstom Urbalis 888 From 2008 to 2015 159 240 Brownfield and Greenfield STO and DTO BTS Skytrain Sukhumvit Line East section Bombardier CITYFLO 450 2015 1 7 Greenfield STO Samrong extension installation Chengdu Metro L4 L7 Alstom Urbalis 2015 22 4 Greenfield ATO Delhi Metro Line 7 Line 9 Bombardier CITYFLO 650 2018 Temp Driver on Board 2021 Full ATO Operations 55 Nanjing Metro 2 3 10 12 Siemens Trainguard MT CBTC From 2010 to 2015 137 140 Greenfield Sao Paulo Metro 5 Bombardier CITYFLO 650 2015 20 34 Brownfield amp Greenfield UTO Shanghai Metro 10 12 13 16 Alstom Urbalis 888 From 2010 to 2015 120 152 Greenfield UTO and STO Taipei Metro Circular Ansaldo STS CBTC 2015 15 17 Greenfield UTO Wuxi Metro 1 2 Alstom Urbalis 2015 58 46 Greenfield STO Philadelphia SEPTA SEPTA Routes 101 and 102 Ansaldo STS CBTC 2015 19 2 29 STO Bangkok MRT Purple Line Bombardier CITYFLO 650 2015 23 21 Greenfield STO with train attendants who drive trains in the event of a disruption These train attendants are on standby in the train Buenos Aires Underground nbsp Siemens Trainguard MT CBTC 2016 8 20 Buenos Aires Underground nbsp Siemens Trainguard MT CBTC 2016 4 5 18 TBD TBD Hong Kong MTR South Island line Alstom Urbalis 400 2016 7 10 Greenfield UTO Hyderabad Metro Rail L1 L2 L3 Thales SelTrac 2016 72 57 Greenfield STO Kochi Metro L1 Alstom Urbalis 400 2016 26 25 Greenfield ATO New York City Subway IRT Flushing Line Thales SelTrac 2016 17 46 note 3 Brownfield and Greenfield STO Kuala Lumpur Metro LRT Line 3 amp 4 Ampang and Sri Petaling lines Thales SelTrac 2016 45 1 50 Brownfield UTO Kuala Lumpur Metro LRT Line 5 Kelana Jaya Line Thales SelTrac 2016 46 4 76 Brownfield UTO Walt Disney World Walt Disney World Monorail System Thales SelTrac 2016 22 15 Brownfield UTO Fuzhou Metro 1 Siemens Trainguard MT CBTC 2016 24 28 Greenfield STO Kuala Lumpur Metro MRT Line 9 Kajang Line Bombardier CITYFLO 650 2017 51 74 Greenfield UTO Delhi Metro LIne 8 Nippon Signal SPARCS 2017 Temp Driver on Board 2021 Full ATO Operations Greenfeild UTO Lille Metro 1 Alstom Urbalis 2017 15 27 Brownfield UTO Lucknow Metro L1 Alstom Urbalis 2017 23 20 Greenfield ATO New York City Subway IND Queens Boulevard Line Siemens Thales Trainguard MT CBTC 2017 2022 note 4 21 9 note 5 309 note 6 Brownfield ATO Train conductors will be located aboard the train because other parts of the routes using the Queens Boulevard Line will not be equipped with CBTC Stockholm Metro Red line Ansaldo STS CBTC 2017 41 30 Brownfield STO gt UTO Taichung Metro Green Alstom Urbalis 2017 18 29 Greenfield UTO Singapore MRT North South line Thales SelTrac 2017 45 3 198 Brownfield UTO 25 with train attendants Train Captains who drive trains in the event of a disruption These train attendants are on standby in the train BTS Skytrain Sukhumvit Line East section Bombardier CITYFLO 450 2018 11 Greenfield STO Samut Prakarn extension installation Singapore MRT East West line Thales SelTrac 2018 57 2 198 Brownfield original line Greenfield Tuas West Extension only UTO 25 with train attendants who drive trains in the event of a disruption These train attendants are on standby in the train Copenhagen S Train All lines Siemens Trainguard MT CBTC 2021 170 136 Brownfield STO Doha Metro L1 Thales SelTrac 2018 33 35 Greenfield ATO New York City Subway IND Eighth Avenue Line Siemens Thales Trainguard MT CBTC 2018 2024 note 7 9 3 Brownfield ATO Train conductors will be located aboard the train because other parts of the routes using the Eighth Avenue Line will not be equipped with CBTC Ottawa Light Rail Confederation Line Thales SelTrac 2018 12 5 34 Greenfield STO Port Authority Trans Hudson PATH All lines Siemens Trainguard MT CBTC 2018 22 2 50 Brownfield ATO Rennes ART B Siemens Trainguard MT CBTC 2018 12 19 Greenfield UTO Riyadh Metro L4 L5 and L6 Alstom Urbalis 2018 64 69 Greenfield ATO Sosawonsi Co Gyeonggi do Seohae Line Siemens Trainguard MT CBTC 2018 23 3 7 Greenfield ATO Bangkok MRT Blue Line Siemens Trainguard MT CBTC 2019 47 54 Brownfield amp Greenfield STO with train attendants who drive trains in the event of a disruption BTS Skytrain Sukhumvit Line North section Bombardier CITYFLO 450 2019 17 8 24 Greenfield STO Phaholyothin extension installation Buenos Aires Underground nbsp TBD TBD 2019 11 26 TBD TBD Panama Metro 2 Alstom Urbalis 2019 21 21 Greenfield ATO Sydney Metro Metro North West Line Alstom Urbalis 400 2019 37 22 Brownfield UTO Gimpo Gimpo Goldline Nippon Signal SPARCS 2019 23 63 23 Greenfield UTO Jakarta MRT North south line Nippon Signal SPARCS 2019 20 1 16 Greenfield STO Fuzhou Metro 2 Siemens Trainguard MT CBTC 2019 30 31 greenfield STO Singapore MRT Thomson East Coast line Alstom Urbalis 400 2020 43 91 Greenfield UTO BTS Skytrain Gold Line Bombardier CITYFLO 650 2020 1 7 3 Greenfield UTO Suvarnabhumi Airport APM MNTB to SAT 1 Siemens Trainguard MT CBTC 2020 1 6 Greenfield UTO Fuzhou Metro Line 1 Extension Siemens Trainguard MT CBTC 2020 29 28 Brownfield STO Bucharest Metro Line M5 Alstom Urbalis 400 2020 6 9 13 STO To be fully operational after the delivery of the 13 Alstom Metropolis BM4 trains Bay Area Rapid Transit Berryessa North San Jose Richmond line Berryessa North San Jose Daly City line Antioch SFO Millbrae line Richmond Millbrae SFO line Dublin Pleasanton Daly City line Hitachi Rail STS CBTC 2030 211 5 Brownfield STO Bangkok MRT Pink Yellow Bombardier CITYFLO 650 2021 64 9 72 Greenfield UTO Hong Kong MTR East Rail line Siemens Trainguard MT CBTC 2021 41 5 37 Brownfield STO Kuala Lumpur Metro MRT Line 12 Putrajaya Line Bombardier CITYFLO 650 2021 52 2 Greenfield UTO London Underground Metropolitan District Circle Hammersmith amp City Thales SelTrac 2021 to 2022 310 192 Brownfield STO Baselland Transport BLT Line 19 Waldenburgerbahn Stadler CBTC 2022 13 2 10 Greenfield STO Sao Paulo Metro 17 Thales SelTrac 2022 17 7 24 Greenfield UTO under construction Sao Paulo Metro Line 6 Nippon Signal SPARCS 2023 15 24 Greenfield UTO under construction Tokyo Tokyo Metro Marunouchi Line 26 Mitsubishi 2023 27 4 53 Brownfield Tokyo Tokyo Metro Hibiya Line 2023 20 3 42 Brownfield Seoul Sillim Line LS ELECTRIC LTran CX 2023 7 8 JR West Wakayama Line 2023 42 5 Brownfield Kuala Lumpur Metro LRT Line 11 Shah Alam Line Thales SelTrac 2024 36 Brownfield UTO Guangzhou Metro Line 4 Line 5 Siemens Trainguard MT CBTC 70 Guangzhou Metro Line 9 Thales SelTrac 2017 20 1 11 Greenfield DTO Marmaray Lines Commuter Lines Invensys Sirius 77 Greenfield STO Tokyo Jōban Line 27 Thales SelTrac 2017 30 70 Brownfield STO The plan was abandoned because of its technical and cost problems 28 the control system was replaced by ATACS 28 Hong Kong MTR Kwun Tong line Tsuen Wan line Island line Tung Chung line Tseung Kwan O line Airport Express Alstom Thales Advanced SelTrac Unknown 158 Brownfield STO amp DTO Delayed from the initial commissioning date of 2019 due to a train crash while testing Santiago Metro Line 1 Bombardier CBTC 2012 20 4 Brownfield ATO GoA 3 Santiago Metro Line 6 Line 3 Thales CBTC 2017 2019 respectively 15 4 21 7 respectively 37 Greenfield UTO Ahmedabad MEGA Nippon Signal SPARCS 39 259 96 coaches Rolling Stock Lahore Orange Line Alstom Casco Urabliss888 2020 27 27 CRRC Greenfield ATO GOA3 Melbourne Cranbourne line Pakenham line Sunbury line Bombardier CITYFLO 650 2023 115 8 70 BrownfieldNotes and references editNotes edit Only radio based projects using the moving block principle are shown This is the number of four car train sets available The BMT Canarsie Line runs trains with eight cars This is the number of eleven car train sets available The IRT Flushing Line runs trains with eleven cars though they are not all linked together they are arranged in five and six car sets Work being done in phases the main phase between 50th Street and Kew Gardens Union Turnpike will be completed in 2022 Includes a 1 48 km express bypass where non stopping express trains take a different route than stopping local trains This is the number of four and five car sets to be equipped with CBTC they will be linked up in sets of 8 or 10 cars each Work being done in phases the first phase between 59th and High Streets and be completed in 2024 References edit Busiest Subways 1 Archived 2018 12 26 at the Wayback Machine Matt Rosenberg for About com Part of the New York Times Company Accessed July 2012 a b 1474 1 1999 IEEE Standard for Communications Based Train Control CBTC Performance and Functional Requirements 2 Accessed at January 14 2019 Digital radio shows great potential for Rail 3 Bruno Gillaumin International Railway Journal May 2001 Retrieved by findarticles com in June 2011 Bombardier Marks 15th Anniversary of Its World First Radio Based Driverless Rail Control System Press release Bombardier Transportation MarketWired March 29 2018 Archived from the original on January 22 2019 Retrieved January 22 2019 CBTC Projects 4 Archived 2015 06 14 at the Wayback Machine www tsd org cbtc projects 2005 Accessed June 2011 a b CBTC radios What to do Which way to go 5 Archived 2011 07 28 at the Wayback Machine Tom Sullivan 2005 www tsd org Accessed May 2011 a b Subset 023 ERTMS ETCS Glossary of Terms and Abbreviations ERTMS USERS GROUP 2014 Archived from the original on 2018 12 21 Retrieved 2018 12 21 IEC 62290 1 Railway applications Urban guided transport management and command control systems Part 1 System principles and fundamental concepts 6 IEC 2006 Accessed February 2014 CITYFLO 650 Metro de Madrid Solving the capacity challenge 7 Archived 2012 03 30 at the Wayback Machine Bombardier Transportation Rail Control Solutions 2010 Accessed June 2011 Madrid s silent revolution 8 in International Railway Journal Keith Barrow 2010 Accessed through goliath ecnext com in June 2011 a b Semi automatic driverless and unattended operation of trains 9 Archived 2010 11 19 at the Wayback Machine IRSE ITC 2010 Accessed through www irse itc net in June 2011 CBTC mas trenes en hora punta 10 permanent dead link Comunidad de Madrid www madrig org 2010 Accessed June 2011 How CBTC can Increase capacity communications based train control 11 William J Moore Railway Age 2001 Accessed through findarticles com in June 2011 ETRMS Level 3 Risks and Benefits to UK Railways pg 19 12 Transport Research Laboratory Accessed December 2011 ETRMS Level 3 Risks and Benefits to UK Railways Table 5 13 Transport Research Laboratory Accessed December 2011 ETRMS Level 3 Risks and Benefits to UK Railways pg 18 14 Transport Research Laboratory Accessed December 2011 a b CBTC World Congress Presentations Stockholm November 2011 15 Global Transport Forum Accessed December 2011 Bombardier to Deliver Major London Underground Signalling 16 Press release Bombardier Transportation Media Center 2011 Accessed June 2011 a b Service Summary PDF Toronto Transit Commission Stuart Green TTCStuart October 2 2021 This weekend s scheduled TTC subway closure is now over and full service has resumed Crews have completed the work on this phase of the new Automatic Train Control signaling system on Line 1 ATC now operating Vaughan MC to Eglinton Tweet via Twitter Fox Chris 2019 04 05 New signal system is three years behind schedule and 98M over budget report CP24 Retrieved 2019 04 10 Modernizing the signal system 2017 subway closures Toronto Transit Commission January 18 2017 Retrieved January 23 2017 video position 1 56 Trains will be able to operate as frequently as every 1 minute and 55 seconds instead of the current limit of two and a half minutes 2 19 When installation is completed along the entire line in 2019 it will allow for as much as 25 more capacity 2 33 ATC will come online on all of Line 1 in phases by the end of 2019 starting with the portion of Line 1 between Spadina and Wilson stations and with the Line 1 extension into York Region that opens at the end of this year Helsinki Metro automation ambitions are scaled back Urban Rail News Railway Gazette International 2012 Thales awarded signalling contract for new Salvador metro Thales Group 2014 03 24 Retrieved 2019 05 09 a b Cheng Kenneth 2017 04 12 Full day signalling tests on North South Line to start on Sunday TODAY Online Retrieved 2022 05 22 三菱電機 東京メトロ丸ノ内線に列車制御システム向け無線装置を納入 in Japanese Mynavi Corporation ja February 22 2018 Briginshaw David January 8 2014 JR East selects Thales to design first Japanese CBTC hollandco com Holland Retrieved January 9 2014 a b 首都圏のICT列車制御 JR東が海外方式導入を断念 国産 ATACS 推進 in Japanese Nikkan Kogyo Shimbun Retrieved 12 January 2018 Further reading edit Argenia Railway Technologies SafeNet CBTC Thales SelTrac R CBTC Metro Rail Communication Network Simulation Retrieved from https en wikipedia org w index php title Communications based train control amp oldid 1210662275, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.