The Chengdu Metro is the rapid transit system of Chengdu, the capital of Sichuan, China. With the opening of Line 1 on 27 September 2010, the system consists of 12 subway lines and 1 light rail line. It has subsequently undergone rapid expansion. Since the opening of Lines 6, 8, 9, and 17 on 18 December 2020, the Chengdu Metro is the 4th longest metro system in the world.

Chengdu Metro
Overview
OwnerCity of Chengdu
LocaleChengdu, Sichuan, China
Transit typeRapid transit
Number of lines13[1]
Number of stations373[1]
Daily ridership3.1713 million (2018 Avg.)[2]
7.1737 million (2021 Peak)[3]
Annual ridership1800 million (2021)[4]
Websitewww.chengdurail.com
Operation
Began operation27 September 2010; 12 years ago (2010-09-27)
(10 September 2010; 12 years ago (2010-09-10) Public Trial)
Operator(s)Chengdu Rail Transit Group
Technical
System length518.5 km (322.2 mi)[5] (excluding Chengdu Tram)
557.8 km (346.6 mi)[6][1] (including Chengdu Tram)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
ElectrificationOverhead line1,500 V DC[a] and 25 kV 50 Hz AC[b]
System map

There are currently 12 operating subway lines totaling 518.5 km (322.2 mi)[5] of track, and 1 tram line (Line T2). The Chengdu Metro serves over 8 million trips per day.[7] As of 2021, about 2.2 million and 4.6 million people live within 500 and 800 metres (1,640 and 2,625 ft) of a subway station in Chengdu, respectively.[3]

Operating network

There are 12 subway lines operating currently, covering 518.5 km (322.2 mi)[5] with 337 stations and a light rail line with 36 stop (Line T2) operating, covering 39.3 km (24.4 mi).

 
Chengdu Metro Network
Map of Chengdu Metro            
  •  
Line Terminals
(District/County)
Commencement Newest
Extension
Length
km
Stations
1 Weijianian
(Jinniu)
Science City
(Shuangliu)
2010 2018 40.99 35
Wugensong
(Shuangliu)
2 Xipu
(Pidu)
Longquanyi
(Longquanyi)
2012 2014 42.32 32
3 Chengdu Medical College
(Xindu)
Shuangliu West Station
(Shuangliu)
2016 2018 49.89 37
4 Wansheng
(Wenjiang)
Xihe
(Longquanyi)
2015 2017 43.28 30
5 Huagui Road
(Xindu)
Huilong
(Shuangliu)
2019 49.02[8] 41
6 Wangcong Temple
(Pidu)
Lanjiagou
(Shuangliu)
2020 68.88 56
7
loop line
Cuijiadian
(Chenghua)
Cuijiadian
(Chenghua)
2017 38.61 31
8 Shilidian
(Chenghua)
Lianhua
(Shuangliu)
2020 29.1 25
9 Financial City East
(Jinjiang)
Huangtianba
(Qingyang)
2020 22.18 13
10 Taipingyuan
(Wuhou)
Xinping
(Xinjin)
2017 2019 37.972 16
17 Jinxing
(Wenjiang)
Jitouqiao
(Wuhou)
2020 26.15 9
18 South Railway Station
(Wuhou)
Tianfu International Airport North
(Jianyang)
2020 69.39[9] 10
Total 518 335

Line 1

The first phase of Line 1 cost 7 billion yuan to construct.[10] A natural ventilation system has been used in the underground section of Line 1 on the subway system from Southern Third Ring Road to Jincheng Plaza Station. Square ventilation units are built every 30 m (98 ft 5 in) along the subway top to allow fresh air from the ground enter the construction site underground. The method is used in subway construction in other countries as it cuts the construction cost and it saves energy. The subway system is the first in China to adopt such a ventilation system during construction. Chengdu Metro is planning to set up a section for subway fire control and introduce the latest fire fighting technologies and vehicles. Line 1's color is dark blue.[11]

Line 2

 

Line 2 is a crosstown northwest–southeast trunk route. This line serves the Chengdu East railway station. Line 2 began operation on 16 September 2012. An 11 km (6.8 mi) long mostly elevated extension to Longquanyi began testing in April 2014 opened in October 2014. It total it is currently 42.32 km (26.30 mi) long. Line 2's color is orange.[12]

Line 3

 

Line 3 runs in a northeast–southwest direction from Chengdu Medical College to Shuangliu West Station. The total length is 49.85 km (30.98 mi). Phase 1 of this line began construction on 28 April 2012, and opened on 31 July 2016. It was Chengdu's final line to use the lower capacity type B trains, subsequent lines favoring the longer and wider Type A cars. Line 3's color is magenta.

Line 4

Line 4 is the third line to enter revenue service on the metro network in Chengdu, Sichuan. Line 4 runs in an east–west direction, stretching from Wansheng in Wenjiang to Xihe in the Longquanyi. The first phase started construction on 22 July 2011, and began operation on 26 December 2015. Testing began on the east of west extensions of Line 4 as part of Phase II expansion on 10 December 2016. Line 4's color is green.

Line 5

 
Fuqin station of Line 5

Line 5 is a crosstown north–south trunk line. Despite being numbered such, it was the seventh line to open, having started operation on 27 December 2019. Line 5's color is purple.

Line 6

 
Xipu station of Line 6

Line 6 is a crosstown northwest–south-west pivotal line. It is the second longest metro line in Chengdu and the longest non-branching line in China at 68.88 km (42.80 mi) (with Chengdu Line 18 being in first place for both). It has more stations than any other metro line in China, with 54 currently plus two more infill stations coming later. It is one of the four lines to have started operation on 18 Dec 2020. Line 6's color is brown.

Line 7

 

Line 7 is a 38.61 km (23.99 mi) loop line which runs around downtown Chengdu. Despite the number, it was actually the sixth line to open, having started operation on 6 December 2017. Line 7's color is sky blue.

Line 8

Line 8 is a 29.1 km (18.1 mi) crosstown northeast–southwest filling line. Phase 1 started operation on 18 Dec 2020, the same day as lines 6, 9, and 18. Line 8's color is chartreuse.

Line 9

 
Huaxing station of Line 9

Line 9 will be the system's second circle line when it is completed. It is the first driverless metro line in Mid/West China. Phase 1 started operation on 18 Dec 2020. Line 9's color is bright orange.

Line 10

Line 10 is a 39.972 km (24.837 mi) line serving Chengdu Shuangliu International Airport. It started operation on 6 September 2017. It was also the first line to use the higher-capacity type A trains. Line 10's color is blue.

Line 17

 
Fengxihe station of Line 17

Line 17 is a 26.15 km (16.25 mi) express line at west side of Chengdu. Phase 1, including phase 1 of line 19, started operation on 18 Dec 2020. Like line 18 is uses a special variant of Type A trains with one less door per side and using 25 kV AC overhead power, as opposed to the "standard" 1500 V DC most newer metros in China use. Line 17's color is pale green.

Line 18

 

Line 18 is the first express subway line in the city. It parallels the southern section of Line 1 serving Tianfu New Area. It started operation on 27 September 2020. Phase 2 started operation on 18 Dec 2020. At 69.39 km (43.12 mi), it is the third longest metro line in China after Chongqing Line 6 in second place and Shanghai Line 11 being the longest. It is still however the longest line that does not have any branches. Like line 17, it uses a special variant of Type A trains with one less door per side and using 25 kV AC overhead power. Line 18's color is teal.

Tram Line 2

 
Hexin Road station of Tram Line 2

Chengdu Tram Line 2 has 39.3 km (24.4 mi) of operating tracks and 35 stations (47 when fully completed). The line uses low-floor trams derived from the Alstom Citadis. Tram Line 2's color is light green.

History

 
Evolution of the Chengdu Metro

Inception

In 1985, the Chengdu Planning Bureau set up an integrated transportation planning office which began the process of the planning for a rapid transit network for Chengdu.[13] By 1992, a proposal for the subway was sent to the National Planning Commission[14] and was subsequently rejected.[13] In 2004 before the approval of the National Development and Reform Commission Chengdu started reconstructing Tianfu Square with provisions for Tianfu Square station.[15] The first phase of Chengdu Metro, consisting of Lines 1 and 2, were approved by the NDRC on 11 September 2005.[16]

First phase projects

2005

  • Line 1 started construction on 28 December 2005.[17]

2007

  • Line 2 began construction on 29 December 2007.[18]

2009

  • In May 2009 the NDRC approved the addition of a western and eastern extensions of Line 2, and approved the first phase of Lines 3 and 4 in Phase 1.[19]

2010

  • Line 1 opened on 27 September 2010.[20][21]

2011

  • Construction of the first phase of Line 4 started construction on 22 July 2011.[22]

2012

  • On 25 April 2012, Line 3 was approved by the Development and Reform Commission.[23]
  • On 16 January 2012, the National Development and Reform Commission officially approved the southern extension of Line 1.[24]
  • On 28 April 2012, Line 3 started construction.[25]

2013

  • On 8 June 2013, Line 2 West Extension to Xipu, and Ocean Park Station on Line 1 was opened. Ocean Park was then renamed to Jincheng Plaza.

2014

  • On 26 October 2014, Line 2 East Extension to Longquanyi opened.

2015

  • On 25 July 2015, Line 1 South Extension opened.[26]
  • On 10 December 2015, Line 4 Phase 1 opened.

2016

  • On 31 July 2016, Line 3 Phase 1 was opened marking the completion of the first phase.

Second phase projects

2009

  • In May 2009, the NDRC approved the second phase of expansion for the Chengdu Metro consisting Line 1 Phase 3, Line 3 Phase 2 and 3, Line 4 Phase 2, Line 5 Phase 1 and 2, Line 6 Phase 1, Line 7, Line 10 Phase 1, and Line 18. In total Phase 2 consists of 183.3 km (113.9 mi) of new subway.[27]

2014

  • On 4 June 2014, Line 10 Phase 1 started construction.[28]

2015

  • In August 2015, Line 5 Phase 1 started construction.[29]

2017

  • On 28 February 2017, Line 18's first tunnel boring machine was launched.[30]
  • On 2 June 2017, Line 4 Phase 2 was opened.[31]
  • On 6 September 2017, Line 10 phase 1 was opened.[32]
  • On 6 December 2017, Line 7 was opened.[33]

2018

  • On 18 March 2018, Line 1 Phase 3 opened.[34]
  • On 26 December 2018, Line 3 Phase 2 and 3 opened.[35]

2019

  • In November 2019, Chengdu Metro started to use new signage branding with the opening of Line 5.[36]
  • On 27 December 2019, Line 5 and Line 10 Phase 2 opened.[37]

2020

  • On 2 June 2020, Line 18, the biggest PPP project in China, started its 3-month trial operation in preparation for opening.[38]
  • On 6 August 2020, Line 18 completed fire-prevention assessment.[40]
  • On 27 September 2020, Line 18 Phase 1 opened.
  • On 18 December 2020, Line 6 Phase 1/2/3, Line 8 Phase 1, Line 9 Phase 1, Line 17 Phase 1, Line 18 Phase 2 opened, marking the completion of Phase 2 and 3 projects.[41]
  • In 2020, with the opening of Line 6, Line 18 and other lines, Chengdu Metro refreshed the wayfinding in all stations with alpha-numeric station identifiers.[42] In addition, new LCD passenger information systems, such as "comprehensive information screen" LCD, in station concourses and on screen doors at some stations.[43]

2022

Third phase projects

2016

  • On 11 July 2016, NDRC approved the third phase of expansion, consisting of Line 6 phase 2 and 3, Line 8, Line 9, Line 10 Phase 2, Line 17 Phase 1, and Line 18.[45] The third phase was to be simultaneously built with the already under construction second phase.
  • On 31 December 2016, Lines 8, Line 9 and Line 10 Phase 2 started construction.[46]
  • On 16 August 2016, Line 18 started construction.[47]

2017

  • On 27 February 2017, Line 17 Phase 1 started construction.[48]

2019

  • On 19 February 2019, Line 9's first train was delivered from CRRC Changchun Railway Vehicles. It is Chengdu's the first ever subway train capable of GoA4 ATO.[49]
  • On 30 July 2019, the TBM finished tunneling between Chengdu West Railway to Huangtianba Stations, completing tunneling for Line 9.[50]
  • On 5 August 2019, all stations on Line 17 Phase 1 completed construction of main structure and roofing.[51]

2020

  • On 14 January 2020, the last section of track was laid between Sanyuan Station to Jincheng Avenue Station, completing track work for all of Line 9 Phase 1.[52]
  • On 11 April 2020, Chengdu Metro reported that track-laying for Line 8 was completed.[53]
  • On 19 June 2020, Line 9 and Line 17 both started 3-month trial operations.[54]
  • On 24 June 2020, Construction finished for Wutongmiao Temple Depot (五桐庙停车场) for Line 17.[55]
  • On 8 July 2020, Line 6 Phase 1 and 2 was officially powered on.[56]
  • On 8 August 2020, Line 8's whole line power network passed quality assessment.[58]
  • On 18 Dec 2020, Line 6 Phase 1/2/3, Line 8 Phase 1, Line 9 Phase 1, Line 17 Phase 1, Line 18 Phase 2 opened.[41] Marking the completion of Phase 2 and 3 projects and making the Chengdu Metro the 4th largest subway system in the world with over 500 km of operating subway route after 15 years of breakneck growth.

Fourth phase projects

2019

  • On 17 June 2019, the NDRC approved the fourth phase expansion for the Chengdu Metro. It consists of Line 8 Phase 2, Line 10 Phase 3, Line 13 Phase 1, Line 17 Phase 2, Line 18 Phase 3, Line 19 Phase 2, Line 27 Phase 1, Line 30 Phase 1.[59] The Fourth Phase consists of 176.65 km (109.77 mi) of new lines.[7]

2020

  • On 18 March 2020, construction started on Line 8 Phase 2, Line 19 Phase 2, Line 27 Phase 1, and Line 30 Phase 1.[60]
  • On 11 April 2020, construction started on Line 10 Phase 3, Line 13 Phase 1, Line 17 Phase 2, Line 18 Phase 3, and Line 19 Phase 2.[53]
  • On 18 May 2020,Line 8 Phase 2, Line 27 Phase 1, Line 30 Phase 1 started construction. This marks the date all 4th Phase projects started construction.[61]
  • On 17 July 2020, construction officially started for last 4 stations on Line 30 in Longquanyi District.[62]
  • On 27 Nov 2020, construction officially started for Line S3, connection line between Chengdu and Ziyang.[63]

2021

  • On 2 April 2021, Chengdu Metro reached 700 0000 ridership per day for the first time.[64]

2022

  • On 16 Dec 2022, Line 13 Phase 1 finished Sanguantang to Jiuyanqiao Section tunnel construction, marking the success of the longest underwater/river tunnel work in Chengdu Metro history.[65]
  • In Dec 2022, Line 30 Phase 1 finished Financial City North's water/cable/pipe reroute, marking station's main structure construction enters next stage.[66]

2023

  • On 13 Jan 2023, all 15 stations of Line 13 Phase 1 finished structural construction. The line's tunnel finished 62%, railroad finished 10%. [68]
  • On 12 Feb 2023, Line 19 Phase 2 is officially powered on.[69]
  • On 17 Feb 2023, Line 30 Phase 1 Terminal 2 of Shuangliu International Airport East~Sisheng section's left tunnel is finished, marking the completion of the 18th tunnel.[70]
  • On 21 Feb 2023, Line 19 Phase 2 signal and communication system started operational testing in Xinmiao Control Centre (新苗控制中心), and Phase 2 signal now synchronizes with Phase 1.[71]
  • On 22 Feb 2023, Line 17 Phase 2 finished Jinxing station's main power centre's land clearance.[72]
  • On 20 March 2023, Line 19's Changshun Villige Depot (长顺村停车场) is handover to operation. [73]
  • On 21 March 2023, Line 27 finished all station construction.[74]
  • On 27 March 2023, Line 8 Phase 2 finished Longgang~Lianhua section tunnel work. Line 8 Phase 2 entered railroad construction, electrics, and refurbishment stage.[77]
  • On 28 March 2023, Line 19 Phase 2 finished 160 km/h high-speed train testing, entering 1-2 months of systematic testing.[78]
  • On 28 March 2023, Chengdu Rail Transit 2023 Annal Media Gala was held in Wenjiashan Station of Line 19.[79]
  • On 29 March 2023, Line S3 finished Baotai Avenue~Changhong Square's left tunnel.[80][81]
  • On 30 March 2023, Line 13 Jiuyanqiao~Xinnanmen section's tunnel boring machine finished construction.[82]
  • On 30 March 2023, Line 19 Phase 2 finished construction and handover to operation team for operational testing. [83]
  • On 31 March 2023, Line 30 Phase 1 's Gaobeiba Depot (高碑坝车辆段) is powered on.[85]
  • From Jan to March 2023, Chengdu Metro TOD initialed 4 new land project of 20 0000 Sq Meter, and 23 TOD projects, 38 new construction project sections.[86]

Fifth phase projects

2023

  • On 13 Jan 2023, Chengdu Government published the fifth phase expansion and the environmental assessment for Chengdu Metro. The Fifth Phase plan consists of 199.8 km (124.1 mi) of 10 new lines, including Line 5 Phase 3、Line 9 Phase 2、Line 10 Phase 4、Line 12 Phase 1、Line 16 Phase 1、Line 18 Phase 4、Line 20 Phase 1、Line 22 Phase 1、Line 23 Phase 1、Line 27 Phase 2.[87]
  • On 15 Feb 2023, Line S11 is approved by Sichuan Development and Reform Commission .[88]
  • On 30 March 2023, Line S11 (Chengdu - Deyang Line) started construction. This line plans to open at 2026. It consists of 70.84 km route of 45.30km elevated section,23.91km underground section, and 1.63km transit section.[89]
  • On 31 March 2023, Chengdu Metro reached 100 0000 0000 ridership, as one rider enters gate at 15:29:16.[90]

Network expansion

Lines under construction

 
Map of Chengdu Metro plan (2024)

Chengdu had built about 291 km (181 mi) of subway lines in 2020.[91] In 2017, the construction of the first phases of Lines 8, 9, 11, 17 and Line 10 (Phase 2) started, the length of subway under construction in Chengdu totaling 400 km (249 mi).[92] It is expected by the end of 2020, Lines 6, 8, 9, 17 and 18 will open. Extending the Chengdu Metro network to 518.5 km (322.2 mi) of route (excluding Chengdu Tram).[5]

Est. Opening Line Phase Terminals Length (km) Stations Notes
2023 19 Phase 1 Jiujiang North Hejiang 42.87 12
2024 10 Phase 3 Taipingyuan Luomashi 5.67 5
8 Phase 2 Southwest section Longgang Lianhua 1.25 1
Phase 2 Northeast section Shilidian Guilong Road 6.56 6
13 Phase 1 Wayaotan Long’an 29.07 21
17 Phase 2 Jitouqiao Gaohong 24.8 18
18 Phase 3 North Section North Railway Station South Railway Station 10.99 4 [93][94]
Phase 3 Guanyan Section Tianfu International Airport North Guanyan 2.57 1
27 Phase 1 Shifo Shuxin Road 24.86 23
30 Terminal 2 of Shuangliu International Airport Longquan 27.74 24 [95]
S3 Futian Ziyang North Railway Station 38.70 7 Through-operates with 18
2026 S5 Honglian Meishan East Railway Station 59.315 13
2027 S11 Phase 1 Deyang Railway Station Weijianian 70.845 16

Long-term planning

In December 2020, Chengdu Municipal Bureau of Planning and Natural Resources announced the long-term planning including Lines 1-33, D1-D6 and S1-S19.[96]

Fares

Single ride card

Single Ride Card is an IC card for one trip. Riders can purchase it through attendants in station's Service Centers or use ticket-vending machines. One ticket allows only one rider in with validity of the same day. If riders have not used the Single Ride Card, they may refund it at the same day at the same station.[97]

From its opening until 1 June 2017, Chengdu Metro used a fare system based on station counts.[98] With a 2-hour grace period in the subway system.[99] In October 2016, Chengdu Metro held public meeting for price changing issues and set new pricing plans.[100]

From 2 June 2017, Chengdu Metro starts new fare system based on distance.[101]

Distance (km) Distance to next price level (km) Total Price (CNY )
0~4 4 ¥2
4~8 4 ¥3
8~12 4 ¥4
12~18 6 ¥5
18~24 6 ¥6
24~32 8 ¥7
32~40 8 ¥8
40~50 10 ¥9
When the trip is longer than 50 km, each additional 20 km requires another ¥1
Each rider has a 3-hour grace period in the system.

Reloadable IC cards

The Tianfutong Pass is a reloadable IC Card accepted by the Chengdu Metro.[102] Normal Tianfutong Passes provide 10% discounts. Student Tianfutong Passes provide 50% discounts. Senior Tianfutong Passes have special discounts depending on time of use.[103][102] Additionally, passengers can pay for single rides directly using Debit IC cards offered by participating banks.[104][105]

Train types and technology

 
The interior of a Line 7 train showing local ancient Sanxingdui/Jinsha culture.

All "standard" Chengdu Metro lines in operation run on 1,500 V DC supplied by overhead lines.[106][107][108] Express lines meanwhile run on 25 kV AC to get to top speed quicker. Trains on Lines 3, 4, 7, 10 and some of the newer Line 2 trains have a Golden Sun Bird insignia. New trains are equipped with LCD passenger information systems.

 
 
 
 
Line 6 Train LCD Passenger Information System

Signaling system

All Chengdu Metro lines are equipped with CBTC.[109] Chengdu Metro Line 1, which opened to traffic in 2010, used a CBTC signaling system provided by Zhejiang Zhonghe Technology, a subsidiary of Zhejiang University,[110] in collaboration with Ansaldo STS.[111] This system is also used on Chengdu Metro Line 6[112] and 10.[113] Chengdu Metro Line 3, which opened in 2016, was one of the first adoptions of a domestic CBTC signal system implementation by Beijing Traffic Control Technology.[114] Beijing Traffic Control Technology's CBTC system is also used in Line 5.[115] Alstom's Urbalis 888 CBTC signal system in collaboration with CASCO is used on Line 18, 19, Chengdu Light Rail Line 2 and the fully automated GoA4 Line 9.[116]

Type A trains

In response to congestion and high ridership, Lines 7, 8 and 10 are equipped with higher capacity 6-car aluminum alloy Type A trains. The total length of 140 metres (459 ft 4 in) and width is 3 metres (9 ft 10 in). All trains have a maximum operating speed of 80 km/h (50 mph). The capacity of a 6-car train is 1,828 passengers with a crush load capacity of 2,488 passengers. Line 7 trains are designed and managed by CRRC Qingdao Sifang with CRRC Chengdu performing manufacturing and assembly.[117] Lines 5, 6 and 9 are equipped with even higher capacity eight car aluminum alloy Type A trains. The capacity of an eight car trainset is 2,480 passengers with a crush load capacity of 3,456 passengers.[118]

Type B trains

Lines 1, 2, 3 and 4 use six car stainless steel Type B trains with a total length of 120 metres (393 ft 8 in) and width 2.8 metres (9 ft 2 in). The capacity of each train set is 1,460 people with a crush load capacity of 1,880 passengers.[119] All trains have a maximum operating speed of 80 km/h (50 mph). Lines 1 and 2 use CRRC Qingdao Sifang and CRRC Chengdu trains.[120] Trains on Line 3 and 4 are manufactured by CRRC Changchun Railway Vehicles and CRRC Chengdu.[121] In 2008, Chengdu Metro in anticipation of the opening of Line 1, purchased and initial order of 17 six car trains sets from CRRC Qingdao Sifang.[122] In April 2011, a further order was announced for trains from CRRC for Line 2, taking the total to 59 six car sets.[123]

Light Rail trains

Currently, only Chengdu Light Rail Line 2 is in operation. Light Rail Line 2 uses low floor light rail trains provided by domestic manufacturer CRRC. The tram system uses light rail trains, of each having 5 cars and 8 doors. Chengdu Light Rail Line R2 opened to public on 26 December 2018 and extended on 27 December 2019. It is 39.3 km (24.4 mi) long, with 35 stations (47 station when completed). In early 2020, this line is included in the latest Chengdu Metro's official system map.[124][125][126]

Other rail transit

High-speed intercity rail

There are also two high-speed intercity railways in Chengdu, not part of Chengdu Metro system: the Chengdu–Dujiangyan intercity railway and Chengdu–Pujiang intercity railway. They are operated by Chengdu Metropolitan Railway Company Limited, which is China's first joint venture between a local government and China's national rail operator. The city and the Ministry of Railways worked together in building high-speed intercity rail lines.[127]

Network map

 


See also

Notes

  1. ^ Lines 1–10, 27, 30
  2. ^ Lines 13, 17, 18, 19

References

  1. ^ a b c 中國新聞网 (18 December 2020). "成都地铁新开5条线 运营里程558公里".
  2. ^ 成都地铁运营 (2 February 2019). 成都地铁2018年绿色出行报告. 搜狐 (in Chinese). Retrieved 2 February 2019.
  3. ^ a b 袁弘 (23 August 2021). 成都轨道交通成网效果评估出炉 市民平均通勤时长减少. 成都市住房和城乡建设局 (in Chinese). Retrieved 16 March 2022.
  4. ^ 程文雯 (21 September 2019). "2021年度成都地铁客运总量突破18亿乘次". 四川日报. Retrieved 7 January 2022.
  5. ^ a b c d "地铁"新7线"陆续开始"跑磨合"". 四川省交通运输厅 (Sichuan Transport Department).
  6. ^ "年末成都轨道交通运营里程将达557.8公里". 27 September 2020.
  7. ^ a b "成都市城市轨道交通第四期建设规划全面启动 未来5年再建8个地铁新项目-新闻-上海证券报·中国证券网". news.cnstock.com. Retrieved 15 September 2019.
  8. ^ "成都地铁5号线、10号线竣工验收!创下国内多个"首次"". 28 November 2019.
  9. ^ "成都"东进"首条主动脉 18号线一二期首开段竣工验收".
  10. ^ Huang Zhiling and Bao Xinyan, Work begins on new metro schemes, China Daily, 2005-12-29
  11. ^ Chengdu Municipal Government, Subway to Adopt Natural Ventilation 30 September 2007 at the Wayback Machine, Retrieved on 2007-03-13
  12. ^ . Archived from the original on 19 December 2012. Retrieved 16 September 2012.
  13. ^ a b . honglian88.com. Archived from the original on 11 August 2018. Retrieved 10 August 2018.
  14. ^ 四川在线 – 总工于波缺席首发 给1号线打90分. sichuan.scol.com.cn. Retrieved 10 August 2018.
  15. ^ 天府"地铁总站"占了地宫两层[图]_新闻频道. news.sohu.com. Retrieved 11 August 2018.
  16. ^ 成都地铁1号线最迟明年6月全面开建(图)_网易新闻. news.163.com. Retrieved 11 August 2018.
  17. ^ (in Simplified Chinese). Xinhua News Agency. 27 September 2010. Archived from the original on 20 October 2010. Retrieved 27 September 2010.
  18. ^ (in Chinese). Sichuan Online. 13 September 2012. Archived from the original on 6 May 2014. Retrieved 13 September 2012.
  19. ^ . ndrc.gov.cn (in Chinese (China)). Archived from the original on 11 August 2018. Retrieved 11 August 2018.
  20. ^ http://www.chinadaily.com.cn/china/2010-09/27/content_11355596.htm, China Daily, 2010-09-27
  21. ^ (in Simplified Chinese). Sichuan Online. 24 August 2010. Archived from the original on 26 January 2016. Retrieved 27 September 2010.
  22. ^ 成都地铁4号线获发改委批复 10月正式开建 (in Simplified Chinese). Sichuan Online. 22 July 2011. Retrieved 22 July 2011.
  23. ^ 成都地铁3号线一期工程获批 最高时速80公里 (in Simplified Chinese). 华西都市报. 27 April 2012. Retrieved 27 April 2012.
  24. ^ 成都地铁1号线南延线获国家发改委批复 (in Simplified Chinese). 四川新闻网. 29 August 2012. Retrieved 29 August 2012.
  25. ^ (in Simplified Chinese). 新华网四川频道. 27 April 2012. Archived from the original on 23 May 2012. Retrieved 28 April 2012.
  26. ^ "地铁1号线南延线今日正式开通 天府新区半小时到市中心_本网最新_新闻首页_成都全搜索".
  27. ^ . ndrc.gov.cn (in Chinese (China)). Archived from the original on 11 August 2018. Retrieved 11 August 2018.
  28. ^ 成都地铁10号线一期启动建设 2号线东延线10月有望开通试运营_本网原创_四川新闻_四川在线. sichuan.scol.com.cn (in Chinese (China)). Retrieved 19 August 2018.
  29. ^ . scnews.newssc.org. Archived from the original on 18 July 2020. Retrieved 19 August 2018.
  30. ^ "国内设计时速最快 成都轨道交通18号线首台盾构机始发" (in Chinese). 四川新闻网. 28 February 2017. Retrieved 28 February 2017.
  31. ^ (in Chinese). Chengdu Metro. 2 June 2017. Archived from the original on 6 June 2017. Retrieved 2 June 2017.
  32. ^ (in Chinese). 163.com news Sichuan. 6 September 2017. Archived from the original on 6 September 2017. Retrieved 6 September 2017.
  33. ^ 成都地铁7号线正式开通试运营 (in Chinese). Sichuan Online. 6 December 2017. Retrieved 6 December 2017.
  34. ^ 成都地铁1号线三期今日9点开通试运营 (in Chinese). Sichuan Online. 18 March 2018. Retrieved 18 March 2018.
  35. ^ 双流新都居民喜提成都地铁3号线二三期:晚上都可以去逛春熙路了 (in Chinese). Sina Sichuan. 26 December 2018. Retrieved 26 December 2018.
  36. ^ ""妈妈再也不用担心我'打不到方向'了"!".
  37. ^ "明日 成都轨道交通三线齐开". 26 December 2019.
  38. ^ "成都轨道交通18号线首开段实现空载".
  39. ^ 成都商报 (严丹 闫宇恒). "成都地铁6号线三期工程轨行区全面转入列车动车调试阶段".
  40. ^ 成都商报 (7 August 2020). "6号线、8号线、9号线、17号线、18号线 这些地铁线路今年开通". Sichuan Online.
  41. ^ a b 中國新聞网 (18 December 2020). "成都地铁新开5条线 运营里程558公里".
  42. ^ 爱你的. "迎接大运会,成都地铁每个车站有了"身份证号"!". Weixin Official Accounts Platform. Retrieved 6 July 2022.
  43. ^ 爱你的. "为了迎接18号线开通,火车南站再添新装备!(放大招,送票卡)". Weixin Official Accounts Platform. Retrieved 6 July 2022.
  44. ^ "关于成都地铁5号线幸福桥至廖家湾地铁噪音问题,已降低列车运行". 7 August 2020.
  45. ^ . ndrc.gov.cn. Archived from the original on 22 June 2019. Retrieved 19 August 2018.
  46. ^ 网易. 成都地铁8号线一期9号线一期10号线二期正式开工_网易新闻. news.163.com. Retrieved 19 August 2018.
  47. ^ . cddrc.gov.cn. Archived from the original on 7 May 2018. Retrieved 19 August 2018.
  48. ^ (in Chinese). 网易. 28 February 2017. Archived from the original on 8 May 2018. Retrieved 28 February 2017.
  49. ^ "厉害!成都首条无人驾驶地铁要来了!全自动无人驾驶列车亮相!". Sohu.
  50. ^ "中国西部首条全自动无人驾驶地铁线路——成都轨道交通9号线全线"洞通"".
  51. ^ "成都地铁17号线一期全线车站封顶" (in Chinese). 成都市温江区人民政府. 7 August 2019.
  52. ^ "成都地铁9号线一期工程长轨通" (in Chinese). 中国中铁. 24 January 2020. Retrieved 26 July 2020.
  53. ^ a b "8号线一期全线"轨通"!还有其他在建线路最新进展!".
  54. ^ "即将开启空载调试、空载试运行 成都地铁9号线、17号线离开通也近了!".
  55. ^ "成都地铁17号线列车有家啦!五桐庙停车场主体工程完工".
  56. ^ "成都地铁6号线一二期工程"通电"啦".
  57. ^ "喜!成都地铁30号线龙泉段开始放线 龙泉驿设置4个站点".
  58. ^ 新浪网 (12 August 2020). "成都地铁8号线建设最新进展".
  59. ^ "国家发展改革委关于成都市城市轨道交通第四期建设规划(2019-2024年)的批复". 17 June 2019. Retrieved 21 August 2019.
  60. ^ "刚刚!成都地铁8号线二期、27号一期、30号线一期三线开建!_四川在线". sichuan.scol.com.cn. Retrieved 14 June 2020.
  61. ^ "成都地铁8号线二期、27号线一期、30号线一期开工 轨道交通第四期建设规划全部开工". sichuan.scol.com.cn.
  62. ^ "喜!成都地铁30号线龙泉段开始放线 龙泉驿设置4个站点".
  63. ^ "轨道交通资阳线年底前开工建设 预计2024年底通车试运营".
  64. ^ "成都地铁单日客运量首次突破700万".
  65. ^ "成都地铁再上新!首个四线换乘车站揭秘" (in Chinese). 21 December 2022.
  66. ^ "成都地铁再上新!首个四线换乘车站揭秘" (in Chinese). 21 December 2022.
  67. ^ "成都地铁再上新!首个四线换乘车站揭秘" (in Chinese). 21 December 2022.
  68. ^ "10号线三期、17号线二期、18号线三期……成都轨道交通9条在建线路进展→" (in Chinese).
  69. ^ "195座车站封顶、23个TOD实施 成都轨道集团迎来一季度"开门红"" (in Chinese).
  70. ^ "地铁19号线二期年内试运营!成都轨交建设最新进展" (in Chinese). 21 December 2022.
  71. ^ "地铁19号线二期年内试运营!成都轨交建设最新进展" (in Chinese). 21 December 2022.
  72. ^ "地铁19号线二期年内试运营!成都轨交建设最新进展" (in Chinese). 21 December 2022.
  73. ^ "195座车站封顶、23个TOD实施 成都轨道集团迎来一季度"开门红"" (in Chinese).
  74. ^ "成都地铁27号线一期全线车站主体结构顺利封顶" (in Chinese).
  75. ^ "赶飞机注意!成都地铁18号线快线时刻表公布→".
  76. ^ "成都地铁18号线运力增长18%,还提供"地铁+机场"无障碍预约服务".
  77. ^ "成都地铁8号线龙莲盾构区间顺利通过验收".
  78. ^ "热滑完成!成都地铁19号线二期提前通车有望".
  79. ^ "成都轨道交通19号线二期举办"开门评风"媒体交流活动".
  80. ^ "成都地铁S3资阳线宝台大道站~苌弘广场站盾构区间左线顺利洞通!".
  81. ^ "#成都轨道交通建设进展# 3月29日上午10时左右,伴随着盾构机刀盘缓缓破除玻纤桩驶入车站,轨道交通资阳线"同城一号"盾构机在苌弘广场站顺利出洞,标志着宝台大道站~苌弘广场站盾构区间左线顺利洞通,取得了阶段性的胜利。". weibo.
  82. ^ "成成都地铁13号线九新区间顺利完成盾构吊装". 13 January 2023. Retrieved 2 April 2023.
  83. ^ "成都轨道交通19号线二期轨行区正式移交运营".
  84. ^ "成都、上海轨道交通二维码实现互联互通".
  85. ^ "#成都轨道交通建设进展# 30号线一期工程高碑坝车辆段110kV铜牧线顺利完成迁改送电。". weibo.
  86. ^ "195座车站封顶、23个TOD实施 成都轨道集团迎来一季度"开门红"" (in Chinese).
  87. ^ "成都轨道交通第五期规划最新公示". 13 January 2023. Retrieved 31 March 2023.
  88. ^ "地铁19号线二期年内试运营!成都轨交建设最新进展" (in Chinese). 21 December 2022.
  89. ^ "成德市域铁路S11线30日开工". chengdu.gov.cn. Retrieved 1 April 2023.
  90. ^ "四川成都轨道交通线网累计客运量突破100亿人次". ChinaNews.com.cn. Retrieved 1 April 2023.
  91. ^ (in Simplified Chinese). Sichuan Online. 9 November 2012. Archived from the original on 6 January 2014. Retrieved 9 November 2012.
  92. ^ 成都地铁加速成网今年13条线同时在建_新闻资讯_新闻首页_成都全搜索. news.chengdu.cn. Retrieved 25 February 2017.
  93. ^ "关于成都轨道交通18号线三期工程环境影响报告书的批复". 21 June 2019.
  94. ^ "成都轨道交通18号线三期工程首次环境影响评价信息公开". 9 December 2019.
  95. ^ . Archived from the original on 10 November 2021. 30号线一期工程,起于双流机场2航站楼站,止于龙泉站。线路全长约27.74 km,共设车站24座,全部为地下线
  96. ^ "正在公示!成都轨道交通线网规划拟优化,首次出现D字头编号".
  97. ^ "单程票" (in Chinese). 成都地铁 Chengdu Metro. Retrieved 27 July 2020.
  98. ^ "下月起 成都将现6元地铁票" (in Chinese). 新浪. 7 May 2013. Retrieved 7 May 2013.
  99. ^ "地铁公交免费换乘暂不实施" (in Chinese). 新浪. 15 May 2013. Retrieved 15 May 2013.
  100. ^ "成都地铁票价调整听证,八成代表赞成方案一,你会赞成吗?" (in Chinese). 四川省人民政府. 19 October 2016. Retrieved 19 October 2016.
  101. ^ "6月2日起成都地铁票价改里程计价 起步价4公里2元". 腾讯. 四川新闻客户端. 27 May 2017. Retrieved 28 May 2017.
  102. ^ a b "天府通" (in Chinese). 成都天府通 Chengdu Tianfutong. Retrieved 27 July 2020.
  103. ^ "天府通持卡乘车须知" (in Chinese). 成都地铁 Chengdu Metro. 31 July 2017. Retrieved 27 July 2020.
  104. ^ "长城华西银行" (in Chinese). 长城华西银行. 31 July 2017. Retrieved 27 July 2020.
  105. ^ "金融IC卡" (in Chinese). 成都地铁 Chengdu Metro. 31 July 2017. Retrieved 27 July 2020.
  106. ^ 成都地铁1号线南延线接触网成功送电 (in Chinese). 中国中铁. 16 December 2014. Retrieved 16 December 2014.
  107. ^ 成都地铁3号线延长线19个站点公布 南起双流北通新都 (in Chinese). Sichuan Online. 13 January 2015. Retrieved 13 January 2015.
  108. ^ 成都地铁4号线二期工程全线接触网"电通" (in Chinese). 成都地铁. 10 December 2016. Retrieved 10 December 2016.
  109. ^ . 华西都市报. 22 December 2015. Archived from the original on 23 December 2017. Retrieved 6 July 2022.
  110. ^ . 四川新闻. 27 September 2011. Archived from the original on 31 December 2011. Retrieved 6 July 2022.
  111. ^ "众合机电与意大利军工巨头签3700万欧元采购备忘-搜狐财经". business.sohu.com. Retrieved 6 July 2022.
  112. ^ . 腾讯网. 28 August 2017. Archived from the original on 5 April 2020. Retrieved 6 July 2022.
  113. ^ . 搜狐. 7 September 2017. Archived from the original on 5 April 2020. Retrieved 6 July 2022.
  114. ^ . Traffic Control Technology. Archived from the original on 26 December 2017. Retrieved 6 July 2022.
  115. ^ . Traffic Control Technology. Archived from the original on 26 December 2017. Retrieved 6 July 2022.
  116. ^ . CASCO. Archived from the original on 20 January 2019. Retrieved 6 July 2022.
  117. ^ 成都地铁7号线列车下线 315天刷新"成都速度". sc.sina.com.cn. Retrieved 7 October 2018.
  118. ^ 北京报道, □记者 王璐 (27 December 2019). "成都最长地铁建成通车在即". tech.sina.com.cn. Retrieved 26 December 2019.
  119. ^ "最成都"地铁车成功试跑 取名"天府神韵"(图) -四川新闻-四川新闻网. scnews.newssc.org. Retrieved 7 October 2018.
  120. ^ 明年2月 成都市民将坐上"成都造"地铁. news.chengdu.cn. Retrieved 7 October 2018.
  121. ^ 成都地铁4号线二期车辆有望10月全部交付使用_四川新闻_蓉城聚焦_四川在线. sichuan.scol.com.cn. Retrieved 7 October 2018.
  122. ^ 网易. 来了!地铁列车开到成都了(图)_网易新闻. news.163.com. Retrieved 7 October 2018.
  123. ^ "Chengdu Metro orders more cars". 7 April 2011. Retrieved 8 April 2011.
  124. ^ 成都头条. "成都地铁线路图更新,你家在哪条新线附近". 新浪网.
  125. ^ 成都地铁规划建设. "官方发布的成都地铁2020年线网图,快来围观".
  126. ^ "成都地铁线路图".
  127. ^ . Chengdu Post (in Simplified Chinese). 4 September 2010. Archived from the original on 6 May 2014. Retrieved 6 September 2010.

External links

  • Chengdu Metro Official Website (in Chinese)
  • Chengdu Metro on Urbanrail

chengdu, metro, rapid, transit, system, chengdu, capital, sichuan, china, with, opening, line, september, 2010, system, consists, subway, lines, light, rail, line, subsequently, undergone, rapid, expansion, since, opening, lines, december, 2020, longest, metro. The Chengdu Metro is the rapid transit system of Chengdu the capital of Sichuan China With the opening of Line 1 on 27 September 2010 the system consists of 12 subway lines and 1 light rail line It has subsequently undergone rapid expansion Since the opening of Lines 6 8 9 and 17 on 18 December 2020 the Chengdu Metro is the 4th longest metro system in the world Chengdu MetroOverviewOwnerCity of ChengduLocaleChengdu Sichuan ChinaTransit typeRapid transitNumber of lines13 1 Number of stations373 1 Daily ridership3 1713 million 2018 Avg 2 7 1737 million 2021 Peak 3 Annual ridership1800 million 2021 4 Websitewww wbr chengdurail wbr comOperationBegan operation27 September 2010 12 years ago 2010 09 27 10 September 2010 12 years ago 2010 09 10 Public Trial Operator s Chengdu Rail Transit GroupTechnicalSystem length518 5 km 322 2 mi 5 excluding Chengdu Tram 557 8 km 346 6 mi 6 1 including Chengdu Tram Track gauge1 435 mm 4 ft 8 1 2 in standard gaugeElectrificationOverhead line 1 500 V DC a and 25 kV 50 Hz AC b System mapThere are currently 12 operating subway lines totaling 518 5 km 322 2 mi 5 of track and 1 tram line Line T2 The Chengdu Metro serves over 8 million trips per day 7 As of 2021 about 2 2 million and 4 6 million people live within 500 and 800 metres 1 640 and 2 625 ft of a subway station in Chengdu respectively 3 Contents 1 Operating network 1 1 Line 1 1 2 Line 2 1 3 Line 3 1 4 Line 4 1 5 Line 5 1 6 Line 6 1 7 Line 7 1 8 Line 8 1 9 Line 9 1 10 Line 10 1 11 Line 17 1 12 Line 18 1 13 Tram Line 2 2 History 2 1 Inception 2 2 First phase projects 2 2 1 2005 2 2 2 2007 2 2 3 2009 2 2 4 2010 2 2 5 2011 2 2 6 2012 2 2 7 2013 2 2 8 2014 2 2 9 2015 2 2 10 2016 2 3 Second phase projects 2 3 1 2009 2 3 2 2014 2 3 3 2015 2 3 4 2017 2 3 5 2018 2 3 6 2019 2 3 7 2020 2 3 8 2022 2 4 Third phase projects 2 4 1 2016 2 4 2 2017 2 4 3 2019 2 4 4 2020 2 5 Fourth phase projects 2 5 1 2019 2 5 2 2020 2 5 3 2021 2 5 4 2022 2 5 5 2023 2 6 Fifth phase projects 2 6 1 2023 3 Network expansion 3 1 Lines under construction 3 2 Long term planning 4 Fares 4 1 Single ride card 4 2 Reloadable IC cards 5 Train types and technology 5 1 Signaling system 5 2 Type A trains 5 3 Type B trains 5 4 Light Rail trains 6 Other rail transit 6 1 High speed intercity rail 7 Network map 8 See also 9 Notes 10 References 11 External linksOperating network EditThere are 12 subway lines operating currently covering 518 5 km 322 2 mi 5 with 337 stations and a light rail line with 36 stop Line T2 operating covering 39 3 km 24 4 mi Chengdu Metro Network Map of Chengdu Metro Line Terminals District County Commencement NewestExtension Lengthkm Stations1 Weijianian Jinniu Science City Shuangliu 2010 2018 40 99 35Wugensong Shuangliu 2 Xipu Pidu Longquanyi Longquanyi 2012 2014 42 32 323 Chengdu Medical College Xindu Shuangliu West Station Shuangliu 2016 2018 49 89 374 Wansheng Wenjiang Xihe Longquanyi 2015 2017 43 28 305 Huagui Road Xindu Huilong Shuangliu 2019 49 02 8 416 Wangcong Temple Pidu Lanjiagou Shuangliu 2020 68 88 567 loop line Cuijiadian Chenghua Cuijiadian Chenghua 2017 38 61 318 Shilidian Chenghua Lianhua Shuangliu 2020 29 1 259 Financial City East Jinjiang Huangtianba Qingyang 2020 22 18 1310 Taipingyuan Wuhou Xinping Xinjin 2017 2019 37 972 1617 Jinxing Wenjiang Jitouqiao Wuhou 2020 26 15 918 South Railway Station Wuhou Tianfu International Airport North Jianyang 2020 69 39 9 10Total 518 335Line 1 Edit Jinjiang Hotel station of Line 1 Main article Line 1 Chengdu Metro The first phase of Line 1 cost 7 billion yuan to construct 10 A natural ventilation system has been used in the underground section of Line 1 on the subway system from Southern Third Ring Road to Jincheng Plaza Station Square ventilation units are built every 30 m 98 ft 5 in along the subway top to allow fresh air from the ground enter the construction site underground The method is used in subway construction in other countries as it cuts the construction cost and it saves energy The subway system is the first in China to adopt such a ventilation system during construction Chengdu Metro is planning to set up a section for subway fire control and introduce the latest fire fighting technologies and vehicles Line 1 s color is dark blue 11 Line 2 Edit People s Park station of Line 2 Main article Line 2 Chengdu Metro Line 2 is a crosstown northwest southeast trunk route This line serves the Chengdu East railway station Line 2 began operation on 16 September 2012 An 11 km 6 8 mi long mostly elevated extension to Longquanyi began testing in April 2014 opened in October 2014 It total it is currently 42 32 km 26 30 mi long Line 2 s color is orange 12 Line 3 Edit Xinnanmen station of Line 3 Main article Line 3 Chengdu Metro Line 3 runs in a northeast southwest direction from Chengdu Medical College to Shuangliu West Station The total length is 49 85 km 30 98 mi Phase 1 of this line began construction on 28 April 2012 and opened on 31 July 2016 It was Chengdu s final line to use the lower capacity type B trains subsequent lines favoring the longer and wider Type A cars Line 3 s color is magenta Line 4 Edit Taisheng Road South station of Line 4 Main article Line 4 Chengdu Metro Line 4 is the third line to enter revenue service on the metro network in Chengdu Sichuan Line 4 runs in an east west direction stretching from Wansheng in Wenjiang to Xihe in the Longquanyi The first phase started construction on 22 July 2011 and began operation on 26 December 2015 Testing began on the east of west extensions of Line 4 as part of Phase II expansion on 10 December 2016 Line 4 s color is green Line 5 Edit Fuqin station of Line 5 Main article Line 5 Chengdu Metro Line 5 is a crosstown north south trunk line Despite being numbered such it was the seventh line to open having started operation on 27 December 2019 Line 5 s color is purple Line 6 Edit Xipu station of Line 6 Main article Line 6 Chengdu Metro Line 6 is a crosstown northwest south west pivotal line It is the second longest metro line in Chengdu and the longest non branching line in China at 68 88 km 42 80 mi with Chengdu Line 18 being in first place for both It has more stations than any other metro line in China with 54 currently plus two more infill stations coming later It is one of the four lines to have started operation on 18 Dec 2020 Line 6 s color is brown Line 7 Edit Shizishan station of Line 7 Main article Line 7 Chengdu Metro Line 7 is a 38 61 km 23 99 mi loop line which runs around downtown Chengdu Despite the number it was actually the sixth line to open having started operation on 6 December 2017 Line 7 s color is sky blue Line 8 Edit Dongjiao Memory station of Line 8 Main article Line 8 Chengdu Metro Line 8 is a 29 1 km 18 1 mi crosstown northeast southwest filling line Phase 1 started operation on 18 Dec 2020 the same day as lines 6 9 and 18 Line 8 s color is chartreuse Line 9 Edit Huaxing station of Line 9 Main article Line 9 Chengdu Metro Line 9 will be the system s second circle line when it is completed It is the first driverless metro line in Mid West China Phase 1 started operation on 18 Dec 2020 Line 9 s color is bright orange Line 10 Edit Terminal 1 of Shuangliu International Airport station of Line 10 Main article Line 10 Chengdu Metro Line 10 is a 39 972 km 24 837 mi line serving Chengdu Shuangliu International Airport It started operation on 6 September 2017 It was also the first line to use the higher capacity type A trains Line 10 s color is blue Line 17 Edit Fengxihe station of Line 17 Main article Line 17 Chengdu Metro Line 17 is a 26 15 km 16 25 mi express line at west side of Chengdu Phase 1 including phase 1 of line 19 started operation on 18 Dec 2020 Like line 18 is uses a special variant of Type A trains with one less door per side and using 25 kV AC overhead power as opposed to the standard 1500 V DC most newer metros in China use Line 17 s color is pale green Line 18 Edit Main article Line 18 Chengdu Metro Century City station of Line 18Line 18 is the first express subway line in the city It parallels the southern section of Line 1 serving Tianfu New Area It started operation on 27 September 2020 Phase 2 started operation on 18 Dec 2020 At 69 39 km 43 12 mi it is the third longest metro line in China after Chongqing Line 6 in second place and Shanghai Line 11 being the longest It is still however the longest line that does not have any branches Like line 17 it uses a special variant of Type A trains with one less door per side and using 25 kV AC overhead power Line 18 s color is teal Tram Line 2 Edit Hexin Road station of Tram Line 2 Main article Line 2 Chengdu Tram Chengdu Tram Line 2 has 39 3 km 24 4 mi of operating tracks and 35 stations 47 when fully completed The line uses low floor trams derived from the Alstom Citadis Tram Line 2 s color is light green History Edit Evolution of the Chengdu Metro Inception Edit In 1985 the Chengdu Planning Bureau set up an integrated transportation planning office which began the process of the planning for a rapid transit network for Chengdu 13 By 1992 a proposal for the subway was sent to the National Planning Commission 14 and was subsequently rejected 13 In 2004 before the approval of the National Development and Reform Commission Chengdu started reconstructing Tianfu Square with provisions for Tianfu Square station 15 The first phase of Chengdu Metro consisting of Lines 1 and 2 were approved by the NDRC on 11 September 2005 16 First phase projects Edit 2005 Edit Line 1 started construction on 28 December 2005 17 2007 Edit Line 2 began construction on 29 December 2007 18 2009 Edit In May 2009 the NDRC approved the addition of a western and eastern extensions of Line 2 and approved the first phase of Lines 3 and 4 in Phase 1 19 2010 Edit Line 1 opened on 27 September 2010 20 21 2011 Edit Construction of the first phase of Line 4 started construction on 22 July 2011 22 2012 Edit On 25 April 2012 Line 3 was approved by the Development and Reform Commission 23 On 16 January 2012 the National Development and Reform Commission officially approved the southern extension of Line 1 24 On 28 April 2012 Line 3 started construction 25 2013 Edit On 8 June 2013 Line 2 West Extension to Xipu and Ocean Park Station on Line 1 was opened Ocean Park was then renamed to Jincheng Plaza 2014 Edit On 26 October 2014 Line 2 East Extension to Longquanyi opened 2015 Edit On 25 July 2015 Line 1 South Extension opened 26 On 10 December 2015 Line 4 Phase 1 opened 2016 Edit On 31 July 2016 Line 3 Phase 1 was opened marking the completion of the first phase Second phase projects Edit 2009 Edit In May 2009 the NDRC approved the second phase of expansion for the Chengdu Metro consisting Line 1 Phase 3 Line 3 Phase 2 and 3 Line 4 Phase 2 Line 5 Phase 1 and 2 Line 6 Phase 1 Line 7 Line 10 Phase 1 and Line 18 In total Phase 2 consists of 183 3 km 113 9 mi of new subway 27 2014 Edit On 4 June 2014 Line 10 Phase 1 started construction 28 2015 Edit In August 2015 Line 5 Phase 1 started construction 29 2017 Edit On 28 February 2017 Line 18 s first tunnel boring machine was launched 30 On 2 June 2017 Line 4 Phase 2 was opened 31 On 6 September 2017 Line 10 phase 1 was opened 32 On 6 December 2017 Line 7 was opened 33 2018 Edit On 18 March 2018 Line 1 Phase 3 opened 34 On 26 December 2018 Line 3 Phase 2 and 3 opened 35 2019 Edit In November 2019 Chengdu Metro started to use new signage branding with the opening of Line 5 36 On 27 December 2019 Line 5 and Line 10 Phase 2 opened 37 2020 Edit On 2 June 2020 Line 18 the biggest PPP project in China started its 3 month trial operation in preparation for opening 38 On 27 May 2020 Line 6 begins testing 39 On 6 August 2020 Line 18 completed fire prevention assessment 40 On 27 September 2020 Line 18 Phase 1 opened On 18 December 2020 Line 6 Phase 1 2 3 Line 8 Phase 1 Line 9 Phase 1 Line 17 Phase 1 Line 18 Phase 2 opened marking the completion of Phase 2 and 3 projects 41 In 2020 with the opening of Line 6 Line 18 and other lines Chengdu Metro refreshed the wayfinding in all stations with alpha numeric station identifiers 42 In addition new LCD passenger information systems such as comprehensive information screen LCD in station concourses and on screen doors at some stations 43 2022 Edit On 16 Feb 2020 in order to fix the noise issue of Line 5 Xingfuqiao to Beibu Shopping Mall to Liaojiawan sections now limits operational speed of 60km h on average minimizing the noise to environment and neighbourhoods 44 Third phase projects Edit 2016 Edit On 11 July 2016 NDRC approved the third phase of expansion consisting of Line 6 phase 2 and 3 Line 8 Line 9 Line 10 Phase 2 Line 17 Phase 1 and Line 18 45 The third phase was to be simultaneously built with the already under construction second phase On 31 December 2016 Lines 8 Line 9 and Line 10 Phase 2 started construction 46 On 16 August 2016 Line 18 started construction 47 2017 Edit On 27 February 2017 Line 17 Phase 1 started construction 48 2019 Edit On 19 February 2019 Line 9 s first train was delivered from CRRC Changchun Railway Vehicles It is Chengdu s the first ever subway train capable of GoA4 ATO 49 On 30 July 2019 the TBM finished tunneling between Chengdu West Railway to Huangtianba Stations completing tunneling for Line 9 50 On 5 August 2019 all stations on Line 17 Phase 1 completed construction of main structure and roofing 51 2020 Edit On 14 January 2020 the last section of track was laid between Sanyuan Station to Jincheng Avenue Station completing track work for all of Line 9 Phase 1 52 On 11 April 2020 Chengdu Metro reported that track laying for Line 8 was completed 53 On 19 June 2020 Line 9 and Line 17 both started 3 month trial operations 54 On 24 June 2020 Construction finished for Wutongmiao Temple Depot 五桐庙停车场 for Line 17 55 On 8 July 2020 Line 6 Phase 1 and 2 was officially powered on 56 On July 17 2020 Construction officially started for the 4 stations on Line 30 in Longquanyi District 57 On 8 August 2020 Line 8 s whole line power network passed quality assessment 58 On 18 Dec 2020 Line 6 Phase 1 2 3 Line 8 Phase 1 Line 9 Phase 1 Line 17 Phase 1 Line 18 Phase 2 opened 41 Marking the completion of Phase 2 and 3 projects and making the Chengdu Metro the 4th largest subway system in the world with over 500 km of operating subway route after 15 years of breakneck growth Fourth phase projects Edit 2019 Edit On 17 June 2019 the NDRC approved the fourth phase expansion for the Chengdu Metro It consists of Line 8 Phase 2 Line 10 Phase 3 Line 13 Phase 1 Line 17 Phase 2 Line 18 Phase 3 Line 19 Phase 2 Line 27 Phase 1 Line 30 Phase 1 59 The Fourth Phase consists of 176 65 km 109 77 mi of new lines 7 2020 Edit On 18 March 2020 construction started on Line 8 Phase 2 Line 19 Phase 2 Line 27 Phase 1 and Line 30 Phase 1 60 On 11 April 2020 construction started on Line 10 Phase 3 Line 13 Phase 1 Line 17 Phase 2 Line 18 Phase 3 and Line 19 Phase 2 53 On 18 May 2020 Line 8 Phase 2 Line 27 Phase 1 Line 30 Phase 1 started construction This marks the date all 4th Phase projects started construction 61 On 17 July 2020 construction officially started for last 4 stations on Line 30 in Longquanyi District 62 On 27 Nov 2020 construction officially started for Line S3 connection line between Chengdu and Ziyang 63 2021 Edit On 2 April 2021 Chengdu Metro reached 700 0000 ridership per day for the first time 64 2022 Edit On 16 Dec 2022 Line 13 Phase 1 finished Sanguantang to Jiuyanqiao Section tunnel construction marking the success of the longest underwater river tunnel work in Chengdu Metro history 65 In Dec 2022 Line 30 Phase 1 finished Financial City North s water cable pipe reroute marking station s main structure construction enters next stage 66 In Dec 2022 Chengdu Metro s deepest and also first 4 line transfer station Luomashi finished digging Line 18 Phase 1 s platform is 45 5M deep with North Railway Station Luomashi s deepest tunnel at 48 8M equivalent to 16 floors underground Luomashi has Line 1 Line 4 Line 10 Line 18 67 2023 Edit On 13 Jan 2023 all 15 stations of Line 13 Phase 1 finished structural construction The line s tunnel finished 62 railroad finished 10 68 On 12 Feb 2023 Line 19 Phase 2 is officially powered on 69 On 17 Feb 2023 Line 30 Phase 1 Terminal 2 of Shuangliu International Airport East Sisheng section s left tunnel is finished marking the completion of the 18th tunnel 70 On 21 Feb 2023 Line 19 Phase 2 signal and communication system started operational testing in Xinmiao Control Centre 新苗控制中心 and Phase 2 signal now synchronizes with Phase 1 71 On 22 Feb 2023 Line 17 Phase 2 finished Jinxing station s main power centre s land clearance 72 On 20 March 2023 Line 19 s Changshun Villige Depot 长顺村停车场 is handover to operation 73 On 21 March 2023 Line 27 finished all station construction 74 On 26 March 2023 Line 18 increased express service from 6 to 16 trains to match the increasing needs for Chengdu Tianfu International Airport and daily commuters Line 18 also increased 58 trains daily 36 trains for Airport Express Service 75 76 On 27 March 2023 Line 8 Phase 2 finished Longgang Lianhua section tunnel work Line 8 Phase 2 entered railroad construction electrics and refurbishment stage 77 On 28 March 2023 Line 19 Phase 2 finished 160 km h high speed train testing entering 1 2 months of systematic testing 78 On 28 March 2023 Chengdu Rail Transit 2023 Annal Media Gala was held in Wenjiashan Station of Line 19 79 On 29 March 2023 Line S3 finished Baotai Avenue Changhong Square s left tunnel 80 81 On 30 March 2023 Line 13 Jiuyanqiao Xinnanmen section s tunnel boring machine finished construction 82 On 30 March 2023 Line 19 Phase 2 finished construction and handover to operation team for operational testing 83 On 30 March 2023 Chengdu Metro and Shanghai Metro s QR Code ticketing system are officially unified and connected 84 On 31 March 2023 Line 30 Phase 1 s Gaobeiba Depot 高碑坝车辆段 is powered on 85 From Jan to March 2023 Chengdu Metro TOD initialed 4 new land project of 20 0000 Sq Meter and 23 TOD projects 38 new construction project sections 86 Fifth phase projects Edit 2023 Edit On 13 Jan 2023 Chengdu Government published the fifth phase expansion and the environmental assessment for Chengdu Metro The Fifth Phase plan consists of 199 8 km 124 1 mi of 10 new lines including Line 5 Phase 3 Line 9 Phase 2 Line 10 Phase 4 Line 12 Phase 1 Line 16 Phase 1 Line 18 Phase 4 Line 20 Phase 1 Line 22 Phase 1 Line 23 Phase 1 Line 27 Phase 2 87 On 15 Feb 2023 Line S11 is approved by Sichuan Development and Reform Commission 88 On 30 March 2023 Line S11 Chengdu Deyang Line started construction This line plans to open at 2026 It consists of 70 84 km route of 45 30km elevated section 23 91km underground section and 1 63km transit section 89 On 31 March 2023 Chengdu Metro reached 100 0000 0000 ridership as one rider enters gate at 15 29 16 90 Network expansion EditLines under construction Edit Map of Chengdu Metro plan 2024 Chengdu had built about 291 km 181 mi of subway lines in 2020 91 In 2017 the construction of the first phases of Lines 8 9 11 17 and Line 10 Phase 2 started the length of subway under construction in Chengdu totaling 400 km 249 mi 92 It is expected by the end of 2020 Lines 6 8 9 17 and 18 will open Extending the Chengdu Metro network to 518 5 km 322 2 mi of route excluding Chengdu Tram 5 Est Opening Line Phase Terminals Length km Stations Notes2023 19 Phase 1 Jiujiang North Hejiang 42 87 122024 10 Phase 3 Taipingyuan Luomashi 5 67 58 Phase 2 Southwest section Longgang Lianhua 1 25 1Phase 2 Northeast section Shilidian Guilong Road 6 56 613 Phase 1 Wayaotan Long an 29 07 2117 Phase 2 Jitouqiao Gaohong 24 8 1818 Phase 3 North Section North Railway Station South Railway Station 10 99 4 93 94 Phase 3 Guanyan Section Tianfu International Airport North Guanyan 2 57 127 Phase 1 Shifo Shuxin Road 24 86 2330 Terminal 2 of Shuangliu International Airport Longquan 27 74 24 95 S3 Futian Ziyang North Railway Station 38 70 7 Through operates with 182026 S5 Honglian Meishan East Railway Station 59 315 132027 S11 Phase 1 Deyang Railway Station Weijianian 70 845 16Long term planning Edit In December 2020 Chengdu Municipal Bureau of Planning and Natural Resources announced the long term planning including Lines 1 33 D1 D6 and S1 S19 96 Fares EditSingle ride card Edit Single Ride Card is an IC card for one trip Riders can purchase it through attendants in station s Service Centers or use ticket vending machines One ticket allows only one rider in with validity of the same day If riders have not used the Single Ride Card they may refund it at the same day at the same station 97 From its opening until 1 June 2017 Chengdu Metro used a fare system based on station counts 98 With a 2 hour grace period in the subway system 99 In October 2016 Chengdu Metro held public meeting for price changing issues and set new pricing plans 100 From 2 June 2017 Chengdu Metro starts new fare system based on distance 101 Distance km Distance to next price level km Total Price CNY 元 0 4 4 24 8 4 38 12 4 412 18 6 518 24 6 624 32 8 732 40 8 840 50 10 9When the trip is longer than 50 km each additional 20 km requires another 1Each rider has a 3 hour grace period in the system Reloadable IC cards Edit The Tianfutong Pass is a reloadable IC Card accepted by the Chengdu Metro 102 Normal Tianfutong Passes provide 10 discounts Student Tianfutong Passes provide 50 discounts Senior Tianfutong Passes have special discounts depending on time of use 103 102 Additionally passengers can pay for single rides directly using Debit IC cards offered by participating banks 104 105 Train types and technology Edit The interior of a Line 7 train showing local ancient Sanxingdui Jinsha culture All standard Chengdu Metro lines in operation run on 1 500 V DC supplied by overhead lines 106 107 108 Express lines meanwhile run on 25 kV AC to get to top speed quicker Trains on Lines 3 4 7 10 and some of the newer Line 2 trains have a Golden Sun Bird insignia New trains are equipped with LCD passenger information systems Line 6 Train LCD Passenger Information System Signaling system Edit All Chengdu Metro lines are equipped with CBTC 109 Chengdu Metro Line 1 which opened to traffic in 2010 used a CBTC signaling system provided by Zhejiang Zhonghe Technology a subsidiary of Zhejiang University 110 in collaboration with Ansaldo STS 111 This system is also used on Chengdu Metro Line 6 112 and 10 113 Chengdu Metro Line 3 which opened in 2016 was one of the first adoptions of a domestic CBTC signal system implementation by Beijing Traffic Control Technology 114 Beijing Traffic Control Technology s CBTC system is also used in Line 5 115 Alstom s Urbalis 888 CBTC signal system in collaboration with CASCO is used on Line 18 19 Chengdu Light Rail Line 2 and the fully automated GoA4 Line 9 116 Type A trains Edit In response to congestion and high ridership Lines 7 8 and 10 are equipped with higher capacity 6 car aluminum alloy Type A trains The total length of 140 metres 459 ft 4 in and width is 3 metres 9 ft 10 in All trains have a maximum operating speed of 80 km h 50 mph The capacity of a 6 car train is 1 828 passengers with a crush load capacity of 2 488 passengers Line 7 trains are designed and managed by CRRC Qingdao Sifang with CRRC Chengdu performing manufacturing and assembly 117 Lines 5 6 and 9 are equipped with even higher capacity eight car aluminum alloy Type A trains The capacity of an eight car trainset is 2 480 passengers with a crush load capacity of 3 456 passengers 118 Type B trains Edit Lines 1 2 3 and 4 use six car stainless steel Type B trains with a total length of 120 metres 393 ft 8 in and width 2 8 metres 9 ft 2 in The capacity of each train set is 1 460 people with a crush load capacity of 1 880 passengers 119 All trains have a maximum operating speed of 80 km h 50 mph Lines 1 and 2 use CRRC Qingdao Sifang and CRRC Chengdu trains 120 Trains on Line 3 and 4 are manufactured by CRRC Changchun Railway Vehicles and CRRC Chengdu 121 In 2008 Chengdu Metro in anticipation of the opening of Line 1 purchased and initial order of 17 six car trains sets from CRRC Qingdao Sifang 122 In April 2011 a further order was announced for trains from CRRC for Line 2 taking the total to 59 six car sets 123 Light Rail trains Edit Currently only Chengdu Light Rail Line 2 is in operation Light Rail Line 2 uses low floor light rail trains provided by domestic manufacturer CRRC The tram system uses light rail trains of each having 5 cars and 8 doors Chengdu Light Rail Line R2 opened to public on 26 December 2018 and extended on 27 December 2019 It is 39 3 km 24 4 mi long with 35 stations 47 station when completed In early 2020 this line is included in the latest Chengdu Metro s official system map 124 125 126 Other rail transit EditHigh speed intercity rail Edit There are also two high speed intercity railways in Chengdu not part of Chengdu Metro system the Chengdu Dujiangyan intercity railway and Chengdu Pujiang intercity railway They are operated by Chengdu Metropolitan Railway Company Limited which is China s first joint venture between a local government and China s national rail operator The city and the Ministry of Railways worked together in building high speed intercity rail lines 127 Network map Edit See also EditList of metro systemsNotes Edit Lines 1 10 27 30 Lines 13 17 18 19References Edit a b c 中國新聞网 18 December 2020 成都地铁新开5条线 运营里程558公里 成都地铁运营 2 February 2019 成都地铁2018年绿色出行报告 搜狐 in Chinese Retrieved 2 February 2019 a b 袁弘 23 August 2021 成都轨道交通成网效果评估出炉 市民平均通勤时长减少 成都市住房和城乡建设局 in Chinese Retrieved 16 March 2022 程文雯 21 September 2019 2021年度成都地铁客运总量突破18亿乘次 四川日报 Retrieved 7 January 2022 a b c d 地铁 新7线 陆续开始 跑磨合 四川省交通运输厅 Sichuan Transport Department 年末成都轨道交通运营里程将达557 8公里 27 September 2020 a b 成都市城市轨道交通第四期建设规划全面启动 未来5年再建8个地铁新项目 新闻 上海证券报 中国证券网 news cnstock com Retrieved 15 September 2019 成都地铁5号线 10号线竣工验收 创下国内多个 首次 28 November 2019 成都 东进 首条主动脉 18号线一二期首开段竣工验收 Huang Zhiling and Bao Xinyan Work begins on new metro schemes China Daily 2005 12 29 Chengdu Municipal Government Subway to Adopt Natural Ventilation Archived 30 September 2007 at the Wayback Machine Retrieved on 2007 03 13 成都地铁2号线今日正式开通试运营 Archived from the original on 19 December 2012 Retrieved 16 September 2012 a b 成都地铁梦想到现实的记忆切片 honglian88 com Archived from the original on 11 August 2018 Retrieved 10 August 2018 四川在线 总工于波缺席首发 给1号线打90分 sichuan scol com cn Retrieved 10 August 2018 天府 地铁总站 占了地宫两层 图 新闻频道 news sohu com Retrieved 11 August 2018 成都地铁1号线最迟明年6月全面开建 图 网易新闻 news 163 com Retrieved 11 August 2018 成都开通我国西部地区首条地铁 in Simplified Chinese Xinhua News Agency 27 September 2010 Archived from the original on 20 October 2010 Retrieved 27 September 2010 成都地铁二号线一期工程本月16日开通试运营 in Chinese Sichuan Online 13 September 2012 Archived from the original on 6 May 2014 Retrieved 13 September 2012 成都市城市快速轨道交通建设规划 2005 2015 调整方案通过批准 ndrc gov cn in Chinese China Archived from the original on 11 August 2018 Retrieved 11 August 2018 http www chinadaily com cn china 2010 09 27 content 11355596 htm China Daily 2010 09 27 成都进入地铁时代 市民体验1号线开通试运营 in Simplified Chinese Sichuan Online 24 August 2010 Archived from the original on 26 January 2016 Retrieved 27 September 2010 成都地铁4号线获发改委批复 10月正式开建 in Simplified Chinese Sichuan Online 22 July 2011 Retrieved 22 July 2011 成都地铁3号线一期工程获批 最高时速80公里 in Simplified Chinese 华西都市报 27 April 2012 Retrieved 27 April 2012 成都地铁1号线南延线获国家发改委批复 in Simplified Chinese 四川新闻网 29 August 2012 Retrieved 29 August 2012 成都地铁3号线一期获批 明日开工设15站点 in Simplified Chinese 新华网四川频道 27 April 2012 Archived from the original on 23 May 2012 Retrieved 28 April 2012 地铁1号线南延线今日正式开通 天府新区半小时到市中心 本网最新 新闻首页 成都全搜索 成都市城市轨道交通近期建设规划 2013 2020年 通过批准 ndrc gov cn in Chinese China Archived from the original on 11 August 2018 Retrieved 11 August 2018 成都地铁10号线一期启动建设 2号线东延线10月有望开通试运营 本网原创 四川新闻 四川在线 sichuan scol com cn in Chinese China Retrieved 19 August 2018 成都地铁5号线开建 北起新都南至天府新区2019年开通 四川新闻 四川新闻网 scnews newssc org Archived from the original on 18 July 2020 Retrieved 19 August 2018 国内设计时速最快 成都轨道交通18号线首台盾构机始发 in Chinese 四川新闻网 28 February 2017 Retrieved 28 February 2017 成都地铁4号线二期正式开通试运营 移动电子支付系统即日起用于全线网 in Chinese Chengdu Metro 2 June 2017 Archived from the original on 6 June 2017 Retrieved 2 June 2017 通车 地铁10号线一期今天试运营 最成都号 上线首发 in Chinese 163 com news Sichuan 6 September 2017 Archived from the original on 6 September 2017 Retrieved 6 September 2017 成都地铁7号线正式开通试运营 in Chinese Sichuan Online 6 December 2017 Retrieved 6 December 2017 成都地铁1号线三期今日9点开通试运营 in Chinese Sichuan Online 18 March 2018 Retrieved 18 March 2018 双流新都居民喜提成都地铁3号线二三期 晚上都可以去逛春熙路了 in Chinese Sina Sichuan 26 December 2018 Retrieved 26 December 2018 妈妈再也不用担心我 打不到方向 了 明日 成都轨道交通三线齐开 26 December 2019 成都轨道交通18号线首开段实现空载 成都商报 严丹 闫宇恒 成都地铁6号线三期工程轨行区全面转入列车动车调试阶段 成都商报 7 August 2020 6号线 8号线 9号线 17号线 18号线 这些地铁线路今年开通 Sichuan Online a b 中國新聞网 18 December 2020 成都地铁新开5条线 运营里程558公里 爱你的 迎接大运会 成都地铁每个车站有了 身份证号 Weixin Official Accounts Platform Retrieved 6 July 2022 爱你的 为了迎接18号线开通 火车南站再添新装备 放大招 送票卡 Weixin Official Accounts Platform Retrieved 6 July 2022 关于成都地铁5号线幸福桥至廖家湾地铁噪音问题 已降低列车运行 7 August 2020 关于成都市城市轨道交通第三期建设规划 2016 2020年 的批复 发改基础 2016 1493号 ndrc gov cn Archived from the original on 22 June 2019 Retrieved 19 August 2018 网易 成都地铁8号线一期9号线一期10号线二期正式开工 网易新闻 news 163 com Retrieved 19 August 2018 成都地铁18号线一期工程昨日正式开工 Chengdu Municipal Development and Reform Commission cddrc gov cn Archived from the original on 7 May 2018 Retrieved 19 August 2018 成都地铁17号线一期开建 预计2020年通车 in Chinese 网易 28 February 2017 Archived from the original on 8 May 2018 Retrieved 28 February 2017 厉害 成都首条无人驾驶地铁要来了 全自动无人驾驶列车亮相 Sohu 中国西部首条全自动无人驾驶地铁线路 成都轨道交通9号线全线 洞通 成都地铁17号线一期全线车站封顶 in Chinese 成都市温江区人民政府 7 August 2019 成都地铁9号线一期工程长轨通 in Chinese 中国中铁 24 January 2020 Retrieved 26 July 2020 a b 8号线一期全线 轨通 还有其他在建线路最新进展 即将开启空载调试 空载试运行 成都地铁9号线 17号线离开通也近了 成都地铁17号线列车有家啦 五桐庙停车场主体工程完工 成都地铁6号线一二期工程 通电 啦 喜 成都地铁30号线龙泉段开始放线 龙泉驿设置4个站点 新浪网 12 August 2020 成都地铁8号线建设最新进展 国家发展改革委关于成都市城市轨道交通第四期建设规划 2019 2024年 的批复 17 June 2019 Retrieved 21 August 2019 刚刚 成都地铁8号线二期 27号一期 30号线一期三线开建 四川在线 sichuan scol com cn Retrieved 14 June 2020 成都地铁8号线二期 27号线一期 30号线一期开工 轨道交通第四期建设规划全部开工 sichuan scol com cn 喜 成都地铁30号线龙泉段开始放线 龙泉驿设置4个站点 轨道交通资阳线年底前开工建设 预计2024年底通车试运营 成都地铁单日客运量首次突破700万 成都地铁再上新 首个四线换乘车站揭秘 in Chinese 21 December 2022 成都地铁再上新 首个四线换乘车站揭秘 in Chinese 21 December 2022 成都地铁再上新 首个四线换乘车站揭秘 in Chinese 21 December 2022 10号线三期 17号线二期 18号线三期 成都轨道交通9条在建线路进展 in Chinese 195座车站封顶 23个TOD实施 成都轨道集团迎来一季度 开门红 in Chinese 地铁19号线二期年内试运营 成都轨交建设最新进展 in Chinese 21 December 2022 地铁19号线二期年内试运营 成都轨交建设最新进展 in Chinese 21 December 2022 地铁19号线二期年内试运营 成都轨交建设最新进展 in Chinese 21 December 2022 195座车站封顶 23个TOD实施 成都轨道集团迎来一季度 开门红 in Chinese 成都地铁27号线一期全线车站主体结构顺利封顶 in Chinese 赶飞机注意 成都地铁18号线快线时刻表公布 成都地铁18号线运力增长18 还提供 地铁 机场 无障碍预约服务 成都地铁8号线龙莲盾构区间顺利通过验收 热滑完成 成都地铁19号线二期提前通车有望 成都轨道交通19号线二期举办 开门评风 媒体交流活动 成都地铁S3资阳线宝台大道站 苌弘广场站盾构区间左线顺利洞通 成都轨道交通建设进展 3月29日上午10时左右 伴随着盾构机刀盘缓缓破除玻纤桩驶入车站 轨道交通资阳线 同城一号 盾构机在苌弘广场站顺利出洞 标志着宝台大道站 苌弘广场站盾构区间左线顺利洞通 取得了阶段性的胜利 weibo 成成都地铁13号线九新区间顺利完成盾构吊装 13 January 2023 Retrieved 2 April 2023 成都轨道交通19号线二期轨行区正式移交运营 成都 上海轨道交通二维码实现互联互通 成都轨道交通建设进展 30号线一期工程高碑坝车辆段110kV铜牧线顺利完成迁改送电 weibo 195座车站封顶 23个TOD实施 成都轨道集团迎来一季度 开门红 in Chinese 成都轨道交通第五期规划最新公示 13 January 2023 Retrieved 31 March 2023 地铁19号线二期年内试运营 成都轨交建设最新进展 in Chinese 21 December 2022 成德市域铁路S11线30日开工 chengdu gov cn Retrieved 1 April 2023 四川成都轨道交通线网累计客运量突破100亿人次 ChinaNews com cn Retrieved 1 April 2023 2020年 成都市轨道交通运营网总规模约291公里 in Simplified Chinese Sichuan Online 9 November 2012 Archived from the original on 6 January 2014 Retrieved 9 November 2012 成都地铁加速成网今年13条线同时在建 新闻资讯 新闻首页 成都全搜索 news chengdu cn Retrieved 25 February 2017 关于成都轨道交通18号线三期工程环境影响报告书的批复 21 June 2019 成都轨道交通18号线三期工程首次环境影响评价信息公开 9 December 2019 轨道交通30号线一期工程 Archived from the original on 10 November 2021 30号线一期工程 起于双流机场2航站楼站 止于龙泉站 线路全长约27 74 km 共设车站24座 全部为地下线 正在公示 成都轨道交通线网规划拟优化 首次出现D字头编号 单程票 in Chinese 成都地铁 Chengdu Metro Retrieved 27 July 2020 下月起 成都将现6元地铁票 in Chinese 新浪 7 May 2013 Retrieved 7 May 2013 地铁公交免费换乘暂不实施 in Chinese 新浪 15 May 2013 Retrieved 15 May 2013 成都地铁票价调整听证 八成代表赞成方案一 你会赞成吗 in Chinese 四川省人民政府 19 October 2016 Retrieved 19 October 2016 6月2日起成都地铁票价改里程计价 起步价4公里2元 腾讯 四川新闻客户端 27 May 2017 Retrieved 28 May 2017 a b 天府通 in Chinese 成都天府通 Chengdu Tianfutong Retrieved 27 July 2020 天府通持卡乘车须知 in Chinese 成都地铁 Chengdu Metro 31 July 2017 Retrieved 27 July 2020 长城华西银行 in Chinese 长城华西银行 31 July 2017 Retrieved 27 July 2020 金融IC卡 in Chinese 成都地铁 Chengdu Metro 31 July 2017 Retrieved 27 July 2020 成都地铁1号线南延线接触网成功送电 in Chinese 中国中铁 16 December 2014 Retrieved 16 December 2014 成都地铁3号线延长线19个站点公布 南起双流北通新都 in Chinese Sichuan Online 13 January 2015 Retrieved 13 January 2015 成都地铁4号线二期工程全线接触网 电通 in Chinese 成都地铁 10 December 2016 Retrieved 10 December 2016 揭秘地铁 最强大脑 控制发车 最短间隔90秒 华西都市报 22 December 2015 Archived from the original on 23 December 2017 Retrieved 6 July 2022 成都地铁声称1号线所用信号系统是安全的 四川新闻 27 September 2011 Archived from the original on 31 December 2011 Retrieved 6 July 2022 众合机电与意大利军工巨头签3700万欧元采购备忘 搜狐财经 business sohu com Retrieved 6 July 2022 众合科技 7 12亿地铁信号系统项目中标公示结束 证券 腾讯网 腾讯网 28 August 2017 Archived from the original on 5 April 2020 Retrieved 6 July 2022 两年磨一剑 众合欲争先 成都地铁10号线一期工程文化主题列车首发仪式 搜狐 7 September 2017 Archived from the original on 5 April 2020 Retrieved 6 July 2022 系统集成业绩 交控科技 Traffic Control Technology Archived from the original on 26 December 2017 Retrieved 6 July 2022 交控科技中标成都地铁5号线信号系统项目 交控科技 Traffic Control Technology Archived from the original on 26 December 2017 Retrieved 6 July 2022 7号线开通 卡斯柯助力成都地铁进入 井 环 时代 CASCO Archived from the original on 20 January 2019 Retrieved 6 July 2022 成都地铁7号线列车下线 315天刷新 成都速度 sc sina com cn Retrieved 7 October 2018 北京报道 记者 王璐 27 December 2019 成都最长地铁建成通车在即 tech sina com cn Retrieved 26 December 2019 最成都 地铁车成功试跑 取名 天府神韵 图 四川新闻 四川新闻网 scnews newssc org Retrieved 7 October 2018 明年2月 成都市民将坐上 成都造 地铁 news chengdu cn Retrieved 7 October 2018 成都地铁4号线二期车辆有望10月全部交付使用 四川新闻 蓉城聚焦 四川在线 sichuan scol com cn Retrieved 7 October 2018 网易 来了 地铁列车开到成都了 图 网易新闻 news 163 com Retrieved 7 October 2018 Chengdu Metro orders more cars 7 April 2011 Retrieved 8 April 2011 成都头条 成都地铁线路图更新 你家在哪条新线附近 新浪网 成都地铁规划建设 官方发布的成都地铁2020年线网图 快来围观 成都地铁线路图 全国首家地铁合资公司9月10日将在成都诞生 Chengdu Post in Simplified Chinese 4 September 2010 Archived from the original on 6 May 2014 Retrieved 6 September 2010 External links Edit Wikimedia Commons has media related to Chengdu Metro Chengdu Metro Official Website in Chinese Chengdu Metro on Urbanrail Retrieved from https en wikipedia org w index php title Chengdu Metro amp oldid 1148528843, wikipedia, wiki, book, books, library,