Nanjing Metro

The Nanjing Metro is a rapid transit system serving the urban and suburban districts of Nanjing, the capital city of Jiangsu Province in the People's Republic of China.

Nanjing Metro
Overview
Native name
Chinese name
Simplified Chinese南京地铁
Transcriptions
LocaleNanjing, Jiangsu
Transit typeRapid transit
Number of lines12
Number of stations208
Daily ridership3.106 million (March 2018 avg.)[1]
4.00854 million (March 8, 2019 peak)[2]
Annual ridership977.4 million (2017)[3]
Websitehttp://www.njmetro.com.cn/
Operation
Began operation3 September 2005; 17 years ago (2005-09-03)[4]
Technical
System length449 km (279 mi)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification1,500 V DC overhead lines
System map

Proposals for a metro system serving Nanjing first began in 1984, with approval by the State Planning Commission granted in 1994. Construction began on the initial 16-station Line 1 in 1999, and opened in 2005. The system has 12 lines and 208 stations running on 449.45 km (279.28 mi) of track. It is operated and maintained by the Nanjing Metro Group Company. Future expansion plans include 30 lines set to open within the next few years, with several more awaiting approval to begin construction.

History

Early proposals

In 1984 the first serious proposal for construction of a subway appeared in the Municipal People's Congress.[5] In April 1986, the Nanjing Integrated Transport Planning group was established to research on how to implement a subway system in Nanjing. In December 1986 the team published the "Nanjing Metro Initial Phase". The phase consists of a north–south line, east–west line and a diagonal Northwest to Southeast line. The three lines meet in the city center forming a triangle.[6] A revision of the "Nanjing City Master Plan" in 1993 added another line through the urban core, and three light metro lines connecting Nanjing's suburbs in Pukou and the at time proposed new airport. In addition a suburban railway to Longtan was proposed. A 1999 report on "Nanjing city rapid rail transit network planning" further proposed six subway lines, two subway extensions and three light metro lines.[7]

In 1994, the State Planning Commission approved the preparatory work for the subway only to have the entire metro project postponed in 1995 amid a national freeze on new metro projects.[8]

Major changes were made to "Nanjing Urban Rail Transit Network Planning" in 2003.[citation needed] The new master plan consisted of 13 lines, of which nine are subway lines and four are light metro lines. The new Line 6 will be a loop line connecting all the urban radial lines. The plan retained the original lines 1, 2 and 3 from the previous plan. According to the new plan, the initial phase would consist of the completion of Metro Line 1 and 2 by 2010. Together the two lines will form a basic "cross" network. By 2020 the completion of Lines 1, 2, 3, and 4 was to form a more robust "pound" shaped (#) network. Longer-term plans include the construction of a loop line connecting all existing lines. The plan also identified four subway lines crossing the Yangtze river.

First line

The initial section of Line 1 from Maigaoqiao to Xiaohang received final official approval in 1999. In May 2000, the Experimental Station resumed construction with the entire Line 1 project in full construction in December.

A western extension of Line 1 from Xiaohang to a newly built stadium was fast tracked after Nanjing won hosting the National Games. Line 1's initial section and the western extension started trial operations on September 3, 2005, running from Maigaoqiao to Olympic Stadium with 16 stations and a total length of 21.72 kilometers (13.50 mi).[5] The opening of the Nanjing Metro Line 1 gave Nanjing the sixth metro system in the Chinese mainland after Beijing, Tianjin, Shanghai, Guangzhou and Shenzhen.

Current system

Line Termini (District) Opening Newest extension Length Stations
 1  Baguazhoudaqiaonan
(Qixia)
CPU
(Jiangning)
3 September 2005 28 December 2022 45.44 km (28.24 mi)[9] 32
 2  Yuzui
(Jianye)
Jingtianlu
(Qixia)
28 May 2010 28 December 2021 43.6 km (27.1 mi)[10] 30[10]
 3  Linchang
(Pukou)
Mozhou­donglu
(Jiangning)
1 April 2015 18 October 2015 44.9 km (27.9 mi)[11] 29[11]
 4  Longjiang
(Gulou)
Xianlinhu
(Qixia)
18 January 2017 n/a 33.8 km (21.0 mi)[12] 18[12]
 7  Mufuxilu
(Gulou)
Xianxinlu
(Qixia)
28 December 2022 n/a 13.84 km (8.60 mi) 10
 10  Andemen
(Yuhuatai)
Yushanlu
(Pukou)
1 July 2014 n/a 21.6 km (13.4 mi)[13] 14[13]
 S1  Nanjing South Railway Station
(Yuhuatai)
Konggangxinchengjiangning
(Jiangning)
1 July 2014 26 May 2018 36.3 km (22.6 mi)[14] 9[14]
 S3  Nanjing South Railway Station
(Yuhuatai)
Gaojiachong
(Pukou)
6 December 2017 n/a 36.3 km (22.6 mi)[15] 19[15]
 S6  Maqun
(Qixia)
Jurong
(Jurong)
28 December 2021 n/a 43.6 km (27.1 mi)[16] 13[16]
 S7  Konggangxinchengjiangning
(Jiangning)
Wuxiangshan
(Lishui)
26 May 2018 n/a 28.8 km (17.9 mi)[17] 9[17]
 S8  Changjiangdaqiaobei
(Pukou)
Jinniuhu
(Luhe)
1 August 2014 30 September 2022 47.3 km (29.4 mi)[18] 19[18]
 S9  Xiangyulunan
(Jiangning)
Gaochun
(Gaochun)
30 December 2017 n/a 52.4 km (32.6 mi)[19] 6[19]
Total 449.45 km (279.28 mi) 208[a]
  • a Discrepancies between these figures are explained by interchange stations. If interchange stations are counted once for each line they serve, there would be 118 urban line stations, 73 S-line stations, and 191 total stations.
 
Evolution of the Nanjing Metro
 
Headquarters for the Nanjing Metro, located on top of exit 3 of the Zhujianglu station.

Line 1

Line 1 runs mainly in a north–south direction. The line starts at Maigaoqiao in the north, heading southwards to CPU (China Pharmaceutical University). The construction of Line 1 began in the year 2000 and was inaugurated on September 3, 2005, with 16 stations and a length of 21.72 kilometers (13.50 mi).[20] On May 28, 2010, Line 1's 24.5-kilometer (15.2 mi) long south extension entered into operation.[21][22] Thus, before the transfer of Line 1's Olympic Sport Center Branch to Line 10, Line 1 was 46.2-kilometer (28.7 mi) long with 31 stations.[citation needed] The Olympic Sport Center branch line broke away from Line 1 and formed parts of Line 10,[23] when the latter's construction finished and entered operation on July 1, 2014. Currently, Line 1 is 38.9-kilometer (24.2 mi) long with 27 stations.[24] Line 1's color is light blue.

Line 2

Line 2 is 43.4-kilometer (27.0 mi) long and has 30 stations.[10] It runs mainly in an east–west direction, from Yuzui in the southwest to Jingtianlu in the northeast. It entered into operation on May 28, 2010.[21][22] On 28 December 2021, the line was extended west 5.4 kilometers (3.4 mi) with 4 new stations to Yuzui Station.[25] Line 2's color is red.

Line 3

Groundbreaking work for Line 3 started in January 2010. This line, with a north–south orientation, started operation on April 1, 2015[26] and is 44.9 kilometres (27.9 mi) in length with 29 stations.[11] Line 3's color is green.

Line 4

Construction of east–west Line 4 begun in late 2012[27] and the first phase entered operation on January 18, 2017. The completed portion is 33.75 kilometers (20.97 mi) in length.[28] The line is known as A Zi (the Purple) as the branding for the line and the train color is purple, the first of which were delivered in April 2015.[29] The line started operation on January 18, 2017.[30] Line 4's color is purple.

Line 7

Line 10

Line 10 is a western extension from Line 1's Olympic Stadium branch line, which broke away from Line 1 and formed part of Line 10 when the new line was completed. Construction started in February 2012,[31] finished in 2014. The line is approximately 21.6-kilometer (13.4 mi) long with 14 stations,[13] and entered operation on July 1, 2014.[32] Line 10's color is beige.

Line S1

Line S1 acts as Nanjing's airport express line, connecting Nanjing South Railway Station to Gaochun District via Nanjing Lukou International Airport. The entire line was planned to be 85.8-kilometer (53.3 mi) long with 13 stations.[33] The first phase from Nanjing South to Lukou International Airport started construction on December 27, 2011, and finished in 2014. The first phase opened on July 1, 2014, in time for the Nanjing 2014 Summer Youth Olympics. It is 35.8-kilometer (22.2 mi) long with 8 stations.[14] The second phase extension later became Line S9.[34] Line S1's color is teal.

Line S3

Line S3 opened on 6 December 2017. It starts from Nanjing South Railway Station and heads west, crossing the Yangtze River on the cantilever along the edge of Dashengguan Yangzte River bridge together with high-speed rail trains, before terminating at the Gaojiachong station in Qiaolin, southwest of Pukou District. Originally planned as Metro Line 12 or the Ninghe Intercity Rail Line, the route started construction in late 2011. Besides Nanjing South Railway Station in which passengers can transfer to Lines 1, 3, or S1, Youfangqiao station is also a transfer station between Line S3 and Line 2.[35][36] Phase one is 37.53 kilometers (23.32 mi) long with 19 stations[37] and connects Nanjing South Railway Station to Jiangbei New Area in Pukou. Phase 2 is now still being planned, which might extends further southwest from phase 1 to Hexian county in the far future.[38] Line S3's color is magenta.

Line S6

Line S6 or the Nanjing-Jurong Intercity Railway is a 43.7 kilometers (27.2 mi) connecting suburban Nanjing with neighboring Jurong opened on 28 December 2021. It is the first line in Nanjing Metro that reaches other cities, starting at Maqun station, ending at Jurong station. Line S6's color is lilac.

Line S7

Line S7 opened on 26 May 2018. It is an extension of Line S1 further southeast, starting at Konggangxinchengjiangning station, ending at Wuxiangshan station in South Lishui District. Some Line S1 trains continue to operate into Line S7. Line S7's color is pink.

Line S8

Line S8 is a suburban metro line which connects Luhe District to Pukou District. The line is 45.2 kilometers (28.1 mi) long,[18] 34.1 kilometers (21.2 mi) of the line is elevated. The line features 17 stations[18] including 6 underground stations and 11 elevated ones. It uses B size trains in 4 car sets that are capable of running up to 100 kilometers per hour (62 mph). Construction of the line started on June 21, 2012, and it was officially opened on August 1, 2014.[39][40] Line S8's color is orange.

Line S9

Line S9 starts from Xiangyulunan station, the 6th station from Nanjing South Railway Station on Line S1, and extends further south to Gaochun District for a total length of 52.42 km (32.57 mi). Upon opening on December 30, 2017, Nanjing became the first city in mainland China where every district is accessible by metro.[41] Line S9's color is yellow.

Under-construction projects

 
The map above details Nanjing Metro's plans for all lines and stations that are planned to enter operation by the end of 2022.
Route Name Termini Planned Opening Length Stations Status Notes
 3  Line 3 (phase III) Mozhoudonglu Molingjiedao 3 km 2 u/c since May 2021 [42]
 4  Line 4 (phase II) Longjiang Zhenzhuquan 9.7 km 7 u/c since February 2021
 5  Line 5 Fangjiaying Jiyindadao 2022 37.4 km 30 u/c since December 2016 [43]
 6  Line 6 Qixiashan Nanjing South Railway Station 2023[44] 32.4 km 19 u/c since December 2019 [45]
 7  Line 7 (Southern section) Xishanqiao Zhongfulu 21.6 km 17 u/c since November 2017 [46]
 9  Line 9 (phase I) Danxialu Binjiang Park 2023 19.67 km 16 u/c since March 2020
 10  Line 10 (phase II & III) Andemen Shiyangdonglu 13.33 km 10 u/c since June 2020 [47]
 11  Line 11 (phase I) Puzhoulu Maluowei 27.0 km 20 u/c since November 2021 [48]
 S2  Line S2 Ma'anshan section Cihu Dangtu South 2027 27.5 km 8 u/c since December 2021 [49]
 S2  Line S2 Nanjing section Tongjing Xishanqiao 2027 26.51 km 8 u/c since December 2021 [50]
 S4  Line S4 Nanjing-Chuzhou Intercity Railway Nanjing North Railway Station Chuzhou Railway Station 2022 54.4 km 16 u/c since December 2018[51] [52]
 S5  Line S5 Phase I Xianlinhu Yangzhou West Railway Station 2026 57.61 km 16 u/c since December 2021 [53]
 S8  Line S8 extension Fanhezhen 2.02 km 2 u/c since November 2018 [54][55]

Line 5

Line 5 received approval on 14 January 2015.[56] Before the relocation in 2017, the line is projected to be 37.4 kilometers (23.2 mi) long, containing 30 stations and to cover a route from Fangjiaying station in Gulou District to Jiyindadao station in Jiangning District.[57]

Line 6

Line 6 is a 32.4 km fully underground line with 19 stations. Construction started on 28 December 2019.[58]

Line 7

Line 7 is a 35.7 kilometers (22.2 mi) north–south line roughly following the south bank of the Yangtze River with 26 stations.[59] A southern section has been under construction since November 2017.[60] The rest of the line started construction in November 2018.[61]

Line 9

Line 9 (phase I) is a 19.67 kilometers (12.22 mi) have a total of 16 stations, all of which are underground. The symbol of the train is orange red, and the maximum speed is 80 km/h. The route passes through Xuanwu District, Gulou District and Jianye District, and passes through Nanjing Railway Station, Xiaguan, Longjiang, Lüboyuan, Jiangsu Grand Theater and other areas. In the future, it will become an important line within the main city to connect the central Hexi, Xiaguan and Xinzhuang areas. The regional line is of great significance to the development of Hexi New City and the upgrading and reconstruction of the Xiaguan area. Construction started in May 2020, the construction period is about 4 years.[62] The list of stations: Danxialu, Caohouxun, Nanjing Railway Station, Zhongyangmen, Chenghecun, Daqiaonanlu, Xiaguan, Agricultural Trade Centre, Dinghuaimendajie, Longjiang, Guanziqiao, Hanzhongmendajie, Shuiximendajie, Qinghelu, Lüboyuan and Binjianggongyuan.[63] In the southern extension of Phase 2, Line 9 is expected to be extended all the way to Banqiao in the far south west of Nanjing.

Line S4

Line S4 or the Nanjing-Chuzhou Intercity Railway is a 51 kilometers (32 mi) connecting suburban Nanjing with neighboring Lai'an and Chuzhou of Anhui. The line will feature passing loops at select stations to allow for distinct express and local services.[64] The line is planned to open by 2022.[65][66] The line is planned to connect with the Chuzhou Metro.[67]

Ticket system

Fares on the Nanjing Subway are distance-based. Fares range from 2 yuan (approx US$0.30) for journeys under 8 stations, to 4 yuan for longer journeys.[68] There is a 5% discount for users of the Nanjing Public Utility IC Card. Fares can also be paid using Alipay.[69]

Single tickets

Single journey tickets can be purchased from the ticket vending machine or at a ticket window. The ticket vending machine accepts both coins and bills (¥5 and ¥10).

Transit card

Apart from one-way tickets, fares can be paid with the Nanjing Public Utility IC Card, or Jinlingtong (Chinese: 金陵通; pinyin: Jīnlíngtōng). It can be purchased for a refundable fee of 25 yuan (about 3.8 dollars) and refilled at ticket booths inside the metro stations as well as many collaborative convenience stores throughout the city. The card can be used to pay for other means of public transportation, such as the city taxi and the city bus.

This transit card is similar to Beijing's Yikatong, and the Octopus card of Hong Kong's MTR.

Rolling stock

  • 20 six-car Alstom/Nanjing Puzhen Rolling Stock Works Metropolis sets - ordered in 2002 for Line 1 opening.[20]
  • 21 six-car Alstom/Nanjing Puzhen Rolling Stock Works Metropolis ordered January 2008 for Line 1 extension.[21]
  • 24 six-car Alstom/Nanjing Puzhen Rolling Stock Works Metropolis cars ordered 2007 for Line 2.[70]
  • 26 four-car Alstom/Nanjing Puzhen Rolling Stock Works Metropolis cars ordered 2013 for Line S8.[71]
  • 29 six-car Alstom/Nanjing Puzhen Rolling Stock Works Metropolis cars ordered 2013 for Line 4.[72]

[needs update]

Signalling system

For Line 1, Siemens Transportation Systems (TS) was awarded the supply contract in November 2002.

For Line 2, Siemens Transportation Systems (TS) and its local partner Nanjing Research Institute of Electronic Technology (NRIET) have been awarded to supply the signaling system after signing a contract (about 25 million Euro). Technologies used include Trainguard MT, Vicos OC 501, Sicas ECC and Az S 350 U axle counting system.[73]

[needs update]

Gallery

Network Map

 

See also

Notes

a Discrepancies between these figures are explained by interchange stations. If interchange stations are counted once for each line they serve, there would be 114 urban line stations, 50 S-line stations, and 164 total stations.

References

  1. ^ dt0001. 2018年3月南京地铁日均客流310.6万人次,比上月增加86.3万人次. 地铁族. Retrieved 2018-04-01.
  2. ^ 南京地铁 (2019-03-09). "Sina Visitor System" 【刷新纪录!妇女节南京地铁客流突破408万人次】. 新浪微博 (in Chinese). Retrieved 2019-03-12.
  3. ^ [City Rail Transit Summary Dec 2017] (in Chinese). Nanjing Bureau of Statistics (南京市统计局). Archived from the original on 2018-02-15. Retrieved 2018-02-11.
  4. ^ 大事记. Nanjing Metro. Retrieved 2018-07-24. 9月3日 南京地铁一号线一期工程开通试运营
  5. ^ a b "南京地铁二十年梦圆". 扬子晚报. 2005-04-30.
  6. ^ 彭长生 (1993). "南京地铁一期工程与轨道交通规划". 都市快轨交通 (3).
  7. ^ 何宁,杨涛 (27 April 2005). "南京城市轨道交通规划:二十年规划 宏图变通途". 南京日报.
  8. ^ 国务院办公厅. "国务院办公厅关于暂停审批城市地下快速轨道交通项目的通知". 1995年12月28日. 中央政府网. Retrieved 2014-10-04.
  9. ^ 1号线 [Line 1] (in Simplified Chinese). Nanjing Metro. from the original on October 7, 2016. Retrieved March 28, 2017.
  10. ^ a b c [Nanjing-Jurong Line, Nanjing Metro Line 2 West Extension Enters Operation Today] (in Simplified Chinese). Sina News Jiangsu. Archived from the original on January 5, 2022. Retrieved January 5, 2022.
  11. ^ a b c 3号线 [Line 3] (in Simplified Chinese). Nanjing Metro. from the original on October 7, 2016. Retrieved December 16, 2016.
  12. ^ a b [Metro Line 4 Begins Construction This Month] (in Simplified Chinese). Sina. August 14, 2012. Archived from the original on January 10, 2017. Retrieved December 16, 2016.
  13. ^ a b c 10号线 [Line 10] (in Simplified Chinese). Nanjing Metro. from the original on October 7, 2016. Retrieved December 16, 2016.
  14. ^ a b c S1号线 [Line S1] (in Simplified Chinese). Nanjing Metro. from the original on October 7, 2016. Retrieved December 16, 2016.
  15. ^ a b [Ning-He Intercity Railway Tunnels Complete This Month, Ning-Ju Intercity Railway Completes Pre-Feasibility Study]. Xiandai Daily (in Simplified Chinese). August 16, 2016. Archived from the original on January 10, 2017. Retrieved December 18, 2016.
  16. ^ a b (in Simplified Chinese). Archived from the original on December 28, 2021. Retrieved January 5, 2022.
  17. ^ a b [Nanjing Metro Ning-Li Line Will Open in 2018]. Xinhua News (in Simplified Chinese). April 11, 2016. Archived from the original on January 10, 2017. Retrieved December 18, 2016.
  18. ^ a b c d [Line S8] (in Simplified Chinese). Nanjing Metro. Archived from the original on June 23, 2015. Retrieved December 16, 2016.
  19. ^ a b [Ninggao Line's Six Stations May Open by the End of Next Year]. Renmin Daily (in Simplified Chinese). September 10, 2016. Archived from the original on January 10, 2017. Retrieved December 18, 2016.
  20. ^ a b "Nanjing metro inaugurated". Railway Gazette International. 1 October 2005. Retrieved 2014-07-03.
  21. ^ a b c "Nanjing Metro places €85·5m train order". Railway Gazette International. 25 January 2008. Retrieved 2014-07-03.
  22. ^ a b 南京地铁二号线载人模拟运营]. Sina News (in Chinese). Retrieved 2010-05-25.
  23. ^ 地铁1号线四站将于6月1日起开始割接 [Four Stations of Metro Line 1 will start from June 1 cutover] (in Chinese). 南京地铁官方网站 [Nanjing Metro official website]. 29 May 2014. Retrieved 2014-07-03.
  24. ^ 1号线 [Line 1] (in Chinese). 南京地铁集团有限公司 [Nanjing Metro Group Co., Ltd.] Retrieved 2015-07-09.
  25. ^ "南京轨道交通"大爆发" 15条线路同时开建".
  26. ^ "Nanjing metro Line 3 opens". Railway Gazette International. 2 April 2015. Retrieved 2015-04-04.
  27. ^ 南京地铁4号线年底前开工. China Daily. 5 September 2012. Retrieved 2012-10-07.
  28. ^ [Metro Line 4, central city's "east-west line" achieves multiple firsts] (in Chinese). Nanjing Daily News. January 18, 2017. Archived from the original on 2017-01-26. Retrieved January 18, 2017.
  29. ^ . Nanjing China. 2 April 2015. Archived from the original on 2016-08-04. Retrieved 2016-05-28.
  30. ^ 南京地铁4号线“阿紫”开通试运营--图片频道--人民网. pic.people.com.cn (in Chinese (China)). Retrieved 2017-01-19.
  31. ^ 南京地铁三号线暨一号线西延过江线试验段开工 [Nanjing Metro Line Line 1-cum-west extension line test section over the river started]. www.ce.cn (www.chinaeconomy.cn) (in Chinese). 11 January 2010. Retrieved 2010-05-25.
  32. ^ [Nanjing Metro Line 10, the opening of the airport line tomorrow morning 6:00 to be operational at that time]. 扬子晚报网 [Yangzi Evening News Network] (in Chinese). 30 June 2014. Archived from the original on 14 July 2014. Retrieved 2014-07-03.
  33. ^ 地铁机场线、宁天城际一期工程传新动态 [Metro airport line, intercity one day pass new dynamic project]. www.HOUSE365.com (in Chinese). 26 April 2012. Retrieved 2014-07-03.
  34. ^ . Nanjing China. 21 January 2016. Archived from the original on 2016-08-04. Retrieved 2016-05-28.
  35. ^ "Alstom to Support the Metro Development of Nanjing". Railway News. 10 September 2014. Retrieved 2016-05-28.
  36. ^ . Jinling Evening News. Archived from the original on 2011-10-29. Retrieved 2012-12-26.
  37. ^ "宁和城际一期最快11月开通运营-扬子晚报网". www.yangtse.com.
  38. ^ . Nanjing China. 10 May 2016. Archived from the original on 2016-08-04. Retrieved 2016-05-28.
  39. ^ [Travel from North Daqiao Road to Jinniuhu will only require half an hour]. Nanjing People's Government. 2012-06-11. Archived from the original on 2012-10-10. Retrieved 2012-12-26.
  40. ^ 宁天城际一期开工 青奥会前通车 [Phase I of the Ningtian (Nanjing–Tianchang) intercity railway begins construction, will begin operations before 2014 Summer Youth Olympics]. 2012-06-22. Archived from the original on 2012-12-02. Retrieved 2012-12-26.
  41. ^ . Nanjing Daily (in Chinese). Archived from the original on 2014-02-21.
  42. ^ 好消息!南京地铁3号线三期工程进入实质性施工阶段,新建2座车站 2021-5-27
  43. ^ (PDF). 2021-02-21. Archived from the original (PDF) on 21 February 2021. Retrieved 2022-01-12.
  44. ^ . 2021-02-21. Archived from the original on 21 February 2021. Retrieved 2022-01-12.
  45. ^ . 2019-10-18. Archived from the original on 18 October 2019. Retrieved 2022-01-12.
  46. ^ . 2017-12-01. Archived from the original on 1 December 2017. Retrieved 2022-01-12.
  47. ^ 上海隧道江苏. "你们开摊,我们开工!南京地铁10号线二期工程TA02标正式开工啦". Weixin Official Accounts Platform. Retrieved 2022-01-12.
  48. ^ "直击现场,南京地铁11号线正式开工!_南报网". www.njdaily.cn. Retrieved 2022-01-12.
  49. ^ "宁马城际铁路(马鞍山段)开工". 安徽省人民政府. 2021-01-04.{{cite web}}: CS1 maint: url-status (link)
  50. ^ "南京三条市域铁路今日集中开工_南京晨报_2021年12月28日A03". njcb.xhby.net. Retrieved 2022-01-12.
  51. ^ . 2020-02-06. Archived from the original on 6 February 2020. Retrieved 2022-01-12.
  52. ^ . 滁州市生态环境局. 2019-08-28. Archived from the original on 28 August 2019. Retrieved 2022-01-13.
  53. ^ "1小时拥抱"大蓝鲸"!宁马、宁滁、宁扬三条跨市域轨道交通线路开工-现代快报网". www.xdkb.net. Retrieved 2022-01-12.
  54. ^ "南京地铁S8线南延线正式开工_中国拟在建项目网". m.bhi.com.cn. Retrieved 2022-01-13.
  55. ^ "南京四大重点交通工程同步开工".
  56. ^ "Nanjing Metro Line 5 MoU Signed". Railway Gazette International. 16 January 2015. Retrieved 2016-05-28.
  57. ^ . Nanjing China. 21 February 2016. Archived from the original on 2016-08-04. Retrieved 2016-05-28.
  58. ^ "南京地铁6号线开工,城市"纵贯线"串起机场高铁邮轮". 2019-12-28.
  59. ^ "南京地铁 7 号线工程" (PDF). www.jshbgz.cn. 南京地铁建设有限责任公司. Retrieved 2018-12-21.
  60. ^ . www.yangtse.com. Archived from the original on 2017-12-01. Retrieved 2018-12-21.
  61. ^ "南京地铁7号线11月29日开工 预计2021年通车--扬子晚报网". www.yangtse.com. Retrieved 2018-12-21.
  62. ^ "The first phase of Nanjing Metro Line 9 officially started". seetao.com. Retrieved 2020-05-14.
  63. ^ "Nanjing Metro Line 9 Station Locations and Names Announced". thenanjinger.com. Retrieved 2019-10-23.
  64. ^ "宁马、宁滁城际可行性报告获批,安徽媒体:南京离安徽又近了_中国政库_澎湃新闻-The Paper". www.thepaper.cn. Retrieved 2022-04-26.
  65. ^ "宁滁城际铁路合同,预计2022年通车". js.xhby.net. Retrieved 2018-12-19.
  66. ^ "宁滁城际铁路开工". js.xhby.net. 30 December 2018. Retrieved 2018-12-30.
  67. ^ "宁滁城际规划图 (第3页) - 一起扣扣网". j.17qq.com. Retrieved 2020-11-21.
  68. ^ "Public Transportation". Nanjing China. 26 March 2014. Retrieved 2016-05-28.
  69. ^ "Using Alipay for Nanjing Buses and Metro". 25 January 2019.
  70. ^ . Railway Gazette International. 1 June 2007. Archived from the original on 16 May 2012.
  71. ^ "Nanjing SR Puzhen Rail wins metro rail deal in China". Railway Technology. 8 February 2013. Retrieved 2016-05-28.
  72. ^ "Nanjing SR Puzhen to deliver 174 train cars to Nanjing Metro Line 4 in China". Railway Technology. 6 June 2013. Retrieved 2016-05-28.
  73. ^ "Siemens to supply advanced signaling and control systems to Nanjing Metro Line 2". Siemens AG. 20 April 2007. Retrieved 2008-06-30.[dead link]

External links

  • Nanjing Metro – official website (in Chinese)
  • Nanjing at UrbanRail.net

nanjing, metro, rapid, transit, system, serving, urban, suburban, districts, nanjing, capital, city, jiangsu, province, people, republic, china, overviewnative, namechinese, namesimplified, chinese南京地铁transcriptionslocalenanjing, jiangsutransit, typerapid, tra. The Nanjing Metro is a rapid transit system serving the urban and suburban districts of Nanjing the capital city of Jiangsu Province in the People s Republic of China Nanjing MetroOverviewNative nameChinese nameSimplified Chinese南京地铁TranscriptionsLocaleNanjing JiangsuTransit typeRapid transitNumber of lines12Number of stations208Daily ridership3 106 million March 2018 avg 1 4 00854 million March 8 2019 peak 2 Annual ridership977 4 million 2017 3 Websitehttp www njmetro com cn OperationBegan operation3 September 2005 17 years ago 2005 09 03 4 TechnicalSystem length449 km 279 mi Track gauge1 435 mm 4 ft 8 1 2 in standard gaugeElectrification1 500 V DC overhead linesSystem mapProposals for a metro system serving Nanjing first began in 1984 with approval by the State Planning Commission granted in 1994 Construction began on the initial 16 station Line 1 in 1999 and opened in 2005 The system has 12 lines and 208 stations running on 449 45 km 279 28 mi of track It is operated and maintained by the Nanjing Metro Group Company Future expansion plans include 30 lines set to open within the next few years with several more awaiting approval to begin construction Contents 1 History 1 1 Early proposals 1 2 First line 2 Current system 2 1 Line 1 2 2 Line 2 2 3 Line 3 2 4 Line 4 2 5 Line 7 2 6 Line 10 2 7 Line S1 2 8 Line S3 2 9 Line S6 2 10 Line S7 2 11 Line S8 2 12 Line S9 3 Under construction projects 3 1 Line 5 3 2 Line 6 3 3 Line 7 3 4 Line 9 3 5 Line S4 4 Ticket system 4 1 Single tickets 4 2 Transit card 5 Rolling stock 6 Signalling system 7 Gallery 8 Network Map 9 See also 10 Notes 11 References 12 External linksHistory EditEarly proposals Edit In 1984 the first serious proposal for construction of a subway appeared in the Municipal People s Congress 5 In April 1986 the Nanjing Integrated Transport Planning group was established to research on how to implement a subway system in Nanjing In December 1986 the team published the Nanjing Metro Initial Phase The phase consists of a north south line east west line and a diagonal Northwest to Southeast line The three lines meet in the city center forming a triangle 6 A revision of the Nanjing City Master Plan in 1993 added another line through the urban core and three light metro lines connecting Nanjing s suburbs in Pukou and the at time proposed new airport In addition a suburban railway to Longtan was proposed A 1999 report on Nanjing city rapid rail transit network planning further proposed six subway lines two subway extensions and three light metro lines 7 In 1994 the State Planning Commission approved the preparatory work for the subway only to have the entire metro project postponed in 1995 amid a national freeze on new metro projects 8 Major changes were made to Nanjing Urban Rail Transit Network Planning in 2003 citation needed The new master plan consisted of 13 lines of which nine are subway lines and four are light metro lines The new Line 6 will be a loop line connecting all the urban radial lines The plan retained the original lines 1 2 and 3 from the previous plan According to the new plan the initial phase would consist of the completion of Metro Line 1 and 2 by 2010 Together the two lines will form a basic cross network By 2020 the completion of Lines 1 2 3 and 4 was to form a more robust pound shaped network Longer term plans include the construction of a loop line connecting all existing lines The plan also identified four subway lines crossing the Yangtze river First line Edit The initial section of Line 1 from Maigaoqiao to Xiaohang received final official approval in 1999 In May 2000 the Experimental Station resumed construction with the entire Line 1 project in full construction in December A western extension of Line 1 from Xiaohang to a newly built stadium was fast tracked after Nanjing won hosting the National Games Line 1 s initial section and the western extension started trial operations on September 3 2005 running from Maigaoqiao to Olympic Stadium with 16 stations and a total length of 21 72 kilometers 13 50 mi 5 The opening of the Nanjing Metro Line 1 gave Nanjing the sixth metro system in the Chinese mainland after Beijing Tianjin Shanghai Guangzhou and Shenzhen Current system EditSee also List of Nanjing Metro stations Line Termini District Opening Newest extension Length Stations 1 Baguazhoudaqiaonan Qixia CPU Jiangning 3 September 2005 28 December 2022 45 44 km 28 24 mi 9 32 2 Yuzui Jianye Jingtianlu Qixia 28 May 2010 28 December 2021 43 6 km 27 1 mi 10 30 10 3 Linchang Pukou Mozhou donglu Jiangning 1 April 2015 18 October 2015 44 9 km 27 9 mi 11 29 11 4 Longjiang Gulou Xianlinhu Qixia 18 January 2017 n a 33 8 km 21 0 mi 12 18 12 7 Mufuxilu Gulou Xianxinlu Qixia 28 December 2022 n a 13 84 km 8 60 mi 10 10 Andemen Yuhuatai Yushanlu Pukou 1 July 2014 n a 21 6 km 13 4 mi 13 14 13 S1 Nanjing South Railway Station Yuhuatai Konggangxinchengjiangning Jiangning 1 July 2014 26 May 2018 36 3 km 22 6 mi 14 9 14 S3 Nanjing South Railway Station Yuhuatai Gaojiachong Pukou 6 December 2017 n a 36 3 km 22 6 mi 15 19 15 S6 Maqun Qixia Jurong Jurong 28 December 2021 n a 43 6 km 27 1 mi 16 13 16 S7 Konggangxinchengjiangning Jiangning Wuxiangshan Lishui 26 May 2018 n a 28 8 km 17 9 mi 17 9 17 S8 Changjiangdaqiaobei Pukou Jinniuhu Luhe 1 August 2014 30 September 2022 47 3 km 29 4 mi 18 19 18 S9 Xiangyulunan Jiangning Gaochun Gaochun 30 December 2017 n a 52 4 km 32 6 mi 19 6 19 Total 449 45 km 279 28 mi 208 a a Discrepancies between these figures are explained by interchange stations If interchange stations are counted once for each line they serve there would be 118 urban line stations 73 S line stations and 191 total stations Evolution of the Nanjing Metro Headquarters for the Nanjing Metro located on top of exit 3 of the Zhujianglu station Line 1 Edit Main article Line 1 Nanjing Metro Line 1 runs mainly in a north south direction The line starts at Maigaoqiao in the north heading southwards to CPU China Pharmaceutical University The construction of Line 1 began in the year 2000 and was inaugurated on September 3 2005 with 16 stations and a length of 21 72 kilometers 13 50 mi 20 On May 28 2010 Line 1 s 24 5 kilometer 15 2 mi long south extension entered into operation 21 22 Thus before the transfer of Line 1 s Olympic Sport Center Branch to Line 10 Line 1 was 46 2 kilometer 28 7 mi long with 31 stations citation needed The Olympic Sport Center branch line broke away from Line 1 and formed parts of Line 10 23 when the latter s construction finished and entered operation on July 1 2014 Currently Line 1 is 38 9 kilometer 24 2 mi long with 27 stations 24 Line 1 s color is light blue Line 2 Edit Main article Line 2 Nanjing Metro Line 2 is 43 4 kilometer 27 0 mi long and has 30 stations 10 It runs mainly in an east west direction from Yuzui in the southwest to Jingtianlu in the northeast It entered into operation on May 28 2010 21 22 On 28 December 2021 the line was extended west 5 4 kilometers 3 4 mi with 4 new stations to Yuzui Station 25 Line 2 s color is red Line 3 Edit Main article Line 3 Nanjing Metro Groundbreaking work for Line 3 started in January 2010 This line with a north south orientation started operation on April 1 2015 26 and is 44 9 kilometres 27 9 mi in length with 29 stations 11 Line 3 s color is green Line 4 Edit Main article Line 4 Nanjing Metro Construction of east west Line 4 begun in late 2012 27 and the first phase entered operation on January 18 2017 The completed portion is 33 75 kilometers 20 97 mi in length 28 The line is known as A Zi the Purple as the branding for the line and the train color is purple the first of which were delivered in April 2015 29 The line started operation on January 18 2017 30 Line 4 s color is purple Line 7 Edit Main article Line 7 Nanjing Metro Line 10 Edit Main article Line 10 Nanjing Metro Line 10 is a western extension from Line 1 s Olympic Stadium branch line which broke away from Line 1 and formed part of Line 10 when the new line was completed Construction started in February 2012 31 finished in 2014 The line is approximately 21 6 kilometer 13 4 mi long with 14 stations 13 and entered operation on July 1 2014 32 Line 10 s color is beige Line S1 Edit Main article Line S1 Nanjing Metro Line S1 acts as Nanjing s airport express line connecting Nanjing South Railway Station to Gaochun District via Nanjing Lukou International Airport The entire line was planned to be 85 8 kilometer 53 3 mi long with 13 stations 33 The first phase from Nanjing South to Lukou International Airport started construction on December 27 2011 and finished in 2014 The first phase opened on July 1 2014 in time for the Nanjing 2014 Summer Youth Olympics It is 35 8 kilometer 22 2 mi long with 8 stations 14 The second phase extension later became Line S9 34 Line S1 s color is teal Line S3 Edit Main article Line S3 Nanjing Metro Line S3 opened on 6 December 2017 It starts from Nanjing South Railway Station and heads west crossing the Yangtze River on the cantilever along the edge of Dashengguan Yangzte River bridge together with high speed rail trains before terminating at the Gaojiachong station in Qiaolin southwest of Pukou District Originally planned as Metro Line 12 or the Ninghe Intercity Rail Line the route started construction in late 2011 Besides Nanjing South Railway Station in which passengers can transfer to Lines 1 3 or S1 Youfangqiao station is also a transfer station between Line S3 and Line 2 35 36 Phase one is 37 53 kilometers 23 32 mi long with 19 stations 37 and connects Nanjing South Railway Station to Jiangbei New Area in Pukou Phase 2 is now still being planned which might extends further southwest from phase 1 to Hexian county in the far future 38 Line S3 s color is magenta Line S6 Edit Main article Line S6 Nanjing Metro Line S6 or the Nanjing Jurong Intercity Railway is a 43 7 kilometers 27 2 mi connecting suburban Nanjing with neighboring Jurong opened on 28 December 2021 It is the first line in Nanjing Metro that reaches other cities starting at Maqun station ending at Jurong station Line S6 s color is lilac Line S7 Edit Main article Line S7 Nanjing Metro Line S7 opened on 26 May 2018 It is an extension of Line S1 further southeast starting at Konggangxinchengjiangning station ending at Wuxiangshan station in South Lishui District Some Line S1 trains continue to operate into Line S7 Line S7 s color is pink Line S8 Edit Main article Line S8 Nanjing Metro Line S8 is a suburban metro line which connects Luhe District to Pukou District The line is 45 2 kilometers 28 1 mi long 18 34 1 kilometers 21 2 mi of the line is elevated The line features 17 stations 18 including 6 underground stations and 11 elevated ones It uses B size trains in 4 car sets that are capable of running up to 100 kilometers per hour 62 mph Construction of the line started on June 21 2012 and it was officially opened on August 1 2014 39 40 Line S8 s color is orange Line S9 Edit Main article Line S9 Nanjing Metro Line S9 starts from Xiangyulunan station the 6th station from Nanjing South Railway Station on Line S1 and extends further south to Gaochun District for a total length of 52 42 km 32 57 mi Upon opening on December 30 2017 Nanjing became the first city in mainland China where every district is accessible by metro 41 Line S9 s color is yellow Under construction projects Edit The map above details Nanjing Metro s plans for all lines and stations that are planned to enter operation by the end of 2022 Route Name Termini Planned Opening Length Stations Status Notes 3 Line 3 phase III Mozhoudonglu Molingjiedao 3 km 2 u c since May 2021 42 4 Line 4 phase II Longjiang Zhenzhuquan 9 7 km 7 u c since February 2021 5 Line 5 Fangjiaying Jiyindadao 2022 37 4 km 30 u c since December 2016 43 6 Line 6 Qixiashan Nanjing South Railway Station 2023 44 32 4 km 19 u c since December 2019 45 7 Line 7 Southern section Xishanqiao Zhongfulu 21 6 km 17 u c since November 2017 46 9 Line 9 phase I Danxialu Binjiang Park 2023 19 67 km 16 u c since March 2020 10 Line 10 phase II amp III Andemen Shiyangdonglu 13 33 km 10 u c since June 2020 47 11 Line 11 phase I Puzhoulu Maluowei 27 0 km 20 u c since November 2021 48 S2 Line S2 Ma anshan section Cihu Dangtu South 2027 27 5 km 8 u c since December 2021 49 S2 Line S2 Nanjing section Tongjing Xishanqiao 2027 26 51 km 8 u c since December 2021 50 S4 Line S4 Nanjing Chuzhou Intercity Railway Nanjing North Railway Station Chuzhou Railway Station 2022 54 4 km 16 u c since December 2018 51 52 S5 Line S5 Phase I Xianlinhu Yangzhou West Railway Station 2026 57 61 km 16 u c since December 2021 53 S8 Line S8 extension Fanhezhen 2 02 km 2 u c since November 2018 54 55 Line 5 Edit Main article Line 5 Nanjing Metro Line 5 received approval on 14 January 2015 56 Before the relocation in 2017 the line is projected to be 37 4 kilometers 23 2 mi long containing 30 stations and to cover a route from Fangjiaying station in Gulou District to Jiyindadao station in Jiangning District 57 Line 6 Edit Line 6 is a 32 4 km fully underground line with 19 stations Construction started on 28 December 2019 58 Line 7 Edit Line 7 is a 35 7 kilometers 22 2 mi north south line roughly following the south bank of the Yangtze River with 26 stations 59 A southern section has been under construction since November 2017 60 The rest of the line started construction in November 2018 61 Line 9 Edit Line 9 phase I is a 19 67 kilometers 12 22 mi have a total of 16 stations all of which are underground The symbol of the train is orange red and the maximum speed is 80 km h The route passes through Xuanwu District Gulou District and Jianye District and passes through Nanjing Railway Station Xiaguan Longjiang Luboyuan Jiangsu Grand Theater and other areas In the future it will become an important line within the main city to connect the central Hexi Xiaguan and Xinzhuang areas The regional line is of great significance to the development of Hexi New City and the upgrading and reconstruction of the Xiaguan area Construction started in May 2020 the construction period is about 4 years 62 The list of stations Danxialu Caohouxun Nanjing Railway Station Zhongyangmen Chenghecun Daqiaonanlu Xiaguan Agricultural Trade Centre Dinghuaimendajie Longjiang Guanziqiao Hanzhongmendajie Shuiximendajie Qinghelu Luboyuan and Binjianggongyuan 63 In the southern extension of Phase 2 Line 9 is expected to be extended all the way to Banqiao in the far south west of Nanjing Line S4 Edit Line S4 or the Nanjing Chuzhou Intercity Railway is a 51 kilometers 32 mi connecting suburban Nanjing with neighboring Lai an and Chuzhou of Anhui The line will feature passing loops at select stations to allow for distinct express and local services 64 The line is planned to open by 2022 65 66 The line is planned to connect with the Chuzhou Metro 67 Ticket system EditFares on the Nanjing Subway are distance based Fares range from 2 yuan approx US 0 30 for journeys under 8 stations to 4 yuan for longer journeys 68 There is a 5 discount for users of the Nanjing Public Utility IC Card Fares can also be paid using Alipay 69 Single tickets Edit Single journey tickets can be purchased from the ticket vending machine or at a ticket window The ticket vending machine accepts both coins and bills 5 and 10 Transit card Edit Apart from one way tickets fares can be paid with the Nanjing Public Utility IC Card or Jinlingtong Chinese 金陵通 pinyin Jinlingtōng It can be purchased for a refundable fee of 25 yuan about 3 8 dollars and refilled at ticket booths inside the metro stations as well as many collaborative convenience stores throughout the city The card can be used to pay for other means of public transportation such as the city taxi and the city bus This transit card is similar to Beijing s Yikatong and the Octopus card of Hong Kong s MTR Rolling stock Edit20 six car Alstom Nanjing Puzhen Rolling Stock Works Metropolis sets ordered in 2002 for Line 1 opening 20 21 six car Alstom Nanjing Puzhen Rolling Stock Works Metropolis ordered January 2008 for Line 1 extension 21 24 six car Alstom Nanjing Puzhen Rolling Stock Works Metropolis cars ordered 2007 for Line 2 70 26 four car Alstom Nanjing Puzhen Rolling Stock Works Metropolis cars ordered 2013 for Line S8 71 29 six car Alstom Nanjing Puzhen Rolling Stock Works Metropolis cars ordered 2013 for Line 4 72 needs update Signalling system EditFor Line 1 Siemens Transportation Systems TS was awarded the supply contract in November 2002 For Line 2 Siemens Transportation Systems TS and its local partner Nanjing Research Institute of Electronic Technology NRIET have been awarded to supply the signaling system after signing a contract about 25 million Euro Technologies used include Trainguard MT Vicos OC 501 Sicas ECC and Az S 350 U axle counting system 73 needs update Gallery Edit A Line 1 train approaching Hongshan Zoo station A Line 1 train at Zhangfuyuan station A line 2 train near Xianhemen station A Line 3 train leaving Linchang station A line 10 train approaching Xiaohang station A view in Line 10 train carriage Nanjing Line S3 train A Line S8 train A train of Nanjing Metro Line S9 A train of Nanjing Metro Line S7Network Map Edit See also EditList of Nanjing Metro stations Nanjing trams List of metro systemsNotes Edita Discrepancies between these figures are explained by interchange stations If interchange stations are counted once for each line they serve there would be 114 urban line stations 50 S line stations and 164 total stations References Edit dt0001 2018年3月南京地铁日均客流310 6万人次 比上月增加86 3万人次 地铁族 Retrieved 2018 04 01 南京地铁 2019 03 09 Sina Visitor System 刷新纪录 妇女节南京地铁客流突破408万人次 新浪微博 in Chinese Retrieved 2019 03 12 城市地铁运输情况 2017年12月 City Rail Transit Summary Dec 2017 in Chinese Nanjing Bureau of Statistics 南京市统计局 Archived from the original on 2018 02 15 Retrieved 2018 02 11 大事记 Nanjing Metro Retrieved 2018 07 24 9月3日 南京地铁一号线一期工程开通试运营 a b 南京地铁二十年梦圆 扬子晚报 2005 04 30 彭长生 1993 南京地铁一期工程与轨道交通规划 都市快轨交通 3 何宁 杨涛 27 April 2005 南京城市轨道交通规划 二十年规划 宏图变通途 南京日报 国务院办公厅 国务院办公厅关于暂停审批城市地下快速轨道交通项目的通知 1995年12月28日 中央政府网 Retrieved 2014 10 04 1号线 Line 1 in Simplified Chinese Nanjing Metro Archived from the original on October 7 2016 Retrieved March 28 2017 a b c 宁句城际 南京地铁2号线西延线今日开通初期运营 Nanjing Jurong Line Nanjing Metro Line 2 West Extension Enters Operation Today in Simplified Chinese Sina News Jiangsu Archived from the original on January 5 2022 Retrieved January 5 2022 a b c 3号线 Line 3 in Simplified Chinese Nanjing Metro Archived from the original on October 7 2016 Retrieved December 16 2016 a b 地铁四号线两站点本月开建 一期工程力争年内全面开工 Metro Line 4 Begins Construction This Month in Simplified Chinese Sina August 14 2012 Archived from the original on January 10 2017 Retrieved December 16 2016 a b c 10号线 Line 10 in Simplified Chinese Nanjing Metro Archived from the original on October 7 2016 Retrieved December 16 2016 a b c S1号线 Line S1 in Simplified Chinese Nanjing Metro Archived from the original on October 7 2016 Retrieved December 16 2016 a b 宁和城际盾构隧道本月贯通 宁句城际目前已完成预可行性研究工作 Ning He Intercity Railway Tunnels Complete This Month Ning Ju Intercity Railway Completes Pre Feasibility Study Xiandai Daily in Simplified Chinese August 16 2016 Archived from the original on January 10 2017 Retrieved December 18 2016 a b 宁句城际 地铁2号线西延线今开通 in Simplified Chinese Archived from the original on December 28 2021 Retrieved January 5 2022 a b 宁溧城际全线开工2018年通车 Nanjing Metro Ning Li Line Will Open in 2018 Xinhua News in Simplified Chinese April 11 2016 Archived from the original on January 10 2017 Retrieved December 18 2016 a b c d S8号线 Line S8 in Simplified Chinese Nanjing Metro Archived from the original on June 23 2015 Retrieved December 16 2016 a b 宁高城际二期有望明年底通车全线设6座车站 Ninggao Line s Six Stations May Open by the End of Next Year Renmin Daily in Simplified Chinese September 10 2016 Archived from the original on January 10 2017 Retrieved December 18 2016 a b Nanjing metro inaugurated Railway Gazette International 1 October 2005 Retrieved 2014 07 03 a b c Nanjing Metro places 85 5m train order Railway Gazette International 25 January 2008 Retrieved 2014 07 03 a b 南京地铁二号线载人模拟运营 Sina News in Chinese Retrieved 2010 05 25 地铁1号线四站将于6月1日起开始割接 Four Stations of Metro Line 1 will start from June 1 cutover in Chinese 南京地铁官方网站 Nanjing Metro official website 29 May 2014 Retrieved 2014 07 03 1号线 Line 1 in Chinese 南京地铁集团有限公司 Nanjing Metro Group Co Ltd Retrieved 2015 07 09 南京轨道交通 大爆发 15条线路同时开建 Nanjing metro Line 3 opens Railway Gazette International 2 April 2015 Retrieved 2015 04 04 南京地铁4号线年底前开工 China Daily 5 September 2012 Retrieved 2012 10 07 南京地铁4号线主城 横贯线 连创多个第一 Metro Line 4 central city s east west line achieves multiple firsts in Chinese Nanjing Daily News January 18 2017 Archived from the original on 2017 01 26 Retrieved January 18 2017 First Trainset of Nanjing Metro Line 4 Unveils Nanjing China 2 April 2015 Archived from the original on 2016 08 04 Retrieved 2016 05 28 南京地铁4号线 阿紫 开通试运营 图片频道 人民网 pic people com cn in Chinese China Retrieved 2017 01 19 南京地铁三号线暨一号线西延过江线试验段开工 Nanjing Metro Line Line 1 cum west extension line test section over the river started www ce cn www chinaeconomy cn in Chinese 11 January 2010 Retrieved 2010 05 25 南京地铁10号线 机场线明晨6点通车 运营时刻早知道 Nanjing Metro Line 10 the opening of the airport line tomorrow morning 6 00 to be operational at that time 扬子晚报网 Yangzi Evening News Network in Chinese 30 June 2014 Archived from the original on 14 July 2014 Retrieved 2014 07 03 地铁机场线 宁天城际一期工程传新动态 Metro airport line intercity one day pass new dynamic project www HOUSE365 com in Chinese 26 April 2012 Retrieved 2014 07 03 2nd Phase of Metro Line S1 be in Construction Nanjing China 21 January 2016 Archived from the original on 2016 08 04 Retrieved 2016 05 28 Alstom to Support the Metro Development of Nanjing Railway News 10 September 2014 Retrieved 2016 05 28 12号线变身 宁和城际 Jinling Evening News Archived from the original on 2011 10 29 Retrieved 2012 12 26 宁和城际一期最快11月开通运营 扬子晚报网 www yangtse com 17 Stations of Nanjing Metro Line S3 Mainly Completed Nanjing China 10 May 2016 Archived from the original on 2016 08 04 Retrieved 2016 05 28 大桥北路到金牛湖将只要半小时 Travel from North Daqiao Road to Jinniuhu will only require half an hour Nanjing People s Government 2012 06 11 Archived from the original on 2012 10 10 Retrieved 2012 12 26 宁天城际一期开工 青奥会前通车 Phase I of the Ningtian Nanjing Tianchang intercity railway begins construction will begin operations before 2014 Summer Youth Olympics 2012 06 22 Archived from the original on 2012 12 02 Retrieved 2012 12 26 宁高城际简介 Nanjing Daily in Chinese Archived from the original on 2014 02 21 好消息 南京地铁3号线三期工程进入实质性施工阶段 新建2座车站 2021 5 27 南京地铁五号线工程 环境影响报告书 PDF 2021 02 21 Archived from the original PDF on 21 February 2021 Retrieved 2022 01 12 南京地铁6号线首个车站破土动工 计划2023年建成通车 2021 02 21 Archived from the original on 21 February 2021 Retrieved 2022 01 12 江苏省发展和改革委员会 发改要闻 南京地铁6号线工程 不含岗子村站及相邻区间 可研报告获得批复 2019 10 18 Archived from the original on 18 October 2019 Retrieved 2022 01 12 南京地铁七号线再次传来好消息 将于11月29日全线开工 扬子晚报网 2017 12 01 Archived from the original on 1 December 2017 Retrieved 2022 01 12 上海隧道江苏 你们开摊 我们开工 南京地铁10号线二期工程TA02标正式开工啦 Weixin Official Accounts Platform Retrieved 2022 01 12 直击现场 南京地铁11号线正式开工 南报网 www njdaily cn Retrieved 2022 01 12 宁马城际铁路 马鞍山段 开工 安徽省人民政府 2021 01 04 a href Template Cite web html title Template Cite web cite web a CS1 maint url status link 南京三条市域铁路今日集中开工 南京晨报 2021年12月28日A03 njcb xhby net Retrieved 2022 01 12 2018年安徽省重大前期工作项目推进计划公布 安徽频道 人民网 2020 02 06 Archived from the original on 6 February 2020 Retrieved 2022 01 12 世行贷款滁州至南京城际铁路工程环境影响相关报告全文公示 滁州市生态环境局 2019 08 28 Archived from the original on 28 August 2019 Retrieved 2022 01 13 1小时拥抱 大蓝鲸 宁马 宁滁 宁扬三条跨市域轨道交通线路开工 现代快报网 www xdkb net Retrieved 2022 01 12 南京地铁S8线南延线正式开工 中国拟在建项目网 m bhi com cn Retrieved 2022 01 13 南京四大重点交通工程同步开工 Nanjing Metro Line 5 MoU Signed Railway Gazette International 16 January 2015 Retrieved 2016 05 28 Plan on Nanjing Metro Line 5 Approved Nanjing China 21 February 2016 Archived from the original on 2016 08 04 Retrieved 2016 05 28 南京地铁6号线开工 城市 纵贯线 串起机场高铁邮轮 2019 12 28 南京地铁 7 号线工程 PDF www jshbgz cn 南京地铁建设有限责任公司 Retrieved 2018 12 21 南京地铁七号线再次传来好消息 将于11月29日全线开工 扬子晚报网 www yangtse com Archived from the original on 2017 12 01 Retrieved 2018 12 21 南京地铁7号线11月29日开工 预计2021年通车 扬子晚报网 www yangtse com Retrieved 2018 12 21 The first phase of Nanjing Metro Line 9 officially started seetao com Retrieved 2020 05 14 Nanjing Metro Line 9 Station Locations and Names Announced thenanjinger com Retrieved 2019 10 23 宁马 宁滁城际可行性报告获批 安徽媒体 南京离安徽又近了 中国政库 澎湃新闻 The Paper www thepaper cn Retrieved 2022 04 26 宁滁城际铁路合同 预计2022年通车 js xhby net Retrieved 2018 12 19 宁滁城际铁路开工 js xhby net 30 December 2018 Retrieved 2018 12 30 宁滁城际规划图 第3页 一起扣扣网 j 17qq com Retrieved 2020 11 21 Public Transportation Nanjing China 26 March 2014 Retrieved 2016 05 28 Using Alipay for Nanjing Buses and Metro 25 January 2019 Shanghai and Nanjing order cars Railway Gazette International 1 June 2007 Archived from the original on 16 May 2012 Nanjing SR Puzhen Rail wins metro rail deal in China Railway Technology 8 February 2013 Retrieved 2016 05 28 Nanjing SR Puzhen to deliver 174 train cars to Nanjing Metro Line 4 in China Railway Technology 6 June 2013 Retrieved 2016 05 28 Siemens to supply advanced signaling and control systems to Nanjing Metro Line 2 Siemens AG 20 April 2007 Retrieved 2008 06 30 dead link External links Edit Wikimedia Commons has media related to Nanjing Metro Nanjing Metro official website in Chinese Nanjing at UrbanRail net Retrieved from https en wikipedia org w index php title Nanjing Metro amp oldid 1130363882, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.