Line 1 of the Beijing Subway (Chinese: 北京地铁1号线; pinyin: Běijīng dìtiě yīhào xiàn) is the oldest and one of the busiest lines of Beijing's mass transit rail network. Line 1 runs underneath Chang'an Avenue, the city's grand east–west thoroughfare, right through the heart of Beijing with stops on either side of Tiananmen Square. Line 1's color is dark red. Through operation with the Batong line started on August 29, 2021.[7]

Line 1
Overview
Other name(s)M1 (planned name)
Fuba line (Chinese: 复八线, for Fuxingmen to Sihuidong section)
StatusOperational
LocaleChaoyang, Dongcheng, Xicheng, Haidian, and Shijingshan districts
Beijing
Termini
Stations23 (not accounting for Batong Line, but including Gaobeidian)
Service
TypeRapid transit
SystemBeijing Subway
Operator(s)Beijing Mass Transit Railway Operation Corp., Ltd.
Depot(s)Guchenglu, Sihui Depots[1][2]
Rolling stock6-car Type B (DKZ4, SFM04)
Daily ridership1,234,900 (2014 Avg.)[3]
1,536,900 (2014 Peak)[4][5]
History
OpenedJanuary 15, 1971; 53 years ago (1971-01-15)
Technical
Line length31.04 km (19.29 mi)[6]
CharacterUnderground, at-grade[a]
Track gauge1,435 mm (4 ft 8+12 in)
Operating speed80 km/h (maximum service speed)
Route map

101 Gaojing
102 Fushouling (under renovation, to be reopened 2023)
Yongding River diversion canal
103 Pingguoyuan (closed for renovation)
connects Jingmen railway
Gucheng depot
104 Gucheng
101 railway (for military purpose only)
105 Bajiao Amusement Park
106 Babaoshan
107 Yuquan Lu
108 Wukesong
109 Wanshou Lu
110 Gongzhufen
outer – inner
111 Military Museum
Yongding River diversion canal
112 Muxidi
Line 16 (out-of-system interchange)
113 Nanlishi Lu
connects Line 2
114 Fuxingmen
outer – inner
Line 19 crossing
115 Xidan
116 Tian'anmenxi
117 Tian'anmendong
118 Wangfujing
connects Line 5
119 Dongdan
120 Jianguomen
inner – outer
connects Line 2
121 Yong'anli
Line 17 (to be opened 2024)
122 Guomao
inner – outer
123 Dawang Lu
124 Sihui
Batong line (through operation to Line 1)
connects Batong line (through operation to Line 1) (for depot trains only)
Sihui depot
Through operation
with Batong line (through operation to Line 1)
125 Sihuidong
Batong line (through operation to Line 1)

Ridership edit

As the oldest line of the Beijing Subway, Line 1 was also the most heavily used from the time the subway opened in 1971 until January 2013, when the near-completion of the Line 10 loop caused ridership on that line to surge past Line 1. Recent traffic relief efforts have been completed in recent years. The opening of the first phase of the parallel Line 6, caused an 8.46% decrease in daily demand and a 10-20% reduction in peak flow during rush hour.[8] In addition Beijing BRT line 2 parallels the eastern section of Line 1. In the meantime between 2014 and 2015, Line 1 again upgraded its signals to a communications-based train control system allowing trains to run at headways as low as 1 minutes 45 seconds. However, during peak hours, sections of the line were reported in 2013 to still operate above 100% capacity.[8]

Hours of operation edit

The first east-bound trains departs from Gucheng at 4:58 am and Pingguoyuan at 5:10 am. The first west-bound train departs Sihui at 4:56 am and Sihui East at 5:05 am. The last east-bound train leaves Pingguoyuan at 10:55 pm. The last west-bound train leaves Sihui East at 11:15 pm.[9]

Route edit

Line 1's western terminus is Pingguoyuan, located in Shijingshan District. The line heads southeast to its second stop at Gucheng and from there runs straight east, following Chang'an Avenue all the way to its eastern terminus, Sihuidong in Chaoyang District, just beyond the 4th Ring Road. The line passes through Xidan, Wangfujing and Dongdan, among other important commercial centers of Xicheng and Dongcheng Districts, as well as the Beijing CBD near the China World Trade Center. The line is 31.04 km (19.29 mi)[6] in length with 23 stations in operation. All stations except for Sihui and Sihuidong are underground.

Stations edit

Station list for Line 1 and Batong line of Beijing Subway, after the through operation started on August 29, 2021.[7]

● Normal: GuchengHuanqiu Dujiaqu (Universal Resort)
● Morning rush hour: GongzhufenGuoyuan
● Evening rush hour: GuchengGuoyuan

Line Name Service
routes
Station Name Connections Nearby Bus Stops Distance
km[10]
Location
English Chinese
Line 1 Fushouling
(Opening in early 2024)
福寿岭 Shijingshan
Pingguoyuan
(Under renovation, re-opening in late 2024)
苹果园  6   S1  325 336 358 370 396 399 472 527 597 664 876 892 920 929 931 932 941快 948 961 972 977 977快 981 快速直达专线142 快速直达专线150 M3 M4 M5 M6 M7 M11 M16 M20 M22 0.000 0.000
Gucheng 古城 318 327 337 399 597 941 958 959 992 快速直达专线208 快速直达专线213 快速直达专线222 夜5 专61 专210 专218 2.606 2.606
Bajiao Amusement Park 八角游乐园 325 337 373 436 472 527 574 597 598 663 914 941 959 965 992 夜5 专46 专86 专91 专111 专215 1.921 4.527
Babaoshan 八宝山 1 76 337 373 527 546 574 597 610 914 941 951 961 979 快速直达专线187 夜1 专69 专109 专111 专150 专215 1.953 6.480
Yuquan Lu 玉泉路 1 76 78 337 338 354 370 373 389 436 452 463 472 473 481 507 610 612 644 941 941快 979 夜1 专11 1.479 7.959
Wukesong 五棵松 1 64 76 97 337 370 400 400快 436 568 624 952 967 982 983 夜1 专127 1.810 9.769 Haidian
Wanshou Lu 万寿路 1 32 33 64 68 76 77 89 308 335 337 370 624 627 夜1 夜5 夜16 1.778 11.547
Gongzhufen 公主坟  10  1 32 33 40 52 62 64 68 74 76 77 89 94 134 300 300快 308 323 335 337 368 370 374 394 437 603 624 631快 698 977 977快 夜1 夜5 夜30 1.313 12.860
Military Museum 军事博物馆  9  1 21 40 52 65 68 78 85 94 308 414 夜1 夜5 夜8 1.172 14.032
Muxidi 木樨地  16  (out-of-system interchange) 1 21 32 52 65 68 78 85 94 114 308 320 夜1 夜8 1.166 15.198 Xicheng
Nanlishi Lu 南礼士路 1 3 10 15 19 42 46 49 52 56 夜1 夜8 夜12 1.291 16.489
Fuxingmen 复兴门  2 
 19  (Out-of-system interchange via Taipingqiao)[11]
1 10 15 44 49 52 200 332 387 395 423 691 694 快速直达专线17 快速直达专线201 夜1 夜20 专191 0.424 16.913
Xidan 西单  4  1 7 15 22 52 70 83 88 102 105 109 143 快速直达专线17 夜1 夜4 夜10 1.590 18.503
Tian'anmenxi 天安门西 1 5 52 观光1 观光2 夜1 1.217 19.720
Tian'anmendong 天安门东 1 2 52 82 120 观光1 观光2 夜1 夜2 夜17 0.925 20.645 Dongcheng
Wangfujing 王府井  8  1 41 52 103 120 141 观光2 夜1 夜17 夜18 夜21 0.852 21.497
Dongdan 东单  5  1 39 41 52 104 106 108 110 111 116 120 128 140 684 夜1 夜10 夜17 0.774 22.271
Jianguomen 建国门  2  1 20 39 43 44 52 58 120 122 126 139 140 142 200 403 637 638 639 夜1 夜10 夜19 夜20 夜24 夜28 夜29 1.230 23.501
Yong'anli 永安里 1 9 28 43 58 120 126 140 403 639 668 夜1 夜24 1.377 24.878 Chaoyang
Guomao 国贸  10  1 9 11 28 57 58 72 98 113 348 368 382 388 402 405 421 488 561 647 650 666 667 668 669 687 804 805快 806 807 808 809 814 816 817 818 818快 846 848 930 938快 976 快速直达专线5 快速直达专线9 快速直达专线20 快速直达专线61 快速直达专线69 快速直达专线169 夜1 夜27 夜30 专10 0.790 25.668
Dawang Lu 大望路  14  1 11 31 54 57 58 138 382 388 405 421 486 605 647 666 667 668 804 812 815 815快 816 817 818 818快 823 930 973 985 988 快速直达专线5 快速直达专线20 快速直达专线61 夜1 夜25 夜27 夜34 专141 专165 1.385 27.053
Sihui 四惠 1 57 58 322 363 397 405 455 468 475 496 506 517 553 605 657 666 671 865 988 989 夜1 夜27 专113 专167 1.673 28.726
Sihuidong 四惠东 363 397 468 475 506 517 553 666 夜27 专141 1.714 30.440
Batong line Gaobeidian 高碑店 363 397 475 506 517 666 夜27 专141 1.375 31.815
Communication Univ of China 传媒大学 397 475 506 666 夜27 专36 2.002 33.817
Shuangqiao 双桥 382 397 411 451 475 506 666 夜27 1.894 35.711
Guaanzhuang 管庄 364 388 442 532 615 666 690 BRT2(快速公交2) 夜27 专39 专211 1.912 37.623
Baliqiao 八里桥 322 615 647 666 668 807 夜27 1.763 39.386
Tongzhou Beiyuan 通州北苑 316 317 322 372 591 615 647 666 667 804 805 806 808 809 810 811 861 924 938 快速直达专线1 快速直达专线147 快速直达专线174 快速直达专线196 T1 T2 T3 T4 T10 T11 T12 T13 T19 T22 T41 T43 T51 T60 T87 T90 T103 T118 夜27 专157 1.700 41.086 Tongzhou
Guoyuan 果园 312 316 317 552 591 668 805 938 快速直达专线1 快速直达专线147 快速直达专线166 快速直达专线195 T10 T11 T12 T19 T26 T36 T41 T44 T68 T68区 T87 T103 T118 夜29 1.465 42.551
Jiukeshu 九棵树 372 582 587 668 805 810 938 快速直达专线1 T5 T7 T9 T10 T13 T14 T17 T21 T22 T25 T26 T40 T41 T43 T44 T45 T62 T64 T65 T68 T71 T72 T73 T87 T90 T101 T102 T103 T113 T117 0.990 43.541
Liyuan 梨园 372 587 589 647 668 805 806 810 913 938 快速直达专线1 快速直达专线166 T5 T7 T9 T10 T13 T14 T17 T18 T21 T22 T26 T34 T40 T41 T43 T50 T53 T62 T64 T65 T68 T72 T73 T90 T101 T102 T103 T109 1.225 44.766
Linheli 临河里 435 587 589 591 806 810 924 938 快速直达专线166 T4 T5 T9 T13 T14 T17 T21 T22 T26 T34 T38 T40 T41 T43 T50 T53 T62 T64 T68 T72 T73 T90 T101 T102 T107 T116 T118 专173 专203 1.257 46.023
Tuqiao 土桥 435 591 805 806 807 810 910 924 938 快速直达专线166 快速直达专线167 快速直达专线195 T5 T6 T9 T13 T14 T17 T21 T22 T26 T34 T38 T40 T41 T43 T50 T64 T72 T73 T90 T101 T103 T105 T107 T112 T115 T116 T118 T121 0.776 46.799
Huazhuang 花庄  7  589 806 T14 T34 T40 T43 T53 T68 T72 T73 T90 T101 T102 T116 2.238 49.037
Universal Resort 环球度假区  7  589 T116 1.863 50.900

History edit

 
Yuquan Lu station, Opened on August 5, 1971. The first phase of the Beijing subway project groundbreaking ceremony was held west of Yuquanlu Road.

The first section of subway in Beijing officially started trial operation on January 15, 1971. It was 10.7 km (6.6 mi) long and ran between Beijing railway station to Gongzhufen,[b] which today is a section of Line 1 and 2.[12] A few months later, on August 15, 1971, the line was extended 3 stations west, to Yuquan Lu. The line was extended again to Gucheng in November. On April 23, 1973, the line was extended Pingguoyuan, at this point the line is 23.6 km (14.7 mi) long with 17 stations.[12] On September 15, 1981, the line was again extended westward to Fushouling creating a 27.6 km (17.1 mi) long line with 19 stations. The line was transferred to the newly created Beijing Mass Transit Operation Corporation and was officially opened to the public, ending the decade long trial operation period. By 1981, the annual passenger volume of Beijing Subway was 64.66 million passengers, with a daily average of 177,000 passenger trips.[13]

On August 15, 1986, the second phase of subway construction started and a feasibility study on the construction of the new line between of Fuxingmen to Bawangfen (Today's Beijing CBD) was carried out. A new branch heading east to a new station, Fuxingmen, was completed between Nanlishi Lu and Changchun Jie stations on December 28, 1987. The section between Changchun Jie and Beijing railway station was transferred to the newly created Line 2 and Line 1 ran between Pingguoyuan and Fuxingmen stations. In January 1991, the feasibility study report on the construction of a new line between Fuxingmen to Bawangfen was approved with construction of the new "Fuba line", starting in June 1992. On December 12, 1992, Line 1 was extended east for one station to Xidan. In 1994, Line 1's signals were upgraded to automatic train protection system.[14] On September 28, 1999, the first section of the Fuba line between Tian'anmenxi to Sihuidong was opened. On June 28, 2000, the section between Xidan and Tian'anmenxi stations opened, merging Line 1 and the Fuba Line to create a 31 km (19 mi) line with 23 stations.[14]

Segment Commencement Length Station(s) Name
Gongzhufen — Beijing Railway Station 1 October 1969[c] 10.7 km (6.65 mi) 10 Phase 1 (initial section)
Yuquan Lu — Gongzhufen 5 August 1971 4.9 km (3.04 mi) 3 Yuquan Lu extension
Gucheng — Yuquan Lu 7 November 1971 5.4 km (3.36 mi) 3 Gucheng extension
Pingguoyuan — Gucheng 23 April 1973 2.6 km (1.62 mi) 1 Pingguoyuan extension
Nanlishilu — Fuxingmen 28 December 1987 0.4 km (0.25 mi) 1 Line 1 & 2 realignment project
Changchun Jie — Beijing Railway Station −6.1 km (−3.79 mi) -6
Fuxingmen — Xidan 12 December 1992 1.6 km (0.99 mi) 1 Xidan extension
Tian'anmenxi — Sihuidong 28 September 1999 10.1 km (6.28 mi) 10 Fuba line
Xidan — Tian'anmenxi 28 June 2000 1.3 km (0.81 mi) 2 Line 1 & Fuba line merging project
 
Line 1 train at Wangfujing in 2007.
 
In 1992, Line 1 was extended east one station to Xidan.
 
Platform of Tian'anmen East station

Headway Reduction edit

Since 2014, the signaling and power systems has been gradually upgraded to allow for trains to run more frequently.[15] The upgraded CBTC moving block signaling system in place today reduces rush hour headways from every 2 minutes and 5 seconds to 1 minute 45 seconds.[16]

Platform screen doors edit

 
In 2017, platform screen doors were installed on the platform of Line 1.

Due to platform congestion and suicides, a proposal was made in 2010 to refit all stations on Line 1 with platform screen doors.[17] However, the ventilation system in the older stations of Line 1 was incompatible with full-height platform screen doors, so half height platform screen doors were chosen instead.[18] In July 2016, the operator began installing platform screen doors on Line 1.[19] In 2016, the platform screen doors was installed at Yong'anli station.[20] By the end of 2017, all stations except Pingguoyuan were retrofitted with half-height platform screen doors, and all the screen doors were put into operation for the first time.[21]

Through operations with the Batong line edit

 
Route display reserved for through service from Pingguo Yuan to Universal Resort

In 2010, a CPPCC member Chen Dingwang, proposed that services on Line 1 and the Batong line should directly link, with through operations, reducing travel times and removing the unnecessary forced transfers at Sihuidong or Sihui.[22] However, the Beijing Subway responded that Line 1's and Batong's signal systems are completely different, so through-operation will be more difficult to achieve, from an engineering standpoint. As of 2016, preliminary design and feasibility studies are underway to allow for through operations between Line 1 and Batong.[23] On June 12, 2020, the project of the through operation of Line 1 and Batong line was approved by Beijing Development and Reform Commission.[24] Through operation with the Batong line started on 29 August 2021.[7]

Other facilities edit

Rolling stock for Line 1 is parked and maintained at Gucheng Depot and Sihui Carpark.

Restricted stations edit

Beyond Pingguoyuan, Line 1 extends further northwest where it has several other stations: Gaojing (高井) and Fushouling (福寿岭). Gaojing station is in the military region. Fushouling station is actually outside the military region. These stations are not open for public use.

Fushouling station will open to public in 2023.[25][26]

A proposal to open the Gaojing station to public is mentioned within 2022 and 2023 working plan of the Shijingshan District.[25][27]

Future Development edit

Increasing capacity edit

 
The platforms of some Line 1 stations are longer than the trains used on the line.

Due to Line 1's severe overcapacity problem, there are plans to introduce 7-car or longer trains. In order for this plan to proceed the oldest section of Line 1 between Pingguoyuan and Nanlishi Lu, which only has platforms long enough to accommodate 6-car trains, will need to be lengthened. The newer section between Fuxingmen and Sihuidong, formerly known as "Fuba line" during construction, has platforms long enough for 8-car trains.[28][29] According to an interview to the director of Beijing Municipal Transport Commission in December 2022, they will introduce 7-car trains in the eastern section of Line 1 and the Batong line in future.[30]

Branch to Qinglonghudong edit

On 8 July 2022, an EIA document regarding Phase III construction of Beijing rail transport system (2022–2027) mentions a proposal about the branch line of Line 1. The branch line is a southwest-to-northeast line starts from Qinglonghudong (located at the east side of Qinglong Lake, in Wangzuo, Fengtai District) to Bajiao Amusement Park in Shijingshan District. It will be 19.9 km (12.4 mi) in length with 9 new stations.[31] Construction on the Line 1 branch began on January 19, 2024.[32]

Station name[33] Connections Location
English Chinese
Bajiao Amusement Park 八角游乐园  1  (Main line) Shijingshan
Tiyuchang Nanjie 体育场南街
Garden Expo Park West Gate 园博园西门 Fengtai
Zhangguozhuang 张郭庄  14 
Xi'erqu 西二区
Houlücun Railway Station 后吕村
Yungang 云岗
Wangzuo 王佐
Minzu Univ. 民族大学
Qinglonghudong 青龙湖东


Rolling Stock edit

Current edit

Model Image Manufacturer Year Built Year Refurbished Amount in Service Fleet Numbers Depot
DKZ4G [zh]   CRRC Changchun Railway Vehicles
Beijing Subway Rolling Stock Equipment
1998–2001 2007
2010-2012
2015-2016
2020-2021
31 S401–S431
(01 001–01 031)
Sihui [zh] (except two in Gucheng [zh])
SFM04/04A [zh]   CRRC Qingdao Sifang
Beijing Subway Rolling Stock Equipment
2006–2011 2021 39 G432–G470
(01 032–01 070)
Gucheng
SFM01/02/07 [zh]   2003–2005 2008
2015-2020
2021
108 TQ401–TQ408, TQ415–TQ424
(01 071–01 078, 01 085–01 094)
Tuqiao [zh]
BDK06 [zh]   Beijing Subway Rolling Stock Equipment 2018–2021 72 TQ431–TQ437 (01 101–01 107), 01 108–01 112 Tuqiao, Sihui


Former edit

All were based at Gucheng depot.

Model Image Manufacturer Year Built Years in service Number Made Fleet Numbers (Before 1996) Fleet Numbers (After 1996) Notes
DK1 [zh]   CRRC Changchun Railway Vehicles 1967 2 001–002 Never ran in service due to exceeding the subway's loading gauge.
DK2 [zh]   1969–1970 1969–1985 80 201–219 76 cars were refurbished into DK11.
DK3/3G [zh] 1971–1973 1971-2002 50 Un­known G101–G107 Transferred to line 13 and Batong line.
DK8 [zh] 1982 Un­known 52 401–413 Transferred to line 2.
DK11 [zh]   1984–1985 1984–2008 76 601–619 G201–G207, G2082–G2085, G209–G213
DK20/20G [zh]   1994–1995 1994–2012 42 443–449 G108–G114 Originally retired in 2008, reactivated due to DKZ4 trains being overhauled.
BD1 [zh] Beijing Subway Rolling Stock Equipment 1990–1992 1990–1994 18 3083–3084, 309–311 Transferred to line 2.
BD2/2G [zh]   1994–1998 1995–2012 72 450–454 (first batch only) G115–G126 Originally retired in 2008, reactivated due to DKZ4 trains being overhauled.
BD3 [zh] 1995 1996–2001 2 G2081, G2086 Linked with DK3 cars G2082–G2085.

See also edit

Notes edit

  1. ^ The section from Sihui to Sihui East is at-grade.
  2. ^ In 1970s, Gongzhufen was called Lixin (立新)
  3. ^ 15 January 1971 - Initial line began operation on a trial basis.

References edit

  1. ^ Gao Yucai (高毓才) (1999). 建设中的北京地铁——地铁"复一八"线. Beijing: China Railways Press (中国铁道出版社). p. 13. ISBN 7-113-03381-4.
  2. ^ Pan Xiaojun (潘晓军) (2013). 北京地铁1号线运输能力挖掘研究. 交通运输系统工程与信息. 13 (4): 200–204.
  3. ^ . Beijing Subway. Archived from the original on 2015-03-30. Retrieved 2015-03-20.
  4. ^ "Ridership". Sina. Retrieved 2012-05-03.[permanent dead link]
  5. ^ . Beijing Subway. Archived from the original on 2012-05-02. Retrieved 2012-05-04.
  6. ^ a b "八通线与1号线贯通?年底见分晓". bjnews.com.cn. 2016-11-16.
  7. ^ a b c . Beijing Daily. 2021-08-25. Archived from the original on 2021-08-25. Retrieved 2021-08-25.
  8. ^ a b . Beijing Municipal Transportation Committee (北京市交通委员会). 2013-02-07. Archived from the original on 2014-01-09. Retrieved 2013-09-15.
  9. ^ [1] October 24, 2008, at the Wayback Machine
  10. ^ "站间公里数 北京地铁官方网站".
  11. ^ . 2022-08-01. Archived from the original on 2022-08-02.
  12. ^ a b 地铁公司大事记1971--1980年. Beijing Subway.
  13. ^ . Archived from the original on 2011-01-01. Retrieved 2011-02-03.
  14. ^ a b . Beijing Subway. Archived from the original on 2011-01-31. Retrieved 2011-02-03.
  15. ^ "北京地铁1号线发车间隔有望再快5秒 为世界最快". news.sina.com.cn. Retrieved 2022-06-15.
  16. ^ 北京地铁1号线、5号线、10号线年底最快两分钟一趟-新华网. news.xinhuanet.com. Retrieved 2017-12-31.
  17. ^ 北京地铁1号2号13号线和八通线将装站台安全门. Sohu. 2010-04-06.
  18. ^ 北京地铁老线加装站台安全门已进入论证阶段. Archived from the original on 2013-04-10. Retrieved 2013-03-09. 大众网 2010-07-04
  19. ^ "Beijing begins installing platform barriers on subway Line 1". China Daily. Xinhua. 2016-07-19. Retrieved 2019-07-11.
  20. ^ . jiangsu.china.com.cn. Archived from the original on 2016-08-21. Retrieved 2016-08-18.
  21. ^ 1号线全线安全门今日投用 北京地铁全线安全门全部启用. news.sina.com.cn. 2017-09-10. Retrieved 2017-11-09.
  22. ^ 北京地铁八通线一号线有望贯通. 中国网. 2011-09-16.
  23. ^ 北京八通线南延工程初步设计顺利通过评审-千龙网·中国首都网. finance.qianlong.com. Retrieved 2016-11-17.
  24. ^ "关于轨道交通1号线与八通线贯通运营工程项目建议书(代可行性研究报告)的批复". Beijing Development and Reform Commission. 2020-06-12. Retrieved 2020-06-19.
  25. ^ a b [Beijing Subway Line 1 Fushouling Station to be completed within the year! Renovation study on Gaojing station will also start.]. 2023-01-05. Archived from the original on 2023-01-24.
  26. ^ "1号线福寿岭站进度到底如何,今明两年能否启用". 2021-03-24. 北京市基础设施投资有限公司回复:经核实,目前公司正在政府部门的组织下开展福寿岭站启动的前期工作,计划2021年开工,建设期一到两年
  27. ^ "石政发〔2022〕1号 北京市石景山区人民政府关于印发2022年折子工程的通知". Archived from the original on October 24, 2022. 26.启动地铁1号线高井站前期研究。 牵头领导:齐春利 主责单位:区西部建设办
  28. ^ . 2013-12-30. Archived from the original on 30 December 2013. Retrieved 2021-12-02.
  29. ^ 潘晓军 (2013). "北京地铁1号线运输能力挖掘研究". 交通运输系统工程与信息. 13 (4): 200–204.
  30. ^ . 2022-12-26. Archived from the original on 2023-02-04. 将1号线东段和八通线由6辆编组扩大至7辆编组
  31. ^ (PDF). China Academy of Railway Sciences Co., Ltd. 2022-07-08. Archived from the original (PDF) on 2022-07-08. Retrieved 2022-07-08.
  32. ^ "China's oldest subway line to expand into Beijing suburbs". China Daily. 2024-01-19. Retrieved 2024-01-19.
  33. ^ "北京地铁1号线今年将建支线". 2023-03-03.

line, beijing, subway, line, beijing, subway, chinese, 北京地铁1号线, pinyin, běijīng, dìtiě, yīhào, xiàn, oldest, busiest, lines, beijing, mass, transit, rail, network, line, runs, underneath, chang, avenue, city, grand, east, west, thoroughfare, right, through, he. Line 1 of the Beijing Subway Chinese 北京地铁1号线 pinyin Beijing ditie yihao xian is the oldest and one of the busiest lines of Beijing s mass transit rail network Line 1 runs underneath Chang an Avenue the city s grand east west thoroughfare right through the heart of Beijing with stops on either side of Tiananmen Square Line 1 s color is dark red Through operation with the Batong line started on August 29 2021 7 Line 1Tiananmen East station platformOverviewOther name s M1 planned name Fuba line Chinese 复八线 for Fuxingmen to Sihuidong section StatusOperationalLocaleChaoyang Dongcheng Xicheng Haidian and Shijingshan districtsBeijingTerminiGucheng Pingguoyuan reopens in 2024 Fushouling opens in 2024 SihuidongStations23 not accounting for Batong Line but including Gaobeidian ServiceTypeRapid transitSystemBeijing SubwayOperator s Beijing Mass Transit Railway Operation Corp Ltd Depot s Guchenglu Sihui Depots 1 2 Rolling stock6 car Type B DKZ4 SFM04 Daily ridership1 234 900 2014 Avg 3 1 536 900 2014 Peak 4 5 HistoryOpenedJanuary 15 1971 53 years ago 1971 01 15 TechnicalLine length31 04 km 19 29 mi 6 CharacterUnderground at grade a Track gauge1 435 mm 4 ft 8 1 2 in Operating speed80 km h maximum service speed Route mapLegend connects Fengsha railway to Sanjiadian 101 Gaojing no regular train services above 102 Fushouling under renovation to be reopened 2023 Yongding River diversion canal Line S1 Shichang Line 6 Jin anqiao Lucheng 103 Pingguoyuan closed for renovation connects Jingmen railway Gucheng depot 104 Gucheng 101 railway for military purpose only 105 Bajiao Amusement Park 106 Babaoshan 107 Yuquan Lu 108 Wukesong 109 Wanshou Lu 110 Gongzhufen Line 10 outer inner 111 Military Museum Line 9 Guogongzhuang National Library Yongding River diversion canal 112 Muxidi Line 16 out of system interchange Wanpingcheng Bei anhe 113 Nanlishi Lu connects Line 2 114 Fuxingmen Line 2 outer inner Line 19 crossing Line 4 115 Xidan Tiangongyuan Anheqiaobei 116 Tian anmenxi 117 Tian anmendong 118 Wangfujing Line 8 Yinghai Zhuxinzhuang connects Line 5 Line 5 119 Dongdan Songjiazhuang Tiantongyuanbei 120 Jianguomen Line 2 inner outer connects Line 2 121 Yong anli Line 17 to be opened 2024 Jiahuihu Future Science City North 122 Guomao Line 10 inner outer 123 Dawang Lu Line 14 Beijing South railway station Shangezhuang 124 Sihui Batong line through operation to Line 1 connects Batong line through operation to Line 1 for depot trains only Sihui depot Through operationwith Batong line through operation to Line 1 125 Sihuidong Batong line through operation to Line 1 Shuangsha railway Universal Resort vte Contents 1 Ridership 2 Hours of operation 3 Route 4 Stations 5 History 5 1 Headway Reduction 5 2 Platform screen doors 5 3 Through operations with the Batong line 6 Other facilities 7 Restricted stations 8 Future Development 8 1 Increasing capacity 8 2 Branch to Qinglonghudong 9 Rolling Stock 9 1 Current 9 2 Former 10 See also 11 Notes 12 ReferencesRidership editAs the oldest line of the Beijing Subway Line 1 was also the most heavily used from the time the subway opened in 1971 until January 2013 when the near completion of the Line 10 loop caused ridership on that line to surge past Line 1 Recent traffic relief efforts have been completed in recent years The opening of the first phase of the parallel Line 6 caused an 8 46 decrease in daily demand and a 10 20 reduction in peak flow during rush hour 8 In addition Beijing BRT line 2 parallels the eastern section of Line 1 In the meantime between 2014 and 2015 Line 1 again upgraded its signals to a communications based train control system allowing trains to run at headways as low as 1 minutes 45 seconds However during peak hours sections of the line were reported in 2013 to still operate above 100 capacity 8 Hours of operation editThe first east bound trains departs from Gucheng at 4 58 am and Pingguoyuan at 5 10 am The first west bound train departs Sihui at 4 56 am and Sihui East at 5 05 am The last east bound train leaves Pingguoyuan at 10 55 pm The last west bound train leaves Sihui East at 11 15 pm 9 Route editLine 1 s western terminus is Pingguoyuan located in Shijingshan District The line heads southeast to its second stop at Gucheng and from there runs straight east following Chang an Avenue all the way to its eastern terminus Sihuidong in Chaoyang District just beyond the 4th Ring Road The line passes through Xidan Wangfujing and Dongdan among other important commercial centers of Xicheng and Dongcheng Districts as well as the Beijing CBD near the China World Trade Center The line is 31 04 km 19 29 mi 6 in length with 23 stations in operation All stations except for Sihui and Sihuidong are underground Stations editStation list for Line 1 and Batong line of Beijing Subway after the through operation started on August 29 2021 7 Normal Gucheng Huanqiu Dujiaqu Universal Resort Morning rush hour Gongzhufen Guoyuan Evening rush hour Gucheng Guoyuan vte Line Name Serviceroutes Station Name Connections Nearby Bus Stops Distancekm 10 Location English Chinese Line 1 Fushouling Opening in early 2024 福寿岭 Shijingshan Pingguoyuan Under renovation re opening in late 2024 苹果园 6 S1 325 336 358 370 396 399 472 527 597 664 876 892 920 929 931 932 941快 948 961 972 977 977快 981 快速直达专线142 快速直达专线150 M3 M4 M5 M6 M7 M11 M16 M20 M22 0 000 0 000 Gucheng 古城 318 327 337 399 597 941 958 959 992 快速直达专线208 快速直达专线213 快速直达专线222 夜5 专61 专210 专218 2 606 2 606 Bajiao Amusement Park 八角游乐园 325 337 373 436 472 527 574 597 598 663 914 941 959 965 992 夜5 专46 专86 专91 专111 专215 1 921 4 527 Babaoshan 八宝山 1 76 337 373 527 546 574 597 610 914 941 951 961 979 快速直达专线187 夜1 专69 专109 专111 专150 专215 1 953 6 480 Yuquan Lu 玉泉路 1 76 78 337 338 354 370 373 389 436 452 463 472 473 481 507 610 612 644 941 941快 979 夜1 专11 1 479 7 959 Wukesong 五棵松 1 64 76 97 337 370 400 400快 436 568 624 952 967 982 983 夜1 专127 1 810 9 769 Haidian Wanshou Lu 万寿路 1 32 33 64 68 76 77 89 308 335 337 370 624 627 夜1 夜5 夜16 1 778 11 547 Gongzhufen 公主坟 10 1 32 33 40 52 62 64 68 74 76 77 89 94 134 300 300快 308 323 335 337 368 370 374 394 437 603 624 631快 698 977 977快 夜1 夜5 夜30 1 313 12 860 Military Museum 军事博物馆 9 1 21 40 52 65 68 78 85 94 308 414 夜1 夜5 夜8 1 172 14 032 Muxidi 木樨地 16 out of system interchange 1 21 32 52 65 68 78 85 94 114 308 320 夜1 夜8 1 166 15 198 Xicheng Nanlishi Lu 南礼士路 1 3 10 15 19 42 46 49 52 56 夜1 夜8 夜12 1 291 16 489 Fuxingmen 复兴门 2 19 Out of system interchange via Taipingqiao 11 1 10 15 44 49 52 200 332 387 395 423 691 694 快速直达专线17 快速直达专线201 夜1 夜20 专191 0 424 16 913 Xidan 西单 4 1 7 15 22 52 70 83 88 102 105 109 143 快速直达专线17 夜1 夜4 夜10 1 590 18 503 Tian anmenxi 天安门西 1 5 52 观光1 观光2 夜1 1 217 19 720 Tian anmendong 天安门东 1 2 52 82 120 观光1 观光2 夜1 夜2 夜17 0 925 20 645 Dongcheng Wangfujing 王府井 8 1 41 52 103 120 141 观光2 夜1 夜17 夜18 夜21 0 852 21 497 Dongdan 东单 5 1 39 41 52 104 106 108 110 111 116 120 128 140 684 夜1 夜10 夜17 0 774 22 271 Jianguomen 建国门 2 1 20 39 43 44 52 58 120 122 126 139 140 142 200 403 637 638 639 夜1 夜10 夜19 夜20 夜24 夜28 夜29 1 230 23 501 Yong anli 永安里 1 9 28 43 58 120 126 140 403 639 668 夜1 夜24 1 377 24 878 Chaoyang Guomao 国贸 10 1 9 11 28 57 58 72 98 113 348 368 382 388 402 405 421 488 561 647 650 666 667 668 669 687 804 805快 806 807 808 809 814 816 817 818 818快 846 848 930 938快 976 快速直达专线5 快速直达专线9 快速直达专线20 快速直达专线61 快速直达专线69 快速直达专线169 夜1 夜27 夜30 专10 0 790 25 668 Dawang Lu 大望路 14 1 11 31 54 57 58 138 382 388 405 421 486 605 647 666 667 668 804 812 815 815快 816 817 818 818快 823 930 973 985 988 快速直达专线5 快速直达专线20 快速直达专线61 夜1 夜25 夜27 夜34 专141 专165 1 385 27 053 Sihui 四惠 1 57 58 322 363 397 405 455 468 475 496 506 517 553 605 657 666 671 865 988 989 夜1 夜27 专113 专167 1 673 28 726 Sihuidong 四惠东 363 397 468 475 506 517 553 666 夜27 专141 1 714 30 440 Batong line Gaobeidian 高碑店 363 397 475 506 517 666 夜27 专141 1 375 31 815 Communication Univ of China 传媒大学 397 475 506 666 夜27 专36 2 002 33 817 Shuangqiao 双桥 382 397 411 451 475 506 666 夜27 1 894 35 711 Guaanzhuang 管庄 364 388 442 532 615 666 690 BRT2 快速公交2 夜27 专39 专211 1 912 37 623 Baliqiao 八里桥 322 615 647 666 668 807 夜27 1 763 39 386 Tongzhou Beiyuan 通州北苑 316 317 322 372 591 615 647 666 667 804 805 806 808 809 810 811 861 924 938 快速直达专线1 快速直达专线147 快速直达专线174 快速直达专线196 T1 T2 T3 T4 T10 T11 T12 T13 T19 T22 T41 T43 T51 T60 T87 T90 T103 T118 夜27 专157 1 700 41 086 Tongzhou Guoyuan 果园 312 316 317 552 591 668 805 938 快速直达专线1 快速直达专线147 快速直达专线166 快速直达专线195 T10 T11 T12 T19 T26 T36 T41 T44 T68 T68区 T87 T103 T118 夜29 1 465 42 551 Jiukeshu 九棵树 372 582 587 668 805 810 938 快速直达专线1 T5 T7 T9 T10 T13 T14 T17 T21 T22 T25 T26 T40 T41 T43 T44 T45 T62 T64 T65 T68 T71 T72 T73 T87 T90 T101 T102 T103 T113 T117 0 990 43 541 Liyuan 梨园 372 587 589 647 668 805 806 810 913 938 快速直达专线1 快速直达专线166 T5 T7 T9 T10 T13 T14 T17 T18 T21 T22 T26 T34 T40 T41 T43 T50 T53 T62 T64 T65 T68 T72 T73 T90 T101 T102 T103 T109 1 225 44 766 Linheli 临河里 435 587 589 591 806 810 924 938 快速直达专线166 T4 T5 T9 T13 T14 T17 T21 T22 T26 T34 T38 T40 T41 T43 T50 T53 T62 T64 T68 T72 T73 T90 T101 T102 T107 T116 T118 专173 专203 1 257 46 023 Tuqiao 土桥 435 591 805 806 807 810 910 924 938 快速直达专线166 快速直达专线167 快速直达专线195 T5 T6 T9 T13 T14 T17 T21 T22 T26 T34 T38 T40 T41 T43 T50 T64 T72 T73 T90 T101 T103 T105 T107 T112 T115 T116 T118 T121 0 776 46 799 Huazhuang 花庄 7 589 806 T14 T34 T40 T43 T53 T68 T72 T73 T90 T101 T102 T116 2 238 49 037 Universal Resort 环球度假区 7 589 T116 1 863 50 900 vteHistory edit nbsp Yuquan Lu station Opened on August 5 1971 The first phase of the Beijing subway project groundbreaking ceremony was held west of Yuquanlu Road The first section of subway in Beijing officially started trial operation on January 15 1971 It was 10 7 km 6 6 mi long and ran between Beijing railway station to Gongzhufen b which today is a section of Line 1 and 2 12 A few months later on August 15 1971 the line was extended 3 stations west to Yuquan Lu The line was extended again to Gucheng in November On April 23 1973 the line was extended Pingguoyuan at this point the line is 23 6 km 14 7 mi long with 17 stations 12 On September 15 1981 the line was again extended westward to Fushouling creating a 27 6 km 17 1 mi long line with 19 stations The line was transferred to the newly created Beijing Mass Transit Operation Corporation and was officially opened to the public ending the decade long trial operation period By 1981 the annual passenger volume of Beijing Subway was 64 66 million passengers with a daily average of 177 000 passenger trips 13 On August 15 1986 the second phase of subway construction started and a feasibility study on the construction of the new line between of Fuxingmen to Bawangfen Today s Beijing CBD was carried out A new branch heading east to a new station Fuxingmen was completed between Nanlishi Lu and Changchun Jie stations on December 28 1987 The section between Changchun Jie and Beijing railway station was transferred to the newly created Line 2 and Line 1 ran between Pingguoyuan and Fuxingmen stations In January 1991 the feasibility study report on the construction of a new line between Fuxingmen to Bawangfen was approved with construction of the new Fuba line starting in June 1992 On December 12 1992 Line 1 was extended east for one station to Xidan In 1994 Line 1 s signals were upgraded to automatic train protection system 14 On September 28 1999 the first section of the Fuba line between Tian anmenxi to Sihuidong was opened On June 28 2000 the section between Xidan and Tian anmenxi stations opened merging Line 1 and the Fuba Line to create a 31 km 19 mi line with 23 stations 14 Segment Commencement Length Station s Name Gongzhufen Beijing Railway Station 1 October 1969 c 10 7 km 6 65 mi 10 Phase 1 initial section Yuquan Lu Gongzhufen 5 August 1971 4 9 km 3 04 mi 3 Yuquan Lu extension Gucheng Yuquan Lu 7 November 1971 5 4 km 3 36 mi 3 Gucheng extension Pingguoyuan Gucheng 23 April 1973 2 6 km 1 62 mi 1 Pingguoyuan extension Nanlishilu Fuxingmen 28 December 1987 0 4 km 0 25 mi 1 Line 1 amp 2 realignment project Changchun Jie Beijing Railway Station 6 1 km 3 79 mi 6 Fuxingmen Xidan 12 December 1992 1 6 km 0 99 mi 1 Xidan extension Tian anmenxi Sihuidong 28 September 1999 10 1 km 6 28 mi 10 Fuba line Xidan Tian anmenxi 28 June 2000 1 3 km 0 81 mi 2 Line 1 amp Fuba line merging project nbsp Line 1 train at Wangfujing in 2007 nbsp In 1992 Line 1 was extended east one station to Xidan nbsp Platform of Tian anmen East station Headway Reduction edit Since 2014 the signaling and power systems has been gradually upgraded to allow for trains to run more frequently 15 The upgraded CBTC moving block signaling system in place today reduces rush hour headways from every 2 minutes and 5 seconds to 1 minute 45 seconds 16 Platform screen doors edit nbsp In 2017 platform screen doors were installed on the platform of Line 1 Due to platform congestion and suicides a proposal was made in 2010 to refit all stations on Line 1 with platform screen doors 17 However the ventilation system in the older stations of Line 1 was incompatible with full height platform screen doors so half height platform screen doors were chosen instead 18 In July 2016 the operator began installing platform screen doors on Line 1 19 In 2016 the platform screen doors was installed at Yong anli station 20 By the end of 2017 all stations except Pingguoyuan were retrofitted with half height platform screen doors and all the screen doors were put into operation for the first time 21 Through operations with the Batong line edit nbsp Route display reserved for through service from Pingguo Yuan to Universal Resort In 2010 a CPPCC member Chen Dingwang proposed that services on Line 1 and the Batong line should directly link with through operations reducing travel times and removing the unnecessary forced transfers at Sihuidong or Sihui 22 However the Beijing Subway responded that Line 1 s and Batong s signal systems are completely different so through operation will be more difficult to achieve from an engineering standpoint As of 2016 preliminary design and feasibility studies are underway to allow for through operations between Line 1 and Batong 23 On June 12 2020 the project of the through operation of Line 1 and Batong line was approved by Beijing Development and Reform Commission 24 Through operation with the Batong line started on 29 August 2021 7 Other facilities editRolling stock for Line 1 is parked and maintained at Gucheng Depot and Sihui Carpark Restricted stations editMain article Beijing Subway restricted stations Beyond Pingguoyuan Line 1 extends further northwest where it has several other stations Gaojing 高井 and Fushouling 福寿岭 Gaojing station is in the military region Fushouling station is actually outside the military region These stations are not open for public use Fushouling station will open to public in 2023 25 26 A proposal to open the Gaojing station to public is mentioned within 2022 and 2023 working plan of the Shijingshan District 25 27 Future Development editIncreasing capacity edit nbsp The platforms of some Line 1 stations are longer than the trains used on the line Due to Line 1 s severe overcapacity problem there are plans to introduce 7 car or longer trains In order for this plan to proceed the oldest section of Line 1 between Pingguoyuan and Nanlishi Lu which only has platforms long enough to accommodate 6 car trains will need to be lengthened The newer section between Fuxingmen and Sihuidong formerly known as Fuba line during construction has platforms long enough for 8 car trains 28 29 According to an interview to the director of Beijing Municipal Transport Commission in December 2022 they will introduce 7 car trains in the eastern section of Line 1 and the Batong line in future 30 Branch to Qinglonghudong edit On 8 July 2022 an EIA document regarding Phase III construction of Beijing rail transport system 2022 2027 mentions a proposal about the branch line of Line 1 The branch line is a southwest to northeast line starts from Qinglonghudong located at the east side of Qinglong Lake in Wangzuo Fengtai District to Bajiao Amusement Park in Shijingshan District It will be 19 9 km 12 4 mi in length with 9 new stations 31 Construction on the Line 1 branch began on January 19 2024 32 Station name 33 Connections Location English Chinese Bajiao Amusement Park 八角游乐园 1 Main line Shijingshan Tiyuchang Nanjie 体育场南街 Garden Expo Park West Gate 园博园西门 Fengtai Zhangguozhuang 张郭庄 14 Xi erqu 西二区 Houlucun Railway Station 后吕村 Yungang 云岗 Wangzuo 王佐 Minzu Univ 民族大学 Qinglonghudong 青龙湖东Rolling Stock editMain article Beijing Subway rolling stock Current edit Model Image Manufacturer Year Built Year Refurbished Amount in Service Fleet Numbers Depot DKZ4G zh nbsp CRRC Changchun Railway VehiclesBeijing Subway Rolling Stock Equipment 1998 2001 20072010 20122015 20162020 2021 31 S401 S431 01 001 01 031 Sihui zh except two in Gucheng zh SFM04 04A zh nbsp CRRC Qingdao SifangBeijing Subway Rolling Stock Equipment 2006 2011 2021 39 G432 G470 01 032 01 070 Gucheng SFM01 02 07 zh nbsp 2003 2005 20082015 20202021 108 TQ401 TQ408 TQ415 TQ424 01 071 01 078 01 085 01 094 Tuqiao zh BDK06 zh nbsp Beijing Subway Rolling Stock Equipment 2018 2021 72 TQ431 TQ437 01 101 01 107 01 108 01 112 Tuqiao Sihui Former edit All were based at Gucheng depot Model Image Manufacturer Year Built Years in service Number Made Fleet Numbers Before 1996 Fleet Numbers After 1996 Notes DK1 zh nbsp CRRC Changchun Railway Vehicles 1967 2 001 002 Never ran in service due to exceeding the subway s loading gauge DK2 zh nbsp 1969 1970 1969 1985 80 201 219 76 cars were refurbished into DK11 DK3 3G zh 1971 1973 1971 2002 50 Un known G101 G107 Transferred to line 13 and Batong line DK8 zh 1982 Un known 52 401 413 Transferred to line 2 DK11 zh nbsp 1984 1985 1984 2008 76 601 619 G201 G207 G2082 G2085 G209 G213 DK20 20G zh nbsp 1994 1995 1994 2012 42 443 449 G108 G114 Originally retired in 2008 reactivated due to DKZ4 trains being overhauled BD1 zh Beijing Subway Rolling Stock Equipment 1990 1992 1990 1994 18 3083 3084 309 311 Transferred to line 2 BD2 2G zh nbsp 1994 1998 1995 2012 72 450 454 first batch only G115 G126 Originally retired in 2008 reactivated due to DKZ4 trains being overhauled BD3 zh 1995 1996 2001 2 G2081 G2086 Linked with DK3 cars G2082 G2085 See also edit nbsp Trains portal Restricted stations of Line 1 Beijing SubwayNotes edit The section from Sihui to Sihui East is at grade In 1970s Gongzhufen was called Lixin 立新 15 January 1971 Initial line began operation on a trial basis References edit Gao Yucai 高毓才 1999 建设中的北京地铁 地铁 复一八 线 Beijing China Railways Press 中国铁道出版社 p 13 ISBN 7 113 03381 4 Pan Xiaojun 潘晓军 2013 北京地铁1号线运输能力挖掘研究 交通运输系统工程与信息 13 4 200 204 客流信息 Beijing Subway Archived from the original on 2015 03 30 Retrieved 2015 03 20 Ridership Sina Retrieved 2012 05 03 permanent dead link Official Ridership Beijing Subway Archived from the original on 2012 05 02 Retrieved 2012 05 04 a b 八通线与1号线贯通 年底见分晓 bjnews com cn 2016 11 16 a b c 四惠四惠东站无须换乘了 北京地铁1号线 八通线本周日跨线运营 Beijing Daily 2021 08 25 Archived from the original on 2021 08 25 Retrieved 2021 08 25 a b 我市轨道交通网络化运营效果凸显 Beijing Municipal Transportation Committee 北京市交通委员会 2013 02 07 Archived from the original on 2014 01 09 Retrieved 2013 09 15 1 Archived October 24 2008 at the Wayback Machine 站间公里数 北京地铁官方网站 地铁开通 虚拟换乘 之后 乘客的地面换乘体验如何 记者进行实地探访 2022 08 01 Archived from the original on 2022 08 02 a b 地铁公司大事记1971 1980年 Beijing Subway 地铁公司1981 1990年地铁大事记 Archived from the original on 2011 01 01 Retrieved 2011 02 03 a b 地铁公司1991 2000年大事记 Beijing Subway Archived from the original on 2011 01 31 Retrieved 2011 02 03 北京地铁1号线发车间隔有望再快5秒 为世界最快 news sina com cn Retrieved 2022 06 15 北京地铁1号线 5号线 10号线年底最快两分钟一趟 新华网 news xinhuanet com Retrieved 2017 12 31 北京地铁1号2号13号线和八通线将装站台安全门 Sohu 2010 04 06 北京地铁老线加装站台安全门已进入论证阶段 Archived from the original on 2013 04 10 Retrieved 2013 03 09 大众网 2010 07 04 Beijing begins installing platform barriers on subway Line 1 China Daily Xinhua 2016 07 19 Retrieved 2019 07 11 北京地铁1号线站台门 开关2000次后 上岗 财经新闻 中国网 东海资讯 jiangsu china com cn Archived from the original on 2016 08 21 Retrieved 2016 08 18 1号线全线安全门今日投用 北京地铁全线安全门全部启用 news sina com cn 2017 09 10 Retrieved 2017 11 09 北京地铁八通线一号线有望贯通 中国网 2011 09 16 北京八通线南延工程初步设计顺利通过评审 千龙网 中国首都网 finance qianlong com Retrieved 2016 11 17 关于轨道交通1号线与八通线贯通运营工程项目建议书 代可行性研究报告 的批复 Beijing Development and Reform Commission 2020 06 12 Retrieved 2020 06 19 a b 北京地铁1号线福寿岭站年内竣工 高井站开启改造研究 Beijing Subway Line 1 Fushouling Station to be completed within the year Renovation study on Gaojing station will also start 2023 01 05 Archived from the original on 2023 01 24 1号线福寿岭站进度到底如何 今明两年能否启用 2021 03 24 北京市基础设施投资有限公司回复 经核实 目前公司正在政府部门的组织下开展福寿岭站启动的前期工作 计划2021年开工 建设期一到两年 石政发 2022 1号 北京市石景山区人民政府关于印发2022年折子工程的通知 Archived from the original on October 24 2022 26 启动地铁1号线高井站前期研究 牵头领导 齐春利 主责单位 区西部建设办 北京地铁1号线6节车厢将扩至7节 2013 12 30 Archived from the original on 30 December 2013 Retrieved 2021 12 02 潘晓军 2013 北京地铁1号线运输能力挖掘研究 交通运输系统工程与信息 13 4 200 204 北京城市副中心 如何实现不依赖小汽车也能便利出行 访北京市交通委员会主任 谢正光 2022 12 26 Archived from the original on 2023 02 04 将1号线东段和八通线由6辆编组扩大至7辆编组 北京市轨道交通第三期建设规划 2022 2027年 环境影响报告书 征求意见稿 pdf PDF China Academy of Railway Sciences Co Ltd 2022 07 08 Archived from the original PDF on 2022 07 08 Retrieved 2022 07 08 China s oldest subway line to expand into Beijing suburbs China Daily 2024 01 19 Retrieved 2024 01 19 北京地铁1号线今年将建支线 2023 03 03 nbsp Wikimedia Commons has media related to Line 1 Beijing Subway Retrieved from https en wikipedia org w index php title Line 1 Beijing Subway amp oldid 1213577720, wikipedia, wiki, book, books, library,