fbpx
Wikipedia

China Railway CRH1

The CRH1 EMU, also known as Hexie (simplified Chinese: 和谐号; traditional Chinese: 和諧號; pinyin: Héxié Hào; literally: "Harmony") is a high-speed train operated by China Railway and built by a joint venture between Bombardier Transportation and Sifang at Bombardier Sifang Power Transportation factory in Qingdao, Shandong Province, People's Republic of China.

China Railways CRH1 EMU
CRH1 high-speed train
In serviceFebruary 1, 2007 – Present
ManufacturerBombardier Sifang (Qingdao) Transportation Ltd.
(Bombardier Transportation and CSR Sifang)
Family nameRegina
Number builtCRH1A: 128 trainsets (1024 cars)
CRH1A–A: 87 trainsets (696 cars)
CRH1B: 24 trainsets (384 cars)
CRH1E: 15 trainsets (240 cars)
CRH1E–250: 5 trainsets (80 cars)
CRH380D: 85 trainsets (680 cars)
FormationCRH1A/A–A: eight cars per trainset (5M3T)
CRH1B/E/E–250: 16 cars per trainset (10M6T)
CRH380D: eight cars per trainset (4M4T)
CapacityCRH1A: 668 or 611 or 646 or 635
CRH1A–A: 613
CRH1B: 1299
CRH1E/E–250: 618 or 642
CRH380D: 495
Operator(s)China Railway
- CR Guangzhou
- CR Shanghai
- CR Nanchang
- CR Chengdu
Line(s) servedHigh speed and major conventional rail lines in southern China
Specifications
Car body constructionCRH1A/B/E: Stainless Steel
CRH1A–A/E–250/380D: Aluminium Alloy
Train lengthCRH1A: 213.5 m (700 ft 6 in)
CRH1A–A: 207.9 m (682 ft 1 in)
CRH1B: 426.3 m (1,398 ft 7 in)
CRH1E: 428.9 m (1,407 ft 2 in)
CRH1E–250: 413.1 m (1,355 ft 4 in)
CRH380D: 215.3 m (706 ft 4 in)
Platform height500–1,250 mm (1 ft 7.7 in – 4 ft 1.2 in)
Maximum speedCRH1A:200 km/h (124 mph)or 250 km/h (155 mph)
CRH1A–A/B/E/E–250:250 km/h (155 mph)
CRH380D: 380 km/h (236 mph)
WeightCRH1A/A–A:435 t (428 long tons; 480 short tons)
CRH1B:850 t (837 long tons; 937 short tons)
CRH1E/E–250:890 t (876 long tons; 981 short tons)
CRH380D:450 t (443 long tons; 496 short tons)
Traction systemWater cooling IGBT-VVVF inverter control (Bombardier MITRAC 1000)[1][2]
Traction motors3-phase AC induction motor (Bombardier DR-1200 [CRH1A] or DR-1500 [CRH1B/E])
Power outputCRH1A: 5.3 MW (7,107 hp)
CRH1A–A: 5.5 MW (7,376 hp)
CRH1B/E/E–250: 11 MW (14,751 hp)
CRH380D: 10 MW (13,410 hp)
TransmissionAC-DC-AC
AccelerationCRH1A/B/E:Maximum 0.6 m/s2 (1.3 mph/s)
CRH380D: 0.48 m/s2 (1.1 mph/s)
DecelerationCRH1A:Emergency 1.2 m/s2 (2.7 mph/s)
General 0.8 m/s2 (1.8 mph/s)
Electric system(s)25 kV 50 Hz AC Overhead catenary
Current collector(s)Pantograph
Braking system(s)Regenerative, electronically controlled pneumatic brakes
Track gauge1,435 mm (4 ft 8+12 in) standard gauge

At the same time as ordering the Shinkansen-based CRH2A and the Pendolino-based CRH5A, the Chinese Ministry of Railways ordered Bombardier-based CRH1, specifically 20 CRH1A trainsets in June 2007 and an additional 20 CRH1A trains, each with eight cars that have total standard capacity of 670 people. The total value of the order is €560 million.[3] In July 2010, a further 40 CRH1A eight-car trains were ordered.[4]

Variants

 
Regina in Sweden. The Regina trains in Sweden are wider than the CRH1 since they are built to make full use of the wider loading gauge used in Sweden.
 
China railways CRH1A

CRH1A

CRH1A and CRH1B are based on Bombardier's Regina family.[5] The train was designed by Sifang and Bombardier jointly in Västerås, Sweden and originally named C2008.[3][5]

Each CRH1A set consists of eight cars, the first batch (CRH1-001A~CRH1-040A) including two first class coaches (ZY), 5 second class coaches (ZE) and 1 second class coach/dining car (ZEC).the second batch (CRH1-081A~CRH1-120A) including two first class coaches (ZY), one first class/second class coaches (ZYE), four second class coaches (ZE) and 1 second class coach/dining car (ZEC). The potential maximum speed of CRH1A is 250 km/h (155 mph), but in fact the maximum speed of the initial 40 sets in operation is always restricted by the software of computer control system, so the maximum speed in service is 220 km/h (137 mph).

The first units (CRH1-001A) were delivered on August 30, 2006,[6] the CRH1A sets started service from February 1, 2007 at the Guangzhou -Shenzhen Railway.

In July 2010, the Chinese MOR ordered additional 40 sets of CRH1A, The designed top operating speed increased to 250 km/h (155 mph), In September 2010, during test run at Qinshen PDL, top speed of CRH1-081A reach 278 km/h (173 mph).[7]

From July 1, 2014, all CRH series EMU numbers have been changed. The original number is (CRH1—xxxA), and now it is changed to (CRH1A-1xxx). Production EMUs after that date are in accordance with the new regulations.

CRH1A-A

In September 2012, The MOR issued a revision in the Zefiro contract, which calls for the order of an additional 106 eight car Zefiro 250 (46 sets) and Zefiro 250NG (60 sets) train sets in lieu of the cancellation of the 16 car Zefiro 380 sets. The NG variant is a new model, which will use new materials in order to achieve weight reductions and more efficient operation.[8]

CRH1B

On October 31, 2007, the Chinese MOR ordered 20 sets of CRH1B trains (CRH1-041B~CRH1-060B). CRH1B is a fleet-extended CRH1A. Each CRH1B consists of 16 cars, including three first class coaches (ZY), 12 second class coaches (ZE) and one dining car (CA). CRH1B, however, have not such restriction on the operational speed, the maximum speed is still 250 km/h (155 mph). CRH1B first come into commercial use on April, 2009, between Shanghai–Nanjing & Shanghai–Hangzhou.[9]

On July 23, 2011, CRH1-046B was hit on ZY104600 car by CRH2-139E in Yongtaiwen PFL accident.

CRH1E

On October 31, 2007, the Chinese MOR ordered 20 sets of CRH1E trains (CRH1-061E~CRH1-080E). The CRH1E is the first high-speed 16-car sleeper train (10M6T) in the world which is based on Bombardier's ZEFIRO 250 km/h (155 mph) design. The train was designed by Bombardier and Zagato. Each train set from the first 12 trainsets consists of one luxury sleeper (WG), 12 soft sleepers (WR), two second class coaches (ZE) and one dining car (CA). The first CRH1E trainset delivered at October 2009, first come into service on November 4, 2009 between Beijing–Shanghai. In fact, only 15 CRH1Es were delivered, three of which having the luxury sleeper replaced with normal sleepers. The other five ended up being CRH1Bs, this time based on the CRH1E design (instead of CRH1A). Later on five additional CRH1Es (based on the CRH1A-A design) have also been manufactured and delivered.[9]

CRH380D

The CRH380D is also derived from the Bombardier Zefiro family (Zefiro 380) of very high speed EMUs and are not direct derivatives of the Regina type trains from which the CRH1A and CRH1B classes are derived.[10] Top speed is advertised at 380 km/h (236 mph).[11] The eight-car version is designated CRH380D, series number CRH380D-1501 ~ CRH380D-1585.[8]

Formation

Power Destination

  • M – Motor car
  • T – Trailer car
  • C – Driver cabin
  • P – Pantograph

Coach Type

  • ZY – First Class Coach
  • ZE – Second Class Coach
  • ZYE – First Class/Second Class Coach
  • ZEC – Second Class Coach/Dining Car
  • ZYT – First Class/Premier Coach
  • ZET – Second Class/Premier Coach
  • ZYS – First Class/Business Coach
  • ZES – Second Class/Business Coach
  • WR – Soft Sleeper Car
  • WRC – Soft Sleeper / Dining Car
  • WG – Luxury Sleeper Car

CRH1A & CRH1A–A

Coach No. 1 2 3 4 5 6 7 8
Type12 ZY ZE ZEC ZE ZY
Type3 ZE ZEC ZYE
Type45 ZE
Type6
(CRH1A–A)
ZE
Power Configuration Mc TP M T M TP Mc
Power Units Unit 1 Unit 2 Unit 3
Capacity1 72 101 19+24 101 72
Capacity2 64 92 23+24 92 64
Capacity3 92 58+14 77
Capacity4 92
Capacity5 91 91 85 91
Capacity6
(CRH1A–A)
48 90 77 63 90 65
  • ^1 Set Nº. 1001~1021, 1167, 1168
  • ^2 Set Nº. 1022~1040
  • ^3 Set Nº. 1086~1090, 1094~1104, 1106~1109, 1117~1119
  • ^4 Set Nº. 1081~1085, 1091~1093, 1105, 1110~1116, 1120
  • ^5 Set Nº. 1121~1166
  • ^6 Set Nº. 1169~1228, 1234~1260

CRH1B

Coach No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Type ZE ZEC ZE ZY
Power Configuration MC TP M TP M T M T M TP M TP MC
Power Units Unit 1 Unit 2 Unit 3 Unit 4 Unit 5 Unit 6
Capacity1 79 92 (56) 92 72 64
Capacity2 68 93 (58) 93 79 75 54
  • ^1 Set Nº. 1041~1060
  • ^2 Set Nº. 1076~1080

CRH1E

Coach No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Type1 ZE WR ZEC WG WR ZE
Type2 ZEC WR
Type3
(CRH1E-NG)
WRC WG WR
Power Configuration Mc TP M TP M T M T M TP M TP Mc
Power Units Unit 1 Unit 2 Unit 3 Unit 4 Unit 5 Unit 6
Capacity1 61 40 (58) 16 40 61
Capacity2 (58) 40
Capacity3
(CRH1E-NG)
55 12 55
  • ^1 Set Nº. 1061~1072
  • ^2 Set Nº. 1073~1075
  • ^3 Set Nº. 1229~1233 (This model is based on the CRH1A-A and sometimes informally called "CRH1E-NG" or "CRH1E-250".)

CRH380D

Coach No. 1 2 3 4 5 6 7 8
Type1 ZYT ZE ZEC ZE ZE ZET
Type2 ZYS ZE ZEC ZES
Power Configuration Mc TP M T M TP Mc
Power Units Unit 1 Unit 2 Unit 3
Capacity1 6+32 84 45+14 84 81 84 6+50
Capacity2 5+28 85 75 63 85 85 5+40
  • ^1 Set Nº. 1501~1510
  • ^2 Set Nº. 1511~1585

Distribution

As of April 2018, 260 CRH1 series EMU and 85 CRH380D series EMU are in service.

Operator Quantity Serial number Depot Lines serving Notes
CRH1A
Guangzhou Railway Group 22 1001~1020, 1167~1168 Guangzhou East Guangzhou–Shenzhen Railway, Guangzhou–Zhuhai Intercity Railway
31 1086~1090, 1094~1104, 1106~1109, 1117~1119, 1123~1124, 1141~1143, 1154, 1165~1166 Shenzhen North Hangzhou–Fuzhou–Shenzhen High-Speed Railway
Nanchang Railway Bureau 18 1121, 1122, 1125~1140 Fuzhou Hangzhou–Fuzhou–Shenzhen High-Speed Railway, Longyan–Xiamen Railway, Xiangtang–Putian Railway
17 1147~1153, 1155~1164 Fuzhou South
17 1081~1085, 1091~1093, 1105, 1110~1116, 1120 Xiamen North
Chengdu Railway Bureau 23 1021~1040, 1144~1146 Chengdu East Chengdu–Dujiangyan Intercity RailwayDazhou–Chengdu Railway, Shanghai–Wuhan–Chengdu High-Speed Railway, Chongqing–Lanzhou Railway
CRH1A-A
Guangzhou Railway Group 4 1169, 1234~1236 Guangzhou East Guangzhou–Shenzhen Railway
9 1170~1176, 1217, 1218 Shenzhen North Hangzhou–Fuzhou–Shenzhen High-Speed Railway
16 1177, 1179~1181, 1183, 1184, 1209~1216, 1248, 1250 Sanya Hainan Eastern Ring High-Speed Railway, Hainan Western Ring High-Speed Railway
33 1182, 1219~1228, 1237~1247, 1249, 1251~1260 Foshan Guiyang–Guangzhou High-Speed Railway, Nanning–Guangzhou High-Speed Railway, Chongqing–Guiyang high-speed railway, Shanghai–Wuhan–Chengdu high-speed railway, Chengdu–Chongqing intercity railway
Nanchang Railway Bureau 24 1185~1208 Fuzhou South Hangzhou–Fuzhou–Shenzhen High-Speed Railway, Longyan–Xiamen Railway, Hefei–Fuzhou High-Speed Railway
CRH1B
Shanghai Railway Bureau 13 1052~1059, 1076~1080 Nanxiang Shanghai–Hangzhou High-Speed Railway, Hangzhou–Fuzhou–Shenzhen High-Speed Railway, Shanghai–Wuhan–Chengdu High-Speed Railway
11 1041~1045, 1047~1051, 1060 Hangzhou Nanjing–Hangzhou High-Speed Railway, Shanghai–Wuhan–Chengdu High-Speed Railway, Shanghai–Hangzhou High-Speed Railway, Hangzhou–Fuzhou–Shenzhen High-Speed Railway
China Railway 1 1046 Retired Written off after Wenzhou train collision, Cars 1-12 are used as a training train whereas Cars 13-16 were scrapped due to derailment.
CRH1E
Shanghai Railway Bureau 20 1061~1075, 1229~1233 Nanxiang Shanghai–Wuhan–Chengdu High-Speed Railway, Shanghai–Hangzhou High-Speed Railway, Hangzhou–Fuzhou–Shenzhen High-Speed Railway, Guangzhou–Shenzhen–Hong Kong Express Rail Link, Nanning–Guangzhou High-Speed Railway
CRH380D
Chengdu Railway Bureau 13 1538~1545, 1550, 1552, 1553, 1555, 1557 Chongqing North Chengdu–Chongqing Intercity Railway
22 1546~1549, 1554, 1556, 1558~1560, 1563, 1564, 1567, 1568, 1571, 1572, 1578~1584 Chengdu East
2 1537, 1551 Guiyang North Chengdu–Chongqing Intercity Railway, Chongqing–Guiyang high-speed railway, Shanghai–Kunming High-Speed Railway
Shanghai Railway Bureau 48 1501~1536, 1561, 1562, 1565, 1566, 1569, 1570, 1573~1577, 1585 Shanghai Nanxiang Nanjing–Hangzhou High-Speed Railway, Shanghai–Nanjing Intercity Railway, Hangzhou–Fuzhou–Shenzhen High-Speed Railway, Shanghai–Kunming High-Speed Railway

See also

References

  1. ^ Briginshaw, David (15 July 2015). "Latest Chinese high-speed train enters service". International Railway Journal. Retrieved 29 February 2016.
  2. ^ (PDF). bombardier.com. Archived from the original (PDF) on 2017-04-21. Retrieved 2016-02-29.
  3. ^ a b "Sleeper EMU to be developed under co-operation deal". Railway Gazette International. 2007-08-01. Retrieved 2007-12-14.
  4. ^ "China orders another 40 CRH1 high-speed trains - International Railway Journal". 2010-07-22. Retrieved 2010-07-22. an additional 40 CRH 1 eight-car
  5. ^ a b "High speed trainsets take shape". Railway Gazette International. 2005-08-01. Retrieved 2009-10-20.
  6. ^ 2006年8月30日 BSP 第一列EMU 动车组出厂 2011-07-08 at the Wayback Machine
  7. ^ . BST. 2010-11-10. Archived from the original on 2011-07-07.
  8. ^ a b Ltd, DVV Media International. "Zefiro 250NG included in revised high speed train contract".
  9. ^ a b Staff (2007-11-01). "Bombardier JV awarded contract for 40 high-speed trainsets in China". oneindia.com. Retrieved 2020-06-08.
  10. ^ The New High Speed Superpower www.eurotrib.com
  11. ^ . 2016-04-21. Archived from the original on 2016-04-21. Retrieved 2020-06-08.

External links

china, railway, crh1, this, article, needs, additional, citations, verification, please, help, improve, this, article, adding, citations, reliable, sources, unsourced, material, challenged, removed, find, sources, news, newspapers, books, scholar, jstor, decem. This article needs additional citations for verification Please help improve this article by adding citations to reliable sources Unsourced material may be challenged and removed Find sources China Railway CRH1 news newspapers books scholar JSTOR December 2007 Learn how and when to remove this template message The CRH1 EMU also known as Hexie simplified Chinese 和谐号 traditional Chinese 和諧號 pinyin Hexie Hao literally Harmony is a high speed train operated by China Railway and built by a joint venture between Bombardier Transportation and Sifang at Bombardier Sifang Power Transportation factory in Qingdao Shandong Province People s Republic of China China Railways CRH1 EMUCRH1 high speed trainIn serviceFebruary 1 2007 PresentManufacturerBombardier Sifang Qingdao Transportation Ltd Bombardier Transportation and CSR Sifang Family nameReginaNumber builtCRH1A 128 trainsets 1024 cars CRH1A A 87 trainsets 696 cars CRH1B 24 trainsets 384 cars CRH1E 15 trainsets 240 cars CRH1E 250 5 trainsets 80 cars CRH380D 85 trainsets 680 cars FormationCRH1A A A eight cars per trainset 5M3T CRH1B E E 250 16 cars per trainset 10M6T CRH380D eight cars per trainset 4M4T CapacityCRH1A 668 or 611 or 646 or 635CRH1A A 613CRH1B 1299CRH1E E 250 618 or 642CRH380D 495Operator s China Railway CR Guangzhou CR Shanghai CR Nanchang CR ChengduLine s servedHigh speed and major conventional rail lines in southern ChinaSpecificationsCar body constructionCRH1A B E Stainless SteelCRH1A A E 250 380D Aluminium AlloyTrain lengthCRH1A 213 5 m 700 ft 6 in CRH1A A 207 9 m 682 ft 1 in CRH1B 426 3 m 1 398 ft 7 in CRH1E 428 9 m 1 407 ft 2 in CRH1E 250 413 1 m 1 355 ft 4 in CRH380D 215 3 m 706 ft 4 in Platform height500 1 250 mm 1 ft 7 7 in 4 ft 1 2 in Maximum speedCRH1A 200 km h 124 mph or 250 km h 155 mph CRH1A A B E E 250 250 km h 155 mph CRH380D 380 km h 236 mph WeightCRH1A A A 435 t 428 long tons 480 short tons CRH1B 850 t 837 long tons 937 short tons CRH1E E 250 890 t 876 long tons 981 short tons CRH380D 450 t 443 long tons 496 short tons Traction systemWater cooling IGBT VVVF inverter control Bombardier MITRAC 1000 1 2 Traction motors3 phase AC induction motor Bombardier DR 1200 CRH1A or DR 1500 CRH1B E Power outputCRH1A 5 3 MW 7 107 hp CRH1A A 5 5 MW 7 376 hp CRH1B E E 250 11 MW 14 751 hp CRH380D 10 MW 13 410 hp TransmissionAC DC ACAccelerationCRH1A B E Maximum 0 6 m s2 1 3 mph s CRH380D 0 48 m s2 1 1 mph s DecelerationCRH1A Emergency 1 2 m s2 2 7 mph s General 0 8 m s2 1 8 mph s Electric system s 25 kV 50 Hz AC Overhead catenaryCurrent collector s PantographBraking system s Regenerative electronically controlled pneumatic brakesTrack gauge1 435 mm 4 ft 8 1 2 in standard gaugeAt the same time as ordering the Shinkansen based CRH2A and the Pendolino based CRH5A the Chinese Ministry of Railways ordered Bombardier based CRH1 specifically 20 CRH1A trainsets in June 2007 and an additional 20 CRH1A trains each with eight cars that have total standard capacity of 670 people The total value of the order is 560 million 3 In July 2010 a further 40 CRH1A eight car trains were ordered 4 Contents 1 Variants 1 1 CRH1A 1 2 CRH1A A 1 3 CRH1B 1 4 CRH1E 1 5 CRH380D 2 Formation 2 1 CRH1A amp CRH1A A 2 2 CRH1B 2 3 CRH1E 2 4 CRH380D 3 Distribution 4 See also 5 References 6 External linksVariants Edit Regina in Sweden The Regina trains in Sweden are wider than the CRH1 since they are built to make full use of the wider loading gauge used in Sweden China railways CRH1A CRH1A Edit CRH1A and CRH1B are based on Bombardier s Regina family 5 The train was designed by Sifang and Bombardier jointly in Vasteras Sweden and originally named C2008 3 5 Each CRH1A set consists of eight cars the first batch CRH1 001A CRH1 040A including two first class coaches ZY 5 second class coaches ZE and 1 second class coach dining car ZEC the second batch CRH1 081A CRH1 120A including two first class coaches ZY one first class second class coaches ZYE four second class coaches ZE and 1 second class coach dining car ZEC The potential maximum speed of CRH1A is 250 km h 155 mph but in fact the maximum speed of the initial 40 sets in operation is always restricted by the software of computer control system so the maximum speed in service is 220 km h 137 mph The first units CRH1 001A were delivered on August 30 2006 6 the CRH1A sets started service from February 1 2007 at the Guangzhou Shenzhen Railway In July 2010 the Chinese MOR ordered additional 40 sets of CRH1A The designed top operating speed increased to 250 km h 155 mph In September 2010 during test run at Qinshen PDL top speed of CRH1 081A reach 278 km h 173 mph 7 From July 1 2014 all CRH series EMU numbers have been changed The original number is CRH1 xxxA and now it is changed to CRH1A 1xxx Production EMUs after that date are in accordance with the new regulations CRH1A A Edit Further information Bombardier Zefiro Zefiro 250 CRH1A A at Chaoshan railway station CRH1A A First Class CRH1A A second classIn September 2012 The MOR issued a revision in the Zefiro contract which calls for the order of an additional 106 eight car Zefiro 250 46 sets and Zefiro 250NG 60 sets train sets in lieu of the cancellation of the 16 car Zefiro 380 sets The NG variant is a new model which will use new materials in order to achieve weight reductions and more efficient operation 8 CRH1B Edit On October 31 2007 the Chinese MOR ordered 20 sets of CRH1B trains CRH1 041B CRH1 060B CRH1B is a fleet extended CRH1A Each CRH1B consists of 16 cars including three first class coaches ZY 12 second class coaches ZE and one dining car CA CRH1B however have not such restriction on the operational speed the maximum speed is still 250 km h 155 mph CRH1B first come into commercial use on April 2009 between Shanghai Nanjing amp Shanghai Hangzhou 9 On July 23 2011 CRH1 046B was hit on ZY104600 car by CRH2 139E in Yongtaiwen PFL accident CRH1E Edit Main article Bombardier Zefiro On October 31 2007 the Chinese MOR ordered 20 sets of CRH1E trains CRH1 061E CRH1 080E The CRH1E is the first high speed 16 car sleeper train 10M6T in the world which is based on Bombardier s ZEFIRO 250 km h 155 mph design The train was designed by Bombardier and Zagato Each train set from the first 12 trainsets consists of one luxury sleeper WG 12 soft sleepers WR two second class coaches ZE and one dining car CA The first CRH1E trainset delivered at October 2009 first come into service on November 4 2009 between Beijing Shanghai In fact only 15 CRH1Es were delivered three of which having the luxury sleeper replaced with normal sleepers The other five ended up being CRH1Bs this time based on the CRH1E design instead of CRH1A Later on five additional CRH1Es based on the CRH1A A design have also been manufactured and delivered 9 CRH1E Two CRH1 series E high speed trains in Shanghai Hongqiao Railway Station Leisure area of CRH1E Deluxe Sleeper Compartment of CRH1ECRH380D Edit CRH380D at Guangzhou North railway station Main article Bombardier Zefiro The CRH380D is also derived from the Bombardier Zefiro family Zefiro 380 of very high speed EMUs and are not direct derivatives of the Regina type trains from which the CRH1A and CRH1B classes are derived 10 Top speed is advertised at 380 km h 236 mph 11 The eight car version is designated CRH380D series number CRH380D 1501 CRH380D 1585 8 Formation EditPower Destination M Motor car T Trailer car C Driver cabin P PantographCoach Type ZY First Class Coach ZE Second Class Coach ZYE First Class Second Class Coach ZEC Second Class Coach Dining Car ZYT First Class Premier Coach ZET Second Class Premier Coach ZYS First Class Business Coach ZES Second Class Business Coach WR Soft Sleeper Car WRC Soft Sleeper Dining Car WG Luxury Sleeper Car car door First Class Coach Interior of a second class coach second class coach buffet car ZEC CRH1A amp CRH1A A Edit Coach No 1 2 3 4 5 6 7 8Type12 ZY ZE ZEC ZE ZYType3 ZE ZEC ZYEType45 ZEType6 CRH1A A ZEPower Configuration Mc TP M T M TP McPower Units Unit 1 Unit 2 Unit 3Capacity1 72 101 19 24 101 72Capacity2 64 92 23 24 92 64Capacity3 92 58 14 77Capacity4 92Capacity5 91 91 85 91Capacity6 CRH1A A 48 90 77 63 90 65 1 Set Nº 1001 1021 1167 1168 2 Set Nº 1022 1040 3 Set Nº 1086 1090 1094 1104 1106 1109 1117 1119 4 Set Nº 1081 1085 1091 1093 1105 1110 1116 1120 5 Set Nº 1121 1166 6 Set Nº 1169 1228 1234 1260CRH1B Edit Coach No 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16Type ZE ZEC ZE ZYPower Configuration MC TP M TP M T M T M TP M TP MCPower Units Unit 1 Unit 2 Unit 3 Unit 4 Unit 5 Unit 6Capacity1 79 92 56 92 72 64Capacity2 68 93 58 93 79 75 54 1 Set Nº 1041 1060 2 Set Nº 1076 1080CRH1E Edit Coach No 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16Type1 ZE WR ZEC WG WR ZEType2 ZEC WRType3 CRH1E NG WRC WG WRPower Configuration Mc TP M TP M T M T M TP M TP McPower Units Unit 1 Unit 2 Unit 3 Unit 4 Unit 5 Unit 6Capacity1 61 40 58 16 40 61Capacity2 58 40Capacity3 CRH1E NG 55 12 55 1 Set Nº 1061 1072 2 Set Nº 1073 1075 3 Set Nº 1229 1233 This model is based on the CRH1A A and sometimes informally called CRH1E NG or CRH1E 250 CRH380D Edit Coach No 1 2 3 4 5 6 7 8Type1 ZYT ZE ZEC ZE ZE ZETType2 ZYS ZE ZEC ZESPower Configuration Mc TP M T M TP McPower Units Unit 1 Unit 2 Unit 3Capacity1 6 32 84 45 14 84 81 84 6 50Capacity2 5 28 85 75 63 85 85 5 40 1 Set Nº 1501 1510 2 Set Nº 1511 1585Distribution EditAs of April 2018 260 CRH1 series EMU and 85 CRH380D series EMU are in service Operator Quantity Serial number Depot Lines serving NotesCRH1AGuangzhou Railway Group 22 1001 1020 1167 1168 Guangzhou East Guangzhou Shenzhen Railway Guangzhou Zhuhai Intercity Railway31 1086 1090 1094 1104 1106 1109 1117 1119 1123 1124 1141 1143 1154 1165 1166 Shenzhen North Hangzhou Fuzhou Shenzhen High Speed RailwayNanchang Railway Bureau 18 1121 1122 1125 1140 Fuzhou Hangzhou Fuzhou Shenzhen High Speed Railway Longyan Xiamen Railway Xiangtang Putian Railway17 1147 1153 1155 1164 Fuzhou South17 1081 1085 1091 1093 1105 1110 1116 1120 Xiamen NorthChengdu Railway Bureau 23 1021 1040 1144 1146 Chengdu East Chengdu Dujiangyan Intercity Railway Dazhou Chengdu Railway Shanghai Wuhan Chengdu High Speed Railway Chongqing Lanzhou RailwayCRH1A AGuangzhou Railway Group 4 1169 1234 1236 Guangzhou East Guangzhou Shenzhen Railway9 1170 1176 1217 1218 Shenzhen North Hangzhou Fuzhou Shenzhen High Speed Railway16 1177 1179 1181 1183 1184 1209 1216 1248 1250 Sanya Hainan Eastern Ring High Speed Railway Hainan Western Ring High Speed Railway33 1182 1219 1228 1237 1247 1249 1251 1260 Foshan Guiyang Guangzhou High Speed Railway Nanning Guangzhou High Speed Railway Chongqing Guiyang high speed railway Shanghai Wuhan Chengdu high speed railway Chengdu Chongqing intercity railwayNanchang Railway Bureau 24 1185 1208 Fuzhou South Hangzhou Fuzhou Shenzhen High Speed Railway Longyan Xiamen Railway Hefei Fuzhou High Speed RailwayCRH1BShanghai Railway Bureau 13 1052 1059 1076 1080 Nanxiang Shanghai Hangzhou High Speed Railway Hangzhou Fuzhou Shenzhen High Speed Railway Shanghai Wuhan Chengdu High Speed Railway11 1041 1045 1047 1051 1060 Hangzhou Nanjing Hangzhou High Speed Railway Shanghai Wuhan Chengdu High Speed Railway Shanghai Hangzhou High Speed Railway Hangzhou Fuzhou Shenzhen High Speed RailwayChina Railway 1 1046 Retired Written off after Wenzhou train collision Cars 1 12 are used as a training train whereas Cars 13 16 were scrapped due to derailment CRH1EShanghai Railway Bureau 20 1061 1075 1229 1233 Nanxiang Shanghai Wuhan Chengdu High Speed Railway Shanghai Hangzhou High Speed Railway Hangzhou Fuzhou Shenzhen High Speed Railway Guangzhou Shenzhen Hong Kong Express Rail Link Nanning Guangzhou High Speed RailwayCRH380DChengdu Railway Bureau 13 1538 1545 1550 1552 1553 1555 1557 Chongqing North Chengdu Chongqing Intercity Railway22 1546 1549 1554 1556 1558 1560 1563 1564 1567 1568 1571 1572 1578 1584 Chengdu East2 1537 1551 Guiyang North Chengdu Chongqing Intercity Railway Chongqing Guiyang high speed railway Shanghai Kunming High Speed RailwayShanghai Railway Bureau 48 1501 1536 1561 1562 1565 1566 1569 1570 1573 1577 1585 Shanghai Nanxiang Nanjing Hangzhou High Speed Railway Shanghai Nanjing Intercity Railway Hangzhou Fuzhou Shenzhen High Speed Railway Shanghai Kunming High Speed RailwaySee also Edit Wikimedia Commons has media related to China Railways CRH1 China Railways CRH2 China Railways CRH3 China Railways CRH5 China Railways CRH380A China Railways CRH6 China Railways CIT Trains Bombardier Zefiro List of high speed trainsReferences Edit Briginshaw David 15 July 2015 Latest Chinese high speed train enters service International Railway Journal Retrieved 29 February 2016 Transportation documents PDF bombardier com Archived from the original PDF on 2017 04 21 Retrieved 2016 02 29 a b Sleeper EMU to be developed under co operation deal Railway Gazette International 2007 08 01 Retrieved 2007 12 14 China orders another 40 CRH1 high speed trains International Railway Journal 2010 07 22 Retrieved 2010 07 22 an additional 40 CRH 1 eight car a b High speed trainsets take shape Railway Gazette International 2005 08 01 Retrieved 2009 10 20 2006年8月30日 BSP 第一列EMU 动车组出厂 Archived 2011 07 08 at the Wayback Machine Successful completion of the type test for BST s first 250km h 8 consist EMU BST 2010 11 10 Archived from the original on 2011 07 07 a b Ltd DVV Media International Zefiro 250NG included in revised high speed train contract a b Staff 2007 11 01 Bombardier JV awarded contract for 40 high speed trainsets in China oneindia com Retrieved 2020 06 08 The New High Speed Superpower www eurotrib com 添加插座 新增母婴设施 成渝高铁380D动车尽显人性化 四川网络广播电视台 四川广播电视台 2016 04 21 Archived from the original on 2016 04 21 Retrieved 2020 06 08 External links EditZefiro 250 Specifications Sheet permanent dead link Zefiro 380 Specifications Sheet permanent dead link CRH1B Train Exterior and Interior Retrieved from https en wikipedia org w index php title China Railway CRH1 amp oldid 1124441207, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.