The Chengdu–Chongqing intercity railway (simplified Chinese: 成渝客运专线; traditional Chinese: 成渝客運專線) is a 307-kilometre (191 mi) long high-speed railway that connects the cities of Chengdu (Sichuan) and Chongqing in southwestern China, with a maximum speed of 350 km/h (220 mph). The route passes through most of the same cities that the older Chengdu–Chongqing Railway does, but is significantly shorter due to the greater use of elevated sections and tunnels. The line includes four major elevated sections and two tunnels.

Chengdu–Chongqing intercity railway
A CRH380D train on Chengdu–Chongqing intercity railway, taken in Jianyang, Sichuan
Overview
Native name成渝客运专线
StatusOperational
OwnerChina Railway
LocaleSichuan and Chongqing
Termini
Stations12
Service
TypeHigh-speed rail
SystemChina Railway High-speed
Train number(s)G8xxx
Operator(s)China Railway Chengdu Group
History
Opened26 December 2015 (2015-12-26)
Technical
Line length307 km (191 mi) (main line)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Operating speed350 km/h (217 mph)
Chinese name
Simplified Chinese成渝客运专线
Traditional Chinese成渝客運專線
Transcriptions
Standard Mandarin
Hanyu PinyinChéngyú Kèyùn Zhuānxiàn
Route map

km
0
Chengdu East
Xiushui
Chengdu South
Huaxingcon passing loop
freight link to Chengdu–Kunming railway
Dongfengqu
Longquanshan tunnel
Jiangxi
53
Jianyang South
83
Ziyang North
124
Zizhong North
Mianyang–Suining–Neijiang railway
from Suining, Mianyang
153
Neijiang North
Mianyang–Luzhou HSR to Zigong East,
New Yibin, Luzhou
Xiaoqinglong
179
Longchang North
213
Rongchang North
223
Dazu South
245
Yongchuan East
275
Bishan
Xinglongchang–Luohuang railway to Tongguanyi
Liangtan He passing loop
connecting line to Chongqing West
Zhongliangshan tunnel
Banbianshan passing loop
Jingxi link to Jingkou, Chongqing North
299
Shapingba
307
Chongqing
km

History

Construction on the Chongqing section began on 22 March 2010 while work on the Sichuan section began on 11 November. The final tunnel achieved breakthrough on 16 December 2013 and a single track line was expected to open in first half of 2014. The complete double track configuration was due to be completed by the end of 2014.[1] The line started operation on 26 December 2015,[2] initially to Chongqing North until renovations were completed at Shapingba on 25 January 2018.[3]

Journey time

The railway reduced travel time between Chengdu and Chongqing to 75 minutes, 45 minutes quicker than the previous fastest route via Suining.[4] Travel time was reduced further to only one hour on December 24, 2020 with the introduction of Fuxing trains and 350 km/h (220 mph) operations on the line.[5][6]

An additional line is planned which will offer a faster journey time when complete, the Chengdu–Chongqing Central line high-speed railway.

Railway stations

There are 12 stations along the line:[7]

Sichuan section

Chongqing section

References

  1. ^ Chengyu Passenger Line achieves breakthrough
  2. ^ "成渝高铁成都首发_四川在线". sichuan.scol.com.cn. Retrieved 2021-01-06.
  3. ^ "重庆西站 成渝高铁枢纽段沙坪坝站 渝贵铁路开通_大渝网_腾讯网". cq.qq.com. Retrieved 2021-01-06.
  4. ^ . 2012-07-31. Archived from the original on 2013-12-17. Retrieved 2012-10-22., luzhouol.cn, 2012-07-31
  5. ^ "成渝高铁达标提速提质首发班组亮相".{{cite web}}: CS1 maint: url-status (link)
  6. ^ 澎湃新闻 (2020-10-25). "成渝高铁年内将开复兴号动车组,两地1小时可达". finance.sina.com.cn. Retrieved 2020-10-25.
  7. ^ "成都至重庆铁路客运重庆段开工 形成1小时交通圈_新闻中心_新浪网". news.sina.com.cn. Retrieved 2021-01-06.

External links

chengdu, chongqing, intercity, railway, under, construction, railway, chengdu, chongqing, central, line, high, speed, railway, simplified, chinese, 成渝客运专线, traditional, chinese, 成渝客運專線, kilometre, long, high, speed, railway, that, connects, cities, chengdu, si. For the under construction railway see Chengdu Chongqing Central line high speed railway The Chengdu Chongqing intercity railway simplified Chinese 成渝客运专线 traditional Chinese 成渝客運專線 is a 307 kilometre 191 mi long high speed railway that connects the cities of Chengdu Sichuan and Chongqing in southwestern China with a maximum speed of 350 km h 220 mph The route passes through most of the same cities that the older Chengdu Chongqing Railway does but is significantly shorter due to the greater use of elevated sections and tunnels The line includes four major elevated sections and two tunnels Chengdu Chongqing intercity railwayA CRH380D train on Chengdu Chongqing intercity railway taken in Jianyang SichuanOverviewNative name成渝客运专线StatusOperationalOwnerChina RailwayLocaleSichuan and ChongqingTerminiChengdu EastChongqingStations12ServiceTypeHigh speed railSystemChina Railway High speedTrain number s G8xxxOperator s China Railway Chengdu GroupHistoryOpened26 December 2015 2015 12 26 TechnicalLine length307 km 191 mi main line Track gauge1 435 mm 4 ft 8 1 2 in standard gaugeOperating speed350 km h 217 mph Chinese nameSimplified Chinese成渝客运专线Traditional Chinese成渝客運專線TranscriptionsStandard MandarinHanyu PinyinChengyu Keyun ZhuanxianRoute mapLegendkm elevXi an Chengdu HSR from Xi an NorthChengdu Kunming railway Chengdu Chongqing railway to ChengduDazhou Chengdu railway to Dazhou Chengdu Chongqing railway to Chongqing0 Chengdu EastXiushuiChengdu South Chengdu Kunming railwayto KunmingChengdu Guiyang HSR to Guiyang East EmeishanHuaxingcon passing loopfreight link to Chengdu Kunming railwayDongfengquLongquanshan tunnelJiangxi53 Jianyang SouthTuoChengdu Chongqing railway83 Ziyang North124 Zizhong NorthTuoTuoMianyang Suining Neijiang railwayfrom Suining Mianyang153 Neijiang NorthMianyang Luzhou HSR to Zigong East New Yibin LuzhouXiaoqinglong179 Longchang North213 Rongchang NorthChengdu Chongqing railway223 Dazu South5 crossing of Chengdu Chongqing railway245 Yongchuan East275 BishanXinglongchang Luohuang railway to TongguanyiLiangtan He passing loopconnecting line to Chongqing WestZhongliangshan tunnelBanbianshan passing loopJingxi link to Jingkou Chongqing NorthXiangyang Chongqing railway from Xiangyang299 ShapingbaChengdu Chongqing railway from Chengdu307 ChongqingkmThis diagram viewtalkedit Contents 1 History 2 Journey time 3 Railway stations 4 References 5 External linksHistory EditConstruction on the Chongqing section began on 22 March 2010 while work on the Sichuan section began on 11 November The final tunnel achieved breakthrough on 16 December 2013 and a single track line was expected to open in first half of 2014 The complete double track configuration was due to be completed by the end of 2014 1 The line started operation on 26 December 2015 2 initially to Chongqing North until renovations were completed at Shapingba on 25 January 2018 3 Journey time EditThe railway reduced travel time between Chengdu and Chongqing to 75 minutes 45 minutes quicker than the previous fastest route via Suining 4 Travel time was reduced further to only one hour on December 24 2020 with the introduction of Fuxing trains and 350 km h 220 mph operations on the line 5 6 An additional line is planned which will offer a faster journey time when complete the Chengdu Chongqing Central line high speed railway Railway stations EditThere are 12 stations along the line 7 Sichuan section Chengdu East railway station Jianyang South railway station Ziyang North railway station Zizhong North railway station Neijiang North railway station Longchang North railway stationChongqing section Rongchang North railway station Dazu railway station Yongchuan East railway station Bishan railway station Shapingba railway station Chongqing railway stationReferences Edit Chengyu Passenger Line achieves breakthrough 成渝高铁成都首发 四川在线 sichuan scol com cn Retrieved 2021 01 06 重庆西站 成渝高铁枢纽段沙坪坝站 渝贵铁路开通 大渝网 腾讯网 cq qq com Retrieved 2021 01 06 成渝客运专线最快2014年通车 2012 07 31 Archived from the original on 2013 12 17 Retrieved 2012 10 22 luzhouol cn 2012 07 31 成渝高铁达标提速提质首发班组亮相 a href Template Cite web html title Template Cite web cite web a CS1 maint url status link 澎湃新闻 2020 10 25 成渝高铁年内将开复兴号动车组 两地1小时可达 finance sina com cn Retrieved 2020 10 25 成都至重庆铁路客运重庆段开工 形成1小时交通圈 新闻中心 新浪网 news sina com cn Retrieved 2021 01 06 External links Edit Retrieved from https en wikipedia org w index php title Chengdu Chongqing intercity railway amp oldid 1064950595, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.