fbpx
Wikipedia

China Railway CRH2

The CRH2 Hexie (simplified Chinese: 和谐号; traditional Chinese: 和諧號; pinyin: Héxié Hào; literally: "Harmony") is one of the high-speed train models in China. The CRH2 is based on the E2-1000 Series Shinkansen design from Japan with the license purchased from a consortium formed of Kawasaki Heavy Industries, Mitsubishi Electric, and Hitachi, and represents the second Shinkansen train model to be exported.

China Railway CRH2 EMU
In service2007–present
ManufacturerKawasaki Heavy Industries,
CRRC Qingdao Sifang
Family nameShinkansen (E2 series)
Number builtCRH2A: 60+40 trainsets (800 cars)
CRH2B: 20 trainsets (320 cars)
CRH2C (stage 1): 30 trainsets (240 cars)
CRH2C (stage 2): 20 trainsets (160 cars)
CRH2E: 20 trainsets (320 cars)
FormationCRH2A: 8 cars per trainset (4M4T)
CRH2B/E: 16 cars per trainset (8M8T)
CRH2C: 8 cars per trainset (6M2T)
CapacityCRH2A: 610/571/562/588/600/608
CRH2B: 1230
CRH2C: 610/626
CRH2E: 630/880(CRH2E-2463, 2464 and 2465)
Operator(s)China Railway
- CR Beijing
- CR Shanghai
- CR Jinan
- CR Xi'an
- CR Wuhan
- CR Nanchang
- CR Zhengzhou
- CR Taiyuan
- CR Chengdu
- CR Guangzhou
- CR Nanning
Line(s) servedMost 200-250km/h high speed rail lines across China, plus some conventional lines
Specifications
Train lengthCRH2A/C: 201.4 m (660 ft 9 in)
CRH2B/E: 401.4 m (1,316 ft 11 in)
Width3,380 mm (11 ft 1 in)
Height3,700 mm (12 ft 2 in)
Platform height1,250 mm (4 ft 1 in)
Maximum speedCRH2A/B/E: 250 km/h (155 mph)
CRH2C (stage 1): 350 km/h (217 mph)
CRH2C (stage 2): 380 km/h (236 mph)
Traction systemWater cooling IGBTVVVF inverter control
(CRH2B/E: Mitsubishi Electric type MAP-304-A25V141,
CRH2A/C: Hitachi type CII-HHR1420A/B/D, Zhuzhou CSR Times Electric type TGA10/10A/10E/10G)
Traction motors3-phase AC induction motors
(CRH2B/E: Mitsubishi Electric type MB-5120-A, Zhuzhou CSR Times Electric type MT-205
CRH2A/C: Hitachi/CRRC Yongji Electric type YJ-92A, Zhuzhou CSR Times Electric type YQ-365)
Power outputCRH2A: 4.8 MW (6,437 hp)
CRH2B/E: 9.6 MW (12,874 hp)
CRH2C:
  • Stage 1: 7.2 MW (9,655 hp)
  • Stage 2: 8.76 MW (11,747 hp)
  • TransmissionAC-DC-AC
    Electric system(s)25 kV 50 Hz AC Overhead catenary
    Current collector(s)Pantograph
    Braking system(s)Regenerative, electronically controlled pneumatic brakes
    Track gauge1,435 mm (4 ft 8+12 in) standard gauge

    In 2004, the Ministry of Railway in China purchased an initial 60 sets of the train from Kawasaki Heavy Industries with a maximum speed of 250 km/h (155 mph). However, the newer versions of the CRH2 are not related to the E2-1000 Series despite having the same exterior shell.[1]

    Variants

     
    The CRH2 developed from the E2 Series Shinkansen
     
    CRH2A-2260&2011 at Xiamen railway station

    CRH2A

    On October 20, 2004, the Ministry of Railway in China ordered 60 sets of CRH2A trains from Kawasaki Heavy Industries in Japan. Along with 60 sets of Bombardier's Regina-based CRH1A, and 40 sets of Alstom's Pendolino-based CRH5A, these train sets are consider as first batch of CRH trains.

    Each of the CRH2A set consists of 8 cars. The first 3 sets (CRH2-001A - CRH2-003A) were built in Japan, the next 6 sets (CRH2-004A - CRH2-009A) were delivered in complete knock down form and assembled by CSR Sifang Locomotive and Rolling Stock. The remaining 51 sets (CRH2-010A - CRH2-060A) were built by Sifang through technology transfer from Japan.

    The first train arrived at Qingdao port on March 8, 2006 with little fanfare, and was not even publicized in China. These trains have a maximum operation speed of 250 km/h (155 mph) and started providing high-speed train service from April 18, 2007, the date of the sixth national railway speed-up.

    According to Chinese and Japanese media, CRH2A trains started test trials ahead of commercial operation on the Shanghai-Hangzhou and Shanghai-Nanjing lines on January 28, 2007.

    On September 14, 2010, the Chinese MOR ordered additional 40 sets of CRH2A trains (CRH2-151A - CRH2-190A) from CSR Sifang.

    CRH2B

     
    CRH2B at Wuxi Station

    In November 2007, the Ministry of Railway in China ordered 10 CRH2 sets with 16 cars per set (8M8T). These trains have been given designations CRH2B (CRH2-111B - CRH2-120B). Each CRH2B has three 1st seating cars (ZY), twelve 2nd seating cars (ZE), and one dining car (CA). Designed maximum operation speed is 250 km/h (155 mph) with a power of 9,600 kW (12,874 hp).

    The first units were delivered on June 29, 2008,[2][3] and came into service on the Hefei–Nanjing Passenger Railway on August 1, 2008.[4]

    CRH2C (CRH2-350)

     
    CRH2C

    After the introduction of the modified E2-1000 Series, Sifang built its own CRH2 with a maximum safe operating speed of 350 km/h (217 mph). The original train sets imported from Kawasaki had a maximum safe operating speed of 250 km/h (160 mph).

    During June 2005 and September 2005, The Chinese Ministry of Railways launched bidding for High speed trains with a top speed over 300 km/h (186 mph). Along with Siemens's Velaro-based CRH3C, CSR Sifang bid 60 sets of CRH2C, includes 30 sets of CRH2C stage one with a top speed of 300 km/h (186 mph), and 30 sets of CRH2C stage two with a top speed of 350 km/h (217 mph).

    In development and research of the 350 km/h (217 mph) high speed train, The CRH2-300 project was launched by Chinese MOR and CSR. In 2006 the China Development Bank provided CNY 15 billion developmental financial loans to CSR Group for the projects of 200–300 km/h (124–186 mph) high speed trains.[5] Over 50 academics, 150,000 technicians, 600 contractors were involved in the project.[6] This train's livery is not like the CRH2A, which the blue stripe does not end at the fronts of trainsets.

    CRH2C stage one

     
    CRH2-064C

    CRH2C Stage one is a modified version of CRH2A. It has a maximum operating speed up to 300 km/h (186 mph) by replacing two intermediate trailer cars with motorized cars. Equipped with an array of the state-of-the-art technologies, including aluminum alloy body with a reduced weight, high speed turntable, high speed pantograph, and optic-fiber based integrated control system.[7]

    Chinese MOR ordered 30 sets of CRH2C stage one, name code CRH2-061C - CRH2-090C. The first set, CRH2-061C was unveiled on December 22, 2007.[8][9]

    During the test on April 22, 2008, CRH2-061C reached a top speed of over 370 km/h (230 mph) on Beijing-Tianjin high-speed rail.[10]

    During the test on December 11, 2009, CRH2-061C reached a top speed of 394.2 km/h (244.9 mph) on Zhengzhou-Xi'an high-speed rail.[11]

    Together with CRH3C, the CRH2C stage one first came into service on Beijing-Tianjin Intercity high-speed rail on August 1, 2008, and all CRH2C stage one trains have been replaced by CRH3C in April, 2009. Currently, most of these trains are serving on the Shanghai-Nanjing high speed rail.

    CRH2C stage two

    CRH2C Stage two is the "re-design" version of the CRH2. Some of the details, like the aluminum body structure, noise reduction technology & reduction technique, draw on the CRH3C. According to CSR Sifang, the improvements include the following aspects:

    • The axle weight of the bogie increased from 14 to 15 tonnes (30,865 to 33,069 lb), to prevent tremble of the train body at a higher speed,[6] the gear ratio has been optimized from 3.036 to 2.379, the critical instability speed is 550 km/h (340 mph).
    • The thermal capacity of the bogie has been increased, which satisfied the continuous operation at 350 km/h (217 mph)
    • With the YQ-365 type AC traction motor. It has a maximum operating speed up to 350 km/h (217 mph) with a power of 8,760 kW (11,747 hp).
    • The rigidity of the car body has been increased to lower the noise and vibration.
    • Optimized car body and window design for better air tightness and strength.
    • Added pressure protection system to avoid pressure fluctuation in the compartment and improvement of comfort.
    • Optimized design of the roof antenna, exterior windscreen and windows for a lower air resistance.[12]

    Chinese MOR ordered 30 sets of CRH2C stage two, name code CRH2-091C - CRH2-110C and CRH2-141C - CRH2-150C. The first set, CRH2-091C was unveiled in January 2010 and came into service on Zhengzhou-Xi'an high-speed rail in February, 2010.[13]

    CRH2E

     
    A CRH2E arriving Beijing West railway station as D924 Guangzhou-Beijing overnight train in 2015.
     
    Inside a traditional berth style sleeper car of a CRH2E.

    In November and December 2007, the Ministry of Railway in China ordered 20 CRH2 sleeper trains with 16 cars per set (8M8T). These trains are modified CRH2Bs, outfitted with traditional railway sleeping berths (couchette car) and have been given designations CRH2E (numbered CRH2-121E - CRH2-140E). Each CRH2E has thirteen 1st class sleeping cars (WR), two 2nd class seating cars (ZE), and one buffet car (CA) or one second class/dining car (ZEC). Designed maximum operation speed is 250 km/h (155 mph) with 9,600 kW (12,874 hp) of power output.

    The first batch of CRH2E, CRH2-121E - CRH2-126E, came into service on Beijing-Shanghai railway on December 21, 2008.[2][14] On 23 July 2011, one sleeper coach on CRH2-139E trainset has been derailed in the 2011 Wenzhou train collision, together with CRH1-046B.

    The rest of CRH2Es were deployed on Beijing–Guangzhou–Shenzhen–Hong Kong High-Speed Railway since January 2015, operating overnight sleeper trains between Beijing and Guangzhou (including some trains to Shenzhen).

    Double Deck CRH2E

    A brand new variant of the CRH2E entered service in 2017 numbered beyond CRH2E-2463.[15][16] Instead of a traditional railway sleeping berth the sleeper train is organized with the corridor running down the middle of the traincar with double deck "capsules" on each side.[17] Each capsule is similar in layout to airplane first class, and passengers are no longer sharing the room. Each capsule comes with independent tables, outlets, lamps, hangers and curtains. The body of the train is redesigned to reduce noise levels during travel. The trains have been dubbed "moving hotels".[18]

     
    Front
     
    Exterior
     
    Interior
     
    Leaving Beijing South

    CRH2G

    CRH2G is a specialized cold and sand/windstorm resistant version of the CRH2 manufactured by CRRC Qingdao Sifang. The trains were tested on the Lanzhou–Xinjiang HSR and Harbin–Dalian HSR.[19] Tests where completed on November 10, 2015 and the first sets were assigned to Lanzhou–Xinjiang HSR.[20]

    CRH2-380

     
    CRH2C-2150, an experimental testbed for CRH380A, at Shanghai Hongqiao Station.

    In 2008, the Chinese MOR & CSR launched CRH2-380 project, the main purpose is to develop new-generation of high speed trains with maximum operation speed of 380 km/h (236 mph). CRH2 is one of the fundamental platforms of the new trains, which is designated as CRH380A.

    Formation

    At the time of the sixth national railway speed-up, at least 37 CRH2A sets had been delivered by Kawasaki and Sifang.[21] In 2008, all 60 CRH2A sets had been delivered by Kawasaki. The post-2008 production model of the CRH2 are designed and made solely by Sifang with a maximum safe operation speed of 350 km/h (217 mph).[1]

    Power Destination

    • M - Motor car
    • T - Trailer car
    • C - Driver cabin
    • P - Pantograph

    Coach Type

    • ZY - First Class Coach
    • ZE - Second Class Coach
    • ZYE - First Class/Second Class Coach
    • ZEC - Second Class Coach/Buffet Car
    • CA - Buffet Car
    • WR - Soft Sleeper Car
    • WRC - Soft Sleeper Car / Dining Coach

    CRH2A (Previous)

    Coach No. 1 2 3 4 5 6 7 8
    Type1 ZE ZEC ZE ZY ZE
    Type2 ZE ZY ZE ZEC ZE ZY ZE
    Type3 ZE ZET ZE ZEC ZE ZY ZE
    Type4 ZYS ZE ZE ZEC ZE ZYT
    Type5 ZY ZE ZEC ZE ZY
    Type6 ZE ZEC ZY ZE
    Type7 ZE ZYE ZE ZEC ZE ZY ZE
    Type8 ZY ZE ZEC ZE
    Power Configuration TC M TP T MP M TC
    Power Units Unit 1 Unit 2
    Capacity1 55 100 85 100 55 (+16) 100 51 64
    Capacity2 55 100 46 100 55 (+16) 100 51 64
    Capacity3 55 100 43+16 100 55 (+16) 100 51 64
    Capacity4 15+4 51+4 85 100 55 (+16) 100 24+4
    Capacity5 42 78 85 100 55 (+16) 100 51
    Capacity6 55 100 85 100 55 (+16) 78 51 64
    Capacity7 55 100 16+43 100 71 100 51 64
    Capacity8 48 90 90 77 63 90 90 65
    • ^1 Other train sets
    • ^2 Set Nº. 2006, 2011 and 2021
    • ^3 Set Nº. 2015, 2027 and 2030
    • ^4 Set Nº. 2042
    • ^5 Set Nº. 2043
    • ^6 Set Nº. 2044–2060
    • ^7 Set Nº. 2151–2211. Coach No. 3 has 16 First Class Seats and 43 Second Class seats
    • ^8 Set Nº. 2212–2416, 2427–2460, 2473–2499, 2828, 4001–4071, 4082–4095 and 4114–4131

    CRH2A (Renovated)

    Coach No. 1 2 3 4 5 6 7 8
    Type1 ZE ZEC ZE ZY ZE
    Type2 (EC) ZY ZE ZEC ZE
    Power Configuration TC M MP M MP M TC
    Power Units Unit 1 Unit 2
    Capacity1 55 100 85 100 55 (+16) 100 51 64
    Capacity2 (EC) 48 90 90 77 63 90 90 65
    • ^1 Set Nº. 2001–2009, 2011–2060 and 2151–2211
    • ^2 Set Nº. 2212–2416, 2427–2460, 2473–2499, 2828, 4001–4071, 4082–4095 and 4114–4131

    CRH2B

    Coach No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
    Type ZY ZE CA ZE
    Power Configuration TC M TP T M T M T TP M TC
    Power Units Unit 1 Unit 2 Unit 3 Unit 4
    Capacity 36 68 51 100 85 100 85 (32) 85 100 85 100 85 100 85 65
    • Set Nº. 2111–2120, 2466–2472 and 4096–4105

    CRH2C

    Coach No. 1 2 3 4 5 6 7 8
    Type1 ZE ZEC ZE ZY ZE
    Type2 ZE ZEC ZE ZY ZE
    Power Configuration TC M MP M MP M TC
    Power Units Unit 1 Unit 2
    Capacity1 55 100 85 100 55+16 100 51 64
    Capacity2 55 100 85 100 54+16 100 51 65
    • ^1 Set Nº. 2062–2067 and 2069–2090
    • ^2 Set Nº. 2091–2110 and 2141–2149

    CRH2E

    Coach No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
    Type1 ZE WR CA WR ZE
    Type2 ZE WR WRC WR ZE
    Type3 WR WRC WR
    Power Configuration TC M TP T M T M T TP M TC
    Power Units Unit 1 Unit 2 Unit 3 Unit 4
    Capacity1 55 40 (0) 40 40 55
    Capacity2 55 40 20 55
    Capacity3 40 60 20 60 40
    • ^1 Set Nº. 2121–2138 and 2140
    • ^2 Set Nº. 2461 and 2462
    • ^3 Set Nº. 2463–2465

    CRH2G

    Coach No. 1 2 3 4 5 6 7 8
    Type ZY ZE ZEC ZE
    Power Configuration TC M MP M MP M TC
    Power Units Unit 1 Unit 2
    Capacity 48 90 77 63 90 65
    • Set Nº. 2417–2426, 4072–4081 and 4106–4113

    Accidents

    On July 23rd, two bullet trains were traveling in the same direction and the train in front, the CRH 1-046B was stopped by a power failure or a faulty signal hit by lightning. The light that the second train was supposed to stop at was hit by lightning, malfunctioned and showed a green signal while it was supposed to be red. The second train was a CRH 2-139E. The CRH2 front cars fell off the viaduct and one standing at a 90° angle between the viaduct and the ground. The cars that fell to the ground are cars 1-3 and the fourth one was the one standing.

    Distribution

    As of February 2011:

    Operator Quantity Serial number Depot Lines serving
    CRH2A
    Beijing Railway Bureau 2 2478, 2479 Beijing Beijing–Harbin Railway
    Wuhan Railway Bureau 24 2011, 2013, 2019, 2033, 2034, 2039, 2043, 2045~2051, 2053, 2055, 2169, 2179, 2180, 2200, 2205, 2206, 2209, 2210 Hankou Beijing–Guangzhou Railway, Shanghai–Wuhan–Chengdu High-Speed Railway, Hankou–Danjiangkou Railway
    24 2017, 2022, 2023, 2027, 2029, 2035, 2052, 2054, 2056, 2059, 2060, 2151, 2152, 2162~2164, 2173, 2192, 2193, 2199, 2201, 2207, 2208, 2211 Wuhan Shanghai–Wuhan–Chengdu High-Speed Railway
    Shanghai Railway Bureau 46 2001, 2003~2009, 2012, 2015, 2018, 2020, 2024, 2026, 2028, 2030, 2031, 2044, 2057, 2058, 2153, 2154, 2158, 2159, 2161, 2166~2168, 2174~2177, 2181~2184, 2186~2189, 2194~2196, 2202~2204 Shanghai South Shanghai–Hangzhou High-Speed Railway, Hangzhou–Fuzhou–Shenzhen High-Speed Railway, Shanghai–Wuhan–Chengdu High-Speed Railway, Jinshan Railway
    7 2021, 2032, 2041, 2155, 2157, 2185, 2190 Hefei South Hefei–Fuzhou High-Speed Railway, Nanjing–Anqing Intercity Railway
    12 2002, 2014, 2016, 2025, 2036-2038, 2156, 2160, 2165, 2178, 2197 Nanjing Nanjing–Qidong Railway, Nanjing–Anqing Intercity Railway
    Nanchang Railway Bureau 20 2215~2218, 2233, 2236, 2237, 2246, 2249, 2250, 2252, 2257, 2258, 2260, 2261, 2284, 2285, 2290, 2429, 2430 Nanchang Nanchang–Jiujiang Intercity Railway, Wuhan–Jiujiang Passenger Railway
    20 2212~2214, 2220~2224, 2247, 2248, 2251, 2253~2256, 2259, 2291~2293, 2302 Nanchang West Xiangtang–Putian Railway
    18 2219, 2234, 2235, 2282, 2283, 2324, 2427, 2447, 2452, 2457, 2458, 4006, 4045~4050 Xiamen North Shanghai–Hangzhou High-Speed Railway, Hangzhou–Fuzhou–Shenzhen High-Speed Railway
    3 Fuzhou South Shanghai–Hangzhou High-Speed Railway, Hangzhou–Fuzhou–Shenzhen High-Speed Railway, Xiangtang–Putian Railway
    23 2275, 2434~2437, 2440~2442, 2446, 2455, 2456, 2476, 2477, 2493, 2494, 4008, 4009, 4012~4017 Longyan Shanghai–Hangzhou High-Speed Railway, Hangzhou–Fuzhou–Shenzhen High-Speed Railway, Longyan–Xiamen Railway
    Chengdu Railway Bureau 31 2230, 2231, 2272, 2305, 2321, 2323, 2325, 2333, 2335~2340, 2363, 2374, 2385, 2390, 2438, 2480~2482, 2491, 4007, 4022, 4035~4040 Chongqing North Shanghai–Wuhan–Chengdu High-Speed Railway, Nanjing–Hangzhou High-Speed Railway, Wuhan–Jiujiang Passenger Railway
    22 2040, 2042, 2170~2172, 2191, 2198, 2228, 2304, 2360, 2364, 2373, 2391, 2392, 2395~2397, 2490, 2492, 4020, 4023, 4042 Guiyang North Guiyang–Guangzhou High-Speed Railway, Hengyang–Liuzhou Intercity Railway, Liuzhou–Nanning Intercity Railway
    Nanning Railway Bureau 54 2238, 2240~2245, 2262, 2263, 2269, 2270, 2276, 2281, 2286, 2287, 2296, 2297, 2303, 2312~2315, 2327, 2328, 2346~2348, 2351, 2370, 2371, 2375, 2377, 2378, 2383, 2386, 2387, 2393, 2394, 2398, 2399, 2401, 2404, 2407, 2443~2445, 2450, 4018, 4027, 4031, 4032, 4069, 4114, 4115 Nanning Hengyang–Liuzhou Intercity Railway, Liuzhou–Nanning Intercity Railway, Guiyang–Guangzhou High-Speed Railway, Nanning–Guangzhou High-Speed Railway
    40 2239, 2266, 2277~2280, 2288, 2289, 2300, 2301, 2306, 2307, 2366~2369, 2376, 2384, 2400, 2402, 2412, 2413, 2431~2433, 2439, 4033, 4034, 4041, 4043, 4044, 4068, 4070, 4071, 4116~4121 Guilin North Hengyang–Liuzhou Intercity Railway, Liuzhou–Nanning Intercity Railway, Guiyang–Guangzhou High-Speed Railway, Nanning–Guangzhou High-Speed Railway
    China MOR 1 2828 Official Train
    1 2010 Track Inspection Train
    CRH2B
    Shanghai Railway Bureau 10 2111~2120 Nanjing Shanghai–Wuhan–Chengdu High-Speed Railway, Shanghai–Hangzhou High-Speed Railway, Hangzhou–Fuzhou–Shenzhen High-Speed Railway
    CRH2C
    Shanghai Railway Bureau 27 2062~2067, 2069~2090 Nanjing South Shanghai–Hangzhou High-Speed Railway, Hangzhou–Ningbo High-Speed Railway, Shanghai–Nanjing Intercity Railway, Nanjing–Hangzhou High-Speed Railway
    18 2097~2110, 2141~2144 Hefei South Hefei–Nanjing Passenger Railway, Nanjing–Hangzhou High-Speed Railway, Shanghai–Nanjing Intercity Railway
    Xi'an Railway Bureau 9 2091~2096, 2145~2149 Xi'an North Zhengzhou–Xi'an High-Speed Railway
    China MOR 3 2061, 2068, 2150 Track Inspection Train
    CRH2E
    Beijing Railway Bureau 19 2121~2126, 2128, 2130~2138, 2463~2465 Beijing Beijing–Shanghai Railway, Beijing–Guangzhou High-Speed Railway, Guangzhou–Zhuhai Intercity Railway
    CRH2J
    China Railway Corporation 1 0205 Comprehensive inspection trains in orange livery

    See also

    References

    1. ^ a b Japan Inc Shoots Itself on the Foot
    2. ^ a b 关于动卧车票及CRH2系列列车的一些最新消息!
    3. ^ 视频:我国首列具自主知识产权长大编组动车组下线
    4. ^
    5. ^ 南车集团高速列车项目获国家开发银行150亿贷款
    6. ^ a b High Speed Rail (HSR) in China: 5 Years Equals 40 Years Archived 2013-01-01 at archive.today
    7. ^ Proprietary High Speed Locomotives
    8. ^
    9. ^ 国产首列时速300公里"和谐号"动车组成功下线 2008-04-03 at the Wayback Machine
    10. ^ 京津城际列车跑出370公里时速 创国产动车组纪录 2008-04-29 at the Wayback Machine
    11. ^ . Archived from the original on 2017-08-27. Retrieved 2010-10-20.
    12. ^ CRH2C page on CSR Sifang official site[permanent dead link]
    13. ^ 南车青岛四方股份造动车组装备郑西高铁
    14. ^ 南车四方自主研制的世界首批长大编组卧车动车组投入运营 2016-03-03 at the Wayback Machine
    15. ^ "我国首列时速250公里纵向卧铺动车组下线-南方都市报·奥一网". epaper.oeeee.com. Retrieved 2020-06-07.
    16. ^ "都是小"包间"!中国推出最新型纵向卧铺动车组-中新网". www.chinanews.com. Retrieved 2020-06-07.
    17. ^ "中国第一款纵向布局"双层"卧铺动车组下线 - 行业 - 人民铁道网 - 中国官方铁路门户". www.peoplerail.com. Retrieved 2017-07-02.
    18. ^ "China's New High-Speed Sleeper Train is Literally a 'Moving Hotel'". nextshark. July 2017.
    19. ^ "中国高寒动车组拿到市场"准生证",零下40℃照样跑_10%公司_澎湃新闻-The Paper". www.thepaper.cn. Retrieved 2020-06-07.
    20. ^ xj.people.com.cn http://xj.people.com.cn/n/2015/1210/c188521-27291462.html. Retrieved 2020-06-07. {{cite web}}: Missing or empty |title= (help)
    21. ^ 52列動車組將投入運營 37列為南車四方制造的和諧號CRH2型 2007-10-31 at the Wayback Machine, Science and Technology Daily

    External links

    •   Media related to China Railways CRH2 at Wikimedia Commons

    china, railway, crh2, this, article, needs, additional, citations, verification, please, help, improve, this, article, adding, citations, reliable, sources, unsourced, material, challenged, removed, find, sources, news, newspapers, books, scholar, jstor, april. This article needs additional citations for verification Please help improve this article by adding citations to reliable sources Unsourced material may be challenged and removed Find sources China Railway CRH2 news newspapers books scholar JSTOR April 2015 Learn how and when to remove this template message This article may be expanded with text translated from the corresponding article in Chinese November 2022 Click show for important translation instructions Machine translation like DeepL or Google Translate is a useful starting point for translations but translators must revise errors as necessary and confirm that the translation is accurate rather than simply copy pasting machine translated text into the English Wikipedia Do not translate text that appears unreliable or low quality If possible verify the text with references provided in the foreign language article You must provide copyright attribution in the edit summary accompanying your translation by providing an interlanguage link to the source of your translation A model attribution edit summary is Content in this edit is translated from the existing Chinese Wikipedia article at zh 和谐号CRH2型电力动车组 see its history for attribution You should also add the template Translated zh 和谐号CRH2型电力动车组 to the talk page For more guidance see Wikipedia Translation The CRH2 Hexie simplified Chinese 和谐号 traditional Chinese 和諧號 pinyin Hexie Hao literally Harmony is one of the high speed train models in China The CRH2 is based on the E2 1000 Series Shinkansen design from Japan with the license purchased from a consortium formed of Kawasaki Heavy Industries Mitsubishi Electric and Hitachi and represents the second Shinkansen train model to be exported China Railway CRH2 EMUCRH2 at Nanjing railway stationIn service2007 presentManufacturerKawasaki Heavy Industries CRRC Qingdao SifangFamily nameShinkansen E2 series Number builtCRH2A 60 40 trainsets 800 cars CRH2B 20 trainsets 320 cars CRH2C stage 1 30 trainsets 240 cars CRH2C stage 2 20 trainsets 160 cars CRH2E 20 trainsets 320 cars FormationCRH2A 8 cars per trainset 4M4T CRH2B E 16 cars per trainset 8M8T CRH2C 8 cars per trainset 6M2T CapacityCRH2A 610 571 562 588 600 608CRH2B 1230CRH2C 610 626CRH2E 630 880 CRH2E 2463 2464 and 2465 Operator s China Railway CR Beijing CR Shanghai CR Jinan CR Xi an CR Wuhan CR Nanchang CR Zhengzhou CR Taiyuan CR Chengdu CR Guangzhou CR NanningLine s servedMost 200 250km h high speed rail lines across China plus some conventional linesSpecificationsTrain lengthCRH2A C 201 4 m 660 ft 9 in CRH2B E 401 4 m 1 316 ft 11 in Width3 380 mm 11 ft 1 in Height3 700 mm 12 ft 2 in Platform height1 250 mm 4 ft 1 in Maximum speedCRH2A B E 250 km h 155 mph CRH2C stage 1 350 km h 217 mph CRH2C stage 2 380 km h 236 mph Traction systemWater cooling IGBT VVVF inverter control CRH2B E Mitsubishi Electric type MAP 304 A25V141 CRH2A C Hitachi type CII HHR1420A B D Zhuzhou CSR Times Electric type TGA10 10A 10E 10G Traction motors3 phase AC induction motors CRH2B E Mitsubishi Electric type MB 5120 A Zhuzhou CSR Times Electric type MT 205CRH2A C Hitachi CRRC Yongji Electric type YJ 92A Zhuzhou CSR Times Electric type YQ 365 Power outputCRH2A 4 8 MW 6 437 hp CRH2B E 9 6 MW 12 874 hp CRH2C Stage 1 7 2 MW 9 655 hp Stage 2 8 76 MW 11 747 hp TransmissionAC DC ACElectric system s 25 kV 50 Hz AC Overhead catenaryCurrent collector s PantographBraking system s Regenerative electronically controlled pneumatic brakesTrack gauge1 435 mm 4 ft 8 1 2 in standard gaugeIn 2004 the Ministry of Railway in China purchased an initial 60 sets of the train from Kawasaki Heavy Industries with a maximum speed of 250 km h 155 mph However the newer versions of the CRH2 are not related to the E2 1000 Series despite having the same exterior shell 1 Contents 1 Variants 1 1 CRH2A 1 2 CRH2B 1 3 CRH2C CRH2 350 1 3 1 CRH2C stage one 1 3 2 CRH2C stage two 1 4 CRH2E 1 4 1 Double Deck CRH2E 1 5 CRH2G 1 6 CRH2 380 2 Formation 2 1 CRH2A Previous 2 2 CRH2A Renovated 2 3 CRH2B 2 4 CRH2C 2 5 CRH2E 2 6 CRH2G 3 Accidents 4 Distribution 5 See also 6 References 7 External linksVariants Edit The CRH2 developed from the E2 Series Shinkansen CRH2A 2260 amp 2011 at Xiamen railway station CRH2A Edit On October 20 2004 the Ministry of Railway in China ordered 60 sets of CRH2A trains from Kawasaki Heavy Industries in Japan Along with 60 sets of Bombardier s Regina based CRH1A and 40 sets of Alstom s Pendolino based CRH5A these train sets are consider as first batch of CRH trains Each of the CRH2A set consists of 8 cars The first 3 sets CRH2 001A CRH2 003A were built in Japan the next 6 sets CRH2 004A CRH2 009A were delivered in complete knock down form and assembled by CSR Sifang Locomotive and Rolling Stock The remaining 51 sets CRH2 010A CRH2 060A were built by Sifang through technology transfer from Japan The first train arrived at Qingdao port on March 8 2006 with little fanfare and was not even publicized in China These trains have a maximum operation speed of 250 km h 155 mph and started providing high speed train service from April 18 2007 the date of the sixth national railway speed up According to Chinese and Japanese media CRH2A trains started test trials ahead of commercial operation on the Shanghai Hangzhou and Shanghai Nanjing lines on January 28 2007 On September 14 2010 the Chinese MOR ordered additional 40 sets of CRH2A trains CRH2 151A CRH2 190A from CSR Sifang CRH2B Edit CRH2B at Wuxi Station In November 2007 the Ministry of Railway in China ordered 10 CRH2 sets with 16 cars per set 8M8T These trains have been given designations CRH2B CRH2 111B CRH2 120B Each CRH2B has three 1st seating cars ZY twelve 2nd seating cars ZE and one dining car CA Designed maximum operation speed is 250 km h 155 mph with a power of 9 600 kW 12 874 hp The first units were delivered on June 29 2008 2 3 and came into service on the Hefei Nanjing Passenger Railway on August 1 2008 4 CRH2C CRH2 350 Edit CRH2C After the introduction of the modified E2 1000 Series Sifang built its own CRH2 with a maximum safe operating speed of 350 km h 217 mph The original train sets imported from Kawasaki had a maximum safe operating speed of 250 km h 160 mph During June 2005 and September 2005 The Chinese Ministry of Railways launched bidding for High speed trains with a top speed over 300 km h 186 mph Along with Siemens s Velaro based CRH3C CSR Sifang bid 60 sets of CRH2C includes 30 sets of CRH2C stage one with a top speed of 300 km h 186 mph and 30 sets of CRH2C stage two with a top speed of 350 km h 217 mph In development and research of the 350 km h 217 mph high speed train The CRH2 300 project was launched by Chinese MOR and CSR In 2006 the China Development Bank provided CNY 15 billion developmental financial loans to CSR Group for the projects of 200 300 km h 124 186 mph high speed trains 5 Over 50 academics 150 000 technicians 600 contractors were involved in the project 6 This train s livery is not like the CRH2A which the blue stripe does not end at the fronts of trainsets CRH2C stage one Edit CRH2 064C CRH2C Stage one is a modified version of CRH2A It has a maximum operating speed up to 300 km h 186 mph by replacing two intermediate trailer cars with motorized cars Equipped with an array of the state of the art technologies including aluminum alloy body with a reduced weight high speed turntable high speed pantograph and optic fiber based integrated control system 7 Chinese MOR ordered 30 sets of CRH2C stage one name code CRH2 061C CRH2 090C The first set CRH2 061C was unveiled on December 22 2007 8 9 During the test on April 22 2008 CRH2 061C reached a top speed of over 370 km h 230 mph on Beijing Tianjin high speed rail 10 During the test on December 11 2009 CRH2 061C reached a top speed of 394 2 km h 244 9 mph on Zhengzhou Xi an high speed rail 11 Together with CRH3C the CRH2C stage one first came into service on Beijing Tianjin Intercity high speed rail on August 1 2008 and all CRH2C stage one trains have been replaced by CRH3C in April 2009 Currently most of these trains are serving on the Shanghai Nanjing high speed rail CRH2C stage two Edit CRH2C Stage two is the re design version of the CRH2 Some of the details like the aluminum body structure noise reduction technology amp reduction technique draw on the CRH3C According to CSR Sifang the improvements include the following aspects The axle weight of the bogie increased from 14 to 15 tonnes 30 865 to 33 069 lb to prevent tremble of the train body at a higher speed 6 the gear ratio has been optimized from 3 036 to 2 379 the critical instability speed is 550 km h 340 mph The thermal capacity of the bogie has been increased which satisfied the continuous operation at 350 km h 217 mph With the YQ 365 type AC traction motor It has a maximum operating speed up to 350 km h 217 mph with a power of 8 760 kW 11 747 hp The rigidity of the car body has been increased to lower the noise and vibration Optimized car body and window design for better air tightness and strength Added pressure protection system to avoid pressure fluctuation in the compartment and improvement of comfort Optimized design of the roof antenna exterior windscreen and windows for a lower air resistance 12 Chinese MOR ordered 30 sets of CRH2C stage two name code CRH2 091C CRH2 110C and CRH2 141C CRH2 150C The first set CRH2 091C was unveiled in January 2010 and came into service on Zhengzhou Xi an high speed rail in February 2010 13 CRH2E Edit A CRH2E arriving Beijing West railway station as D924 Guangzhou Beijing overnight train in 2015 Inside a traditional berth style sleeper car of a CRH2E In November and December 2007 the Ministry of Railway in China ordered 20 CRH2 sleeper trains with 16 cars per set 8M8T These trains are modified CRH2Bs outfitted with traditional railway sleeping berths couchette car and have been given designations CRH2E numbered CRH2 121E CRH2 140E Each CRH2E has thirteen 1st class sleeping cars WR two 2nd class seating cars ZE and one buffet car CA or one second class dining car ZEC Designed maximum operation speed is 250 km h 155 mph with 9 600 kW 12 874 hp of power output The first batch of CRH2E CRH2 121E CRH2 126E came into service on Beijing Shanghai railway on December 21 2008 2 14 On 23 July 2011 one sleeper coach on CRH2 139E trainset has been derailed in the 2011 Wenzhou train collision together with CRH1 046B The rest of CRH2Es were deployed on Beijing Guangzhou Shenzhen Hong Kong High Speed Railway since January 2015 operating overnight sleeper trains between Beijing and Guangzhou including some trains to Shenzhen Double Deck CRH2E Edit A brand new variant of the CRH2E entered service in 2017 numbered beyond CRH2E 2463 15 16 Instead of a traditional railway sleeping berth the sleeper train is organized with the corridor running down the middle of the traincar with double deck capsules on each side 17 Each capsule is similar in layout to airplane first class and passengers are no longer sharing the room Each capsule comes with independent tables outlets lamps hangers and curtains The body of the train is redesigned to reduce noise levels during travel The trains have been dubbed moving hotels 18 Front Exterior Interior Leaving Beijing South CRH2G Edit CRH2G is a specialized cold and sand windstorm resistant version of the CRH2 manufactured by CRRC Qingdao Sifang The trains were tested on the Lanzhou Xinjiang HSR and Harbin Dalian HSR 19 Tests where completed on November 10 2015 and the first sets were assigned to Lanzhou Xinjiang HSR 20 CRH2 380 Edit CRH2C 2150 an experimental testbed for CRH380A at Shanghai Hongqiao Station Main article China Railways CRH380A In 2008 the Chinese MOR amp CSR launched CRH2 380 project the main purpose is to develop new generation of high speed trains with maximum operation speed of 380 km h 236 mph CRH2 is one of the fundamental platforms of the new trains which is designated as CRH380A Formation EditAt the time of the sixth national railway speed up at least 37 CRH2A sets had been delivered by Kawasaki and Sifang 21 In 2008 all 60 CRH2A sets had been delivered by Kawasaki The post 2008 production model of the CRH2 are designed and made solely by Sifang with a maximum safe operation speed of 350 km h 217 mph 1 Power Destination M Motor car T Trailer car C Driver cabin P PantographCoach Type ZY First Class Coach ZE Second Class Coach ZYE First Class Second Class Coach ZEC Second Class Coach Buffet Car CA Buffet Car WR Soft Sleeper Car WRC Soft Sleeper Car Dining Coach First Class Coach Second Class Coach Buffet Car The buffet car of the CRH2E Compartment ConnectionCRH2A Previous Edit Coach No 1 2 3 4 5 6 7 8Type1 ZE ZEC ZE ZY ZEType2 ZE ZY ZE ZEC ZE ZY ZEType3 ZE ZET ZE ZEC ZE ZY ZEType4 ZYS ZE ZE ZEC ZE ZYTType5 ZY ZE ZEC ZE ZYType6 ZE ZEC ZY ZEType7 ZE ZYE ZE ZEC ZE ZY ZEType8 ZY ZE ZEC ZEPower Configuration TC M TP T MP M TCPower Units Unit 1 Unit 2Capacity1 55 100 85 100 55 16 100 51 64Capacity2 55 100 46 100 55 16 100 51 64Capacity3 55 100 43 16 100 55 16 100 51 64Capacity4 15 4 51 4 85 100 55 16 100 24 4Capacity5 42 78 85 100 55 16 100 51Capacity6 55 100 85 100 55 16 78 51 64Capacity7 55 100 16 43 100 71 100 51 64Capacity8 48 90 90 77 63 90 90 65 1 Other train sets 2 Set Nº 2006 2011 and 2021 3 Set Nº 2015 2027 and 2030 4 Set Nº 2042 5 Set Nº 2043 6 Set Nº 2044 2060 7 Set Nº 2151 2211 Coach No 3 has 16 First Class Seats and 43 Second Class seats 8 Set Nº 2212 2416 2427 2460 2473 2499 2828 4001 4071 4082 4095 and 4114 4131CRH2A Renovated Edit Coach No 1 2 3 4 5 6 7 8Type1 ZE ZEC ZE ZY ZEType2 EC ZY ZE ZEC ZEPower Configuration TC M MP M MP M TCPower Units Unit 1 Unit 2Capacity1 55 100 85 100 55 16 100 51 64Capacity2 EC 48 90 90 77 63 90 90 65 1 Set Nº 2001 2009 2011 2060 and 2151 2211 2 Set Nº 2212 2416 2427 2460 2473 2499 2828 4001 4071 4082 4095 and 4114 4131CRH2B Edit Coach No 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16Type ZY ZE CA ZEPower Configuration TC M TP T M T M T TP M TCPower Units Unit 1 Unit 2 Unit 3 Unit 4Capacity 36 68 51 100 85 100 85 32 85 100 85 100 85 100 85 65Set Nº 2111 2120 2466 2472 and 4096 4105CRH2C Edit Coach No 1 2 3 4 5 6 7 8Type1 ZE ZEC ZE ZY ZEType2 ZE ZEC ZE ZY ZEPower Configuration TC M MP M MP M TCPower Units Unit 1 Unit 2Capacity1 55 100 85 100 55 16 100 51 64Capacity2 55 100 85 100 54 16 100 51 65 1 Set Nº 2062 2067 and 2069 2090 2 Set Nº 2091 2110 and 2141 2149CRH2E Edit Coach No 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16Type1 ZE WR CA WR ZEType2 ZE WR WRC WR ZEType3 WR WRC WRPower Configuration TC M TP T M T M T TP M TCPower Units Unit 1 Unit 2 Unit 3 Unit 4Capacity1 55 40 0 40 40 55Capacity2 55 40 20 55Capacity3 40 60 20 60 40 1 Set Nº 2121 2138 and 2140 2 Set Nº 2461 and 2462 3 Set Nº 2463 2465CRH2G Edit Coach No 1 2 3 4 5 6 7 8Type ZY ZE ZEC ZEPower Configuration TC M MP M MP M TCPower Units Unit 1 Unit 2Capacity 48 90 77 63 90 65Set Nº 2417 2426 4072 4081 and 4106 4113Accidents EditMain article Wenzhou train collision On July 23rd two bullet trains were traveling in the same direction and the train in front the CRH 1 046B was stopped by a power failure or a faulty signal hit by lightning The light that the second train was supposed to stop at was hit by lightning malfunctioned and showed a green signal while it was supposed to be red The second train was a CRH 2 139E The CRH2 front cars fell off the viaduct and one standing at a 90 angle between the viaduct and the ground The cars that fell to the ground are cars 1 3 and the fourth one was the one standing Distribution EditAs of February 2011 update Operator Quantity Serial number Depot Lines servingCRH2ABeijing Railway Bureau 2 2478 2479 Beijing Beijing Harbin RailwayWuhan Railway Bureau 24 2011 2013 2019 2033 2034 2039 2043 2045 2051 2053 2055 2169 2179 2180 2200 2205 2206 2209 2210 Hankou Beijing Guangzhou Railway Shanghai Wuhan Chengdu High Speed Railway Hankou Danjiangkou Railway24 2017 2022 2023 2027 2029 2035 2052 2054 2056 2059 2060 2151 2152 2162 2164 2173 2192 2193 2199 2201 2207 2208 2211 Wuhan Shanghai Wuhan Chengdu High Speed RailwayShanghai Railway Bureau 46 2001 2003 2009 2012 2015 2018 2020 2024 2026 2028 2030 2031 2044 2057 2058 2153 2154 2158 2159 2161 2166 2168 2174 2177 2181 2184 2186 2189 2194 2196 2202 2204 Shanghai South Shanghai Hangzhou High Speed Railway Hangzhou Fuzhou Shenzhen High Speed Railway Shanghai Wuhan Chengdu High Speed Railway Jinshan Railway7 2021 2032 2041 2155 2157 2185 2190 Hefei South Hefei Fuzhou High Speed Railway Nanjing Anqing Intercity Railway12 2002 2014 2016 2025 2036 2038 2156 2160 2165 2178 2197 Nanjing Nanjing Qidong Railway Nanjing Anqing Intercity RailwayNanchang Railway Bureau 20 2215 2218 2233 2236 2237 2246 2249 2250 2252 2257 2258 2260 2261 2284 2285 2290 2429 2430 Nanchang Nanchang Jiujiang Intercity Railway Wuhan Jiujiang Passenger Railway20 2212 2214 2220 2224 2247 2248 2251 2253 2256 2259 2291 2293 2302 Nanchang West Xiangtang Putian Railway18 2219 2234 2235 2282 2283 2324 2427 2447 2452 2457 2458 4006 4045 4050 Xiamen North Shanghai Hangzhou High Speed Railway Hangzhou Fuzhou Shenzhen High Speed Railway3 Fuzhou South Shanghai Hangzhou High Speed Railway Hangzhou Fuzhou Shenzhen High Speed Railway Xiangtang Putian Railway23 2275 2434 2437 2440 2442 2446 2455 2456 2476 2477 2493 2494 4008 4009 4012 4017 Longyan Shanghai Hangzhou High Speed Railway Hangzhou Fuzhou Shenzhen High Speed Railway Longyan Xiamen RailwayChengdu Railway Bureau 31 2230 2231 2272 2305 2321 2323 2325 2333 2335 2340 2363 2374 2385 2390 2438 2480 2482 2491 4007 4022 4035 4040 Chongqing North Shanghai Wuhan Chengdu High Speed Railway Nanjing Hangzhou High Speed Railway Wuhan Jiujiang Passenger Railway22 2040 2042 2170 2172 2191 2198 2228 2304 2360 2364 2373 2391 2392 2395 2397 2490 2492 4020 4023 4042 Guiyang North Guiyang Guangzhou High Speed Railway Hengyang Liuzhou Intercity Railway Liuzhou Nanning Intercity RailwayNanning Railway Bureau 54 2238 2240 2245 2262 2263 2269 2270 2276 2281 2286 2287 2296 2297 2303 2312 2315 2327 2328 2346 2348 2351 2370 2371 2375 2377 2378 2383 2386 2387 2393 2394 2398 2399 2401 2404 2407 2443 2445 2450 4018 4027 4031 4032 4069 4114 4115 Nanning Hengyang Liuzhou Intercity Railway Liuzhou Nanning Intercity Railway Guiyang Guangzhou High Speed Railway Nanning Guangzhou High Speed Railway40 2239 2266 2277 2280 2288 2289 2300 2301 2306 2307 2366 2369 2376 2384 2400 2402 2412 2413 2431 2433 2439 4033 4034 4041 4043 4044 4068 4070 4071 4116 4121 Guilin North Hengyang Liuzhou Intercity Railway Liuzhou Nanning Intercity Railway Guiyang Guangzhou High Speed Railway Nanning Guangzhou High Speed RailwayChina MOR 1 2828 Official Train1 2010 Track Inspection TrainCRH2BShanghai Railway Bureau 10 2111 2120 Nanjing Shanghai Wuhan Chengdu High Speed Railway Shanghai Hangzhou High Speed Railway Hangzhou Fuzhou Shenzhen High Speed RailwayCRH2CShanghai Railway Bureau 27 2062 2067 2069 2090 Nanjing South Shanghai Hangzhou High Speed Railway Hangzhou Ningbo High Speed Railway Shanghai Nanjing Intercity Railway Nanjing Hangzhou High Speed Railway18 2097 2110 2141 2144 Hefei South Hefei Nanjing Passenger Railway Nanjing Hangzhou High Speed Railway Shanghai Nanjing Intercity RailwayXi an Railway Bureau 9 2091 2096 2145 2149 Xi an North Zhengzhou Xi an High Speed RailwayChina MOR 3 2061 2068 2150 Track Inspection TrainCRH2EBeijing Railway Bureau 19 2121 2126 2128 2130 2138 2463 2465 Beijing Beijing Shanghai Railway Beijing Guangzhou High Speed Railway Guangzhou Zhuhai Intercity RailwayCRH2JChina Railway Corporation 1 0205 Comprehensive inspection trains in orange liverySee also EditChina Railway CRH1 China Railway CRH3 China Railway CRH5 China Railway CRH380A China Railway CRH6 China Railway CIT trains List of high speed trainsReferences Edit a b Japan Inc Shoots Itself on the Foot a b 关于动卧车票及CRH2系列列车的一些最新消息 视频 我国首列具自主知识产权长大编组动车组下线 上海至合肥动车昨首发 全程3 5小时 南车集团高速列车项目获国家开发银行150亿贷款 a b High Speed Rail HSR in China 5 Years Equals 40 Years Archived 2013 01 01 at archive today Proprietary High Speed Locomotives 我国自主研制的首列时速300公里动车组下线 国产首列时速300公里 和谐号 动车组成功下线 Archived 2008 04 03 at the Wayback Machine 京津城际列车跑出370公里时速 创国产动车组纪录 Archived 2008 04 29 at the Wayback Machine 最高时速394 2公里比波音747起飞时还快 Archived from the original on 2017 08 27 Retrieved 2010 10 20 CRH2C page on CSR Sifang official site permanent dead link 南车青岛四方股份造动车组装备郑西高铁 南车四方自主研制的世界首批长大编组卧车动车组投入运营 Archived 2016 03 03 at the Wayback Machine 我国首列时速250公里纵向卧铺动车组下线 南方都市报 奥一网 epaper oeeee com Retrieved 2020 06 07 都是小 包间 中国推出最新型纵向卧铺动车组 中新网 www chinanews com Retrieved 2020 06 07 中国第一款纵向布局 双层 卧铺动车组下线 行业 人民铁道网 中国官方铁路门户 www peoplerail com Retrieved 2017 07 02 China s New High Speed Sleeper Train is Literally a Moving Hotel nextshark July 2017 中国高寒动车组拿到市场 准生证 零下40 照样跑 10 公司 澎湃新闻 The Paper www thepaper cn Retrieved 2020 06 07 xj people com cn http xj people com cn n 2015 1210 c188521 27291462 html Retrieved 2020 06 07 a href Template Cite web html title Template Cite web cite web a Missing or empty title help 52列動車組將投入運營 37列為南車四方制造的和諧號CRH2型 Archived 2007 10 31 at the Wayback Machine Science and Technology DailyExternal links Edit Media related to China Railways CRH2 at Wikimedia Commons Retrieved from https en wikipedia org w index php title China Railway CRH2 amp oldid 1124468998, wikipedia, wiki, book, books, library,

    article

    , read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.