fbpx
Wikipedia

U.S. Route 70 in North Carolina

U.S. Route 70 (US 70) is a part of the United States Numbered Highway System that runs from Globe, Arizona, to the Crystal Coast of the US state of North Carolina. In North Carolina, it is a major 488-mile-long (785 km) east–west highway that runs from the Tennessee border to the Atlantic Ocean. From the Tennessee state line near Paint Rock to Asheville it follows the historic Dixie Highway, running concurrently with US 25. The highway connects several major cities including Asheville, High Point, Greensboro, Durham, Raleigh, Goldsboro, and New Bern. From Beaufort on east, US 70 shares part of the Outer Banks Scenic Byway, a National Scenic Byway, before ending in the community of Atlantic, located along Core Sound.

U.S. Highway 70

Route of US 70 in North Carolina highlighted in red
Route information
Maintained by NCDOT
Length488 mi[1] (785 km)
ExistedNovember 11, 1926 (November 11, 1926)–present
Tourist
routes
Major junctions
West end US 25 / US 70 at the Tennessee line near Paint Rock
Major intersections
East endSchool Drive in Atlantic
Location
CountryUnited States
StateNorth Carolina
CountiesMadison, Buncombe, McDowell, Burke, Catawba, Iredell, Rowan, Davidson, Randolph, Guilford, Alamance, Orange, Durham, Wake, Johnston, Wayne, Lenoir, Jones, Craven, Carteret
Highway system
NC 69 NC 71

US 70 is an original US Highway, signed on November 11, 1926, when the US Highway System was approved. Since then, the highway has been realigned in places. One of the larger extensions of US 70 came in 1931 when the highway was extended concurrently along North Carolina Highway 101 (NC 101) from Beaufort to Atlantic. While sections of US 70 have been converted to freeway standards, along most of the routing it is a four-lane highway. Several new projects beginning in the 2000s have placed US 70 on interstate grade freeways, such as the Clayton and Goldsboro bypasses. On May 24, 2016, AASHTO assigned the Future I-42 designation to the majority of US 70's routing east of Garner. Additionally, a short freeway segment in east Durham was officially designated as I-885 on June 30, 2022, a route that connects I-40 to I-85 through the Research Triangle Park and east Durham.

Route description

US 70 travels through several diverse regions in North Carolina, including the Bald and Black Mountains of Western North Carolina, the rural Foothills, the urban Piedmont, the farmlands of the Inner Banks, and the coastal communities of the Crystal Coast. All of US 70 east of Durham, and smaller segments including Statesville to Salisbury and Lexington to Greensboro, are listed in the National Highway System, a network of roads important to the country's economy, defense, and mobility.[2][3] US 70 also overlaps two state scenic byways: the Appalachian Medley, from Hot Springs to Walnut, and the Clayton Bypass Scenic Byway, from I-40 to US 70 Bus.[4]

Western Mountains and Foothills

US 70, in concurrency with US 25, enters from Tennessee as a two-lane mountain highway meandering through the Bald Mountains. In Hot Springs it crosses the French Broad River and the Appalachian Trail, then goes northeasterly through Tanyard Gap to Hurricane. Proceeding south, it goes through the Walnut Mountains and then joins NC 213 near Walnut. Continuing on a more southeasterly routing, it becomes the US 25 Bus./US 70 Bus. split-off towards downtown Marshall at Mashburn Gap. At the Hayes Run Road interchange, NC 213 splits and continues towards Mars Hill. Before US 25 Bus./US 70 Bus. rejoins at Ivy River Road, the highway widens to four lanes; afterwards, it follows along Ivy Creek before crossing the Madison/Buncombe county line.[5]

In Weaverville, US 25/US 70 joins Future I-26/US 19/US 23 (exit 19), then continues south on the Morris L. McGough Freeway to Asheville.[6] US 25 separates at Merrimon Avenue (exit 23), continuing solo into downtown Asheville. At the Patton Avenue interchange, US 70 switches to an I-240/US 74A concurrency as it goes east along the Billy Graham Freeway.[6] At Charlotte Avenue (exit 5B), US 70/US 74A splits from I-240 before it goes through the Beaucatcher Cut. At College Street, which changes into Tunnel Road, US 70/US 74A passes through Beaucatcher Tunnel (built in 1927).[7] On the eastern side of Beaucatcher Mountain, US 70/US ;74A goes through a commercial corridor that leads to Asheville Mall, where US 74A splits and continues along South Tunnel Road and connects with I-240 at a unique three-level diamond interchange. In the East Asheville area is the historic Oteen Veterans Administration Hospital Historic District as well as the Blue Ridge Parkway. At Jones Mountain, US 70 leaves the Asheville city limits and begins its parallel north of I-40, as it goes through Swannanoa and Black Mountain. At Ridgecrest, US 70 merges with I-40 (exit 65). At Swannanoa Gap it crosses the Eastern Continental Divide (elevation 2,786 feet (849 m)) and enters McDowell County.[8]

At the top of the gap, in addition to a reduced speed limit there is a truck information station that requires all trucks to go through before continuing. The following 5-mile (8.0 km) descent is a 6% grade along Youngs Ridge to Old Fort, along which are several reduce-speed warning lights and three runaway truck ramps. It is likely that, on both on the ascent and the descent, most trucks and some cars will be going slower than posted speed limits, and that, despite the fact that this section is six lanes wide, slower vehicles may be traveling in the passing lanes. At Old Fort, US 70 splits from I-40 (at exit 72) and travels through the downtown area and by the Mountain Gateway Museum and Heritage Center. East of Old Fort, US 70 travels northeasterly towards Marion and forms the southern boundary of the Pisgah National Forest. At Pleasant Gardens, it connects with NC 80, which travelers can follow towards Mount Mitchell, the highest peak east of the Mississippi River. Crossing the Catawba River and entering Marion, US 70 connects with US 221/NC 226 and then forms a short concurrency with US 221 Bus. along Main Street. East of Marion, US 70 connects with NC 126 in Nebo, where travelers can visit Lake James State Park.[9]

Entering Burke County near Bridgewater, US 70 passes through Glen Alpine and then enters Morganton, where it forms a brief concurrency with US 64 as it proceeds along Fleming Drive, while US 70 Bus. passes through the downtown area. Continuing east, it goes through the towns of Drexel, Valdese, Rutherford College, Connelly Springs and Hildebran before crossing into Catawba County at Long View. In Hickory, US 70 serves as the town's commercial corridor as US 321 Bus. begins its concurrency at the US 321 interchange. In Conover, US 321 Bus. turns at Northwest Boulevard towards Newton and then crosses NC 16. Continuing east through Claremont and Catawba, US 70 crosses the Catawba River for the second time and enters Iredell County.[10][11]

Piedmont Triad and the Triangle

After passing through Celeste Hinkle and by the Statesville Regional Airport, US 70 enters the city limits of Statesville and connects with US 64/NC 90 at the intersection of Newton Drive and Garner Bagnal Boulevard. Passing south of the downtown area, it begins to parallel the Norfolk Southern Railway south to Salisbury. Crossing US 21 at Shelton Avenue and I-77 (exit 49A), it leaves Statesville and proceeds southeasterly along Statesville Boulevard, also known as the Jim Graham Highway, through an area of farmland and factories that are wedged between the four-lane highway and the railway.[6] After crossing into Rowan County, US 70 goes through Cleveland and shares a short concurrency with NC 801 near Barber before entering Salisbury. On Jake Alexander Boulevard, US 70 shares a concurrency with US 601 until the Rowan Mills area, where it switches onto Main Street with US 29 and later NC 150. Traveling northeasterly through downtown Salisbury, it then goes by the North Carolina Transportation Museum before passing through Spencer. At the Yadkin River, the four-lane highway reduces to two-lanes as it crosses over into Davidson County. Adjacent to the bridge over which US 29/US 70/NC 150 travels are the Wil-Cox Bridge, a concrete arch pedestrian bridge, and two North Carolina Railroad (NCRR) Warren truss bridges.[12][13]

 
US 29/US 70/NC 150, along WilCox Way towards Spencer

At 1.16 miles (1.87 km) from the Yadkin River, NC 150 splits towards Churchland while US 29/US 70 merges with I-85/US 52 (at exit 84). After a 4.31-mile (6.94 km) concurrency, I-85 splits off and continues towards Greensboro, and I-285 begins (at exit 87). Entering the Lexington city limits, additional route changes occur; I-285/US 52 departs (at exit 87) towards Winston-Salem, and US 64 merges from Mocksville. After skirting north of downtown Lexington, US 64 departs again towards Asheboro, and the highway continues northeasterly as a four-lane expressway. After passing through Thomasville, it then proceeds briefly through Randolph County and then into High Point and Guilford County. Staying south of the downtown area, it connects with I-74 with its second three-level diamond interchange. Near Groometown, the highway merges with I-85 for a brief 1-mile (1.6 km) concurrency (between exits 118 and 120A). To connect with I-73/US 421 (Greensboro Urban Loop), travelers must continue on I-85 or stay in the left travel lanes; this stretch of freeway features numerous sign gantries and surface markings to guide travelers. Continuing northeasterly along Preddy Boulevard into Greensboro, it connects with South US 220 (at exit 35), where travelers can connect to Interstate 85, or go northbound to reach I-40 west or the Greensboro Coliseum.[6] Merging onto I-40/US 220/US 29 (at exit 219), the following 2-mile (3.2 km) stretch of freeway is known locally as "Death Valley", a nickname given because of the high number of deaths due to car crashes in this area, owed to having five routes attached to it.[14] Separating from I-40/I-85 Bus. at the O'Henry Boulevard interchange (at exit 223), US 29/US 70/US 220 continue north, passing by the North Carolina A&T campus to the Wendover Avenue interchange, where the 3 routes break up. With US 29 continuing north along the expressway towards Reidsville and Danville, Virginia, and US 220 North going west on Wendover Avenue to follow Battleground Road to Summerfield, US 70 again proceeds solo, east on Wendover Ave towards Burlington. At the eastern edge of Greensboro's city limit, US 70 connects with I-785/I-840 (Greensboro Urban Loop). Leaving Greensboro and entering McLeansville, US 70 takes on the name "Burlington Road" as well as the Charlotte Hawkins Brown Memorial Highway. Here it is a two lane road, and is also an important route that connects McLeansville with other small towns such as Sedalia and Gibsonville, as well as the Rock Creek and Stoney Creek centers in Whitsett; east of Whitsett, it enters Alamance County.[6][15][16][17]

Passing south of Elon, US 70 runs on Church St, a four lane retail corridor, as it enters Burlington's city limits. It connects with NC 87 and NC 100 as well as NC 62 as it enters downtown Burlington. Sharing a brief concurrency with NC 62 through the downtown area, it then proceeds southeasterly to Haw River. As it nears the town of Haw River, it then goes northeasterly again to bypass the town and crosses over the Haw River via Three Governors Bridge; heading easterly again, the highway drops back to two lanes after connecting with NC 49.[6] At Mebane, US 70 crosses into Orange County. Passing through the communities of Miles and Efland, and parallels the NCRR railroad just to the north, US 70 makes a unique median divide in Duke Forest to merge with the I-85 Connector (SR 1239); constructed in the mid-1950s when US 70 was rerouted here onto what is now I-40/I-85. Crossing the Eno River, US 70 passes along the northern edge of Hillsborough, while US 70 Bus. goes through its downtown area. Crossing the Eno River again, it borders along the Eno River State Park, while traveling through another area of the Duke Forest. At Eno, US 70 merges onto I-85 (exit 170), while US 70 Bus. continues along its former alignment to Bennett Place.[18][19]

Entering both Durham and Durham County, I-85/US 70 maintains an east–west routing north of the downtown area, along a stretch of highway dedicated to Dr. John H. Franklin.[20] At exit 174A US 15/US 501 join the freeway; at exit 176B US 501 departs and continues north along Duke Street. US 70 leaves I-85/US 15 at exit 178, and forms a concurrency with I-885, which begins at the interchange. I-85 and US 15 continue north toward Oxford and Petersburg. Traveling on a southeasterly direction along four-lane freeway in East Durham, it has interchanges with US 70 Bus./ NC 98 and Carr Drive. Soon after I-885 departs from the route to head toward I-40, US 70 downgrades to an expressway. At Bethesda, Miami Boulevard (SR 1959) continues south into the Research Triangle Park, while US 70 enters Wake County along New Raleigh Highway.[21]

After crossing Raleigh city limits, US 70, here called Glenwood Avenue, makes a connection with I-540 (exit 292), which goes to the front entrance of RDU Airport; the following Lumley Road/Westgate Road interchange (at exit 293) goes to the North Cargo and General Aviation area of RDU Airport. Adjacent to the airport is William B. Umstead State Park. With NC 50 joining US 70 at Creedmoor Road, US 70 crosses under I-440/US 1 after passing by Crabtree Valley Mall. Inside the Raleigh Beltline, US 70/NC 50 travel through a residential area until Wade Avenue, where they join US 401 along Capital Boulevard. In the downtown area, Capital Boulevard splits into Dawson and McDowell Streets; various sites are adjacent or nearby, including the North Carolina Museum of Natural Sciences and North Carolina Museum of History (via Jones Street), the North Carolina State Capitol (via Morgan Street), the Raleigh Convention Center, the Red Hat Amphitheater, and the Duke Energy Center for the Performing Arts (via South Street). Leaving the downtown area after the Martin Luther King Jr. Boulevard/Western Boulevard interchange, Dawson–McDowell Streets merge and become Saunders Street, which promptly exits the Raleigh Beltline crossing under I-40/US 64. In Garner, US 401 departs along Fayetteville Street towards Fuquay-Varina, followed by NC 50 along Benson Road towards Benson. East of Garner, US 70 merges with I-40 (exit 306A), while US 70 Bus. head towards Clayton. At the Wake/Johnston county line, US 70 splits from I-40 for the last time (at exit 309) and onto the Clayton Bypass.[22]

Coastal Plain and Down East

 
Oxeye daisies and Coreopsis lanceolata along the Clayton Bypass

After 10.7 miles (17.2 km) along the Clayton Bypass, US 70 crosses US 70 Bus., from Clayton to Smithfiled, and changes from freeway to expressway. Continuing through Wilson's Mills and crossing the Neuse River, it enters Selma, where travelers have the choice to stay on mainline US 70, connecting with US 301/NC 39/NC 96, I-95, and US 70A, or take US 70 Bypass to avoid all that. Southeast of Selma, US 70 Bus. rejoins from Smithfield and near Princeton, US 70A rejoins from Pine Level. East of Princeton, it enters Wayne County. Northwest of Goldsboro, the US 70 Bypass spurs northeast towards I-795, while US 70 goes into Goldsboro. In Goldsboro, it also connects with I-795 and then joins a concurrency with US 13/US 117, passing north of the downtown area while US 70 Bus. goes through it via Grantham Street. After .61 miles (0.98 km), US 117 separates and continues north; at Berkeley Boulevard, US 13 separates towards Snow Hill and also connects to Seymour Johnson Air Force Base. East of Goldsboro, US 70 Bus. reunites along Ash Street. Entering Lenoir County, near LaGrange, US 70 Bypass reconnects with US 70, where the highway continues east. US 70 connects with NC 148 at Falling Creek, which goes to the North Carolina Global TransPark. As it enters Kinston, it is joined by US 258, from Snow Hill, as they both bypass south of the downtown area, while US 70 Bus./US 258 Bus. go through the downtown area. Near Dupreeville, US 70 Bus./US 258 Bus. rejoin; they then separate, with US 258 continuing south to Richlands, while NC 58 shares a short concurrency before continuing towards Trenton.[23][24][25]

Bypassing south of Dover, in Jones County, US 70 travels through the Great Dover Swamp, most of which has been drained and converted to farmland. After 11.9 miles (19.2 km) it enters Craven County, south of Cove City. At Clarks Road (exit 409) is the Craven County Rest Area.[26] At exit 410A US 17 joins in concurrency as the freeway enters New Bern. The freeway, designated the Richard Spaight Memorial Highway, passes southeast of the downtown area and enters James City after crossing the Trent River via the Freedom Memorial Bridges.[6] Traveling southeast along the U.S. Marine Corp Highway, US 70 passes by the Coastal Carolina Regional Airport, and then enters the Croatan National Forest before reaching the Marine Corps Air Station Cherry Point, in Havelock.[6][27] Going south, it crosses into Carteret County and then passes west of Newport as it leaves the Croatan National Forest and into Morehead City. After connecting with the eastern terminus of NC 24, which goes to Swansboro, US 70, along Arendell Street, is split in the middle by the NCRR railroad. Adjacent to the Carteret Community College is the Carteret County Visitor Center; the Atlantic Beach Bridge connects Morehead City with Bogue Banks, including Fort Macon State Park.[26] Through the downtown area, it reaches the end of the peninsula and the Port of Morehead City. Crossing over the Newport River/Intracoastal Waterway, it travels along Radio Island and then crosses Beaufort Channel (Gallants Creek) via Grayden Paul Bridge into downtown Beaufort. Traveling along Cedar and Live Oak Streets, US 70 goes north out of Beaufort and then east, crossing over the North River and Ward Creek to Otway. Going southeast to Smyrna, it then turns northeasterly along the Core Sound. After crossing the Salter's Creek via Dan Taylor Memorial Bridge it connects with NC 12 continuing to Cedar Island and the Outer Banks.[6] Through the Sea Level community and into Atlantic, where US 70 ends at School Drive, at 2,500 feet (760 m), the road ends at Little Port Brook.[28][29][30]

History

Established as an original U.S. Route (1926), US 70 was assigned along the Great Central Highway, in concurrency with NC 10, between Asheville and Beaufort; northwest of Asheville, US 70 shared concurrency with US 25/NC 20 (Dixie Highway) to the Tennessee state line. The original routing of US 70 connects the same cities as it does today through North Carolina, with interstate highways in parallel or in concurrency with it.[31][32]

Early state routes

In 1916 the North Carolina State Highway Commission prepared a map for the Five Year Federal Aid Program. The general present-day routing of US 70 was a mix of both improved and unimproved highways. When the highways were signed, the majority of US 70's routing ran along NC 10 which was built from the Georgia state line south of Murphy to Beaufort. However, the routing north and west of Asheville comprised parts of NC 20 and NC 29. US 70 was established as an original U.S. route in 1926.

Original routing

US 70 was established as an original US highway running from US 66 near Holbrook, Arizona, to Beaufort, North Carolina. The highway entered the state at the Tennessee state line and followed along a topsoil road concurrently with NC 20. In Marshall, US 70 turned onto NC 20's former routing and followed it to the south. Upon reaching NC 29, US 70 turned to the south along the hard surface road and followed it to Asheville. North of Biltmore, US 70 turned left and followed along a hard surfaced road in concurrency with NC 10. Between Old Fort and Garden City the road switched to an oil-treated road and then briefly switched to a topsoil road between Garden City and Marion. As the road left Marion to the east, it again became a hard surface road. The highway continued east through Morganton and Hickory. In Conover, the highway turned due south until reaching Newton. In Newton, US 70/NC 10 turned to the left and followed a topsoil road to the southeast. The highway made several turns between the northeast and the southeast before reaching Statesville. The highway turned left in Statesville to follow along a hard-surfaced highway to Salisbury. Upon reaching Salisbury, US 70/NC 10 turned to the left and followed concurrently along US 170 to the northeast. In Greensboro, the route turned to the east through Burlington to Graham. The highway followed a brief concurrency with NC 62 between Graham and Mebane before again turning to the east. The route ran through Hillsborough and Durham before turning south through Brassfield and Nelson. In Cary, US 70/NC 10 met up with US 1/NC 50 and followed a brief concurrency between Cary and Raleigh. After passing through Raleigh, US 70 turned to the south to run through Garner before turning east to pass through Auburn and Clayton. Upon reaching Smithfield, the highway turned to the left and followed briefly along NC 22 to the northeast. Just before reaching Selma, US 70/NC 10 turned right to head to the southeast. The hard-surfaced highway passed through Goldsboro and La Grange before reaching Kinston. In Kinston, the highway turned to the northeast and ran briefly concurrent with NC 11 before running east toward Fort Barnwell. As the highway neared the Neuse River, it turned to the southeast to parallel the river to New Bern. Passing through New Bern, the highway continued to follow the Neuse until reaching Havelock where the river turns further to the east. Shortly after passing Havelock, the road turned toward the east. After intersecting NC 101 the road type changed to a topsoil road. The highway continued as a topsoil road until North Harlowe, where it became a graded road. Just before entering Beaufort the highway changed back to a hard surface road. US 70 and NC 10 both ended in Beaufort.

Early 20th century

In 1928 US 70/NC 10 was swapped with route NC 101 towards Beaufort. Around 1929 US 70 was placed on its modern routing between Marion and Nebo; its former routing becoming part of NC 105. North of Newton, US 70 was given a new primary routing in concurrency with NC 110. In Raleigh, US 70 was placed on a new primary routing along Western Boulevard, then north along Boylan Avenue to South Street, then Fayetteville Street to Lenoir Street, and finally East Street; the old alignment along Hillsborough Road and by the state capital remained part of US 1/NC 50.[33] In 1930 US 70/NC 10 was swapped with NC 100 between Gibsonville and Burlington. Also around that time US 70/NC 10 was rerouted in downtown Salisbury via Innis Street to Main Street, leaving behind Fulton and Liberty streets.[31]

In 1931 US 70 was extended northeast from Beaufort to Atlantic, ending at Cedar Island Road (SR 1387). Around 1932 US 70 was rerouted in downtown Asheville from Biltmore Avenue onto Tunnel Road; the old alignment remained part of US 25.[34] In 1934 both NC 10 and NC 20 were removed along US 70's route. By 1936, US 70 was placed on First Avenue through Hickory and was removed from Beaman Road near New Bern.[35] In 1939 US 70 was removed from Hollins Road in Marshall.[36]

Mid 20th century

In 1941 US 70 was swapped with NC 55 from Kinston to west of New Bern. Also around that same year, US 70 was given its modern routing between the Yadkin River and Lexington. By 1944, US 70 was removed from Old Highway 70 Loop (SR 1620) near Icard; in Havelock, US 70 was removed from Church Road, Miller Boulevard and Roosevelt Boulevard to its modern alignment. Around 1948, US 70 was swapped with US 70A in the Hickory–Conover area and with US 70A in Hillsborough.[37] By 1949, US 70 was placed on its modern routing between Swannanoa and Black Mountain and between Lexington and Thomasville, swapped with US 70A in High Point, removed from Bennett Memorial Drive in Durham, and switched from Wilson Street to Kornegay Street in Dover.[38]

In 1952 US 70 was placed on new bypasses in Lexington, Thomasville, and Durham; all former alignments became individual or extensions of existing US 70A. By 1953, US 70 was rerouted back onto Fulton Street and Liberty Street in Salisbury, US 70 was split on one-way streets in downtown Greensboro, and US 70 was rerouted onto Eden and Front Streets in New Bern.[39] In 1954 US 70 was rerouted onto Woodfin Street in Asheville; placed on its modern alignment between Black Mountain and Old Fort, leaving behind Mill Creek Road (SR 1407)/Old US 70 (SR 1400), placed on one-way streets in downtown Raleigh, and rerouted on a more direct route between Smithfield and Princeton along existing secondary roads, leaving behind US 70A through Selma. Around 1956 US 70 was placed on new bypass south of Morganton. By 1957, US 70 was split on one-way streets in downtown Marion, replaced US 70A in Salisbury, leaving the downtown area, and placed on its modern alignment in western Rowan County. It was placed on its modern alignment from Thomasville to Greensboro, then continued east on freeway to Efland, its old alignment becoming US 70A; it was placed on new bypass east of Durham, its former alignment along Avondale Drive, Greer Street, and Miami Boulevard becoming parts of NC 55, NC 98, and US 70A respectively. It was placed on bypass north Goldsboro, leaving behind US 70A through the downtown area, and placed on bypass south of Kinston, also leaving behind US 70A through its downtown area.[40] Around 1958 US 70 was removed from Ann Street to its current routing along Cedar Street in Beaufort. In 1960 US 25/US 70 was placed on new bypass north of Marshall, leaving behind US 25 Bus./US 70 Bus.[41]

In 1961 US 70 was removed from Woodfin Street and onto the East–West Freeway in Asheville; in Salisbury, US 70 was rerouted following Innis Street south to I-85, then continued north in concurrency into Davidson County.[42] In 1963 US 70 was rerouted back along its former alignment between Greensboro and Efland, replacing part of US 70A; the former freeway alignment remains part of I-85.[43] Around 1964 US 70 was placed on new causeway over the Newport River/Intracoastal Waterway; bridges on the old alignment were removed, leaving Old Causeway Road (SR 1205) on Radio Island. Around 1965 US 70 was removed from I-85 in Rowan County, rerouted through downtown Salisbury on one-way streets, then north along Main Street in concurrency with US 29. In 1967 US 70 was rerouted onto O. Henry Boulevard to Wendover Avenue in Greensboro; its old alignment along Market Street was downgraded to secondary roads. In the same year, US 70 was adjusted at the Salisbury and Wilmington Street split.[44] By 1968, US 70 was placed on a new bypass west of Newport, leaving behind Chatham Street (SR 1247).[45] In 1969 US 70 was placed on a new bypass south of La Grange, leaving behind Washington Street (SR 1603).[46] In 1970 US 70 eastbound was removed from Main Street and onto Logan Street in Marion.[47] In the same year, US 70 was placed on a new bypass north of Princeton, leaving behind Dr. Donnie H. Jones Jr. Boulevard (SR 2556).[48]

 
Aerial photograph of US 70 bypassing the city of New Bern, crossing the Neuse and Trent Rivers

Late 20th century

In 1972 US 19/US 23/US 70 was removed from Merrimon Avenue, between Asheville and Woodfin, and placed on a new freeway; US 25 remains along the old alignment.[49] In Raleigh, US 70/NC 50 were removed from Glenwood Avenue and placed on the Raleigh Beltline to North Boulevard/Downtown Boulevard.[50] In Atlantic, US 70 was truncated to its current eastern terminus at School Drive; the former alignment was abandoned, with a bridge removed from the Atlantic Harbor of Refuge Channel.[51][52] From 1978 to 1979, in phases, US 70 was placed on a new bypass south of Dover and New Bern; the former alignment became Old US Highway 70 (SR 1005).[53][54][55][56][57]

In 1981 US 70 was rerouted from Crosstown Expressway onto Charlotte, Poplar, and Pine Streets (the latter two removed for College Street) to Beaucatcher Tunnel; this replaced part of NC 694, while Crosstown Expressway was rerouted through Beaucatcher Cut.[58] In Salisbury, US 70 was rerouted south along Jake Alexander Boulevard, in concurrency with US 601, to Main Street, where it joined US 29 through the city; the old alignment along Innes, Liberty, Fulton, and Lee Streets was downgraded to secondary roads.[59][60] In Burlington, US 70/NC 62 was realigned along one-way streets along Church and Fisher Streets, eliminating the use of Davis and Hoke Streets.[61] In 1982 US 25/US 70 was placed on a new alignment north of Marshall to Weaverville; the old alignment became an extension of existing business loops in Marshall and Weaverville, and some sections were downgraded to secondary roads around Woodfin. In the same year, upgrades between Black Mountain and Old Fort were completed, allowing the addition of I-40 alongside US 70.[62] In 1987 US 25/US 70 was placed on a new bypass west of Walnut, leaving behind Walnut Drive (SR 1349).[63] In 1989 US 70 was removed from downtown Raleigh and was completely rerouted onto the Raleigh Beltway going east, then south, continuing at I-40 southeasterly to exit 306; the former alignment through Raleigh and Garner became US 70 Bus., though unsigned inside the Raleigh Beltline.[64][65] In 1990 US 70 was rerouted onto Industrial Boulevard and Monroe Street, from Newton Drive to east of I-77, in Statesville; the former alignment along Front Street and Salisbury Road was downgraded to secondary roads.[66][67][68]

In 1991 one-way streets along Logan, New, and Garden Streets were discontinued and reallocated to the city of Marion to maintain; US 70 reverted to two-way traffic along Main and Court Streets.[69][70] In the same year, US 70 was removed from the Raleigh Beltline and rerouted along Gleenwood Avenue, Wade Avenue, Capital Boulevard, Dawson–McDowell Streets, and Saunders Street. South of the Raleigh Beltline, it continued along Saunders, then Wilmington Street, and through Garner to I-40; the reroute in Wake County replaced all of US 70 Bus.[71][72] In 1993 US 70 was rerouted onto a new bypass north of Haw River, leaving Main Street (SR 1801) and a short concurrency with NC 49.[73] In Orange and Durham counties, US 70's concurrency with I-85 was extended 2.5 miles (4.0 km) as part of a major reconfiguration of exits 172 and 173. The original configuration had Hillsborough Road weave in and out of I-85 between the two exits; the realignment of US 70 allowed NCDOT to remove the weave and re-purpose exit 172 as an interchange for NC 147 (completed in 2001). The former alignment became an extension of US 70 Bus., which for the remainder of the decade had a hidden concurrency with I-85/US 70, with the weave persisting during construction.[74][75] In 1997 NCDOT established the oddity known as the four US 70s of Selma–Smithfield: US 70, US 70A, US 70 Bus. and US 70 Bypass. Before 1997, US 70 was routed through Smithfield while US 70A followed the pre-1954 route through Selma. The new configuration established US 70 following its former route east to Selma, with a short bypass route of I-95 (no interchange), then reconnecting to an existing section of US 70 east of I-95; US 70A was truncated near the I-95 interchange in Selma, while the former alignment through Smithfield became a business route.[76][77][78][79]

21st century

On June 9, 2008, the Clayton Bypass opened, redirecting US 70 onto I-40 between exits 306 to 309 and then on a new 10.7-mile (17.2 km) four-lane freeway bypass south of Clayton.[80][81] Planning for the bypass began in 1991, but construction did not start until 2005 because of several delays regarding the Dwarf wedgemussel, an endangered species, habitat in the area. Originally scheduled for completion in June 2009, a severe drought in 2007–2008 allowed construction to proceed more rapidly than anticipated.[82][83] NCDOT was given the approval by AASHTO to officially designate US 70 along the bypass on May 6, 2008, with the former alignment becoming an extension of US 70 Bus.[84] Compared to the former alignment through Clayton, the bypass is estimated to cut fifteen minutes of travel time for drivers traveling between Raleigh and eastern North Carolina.[85][86]

In 2010 US 70 was placed on Statesville Boulevard, a then new 3.81-mile (6.13 km) four-lane expressway running east of Statesville towards Salisbury; the former alignment was downgraded to a secondary road.[87]

In 2013 US 70 was placed on a new freeway, with an interchange with NC 148 at Falling Creek. Justification for the improvement was given as a need for better service to the Global TransPark; the old alignment was reduced from four to two lanes, becoming Sanderson Way (SR 2032).[88]

In December 2011 the first section of the Goldsboro Bypass was opened from I-795 to Wayne Memorial Drive. The section was temporarily numbered as NC 44, while the western and eastern sections were under construction. The western section of the bypass from US 70 west of Goldsboro to I-795 opened on October 17, 2015. The final section from Wayne Memorial Drive to US 70 was completed in May 2016.[89] The route is currently listed as US 70 Bypass.[90], while the routes in the city are currently being signed as US 70 and US 70 Business.

In east Durham, the construction of the East End Connector linking NC 147 and US 70 began in February 2015 as part of the I-885 proposal.[91] The project also altered the interchanges at Carr Road and NC 98 (Holloway Street), to a dumbbell and a diamond interchange, respectively.[92] Once scheduled to be completed in January 2020, the East End Connector and related road improvement projects were eventually completed on June 30, 2022.[93] I-885 was officially designated along the entire freeway portion of US 70, a route that continues past US 70 down toward I-40 through the Research Triangle Park.

Future

Greensboro / High Point

Currently, the portion of US 70 going west of Greensboro runs concurrently with US 29 and US 220 (south), I-40 (west), and soon to be decommissioned I-85 Business (south), while the portion going east of Greensboro, remains on Wendover Avenue East leaving town towards Burlington. On, October 5, 2019, NCDOT submitted an application to AASHTO, and received approval, for the re-routing of US 70 in Greensboro, High Point, and a part of Thomasville. Under the state plan, it will continue west along Wendover Avenue through Greensboro to NC Highway 68 (Eastchester Drive) in High Point, and then onto NC 68, south-bound from High Point to the southern terminus of NC 68 in Thomasville. According to NCDOT, this will provide a more direct, continuous route through the cities of Greensboro and High Point, improve regional connectivity, and remove traffic from concurrent interstate routes (e.g. I-40's "Death Valley" interchange in Greensboro, and the I-85/US 29 interchange near Jamestown).[94]

Raleigh to Morehead City

A multi-county project, also known as the "US 70 Corridor" or "Super 70", is a collection of several projects along US 70 to improve passenger and freight movement eventually leading to the establishment of Interstate 42,[95] which is the US Department of Transportation's High Priority Corridor #82.[96] The entire project has a budgeted cost (as of late 2018) of about $1.3 billion, and about 29 miles still without a budget. Some projects like the Clayton and Goldsboro bypasses are completed, while others have yet to be scheduled. The project involves the counties of Wake, Johnston, Wayne, Lenoir, Jones, Craven, and Carteret.[97][98]

Wilson's Mills improvements

A 5-mile (8.0 km) section of US 70 at Wilson's Mills, connecting to the Clayton Bypass in the west will be upgraded to a freeway for an estimated $31 million. Construction is planned to begin in 2020 and finish around 2022.[99]

Smithfield/Selma improvements

Improvements are in the planning stages for the 13.8-mile (22.2 km) segment of US 70 between Wilson's Mills and Princeton. Some of this section is already freeway, but will require improvements to bring it up to interstate standards and add an interchange with I-95. Adding the interchange will require shifting I-95 2,000 feet (610 m) east to incorporate the new changes. This proposed project is not currently budgeted nor does it have a timeline for completion.[100]

Princeton bypass

The existing Princeton bypass will be improved to interstate standards. The 6.7-mile (10.8 km) project is estimated to cost $170 million, with construction scheduled to begin in 2028.[101][102][103]

Kinston bypass

The Kinston Bypass is a project that has been in the planning stages since the 1990s. The project was put on hold until 2007 when NCDOT revitalized the project. While several northern bypasses were planned, in January 2014 the northern bypasses were removed in favor of a southern alternative. The project was defunded in 2014 with the release of the 2015–2024 State Transportation Improvement Plan, and studies were suspended.[104] The K​inston Bypass would be approximately 21 miles (34 km) of a four-lane, median divided freeway accessible via ramps at interchanges. When complete, the bypass would improve regional mobility, connectivity, and capacity for US 70, reducing traffic congestion and delays that exist along US 70 between La Grange and Dover.​ It would be built in phases, and as of 2022, only one phase—just east of LaGrange—is funded for construction, starting in 2028.[105]

James City freeway

In James City, a 5.1-mile (8.2 km) segment of the US 70 improvement project will upgrade the existing highway to freeway standards by elevating it over existing surface streets, improving the frontage roads, and building interchanges. It will connect to the existing US 70 freeway in New Bern. This project is estimated to cost $66 million. Construction is scheduled to begin in early 2020 and be complete in early 2024.[106]

James City to Havelock

Between James City and Havelock, a 6.3-mile (10.1 km) section of US 70 will be converted to interstate standards for $132 million.[107] The money will come primarily from a $147 million federal grant the state received in 2018.[108] With the release of the 2020 draft STIP, it was revealed that NCDOT is attempting to start construction in 2020.

Havelock bypass

The Havelock Bypass is a planned 10-mile (16 km) four-lane freeway intended to improve existing sections of US 70 and a bypass west of Havelock, through the Croatan National Forest. Draft and environmental studies began in September 2011 and were completed in January 2016. Property acquisition started in 2016, with construction to begin in February 2019. Estimated to cost $173 million, it is scheduled to be completed in 2022.[109]

Gallants channel bridge

The Gallants Channel Bridge is a project to replace the Dan Taylor Memorial Bridge by rerouting US 70 over Gallants Channel with a 65-foot (20 m) fixed span bridge, widened to four-lanes with a median at a new location, and building a new bridge on Turner Street, for an estimated $66.4 million. Construction began on March 25, 2015, by Conti Enterprises, Inc., of Edison, New Jersey. All work but landscaping is scheduled to be completed by July 15, 2018, with final completion expected in January 2019. Once complete, the existing bascule bridge will be removed and US 70 will be routed out of downtown Beaufort.[110]

Other corridor projects

Other projects, including improvements between James City and Morehead City, Slocum Gate and the Newport River Bridge are in various stages of planning and construction.[97]

Future Interstate 42

 

 

Future Interstate 42

LocationClaytonMorehead City
Length137 mi (220 km)

The Fixing America's Surface Transportation Act (FAST Act), signed by President Barack Obama on December 14, 2015, added the US 70 corridor between Garner and Morehead City to the Interstate system as a future Interstate. Justification for the designation included better connections with Seymour Johnson Air Force Base, the North Carolina Global Transpark, Marine Corps Air Station Cherry Point, and the Port of Morehead City with the rest of state and the eastern seaboard.[111][112][113] With no specified number codified in the act, the Regional Transportation Alliance (RTA) expected this corridor to be called I-46 or another suitable designation, and the US Highway 70 Corridor Commission recommended I-50.[114][115] On March 30, 2016, Governor Pat McCrory and various officials unveiled "Future Interstate" signage along the corridor.[116]

For the Spring 2016 AASHTO Special Committee on U.S. Route Numbering, NCDOT proposed I-36 for this route. On May 24, 2016, AASHTO assigned Interstate 42 for the route.[117]

In October 2021, AASHTO approved two segments of I-42, the 10-mile (16 km) Clayton Bypass and the 22-mile (35 km) Goldsboro Bypass; this was followed by the Federal Highway Administration subsequent approval in March 2022.[118][119] In May 2022, AASHTO also approved the elimination of US 70 Bypass, clearing the way for NCDOT to fully redesignate the route.[120]

Major intersections

CountyLocationmi[1]kmExitDestinationsNotes
Madison0.000.00 
 
 
 
US 25 north / US 70 west (SR 9 west) – Newport
Continuation into Tennessee
Hot Springs5.89.3 
 
NC 209 south (Lance Avenue) – Lake Junaluska
Hurricane11.017.7 
 
NC 208 north – Greeneville
16.526.6Walnut Drive (NC 213 west)West end of NC 213 overlap
20.032.2 
 
 
 
 
 
US 25 Bus. south / US 70 Bus. east (Main Street) – Downtown Marshall, Public Library
22.335.9 
 
NC 213 east – Mars Hill, Mars Hill University
East end of NC 213 overlap
23.537.8 
 
NC 251 south (Tillery Branch Road)
25.340.7 
 
 
 
 
 
US 25 Bus. north / US 70 Bus. west (Ivy River Road) – Marshall
BuncombeWeaverville32.051.5 
 
 
  
 
Future I-26 west / US 19 / US 23 north – Johnson City
West end of Future I-26/US 19/US 23 overlap; I-26 north exit 19B, south exit 19
19AWeavervilleNo exit number eastbound; exit numbers follow I-26
34.355.221New Stock Road – Weaverville
Woodfin36.358.423 
 
US 25 south (US 19 Bus.) / Merrimon Avenue – Woodfin, North Asheville
East end of US 25 overlap
37.259.924Elk Mountain Road  Woodfin
Asheville38.562.025  NC 251 – University of North Carolina Asheville
40.064.4Hill StreetWestbound exit and eastbound entrance
40.264.7 
 
  
 
  
 
 
 
 
Future I-26 / US 19 / US 23 south / I-240 / US 74A west to I-40 west – West Asheville
East end of Future I-26/US 19/US 23 overlap; west end of I-240/US 74A overlap; I-240 exit 4A
Patton Avenue – DowntownExit numbers follow I-240; no westbound exit
40.765.54CMontford Avenue / Haywood Street
41.266.35A  US 25 (Merrimon Avenue)Eastbound entrance includes direct entrance ramp from Woodfin Street
41.566.8 
 
I-240 east – Oteen
East end of I-240 overlap; I-240 exit 5B
41.867.3 
 
NC 694 north (Town Mountain Road)
Beaucatcher Tunnel
42.668.6  I-240I-240 exit 6; access to I-240 east via Chunns Cove Road
43.469.8US 74A east (South Tunnel Road) – MallEast end of US 74A overlap
43.670.2  I-240Three-level diamond interchange; I-240 exit 7
45.573.2 
 
NC 81 west (Swannanoa River Road)
46.174.2  Blue Ridge Parkway – Folk Art Center, Mount Mitchell State ParkInterchange
 
 
Porters Cove Road to I-40
I-40 exit 55
Black Mountain55.889.8  
 
 
NC 9 to I-40 west
56.590.9 
 
I-40 west
West end of I-40 overlap; westbound left exit and eastbound left entrance; I-40 exit 65
Ridgecrest57.993.266Dunsmore Avenue – RidgecrestExit number follows I-40
McDowell63.5102.2 
 
I-40 east
East end of I-40 overlap; eastbound left entrance and westbound left exit; I-40 exit 72
73.0117.5 
 
NC 80 north (Lake Tahoma Road)
To Mount Mitchell State Park
Marion74.8120.4   US 221 / NC 226 – Spruce Pine, Newland
75.0120.7 
 
 
US 221 Bus. north (Main Street) – Spruce Pine, Newland
North end of US 221 Business overlap
77.2124.2 
 
 
US 221 Bus. south (Main Street) – Rutherfordton
South end of US 221 Business overlap
Nebo82.2132.3 
 
NC 126 east
To Lake James State Park
BurkeMorganton96.2154.8 
 
 
 
 
 
 
 
 
US 64 east (By-pass) / US 70 Bus. east (Union Street east) to NC 18 / NC 181
North end of US 64 overlap
97.3156.6 
 
 
 
 
US 64 west / US 64 Bus. east (Burkemont Avenue) – Rutherfordton
South end of US 64 overlap
98.4158.4  NC 18 (Sterling Street) – Shelby
100.5161.7 
 
 
US 70 Bus. west (Union Street)
Drexel104.0167.4  NC 114 (Drexel Road)
CatawbaHickory118.5190.7  
 
US 321 to I-40 – Lenoir, Asheville, Statesville
 
 
 
US 321 Bus. begins
Interchange; US 321 exit 44; north end of US 321 Bus. overlap
119.5192.3 
 
  Center Street to NC 127
Access to Frye Regional Medical Center
121.5195.5 
 
Lenoir Rhyne Boulevard to I-40
I-40 exit 125
Conover126.5203.6 
 
 
 
 
US 321 Bus. south to NC 16
 
 
 
7th Street Place SW to NC 16 Bus.
South end of US 321 Bus. overlap
127.8205.7  NC 16 (Thornburg Drive NE)
Catawba134.5216.5  NC 10 – Newton
Catawba RiverBridge
IredellStatesville145.8234.6   US 64 / NC 90 – Taylorsville
148.0238.2   US 21 / NC 115 (Shelton Avenue) – Troutman
149.2240.1  I-77 – Charlotte, ElkinI-77 exit 49A
Rowan162.4261.4 
 
NC 801 south – Mooresville
South end of NC 801 overlap
164.0263.9 
 
NC 801 north – Cooleemee
North end of NC 801 overlap
Salisbury170.0273.6 
 
US 601 north (Jake Alexander Boulevard North) – Mocksville
West end of US 601 overlap
172.5277.6  NC 150 (Mooresville Road) – Mooresville
173.5279.2 
 
 
 
 
 
US 29 south (Main Street) / US 601 south (Jake Alexander Boulevard South) to I-85 – Rowan County Airport, China Grove
Interchange; east end of US 601 overlap; west end of US 29 overlap
174.3280.5 
 
NC 150 west (Mooresville Road)
West end of NC 150 overlap
Yadkin RiverNew bridge (replaced the Wil-Cox Bridge in 2012)
Davidson182.2293.2  
 
I-85 / US 52 south – Salisbury, Charlotte
Permanently closed as of April 2010;[121][122][123][124] former exit 82 on I-85
183.0294.5 
 
NC 150 east
East end of NC 150 overlap
  
 
I-85 / US 52 south – Salisbury, Charlotte
West end of freeway section; west end of I-85/US 52 overlap; I-85 exit 84
184.0296.185Clark RoadPermanently closed as of November 2012;[125] exit numbers follow I-85
185.4298.486Belmont Road
Lexington187.5301.8 
 
I-85 north – High Point, Greensboro
   I-285 / I-85 BL begin
East end of I-85 overlap; west end of I-285/I-85 Bus. overlap; eastbound left exit and westbound left entrance; I-85 exit 87
188.0302.684 
 
 
 
 
NC 47 east to I-85 north
Exit numbers follow I-285
188.8303.885Green Needles Road
190.0305.886Lexington, Downtown
191.0307.4 
 
US 52 north (I-285 north) – Winston-Salem
East end of I-285/US 52 overlap; eastbound exit and westbound entrance; I-285 exit 87
192.0309.0Old US 64Split into separate exits (east and west) westbound
192.7310.1 
 
US 64 west – Mocksville
West end of US 64 overlap
Smokehouse LaneRight-in/right-out interchange; westbound exit and entrance
193.5311.4  NC 8 (Winston Road) – Lexington, Winston-SalemEast end of freeway
194.0312.2 
 
US 64 east – Asheboro, Lexington
Interchange; east end of US 64 overlap
Thomasville201.5324.3ThomasvilleInterchange; eastbound exit and westbound entrance
204.0328.3  NC 109 – Thomasville, Winston-SalemInterchange
205.5330.7  NC 68 (National Highway) – Thomasville, West High PointInterchange
Randolph207.0333.1High Point, ThomasvilleWest end of expressway
207.5333.9Prospect Street
GuilfordHigh Point208.5335.5W. Green Drive
209.3336.8Surrett Drive
210.0338.0S. Main Street – Archdale, High Point, Downtown
211.0339.6Brentwood StreetWestbound access is part of I-74/US 311 exit
  I-74 – Winston-Salem, AsheboroEast end of expressway; three-level diamond interchange; I-74 exit 71B
212.0341.2Baker RoadInterchange
213.5343.6Kivett Drive / M.L. King Jr. DriveInterchange
Greensboro216.0347.6Guildford College Road
Vickery Chapel Road – Jamestown
West end of freeway
217.0349.2 
 
I-85 south – Charlotte, Salisbury
West end of I-85 overlap; I-85 exit 118
218.2351.2119Groometown Road to Grandover ParkwayExit number follows I-85; westbound access is part of exit 33
219.0352.4 
 
  I-85 north / US 421 – Durham, Sanford
North end of I-85 overlap; eastbound exit and westbound entrance; I-85 exit 120A
33  
 
 
 
 
I-73 / US 421 north to I-40 west / Groometown Road – Winston-Salem
No eastbound exit to I-73/US 421
220.0354.134Holden Road
221.0355.735A 
 
US 220 south – Asheboro
221.2356.035B 
 
 
 
 
US 220 north to I-40 west – Coliseum Area
Eastbound exit and westbound entrance
221.8357.035CRehobeth Church Road / Vandalia Road
223.0358.9 
 
 
 
I-40 west / US 220 south – Winston-Salem
West end of I-40 overlap; eastbound exit and westbound entrance; I-40 exit 219
223.3359.4220Randleman RoadLeft entrance westbound; exit numbers follow I-40
223.9360.3221South Elm-Eugene Street – Downtown
225.0362.1222 
 
 
 
 
 
Martin L. King Jr. Drive to I-40 east / I-85 BL north – Sanford
No direct westbound entrance; left exit westbound; former US 421; signed only as "Sanford" eastbound; no exit number westbound
225.1362.3 
 
I-40 east
East end of I-40 overlap; eastbound left exit and westbound left entrance; I-40 exit 223; east end of freeway section, west end of O'Henry Boulevard expressway section
225.8363.4Florida StreetEastbound exit and entrance only
226.5364.5Gate City Boulevard eastCloverleaf interchange; formerly Lee Street; former NC 6
Gate City Boulevard west
227.2365.6Market Street – North Carolina A&T University
227.6366.3Sullivan StreetEastbound exit and entrance only
227.8366.6Bessemer Street
228.0366.9 
 
 
 
US 29 north (O'Henry Boulevard north) / US 220 north (Wendover Avenue west) – Reidsville
Cloverleaf interchange; east end of expressway section; east end of US 29/US 220 overlap
229.5369.3Huffine Mill RoadInterchange; westbound entrance includes direct exit ramp onto Oak Grove Avenue/Foushee Street
232.0373.4   
 
 
 
I-785 / I-840 to I-40 / I-85 – Danville, Raleigh, Charlotte
I-840 exit 18
Whitsett240.0386.2 
 
NC 100 east – Gibsonville
Western terminus of NC 100
240.2386.6  NC 61 – Gibsonville
AlamanceBurlington246.0395.9 
 
 
 
NC 54 east (Chapel Hill Road) / NC 62 south (Alamance Road) – Alamance
West end of NC 62 overlap
247.8398.8   NC 87 / NC 100 (Webb Avenue)
248.2399.4 
 
NC 62 north (Rauhunt Street) – Yanceyville
East end of NC 62 overlap
Haw River252.8406.8  NC 49 – Graham
Mebane257.5414.4 
 
NC 119 north (Second Street)
West end of NC 119 overlap
257.7414.7 
 
NC 119 south (Fifth Street)
East end of NC 119 overlap
Orange265.0426.5 
 
 
 
 
 
 
NC 86 Truck south to I-40 / I-85 – Greensboro
West end of NC 86 Truck overlap; westbound left exit and eastbound entrance
Hillsborough266.8429.4 
 
 
US 70 Bus. east (Revere Road) / Short Street West / Faucett Mill Road – Hillsborough
267.2430.0 
 
 
NC 86 Truck ends
  
 
NC 86 to NC 57 – Yanceyville
Northern terminus of NC 86 Truck; east end of NC 86 Truck overlap
271.0436.1 
 
 
US 70 Bus. west – Hillsborough
Eno274.0441.0 
 
 
US 70 Bus. east
West end of freeway; eastbound exit and westbound left entrance
 
 
I-85 south
West end of I-85 overlap; westbound left exit and eastbound left entrance; I-85 south exit 170
DurhamDurham276.1444.3172 
 
NC 147 south – Downtown Durham, Research Triangle Park
Exit numbers follow I-85; eastbound exit and westbound entrance
277.0445.8173Cole Mill Road
277.5446.6174A  
 
 
 
 
 
 
US 15 / US 501 south to US 70 Bus. (Hillsborough Road) / NC 147 – Chapel Hill
West end of US 15/US 501 overlap; westbound exit and eastbound entrance
278.1447.6174BHillandale Road
278.8448.7175  NC 157 (Guess Road)To NC School of Science & Math and Duke Homestead
280.0450.6176 
 
US 501 north (Duke Street) / Gregson Street – Northgate
East end of US 501 overlap; signed eastbound as exits 176A (Gregson St.) and 176B (US 501)
281.0452.2177 
 
 
 
 
 
 
US 15 Bus. south / US 501 Bus. (Roxboro Street) / NC 55 east (Avondale Drive)
To North Carolina Central University
282.0453.813  
 
 
 
I-85 / US 15 north / I-885 ends – Oxford, Petersburg, Henderson
Exit numbers follow I-885; east end of I-85/US 15 overlap; west end of I-885 overlap; no exit number eastbound; I-85 exit 178
283.0455.412Cheek RoadExit numbers follow I-885
284.0457.111 
 
 
  US 70 Bus. west / NC 98 – Durham, Wake Forest
Exit numbers follow I-885
284.8458.3288ACarr RoadDumbbell interchange; eastbound exit via exit 11
285.0458.7288B 
 
 
 
I-885 south to NC 147 – RDU Airport
Exit 10 on I-885; east end of I-885 overlap; east end of freeway
WakeRaleigh292.0469.9292  
 
 
 
I-540 to I-40 / US 1 – Wake Forest, RDU Airport
Interchange; I-540 exit 4; westbound access is part of exit 293
292.5470.7293Lumley Road / Westgate RoadInterchange
299.0481.2 
 
NC 50 north – Creedmoor
West end of NC 50 overlap
300.0482.8  I-440 (US 1) / Ridge Road – Sanford, Rocky Mount, Wake Forest, WilsonCloverleaf interchange; I-440 exit 7
 
 
Glenwood Avenue south / Wade Avenue west to I-40
Interchange
303.0487.6Capital Boulevard north (US 401 north)Interchange; west end of US 401 overlap
303.6488.6Peace StreetInterchange via ramps northbound, connector road southbound
305.0490.8Martin Luther King Jr. Boulevard / Western BoulevardInterchange
306.0492.5   I-40 / US 64 – Cary, Chapel Hill, Farmers MarketI-40 exit 298
307.0494.1Wilmington Street – DowntownInterchange; westbound exit and eastbound entrance
Garner308.0495.7 
 
US 401 south – Fuquay-Varina, Fayetteville
Interchange; east end of US 401 overlap; eastbound exit and westbound left entrance
310.0498.9Vandora Springs Road – Shopping CenterInterchange
Aversboro RoadRight-in/right-out interchange; eastbound exit and entrance only
311.0500.5 
 
NC 50 south – Garner, Benson, Shopping Center
Interchange; east end of NC 50 overlap
313.0503.7306B 
 
 
 
 
I-40 west (Tom Bradshaw Freeway) / US 70 Bus. east – Raleigh, Clayton
West end of freeway section; west end of I-40 overlap; exit number follows I-40 and is for US 70 Bus., no exit number eastbound; I-40 east exit 306, west exit 306A
317.6511.1318 
 
I-40 east – Benson
East end of I-40 overlap; I-40 exit 309; future western terminus of I-42
Johnston320.0515.0320  NC 42 – Clayton
323.0519.8323Ranch Road
326.0524.6326 
 
US 70 Bus. – Smithfield
333.0535.9333Buffalo Road
334.0537.5 
 
 
US 70 Byp. east – Goldsboro
Eastbound left exit and westbound left entrance; future I-42 exit 334
Selma335.0539.1 
 
   NC 39 north / US 301 / NC 96 – Selma, Smithfield
West end of unsigned NC 39 overlap
335.6540.1  I-95 – Benson, WilsonI-95 exit 97
335.9540.6 
 
 
 
NC 39 ends / US 70A east – Pine Level
East end of unsigned NC 39 overlap
336.2541.1 
 
 
US 70 Byp. west – Raleigh
Interchange; westbound left exit and eastbound left entrance; future I-42 exit 336
338.0544.0 
 
 
US 70 Bus. west – Smithfield
344.0553.6 
 
US 70A west – Pine Level
WayneGoldsboro352.2566.8 
 
 
US 70 Byp. east
353.0568.1  NC 581
356.5573.7  
 
 
I-795 to US 117 south – Wilson, Wilmington
I-795 exit 25
357.0574.5 
 
 
  
 
US 70 Bus. east (Grantham Street) / US 13 / US 117 south – Goldsboro, Mount Olive, Wilmington
West end of US 13/US 117 overlap
357.5575.3 
 
US 117 north – Wilson, Gov. Charles B. Aycock Birthplace
Interchange; east end of US 117 overlap; eastbound exit and westbound entrance
358.0576.1 
 
 
 
 
 
US 117 Bus. / NC 111 north (William Street) to US 117
Interchange; west end of NC 111 overlap
359.0577.8Wayne Memorial DriveInterchange
360.7580.5Best Road / Spence AvenueInterchange
361.5581.8 
 
US 13 north (Berkeley Boulevard) – Snow Hill
Interchange; east end of US 13 overlap; to Seymour Johnson AFB
363.0584.2 
 
 
US 70 Bus. west (Ash Street)
364.0585.8 
 
NC 111 south – Beulaville
East end of NC 111 overlap; to Cliffs of the Neuse State Park
LenoirLa Grange 
 
 
US 70 Byp. west
372.0598.7  NC 903 – La Grange
Kinston381.7614.3 
 
US 258 north – Snow Hill
West end of US 258 overlap; to North Carolina Global TransPark
382.0614.8 
 
 
 
 
 
US 70 Bus. east / US 258 Bus. south – Kinston
384.5618.8   NC 11 / NC 55 (Old Pink Hill Road) – Pink Hill, Mount Olive
385.0619.6 
 
 
 
 
 
 
 
 
 
US 258 south / US 70 Bus. west / US 258 Bus. north / NC 58 north – Richlands, Kinston
East end of US 258 overlap; west end of NC 58 overlap
386.0621.2 
 
NC 58 south – Trenton
East end of NC 58 overlap
Jones393.0632.5DoverAt-grade intersection; west end of freeway
Craven402.0647.0 
 
NC 41 south (Trenton Road) – Cove City, Trenton
Northern terminus of NC 41
408.0656.6SR 1224 – Tuscarora
411.0661.4409Clark Road
411.5662.2410A 
 
US 17 south – Jacksonville
East end of US 17 overlap
412.8664.3411 
 
NC 43 north – Greenville, Vanceboro
Southern terminus of NC 43
New Bern415.0667.9Glenburnie Road – Craven Community College
416.0669.5 
 
US 17 Bus. – New Bern, Jacksonville
417.7672.2416 
 
NC 55 west / Pembroke Road – Trent Woods
West end of NC 55 overlap
Trent RiverFreedom Memorial Bridge
James City419.0674.3417A-B 
 
 
 
US 17 north / NC 55 east / E. Front Street – New Bern, Washington, Bayboro
East end of freeway; signed separately as exits 417A (E. Front St.) and 417B (US 17/NC 55) westbound; east end of US 17/NC 55 overlap
HavelockCherry Point Slocum GateInterchange; no eastbound exit
435.0700.1 
 
NC 101 east (Fontana Boulevard)
Western terminus of NC 101
CarteretMorehead City449.0722.6 
 
NC 24 west – Jacksonville
Eastern terminus of NC 24
453.0729.0 
 
To NC 58 – Atlantic Beach
To Fort Macon State Park
Beaufort457.3736.0 
 
 
US 70 Bus. east (Turner Street)
458.0737.1  NC 101 – Havelock
459.5739.5 
 
 
US 70 Bus. west (Live Oak Street)
Sea Level483.0777.3 
 
NC 12 north – Cedar Island
Southern terminus of NC 12
Atlantic488.0785.4School Drive – Cedar IslandNational eastern terminus; road continues as Seashore Drive
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

See also

References

  1. ^ a b Google (August 13, 2012). "U.S. Route 70 in North Carolina" (Map). Google Maps. Google. Retrieved August 13, 2012.
  2. ^ Federal Highway Administration (March 25, 2015). National Highway System: North Carolina (PDF) (Map). Raleigh: Federal Highway Administration. (PDF) from the original on September 22, 2015. Retrieved April 6, 2016.
  3. ^ "What is the National Highway System?". National Highway System. Federal Highway Administration. February 26, 2016. from the original on September 24, 2012. Retrieved April 6, 2016.
  4. ^ "NCDOT: Scenic Byways". from the original on January 25, 2011. Retrieved March 31, 2016.
  5. ^ North Carolina Department of Transportation (September 2015). Madison County, North Carolina (PDF) (Map). Raleigh: North Carolina Department of Transportation. (PDF) from the original on April 15, 2016. Retrieved April 3, 2016.
  6. ^ a b c d e f g h i "Road and Bridge Namings in North Carolina" (PDF). North Carolina Department of Transportation. July 30, 2015. (PDF) from the original on March 30, 2016. Retrieved April 4, 2016.
  7. ^ "Bridgehunter.com: Beaucatcher Tunnel". from the original on April 15, 2016. Retrieved April 3, 2016.
  8. ^ North Carolina Department of Transportation (September 2015). Buncombe County, North Carolina (PDF) (Map). Raleigh: North Carolina Department of Transportation. (PDF) from the original on December 24, 2015. Retrieved April 3, 2016.
  9. ^ North Carolina Department of Transportation (September 2015). McDowell County, North Carolina (PDF) (Map). Raleigh: North Carolina Department of Transportation. (PDF) from the original on December 24, 2015. Retrieved April 3, 2016.
  10. ^ North Carolina Department of Transportation (September 2015). Burke County, North Carolina (PDF) (Map). Raleigh: North Carolina Department of Transportation. (PDF) from the original on March 4, 2016. Retrieved April 3, 2016.
  11. ^ North Carolina Department of Transportation (November 2015). Catawba County, North Carolina (PDF) (Map). Raleigh: North Carolina Department of Transportation. (PDF) from the original on December 20, 2015. Retrieved April 3, 2016.
  12. ^ North Carolina Department of Transportation (February 2016). Iredell County, North Carolina (PDF) (Map). Raleigh: North Carolina Department of Transportation. (PDF) from the original on April 15, 2016. Retrieved April 3, 2016.
  13. ^ North Carolina Department of Transportation (April 2015). Rowan County, North Carolina (PDF) (Map). Raleigh: North Carolina Department of Transportation. (PDF) from the original on December 24, 2015. Retrieved April 3, 2016.
  14. ^ Wireback, Taft (August 25, 2015). "Planners seek public reaction to Greensboro-area transportation plans". News & Record. Greensboro, NC. Retrieved April 4, 2016.
  15. ^ North Carolina Department of Transportation (April 2015). Davidson County, North Carolina (PDF) (Map). Raleigh: North Carolina Department of Transportation. (PDF) from the original on December 20, 2015. Retrieved April 4, 2016.
  16. ^ North Carolina Department of Transportation (April 2016). Randolph County, North Carolina (PDF) (Map). Raleigh: North Carolina Department of Transportation. (PDF) from the original on April 16, 2016. Retrieved April 4, 2016.
  17. ^ North Carolina Department of Transportation (April 2015). Guilford County, North Carolina (PDF) (Map). Raleigh: North Carolina Department of Transportation. (PDF) from the original on April 16, 2016. Retrieved April 4, 2016.
  18. ^ North Carolina Department of Transportation (June 2015). Alamance County, North Carolina (PDF) (Map). Raleigh: North Carolina Department of Transportation. (PDF) from the original on December 20, 2015. Retrieved April 4, 2016.
  19. ^ North Carolina Department of Transportation (June 2015). Orange County, North Carolina (PDF) (Map). Raleigh: North Carolina Department of Transportation. (PDF) from the original on April 16, 2016. Retrieved April 4, 2016.
  20. ^ Baumgartner Vaughan, Dawn (November 27, 2017). "Why I-85 in Durham is now the 'Dr. John H. Franklin Highway'". News & Observer. Raleigh, NC. from the original on December 1, 2017. Retrieved November 28, 2017.
  21. ^ North Carolina Department of Transportation (February 2016). Durham County, North Carolina (PDF) (Map). Raleigh: North Carolina Department of Transportation. (PDF) from the original on April 16, 2016. Retrieved April 4, 2016.
  22. ^ North Carolina Department of Transportation (November 2015). Wake County, North Carolina (PDF) (Map). Raleigh: North Carolina Department of Transportation. (PDF) from the original on December 20, 2015. Retrieved April 4, 2016.
  23. ^ North Carolina Department of Transportation (November 2015). Johnston County, North Carolina (PDF) (Map). Raleigh: North Carolina Department of Transportation. (PDF) from the original on April 1, 2016. Retrieved April 4, 2016.
  24. ^ North Carolina Department of Transportation (November 2015). Wayne County, North Carolina (PDF) (Map). Raleigh: North Carolina Department of Transportation. (PDF) from the original on April 16, 2016. Retrieved April 4, 2016.
route, north, carolina, this, article, about, section, entire, route, route, been, suggested, that, this, article, should, split, into, article, titled, interstate, discuss, march, 2022, route, part, united, states, numbered, highway, system, that, runs, from,. This article is about the section of U S Route 70 in North Carolina For the entire route see U S Route 70 It has been suggested that this article should be split into a new article titled Interstate 42 discuss March 2022 U S Route 70 US 70 is a part of the United States Numbered Highway System that runs from Globe Arizona to the Crystal Coast of the US state of North Carolina In North Carolina it is a major 488 mile long 785 km east west highway that runs from the Tennessee border to the Atlantic Ocean From the Tennessee state line near Paint Rock to Asheville it follows the historic Dixie Highway running concurrently with US 25 The highway connects several major cities including Asheville High Point Greensboro Durham Raleigh Goldsboro and New Bern From Beaufort on east US 70 shares part of the Outer Banks Scenic Byway a National Scenic Byway before ending in the community of Atlantic located along Core Sound U S Highway 70Route of US 70 in North Carolina highlighted in redRoute informationMaintained by NCDOTLength488 mi 1 785 km ExistedNovember 11 1926 November 11 1926 presentTouristroutesAppalachian Medley Clayton Bypass Scenic Byway Outer Banks Scenic BywayMajor junctionsWest endUS 25 US 70 at the Tennessee line near Paint RockMajor intersectionsI 26 I 240 in Asheville I 77 in Statesville I 74 in High Point I 73 I 85 US 421 in Greensboro I 40 US 220 in Greensboro I 85 I 885 in Durham I 540 near Raleigh I 40 US 64 in Raleigh I 40 in Garner I 95 near SelmaEast endSchool Drive in AtlanticLocationCountryUnited StatesStateNorth CarolinaCountiesMadison Buncombe McDowell Burke Catawba Iredell Rowan Davidson Randolph Guilford Alamance Orange Durham Wake Johnston Wayne Lenoir Jones Craven CarteretHighway systemUnited States Numbered Highway SystemList Special DividedNorth Carolina Highway SystemInterstate US State Scenic NC 69 NC 71US 70 is an original US Highway signed on November 11 1926 when the US Highway System was approved Since then the highway has been realigned in places One of the larger extensions of US 70 came in 1931 when the highway was extended concurrently along North Carolina Highway 101 NC 101 from Beaufort to Atlantic While sections of US 70 have been converted to freeway standards along most of the routing it is a four lane highway Several new projects beginning in the 2000s have placed US 70 on interstate grade freeways such as the Clayton and Goldsboro bypasses On May 24 2016 AASHTO assigned the Future I 42 designation to the majority of US 70 s routing east of Garner Additionally a short freeway segment in east Durham was officially designated as I 885 on June 30 2022 a route that connects I 40 to I 85 through the Research Triangle Park and east Durham Contents 1 Route description 1 1 Western Mountains and Foothills 1 2 Piedmont Triad and the Triangle 1 3 Coastal Plain and Down East 2 History 2 1 Early state routes 2 2 Original routing 2 3 Early 20th century 2 4 Mid 20th century 2 5 Late 20th century 2 6 21st century 3 Future 3 1 Greensboro High Point 3 2 Raleigh to Morehead City 3 2 1 Wilson s Mills improvements 3 2 2 Smithfield Selma improvements 3 2 3 Princeton bypass 3 2 4 Kinston bypass 3 2 5 James City freeway 3 2 6 James City to Havelock 3 2 7 Havelock bypass 3 2 8 Gallants channel bridge 3 2 9 Other corridor projects 4 Future Interstate 42 5 Major intersections 6 See also 7 References 8 External linksRoute description EditUS 70 travels through several diverse regions in North Carolina including the Bald and Black Mountains of Western North Carolina the rural Foothills the urban Piedmont the farmlands of the Inner Banks and the coastal communities of the Crystal Coast All of US 70 east of Durham and smaller segments including Statesville to Salisbury and Lexington to Greensboro are listed in the National Highway System a network of roads important to the country s economy defense and mobility 2 3 US 70 also overlaps two state scenic byways the Appalachian Medley from Hot Springs to Walnut and the Clayton Bypass Scenic Byway from I 40 to US 70 Bus 4 Western Mountains and Foothills Edit US 70 in concurrency with US 25 enters from Tennessee as a two lane mountain highway meandering through the Bald Mountains In Hot Springs it crosses the French Broad River and the Appalachian Trail then goes northeasterly through Tanyard Gap to Hurricane Proceeding south it goes through the Walnut Mountains and then joins NC 213 near Walnut Continuing on a more southeasterly routing it becomes the US 25 Bus US 70 Bus split off towards downtown Marshall at Mashburn Gap At the Hayes Run Road interchange NC 213 splits and continues towards Mars Hill Before US 25 Bus US 70 Bus rejoins at Ivy River Road the highway widens to four lanes afterwards it follows along Ivy Creek before crossing the Madison Buncombe county line 5 In Weaverville US 25 US 70 joins Future I 26 US 19 US 23 exit 19 then continues south on the Morris L McGough Freeway to Asheville 6 US 25 separates at Merrimon Avenue exit 23 continuing solo into downtown Asheville At the Patton Avenue interchange US 70 switches to an I 240 US 74A concurrency as it goes east along the Billy Graham Freeway 6 At Charlotte Avenue exit 5B US 70 US 74A splits from I 240 before it goes through the Beaucatcher Cut At College Street which changes into Tunnel Road US 70 US 74A passes through Beaucatcher Tunnel built in 1927 7 On the eastern side of Beaucatcher Mountain US 70 US 74A goes through a commercial corridor that leads to Asheville Mall where US 74A splits and continues along South Tunnel Road and connects with I 240 at a unique three level diamond interchange In the East Asheville area is the historic Oteen Veterans Administration Hospital Historic District as well as the Blue Ridge Parkway At Jones Mountain US 70 leaves the Asheville city limits and begins its parallel north of I 40 as it goes through Swannanoa and Black Mountain At Ridgecrest US 70 merges with I 40 exit 65 At Swannanoa Gap it crosses the Eastern Continental Divide elevation 2 786 feet 849 m and enters McDowell County 8 At the top of the gap in addition to a reduced speed limit there is a truck information station that requires all trucks to go through before continuing The following 5 mile 8 0 km descent is a 6 grade along Youngs Ridge to Old Fort along which are several reduce speed warning lights and three runaway truck ramps It is likely that on both on the ascent and the descent most trucks and some cars will be going slower than posted speed limits and that despite the fact that this section is six lanes wide slower vehicles may be traveling in the passing lanes At Old Fort US 70 splits from I 40 at exit 72 and travels through the downtown area and by the Mountain Gateway Museum and Heritage Center East of Old Fort US 70 travels northeasterly towards Marion and forms the southern boundary of the Pisgah National Forest At Pleasant Gardens it connects with NC 80 which travelers can follow towards Mount Mitchell the highest peak east of the Mississippi River Crossing the Catawba River and entering Marion US 70 connects with US 221 NC 226 and then forms a short concurrency with US 221 Bus along Main Street East of Marion US 70 connects with NC 126 in Nebo where travelers can visit Lake James State Park 9 Entering Burke County near Bridgewater US 70 passes through Glen Alpine and then enters Morganton where it forms a brief concurrency with US 64 as it proceeds along Fleming Drive while US 70 Bus passes through the downtown area Continuing east it goes through the towns of Drexel Valdese Rutherford College Connelly Springs and Hildebran before crossing into Catawba County at Long View In Hickory US 70 serves as the town s commercial corridor as US 321 Bus begins its concurrency at the US 321 interchange In Conover US 321 Bus turns at Northwest Boulevard towards Newton and then crosses NC 16 Continuing east through Claremont and Catawba US 70 crosses the Catawba River for the second time and enters Iredell County 10 11 Piedmont Triad and the Triangle Edit After passing through Celeste Hinkle and by the Statesville Regional Airport US 70 enters the city limits of Statesville and connects with US 64 NC 90 at the intersection of Newton Drive and Garner Bagnal Boulevard Passing south of the downtown area it begins to parallel the Norfolk Southern Railway south to Salisbury Crossing US 21 at Shelton Avenue and I 77 exit 49A it leaves Statesville and proceeds southeasterly along Statesville Boulevard also known as the Jim Graham Highway through an area of farmland and factories that are wedged between the four lane highway and the railway 6 After crossing into Rowan County US 70 goes through Cleveland and shares a short concurrency with NC 801 near Barber before entering Salisbury On Jake Alexander Boulevard US 70 shares a concurrency with US 601 until the Rowan Mills area where it switches onto Main Street with US 29 and later NC 150 Traveling northeasterly through downtown Salisbury it then goes by the North Carolina Transportation Museum before passing through Spencer At the Yadkin River the four lane highway reduces to two lanes as it crosses over into Davidson County Adjacent to the bridge over which US 29 US 70 NC 150 travels are the Wil Cox Bridge a concrete arch pedestrian bridge and two North Carolina Railroad NCRR Warren truss bridges 12 13 US 29 US 70 NC 150 along WilCox Way towards Spencer At 1 16 miles 1 87 km from the Yadkin River NC 150 splits towards Churchland while US 29 US 70 merges with I 85 US 52 at exit 84 After a 4 31 mile 6 94 km concurrency I 85 splits off and continues towards Greensboro and I 285 begins at exit 87 Entering the Lexington city limits additional route changes occur I 285 US 52 departs at exit 87 towards Winston Salem and US 64 merges from Mocksville After skirting north of downtown Lexington US 64 departs again towards Asheboro and the highway continues northeasterly as a four lane expressway After passing through Thomasville it then proceeds briefly through Randolph County and then into High Point and Guilford County Staying south of the downtown area it connects with I 74 with its second three level diamond interchange Near Groometown the highway merges with I 85 for a brief 1 mile 1 6 km concurrency between exits 118 and 120A To connect with I 73 US 421 Greensboro Urban Loop travelers must continue on I 85 or stay in the left travel lanes this stretch of freeway features numerous sign gantries and surface markings to guide travelers Continuing northeasterly along Preddy Boulevard into Greensboro it connects with South US 220 at exit 35 where travelers can connect to Interstate 85 or go northbound to reach I 40 west or the Greensboro Coliseum 6 Merging onto I 40 US 220 US 29 at exit 219 the following 2 mile 3 2 km stretch of freeway is known locally as Death Valley a nickname given because of the high number of deaths due to car crashes in this area owed to having five routes attached to it 14 Separating from I 40 I 85 Bus at the O Henry Boulevard interchange at exit 223 US 29 US 70 US 220 continue north passing by the North Carolina A amp T campus to the Wendover Avenue interchange where the 3 routes break up With US 29 continuing north along the expressway towards Reidsville and Danville Virginia and US 220 North going west on Wendover Avenue to follow Battleground Road to Summerfield US 70 again proceeds solo east on Wendover Ave towards Burlington At the eastern edge of Greensboro s city limit US 70 connects with I 785 I 840 Greensboro Urban Loop Leaving Greensboro and entering McLeansville US 70 takes on the name Burlington Road as well as the Charlotte Hawkins Brown Memorial Highway Here it is a two lane road and is also an important route that connects McLeansville with other small towns such as Sedalia and Gibsonville as well as the Rock Creek and Stoney Creek centers in Whitsett east of Whitsett it enters Alamance County 6 15 16 17 Passing south of Elon US 70 runs on Church St a four lane retail corridor as it enters Burlington s city limits It connects with NC 87 and NC 100 as well as NC 62 as it enters downtown Burlington Sharing a brief concurrency with NC 62 through the downtown area it then proceeds southeasterly to Haw River As it nears the town of Haw River it then goes northeasterly again to bypass the town and crosses over the Haw River via Three Governors Bridge heading easterly again the highway drops back to two lanes after connecting with NC 49 6 At Mebane US 70 crosses into Orange County Passing through the communities of Miles and Efland and parallels the NCRR railroad just to the north US 70 makes a unique median divide in Duke Forest to merge with the I 85 Connector SR 1239 constructed in the mid 1950s when US 70 was rerouted here onto what is now I 40 I 85 Crossing the Eno River US 70 passes along the northern edge of Hillsborough while US 70 Bus goes through its downtown area Crossing the Eno River again it borders along the Eno River State Park while traveling through another area of the Duke Forest At Eno US 70 merges onto I 85 exit 170 while US 70 Bus continues along its former alignment to Bennett Place 18 19 Entering both Durham and Durham County I 85 US 70 maintains an east west routing north of the downtown area along a stretch of highway dedicated to Dr John H Franklin 20 At exit 174A US 15 US 501 join the freeway at exit 176B US 501 departs and continues north along Duke Street US 70 leaves I 85 US 15 at exit 178 and forms a concurrency with I 885 which begins at the interchange I 85 and US 15 continue north toward Oxford and Petersburg Traveling on a southeasterly direction along four lane freeway in East Durham it has interchanges with US 70 Bus NC 98 and Carr Drive Soon after I 885 departs from the route to head toward I 40 US 70 downgrades to an expressway At Bethesda Miami Boulevard SR 1959 continues south into the Research Triangle Park while US 70 enters Wake County along New Raleigh Highway 21 After crossing Raleigh city limits US 70 here called Glenwood Avenue makes a connection with I 540 exit 292 which goes to the front entrance of RDU Airport the following Lumley Road Westgate Road interchange at exit 293 goes to the North Cargo and General Aviation area of RDU Airport Adjacent to the airport is William B Umstead State Park With NC 50 joining US 70 at Creedmoor Road US 70 crosses under I 440 US 1 after passing by Crabtree Valley Mall Inside the Raleigh Beltline US 70 NC 50 travel through a residential area until Wade Avenue where they join US 401 along Capital Boulevard In the downtown area Capital Boulevard splits into Dawson and McDowell Streets various sites are adjacent or nearby including the North Carolina Museum of Natural Sciences and North Carolina Museum of History via Jones Street the North Carolina State Capitol via Morgan Street the Raleigh Convention Center the Red Hat Amphitheater and the Duke Energy Center for the Performing Arts via South Street Leaving the downtown area after the Martin Luther King Jr Boulevard Western Boulevard interchange Dawson McDowell Streets merge and become Saunders Street which promptly exits the Raleigh Beltline crossing under I 40 US 64 In Garner US 401 departs along Fayetteville Street towards Fuquay Varina followed by NC 50 along Benson Road towards Benson East of Garner US 70 merges with I 40 exit 306A while US 70 Bus head towards Clayton At the Wake Johnston county line US 70 splits from I 40 for the last time at exit 309 and onto the Clayton Bypass 22 Coastal Plain and Down East Edit Oxeye daisies and Coreopsis lanceolata along the Clayton Bypass After 10 7 miles 17 2 km along the Clayton Bypass US 70 crosses US 70 Bus from Clayton to Smithfiled and changes from freeway to expressway Continuing through Wilson s Mills and crossing the Neuse River it enters Selma where travelers have the choice to stay on mainline US 70 connecting with US 301 NC 39 NC 96 I 95 and US 70A or take US 70 Bypass to avoid all that Southeast of Selma US 70 Bus rejoins from Smithfield and near Princeton US 70A rejoins from Pine Level East of Princeton it enters Wayne County Northwest of Goldsboro the US 70 Bypass spurs northeast towards I 795 while US 70 goes into Goldsboro In Goldsboro it also connects with I 795 and then joins a concurrency with US 13 US 117 passing north of the downtown area while US 70 Bus goes through it via Grantham Street After 61 miles 0 98 km US 117 separates and continues north at Berkeley Boulevard US 13 separates towards Snow Hill and also connects to Seymour Johnson Air Force Base East of Goldsboro US 70 Bus reunites along Ash Street Entering Lenoir County near LaGrange US 70 Bypass reconnects with US 70 where the highway continues east US 70 connects with NC 148 at Falling Creek which goes to the North Carolina Global TransPark As it enters Kinston it is joined by US 258 from Snow Hill as they both bypass south of the downtown area while US 70 Bus US 258 Bus go through the downtown area Near Dupreeville US 70 Bus US 258 Bus rejoin they then separate with US 258 continuing south to Richlands while NC 58 shares a short concurrency before continuing towards Trenton 23 24 25 Bypassing south of Dover in Jones County US 70 travels through the Great Dover Swamp most of which has been drained and converted to farmland After 11 9 miles 19 2 km it enters Craven County south of Cove City At Clarks Road exit 409 is the Craven County Rest Area 26 At exit 410A US 17 joins in concurrency as the freeway enters New Bern The freeway designated the Richard Spaight Memorial Highway passes southeast of the downtown area and enters James City after crossing the Trent River via the Freedom Memorial Bridges 6 Traveling southeast along the U S Marine Corp Highway US 70 passes by the Coastal Carolina Regional Airport and then enters the Croatan National Forest before reaching the Marine Corps Air Station Cherry Point in Havelock 6 27 Going south it crosses into Carteret County and then passes west of Newport as it leaves the Croatan National Forest and into Morehead City After connecting with the eastern terminus of NC 24 which goes to Swansboro US 70 along Arendell Street is split in the middle by the NCRR railroad Adjacent to the Carteret Community College is the Carteret County Visitor Center the Atlantic Beach Bridge connects Morehead City with Bogue Banks including Fort Macon State Park 26 Through the downtown area it reaches the end of the peninsula and the Port of Morehead City Crossing over the Newport River Intracoastal Waterway it travels along Radio Island and then crosses Beaufort Channel Gallants Creek via Grayden Paul Bridge into downtown Beaufort Traveling along Cedar and Live Oak Streets US 70 goes north out of Beaufort and then east crossing over the North River and Ward Creek to Otway Going southeast to Smyrna it then turns northeasterly along the Core Sound After crossing the Salter s Creek via Dan Taylor Memorial Bridge it connects with NC 12 continuing to Cedar Island and the Outer Banks 6 Through the Sea Level community and into Atlantic where US 70 ends at School Drive at 2 500 feet 760 m the road ends at Little Port Brook 28 29 30 History EditEstablished as an original U S Route 1926 US 70 was assigned along the Great Central Highway in concurrency with NC 10 between Asheville and Beaufort northwest of Asheville US 70 shared concurrency with US 25 NC 20 Dixie Highway to the Tennessee state line The original routing of US 70 connects the same cities as it does today through North Carolina with interstate highways in parallel or in concurrency with it 31 32 Early state routes Edit In 1916 the North Carolina State Highway Commission prepared a map for the Five Year Federal Aid Program The general present day routing of US 70 was a mix of both improved and unimproved highways When the highways were signed the majority of US 70 s routing ran along NC 10 which was built from the Georgia state line south of Murphy to Beaufort However the routing north and west of Asheville comprised parts of NC 20 and NC 29 US 70 was established as an original U S route in 1926 Original routing Edit US 70 was established as an original US highway running from US 66 near Holbrook Arizona to Beaufort North Carolina The highway entered the state at the Tennessee state line and followed along a topsoil road concurrently with NC 20 In Marshall US 70 turned onto NC 20 s former routing and followed it to the south Upon reaching NC 29 US 70 turned to the south along the hard surface road and followed it to Asheville North of Biltmore US 70 turned left and followed along a hard surfaced road in concurrency with NC 10 Between Old Fort and Garden City the road switched to an oil treated road and then briefly switched to a topsoil road between Garden City and Marion As the road left Marion to the east it again became a hard surface road The highway continued east through Morganton and Hickory In Conover the highway turned due south until reaching Newton In Newton US 70 NC 10 turned to the left and followed a topsoil road to the southeast The highway made several turns between the northeast and the southeast before reaching Statesville The highway turned left in Statesville to follow along a hard surfaced highway to Salisbury Upon reaching Salisbury US 70 NC 10 turned to the left and followed concurrently along US 170 to the northeast In Greensboro the route turned to the east through Burlington to Graham The highway followed a brief concurrency with NC 62 between Graham and Mebane before again turning to the east The route ran through Hillsborough and Durham before turning south through Brassfield and Nelson In Cary US 70 NC 10 met up with US 1 NC 50 and followed a brief concurrency between Cary and Raleigh After passing through Raleigh US 70 turned to the south to run through Garner before turning east to pass through Auburn and Clayton Upon reaching Smithfield the highway turned to the left and followed briefly along NC 22 to the northeast Just before reaching Selma US 70 NC 10 turned right to head to the southeast The hard surfaced highway passed through Goldsboro and La Grange before reaching Kinston In Kinston the highway turned to the northeast and ran briefly concurrent with NC 11 before running east toward Fort Barnwell As the highway neared the Neuse River it turned to the southeast to parallel the river to New Bern Passing through New Bern the highway continued to follow the Neuse until reaching Havelock where the river turns further to the east Shortly after passing Havelock the road turned toward the east After intersecting NC 101 the road type changed to a topsoil road The highway continued as a topsoil road until North Harlowe where it became a graded road Just before entering Beaufort the highway changed back to a hard surface road US 70 and NC 10 both ended in Beaufort Early 20th century Edit In 1928 US 70 NC 10 was swapped with route NC 101 towards Beaufort Around 1929 US 70 was placed on its modern routing between Marion and Nebo its former routing becoming part of NC 105 North of Newton US 70 was given a new primary routing in concurrency with NC 110 In Raleigh US 70 was placed on a new primary routing along Western Boulevard then north along Boylan Avenue to South Street then Fayetteville Street to Lenoir Street and finally East Street the old alignment along Hillsborough Road and by the state capital remained part of US 1 NC 50 33 In 1930 US 70 NC 10 was swapped with NC 100 between Gibsonville and Burlington Also around that time US 70 NC 10 was rerouted in downtown Salisbury via Innis Street to Main Street leaving behind Fulton and Liberty streets 31 In 1931 US 70 was extended northeast from Beaufort to Atlantic ending at Cedar Island Road SR 1387 Around 1932 US 70 was rerouted in downtown Asheville from Biltmore Avenue onto Tunnel Road the old alignment remained part of US 25 34 In 1934 both NC 10 and NC 20 were removed along US 70 s route By 1936 US 70 was placed on First Avenue through Hickory and was removed from Beaman Road near New Bern 35 In 1939 US 70 was removed from Hollins Road in Marshall 36 Mid 20th century Edit In 1941 US 70 was swapped with NC 55 from Kinston to west of New Bern Also around that same year US 70 was given its modern routing between the Yadkin River and Lexington By 1944 US 70 was removed from Old Highway 70 Loop SR 1620 near Icard in Havelock US 70 was removed from Church Road Miller Boulevard and Roosevelt Boulevard to its modern alignment Around 1948 US 70 was swapped with US 70A in the Hickory Conover area and with US 70A in Hillsborough 37 By 1949 US 70 was placed on its modern routing between Swannanoa and Black Mountain and between Lexington and Thomasville swapped with US 70A in High Point removed from Bennett Memorial Drive in Durham and switched from Wilson Street to Kornegay Street in Dover 38 In 1952 US 70 was placed on new bypasses in Lexington Thomasville and Durham all former alignments became individual or extensions of existing US 70A By 1953 US 70 was rerouted back onto Fulton Street and Liberty Street in Salisbury US 70 was split on one way streets in downtown Greensboro and US 70 was rerouted onto Eden and Front Streets in New Bern 39 In 1954 US 70 was rerouted onto Woodfin Street in Asheville placed on its modern alignment between Black Mountain and Old Fort leaving behind Mill Creek Road SR 1407 Old US 70 SR 1400 placed on one way streets in downtown Raleigh and rerouted on a more direct route between Smithfield and Princeton along existing secondary roads leaving behind US 70A through Selma Around 1956 US 70 was placed on new bypass south of Morganton By 1957 US 70 was split on one way streets in downtown Marion replaced US 70A in Salisbury leaving the downtown area and placed on its modern alignment in western Rowan County It was placed on its modern alignment from Thomasville to Greensboro then continued east on freeway to Efland its old alignment becoming US 70A it was placed on new bypass east of Durham its former alignment along Avondale Drive Greer Street and Miami Boulevard becoming parts of NC 55 NC 98 and US 70A respectively It was placed on bypass north Goldsboro leaving behind US 70A through the downtown area and placed on bypass south of Kinston also leaving behind US 70A through its downtown area 40 Around 1958 US 70 was removed from Ann Street to its current routing along Cedar Street in Beaufort In 1960 US 25 US 70 was placed on new bypass north of Marshall leaving behind US 25 Bus US 70 Bus 41 In 1961 US 70 was removed from Woodfin Street and onto the East West Freeway in Asheville in Salisbury US 70 was rerouted following Innis Street south to I 85 then continued north in concurrency into Davidson County 42 In 1963 US 70 was rerouted back along its former alignment between Greensboro and Efland replacing part of US 70A the former freeway alignment remains part of I 85 43 Around 1964 US 70 was placed on new causeway over the Newport River Intracoastal Waterway bridges on the old alignment were removed leaving Old Causeway Road SR 1205 on Radio Island Around 1965 US 70 was removed from I 85 in Rowan County rerouted through downtown Salisbury on one way streets then north along Main Street in concurrency with US 29 In 1967 US 70 was rerouted onto O Henry Boulevard to Wendover Avenue in Greensboro its old alignment along Market Street was downgraded to secondary roads In the same year US 70 was adjusted at the Salisbury and Wilmington Street split 44 By 1968 US 70 was placed on a new bypass west of Newport leaving behind Chatham Street SR 1247 45 In 1969 US 70 was placed on a new bypass south of La Grange leaving behind Washington Street SR 1603 46 In 1970 US 70 eastbound was removed from Main Street and onto Logan Street in Marion 47 In the same year US 70 was placed on a new bypass north of Princeton leaving behind Dr Donnie H Jones Jr Boulevard SR 2556 48 Aerial photograph of US 70 bypassing the city of New Bern crossing the Neuse and Trent Rivers Late 20th century Edit In 1972 US 19 US 23 US 70 was removed from Merrimon Avenue between Asheville and Woodfin and placed on a new freeway US 25 remains along the old alignment 49 In Raleigh US 70 NC 50 were removed from Glenwood Avenue and placed on the Raleigh Beltline to North Boulevard Downtown Boulevard 50 In Atlantic US 70 was truncated to its current eastern terminus at School Drive the former alignment was abandoned with a bridge removed from the Atlantic Harbor of Refuge Channel 51 52 From 1978 to 1979 in phases US 70 was placed on a new bypass south of Dover and New Bern the former alignment became Old US Highway 70 SR 1005 53 54 55 56 57 In 1981 US 70 was rerouted from Crosstown Expressway onto Charlotte Poplar and Pine Streets the latter two removed for College Street to Beaucatcher Tunnel this replaced part of NC 694 while Crosstown Expressway was rerouted through Beaucatcher Cut 58 In Salisbury US 70 was rerouted south along Jake Alexander Boulevard in concurrency with US 601 to Main Street where it joined US 29 through the city the old alignment along Innes Liberty Fulton and Lee Streets was downgraded to secondary roads 59 60 In Burlington US 70 NC 62 was realigned along one way streets along Church and Fisher Streets eliminating the use of Davis and Hoke Streets 61 In 1982 US 25 US 70 was placed on a new alignment north of Marshall to Weaverville the old alignment became an extension of existing business loops in Marshall and Weaverville and some sections were downgraded to secondary roads around Woodfin In the same year upgrades between Black Mountain and Old Fort were completed allowing the addition of I 40 alongside US 70 62 In 1987 US 25 US 70 was placed on a new bypass west of Walnut leaving behind Walnut Drive SR 1349 63 In 1989 US 70 was removed from downtown Raleigh and was completely rerouted onto the Raleigh Beltway going east then south continuing at I 40 southeasterly to exit 306 the former alignment through Raleigh and Garner became US 70 Bus though unsigned inside the Raleigh Beltline 64 65 In 1990 US 70 was rerouted onto Industrial Boulevard and Monroe Street from Newton Drive to east of I 77 in Statesville the former alignment along Front Street and Salisbury Road was downgraded to secondary roads 66 67 68 In 1991 one way streets along Logan New and Garden Streets were discontinued and reallocated to the city of Marion to maintain US 70 reverted to two way traffic along Main and Court Streets 69 70 In the same year US 70 was removed from the Raleigh Beltline and rerouted along Gleenwood Avenue Wade Avenue Capital Boulevard Dawson McDowell Streets and Saunders Street South of the Raleigh Beltline it continued along Saunders then Wilmington Street and through Garner to I 40 the reroute in Wake County replaced all of US 70 Bus 71 72 In 1993 US 70 was rerouted onto a new bypass north of Haw River leaving Main Street SR 1801 and a short concurrency with NC 49 73 In Orange and Durham counties US 70 s concurrency with I 85 was extended 2 5 miles 4 0 km as part of a major reconfiguration of exits 172 and 173 The original configuration had Hillsborough Road weave in and out of I 85 between the two exits the realignment of US 70 allowed NCDOT to remove the weave and re purpose exit 172 as an interchange for NC 147 completed in 2001 The former alignment became an extension of US 70 Bus which for the remainder of the decade had a hidden concurrency with I 85 US 70 with the weave persisting during construction 74 75 In 1997 NCDOT established the oddity known as the four US 70s of Selma Smithfield US 70 US 70A US 70 Bus and US 70 Bypass Before 1997 US 70 was routed through Smithfield while US 70A followed the pre 1954 route through Selma The new configuration established US 70 following its former route east to Selma with a short bypass route of I 95 no interchange then reconnecting to an existing section of US 70 east of I 95 US 70A was truncated near the I 95 interchange in Selma while the former alignment through Smithfield became a business route 76 77 78 79 21st century Edit On June 9 2008 the Clayton Bypass opened redirecting US 70 onto I 40 between exits 306 to 309 and then on a new 10 7 mile 17 2 km four lane freeway bypass south of Clayton 80 81 Planning for the bypass began in 1991 but construction did not start until 2005 because of several delays regarding the Dwarf wedgemussel an endangered species habitat in the area Originally scheduled for completion in June 2009 a severe drought in 2007 2008 allowed construction to proceed more rapidly than anticipated 82 83 NCDOT was given the approval by AASHTO to officially designate US 70 along the bypass on May 6 2008 with the former alignment becoming an extension of US 70 Bus 84 Compared to the former alignment through Clayton the bypass is estimated to cut fifteen minutes of travel time for drivers traveling between Raleigh and eastern North Carolina 85 86 In 2010 US 70 was placed on Statesville Boulevard a then new 3 81 mile 6 13 km four lane expressway running east of Statesville towards Salisbury the former alignment was downgraded to a secondary road 87 In 2013 US 70 was placed on a new freeway with an interchange with NC 148 at Falling Creek Justification for the improvement was given as a need for better service to the Global TransPark the old alignment was reduced from four to two lanes becoming Sanderson Way SR 2032 88 In December 2011 the first section of the Goldsboro Bypass was opened from I 795 to Wayne Memorial Drive The section was temporarily numbered as NC 44 while the western and eastern sections were under construction The western section of the bypass from US 70 west of Goldsboro to I 795 opened on October 17 2015 The final section from Wayne Memorial Drive to US 70 was completed in May 2016 89 The route is currently listed as US 70 Bypass 90 while the routes in the city are currently being signed as US 70 and US 70 Business In east Durham the construction of the East End Connector linking NC 147 and US 70 began in February 2015 as part of the I 885 proposal 91 The project also altered the interchanges at Carr Road and NC 98 Holloway Street to a dumbbell and a diamond interchange respectively 92 Once scheduled to be completed in January 2020 the East End Connector and related road improvement projects were eventually completed on June 30 2022 93 I 885 was officially designated along the entire freeway portion of US 70 a route that continues past US 70 down toward I 40 through the Research Triangle Park Future EditGreensboro High Point Edit Currently the portion of US 70 going west of Greensboro runs concurrently with US 29 and US 220 south I 40 west and soon to be decommissioned I 85 Business south while the portion going east of Greensboro remains on Wendover Avenue East leaving town towards Burlington On October 5 2019 NCDOT submitted an application to AASHTO and received approval for the re routing of US 70 in Greensboro High Point and a part of Thomasville Under the state plan it will continue west along Wendover Avenue through Greensboro to NC Highway 68 Eastchester Drive in High Point and then onto NC 68 south bound from High Point to the southern terminus of NC 68 in Thomasville According to NCDOT this will provide a more direct continuous route through the cities of Greensboro and High Point improve regional connectivity and remove traffic from concurrent interstate routes e g I 40 s Death Valley interchange in Greensboro and the I 85 US 29 interchange near Jamestown 94 Raleigh to Morehead City Edit A multi county project also known as the US 70 Corridor or Super 70 is a collection of several projects along US 70 to improve passenger and freight movement eventually leading to the establishment of Interstate 42 95 which is the US Department of Transportation s High Priority Corridor 82 96 The entire project has a budgeted cost as of late 2018 of about 1 3 billion and about 29 miles still without a budget Some projects like the Clayton and Goldsboro bypasses are completed while others have yet to be scheduled The project involves the counties of Wake Johnston Wayne Lenoir Jones Craven and Carteret 97 98 Wilson s Mills improvements Edit A 5 mile 8 0 km section of US 70 at Wilson s Mills connecting to the Clayton Bypass in the west will be upgraded to a freeway for an estimated 31 million Construction is planned to begin in 2020 and finish around 2022 99 Smithfield Selma improvements Edit Improvements are in the planning stages for the 13 8 mile 22 2 km segment of US 70 between Wilson s Mills and Princeton Some of this section is already freeway but will require improvements to bring it up to interstate standards and add an interchange with I 95 Adding the interchange will require shifting I 95 2 000 feet 610 m east to incorporate the new changes This proposed project is not currently budgeted nor does it have a timeline for completion 100 Princeton bypass Edit The existing Princeton bypass will be improved to interstate standards The 6 7 mile 10 8 km project is estimated to cost 170 million with construction scheduled to begin in 2028 101 102 103 Kinston bypass Edit The Kinston Bypass is a project that has been in the planning stages since the 1990s The project was put on hold until 2007 when NCDOT revitalized the project While several northern bypasses were planned in January 2014 the northern bypasses were removed in favor of a southern alternative The project was defunded in 2014 with the release of the 2015 2024 State Transportation Improvement Plan and studies were suspended 104 The K inston Bypass would be approximately 21 miles 34 km of a four lane median divided freeway accessible via ramps at interchanges When complete the bypass would improve regional mobility connectivity and capacity for US 70 reducing traffic congestion and delays that exist along US 70 between La Grange and Dover It would be built in phases and as of 2022 only one phase just east of LaGrange is funded for construction starting in 2028 105 James City freeway Edit In James City a 5 1 mile 8 2 km segment of the US 70 improvement project will upgrade the existing highway to freeway standards by elevating it over existing surface streets improving the frontage roads and building interchanges It will connect to the existing US 70 freeway in New Bern This project is estimated to cost 66 million Construction is scheduled to begin in early 2020 and be complete in early 2024 106 James City to Havelock Edit Between James City and Havelock a 6 3 mile 10 1 km section of US 70 will be converted to interstate standards for 132 million 107 The money will come primarily from a 147 million federal grant the state received in 2018 108 With the release of the 2020 draft STIP it was revealed that NCDOT is attempting to start construction in 2020 Havelock bypass Edit The Havelock Bypass is a planned 10 mile 16 km four lane freeway intended to improve existing sections of US 70 and a bypass west of Havelock through the Croatan National Forest Draft and environmental studies began in September 2011 and were completed in January 2016 Property acquisition started in 2016 with construction to begin in February 2019 Estimated to cost 173 million it is scheduled to be completed in 2022 109 Gallants channel bridge Edit The Gallants Channel Bridge is a project to replace the Dan Taylor Memorial Bridge by rerouting US 70 over Gallants Channel with a 65 foot 20 m fixed span bridge widened to four lanes with a median at a new location and building a new bridge on Turner Street for an estimated 66 4 million Construction began on March 25 2015 by Conti Enterprises Inc of Edison New Jersey All work but landscaping is scheduled to be completed by July 15 2018 with final completion expected in January 2019 Once complete the existing bascule bridge will be removed and US 70 will be routed out of downtown Beaufort 110 Other corridor projects Edit Other projects including improvements between James City and Morehead City Slocum Gate and the Newport River Bridge are in various stages of planning and construction 97 Future Interstate 42 Edit Future Interstate 42LocationClayton Morehead CityLength137 mi 220 km The Fixing America s Surface Transportation Act FAST Act signed by President Barack Obama on December 14 2015 added the US 70 corridor between Garner and Morehead City to the Interstate system as a future Interstate Justification for the designation included better connections with Seymour Johnson Air Force Base the North Carolina Global Transpark Marine Corps Air Station Cherry Point and the Port of Morehead City with the rest of state and the eastern seaboard 111 112 113 With no specified number codified in the act the Regional Transportation Alliance RTA expected this corridor to be called I 46 or another suitable designation and the US Highway 70 Corridor Commission recommended I 50 114 115 On March 30 2016 Governor Pat McCrory and various officials unveiled Future Interstate signage along the corridor 116 For the Spring 2016 AASHTO Special Committee on U S Route Numbering NCDOT proposed I 36 for this route On May 24 2016 AASHTO assigned Interstate 42 for the route 117 In October 2021 AASHTO approved two segments of I 42 the 10 mile 16 km Clayton Bypass and the 22 mile 35 km Goldsboro Bypass this was followed by the Federal Highway Administration subsequent approval in March 2022 118 119 In May 2022 AASHTO also approved the elimination of US 70 Bypass clearing the way for NCDOT to fully redesignate the route 120 Major intersections EditCountyLocationmi 1 kmExitDestinationsNotesMadison 0 000 00 US 25 north US 70 west SR 9 west NewportContinuation into TennesseeHot Springs5 89 3 NC 209 south Lance Avenue Lake JunaluskaHurricane11 017 7 NC 208 north Greeneville 16 526 6Walnut Drive NC 213 west West end of NC 213 overlap 20 032 2 US 25 Bus south US 70 Bus east Main Street Downtown Marshall Public Library 22 335 9 NC 213 east Mars Hill Mars Hill UniversityEast end of NC 213 overlap 23 537 8 NC 251 south Tillery Branch Road 25 340 7 US 25 Bus north US 70 Bus west Ivy River Road MarshallBuncombeWeaverville32 051 5 Future I 26 west US 19 US 23 north Johnson CityWest end of Future I 26 US 19 US 23 overlap I 26 north exit 19B south exit 1919AWeavervilleNo exit number eastbound exit numbers follow I 2634 355 221New Stock Road WeavervilleWoodfin36 358 423 US 25 south US 19 Bus Merrimon Avenue Woodfin North AshevilleEast end of US 25 overlap37 259 924Elk Mountain Road WoodfinAsheville38 562 025 NC 251 University of North Carolina Asheville40 064 4 Hill StreetWestbound exit and eastbound entrance40 264 7 Future I 26 US 19 US 23 south I 240 US 74A west to I 40 west West AshevilleEast end of Future I 26 US 19 US 23 overlap west end of I 240 US 74A overlap I 240 exit 4A Patton Avenue DowntownExit numbers follow I 240 no westbound exit40 765 54CMontford Avenue Haywood Street41 266 35A US 25 Merrimon Avenue Eastbound entrance includes direct entrance ramp from Woodfin Street41 566 8 I 240 east OteenEast end of I 240 overlap I 240 exit 5B41 867 3 NC 694 north Town Mountain Road Beaucatcher Tunnel42 668 6 I 240I 240 exit 6 access to I 240 east via Chunns Cove Road43 469 8US 74A east South Tunnel Road MallEast end of US 74A overlap43 670 2 I 240Three level diamond interchange I 240 exit 745 573 2 NC 81 west Swannanoa River Road 46 174 2 Blue Ridge Parkway Folk Art Center Mount Mitchell State ParkInterchange Porters Cove Road to I 40I 40 exit 55Black Mountain55 889 8 NC 9 to I 40 west56 590 9 I 40 westWest end of I 40 overlap westbound left exit and eastbound left entrance I 40 exit 65Ridgecrest57 993 266Dunsmore Avenue RidgecrestExit number follows I 40McDowell 63 5102 2 I 40 eastEast end of I 40 overlap eastbound left entrance and westbound left exit I 40 exit 72 73 0117 5 NC 80 north Lake Tahoma Road To Mount Mitchell State ParkMarion74 8120 4 US 221 NC 226 Spruce Pine Newland75 0120 7 US 221 Bus north Main Street Spruce Pine NewlandNorth end of US 221 Business overlap77 2124 2 US 221 Bus south Main Street RutherfordtonSouth end of US 221 Business overlapNebo82 2132 3 NC 126 eastTo Lake James State ParkBurkeMorganton96 2154 8 US 64 east By pass US 70 Bus east Union Street east to NC 18 NC 181North end of US 64 overlap97 3156 6 US 64 west US 64 Bus east Burkemont Avenue RutherfordtonSouth end of US 64 overlap98 4158 4 NC 18 Sterling Street Shelby100 5161 7 US 70 Bus west Union Street Drexel104 0167 4 NC 114 Drexel Road CatawbaHickory118 5190 7 US 321 to I 40 Lenoir Asheville Statesville US 321 Bus beginsInterchange US 321 exit 44 north end of US 321 Bus overlap119 5192 3 Center Street to NC 127Access to Frye Regional Medical Center121 5195 5 Lenoir Rhyne Boulevard to I 40I 40 exit 125Conover126 5203 6 US 321 Bus south to NC 16 7th Street Place SW to NC 16 Bus South end of US 321 Bus overlap127 8205 7 NC 16 Thornburg Drive NE Catawba134 5216 5 NC 10 NewtonCatawba RiverBridgeIredellStatesville145 8234 6 US 64 NC 90 Taylorsville148 0238 2 US 21 NC 115 Shelton Avenue Troutman149 2240 1 I 77 Charlotte ElkinI 77 exit 49ARowan 162 4261 4 NC 801 south MooresvilleSouth end of NC 801 overlap 164 0263 9 NC 801 north CooleemeeNorth end of NC 801 overlapSalisbury170 0273 6 US 601 north Jake Alexander Boulevard North MocksvilleWest end of US 601 overlap172 5277 6 NC 150 Mooresville Road Mooresville173 5279 2 US 29 south Main Street US 601 south Jake Alexander Boulevard South to I 85 Rowan County Airport China GroveInterchange east end of US 601 overlap west end of US 29 overlap174 3280 5 NC 150 west Mooresville Road West end of NC 150 overlapYadkin RiverNew bridge replaced the Wil Cox Bridge in 2012 Davidson 182 2293 2 I 85 US 52 south Salisbury CharlottePermanently closed as of April 2010 121 122 123 124 former exit 82 on I 85 183 0294 5 NC 150 eastEast end of NC 150 overlap I 85 US 52 south Salisbury CharlotteWest end of freeway section west end of I 85 US 52 overlap I 85 exit 84 184 0296 185Clark RoadPermanently closed as of November 2012 125 exit numbers follow I 85 185 4298 486Belmont RoadLexington187 5301 8 I 85 north High Point Greensboro I 285 I 85 BL beginEast end of I 85 overlap west end of I 285 I 85 Bus overlap eastbound left exit and westbound left entrance I 85 exit 87188 0302 684 NC 47 east to I 85 northExit numbers follow I 285188 8303 885Green Needles Road190 0305 886Lexington Downtown191 0307 4 US 52 north I 285 north Winston SalemEast end of I 285 US 52 overlap eastbound exit and westbound entrance I 285 exit 87192 0309 0 Old US 64Split into separate exits east and west westbound192 7310 1 US 64 west MocksvilleWest end of US 64 overlap Smokehouse LaneRight in right out interchange westbound exit and entrance193 5311 4 NC 8 Winston Road Lexington Winston SalemEast end of freeway194 0312 2 US 64 east Asheboro LexingtonInterchange east end of US 64 overlapThomasville201 5324 3ThomasvilleInterchange eastbound exit and westbound entrance204 0328 3 NC 109 Thomasville Winston SalemInterchange205 5330 7 NC 68 National Highway Thomasville West High PointInterchangeRandolph 207 0333 1 High Point ThomasvilleWest end of expressway 207 5333 9 Prospect StreetGuilfordHigh Point208 5335 5 W Green Drive209 3336 8 Surrett Drive210 0338 0 S Main Street Archdale High Point Downtown211 0339 6 Brentwood StreetWestbound access is part of I 74 US 311 exit I 74 Winston Salem AsheboroEast end of expressway three level diamond interchange I 74 exit 71B212 0341 2Baker RoadInterchange213 5343 6Kivett Drive M L King Jr DriveInterchangeGreensboro216 0347 6 Guildford College RoadVickery Chapel Road JamestownWest end of freeway217 0349 2 I 85 south Charlotte SalisburyWest end of I 85 overlap I 85 exit 118218 2351 2119Groometown Road to Grandover ParkwayExit number follows I 85 westbound access is part of exit 33219 0352 4 I 85 north US 421 Durham SanfordNorth end of I 85 overlap eastbound exit and westbound entrance I 85 exit 120A33 I 73 US 421 north to I 40 west Groometown Road Winston SalemNo eastbound exit to I 73 US 421220 0354 134Holden Road221 0355 735A US 220 south Asheboro221 2356 035B US 220 north to I 40 west Coliseum AreaEastbound exit and westbound entrance221 8357 035CRehobeth Church Road Vandalia Road223 0358 9 I 40 west US 220 south Winston SalemWest end of I 40 overlap eastbound exit and westbound entrance I 40 exit 219223 3359 4220Randleman RoadLeft entrance westbound exit numbers follow I 40223 9360 3221South Elm Eugene Street Downtown225 0362 1222 Martin L King Jr Drive to I 40 east I 85 BL north SanfordNo direct westbound entrance left exit westbound former US 421 signed only as Sanford eastbound no exit number westbound225 1362 3 I 40 eastEast end of I 40 overlap eastbound left exit and westbound left entrance I 40 exit 223 east end of freeway section west end of O Henry Boulevard expressway section225 8363 4 Florida StreetEastbound exit and entrance only226 5364 5 Gate City Boulevard eastCloverleaf interchange formerly Lee Street former NC 6 Gate City Boulevard west227 2365 6 Market Street North Carolina A amp T University227 6366 3 Sullivan StreetEastbound exit and entrance only227 8366 6 Bessemer Street228 0366 9 US 29 north O Henry Boulevard north US 220 north Wendover Avenue west ReidsvilleCloverleaf interchange east end of expressway section east end of US 29 US 220 overlap229 5369 3Huffine Mill RoadInterchange westbound entrance includes direct exit ramp onto Oak Grove Avenue Foushee Street232 0373 4 I 785 I 840 to I 40 I 85 Danville Raleigh CharlotteI 840 exit 18Whitsett240 0386 2 NC 100 east GibsonvilleWestern terminus of NC 100240 2386 6 NC 61 GibsonvilleAlamanceBurlington246 0395 9 NC 54 east Chapel Hill Road NC 62 south Alamance Road AlamanceWest end of NC 62 overlap247 8398 8 NC 87 NC 100 Webb Avenue 248 2399 4 NC 62 north Rauhunt Street YanceyvilleEast end of NC 62 overlapHaw River252 8406 8 NC 49 GrahamMebane257 5414 4 NC 119 north Second Street West end of NC 119 overlap257 7414 7 NC 119 south Fifth Street East end of NC 119 overlapOrange 265 0426 5 NC 86 Truck south to I 40 I 85 GreensboroWest end of NC 86 Truck overlap westbound left exit and eastbound entranceHillsborough266 8429 4 US 70 Bus east Revere Road Short Street West Faucett Mill Road Hillsborough267 2430 0 NC 86 Truck ends NC 86 to NC 57 YanceyvilleNorthern terminus of NC 86 Truck east end of NC 86 Truck overlap 271 0436 1 US 70 Bus west HillsboroughEno274 0441 0 US 70 Bus eastWest end of freeway eastbound exit and westbound left entrance I 85 southWest end of I 85 overlap westbound left exit and eastbound left entrance I 85 south exit 170DurhamDurham276 1444 3172 NC 147 south Downtown Durham Research Triangle ParkExit numbers follow I 85 eastbound exit and westbound entrance277 0445 8173Cole Mill Road277 5446 6174A US 15 US 501 south to US 70 Bus Hillsborough Road NC 147 Chapel HillWest end of US 15 US 501 overlap westbound exit and eastbound entrance278 1447 6174BHillandale Road278 8448 7175 NC 157 Guess Road To NC School of Science amp Math and Duke Homestead280 0450 6176 US 501 north Duke Street Gregson Street NorthgateEast end of US 501 overlap signed eastbound as exits 176A Gregson St and 176B US 501 281 0452 2177 US 15 Bus south US 501 Bus Roxboro Street NC 55 east Avondale Drive To North Carolina Central University282 0453 813 I 85 US 15 north I 885 ends Oxford Petersburg HendersonExit numbers follow I 885 east end of I 85 US 15 overlap west end of I 885 overlap no exit number eastbound I 85 exit 178283 0455 412Cheek RoadExit numbers follow I 885284 0457 111 US 70 Bus west NC 98 Durham Wake ForestExit numbers follow I 885284 8458 3288ACarr RoadDumbbell interchange eastbound exit via exit 11285 0458 7288B I 885 south to NC 147 RDU AirportExit 10 on I 885 east end of I 885 overlap east end of freewayWakeRaleigh292 0469 9292 I 540 to I 40 US 1 Wake Forest RDU AirportInterchange I 540 exit 4 westbound access is part of exit 293292 5470 7293Lumley Road Westgate RoadInterchange299 0481 2 NC 50 north CreedmoorWest end of NC 50 overlap300 0482 8 I 440 US 1 Ridge Road Sanford Rocky Mount Wake Forest WilsonCloverleaf interchange I 440 exit 7 Glenwood Avenue south Wade Avenue west to I 40Interchange303 0487 6Capital Boulevard north US 401 north Interchange west end of US 401 overlap303 6488 6Peace StreetInterchange via ramps northbound connector road southbound305 0490 8Martin Luther King Jr Boulevard Western BoulevardInterchange306 0492 5 I 40 US 64 Cary Chapel Hill Farmers MarketI 40 exit 298307 0494 1Wilmington Street DowntownInterchange westbound exit and eastbound entranceGarner308 0495 7 US 401 south Fuquay Varina FayettevilleInterchange east end of US 401 overlap eastbound exit and westbound left entrance310 0498 9Vandora Springs Road Shopping CenterInterchangeAversboro RoadRight in right out interchange eastbound exit and entrance only311 0500 5 NC 50 south Garner Benson Shopping CenterInterchange east end of NC 50 overlap313 0503 7306B I 40 west Tom Bradshaw Freeway US 70 Bus east Raleigh ClaytonWest end of freeway section west end of I 40 overlap exit number follows I 40 and is for US 70 Bus no exit number eastbound I 40 east exit 306 west exit 306A 317 6511 1318 I 40 east BensonEast end of I 40 overlap I 40 exit 309 future western terminus of I 42Johnston 320 0515 0320 NC 42 Clayton 323 0519 8323Ranch Road 326 0524 6326 US 70 Bus Smithfield 333 0535 9333Buffalo Road 334 0537 5 US 70 Byp east GoldsboroEastbound left exit and westbound left entrance future I 42 exit 334Selma335 0539 1 NC 39 north US 301 NC 96 Selma SmithfieldWest end of unsigned NC 39 overlap335 6540 1 I 95 Benson WilsonI 95 exit 97335 9540 6 NC 39 ends US 70A east Pine LevelEast end of unsigned NC 39 overlap 336 2541 1 US 70 Byp west RaleighInterchange westbound left exit and eastbound left entrance future I 42 exit 336 338 0544 0 US 70 Bus west Smithfield 344 0553 6 US 70A west Pine LevelWayneGoldsboro352 2566 8 US 70 Byp east353 0568 1 NC 581356 5573 7 I 795 to US 117 south Wilson WilmingtonI 795 exit 25357 0574 5 US 70 Bus east Grantham Street US 13 US 117 south Goldsboro Mount Olive WilmingtonWest end of US 13 US 117 overlap357 5575 3 US 117 north Wilson Gov Charles B Aycock BirthplaceInterchange east end of US 117 overlap eastbound exit and westbound entrance358 0576 1 US 117 Bus NC 111 north William Street to US 117Interchange west end of NC 111 overlap359 0577 8Wayne Memorial DriveInterchange360 7580 5Best Road Spence AvenueInterchange361 5581 8 US 13 north Berkeley Boulevard Snow HillInterchange east end of US 13 overlap to Seymour Johnson AFB363 0584 2 US 70 Bus west Ash Street 364 0585 8 NC 111 south BeulavilleEast end of NC 111 overlap to Cliffs of the Neuse State ParkLenoirLa Grange US 70 Byp west372 0598 7 NC 903 La GrangeKinston381 7614 3 US 258 north Snow HillWest end of US 258 overlap to North Carolina Global TransPark382 0614 8 US 70 Bus east US 258 Bus south Kinston384 5618 8 NC 11 NC 55 Old Pink Hill Road Pink Hill Mount Olive385 0619 6 US 258 south US 70 Bus west US 258 Bus north NC 58 north Richlands KinstonEast end of US 258 overlap west end of NC 58 overlap386 0621 2 NC 58 south TrentonEast end of NC 58 overlapJones 393 0632 5DoverAt grade intersection west end of freewayCraven 402 0647 0 NC 41 south Trenton Road Cove City TrentonNorthern terminus of NC 41 408 0656 6 SR 1224 Tuscarora 411 0661 4409Clark Road 411 5662 2410A US 17 south JacksonvilleEast end of US 17 overlap 412 8664 3411 NC 43 north Greenville VanceboroSouthern terminus of NC 43New Bern415 0667 9 Glenburnie Road Craven Community College416 0669 5 US 17 Bus New Bern Jacksonville417 7672 2416 NC 55 west Pembroke Road Trent WoodsWest end of NC 55 overlapTrent RiverFreedom Memorial BridgeJames City419 0674 3417A B US 17 north NC 55 east E Front Street New Bern Washington BayboroEast end of freeway signed separately as exits 417A E Front St and 417B US 17 NC 55 westbound east end of US 17 NC 55 overlapHavelockCherry Point Slocum GateInterchange no eastbound exit435 0700 1 NC 101 east Fontana Boulevard Western terminus of NC 101CarteretMorehead City449 0722 6 NC 24 west JacksonvilleEastern terminus of NC 24453 0729 0 To NC 58 Atlantic BeachTo Fort Macon State ParkBeaufort457 3736 0 US 70 Bus east Turner Street 458 0737 1 NC 101 Havelock459 5739 5 US 70 Bus west Live Oak Street Sea Level483 0777 3 NC 12 north Cedar IslandSouthern terminus of NC 12Atlantic488 0785 4School Drive Cedar IslandNational eastern terminus road continues as Seashore Drive1 000 mi 1 609 km 1 000 km 0 621 mi Closed former Concurrency terminus Incomplete access UnopenedSee also EditSpecial routes of U S Route 70 North Carolina Bicycle Route 7 Briefly concurrent with US 70 near Dover and from North River Corner to NC 12 United States portal U S Roads portalReferences Edit a b Google August 13 2012 U S Route 70 in North Carolina Map Google Maps Google Retrieved August 13 2012 Federal Highway Administration March 25 2015 National Highway System North Carolina PDF Map Raleigh Federal Highway Administration Archived PDF from the original on September 22 2015 Retrieved April 6 2016 What is the National Highway System National Highway System Federal Highway Administration February 26 2016 Archived from the original on September 24 2012 Retrieved April 6 2016 NCDOT Scenic Byways Archived from the original on January 25 2011 Retrieved March 31 2016 North Carolina Department of Transportation September 2015 Madison County North Carolina PDF Map Raleigh North Carolina Department of Transportation Archived PDF from the original on April 15 2016 Retrieved April 3 2016 a b c d e f g h i Road and Bridge Namings in North Carolina PDF North Carolina Department of Transportation July 30 2015 Archived PDF from the original on March 30 2016 Retrieved April 4 2016 Bridgehunter com Beaucatcher Tunnel Archived from the original on April 15 2016 Retrieved April 3 2016 North Carolina Department of Transportation September 2015 Buncombe County North Carolina PDF Map Raleigh North Carolina Department of Transportation Archived PDF from the original on December 24 2015 Retrieved April 3 2016 North Carolina Department of Transportation September 2015 McDowell County North Carolina PDF Map Raleigh North Carolina Department of Transportation Archived PDF from the original on December 24 2015 Retrieved April 3 2016 North Carolina Department of Transportation September 2015 Burke County North Carolina PDF Map Raleigh North Carolina Department of Transportation Archived PDF from the original on March 4 2016 Retrieved April 3 2016 North Carolina Department of Transportation November 2015 Catawba County North Carolina PDF Map Raleigh North Carolina Department of Transportation Archived PDF from the original on December 20 2015 Retrieved April 3 2016 North Carolina Department of Transportation February 2016 Iredell County North Carolina PDF Map Raleigh North Carolina Department of Transportation Archived PDF from the original on April 15 2016 Retrieved April 3 2016 North Carolina Department of Transportation April 2015 Rowan County North Carolina PDF Map Raleigh North Carolina Department of Transportation Archived PDF from the original on December 24 2015 Retrieved April 3 2016 Wireback Taft August 25 2015 Planners seek public reaction to Greensboro area transportation plans News amp Record Greensboro NC Retrieved April 4 2016 North Carolina Department of Transportation April 2015 Davidson County North Carolina PDF Map Raleigh North Carolina Department of Transportation Archived PDF from the original on December 20 2015 Retrieved April 4 2016 North Carolina Department of Transportation April 2016 Randolph County North Carolina PDF Map Raleigh North Carolina Department of Transportation Archived PDF from the original on April 16 2016 Retrieved April 4 2016 North Carolina Department of Transportation April 2015 Guilford County North Carolina PDF Map Raleigh North Carolina Department of Transportation Archived PDF from the original on April 16 2016 Retrieved April 4 2016 North Carolina Department of Transportation June 2015 Alamance County North Carolina PDF Map Raleigh North Carolina Department of Transportation Archived PDF from the original on December 20 2015 Retrieved April 4 2016 North Carolina Department of Transportation June 2015 Orange County North Carolina PDF Map Raleigh North Carolina Department of Transportation Archived PDF from the original on April 16 2016 Retrieved April 4 2016 Baumgartner Vaughan Dawn November 27 2017 Why I 85 in Durham is now the Dr John H Franklin Highway News amp Observer Raleigh NC Archived from the original on December 1 2017 Retrieved November 28 2017 North Carolina Department of Transportation February 2016 Durham County North Carolina PDF Map Raleigh North Carolina Department of Transportation Archived PDF from the original on April 16 2016 Retrieved April 4 2016 North Carolina Department of Transportation November 2015 Wake County North Carolina PDF Map Raleigh North Carolina Department of Transportation Archived PDF from the original on December 20 2015 Retrieved April 4 2016 North Carolina Department of Transportation November 2015 Johnston County North Carolina PDF Map Raleigh North Carolina Department of Transportation Archived PDF from the original on April 1 2016 Retrieved April 4 2016 North Carolina Department of Transportation November 2015 Wayne County North Carolina PDF Map Raleigh North Carolina Department of Transportation Archived PDF from the original on April 16 2016 Retrieved April 4 2016 span, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.