fbpx
Wikipedia

Line 8 (Guangzhou Metro)

Line 8 of the Guangzhou Metro is a north-west L-shaped line on the system that runs from Jiaoxin to Wanshengwei, spanning a total of 33.9 km (21.06 mi)[4][5] with 28 stations. It interchanges with Line 1 at Chen Clan Academy, Line 2 at Changgang, Line 3 at Kecun, Line 4 at Wanshengwei and Line 6 at Cultural Park. All stations on Line 8 are underground.[6] Line 8's color is teal.

Line 8
Platform of Baogang Dadao station (November 2020)
Overview
Other name(s)M2e ("" shape plan name)
M2e / M3e (5 lines plan name)
M4 / M5 (7 lines plan name)
M8 (2000 plan name)
Pazhou line
(琶洲线)
StatusOperational
OwnerCity of Guangzhou
LocaleHaizhu, Liwan and Baiyun Districts
Guangzhou, Guangdong
Termini
Stations28
Service
TypeRapid transit
SystemGuangzhou Metro
Services1
Operator(s)Guangzhou Metro Corporation
Rolling stock?? CRRC Zhuzhou Locomotive Metro cars[1]
Daily ridership645,700 (2017 daily average)[2]
878,000 (2019 Peak)[3]
History
Opened25 September 2010; 12 years ago (2010-09-25)
Technical
Line length33.9 km (21.1 mi)[4][5]
Number of tracks2
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in)
ElectrificationOverhead lines, 1,500 V DC
Route map

North extension
(planned)
North extension
(planned)
Jiangfu
 24 
connection to Line 24
Jiangcun
Jianggao
Fengxiang Lu
Liuxi River
Jiaoxin
Baiyunhu Depot
Tinggang
Shijing
Shijing River
Xiaoping
Shitan
Julong
 12 
Shangbu
Tongde
Ezhangtan
Zengbu River
Xicun
 5 
 5 
 22 
to Panyu Square
to Airport North (Terminal 2)
 11  clockwise
Caihongqiao
 11   13   22 
 13 
to Chaoyang
to Xinsha
Chen Clan Academy
 1 
Hualinsi Buddhist Temple
Cultural Park
 6 
 28  to Luzhou
Tongfuxi
Line reservation
Haizhu Creek
Fenghuang Xincun
Shayuan
Baogang Dadao
Changgang
 2 
Connection to Line 2
Xiaogang
Sun Yat-sen University
Lujiang
Kecun
 3 
Connection to Line 3
Chigang
 12 
Huangpu Stream
Modiesha
 18   28 
Connection to Line 11
Xingangdong
Chisha Depot (Line 11)
Pazhou
 11   28 
 11  anti-clockwise
Guangfo circular IR
 28  to Songshanhu
Wanshengwei
 4   THZ1 
East extension
(planned)
East extension
(planned)
Huangpu Old Port
Xinzhou
Changzhou
 7 
Shating
Hualong
Xianling
Longzelu
Lianhua
Line 8
Simplified Chinese广州地铁8号线
Traditional Chinese廣州地鐵8號線
Cantonese YaleGwóngjāu Deihtit Baat Houh Sin
Transcriptions
Standard Mandarin
Hanyu PinyinGuǎngzhōu Dìtiě Bā Hào Xiàn
Yue: Cantonese
Yale RomanizationGwóngjāu Deihtit Baat Houh Sin
Jyutpinggwong2 zau1 dei6 tit3 baat3 hou6 sin3
Canton Romanizationguong2 zeo1 déi6 tid3 bad3 hou6 xin3

Line 8 used to run as part of Line 2 until the extension to both lines opened for trial operation on 25 September 2010, and Changgang to Fenghuang Xincun started operation on 3 November 2010.[7][8] With the northern extension of Line 8, daily ridership is projected to immediately reach 960,000 passengers per day, growing to 1.33 million per day in the short term and topping 1.65 million per day in the long-term.[9]

History

 
Line 8 drawn to scale.
 
The former alignment of Line 2 before the creation of Line 8 drawn to scale.
  • 2004 - The Line 2 and 8 realignment project; and Line 8 Cultural Park to Xiaogang extension was announced. Creating Line 8 by splitting off the southeastern portion (Xiaogang to Wanshengwei) from Line 2.
  • June 2007 - Line 2 and 8 realignment; and Line 8 phase 1 (Cultural Park to Xiaogang extension) was approved by the NDRC.
  • 1 August 2007 - Construction of Line 2 and 8 realignment project; and Line 8 phase 1 extension officially commenced.
  • 10 March 2010 - Line 8 phase 2 (northern extension) was announced by extend Line 8 from Liwan to Baiyun.
  • 21 September 2010 - Line 2's services of train bound between Sanyuanli to Wanshengwei ends.
  • 25 September 2010 - Line 2 and 8 realignment project; and Line 8 phase 1 extension first section was completed and enter operation.
  • 3 November 2010 - Line 2 and 8 realignment project; and Line 8 phase 1 extension second section enter operation.
  • 9 July 2014 - Line 8 phase 3 (further north extension) was announced by further extend Line 8 from Baiyun to Huadu.
  • 28 December 2019 - The section from Cultural Park to Fenghuang Xincun was opened.[4]
  • 26 November 2020 - The section from Cultural Park to Jiaoxin was opened, except for Xicun and Caihongqiao stations.[5]
  • 28 September 2022 - Caihongqiao station was opened.
  • 28 December 2022 - Xicun station was opened.
Segment Commencement Length Station(s) Name
Xiaogang — Wanshengwei 25 September 2010 10.8 km (6.71 mi) 9 Line 2 & 8 realignment project
Changgang — Xiaogang 25 September 2010 0.6 km (0.37 mi) 1
Fenghuang Xincun — Changgang 3 November 2010 4.4 km (2.73 mi) 3
Cultural Park — Fenghuang Xincun 28 December 2019[4] 1.8 km (1.12 mi)[4] 2
Jiaoxin — Cultural Park 26 November 2020 16.3 km (10.13 mi)[5] 11 Northern extension
Caihongqiao 28 September 2022 Infill station 1
Xicun 28 December 2022 Infill station 1

Stations

Service

routes

Station
no.
Station name Connections Distance
km
Location
English Chinese
8 01 Jiaoxin 滘心 0.00 0.00 Baiyun
8 02 Tinggang 亭岗 1.66 1.66
8 03 Shijing 石井 1.83 3.49
8 04 Xiaoping 小坪 2.00 5.49
8 05 Shitan 石潭 Baiyun Railway Station:  12   22   24  1.35 6.84
8 06 Julong 聚龙  12  0.79 7.63
8 07 Shangbu 上步 1.14 8.77
8 08 Tongde 同德 0.85 9.62
8 09 Ezhangtan 鹅掌坦 0.83 10.45
8 10 Xicun 西村  5  1.86 12.31 Liwan
8 11 Caihongqiao 彩虹桥  11   13   22  0.96 13.27
8 12 Chen Clan Academy 陈家祠  1  1.05 14.32
8 13 Hualinsi Buddhist Temple 华林寺 0.76 15.08
8 14 Cultural Park 文化公园  6  1.02 16.10
8 15 Tongfuxi 同福西 0.88 16.98 Haizhu
8 16 Fenghuang Xincun 凤凰新村 0.86 17.84
8 17 Shayuan 沙园  Guangfo  0.83 18.67
8 18 Baogang Dadao 宝岗大道 1.05 19.72
8 19 Changgang 昌岗  2  0.84 20.56
8 20 Xiaogang 晓港 0.67 21.23
8 21 Sun Yat-sen University 中大 South Gate of Sun Yat-sen University:  10  (OSI) 1.19 22.42
8 22 Lujiang 鹭江 1.69 24.11
8 23 Kecun 客村  3  1.24 25.35
8 24 Chigang 赤岗  12  1.48 26.83
8 25 Modiesha 磨碟沙  18   28  0.77 27.60
8 26 Xingangdong 新港东 1.57 29.17
8 27 Pazhou 琶洲  11   28  0.99 30.16
8 28 Wanshengwei 万胜围  4     THZ1  1.83 31.99

Further North Extension

Part of Phase 3 adjustment plan of Guangzhou Metro, now under review by the National Development and Reform Commission as of September 2022.[10] This extension will bring Line further North beyond Jiaoxin Station.[11] The extension will have provisions to be divided into two lines at Jiangfu Station. With the northern section of Line 8 between Jiangfu Station and Guangzhou North Railway Station will be spun off to form the new Line 24.[12][13]

However, according to the latest environmental impact assessment announcement, Line 24 is used as an extension of Line 8 to announce the line design information. The part to the north of Jiangfu Station is taken as part of the further north extension of Line 8, and the part to the south of Jiangfu Station is taken as the "Subline of the North Extension of Line 8". Even so, the line specifications of these two parts are still configured according to the separate Line 24, because it avoids the need to increase the number of new service lines when it is submitted to the National Development and Reform Commission for approval.[14][15][16][17]

Station name Connections Location
English Chinese
Jiangfu 江府  24  Baiyun
Jiangcun 江村
Jianggao 江高
Fengxiang Lu 凤翔路

East Extension

  • Under planning. The extension is 18 km with 8 new stations.[18]
Station name[18] Connections Location
English Chinese
Huangpu Old Port 黄埔古港 Haizhu
Xinzhou 新洲
Changzhou 新洲  7  Huangpu
Shating 沙亭 Panyu
Hualong 化龙
Xianling 仙岭
Longzelu 龙泽路
Lianhua 莲花 Guangzhou Lianhuashan railway station (U/C)

References

  1. ^ "Guangzhou Metro Line 8 Stock". 10 December 2015.
  2. ^ http://www.gzmtr.com/ygwm/gsgk/qynb/201806/P020180627541408016222.pdf[bare URL PDF]
  3. ^ 广州地铁刷新单日客流新高 达逾1156万人次. 人民网. 2020-01-02. Retrieved 2020-01-02.
  4. ^ a b c d e . 2019-12-27. Archived from the original on 2019-12-27. 凤凰新村至文化公园段长1.8公里,开通后,将连通广州"河南"与沿江路,八号线增加至17.6公里
  5. ^ a b c d . www.gd.xinhuanet.com. Archived from the original on December 4, 2020. Retrieved 2020-11-27. 此次开通的八号线北延段全长16.3公里
  6. ^ "Guangzhou Metro". Railway-Technology.com. Retrieved 14 March 2017.
  7. ^ 404 Not Found 2010-09-21 at the Wayback Machine
  8. ^ . Gzmtr.com. 16 September 2010. Archived from the original on 28 February 2012. Retrieved 12 July 2013.
  9. ^ "广州力争今年建成两条地铁新线--广东频道--人民网". gd.people.com.cn. Retrieved 2019-01-23.
  10. ^ "广州地铁24号线、8号线北延江府段正纳入建设规划调整向国家申报". 2022-09-20. Archived from the original on 2022-11-01.
  11. ^ "今明两年共7条地铁新线动工 快看看有没有经过你家!". cj.sina.com.cn. Retrieved 2018-01-27.
  12. ^ . gz.house.qq.com (in Chinese (China)). Archived from the original on 2018-07-12. Retrieved 2018-01-27.
  13. ^ . www.gzggzy.cn. Archived from the original on 2018-10-15. Retrieved 2020-08-22.
  14. ^ "广州市城市轨道交通8号线北延段工程(滘心~广州北站)社会稳定风险分析公众意见征询公示". 广州地铁集团有限公司. 2022-12-11. from the original on 2022-12-11.
  15. ^ "广州市城市轨道交通8号线北延段支线工程(江府~纪念堂)社会稳定风险分析公众意见征询公示". 广州地铁集团有限公司. 2022-12-11. from the original on 2022-12-11.
  16. ^ 王彤 (2019-12-10). "地铁24号线纳入三期调整 争取年内上报国家审批". 新快报. from the original on 2022-12-13.
  17. ^ 李天研 (2022-12-21). "8号线北延段速度分两档,快速列车可由广州北站直通纪念堂". 广州日报. Archived from the original on 2022-12-22.
  18. ^ a b "8号线东延段新版站点揭晓,拟增设龙泽路站". 2023-03-09.

line, guangzhou, metro, line, guangzhou, metro, north, west, shaped, line, system, that, runs, from, jiaoxin, wanshengwei, spanning, total, with, stations, interchanges, with, line, chen, clan, academy, line, changgang, line, kecun, line, wanshengwei, line, cu. Line 8 of the Guangzhou Metro is a north west L shaped line on the system that runs from Jiaoxin to Wanshengwei spanning a total of 33 9 km 21 06 mi 4 5 with 28 stations It interchanges with Line 1 at Chen Clan Academy Line 2 at Changgang Line 3 at Kecun Line 4 at Wanshengwei and Line 6 at Cultural Park All stations on Line 8 are underground 6 Line 8 s color is teal Line 8Platform of Baogang Dadao station November 2020 OverviewOther name s M2e 十 shape plan name M2e M3e 5 lines plan name M4 M5 7 lines plan name M8 2000 plan name Pazhou line 琶洲线 StatusOperationalOwnerCity of GuangzhouLocaleHaizhu Liwan and Baiyun DistrictsGuangzhou GuangdongTerminiJiaoxinWanshengweiStations28ServiceTypeRapid transitSystemGuangzhou MetroServices1Operator s Guangzhou Metro CorporationRolling stock CRRC Zhuzhou Locomotive Metro cars 1 Daily ridership645 700 2017 daily average 2 878 000 2019 Peak 3 HistoryOpened25 September 2010 12 years ago 2010 09 25 TechnicalLine length33 9 km 21 1 mi 4 5 Number of tracks2CharacterUndergroundTrack gauge1 435 mm 4 ft 8 1 2 in ElectrificationOverhead lines 1 500 V DCRoute mapLegendNorth extension planned North extension planned 24 to Guangzhou North Railway StationJiangfu 24 connection to Line 24 24 to Sun Yat sen Memorial HallJiangcunJianggaoFengxiang LuLiuxi RiverJiaoxinBaiyunhu DepotTinggangShijingShijing RiverXiaopingJingguang RailwayShitan Guangzhou Baiyun railway stationJulong 12 12 to Xunfenggangto Higher Education Mega Center SouthShangbuTongdeEzhangtanZengbu RiverXicun 5 5 to Jiaokouto WenchongGuangmao railway 22 to Panyu Squareto Airport North Terminal 2 11 clockwiseCaihongqiao 11 13 22 13 to Chaoyangto Xinsha 1 to Xilangto Guangzhou East Railway StationChen Clan Academy 1 Hualinsi Buddhist TempleCultural Park 6 6 to Xunfenggangto XiangxuePearl River 28 to LuzhouTongfuxi Line reservationHaizhu CreekFenghuang Xincun Guangfo to Xincheng DongShayuan Guangfo Guangfo to LijiaoBaogang Dadao 2 to Guangzhou South Railway Stationto JiahewanggangChanggang 2 Connection to Line 2XiaogangSun Yat sen University 10 to Xilangto Tianhe Coach TerminalLujiang 3 to Panyu Squareto Tianhe Coach Terminal Airport North Terminal 2 Kecun 3 Connection to Line 3Chigang 12 12 to Higher Education Mega Center Southto XunfenggangHuangpu StreamModiesha 18 28 18 to Wanqingshato XiancunConnection to Line 11XingangdongChisha Depot Line 11 Pazhou 11 28 11 anti clockwiseGuangfo circular IR 28 to Songshanhu THZ1 to Canton TowerWanshengwei 4 THZ1 4 to Nansha Passenger Portto HuangcunEast extension planned East extension planned Huangpu Old PortXinzhouChangzhou 7 7 to Meidi Dadaoto YanshanShatingHualongXianlingLongzeluLianhuaThis diagram viewtalkeditLine 8Simplified Chinese广州地铁8号线Traditional Chinese廣州地鐵8號線Cantonese YaleGwongjau Deihtit Baat Houh SinTranscriptionsStandard MandarinHanyu PinyinGuǎngzhōu Ditie Ba Hao XianYue CantoneseYale RomanizationGwongjau Deihtit Baat Houh SinJyutpinggwong2 zau1 dei6 tit3 baat3 hou6 sin3Canton Romanizationguong2 zeo1 dei6 tid3 bad3 hou6 xin3Line 8 used to run as part of Line 2 until the extension to both lines opened for trial operation on 25 September 2010 and Changgang to Fenghuang Xincun started operation on 3 November 2010 7 8 With the northern extension of Line 8 daily ridership is projected to immediately reach 960 000 passengers per day growing to 1 33 million per day in the short term and topping 1 65 million per day in the long term 9 Contents 1 History 2 Stations 2 1 Further North Extension 2 2 East Extension 3 ReferencesHistory Edit Line 8 drawn to scale The former alignment of Line 2 before the creation of Line 8 drawn to scale 2004 The Line 2 and 8 realignment project and Line 8 Cultural Park to Xiaogang extension was announced Creating Line 8 by splitting off the southeastern portion Xiaogang to Wanshengwei from Line 2 June 2007 Line 2 and 8 realignment and Line 8 phase 1 Cultural Park to Xiaogang extension was approved by the NDRC 1 August 2007 Construction of Line 2 and 8 realignment project and Line 8 phase 1 extension officially commenced 10 March 2010 Line 8 phase 2 northern extension was announced by extend Line 8 from Liwan to Baiyun 21 September 2010 Line 2 s services of train bound between Sanyuanli to Wanshengwei ends 25 September 2010 Line 2 and 8 realignment project and Line 8 phase 1 extension first section was completed and enter operation 3 November 2010 Line 2 and 8 realignment project and Line 8 phase 1 extension second section enter operation 9 July 2014 Line 8 phase 3 further north extension was announced by further extend Line 8 from Baiyun to Huadu 28 December 2019 The section from Cultural Park to Fenghuang Xincun was opened 4 26 November 2020 The section from Cultural Park to Jiaoxin was opened except for Xicun and Caihongqiao stations 5 28 September 2022 Caihongqiao station was opened 28 December 2022 Xicun station was opened Segment Commencement Length Station s NameXiaogang Wanshengwei 25 September 2010 10 8 km 6 71 mi 9 Line 2 amp 8 realignment projectChanggang Xiaogang 25 September 2010 0 6 km 0 37 mi 1Fenghuang Xincun Changgang 3 November 2010 4 4 km 2 73 mi 3Cultural Park Fenghuang Xincun 28 December 2019 4 1 8 km 1 12 mi 4 2Jiaoxin Cultural Park 26 November 2020 16 3 km 10 13 mi 5 11 Northern extensionCaihongqiao 28 September 2022 Infill station 1Xicun 28 December 2022 Infill station 1Stations EditService routes Stationno Station name Connections Distancekm LocationEnglish Chinese 8 01 Jiaoxin 滘心 0 00 0 00 Baiyun 8 02 Tinggang 亭岗 1 66 1 66 8 03 Shijing 石井 1 83 3 49 8 04 Xiaoping 小坪 2 00 5 49 8 05 Shitan 石潭 Baiyun Railway Station 12 22 24 1 35 6 84 8 06 Julong 聚龙 12 0 79 7 63 8 07 Shangbu 上步 1 14 8 77 8 08 Tongde 同德 0 85 9 62 8 09 Ezhangtan 鹅掌坦 0 83 10 45 8 10 Xicun 西村 5 1 86 12 31 Liwan 8 11 Caihongqiao 彩虹桥 11 13 22 0 96 13 27 8 12 Chen Clan Academy 陈家祠 1 1 05 14 32 8 13 Hualinsi Buddhist Temple 华林寺 0 76 15 08 8 14 Cultural Park 文化公园 6 1 02 16 10 8 15 Tongfuxi 同福西 0 88 16 98 Haizhu 8 16 Fenghuang Xincun 凤凰新村 0 86 17 84 8 17 Shayuan 沙园 Guangfo 0 83 18 67 8 18 Baogang Dadao 宝岗大道 1 05 19 72 8 19 Changgang 昌岗 2 0 84 20 56 8 20 Xiaogang 晓港 0 67 21 23 8 21 Sun Yat sen University 中大 South Gate of Sun Yat sen University 10 OSI 1 19 22 42 8 22 Lujiang 鹭江 1 69 24 11 8 23 Kecun 客村 3 1 24 25 35 8 24 Chigang 赤岗 12 1 48 26 83 8 25 Modiesha 磨碟沙 18 28 0 77 27 60 8 26 Xingangdong 新港东 1 57 29 17 8 27 Pazhou 琶洲 11 28 0 99 30 16 8 28 Wanshengwei 万胜围 4 THZ1 1 83 31 99Further North Extension Edit Part of Phase 3 adjustment plan of Guangzhou Metro now under review by the National Development and Reform Commission as of September 2022 10 This extension will bring Line further North beyond Jiaoxin Station 11 The extension will have provisions to be divided into two lines at Jiangfu Station With the northern section of Line 8 between Jiangfu Station and Guangzhou North Railway Station will be spun off to form the new Line 24 12 13 However according to the latest environmental impact assessment announcement Line 24 is used as an extension of Line 8 to announce the line design information The part to the north of Jiangfu Station is taken as part of the further north extension of Line 8 and the part to the south of Jiangfu Station is taken as the Subline of the North Extension of Line 8 Even so the line specifications of these two parts are still configured according to the separate Line 24 because it avoids the need to increase the number of new service lines when it is submitted to the National Development and Reform Commission for approval 14 15 16 17 Station name Connections LocationEnglish ChineseJiangfu 江府 24 BaiyunJiangcun 江村Jianggao 江高Fengxiang Lu 凤翔路East Extension Edit Under planning The extension is 18 km with 8 new stations 18 Station name 18 Connections LocationEnglish ChineseHuangpu Old Port 黄埔古港 HaizhuXinzhou 新洲Changzhou 新洲 7 HuangpuShating 沙亭 PanyuHualong 化龙Xianling 仙岭Longzelu 龙泽路Lianhua 莲花 Guangzhou Lianhuashan railway station U C References Edit Guangzhou Metro Line 8 Stock 10 December 2015 http www gzmtr com ygwm gsgk qynb 201806 P020180627541408016222 pdf bare URL PDF 广州地铁刷新单日客流新高 达逾1156万人次 人民网 2020 01 02 Retrieved 2020 01 02 a b c d e 八号线凤凰新村至文化公园段明天正式运营 2019 12 27 Archived from the original on 2019 12 27 凤凰新村至文化公园段长1 8公里 开通后 将连通广州 河南 与沿江路 八号线增加至17 6公里 a b c d 广州地铁八号线北延段正式开通 同德围 解围 新华网 www gd xinhuanet com Archived from the original on December 4 2020 Retrieved 2020 11 27 此次开通的八号线北延段全长16 3公里 Guangzhou Metro Railway Technology com Retrieved 14 March 2017 404 Not Found Archived 2010 09 21 at the Wayback Machine 广州地铁 Gzmtr com 16 September 2010 Archived from the original on 28 February 2012 Retrieved 12 July 2013 广州力争今年建成两条地铁新线 广东频道 人民网 gd people com cn Retrieved 2019 01 23 广州地铁24号线 8号线北延江府段正纳入建设规划调整向国家申报 2022 09 20 Archived from the original on 2022 11 01 今明两年共7条地铁新线动工 快看看有没有经过你家 cj sina com cn Retrieved 2018 01 27 广州8号线北延段拟分为两条线 江府站以南为8号线 房产广州站 腾讯网 gz house qq com in Chinese China Archived from the original on 2018 07 12 Retrieved 2018 01 27 详细页 www gzggzy cn Archived from the original on 2018 10 15 Retrieved 2020 08 22 广州市城市轨道交通8号线北延段工程 滘心 广州北站 社会稳定风险分析公众意见征询公示 广州地铁集团有限公司 2022 12 11 Archived from the original on 2022 12 11 广州市城市轨道交通8号线北延段支线工程 江府 纪念堂 社会稳定风险分析公众意见征询公示 广州地铁集团有限公司 2022 12 11 Archived from the original on 2022 12 11 王彤 2019 12 10 地铁24号线纳入三期调整 争取年内上报国家审批 新快报 Archived from the original on 2022 12 13 李天研 2022 12 21 8号线北延段速度分两档 快速列车可由广州北站直通纪念堂 广州日报 Archived from the original on 2022 12 22 a b 8号线东延段新版站点揭晓 拟增设龙泽路站 2023 03 09 Retrieved from https en wikipedia org w index php title Line 8 Guangzhou Metro amp oldid 1157224531, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.