The Rampal Power Station (Bengali: রামপাল বিদ্যুৎ কেন্দ্র) is a 1320 megawatt coal-fired power station currently under construction at Rampal Upazila of Bagerhat District in Khulna, Bangladesh.[1] The power plant is being constructed on an area of over 1834 acres of land, is situated 14 kilometres north of the world's largest mangrove forest Sundarbans which is a UNESCO World Heritage Site. It will be the country's largest power plant.[2]

Rampal Power Station
Official nameRampal Coal-fire Power Station
CountryBangladesh
LocationSapmari, Rampal Upazila of Bagerhat District
Coordinates22°35′44″N 89°33′15″E / 22.595556°N 89.55402778°E / 22.595556; 89.55402778
StatusUnder construction
Construction beganJuly 2016
Construction cost৳160 billion
Owner(s)National Thermal Power Corporation (India) and Bangladesh Power Development Board (Bangladesh)
Thermal power station
Primary fuelCoal
Site area7,421,935 m2
1,834.000 acres
Power generation
Nameplate capacity1320 MW
External links
CommonsRelated media on Commons

It is being set up by BIFPCL (Bangladesh India Friendship Power Company Limited) which is 50:50 joint venture between India's state owned National Thermal Power Corporation (NTPC) and Bangladesh's Bangladesh Power Development Board (BPDB). BIFCPL awarded an EPC contract to Bharat Heavy Electricals Limited (BHEL) valued at over US$1.49 billion for setting up of Maitree Super Thermal Power Project (2X660MW).[3] BHEL has started EPC activities and the first dispatch happened in January 2018.[4]

Capacity edit

The planned capacity of the power plant in 1320 MW (2x660 MW). Unit-1 with capacity to generate 660MW, is scheduled to be commissioned in Oct'22.[5]

Stage Unit Number Capacity (MW) Date of Commissioning Status
1st 1 660 Oct, 2022 Running [6]
1st 2 660 -- Under progress

Agreements edit

In August 2010, a Memorandum of Understanding was signed between Bangladesh Power Development Board (BPDB) and India's state-owned National Thermal Power Corporation (NTPC) where they designated to implement the project by 2016.[7] On 29 January 2012, the Bangladesh Power Development Board signed an agreement with NTPC to build the plant.[8] The joint venture company is known as Bangladesh India Friendship Power Company (BIFPC).[9] The BPDB and the NTPC agreed to implement the project on a 50:50 equity basis. The NTPC will set up and operate the plant.[10] Bangladesh and India will equally share up to 30 per cent of the capital of this project as equity. The remainder of the capital, which might be equivalent to US$1.5 billion, will be taken as bank loans with help from the NTPC. According to the sources in the Bangladesh Power Division, the joint venture company will enjoy a 15-year tax holiday.[11]

Environmental issues edit

This project violates the environmental impact assessment guidelines for coal-based thermal power plants.[12] A 2016 Unesco report called the Environmental Impact Assessment questionable, and called for shelving the project.[13]

On 1 August 2013, Department of Environment (DoE) of Bangladesh approved construction, but then changed its stance and set 50 preconditions for the project.[14] But the location of the plant, 14 kilometres from the Sundarbans, violates one of the basic preconditions which says such projects must be outside a 25-kilometer radius from the outer periphery of an ecologically sensitive area.[12]

Environmental activists contend that the proposed location of the Rampal Station would violate provisions of the Ramsar Convention. The Ramsar Convention, to which Bangladesh is a signatory, is an international environmental treaty for the conservation of wetlands. The Sundarbans are on Ramsar's list of wetlands of international importance.[15][16]

The plant will need to import 4.72 million tons of coal per year. This massive freight will need about 59 ships each having 80,000-ton capacity that would be taken to the port on the bank of the Poshur river. The 40 kilometres from the port to the plant cuts through the Sundarbans and it includes the river flow path. Environmentalists say these coal-carrying vehicles are not often covered as they scatter large amounts of fly ash, coal dust and sulphur, and other toxic chemicals are released throughout the life of the project. Carrying large amount of coal through the shallow rivers also pose a threat as five vessels with load of coal, oil and potash sank in the nearby rivers from the time period of December 2014 to January 2017.[17]

The plant would draw 219,600 cubic metres of water every day[18] from the Poshur river, and discharge treated waste water back into that river causing pollutants to be introduced into the water supply to the detriment of the mangroves, the marine animals living there and nearby population.[19]

The predictions made by environment and ecology experts are that the plant will release toxic gases such as carbon monoxide, oxides of nitrogen and sulphur dioxide, thereby putting the surrounding areas and, most importantly, Sundarban at grave risk.[20]

According to a report published in New Age, in past few years the Indian central and state authorities which deal with environmental concerns in India denied the proposal of NTPC to set up a similar coal-fired thermal power plant at Gajmara in Gadarwara of Madhya Pradesh over a number of points. NTPC failed to get approval of the Indian Central Green Panel (Green Tribunal) in 2010 for the construction of that coal-fired thermal power plant because a vast portion of double-crop agricultural land reportedly comprised the site, a similar situation to Rampal.[20]

Government position edit

The government of Bangladesh rejects the allegations that the coal-based power plant would adversely affect the world's largest mangrove forest.[21] Tawfiq-e-Elahi Chowdhury, energy adviser of the Bangladeshi prime minister, said that the controversy over the power plant and its impact on the Sundarbans was "not based on facts." He also said that the plant will not negatively affect the mangrove forest because the emission of green house gas will be kept at the minimum level.

The government also claimed of importing high quality coal, build a 275-meter high chimney, employing state-of-the art technology and other steps to keep its impact on the Sundarbans at a negligible level.[22]

Opposition edit

On 1 March 2011, a bench of Bangladesh High Court asked the government "why the construction of the plant should not be declared illegal".[23] Environmental experts have expressed concerns that the proposed plant at Rampal in Bagerhat might destroy the world's largest mangrove forest Sundarbans, a UNESCO world heritage site. Faridul Islam, chief coordinator of Save the Sundarbans, pointed out that the selected location of the project was only nine kilometers from Sundarban. About 2.5 million people depend on the Sundarban region, such as wood-cutters, fishermen, and honey hunters.

The National Committee on Protection of Oil, Gas, Mineral Resources, and Power-Port, environmentalist groups, bodies of the left-leaning parties and general people of Bangladesh vowed to resist the planned inauguration of the Rampal Power Plant scheduled on 22 October 2013.[21] On 24 September 2013 thousands of people in Bangladesh began a rally for 5 days and 400 kilometres to oppose the power plant. Their march began in the capital city of Dhaka but slowly went to the world's largest mangrove forest,"Sundarban".[12] As of 30 June 2016, with construction yet to begin, UNESCO had scheduled a meeting for 11 July to decide whether to declare the Sundarbans a "World Heritage Site in Danger," its strongest possible signal to the two governments and to international lenders that the plant should not be built.[24]

Educationist Prof. Anu Muhammad and politician Dr. Manisha Chakraborty also opposed to Rampal power plant mentioning that 40 million people will be adversely affected by this power plant.[25]

In India too there has been some fragmented opposition of the power plant. In his interview with Siddharth Sivakumar of the Indian cultural website Tinpahar, Shayan Chowdhury Arnob said on this issue, "The Rampal Power Plant might become the biggest Power Plant, but it would cost the world its largest mangrove forest, the Sundarbans. Sundarbans has its life in numerous intertwined organic chains. When a chain is broken everything would fall apart, one after the other. Money has nothing to do with development or happiness; it's about our attitude to life."[26] In a press conference in New Delhi, India, social and civil society activists from Narmada Bachao Andolan's National Alliance of People's Movements wrote an "open letter" to Indian Prime Minister Narendra Modi on 18 October 2016, appealing to him to withdraw support for the plant saying that it might cause irreparable damage to the Sundarbans in Bangladesh.[27]

On 18 January 2017 in the 47th annual meeting of the World Economic Forum (WEF) in Davos of Switzerland, former Vice-President of the United States, Al Gore has urged Prime Minister of Bangladesh, Sheikh Hasina to stop building the coal powered plant close to the largest mangrove forest, Sundarbans.[28]

At least 10 activists from various organisations have been admitted to Dhaka Medical College and Hospital, when police used tear gas and rubber bullets to break up the Anti-Rampal protests in the Dhaka University area on 26 January 2017.[29]

See also edit

References edit

  1. ^ . The Independent. Dhaka. 8 March 2011. Archived from the original on 10 March 2011.
  2. ^ Rahman, Khalilur (24 February 2013). . Financial Express. Dhaka. Archived from the original on 25 February 2013.
  3. ^ Sengupta, Debjoy. "Bhel bags NTPC's Bangladesh project". The Economic Times.
  4. ^ "Boiler components dispatched for BHEL's ovserseas project - Times of India". The Times of India. Retrieved 6 February 2018.
  5. ^ "Commercial production at Rampal power plant likely to start in October". Dhaka Tribune.
  6. ^ "Rampal plant: PM Hasina, Modi to jointly announce completion of Unit-I in September". 30 August 2022.
  7. ^ Ahsan, Manjurul (14 May 2011). . New Age. Dhaka. Archived from the original on 2 February 2012.
  8. ^ "Final report on environmental impact assessment of 2x (500–660) MW coal based thermal power plant to be constructed at the location of Khulna – India Environment Portal – News, reports, documents, blogs, data, analysis on environment & development – India, South Asia". indiaenvironmentportal.org.in.
  9. ^ Ritu, Moshahida Sultana (11 June 2013). "Who gains, who loses?". The Daily Star.
  10. ^ "Coal-fired energy BD signs power plant deal with Delhi". Pakistan Observer.
  11. ^ . The Independent. Dhaka. 8 August 2013. Archived from the original on 2 October 2013.
  12. ^ a b c Kumar, Chaitanya (24 September 2013). "Bangladesh Power Plant Struggle Calls for International Solidarity". The Huffington Post.
  13. ^ Iftekhar Mahmud (24 September 2016). "Unesco calls for shelving Rampal project". Prothom Alo. Retrieved 13 October 2016.
  14. ^ "DoE changes stance on Rampal power plant". The Financial Express. 7 September 2013.
  15. ^ . Dhaka Courier. 29 September 2013. Archived from the original on 20 February 2016. Retrieved 29 November 2015 – via HighBeam Research.
  16. ^ Anisul Islam Noor (27 October 2015). "Rampal plant won't hamper environ". The New Nation. Retrieved 29 November 2015.
  17. ^ "Another Coal Barge Sinks in the Sundarbans World Heritage Site". EcoWatch. Waterkeeper Alliance. 17 January 2017. Retrieved 28 January 2017.
  18. ^ Hance, Jeremy (2 March 2016). "Thousands to march against coal plant threat to Bangladesh's Sundarbans forest". The Guardian. ISSN 0261-3077. Retrieved 27 January 2017.
  19. ^ "A new power plant could devastate the world's largest mangrove forest". Washington Post. Retrieved 27 January 2017.
  20. ^ a b . New Age (Editorial). Dhaka. 26 May 2013. Archived from the original on 4 March 2016.
  21. ^ a b Habib, Haroon (27 September 2013). "Bangladesh begins import of power from India". The Hindu.
  22. ^ "Govt to lay foundation stone Oct 22". The Daily Star. 26 September 2013.
  23. ^ . bdnews24.com. 18 June 2011. Archived from the original on 30 October 2012.
  24. ^ "US Exim bank urged to refrain from financing". The Daily Star. 29 June 2016.
  25. ^ "Rampal power plant to affect 40m people | The Asian Age Online, Bangladesh". The Asian Age. 5 October 2016. Retrieved 29 July 2018.
  26. ^ "Siddharth Sivakumar in conversation with Arnob". Tinpahar.
  27. ^ "Rampal Power Plant: Protest in India too". The Daily Star. 19 October 2016. Retrieved 27 January 2017.
  28. ^ "Stop building Rampal Power Plant so close to Sundarban: Al Gore to Sheikh Hasina | Foreign Relations | ABnews24". abnews24.com/english. Retrieved 28 January 2017.
  29. ^ "Anti-Rampal activists announce plans for more protests". bdnews24.com. Retrieved 27 January 2017.

External links edit

rampal, power, station, bengali, মপ, 1320, megawatt, coal, fired, power, station, currently, under, construction, rampal, upazila, bagerhat, district, khulna, bangladesh, power, plant, being, constructed, area, over, 1834, acres, land, situated, kilometres, no. The Rampal Power Station Bengali র মপ ল ব দ য ৎ ক ন দ র is a 1320 megawatt coal fired power station currently under construction at Rampal Upazila of Bagerhat District in Khulna Bangladesh 1 The power plant is being constructed on an area of over 1834 acres of land is situated 14 kilometres north of the world s largest mangrove forest Sundarbans which is a UNESCO World Heritage Site It will be the country s largest power plant 2 Rampal Power StationOfficial nameRampal Coal fire Power StationCountryBangladeshLocationSapmari Rampal Upazila of Bagerhat DistrictCoordinates22 35 44 N 89 33 15 E 22 595556 N 89 55402778 E 22 595556 89 55402778StatusUnder constructionConstruction beganJuly 2016Construction cost 160 billionOwner s National Thermal Power Corporation India and Bangladesh Power Development Board Bangladesh Thermal power stationPrimary fuelCoalSite area7 421 935 m21 834 000 acresPower generationNameplate capacity1320 MWExternal linksCommonsRelated media on Commons edit on Wikidata It is being set up by BIFPCL Bangladesh India Friendship Power Company Limited which is 50 50 joint venture between India s state owned National Thermal Power Corporation NTPC and Bangladesh s Bangladesh Power Development Board BPDB BIFCPL awarded an EPC contract to Bharat Heavy Electricals Limited BHEL valued at over US 1 49 billion for setting up of Maitree Super Thermal Power Project 2X660MW 3 BHEL has started EPC activities and the first dispatch happened in January 2018 4 Contents 1 Capacity 2 Agreements 3 Environmental issues 3 1 Government position 4 Opposition 5 See also 6 References 7 External linksCapacity editThe planned capacity of the power plant in 1320 MW 2x660 MW Unit 1 with capacity to generate 660MW is scheduled to be commissioned in Oct 22 5 Stage Unit Number Capacity MW Date of Commissioning Status1st 1 660 Oct 2022 Running 6 1st 2 660 Under progressAgreements editIn August 2010 a Memorandum of Understanding was signed between Bangladesh Power Development Board BPDB and India s state owned National Thermal Power Corporation NTPC where they designated to implement the project by 2016 7 On 29 January 2012 the Bangladesh Power Development Board signed an agreement with NTPC to build the plant 8 The joint venture company is known as Bangladesh India Friendship Power Company BIFPC 9 The BPDB and the NTPC agreed to implement the project on a 50 50 equity basis The NTPC will set up and operate the plant 10 Bangladesh and India will equally share up to 30 per cent of the capital of this project as equity The remainder of the capital which might be equivalent to US 1 5 billion will be taken as bank loans with help from the NTPC According to the sources in the Bangladesh Power Division the joint venture company will enjoy a 15 year tax holiday 11 Environmental issues editThis project violates the environmental impact assessment guidelines for coal based thermal power plants 12 A 2016 Unesco report called the Environmental Impact Assessment questionable and called for shelving the project 13 On 1 August 2013 Department of Environment DoE of Bangladesh approved construction but then changed its stance and set 50 preconditions for the project 14 But the location of the plant 14 kilometres from the Sundarbans violates one of the basic preconditions which says such projects must be outside a 25 kilometer radius from the outer periphery of an ecologically sensitive area 12 Environmental activists contend that the proposed location of the Rampal Station would violate provisions of the Ramsar Convention The Ramsar Convention to which Bangladesh is a signatory is an international environmental treaty for the conservation of wetlands The Sundarbans are on Ramsar s list of wetlands of international importance 15 16 The plant will need to import 4 72 million tons of coal per year This massive freight will need about 59 ships each having 80 000 ton capacity that would be taken to the port on the bank of the Poshur river The 40 kilometres from the port to the plant cuts through the Sundarbans and it includes the river flow path Environmentalists say these coal carrying vehicles are not often covered as they scatter large amounts of fly ash coal dust and sulphur and other toxic chemicals are released throughout the life of the project Carrying large amount of coal through the shallow rivers also pose a threat as five vessels with load of coal oil and potash sank in the nearby rivers from the time period of December 2014 to January 2017 17 The plant would draw 219 600 cubic metres of water every day 18 from the Poshur river and discharge treated waste water back into that river causing pollutants to be introduced into the water supply to the detriment of the mangroves the marine animals living there and nearby population 19 The predictions made by environment and ecology experts are that the plant will release toxic gases such as carbon monoxide oxides of nitrogen and sulphur dioxide thereby putting the surrounding areas and most importantly Sundarban at grave risk 20 According to a report published in New Age in past few years the Indian central and state authorities which deal with environmental concerns in India denied the proposal of NTPC to set up a similar coal fired thermal power plant at Gajmara in Gadarwara of Madhya Pradesh over a number of points NTPC failed to get approval of the Indian Central Green Panel Green Tribunal in 2010 for the construction of that coal fired thermal power plant because a vast portion of double crop agricultural land reportedly comprised the site a similar situation to Rampal 20 Government position edit The government of Bangladesh rejects the allegations that the coal based power plant would adversely affect the world s largest mangrove forest 21 Tawfiq e Elahi Chowdhury energy adviser of the Bangladeshi prime minister said that the controversy over the power plant and its impact on the Sundarbans was not based on facts He also said that the plant will not negatively affect the mangrove forest because the emission of green house gas will be kept at the minimum level The government also claimed of importing high quality coal build a 275 meter high chimney employing state of the art technology and other steps to keep its impact on the Sundarbans at a negligible level 22 Opposition editOn 1 March 2011 a bench of Bangladesh High Court asked the government why the construction of the plant should not be declared illegal 23 Environmental experts have expressed concerns that the proposed plant at Rampal in Bagerhat might destroy the world s largest mangrove forest Sundarbans a UNESCO world heritage site Faridul Islam chief coordinator of Save the Sundarbans pointed out that the selected location of the project was only nine kilometers from Sundarban About 2 5 million people depend on the Sundarban region such as wood cutters fishermen and honey hunters The National Committee on Protection of Oil Gas Mineral Resources and Power Port environmentalist groups bodies of the left leaning parties and general people of Bangladesh vowed to resist the planned inauguration of the Rampal Power Plant scheduled on 22 October 2013 21 On 24 September 2013 thousands of people in Bangladesh began a rally for 5 days and 400 kilometres to oppose the power plant Their march began in the capital city of Dhaka but slowly went to the world s largest mangrove forest Sundarban 12 As of 30 June 2016 with construction yet to begin UNESCO had scheduled a meeting for 11 July to decide whether to declare the Sundarbans a World Heritage Site in Danger its strongest possible signal to the two governments and to international lenders that the plant should not be built 24 Educationist Prof Anu Muhammad and politician Dr Manisha Chakraborty also opposed to Rampal power plant mentioning that 40 million people will be adversely affected by this power plant 25 In India too there has been some fragmented opposition of the power plant In his interview with Siddharth Sivakumar of the Indian cultural website Tinpahar Shayan Chowdhury Arnob said on this issue The Rampal Power Plant might become the biggest Power Plant but it would cost the world its largest mangrove forest the Sundarbans Sundarbans has its life in numerous intertwined organic chains When a chain is broken everything would fall apart one after the other Money has nothing to do with development or happiness it s about our attitude to life 26 In a press conference in New Delhi India social and civil society activists from Narmada Bachao Andolan s National Alliance of People s Movements wrote an open letter to Indian Prime Minister Narendra Modi on 18 October 2016 appealing to him to withdraw support for the plant saying that it might cause irreparable damage to the Sundarbans in Bangladesh 27 On 18 January 2017 in the 47th annual meeting of the World Economic Forum WEF in Davos of Switzerland former Vice President of the United States Al Gore has urged Prime Minister of Bangladesh Sheikh Hasina to stop building the coal powered plant close to the largest mangrove forest Sundarbans 28 At least 10 activists from various organisations have been admitted to Dhaka Medical College and Hospital when police used tear gas and rubber bullets to break up the Anti Rampal protests in the Dhaka University area on 26 January 2017 29 See also edit nbsp Bangladesh portal nbsp Energy portalElectricity sector in Bangladesh Environmental impact of development in the Sundarbans List of power stations in BangladeshReferences edit Indo Bangla joint company for power import The Independent Dhaka 8 March 2011 Archived from the original on 10 March 2011 Rahman Khalilur 24 February 2013 Demand for Rampal power plant relocation Financial Express Dhaka Archived from the original on 25 February 2013 Sengupta Debjoy Bhel bags NTPC s Bangladesh project The Economic Times Boiler components dispatched for BHEL s ovserseas project Times of India The Times of India Retrieved 6 February 2018 Commercial production at Rampal power plant likely to start in October Dhaka Tribune Rampal plant PM Hasina Modi to jointly announce completion of Unit I in September 30 August 2022 Ahsan Manjurul 14 May 2011 Experts denounce Bagerhat coal fired power plant plan New Age Dhaka Archived from the original on 2 February 2012 Final report on environmental impact assessment of 2x 500 660 MW coal based thermal power plant to be constructed at the location of Khulna India Environment Portal News reports documents blogs data analysis on environment amp development India South Asia indiaenvironmentportal org in Ritu Moshahida Sultana 11 June 2013 Who gains who loses The Daily Star Coal fired energy BD signs power plant deal with Delhi Pakistan Observer Power Division seeks 302m for Rampal plant The Independent Dhaka 8 August 2013 Archived from the original on 2 October 2013 a b c Kumar Chaitanya 24 September 2013 Bangladesh Power Plant Struggle Calls for International Solidarity The Huffington Post Iftekhar Mahmud 24 September 2016 Unesco calls for shelving Rampal project Prothom Alo Retrieved 13 October 2016 DoE changes stance on Rampal power plant The Financial Express 7 September 2013 The Roar of Disapproval Dhaka Courier 29 September 2013 Archived from the original on 20 February 2016 Retrieved 29 November 2015 via HighBeam Research Anisul Islam Noor 27 October 2015 Rampal plant won t hamper environ The New Nation Retrieved 29 November 2015 Another Coal Barge Sinks in the Sundarbans World Heritage Site EcoWatch Waterkeeper Alliance 17 January 2017 Retrieved 28 January 2017 Hance Jeremy 2 March 2016 Thousands to march against coal plant threat to Bangladesh s Sundarbans forest The Guardian ISSN 0261 3077 Retrieved 27 January 2017 A new power plant could devastate the world s largest mangrove forest Washington Post Retrieved 27 January 2017 a b More reasons to stop Rampal power plant New Age Editorial Dhaka 26 May 2013 Archived from the original on 4 March 2016 a b Habib Haroon 27 September 2013 Bangladesh begins import of power from India The Hindu Govt to lay foundation stone Oct 22 The Daily Star 26 September 2013 No coal run power plant in Bagerhat BNP bdnews24 com 18 June 2011 Archived from the original on 30 October 2012 US Exim bank urged to refrain from financing The Daily Star 29 June 2016 Rampal power plant to affect 40m people The Asian Age Online Bangladesh The Asian Age 5 October 2016 Retrieved 29 July 2018 Siddharth Sivakumar in conversation with Arnob Tinpahar Rampal Power Plant Protest in India too The Daily Star 19 October 2016 Retrieved 27 January 2017 Stop building Rampal Power Plant so close to Sundarban Al Gore to Sheikh Hasina Foreign Relations ABnews24 abnews24 com english Retrieved 28 January 2017 Anti Rampal activists announce plans for more protests bdnews24 com Retrieved 27 January 2017 External links edit Retrieved from https en wikipedia org w index php title Rampal Power Station amp oldid 1169160505, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.