fbpx
Wikipedia

MP 89

The MP 89 (French: Métro Pneu appel d'offres de 1989; English: Rubber-tyred metro ordered in 1989) is a rubber tired variant of electric multiple units used on the Paris Métro. Designed by Roger Tallon, two types are built by GEC-Alstom for service on Lines 4 and 14, and will soon enter service on Line 6. The trains on Line 1 were moved to Line 4 between 2011 and 2013 to replace the older MP 59s, though only 48 trains are used for revenue service. The remaining four trains are stored either at Montrouge or Saint Ouen as operational spares.

MP 89
MP 89 CA (left) and MP 89 CC (right) at Cité on Line 4.
Interior of MP 89 train
In service
  • CC: 27 March 1997–present
  • CA: 15 October 1998–present
ManufacturerGEC-Alsthom
Family nameMetropolis
ReplacedMP 59, MP 73
Constructed1992–2001
Number built
  • CC: 312 cars (52 trainsets)
  • CA: 126 cars (21 trainsets)
Formation
  • Line 4: 6 cars per trainset
  • Line 6: 5 cars per trainset
Capacity
  • CC: 720 passengers, 242 seats
  • CA: 722 passengers, 210 seats
OperatorsRATP
Lines served
Specifications
Car body constructionAluminium
Train length
  • 5-car sets: 75 m (246 ft 1 in)
  • 6-car sets: 90 m (295 ft 3 in)
Car length15 m (49 ft 3 in)
Width2.45 m (8 ft 0 in)
Height3.47 m (11 ft 5 in)
Doors3 pairs per side, per car
Maximum speed
  • CC: 70 km/h (43 mph)
  • CA: 80 km/h (50 mph)
Traction systemGEC-Alstom GTOVVVF
Traction motors3-phase AC induction motor type 4ELA 2848 C
Power output2,000 kW (2,700 hp)
TransmissionElastic coupling, gear wheel and reduction gear wheel into the wheels
Ratio : 9.113
Acceleration4.8 km/(h⋅s) (3.0 mph/s)
Deceleration6.4 km/(h⋅s) (4.0 mph/s) (emergency brake)[1]
Electric system(s)Guide bar750 V DC
Current collector(s)Contact shoes, side running on the vertical face of the guide bars
BogiesType CL449
Braking system(s)Electrodynamic, regenerative, disc,
Coupling systemScharfenberg type
Track gauge1,435 mm (4 ft 8+12 in) standard gauge, with running pads for the rubber tired wheels outside of the steel rails

Conception edit

 
An MP 89 CC train at Bastille - Line 1
 
An MP 89 CC train at Mairie de Montrouge on Line 4 prior to the installation of PSDs

In 1978, RATP possessed a large number of outdated Sprague-Thomson trains, many of which were rapidly approaching 60 and 70 years old. With the MF 77 trains in place along Lines 8, 9 and 13, most of the Sprague were replaced. However, there were still some trains in service along Line 9, which were approaching 80 years old. Those trains were finally retired in 1983, reducing the average age of rolling stock to 14 years. Anticipating further aging in its rolling stock, RATP changed its policy regarding replacement of rolling stock to avoid a massive, simultaneous replacement of all rolling stock.

September 28, 1990 marked the approval of the contract to manufacture the MP 89 trains by RATP for an order of 665 cars, with GEC- Alsthom being selected as the manufacturer. In 1994, a prototype MP 89 CA was built for testing at a facility on the Petite Ceinture (the name of this facility was BEPC, Base d'Essais de la Petite Ceinture), the former rail line that encircled Paris. A total of 52 trains for Line 1 and 21 trains for Line 14 were built, totaling 438 cars, fewer than the 665 cars mentioned in the contract. The first MP 89 CC trains went into service on Line 1 on March 27, 1997 and the MP 89 CA trains went into service on Line 14 on October 15, 1998.

The MP 89 class was developed initially when the need to replace the original rubber-tyred MP 55 cars of Line 11 was identified, and rolling stock was required for the new Line 14 as well as the anticipation of the extension of Line 1 into the La Défense business district. This was to be achieved by the construction of this new class of cars for Lines 1 and 14, with the cascading of refurbished MP 59 stock from Line 1 to lines 11 and 4. Two types were designed, the driverless MP 89 CA for the automated Line 14, and MP 89 CC for the then manually driven line 1. Both subclasses are visually similar except for the provision of a drivers cab in the outer end of the MP 89 CC cars.

Description edit

 
Bogie from an MP 89 Paris Métro rolling stock showing the two special wheelsets
Automated station announcements of the MP 89 CC as it arrives at station Marcadet-Poissonniers

The MP 89 contains many features that are equipped in both subclasses. These innovative features made the MP 89 the first of its kind on the Metro and allowed the RATP to continue to equip its lines with the modernized stock.

Among many features, the MP 89 is the first class of rolling stock to include the automatic opening and closing of doors. Instead of a passenger having to pull a lever or push a button to open the door in order to enter or exit the train, all of the doors on the platform side open and close automatically. This is due to the fact that the lines using this material are predominantly underground. This feature was carried on by the MF 2000 and MP 05 rolling stock.

The MP 89 is also equipped with an audio and visual automatic system (AVSA Annonces Visuelles et Sonnores Automatiques) which automatically detects the positioning of the station platform (whether the platform is on the left, or on the right side of the train). This detection allows the automatic opening of the train doors on the appropriate side of the platform. The system also allows for the operation of automated station announcements. Instead of the conductor having to utilize the intercom to announce station names, the automated system does this automatically. On curved stations, this system is especially vital due to the gap between the train and the curved platform. Automated messages announce the presence of the curves.

For example; if an MP 89 CC train approaches the curved station of Barbès – Rochechouart on Line 4, there will be an automated announcement of the station name "Barbès – Rochechouart" just prior to the train entering the station. As the train approaches the platform and begins to slow down, a second station name announcement "Barbès – Rochechouart" is made. In the case that a platform is curved, a third announcement is made in French, English, and a third language (usually Spanish, German, or Italian) that alerts passengers to "Please mind the gap between the train and platform". The MP 89 CA does not utilize "mind the gap" announcements at the present time because none of the platforms on Line 14 are curved.

Another new feature of the MP 89 is the interconnecting gangways in between cars, which was achieved with the prototype BOA and later the MF 88. This is described further in the next section, because the type of gangway equipped differs between the CC and CA versions. The gangways were subsequently improved and equipped the later MF 2000 and MP 05 stock trains. (from fr:MP 89).

Manually driven (CC) stock (Line 4 and 6) edit

 
MP 89CC #46 at the St. Ouen shops
 
MP 89CC #48 at Kléber station
Sound of the start of an MP89 CA outdoors (L14)
Sound of the arrival of an MP89 CA indoors (L14)
Sound of the complete journey (departure, full speed-80kph, and arrival), between St Lazare and Pont Cardinet in the Ca19, on line 14
 
Cabin of the MP 89CC

The MP 89 CC is manually controlled by the driver and originally circulated on Line 1 from their inception in 1997 until February, 2013, replacing the aging MP 59 during the course of 1997 and 2000. The first train (#01) was delivered to the RATP in 1995 and was originally without articulation. Interconnecting gangways would not be installed until the train went into passenger service in 1997. 52 6-car trains were ordered for Line 1.

From 2006 to 2007, an experimental program ran on selected train-sets on an LCD passenger information system (Dilidam). This system would later be adopted by the new MP 05 automated rolling stock that now operate on Line 1 (from fr:MP 89).

Besides the provision of a driver's cab on the CC version of the MP 89, another key difference between the CC and CA stock is the interconnecting gangways between trains. Most of the CC stock are equipped with reinforced gangways, which consists of solid interior panels. This was designed mainly due to fears that the curved platforms on Line 1 (such as Bastille), as well as storage of the trains within the tunnels, could cause significant damage to rubber gangways. However, some trains (#s 02, 08, 09, 13, 18, 51, and 52) have been fitted with rubber gangways since 2000, and six trains (#s 43, 45, 46, 48, 49, and 50) contain prototype gangways that were later implemented in the MF 01 stock (from fr:MP 89). In 2012, train #12 was retrofitted with the MF 01 type gangways upon transfer of the train to Line 4, and in March, 2014, train #01 was retrofitted.

Because Line 4 is a much curvier line compared to Line 1, there were also concerns that the interconnecting gangways would become damaged from excessive wear and tear caused by the curvature of the tracks and stations. It was originally planned that all of the MP 89 CC trains would be re-fitted with the same rubber gangways as the MP 05. However, after modifying the Line 4 tracks to better suit the MP 89, the plan was cancelled.[2]

Fully automated (CA) stock (Line 14) edit

 
Interior of the MP 89 CA on Line 14.

The MP 89 CA operates on the Line 14, and is best known for being fully automatic without the use of any driver or cab. Similar to the Metropolis counterparts operating on Singapore's North East and Circle lines, the trains ends offer passengers an unblocked view of the tracks ahead. They do however have full driving facilities located behind a locked cabinet, for use in case of emergency or when the automatic drive is not adequate. 19 6-car sets were initially ordered, with a further 2 sets delivered for the extension of Line 14 from Madeleine to Saint-Lazare. All of the MP 89CA stock on Line 14 are equipped with rubber gangways.

Transfer of (CC) stock to Line 4 edit

Beginning in April 2011, and lasting through March 2013, the MP 89 trainsets on Line 1 were gradually transferred over to Line 4. This cascading process was initiated by the full automation of Line 1, which brought on board a new class of fully automated rolling stock, the MP 05. This in-turn, allowed the aging MP 59 trainsets on Line 4 to be retired.

In April, 2011, the MP 89 CC #01 was moved to Line 4, as work to fully automate Line 1 was nearing completion. The transfer of these trains to Line 4 will allow RATP to retire the MP 59 stock, which are reaching the ends of their useful lives. After various internal components (such as the automated station announcements) were updated to accommodate service on Line 4, train #01 went into service on May 23, 2011. Until September, 2011, train #01 was the only MP 89CC train to operate on Line 4. On September 10, 2011, train #44 went into service, marking the second train to be transferred. As the new MP 05 rolling stock began to debut on Line 1 during November, 2011, more MP 89 stock was put into service, allowing the RATP to transfer two to three trains per month.

By December 21, 2012, Line 1 had reached 100% automation, though three MP 89 trains, #s 02, 46, and 50, continued to operate as supplemental trains during rush hour. As of February 21, 2013, the MP 89 are no longer used on Line 1 and the MP 05 trains are now fully controlled by the central command centre and train spacing (SAET) instead of the signaling system that guided the MP 89 trains.

As of June, 2013, all 52 trains have been transferred over to Line 4. However, only 48 trains are used for revenue service (just as the MP 59s were). The remaining four trains are stored at either the garage behind the Mairie de Montrouge station, or at the Saint Ouen workshop as operational spares.[3]

Formations edit

MP89 CC edit

    used trains in a 6-car formation (4M2T).

As of 13 January 2024, all six-car sets were left in Saint-Ouen Depot.

These trains stopped providing service on line 4 on December 15, 2023.

 
<-Pte de Clignancourt
Bagneux->
 
 
Car No. 1 2 3 4 5 6
Type T M M M M T
Designation 89 S xxx (even number) 89 N1 xxx (even number) 89 N2 xxx (even number) 82 N2 xxx (odd number) 89 N1 xxx (odd number) 89 S xxx (odd number)
equipement CP, SIV VVVF VVVF VVVF VVVF CP, SIV

    use trains in a 5-car formation (3M2T).

As of 29 November 2023, 12 five-car sets are allocated to Place d’Italie Depot for use on Line 6, as shown below.

 
<-Étoile
Nation->
 
 
Car No. 1 2 3 4 5
Type T M M M T
Designation 89 S xxx (even number) 89 N1 xxx (even number) 89 N2 xxx (even number) 82 N2 xxx (odd number) 89 S xxx (odd number)
equipement CP, SIV VVVF VVVF VVVF CP, SIV

The last set, which is six cars long, is unassigned.

MP89 CA edit

    use driverless trains in a 6-car formation (4M2T).

As of 04 May 2023, 21 six-car sets were allocated to St Ouen Depot for use on Line 4, as shown below.

 
<-Pte de Clignancourt
Bagneux->
 
 
Car No. 1 2 3 4 5 6
Type T M M M M T
Designation 89 S1 xxx (even number) 89 N1 xxx (even number) 89 N2 xxx (even number) 82 N2 xxx (odd number) 89 N1 xxx (odd number) 89 S1 xxx (odd number)
equipement CP, SIV VVVF VVVF VVVF VVVF CP, SIV

    use driverless trains in a 6-car formation (4M2T).

March 24, 2023 marks the last day of circulation of MP 89 CA on line 14, which loses its original rolling stock.

 
<-Saint-Ouen
Olympiades->
 
 
Car No. 1 2 3 4 5 6
Type T M M M M T
Designation 89 S1 xxx (even number) 89 N1 xxx (even number) 89 N2 xxx (even number) 82 N2 xxx (odd number) 89 N1 xxx (odd number) 89 S1 xxx (odd number)
equipement CP, SIV VVVF VVVF VVVF VVVF CP, SIV

Future transfers edit

New trains of the MP 14 series will replace the current fleet of Line 14, because of the extensions of the Grand Paris Express project. The current fleet of 21 MP 89 CA and 11 MP 05 trains will transfer to the newly-automated Line 4, where it will be joined by 20 MP 14 trains to meet the current peak vehicle requirements.

The 52 MP 89 CC trains that currently serve Line 4 would then be shortened from six to five cars, and transfer to Line 6 to replace the MP 73 trains.[4] Line 6 currently has 47 MP 73 trains, meaning that Île-de-France Mobilités would be able to immediately start refurbishment on five MP 89 CC trains when they are released from service.[5]

For the transfer from the     line to the    , there are several modifications to be made, such as:

  • Integrate the specific equipment kits predefined and supplied by the holder of the dedicated contract,
  • integrate RATP equipment, Octys (improved autopilot) and video protection systems,
  • replace all the seat upholstery
  • carry out all electronic and electrical transformation operations,
  • renovate the ceilings
  • carry out the installation of the IDFM logos and on-board signalisation
  • carry out functional tests (in progress for 4 trainset)

For the transfer only the technical modifications will be carried out. The aesthetic modifications and the modifications will be later. The RATP changing the 52 trainsets into 5 cars it will be able to carry out the renovation of 2 or 3 trains at a time without degrading the operation of the M6, reserves included. [6]

As of October, 2021, one 5-car trainset is being used to conduct overnight testing on the 6.

Other networks edit

The MP 89 CA has been operating on line M2 of the Lausanne Metro since 2008, with two-car trains instead of the six-car trains variant used in Paris (MP 89 TL).

The Santiago Metro uses a forked CC version named NS 93. These trains are essentially an upgraded version of the MP 89 trains, and operate in six and seven-car formations on the line 5 and eight-car formations on the line 1. The NS 93 is noticeably taller than the MP 89, to accommodate air conditioning.

Gallery edit

References edit

  1. ^ http://fbrisou.free.fr/RAIL21/FicheMP89.pdf [bare URL PDF]
  2. ^ M4 : Prolongement & arrivée du MP89 (French)
  3. ^ M4 : Prolongement & arrivée du MP89 (French)
  4. ^ (PDF). Île-de-France Mobilités (in French). Paris: Île-de-France Mobilités. 21 December 2018. Archived from the original (PDF) on 8 March 2019. Retrieved 8 March 2019.
  5. ^ (PDF). Recueil des actes administratifs du STIF (in French) (113). Paris: 40–43. 26 August 2016. Archived from the original (PDF) on 26 October 2018. Retrieved 26 October 2018.
  6. ^ "Services - 29503-2020 - TED Tenders Electronic Daily".

External links edit

  •   Media related to MP 89 at Wikimedia Commons
  • TRUCK (bogie)

help, expand, this, article, with, text, translated, from, corresponding, article, french, october, 2020, click, show, important, translation, instructions, machine, translation, like, deepl, google, translate, useful, starting, point, translations, translator. You can help expand this article with text translated from the corresponding article in French October 2020 Click show for important translation instructions Machine translation like DeepL or Google Translate is a useful starting point for translations but translators must revise errors as necessary and confirm that the translation is accurate rather than simply copy pasting machine translated text into the English Wikipedia Do not translate text that appears unreliable or low quality If possible verify the text with references provided in the foreign language article You must provide copyright attribution in the edit summary accompanying your translation by providing an interlanguage link to the source of your translation A model attribution edit summary is Content in this edit is translated from the existing French Wikipedia article at fr MP 89 see its history for attribution You should also add the template Translated fr MP 89 to the talk page For more guidance see Wikipedia Translation The MP 89 French Metro Pneu appel d offres de 1989 English Rubber tyred metro ordered in 1989 is a rubber tired variant of electric multiple units used on the Paris Metro Designed by Roger Tallon two types are built by GEC Alstom for service on Lines 4 and 14 and will soon enter service on Line 6 The trains on Line 1 were moved to Line 4 between 2011 and 2013 to replace the older MP 59s though only 48 trains are used for revenue service The remaining four trains are stored either at Montrouge or Saint Ouen as operational spares MP 89MP 89 CA left and MP 89 CC right at Cite on Line 4 Interior of MP 89 trainIn serviceCC 27 March 1997 presentCA 15 October 1998 presentManufacturerGEC AlsthomFamily nameMetropolisReplacedMP 59 MP 73Constructed1992 2001Number builtCC 312 cars 52 trainsets CA 126 cars 21 trainsets FormationLine 4 6 cars per trainsetLine 6 5 cars per trainsetCapacityCC 720 passengers 242 seatsCA 722 passengers 210 seatsOperatorsRATPLines served SpecificationsCar body constructionAluminiumTrain length5 car sets 75 m 246 ft 1 in 6 car sets 90 m 295 ft 3 in Car length15 m 49 ft 3 in Width2 45 m 8 ft 0 in Height3 47 m 11 ft 5 in Doors3 pairs per side per carMaximum speedCC 70 km h 43 mph CA 80 km h 50 mph Traction systemGEC Alstom GTO VVVFTraction motors3 phase AC induction motor type 4ELA 2848 CPower output2 000 kW 2 700 hp TransmissionElastic coupling gear wheel and reduction gear wheel into the wheelsRatio 9 113Acceleration4 8 km h s 3 0 mph s Deceleration6 4 km h s 4 0 mph s emergency brake 1 Electric system s Guide bar 750 V DCCurrent collector s Contact shoes side running on the vertical face of the guide barsBogiesType CL449Braking system s Electrodynamic regenerative disc Coupling systemScharfenberg typeTrack gauge1 435 mm 4 ft 8 1 2 in standard gauge with running pads for the rubber tired wheels outside of the steel rails Contents 1 Conception 2 Description 2 1 Manually driven CC stock Line 4 and 6 2 2 Fully automated CA stock Line 14 3 Transfer of CC stock to Line 4 4 Formations 4 1 MP89 CC 4 2 MP89 CA 5 Future transfers 6 Other networks 7 Gallery 8 References 9 External linksConception editThis section does not cite any sources Please help improve this section by adding citations to reliable sources Unsourced material may be challenged and removed March 2024 Learn how and when to remove this template message nbsp An MP 89 CC train at Bastille Line 1 nbsp An MP 89 CC train at Mairie de Montrouge on Line 4 prior to the installation of PSDsIn 1978 RATP possessed a large number of outdated Sprague Thomson trains many of which were rapidly approaching 60 and 70 years old With the MF 77 trains in place along Lines 8 9 and 13 most of the Sprague were replaced However there were still some trains in service along Line 9 which were approaching 80 years old Those trains were finally retired in 1983 reducing the average age of rolling stock to 14 years Anticipating further aging in its rolling stock RATP changed its policy regarding replacement of rolling stock to avoid a massive simultaneous replacement of all rolling stock September 28 1990 marked the approval of the contract to manufacture the MP 89 trains by RATP for an order of 665 cars with GEC Alsthom being selected as the manufacturer In 1994 a prototype MP 89 CA was built for testing at a facility on the Petite Ceinture the name of this facility was BEPC Base d Essais de la Petite Ceinture the former rail line that encircled Paris A total of 52 trains for Line 1 and 21 trains for Line 14 were built totaling 438 cars fewer than the 665 cars mentioned in the contract The first MP 89 CC trains went into service on Line 1 on March 27 1997 and the MP 89 CA trains went into service on Line 14 on October 15 1998 The MP 89 class was developed initially when the need to replace the original rubber tyred MP 55 cars of Line 11 was identified and rolling stock was required for the new Line 14 as well as the anticipation of the extension of Line 1 into the La Defense business district This was to be achieved by the construction of this new class of cars for Lines 1 and 14 with the cascading of refurbished MP 59 stock from Line 1 to lines 11 and 4 Two types were designed the driverless MP 89 CA for the automated Line 14 and MP 89 CC for the then manually driven line 1 Both subclasses are visually similar except for the provision of a drivers cab in the outer end of the MP 89 CC cars Description edit nbsp Bogie from an MP 89 Paris Metro rolling stock showing the two special wheelsets source source Automated station announcements of the MP 89 CC as it arrives at station Marcadet PoissonniersThe MP 89 contains many features that are equipped in both subclasses These innovative features made the MP 89 the first of its kind on the Metro and allowed the RATP to continue to equip its lines with the modernized stock Among many features the MP 89 is the first class of rolling stock to include the automatic opening and closing of doors Instead of a passenger having to pull a lever or push a button to open the door in order to enter or exit the train all of the doors on the platform side open and close automatically This is due to the fact that the lines using this material are predominantly underground This feature was carried on by the MF 2000 and MP 05 rolling stock The MP 89 is also equipped with an audio and visual automatic system AVSA Annonces Visuelles et Sonnores Automatiques which automatically detects the positioning of the station platform whether the platform is on the left or on the right side of the train This detection allows the automatic opening of the train doors on the appropriate side of the platform The system also allows for the operation of automated station announcements Instead of the conductor having to utilize the intercom to announce station names the automated system does this automatically On curved stations this system is especially vital due to the gap between the train and the curved platform Automated messages announce the presence of the curves For example if an MP 89 CC train approaches the curved station of Barbes Rochechouart on Line 4 there will be an automated announcement of the station name Barbes Rochechouart just prior to the train entering the station As the train approaches the platform and begins to slow down a second station name announcement Barbes Rochechouart is made In the case that a platform is curved a third announcement is made in French English and a third language usually Spanish German or Italian that alerts passengers to Please mind the gap between the train and platform The MP 89 CA does not utilize mind the gap announcements at the present time because none of the platforms on Line 14 are curved Another new feature of the MP 89 is the interconnecting gangways in between cars which was achieved with the prototype BOA and later the MF 88 This is described further in the next section because the type of gangway equipped differs between the CC and CA versions The gangways were subsequently improved and equipped the later MF 2000 and MP 05 stock trains from fr MP 89 Manually driven CC stock Line 4 and 6 edit nbsp MP 89CC 46 at the St Ouen shops nbsp MP 89CC 48 at Kleber station source source Sound of the start of an MP89 CA outdoors L14 source source Sound of the arrival of an MP89 CA indoors L14 source source Sound of the complete journey departure full speed 80kph and arrival between St Lazare and Pont Cardinet in the Ca19 on line 14 nbsp Cabin of the MP 89CCThe MP 89 CC is manually controlled by the driver and originally circulated on Line 1 from their inception in 1997 until February 2013 replacing the aging MP 59 during the course of 1997 and 2000 The first train 01 was delivered to the RATP in 1995 and was originally without articulation Interconnecting gangways would not be installed until the train went into passenger service in 1997 52 6 car trains were ordered for Line 1 From 2006 to 2007 an experimental program ran on selected train sets on an LCD passenger information system Dilidam This system would later be adopted by the new MP 05 automated rolling stock that now operate on Line 1 from fr MP 89 Besides the provision of a driver s cab on the CC version of the MP 89 another key difference between the CC and CA stock is the interconnecting gangways between trains Most of the CC stock are equipped with reinforced gangways which consists of solid interior panels This was designed mainly due to fears that the curved platforms on Line 1 such as Bastille as well as storage of the trains within the tunnels could cause significant damage to rubber gangways However some trains s 02 08 09 13 18 51 and 52 have been fitted with rubber gangways since 2000 and six trains s 43 45 46 48 49 and 50 contain prototype gangways that were later implemented in the MF 01 stock from fr MP 89 In 2012 train 12 was retrofitted with the MF 01 type gangways upon transfer of the train to Line 4 and in March 2014 train 01 was retrofitted Because Line 4 is a much curvier line compared to Line 1 there were also concerns that the interconnecting gangways would become damaged from excessive wear and tear caused by the curvature of the tracks and stations It was originally planned that all of the MP 89 CC trains would be re fitted with the same rubber gangways as the MP 05 However after modifying the Line 4 tracks to better suit the MP 89 the plan was cancelled 2 Fully automated CA stock Line 14 edit This section does not cite any sources Please help improve this section by adding citations to reliable sources Unsourced material may be challenged and removed March 2024 Learn how and when to remove this template message nbsp Interior of the MP 89 CA on Line 14 The MP 89 CA operates on the Line 14 and is best known for being fully automatic without the use of any driver or cab Similar to the Metropolis counterparts operating on Singapore s North East and Circle lines the trains ends offer passengers an unblocked view of the tracks ahead They do however have full driving facilities located behind a locked cabinet for use in case of emergency or when the automatic drive is not adequate 19 6 car sets were initially ordered with a further 2 sets delivered for the extension of Line 14 from Madeleine to Saint Lazare All of the MP 89CA stock on Line 14 are equipped with rubber gangways Transfer of CC stock to Line 4 editBeginning in April 2011 and lasting through March 2013 the MP 89 trainsets on Line 1 were gradually transferred over to Line 4 This cascading process was initiated by the full automation of Line 1 which brought on board a new class of fully automated rolling stock the MP 05 This in turn allowed the aging MP 59 trainsets on Line 4 to be retired In April 2011 the MP 89 CC 01 was moved to Line 4 as work to fully automate Line 1 was nearing completion The transfer of these trains to Line 4 will allow RATP to retire the MP 59 stock which are reaching the ends of their useful lives After various internal components such as the automated station announcements were updated to accommodate service on Line 4 train 01 went into service on May 23 2011 Until September 2011 train 01 was the only MP 89CC train to operate on Line 4 On September 10 2011 train 44 went into service marking the second train to be transferred As the new MP 05 rolling stock began to debut on Line 1 during November 2011 more MP 89 stock was put into service allowing the RATP to transfer two to three trains per month By December 21 2012 Line 1 had reached 100 automation though three MP 89 trains s 02 46 and 50 continued to operate as supplemental trains during rush hour As of February 21 2013 the MP 89 are no longer used on Line 1 and the MP 05 trains are now fully controlled by the central command centre and train spacing SAET instead of the signaling system that guided the MP 89 trains As of June 2013 all 52 trains have been transferred over to Line 4 However only 48 trains are used for revenue service just as the MP 59s were The remaining four trains are stored at either the garage behind the Mairie de Montrouge station or at the Saint Ouen workshop as operational spares 3 Formations editMP89 CC edit nbsp nbsp used trains in a 6 car formation 4M2T As of 13 January 2024 all six car sets were left in Saint Ouen Depot These trains stopped providing service on line 4 on December 15 2023 lt Pte de ClignancourtBagneux gt Car No 1 2 3 4 5 6Type T M M M M TDesignation 89 S xxx even number 89 N1 xxx even number 89 N2 xxx even number 82 N2 xxx odd number 89 N1 xxx odd number 89 S xxx odd number equipement CP SIV VVVF VVVF VVVF VVVF CP SIV nbsp nbsp use trains in a 5 car formation 3M2T As of 29 November 2023 12 five car sets are allocated to Place d Italie Depot for use on Line 6 as shown below lt EtoileNation gt Car No 1 2 3 4 5Type T M M M TDesignation 89 S xxx even number 89 N1 xxx even number 89 N2 xxx even number 82 N2 xxx odd number 89 S xxx odd number equipement CP SIV VVVF VVVF VVVF CP SIVThe last set which is six cars long is unassigned MP89 CA edit nbsp nbsp use driverless trains in a 6 car formation 4M2T As of 04 May 2023 21 six car sets were allocated to St Ouen Depot for use on Line 4 as shown below lt Pte de ClignancourtBagneux gt Car No 1 2 3 4 5 6Type T M M M M TDesignation 89 S1 xxx even number 89 N1 xxx even number 89 N2 xxx even number 82 N2 xxx odd number 89 N1 xxx odd number 89 S1 xxx odd number equipement CP SIV VVVF VVVF VVVF VVVF CP SIV nbsp nbsp use driverless trains in a 6 car formation 4M2T March 24 2023 marks the last day of circulation of MP 89 CA on line 14 which loses its original rolling stock lt Saint OuenOlympiades gt Car No 1 2 3 4 5 6Type T M M M M TDesignation 89 S1 xxx even number 89 N1 xxx even number 89 N2 xxx even number 82 N2 xxx odd number 89 N1 xxx odd number 89 S1 xxx odd number equipement CP SIV VVVF VVVF VVVF VVVF CP SIVFuture transfers editNew trains of the MP 14 series will replace the current fleet of Line 14 because of the extensions of the Grand Paris Express project The current fleet of 21 MP 89 CA and 11 MP 05 trains will transfer to the newly automated Line 4 where it will be joined by 20 MP 14 trains to meet the current peak vehicle requirements The 52 MP 89 CC trains that currently serve Line 4 would then be shortened from six to five cars and transfer to Line 6 to replace the MP 73 trains 4 Line 6 currently has 47 MP 73 trains meaning that Ile de France Mobilites would be able to immediately start refurbishment on five MP 89 CC trains when they are released from service 5 For the transfer from the nbsp nbsp line to the nbsp nbsp there are several modifications to be made such as Integrate the specific equipment kits predefined and supplied by the holder of the dedicated contract integrate RATP equipment Octys improved autopilot and video protection systems replace all the seat upholstery carry out all electronic and electrical transformation operations renovate the ceilings carry out the installation of the IDFM logos and on board signalisation carry out functional tests in progress for 4 trainset For the transfer only the technical modifications will be carried out The aesthetic modifications and the modifications will be later The RATP changing the 52 trainsets into 5 cars it will be able to carry out the renovation of 2 or 3 trains at a time without degrading the operation of the M6 reserves included 6 As of October 2021 one 5 car trainset is being used to conduct overnight testing on the 6 Other networks editThis section does not cite any sources Please help improve this section by adding citations to reliable sources Unsourced material may be challenged and removed March 2024 Learn how and when to remove this template message The MP 89 CA has been operating on line M2 of the Lausanne Metro since 2008 with two car trains instead of the six car trains variant used in Paris MP 89 TL The Santiago Metro uses a forked CC version named NS 93 These trains are essentially an upgraded version of the MP 89 trains and operate in six and seven car formations on the line 5 and eight car formations on the line 1 The NS 93 is noticeably taller than the MP 89 to accommodate air conditioning Gallery edit nbsp Wikimedia Commons has media related to MP 89 nbsp MP 89 CA on Line 14 2019 nbsp Interior nbsp MP 89 CC on Line 1 2009 nbsp MP 89 CC at Bastille station 2008 References edit http fbrisou free fr RAIL21 FicheMP89 pdf bare URL PDF M4 Prolongement amp arrivee du MP89 French M4 Prolongement amp arrivee du MP89 French Le metro avec vue entierement revu PDF Ile de France Mobilites in French Paris Ile de France Mobilites 21 December 2018 Archived from the original PDF on 8 March 2019 Retrieved 8 March 2019 Conseil du 13 juillet 2016 PDF Recueil des actes administratifs du STIF in French 113 Paris 40 43 26 August 2016 Archived from the original PDF on 26 October 2018 Retrieved 26 October 2018 Services 29503 2020 TED Tenders Electronic Daily External links edit nbsp Media related to MP 89 at Wikimedia Commons TRUCK bogie Retrieved from https en wikipedia org w index php title MP 89 amp oldid 1215160808, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.