Line 5 (São Paulo Metro)

Line 5 (Lilac) (Portuguese: Linha 5–Lilás) is one of the six lines that make up the São Paulo Metro and one of the 13 lines that make up the Metropolitan Rail Transportation Network. The line transports about 600,000 people every business day, and since August 2018 it is operated by the private company ViaMobilidade.[2]

São Paulo Subway Line 5 (Lilac)
Overview
StatusOperational
Owner Government of the State of São Paulo
LocaleSão Paulo, Brazil
Termini
Connecting lines
Stations17 operational
2 in project
Websitewww.viamobilidade.com.br
Service
TypeRapid transit
SystemSão Paulo Metro
Operator(s) ViaMobilidade (CCR)
Depot(s)Capão Redondo rail yard
Guido Caloi rail yard
Rolling stock
History
Commenced1998
OpenedOctober 20, 2002
Last extensionSeptember 28, 2018
Technical
Line length19.9 km (12.4 mi)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge[1]
Electrification1,500 V DC catenary
Operating speed80 km/h (50 mph)
SignallingBombardier CITYFLO 650 CBTC
Route map

Jardim Ângela
Comendador Sant'Anna
In project
Capão Redondo rail yard
Capão Redondo
Campo Limpo
Vila das Belezas
Giovanni Gronchi
Guido Caloi rail yard
Pinheiros River
Marginal Pinheiros
Santo Amaro
Largo Treze
Adolfo Pinheiro
Alto da Boa Vista
Borba Gato
Brooklin
Água Espraiada Brook
Av. Jornalista Roberto Marinho
Campo Belo
Eucaliptos
Moema
Bicicletas train park
AACD–Servidor
Hospital São Paulo
Santa Cruz
Chácara Klabin

The southern section of the line, between Largo Treze and Capão Redondo was completed in 2002 and was envisioned as a railway line of the CPTM called Line G. The project was transferred to the São Paulo Metro and renamed to Line 5 - Lilac. A northern extension connecting it with the rest of the São Paulo Metro network started construction 2009 with a completion deadline of 2013.[3] The project stalled due to issues with property acquisition and restarted in 2011.[4] The completion deadline of the extension has been delayed several times, but it has been reached on 8 April 2019.[5]

Identification placard at Capão Redondo station
Alstom train in Line 5

Stations Edit

Operational Edit

There are currently 17 operational stations on the Capão Redondo ↔ Chácara Klabin stretch:

Code Station Platforms Position Connections District
TBA Jardim Ângela TBA Underground   Jardim Ângela Bus Terminal Capão Redondo
Comendador Sant'Anna Elevated -
CPR Capão Redondo Side platforms -
CPL Campo Limpo   Campo Limpo Bus Terminal Campo Limpo
VBE Vila das Belezas - Vila Andrade
GGR Giovanni Gronchi   João Dias Bus Terminal
STA Santo Amaro     Santo Amaro
LTR Largo Treze Underground   Santo Amaro Bus Terminal
APN Adolfo Pinheiro -
ABV Alto da Boa Vista Island platform -
BGA Borba Gato -
BRK Brooklin   Diadema–Morumbi Metropolitan Corridor Campo Belo
CPB Campo Belo     (Future)
ECT Eucaliptos Side platforms - Moema
MOE Moema    20  (Planned)
SER AACD–Servidor -
HSP Hospital São Paulo - Vila Mariana
SCZ Santa Cruz    
  Santa Cruz Bus Terminal
CKL Chácara Klabin    

Extensions from Chácara Klabin station to Ipiranga and from Capão Redondo to Jardim Ângela are planned.[6]

Technical specifications Edit

The line operates with 25 trains (out of 26 available)[7] and is made-up by 17 stations, transporting about 600,000 people every business day.[2] Eight additional trains are expected to be added to the line in 2020, after CBTC installation and other enhancements are completed.[8]

It was the first line in the Sao Paulo Metro to utilize a 1500 V tension Catenary, Standard Gauge, beside trains with IGBT power conversion and 1.60 m (5 ft 3 in) wide doors.[9] Santo Amaro station was the first in Brazil to be built on a cable-stayed bridge.[10]

During the 11.5 km (7.1 mi) extension between Largo Treze and Chacara Klabin stations, three TBMs were used and 26 CAF trains were added to the line in addition to the eight Alstom trains originally available.[11]

Gallery Edit

References Edit

  1. ^ Ferreira, Robert; Tharcisiu Alves. (January 2012). "São Paulo Metro". nycsubway.org. Archived from the original on February 2, 2014. Retrieved February 2, 2014. On Lines 1, 2 and 3, the track gauge is a non-standard 1600 mm, the third rail is 750 V DC and under running. For Lines 4 and 5, the track gauge is 1435 mm and they use overhead pantograph, precluding any connection to the rest of the system, plus the 4 and 5 lines can't connect because the trains on the 4 line use drive-less technology while trains on 5 line are OPTO. Lines 7, 8, 9, 10, 11 and 12 (operated by CPTM) are all 1600 mm and use overhead pantograph.
  2. ^ a b "Linha 5-Lilás do Metrô teve aumento de quase 90% no fluxo de usuários desde agosto". June 6, 2019.
  3. ^ "Linha 5 do metrô de São Paulo atrasa e fica para o próximo governo". Folha de S.Paulo. Retrieved June 5, 2017.
  4. ^ "Governador dá início às obras de expansão da Linha 5-Lilás e vistoria a construção da estação Adolfo Pinheiro". diariodacptm.blogspot.ca. Retrieved June 5, 2017.
  5. ^ "SP inaugura estação Campo Belo da Linha 5-Lilás do Metrô nesta segunda-feira" (in Portuguese). G1. April 8, 2019. Retrieved April 8, 2019.
  6. ^ "Linha 5 Lilás recebe licença ambiental da extensão até o Jardim Ângela". January 24, 2019.
  7. ^ "Perguntas Frequentes". www.viamobilidade.com.br. Retrieved August 13, 2020.
  8. ^ "Metrô espera concluir atualização da antiga frota F da Linha 5 ainda neste semestre". March 28, 2019.
  9. ^ "CPTM recebe o primeiro trem da futura Linha 5 do Metrô de São Paulo". February 12, 2002.
  10. ^ "Linha 5 do Metrô passa a funcionar aos domingos e feriados". August 8, 2008.
  11. ^ "Arquitetura, Construção e Engenharia | Portal AECweb".

line, são, paulo, metro, line, lilac, portuguese, linha, lilás, lines, that, make, são, paulo, metro, lines, that, make, metropolitan, rail, transportation, network, line, transports, about, people, every, business, since, august, 2018, operated, private, comp. Line 5 Lilac Portuguese Linha 5 Lilas is one of the six lines that make up the Sao Paulo Metro and one of the 13 lines that make up the Metropolitan Rail Transportation Network The line transports about 600 000 people every business day and since August 2018 it is operated by the private company ViaMobilidade 2 Sao Paulo Subway Line 5 Lilac Santo Amaro StationOverviewStatusOperationalOwnerGovernment of the State of Sao PauloLocaleSao Paulo BrazilTerminiCapao RedondoChacara KlabinConnecting linesStations17 operational2 in projectWebsitewww wbr viamobilidade wbr com wbr brServiceTypeRapid transitSystemSao Paulo MetroOperator s ViaMobilidade CCR Depot s Capao Redondo rail yardGuido Caloi rail yardRolling stock48 Alstom CAF Siemens F stock 8 trains 156 CAF P stock 26 trains HistoryCommenced1998OpenedOctober 20 2002Last extensionSeptember 28 2018TechnicalLine length19 9 km 12 4 mi Track gauge1 435 mm 4 ft 8 1 2 in standard gauge 1 Electrification1 500 V DC catenaryOperating speed80 km h 50 mph SignallingBombardier CITYFLO 650 CBTCRoute mapLegendJardim AngelaComendador Sant AnnaIn projectCapao Redondo rail yardCapao RedondoCampo LimpoVila das BelezasGiovanni GronchiGuido Caloi rail yardPinheiros RiverMarginal PinheirosSanto AmaroLargo TrezeAdolfo PinheiroAlto da Boa VistaBorba GatoBrooklinAgua Espraiada BrookAv Jornalista Roberto MarinhoCampo BeloEucaliptosMoemaBicicletas train parkAACD ServidorHospital Sao Pauloto JabaquaraSanta Cruzto Tucuruvito Vila MadalenaChacara Klabinto Vila PrudenteThe southern section of the line between Largo Treze and Capao Redondo was completed in 2002 and was envisioned as a railway line of the CPTM called Line G The project was transferred to the Sao Paulo Metro and renamed to Line 5 Lilac A northern extension connecting it with the rest of the Sao Paulo Metro network started construction 2009 with a completion deadline of 2013 3 The project stalled due to issues with property acquisition and restarted in 2011 4 The completion deadline of the extension has been delayed several times but it has been reached on 8 April 2019 5 Identification placard at Capao Redondo stationAlstom train in Line 5Contents 1 Stations 1 1 Operational 2 Technical specifications 3 Gallery 4 ReferencesStations EditOperational Edit There are currently 17 operational stations on the Capao Redondo Chacara Klabin stretch Code Station Platforms Position Connections DistrictTBA Jardim Angela TBA Underground nbsp Jardim Angela Bus Terminal Capao RedondoComendador Sant Anna Elevated CPR Capao Redondo Side platforms CPL Campo Limpo nbsp Campo Limpo Bus Terminal Campo LimpoVBE Vila das Belezas Vila AndradeGGR Giovanni Gronchi nbsp Joao Dias Bus TerminalSTA Santo Amaro nbsp nbsp Santo AmaroLTR Largo Treze Underground nbsp Santo Amaro Bus TerminalAPN Adolfo Pinheiro ABV Alto da Boa Vista Island platform BGA Borba Gato BRK Brooklin nbsp Diadema Morumbi Metropolitan Corridor Campo BeloCPB Campo Belo nbsp nbsp Future ECT Eucaliptos Side platforms MoemaMOE Moema nbsp 20 Planned SER AACD Servidor HSP Hospital Sao Paulo Vila MarianaSCZ Santa Cruz nbsp nbsp nbsp Santa Cruz Bus TerminalCKL Chacara Klabin nbsp nbsp Extensions from Chacara Klabin station to Ipiranga and from Capao Redondo to Jardim Angela are planned 6 Technical specifications EditThe line operates with 25 trains out of 26 available 7 and is made up by 17 stations transporting about 600 000 people every business day 2 Eight additional trains are expected to be added to the line in 2020 after CBTC installation and other enhancements are completed 8 It was the first line in the Sao Paulo Metro to utilize a 1500 V tension Catenary Standard Gauge beside trains with IGBT power conversion and 1 60 m 5 ft 3 in wide doors 9 Santo Amaro station was the first in Brazil to be built on a cable stayed bridge 10 During the 11 5 km 7 1 mi extension between Largo Treze and Chacara Klabin stations three TBMs were used and 26 CAF trains were added to the line in addition to the eight Alstom trains originally available 11 Gallery Edit nbsp Moema Station opened in 2018 nbsp Moema Station opened in 2018 nbsp Moema Station opened in 2018 nbsp Adolfo Pinheiro Station opened in 2014 nbsp Eucaliptos Station opened in 2018 nbsp Train from P stock before redesign by ViaMobilidade nbsp Train from P stock before redesign by ViaMobilidade nbsp Elevated section of Line 5 Lilac opened in 2002 nbsp Santo Amaro Station opened in 2002 nbsp Santo Amaro Station opened in 2002 nbsp Santo Amaro Station opened in 2002References Edit Ferreira Robert Tharcisiu Alves January 2012 Sao Paulo Metro nycsubway org Archived from the original on February 2 2014 Retrieved February 2 2014 On Lines 1 2 and 3 the track gauge is a non standard 1600 mm the third rail is 750 V DC and under running For Lines 4 and 5 the track gauge is 1435 mm and they use overhead pantograph precluding any connection to the rest of the system plus the 4 and 5 lines can t connect because the trains on the 4 line use drive less technology while trains on 5 line are OPTO Lines 7 8 9 10 11 and 12 operated by CPTM are all 1600 mm and use overhead pantograph a b Linha 5 Lilas do Metro teve aumento de quase 90 no fluxo de usuarios desde agosto June 6 2019 Linha 5 do metro de Sao Paulo atrasa e fica para o proximo governo Folha de S Paulo Retrieved June 5 2017 Governador da inicio as obras de expansao da Linha 5 Lilas e vistoria a construcao da estacao Adolfo Pinheiro diariodacptm blogspot ca Retrieved June 5 2017 SP inaugura estacao Campo Belo da Linha 5 Lilas do Metro nesta segunda feira in Portuguese G1 April 8 2019 Retrieved April 8 2019 Linha 5 Lilas recebe licenca ambiental da extensao ate o Jardim Angela January 24 2019 Perguntas Frequentes www viamobilidade com br Retrieved August 13 2020 Metro espera concluir atualizacao da antiga frota F da Linha 5 ainda neste semestre March 28 2019 CPTM recebe o primeiro trem da futura Linha 5 do Metro de Sao Paulo February 12 2002 Linha 5 do Metro passa a funcionar aos domingos e feriados August 8 2008 Arquitetura Construcao e Engenharia Portal AECweb Retrieved from https en wikipedia org w index php title Line 5 Sao Paulo Metro amp oldid 1168523082, wikipedia, wiki, book, books, library,