Noida International Airport (IATA: DXN, ICAO: VIND), also known as Jewar Airport,[3][4][5][6] is an upcoming international airport being constructed near Jewar in Gautam Buddha Nagar District, Uttar Pradesh in India, which will serve the National Capital Region (NCR).[7] The airport is situated in the new planned YEIDA city.[8]

Noida International Airport
Summary
Airport typePublic
OwnerNoida International Airport Limited (NIAL)
OperatorYamuna International Airport Private Limited (YIAPL)
(an SPE of Zurich Airport AG)
ServesNational Capital Region (NCR)
LocationJewar, Gautam Buddha Nagar District, Uttar Pradesh, India[1]
Opened30 September 2024; 5 months' time (2024-09-30) (expected)[2]
Coordinates28°10′12″N 077°36′36″E / 28.17000°N 77.61000°E / 28.17000; 77.61000
Websiteniairport.in
Map
DXN/VIND
Location of the airport in Uttar Pradesh
DXN/VIND
DXN/VIND (India)

Once completed, it will be an alternative to Indira Gandhi International Airport in Delhi by relieving its high and rising traffic load, and is planned to be India's and Asia's largest airport. The Noida International Airport Limited (NIAL) will be the implementing agency on behalf of the Government of Uttar Pradesh. The airport is to be developed through a public-private partnership model (PPP). In 2019, Flughafen Zürich AG, the operator of Zurich Airport in Switzerland won the bid to build and operate the airport for 40 years.[9]

The National Highways Authority of India (NHAI) is also constructing a 31-kilometre long (19 mi) greenfield highway from the airport to Sector-65, Faridabad on Delhi–Mumbai Expressway. The proposed plan in Jewar is to build a two-runway airport by 2024, and at a future date, to expand it into a 7,200 acres (2,900 ha) eight-runway airport.[10] According to the plan, the airport will handle 1.2 crore (12 million) passengers per annum initially and up to 6-12 crore passengers per annum, after its expansion over a period of 30 years. It will be the third commercial airport in the National Capital Region, after Indira Gandhi International Airport and Hindon Airport.

History edit

The project was first proposed in 2001 by then Uttar Pradesh Chief Minister Rajnath Singh as a greenfield Taj International Aviation Hub (TIAH)[11] at Jewar near Greater Noida, adjacent to the Yamuna Expressway.[12] The Central Government cleared the techno-feasibility report for setting up TIAH in April 2003. It was to be built at an approximate cost of 5000 crores by the year 2007–2008. The project was put on hold during the UPA regime because the project site was within 150 km (93 mi) of an existing greenfield airport in Delhi.[13] This site was within 72 km (45 mi) of Indira Gandhi International Airport (IGI), Delhi. Its operator GMR Group had protested against plans for another international airport within 150 km (93 mi) of the existing Delhi Airport, claiming that it would impact traffic and revenue generation. GMR has the right of first refusal (RoFR) on a new airport within 150 km (93 mi) of the existing Delhi Airport. The RoFR was to ensure that GMR gets preference in bidding for the Greater Noida airport in case its bid price is within 10% of the lowest bidder.[citation needed]

When the Akhilesh Yadav-led government was formed in Uttar Pradesh in 2012, it contemplated shelving the project while proposing a new international airport in Agra. In June 2013, the State Government decided on the Kurrikupa village near Hirangaon, Tundla in the Firozabad district as the site for the proposed airport.[14][15] In January 2014, the Defence Ministry raised some objections regarding the site near Tundla.[16] The state government allocated land near Etmadpur for the proposed airport in November 2014.[17]

In 2014, the Bharatiya Janata Party (BJP) was voted to power at the federal level and the project was again shifted back to Jewar.[18] [11] The Civil Aviation Ministry cleared the proposal for the new airport to be set up on 2,200 acres (890 ha) of land in June 2015.[19] In July 2017, the Union Chief Secretary for Aviation warned the Uttar Pradesh government to expedite the planning process as Hisar Airport was also pushing for its competing Union Cabinet approval for building another airport to serve the NCR region, thus prolonging the return on investment for both airports due to a still-feasible-but-diluted viability for both.[20] The Ministry of Civil Aviation (MoCA) gave an in-principle approval to the Uttar Pradesh government to build the airport in May 2018.[21] Prime Minister Narendra Modi laid the foundation stone on 25 November 2021.[22]

Location edit

The Noida International Airport (NIA) is located around 7 km (4.3 mi) north of Jewar Town in Gautam Buddh Nagar district of Uttar Pradesh in India. Noida, Dadri, and Jewar are the three tehsils (sub-divisions) in this district. In October 2017, for the first phase of building the airport, the Yamuna Expressway Industrial Development Authority (YEIDA) acquired land in villages such as Mukimpur Siwara, Dayanat Pur, Ramner, Kishorpur, Banwari Bas, Ranhera, Rohi, and Parohi.[23] Similarly in January 2021, YEIDA started taking possession of land for the phase-2 expansion in villages such as Ranhera, Shahpur Nangla, Birampur, Karauli Bangar, and Dayanat Pur (Jewar Tehsil).[24]

The project site is located 72 kilometres (45 mi) from Indira Gandhi International Airport (IGI), the airport that currently serves the needs of the entire Delhi NCR and is quickly reaching its peak capacity.[25] Jewar Airport is 36 km (22 mi) from Bulandshahr, 38 km (24 mi) from Palwal, 60 km (37 mi) from Noida and 70 km (43 mi) from Faridabad, Ghaziabad, and Mathura. It is about 40 km (25 mi) from Pari Chowk in Greater Noida, 65 km (40 mi) from Aligarh, 65 km (40 mi) from Gurgaon and 130 km (81 mi) from Agra. It will be connected to the Yamuna Expressway, allowing domestic and international tourists to reach Agra, Mathura, and Vrindavan.[26]

Connectivity edit

Alternate airports nearby edit

Under the National Capital Region Transport Plan, the Hisar International Airport[27] (190 km Northwest of IGI & 270 km Northwest of Noida International Airport)[28] is being developed as an alternate to the IGI Airport.

Road edit

The Noida International Airport (NIA) shall be connected with various highways in Delhi NCR like GhaziabadBulandshahrAligarh (NH-34) and Delhi–Ghaziabad–Meerut Expressway.

The NHAI is also constructing a 31-kilometre long (19 mi) highway which will connect Jewar Airport with Faridabad on Delhi–Mumbai Expressway.[29] The greenfield alignment is as follows (east to west):

Railway edit

Metro trains edit

  • Personal rapid transit (PRT) from amusement park to Noida International Airport is included in the proposed film city project, located in Greater Noida's Sector 21 to the airport.[32]

Semi-High Speed Railway edit

  • "Ghaziabad-Jewar RRTS", 71.1 km long rapid rail with 11 stations costing ₹16,000 cr, will be completed in 2 phases by 2031.[33]

  • "Palwal-Noida International Airport-Khurja Railway" (PNAKR line), 61 km long line will have a new railway station at Noida airport which will be connected to Palwal 28 km to west on New Delhi-Mumbai main line and Khurja 33 km to east on Howrah–Delhi main line (Amritsar-Kolkata line).[34]

  • "Noida International Airport-Chola Railway", 20 long line will connect multi logistics have at Noida airport to existing chola railway station to west on "Howrah–Delhi main line".[34]

High-Speed Railway edit

Construction edit

The project was first proposed in 2001 by the then Chief Minister of Uttar Pradesh, Rajnath Singh, as Taj International Aviation Hub (TIAH) in Jewar. However, in 2012 the project was shelved by the then Chief Minister of Uttar Pradesh, Akhilesh Yadav as he planned to build a new airport near Tundla, Firozabad District. The project was revived in 2018 by the BJP government,[37] with allocation of ₹ 1,260 crores for land acquisition,[38] to build the airport under the Public–Private Partnership (PPP) model.[39][40] In 2019, the land acquisition for the phase-1 commenced,[41][42][43][44] which completed in 2020,[45][46] Flughafen Zürich AG (Zurich Airport AG) was given the contract for developing and operating the airport for 40 years,[47][48] and the tender for 760 m (2,490 ft) road connecting the airport to the Yamuna Expressway was awarded.[49] In 2021, after Airports Authority of India (AAI) approved the master plan for the airport,[50][51] Prime Minister Narendra Modi laid the foundation stone on 25 November,[52] and Zurich Aurport AG started the construction.[53][54] In 2022, Tata Projects Limited was awarded the civil construction contract.[55][56] In 2023, the airport was awarded the airport code "DXN" by the International Air Transport Association (IATA).[6]

Ecological threats edit

India's environmental ministry had imposed certain conditions for granting approval for the Noida airport, conditions imposed regarding the protection of Dhanauri Wetlands remain ignored by the Uttar Pradesh government and no action has been taken to designate it as Ramsar Site, it's land has been allocated by YEIDA for construction resulting in the reduction of the wetland area, and it is under the threat.[57]

Current status edit

  • Aug 2022: The airport will be completed for testing in March 2024, and will become operational for traffic in October 2024.[60]
  • Oct 2023: More than 50% of work has been completed on the airport.[61]

See also edit

References edit

  1. ^ "UP govt revives Jewar airport project, survey to start today". Daily News Analysis. Retrieved 14 May 2017.
  2. ^ "Noida International Airport: Greater Noida's Jewar Airport opening date revealed, luxury hotel, metro to be built". News. 16 January 2023. Retrieved 17 January 2023.
  3. ^ "Uttar Pradesh CM Yogi Adityanath approves name, design, and logo of Jewar airport". The Times of India. 17 December 2020. Retrieved 17 December 2020.
  4. ^ "Jewar airport to be called Noida International Greenfield Airport: Key features". India Today. 17 December 2020. Retrieved 17 December 2020.
  5. ^ "6 runways, electronic city & more! UP govt makes Rs 2000 crore provision in the budget for Jewar airport expansion". The Financial Express. 23 February 2021. Retrieved 2 March 2021.
  6. ^ a b Sharma, Anu (27 September 2023). "Noida International Airport of Jewar launches DXN as IATA code". Mint. Retrieved 27 September 2023.
  7. ^ "Jewar international airport: Inauguration of Jewar airport by end of December: Nandi". The Times of India. 31 October 2018. Retrieved 7 December 2019.
  8. ^ Rajput, Vinod (9 October 2023). "Yeida expedites land acquisition for Noida airport's MRO hub". Hindustan Times. Retrieved 19 November 2023.
  9. ^ "New Greenfield Noida International Airport at Jewar picking momentum- Progress Report". Press Information Bureau. 3 April 2018. Retrieved 11 May 2018.
  10. ^ Sinha, Meenakshi. "With six runways, Jewar set to be India's largest airport". The Economic Times. Retrieved 2 December 2021.
  11. ^ a b "Noida: Three governments, countless proposals later, Jewar finally to get airport". Hindustan Times. 24 June 2017. Retrieved 10 May 2018.
  12. ^ . Greater Noida Authority. Archived from the original on 19 December 2011.
  13. ^ "Greater Noida's Jewar airport awaits nod from civil aviation ministry". The Times of India. 8 April 2017. Retrieved 10 May 2018.
  14. ^ Umesh Raghuvanshi (21 June 2013). . Hindustan Times. Archived from the original on 2 April 2015. Retrieved 29 July 2015.
  15. ^ "Hindustan Times e-Paper". paper.hindustantimes.com.
  16. ^ "Taj international airport project hits MoD hurdle". The Indian Express. 11 January 2014. Retrieved 11 April 2021.
  17. ^ "Land given for international airport near Agra: Akhilesh Yadav". Zee News. 8 November 2014. Retrieved 11 April 2021.
  18. ^ "Jewar Bazar: Jewar's Local Search Engine".
  19. ^ Srivastava, Anvit (26 June 2015). "Jewar to take wing as ministry clears second NCR airport". The Times of India. Retrieved 11 April 2021.
  20. ^ "Aviation Secy Tells UP To Form Jewar Airport SPV, Yamuna Authority's Hands Full". Moneycontrol. 10 July 2017. Retrieved 11 April 2021.
  21. ^ "Noida International Airport project to be completed by 2022". Business Today. 9 May 2018. Retrieved 11 May 2018.
  22. ^ "On Tractors, Bikes And Cars, Thousands Turn Up For Noida Airport's Inauguration". NDTV. PTI. 25 November 2021. Retrieved 28 March 2024.
  23. ^ Keelor, Vandana (31 October 2017). "Eight villages marked for land acquisition in Jewar". The Times of India. Retrieved 6 August 2022.
  24. ^ "UP set to take over seven villages for third Jewar airport runway". The Times of India. 30 January 2021. Retrieved 6 August 2022.
  25. ^ "Explained: Why Delhi-NCR's second airport in Jewar town is significant". The Indian Express. 21 January 2020. Retrieved 23 July 2020.
  26. ^ "Greater Noida Airport foundation stone to be laid by Oct: Govt". The Times of India. 3 April 2018. Retrieved 11 May 2018.
  27. ^ "International airport at Hisar, Haryana to give breather to IGI airport in Delhi? See what CM said". Zee Business. IANS. 29 October 2019. Retrieved 17 December 2023.
  28. ^ "New Greenfield Noida International Airport at Jewar picking momentum- Progress Report". Press Information Bureau. 3 April 2018. Retrieved 11 May 2018.
  29. ^ "Delhi-Mumbai expressway will be linked to Jewar airport". The Times of India. 8 July 2022. Retrieved 6 August 2022.
  30. ^ Rajput, Vinod (3 September 2021). "Metro corridor to link Capital, Jewar airport". Hindustan Times. Retrieved 17 December 2023.
  31. ^ Shalabh (9 April 2021). "Greater Noida to Jewar airport in less than 25 minutes? DMRC to ready plan". The Times of India. Retrieved 7 September 2021.
  32. ^ "Driverless pod car between Jewar airport & amusement park in Film City: Plan details". The Times of India. 7 September 2021. Retrieved 7 September 2021.
  33. ^ सिंह, धीरेंद्र (6 December 2023). "71.1 किमी, 11 स्टेशन, गाजियाबाद से एयरपोर्ट वाया कासना कैसे जाएगी रैपिड रेल, समझिए पूरा रूट". Navbharat Times (in Hindi). Retrieved 8 December 2023.
  34. ^ a b Arora, Nitin (7 December 2023). "Noida International Airport: नोएडा एयरपोर्ट को लेकर नया अपडेट, जेवर को इन दो रेलवे स्टेशनों से जोड़ा जाएगा". Zee News Hindi (in Hindi). Retrieved 8 December 2023.
  35. ^ "Haryana CM Khattar greenlights rail link between IGI & Hisar airport". Hindustan Times. 12 April 2023. Retrieved 17 December 2023.
  36. ^ Bhandari, Shashwat (11 November 2020). "Delhi Varanasi bullet train station Jewar Airport Noida international greenfield airport". India TV News. Retrieved 7 September 2021.
  37. ^ Sinha, Meenakshi (9 December 2018). "10-member government panel to be part of Jewar airport agency". The Times of India. Retrieved 26 January 2021.
  38. ^ "UP Government Approves Rs 1,260 Crore For Jewar Airport Land Acquisition". NDTV.com. 23 November 2018. Retrieved 26 January 2021.
  39. ^ "Jewar airport to be built on public-private-partnership mode". NewsroomPost. 9 December 2018. Retrieved 26 January 2021.
  40. ^ Alam, Shafaque (29 December 2018). "Rehab plan of landlosers for Jewar airport ready". The Times of India. Retrieved 26 January 2021.
  41. ^ Alam, Shafaque (12 January 2019). "Land acquisition for Jewar airport to start by January-end". The Times of India. Retrieved 26 January 2021.
  42. ^ Prasad, Nikita (28 February 2019). "Jewar International Airport: How UP government is clearing land acquisition hurdles". The Financial Express. Retrieved 9 March 2019.
  43. ^ "पीएम आज आ रहे हैं ग्रेटर नोएडा, जानिए- क्यों नहीं करेंगे जेवर एयरपोर्ट का शिलान्यास". Dainik Jagran (in Hindi). 9 March 2019. Retrieved 9 March 2019.
  44. ^ "Admin takes over 57% land needed for Jewar airport project". Hindustan Times. 5 September 2019. Retrieved 6 September 2019.
  45. ^ "Land For Jewar Airport Phase One Acquired After Villagers Clash With Officials". NDTV.com. 28 January 2020. Retrieved 29 January 2020.
  46. ^ "Jewar Airport's land acquisition done, some farmers protest". Times Now News. 29 January 2020. Retrieved 29 January 2020.
  47. ^ "Zurich Airports win bid to build, operate Jewar airport for 40 years". The Economic Times. 29 November 2019. Retrieved 29 November 2019.
  48. ^ "UP, Zurich set to sign final Jewar airport deal on October 7". The Times of India. 30 September 2020. Retrieved 30 September 2020.
  49. ^ "Greater Noida: Yeida to build the road to link Jewar airport site with Yamuna Expressway". Hindustan Times. 30 May 2020. Retrieved 30 May 2020.
  50. ^ Sinha, Snehil (10 February 2021). "AAI reviews Jewar airport plan, gives nod". The Times of India. Retrieved 10 February 2021.
  51. ^ "After Centre, NIAL Board approves Noida International Airport master plan". Business Standard India. Press Trust of India. 13 August 2021. Retrieved 5 September 2021.
  52. ^ "Noida International Airport live updates: PM Modi lays foundation stone for Jewar Airport". The Times of India. Retrieved 25 November 2021.
  53. ^ "Noida: Construction work begins at international airport site in Jewar". Hindustan Times. 23 August 2021. Retrieved 5 September 2021.
  54. ^ "Why is Yogi pushing for more airports in UP?". India Today. Retrieved 5 September 2021.
  55. ^ "tata projects: Tata Projects bags contract to build Noida International Airport". The Times of India. 4 June 2022. Retrieved 5 June 2022.
  56. ^ Mukul, Prabnav (3 June 2022). "Tata Projects to construct Noida International Airport". The Indian Express. Retrieved 5 June 2022.
  57. ^ 15 km from Denver airport a wetland awaits protection, Indian Express, 5 February 2024.
  58. ^ "Tender opens for e-way to link Faridabad, Jewar airport". Tribune. 31 July 2022. Retrieved 6 August 2022.
  59. ^ मिश्र, दिनेश; ऐश्वर्य कुमार, राय (31 July 2022). "Noida Airport: 2 साल में दिल्ली-मुंबई एक्सप्रेसवे से जुड़ेगा जेवर एयरपोर्ट, 6 लेन पर खर्च होंगे 16.5 अरब, NHAI ने निकाला टेंडर". Navbharat Times (in Hindi). Retrieved 6 August 2022.
  60. ^ "Jewar airport to be ready by Oct 2024". Hindustan Times. 4 August 2022. Retrieved 6 August 2022.
  61. ^ Mishra, Dheeraj (1 October 2023). "Upcoming Noida Airport in Jewar over halfway mark: Here are the details of the mega project". The Indian Express. Retrieved 1 October 2023.

External links edit

  • Project status as on 9-April-2008
  • Project status as on 8-May-2009
  • Project status as on 27-Dec-2009
  • Project status as on 02-Mar-2010

noida, international, airport, iata, icao, vind, also, known, jewar, airport, upcoming, international, airport, being, constructed, near, jewar, gautam, buddha, nagar, district, uttar, pradesh, india, which, will, serve, national, capital, region, airport, sit. Noida International Airport IATA DXN ICAO VIND also known as Jewar Airport 3 4 5 6 is an upcoming international airport being constructed near Jewar in Gautam Buddha Nagar District Uttar Pradesh in India which will serve the National Capital Region NCR 7 The airport is situated in the new planned YEIDA city 8 Noida International AirportIATA DXNICAO VINDSummaryAirport typePublicOwnerNoida International Airport Limited NIAL OperatorYamuna International Airport Private Limited YIAPL an SPE of Zurich Airport AG ServesNational Capital Region NCR LocationJewar Gautam Buddha Nagar District Uttar Pradesh India 1 Opened30 September 2024 5 months time 2024 09 30 expected 2 Coordinates28 10 12 N 077 36 36 E 28 17000 N 77 61000 E 28 17000 77 61000Websiteniairport wbr inMapDXN VINDLocation of the airport in Uttar PradeshShow map of Uttar PradeshDXN VINDDXN VIND India Show map of India Once completed it will be an alternative to Indira Gandhi International Airport in Delhi by relieving its high and rising traffic load and is planned to be India s and Asia s largest airport The Noida International Airport Limited NIAL will be the implementing agency on behalf of the Government of Uttar Pradesh The airport is to be developed through a public private partnership model PPP In 2019 Flughafen Zurich AG the operator of Zurich Airport in Switzerland won the bid to build and operate the airport for 40 years 9 The National Highways Authority of India NHAI is also constructing a 31 kilometre long 19 mi greenfield highway from the airport to Sector 65 Faridabad on Delhi Mumbai Expressway The proposed plan in Jewar is to build a two runway airport by 2024 and at a future date to expand it into a 7 200 acres 2 900 ha eight runway airport 10 According to the plan the airport will handle 1 2 crore 12 million passengers per annum initially and up to 6 12 crore passengers per annum after its expansion over a period of 30 years It will be the third commercial airport in the National Capital Region after Indira Gandhi International Airport and Hindon Airport Contents 1 History 2 Location 3 Connectivity 3 1 Alternate airports nearby 3 2 Road 3 3 Railway 3 3 1 Metro trains 3 3 2 Semi High Speed Railway 3 3 3 High Speed Railway 4 Construction 5 Ecological threats 6 Current status 7 See also 8 References 9 External linksHistory editThe project was first proposed in 2001 by then Uttar Pradesh Chief Minister Rajnath Singh as a greenfield Taj International Aviation Hub TIAH 11 at Jewar near Greater Noida adjacent to the Yamuna Expressway 12 The Central Government cleared the techno feasibility report for setting up TIAH in April 2003 It was to be built at an approximate cost of 5000 crores by the year 2007 2008 The project was put on hold during the UPA regime because the project site was within 150 km 93 mi of an existing greenfield airport in Delhi 13 This site was within 72 km 45 mi of Indira Gandhi International Airport IGI Delhi Its operator GMR Group had protested against plans for another international airport within 150 km 93 mi of the existing Delhi Airport claiming that it would impact traffic and revenue generation GMR has the right of first refusal RoFR on a new airport within 150 km 93 mi of the existing Delhi Airport The RoFR was to ensure that GMR gets preference in bidding for the Greater Noida airport in case its bid price is within 10 of the lowest bidder citation needed When the Akhilesh Yadav led government was formed in Uttar Pradesh in 2012 it contemplated shelving the project while proposing a new international airport in Agra In June 2013 the State Government decided on the Kurrikupa village near Hirangaon Tundla in the Firozabad district as the site for the proposed airport 14 15 In January 2014 the Defence Ministry raised some objections regarding the site near Tundla 16 The state government allocated land near Etmadpur for the proposed airport in November 2014 17 In 2014 the Bharatiya Janata Party BJP was voted to power at the federal level and the project was again shifted back to Jewar 18 11 The Civil Aviation Ministry cleared the proposal for the new airport to be set up on 2 200 acres 890 ha of land in June 2015 19 In July 2017 the Union Chief Secretary for Aviation warned the Uttar Pradesh government to expedite the planning process as Hisar Airport was also pushing for its competing Union Cabinet approval for building another airport to serve the NCR region thus prolonging the return on investment for both airports due to a still feasible but diluted viability for both 20 The Ministry of Civil Aviation MoCA gave an in principle approval to the Uttar Pradesh government to build the airport in May 2018 21 Prime Minister Narendra Modi laid the foundation stone on 25 November 2021 22 Location editThe Noida International Airport NIA is located around 7 km 4 3 mi north of Jewar Town in Gautam Buddh Nagar district of Uttar Pradesh in India Noida Dadri and Jewar are the three tehsils sub divisions in this district In October 2017 for the first phase of building the airport the Yamuna Expressway Industrial Development Authority YEIDA acquired land in villages such as Mukimpur Siwara Dayanat Pur Ramner Kishorpur Banwari Bas Ranhera Rohi and Parohi 23 Similarly in January 2021 YEIDA started taking possession of land for the phase 2 expansion in villages such as Ranhera Shahpur Nangla Birampur Karauli Bangar and Dayanat Pur Jewar Tehsil 24 The project site is located 72 kilometres 45 mi from Indira Gandhi International Airport IGI the airport that currently serves the needs of the entire Delhi NCR and is quickly reaching its peak capacity 25 Jewar Airport is 36 km 22 mi from Bulandshahr 38 km 24 mi from Palwal 60 km 37 mi from Noida and 70 km 43 mi from Faridabad Ghaziabad and Mathura It is about 40 km 25 mi from Pari Chowk in Greater Noida 65 km 40 mi from Aligarh 65 km 40 mi from Gurgaon and 130 km 81 mi from Agra It will be connected to the Yamuna Expressway allowing domestic and international tourists to reach Agra Mathura and Vrindavan 26 Connectivity editAlternate airports nearby edit Under the National Capital Region Transport Plan the Hisar International Airport 27 190 km Northwest of IGI amp 270 km Northwest of Noida International Airport 28 is being developed as an alternate to the IGI Airport Road edit The Noida International Airport NIA shall be connected with various highways in Delhi NCR like Ghaziabad Bulandshahr Aligarh NH 34 and Delhi Ghaziabad Meerut Expressway The NHAI is also constructing a 31 kilometre long 19 mi highway which will connect Jewar Airport with Faridabad on Delhi Mumbai Expressway 29 The greenfield alignment is as follows east to west Yamuna Expressway at Dayanat Pur village Jewar KGP Expressway at Mohna village Ballabhgarh Delhi Mumbai Expressway at Sector 65 Faridabad Railway edit Metro trains edit Noida International Airport is also proposed to be connected to Noida Metro via the Greater Noida route and the Delhi Metro via the Faridabad Ballabhgarh Palwal Jewar route 30 31 Personal rapid transit PRT from amusement park to Noida International Airport is included in the proposed film city project located in Greater Noida s Sector 21 to the airport 32 Semi High Speed Railway edit Ghaziabad Jewar RRTS 71 1 km long rapid rail with 11 stations costing 16 000 cr will be completed in 2 phases by 2031 33 Palwal Noida International Airport Khurja Railway PNAKR line 61 km long line will have a new railway station at Noida airport which will be connected to Palwal 28 km to west on New Delhi Mumbai main line and Khurja 33 km to east on Howrah Delhi main line Amritsar Kolkata line 34 Hisar Airport Noida International Airport Railway line HANAR Line From PNAK line at Palwal the Noida Airport will be directly connected with IGI via Haryana Orbital Rail Corridor HORC and Delhi Jaipur line and Hisar Airport via HORC and Hisar International Airport IGI Airport line HIAIGI Line through Jhajjar Rohtak Hansi Hisar 35 Noida International Airport Chola Railway 20 long line will connect multi logistics have at Noida airport to existing chola railway station to west on Howrah Delhi main line 34 High Speed Railway edit High Speed Railway HSR station in the proposed Delhi Varanasi HSR corridor included in India s High Speed Rail project 36 Construction editThe project was first proposed in 2001 by the then Chief Minister of Uttar Pradesh Rajnath Singh as Taj International Aviation Hub TIAH in Jewar However in 2012 the project was shelved by the then Chief Minister of Uttar Pradesh Akhilesh Yadav as he planned to build a new airport near Tundla Firozabad District The project was revived in 2018 by the BJP government 37 with allocation of 1 260 crores for land acquisition 38 to build the airport under the Public Private Partnership PPP model 39 40 In 2019 the land acquisition for the phase 1 commenced 41 42 43 44 which completed in 2020 45 46 Flughafen Zurich AG Zurich Airport AG was given the contract for developing and operating the airport for 40 years 47 48 and the tender for 760 m 2 490 ft road connecting the airport to the Yamuna Expressway was awarded 49 In 2021 after Airports Authority of India AAI approved the master plan for the airport 50 51 Prime Minister Narendra Modi laid the foundation stone on 25 November 52 and Zurich Aurport AG started the construction 53 54 In 2022 Tata Projects Limited was awarded the civil construction contract 55 56 In 2023 the airport was awarded the airport code DXN by the International Air Transport Association IATA 6 Ecological threats editIndia s environmental ministry had imposed certain conditions for granting approval for the Noida airport conditions imposed regarding the protection of Dhanauri Wetlands remain ignored by the Uttar Pradesh government and no action has been taken to designate it as Ramsar Site it s land has been allocated by YEIDA for construction resulting in the reduction of the wetland area and it is under the threat 57 Current status editJul 2022 Tender for Faridabad Noida Airport Expressway 31 km 19 mi long spur from Sector 65 Faridabad on Delhi Mumbai Expressway to the airport s site was awarded by the National Highways Authority of India NHAI 58 59 Aug 2022 The airport will be completed for testing in March 2024 and will become operational for traffic in October 2024 60 Oct 2023 More than 50 of work has been completed on the airport 61 See also editList of airports in IndiaReferences edit UP govt revives Jewar airport project survey to start today Daily News Analysis Retrieved 14 May 2017 Noida International Airport Greater Noida s Jewar Airport opening date revealed luxury hotel metro to be built News 16 January 2023 Retrieved 17 January 2023 Uttar Pradesh CM Yogi Adityanath approves name design and logo of Jewar airport The Times of India 17 December 2020 Retrieved 17 December 2020 Jewar airport to be called Noida International Greenfield Airport Key features India Today 17 December 2020 Retrieved 17 December 2020 6 runways electronic city amp more UP govt makes Rs 2000 crore provision in the budget for Jewar airport expansion The Financial Express 23 February 2021 Retrieved 2 March 2021 a b Sharma Anu 27 September 2023 Noida International Airport of Jewar launches DXN as IATA code Mint Retrieved 27 September 2023 Jewar international airport Inauguration of Jewar airport by end of December Nandi The Times of India 31 October 2018 Retrieved 7 December 2019 Rajput Vinod 9 October 2023 Yeida expedites land acquisition for Noida airport s MRO hub Hindustan Times Retrieved 19 November 2023 New Greenfield Noida International Airport at Jewar picking momentum Progress Report Press Information Bureau 3 April 2018 Retrieved 11 May 2018 Sinha Meenakshi With six runways Jewar set to be India s largest airport The Economic Times Retrieved 2 December 2021 a b Noida Three governments countless proposals later Jewar finally to get airport Hindustan Times 24 June 2017 Retrieved 10 May 2018 New initiatives Greater Noida Authority Archived from the original on 19 December 2011 Greater Noida s Jewar airport awaits nod from civil aviation ministry The Times of India 8 April 2017 Retrieved 10 May 2018 Umesh Raghuvanshi 21 June 2013 UP to seek DGCA nod for Taj airport Hindustan Times Archived from the original on 2 April 2015 Retrieved 29 July 2015 Hindustan Times e Paper paper hindustantimes com Taj international airport project hits MoD hurdle The Indian Express 11 January 2014 Retrieved 11 April 2021 Land given for international airport near Agra Akhilesh Yadav Zee News 8 November 2014 Retrieved 11 April 2021 Jewar Bazar Jewar s Local Search Engine Srivastava Anvit 26 June 2015 Jewar to take wing as ministry clears second NCR airport The Times of India Retrieved 11 April 2021 Aviation Secy Tells UP To Form Jewar Airport SPV Yamuna Authority s Hands Full Moneycontrol 10 July 2017 Retrieved 11 April 2021 Noida International Airport project to be completed by 2022 Business Today 9 May 2018 Retrieved 11 May 2018 On Tractors Bikes And Cars Thousands Turn Up For Noida Airport s Inauguration NDTV PTI 25 November 2021 Retrieved 28 March 2024 Keelor Vandana 31 October 2017 Eight villages marked for land acquisition in Jewar The Times of India Retrieved 6 August 2022 UP set to take over seven villages for third Jewar airport runway The Times of India 30 January 2021 Retrieved 6 August 2022 Explained Why Delhi NCR s second airport in Jewar town is significant The Indian Express 21 January 2020 Retrieved 23 July 2020 Greater Noida Airport foundation stone to be laid by Oct Govt The Times of India 3 April 2018 Retrieved 11 May 2018 International airport at Hisar Haryana to give breather to IGI airport in Delhi See what CM said Zee Business IANS 29 October 2019 Retrieved 17 December 2023 New Greenfield Noida International Airport at Jewar picking momentum Progress Report Press Information Bureau 3 April 2018 Retrieved 11 May 2018 Delhi Mumbai expressway will be linked to Jewar airport The Times of India 8 July 2022 Retrieved 6 August 2022 Rajput Vinod 3 September 2021 Metro corridor to link Capital Jewar airport Hindustan Times Retrieved 17 December 2023 Shalabh 9 April 2021 Greater Noida to Jewar airport in less than 25 minutes DMRC to ready plan The Times of India Retrieved 7 September 2021 Driverless pod car between Jewar airport amp amusement park in Film City Plan details The Times of India 7 September 2021 Retrieved 7 September 2021 स ह ध र द र 6 December 2023 71 1 क म 11 स ट शन ग ज य ब द स एयरप र ट व य क सन क स ज एग र प ड र ल समझ ए प र र ट Navbharat Times in Hindi Retrieved 8 December 2023 a b Arora Nitin 7 December 2023 Noida International Airport न एड एयरप र ट क ल कर नय अपड ट ज वर क इन द र लव स ट शन स ज ड ज एग Zee News Hindi in Hindi Retrieved 8 December 2023 Haryana CM Khattar greenlights rail link between IGI amp Hisar airport Hindustan Times 12 April 2023 Retrieved 17 December 2023 Bhandari Shashwat 11 November 2020 Delhi Varanasi bullet train station Jewar Airport Noida international greenfield airport India TV News Retrieved 7 September 2021 Sinha Meenakshi 9 December 2018 10 member government panel to be part of Jewar airport agency The Times of India Retrieved 26 January 2021 UP Government Approves Rs 1 260 Crore For Jewar Airport Land Acquisition NDTV com 23 November 2018 Retrieved 26 January 2021 Jewar airport to be built on public private partnership mode NewsroomPost 9 December 2018 Retrieved 26 January 2021 Alam Shafaque 29 December 2018 Rehab plan of landlosers for Jewar airport ready The Times of India Retrieved 26 January 2021 Alam Shafaque 12 January 2019 Land acquisition for Jewar airport to start by January end The Times of India Retrieved 26 January 2021 Prasad Nikita 28 February 2019 Jewar International Airport How UP government is clearing land acquisition hurdles The Financial Express Retrieved 9 March 2019 प एम आज आ रह ह ग र टर न एड ज न ए क य नह कर ग ज वर एयरप र ट क श ल न य स Dainik Jagran in Hindi 9 March 2019 Retrieved 9 March 2019 Admin takes over 57 land needed for Jewar airport project Hindustan Times 5 September 2019 Retrieved 6 September 2019 Land For Jewar Airport Phase One Acquired After Villagers Clash With Officials NDTV com 28 January 2020 Retrieved 29 January 2020 Jewar Airport s land acquisition done some farmers protest Times Now News 29 January 2020 Retrieved 29 January 2020 Zurich Airports win bid to build operate Jewar airport for 40 years The Economic Times 29 November 2019 Retrieved 29 November 2019 UP Zurich set to sign final Jewar airport deal on October 7 The Times of India 30 September 2020 Retrieved 30 September 2020 Greater Noida Yeida to build the road to link Jewar airport site with Yamuna Expressway Hindustan Times 30 May 2020 Retrieved 30 May 2020 Sinha Snehil 10 February 2021 AAI reviews Jewar airport plan gives nod The Times of India Retrieved 10 February 2021 After Centre NIAL Board approves Noida International Airport master plan Business Standard India Press Trust of India 13 August 2021 Retrieved 5 September 2021 Noida International Airport live updates PM Modi lays foundation stone for Jewar Airport The Times of India Retrieved 25 November 2021 Noida Construction work begins at international airport site in Jewar Hindustan Times 23 August 2021 Retrieved 5 September 2021 Why is Yogi pushing for more airports in UP India Today Retrieved 5 September 2021 tata projects Tata Projects bags contract to build Noida International Airport The Times of India 4 June 2022 Retrieved 5 June 2022 Mukul Prabnav 3 June 2022 Tata Projects to construct Noida International Airport The Indian Express Retrieved 5 June 2022 15 km from Denver airport a wetland awaits protection Indian Express 5 February 2024 Tender opens for e way to link Faridabad Jewar airport Tribune 31 July 2022 Retrieved 6 August 2022 म श र द न श ऐश वर य क म र र य 31 July 2022 Noida Airport 2 स ल म द ल ल म बई एक सप र सव स ज ड ग ज वर एयरप र ट 6 ल न पर खर च ह ग 16 5 अरब NHAI न न क ल ट डर Navbharat Times in Hindi Retrieved 6 August 2022 Jewar airport to be ready by Oct 2024 Hindustan Times 4 August 2022 Retrieved 6 August 2022 Mishra Dheeraj 1 October 2023 Upcoming Noida Airport in Jewar over halfway mark Here are the details of the mega project The Indian Express Retrieved 1 October 2023 External links editProject status as on 9 April 2008 Project status as on 8 May 2009 Project status as on 27 Dec 2009 Project status as on 02 Mar 2010 Project status as on 13 Mar 2010 Retrieved from https en wikipedia org w index php title Noida International Airport amp oldid 1220145774, wikipedia, wiki, book, books, library,