Indian MRCA competition

The Medium Multi-Role Combat Aircraft (MMRCA) competition in India, also known as the MRCA tender, was a competition to supply 126 multi-role combat aircraft to the Indian Air Force (IAF). The Defence Ministry had allocated 55,000 crore (US$6.9 billion) at 2008 prices for the purchase of these aircraft,[2] making it India's single largest defence deal.[3] The MMRCA tender was floated with the idea of filling the gap between its future Light Combat Aircraft and its in-service Sukhoi Su-30MKI air superiority fighter.

The six competing MRCA aircraft. (L-R): Rafale, Typhoon, F-16C/D, F/A-18E/F, JAS 39 Gripen, and MiG-35.[1]

The contest featured six fighter aircraft: Boeing F/A-18E/F Super Hornet, Dassault Rafale, Eurofighter Typhoon, Lockheed Martin F-16, Mikoyan MiG-35, and Saab JAS 39 Gripen. On 27 April 2011, after an intensive and detailed technical evaluation by the IAF, it reduced the bidders to two fighters—Eurofighter Typhoon and Dassault Rafale. On 31 January 2012 it was announced that Dassault Rafale had won the competition due to its lower life-cycle cost. The deal had been reported to cost US$28–30 billion in 2014.

However, the deal stalled due to disagreements over production in India. Dassault refused to take responsibility for the 108 HAL-manufactured Rafales, as it had reservations about the ability of HAL to accommodate the complex manufacturing and technology transfers of the aircraft. Instead, Dassault said it would have to negotiate two separate production contracts by both companies. The Indian Defence Ministry instead wanted Dassault to be solely responsible for the sale and delivery of all 126 aircraft.[4][5] In May 2013, The Times of India reported that negotiations were "back on track", with plans for the first 18 Rafales to be delivered in 2017.[6] Another point of contention is a provision where Dassault was to reinvest 50 percent of the deal's earnings into India's defence sectors, either through purchases or technological expertise.[7][8] In March 2014, the two sides were reported to have agreed that the first 18 aircraft would be delivered to India in flying condition and that the remaining 108 would be 70 percent built by HAL.[9] In December 2014, it was reported that India and France expect to sign a contract by March 2015.[10] On 13 April 2015, the defence minister Manohar Parrikar made an announcement that the M-MRCA tender is "effectively dead". India officially withdrew the 126-aircraft MMRCA tender on 30 July 2015.[11][12]

On the joint press statement made by Prime Minister Narendra Modi's with President François Hollande, during his visit of France, the PM said that India will purchase 36 Rafales, This contract was finalised and all the 36 aircraft will arrive in India in flying condition.[13] The agreed upon terms in April 2015 totaled US$8.8 billion[14][15] for 36 airplanes costing $244 million each, with an offset requirement of 30 percent of the deal's value for France to reinvest in India's defense sector and create infrastructure in India for the Rafale to operate.

In January 2016, the Indian government directed the Indian Navy to undertake detailed briefings with Dassault regarding the Rafale, in a potential start to procurement of the naval version for its aircraft carriers. The government wants commonalities between logistics and spares for fighters with the Navy and Air Force, which could lead to a purchase of 54 naval fighters.[16]

Background edit

Indian Air Force summary edit

The Indian Air Force (IAF) is the air arm of the Armed Forces of India and has the primary responsibility of conducting aerial warfare, defending the Indian airspace, conducting strategic strikes inside enemy territory and providing aerial cover to ground troops.[17] It is the fourth largest air force in the world, with a strength of more than 1,500 aircraft, including more than 750 combat aircraft.[18][19]

IAF sanctioned fleet size edit

The minimum sanctioned strength of the IAF is 39.5 squadrons of combat aircraft, with a healthy level of 44 squadrons.[20][21] However, this level was achieved only in the mid-1980s with the acquisition of the Mirage 2000s, MiG-29s and Jaguars. In addition, most IAF aircraft were comparatively new at the time, being less than 10 years old. Most of the older aircraft would have become obsolete by the mid-1990s, with the rest needing replacement by 2010. However, these aircraft were not replaced, which led to frequent crashes and attrition losses. Reduction in force levels and phasing out of aircraft have meant that the IAF operates only 30 fighter squadrons as of January 2014.[22] Even with the planned MMRCA procurement, the IAF will reach sanctioned strength only by 2017.[20]

 
A Sukhoi Su-30MKI

Aging MiGs edit

 
IAF MiG-21 Bison, the latest upgrade of IAF MiG-21s

Due to budgetary constraints—specifically, the economic problems in the early 1990s—the refurbishment of old planes and purchase of new ones was halted. Added to this was the disintegration of the Soviet Union, which led to severe shortage of aircraft spares, which rendered many of them unserviceable.[citation needed]

The attrition was stemmed to some extent by extensive upgrade programs on the MiG-21 (bis upgrade), MiG-27, Jaguar (DARIN I upgrade) and other aircraft in the mid-1990s.[citation needed] An aggressive program of upgrades was initiated. The MiG-21bis aircraft have been upgraded to MiG-21 Bison levels (125 aircraft will be upgraded to that standard), Jaguars to DARIN III standards, and Mirage 2000s and MiG-27s were also upgraded. The MiG-23MF air defence interceptor was phased out in 2007 by the IAF. Further retirements of MiG-23BN ground attack aircraft began in March 2009.[23][24] With decreased aircraft squadrons level, MiG-23s are set to be replaced by MRCA winner.[25]

Requirements edit

The IAF projected a requirement for about 126 aircraft in 2001, when the strength was at 39.5 squadrons (down from 45). There is an option for an additional 74 aircraft.[26] Initial requirements appeared to be for a 20-ton class fighter aircraft with the Mirage 2000 as the strongest contender. However, the 20-ton MTOW limit requirement has been removed. Also, considering the delays in the bidding, it was very likely that the LCA would be ready for induction by then. The IAF then would require replacements for its frontline strike aircraft like the MiG-27 and Jaguar, which would be retiring by 2015. India's future 5th-generation aircraft, the Russo-Indian Sukhoi/HAL FGFA and the indigenous Medium Combat Aircraft will not be ready before 2025,[27] and 2022, respectively, thus providing the need for a replacement. Thus, the MRCA tender is more likely to be a medium-weight aircraft (MTOW of ~24 tons). This has led to a renaming of the competition as the Medium Multi-Role Combat Aircraft (MMRCA) tender.[citation needed]

The Indian government is to buy the first 18 aircraft directly from the manufacturer. The remaining fighters will be built under licence with a transfer of technology (ToT) by HAL.[28]

The IAF was keen on buying the Mirage 2000–5, after it was impressed by the Mirage 2000's capabilities during the Kargil War. However, due to the upcoming manufacture of the Dassault Rafale and lack of orders, the Mirage production lines were to be closed down. French officials stated that they could be kept open if India had made a firm commitment. However, the Indian Government decided to go in for a multi-vendor tendering process. Requests for Information (RFI) were issued in 2004. The RFIs were initially sent to four vendors: Dassault (Mirage 2000-5 Mk.2), Lockheed Martin (F-16C/D), Mikoyan (MiG-29OVT), and Saab (JAS 39 Gripen).[29]

Due to the tendering process and delay in issuing the RFIs, Dassault decided to remove the Mirage 2000-5 from the bidding process and enter the Rafale in its place. The MiG-35 was entered in place of the prototype MiG-29OVT. The Eurofighter consortium entered the Typhoon into the competition. The Boeing F/A-18E/F Super Hornet also joined the tendering.[30]

Bidders edit

Six aircraft were bid for the order – the Swedish Saab Gripen, Eurofighter Typhoon, French Dassault Rafale, Russian Mikoyan MiG-35, and the American F-16IN and F/A-18IN Super Hornet ("IN" are the proposed Indian versions). Previously, Mikoyan and Dassault have been regular suppliers of aircraft for the Indian Air Force and in terms of transfers of technology, licensed production in India, personnel training, supply of spare parts, maintenance, and upgrading.[31]

Dassault Rafale edit

 
Dassault Rafale – the Winner of MRCA competition.

The Dassault Rafale is a French twin-engined delta-wing agile multi-role fighter aircraft designed and built by Dassault Aviation. The Rafale was brought in as the replacement for the Mirage 2000-5 that was originally a competitor for the tender,[32] after the production lines for the Mirage closed down, as well as the entry of much more advanced aircraft into the competition.[33]

The Rafale has the advantage of being logistically and operationally similar to the Mirage 2000, which the IAF already operated and used with great success during the Kargil War in Operation Safed Sagar. This would require fewer changes in the existing infrastructure of the IAF, which reduces costs. Moreover, being 100% French also provided Dassault a distinct edge over its competitors on the issue of technology transfer.[34] Dassault claims that the Rafale has an advantage over many of the competitors because it is not subject to ITAR restrictions.[35]

While not included in the MRCA requirement, the French fighter has more configurations of potential interest for the IAF: a carrier-based version (the Rafale M) and a capability for nuclear strategic strike. Both of these particular versions are in use in the French Armed Forces. At present however the Rafale M uses a catapult system (not present on the initial Vikrant) and the nuclear strike use is earmarked by others jets of the IAF.[36] On 26 June 2012, it was revealed that the Rafale M (naval variant) could be used on a STOBAR aircraft carrier without any modification of the planes or installation of catapults on the flight deck.[37]

The French government has cleared full technology transfer of the Rafale to India, including that of the RBE2-AA AESA radar which will be integrated into the Rafale by 2010[38] and also the transfer of software source code, which will allow Indian scientists to re-programme a radar or any sensitive equipment if needed.[34] Without the software source code, the IAF would have to specify mission parameters to foreign manufacturers to enable configuration of their radar, seriously compromising security in the process.[39]

Dassault has also offered to fit the GTX-35VS Kaveri engine into the Rafale, which if chosen, would greatly improve commonality with the HAL Tejas that will enter service into the IAF by 2010. Concerns have been raised about cost issues as well as potential sales to Pakistan, which has also expressed interest in the Rafale. However, no such jets have been sold to Pakistan. India and France have recently agreed to "go beyond a buyer-seller relationship".[40] On 31 January 2012 Rafale was declared the winner of the MMRCA competition, beating Eurofighter Typhoon on cost.[41]

Eurofighter Typhoon edit

 
Eurofighter Typhoon

The Eurofighter Typhoon is a twin-engine multi-role canard-delta air superiority fighter aircraft, designed and built by a consortium of European aerospace manufacturers through Eurofighter GmbH.

Eurofighter is offering the Tranche-3 Typhoon for the Indian requirement, equipped with the CAESAR AESA radar. EADS has invited India to become a partner of the Eurofighter Typhoon programme if the Typhoon wins the contract, and will be given technological and development participation in future tranches of the Typhoon.[42] Bernhard Gerwert, CEO of EADS Defense Department, elaborated that if India becomes the fifth partner of the Eurofighter programme, it will be able to manufacture assemblies for new Eurofighters.[43]

In January 2010, EADS offered to include thrust vectoring nozzles (TVNs) with the Typhoon's EJ200 engines for India. Thrust vectoring will improve operational capabilities, and reduce fuel burn by up to 5% and increase thrust while supersonic cruising by 7%.[44]

Boeing F/A-18E/F Super Hornet edit

 
F/A-18F Super Hornet

The Boeing F/A-18E/F Super Hornet is a twin-engine carrier-based multirole fighter aircraft. The MMRCA contract represents a prime opportunity for US defence companies to gain a foothold in the Indian defence market, which is estimated to be about US$100 billion in the next 10 years. Initially, the Request for Information (RFI) was not issued to Boeing, which decided to field the Super Hornet. The US Government allowed Boeing to participate in the RFI, and later gave permission for the Request For Proposal (RFP). However, any sale of aircraft would have to be approved by the US Congress.

Initial reactions within the IAF were enthusiastic, although there were apprehensions of support issues in case of future sanctions. The US stated that there would have been some restrictions and pre-conditions for the purchase of the aircraft.[45]

On 24 April 2008, Boeing submitted its 7,000-page proposal to the Ministry of Defence through the US Embassy in New Delhi, before the 28 April deadline for the submission for proposals. The Super Hornet variant being offered to India, the F/A-18IN, is based on the F/A-18E/F model operated by the US Navy and being built for the Royal Australian Air Force (RAAF). Raytheon's APG-79 AESA radar was offered on the aircraft. There would have been limited Transfer of Technology on the radar, up to the level approved by the US Government. However, Raytheon stated that the level of ToT offered would be compliant with the RFP requirements.[46] Delivery of the first F/A-18IN Super Hornets could have begun approximately 36 months after contract award.[47]

Boeing proposed joint manufacture of the jets with Indian partners. It also planned to offset the cost by setting up a US$100 million maintenance and training hub in Nagpur. This is the first time the Super Hornet has been offered for production in a foreign country.[48] On 14 February 2008, Boeing and Tata Industries agreed to form a joint-venture company. The new entity formed in February 2008, will supply components for Boeing military aircraft, including the Super Hornet.[49][50]

In order to satisfy its offset requirements, Boeing has signed long-term partnership agreements with Hindustan Aeronautics Limited (HAL), Tata Industries, and Larsen & Toubro.[47]

Lockheed Martin F-16IN Super Viper edit

 
F-16 Block 60

India initially sent the RFI for a F-16C/D Block 52+ configuration aircraft. On 17 January 2008, Lockheed Martin offered a customized version of the F-16, the F-16IN Super Viper for the Indian MMRCA contract.[51] The F-16IN, which is similar to the F-16 Block 60, will be a 4.5 generation aircraft. It will be more advanced than the F-16 Block 52s that the Pakistan Air Force has acquired.

Lockheed Martin described the F-16IN as "the most advanced and capable F-16 ever." Based closely on the F-16E/F Block 60 as supplied to the UAE, the features on the F-16IN include:[52]

  • Conformal Fuel Tanks (CFTs) – This will give the F-16IN a combat range of 1700 km with 1500 kg weapons load.
  • A Northrop Grumman AN/APG-80 AESA (active electronically scanned array) radar.[53] This is the same radar fitted on the F-16 Block 60s in service in UAE.
  • General Electric F110-132A engine with 143 kN full afterburning thrust with FADEC Controls.
  • Electronic warfare suites and infra-red searching.
  • Advanced all-color glass cockpit.
  • Helmet-mounted cueing system.

Lockheed Martin offered to sell India the F-35 Lightning II aircraft in the future, as replacements, if the F-16 was chosen.[52]

Mikoyan MiG-35 edit

 
Mikoyan MiG-35

The Mikoyan MiG-35 (Russian: Микоян МиГ-35) (NATO reporting name Fulcrum-F) is the production version of the latest MiG-29 and incorporates mature development of the MiG-29M/M2 and MiG-29K/KUB technology, such as glass cockpit and fly-by-wire technology. The IAF already operates MiG-29s, and the Navy has ordered MiG-29K/KUBs for its INS Vikramaditya (formerly Admiral Gorshkov) and INS Vikrant-class aircraft carriers.

Russia unveiled the MiG-35 at Aero India 2007 in Bangalore, amid Moscow's keen interest to sell these planes to India. This was the first time that the final version of the MiG-35 was publicly displayed at an international air show, and thus, generated a great deal of interest.[54]

Since the IAF already has maintenance and upgrade facilities for the MiG-29, this would mean that the fighter could be brought into service with a minimum of expenditure on infrastructure.[citation needed] A major advantage of MiG-35 is that Russia is committed to transfer the plane's technology, including the new advanced Zhuk Active Electronically Scanned Array radar, to India.[55] In the past, Russia has provided customised versions of military equipment such as the Su-30MKI and continued to provide support for equipment during international sanctions. However, Russian product support, especially for the MiG-29 fleet has been inadequate.[56]

Additionally, buying the MiG-35 would mean an almost total dependence on a single supplier for India's entire fighter fleet. Recent Russian demands for renegotiation of earlier contracts, the sale of RD-93 engines (a variant of the Klimov RD-33 that powers the Indian MiG-29s) to Pakistan for its JF-17 Thunder aircraft and concurrently supplying combat aircraft to China[56] has also caused concern in New Delhi.

Saab Gripen NG edit

 
Gripen in flight

The Saab JAS 39 Gripen (Griffin or "Gryphon") is a fighter aircraft manufactured by the Swedish aerospace company Saab. The aircraft is in service with the Swedish, Czech, Hungarian, Brazilian, and the South African air forces. The Royal Thai Air Force has also received the aircraft.

The Gripen was one of the aircraft that the IAF sent the Request for Information. The Gripen participated at Aero India 2007, where one JAS 39C (single seater) and two JAS 39D (two-seater) variants were brought.[57] Gripen International offered the Gripen IN, a version of the Gripen NG (Next Generation) for India's competition.[58] The Gripen NG has increased fuel capacity, more powerful powerplant, higher payload, upgraded avionics and other improvements.[59][60]

Comparison of the aircraft edit

Aircraft Dassault Rafale[61] Eurofighter Typhoon[62][63] F-16IN
"Super Viper"
[64][65]
F/A-18E/F
Super Hornet
[66][67][68][69]
JAS 39 NG(IN)[59][70][71][72][73][74][75] MiG-35
Fulcrum-F
[76][77][78][79][80]
Country of origin   France   Germany
  Italy
  Spain
  United Kingdom
  United States   United States   Sweden   Russia
Manufacturer Dassault Aviation Eurofighter GmbH Lockheed Martin Boeing Defense, Space & Security Saab RAC-MiG
Length 15.30 m
(50.1 ft)
15.96 m
(52 ft 5 in)
15.03 m
(49 ft 3 in)
18.31 m
(60 ft 1¼ in)
15.2 m
(49 ft 10 in)
17.3 m
(56 ft 9 in)
Wingspan 10.90 m
(35.7 ft)
10.95 m
(35 ft 11 in)
10.0 m
(32 ft 8 in)
13.62 m
(44 ft 8½ in)
8.6 m
(28 ft 3 in)
12 m
(39 ft 4 in)
Height 5.30 m
(17.3 ft)
5.28 m
(17 ft 4 in)
5.09 m
(16 ft 7 in)
4.88 m
(16 ft)
4.5 m
(14 ft 9 in)
4.7 m
(15 ft 5 in)
Wing area 45.7 m²
(492 ft²)
50.0 m²
(538 ft²)
27.9 m²
(300 ft²)
46.5 m²
(500 ft²)
31.0 m²
(334 ft²)
38.0 m²
(409 ft²)
Empty weight 10,000 kg
(22,046 lb)
11,000 kg
(24,250 lb)
9,979 kg
(22,000 lb)[81]
14,552 kg
(32,081 lb),[69]
8,000 kg
(17,600 lb)
11,000 kg
(24,280 lb)
Maximum payload 9,500 kg
(21,000 lb)
9,000 kg
(19,800 lb)
7,800 kg
(17,200 lb)
8,050 kg
(17,750 lb)
5,300 kg
(11,880 lb)[82]
6,500 kg
(14,330 lb)
Maximum takeoff weight (MTOW) 24,500 kg
(54,013 lb)
23,500 kg
(51,800 lb)
21,800 kg
(48,000 lb)
29,937 kg
(66,000 lb)[69]
16,500 kg
(36,400 lb)
24,500 kg
(54,013 lb)
Powerplant SNECMA M88-2 Eurojet EJ200 GE F110-132 GE F414-400 GE F414-GE-39E Klimov RD-33MK
Thrust
• Dry thrust
50 kN each
(11,250 lbf)
60 kN each
(13,500 lbf)
84 kN
(19,000 lbf)
62.3 kN each
(14,000 lbf)
62.3 kN
(14,000 lbf)
47 kN each
(10,600 lbf)
• Afterburner thrust: 75 kN each
(17,000 lbf)
90 kN each
(20,232 lbf)
144 kN
(32,500 lbf)
98 kN each
(22,000 lbf)
98 kN
(22,000 lbf)
80 kN each
(18,000 lbf)
Fuel • Internal
         • External
4,700 kg
7,500 kg
4,996 kg[83] 3,265 kg
5,880 kg
F/A-18E: 6,780 kg,
5 tanks, total 7,381 kg
3,400 kg[72]

3,655 kg[72]

4,800 kg
4,200 kg
External stations** 14 (5 'wet') 13 (3 'wet') 11 (3 'wet') 11 (5 'wet') 10 (4 'wet') 9 (5 'wet')
Maximum speed
    • At sea level
Mach 1.8+
(Supercruise: Mach 1+[84])
Mach 2.0+[85]
(Supercruise: Mach 1.2)
Mach 2.05
800 KCAS
Mach 1.8 Mach 2.0+
(Supercruise: Mach 1.2[86])
Mach 2.25
Mach 1.2
Ferry range
   • Unrefueled:
   • Extl. tanks
3,700+  km 3,790 km[87] 4,220  km 3,054 km 2,500 km
4,075 km
2,000 km
3,000 km with 3 drop tanks
Combat radius 1,800 km 1,390 km on air defence with 10-min loiter[88] 550 km on a hi-lo-hi mission with six 1,000 lb (450 kg) bombs 722 km 1300 km with six AAMs + drop tanks, and 30 min on station 1000 km
Service ceiling 15,240 m
(50,000 ft)
19,812 m
(65,000 ft)
18,000 m
(60,000 ft)
15,000 m
(50,000 ft)
15,240 m
(56,000 ft)
17,500 m
(57,400 ft)
Rate of climb 305 m/s
(60,000 ft/min)
315 m/s
(62,000 ft/min)
254 m/s
(50,000 ft/min)
228 m/s
(44,882 ft/min)
N/A 330 m/s
(65,000 ft/min)
Thrust/weight 1.13 1.18 1.1 0.93 1.18 1.1
Thrust vectoring None Thrust vector upgrade has been offered[89] None None None May be fitted with thrust vectoring
Runway needed 400 metres (1,300 ft)[90] 700 metres (2,300 ft)
Unit cost ~US$84.48 million
64 million
~US$108 million
80 million as of 2009[91]
US$50 million[92] US$55 million as of 2011[93] US$48 million US$38.5 million
Notes ** = Wet stations

Order value edit

The order is for 126 aircraft with the option to buy another 64–74 more.[94] While there were reports of the direct order being increased to 200, or split between two vendors, Former Chief of Air Staff of the IAF, Air Marshal S.P. Tyagi stated during Aero India 2007 that the number would remain the same, and would be sourced from a single vendor.[95] The first squadron would be directly supplied by the vendor, while the rest would be manufactured under license in India by HAL.[30]

The Government of India has sanctioned approximately 37,000 crore (US$4.6 billion),[96] with reports that another US$2 billion might be added to this. This is indicative of the high importance of the order to the respective vendors. The total value of purchasing the aircraft is expected to be US$20 billion, with options for purchasing more aircraft.[97]

Offset clause edit

The economic offset for the MMRCA tender was increased to 50% under the DPP 2006. The bidders must confirm the offset details in a separate proposal, to be submitted by 9 June 2008.[94] This brings the value of offsets in the MMRCA deal to almost 25,000 crore (US$3.1 billion).

Tender history edit

 
An advertisement for the Saab Gripen at a bus station in Central New Delhi in March 2008. The importance of the contract has led to hectic advertising and lobbying by the bidders. The bus stop in this image is located very close to major Government offices, Parliament and Indian Army and Indian Air Force Headquarters.

Request for proposal edit

The initial Request for Information (RFI) for the Multi-Role Combat Aircraft (MRCA) was put out in 2001. At that time the request for proposal (RFP) was expected to be issued in December 2005. Later the RFP was expected to be issued in June 2007.[96] During Aero India 2007, Defence Minister A.K. Antony stated that the RFP would be issued by 31 March 2007. However, Air Marshal A.S. Tyagi, in his last press conference before he retired, had stated that there were delays in issuing the RFP. His successor, Air Marshal F.H. Major had said that the RFP would be issued by June. The delays were said to be due to new factors added into the RFP such as Total Life-cycle Costs as well as fine-tuning the Offset policy, under the new DPP 2005. The Total Life-cycle Cost has been introduced for the first time in Indian defence procurements, and has reportedly been a major source of the delay.[30][98]

On 29 June, the Defence Acquisition Council (DAC), headed by the Defence Minister, cleared the process for the procurement of 126 aircraft.[99] The 211-page RFP was approved for release to the respective bidders. On 28 August 2007, the RFP was released to the 6 bidding companies.[100]

Tender process edit

The bidders had to give their Formal Proposals within six months from the release of the RFP, latest by 3 March 2008. However, some of the bidders asked for an extension of the deadline, citing complexity of the RFP. The deadline for submission of the proposals was then extended by a month. The Formal Proposals will have to be submitted by 28 April 2008. The Proposals will then be technically evaluated to check for compliance with IAF's requirements and other RFP conditions. After that, field trials will be carried out to evaluate the performance. Finally, the Commercial Proposal of the vendors, short-listed after technical and field evaluations, will be examined and compared, and a winner announced.[30][101][102]

After the winner is chosen, there will be further rounds of negotiation to decide the final price, as well as sensor suite and aircraft configuration, along with other factors, like offsets and maintenance. The first squadron of 18 aircraft will come in a 'fly away' condition, while the remaining 108 will be manufactured in India under ToT.[100]

Testing and evaluations edit

 
Typhoon

On 8 August 2008, the then IAF Chief Air Marshal Fali H. Major informed that technical evaluations were being conducted and claimed that the IAF is all set to conduct field trials of the MRCA bidding aircraft in the second half of 2008.[103] The industry offset proposals from the bidders have been provided to India as of 11 August 2008.[104] The technical evaluation of the medium multi-role combat aircraft (MMRCA) has been completed by 18 November 2008.[105]

There have been concerns that this process would take a few years at least, and getting the aircraft after that would take longer. It is reasonable to expect that the aircraft can be delivered no sooner than 2011.[106]

In January 2009 SAAB International, proposed to India the transfer of technology if Gripen win the MRCA and make India 'an independent manufacturer' of its own fighter jets. SAAB favored 'extensive transfer of technology' well in excess of 60% more than requirement of RFI to boost India's indigenous capabilities in fighter jets.[107]

It was reported in April 2009 that Dassault Aviation's Rafale has been rejected after technical evaluation of the fighters.[108][109] However, this has been disputed by IAF.[110] In late May 2009 Times of India has reported that Dassault Aviation has submitted the missing answers to the General Staff Qualitative Requirements drawn up by the IAF, and after serious diplomatic intervention, they are back in the race.[111]

On 27 May 2009 Indian Air Force completed the technical evaluation of all 6 fighter jets. Air chief marshal Fali H. Major told the press that the reports had been submitted to the ministry of defence. The aircraft will be put through a rigorous testing process at Bangalore, Jaisalmer and Leh. The aircraft will undergo technical and humid condition tests in Bangalore. Desert trials will be conducted in Jaisalmer, Rajasthan and High-altitude and mountainous condition trials will be conducted at Leh in Ladakh.[34]

 
Rafale

Flight evaluation of the fighters started in August 2009 at Bangalore.[112] The F/A-18E/F and F-16IN completed their field trials by mid-September 2009.[113] The Rafale began trials in late September 2009.[114] As of late October 2009, the IAF has completed the trials of F/A-18, F-16, Rafale, and MiG-35. According to Air Chief Marshal P.V. Naik, all the aircraft tested so far "are going neck and neck".[115]

The Gripen was the last of the aircraft to be evaluated by the IAF. On 22 March, two Gripens left Bangalore, one to Jaisalmer and the other to Leh, Ladakh. At Jaisalmer AFS, a Gripen would undertake the hot weather trials and also a dummy run and bomb drop at the Pokhran Firing Range. The other Gripen headed towards Leh, would perform high altitude tests involving landing, refueling and restarting engines. Prior to the Gripen, 4 out of the 5 aircraft had issues restarting their engines during trials conducted in Leh.[116] The Gripen completed its high altitude tests in Leh and other hot weather tests.[117]

Updated bids were requested by the MOD in April 2010. The IAF was to complete an evaluation report on the six fighters in July 2010 and then begin to shortlist them based on the air force's evaluations.[118] A report suggested Rafale and Typhoon were in the final stage.[119] The Sunday Telegraph reported in November 2010 that the Eurofighter Typhoon was leading the competition on "technical terms". Now Indian government will take its strategic decision.[120] On 18 December 2010, the IAF chief stated that the "evaluation of the fighters has been completed and the matter is now with the Ministry of Defence". He hoped a contract would be signed by July 2011.[121]

Aircraft shortlisted edit

It was reported on 27 April 2011 that only Eurofighter Typhoon and Dassault Rafale made the cut to the shortlist.[122][123] Eurofighter and Dassault have been told to keep their commercial bids open till 31 December 2011.[124] The US ambassador in India, Timothy Roemer said that they were "deeply disappointed" by the news, but added that they were reviewing the documents received from the Government of India and were "respectful of the procurement process". He also said that the US looked forward to continuing to grow and develop their defence partnership with India.[125] Officials from SAAB confirmed that the Gripen was not shortlisted but added that they were committed to the Indian market and continue their plans for growth and that they see large business opportunities in the aerospace, defence and security sectors in India.[126]

A leaked US diplomatic cable has brought forward the fact that US diplomats already held the view that Indian defense trade, in such important deals with the US, will be subject to scrutiny, owing to the US maintaining a favorable military partnership with Pakistan and due to the sanctions that the US imposed on India after the Pokhran-II nuclear tests. Timothy Roemer, the US ambassador to India, said in a 29 October 2009 cable to Michele Flournoy, a top Pentagon official then about to visit India that "Our ability to seize the opportunities presented by this newly improved environment is limited by the commonly held view that the US will not prove to be a reliable supplier of defense equipment".[127]

After entries from Lockheed Martin and Boeing were not short-listed, both companies requested a debrief to understand why their bids fell short in the technical evaluation. On 11 July 2011 representatives from Lockheed Martin and Boeing attended a government-to-government debriefing between Indian and US officials. The companies stated they accepted the IAF decision in releases.[128][129] In late July 2011, the IAF said that the lowest bidder was to be determined in the "next five to six weeks".[130]

The Air Force is not looking at price. That's not our area of concern. What we want is QRs are focussed on technical aspects, latest technology

Air Marshal PK Barbora, Ex Vice Chief of Air Staff[131]

On 9 October 2011, despite reports that a winner would be announced in October 2011, Air Chief Marshal Norman Anil Kumar Browne stated that India is first approving the finalists' industrial offset offers, and allowing each time to make a final bid. A total cost based on life-cycle cost, purchase cost, and technology transfer value for each competitor will be calculated. The two competing financial bids were formally opened on 4 November 2011.[30]

French newspaper La Tribune reported on 12 January that the Eurofighter consortium seems to have submitted the lower bid.[132]

Selection of the Rafale edit

On 31 January 2012, it was announced that the Dassault Rafale won the competition and has been selected for exclusive negotiations.[133] The reasons given for selection included lower unit cost and lower overall lifecycle cost for the Rafale compared to the Eurofighter due to lower fuel consumption and simpler maintenance requirements.[134] Some reports indicated that EADS may try to re-enter the bid with a lower price quote, but MoD sources ruled out re-entry; the Rafale's lifecycle cost per unit was about $40 million less than that of the Typhoon. MoD sources also indicated that the final value of MMRCA deal for 126 aircraft (After negotiations) was expected to be about $20–$25 billion.[135]

Defense analysts also point out the operational performance of Rafale during the Libyan bombing campaign and in Afghanistan, the existing experience of the Indian Air Force in operating the French Mirage 2000H during the Kargil War and compatibility with Indian, Israeli, and Russian sub-systems as possible reasons.[136] It was also noted that the recent decision to upgrade India's Mirage 2000H fighters will simplify the Indian Air Force's logistics chain. Historical reasons are also considered by analysts to be a potential reason as France was also the only Western nation not to impose sanctions after India tested five nuclear devices in 1998.[137]

Reactions to selection edit

The decision was welcomed in France with the French President Nicolas Sarkozy, Minister of State for Foreign Trade Pierre Lellouche, and Dassault Aviation all issuing statements in support of the decision. Dassault Aviation shares soared more than 21 percent on the Paris Stock Exchange immediately after the news broke.[138] Nicolas Sarkozy said the selection of Dassault's Rafale multi-role fighter "goes far beyond the company that makes them, far beyond aerospace – it is a vote of confidence in the entire French economy."[139] The office of the French President issued a statement:

The President of the French Republic has learned of India’s selection of the Rafale for the acquisition by the Indian Air Force of 126 fighter aircraft. France is pleased with the Indian government’s decision to select the French aircraft to enter into exclusive negotiations with Dassault. This announcement comes at the end of a very high-level, fair and transparent competition involving two European finalists.

The Rafale has been selected thanks to the aircraft’s competitive life-cycle costs, after the April 2011 pre-selection on the basis of its top-level operational performance. The negotiation of the contract will begin very soon and has the full support of the French authorities. It will include important technology transfers guaranteed by the French government.

The realization of the Rafale project will illustrate the depth and scale of the strategic partnership between France and India.[140]

Dassault Aviation also released a statement claiming that following the announcement of the final selection of the Rafale in the frame of the MMRCA program, Dassault Aviation and its partners are honored and grateful to the Indian Government and the people of India to be given the opportunity to extend their long-lasting cooperation. Dassault Aviation also stated that they reiterate their commitment to meet the operational requirements of the Indian Air Force and underline their pride in contributing to India's defence for over half a century. The French Minister of State for Foreign Trade Pierre Lellouche called the selection as a positive sign for the struggling French economy but he later cautioned that a number of things remained to be finalized: "I confirm that we are in a very positive phase for the Rafale in India. ... At this stage we have to remain prudent; we are in a phase of exclusive negotiations. We have won the contract but there a number of things to finalize so let's be cautious for now". He also stated that he hoped that the order will finally open up real perspectives for the Rafale programme and referring to the lobbying done by the American, Russian and British governments, added that the political pressure applied by the competitors did not make things very easy.[139]

Eurofighter issued a statement saying that although they are disappointed, they respect the decision: "India took the decision to select our competitor as the preferred bidder in the Medium Multi-Role Combat Aircraft (MMRCA) tender. Although this is not yet a contract signature and contract negotiations are still ahead, we are disappointed. However, we respect the decision of the Indian MoD. With the Eurofighter Typhoon, we offered the Indian Air Force the most modern combat aircraft available. Based on the Indian Government feedback, we will now carefully analyze and evaluate this situation together with our European Partner Companies and their respective Governments." Officials at the British High Commission in Delhi also said they were disappointed with the decision but added that it was expressly said this was about the cost of the contract, not a reflection on the health of bilateral relations between India and the countries.[136]

After the announcement of Dassault Rafale as the L1 bidder, the Eurofighter Consortium also decided to lower the price of the Typhoon jets to stay in the race. This decision came after extensive discussion amongst the member nations. However, the Indian MoD officials ruled out any possibility of a comeback by the Eurofighter Typhoon in the competition. According to them, Dassault Rafale beat the Typhoon by a huge margin in terms of life cycle costs as well as direct acquisition costs. In March 2012 UK defense minister Gerald Howarth told the British House of Commons that the Eurofighter Consortium respects the Indian government's decision but stands ready to enter further negotiations if possible.[141][142][143][144][145]

Contract negotiations edit

Initial negotiations edit

Though a letter of intent (LoI) has been issued to Dassault, contract negotiations must be completed.[146] Indian Defence Minister A K Antony confirmed that the contract was not expected to be signed until after March 2012.[147] A total of 126 Rafale fighters are to be supplied; Dassault Aviation is to build the initial batch of 18, with the remaining aircraft produced by HAL in India.[148][149]

It has been speculated that at a later stage, India's order may include a further 64 aircraft to equip three squadrons. Some Indian politicians have questioned the aircraft's performance, notably precision bombing, in Opération Harmattan during the Libyan Civil War and have alleged "manipulation in the evaluation process."[150][151] In response to these concerns, an independent investigation concluded that the evaluation was conducted according to the RFP terms and defence procurement procedures.[152]

In February 2012, Dassault Aviation and Reliance Industries Ltd (RIL) formed a joint venture for joint opportunities in the defence sector and cooperation in the execution of the MMRCA deal. The partnership provides Dassault with a substantial opportunity to fulfill its offset responsibilities under the contract.[153][154] Dassault wanted RIL to be the main partner in production of the aircraft, but the Indian government refused to allow that as the tender for the procurement had already specified that Hindustan Aeronautics would be the lead integrator. The differences were resolved when Dassault agreed to the Indian government's condition.[155][156] Dassault will now help Reliance create a 1,500 crore (US$188 million) factory in Bangalore, similar to its production facilities in France, to produce the wings of aircraft.[157][158]

Indian Air Force chief Air Chief Marshal N A K Browne went on a four-day tour of France from 21 May 2012. The tour was to include a visit to a French Rafale squadron and see Rafale's production facilities at Merignac. He would also meet the French Chief of Defence Staff Admiral Edouard Guillaud and his French Air force counterpart General Jean-Paul Palomeros to discuss the ongoing defence cooperation between India and France.[159]

Delays edit

In September 2012, India media outlets suggested cost escalation and contract delays are likely.[33] The Indian Air Force expected to complete negotiations and sign the contract by the end of the fiscal year, in March 2013.[160] However, in 2013, Indian Minister of External Affairs, Salman Khurshid said that the contract was taking longer than expected to finalize.[161] EADS on the other hand is still hopeful of the contract given the delay in signing the contract. It is said that the deal came up during the visit of British prime minister to India in February 2013.[162][163]

In January 2014, the cost of the aircraft had reportedly escalated by 100% to no less than US$28–30 billion. The cost of the program was projected at US$12 billion (Rs42,000 crore) in 2007. The cost increased to US$18 billion (Rs90,000 crore) in January 2012 when the lowest bidder was declared.[22] In February 2014, it was reported that contract had not been signed due to the department's budget had been spent for the year, but that it was expected to be signed in the next fiscal year, not before six months after the new government takes charge after the elections.[164] In March 2014, the two sides were reported to have agreed that the first 18 aircraft would be delivered to India in flying condition and that the remaining 108 would be 70% built by HAL.[165]

In June 2014, following the Indian general elections, it was reported the contract negotiations had stalled, as neither Dassault Aviation nor HAL, which would produce the Rafale in India, were willing to issue written guarantees on delivery schedules, a condition which the MoD insisted upon before signing the contract for the aircraft.[166] Owing to the continued deadlock over the Rafale negotiations, it was reported that both Eurofighter and Saab remained hopeful their bids could be reconsidered. Saab had also submitted a proposal to co-develop the HAL Tejas Mk. II LCA with the Defence Research and Developments Organisation(DRDO), thus reducing the need to induct the Rafale; however, a spokesman for the DRDO said foreign assistance with the Tejas Mk. II project was not needed, as the work was progressing satisfactorily.[167]

On an official visit to India at the start of July 2014, Laurent Fabius, the Foreign Minister of France, said discussions were "developing in [a] very positive way" and that he was "very confident about the final outcome." It was also noted that of the four committees set up by the MoD to review the Rafale project, three had replied positively about inducting the aircraft, but that the recommendation of the fourth committee, which dealt with pricing and costs, would be crucial for the government's final decision. Analysts also noted that it was vital for the technology element of the project to also be transferred to India.[168] During the visit there was speculation that the MoD was considering reducing the order from 126 to 80 aircraft due to the escalating costs of the deal.[169] During an official visit from 6–8 July 2014, the British Foreign Secretary William Hague said he had discussed the Rafale contract and the Eurofighter, among other issues, with Sushma Swaraj, the new Indian Minister of External Affairs. "Of course, we have always had a strong belief in the capabilities of the Eurofighter and its potential. It is always available to those countries that are able and willing to purchase it", Hague told reporters.[170] Germany also expressed support for the Eurofighter to be reconsidered, and the US lobby said re-evaluating the American candidates in the MMRCA competition would "set the right tone" for a September visit to the US by the new Prime Minister Narendra Modi.[171]

By 14 July 2014, it was reported another meeting of a sub-committee of the contract negotiation committee had been scheduled for later that week in Bangalore, with MoD, Air Force, Dassault, DRDO and HAL representatives to be in attendance.[171] It was reported the contract negotiations had finally reached the stage where they could be finalised in the upcoming three months, after which the Cabinet Committee on Security (CCS) would review the approval process before the contract could be signed. According to a source, none of the previously eliminated candidates in the MMRCA competition could be officially re-evaluated. "There are only two possibilities. One, the deal is inked for the Rafale jets. Conversely, the entire MMRCA process is scrapped after being in the works for a decade, and a fresh global tender or RFP (request for proposal) is issued."[171] On 16 July, it was reported the contract sub-committee would be negotiating final details in Bangalore from 17–19 July, leaving the way clear for finalising the contract. "We expect total closure of negotiations over Transfer of Technology (ToT) from this round. With that done, we will have completed negotiations by sub-committees on ToT, offsets and maintenance. What will remain will be the overall cost and there too, 75 per cent of the work has been completed, " a senior MoD official said. ACM Raha expressed his optimism, and said the negotiations for the Rafale "are progressing well" and the contract is likely "sooner than later in the current financial year (2014–15)." Raha said he expected the IAF to attain a strength of 42 squadrons by 2022, up from the current number of 34, which is well below desired strength. Raha expressed confidence that the induction of the Rafale and the HAL LCA would "arrest the drawdown in the strength of fighter squadrons ... [the] IAF is likely to have its sanctioned strength of combat squadrons operational sooner than later."[172] Sources indicated the IAF believes that Contract Negotiation Committee (CNC) could complete the necessary work before December 2014, after which the Cabinet Committee on Security (CCS) will consult with the Finance Ministry before signing the contract.[173] On 12 August, Arun Jaitley, the new Defence Minister of India, issued a statement that negotiations will continue as planned.[174]

Continued delays and final negotiations edit

On 18 August 2014, a senior defence ministry official said a draft contract was being finalised and that the Cost Negotiations Committee was expected to file a final report shortly. Other ministry sources said the ministry was requesting Dassault to revise its pricing structure, as the estimated price had increased to 106,000 crore (US$13 billion) from the original estimate of 42,000 crore (US$5 billion) envisioned in 2007.[175] On 2 September, the Chief of Air Staff, Air Chief Marshal Arup Raha, said the contract was expected to be signed "soon," and further stressed the importance of keeping the Rafale deal, by then estimated to cost 150,000 crore (US$19 billion). Although the Eurofighter consortium has made a counteroffer, by which India could purchase 126 discounted Typhoons, Raha dismissed any chance of the Typhoon being reconsidered. "It will not be appropriate to make any changes in the process. The current government has set the pace of work and things are moving fast enough on the fighter deal." Regarding the counteroffer, a senior defence ministry official said, "Rafale has run through the finish line. It’s too late in the day to parachute into the race. The door is closed."[176]

Despite efforts, negotiations had once again stalled by October 2014, due to disputes over final costs and technology transfers. According to official reports, Dassault remained unwilling to be held liable for the 108 Rafales to be manufactured under licence by HAL, and had expressed doubts the Indian defence industry had fully developed the capabilities to handle aspects of the sensitive technologies being supplied with the Rafale, including its electronically scanned AESA radar. Due to the protracted lack of progress over the final negotiations, a senior team of Dassault executives and French defence ministry officials were scheduled to visit India in November to expedite the process.[177] The French ambassador to India, Francois Richier, expressed satisfaction with the progress of the negotiations, however, stating they were "progressing well ... moving in the right direction." A French diplomat further said "this is a very big contract, complex ... it takes time."[178]

On 5 November 2014, Dassault Aviation CEO Eric Trappier said he expected the final contract would be signed by March 2015.[179]

Change of Plan edit

Initially it was 18 Rafales that were to be built and sent to India in fly away conditions by France. But, on the joint press statement made by Prime Minister Narendra Modi's with President François Hollande, during his visit of France, the PM said that India will purchase 36 Rafales directly from France. And the contract is said to be sealed soon.[13] There is some controversy surrounding the change in the original deal due to a shift in Indian leadership, which led to the transition of the deal to the private sector. It was handed over to a newly established entity, Reliance Defence Limited, which lacks previous expertise in this specific industry.

Fate of the deal edit

On 31 July 2015, Defence Minister Manohar Parrikar stated in Rajya Sabha that the deal for 126 MMRCA was officially withdrawn by the government.[180][181] On 23 September 2016, Indian Defence Minister Manohar Parrikar and his French counterpart Jean-Yves Le Drian signed the contract for the purchase of 36 off-the-shelf Rafales in a deal worth €7.8 billion with an option for 18 more at the same inflation-adjusted price.[182] The deliveries were to begin in 2019 and complete by 2022.[183] The deal includes weapons and spares; the aircraft will be equipped with Meteor BVRAAM missiles.[184][185] Indian Air Force was handed over the first Rafale in October 2019.[186] The first batch of 5 fighters arrived in India on 29 July 2020. As of January 2021, a total of 11 fighters have arrived in India from France.[187]

MRFA edit

An RFI was issued by India in April 2018 for the procurement of 114 multi-role combat aircraft for the Indian Air Force.[188][189][190] The Indian Navy is also combining its plan for acquisition for new fighter jets with this program. As many as eight aircraft are now competing in this fresh tender which is referred as MMRCA 2.0 or MRFA (Multi-Role Fighter Aircraft) in the Indian media.[191] The following are the eight aircraft competing in the competition:[191]

See also edit

Parallel projects

References edit

  1. ^ Unofficial logo
  2. ^ Pandey, Vinay (17 January 2008). . The Times of India. Archived from the original on 5 November 2011.
  3. ^ "MRCA RFP: India floats its biggest-ever global tender for jet fighters". Aviation and Aerospace. Domain B. 28 August 2007. Retrieved 23 January 2008. On Tuesday India floated its biggest ever global defence tender for purchase of 126 multi-role combat aircraft in a deal potentially valued at $11 billion.
  4. ^ "Report: India-France Rafale Deal Stalled". Defense News. 5 April 2013. Archived from the original on 28 June 2013. Retrieved 7 April 2013.
  5. ^ Prusty, Nigam; Kotoky, Anurag (5 April 2013). . Reuters. Archived from the original on 7 April 2013. Retrieved 7 April 2013.
  6. ^ "New Sukhoi base to cover south India". The Times of India. 13 May 2013. Archived from the original on 29 June 2013. Retrieved 19 October 2013.
  7. ^ . United Press International. 21 September 2012. Archived from the original on 22 September 2012. Retrieved 8 August 2013.
  8. ^ . Rediff.com. 11 February 2013. Archived from the original on 22 May 2013. Retrieved 16 August 2013.
  9. ^ Gokhale, Nitin (3 March 2014). "A big step in India's Rafale jet deal with France". NDTV. from the original on 3 March 2014. Retrieved 3 March 2014.
  10. ^ Raghuvanshi, Vvivek; Tran, Pierre (1 December 2014). "India, France Agree to Finalize Rafale Deal by Spring". Defense News. Archived from the original on 2 December 2014. Retrieved 1 December 2014.
  11. ^ "Government withdraws tender for 126 medium multi role combat aircraft: Manohar Parrikar". Economic Times. 30 July 2015. Retrieved 20 November 2015.
  12. ^ India ends MMRCA fighter acquisition
  13. ^ a b Irish, John; Pineau, Elizabeth (10 April 2015). "India orders 36 French-made Rafale fighter jets - PM Modi". Reuters. Retrieved 10 April 2015.
  14. ^ "Finally, A Deal. India To Buy 36 Rafale Jets For $8.8 Billion". NDTV.com. Retrieved 9 August 2023.
  15. ^ "India signs deal to buy 36 French-made Rafale fighter jets". France 24. 23 September 2016. Retrieved 9 August 2023.
  16. ^ India To Evaluate Rafale for Navy – Defensenews.com, 19 January 2016
  17. ^ The Indian Air Force Today, Our Strength 21 September 2013 at the Wayback Machine, Indian Air Force
  18. ^ Reed Business Information Limited. "AirSpace". flightglobal.com. {{cite web}}: |author= has generic name (help)
  19. ^ Lambeth, Benjamin. "Airpower at 18,000': The Indian Air Force in the Kargil War". Carnegie Endowment. Retrieved 12 February 2014.
  20. ^ a b Pandit, Rajat (20 January 2009). . The Times of India. Archived from the original on 31 October 2011.
  21. ^ An IAF combat squadron usually consists of 18 aircraft in service with another 3–4 in maintenance.
  22. ^ a b "dna exclusive: 100% price escalation on Rafale fighter aircraft to Rs 1.75 lakh crore likely to dent IAF's strike capability". dna. 26 January 2014.
  23. ^
  24. ^ Last Flight of the MiG-23 BN 9 June 2011 at the Wayback Machine. bharat-rakshak.com
  25. ^ MiG-23 are set to be replaced by new hardware from either Russia, the United States or Europe i.e. mrca today 22 February 2008 at the Wayback Machine. dailytimes.com.pk
  26. ^ , The Times of India (report), archived from the original on 12 January 2009, Chief of Air Staff Air Chief Marshal F.H. Major said there was no proposal at the moment to increase the order to 200 aircraft, but 'a review after induction, based on cost-benefit analysis, is of course possible in future.'
  27. ^ . The Times of India. 23 April 2010. Archived from the original on 26 April 2010.
  28. ^ Hoyle, Craig. "India launches contest for 126 new fighters with RFP release". FlightGlobal, 28 August 2007.
  29. ^ "An alternate theory of the MMRCA process – I". Strat Post. 9 April 2012. Retrieved 5 November 2013.
  30. ^ a b c d e "India's M-MRCA Fighter Competition: Is the Deal in Trouble?". Defense Industry Daily. Retrieved 5 November 2013.
  31. ^ . The New Indian Express. 15 February 2009. Archived from the original on 6 November 2013. Retrieved 5 November 2013.
  32. ^ . Hindustan Times. 26 February 2006. Archived from the original on 15 May 2006. Retrieved 10 September 2006.
  33. ^ a b "India’s M-MRCA Fighter Competition: Is the Deal In Trouble?". Defence Industry Daily, 5 September 2012.
  34. ^ a b c Dassault ups the ante with full technology transfer for Rafale news, Domain-b.com. 5 November 2008. Retrieved 6 November 2008.
  35. ^ "Eurofighter and Rafale finalists in Indian MMRCA competition". Defence Aviation. 29 April 2011. Retrieved 5 November 2013.
  36. ^ "India’s Joint Nuclear Command Wants 40 Nuclear Strike Jets. Retrieved 2011-09-18."
  37. ^ "Mer et Marine".
  38. ^ Andrew Doyle, "New Radar could boost Rafale's export prospects", Flight International, 11 November 2008
  39. ^ . Yahoo News. 1 February 2012. Archived from the original on 8 December 2015. Retrieved 5 November 2013.
  40. ^ Samuel, Henry (26 January 2008). "France and India deepen defence ties". The Daily Telegraph. London. Retrieved 5 May 2010.
  41. ^ "Dassault Rafale wins MMRCA deal beating Eurofighter Typhoon". The Times of India. 31 January 2012.
  42. ^ Webster, Philip (25 April 2008). . Forbes. Archived from the original on 27 August 2009. Retrieved 7 November 2008. {{cite journal}}: Unknown parameter |agency= ignored (help)
  43. ^ Eurofighter sweetens its India offer. Business Standard, 3 August 2009
  44. ^ Upgraded Eurofighter offered to Indian Air Force 5 January 2010 at the Wayback Machine. Thaindian.com. Retrieved 1 February 2011.
  45. ^ Sale of military equipment: US wants India to accept conditions, 7 November 2008.
  46. ^ Raytheon to transfer AESA radar technology to India up to the level permitted by US government 7 March 2012 at the Wayback Machine
  47. ^ a b Boeing, "Boeing Delivers Proposal to Equip Indian Air Force with Super Hornet Fighters" 28 April 2008 at the Wayback Machine. Boeing, 24 April 2008. Retrieved 26 April 2008.
  48. ^ "Boeing wants to sell F-18s to India"[permanent dead link], IBN Live, 20 May 2006.
  49. ^ David Donald (19 February 2008). . AINOnline. Archived from the original on 13 January 2009. Retrieved 19 February 2008.
  50. ^ Tata, Boeing forming JV for defence products. Financial Express (14 February 2008). Retrieved 1 February 2011.
  51. ^ "F-16 maker Lockheed mounts an India campaign". The Times of India. 17 January 2008.
  52. ^ a b "F-16IN Brochure"[permanent dead link] (PDF). Lockheed Martin
  53. ^ AN/APG-80 – F-16 AESA Radar 13 January 2008 at the Wayback Machine. Es.northropgrumman.com. Retrieved 1 February 2011.
  54. ^ "Aero India 2007 News". indianaviationnews.net.
  55. ^ "MiG-35 in radar testing". Russia & CIS Observer. 19 July 2010.
  56. ^ a b Security Research Review: Volume 1(3) Selection of MRCA for the IAF – Air Marshall(r) B K Pandey 2 April 2007 at the Wayback Machine. Bharat-rakshak.com. Retrieved 1 February 2011.
  57. ^ Fighter Aircraft Programs at Aero India – 2007 25 March 2009 at the Wayback Machine. defense-update.com
  58. ^ "Gripen next generation fighter for India – The Independent Choice", Gripen International, 28 April 2008.
  59. ^ a b Hoyle, Craig. "Saab reveals Gripen Demo aircraft", Flightglobal.com, 23 April 2008.
  60. ^ "Gripen Demonstrator – The Future has Arrived!", Gripen International, 23 April 2008.
  61. ^ , FR: Dassault, archived from the original on 8 April 2011
  62. ^ , Eurofighter, archived from the original on 18 November 2007
  63. ^ Eurofighter Typhoon (in German), DE: Luftwaffe, 29 September 2023
  64. ^ F-16C/D Factsheet. US Air Force
  65. ^ F-16 Specifications 21 April 2011 at the Wayback Machine. Lockheed Martin
  66. ^ F/A-18E/F Super Hornet page. Boeing
  67. ^ Super Hornet Overview. Boeing (PDF)
  68. ^ Aircraft Museum – F/A-18E/F Super Hornet. Aerospace Web. Retrieved 1 February 2011.
  69. ^ a b c BP (JPEG), Blogspot
  70. ^ Official Gripen IN Technical Specifications, SE: Saab, archived from the original on 4 January 2013
  71. ^ Pressbrief Gripen NG (PDF) (in Dutch), NL, 8 August 2008, retrieved 14 February 2014{{citation}}: CS1 maint: location missing publisher (link)
  72. ^ a b c Saab NG presentation (PDF), JSF Nieuws, p. 5
  73. ^ . Archived from the original (PDF) on 9 August 2017. Retrieved 28 January 2022. {{cite web}}: Missing or empty |title= (help)
  74. ^ "Gripen E-series | Saab". Start. Retrieved 28 January 2022.
  75. ^ "The F414 Engine | GE Aviation". www.geaviation.com. Retrieved 28 January 2022.
  76. ^ , RU: MiG Aravia, archived from the original on 27 September 2007
  77. ^ MiG-29M2 specifications 3 January 2008 at the Wayback Machine. RAC MiG (the MiG-29M2 is similar to the MiG-35).
  78. ^ MiG-35, Deagel
  79. ^ MiG-35 specifications. Airforce technology. (Ferry range with three external fuel tanks 3,100 km).
  80. ^ Aero India 2007 Brochure, Bharat-Rakshak
  81. ^ F-16 Versions – F-16E/F. F-16.net. Retrieved 1 February 2011.
  82. ^ "Gripen Dimensions" 30 October 2013 at the Wayback Machine. Saab
  83. ^ Technische Daten Eurofighter Austria (in German), AT: Air Power
  84. ^ "Fox Three." 25 May 2013 at the Wayback Machine dassault-aviation.com.
  85. ^ BMLVS – Abteilung Kommunikation. "Bundesheer – Waffen und Gerät – Eurofighter EF 2000". bmlv.gv.at.
  86. ^ "Gripen – the smart fighter official website". gripen.com.
  87. ^ Ferry range 3790 km, Eurofighter Technische Daten Seite 111; Militar-Jets Geschichte Technik Typen, Verlag GeraMond ISBN 3-7654-7035-X german
  88. ^ EFA-2000 Eurofighter. Fas.org. Retrieved 1 February 2011.
  89. ^ "Upgraded Eurofighter offered to Indian Air Force" 5 January 2010 at the Wayback Machine. Thaindian News, 4 January 2010.
  90. ^ "Rafale." Federation of American Scientists. Retrieved: 10 February 2012.
  91. ^ Eurofighter Typhoon | 10 July 2011 at the Wayback Machine. Eurofighter.com. Retrieved on 9 December 2013.
  92. ^ Report on U.S. Competitiveness in the Fighter Aircraft Export Market. CSIS
  93. ^ Capaccio, Tony (16 December 2010). "Lockheed F-35 Program Faces $1 Billion Cut in U.S. Senate Spending Measure". Bloomberg L.P. Retrieved 12 September 2011.
  94. ^ a b David Donald and Chris Pocock, India's fighter shootout has the world’s eye 28 April 2008 at the Wayback Machine, AINonline, 21 February 2008. Retrieved 27 April 2008.
  95. ^ "Yahoo India News – Latest India News & World News Headlines". Yahoo News India.[permanent dead link]
  96. ^ a b RFP for IAF's multi-role combat aircraft pushed back further, Domain-b report from May 2007
  97. ^ . 11 July 2012. Archived from the original on 7 May 2013.
  98. ^ "Defence Technology Indigenisation: Need to go beyond Lip Service". IDSA. Retrieved 5 November 2013.
  99. ^ "DAC clears procurement of 126 MMRCA". Press Information Bureau (PIB), Government of India. 29 June 2007.
  100. ^ a b "RFP for 126 MMRCA released". Press Information Bureau (PIB), Government of India. 28 August 2007.
  101. ^ . SP's Aviation. Archived from the original on 5 November 2013. Retrieved 5 November 2013.
  102. ^ . Aeromag Asia. Archived from the original on 5 November 2013. Retrieved 5 November 2013.
  103. ^ "Indian Air Force to start conducting MMRCA field trials from later on in the year news". Domain-B Domain-b.com'. 8 August 2008.
  104. ^ Govindasamy, Siva. "Indian MRCA bidders submit offset proposals", Flight International, 11 August 2008.
  105. ^ Jaideep Hardikar, IAF’s flying coffins may finally rest in peace, DNA India, 18 November 2008.
  106. ^ IAF for high modernisation[permanent dead link], Deccan Herald, 13 November 2008. Air Marshal F.H. Major: "Citing reasons for delay in IAF’s procurement process, Air Chief Marshal said that in aviation, the gestation period to procure any equipment was very long and it takes about 24–36 months for any requirement to come into effect."
  107. ^ India – Multi-Role Fighter / Medium Multi-Role Fighter Aircraft (MMRCA). Globalsecurity.org. Retrieved 1 February 2011.
  108. ^ "India Rejects Dassault Aviation's Bid". Wall Street Journal, 16 April 2009
  109. ^ . The Times of India, 17 April 2009.
  110. ^ Govindasamy, Siva (20 April 2009). . Flight International. Archived from the original on 21 April 2009.
  111. ^ . The Times of India. 22 May 2009. Archived from the original on 22 October 2012.
  112. ^ "IAF begins flight trials for foreign firms". Press Trust of India. 17 August 2009. Retrieved 19 August 2009.
  113. ^ "F-16 Super Viper IN completes field trials". 7 September 2009. Archived from the original on 16 June 2013. Retrieved 29 September 2009.
  114. ^ . The Hindu. Chennai, India. 26 September 2009. Archived from the original on 29 September 2009. Retrieved 29 September 2009.
  115. ^ India should be front-runner in space technology: Air chief 7 December 2009 at the Wayback Machine. Thaindian.com. Retrieved 1 February 2011.
  116. ^ Sharma, Ravi (22 March 2010). "Gripens head for AFS Jaisalmer". thehindu.com. Chennai, India. Retrieved 6 April 2010.
  117. ^ defence.professionals 20 January 2016 at the Wayback Machine. defpro.com (25 May 2010). Retrieved 1 February 2011.
  118. ^ "Politics/Nation". The Times of India. 1 July 2010.
  119. ^ . timesnow.tv. Archived from the original on 15 August 2010.
  120. ^ Swami, Praveen; Nelson, Dean (6 November 2010). "UK closes in on $11bn fighter deal". The Daily Telegraph. London.
  121. ^ . The Times of India (18 December 2010). Retrieved 1 February 2011.
  122. ^ . Hindustan Times. India. Archived from the original on 1 May 2011.
  123. ^ Bajaj, Vikas (29 April 2011), "India Rejects US Bids for Big Order of Fighter Jets", The New York Times
  124. ^ "Rafale, Eurofighter to fight it out over IAF MMRCA order". India Times. 29 April 2011.
  125. ^ India chooses European fighters over US rivals, UK: BBC, 28 April 2011
  126. ^ . Defense update. Archived from the original on 29 April 2011.
  127. ^ "US–India: defense". Reuters. 30 April 2011.
  128. ^ "US fighter companies satisfied after MMRCA downselect debrief". Flight Global. 15 July 2011.
  129. ^ . Brahmand Defence and Aerospace News. 14 July 2011. Archived from the original on 18 July 2011.
  130. ^ Menon, Jay (28 July 2011), India May Pick Fighter Contest Winner Soon, Aviation Week[permanent dead link]
  131. ^ . Surya Gangadharan, Jaimon Joseph, CNN-IBN. 5 April 2011. Archived from the original on 7 April 2011. Retrieved 16 September 2011.
  132. ^ "Inde : l'Eurofighter serait moins cher que le Rafale". La Tribune. 10 January 2012. Retrieved 30 January 2012.
  133. ^ "India picks French jet over Eurofighter in $10bn deal." BBC News, 31 January 2012. Retrieved: 31 January 2012.
  134. ^ "Rafale edges out Eurofighter." The Hindu, 5 February 2012. Retrieved: 5 February 2012.
  135. ^ Times of India, 10 February 2012. Retrieved: 11 February 2012.
  136. ^ a b "India picks French jet over Eurofighter in $10bn deal". BBC. 31 January 2012.
  137. ^ "France hails India jet deal as vote of confidence". Defence Aerospace. 1 February 2012.
  138. ^ "French Rafale lowest bidder in India". Reuters. 31 January 2012.
  139. ^ a b "France hails India jet deal as vote of confidence". Expatica. 31 January 2012.
  140. ^ Pocock, Chris. "Rafale First Export Success Will Be $10 Billion-plus Indian Order". AINonline. 3 February 2012.
  141. ^ Peacock, Louisa (6 February 2012). "BAE may cut Typhoon price to win India order". The Telegraph. London, UK. Retrieved 10 February 2012.
  142. ^ "BAE may cut price of Eurofighter Typhoon to win back $11 bn deal from Dassault Rafale". The Economic Times. Archived from the original on 9 July 2012. Retrieved 10 February 2012.
  143. ^ . The Times of India. 2 February 2012. Archived from the original on 4 February 2012. Retrieved 10 February 2012.
  144. ^ "Indian MoD Selects Dassault for Exclusive Talks on MMRCA Programme". Defpro. Archived from the original on 29 July 2012. Retrieved 10 February 2012.
  145. ^ Adlam, Jim. "Eurofighter still in running for Indian MMRCA competition?". Air Forces Online. Retrieved 14 March 2012.
  146. ^ |topnews|text|FRONTPAGE "Indian Victory a Breakthrough for France's Rafale". Defense News, 31 January 2012.
  147. ^ "French Rafale favoured for huge India warplane deal." Reuters, 31 January 2012. Retrieved: 31 January 2012.
  148. ^ Hoyle, Craig. "Dassault confirms selection for Indian MMRCA deal". Flight International, 31 January 2012.
  149. ^ "Dassault Rafale bags $10.4 bn deal to supply 126 multi-role combat aircrafts [sic] to IAF". The Economic Times. 31 January 2012. Retrieved 31 January 2012.
  150. ^ . United Press International. 23 March 2011. Archived from the original on 24 March 2012. Retrieved 15 January 2013.
  151. ^ . Rediff.com. 4 April 2012. Archived from the original on 6 April 2012. Retrieved 15 January 2013.
  152. ^ Gupta, Shishir (11 July 2012). . Hindustan Times. Archived from the original on 11 July 2012. Retrieved 15 January 2013.
  153. ^ Luthra, Gulshan (February 2012). . India Strategic. Archived from the original on 12 December 2013. Retrieved 10 December 2013.
  154. ^ . SP's Aviation. 13 February 2012. Archived from the original on 12 December 2013. Retrieved 10 December 2013.
  155. ^ . Zee News. 7 February 2013. Archived from the original on 28 May 2013. Retrieved 10 December 2013.
  156. ^ . The Hindu. 26 July 2013. Archived from the original on 13 December 2013. Retrieved 10 December 2013.
  157. ^ . NDTV. 10 December 2013. Archived from the original on 22 December 2013. Retrieved 10 December 2013.
  158. ^ . Financial Express. 10 December 2013. Archived from the original on 12 December 2013. Retrieved 10 December 2013.
  159. ^ "Air Chief N A K Browne in France, to visit Rafale Squadron". Times of India.
  160. ^ "IAF to finalise Rafale fighter deal this fiscal". Firstpost. 20 September 2012.
  161. ^ "Mali Strikes Showcase Rafale As Hollande, Le Drian Head to UAE."
  162. ^ "Cameron presses India to buy Eurofighter". BFN. 18 February 2013. Archived from the original on 7 April 2013. Retrieved 1 March 2013.
  163. ^ Watt, Nicholas (15 February 2013). "David Cameron to press India over Eurofighter jet sales". The Guardian. London. Retrieved 1 March 2013.
  164. ^ Pandit, Rajat (7 February 2014). "Mega 126-fighter jet deal will be inked next fiscal, defence minister AK Antony says". Times of India. TNN. Retrieved 6 February 2014.
  165. ^ Gokhale, Nitin (3 March 2014). "A big step in India's Rafale jet deal with France". www.ndtv.com. All India. from the original on 3 March 2014. Retrieved 3 March 2014.
  166. ^ Raghuvanshi, Vivek (17 June 2014). "India's fighter jet negotiations stall over delivery commitments". DefenseNews. Archived from the original on 18 July 2014. Retrieved 15 July 2014.
  167. ^ Shukla, Ajai (17 June 2014). "Rafale contract elusive, Eurofighter and Saab remain hopeful". Business Standard. Retrieved 15 July 2014.
  168. ^ Aneja, Atul; Haidar, Suhasini; Singh, Mahim Pratap (1 July 2014). "France confident of clinching Rafale deal". The Hindu. Retrieved 15 July 2014.
  169. ^ "India may curtail Rafale demand". Deccan Chronicle. 2 July 2014. Retrieved 15 July 2014.
  170. ^ "Hague Pushes Eurofighter on India Visit". DefenseNews. 8 July 2014. Archived from the original on 18 July 2014. Retrieved 15 July 2014.
  171. ^ a b c Pandit, Rajat (15 July 2014). "India undertakes final negotiations for mega fighter deal amid hectic lobbying". Times of India. Retrieved 15 July 2014.
  172. ^ "IAF plans early induction of Rafale combat jet". IndiaTV. 16 July 2014. Retrieved 16 July 2014.
  173. ^ Purohit, Jugal R. (16 July 2014). "IAF inches closer to the mega jet fighter deal". indiatoday. Retrieved 16 July 2014.
  174. ^ "India says fighter jet deal with France still in the works". RFI. 13 August 2014. Retrieved 19 August 2014.
  175. ^ Sagar, Pradip R. (18 August 2014). "Rafale fighter jet deal contract with France almost ready: Defence ministry". dna. Retrieved 19 August 2014.
  176. ^ Singh, Rahul (3 September 2014). . Hindustan Times. Archived from the original on 2 September 2014. Retrieved 8 September 2014.
  177. ^ Siddiqui, Huma (31 October 2014). "French team to visit India to put MMRCA deal on fast track". Financial Express. Retrieved 1 November 2014.
  178. ^ Siddiqui, Huma (29 October 2014). "Negotiations moving in right direction: France on Rafale fighter plane deal". The Economic Times. Retrieved 1 November 2014.
  179. ^ "India-Rafale Deal Could Be Concluded By March 2015, Says Dassault CEO". DefenseWorld. 6 November 2014. Retrieved 8 November 2014.
  180. ^ "It's Final: #MMRCA Dead, Rafales Coming". LiveFist. 13 April 2015. Retrieved 13 April 2015.
  181. ^ "Government withdraws tender for 126 MMRCA: Parrikar". CNN IBN. 31 July 2015.
  182. ^ "India finally signs deal with France for 36 Rafale fighters". IHS Jane's Defence Weekly. 23 September 2016. Retrieved 24 September 2016.
  183. ^ "India and France sign Rafale fighter jet deal". BBC News. 23 September 2016. Retrieved 23 September 2016.
  184. ^ Peri, Dinakar (23 September 2016). "India, France conclude Rafale deal". The Hindu. Retrieved 23 September 2016.
  185. ^ "Rafale Deal For 36 Fighter Jets Finally Sealed After Long Wait: 10 Facts". NDTV. Retrieved 23 September 2016.
  186. ^ Bhalla, Abhishek. "Rajnath Singh inducts first Rafale in IAF, says squadron will be ready to be deal with Pak by Feb 2021". India Today.
  187. ^ "Three more Rafale jets arrive in India from France". The Economic Times.
  188. ^ "RFI for Fighter Aircraft For The Indian Air Force".
  189. ^ Request for information for procurement of fighteraircraft for the Indian air force (PDF)
  190. ^ Gurung, Shaurya Karanbir. "Six global companies respond to India's RFI for 110 fighter jets". The Economic Times.
  191. ^ a b "MMRCA 2.0 Contenders".
  192. ^ . Archived from the original on 14 July 2020. Retrieved 11 July 2020.
  193. ^ Publications, L. M. (1 August 2019). "Lockheed Martin F-21: Meet the 'Make In India' Fighter Jet". Global Defense Corp. Retrieved 7 July 2021.
  194. ^ GDC (30 September 2019). "American Lockheed Martin Submit Proposal to Build F-21 Under "Make In India" Initiatives". Global Defense Corp. Retrieved 7 July 2021.

External links edit

  • "The IAF's MRCA contract: A three way shoot-out"
  • , by Air Marshal B.K. Pandey, Former C-in-C, Training Command, Indian Air Force for Bharat-Rakshak
  • "Acquisition of single-engine fighter aircraft – A few suggestions to expedite the procurement process"

indian, mrca, competition, medium, multi, role, combat, aircraft, mmrca, competition, india, also, known, mrca, tender, competition, supply, multi, role, combat, aircraft, indian, force, defence, ministry, allocated, crore, billion, 2008, prices, purchase, the. The Medium Multi Role Combat Aircraft MMRCA competition in India also known as the MRCA tender was a competition to supply 126 multi role combat aircraft to the Indian Air Force IAF The Defence Ministry had allocated 55 000 crore US 6 9 billion at 2008 prices for the purchase of these aircraft 2 making it India s single largest defence deal 3 The MMRCA tender was floated with the idea of filling the gap between its future Light Combat Aircraft and its in service Sukhoi Su 30MKI air superiority fighter The six competing MRCA aircraft L R Rafale Typhoon F 16C D F A 18E F JAS 39 Gripen and MiG 35 1 The contest featured six fighter aircraft Boeing F A 18E F Super Hornet Dassault Rafale Eurofighter Typhoon Lockheed Martin F 16 Mikoyan MiG 35 and Saab JAS 39 Gripen On 27 April 2011 after an intensive and detailed technical evaluation by the IAF it reduced the bidders to two fighters Eurofighter Typhoon and Dassault Rafale On 31 January 2012 it was announced that Dassault Rafale had won the competition due to its lower life cycle cost The deal had been reported to cost US 28 30 billion in 2014 However the deal stalled due to disagreements over production in India Dassault refused to take responsibility for the 108 HAL manufactured Rafales as it had reservations about the ability of HAL to accommodate the complex manufacturing and technology transfers of the aircraft Instead Dassault said it would have to negotiate two separate production contracts by both companies The Indian Defence Ministry instead wanted Dassault to be solely responsible for the sale and delivery of all 126 aircraft 4 5 In May 2013 The Times of India reported that negotiations were back on track with plans for the first 18 Rafales to be delivered in 2017 6 Another point of contention is a provision where Dassault was to reinvest 50 percent of the deal s earnings into India s defence sectors either through purchases or technological expertise 7 8 In March 2014 the two sides were reported to have agreed that the first 18 aircraft would be delivered to India in flying condition and that the remaining 108 would be 70 percent built by HAL 9 In December 2014 update it was reported that India and France expect to sign a contract by March 2015 10 On 13 April 2015 the defence minister Manohar Parrikar made an announcement that the M MRCA tender is effectively dead India officially withdrew the 126 aircraft MMRCA tender on 30 July 2015 11 12 On the joint press statement made by Prime Minister Narendra Modi s with President Francois Hollande during his visit of France the PM said that India will purchase 36 Rafales This contract was finalised and all the 36 aircraft will arrive in India in flying condition 13 The agreed upon terms in April 2015 totaled US 8 8 billion 14 15 for 36 airplanes costing 244 million each with an offset requirement of 30 percent of the deal s value for France to reinvest in India s defense sector and create infrastructure in India for the Rafale to operate In January 2016 the Indian government directed the Indian Navy to undertake detailed briefings with Dassault regarding the Rafale in a potential start to procurement of the naval version for its aircraft carriers The government wants commonalities between logistics and spares for fighters with the Navy and Air Force which could lead to a purchase of 54 naval fighters 16 Contents 1 Background 1 1 Indian Air Force summary 1 2 IAF sanctioned fleet size 1 3 Aging MiGs 2 Requirements 3 Bidders 3 1 Dassault Rafale 3 2 Eurofighter Typhoon 3 3 Boeing F A 18E F Super Hornet 3 4 Lockheed Martin F 16IN Super Viper 3 5 Mikoyan MiG 35 3 6 Saab Gripen NG 3 7 Comparison of the aircraft 4 Order value 4 1 Offset clause 5 Tender history 5 1 Request for proposal 5 2 Tender process 5 3 Testing and evaluations 5 4 Aircraft shortlisted 5 5 Selection of the Rafale 5 5 1 Reactions to selection 5 6 Contract negotiations 5 6 1 Initial negotiations 5 6 2 Delays 5 6 3 Continued delays and final negotiations 5 6 4 Change of Plan 6 Fate of the deal 7 MRFA 8 See also 9 References 10 External linksBackground editIndian Air Force summary edit The Indian Air Force IAF is the air arm of the Armed Forces of India and has the primary responsibility of conducting aerial warfare defending the Indian airspace conducting strategic strikes inside enemy territory and providing aerial cover to ground troops 17 It is the fourth largest air force in the world with a strength of more than 1 500 aircraft including more than 750 combat aircraft 18 19 IAF sanctioned fleet size edit The minimum sanctioned strength of the IAF is 39 5 squadrons of combat aircraft with a healthy level of 44 squadrons 20 21 However this level was achieved only in the mid 1980s with the acquisition of the Mirage 2000s MiG 29s and Jaguars In addition most IAF aircraft were comparatively new at the time being less than 10 years old Most of the older aircraft would have become obsolete by the mid 1990s with the rest needing replacement by 2010 However these aircraft were not replaced which led to frequent crashes and attrition losses Reduction in force levels and phasing out of aircraft have meant that the IAF operates only 30 fighter squadrons as of January 2014 22 Even with the planned MMRCA procurement the IAF will reach sanctioned strength only by 2017 20 nbsp A Sukhoi Su 30MKI Aging MiGs edit nbsp IAF MiG 21 Bison the latest upgrade of IAF MiG 21s Due to budgetary constraints specifically the economic problems in the early 1990s the refurbishment of old planes and purchase of new ones was halted Added to this was the disintegration of the Soviet Union which led to severe shortage of aircraft spares which rendered many of them unserviceable citation needed The attrition was stemmed to some extent by extensive upgrade programs on the MiG 21 bis upgrade MiG 27 Jaguar DARIN I upgrade and other aircraft in the mid 1990s citation needed An aggressive program of upgrades was initiated The MiG 21bis aircraft have been upgraded to MiG 21 Bison levels 125 aircraft will be upgraded to that standard Jaguars to DARIN III standards and Mirage 2000s and MiG 27s were also upgraded The MiG 23MF air defence interceptor was phased out in 2007 by the IAF Further retirements of MiG 23BN ground attack aircraft began in March 2009 23 24 With decreased aircraft squadrons level MiG 23s are set to be replaced by MRCA winner 25 Requirements editThe IAF projected a requirement for about 126 aircraft in 2001 when the strength was at 39 5 squadrons down from 45 There is an option for an additional 74 aircraft 26 Initial requirements appeared to be for a 20 ton class fighter aircraft with the Mirage 2000 as the strongest contender However the 20 ton MTOW limit requirement has been removed Also considering the delays in the bidding it was very likely that the LCA would be ready for induction by then The IAF then would require replacements for its frontline strike aircraft like the MiG 27 and Jaguar which would be retiring by 2015 India s future 5th generation aircraft the Russo Indian Sukhoi HAL FGFA and the indigenous Medium Combat Aircraft will not be ready before 2025 27 and 2022 respectively thus providing the need for a replacement Thus the MRCA tender is more likely to be a medium weight aircraft MTOW of 24 tons This has led to a renaming of the competition as the Medium Multi Role Combat Aircraft MMRCA tender citation needed The Indian government is to buy the first 18 aircraft directly from the manufacturer The remaining fighters will be built under licence with a transfer of technology ToT by HAL 28 The IAF was keen on buying the Mirage 2000 5 after it was impressed by the Mirage 2000 s capabilities during the Kargil War However due to the upcoming manufacture of the Dassault Rafale and lack of orders the Mirage production lines were to be closed down French officials stated that they could be kept open if India had made a firm commitment However the Indian Government decided to go in for a multi vendor tendering process Requests for Information RFI were issued in 2004 The RFIs were initially sent to four vendors Dassault Mirage 2000 5 Mk 2 Lockheed Martin F 16C D Mikoyan MiG 29OVT and Saab JAS 39 Gripen 29 Due to the tendering process and delay in issuing the RFIs Dassault decided to remove the Mirage 2000 5 from the bidding process and enter the Rafale in its place The MiG 35 was entered in place of the prototype MiG 29OVT The Eurofighter consortium entered the Typhoon into the competition The Boeing F A 18E F Super Hornet also joined the tendering 30 Bidders editSix aircraft were bid for the order the Swedish Saab Gripen Eurofighter Typhoon French Dassault Rafale Russian Mikoyan MiG 35 and the American F 16IN and F A 18IN Super Hornet IN are the proposed Indian versions Previously Mikoyan and Dassault have been regular suppliers of aircraft for the Indian Air Force and in terms of transfers of technology licensed production in India personnel training supply of spare parts maintenance and upgrading 31 Dassault Rafale edit nbsp Dassault Rafale the Winner of MRCA competition Main article Dassault Rafale The Dassault Rafale is a French twin engined delta wing agile multi role fighter aircraft designed and built by Dassault Aviation The Rafale was brought in as the replacement for the Mirage 2000 5 that was originally a competitor for the tender 32 after the production lines for the Mirage closed down as well as the entry of much more advanced aircraft into the competition 33 The Rafale has the advantage of being logistically and operationally similar to the Mirage 2000 which the IAF already operated and used with great success during the Kargil War in Operation Safed Sagar This would require fewer changes in the existing infrastructure of the IAF which reduces costs Moreover being 100 French also provided Dassault a distinct edge over its competitors on the issue of technology transfer 34 Dassault claims that the Rafale has an advantage over many of the competitors because it is not subject to ITAR restrictions 35 While not included in the MRCA requirement the French fighter has more configurations of potential interest for the IAF a carrier based version the Rafale M and a capability for nuclear strategic strike Both of these particular versions are in use in the French Armed Forces At present however the Rafale M uses a catapult system not present on the initial Vikrant and the nuclear strike use is earmarked by others jets of the IAF 36 On 26 June 2012 it was revealed that the Rafale M naval variant could be used on a STOBAR aircraft carrier without any modification of the planes or installation of catapults on the flight deck 37 The French government has cleared full technology transfer of the Rafale to India including that of the RBE2 AA AESA radar which will be integrated into the Rafale by 2010 38 and also the transfer of software source code which will allow Indian scientists to re programme a radar or any sensitive equipment if needed 34 Without the software source code the IAF would have to specify mission parameters to foreign manufacturers to enable configuration of their radar seriously compromising security in the process 39 Dassault has also offered to fit the GTX 35VS Kaveri engine into the Rafale which if chosen would greatly improve commonality with the HAL Tejas that will enter service into the IAF by 2010 Concerns have been raised about cost issues as well as potential sales to Pakistan which has also expressed interest in the Rafale However no such jets have been sold to Pakistan India and France have recently agreed to go beyond a buyer seller relationship 40 On 31 January 2012 Rafale was declared the winner of the MMRCA competition beating Eurofighter Typhoon on cost 41 Eurofighter Typhoon edit nbsp Eurofighter Typhoon Main article Eurofighter Typhoon The Eurofighter Typhoon is a twin engine multi role canard delta air superiority fighter aircraft designed and built by a consortium of European aerospace manufacturers through Eurofighter GmbH Eurofighter is offering the Tranche 3 Typhoon for the Indian requirement equipped with the CAESAR AESA radar EADS has invited India to become a partner of the Eurofighter Typhoon programme if the Typhoon wins the contract and will be given technological and development participation in future tranches of the Typhoon 42 Bernhard Gerwert CEO of EADS Defense Department elaborated that if India becomes the fifth partner of the Eurofighter programme it will be able to manufacture assemblies for new Eurofighters 43 In January 2010 EADS offered to include thrust vectoring nozzles TVNs with the Typhoon s EJ200 engines for India Thrust vectoring will improve operational capabilities and reduce fuel burn by up to 5 and increase thrust while supersonic cruising by 7 44 Boeing F A 18E F Super Hornet edit nbsp F A 18F Super Hornet Main article Boeing F A 18E F Super Hornet The Boeing F A 18E F Super Hornet is a twin engine carrier based multirole fighter aircraft The MMRCA contract represents a prime opportunity for US defence companies to gain a foothold in the Indian defence market which is estimated to be about US 100 billion in the next 10 years Initially the Request for Information RFI was not issued to Boeing which decided to field the Super Hornet The US Government allowed Boeing to participate in the RFI and later gave permission for the Request For Proposal RFP However any sale of aircraft would have to be approved by the US Congress Initial reactions within the IAF were enthusiastic although there were apprehensions of support issues in case of future sanctions The US stated that there would have been some restrictions and pre conditions for the purchase of the aircraft 45 On 24 April 2008 Boeing submitted its 7 000 page proposal to the Ministry of Defence through the US Embassy in New Delhi before the 28 April deadline for the submission for proposals The Super Hornet variant being offered to India the F A 18IN is based on the F A 18E F model operated by the US Navy and being built for the Royal Australian Air Force RAAF Raytheon s APG 79 AESA radar was offered on the aircraft There would have been limited Transfer of Technology on the radar up to the level approved by the US Government However Raytheon stated that the level of ToT offered would be compliant with the RFP requirements 46 Delivery of the first F A 18IN Super Hornets could have begun approximately 36 months after contract award 47 Boeing proposed joint manufacture of the jets with Indian partners It also planned to offset the cost by setting up a US 100 million maintenance and training hub in Nagpur This is the first time the Super Hornet has been offered for production in a foreign country 48 On 14 February 2008 Boeing and Tata Industries agreed to form a joint venture company The new entity formed in February 2008 will supply components for Boeing military aircraft including the Super Hornet 49 50 In order to satisfy its offset requirements Boeing has signed long term partnership agreements with Hindustan Aeronautics Limited HAL Tata Industries and Larsen amp Toubro 47 Lockheed Martin F 16IN Super Viper edit nbsp F 16 Block 60 See also General Dynamics F 16 Fighting Falcon Variants India initially sent the RFI for a F 16C D Block 52 configuration aircraft On 17 January 2008 Lockheed Martin offered a customized version of the F 16 the F 16IN Super Viper for the Indian MMRCA contract 51 The F 16IN which is similar to the F 16 Block 60 will be a 4 5 generation aircraft It will be more advanced than the F 16 Block 52s that the Pakistan Air Force has acquired Lockheed Martin described the F 16IN as the most advanced and capable F 16 ever Based closely on the F 16E F Block 60 as supplied to the UAE the features on the F 16IN include 52 Conformal Fuel Tanks CFTs This will give the F 16IN a combat range of 1700 km with 1500 kg weapons load A Northrop Grumman AN APG 80 AESA active electronically scanned array radar 53 This is the same radar fitted on the F 16 Block 60s in service in UAE General Electric F110 132A engine with 143 kN full afterburning thrust with FADEC Controls Electronic warfare suites and infra red searching Advanced all color glass cockpit Helmet mounted cueing system Lockheed Martin offered to sell India the F 35 Lightning II aircraft in the future as replacements if the F 16 was chosen 52 Mikoyan MiG 35 edit nbsp Mikoyan MiG 35 Main article Mikoyan MiG 35 The Mikoyan MiG 35 Russian Mikoyan MiG 35 NATO reporting name Fulcrum F is the production version of the latest MiG 29 and incorporates mature development of the MiG 29M M2 and MiG 29K KUB technology such as glass cockpit and fly by wire technology The IAF already operates MiG 29s and the Navy has ordered MiG 29K KUBs for its INS Vikramaditya formerly Admiral Gorshkov and INS Vikrant class aircraft carriers Russia unveiled the MiG 35 at Aero India 2007 in Bangalore amid Moscow s keen interest to sell these planes to India This was the first time that the final version of the MiG 35 was publicly displayed at an international air show and thus generated a great deal of interest 54 Since the IAF already has maintenance and upgrade facilities for the MiG 29 this would mean that the fighter could be brought into service with a minimum of expenditure on infrastructure citation needed A major advantage of MiG 35 is that Russia is committed to transfer the plane s technology including the new advanced Zhuk Active Electronically Scanned Array radar to India 55 In the past Russia has provided customised versions of military equipment such as the Su 30MKI and continued to provide support for equipment during international sanctions However Russian product support especially for the MiG 29 fleet has been inadequate 56 Additionally buying the MiG 35 would mean an almost total dependence on a single supplier for India s entire fighter fleet Recent Russian demands for renegotiation of earlier contracts the sale of RD 93 engines a variant of the Klimov RD 33 that powers the Indian MiG 29s to Pakistan for its JF 17 Thunder aircraft and concurrently supplying combat aircraft to China 56 has also caused concern in New Delhi Saab Gripen NG edit nbsp Gripen in flight Main article Saab JAS 39 Gripen The Saab JAS 39 Gripen Griffin or Gryphon is a fighter aircraft manufactured by the Swedish aerospace company Saab The aircraft is in service with the Swedish Czech Hungarian Brazilian and the South African air forces The Royal Thai Air Force has also received the aircraft The Gripen was one of the aircraft that the IAF sent the Request for Information The Gripen participated at Aero India 2007 where one JAS 39C single seater and two JAS 39D two seater variants were brought 57 Gripen International offered the Gripen IN a version of the Gripen NG Next Generation for India s competition 58 The Gripen NG has increased fuel capacity more powerful powerplant higher payload upgraded avionics and other improvements 59 60 Comparison of the aircraft edit Aircraft Dassault Rafale 61 Eurofighter Typhoon 62 63 F 16IN Super Viper 64 65 F A 18E FSuper Hornet 66 67 68 69 JAS 39 NG IN 59 70 71 72 73 74 75 MiG 35 Fulcrum F 76 77 78 79 80 Country of origin nbsp France nbsp Germany nbsp Italy nbsp Spain nbsp United Kingdom nbsp United States nbsp United States nbsp Sweden nbsp Russia Manufacturer Dassault Aviation Eurofighter GmbH Lockheed Martin Boeing Defense Space amp Security Saab RAC MiG Length 15 30 m 50 1 ft 15 96 m 52 ft 5 in 15 03 m 49 ft 3 in 18 31 m 60 ft 1 in 15 2 m 49 ft 10 in 17 3 m 56 ft 9 in Wingspan 10 90 m 35 7 ft 10 95 m 35 ft 11 in 10 0 m 32 ft 8 in 13 62 m 44 ft 8 in 8 6 m 28 ft 3 in 12 m 39 ft 4 in Height 5 30 m 17 3 ft 5 28 m 17 ft 4 in 5 09 m 16 ft 7 in 4 88 m 16 ft 4 5 m 14 ft 9 in 4 7 m 15 ft 5 in Wing area 45 7 m 492 ft 50 0 m 538 ft 27 9 m 300 ft 46 5 m 500 ft 31 0 m 334 ft 38 0 m 409 ft Empty weight 10 000 kg 22 046 lb 11 000 kg 24 250 lb 9 979 kg 22 000 lb 81 14 552 kg 32 081 lb 69 8 000 kg 17 600 lb 11 000 kg 24 280 lb Maximum payload 9 500 kg 21 000 lb 9 000 kg 19 800 lb 7 800 kg 17 200 lb 8 050 kg 17 750 lb 5 300 kg 11 880 lb 82 6 500 kg 14 330 lb Maximum takeoff weight MTOW 24 500 kg 54 013 lb 23 500 kg 51 800 lb 21 800 kg 48 000 lb 29 937 kg 66 000 lb 69 16 500 kg 36 400 lb 24 500 kg 54 013 lb Powerplant 2 SNECMA M88 2 2 Eurojet EJ200 1 GE F110 132 2 GE F414 400 1 GE F414 GE 39E 2 Klimov RD 33MK Thrust Dry thrust 50 kN each 11 250 lbf 60 kN each 13 500 lbf 84 kN 19 000 lbf 62 3 kN each 14 000 lbf 62 3 kN 14 000 lbf 47 kN each 10 600 lbf Afterburner thrust 75 kN each 17 000 lbf 90 kN each 20 232 lbf 144 kN 32 500 lbf 98 kN each 22 000 lbf 98 kN 22 000 lbf 80 kN each 18 000 lbf Fuel Internal External 4 700 kg7 500 kg 4 996 kg 83 3 265 kg5 880 kg F A 18E 6 780 kg 5 tanks total 7 381 kg 3 400 kg 72 3 655 kg 72 4 800 kg4 200 kg External stations 14 5 wet 13 3 wet 11 3 wet 11 5 wet 10 4 wet 9 5 wet Maximum speed At sea level Mach 1 8 Supercruise Mach 1 84 Mach 2 0 85 Supercruise Mach 1 2 Mach 2 05 800 KCAS Mach 1 8 Mach 2 0 Supercruise Mach 1 2 86 Mach 2 25 Mach 1 2 Ferry range Unrefueled Extl tanks 3 700 km 3 790 km 87 4 220 km 3 054 km 2 500 km 4 075 km 2 000 km 3 000 km with 3 drop tanks Combat radius 1 800 km 1 390 km on air defence with 10 min loiter 88 550 km on a hi lo hi mission with six 1 000 lb 450 kg bombs 722 km 1300 km with six AAMs drop tanks and 30 min on station 1000 km Service ceiling 15 240 m 50 000 ft 19 812 m 65 000 ft 18 000 m 60 000 ft 15 000 m 50 000 ft 15 240 m 56 000 ft 17 500 m 57 400 ft Rate of climb 305 m s 60 000 ft min 315 m s 62 000 ft min 254 m s 50 000 ft min 228 m s 44 882 ft min N A 330 m s 65 000 ft min Thrust weight 1 13 1 18 1 1 0 93 1 18 1 1 Thrust vectoring None Thrust vector upgrade has been offered 89 None None None May be fitted with thrust vectoring Runway needed 400 metres 1 300 ft 90 700 metres 2 300 ft Unit cost US 84 48 million 64 million US 108 million 80 million as of 2009 91 US 50 million 92 US 55 million as of 2011 93 US 48 million US 38 5 million Notes Wet stationsOrder value editThe order is for 126 aircraft with the option to buy another 64 74 more 94 While there were reports of the direct order being increased to 200 or split between two vendors Former Chief of Air Staff of the IAF Air Marshal S P Tyagi stated during Aero India 2007 that the number would remain the same and would be sourced from a single vendor 95 The first squadron would be directly supplied by the vendor while the rest would be manufactured under license in India by HAL 30 The Government of India has sanctioned approximately 37 000 crore US 4 6 billion 96 with reports that another US 2 billion might be added to this This is indicative of the high importance of the order to the respective vendors The total value of purchasing the aircraft is expected to be US 20 billion with options for purchasing more aircraft 97 Offset clause edit The economic offset for the MMRCA tender was increased to 50 under the DPP 2006 The bidders must confirm the offset details in a separate proposal to be submitted by 9 June 2008 94 This brings the value of offsets in the MMRCA deal to almost 25 000 crore US 3 1 billion Tender history editSee also Rafale deal controversy nbsp An advertisement for the Saab Gripen at a bus station in Central New Delhi in March 2008 The importance of the contract has led to hectic advertising and lobbying by the bidders The bus stop in this image is located very close to major Government offices Parliament and Indian Army and Indian Air Force Headquarters Request for proposal edit The initial Request for Information RFI for the Multi Role Combat Aircraft MRCA was put out in 2001 At that time the request for proposal RFP was expected to be issued in December 2005 Later the RFP was expected to be issued in June 2007 96 During Aero India 2007 Defence Minister A K Antony stated that the RFP would be issued by 31 March 2007 However Air Marshal A S Tyagi in his last press conference before he retired had stated that there were delays in issuing the RFP His successor Air Marshal F H Major had said that the RFP would be issued by June The delays were said to be due to new factors added into the RFP such as Total Life cycle Costs as well as fine tuning the Offset policy under the new DPP 2005 The Total Life cycle Cost has been introduced for the first time in Indian defence procurements and has reportedly been a major source of the delay 30 98 On 29 June the Defence Acquisition Council DAC headed by the Defence Minister cleared the process for the procurement of 126 aircraft 99 The 211 page RFP was approved for release to the respective bidders On 28 August 2007 the RFP was released to the 6 bidding companies 100 Tender process edit The bidders had to give their Formal Proposals within six months from the release of the RFP latest by 3 March 2008 However some of the bidders asked for an extension of the deadline citing complexity of the RFP The deadline for submission of the proposals was then extended by a month The Formal Proposals will have to be submitted by 28 April 2008 The Proposals will then be technically evaluated to check for compliance with IAF s requirements and other RFP conditions After that field trials will be carried out to evaluate the performance Finally the Commercial Proposal of the vendors short listed after technical and field evaluations will be examined and compared and a winner announced 30 101 102 After the winner is chosen there will be further rounds of negotiation to decide the final price as well as sensor suite and aircraft configuration along with other factors like offsets and maintenance The first squadron of 18 aircraft will come in a fly away condition while the remaining 108 will be manufactured in India under ToT 100 Testing and evaluations edit nbsp Typhoon On 8 August 2008 the then IAF Chief Air Marshal Fali H Major informed that technical evaluations were being conducted and claimed that the IAF is all set to conduct field trials of the MRCA bidding aircraft in the second half of 2008 103 The industry offset proposals from the bidders have been provided to India as of 11 August 2008 104 The technical evaluation of the medium multi role combat aircraft MMRCA has been completed by 18 November 2008 105 There have been concerns that this process would take a few years at least and getting the aircraft after that would take longer It is reasonable to expect that the aircraft can be delivered no sooner than 2011 106 In January 2009 SAAB International proposed to India the transfer of technology if Gripen win the MRCA and make India an independent manufacturer of its own fighter jets SAAB favored extensive transfer of technology well in excess of 60 more than requirement of RFI to boost India s indigenous capabilities in fighter jets 107 It was reported in April 2009 that Dassault Aviation s Rafale has been rejected after technical evaluation of the fighters 108 109 However this has been disputed by IAF 110 In late May 2009 Times of India has reported that Dassault Aviation has submitted the missing answers to the General Staff Qualitative Requirements drawn up by the IAF and after serious diplomatic intervention they are back in the race 111 On 27 May 2009 Indian Air Force completed the technical evaluation of all 6 fighter jets Air chief marshal Fali H Major told the press that the reports had been submitted to the ministry of defence The aircraft will be put through a rigorous testing process at Bangalore Jaisalmer and Leh The aircraft will undergo technical and humid condition tests in Bangalore Desert trials will be conducted in Jaisalmer Rajasthan and High altitude and mountainous condition trials will be conducted at Leh in Ladakh 34 nbsp Rafale Flight evaluation of the fighters started in August 2009 at Bangalore 112 The F A 18E F and F 16IN completed their field trials by mid September 2009 113 The Rafale began trials in late September 2009 114 As of late October 2009 the IAF has completed the trials of F A 18 F 16 Rafale and MiG 35 According to Air Chief Marshal P V Naik all the aircraft tested so far are going neck and neck 115 The Gripen was the last of the aircraft to be evaluated by the IAF On 22 March two Gripens left Bangalore one to Jaisalmer and the other to Leh Ladakh At Jaisalmer AFS a Gripen would undertake the hot weather trials and also a dummy run and bomb drop at the Pokhran Firing Range The other Gripen headed towards Leh would perform high altitude tests involving landing refueling and restarting engines Prior to the Gripen 4 out of the 5 aircraft had issues restarting their engines during trials conducted in Leh 116 The Gripen completed its high altitude tests in Leh and other hot weather tests 117 Updated bids were requested by the MOD in April 2010 The IAF was to complete an evaluation report on the six fighters in July 2010 and then begin to shortlist them based on the air force s evaluations 118 A report suggested Rafale and Typhoon were in the final stage 119 The Sunday Telegraph reported in November 2010 that the Eurofighter Typhoon was leading the competition on technical terms Now Indian government will take its strategic decision 120 On 18 December 2010 the IAF chief stated that the evaluation of the fighters has been completed and the matter is now with the Ministry of Defence He hoped a contract would be signed by July 2011 121 Aircraft shortlisted edit It was reported on 27 April 2011 that only Eurofighter Typhoon and Dassault Rafale made the cut to the shortlist 122 123 Eurofighter and Dassault have been told to keep their commercial bids open till 31 December 2011 124 The US ambassador in India Timothy Roemer said that they were deeply disappointed by the news but added that they were reviewing the documents received from the Government of India and were respectful of the procurement process He also said that the US looked forward to continuing to grow and develop their defence partnership with India 125 Officials from SAAB confirmed that the Gripen was not shortlisted but added that they were committed to the Indian market and continue their plans for growth and that they see large business opportunities in the aerospace defence and security sectors in India 126 A leaked US diplomatic cable has brought forward the fact that US diplomats already held the view that Indian defense trade in such important deals with the US will be subject to scrutiny owing to the US maintaining a favorable military partnership with Pakistan and due to the sanctions that the US imposed on India after the Pokhran II nuclear tests Timothy Roemer the US ambassador to India said in a 29 October 2009 cable to Michele Flournoy a top Pentagon official then about to visit India that Our ability to seize the opportunities presented by this newly improved environment is limited by the commonly held view that the US will not prove to be a reliable supplier of defense equipment 127 After entries from Lockheed Martin and Boeing were not short listed both companies requested a debrief to understand why their bids fell short in the technical evaluation On 11 July 2011 representatives from Lockheed Martin and Boeing attended a government to government debriefing between Indian and US officials The companies stated they accepted the IAF decision in releases 128 129 In late July 2011 the IAF said that the lowest bidder was to be determined in the next five to six weeks 130 The Air Force is not looking at price That s not our area of concern What we want is QRs are focussed on technical aspects latest technology Air Marshal PK Barbora Ex Vice Chief of Air Staff 131 On 9 October 2011 despite reports that a winner would be announced in October 2011 Air Chief Marshal Norman Anil Kumar Browne stated that India is first approving the finalists industrial offset offers and allowing each time to make a final bid A total cost based on life cycle cost purchase cost and technology transfer value for each competitor will be calculated The two competing financial bids were formally opened on 4 November 2011 30 French newspaper La Tribune reported on 12 January that the Eurofighter consortium seems to have submitted the lower bid 132 Selection of the Rafale edit On 31 January 2012 it was announced that the Dassault Rafale won the competition and has been selected for exclusive negotiations 133 The reasons given for selection included lower unit cost and lower overall lifecycle cost for the Rafale compared to the Eurofighter due to lower fuel consumption and simpler maintenance requirements 134 Some reports indicated that EADS may try to re enter the bid with a lower price quote but MoD sources ruled out re entry the Rafale s lifecycle cost per unit was about 40 million less than that of the Typhoon MoD sources also indicated that the final value of MMRCA deal for 126 aircraft After negotiations was expected to be about 20 25 billion 135 Defense analysts also point out the operational performance of Rafale during the Libyan bombing campaign and in Afghanistan the existing experience of the Indian Air Force in operating the French Mirage 2000H during the Kargil War and compatibility with Indian Israeli and Russian sub systems as possible reasons 136 It was also noted that the recent decision to upgrade India s Mirage 2000H fighters will simplify the Indian Air Force s logistics chain Historical reasons are also considered by analysts to be a potential reason as France was also the only Western nation not to impose sanctions after India tested five nuclear devices in 1998 137 Reactions to selection edit The decision was welcomed in France with the French President Nicolas Sarkozy Minister of State for Foreign Trade Pierre Lellouche and Dassault Aviation all issuing statements in support of the decision Dassault Aviation shares soared more than 21 percent on the Paris Stock Exchange immediately after the news broke 138 Nicolas Sarkozy said the selection of Dassault s Rafale multi role fighter goes far beyond the company that makes them far beyond aerospace it is a vote of confidence in the entire French economy 139 The office of the French President issued a statement The President of the French Republic has learned of India s selection of the Rafale for the acquisition by the Indian Air Force of 126 fighter aircraft France is pleased with the Indian government s decision to select the French aircraft to enter into exclusive negotiations with Dassault This announcement comes at the end of a very high level fair and transparent competition involving two European finalists The Rafale has been selected thanks to the aircraft s competitive life cycle costs after the April 2011 pre selection on the basis of its top level operational performance The negotiation of the contract will begin very soon and has the full support of the French authorities It will include important technology transfers guaranteed by the French government The realization of the Rafale project will illustrate the depth and scale of the strategic partnership between France and India 140 Dassault Aviation also released a statement claiming that following the announcement of the final selection of the Rafale in the frame of the MMRCA program Dassault Aviation and its partners are honored and grateful to the Indian Government and the people of India to be given the opportunity to extend their long lasting cooperation Dassault Aviation also stated that they reiterate their commitment to meet the operational requirements of the Indian Air Force and underline their pride in contributing to India s defence for over half a century The French Minister of State for Foreign Trade Pierre Lellouche called the selection as a positive sign for the struggling French economy but he later cautioned that a number of things remained to be finalized I confirm that we are in a very positive phase for the Rafale in India At this stage we have to remain prudent we are in a phase of exclusive negotiations We have won the contract but there a number of things to finalize so let s be cautious for now He also stated that he hoped that the order will finally open up real perspectives for the Rafale programme and referring to the lobbying done by the American Russian and British governments added that the political pressure applied by the competitors did not make things very easy 139 Eurofighter issued a statement saying that although they are disappointed they respect the decision India took the decision to select our competitor as the preferred bidder in the Medium Multi Role Combat Aircraft MMRCA tender Although this is not yet a contract signature and contract negotiations are still ahead we are disappointed However we respect the decision of the Indian MoD With the Eurofighter Typhoon we offered the Indian Air Force the most modern combat aircraft available Based on the Indian Government feedback we will now carefully analyze and evaluate this situation together with our European Partner Companies and their respective Governments Officials at the British High Commission in Delhi also said they were disappointed with the decision but added that it was expressly said this was about the cost of the contract not a reflection on the health of bilateral relations between India and the countries 136 After the announcement of Dassault Rafale as the L1 bidder the Eurofighter Consortium also decided to lower the price of the Typhoon jets to stay in the race This decision came after extensive discussion amongst the member nations However the Indian MoD officials ruled out any possibility of a comeback by the Eurofighter Typhoon in the competition According to them Dassault Rafale beat the Typhoon by a huge margin in terms of life cycle costs as well as direct acquisition costs In March 2012 UK defense minister Gerald Howarth told the British House of Commons that the Eurofighter Consortium respects the Indian government s decision but stands ready to enter further negotiations if possible 141 142 143 144 145 Contract negotiations edit Initial negotiations edit See also Dassault Rafale in India Though a letter of intent LoI has been issued to Dassault contract negotiations must be completed 146 Indian Defence Minister A K Antony confirmed that the contract was not expected to be signed until after March 2012 147 A total of 126 Rafale fighters are to be supplied Dassault Aviation is to build the initial batch of 18 with the remaining aircraft produced by HAL in India 148 149 It has been speculated that at a later stage India s order may include a further 64 aircraft to equip three squadrons Some Indian politicians have questioned the aircraft s performance notably precision bombing in Operation Harmattan during the Libyan Civil War and have alleged manipulation in the evaluation process 150 151 In response to these concerns an independent investigation concluded that the evaluation was conducted according to the RFP terms and defence procurement procedures 152 In February 2012 Dassault Aviation and Reliance Industries Ltd RIL formed a joint venture for joint opportunities in the defence sector and cooperation in the execution of the MMRCA deal The partnership provides Dassault with a substantial opportunity to fulfill its offset responsibilities under the contract 153 154 Dassault wanted RIL to be the main partner in production of the aircraft but the Indian government refused to allow that as the tender for the procurement had already specified that Hindustan Aeronautics would be the lead integrator The differences were resolved when Dassault agreed to the Indian government s condition 155 156 Dassault will now help Reliance create a 1 500 crore US 188 million factory in Bangalore similar to its production facilities in France to produce the wings of aircraft 157 158 Indian Air Force chief Air Chief Marshal N A K Browne went on a four day tour of France from 21 May 2012 The tour was to include a visit to a French Rafale squadron and see Rafale s production facilities at Merignac He would also meet the French Chief of Defence Staff Admiral Edouard Guillaud and his French Air force counterpart General Jean Paul Palomeros to discuss the ongoing defence cooperation between India and France 159 Delays edit In September 2012 India media outlets suggested cost escalation and contract delays are likely 33 The Indian Air Force expected to complete negotiations and sign the contract by the end of the fiscal year in March 2013 160 However in 2013 Indian Minister of External Affairs Salman Khurshid said that the contract was taking longer than expected to finalize 161 EADS on the other hand is still hopeful of the contract given the delay in signing the contract It is said that the deal came up during the visit of British prime minister to India in February 2013 162 163 In January 2014 the cost of the aircraft had reportedly escalated by 100 to no less than US 28 30 billion The cost of the program was projected at US 12 billion Rs42 000 crore in 2007 The cost increased to US 18 billion Rs90 000 crore in January 2012 when the lowest bidder was declared 22 In February 2014 it was reported that contract had not been signed due to the department s budget had been spent for the year but that it was expected to be signed in the next fiscal year not before six months after the new government takes charge after the elections 164 In March 2014 the two sides were reported to have agreed that the first 18 aircraft would be delivered to India in flying condition and that the remaining 108 would be 70 built by HAL 165 In June 2014 following the Indian general elections it was reported the contract negotiations had stalled as neither Dassault Aviation nor HAL which would produce the Rafale in India were willing to issue written guarantees on delivery schedules a condition which the MoD insisted upon before signing the contract for the aircraft 166 Owing to the continued deadlock over the Rafale negotiations it was reported that both Eurofighter and Saab remained hopeful their bids could be reconsidered Saab had also submitted a proposal to co develop the HAL Tejas Mk II LCA with the Defence Research and Developments Organisation DRDO thus reducing the need to induct the Rafale however a spokesman for the DRDO said foreign assistance with the Tejas Mk II project was not needed as the work was progressing satisfactorily 167 On an official visit to India at the start of July 2014 Laurent Fabius the Foreign Minister of France said discussions were developing in a very positive way and that he was very confident about the final outcome It was also noted that of the four committees set up by the MoD to review the Rafale project three had replied positively about inducting the aircraft but that the recommendation of the fourth committee which dealt with pricing and costs would be crucial for the government s final decision Analysts also noted that it was vital for the technology element of the project to also be transferred to India 168 During the visit there was speculation that the MoD was considering reducing the order from 126 to 80 aircraft due to the escalating costs of the deal 169 During an official visit from 6 8 July 2014 the British Foreign Secretary William Hague said he had discussed the Rafale contract and the Eurofighter among other issues with Sushma Swaraj the new Indian Minister of External Affairs Of course we have always had a strong belief in the capabilities of the Eurofighter and its potential It is always available to those countries that are able and willing to purchase it Hague told reporters 170 Germany also expressed support for the Eurofighter to be reconsidered and the US lobby said re evaluating the American candidates in the MMRCA competition would set the right tone for a September visit to the US by the new Prime Minister Narendra Modi 171 By 14 July 2014 it was reported another meeting of a sub committee of the contract negotiation committee had been scheduled for later that week in Bangalore with MoD Air Force Dassault DRDO and HAL representatives to be in attendance 171 It was reported the contract negotiations had finally reached the stage where they could be finalised in the upcoming three months after which the Cabinet Committee on Security CCS would review the approval process before the contract could be signed According to a source none of the previously eliminated candidates in the MMRCA competition could be officially re evaluated There are only two possibilities One the deal is inked for the Rafale jets Conversely the entire MMRCA process is scrapped after being in the works for a decade and a fresh global tender or RFP request for proposal is issued 171 On 16 July it was reported the contract sub committee would be negotiating final details in Bangalore from 17 19 July leaving the way clear for finalising the contract We expect total closure of negotiations over Transfer of Technology ToT from this round With that done we will have completed negotiations by sub committees on ToT offsets and maintenance What will remain will be the overall cost and there too 75 per cent of the work has been completed a senior MoD official said ACM Raha expressed his optimism and said the negotiations for the Rafale are progressing well and the contract is likely sooner than later in the current financial year 2014 15 Raha said he expected the IAF to attain a strength of 42 squadrons by 2022 up from the current number of 34 which is well below desired strength Raha expressed confidence that the induction of the Rafale and the HAL LCA would arrest the drawdown in the strength of fighter squadrons the IAF is likely to have its sanctioned strength of combat squadrons operational sooner than later 172 Sources indicated the IAF believes that Contract Negotiation Committee CNC could complete the necessary work before December 2014 after which the Cabinet Committee on Security CCS will consult with the Finance Ministry before signing the contract 173 On 12 August Arun Jaitley the new Defence Minister of India issued a statement that negotiations will continue as planned 174 Continued delays and final negotiations edit On 18 August 2014 a senior defence ministry official said a draft contract was being finalised and that the Cost Negotiations Committee was expected to file a final report shortly Other ministry sources said the ministry was requesting Dassault to revise its pricing structure as the estimated price had increased to 106 000 crore US 13 billion from the original estimate of 42 000 crore US 5 billion envisioned in 2007 175 On 2 September the Chief of Air Staff Air Chief Marshal Arup Raha said the contract was expected to be signed soon and further stressed the importance of keeping the Rafale deal by then estimated to cost 150 000 crore US 19 billion Although the Eurofighter consortium has made a counteroffer by which India could purchase 126 discounted Typhoons Raha dismissed any chance of the Typhoon being reconsidered It will not be appropriate to make any changes in the process The current government has set the pace of work and things are moving fast enough on the fighter deal Regarding the counteroffer a senior defence ministry official said Rafale has run through the finish line It s too late in the day to parachute into the race The door is closed 176 Despite efforts negotiations had once again stalled by October 2014 due to disputes over final costs and technology transfers According to official reports Dassault remained unwilling to be held liable for the 108 Rafales to be manufactured under licence by HAL and had expressed doubts the Indian defence industry had fully developed the capabilities to handle aspects of the sensitive technologies being supplied with the Rafale including its electronically scanned AESA radar Due to the protracted lack of progress over the final negotiations a senior team of Dassault executives and French defence ministry officials were scheduled to visit India in November to expedite the process 177 The French ambassador to India Francois Richier expressed satisfaction with the progress of the negotiations however stating they were progressing well moving in the right direction A French diplomat further said this is a very big contract complex it takes time 178 On 5 November 2014 Dassault Aviation CEO Eric Trappier said he expected the final contract would be signed by March 2015 179 Change of Plan edit Initially it was 18 Rafales that were to be built and sent to India in fly away conditions by France But on the joint press statement made by Prime Minister Narendra Modi s with President Francois Hollande during his visit of France the PM said that India will purchase 36 Rafales directly from France And the contract is said to be sealed soon 13 There is some controversy surrounding the change in the original deal due to a shift in Indian leadership which led to the transition of the deal to the private sector It was handed over to a newly established entity Reliance Defence Limited which lacks previous expertise in this specific industry Fate of the deal editOn 31 July 2015 Defence Minister Manohar Parrikar stated in Rajya Sabha that the deal for 126 MMRCA was officially withdrawn by the government 180 181 On 23 September 2016 Indian Defence Minister Manohar Parrikar and his French counterpart Jean Yves Le Drian signed the contract for the purchase of 36 off the shelf Rafales in a deal worth 7 8 billion with an option for 18 more at the same inflation adjusted price 182 The deliveries were to begin in 2019 and complete by 2022 183 The deal includes weapons and spares the aircraft will be equipped with Meteor BVRAAM missiles 184 185 Indian Air Force was handed over the first Rafale in October 2019 186 The first batch of 5 fighters arrived in India on 29 July 2020 As of January 2021 a total of 11 fighters have arrived in India from France 187 MRFA editAn RFI was issued by India in April 2018 for the procurement of 114 multi role combat aircraft for the Indian Air Force 188 189 190 The Indian Navy is also combining its plan for acquisition for new fighter jets with this program As many as eight aircraft are now competing in this fresh tender which is referred as MMRCA 2 0 or MRFA Multi Role Fighter Aircraft in the Indian media 191 The following are the eight aircraft competing in the competition 191 Boeing F A 18E F Super Hornet Boeing F 15EX Eagle II 192 Dassault Rafale Eurofighter Typhoon Lockheed Martin F 21 A variant of F 16V with 14 193 customization for Indian requirements 194 Mikoyan MiG 35 Saab JAS 39 Gripen E F Sukhoi Su 35See also editParallel projects HAL Tejas HAL Tejas Mark 2 or Medium Weight Fighter or HAL MWF Advanced Medium Combat Aircraft Sukhoi HAL FGFAReferences edit Unofficial logo Pandey Vinay 17 January 2008 F 16 maker Lockheed mounts an India campaign The Times of India Archived from the original on 5 November 2011 MRCA RFP India floats its biggest ever global tender for jet fighters Aviation and Aerospace Domain B 28 August 2007 Retrieved 23 January 2008 On Tuesday India floated its biggest ever global defence tender for purchase of 126 multi role combat aircraft in a deal potentially valued at 11 billion Report India France Rafale Deal Stalled Defense News 5 April 2013 Archived from the original on 28 June 2013 Retrieved 7 April 2013 Prusty Nigam Kotoky Anurag 5 April 2013 India s 15 billion Rafale deal faces delays sources Reuters Archived from the original on 7 April 2013 Retrieved 7 April 2013 New Sukhoi base to cover south India The Times of India 13 May 2013 Archived from the original on 29 June 2013 Retrieved 19 October 2013 India Air Force to Buy French Fighters United Press International 21 September 2012 Archived from the original on 22 September 2012 Retrieved 8 August 2013 Rs 14 000 cr cut from defence budget hits plans Rediff com 11 February 2013 Archived from the original on 22 May 2013 Retrieved 16 August 2013 Gokhale Nitin 3 March 2014 A big step in India s Rafale jet deal with France NDTV Archived from the original on 3 March 2014 Retrieved 3 March 2014 Raghuvanshi Vvivek Tran Pierre 1 December 2014 India France Agree to Finalize Rafale Deal by Spring Defense News Archived from the original on 2 December 2014 Retrieved 1 December 2014 Government withdraws tender for 126 medium multi role combat aircraft Manohar Parrikar Economic Times 30 July 2015 Retrieved 20 November 2015 India ends MMRCA fighter acquisition a b Irish John Pineau Elizabeth 10 April 2015 India orders 36 French made Rafale fighter jets PM Modi Reuters Retrieved 10 April 2015 Finally A Deal India To Buy 36 Rafale Jets For 8 8 Billion NDTV com Retrieved 9 August 2023 India signs deal to buy 36 French made Rafale fighter jets France 24 23 September 2016 Retrieved 9 August 2023 India To Evaluate Rafale for Navy Defensenews com 19 January 2016 The Indian Air Force Today Our Strength Archived 21 September 2013 at the Wayback Machine Indian Air Force Reed Business Information Limited AirSpace flightglobal com a href Template Cite web html title Template Cite web cite web a author has generic name help Lambeth Benjamin Airpower at 18 000 The Indian Air Force in the Kargil War Carnegie Endowment Retrieved 12 February 2014 a b Pandit Rajat 20 January 2009 India ready for war Forces grapple with delays red tape The Times of India Archived from the original on 31 October 2011 An IAF combat squadron usually consists of 18 aircraft in service with another 3 4 in maintenance a b dna exclusive 100 price escalation on Rafale fighter aircraft to Rs 1 75 lakh crore likely to dent IAF s strike capability dna 26 January 2014 Cabinet Committee for Political Affairs CCPA cleared an acquisition of 95 MiG 23 BNs Last Flight of the MiG 23 BN Archived 9 June 2011 at the Wayback Machine bharat rakshak com MiG 23 are set to be replaced by new hardware from either Russia the United States or Europe i e mrca today Archived 22 February 2008 at the Wayback Machine dailytimes com pk IAF to buy all 126 aircraft from one company The Times of India report archived from the original on 12 January 2009 Chief of Air Staff Air Chief Marshal F H Major said there was no proposal at the moment to increase the order to 200 aircraft but a review after induction based on cost benefit analysis is of course possible in future India says to have fifth generation jets in 2018 The Times of India 23 April 2010 Archived from the original on 26 April 2010 Hoyle Craig India launches contest for 126 new fighters with RFP release FlightGlobal 28 August 2007 An alternate theory of the MMRCA process I Strat Post 9 April 2012 Retrieved 5 November 2013 a b c d e India s M MRCA Fighter Competition Is the Deal in Trouble Defense Industry Daily Retrieved 5 November 2013 Fight for Combat aircraft contract The New Indian Express 15 February 2009 Archived from the original on 6 November 2013 Retrieved 5 November 2013 India to shop for more combat aircraft Hindustan Times 26 February 2006 Archived from the original on 15 May 2006 Retrieved 10 September 2006 a b India s M MRCA Fighter Competition Is the Deal In Trouble Defence Industry Daily 5 September 2012 a b c Dassault ups the ante with full technology transfer for Rafale news Domain b com 5 November 2008 Retrieved 6 November 2008 Eurofighter and Rafale finalists in Indian MMRCA competition Defence Aviation 29 April 2011 Retrieved 5 November 2013 India s Joint Nuclear Command Wants 40 Nuclear Strike Jets Retrieved 2011 09 18 Mer et Marine Andrew Doyle New Radar could boost Rafale s export prospects Flight International 11 November 2008 French firm to supply fighter aircraft to Indian Air Force Yahoo News 1 February 2012 Archived from the original on 8 December 2015 Retrieved 5 November 2013 Samuel Henry 26 January 2008 France and India deepen defence ties The Daily Telegraph London Retrieved 5 May 2010 Dassault Rafale wins MMRCA deal beating Eurofighter Typhoon The Times of India 31 January 2012 Webster Philip 25 April 2008 Typhoon Development Forbes Archived from the original on 27 August 2009 Retrieved 7 November 2008 a href Template Cite journal html title Template Cite journal cite journal a Unknown parameter agency ignored help Eurofighter sweetens its India offer Business Standard 3 August 2009 Upgraded Eurofighter offered to Indian Air Force Archived 5 January 2010 at the Wayback Machine Thaindian com Retrieved 1 February 2011 Sale of military equipment US wants India to accept conditions 7 November 2008 Raytheon to transfer AESA radar technology to India up to the level permitted by US government Archived 7 March 2012 at the Wayback Machine a b Boeing Boeing Delivers Proposal to Equip Indian Air Force with Super Hornet Fighters Archived 28 April 2008 at the Wayback Machine Boeing 24 April 2008 Retrieved 26 April 2008 Boeing wants to sell F 18s to India permanent dead link IBN Live 20 May 2006 David Donald 19 February 2008 Boeing seeks leverage on Indian fighter order AINOnline Archived from the original on 13 January 2009 Retrieved 19 February 2008 Tata Boeing forming JV for defence products Financial Express 14 February 2008 Retrieved 1 February 2011 F 16 maker Lockheed mounts an India campaign The Times of India 17 January 2008 a b F 16IN Brochure permanent dead link PDF Lockheed Martin AN APG 80 F 16 AESA Radar Archived 13 January 2008 at the Wayback Machine Es northropgrumman com Retrieved 1 February 2011 Aero India 2007 News indianaviationnews net MiG 35 in radar testing Russia amp CIS Observer 19 July 2010 a b Security Research Review Volume 1 3 Selection of MRCA for the IAF Air Marshall r B K Pandey Archived 2 April 2007 at the Wayback Machine Bharat rakshak com Retrieved 1 February 2011 Fighter Aircraft Programs at Aero India 2007 Archived 25 March 2009 at the Wayback Machine defense update com Gripen next generation fighter for India The Independent Choice Gripen International 28 April 2008 a b Hoyle Craig Saab reveals Gripen Demo aircraft Flightglobal com 23 April 2008 Gripen Demonstrator The Future has Arrived Gripen International 23 April 2008 Official Rafale specifications FR Dassault archived from the original on 8 April 2011 Official Typhoon Specifications Eurofighter archived from the original on 18 November 2007 Eurofighter Typhoon in German DE Luftwaffe 29 September 2023 F 16C D Factsheet US Air Force F 16 Specifications Archived 21 April 2011 at the Wayback Machine Lockheed Martin F A 18E F Super Hornet page Boeing Super Hornet Overview Boeing PDF Aircraft Museum F A 18E F Super Hornet Aerospace Web Retrieved 1 February 2011 a b c BP JPEG Blogspot Official Gripen IN Technical Specifications SE Saab archived from the original on 4 January 2013 Pressbrief Gripen NG PDF in Dutch NL 8 August 2008 retrieved 14 February 2014 a href Template Citation html title Template Citation citation a CS1 maint location missing publisher link a b c Saab NG presentation PDF JSF Nieuws p 5 https web archive org web 20170809225814 https aviationweek com site files aviationweek com files uploads 2014 09 asd 09 25 2014 jas7 pdf Archived from the original PDF on 9 August 2017 Retrieved 28 January 2022 a href Template Cite web html title Template Cite web cite web a Missing or empty title help Gripen E series Saab Start Retrieved 28 January 2022 The F414 Engine GE Aviation www geaviation com Retrieved 28 January 2022 MiG 35 RU MiG Aravia archived from the original on 27 September 2007 MiG 29M2 specifications Archived 3 January 2008 at the Wayback Machine RAC MiG the MiG 29M2 is similar to the MiG 35 MiG 35 Deagel MiG 35 specifications Airforce technology Ferry range with three external fuel tanks 3 100 km Aero India 2007 Brochure Bharat Rakshak F 16 Versions F 16E F F 16 net Retrieved 1 February 2011 Gripen Dimensions Archived 30 October 2013 at the Wayback Machine Saab Technische Daten Eurofighter Austria in German AT Air Power Fox Three Archived 25 May 2013 at the Wayback Machine dassault aviation com BMLVS Abteilung Kommunikation Bundesheer Waffen und Gerat Eurofighter EF 2000 bmlv gv at Gripen the smart fighter official website gripen com Ferry range 3790 km Eurofighter Technische Daten Seite 111 Militar Jets Geschichte Technik Typen Verlag GeraMond ISBN 3 7654 7035 X german EFA 2000 Eurofighter Fas org Retrieved 1 February 2011 Upgraded Eurofighter offered to Indian Air Force Archived 5 January 2010 at the Wayback Machine Thaindian News 4 January 2010 Rafale Federation of American Scientists Retrieved 10 February 2012 Eurofighter Typhoon Archived 10 July 2011 at the Wayback Machine Eurofighter com Retrieved on 9 December 2013 Report on U S Competitiveness in the Fighter Aircraft Export Market CSIS Capaccio Tony 16 December 2010 Lockheed F 35 Program Faces 1 Billion Cut in U S Senate Spending Measure Bloomberg L P Retrieved 12 September 2011 a b David Donald and Chris Pocock India s fighter shootout has the world s eye Archived 28 April 2008 at the Wayback Machine AINonline 21 February 2008 Retrieved 27 April 2008 Yahoo India News Latest India News amp World News Headlines Yahoo News India permanent dead link a b RFP for IAF s multi role combat aircraft pushed back further Domain b report from May 2007 Path clear for Rafale fighter deal Antony 11 July 2012 Archived from the original on 7 May 2013 Defence Technology Indigenisation Need to go beyond Lip Service IDSA Retrieved 5 November 2013 DAC clears procurement of 126 MMRCA Press Information Bureau PIB Government of India 29 June 2007 a b RFP for 126 MMRCA released Press Information Bureau PIB Government of India 28 August 2007 MMRCA IAF Conducts Marathon Race for Jet Fighters SP s Aviation Archived from the original on 5 November 2013 Retrieved 5 November 2013 It s Dassault Vs Eurofighter for MMRCA contract in India Aeromag Asia Archived from the original on 5 November 2013 Retrieved 5 November 2013 Indian Air Force to start conducting MMRCA field trials from later on in the year news Domain B Domain b com 8 August 2008 Govindasamy Siva Indian MRCA bidders submit offset proposals Flight International 11 August 2008 Jaideep Hardikar IAF s flying coffins may finally rest in peace DNA India 18 November 2008 IAF for high modernisation permanent dead link Deccan Herald 13 November 2008 Air Marshal F H Major Citing reasons for delay in IAF s procurement process Air Chief Marshal said that in aviation the gestation period to procure any equipment was very long and it takes about 24 36 months for any requirement to come into effect India Multi Role Fighter Medium Multi Role Fighter Aircraft MMRCA Globalsecurity org Retrieved 1 February 2011 India Rejects Dassault Aviation s Bid Wall Street Journal 16 April 2009 French fighter jet out of race for biggest IAF deal The Times of India 17 April 2009 Govindasamy Siva 20 April 2009 Indian Air Force says Rafale still in fighter competition Flight International Archived from the original on 21 April 2009 France s Rafale back in race for Rs42 000cr deal The Times of India 22 May 2009 Archived from the original on 22 October 2012 IAF begins flight trials for foreign firms Press Trust of India 17 August 2009 Retrieved 19 August 2009 F 16 Super Viper IN completes field trials 7 September 2009 Archived from the original on 16 June 2013 Retrieved 29 September 2009 rafale lands in Bangalore The Hindu Chennai India 26 September 2009 Archived from the original on 29 September 2009 Retrieved 29 September 2009 India should be front runner in space technology Air chief Archived 7 December 2009 at the Wayback Machine Thaindian com Retrieved 1 February 2011 Sharma Ravi 22 March 2010 Gripens head for AFS Jaisalmer thehindu com Chennai India Retrieved 6 April 2010 defence professionals Archived 20 January 2016 at the Wayback Machine defpro com 25 May 2010 Retrieved 1 February 2011 Politics Nation The Times of India 1 July 2010 New fighters for Indian Air Force timesnow tv Archived from the original on 15 August 2010 Swami Praveen Nelson Dean 6 November 2010 UK closes in on 11bn fighter deal The Daily Telegraph London Deal to buy 126 fighter jets to be inked by mid 2011 IAF The Times of India 18 December 2010 Retrieved 1 February 2011 India says no to US fighter planes Hindustan Times India Archived from the original on 1 May 2011 Bajaj Vikas 29 April 2011 India Rejects US Bids for Big Order of Fighter Jets The New York Times Rafale Eurofighter to fight it out over IAF MMRCA order India Times 29 April 2011 India chooses European fighters over US rivals UK BBC 28 April 2011 Typhoon Rafale shortlisted for MMRCA Defense update Archived from the original on 29 April 2011 US India defense Reuters 30 April 2011 US fighter companies satisfied after MMRCA downselect debrief Flight Global 15 July 2011 IAF briefs Lockheed Martin on MMRCA deal Brahmand Defence and Aerospace News 14 July 2011 Archived from the original on 18 July 2011 Menon Jay 28 July 2011 India May Pick Fighter Contest Winner Soon Aviation Week permanent dead link IAF set to seal 10 bn combat aircraft deal Surya Gangadharan Jaimon Joseph CNN IBN 5 April 2011 Archived from the original on 7 April 2011 Retrieved 16 September 2011 Inde l Eurofighter serait moins cher que le Rafale La Tribune 10 January 2012 Retrieved 30 January 2012 India picks French jet over Eurofighter in 10bn deal BBC News 31 January 2012 Retrieved 31 January 2012 Rafale edges out Eurofighter The Hindu 5 February 2012 Retrieved 5 February 2012 1 Times of India 10 February 2012 Retrieved 11 February 2012 a b India picks French jet over Eurofighter in 10bn deal BBC 31 January 2012 France hails India jet deal as vote of confidence Defence Aerospace 1 February 2012 French Rafale lowest bidder in India Reuters 31 January 2012 a b France hails India jet deal as vote of confidence Expatica 31 January 2012 Pocock Chris Rafale First Export Success Will Be 10 Billion plus Indian Order AINonline 3 February 2012 Peacock Louisa 6 February 2012 BAE may cut Typhoon price to win India order The Telegraph London UK Retrieved 10 February 2012 BAE may cut price of Eurofighter Typhoon to win back 11 bn deal from Dassault Rafale The Economic Times Archived from the original on 9 July 2012 Retrieved 10 February 2012 Edged out Eurofighter Typhoon still hopes to bag IAF fighter deal The Times of India 2 February 2012 Archived from the original on 4 February 2012 Retrieved 10 February 2012 Indian MoD Selects Dassault for Exclusive Talks on MMRCA Programme Defpro Archived from the original on 29 July 2012 Retrieved 10 February 2012 Adlam Jim Eurofighter still in running for Indian MMRCA competition Air Forces Online Retrieved 14 March 2012 topnews text FRONTPAGE Indian Victory a Breakthrough for France s Rafale Defense News 31 January 2012 French Rafale favoured for huge India warplane deal Reuters 31 January 2012 Retrieved 31 January 2012 Hoyle Craig Dassault confirms selection for Indian MMRCA deal Flight International 31 January 2012 Dassault Rafale bags 10 4 bn deal to supply 126 multi role combat aircrafts sic to IAF The Economic Times 31 January 2012 Retrieved 31 January 2012 India s Rafale jet deal questioned United Press International 23 March 2011 Archived from the original on 24 March 2012 Retrieved 15 January 2013 Exclusive 20 bn Rafale deal was manipulated says MP Rediff com 4 April 2012 Archived from the original on 6 April 2012 Retrieved 15 January 2013 Gupta Shishir 11 July 2012 Path clear for Rafale fighter deal Antony Hindustan Times Archived from the original on 11 July 2012 Retrieved 15 January 2013 Luthra Gulshan February 2012 Rafale Partners with Reliance India Strategic Archived from the original on 12 December 2013 Retrieved 10 December 2013 Dassault signs MoU with Reliance Industries SP s Aviation 13 February 2012 Archived from the original on 12 December 2013 Retrieved 10 December 2013 HAL will be main partner in Rafale aircraft deal Dassault Zee News 7 February 2013 Archived from the original on 28 May 2013 Retrieved 10 December 2013 Dassault CEO talks of hope and uncertainty The Hindu 26 July 2013 Archived from the original on 13 December 2013 Retrieved 10 December 2013 Reliance Dassault planning facility to produce warplane wings report NDTV 10 December 2013 Archived from the original on 22 December 2013 Retrieved 10 December 2013 RIL Dassault plan to set up Rs 1 000 cr warplane facility Financial Express 10 December 2013 Archived from the original on 12 December 2013 Retrieved 10 December 2013 Air Chief N A K Browne in France to visit Rafale Squadron Times of India IAF to finalise Rafale fighter deal this fiscal Firstpost 20 September 2012 Mali Strikes Showcase Rafale As Hollande Le Drian Head to UAE Cameron presses India to buy Eurofighter BFN 18 February 2013 Archived from the original on 7 April 2013 Retrieved 1 March 2013 Watt Nicholas 15 February 2013 David Cameron to press India over Eurofighter jet sales The Guardian London Retrieved 1 March 2013 Pandit Rajat 7 February 2014 Mega 126 fighter jet deal will be inked next fiscal defence minister AK Antony says Times of India TNN Retrieved 6 February 2014 Gokhale Nitin 3 March 2014 A big step in India s Rafale jet deal with France www ndtv com All India Archived from the original on 3 March 2014 Retrieved 3 March 2014 Raghuvanshi Vivek 17 June 2014 India s fighter jet negotiations stall over delivery commitments DefenseNews Archived from the original on 18 July 2014 Retrieved 15 July 2014 Shukla Ajai 17 June 2014 Rafale contract elusive Eurofighter and Saab remain hopeful Business Standard Retrieved 15 July 2014 Aneja Atul Haidar Suhasini Singh Mahim Pratap 1 July 2014 France confident of clinching Rafale deal The Hindu Retrieved 15 July 2014 India may curtail Rafale demand Deccan Chronicle 2 July 2014 Retrieved 15 July 2014 Hague Pushes Eurofighter on India Visit DefenseNews 8 July 2014 Archived from the original on 18 July 2014 Retrieved 15 July 2014 a b c Pandit Rajat 15 July 2014 India undertakes final negotiations for mega fighter deal amid hectic lobbying Times of India Retrieved 15 July 2014 IAF plans early induction of Rafale combat jet IndiaTV 16 July 2014 Retrieved 16 July 2014 Purohit Jugal R 16 July 2014 IAF inches closer to the mega jet fighter deal indiatoday Retrieved 16 July 2014 India says fighter jet deal with France still in the works RFI 13 August 2014 Retrieved 19 August 2014 Sagar Pradip R 18 August 2014 Rafale fighter jet deal contract with France almost ready Defence ministry dna Retrieved 19 August 2014 Singh Rahul 3 September 2014 IAF can t afford delay in Rafale deal Air chief Hindustan Times Archived from the original on 2 September 2014 Retrieved 8 September 2014 Siddiqui Huma 31 October 2014 French team to visit India to put MMRCA deal on fast track Financial Express Retrieved 1 November 2014 Siddiqui Huma 29 October 2014 Negotiations moving in right direction France on Rafale fighter plane deal The Economic Times Retrieved 1 November 2014 India Rafale Deal Could Be Concluded By March 2015 Says Dassault CEO DefenseWorld 6 November 2014 Retrieved 8 November 2014 It s Final MMRCA Dead Rafales Coming LiveFist 13 April 2015 Retrieved 13 April 2015 Government withdraws tender for 126 MMRCA Parrikar CNN IBN 31 July 2015 India finally signs deal with France for 36 Rafale fighters IHS Jane s Defence Weekly 23 September 2016 Retrieved 24 September 2016 India and France sign Rafale fighter jet deal BBC News 23 September 2016 Retrieved 23 September 2016 Peri Dinakar 23 September 2016 India France conclude Rafale deal The Hindu Retrieved 23 September 2016 Rafale Deal For 36 Fighter Jets Finally Sealed After Long Wait 10 Facts NDTV Retrieved 23 September 2016 Bhalla Abhishek Rajnath Singh inducts first Rafale in IAF says squadron will be ready to be deal with Pak by Feb 2021 India Today Three more Rafale jets arrive in India from France The Economic Times RFI for Fighter Aircraft For The Indian Air Force Request for information for procurement of fighteraircraft for the Indian air force PDF Gurung Shaurya Karanbir Six global companies respond to India s RFI for 110 fighter jets The Economic Times a b MMRCA 2 0 Contenders Boeing s India Plans Sharpen Around F 15 amp Super Hornet Archived from the original on 14 July 2020 Retrieved 11 July 2020 Publications L M 1 August 2019 Lockheed Martin F 21 Meet the Make In India Fighter Jet Global Defense Corp Retrieved 7 July 2021 GDC 30 September 2019 American Lockheed Martin Submit Proposal to Build F 21 Under Make In India Initiatives Global Defense Corp Retrieved 7 July 2021 External links edit The IAF s MRCA contract A three way shoot out Selection of the MRCA for the IAF by Air Marshal B K Pandey Former C in C Training Command Indian Air Force for Bharat Rakshak Acquisition of single engine fighter aircraft A few suggestions to expedite the procurement process Retrieved from https en wikipedia org w index php title Indian MRCA competition amp oldid 1220934994, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.