Delhi–Meerut Regional Rapid Transit System

The Delhi–Meerut Regional Rapid Transit System, also called as Delhi–Meerut RRTS, is an 82.15 km (51.05 mi) long, rapid rail corridor that will connect Delhi, Ghaziabad and Meerut, currently under construction. It is one of the three rapid rail corridors planned under Phase I of the RapidX project managed by the National Capital Region Transport Corporation (NCRTC). With a maximum speed of 180 km/h (110 mph), the distance between Delhi and Meerut will be covered in less than 60 minutes. The project is being executed at a cost of 30,274 crore (US$3.8 billion). It will have 22 stations and two depots at Duhai and Modipuram.[4][5][6][7]

Delhi–Meerut Regional Rapid Transit System
RapidX Primary Logo
A Namo Bharat trainset.
Overview
OwnerNational Capital Region Transport Corporation (NCRTC)
Area served
LocaleNational Capital Region (NCR)
Transit type
Number of lines1
Number of stations22 (excluding 2 depots at Modipuram and Duhai)
Annual ridership800,000
HeadquartersNew Delhi
Websitencrtc.in
Operation
Began operation20 October 2023; 41 days ago (2023-10-20) (priority corridor)[1][2]
Operator(s)DB RRTS Operations India Private Limited
CharacterElevated, at-grade and underground
Headway5-10 minutes
Technical
System length82 km (51 mi)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge[3]
Electrification25 kV 50 Hz AC overhead catenary
Average speed100 km/h (62 mph)
Top speed160 km/h (100 mph)
System map

Sarai Kale Khan
New Ashok Nagar
Anand Vihar
Sahibabad
Ghaziabad
Guldhar
Duhai
Muradnagar
Modi Nagar South
Modi Nagar North
Meerut South
Shatabdi Nagar
Meerut Central
Begumpul
Meerut North
Modipuram

The foundation stone for the project was laid by Prime Minister Narendra Modi in March 2019, and construction began in June 2019.[8][9] The project's first phase, or the 17 km (11 mi)-long priority corridor from Sahibabad to Duhai, was expected to become operational by March 2023.[10] However, due to pending works in some stations, especially in Ghaziabad, it got delayed. It was inaugurated by Prime Minister Narendra Modi on 20 October 2023, and the rest of the entire 82 km (51 mi)-long corridor will be opened by June 2025.[1][2]

History edit

 
Namo Bharat trainsets in Duhai

On 8 March 2019, Prime Minister Narendra Modi laid the foundation stone of the corridor.[11] Local transit services will also be provided on the Delhi-Meerut RRTS network in Meerut with 21 km (13 mi) allotted for local transit needs.[12]

The NCRTC planned for the 17 km (11 mi) long priority section between Sahibabad and Duhai to begin regular operations by March 2023.[13] The entire 82 km (51 mi) long Delhi-Ghaziabad-Meerut RRTS corridor is expected be operational by June 2025.[1]

Following the Galwan Valley skirmish on 15 June 2020, there were calls by Swadeshi Jagran Manch for the Government to cancel the bid of a Chinese company related to the transit system.[14][15] The trains are being made by Alstom's manufacturing plant in Savli, Gujarat.[16]

The project was chosen ahead of Delhi–Alwar and Delhi–Panipat projects due to high frequency of travellers and traffic between Delhi and Meerut, to execute the project and reduce pollution, congestion and risk of accidents.[17]

Route edit

  • Length of the corridor: 82 km (51 mi)
  • No. of stations: 14
  • Names of stations: Sarai Kale Khan, New Ashok Nagar, Anand Vihar, Sahibabad, Ghaziabad, Guldhar, Duhai, Muradnagar, Modinagar South, Modinagar North, Meerut South, Shatabdi Nagar, Begumpul and Modipuram.
  • No. of depots: 2
  • Names of depots: Duhai and Modipuram.

8 stations were constructed exclusively for local transit services in Meerut: Partapur, Rithani, Brahmapuri, Meerut Central, Bhaisali, MES Colony, Daurli and Meerut North.

4 stations for which both RRTS and local transit services in Meerut will be provided: Meerut South, Shatabdi Nagar, Begumpul and Modipuram.

Of the entire length, 68.03 km (42.27 mi) is elevated, 14.12 km (8.77 mi) is underground.[4] and 1.45 km (0.90 mi) will be at grade for connections to two depots to be located at Duhai and Modipuram. In densely populated areas of Delhi and Meerut the route will be underground including near the Yamuna river.[6] The entire route is designed for a maximum speed of 180 km/h (110 mph), with an operating speed of 160 km/h (100 mph).[18][19] The average speed (when taking stops into account) will be approximately 100 km/h (62 mph).[19]

The Delhi-Meerut corridor starts from Sarai Kale Khan station in Delhi. The corridor will pass through areas of Delhi, Ghaziabad, and Meerut; terminating at Modipuram in Meerut.[4][6]

Sarai Kale Khan will also become a transit hub with the Sarai Kale Khan - Nizamuddin metro station, the Sarai Kale Khan ISBT, and the Hazrat Nizamuddin railway station in vicinity.[6]

The 38.05 km (23.64 mi) long Sahibabad - Meerut South section, including Duhai Depot, is expected to become operational by January 2024, the 16.60 km (10.31 mi) Hazrat Nizamuddin - Sahibabad in January 2024 and the remaining 37.40 km (23.24 mi) Meerut South - Modipuram in July 2024.[6]

There will be a total of 16 stations.[4] Multimodal transport hubs will be combined with existing transportation such as Delhi Metro, Indian Railways, and Uttar Pradesh State Road Transport Corporation (UPSRTC) bus terminals (planned at Anand Vihar, Sahibabad and Shaheed Sthal stations).[20]

Delhi - Ghaziabad - Meerut RRTS Stations
No. Station Name Integration Station Layout Station for RRTS/Local Transit Construction Update Opening
English Hindi
1   Sarai Kale Khan सराय काले खान – निजामुद्दीन Pink Line
Hazrat Nizamuddin railway station

Sarai Kale Khan ISBT

Elevated RRTS Construction works underway June 2025
2   New Ashok Nagar न्यू अशोक नगर Blue Line Elevated
3   Anand Vihar आनंद विहार Blue Line

Pink Line
Anand Vihar Railway Terminal

Anand Vihar ISBT

Underground
4   Sahibabad साहिबाबाद Elevated
  • Around 2350 piles, 230 pile caps, 110 piers, and 50 pier caps have been built.
  • Over 260 segments have been cast and 4 spans have already been erected.
20 October 2023
5   Ghaziabad ग़ाज़ियाबाद Red Line Elevated
6   Guldhar गुलधर Elevated
7   Duhai दुहाई Elevated
8   Murad Nagar मुराद नगर Elevated
  • Casting testing of 17 piles for the initial pile load test completed
  • 17 km (11 mi) of road widening & construction work has been completed
  • A total of 370 piles and 28 pile caps have been completed
June 2025
9   Modi Nagar South मोदीनगर दक्षिण Elevated
10   Modi Nagar North मोदीनगर उत्तर Elevated
11   Meerut South मेरठ दक्षिण Elevated RRTS and local transit services in Meerut
12   Partapur परतापुर Elevated Local Transit services in Meerut
13   Rithani रिठानी Elevated
14   Shatabdi Nagar शताब्दी नगर Elevated RRTS and local transit services in Meerut
15   Brahampuri ब्रह्मापुरी Elevated Local Transit services in Meerut
16   Meerut Central मेरठ केंद्रीय Underground
17   Bhaisali भैसाली Underground
18   Begumpul बेगमपुल Underground RRTS and local transit services in Meerut
19   MES Colony मेस कॉलोनी Elevated Local Transit services in Meerut
20   Daurli दौरली Elevated
21   Meerut North मेरठ उत्तर Elevated
22   Modipuram मोदीपुरम Elevated RRTS and local transit services in Meerut

Key features edit

  • The Delhi-Ghaziabad-Meerut RRTS corridor is the first RRTS corridor to be implemented in India.
  • Multi-Modal Integration: RRTS stations will be integrated with various modes of transport like Airports, Railway Stations, Inter-State Bus Terminals, Delhi Metro Stations etc. It will facilitate the movement of commuters between modes.[21]
  • Platform Screen Doors: All of the RRTS stations will have platform screen doors for enhanced commuter safety.[22]
  • The implementation of the Delhi-Ghaziabad-Meerut RRTS Corridor is expected to shift the modal share in favour of public transport from 37% to 63% in the region, which is projected to result in a reduction in traffic.[23]
  • As per estimates, this corridor will significantly reduce air pollutants, namely PM 2.5 by 60,000 tonnes, Nitrogen Oxide by 475,000 tonnes, Hydrocarbons by 80,000 tonnes and Carbon Monoxide by 80,000 tonnes per year.

Source of funding edit

Construction edit

The NCRTC has divided the Civil Construction work of Delhi-Meerut RRTS (22 stations and 2 Depots) into 08 (eight) packages. The list of all construction contract is as follows:[27]

Phases Target Opening Date Status
Phase 1 - Sahibabad to Duhai Depot October 2023 Completed
Phase 2 - Duhai Depot to Meerut South March 2024 Under Construction
Phase 3 - Complete Line Including Meerut, Delhi Section January 2025 Under Construction
Package Stations Contractor
Pkg-1 Sahibabad and Ghaziabad
(2 stations)
KEC International and China Civil Engineering Construction Corp. (JV)
Pkg-2 Guldhar and Duhai
(2 stations)
Apco Infratech and China Railway First Group (JV)
Pkg-3 Murad Nagar, Modi Nagar South, Modi Nagar North, Meerut South, Partapur, Rithani & Shatabdi Nagar
(7 stations)
L&T Heavy Civil Infrastructure
Pkg-4 Anand Vihar
(1 station)
Shanghai Tunnel Engineering Co. (STEC)
Pkg-5A Duhai Depot
(1 Depot)
Vijay Nirman Co. and KEC International (JV)
Pkg-5B Modipuram Depot
(1 Depot)
KSM Bashir Mohd & Sons
Pkg-6 Sarai Kale Khan and New Ashok Nagar
(2 stations)
Afcons Infrastructure
Pkg-7 Brahmapuri, MES Colony, Daurli, Meerut North and Modipuram
(5 stations)
L&T Heavy Civil Infrastructure
Pkg-8 Meerut Central, Bhaisali and Begumpul 
(3 stations)
Afcons Infrastructure
Pkg-9A Multistoried Staff Quarters & Connectivity Sam India Builtwell is Lowest Bidder
Pkg-9B Construction of Jangpura stabling yard, Operation control center (OCC) and associated buildings Notice Inviting Bids Pending
Pkg-10 Architectural finishing work for 7 stations
(Sahibabad – Shatabdi Nagar)
Canon Fasteners (6 firms had bid)
Pkg-11 Lot-1 Architectural finishing for elevated stations & E&M systems Metcon India Reality and Infrastructure – C.P. Associates JV
Pkg-11 Lot-2 Architectural finishing for elevated stations & E&M systems URC Constructions
Pkg-12A Pre–Engineered (PEB) Steel Roof Structure for 4 stations
(Sahibabad – Duhai)
Sam India Builtwell
Pkg-12B Pre–Engineered (PEB) Steel Roof Structure for 12 stations in 2 lots URC Constructions (3 firms had bid)
Pkg-13 22,000 MT of Head Hardened Rails ArcelorMittal España
Pkg-14 Track fastening system for ballastless track Schwihag
Pkg-15 Standard Gauge 60 Kg UIC Turnouts and Scissors Cross over Voestalpine VAE VKN India Pvt. Ltd.
Pkg-16 Rails for Duhai & Modipuram depots and Jangpura Stabling Yard

• Lot-1: 2000 MT of UIC 60/60E-1/60 KG 1080 Grade Head Hardened Rails
• Lot-2: 4000 MT of 60 KG 880 Grade Rail Class-A

Financial bids opened Dec 18 – results awaited
Pkg-17 Track-work Larsen & Toubro Limited (Transportation and Infrastructure Independent Company)
Pkg-18 Rail Grinding Machine Tender Cancelled
Pkg-19 Electrification (receiving substations (RSS) and traction overhead equipment (OHE)) IRCON International
Pkg-20 No Information Available No Information Available
Pkg-21 Escalators Schindler India Private Ltd. – Schindler (China) Elevator Company Ltd. JV
Pkg-22 Elevators Otis Elevator Company (India) Ltd. – Otis Elevator (China) Company Ltd. JV
Pkg-23 Tunnel Ventilation System (TVS), Environmental Control System (ECS) STRABAG International
Pkg-24 Design, Supply, Installation, Testing and Commissioning of Signalling and Train Control and Telecommunication Systems Alstom Transport India
Pkg-25 Design, manufacture, supply, testing & commissioning of 210 standard gauge coaches Bombardier Transportation
Pkg-26A Automatic Fare Collection (AFC) System – Systems Integrator Datamatics Global Services – AEP Ticketing solutions (DM-AEP-26A JV)
Pkg-26B Automatic Fare Collection (AFC) System – Financial Institution Paytm Payments Bank Ltd.
Pkg-27 Platform Screen Doors (PSD) System NCRTC – BEL signed MOU
Pkg-M2 Catenary Maintenance Vehicle And Engineering Maintenance Vehicle PTL – Royal JV
Pkg-M5 Fully Automatic CNC under Floor wheel Lathe Machine HYT Engineering Co. Pvt. Ltd.
Pkg-M7 Construction of Emergency Evacuation System including connecting Foot Over Bridge from track level to road level at various locations Quality Buildcon Pvt. Ltd.

Note: Package-1 and Package-2 are part of the priority section on Delhi-Meerut RRTS.

Signalling and train control system edit

The NCRTC has decided to equip the line with ETCS L2 signalling. Tenders for its procurement were invited on 17 April 2020[28] and Alstom was awarded the contract worth approximately 937 crore (US$120 million) in January 2021.[29]

Nokia partnered with Alstom to implement the 4.9G/LTE private wireless network to support the ETCS L2 signalling. This is the first time in the world that an LTE network is being used along with ETCS L2 signalling.[30]

Rolling stock edit

On 1 May 2020, Alstom (then Bombardier Transportation before it was acquired by Alstom in January 2021[31]) emerged as the lowest bidder among a group of three bidders to supply and maintain 210 coaches for a 15 year period, with a price bid of 2,577 crore (US$320 million). The 210 coaches include 180 coaches (30 six-car trains) for RRTS and 30 coaches (10 three-car trains) for Meerut Metro.[32][33]

In September 2020, the NCRTC first unveiled the RRTS train, the design of which is inspired by the Lotus Temple. Designed in Hyderabad, the trains have a design speed of 180 km/h (110 mph) and an operational speed of 160 km/h (100 mph). Each fully air-conditioned, six-car trainset will be able to carry 1750 passengers and will have one premium coach and one coach reserved for women.[34][33] It is compatible with a host of train protection systems like automatic train protection (ATP) and automatic train control (ATC) systems and also has features like regenerative braking.[33]

The entire rolling stock will be manufactured in India, at Alstom's plant in Savli, Gujarat.[35][36] Manufacturing began in July 2021[37] and the first trainset was delivered to NCRTC in May 2022.[33]

Status updates edit

  • May 2017: The Government of Uttar Pradesh approved the Detailed Project Report (DPR) for the Delhi-Meerut RRTS project.[38][39]
  • Feb 2019: The Central Government approved ₹ 30,274 crores for the Delhi-Meerut RRTS project.[40]
  • Mar 2019: Prime Minister Narendra Modi laid the foundation stone for this project.[41]
  • Jun 2019: Pillar construction work started.[42]
  • Oct 2020: Civil construction work on about 50 km (31 mi) between Sahibabad and Shatabdi Nagar was in progress.[43]
  • Feb 2021: The construction of the Anand Vihar Station of Delhi-Meerut RRTS corridor began.[44]
  • Apr 2021: Track laying started for the Ghaziabad section of the corridor.[45]
  • Jun 2021: The first elevated section pier (namely for the Sarai Kale Khan section) is constructed.[46]
  • Jun 2021: Construction work on the first part of the underground portion of began (in Anand Vihar).[47]
  • Jul 2021: The piers were completed for the 24 km (15 mi) elevated stretch.[48]
  • Jul 2021: Alstom began manufacturing 210 trains. These will be manufactured in Alstom's manufacturing plant in Savli, Gujarat.[49]
  • Aug 2021: It was announced that 650 hectares of land between Guldhar and Duhai RRTS Stations will be developed as a commercial, residential and industrial hub.[50]
  • Aug 2021: Construction work on the second underground section began in Meerut.[51]
  • Sep 2021: The installation of Overhead Equipment (OHE) lines began.
  • Oct 2021: Tenders was issued for the construction of the Modipuram depot.[52]
  • Dec 2021: Datamatics Global Services – AEP Ticketing Solutions JV was awarded a Rs. 227 crore Contract for the AFC System.[53]
  • Jan 2022: Nokia and Alstom deployed a private wireless network system based on LTE/4.9G with support for ETCS-II signalling.[54]
  • Mar 2022: The NCRTC unveiled the first images of the RRTS trains, which will be used for operations after the completion of the construction of the priority corridor.[55]
  • Mar 2022: The tunneling work for the underground section of the RRTS corridor in Meerut began.[56]
  • Mar 2022: Paytm Payments Bank won the bid for becoming the financial institution responsible for the fare system, beating the State Bank of India.[57]
  • Apr 2022: Roughly 25% of the corridor was completed.[58]
  • May 2022: Alstom manufactured the first train in Savli, Gujarat.[59]
  • Aug 2022: First trial of the first trainset has been successfully completed.[60]
  • Feb 2023: The trial runs for the trains, including high-speed tests, have been completed, and now there are a total of six trains. The 17-km priority corridor from Sahibabad to Duhai is at its final stages of work, and is confirmed to be opened by mid-June 2023. The second stretch from Duhai to South Meerut will be opened by the first quarter of 2024, and the entire corridor will become operational by March 2025.[61][62][63]
  • Oct 2023: The priority corridor from Sahibabad to Duhai was inaugurated by Prime Minister Narendra Modi on 20 October 2023.[1]

Meerut Metro edit

RRTS line was merged with Line 1 of Meerut Metro due to overlapping route of both. Line 2 and RRTS branch line is awaiting release of funds from the state government and approval for new DPR that has to be made with minor adjustments in the route.

  • Line 1: Partapur to Modipuram, 20 km – elevated (12.8 km) & underground (7.2 km) This line has been Merged with Delhi Meerut RRTS.
  • Line 2: Shradhapuri Phase II to Jagriti Vihar, 15 km – elevated (10.7 km ) & underground (4.3 km). This line is now waiting for approval for a new DPR tender to be floated.
  • RRTS Branch line to Shastri Nagar - This line is waiting for a new tender to be floated.
 
Meerut Metro Proposed Lines

See also edit

References edit

  1. ^ a b c d Anabd, Jatin (20 October 2023). "PM Modi flags off RRTS: What is this mass transport system, how it can benefit NCR". The Indian Express. Retrieved 20 October 2023.
  2. ^ a b "Delhi-Meerut RRTS construction work on schedule, likely to be done June 2025". livemint.com. 4 April 2022. Retrieved 6 April 2022.
  3. ^ Feasibility Report: RRTS Delhi-Ghaziabad-Meerut (PDF) (Report). (PDF) from the original on 13 November 2016. Retrieved 7 October 2017.
  4. ^ a b c d "NCRTC | Delhi – Meerut Corridor". ncrtc.in. Retrieved 11 June 2017.
  5. ^ "Delhi – Meerut RRTS – Information, Route Map, Fares, Tenders & Updates". The Metro Rail Guy. Retrieved 16 October 2023.
  6. ^ a b c d e Staff Reporter. "Delhi-Meerut rapid rail project gets green light". NDTV. Retrieved 20 February 2019.
  7. ^ "India's first rapid rail to open next week, with women driving RAPIDX". Construction World. 12 October 2023. Retrieved 16 October 2023.
  8. ^ Prasad, Nikeeta (8 March 2019). "Delhi to Meerut in 60 mins with 160 kmph rapid rail! PM Modi lays foundation stone; 10 facts you must know". The Financial Express. Retrieved 16 October 2023.
  9. ^ "RAPIDX – India's first indigenous S-HSR all set to Begin Operations on Priority Section". Metro Rail News. 22 August 2023. Retrieved 16 October 2023.
  10. ^ Jha, Abhijay (10 March 2023). "Delhi-Meerut RRTS priority stretch to be ready by March?". The Times of India. Retrieved 16 October 2023.
  11. ^ Shah, Narendra (8 March 2019). "Prime Minister has laid the foundation stone of country's first RRTS". Metro Rail News. Retrieved 15 October 2020.
  12. ^ "India's first rapid rail unveiled, promises Delhi to Meerut in 55 minutes". The Indian Express. 16 March 2022. Retrieved 9 May 2023.
  13. ^ "Delhi-Meerut RRTS: Good news! 17-km long Sahibabad-Duhai stretch to be operational by June 2023; details". The Financial Express. 31 July 2019. Retrieved 15 October 2020.
  14. ^ Arnimesh, Shanker (15 June 2020). "RSS affiliate wants Modi govt to cancel Chinese firm's bid for Delhi-Meerut RRTS project". ThePrint. Retrieved 18 June 2020.
  15. ^ Shrivastava, Rahul (16 June 2020). "Chinese firm bids lowest for Delhi-Meerut project, RSS affiliate asks Modi govt to scrap company's bid". India Today. Retrieved 18 June 2020.
  16. ^ "Delhi-Meerut RRTS Project: Chinese firm to build stretch of India's first Regional Rapid Rail Transit corridor". The Financial Express. 4 January 2021. Retrieved 21 January 2021.
  17. ^ "1st phase of Delhi-Meerut RRTS to open in March – The Financial Express – NCRTC". Retrieved 27 September 2023.
  18. ^ "NCRTC approves Delhi-Ghaziabad-Meerut RRTS corridor". India Today. 6 December 2016. Retrieved 12 June 2017.
  19. ^ a b . ncrtc.in. Archived from the original on 5 June 2017. Retrieved 12 June 2017.
  20. ^ "Delhi-Meerut RRTS: Hubs with connectivity to Delhi Metro, Indian Railways proposed on Delhi-Ghaziabad route". Financial Express. 19 March 2020. Retrieved 9 April 2020.
  21. ^ Singh, Neha (14 March 2020). "NCRTC to integrate Delhi-Meerut RRTS corridor with other modes of transport". Metro Rail News. Retrieved 15 October 2020.
  22. ^ "All RRTS stations to have platform screen doors". The Times of India. 11 August 2019. Retrieved 15 October 2020.
  23. ^ Dash, Dipak K. (22 January 2019). "Delhi Meerut Rapid Rail News: RRTS may take 1 lakh vehicles off roads". The Times of India. Retrieved 15 October 2020.
  24. ^ "New Development Bank approves $500 million loan for RRTS rail project". Hindustan Times. 1 October 2020. Retrieved 15 October 2020.
  25. ^ Saluja, Nishtha. "ADB approves $1 billion loan for construction of Delhi-Meerut RRTS". The Economic Times. Retrieved 15 October 2020.
  26. ^ "Delhi-Meerut high-speed corridor gets Rs 100 crore fillip". The Times of India. 24 September 2020. Retrieved 15 October 2020.
  27. ^ "Delhi-Meerut RRTS RAPIDX". The Metro Rail Guy. Retrieved 19 April 2023.
  28. ^ "NCRTC Invites Bids for Delhi - Meerut RRTS' ETCS Signalling System". The Metro Rail Guy. 28 April 2020. Retrieved 28 April 2020.
  29. ^ "Alstom Will Deploy India's First ETCS L3 System, Bags 937 Cr Delhi-Meerut RRTS Signalling Contract". RailPost. 20 January 2021. from the original on 3 May 2023. Retrieved 3 May 2023.
  30. ^ "Nokia tests mission-critical voice and data on 4.9G private wireless network for NCRTC". ET Telecom. 4 August 2022. from the original on 3 May 2023. Retrieved 3 May 2023.
  31. ^ "A transformational step for Alstom: completion of the acquisition of Bombardier Transportation". Alstom Press releases and news. 29 January 2021. from the original on 15 March 2023. Retrieved 29 April 2023.
  32. ^ "Bombardier bags rolling stock deal for Delhi-Meerut RRTS corridor". The Economic Times. 7 May 2020. from the original on 29 April 2023. Retrieved 29 April 2023.
  33. ^ a b c d Sinha, S (8 May 2022). "First RRTS trainset handed over to NCRTC". Hindustan Times. from the original on 16 May 2022. Retrieved 29 April 2023.
  34. ^ "India's first RRTS train with design speed of 180 kmph unveiled; to have business class". The Times of India. 25 September 2020. Retrieved 15 October 2020.
  35. ^ "Alstom Lowest Bidder for Delhi-Meerut RRTS' 210 Coach Contract". The Metro Rail Guy. 2 May 2020. Retrieved 2 May 2020.
  36. ^ Saluja, N (24 September 2020). "Bombardier to make entire rolling stock for Delhi-Meerut RRTS in India, says NCRTC Head". The Economic Times. from the original on 27 April 2023. Retrieved 15 October 2020.
  37. ^ "French MNC Alstom begins local manufacturing of train cars for Regional Rapid Transit System". The Economic Times. 16 July 2021. from the original on 29 April 2023. Retrieved 29 April 2023.
  38. ^ . ncrtc.in. Archived from the original on 12 June 2017. Retrieved 11 June 2017.
  39. ^ Agarwal, Kabir (6 May 2017). "Delhi-Meerut rapid rail priority for govt: CM Yogi". The Times of India. Retrieved 8 July 2018.
  40. ^ "Govt approves Rs 30,274 cr Delhi-Ghaziabad-Meerut Regional Rapid Transport System". 19 February 2019.
  41. ^ "PM Narendra Modi laid down the foundation stone for the project". 8 March 2019. Retrieved 8 March 2019.
  42. ^ "दिल्ली से मेरठ तक का सफर 60 मिनट में, रोजाना हजारों यात्रियों को होगा फायदा". Dainik Jagran (in Hindi). Retrieved 4 June 2019.
  43. ^ Jha, Abhijay (8 July 2020). "Work on Delhi-Meerut RRTS corridor gathers pace". The Times of India. Retrieved 15 October 2020.
  44. ^ Agarwal, Anshu (9 February 2021). "Construction work for Anand Vihar station of 82km Delhi-Meerut RRTS corridor begins". The Times of India. Retrieved 9 February 2021.
  45. ^ "RRTS project: Laying of tracks for 17 km (11 mi) priority section begins in Ghaziabad". Hindustan Times. 20 July 2021. Retrieved 20 September 2021.
  46. ^ "Delhi-Meerut RRTS: Work in progress! First pier of elevated section constructed - The Financial Express". www.financialexpress.com. 4 June 2021. Retrieved 20 September 2021.
  47. ^ "Underground construction work commenced for Delhi-Meerut RRTS project". Urban Transport News. Retrieved 20 September 2021.
  48. ^ "Piers completed in 24-km elevated stretch of Delhi-Meerut RRTS corridor". The Hindu. 10 July 2021. ISSN 0971-751X. Retrieved 20 September 2021.
  49. ^ "Alstom begins manufacturing of commuter & transit trains for RRTS project". 17 July 2021. from the original on 20 September 2021.
  50. ^ Jha, Abhijay (25 August 2021). "Ghaziabad: 650 hectares along Regional Rapid Rail Transit System corridor to be developed as special area development zone | Ghaziabad News - Times of India". The Times of India. Retrieved 20 September 2021.
  51. ^ Rai, Sandeep (29 August 2021). "Construction work on critical phase of underground RRTS station in Meerut begins". The Times of India. Retrieved 20 September 2021.
  52. ^ "Tender issued for construction of Modipuram depot for Delhi-Meerut RRTS Project". Urban Transport News. Retrieved 1 November 2021.
  53. ^ "Datamatics JV Awarded Delhi - Meerut RRTS' AFC Contract". The Metro Rail Guy. 7 January 2022. Retrieved 22 January 2022.
  54. ^ "Nokia and Alstom to deploy private wireless system in Delhi-Meerut RRTS Train Network". Urban Transport News. Retrieved 30 January 2022.
  55. ^ Nandi, Tamal (16 March 2022). "Coaches of India's first rapid rail unveiled, to be used in Delhi-Meerut RRTS". livemint.com. Retrieved 6 April 2022.
  56. ^ Rai, Sandeep (18 March 2022). "Tunnelling Work For Delhi-meerut Rrts Corridor Begins In Meerut | Meerut News - Times of India". The Times of India. Retrieved 6 April 2022.
  57. ^ "Paytm Awarded Delhi - Meerut RRTS' AFC Contract Package 26B". The Metro Rail Guy. 10 April 2022. Retrieved 10 April 2022.
  58. ^ "Delhi-Meerut RRTS on track, 24.8% completed so far: Ministry". The Hindu. 5 April 2022. ISSN 0971-751X. Retrieved 6 April 2022.
  59. ^ Livemint (8 May 2022). "Delhi-Meerut RRTS: Fastest trainset in country built under 'Make in India'". mint. Retrieved 15 May 2022.
  60. ^ "Delhi-Meerut Rapid Train Hits Track, Trial Btw Sahibabad-Duhai Successful | Watch Video Here". India.com. 8 August 2022. Retrieved 26 February 2023.
  61. ^ "RRTS trials to south Meerut by year-end". The Times of India. 4 February 2023. ISSN 0971-8257. Retrieved 26 February 2023.
  62. ^ "NCRTC Conducts Successful Trial Run Of India's First High-Speed RRTS Train From Duhai To Ghaziabad". India.com. 4 January 2023. Retrieved 26 February 2023.
  63. ^ "Ghaziabad: Four RRTS stations on 17km priority line to be ready by mid-March". Hindustan Times. 25 February 2023. Retrieved 26 February 2023.

delhi, meerut, regional, rapid, transit, system, also, called, delhi, meerut, rrts, long, rapid, rail, corridor, that, will, connect, delhi, ghaziabad, meerut, currently, under, construction, three, rapid, rail, corridors, planned, under, phase, rapidx, projec. The Delhi Meerut Regional Rapid Transit System also called as Delhi Meerut RRTS is an 82 15 km 51 05 mi long rapid rail corridor that will connect Delhi Ghaziabad and Meerut currently under construction It is one of the three rapid rail corridors planned under Phase I of the RapidX project managed by the National Capital Region Transport Corporation NCRTC With a maximum speed of 180 km h 110 mph the distance between Delhi and Meerut will be covered in less than 60 minutes The project is being executed at a cost of 30 274 crore US 3 8 billion It will have 22 stations and two depots at Duhai and Modipuram 4 5 6 7 Delhi Meerut Regional Rapid Transit SystemRapidX Primary LogoA Namo Bharat trainset OverviewOwnerNational Capital Region Transport Corporation NCRTC Area servedDelhi Ghaziabad MeerutLocaleNational Capital Region NCR Transit typeElevated rapid railNumber of lines1Number of stations22 excluding 2 depots at Modipuram and Duhai Annual ridership800 000HeadquartersNew DelhiWebsitencrtc wbr inOperationBegan operation20 October 2023 41 days ago 2023 10 20 priority corridor 1 2 Operator s DB RRTS Operations India Private LimitedCharacterElevated at grade and undergroundHeadway5 10 minutesTechnicalSystem length82 km 51 mi Track gauge1 435 mm 4 ft 8 1 2 in standard gauge 3 Electrification25 kV 50 Hz AC overhead catenaryAverage speed100 km h 62 mph Top speed160 km h 100 mph System mapLegendSarai Kale Khan Pink LineNew Ashok NagarAnand Vihar Blue Line Pink LineDelhiUttar Pradesh borderSahibabadGhaziabad Red LineGuldharDuhaiMuradnagarModi Nagar SouthModi Nagar NorthMeerut SouthShatabdi NagarMeerut CentralBegumpulMeerut NorthModipuramThe foundation stone for the project was laid by Prime Minister Narendra Modi in March 2019 and construction began in June 2019 8 9 The project s first phase or the 17 km 11 mi long priority corridor from Sahibabad to Duhai was expected to become operational by March 2023 10 However due to pending works in some stations especially in Ghaziabad it got delayed It was inaugurated by Prime Minister Narendra Modi on 20 October 2023 and the rest of the entire 82 km 51 mi long corridor will be opened by June 2025 1 2 Contents 1 History 2 Route 3 Key features 4 Source of funding 5 Construction 6 Signalling and train control system 7 Rolling stock 8 Status updates 9 Meerut Metro 10 See also 11 ReferencesHistory edit nbsp Namo Bharat trainsets in DuhaiOn 8 March 2019 Prime Minister Narendra Modi laid the foundation stone of the corridor 11 Local transit services will also be provided on the Delhi Meerut RRTS network in Meerut with 21 km 13 mi allotted for local transit needs 12 The NCRTC planned for the 17 km 11 mi long priority section between Sahibabad and Duhai to begin regular operations by March 2023 13 The entire 82 km 51 mi long Delhi Ghaziabad Meerut RRTS corridor is expected be operational by June 2025 1 Following the Galwan Valley skirmish on 15 June 2020 there were calls by Swadeshi Jagran Manch for the Government to cancel the bid of a Chinese company related to the transit system 14 15 The trains are being made by Alstom s manufacturing plant in Savli Gujarat 16 The project was chosen ahead of Delhi Alwar and Delhi Panipat projects due to high frequency of travellers and traffic between Delhi and Meerut to execute the project and reduce pollution congestion and risk of accidents 17 Route editLength of the corridor 82 km 51 mi No of stations 14 Names of stations Sarai Kale Khan New Ashok Nagar Anand Vihar Sahibabad Ghaziabad Guldhar Duhai Muradnagar Modinagar South Modinagar North Meerut South Shatabdi Nagar Begumpul and Modipuram No of depots 2 Names of depots Duhai and Modipuram 8 stations were constructed exclusively for local transit services in Meerut Partapur Rithani Brahmapuri Meerut Central Bhaisali MES Colony Daurli and Meerut North 4 stations for which both RRTS and local transit services in Meerut will be provided Meerut South Shatabdi Nagar Begumpul and Modipuram Of the entire length 68 03 km 42 27 mi is elevated 14 12 km 8 77 mi is underground 4 and 1 45 km 0 90 mi will be at grade for connections to two depots to be located at Duhai and Modipuram In densely populated areas of Delhi and Meerut the route will be underground including near the Yamuna river 6 The entire route is designed for a maximum speed of 180 km h 110 mph with an operating speed of 160 km h 100 mph 18 19 The average speed when taking stops into account will be approximately 100 km h 62 mph 19 The Delhi Meerut corridor starts from Sarai Kale Khan station in Delhi The corridor will pass through areas of Delhi Ghaziabad and Meerut terminating at Modipuram in Meerut 4 6 Sarai Kale Khan will also become a transit hub with the Sarai Kale Khan Nizamuddin metro station the Sarai Kale Khan ISBT and the Hazrat Nizamuddin railway station in vicinity 6 The 38 05 km 23 64 mi long Sahibabad Meerut South section including Duhai Depot is expected to become operational by January 2024 the 16 60 km 10 31 mi Hazrat Nizamuddin Sahibabad in January 2024 and the remaining 37 40 km 23 24 mi Meerut South Modipuram in July 2024 6 There will be a total of 16 stations 4 Multimodal transport hubs will be combined with existing transportation such as Delhi Metro Indian Railways and Uttar Pradesh State Road Transport Corporation UPSRTC bus terminals planned at Anand Vihar Sahibabad and Shaheed Sthal stations 20 Delhi Ghaziabad Meerut RRTS StationsNo Station Name Integration Station Layout Station for RRTS Local Transit Construction Update OpeningEnglish Hindi1 nbsp Sarai Kale Khan सर य क ल ख न न ज म द द न Pink Line Hazrat Nizamuddin railway station Sarai Kale Khan ISBT Elevated RRTS Construction works underway June 20252 nbsp New Ashok Nagar न य अश क नगर Blue Line Elevated3 nbsp Anand Vihar आन द व ह र Blue Line Pink Line Anand Vihar Railway TerminalAnand Vihar ISBT Underground4 nbsp Sahibabad स ह ब ब द Elevated Around 2350 piles 230 pile caps 110 piers and 50 pier caps have been built Over 260 segments have been cast and 4 spans have already been erected 20 October 20235 nbsp Ghaziabad ग ज य ब द Red Line Elevated6 nbsp Guldhar ग लधर Elevated7 nbsp Duhai द ह ई Elevated8 nbsp Murad Nagar म र द नगर Elevated Casting testing of 17 piles for the initial pile load test completed 17 km 11 mi of road widening amp amp construction work has been completed A total of 370 piles and 28 pile caps have been completed June 20259 nbsp Modi Nagar South म द नगर दक ष ण Elevated10 nbsp Modi Nagar North म द नगर उत तर Elevated11 nbsp Meerut South म रठ दक ष ण Elevated RRTS and local transit services in Meerut12 nbsp Partapur परत प र Elevated Local Transit services in Meerut13 nbsp Rithani र ठ न Elevated14 nbsp Shatabdi Nagar शत ब द नगर Elevated RRTS and local transit services in Meerut15 nbsp Brahampuri ब रह म प र Elevated Local Transit services in Meerut16 nbsp Meerut Central म रठ क द र य Underground17 nbsp Bhaisali भ स ल Underground18 nbsp Begumpul ब गमप ल Underground RRTS and local transit services in Meerut19 nbsp MES Colony म स क ल न Elevated Local Transit services in Meerut20 nbsp Daurli द रल Elevated21 nbsp Meerut North म रठ उत तर Elevated22 nbsp Modipuram म द प रम Elevated RRTS and local transit services in MeerutKey features editThe Delhi Ghaziabad Meerut RRTS corridor is the first RRTS corridor to be implemented in India Multi Modal Integration RRTS stations will be integrated with various modes of transport like Airports Railway Stations Inter State Bus Terminals Delhi Metro Stations etc It will facilitate the movement of commuters between modes 21 Platform Screen Doors All of the RRTS stations will have platform screen doors for enhanced commuter safety 22 The implementation of the Delhi Ghaziabad Meerut RRTS Corridor is expected to shift the modal share in favour of public transport from 37 to 63 in the region which is projected to result in a reduction in traffic 23 As per estimates this corridor will significantly reduce air pollutants namely PM 2 5 by 60 000 tonnes Nitrogen Oxide by 475 000 tonnes Hydrocarbons by 80 000 tonnes and Carbon Monoxide by 80 000 tonnes per year Source of funding editMultilateral Funding About 1 billion from Asian Development Bank ADB 500 million from New Development Bank NDB and 500 million from Asian Infrastructure Investment Bank AIIB 24 25 Contribution from governments From Government of India 20 from Government of Delhi 3 22 and from Government of Uttar Pradesh 16 78 26 Construction editThe NCRTC has divided the Civil Construction work of Delhi Meerut RRTS 22 stations and 2 Depots into 08 eight packages The list of all construction contract is as follows 27 Phases Target Opening Date StatusPhase 1 Sahibabad to Duhai Depot October 2023 CompletedPhase 2 Duhai Depot to Meerut South March 2024 Under ConstructionPhase 3 Complete Line Including Meerut Delhi Section January 2025 Under ConstructionPackage Stations ContractorPkg 1 Sahibabad and Ghaziabad 2 stations KEC International and China Civil Engineering Construction Corp JV Pkg 2 Guldhar and Duhai 2 stations Apco Infratech and China Railway First Group JV Pkg 3 Murad Nagar Modi Nagar South Modi Nagar North Meerut South Partapur Rithani amp Shatabdi Nagar 7 stations L amp T Heavy Civil InfrastructurePkg 4 Anand Vihar 1 station Shanghai Tunnel Engineering Co STEC Pkg 5A Duhai Depot 1 Depot Vijay Nirman Co and KEC International JV Pkg 5B Modipuram Depot 1 Depot KSM Bashir Mohd amp SonsPkg 6 Sarai Kale Khan and New Ashok Nagar 2 stations Afcons InfrastructurePkg 7 Brahmapuri MES Colony Daurli Meerut North and Modipuram 5 stations L amp T Heavy Civil InfrastructurePkg 8 Meerut Central Bhaisali and Begumpul 3 stations Afcons InfrastructurePkg 9A Multistoried Staff Quarters amp Connectivity Sam India Builtwell is Lowest BidderPkg 9B Construction of Jangpura stabling yard Operation control center OCC and associated buildings Notice Inviting Bids PendingPkg 10 Architectural finishing work for 7 stations Sahibabad Shatabdi Nagar Canon Fasteners 6 firms had bid Pkg 11 Lot 1 Architectural finishing for elevated stations amp E amp M systems Metcon India Reality and Infrastructure C P Associates JVPkg 11 Lot 2 Architectural finishing for elevated stations amp E amp M systems URC ConstructionsPkg 12A Pre Engineered PEB Steel Roof Structure for 4 stations Sahibabad Duhai Sam India BuiltwellPkg 12B Pre Engineered PEB Steel Roof Structure for 12 stations in 2 lots URC Constructions 3 firms had bid Pkg 13 22 000 MT of Head Hardened Rails ArcelorMittal EspanaPkg 14 Track fastening system for ballastless track SchwihagPkg 15 Standard Gauge 60 Kg UIC Turnouts and Scissors Cross over Voestalpine VAE VKN India Pvt Ltd Pkg 16 Rails for Duhai amp Modipuram depots and Jangpura Stabling Yard Lot 1 2000 MT of UIC 60 60E 1 60 KG 1080 Grade Head Hardened Rails Lot 2 4000 MT of 60 KG 880 Grade Rail Class A Financial bids opened Dec 18 results awaitedPkg 17 Track work Larsen amp Toubro Limited Transportation and Infrastructure Independent Company Pkg 18 Rail Grinding Machine Tender CancelledPkg 19 Electrification receiving substations RSS and traction overhead equipment OHE IRCON InternationalPkg 20 No Information Available No Information AvailablePkg 21 Escalators Schindler India Private Ltd Schindler China Elevator Company Ltd JVPkg 22 Elevators Otis Elevator Company India Ltd Otis Elevator China Company Ltd JVPkg 23 Tunnel Ventilation System TVS Environmental Control System ECS STRABAG InternationalPkg 24 Design Supply Installation Testing and Commissioning of Signalling and Train Control and Telecommunication Systems Alstom Transport IndiaPkg 25 Design manufacture supply testing amp commissioning of 210 standard gauge coaches Bombardier TransportationPkg 26A Automatic Fare Collection AFC System Systems Integrator Datamatics Global Services AEP Ticketing solutions DM AEP 26A JV Pkg 26B Automatic Fare Collection AFC System Financial Institution Paytm Payments Bank Ltd Pkg 27 Platform Screen Doors PSD System NCRTC BEL signed MOUPkg M2 Catenary Maintenance Vehicle And Engineering Maintenance Vehicle PTL Royal JVPkg M5 Fully Automatic CNC under Floor wheel Lathe Machine HYT Engineering Co Pvt Ltd Pkg M7 Construction of Emergency Evacuation System including connecting Foot Over Bridge from track level to road level at various locations Quality Buildcon Pvt Ltd Note Package 1 and Package 2 are part of the priority section on Delhi Meerut RRTS Signalling and train control system editThe NCRTC has decided to equip the line with ETCS L2 signalling Tenders for its procurement were invited on 17 April 2020 28 and Alstom was awarded the contract worth approximately 937 crore US 120 million in January 2021 29 Nokia partnered with Alstom to implement the 4 9G LTE private wireless network to support the ETCS L2 signalling This is the first time in the world that an LTE network is being used along with ETCS L2 signalling 30 Rolling stock editOn 1 May 2020 Alstom then Bombardier Transportation before it was acquired by Alstom in January 2021 31 emerged as the lowest bidder among a group of three bidders to supply and maintain 210 coaches for a 15 year period with a price bid of 2 577 crore US 320 million The 210 coaches include 180 coaches 30 six car trains for RRTS and 30 coaches 10 three car trains for Meerut Metro 32 33 In September 2020 the NCRTC first unveiled the RRTS train the design of which is inspired by the Lotus Temple Designed in Hyderabad the trains have a design speed of 180 km h 110 mph and an operational speed of 160 km h 100 mph Each fully air conditioned six car trainset will be able to carry 1750 passengers and will have one premium coach and one coach reserved for women 34 33 It is compatible with a host of train protection systems like automatic train protection ATP and automatic train control ATC systems and also has features like regenerative braking 33 The entire rolling stock will be manufactured in India at Alstom s plant in Savli Gujarat 35 36 Manufacturing began in July 2021 37 and the first trainset was delivered to NCRTC in May 2022 33 Status updates editMay 2017 The Government of Uttar Pradesh approved the Detailed Project Report DPR for the Delhi Meerut RRTS project 38 39 Feb 2019 The Central Government approved 30 274 crores for the Delhi Meerut RRTS project 40 Mar 2019 Prime Minister Narendra Modi laid the foundation stone for this project 41 Jun 2019 Pillar construction work started 42 Oct 2020 Civil construction work on about 50 km 31 mi between Sahibabad and Shatabdi Nagar was in progress 43 Feb 2021 The construction of the Anand Vihar Station of Delhi Meerut RRTS corridor began 44 Apr 2021 Track laying started for the Ghaziabad section of the corridor 45 Jun 2021 The first elevated section pier namely for the Sarai Kale Khan section is constructed 46 Jun 2021 Construction work on the first part of the underground portion of began in Anand Vihar 47 Jul 2021 The piers were completed for the 24 km 15 mi elevated stretch 48 Jul 2021 Alstom began manufacturing 210 trains These will be manufactured in Alstom s manufacturing plant in Savli Gujarat 49 Aug 2021 It was announced that 650 hectares of land between Guldhar and Duhai RRTS Stations will be developed as a commercial residential and industrial hub 50 Aug 2021 Construction work on the second underground section began in Meerut 51 Sep 2021 The installation of Overhead Equipment OHE lines began Oct 2021 Tenders was issued for the construction of the Modipuram depot 52 Dec 2021 Datamatics Global Services AEP Ticketing Solutions JV was awarded a Rs 227 crore Contract for the AFC System 53 Jan 2022 Nokia and Alstom deployed a private wireless network system based on LTE 4 9G with support for ETCS II signalling 54 Mar 2022 The NCRTC unveiled the first images of the RRTS trains which will be used for operations after the completion of the construction of the priority corridor 55 Mar 2022 The tunneling work for the underground section of the RRTS corridor in Meerut began 56 Mar 2022 Paytm Payments Bank won the bid for becoming the financial institution responsible for the fare system beating the State Bank of India 57 Apr 2022 Roughly 25 of the corridor was completed 58 May 2022 Alstom manufactured the first train in Savli Gujarat 59 Aug 2022 First trial of the first trainset has been successfully completed 60 Feb 2023 The trial runs for the trains including high speed tests have been completed and now there are a total of six trains The 17 km priority corridor from Sahibabad to Duhai is at its final stages of work and is confirmed to be opened by mid June 2023 The second stretch from Duhai to South Meerut will be opened by the first quarter of 2024 and the entire corridor will become operational by March 2025 61 62 63 Oct 2023 The priority corridor from Sahibabad to Duhai was inaugurated by Prime Minister Narendra Modi on 20 October 2023 1 Meerut Metro editRRTS line was merged with Line 1 of Meerut Metro due to overlapping route of both Line 2 and RRTS branch line is awaiting release of funds from the state government and approval for new DPR that has to be made with minor adjustments in the route Line 1 Partapur to Modipuram 20 km elevated 12 8 km amp underground 7 2 km This line has been Merged with Delhi Meerut RRTS Line 2 Shradhapuri Phase II to Jagriti Vihar 15 km elevated 10 7 km amp underground 4 3 km This line is now waiting for approval for a new DPR tender to be floated RRTS Branch line to Shastri Nagar This line is waiting for a new tender to be floated nbsp Meerut Metro Proposed LinesSee also editDelhi Alwar Regional Rapid Transit System Delhi Panipat Regional Rapid Transit SystemReferences edit a b c d Anabd Jatin 20 October 2023 PM Modi flags off RRTS What is this mass transport system how it can benefit NCR The Indian Express Retrieved 20 October 2023 a b Delhi Meerut RRTS construction work on schedule likely to be done June 2025 livemint com 4 April 2022 Retrieved 6 April 2022 Feasibility Report RRTS Delhi Ghaziabad Meerut PDF Report Archived PDF from the original on 13 November 2016 Retrieved 7 October 2017 a b c d NCRTC Delhi Meerut Corridor ncrtc in Retrieved 11 June 2017 Delhi Meerut RRTS Information Route Map Fares Tenders amp Updates The Metro Rail Guy Retrieved 16 October 2023 a b c d e Staff Reporter Delhi Meerut rapid rail project gets green light NDTV Retrieved 20 February 2019 India s first rapid rail to open next week with women driving RAPIDX Construction World 12 October 2023 Retrieved 16 October 2023 Prasad Nikeeta 8 March 2019 Delhi to Meerut in 60 mins with 160 kmph rapid rail PM Modi lays foundation stone 10 facts you must know The Financial Express Retrieved 16 October 2023 RAPIDX India s first indigenous S HSR all set to Begin Operations on Priority Section Metro Rail News 22 August 2023 Retrieved 16 October 2023 Jha Abhijay 10 March 2023 Delhi Meerut RRTS priority stretch to be ready by March The Times of India Retrieved 16 October 2023 Shah Narendra 8 March 2019 Prime Minister has laid the foundation stone of country s first RRTS Metro Rail News Retrieved 15 October 2020 India s first rapid rail unveiled promises Delhi to Meerut in 55 minutes The Indian Express 16 March 2022 Retrieved 9 May 2023 Delhi Meerut RRTS Good news 17 km long Sahibabad Duhai stretch to be operational by June 2023 details The Financial Express 31 July 2019 Retrieved 15 October 2020 Arnimesh Shanker 15 June 2020 RSS affiliate wants Modi govt to cancel Chinese firm s bid for Delhi Meerut RRTS project ThePrint Retrieved 18 June 2020 Shrivastava Rahul 16 June 2020 Chinese firm bids lowest for Delhi Meerut project RSS affiliate asks Modi govt to scrap company s bid India Today Retrieved 18 June 2020 Delhi Meerut RRTS Project Chinese firm to build stretch of India s first Regional Rapid Rail Transit corridor The Financial Express 4 January 2021 Retrieved 21 January 2021 1st phase of Delhi Meerut RRTS to open in March The Financial Express NCRTC Retrieved 27 September 2023 NCRTC approves Delhi Ghaziabad Meerut RRTS corridor India Today 6 December 2016 Retrieved 12 June 2017 a b RRTS Background ncrtc in Archived from the original on 5 June 2017 Retrieved 12 June 2017 Delhi Meerut RRTS Hubs with connectivity to Delhi Metro Indian Railways proposed on Delhi Ghaziabad route Financial Express 19 March 2020 Retrieved 9 April 2020 Singh Neha 14 March 2020 NCRTC to integrate Delhi Meerut RRTS corridor with other modes of transport Metro Rail News Retrieved 15 October 2020 All RRTS stations to have platform screen doors The Times of India 11 August 2019 Retrieved 15 October 2020 Dash Dipak K 22 January 2019 Delhi Meerut Rapid Rail News RRTS may take 1 lakh vehicles off roads The Times of India Retrieved 15 October 2020 New Development Bank approves 500 million loan for RRTS rail project Hindustan Times 1 October 2020 Retrieved 15 October 2020 Saluja Nishtha ADB approves 1 billion loan for construction of Delhi Meerut RRTS The Economic Times Retrieved 15 October 2020 Delhi Meerut high speed corridor gets Rs 100 crore fillip The Times of India 24 September 2020 Retrieved 15 October 2020 Delhi Meerut RRTS RAPIDX The Metro Rail Guy Retrieved 19 April 2023 NCRTC Invites Bids for Delhi Meerut RRTS ETCS Signalling System The Metro Rail Guy 28 April 2020 Retrieved 28 April 2020 Alstom Will Deploy India s First ETCS L3 System Bags 937 Cr Delhi Meerut RRTS Signalling Contract RailPost 20 January 2021 Archived from the original on 3 May 2023 Retrieved 3 May 2023 Nokia tests mission critical voice and data on 4 9G private wireless network for NCRTC ET Telecom 4 August 2022 Archived from the original on 3 May 2023 Retrieved 3 May 2023 A transformational step for Alstom completion of the acquisition of Bombardier Transportation Alstom Press releases and news 29 January 2021 Archived from the original on 15 March 2023 Retrieved 29 April 2023 Bombardier bags rolling stock deal for Delhi Meerut RRTS corridor The Economic Times 7 May 2020 Archived from the original on 29 April 2023 Retrieved 29 April 2023 a b c d Sinha S 8 May 2022 First RRTS trainset handed over to NCRTC Hindustan Times Archived from the original on 16 May 2022 Retrieved 29 April 2023 India s first RRTS train with design speed of 180 kmph unveiled to have business class The Times of India 25 September 2020 Retrieved 15 October 2020 Alstom Lowest Bidder for Delhi Meerut RRTS 210 Coach Contract The Metro Rail Guy 2 May 2020 Retrieved 2 May 2020 Saluja N 24 September 2020 Bombardier to make entire rolling stock for Delhi Meerut RRTS in India says NCRTC Head The Economic Times Archived from the original on 27 April 2023 Retrieved 15 October 2020 French MNC Alstom begins local manufacturing of train cars for Regional Rapid Transit System The Economic Times 16 July 2021 Archived from the original on 29 April 2023 Retrieved 29 April 2023 NCRTC Uttar Pradesh Government Approves Delhi Meerut RRTS ncrtc in Archived from the original on 12 June 2017 Retrieved 11 June 2017 Agarwal Kabir 6 May 2017 Delhi Meerut rapid rail priority for govt CM Yogi The Times of India Retrieved 8 July 2018 Govt approves Rs 30 274 cr Delhi Ghaziabad Meerut Regional Rapid Transport System 19 February 2019 PM Narendra Modi laid down the foundation stone for the project 8 March 2019 Retrieved 8 March 2019 द ल ल स म रठ तक क सफर 60 म नट म र ज न हज र य त र य क ह ग फ यद Dainik Jagran in Hindi Retrieved 4 June 2019 Jha Abhijay 8 July 2020 Work on Delhi Meerut RRTS corridor gathers pace The Times of India Retrieved 15 October 2020 Agarwal Anshu 9 February 2021 Construction work for Anand Vihar station of 82km Delhi Meerut RRTS corridor begins The Times of India Retrieved 9 February 2021 RRTS project Laying of tracks for 17 km 11 mi priority section begins in Ghaziabad Hindustan Times 20 July 2021 Retrieved 20 September 2021 Delhi Meerut RRTS Work in progress First pier of elevated section constructed The Financial Express www financialexpress com 4 June 2021 Retrieved 20 September 2021 Underground construction work commenced for Delhi Meerut RRTS project Urban Transport News Retrieved 20 September 2021 Piers completed in 24 km elevated stretch of Delhi Meerut RRTS corridor The Hindu 10 July 2021 ISSN 0971 751X Retrieved 20 September 2021 Alstom begins manufacturing of commuter amp transit trains for RRTS project 17 July 2021 Archived from the original on 20 September 2021 Jha Abhijay 25 August 2021 Ghaziabad 650 hectares along Regional Rapid Rail Transit System corridor to be developed as special area development zone Ghaziabad News Times of India The Times of India Retrieved 20 September 2021 Rai Sandeep 29 August 2021 Construction work on critical phase of underground RRTS station in Meerut begins The Times of India Retrieved 20 September 2021 Tender issued for construction of Modipuram depot for Delhi Meerut RRTS Project Urban Transport News Retrieved 1 November 2021 Datamatics JV Awarded Delhi Meerut RRTS AFC Contract The Metro Rail Guy 7 January 2022 Retrieved 22 January 2022 Nokia and Alstom to deploy private wireless system in Delhi Meerut RRTS Train Network Urban Transport News Retrieved 30 January 2022 Nandi Tamal 16 March 2022 Coaches of India s first rapid rail unveiled to be used in Delhi Meerut RRTS livemint com Retrieved 6 April 2022 Rai Sandeep 18 March 2022 Tunnelling Work For Delhi meerut Rrts Corridor Begins In Meerut Meerut News Times of India The Times of India Retrieved 6 April 2022 Paytm Awarded Delhi Meerut RRTS AFC Contract Package 26B The Metro Rail Guy 10 April 2022 Retrieved 10 April 2022 Delhi Meerut RRTS on track 24 8 completed so far Ministry The Hindu 5 April 2022 ISSN 0971 751X Retrieved 6 April 2022 Livemint 8 May 2022 Delhi Meerut RRTS Fastest trainset in country built under Make in India mint Retrieved 15 May 2022 Delhi Meerut Rapid Train Hits Track Trial Btw Sahibabad Duhai Successful Watch Video Here India com 8 August 2022 Retrieved 26 February 2023 RRTS trials to south Meerut by year end The Times of India 4 February 2023 ISSN 0971 8257 Retrieved 26 February 2023 NCRTC Conducts Successful Trial Run Of India s First High Speed RRTS Train From Duhai To Ghaziabad India com 4 January 2023 Retrieved 26 February 2023 Ghaziabad Four RRTS stations on 17km priority line to be ready by mid March Hindustan Times 25 February 2023 Retrieved 26 February 2023 Retrieved from https en wikipedia org w index php title Delhi Meerut Regional Rapid Transit System amp oldid 1186211984, wikipedia, wiki, book, books, library,