The 16th Street Bridge, also known as the Piney Branch Bridge, is an automobile and pedestrian bridge that carries 16th Street NW over Piney Branch and Piney Branch Parkway in Washington, D.C. It was the first parabolic arch bridge in the United States. Construction on the first span began in 1905 as part of the northward extension of 16th Street, and was finished in 1907 but was never opened to traffic. The second span began construction in 1909 and was completed in 1910. The bridge was renovated in 1990, and again beginning in October 2014.

16th Street Bridge
Looking at the west side of the 16th Street Bridge from Piney Branch Parkway NW
Coordinates38°56′18″N 77°02′11″W / 38.9382°N 77.0364°W / 38.9382; -77.0364
Carries16th Street NW
CrossesPiney Branch and Piney Branch Parkway
LocaleWashington, D.C., U.S.
Other name(s)Piney Branch Bridge
OwnerDistrict of Columbia Department of Transportation
Maintained byDistrict of Columbia Department of Transportation
Characteristics
Total length272 feet (83 m)
Width61 feet (19 m)
Longest span125 feet (38 m)
No. of spans1
Load limit40 short tons (36 t)
History
ArchitectJ.J. Morrow and W.J. Douglas
Constructed byPennsylvania Bridge Company (first span);
Cranford Paving Company (second span)
Construction startSeptember 1905 (first span);
June 1909 (second span)
Construction endJanuary 1908 (first span);
April 1910 (second span)
Construction cost$165,000 ($5,395,500 in 2023 dollars)
OpenedApril 15, 1910 (1910-04-15)
Statistics
Daily traffic30,000 vehicles per day
Location

The bridge, which spans the Piney Branch addition to Rock Creek Park, sits at the corner of four Washington, D.C., neighborhoods: Sixteenth Street Heights, Crestwood, Columbia Heights, and Mount Pleasant.

Description edit

The 16th Street Bridge is 272 feet (83 m) long.[1][2] Its span is 125 feet (38 m) in length, and has a rise of 45 feet (14 m).[3] The span is a parabolic arch, the first built in the United States[4][5] and the longest in the world at the time, according to its designer, W.J. Douglas.[3] The abutments and substructure of the bridge are of reinforced concrete;[1][3][6] the arch itself is not reinforced with steel.[3] The interior of the bridge is hollow. Square vertical interior columns 2 feet (0.61 m) in length on each side support the road deck. A latticework of horizontal square beams, each 1 square foot (0.093 m2) in size, intersect the columns and are set perpendicular to one another. This system of columns and beams compress the arch and keep it stable as well push outward against the walls.[7][5] The bridge's abutments are hollow.[1][3] The abutments are stabilized by soil pressing against them from the outside, and the system of beams and columns on the interior of the bridge.[1][7]

The walls of the bridge and the abutments are 2 feet (0.61 m) thick.[3] A bluish crushed diorite was added to the concrete used to pour the walls of the abutments and the spandrel walls, which were left unfinished, and reflect the texture of the wooden forms used to create them.[8] However, the archivolt, balustrade, and pilasters, whose concrete includes yellow sand and crushed granite, have a much different texture.[8] These elements were removed from their molds before the concrete was fully hardened, then roughened with stiff brushes, helping to expose the granite particles within and make them glitter in the sun.[9]

The bridge superstructure rests on walls and columns.[3] The 25-foot (7.6 m) wide spans[1] are of reinforced concrete.[3] Steel beams, their ends resting on the walls of the two bridges, close the gap between the spans.[3] Reinforced concrete slabs lie atop these beams to create a unified deck.[3] Concrete balustrades and newels create a railing on the east and west sides of the bridge.[6][9] The road is 45 feet (14 m) wide, and 8-foot (2.4 m) sidewalks are on either side of the roadway.[2] Granite curbs define the cement sidewalk.[9] The deck is topped by asphalt.[3][9] At 65 feet (20 m) in width (roadway and sidewalks), the deck was the widest in the city when built and could support 40 short tons (36 t).[6]

The bridge has four ornamental cast iron lampposts.[6] The ends of the bridge are flanked by two bronze reclining tigers on concrete pedestals.[10] The archivolt consists of three arch rings, and is of smoothed concrete.[2] Pilasters flank the arch on the sides of the bridge. Stylistically, the bridge is Neoclassical in design.[2]

The bridge cost about $135,000 to build.[2]

Construction edit

Authorization of the first span edit

On March 30, 1899, the United States Congress authorized the extension of 16th Street NW from Morris Road NW (now Monroe Street NW) to the D.C.-Maryland line. Condemnation proceedings to obtain land began on December 2, 1900, were completed on May 27, 1901, and were approved by the Supreme Court of the District of Columbia on April 19, 1902.[11] By November 1903, work had almost reached the stream known as Piney Branch, which runs through a valley about 60 feet (18 m) below the grade of the street. On December 10, 1903, the Commissioners of the District of Columbia[a][12] asked Congress for a 300-foot (91 m) bridge to carry one or two lanes of 16th Street NW over Piney Branch. The bridge, whose cost was estimated at $50,000 ($1,695,556 in 2023 dollars), would be long enough to permit a parkway to pass beneath it.[13]

In March 1904, the commissioners' request finally saw action. Senator Jacob Gallinger (R-New Hampshire) offered an amendment to the Senate's 1905 District of Columbia appropriations bill which both authorized the city to construct the bridge and appropriated[b][14] $50,000 ($1,695,556 in 2023 dollars) for this purpose.[15] The House D.C. appropriations bill also contained the same language, but this provision was stricken from the bill on the floor of the house on March 18.[16] Undeterred, the Senate Committee on the District of Columbia included the bridge authorization in the 1905 D.C. appropriations bill just five days later. The legislation, however, authorized a $50,000 concrete bridge but appropriated only $20,000 ($678,222 in 2023 dollars) for its construction.[17] Half the money came from the federal government, and half from the city.[18]

A fight erupted on the floor of the Senate over the bridge provision. Both the Senate Appropriations Committee and the Senate Committee on the District of Columbia approved the bridge.[19] But many Senators were unhappy that the federal budget was increasing rapidly. The bill was held up for 10 months, while Senators worked behind the scenes to resolve these differences. The D.C. appropriations bill did not reach the Senate floor for another 10 months. When the bill did reach the chamber floor on February 15, 1905, Senator Stephen B. Elkins (R-West Virginia) demanded that the bridge provision be removed. Senator William B. Allison (R-Iowa) rose to support the expenditure.[18] Their floor fight lasted three full days. Elkins claimed on February 16 that no citizens of the city wanted the bridge, and he demanded a full Senate vote on the bridge amendment.[20] Senator Allison replied on February 17 by bringing in petitions from the Brightwood Citizens Association and the Mt. Pleasant Citizens Association asking for construction of the bridge, and pointing out that these petitions had been delivered to the Senate some months ago.[21] Although Elkins won a vote on the amendment, the Senate overwhelmingly approved its inclusion in the final bill on February 17, ending the three-day floor fight.[22]

A conference committee was now appointed by the House and Senate to reconcile the two different D.C appropriations bills. The House voted on February 18 to instruct its conferees to oppose the bridge amendment.[23] The conference began meeting the week of February 20.[24] On Sunday, February 26, the conferees agreed to include the bridge authorization and expenditure in the 1905 D.C. appropriations bill.[25] The conference bill was introduced in the Senate on February 28, and hours later it approved the legislation.[26] The House unanimously approved it on the afternoon of March 1.[27] President Theodore Roosevelt signed the bill into law a few days later.

Constructing the first span edit

Designs and selection of contractor edit

At the time the bridge was approved, Piney Branch was nearly impassable. A rough pine bridge existed at the site of the new bridge to permit pedestrian traffic, while horses and wagons used a nearby ford.[28]

With four months to prepare architectural designs for the bridge before the federal funds became available, the city was ready to build the bridge in July 1905. Major J.J. Morrow, Assistant Engineer Commissioner for the District of Columbia, and W.J. Douglas, Engineer of Bridges for the District of Columbia, submitted sketches of the bridge to the commissioners on July 12.[29] The bridge's final design was by Douglas and city engineer William N. Reynolds (who was also the engineer in charge of construction).[9] H.T. Pratt was the architectural draughtsman.[30] Stylistically, the 16th Street Bridge was to look like the Connecticut Avenue Bridge (built between 1897 and 1907).[4] Their design for the concrete bridge showed a span 125 feet (38 m) long and a road deck 20 to 25 feet (6.1 to 7.6 m) wide,[29][31] and with as much ornamentation as budget would allow.[31] By early August, the plans for the bridge were complete. The bridge would be 272 feet (83 m) long, with a 25-foot (7.6 m) wide road deck. The 125-foot (38 m) long span would rise 60 feet (18 m) above the valley floor. The bridge would be made of reinforced concrete and steel, with hollow spandrels between the arch and abutments. The roof and walls of the arch and the walls of the abutments ranged from 10 to 20 inches (25 to 51 cm) in thickness. Square columns, 2 feet (0.61 m) in length on each side, supported the road deck, and were linked internally by a latticework of 1 square foot (0.093 m2) horizontal concrete beams (which helped to compress the arch and keep it stable as well push outward against the walls).[7]

Although the Piney Branch Bridge (as it was then known) was designed to carry two lanes of traffic and be a completed structure, the D.C. Commissioners expected to build a second span as soon as possible.[3][7] This would expand the road deck to 70 feet (21 m).[7] Subsequently, the first span was built 20 feet (6.1 m) off the centerline of 16th Street.[3][6]

Engineers estimated the foundations for the bridge would be complete before the onset of cold weather in December.[7] Construction bids were advertised on August 26, 1905,[32] and six bids were received by the September 16 deadline.[28][33] The Pennsylvania Bridge Company was selected to construct the bridge.[34][2] Although Congress had appropriated only $20,000 for the job, the city issued a contract worth $42,731 ($1,449,056 in 2023 dollars).[35]

8-hour day law dispute edit

In 1892, Congress enacted an eight-hour day law which applied to contractors doing work on behalf of the federal government. As the District of Columbia was a creature of the federal government, the law also applied to city workers and contractors engaged in work for the city.[36]

In July 1906, a broad investigation into violation of the eight-hour day law by the Pennsylvania Bridge Company was begun by federal inspectors.[37] The company was indicted on July 28, and plead not-guilty.[38] On October 1, city attorneys charged the company with additional violations of the eight-hour law. Initially, John Meigs, the civil engineer in charge of the work, refused to surrender the company's accounting books to the grand jury investigating the alleged crime. The grand jurors complained to D.C. criminal court, which threatened the company with contempt of court. After a discussion between company lawyers and the city, the books were released to the grand jury.[39] The company was again indicted, and again plead not guilty.[40]

The Pennsylvania Bridge Company admitted it had forced workers to stay on the job nine and sometimes 10 hours a day. But it offered two defenses. First, the company said that the District of Columbia had set such stringent deadlines for construction that the company had no choice but to violate the law. Second, the company said that many skilled workers would not work for less than 10 hours a day, and it had acceded to their demands. Neither argument was persuasive to the jury, and the company was found guilty. A $1,500 fine ($50,867 in 2023 dollars) was imposed on the firm.[41]

Completion edit

With the bridge's foundations and abutments underway, additional federal funds were needed to complete the span and road deck. In October 1905, the D.C. Commissioners requested another $30,000 ($1,017,333 in 2023 dollars) from Congress.[42] The Subcommittee of the House Appropriations Committee added the $30,000 appropriation, and legislation making the appropriation passed on April 17, 1906.[43] By June 30, the end of the fiscal year, $15,000 ($508,667 in 2023 dollars) had been expended on the bridge's construction.[44]

The bridge was poured in place.[2] By mid-November 1906, the bridge was halfway completed, and construction officials estimated it would be finished in early 1907.[45] This estimate proved significantly over-optimistic. On December 1, company officials declared the bridge "almost ready", except for the approaches.[3][c] Yet, a month later, the bridge was still under construction.[46] By mid-March 1907, construction was still not finished.[47]

Finally, on June 9, contractors said the bridge would be completed on July 1, 1907.[1][48] The approaches, however, were not complete. D.C. officials had only just received seven bids for their construction, and awarded the $28,000 contract ($915,600 in 2023 dollars) to Hoffman Construction.[48] The total cost of the structure was estimated to be between $44,000[49] and $60,000 ($1,438,800 to $1,962,000 in 2023 dollars).[50]

Work on grading the approaches was still going on in October 1907.[51] At that time, Hoffman Construction estimated they would be done by January 1, 1908.[52] Grading was nearly complete by early December 1907.[53]

The 16th Street Bridge was completed and ready to accept traffic on December 27, 1907. Commissioners Henry B.F. Macfarland and J.J. Morrow drove over the bridge to inaugurate it informally.[54] The bridge was not, however, actually opened to traffic. It remained complete but closed.[49][55]

Construction of the second span edit

 
Original lighting standard used on the 16th Street Bridge in 1910.

By 1908, the economizing mood of Congress had lessened. D.C. officials sought permission to complete the second span of the 16th Street Bridge, and on April 28, 1908, Senator Thomas H. Carter (R-Montana) offered an amendment to the D.C. appropriations bill to authorize construction of a second span and widen the bridge to a full 60 feet (18 m). No funds were appropriated for this purpose, however.[56] The amendment was not accepted, and the 1909 fiscal year started without them.

in December 1908, the D.C. Commissioners again asked Congress for permission to build a second span. The roadway would not be 65 feet (20 m), and the span's cost estimated at $85,000 ($2,882,444 in today's dollars).[57] The House Appropriations Committee approved the funding request on January 6, 1909.[58] The Subcommittee on the District of Columbia of the Senate Appropriations Committee followed suit on February 2.[59] A House–Senate conference committee approved the funding on February 27,[60] and President Theodore Roosevelt signed the legislation into law.[49]

The D.C. Commissioners advertised for construction bids on May 8, 1909.[61] Eight bids were received,[62] with Cranford Paving Company receiving the contract.[2] Design of the second span was nearly the identical to the first, and Captain Edward M. Markham (assistant to the engineer commissioner) and C.B. Hunt (D.C. Engineer of Highways) oversaw the construction. The estimated time for completion of the span was January 1, 1910.[63]

As with the first span, the second span was poured in place.[2] Although construction of the first span had occurred without any reported accidents, construction on the second span did not proceed as safely. On August 14, 1906, an African American worker had his hand crushed on the job site.[64] Despite the accident, construction officials still estimated the time of completion at January 1.[65]

On September 22, 1909,[66] the city entered into a contract with sculptor A. Phimister Proctor to sculpt four reclining tigers in bronze to adorn the ends of the bridge.[6] It is not clear how Proctor was chosen for the job. As models, Proctor studied tigers at the Bronx Zoo, and he sculpted the statues in his New York City studio. The Gorham Company cast the statues, each of which was 10 feet (3.0 m) long and weighed 1 short ton (0.91 t).[d][10][67]

In October 1909, the city advertised bids for lighting for the bridge. Four ornamental lampposts, in either bronze or cast iron, were required. Five bids were received in November,[68] R. L. Watmaugh, a Washington architect, received the lighting contract.[9] The lamps were incandescent lights which used a tungsten filament. An armored steel cable, run under the granite curb, provided power to the lights.[69] Each light gave off 100 watts or 78.48 candela. The lamppost had three globes: A 24-inch (61 cm) central globe and two 17-inch (43 cm) side globes. The central globe was 20 feet (6.1 m) above the roadway, and each lamppost was 160 feet (49 m) apart.[70]

A second accident occurred during the construction of the second span on March 16, 1909. Howard Hurley, a 43-year-old African American worker, died instantly when a wooden beam fell on his skull, crushing it.[71]

As the bridge neared completion, D.C. architect R. L. Watmaugh won a contract to design and manufacture ornamental concrete balustrades for either side of the bridge.[6] The two separate spans were linked as construction ended. Holes were cut in the top of the western wall of the first span. Steel beams were laid at intervals across the open space, the ends of each beam resting on the wall of the span. A concrete slab was then laid across the beams to create the roadway's sub-deck.[3] The 16th Street Bridge opened to traffic on April 15, 1909. The total cost of both spans was estimated at $140,000 ($4,578,000 in today's dollars).[6]

Operation edit

Effects edit

A few weeks after the bridge opened, contractors completed a $30,000 ($981,000 in today's dollars) road project that extended 16th Street several blocks north of the 16th Street Bridge.[1]

The impact of the 16th Street Bridge was substantial. The Mt. Pleasant Heights subdivision opened shortly after construction of the first span, and building lots sold briskly.[1] The price of land along 16th Street NW skyrocketed by 500 percent from 1904 to 1910.[72] In December 1911, the Sixteenth Street Heights subdivision opened. Developers reported that they had seen a 200 percent increase in property values since the second span opened.[73]

Renovations edit

In 1990, the 16th Street Bridge underwent its first renovation. The extent of the work was not clear, but the $3 million ($6,996,434 in 2023 dollars) project took 15 months to complete. At least one lane of the bridge was closed during rush hour.[74] The Proctor tigers were regilded during the renovation.[4]

References edit

Notes edit

  1. ^ Beginning in 1874, the District of Columbia was run by three commissioners, two of which were appointed by the President of the United States with the approval of the Senate and a third member who was selected by the United States Army Corps of Engineers (and who had oversight over the city's public works). One of the civilian members was chosen to act as president of the city commission.
  2. ^ In public budgeting, a program must be authorized by law first. Often, an authorization sets the maximum amount of funds a program may expend in a single year. This does not mean the program is actually funded. An appropriation is needed to actually given the authorized program access to funds. Appropriations may be less than, equal to, or more than the authorization.
  3. ^ Approaches are the portion of a roadway connecting with a bridge which has no reasonable other use than as a means of connecting to the bridge. Approahces may be nonexistent in some cases, while in others they may consist of embankments, ramps, and other elements.
  4. ^ Proctor cast four tigers for the Piney Branch Bridge. After slightly changing the models, two more were cast for placement outside Nassau Hall at Princeton University.

Citations edit

  1. ^ a b c d e f g h "Finishing New Bridge". The Washington Post. June 9, 1907. p. R2.
  2. ^ a b c d e f g h i Myer 1974, p. 74.
  3. ^ a b c d e f g h i j k l m n o "One of the Finest". The Sunday Star. December 2, 1906. p. 15.
  4. ^ a b c Bisbort, Alan (April 10, 1992). "The Draw of Bridges". The Washington Post. pp. A8–A9.
  5. ^ a b Myer 1974, p. 73.
  6. ^ a b c d e f g h "Bridge Nearly Ready". The Washington Post. March 25, 1910. p. 16.
  7. ^ a b c d e f "Piney Branch Bridge". The Evening Star. August 3, 1905. p. 6.
  8. ^ a b Sullivan 1908, p. 156.
  9. ^ a b c d e f Piney Branch Bridge Finished 1910, p. 878.
  10. ^ a b "Six Bronze Tigers Together". The Washington Post. June 12, 1910. p. 11.
  11. ^ "His Annual Report". The Evening Star. November 11, 1902. p. 7.
  12. ^ Crew, Webb & Wooldridge 1892, p. 159.
  13. ^ "Engineer Department". The Evening Star. November 10, 1903. p. 13.
  14. ^ Lee, Johnson & Joyce 2013, pp. 315–318.
  15. ^ "Judges Want Increase". The Evening Star. March 7, 1904. p. 7.
  16. ^ "On the District Bill". The Evening Star. March 18, 1904. p. 8.
  17. ^ "Reported to Senate". The Evening Star. March 23, 1904. p. 2.
  18. ^ a b "Money For District". The Evening Star. February 15, 1905. p. 1.
  19. ^ "The District Bill". The Evening Star. April 25, 1904. p. 1.
  20. ^ "Municipal Building". The Evening Star. February 16, 1905. p. 2.
  21. ^ "The Piney Branch Bridge". The Evening Star. February 17, 1905. p. 1.
  22. ^ "A Three Days' Fight". The Evening Star. February 17, 1905. p. 1.
  23. ^ "The District Bill". The Evening Star. February 18, 1905. p. 1.
  24. ^ "The Week Ending Feb. 25, 1905". The Evening Star. February 25, 1905. p. 3.
  25. ^ "The District Bill". The Evening Star. February 28, 1905. p. 1.
  26. ^ "Liberal to District". The Washington Post. March 1, 1905. p. 5.
  27. ^ "The District Bill". The Evening Star. March 1, 1905. p. 1.
  28. ^ a b "Piney Branch Bridge". The Evening Star. September 16, 1905. p. 16.
  29. ^ a b "Bridge Over Piney Branch". The Washington Post. July 13, 1905. p. 12.
  30. ^ "Orders Issued By Commissioners". The Evening Star. January 13, 1906. p. 6.
  31. ^ a b "Bridge Across Piney Branch". The Evening Star. July 13, 1905. p. 12.
  32. ^ "Proposals". The Washington Post. August 26, 1905. p. B3.
  33. ^ "Bids for new Bridge Opened". The Washington Post. September 17, 1905. p. 5.
  34. ^ "Concrete Bridge Contract". The Washington Post. September 21, 1905. p. 10.
  35. ^ "Affairs of the District". The Evening Star. December 5, 1905. pp. 17, 21–22.
  36. ^ Committee on Education and Labor 1902, p. 47.
  37. ^ "Probing Violations of the 'Eight-Hour Law'". The Washington Post. July 24, 1906. p. 4; "District of Columbia: Death of Col. Samuel Donelson, A Former Doorkeeper of the House". The Baltimore Sun. July 24, 1906. p. 2.
  38. ^ "Hogan Demands Jury Trial". The Washington Post. July 29, 1906. p. E1.
  39. ^ "Bridge Builders Indicted". The Washington Post. October 2, 1906. p. 9; "Violating the 8-Hour Law". The Evening Star. October 2, 1906. p. 7.
  40. ^ "Pleads Not Guilty". The Evening Star. October 13, 1906. p. 6; "District of Columbia: Religious Disagreement Causes a Suit for Limited Divorce". The Baltimore Sun. October 13, 1906. p. 2.
  41. ^ "Penn Company Fined $1,500". The Washington Post. October 18, 1906. p. 2.
  42. ^ "Annual Estimates". The Evening Star. October 10, 1905. p. 2.
  43. ^ "Cut by $2,330,233". The Washington Post. April 17, 1906. p. 4.
  44. ^ "Big Bridge Ready Soon". The Washington Post. October 11, 1906. p. 2.
  45. ^ "Board of Trade Elects Directors". The Evening Star. November 13, 1906. p. 9.
  46. ^ "District Government". The Evening Star. January 1, 1907. p. 10.
  47. ^ "For County Roads". The Evening Star. March 16, 1906. p. 18.
  48. ^ a b "Award of Contract". The Evening Star. June 9, 1907. p. 28.
  49. ^ a b c "Bridge To Be Finished". The Washington Post. May 21, 1909. p. 3.
  50. ^ "Bridge Increases Values". The Washington Post. August 4, 1907. p. F4.
  51. ^ "Argyle Park Homes". The Evening Star. October 19, 1907. p. 18.
  52. ^ "Lots Sell in Argyle". The Washington Post. October 27, 1907. p. R5.
  53. ^ "Annual Report of the Commissioners of the District". The Evening Star. December 3, 1907. pp. 22–23.
  54. ^ "Inspection of City Improvements". The Evening Star. December 28, 1907. p. 8.
  55. ^ "To Widen a Bridge". The Evening Star. January 25, 1908. p. 20.
  56. ^ "Raise District Bill". The Washington Post. April 29, 1908. p. 1.
  57. ^ "Local Estimates Sent to Congress". The Evening Star. December 7, 1908. pp. 1, 9.
  58. ^ "District Bill Is Reported to House". The Evening Star. January 6, 1909. pp. 1, 4; "Local Budget Cut". The Washington Post. January 7, 1909. p. 4.
  59. ^ "Big Increase In the District Bill Reported Today". The Evening Star. February 2, 1909. p. 4.
  60. ^ "Accept With Thanks". The Washington Post. February 28, 1909. p. 7.
  61. ^ "Proposals". The Evening Star. May 8, 1909. p. 10.
  62. ^ "Autos for District use". The Washington Post. May 23, 1909. p. 2.
  63. ^ "Extending 16th Street". The Evening Star. June 13, 1909. p. 24.
  64. ^ "His Hand Crushed". The Evening Star. August 14, 1909. p. 16.
  65. ^ "New Suburban Highway Soon". The Evening Star. September 8, 1908. p. 9; "New Bridge Ready By Jan. 1". The Washington Post. September 9, 1909. p. 16.
  66. ^ Commissioners of the District of Columbia 1910, p. 294.
  67. ^ "The Architectural League's Exhibition". Art and Progress: 153. March 1911.
  68. ^ "Bids for Fancy Lamps". The Evening Star. November 6, 1909. p. 2.
  69. ^ Allen 1910, p. 401.
  70. ^ Allen 1910, p. 405.
  71. ^ "Timber Crushes His Head". The Evening Star. March 16, 1910. p. 16.
  72. ^ "Sixteenth Street Extended Show Rapid Development". The Evening Star. October 9, 1910. p. 15.
  73. ^ "Construction at Piney Branch Bridge – List of Persons Planning to Build Fine Houses". The Washington Post. December 3, 1911. p. R5.
  74. ^ "Work Planned on 16th Street Bridge". The Washington Post. September 8, 1990. p. B5.

Bibliography edit

  • Allen, Walter C. (October 1910). "New Street Lighting in Washington, D.C." The Illuminating Engineer: 401–405.
  • Commissioners of the District of Columbia (1910). Annual Report of the Commissioners of the District of Columbia, Year Ended June 30, 1910. Volume II: Engineer Department Reports. Washington, D.C.: Government Printing Office.
  • Committee on Education and Labor (1902). Eight Hours for Laborers on Government Work. U.S. Senate. 57th Cong., 1st sess. Washington, D.C.: Government Printing Office.
  • Crew, Harvey W.; Webb, William Bensing; Wooldridge, John (1892). Centennial History of the City of Washington, D.C., With Full Outline of the Natural Advantages, Accounts of the Indian Tribes, Selection of the Site, Founding of the City ... to the Present Time. Dayton, Ohio: United Brethren Pub. House.
  • Lee, Robert D.; Johnson, Ronald Wayne; Joyce, Philip G. (2013). Public Budgeting Systems. Burlington, Mass.: Jones & Bartlett Learning. ISBN 9781449627904.
  • Myer, Donald Beekman (1974). Bridges and the City of Washington. Washington, D.C.: United States Commission of Fine Arts.
  • "Piney Branch Bridge Finished". Municipal Journal and Engineer: 878. June 15, 1910.
  • Sullivan, Francis P. (1908). "Concrete Forms and Concrete Surfaces". In Hynes, J.P. (ed.). The Architectural Annual, 1907. Washington, D.C.: Architectural League of America. pp. 153–159.

External links edit

  • Replacement of 16th Street NW Bridge over Military Road NW – DC Dept. of Transportation

16th, street, bridge, washington, 16th, street, bridge, also, known, piney, branch, bridge, automobile, pedestrian, bridge, that, carries, 16th, street, over, piney, branch, piney, branch, parkway, washington, first, parabolic, arch, bridge, united, states, co. The 16th Street Bridge also known as the Piney Branch Bridge is an automobile and pedestrian bridge that carries 16th Street NW over Piney Branch and Piney Branch Parkway in Washington D C It was the first parabolic arch bridge in the United States Construction on the first span began in 1905 as part of the northward extension of 16th Street and was finished in 1907 but was never opened to traffic The second span began construction in 1909 and was completed in 1910 The bridge was renovated in 1990 and again beginning in October 2014 16th Street BridgeLooking at the west side of the 16th Street Bridge from Piney Branch Parkway NWCoordinates38 56 18 N 77 02 11 W 38 9382 N 77 0364 W 38 9382 77 0364Carries16th Street NWCrossesPiney Branch and Piney Branch ParkwayLocaleWashington D C U S Other name s Piney Branch BridgeOwnerDistrict of Columbia Department of TransportationMaintained byDistrict of Columbia Department of TransportationCharacteristicsTotal length272 feet 83 m Width61 feet 19 m Longest span125 feet 38 m No of spans1Load limit40 short tons 36 t HistoryArchitectJ J Morrow and W J DouglasConstructed byPennsylvania Bridge Company first span Cranford Paving Company second span Construction startSeptember 1905 first span June 1909 second span Construction endJanuary 1908 first span April 1910 second span Construction cost 165 000 5 395 500 in 2023 dollars OpenedApril 15 1910 1910 04 15 StatisticsDaily traffic30 000 vehicles per dayLocation The bridge which spans the Piney Branch addition to Rock Creek Park sits at the corner of four Washington D C neighborhoods Sixteenth Street Heights Crestwood Columbia Heights and Mount Pleasant Contents 1 Description 2 Construction 2 1 Authorization of the first span 2 2 Constructing the first span 2 2 1 Designs and selection of contractor 2 2 2 8 hour day law dispute 2 2 3 Completion 2 3 Construction of the second span 3 Operation 3 1 Effects 3 2 Renovations 4 References 4 1 Notes 4 2 Citations 4 3 Bibliography 5 External linksDescription editThe 16th Street Bridge is 272 feet 83 m long 1 2 Its span is 125 feet 38 m in length and has a rise of 45 feet 14 m 3 The span is a parabolic arch the first built in the United States 4 5 and the longest in the world at the time according to its designer W J Douglas 3 The abutments and substructure of the bridge are of reinforced concrete 1 3 6 the arch itself is not reinforced with steel 3 The interior of the bridge is hollow Square vertical interior columns 2 feet 0 61 m in length on each side support the road deck A latticework of horizontal square beams each 1 square foot 0 093 m2 in size intersect the columns and are set perpendicular to one another This system of columns and beams compress the arch and keep it stable as well push outward against the walls 7 5 The bridge s abutments are hollow 1 3 The abutments are stabilized by soil pressing against them from the outside and the system of beams and columns on the interior of the bridge 1 7 The walls of the bridge and the abutments are 2 feet 0 61 m thick 3 A bluish crushed diorite was added to the concrete used to pour the walls of the abutments and the spandrel walls which were left unfinished and reflect the texture of the wooden forms used to create them 8 However the archivolt balustrade and pilasters whose concrete includes yellow sand and crushed granite have a much different texture 8 These elements were removed from their molds before the concrete was fully hardened then roughened with stiff brushes helping to expose the granite particles within and make them glitter in the sun 9 The bridge superstructure rests on walls and columns 3 The 25 foot 7 6 m wide spans 1 are of reinforced concrete 3 Steel beams their ends resting on the walls of the two bridges close the gap between the spans 3 Reinforced concrete slabs lie atop these beams to create a unified deck 3 Concrete balustrades and newels create a railing on the east and west sides of the bridge 6 9 The road is 45 feet 14 m wide and 8 foot 2 4 m sidewalks are on either side of the roadway 2 Granite curbs define the cement sidewalk 9 The deck is topped by asphalt 3 9 At 65 feet 20 m in width roadway and sidewalks the deck was the widest in the city when built and could support 40 short tons 36 t 6 The bridge has four ornamental cast iron lampposts 6 The ends of the bridge are flanked by two bronze reclining tigers on concrete pedestals 10 The archivolt consists of three arch rings and is of smoothed concrete 2 Pilasters flank the arch on the sides of the bridge Stylistically the bridge is Neoclassical in design 2 The bridge cost about 135 000 to build 2 Construction editAuthorization of the first span edit On March 30 1899 the United States Congress authorized the extension of 16th Street NW from Morris Road NW now Monroe Street NW to the D C Maryland line Condemnation proceedings to obtain land began on December 2 1900 were completed on May 27 1901 and were approved by the Supreme Court of the District of Columbia on April 19 1902 11 By November 1903 work had almost reached the stream known as Piney Branch which runs through a valley about 60 feet 18 m below the grade of the street On December 10 1903 the Commissioners of the District of Columbia a 12 asked Congress for a 300 foot 91 m bridge to carry one or two lanes of 16th Street NW over Piney Branch The bridge whose cost was estimated at 50 000 1 695 556 in 2023 dollars would be long enough to permit a parkway to pass beneath it 13 In March 1904 the commissioners request finally saw action Senator Jacob Gallinger R New Hampshire offered an amendment to the Senate s 1905 District of Columbia appropriations bill which both authorized the city to construct the bridge and appropriated b 14 50 000 1 695 556 in 2023 dollars for this purpose 15 The House D C appropriations bill also contained the same language but this provision was stricken from the bill on the floor of the house on March 18 16 Undeterred the Senate Committee on the District of Columbia included the bridge authorization in the 1905 D C appropriations bill just five days later The legislation however authorized a 50 000 concrete bridge but appropriated only 20 000 678 222 in 2023 dollars for its construction 17 Half the money came from the federal government and half from the city 18 A fight erupted on the floor of the Senate over the bridge provision Both the Senate Appropriations Committee and the Senate Committee on the District of Columbia approved the bridge 19 But many Senators were unhappy that the federal budget was increasing rapidly The bill was held up for 10 months while Senators worked behind the scenes to resolve these differences The D C appropriations bill did not reach the Senate floor for another 10 months When the bill did reach the chamber floor on February 15 1905 Senator Stephen B Elkins R West Virginia demanded that the bridge provision be removed Senator William B Allison R Iowa rose to support the expenditure 18 Their floor fight lasted three full days Elkins claimed on February 16 that no citizens of the city wanted the bridge and he demanded a full Senate vote on the bridge amendment 20 Senator Allison replied on February 17 by bringing in petitions from the Brightwood Citizens Association and the Mt Pleasant Citizens Association asking for construction of the bridge and pointing out that these petitions had been delivered to the Senate some months ago 21 Although Elkins won a vote on the amendment the Senate overwhelmingly approved its inclusion in the final bill on February 17 ending the three day floor fight 22 A conference committee was now appointed by the House and Senate to reconcile the two different D C appropriations bills The House voted on February 18 to instruct its conferees to oppose the bridge amendment 23 The conference began meeting the week of February 20 24 On Sunday February 26 the conferees agreed to include the bridge authorization and expenditure in the 1905 D C appropriations bill 25 The conference bill was introduced in the Senate on February 28 and hours later it approved the legislation 26 The House unanimously approved it on the afternoon of March 1 27 President Theodore Roosevelt signed the bill into law a few days later Constructing the first span edit Designs and selection of contractor edit At the time the bridge was approved Piney Branch was nearly impassable A rough pine bridge existed at the site of the new bridge to permit pedestrian traffic while horses and wagons used a nearby ford 28 With four months to prepare architectural designs for the bridge before the federal funds became available the city was ready to build the bridge in July 1905 Major J J Morrow Assistant Engineer Commissioner for the District of Columbia and W J Douglas Engineer of Bridges for the District of Columbia submitted sketches of the bridge to the commissioners on July 12 29 The bridge s final design was by Douglas and city engineer William N Reynolds who was also the engineer in charge of construction 9 H T Pratt was the architectural draughtsman 30 Stylistically the 16th Street Bridge was to look like the Connecticut Avenue Bridge built between 1897 and 1907 4 Their design for the concrete bridge showed a span 125 feet 38 m long and a road deck 20 to 25 feet 6 1 to 7 6 m wide 29 31 and with as much ornamentation as budget would allow 31 By early August the plans for the bridge were complete The bridge would be 272 feet 83 m long with a 25 foot 7 6 m wide road deck The 125 foot 38 m long span would rise 60 feet 18 m above the valley floor The bridge would be made of reinforced concrete and steel with hollow spandrels between the arch and abutments The roof and walls of the arch and the walls of the abutments ranged from 10 to 20 inches 25 to 51 cm in thickness Square columns 2 feet 0 61 m in length on each side supported the road deck and were linked internally by a latticework of 1 square foot 0 093 m2 horizontal concrete beams which helped to compress the arch and keep it stable as well push outward against the walls 7 Although the Piney Branch Bridge as it was then known was designed to carry two lanes of traffic and be a completed structure the D C Commissioners expected to build a second span as soon as possible 3 7 This would expand the road deck to 70 feet 21 m 7 Subsequently the first span was built 20 feet 6 1 m off the centerline of 16th Street 3 6 Engineers estimated the foundations for the bridge would be complete before the onset of cold weather in December 7 Construction bids were advertised on August 26 1905 32 and six bids were received by the September 16 deadline 28 33 The Pennsylvania Bridge Company was selected to construct the bridge 34 2 Although Congress had appropriated only 20 000 for the job the city issued a contract worth 42 731 1 449 056 in 2023 dollars 35 8 hour day law dispute edit In 1892 Congress enacted an eight hour day law which applied to contractors doing work on behalf of the federal government As the District of Columbia was a creature of the federal government the law also applied to city workers and contractors engaged in work for the city 36 In July 1906 a broad investigation into violation of the eight hour day law by the Pennsylvania Bridge Company was begun by federal inspectors 37 The company was indicted on July 28 and plead not guilty 38 On October 1 city attorneys charged the company with additional violations of the eight hour law Initially John Meigs the civil engineer in charge of the work refused to surrender the company s accounting books to the grand jury investigating the alleged crime The grand jurors complained to D C criminal court which threatened the company with contempt of court After a discussion between company lawyers and the city the books were released to the grand jury 39 The company was again indicted and again plead not guilty 40 The Pennsylvania Bridge Company admitted it had forced workers to stay on the job nine and sometimes 10 hours a day But it offered two defenses First the company said that the District of Columbia had set such stringent deadlines for construction that the company had no choice but to violate the law Second the company said that many skilled workers would not work for less than 10 hours a day and it had acceded to their demands Neither argument was persuasive to the jury and the company was found guilty A 1 500 fine 50 867 in 2023 dollars was imposed on the firm 41 Completion edit With the bridge s foundations and abutments underway additional federal funds were needed to complete the span and road deck In October 1905 the D C Commissioners requested another 30 000 1 017 333 in 2023 dollars from Congress 42 The Subcommittee of the House Appropriations Committee added the 30 000 appropriation and legislation making the appropriation passed on April 17 1906 43 By June 30 the end of the fiscal year 15 000 508 667 in 2023 dollars had been expended on the bridge s construction 44 The bridge was poured in place 2 By mid November 1906 the bridge was halfway completed and construction officials estimated it would be finished in early 1907 45 This estimate proved significantly over optimistic On December 1 company officials declared the bridge almost ready except for the approaches 3 c Yet a month later the bridge was still under construction 46 By mid March 1907 construction was still not finished 47 Finally on June 9 contractors said the bridge would be completed on July 1 1907 1 48 The approaches however were not complete D C officials had only just received seven bids for their construction and awarded the 28 000 contract 915 600 in 2023 dollars to Hoffman Construction 48 The total cost of the structure was estimated to be between 44 000 49 and 60 000 1 438 800 to 1 962 000 in 2023 dollars 50 Work on grading the approaches was still going on in October 1907 51 At that time Hoffman Construction estimated they would be done by January 1 1908 52 Grading was nearly complete by early December 1907 53 The 16th Street Bridge was completed and ready to accept traffic on December 27 1907 Commissioners Henry B F Macfarland and J J Morrow drove over the bridge to inaugurate it informally 54 The bridge was not however actually opened to traffic It remained complete but closed 49 55 Construction of the second span edit nbsp Original lighting standard used on the 16th Street Bridge in 1910 By 1908 the economizing mood of Congress had lessened D C officials sought permission to complete the second span of the 16th Street Bridge and on April 28 1908 Senator Thomas H Carter R Montana offered an amendment to the D C appropriations bill to authorize construction of a second span and widen the bridge to a full 60 feet 18 m No funds were appropriated for this purpose however 56 The amendment was not accepted and the 1909 fiscal year started without them in December 1908 the D C Commissioners again asked Congress for permission to build a second span The roadway would not be 65 feet 20 m and the span s cost estimated at 85 000 2 882 444 in today s dollars 57 The House Appropriations Committee approved the funding request on January 6 1909 58 The Subcommittee on the District of Columbia of the Senate Appropriations Committee followed suit on February 2 59 A House Senate conference committee approved the funding on February 27 60 and President Theodore Roosevelt signed the legislation into law 49 The D C Commissioners advertised for construction bids on May 8 1909 61 Eight bids were received 62 with Cranford Paving Company receiving the contract 2 Design of the second span was nearly the identical to the first and Captain Edward M Markham assistant to the engineer commissioner and C B Hunt D C Engineer of Highways oversaw the construction The estimated time for completion of the span was January 1 1910 63 As with the first span the second span was poured in place 2 Although construction of the first span had occurred without any reported accidents construction on the second span did not proceed as safely On August 14 1906 an African American worker had his hand crushed on the job site 64 Despite the accident construction officials still estimated the time of completion at January 1 65 On September 22 1909 66 the city entered into a contract with sculptor A Phimister Proctor to sculpt four reclining tigers in bronze to adorn the ends of the bridge 6 It is not clear how Proctor was chosen for the job As models Proctor studied tigers at the Bronx Zoo and he sculpted the statues in his New York City studio The Gorham Company cast the statues each of which was 10 feet 3 0 m long and weighed 1 short ton 0 91 t d 10 67 In October 1909 the city advertised bids for lighting for the bridge Four ornamental lampposts in either bronze or cast iron were required Five bids were received in November 68 R L Watmaugh a Washington architect received the lighting contract 9 The lamps were incandescent lights which used a tungsten filament An armored steel cable run under the granite curb provided power to the lights 69 Each light gave off 100 watts or 78 48 candela The lamppost had three globes A 24 inch 61 cm central globe and two 17 inch 43 cm side globes The central globe was 20 feet 6 1 m above the roadway and each lamppost was 160 feet 49 m apart 70 A second accident occurred during the construction of the second span on March 16 1909 Howard Hurley a 43 year old African American worker died instantly when a wooden beam fell on his skull crushing it 71 As the bridge neared completion D C architect R L Watmaugh won a contract to design and manufacture ornamental concrete balustrades for either side of the bridge 6 The two separate spans were linked as construction ended Holes were cut in the top of the western wall of the first span Steel beams were laid at intervals across the open space the ends of each beam resting on the wall of the span A concrete slab was then laid across the beams to create the roadway s sub deck 3 The 16th Street Bridge opened to traffic on April 15 1909 The total cost of both spans was estimated at 140 000 4 578 000 in today s dollars 6 Operation editEffects edit A few weeks after the bridge opened contractors completed a 30 000 981 000 in today s dollars road project that extended 16th Street several blocks north of the 16th Street Bridge 1 The impact of the 16th Street Bridge was substantial The Mt Pleasant Heights subdivision opened shortly after construction of the first span and building lots sold briskly 1 The price of land along 16th Street NW skyrocketed by 500 percent from 1904 to 1910 72 In December 1911 the Sixteenth Street Heights subdivision opened Developers reported that they had seen a 200 percent increase in property values since the second span opened 73 Renovations edit In 1990 the 16th Street Bridge underwent its first renovation The extent of the work was not clear but the 3 million 6 996 434 in 2023 dollars project took 15 months to complete At least one lane of the bridge was closed during rush hour 74 The Proctor tigers were regilded during the renovation 4 References editNotes edit Beginning in 1874 the District of Columbia was run by three commissioners two of which were appointed by the President of the United States with the approval of the Senate and a third member who was selected by the United States Army Corps of Engineers and who had oversight over the city s public works One of the civilian members was chosen to act as president of the city commission In public budgeting a program must be authorized by law first Often an authorization sets the maximum amount of funds a program may expend in a single year This does not mean the program is actually funded An appropriation is needed to actually given the authorized program access to funds Appropriations may be less than equal to or more than the authorization Approaches are the portion of a roadway connecting with a bridge which has no reasonable other use than as a means of connecting to the bridge Approahces may be nonexistent in some cases while in others they may consist of embankments ramps and other elements Proctor cast four tigers for the Piney Branch Bridge After slightly changing the models two more were cast for placement outside Nassau Hall at Princeton University Citations edit a b c d e f g h Finishing New Bridge The Washington Post June 9 1907 p R2 a b c d e f g h i Myer 1974 p 74 a b c d e f g h i j k l m n o One of the Finest The Sunday Star December 2 1906 p 15 a b c Bisbort Alan April 10 1992 The Draw of Bridges The Washington Post pp A8 A9 a b Myer 1974 p 73 a b c d e f g h Bridge Nearly Ready The Washington Post March 25 1910 p 16 a b c d e f Piney Branch Bridge The Evening Star August 3 1905 p 6 a b Sullivan 1908 p 156 a b c d e f Piney Branch Bridge Finished 1910 p 878 a b Six Bronze Tigers Together The Washington Post June 12 1910 p 11 His Annual Report The Evening Star November 11 1902 p 7 Crew Webb amp Wooldridge 1892 p 159 Engineer Department The Evening Star November 10 1903 p 13 Lee Johnson amp Joyce 2013 pp 315 318 Judges Want Increase The Evening Star March 7 1904 p 7 On the District Bill The Evening Star March 18 1904 p 8 Reported to Senate The Evening Star March 23 1904 p 2 a b Money For District The Evening Star February 15 1905 p 1 The District Bill The Evening Star April 25 1904 p 1 Municipal Building The Evening Star February 16 1905 p 2 The Piney Branch Bridge The Evening Star February 17 1905 p 1 A Three Days Fight The Evening Star February 17 1905 p 1 The District Bill The Evening Star February 18 1905 p 1 The Week Ending Feb 25 1905 The Evening Star February 25 1905 p 3 The District Bill The Evening Star February 28 1905 p 1 Liberal to District The Washington Post March 1 1905 p 5 The District Bill The Evening Star March 1 1905 p 1 a b Piney Branch Bridge The Evening Star September 16 1905 p 16 a b Bridge Over Piney Branch The Washington Post July 13 1905 p 12 Orders Issued By Commissioners The Evening Star January 13 1906 p 6 a b Bridge Across Piney Branch The Evening Star July 13 1905 p 12 Proposals The Washington Post August 26 1905 p B3 Bids for new Bridge Opened The Washington Post September 17 1905 p 5 Concrete Bridge Contract The Washington Post September 21 1905 p 10 Affairs of the District The Evening Star December 5 1905 pp 17 21 22 Committee on Education and Labor 1902 p 47 Probing Violations of the Eight Hour Law The Washington Post July 24 1906 p 4 District of Columbia Death of Col Samuel Donelson A Former Doorkeeper of the House The Baltimore Sun July 24 1906 p 2 Hogan Demands Jury Trial The Washington Post July 29 1906 p E1 Bridge Builders Indicted The Washington Post October 2 1906 p 9 Violating the 8 Hour Law The Evening Star October 2 1906 p 7 Pleads Not Guilty The Evening Star October 13 1906 p 6 District of Columbia Religious Disagreement Causes a Suit for Limited Divorce The Baltimore Sun October 13 1906 p 2 Penn Company Fined 1 500 The Washington Post October 18 1906 p 2 Annual Estimates The Evening Star October 10 1905 p 2 Cut by 2 330 233 The Washington Post April 17 1906 p 4 Big Bridge Ready Soon The Washington Post October 11 1906 p 2 Board of Trade Elects Directors The Evening Star November 13 1906 p 9 District Government The Evening Star January 1 1907 p 10 For County Roads The Evening Star March 16 1906 p 18 a b Award of Contract The Evening Star June 9 1907 p 28 a b c Bridge To Be Finished The Washington Post May 21 1909 p 3 Bridge Increases Values The Washington Post August 4 1907 p F4 Argyle Park Homes The Evening Star October 19 1907 p 18 Lots Sell in Argyle The Washington Post October 27 1907 p R5 Annual Report of the Commissioners of the District The Evening Star December 3 1907 pp 22 23 Inspection of City Improvements The Evening Star December 28 1907 p 8 To Widen a Bridge The Evening Star January 25 1908 p 20 Raise District Bill The Washington Post April 29 1908 p 1 Local Estimates Sent to Congress The Evening Star December 7 1908 pp 1 9 District Bill Is Reported to House The Evening Star January 6 1909 pp 1 4 Local Budget Cut The Washington Post January 7 1909 p 4 Big Increase In the District Bill Reported Today The Evening Star February 2 1909 p 4 Accept With Thanks The Washington Post February 28 1909 p 7 Proposals The Evening Star May 8 1909 p 10 Autos for District use The Washington Post May 23 1909 p 2 Extending 16th Street The Evening Star June 13 1909 p 24 His Hand Crushed The Evening Star August 14 1909 p 16 New Suburban Highway Soon The Evening Star September 8 1908 p 9 New Bridge Ready By Jan 1 The Washington Post September 9 1909 p 16 Commissioners of the District of Columbia 1910 p 294 The Architectural League s Exhibition Art and Progress 153 March 1911 Bids for Fancy Lamps The Evening Star November 6 1909 p 2 Allen 1910 p 401 Allen 1910 p 405 Timber Crushes His Head The Evening Star March 16 1910 p 16 Sixteenth Street Extended Show Rapid Development The Evening Star October 9 1910 p 15 Construction at Piney Branch Bridge List of Persons Planning to Build Fine Houses The Washington Post December 3 1911 p R5 Work Planned on 16th Street Bridge The Washington Post September 8 1990 p B5 Bibliography edit Allen Walter C October 1910 New Street Lighting in Washington D C The Illuminating Engineer 401 405 Commissioners of the District of Columbia 1910 Annual Report of the Commissioners of the District of Columbia Year Ended June 30 1910 Volume II Engineer Department Reports Washington D C Government Printing Office Committee on Education and Labor 1902 Eight Hours for Laborers on Government Work U S Senate 57th Cong 1st sess Washington D C Government Printing Office Crew Harvey W Webb William Bensing Wooldridge John 1892 Centennial History of the City of Washington D C With Full Outline of the Natural Advantages Accounts of the Indian Tribes Selection of the Site Founding of the City to the Present Time Dayton Ohio United Brethren Pub House Lee Robert D Johnson Ronald Wayne Joyce Philip G 2013 Public Budgeting Systems Burlington Mass Jones amp Bartlett Learning ISBN 9781449627904 Myer Donald Beekman 1974 Bridges and the City of Washington Washington D C United States Commission of Fine Arts Piney Branch Bridge Finished Municipal Journal and Engineer 878 June 15 1910 Sullivan Francis P 1908 Concrete Forms and Concrete Surfaces In Hynes J P ed The Architectural Annual 1907 Washington D C Architectural League of America pp 153 159 External links edit nbsp Wikimedia Commons has media related to wbr 16th Street Bridge and wbr 16th Street Bridge Lions Replacement of 16th Street NW Bridge over Military Road NW DC Dept of Transportation Retrieved from https en wikipedia org w index php title 16th Street Bridge Washington D C amp oldid 1015175824, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.