fbpx
Wikipedia

Tanjung Malim–Port Klang Line

The KTM Tanjung Malim–Port Klang Line (Malay: KTM Laluan Tanjung Malim–Pelabuhan Klang), formerly known as the Port Klang Line (Malay: Laluan Pelabuhan Klang) is one of the three KTM Komuter Central Sector lines provided by Keretapi Tanah Melayu. The electric trains run between Tanjung Malim and Port Klang. Prior to 15 December 2015, the northern terminus of this line was Batu Caves.

Tanjung Malim–Port Klang Line
KTM Class 92 trainset at Bangsar Junction towards  KD19  Port Klang
Overview
Native nameKTM Laluan Tanjung Malim–Pelabuhan Klang
StatusOperational
Owner Keretapi Tanah Melayu
Line number2 (Red)
LocalePerak
Selangor
Kuala Lumpur
Termini
Stations34
Websitewww.ktmb.com.my
Service
TypeCommuter rail (S-train)
System KTM Komuter
Operator(s) Keretapi Tanah Melayu
Depot(s)Seremban
Rolling stockKTM Class 92 Komuter CSR EMU
37 six-car trains
History
Opened14 August 1995; 28 years ago (1995-08-14)
Technical
Line length126 km (78 mi)
CharacterAt grade
Track gauge1,000 mm (3 ft 3+38 in) metre gauge
Electrification25 kV 50 Hz AC Overhead line
Operating speed120 km/h (75 mph)
Route map

KA15
Tanjung Malim  ETS 
KA14
Kuala Kubu Bharu  ETS 
KA13
Rasa
KA12
Batang Kali
KA11
Serendah
 ECR 
KA10
Rawang  ETS 
KA09
Kuang
KA08
Sungai Buloh  ETS 
KA07
Kepong Sentral  ETS 
Sri Damansara Timur
KA06
Kepong
Segambut 2
(planned)
KA05
Segambut
Jalan Kuching
(planned)
PWTC
KA04
Putra
Bandaraya
KA03
Bank Negara
Pasar Seni
KA02
Kuala Lumpur  ETS 
Muzium Negara
KA01
KL Sentral  ETS 
5 6 7 8 10
KD01
Abdullah Hukum
KD02
Angkasapuri
KD03
Pantai Dalam
KD04
Petaling
KD05
Jalan Templer
KD06
Kampung Dato Harun
KD07
Seri Setia
KD08
Setia Jaya
KD09
Subang Jaya
KD10
Batu Tiga
KD11
Shah Alam
KD12
Padang Jawa
KD13
Bukit Badak
KD14
Klang
Pasar Jawa 11
KD15
Teluk Pulai
KD16
Teluk Gadong
KD17
Kampung Raja Uda
KD18
Jalan Kastam
KD19
Port Klang

Interchange stations

integrated paid area
single fare trip
non-integrated paid area
multiple fare trips
interchange within same building
or cross-platform interchange
Location of Port Klang Line
A KTM Class 92 EMU at  KA02  Kuala Lumpur Railway Station.
KTM Komuter dynamic route map display
KTM Komuter passenger information display system (PIDS) at  KD08  Setia Jaya station.

KTM Komuter is an electrified commuter train service first introduced in 1995, catering especially to commuters in Kuala Lumpur and the surrounding suburban areas. It is a popular mode of transportation for commuters working in Kuala Lumpur, as they can travel to the city without the hassle of traffic congestion.[citation needed] Coaches are modern and air-conditioned. For those who drive to the stations/halts, 'Park & Ride' facility is provided at a nominal charge.[citation needed]

The line is one of the components of the Klang Valley Integrated Transit System. The line is numbered 2 and coloured red on official transit maps. It was initially named after its current terminus, Port Klang station.

Line information edit

History edit

The line began as the Selangor Government Railway which connected Bukit Kuda just outside Klang to Kuala Lumpur, opened in September 1886.[1] In 1890 a bridge across the Klang River was constructed, allowing the railway to be re-routed to Bukit Badak and henceforth towards downtown Klang. The line was extended towards Segambut and Rawang in 1892, as a branch line from the Resident station. The railway reached Kuala Kubu Bharu in 1894 and finally Port Klang in 1899.

In 1989 railbus services were offered on the Sentul–Port Klang stretch.[2] The same stretch, along with the Rawang–Seremban stretch, were electrified in the 1990s. Electrification was later extended to Batu Caves in 2009.

During colonial rule, there used to be a branch line from Padang Jawa to Kuala Selangor; the branch line was dismantled between 1931 and 1934.[3]

At present, the Tanjung Malim–Port Klang Line is the oldest existing (and still operational) railway line in the country, taking the title after the TaipingPort Weld line was dismantled in 1987.[4][5]

Stations edit

⇄ = cross-platform interchange
Station code Station name Platform type Interchange station/Notes
 KA15  Tanjung Malim island & side Northern terminus

 ETS  KTM ETS

 KA14  Kuala Kubu Bharu side
 KA13  Rasa side
 KA12  Batang Kali side  ETS  KTM ETS
 KA11  Serendah side
 KA10  Rawang island & side  ETS  KTM ETS
 KA09  Kuang side
 KA08  Sungai Buloh side Connecting station to  PY04  MRT Putrajaya Line

 ETS  KTM ETS

 KA07  Kepong Sentral side Connecting station to  PY08  Sri Damansara Timur on the MRT Putrajaya Line

 ETS  KTM ETS

 KA06  Kepong side Feeder bus T112 to  PY09  Metro Prima for the MRT Putrajaya Line
 KA05  Segambut side RapidKL bus route 190 to Mont Kiara and Sri Hartamas
 KA04  Putra side Cross-platform interchange to Batu Caves–Pulau Sebang Line

A 600-meter pedestrian bridge links to  AG4  SP4  PWTC on the LRT Ampang & Sri Petaling Lines

 KA03  Bank Negara side Seremban Line

Connecting station to  AG6  SP6  Bandaraya on the LRT Ampang & Sri Petaling Lines via a 250-meter pedestrian bridge crossing the Gombak River and Jalan Kuching

 KA02  Kuala Lumpur island & side Batu Caves-Pulau Sebang Line and  ETS  KTM ETS

Connecting station to  KJ14  KG16  Pasar Seni on the LRT Kelana Jaya Line and MRT Kajang Line via a 200-meter pedestrian walkway

 KA01   KS01  KL Sentral island Batu Caves–Pulau Sebang Line, KL Sentral–Terminal Skypark Line and  ETS  KTM ETS

Connecting station to:

Feeder bus T819 to  KG13  Pusat Bandar Damansara on the MRT Kajang Line

 KD01  Abdullah Hukum side Connecting station to  KJ17  LRT Kelana Jaya Line


Link-bridge access to  KB01  Mid Valley on the Batu Caves–Pulau Sebang Line via KL Eco City

 KD02  Angkasapuri side Half-hourly shuttle buses to the University of Malaya are available
 KD03  Pantai Dalam side Proposed connecting station with  CC28  MRT Circle Line
 KD04  Petaling island & side
 KD05  Jalan Templer side
 KD06  Kampung Dato Harun side
 KD07  Seri Setia side
 KD08  Setia Jaya island & side Connecting station to  SB1  Sunway-Setia Jaya on the BRT Sunway Line
 KD09   KS02  Subang Jaya side ⇄ KL Sentral–Terminal Skypark Line

Connecting station to  KJ28  LRT Kelana Jaya Line

 KD10  Batu Tiga side
 KD11  Shah Alam island & side
 KD12  Padang Jawa side
 KD13  Bukit Badak side
 KD14  Klang island & side
 KD15  Teluk Pulai side
 KD16  Teluk Gadong side
 KD17  Kampung Raja Uda side
 KD18  Jalan Kastam island & side
 KD19  Port Klang island Western terminus

Exit to Port Klang International Passenger Terminal to Pulau Ketam, Selangor, Malaysia & Dumai, Indonesia

KTM Komuter Trial Route edit

A new route for KTM Komuter services was introduced in preparation of the infrastructure upgrading works in the Klang Valley Double Tracking project in April 2016. It aimed to increase the frequency and the smooth running of the KTM ETS, KTM Komuter, KTM Intercity & Freight at the Central Sector.[6]

The original Port Klang Line from Batu Caves-Port Klang route was changed to Rawang-Port Klang effective 15 December 2015.

Former Rawang—Tanjung Malim shuttle service edit

The KTM Komuter service was expanded to include three new stations beyond Rawang on April 21, 2007, under what was then known as the Rawang-Rasa shuttle service. The stations were Serendah, Batang Kali, and Rasa.

This 22 km stretch was the first portion of the Rawang-Ipoh double tracking and electrification project to become operational. The service was extended to Kuala Kubu Bharu on January 5, 2008. It was further extended to Tanjung Malim on June 1, 2009, and the service was renamed as the Rawang-Tanjung Malim shuttle service.

Until 11 July 2016, passengers had to disembark at Rawang and transfer to the Rawang-Tanjung Malim shuttle service for stations north of Rawang. Service ran at 30 minutes interval. The first and last trains to leave Rawang are at 05:42 and 21:24 while the first and last trains leaving Tanjung Malim are at 05:42 and 21:54. Journey time between Rawang and Tanjung Malim is 45 minutes.

Beginning 12 July 2016, the Rawang-Tanjung Malim shuttle was terminated and was fully integrated into the Port Klang Line as a through service, with trains running all the way to Tanjung Malim. The line was effectively named the Tanjung Malim–Port Klang Line.

KL Sentral–Terminal Skypark Line (Skypark Link) edit

 
The construction of Skypark Link taken from Persiaran Kerjaya.

Since May 2018, a branch line of the Tanjung Malim–Port Klang Line was opened and extended to Terminal Skypark Komuter station that serves the Subang Airport. The line branches off to Subang Airport after Subang Jaya station. The line is served by KTM Komuter's 10 KL Sentral–Terminal Skypark Line (formerly known as Skypark Link), which runs an express Komuter service between KL Sentral and Terminal Skypark, only stopping at Subang Jaya station in between.

The service is currently suspended due to low ridership.[citation needed]

Service suspension at city centre and Segambut stations edit

Beginning 3 June 2018, Tanjung Malim–Port Klang Line services at three stations in downtown Kuala Lumpur – Putra station, Bank Negara station and the old Kuala Lumpur station, as well as Segambut station will be unavailable during off-peak hours, i.e. between 8 am and 6 pm, to facilitate track upgrading services.[7]

For the three city-centre stations - Putra, Bank Negara and Kuala Lumpur, Port Klang-bound trains will serve the stations between 06:30 and 07:50, while Tanjong Malim-bound trains will call at the stations between 17:45 and 19:45.

For Segambut station, only six trains will serve the station everyday: three towards Tanjong Malim in the morning, and three towards Port Klang in the evening. Free shuttle buses on the route KTM3, provided by Rapid KL, provides a link between Segambut station and KL Sentral.

During off-peak hours, trains will only shuttle between KL Sentral and Port Klang, and between Tanjung Malim and Kepong stations only. An hourly shuttle service between Klang and Setia Jaya is also introduced. Passengers can still connect to Kuala Lumpur city centre on the MRT Kajang Line at Muzium Negara, or on the LRT Kelana Jaya Line at Subang Jaya and Abdullah Hukum.

Future expansion edit

Construction of Segambut 2 railway station was approved in August 2023, and it is expected to be completed by November 2025. It will be located between Kepong and Segambut stations, near United Point Residence.[8]

An infill station between the old Kuala Lumpur station and Bank Negara station, planned to serve the PDRM headquarters at Bukit Aman, is being studied.[9]

Rolling stock edit

The line uses KTM Class 92 trains in 6 car formations.

Gallery edit

See also edit

References edit

  1. ^ "History of Railways in Selangor". Retrieved 23 July 2017.
  2. ^ "KTM Railbus". Malaya Railway. Retrieved 23 July 2017.
  3. ^ "Kuala Selangor Branch". Retrieved 3 February 2019.
  4. ^ "Story behind the first railway of Malaysia". Mysinchew. Retrieved 3 February 2019.
  5. ^ "Port Weld - Down Memory Track". Retrieved 3 February 2019.
  6. ^ (PDF). Archived from the original (PDF) on 11 December 2015. Retrieved 10 December 2015.
  7. ^ "Jadual Waktu Baharu dan Operasi Tren bagi laluan Pelabuhan Klang-Tanjung Malim-Pelabuhan Klang". Retrieved 25 May 2018.
  8. ^ "Construction of Segambut 2 Railway Station catalyst for development of surrounding area". www.thesundaily.my. 24 August 2023. Retrieved 26 August 2023.
  9. ^ "Stesen komuter di Bukit Aman? Ini jawab Ketua Polis Negara". Mstar.com.my. Retrieved 20 February 2020.

External links edit

  • Keretapi Tanah Melayu official website
  • Keretapi.com - Railway Fan website
  • Keretapi Tanah Melayu Railway Fan Club website
  • KTM Komuter Schedule App: Solving The Main Problem for KTM Komuter Customers

tanjung, malim, port, klang, line, malay, laluan, tanjung, malim, pelabuhan, klang, formerly, known, port, klang, line, malay, laluan, pelabuhan, klang, three, komuter, central, sector, lines, provided, keretapi, tanah, melayu, electric, trains, between, tanju. The KTM Tanjung Malim Port Klang Line Malay KTM Laluan Tanjung Malim Pelabuhan Klang formerly known as the Port Klang Line Malay Laluan Pelabuhan Klang is one of the three KTM Komuter Central Sector lines provided by Keretapi Tanah Melayu The electric trains run between Tanjung Malim and Port Klang Prior to 15 December 2015 the northern terminus of this line was Batu Caves Tanjung Malim Port Klang LineKTM Class 92 trainset at Bangsar Junction towards KD19 Port KlangOverviewNative nameKTM Laluan Tanjung Malim Pelabuhan KlangStatusOperationalOwnerKeretapi Tanah MelayuLine number2 Red LocalePerakSelangorKuala LumpurTermini KA15 Tanjung Malim KD19 Port KlangStations34Websitewww wbr ktmb wbr com wbr myServiceTypeCommuter rail S train SystemKTM KomuterOperator s Keretapi Tanah MelayuDepot s SerembanRolling stockKTM Class 92 Komuter CSR EMU37 six car trainsHistoryOpened14 August 1995 28 years ago 1995 08 14 TechnicalLine length126 km 78 mi CharacterAt gradeTrack gauge1 000 mm 3 ft 3 3 8 in metre gaugeElectrification25 kV 50 Hz AC Overhead lineOperating speed120 km h 75 mph Route mapLegendto Ipoh Butterworth Padang BesarKA15 Tanjung Malim ETS PerakSelangor borderKA14 Kuala Kubu Bharu ETS KA13 RasaKA12 Batang KaliKA11 Serendah ECR KA10 Rawang ETS KA09 KuangKA08 Sungai Buloh ETS 12KA07 Kepong Sentral ETS Sri Damansara Timur 12SelangorKuala Lumpur borderKA06 KepongSegambut 2 planned KA05 SegambutJalan Kuching planned 13Batu Caves Pulau Sebang Lineto Batu CavesPWTC 3 4KA04 PutraBandaraya 3 4KA03 Bank NegaraKelana Jaya Line to GombakKajang LinePasar Seni 5 9KA02 Kuala Lumpur ETS Muzium Negara 9KA01 KL Sentral ETS 5 6 7 8 10Batu Caves Pulau Sebang Lineto Pulau Sebang TampinKD01 Abdullah Hukum 5KD02 AngkasapuriKD03 Pantai Dalam 13KD04 PetalingKuala LumpurSelangor borderKD05 Jalan TemplerKD06 Kampung Dato HarunKD07 Seri SetiaKD08 Setia Jaya B1KD09 Subang Jaya 5 10KL Sentral TerminalSkypark Line to TerminalSkyparkKD10 Batu TigaKD11 Shah AlamKD12 Padang JawaKD13 Bukit BadakKD14 KlangPasar Jawa 11Shah Alam Line Bandar Utama Johan Setia KD15 Teluk PulaiKD16 Teluk GadongKD17 Kampung Raja UdaKD18 Jalan KastamKD19 Port Klangto Pulau IndahInterchange stationsintegrated paid areasingle fare tripnon integrated paid areamultiple fare tripsinterchange within same buildingor cross platform interchangerapid transitcommuter railLocation of Port Klang Line A KTM Class 92 EMU at KA02 Kuala Lumpur Railway Station KTM Komuter dynamic route map displayKTM Komuter passenger information display system PIDS at KD08 Setia Jaya station KTM Komuter is an electrified commuter train service first introduced in 1995 catering especially to commuters in Kuala Lumpur and the surrounding suburban areas It is a popular mode of transportation for commuters working in Kuala Lumpur as they can travel to the city without the hassle of traffic congestion citation needed Coaches are modern and air conditioned For those who drive to the stations halts Park amp Ride facility is provided at a nominal charge citation needed The line is one of the components of the Klang Valley Integrated Transit System The line is numbered 2 and coloured red on official transit maps It was initially named after its current terminus Port Klang station Contents 1 Line information 1 1 History 1 2 Stations 1 3 KTM Komuter Trial Route 1 4 Former Rawang Tanjung Malim shuttle service 1 5 KL Sentral Terminal Skypark Line Skypark Link 1 6 Service suspension at city centre and Segambut stations 2 Future expansion 3 Rolling stock 4 Gallery 5 See also 6 References 7 External linksLine information editHistory edit The line began as the Selangor Government Railway which connected Bukit Kuda just outside Klang to Kuala Lumpur opened in September 1886 1 In 1890 a bridge across the Klang River was constructed allowing the railway to be re routed to Bukit Badak and henceforth towards downtown Klang The line was extended towards Segambut and Rawang in 1892 as a branch line from the Resident station The railway reached Kuala Kubu Bharu in 1894 and finally Port Klang in 1899 In 1989 railbus services were offered on the Sentul Port Klang stretch 2 The same stretch along with the Rawang Seremban stretch were electrified in the 1990s Electrification was later extended to Batu Caves in 2009 During colonial rule there used to be a branch line from Padang Jawa to Kuala Selangor the branch line was dismantled between 1931 and 1934 3 At present the Tanjung Malim Port Klang Line is the oldest existing and still operational railway line in the country taking the title after the Taiping Port Weld line was dismantled in 1987 4 5 Stations edit cross platform interchangeStation code Station name Platform type Interchange station Notes KA15 Tanjung Malim island amp side Northern terminus ETS KTM ETS KA14 Kuala Kubu Bharu side KA13 Rasa side KA12 Batang Kali side ETS KTM ETS KA11 Serendah side KA10 Rawang island amp side ETS KTM ETS KA09 Kuang side KA08 Sungai Buloh side Connecting station to PY04 MRT Putrajaya Line ETS KTM ETS KA07 Kepong Sentral side Connecting station to PY08 Sri Damansara Timur on the MRT Putrajaya Line ETS KTM ETS KA06 Kepong side Feeder bus T112 to PY09 Metro Prima for the MRT Putrajaya Line KA05 Segambut side RapidKL bus route 190 to Mont Kiara and Sri Hartamas KA04 Putra side Cross platform interchange to Batu Caves Pulau Sebang Line A 600 meter pedestrian bridge links to AG4 SP4 PWTC on the LRT Ampang amp Sri Petaling Lines KA03 Bank Negara side Seremban Line Connecting station to AG6 SP6 Bandaraya on the LRT Ampang amp Sri Petaling Lines via a 250 meter pedestrian bridge crossing the Gombak River and Jalan Kuching KA02 Kuala Lumpur island amp side Batu Caves Pulau Sebang Line and ETS KTM ETS Connecting station to KJ14 KG16 Pasar Seni on the LRT Kelana Jaya Line and MRT Kajang Line via a 200 meter pedestrian walkway KA01 KS01 KL Sentral island Batu Caves Pulau Sebang Line KL Sentral Terminal Skypark Line and ETS KTM ETS Connecting station to KJ15 LRT Kelana Jaya Line KE1 KT1 ERL KLIA Ekspres and KLIA Transit Linkbridge access to MR1 KL Monorail via Nu Sentral shopping mall KL Sentral Monorail Linkbridge access to KG15 Muzium Negara on the MRT Kajang Line Feeder bus T819 to KG13 Pusat Bandar Damansara on the MRT Kajang Line KD01 Abdullah Hukum side Connecting station to KJ17 LRT Kelana Jaya Line Link bridge access to KB01 Mid Valley on the Batu Caves Pulau Sebang Line via KL Eco City KD02 Angkasapuri side Half hourly shuttle buses to the University of Malaya are available KD03 Pantai Dalam side Proposed connecting station with CC28 MRT Circle Line KD04 Petaling island amp side KD05 Jalan Templer side KD06 Kampung Dato Harun side KD07 Seri Setia side KD08 Setia Jaya island amp side Connecting station to SB1 Sunway Setia Jaya on the BRT Sunway Line KD09 KS02 Subang Jaya side KL Sentral Terminal Skypark Line Connecting station to KJ28 LRT Kelana Jaya Line KD10 Batu Tiga side KD11 Shah Alam island amp side KD12 Padang Jawa side KD13 Bukit Badak side KD14 Klang island amp side KD15 Teluk Pulai side KD16 Teluk Gadong side KD17 Kampung Raja Uda side KD18 Jalan Kastam island amp side KD19 Port Klang island Western terminus Exit to Port Klang International Passenger Terminal to Pulau Ketam Selangor Malaysia amp Dumai IndonesiaKTM Komuter Trial Route edit A new route for KTM Komuter services was introduced in preparation of the infrastructure upgrading works in the Klang Valley Double Tracking project in April 2016 It aimed to increase the frequency and the smooth running of the KTM ETS KTM Komuter KTM Intercity amp Freight at the Central Sector 6 The original Port Klang Line from Batu Caves Port Klang route was changed to Rawang Port Klang effective 15 December 2015 Former Rawang Tanjung Malim shuttle service edit The KTM Komuter service was expanded to include three new stations beyond Rawang on April 21 2007 under what was then known as the Rawang Rasa shuttle service The stations were Serendah Batang Kali and Rasa This 22 km stretch was the first portion of the Rawang Ipoh double tracking and electrification project to become operational The service was extended to Kuala Kubu Bharu on January 5 2008 It was further extended to Tanjung Malim on June 1 2009 and the service was renamed as the Rawang Tanjung Malim shuttle service Until 11 July 2016 passengers had to disembark at Rawang and transfer to the Rawang Tanjung Malim shuttle service for stations north of Rawang Service ran at 30 minutes interval The first and last trains to leave Rawang are at 05 42 and 21 24 while the first and last trains leaving Tanjung Malim are at 05 42 and 21 54 Journey time between Rawang and Tanjung Malim is 45 minutes Beginning 12 July 2016 the Rawang Tanjung Malim shuttle was terminated and was fully integrated into the Port Klang Line as a through service with trains running all the way to Tanjung Malim The line was effectively named the Tanjung Malim Port Klang Line KL Sentral Terminal Skypark Line Skypark Link edit Main article KL Sentral Terminal Skypark Line nbsp The construction of Skypark Link taken from Persiaran Kerjaya Since May 2018 a branch line of the Tanjung Malim Port Klang Line was opened and extended to Terminal Skypark Komuter station that serves the Subang Airport The line branches off to Subang Airport after Subang Jaya station The line is served by KTM Komuter s 10 KL Sentral Terminal Skypark Line formerly known as Skypark Link which runs an express Komuter service between KL Sentral and Terminal Skypark only stopping at Subang Jaya station in between The service is currently suspended due to low ridership citation needed Service suspension at city centre and Segambut stations edit Beginning 3 June 2018 Tanjung Malim Port Klang Line services at three stations in downtown Kuala Lumpur Putra station Bank Negara station and the old Kuala Lumpur station as well as Segambut station will be unavailable during off peak hours i e between 8 am and 6 pm to facilitate track upgrading services 7 For the three city centre stations Putra Bank Negara and Kuala Lumpur Port Klang bound trains will serve the stations between 06 30 and 07 50 while Tanjong Malim bound trains will call at the stations between 17 45 and 19 45 For Segambut station only six trains will serve the station everyday three towards Tanjong Malim in the morning and three towards Port Klang in the evening Free shuttle buses on the route KTM3 provided by Rapid KL provides a link between Segambut station and KL Sentral During off peak hours trains will only shuttle between KL Sentral and Port Klang and between Tanjung Malim and Kepong stations only An hourly shuttle service between Klang and Setia Jaya is also introduced Passengers can still connect to Kuala Lumpur city centre on the MRT Kajang Line at Muzium Negara or on the LRT Kelana Jaya Line at Subang Jaya and Abdullah Hukum Future expansion editConstruction of Segambut 2 railway station was approved in August 2023 and it is expected to be completed by November 2025 It will be located between Kepong and Segambut stations near United Point Residence 8 An infill station between the old Kuala Lumpur station and Bank Negara station planned to serve the PDRM headquarters at Bukit Aman is being studied 9 Rolling stock editThe line uses KTM Class 92 trains in 6 car formations Gallery edit nbsp Tanjung Malim 2 Current northern terminus of the Tanjung Malim Port Klang line since December 2015 nbsp Abdullah Hukum 2 5 The latest KTM station addition to the Tanjung Malim Port Klang line which was built after the completion of KL Eco City nbsp Subang Jaya 2 5 10 Before redevelopment in 2015 nbsp Subang Jaya 2 5 10 After redevelopment that was completed in June 2016 nbsp The modified with additional handle bars interior of a Class 83 EMU train nbsp Interior of the KTM Class 92 EMU end coaches feature longitudinal seating See also editKeretapi Tanah Melayu KTM Intercity KTM West Coast Line KTM East Coast Line KTM ETS KTM Komuter Batu Caves Pulau Sebang Line KL Sentral Terminal Skypark Line Northern Sector Malaysian Railway SystemReferences edit History of Railways in Selangor Retrieved 23 July 2017 KTM Railbus Malaya Railway Retrieved 23 July 2017 Kuala Selangor Branch Retrieved 3 February 2019 Story behind the first railway of Malaysia Mysinchew Retrieved 3 February 2019 Port Weld Down Memory Track Retrieved 3 February 2019 KTM Komuter trial route effective 15 December 2015 PDF Archived from the original PDF on 11 December 2015 Retrieved 10 December 2015 Jadual Waktu Baharu dan Operasi Tren bagi laluan Pelabuhan Klang Tanjung Malim Pelabuhan Klang Retrieved 25 May 2018 Construction of Segambut 2 Railway Station catalyst for development of surrounding area www thesundaily my 24 August 2023 Retrieved 26 August 2023 Stesen komuter di Bukit Aman Ini jawab Ketua Polis Negara Mstar com my Retrieved 20 February 2020 External links editKeretapi Tanah Melayu official website KTM Komuter official website Keretapi com Railway Fan website Keretapi Tanah Melayu Railway Fan Club website KTM Komuter Schedule App Solving The Main Problem for KTM Komuter Customers Retrieved from https en wikipedia org w index php title Tanjung Malim Port Klang Line amp oldid 1197440818, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.