fbpx
Wikipedia

Kajang line

The MRT Kajang Line, previously known as the Sungai Buloh–Kajang Line (SBK Line), is a Mass Rapid Transit (MRT) line servicing the Klang Valley, Malaysia. It is the second fully automated and driverless rail system in the Klang Valley region after the LRT Kelana Jaya Line. Owned by MRT Corp and operated as part of the RapidKL system by Rapid Rail, it forms part of the Klang Valley Integrated Transit System. The line is numbered 9 and coloured green on official transit maps.

Kajang Line
A Siemens Inspiro EMU stock designed by BMW Group Designworks leaving KG14 Semantan station.
Overview
Native nameMRT Laluan Kajang
StatusFully operational
OwnerMRT Corp
Line number9 (green)
LocaleKlang Valley
Termini
Stations29 & 3 reserved
Websitemyrapid.com.my
Service
TypeRapid transit
System Rapid KL
ServicesKwasa DamansaraKajang
Operator(s)Rapid Rail
Depot(s)Sungai Buloh Depot and Kajang Depot
Rolling stockSiemens Inspiro
58 four-car trainsets
Width: 3.1 m (10 ft) - wide profile
Length: 90.18 m (295.9 ft)[1]
Daily ridership215,853 (2019)[2]
Ridership63.95 million (2019)
History
OpenedPhase 1
16 December 2016; 6 years ago (2016-12-16)[3]
Sungai Buloh - Semantan
Phase 2
17 July 2017; 5 years ago (2017-07-17)
Semantan - Kajang
Technical
Line length47 km (29 mi)
Elevated: 41.5 km (25.8 mi)
Underground: 9.5 km (5.9 mi)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification750 V DC third rail
Conduction systemAutomated and driverless
Operating speed100 km/h (62 mph)
Route map

KG04
Kwasa Damansara
KG05
Kwasa Sentral
KG05A
Teknologi
(provisional)
KG06
Kota Damansara
KG07
Surian
KG08
Mutiara Damansara
KG09
Bandar Utama
KG10
Taman Tun Dr Ismail
KG12
Phileo Damansara
KG12A
Bukit Kiara Selatan
(provisional)
KG13
Pavillion Damansara Heights-Pusat Bandar Damansara
KG14
Manulife-Semantan
KL Sentral
KG15
Muzium Negara
Kuala Lumpur
KG16
Pasar Seni
AG8
SP8
Plaza Rakyat
KG17
Merdeka
MR6
AirAsia-Bukit Bintang
KG18A
Pavillion Kuala Lumpur-Bukit Bintang
KG20
Tun Razak Exchange
KG21
Cochrane
KG22
AEON-Maluri
AG13
Maluri
KG23
Taman Pertama
KG24
Taman Midah
KG25
Taman Mutiara
KG26
Taman Connaught
KG27
Taman Suntex
KG28
Sri Raya
KG29
Bandar Tun Hussein Onn
KG30
Batu 11 Cheras
KG31
Bukit Dukung
KG32
Taman Mesra
(provisional)
KG33
Sungai Jernih
KG34
Stadium Kajang
KG35
Kajang

Interchange stations

integrated paid area
single fare trip
non-integrated paid area
multiple fare trips
Route of the Kajang line

It is one of three planned mass rapid transit (MRT) rail lines under Klang Valley Mass Rapid Transit Project by MRT Corp. Phase 1 operations between Sungai Buloh and Semantan commenced service on 16 December 2016.[4] Phase 2 operations between Muzium Negara and Kajang was opened on 17 July 2017, as a free shuttle service, by former Malaysian Prime Minister, Dato' Seri Najib Tun Razak in a ceremony at the Tun Razak Exchange station. Full revenue service between Sungai Buloh and Kajang began the following day.[5][6][7]

History

Initial LRT proposal

In August 2006, the LRT Kota Damansara–Cheras line proposal was first made known to the public by the then deputy Prime Minister, Datuk Seri Najib Tun Razak under a RM10 billion government allocation for the improvement and expansion of the public transportation network in the Klang Valley as a new light rapid transit (LRT) system. The line is also targeted to alleviate traffic congestion in the Klang Valley by encouraging more commuters to opt for public transport.[note 1] It is also aimed to reduce overcrowding on the KL Monorail and to provide an alternative transport mode due to rising fuel prices.[9] It is estimated to be approximately 30 km in length.[8] This is planned in-line with the extension of the LRT Kelana Jaya Line and the LRT Sri Petaling Line, to Subang Jaya and Puchong respectively and converging at Putra Heights.[9] The combined cost of the new line and the proposed extensions were estimated at RM7 billion. Syarikat Prasarana Nasional Berhad (SPNB) was in charge of the construction of these lines. The line was planned to be served by 140 coaches, and the track gauge to be almost similar to existing LRT lines.[10] The Ministry of Transport had approved the alignment of the new line in July 2007 which would then be tabled to the Cabinet for approval.[11] The Finance Ministry's Parliamentary Secretary announced that the line from Kota Damansara to Cheras and Balakong would be completed by 2012.[12] The line would be 40 km long, serving densely populated areas in Damansara and Cheras via "The Golden Triangle" of Kuala Lumpur city.[note 2] The alignment was to be from Persiaran Surian to the Balakong Interchange on the Cheras-Kajang Expressway, passing through the Damansara-Puchong Expressway (LDP), Sprint Highway, the city, Jalan Tun Razak and Jalan Cheras, stopping at around 30 stations. Ownership of the line belonged to SPNB, and would be operated by Rapid Rail. The estimated construction cost is between RM4 billion and RM5 billion.[9]

In September 2008, Executive Director of SPNB said that a 5.9 km section of the line in central Kuala Lumpur will be underground, serving 5 stations. However, the locations of underground stations were not announced. It was during this time that the line was said to be 42 km with 32 stations in total, which would serve areas of Bandar Utama, Bangsar, KL Sentral, Bukit Bintang, Bandar Tasik Selatan and Cheras. The line was being considered for as a Mass Rapid Transit (MRT) system after taking into consideration the catchment area serving a population of 878,000. It was also reported that the detailed design stage for the line would commence in the second quarter of 2009 and the opening date is expected to be in 2014.[14][note 3]

New alignment and conversion to MRT

On 14 September 2009, SPNB managing director Datuk Idrose Mohamed was reported as saying that the new line could end up longer than the earlier announced alignment although he did not offer any further details. A public display of the alignment was launched a day after the announcement. SPNB has raised the necessary funds from Islamic investments of RM2 billion and hopes to gain approval from the Ministry of Transport to call out for tenders.[16] In April 2010, a proposal to extend the line by 16 km was being studied by the government.[note 4] The proposal includes extensions from Kota Damansara to Sungai Buloh (additional 3 km) and from Cheras to Kajang (additional 9 km). This is to provide convenient interchanges to the existing Keretapi Tanah Melayu (KTM) stations at Sungai Buloh and Kajang, as well as supporting the upcoming development of some 3000–acre land in Sungai Buloh. An additional branch line from Damansara Utama to Kelana Jaya (additional 4 km) aimed to relieve congestion on the LDP Highway was also being studied, bringing the total length of the line to 59 km.[17]

Unofficial statements in 2009 claimed that the proposed line was changed to an MRT line.[18] In June 2010, during the tabling of the 10th Malaysia Plan, [19] Prime Minister Najib Tun Razak announced that the government was now considering a RM36 billion Klang Valley MRT proposal from Gamuda Berhad and MMC Corporation Berhad, which is the largest national infrastructure project.[20] The proposal includes 3 lines, including one which is similar to the Kota Damansara—Cheras proposal.[note 5] The MRT lines were to be mostly underground with stations 500m to 1 km apart in areas with high demand. The concept was envisioned to be inspired by Singapore's Mass Rapid Transit (MRT) system.[21][22][note 6] The project, aimed to improve public transport in the Klang Valley, was approved by the Malaysian cabinet on 17 December 2010 and construction of the first line from Sungai Buloh to Kajang would begin in July 2011 with a duration of five to six years. Gross national income from these future lines is between RM3 bil and RM12 bil. The government had appointed MMC-Gamuda JV Sdn Bhd as Project Delivery Partner where it would play the role project manager, supervised by the Land Public Transport Commission (SPAD). The whole project would be divided into nine parcels in which will be done on open tender basis. 10 km of the line would be underground and the remaining 50 km above ground with 35 new stations. MMC-Gamuda would be barred from bidding for any tender except for tunnelling works (the most expensive portion). Ownership of the lines would be given to SPNB.[23][24]

To seek for further consultation from the public, SPAD held a 3-month public display of the alignment of the MRT Kajang Line.[25] On 8 July 2011, Razak officially launched the project. The final alignment was adjusted following the public display, having a length of 51 km with 31 stations where 16 have Park and Ride facilities. Construction was said to be completed in December 2016 and the line would start operations a month after.[26] On 17 August 2011, the government announced that Mass Rapid Transit Corporation Sdn Bhd (MRT Corp), a new company under the Finance Ministry had been formed to take control of the project from Prasarana. MRT Corp would be the asset owner of the project and officially take over the project from Prasarana on 1 September 2011.[27] After the MRT project was formally launched on 8 July 2011, the following amendments have been made to the original proposed alignment following the public display exercise between March and May 2011:[26][28]

  • 31 stations instead of 35 stations will be built and provisions have been made for 3 more stations
  • The location of the proposed TTDI station was moved around 300m southwards to the former Caltex petrol stations. This was due to complaints from Taman Tun Dr Ismail and Damansara Kim residents.[29][30][31][32]
  • Bukit Bintang East and West stations have been combined into one, moved and integrated with KL Monorail station. The station was named Bukit Bintang Central Station and subsequently Bukit Bintang Station.
  • Park and Ride facilities has been increased to 16 from 13 previously.
  • Adjustments to the alignment:
    • Shifting alignment into the former Rubber Research Institute of Malaysia land in Sungai Buloh to cater for future development
    • Adjusting the alignment adjacent to Bandar Kajang station to avoid going through the town centre and through Kajang Stadium.

Contract allocation

On 21 October 2011, MRT Corp shortlisted 5 companies to construct the underground parts of the line including MMC Gamuda Joint Venture and Sinohydro Group.[33] On 26 January 2012, MRT Corp announced the award of the first two civil works contracts for the construction of the MRT Kajang line. IJM Construction Sdn Bhd was appointed the contractor for Package V5 at a tender price of RM974 million, while Ahmad Zaki Sdn Bhd was appointed the contractor for Package V6 at a tender price of RM764 million. Package V5 is from the Maluri portal to Plaza Phoenix (now Taman Connaught) station while Package V6 covers the section between Plaza Phoenix and Bandar Tun Hussein Onn stations.[34] MRT Corp announced the pre-qualification of 28 companies to bid for six System Works Packages for the MRT line on 8 March 2012.[35] Subsequently, in September 2012, another 31 companies were pre-qualified to bid for the remaining five System Works Packages.[36][37]

Construction

 
All stations are fitted with platform screen doors (PSD), as seen here at Semantan station.

All stations are to be equipped with platform screen doors, where this contract was awarded to the Singaporean company Singapore Technology Electronics Ltd.[38] 33kV Main Switching Substations are to be constructed at 4 stations, namely Taman Industri Sungai Buloh (now Kwasa Sentral), Section 16 (now Phileo Damansara), Taman Cuepacs (now Sri Raya) and Kajang stations. The other 3 substations are added at the Cochrane launch shaft, Sungai Buloh depot and Semantan portal. Two more 132/33kV Transmission Main Intakes are constructed at Cochrane Launch shaft and Semantan portal. Tenaga Nasional Berhad (TNB) agreed to supply 116.5MW of power on the Kajang Line which costs RM173.1 million.[39]

On 1 November 2011, the 70's Klang bus stand ceased operations and was demolished to make way for the underground platforms and new entrances of Pasar Seni station. When construction of the station is completed, a new bus hub will be reconstructed.[40] On 1 August 2012, MRT Corp announced that the project was in active construction phase.[31] MRT Corp said that the project cost would not exceed the limit of RM23 billion. The first section between Sungai Buloh and Semantan was expected to open in December 2016, with the entire line opening in July 2017.[41]

On 30 May 2013, tunnel excavation works for the Kajang Line began with the world's first Variable Density Tunnel Boring Machine (VDTBM). This TBM was jointly designed by MMC Gamuda KVMRT Tunnelling and Herrenknecht AG, a German company. Commencement of tunnelling works was launched by former Malaysian Prime Minister Najib Tun Razak at the Cochrane Launch Shaft, which would later become the Cochrane MRT station.[42] The shaft is 30 m deep and this TBM was to dig a distance of 1.2 km towards Pasar Rakyat (now Tun Razak Exchange) station. 10 TBMs were used to construct the 9.5 km tunnelled section of the line, where 6 are Variable Density and 4 are Earth Pressure Balance TBMs.[43] The tunnels are to have a diameter of 6 m, where the first breakthrough of the TBM excavations occurred on 25 December 2013.[44]

Opening

On 2 September 2016, Prime Minister Najib Tun Razak took a surprise visit on the MRT line. He took a return trip from Semantan station to Phileo Damansara station in which he visited the latter.[45]

On 16 December 2016, Phase 1 of the Kajang Line which spans 23 km from opened between Sungai Buloh to Semantan.

The fare of this part of the line and its feeder bus routes was free of charge until 16 January 2017.[46] Two days later, MRT Corp confirms cost of 51 km of Kajang Line would be RM21 billion.[47] On 17 July 2017, Phase Two of the line from Semantan to Kajang began operations.[48]

The line is operated by a subsidiary of Prasarana Malaysia, Rapid Rail, which already operates the Ampang Line, Sri Petaling Line, Kelana Jaya Line and KL Monorail.[49]

Overview

Route

 
KG04 Kwasa Damansara station is the one of interchange station between the MRT lines.

The MRT line covers a span of 47 kilometres from Kwasa Damansara to Kajang, passing the Kuala Lumpur city centre where the alignment goes underground. The line serves a corridor with 1.2 million residents within the Klang Valley region from the northwest to the southeast of Kuala Lumpur. The line starts from Kwasa Damansara which is located to the northwest of Kuala Lumpur, and runs on an elevated guideway to the Semantan portal, passing through Kota Damansara, Bandar Utama, Seksyen 17 Petaling Jaya, Phileo Damansara and Damansara Town Centre. Kwasa Damansara provides cross-platform interchange between the MRT Kajang Line and the MRT Putrajaya Line. The line continues in twin-bore tunnels underground to the Maluri portal, passing through the city centre and the Golden Triangle of Kuala Lumpur. Interchanges to other lines are provided from Muzium Negara to Maluri with the exception of Cochrane station in Kuala Lumpur. Beyond Taman Pertama, the line passes through Cheras and ends in Kajang via an elevated guideway. [20][50]

Station designs

 
A view of former station of Kajang line; Kampung Selamat MRT station from Entrance A.


For the seven underground stations, the overall inspiration was from the Klang Gates Quartz Ridge, a pure quartz dyke found in the Klang Valley which has multi-faceted characteristics and has kaleidoscopic reflections. These features resemble Malaysia's multi-racial, multi-cultural and progressive society.[51] The concept is used in the designs of the different murals in the underground stations. Muzium Negara is fitted with tiles that depict the transition of the city's mode of public transport while Pasar Seni is "painted" with 'Y's, which represents the convergence of the Klang and Gombak rivers. Merdeka has the Rukun Negara sculpted on the walls of the concourse. Tun Razak Exchange has designs of blue and grey motives representing a modern Islamic Corporate theme. Cochrane features harmonious red and yellow colours while Bukit Bintang has vibrant red patterns. Maluri is filled with bright green, blue and yellow tiles which symbolises urban renewal.[51][52]

All stations are wheelchair accessible, with lifts and escalators serving each platform.[51] All platforms are equipped with platform screen doors.[38]

List of stations

Station Code Station Name Image Opened Position Park & Ride Connecting Bus Lines Working Name Interchange/Notes
 KG04  Kwasa Damansara   16 December 2016 Elevated N/A Kota Damansara Northern terminus of both the MRT Kajang Line and MRT Putrajaya Line.

Cross-platform interchange with  PY01  MRT Putrajaya Line

 KG05  Kwasa Sentral   5 lines

 T772 
 T801 
 T802 
 T803 
 T804 

Taman Industri Sungai Buloh Feeder Bus  T804  to  KS03  Terminal Skypark for Skypark Link.
 KG05A  Teknologi   - - - - - Provisional station[26]
 KG06  Kota Damansara   16 December 2016 Elevated N/A 2 lines

 T805 
 780 

PJU 5
 KG07  Surian   N/A 4 lines

 T807 
 T808 
 780 
 802 

Dataran Sunway Feeder Bus  T807  to  KJ25  Lembah Subang for LRT Kelana Jaya Line.
 KG08  Mutiara Damansara   N/A 6 lines

 T809 
 T810 
 PJ06 
 780 
 801 
 802 

The Curve
 KG09  Bandar Utama   6 lines

 T811 
 T812 
 PJ05 
 PJ06 
 780 
 802 

One Utama Future interchange with the  SA01  LRT Shah Alam Line.
 KG10  Taman Tun Dr Ismail (TTDI)   N/A 2 lines

 T813 
 T814 

TTDI
 KG11  Seksyen 17 - - - - - - Shelved station
 KG12  Phileo Damansara   16 December 2016 Elevated 2 lines

 T815 
 T816 

Seksyen 16 Feeder bus  T815  to University of Malaya
 KG12A  Bukit Kiara Selatan   - - - - - Provisional station.

Proposed interchange with  CC01  MRT Circle Line.

 KG13  Pavilion Damansara Heights–Pusat Bandar Damansara   16 December 2016 Elevated 1 lines

 T817 

Pusat Bandar Damansara Feeder bus  T817  to Mid Valley South Gate, providing access to  KB01  Mid Valley on the KTM Seremban Line
 KG14  Manulife–Semantan   N/A 5 lines

 T818 
 T819 
 T820 
 T821 
 T852 

Semantan Feeder bus  T819  to Hilton Kuala Lumpur, which is walking distance from  KA01  KS01  KJ15  KE1  KT1  MR1  KG15  KL Sentral, and  KA05  Segambut on the KTM Port Klang Line
 KG15  Muzium Negara   17 July 2017 Underground N/A 1 line

 RED 

KL Sentral Connecting station to KL Sentral, linked via a 600-meter pedestrian walkway, for:


Theme: Transition, History of Kuala Lumpur's Public Transportation

 KG16  Pasar Seni   13 lines

 PURPLE 
 180 
 600 
 640 
 650 
 750 
 751 
 770 
 772 
 780 
 782 
 821 
 851 

Pasar Seni Interchange station with  KJ14  LRT Kelana Jaya Line

Connecting station to  KA02  Kuala Lumpur for KTM Seremban Line, KTM Port Klang Line and KTM ETS via a pedestrian bridge across the Klang River.

Bus hub to Puchong, Subang Airport, Petaling Jaya, Klang, Shah Alam and Subang Jaya.


Theme: Confluence Between Two Rivers

 KG17  Merdeka   N/A Merdeka Interchange station with  AG8  SP8  Plaza Rakyat for LRT Ampang and Sri Petaling Lines.


Theme: Independence, Spirit of Nationhood

 KG18A  Pavilion Kuala Lumpur–Bukit Bintang   7 lines

 PURPLE 
 GREEN 
 BLUE 
 400 
 420 
 421 
 580 

Bukit Bintang Sentral Connecting station to  MR6  KL Monorail.

Pedestrian access to  KJ10  KLCC on the LRT Kelana Jaya Line and  MR7  Raja Chulan for the KL Monorail via an elevated walkway from Pavilion Kuala Lumpur.

Theme: Dynamic

 KG20  Tun Razak Exchange (TRX)   2 lines

 T407 
 402 

Pasar Rakyat Future cross-platform interchange with  PY23  MRT Putrajaya Line.


Theme: Islamic Corporate

 KG21  Cochrane   4 lines

 T352 
 T400 
 T401 
 GREY 
 420 

Cochrane Feeder bus  T401  to  SP12  Cheras for LRT Sri Petaling Line.

Theme: Urban Living

 KG22  AEON–Maluri   8 lines

 T352 
 T400 
 T401 
 PARROTGREEN 
 GREY 
 400 
 402 
 450 

Maluri Interchange station with  AG13  for LRT Ampang Line.

Feeder bus  T401  to  SP12  Cheras for LRT Sri Petaling Line.

Theme: New Generation

 KG23  Taman Pertama   Elevated N/A 3 lines

 T305 
 400 
 450 

Taman Bukit Ria
 KG24  Taman Midah   4 lines[53]

 T305 
 T402 
 400 
 450 

Taman Bukit Mewah

Feeder bus  T402  to  SP13  Salak Selatan for LRT Sri Petaling Line and Hospital Canselor Tuanku Muhriz UKM.

Proposed interchange with  CC22  MRT Circle Line.

 KG25  Taman Mutiara   N/A 4 lines

 T408 
 T409 
 400 
 450 

Leisure Mall
 KG26  Taman Connaught   N/A 4 lines

 T410 
 T411 
 T412 
 450 

Plaza Phoenix Feeder bus  T410  to  KB04  SP15  KT2  Bandar Tasik Selatan.
 KG27  Taman Suntex   3 lines

 T413 
 T406 
 450 

Taman Suntex
 KG28  Sri Raya   3 lines

 T414 
 T406 
 450 

Taman Cuepacs
 KG29  Bandar Tun Hussein Onn   2 line

 T415 
 KJ03 

Bandar Tun Hussein Onn
 KG30  Batu 11 Cheras   N/A 4 lines

 T416 
 T417 
 450 
 590 

Balakong
 KG31  Bukit Dukung   4 lines
 T453 

 T454 
 T455 
 450 

Taman Koperasi
 KG32  Taman Mesra - - - - - - Shelved station
 KG33  Sungai Jernih   17 July 2017 Elevated 2 line

 T456 
 450 

Saujana Impian
 KG34  Stadium Kajang   N/A 7 lines

 T451 
 T457 
 T458 
 T459 
 T460 
 KJ01 
 450 

Bandar Kajang Feeder bus  T451  to Universiti Kebangsaan Malaysia via  KB06  Kajang and  KB07  UKM stations along the KTM Seremban Line.
 KG35  Kajang   6 lines

 T451 
 T461 
 T462 
 T463 
 T464 
 450 

Kajang Southern terminus.

Interchange station, without paid area integration to  KB06  KTM Seremban Line and KTM ETS.[54]

Proposed Interchange To

Putrajaya Monorail

Services and rolling stock

 
MRT SBK real time passenger information display system (PIDS)
 
MRT SBK interior rolling stock designed by BMW Group Designworks

According to MRT Corp, the four-car train sets are servicing the line with an average headway of 3.5 minutes in an hour, equivalent to 400,000 passengers per day.[55]

The rolling stock is manufactured by Siemens/CSR Nanjing Puzhen in a partnership with SMH Rail Consortium Sdn Bhd. The trains will be driverless with a capacity of 1,200 passengers in a 4-car trainsets formation. The Siemens Inspiro rolling stock will be supplied with the same configuration as the trainsets supplied for Warsaw Metro M1.[56]

  • 29 June 2014: The first two train car bodies arrived in Westport, Port Klang, Selangor. The train will be assembled in the country's first train assembly plant in Rasa, Hulu Selangor. The purpose built plant for the KVMRT project is solely owned and operated by SMH Rail Sdn Bhd. SMH Rail had a consortium partnership with Siemens AG and Siemens Malaysia. Work to assemble the trains began immediately after the first two train car bodies arrived in Westport. The time taken to assemble one train set is about 30 days. The plant has two assembly lines, allowing work on four trains sets to be carried out at the same time.[57]
  • 30 November 2014: Another 14 train car bodies had arrived.

Car length (over coupler): 22.89 m (end car), 22.2 m (intermediate car)[1]

Number of passenger doors per car side / door width: 4 / 1400 mm

Traction power supply: 750 V DC, third rail

The 4-car trainsets are maintained at 2 purpose built facilities, Sungai Buloh and Kajang depots, located nearby Kwasa Damansara and Sungai Jernih stations respectively.[58]

Formation

The train consist of four cars, with cars 1 towards Kajang and cars 4 towards Kwasa Damansara.

All trainsets data are as follows (updated December 2022):[59]

Set designation 1 2 3 4
Formation Cabin Middle Car Middle Car Cabin

Ridership

Kajang Line Ridership[60][61]
Year Month/Quarter Ridership Annual Ridership Note
2022 Q1 7,235,774 45,359,948
Q2 10,682,308
Q3 13,688,093
Q4 13,753,773
2021 Q1 5,369,444 19,573,010
Q2 4,714,785
Q3 2,666,394
Q4 6,822,387
2020 Q1 13,973,715 33,168,335
Q2 3,406,537
Q3 9,608,104
Q4 6,179,979
2019 Q1 14,918,332 63,952,805
Q2 15,243,503
Q3 16,370,286
Q4 17,420,684
2018 Q1 11,333,252 51,314,240
Q2 11,997,681
Q3 13,424,667
Q4 14,558,640
2017 Q1 1,505,856 22,253,637
Q2 1,161,218
Q3 9,318,373 Semantan - Kajang section opened on 17 July 2017
Q4 10,365,061
2016 Dec - - Phase One opened on 16 December 2016 but ridership was not officially tabulated

In the second quarter of 2018, the quarterly ridership is a little short of 12 million, following an overall rising trend. However, the line is deemed to have inadequate ridership to cover the construction, operation and maintenance costs. A target of 250,000 daily passengers is required for the line to break even with its operation costs.[62]

Depots

There are two maintenance depots for the Kajang Line, namely the Sungai Buloh depot and Kajang depots. The former is accessible by trains to the north of Kwasa Damansara station, while the latter is located near Sungai Jernih, where trains access the depot from Bukit Dukung instead.[63][64]

See also

Notes and references

Notes

  1. ^ As of 2006, the percentage of public transport passengers was only 11%.[8]
  2. ^ The Golden Triangle is Malaysia’s leading business hub, spanning areas to the north of Jalan Pudu and Jalan Changkat Thambi Dollah, west of Jalan Tun Razak and south of Jalan Ampang.[13]
  3. ^ By May 2009, tenders for the LRT Kelana Jaya Line and LRT Ampang Line extension projects would be called as the designs have been finalised but there was no news on the implementation of the Kota Damansara-Cheras Line.[15]
  4. ^ The main section of the line is to be extended by 12km while a branch line will extend the line by 4km.[17]
  5. ^ The second line is expected to be connecting Sungai Buloh, Kepong, the city and Serdang while the third line is an orbital route.[21]
  6. ^ Developers in KL city had been asked to redesign their upcoming mixed-development projects to integrate with MRT stations.[21][22]

References

  1. ^ a b "Metro Klang Valley Kuala Lumpur - 58 driverless four-car metro trains" (PDF). Siemens Mobility.{{cite web}}: CS1 maint: url-status (link)
  2. ^ (PDF). Ministry of Transport (Malaysia). Archived from the original (PDF) on 22 April 2020.
  3. ^ Rapid Rail to take over SBK line ops from Dec 15
  4. ^ Ruban, A. (16 December 2016). "A quiet start to Malaysia's first MRT, but commuters happy". The Malay Mail Online. Retrieved 18 December 2016.
  5. ^ "Najib launches Phase 2 of Sungai Buloh-Kajang MRT line". The Star Online. Retrieved 17 July 2017.
  6. ^ "PM picks '17-7-2017' start date for MRT phase two". The Malay Mail. Retrieved 9 June 2017.
  7. ^ "Phase 2 of Sg Buloh-Kajang MRT to be launched on July 17". Free Malaysia Today. 8 June 2017. Retrieved 9 June 2017.
  8. ^ a b "Rail Travel Expansion". The Star. 30 August 2006. from the original on 27 October 2018.
  9. ^ a b c . The Star. 15 June 2008. Archived from the original on 27 October 2018.
  10. ^ "Putting The Best Route Forward". The Star. 24 September 2006. from the original on 27 October 2018.
  11. ^ "New LRT Lines Approved". The Star. 7 July 2007. from the original on 27 October 2018.
  12. ^ "LRT Projects Set For Next Year". The Star. 20 April 2007. from the original on 27 October 2018.
  13. ^ "Golden Triangle's Renaissance". Star Property. 5 August 2016. from the original on 27 October 2018. Retrieved 27 October 2018.
  14. ^ (PDF) (in Malay). Utusan. 5 September 2008. Archived from the original (PDF) on 22 July 2011.
  15. ^ . TheEdgeDaily. 21 May 2009. Archived from the original on 25 May 2009.
  16. ^ "RM6-7 billion for LRT extensions". TheEdgeDaily. 14 September 2009. from the original on 30 October 2018.
  17. ^ a b . TheEdgeDaily. 9 April 2010. Archived from the original on 3 March 2012. Retrieved 30 October 2018.
  18. ^ . Bernama. 11 August 2009. Archived from the original on 23 May 2012.
  19. ^ . Archived from the original on 27 December 2012. Retrieved 20 November 2018.
  20. ^ a b . Archived from the original on 15 May 2015. Retrieved 24 April 2015.
  21. ^ a b c . The New Straits Times. 8 June 2010. Archived from the original on 11 June 2010.
  22. ^ a b Au Foong Yee (7 June 2010). . The Edge. Archived from the original on 3 March 2012. Retrieved 20 November 2018.
  23. ^ Loh Foon Fong (18 December 2010). . The Star. Archived from the original on 19 December 2010.
  24. ^ Loh Foon Fong (19 December 2010). . The Star. Archived from the original on 21 December 2010.
  25. ^ "Klang Valley MRT Public Display Shows Majority Want The Project" (PDF) (Press release). 7 June 2011. (PDF) from the original on 20 November 2018. Retrieved 20 November 2018.
  26. ^ a b c Chooi, Clara. . Malaysian Insider. Archived from the original on 11 July 2011. Retrieved 8 July 2011.
  27. ^ . Malaysian Insider. 19 August 2011. Archived from the original on 3 September 2011. Retrieved 19 August 2011.
  28. ^ transitmy. "MRT Update: MyRapidTransit launching & public viewing on 8 July 2011 at KL Convention Centre". Malaysian Transit. Archived from the original on 20 July 2012. Retrieved 11 July 2011.
  29. ^ "Designing a World Class MRT". The Star. 30 May 2017. from the original on 4 December 2018. Retrieved 4 December 2018.
  30. ^ "TTDI Residents Against MRT System". The Star. 16 January 2011. from the original on 4 December 2018. Retrieved 4 December 2018.
  31. ^ a b . The Star. 2 August 2012. Archived from the original on 3 August 2012. Retrieved 3 December 2018.
  32. ^ Achariam, Noel (30 May 2011). . New Straits Times. Archived from the original on 5 December 2018. Retrieved 6 June 2011.
  33. ^ . Business Times, New Straits Times. 21 October 2011. Archived from the original on 22 October 2011. Retrieved 21 October 2011.
  34. ^ "IJM, AZRB win MRT jobs". The Star. 27 January 2012. from the original on 3 December 2018. Retrieved 3 December 2018.
  35. ^ "Twenty Eight Companies Pre-qualify For Six MRT System Work Packages" (PDF) (Press release). MRT Corp. 8 March 2012. (PDF) from the original on 3 December 2018. Retrieved 3 December 2018.
  36. ^ "MRT Corp Awards 4 Work Packages" (PDF) (Press release). MRT Corp. 12 July 2012. (PDF) from the original on 3 December 2018. Retrieved 3 December 2018.
  37. ^ "MRT Corp awards five contracts worth RM3.74bil for Sungai Buloh-Kajang line". The Star. 15 September 2012. from the original on 3 December 2018. Retrieved 3 December 2018.
  38. ^ a b "MRT Corp awards 3 system work contracts worth RM302mil". The Star. 6 February 2013. from the original on 3 December 2018. Retrieved 3 December 2018.
  39. ^ "Electricity Supply Agreement between MRT Corp and TNB". myMRT. 14 December 2012. from the original on 4 December 2018. Retrieved 4 December 2018.
  40. ^ . Star Metro. Archived from the original on 21 October 2011. Retrieved 21 October 2011.
  41. ^ "Sungai Buloh-Kajang MRT project wont cost over RM23bil, says CEO". The Star. 21 December 2012. from the original on 3 December 2018. Retrieved 3 December 2018.
  42. ^ Syed Umar Ariff (31 May 2013). "MRT project on track, says PM". New Straits Times. Archived from the original on 27 August 2013.
  43. ^ "World's First Variable Density Tunnel Boring Machine Launched". myMRT. 30 May 2013. from the original on 4 December 2018. Retrieved 4 December 2018.
  44. ^ "First Breakthrough for MRT Project". The Star. 25 December 2013. from the original on 4 December 2018. Retrieved 4 December 2018.
  45. ^ "Prime Minister's First MRT Train Ride". myMRT. 1 September 2016. from the original on 4 December 2018. Retrieved 4 December 2018.
  46. ^ "Najib: Free MRT, feeder bus rides until Jan 16". The Star. 15 December 2016. from the original on 4 December 2018. Retrieved 4 December 2018.
  47. ^ Adrian Lai (18 December 2016). "MRT Corp says Rafizi got it wrong, RM21bil for both Phase 1 and 2 of SBK Line". New Straits Times. from the original on 22 December 2016.
  48. ^ "PM picks '17-7-2017' start date for MRT phase two | Malay Mail".
  49. ^ . The Malaysian Insider. 16 June 2014. Archived from the original on 17 June 2014.
  50. ^ "Sungai Buloh-Kajang (SBK Line)". myMRT. from the original on 4 December 2018. Retrieved 4 December 2018.
  51. ^ a b c "Sungai Buloh—Kajang line - Stations". myMRT. from the original on 20 November 2018. Retrieved 20 November 2018.
  52. ^ "MRT stations designed to tell the story of M'sia". The Star. 3 August 2017. from the original on 4 December 2018. Retrieved 4 December 2018.
  53. ^ "MyRapid". www.myrapid.com.my. Retrieved 9 April 2018.
  54. ^ "MRT". MyRapid. Retrieved 7 September 2021.
  55. ^ . Archived from the original on 18 January 2013. Retrieved 15 January 2013.
  56. ^ MRT Corp (14 September 2012). "MRT CORP AWARDS RM3.474 BILLION WORTH OF CONTRACTS" (PDF) (Press release). MRT Corp. (PDF) from the original on 3 July 2020. Retrieved 4 July 2020.
  57. ^ "MRT Newsletter" (PDF) (Press release). MRT Corp. July–December 2014. (PDF) from the original on 3 July 2020. Retrieved 4 July 2020.
  58. ^ (PDF). MRT Corp. 2012. p. 13. Archived from the original (PDF) on 4 March 2016.
  59. ^ "TranSPOT - MRT KGL". Retrieved 20 December 2022.
  60. ^ . web.archive.org. 14 January 2023. Retrieved 14 January 2023.
  61. ^ "Statistic of Rail Transport". Ministry of Transport (Malaysia). from the original on 12 January 2023.
  62. ^ "MRT needs 250,000 daily passengers to break even".
  63. ^ "MRT Sungai Buloh Depot" (Map). Google Maps. Retrieved 26 October 2018.
  64. ^ "MRT Sungai Jernih Depot (Satellite view)" (Map). Google Maps. Retrieved 26 October 2018.

External links

  • Mass Rapid Transit Corporation Sdn Bhd (MRT Corp)
  • Prasarana Malaysia Berhad
  • MRT tunneling works by MMC-Gamuda

kajang, line, kajang, line, previously, known, sungai, buloh, kajang, line, line, mass, rapid, transit, line, servicing, klang, valley, malaysia, second, fully, automated, driverless, rail, system, klang, valley, region, after, kelana, jaya, line, owned, corp,. The MRT Kajang Line previously known as the Sungai Buloh Kajang Line SBK Line is a Mass Rapid Transit MRT line servicing the Klang Valley Malaysia It is the second fully automated and driverless rail system in the Klang Valley region after the LRT Kelana Jaya Line Owned by MRT Corp and operated as part of the RapidKL system by Rapid Rail it forms part of the Klang Valley Integrated Transit System The line is numbered 9 and coloured green on official transit maps Kajang LineA Siemens Inspiro EMU stock designed by BMW Group Designworks leaving KG14 Semantan station OverviewNative nameMRT Laluan KajangStatusFully operationalOwnerMRT CorpLine number9 green LocaleKlang ValleyTermini KG04 Kwasa Damansara KG33 KajangStations29 amp 3 reservedWebsitemyrapid wbr com wbr myServiceTypeRapid transitSystemRapid KLServicesKwasa Damansara KajangOperator s Rapid RailDepot s Sungai Buloh Depot and Kajang DepotRolling stockSiemens Inspiro58 four car trainsetsWidth 3 1 m 10 ft wide profileLength 90 18 m 295 9 ft 1 Daily ridership215 853 2019 2 Ridership63 95 million 2019 HistoryOpenedPhase 116 December 2016 6 years ago 2016 12 16 3 Sungai Buloh SemantanPhase 217 July 2017 5 years ago 2017 07 17 Semantan KajangTechnicalLine length47 km 29 mi Elevated 41 5 km 25 8 mi Underground 9 5 km 5 9 mi Track gauge1 435 mm 4 ft 8 1 2 in standard gaugeElectrification750 V DC third railConduction systemAutomated and driverlessOperating speed100 km h 62 mph Route mapLegendto PutrajayaSungai Buloh DepotKG04 Kwasa Damansara 12KG05 Kwasa SentralKG05A Teknologi provisional KG06 Kota DamansaraKG07 SurianKG08 Mutiara DamansaraKG09 Bandar Utama 11KG10 Taman Tun Dr IsmailKG12 Phileo DamansaraKG12A Bukit Kiara Selatan provisional 13KG13 Pavillion Damansara Heights Pusat Bandar DamansaraKG14 Manulife SemantanKL Sentral 8 67 5 1210KG15 Muzium NegaraKuala Lumpur 125KG16 Pasar SeniAG8SP8 Plaza Rakyat 34KG17 MerdekaMR6 AirAsia Bukit Bintang 8KG18A Pavillion Kuala Lumpur Bukit BintangKG20 Tun Razak Exchange 12KG21 CochraneKG22 AEON MaluriAG13 Maluri 3KG23 Taman PertamaKG24 Taman Midah 13KG25 Taman MutiaraKG26 Taman ConnaughtKG27 Taman SuntexKG28 Sri RayaKG29 Bandar Tun Hussein OnnKG30 Batu 11 CherasKG31 Bukit DukungKG32 Taman Mesra provisional Kajang DepotKG33 Sungai JernihKG34 Stadium KajangKG35 Kajang 1 14Interchange stationsintegrated paid areasingle fare tripnon integrated paid areamultiple fare tripsrapid transitcommuter railThis diagram viewtalkeditRoute of the Kajang line It is one of three planned mass rapid transit MRT rail lines under Klang Valley Mass Rapid Transit Project by MRT Corp Phase 1 operations between Sungai Buloh and Semantan commenced service on 16 December 2016 4 Phase 2 operations between Muzium Negara and Kajang was opened on 17 July 2017 as a free shuttle service by former Malaysian Prime Minister Dato Seri Najib Tun Razak in a ceremony at the Tun Razak Exchange station Full revenue service between Sungai Buloh and Kajang began the following day 5 6 7 Contents 1 History 1 1 Initial LRT proposal 1 2 New alignment and conversion to MRT 1 3 Contract allocation 1 4 Construction 1 5 Opening 2 Overview 2 1 Route 2 2 Station designs 3 List of stations 4 Services and rolling stock 4 1 Formation 5 Ridership 6 Depots 7 See also 8 Notes and references 8 1 Notes 8 2 References 9 External linksHistory EditInitial LRT proposal Edit In August 2006 the LRT Kota Damansara Cheras line proposal was first made known to the public by the then deputy Prime Minister Datuk Seri Najib Tun Razak under a RM10 billion government allocation for the improvement and expansion of the public transportation network in the Klang Valley as a new light rapid transit LRT system The line is also targeted to alleviate traffic congestion in the Klang Valley by encouraging more commuters to opt for public transport note 1 It is also aimed to reduce overcrowding on the KL Monorail and to provide an alternative transport mode due to rising fuel prices 9 It is estimated to be approximately 30 km in length 8 This is planned in line with the extension of the LRT Kelana Jaya Line and the LRT Sri Petaling Line to Subang Jaya and Puchong respectively and converging at Putra Heights 9 The combined cost of the new line and the proposed extensions were estimated at RM7 billion Syarikat Prasarana Nasional Berhad SPNB was in charge of the construction of these lines The line was planned to be served by 140 coaches and the track gauge to be almost similar to existing LRT lines 10 The Ministry of Transport had approved the alignment of the new line in July 2007 which would then be tabled to the Cabinet for approval 11 The Finance Ministry s Parliamentary Secretary announced that the line from Kota Damansara to Cheras and Balakong would be completed by 2012 12 The line would be 40 km long serving densely populated areas in Damansara and Cheras via The Golden Triangle of Kuala Lumpur city note 2 The alignment was to be from Persiaran Surian to the Balakong Interchange on the Cheras Kajang Expressway passing through the Damansara Puchong Expressway LDP Sprint Highway the city Jalan Tun Razak and Jalan Cheras stopping at around 30 stations Ownership of the line belonged to SPNB and would be operated by Rapid Rail The estimated construction cost is between RM4 billion and RM5 billion 9 In September 2008 Executive Director of SPNB said that a 5 9 km section of the line in central Kuala Lumpur will be underground serving 5 stations However the locations of underground stations were not announced It was during this time that the line was said to be 42 km with 32 stations in total which would serve areas of Bandar Utama Bangsar KL Sentral Bukit Bintang Bandar Tasik Selatan and Cheras The line was being considered for as a Mass Rapid Transit MRT system after taking into consideration the catchment area serving a population of 878 000 It was also reported that the detailed design stage for the line would commence in the second quarter of 2009 and the opening date is expected to be in 2014 14 note 3 New alignment and conversion to MRT Edit On 14 September 2009 SPNB managing director Datuk Idrose Mohamed was reported as saying that the new line could end up longer than the earlier announced alignment although he did not offer any further details A public display of the alignment was launched a day after the announcement SPNB has raised the necessary funds from Islamic investments of RM2 billion and hopes to gain approval from the Ministry of Transport to call out for tenders 16 In April 2010 a proposal to extend the line by 16 km was being studied by the government note 4 The proposal includes extensions from Kota Damansara to Sungai Buloh additional 3 km and from Cheras to Kajang additional 9 km This is to provide convenient interchanges to the existing Keretapi Tanah Melayu KTM stations at Sungai Buloh and Kajang as well as supporting the upcoming development of some 3000 acre land in Sungai Buloh An additional branch line from Damansara Utama to Kelana Jaya additional 4 km aimed to relieve congestion on the LDP Highway was also being studied bringing the total length of the line to 59 km 17 Unofficial statements in 2009 claimed that the proposed line was changed to an MRT line 18 In June 2010 during the tabling of the 10th Malaysia Plan 19 Prime Minister Najib Tun Razak announced that the government was now considering a RM36 billion Klang Valley MRT proposal from Gamuda Berhad and MMC Corporation Berhad which is the largest national infrastructure project 20 The proposal includes 3 lines including one which is similar to the Kota Damansara Cheras proposal note 5 The MRT lines were to be mostly underground with stations 500m to 1 km apart in areas with high demand The concept was envisioned to be inspired by Singapore s Mass Rapid Transit MRT system 21 22 note 6 The project aimed to improve public transport in the Klang Valley was approved by the Malaysian cabinet on 17 December 2010 and construction of the first line from Sungai Buloh to Kajang would begin in July 2011 with a duration of five to six years Gross national income from these future lines is between RM3 bil and RM12 bil The government had appointed MMC Gamuda JV Sdn Bhd as Project Delivery Partner where it would play the role project manager supervised by the Land Public Transport Commission SPAD The whole project would be divided into nine parcels in which will be done on open tender basis 10 km of the line would be underground and the remaining 50 km above ground with 35 new stations MMC Gamuda would be barred from bidding for any tender except for tunnelling works the most expensive portion Ownership of the lines would be given to SPNB 23 24 To seek for further consultation from the public SPAD held a 3 month public display of the alignment of the MRT Kajang Line 25 On 8 July 2011 Razak officially launched the project The final alignment was adjusted following the public display having a length of 51 km with 31 stations where 16 have Park and Ride facilities Construction was said to be completed in December 2016 and the line would start operations a month after 26 On 17 August 2011 the government announced that Mass Rapid Transit Corporation Sdn Bhd MRT Corp a new company under the Finance Ministry had been formed to take control of the project from Prasarana MRT Corp would be the asset owner of the project and officially take over the project from Prasarana on 1 September 2011 27 After the MRT project was formally launched on 8 July 2011 the following amendments have been made to the original proposed alignment following the public display exercise between March and May 2011 26 28 31 stations instead of 35 stations will be built and provisions have been made for 3 more stations Future station 1 Teknologi located between Kwasa Sentral and Kota Damansara stations Future station 2 Bukit Kiara located between Phileo Damansara and Pusat Bandar Damansara stations Construction of Taman Mesra station has been shelved The proposed Section 17 station was dropped The location of the proposed TTDI station was moved around 300m southwards to the former Caltex petrol stations This was due to complaints from Taman Tun Dr Ismail and Damansara Kim residents 29 30 31 32 Bukit Bintang East and West stations have been combined into one moved and integrated with KL Monorail station The station was named Bukit Bintang Central Station and subsequently Bukit Bintang Station Park and Ride facilities has been increased to 16 from 13 previously Adjustments to the alignment Shifting alignment into the former Rubber Research Institute of Malaysia land in Sungai Buloh to cater for future development Adjusting the alignment adjacent to Bandar Kajang station to avoid going through the town centre and through Kajang Stadium Contract allocation Edit On 21 October 2011 MRT Corp shortlisted 5 companies to construct the underground parts of the line including MMC Gamuda Joint Venture and Sinohydro Group 33 On 26 January 2012 MRT Corp announced the award of the first two civil works contracts for the construction of the MRT Kajang line IJM Construction Sdn Bhd was appointed the contractor for Package V5 at a tender price of RM974 million while Ahmad Zaki Sdn Bhd was appointed the contractor for Package V6 at a tender price of RM764 million Package V5 is from the Maluri portal to Plaza Phoenix now Taman Connaught station while Package V6 covers the section between Plaza Phoenix and Bandar Tun Hussein Onn stations 34 MRT Corp announced the pre qualification of 28 companies to bid for six System Works Packages for the MRT line on 8 March 2012 35 Subsequently in September 2012 another 31 companies were pre qualified to bid for the remaining five System Works Packages 36 37 Construction Edit All stations are fitted with platform screen doors PSD as seen here at Semantan station All stations are to be equipped with platform screen doors where this contract was awarded to the Singaporean company Singapore Technology Electronics Ltd 38 33kV Main Switching Substations are to be constructed at 4 stations namely Taman Industri Sungai Buloh now Kwasa Sentral Section 16 now Phileo Damansara Taman Cuepacs now Sri Raya and Kajang stations The other 3 substations are added at the Cochrane launch shaft Sungai Buloh depot and Semantan portal Two more 132 33kV Transmission Main Intakes are constructed at Cochrane Launch shaft and Semantan portal Tenaga Nasional Berhad TNB agreed to supply 116 5MW of power on the Kajang Line which costs RM173 1 million 39 On 1 November 2011 the 70 s Klang bus stand ceased operations and was demolished to make way for the underground platforms and new entrances of Pasar Seni station When construction of the station is completed a new bus hub will be reconstructed 40 On 1 August 2012 MRT Corp announced that the project was in active construction phase 31 MRT Corp said that the project cost would not exceed the limit of RM23 billion The first section between Sungai Buloh and Semantan was expected to open in December 2016 with the entire line opening in July 2017 41 On 30 May 2013 tunnel excavation works for the Kajang Line began with the world s first Variable Density Tunnel Boring Machine VDTBM This TBM was jointly designed by MMC Gamuda KVMRT Tunnelling and Herrenknecht AG a German company Commencement of tunnelling works was launched by former Malaysian Prime Minister Najib Tun Razak at the Cochrane Launch Shaft which would later become the Cochrane MRT station 42 The shaft is 30 m deep and this TBM was to dig a distance of 1 2 km towards Pasar Rakyat now Tun Razak Exchange station 10 TBMs were used to construct the 9 5 km tunnelled section of the line where 6 are Variable Density and 4 are Earth Pressure Balance TBMs 43 The tunnels are to have a diameter of 6 m where the first breakthrough of the TBM excavations occurred on 25 December 2013 44 Opening Edit On 2 September 2016 Prime Minister Najib Tun Razak took a surprise visit on the MRT line He took a return trip from Semantan station to Phileo Damansara station in which he visited the latter 45 On 16 December 2016 Phase 1 of the Kajang Line which spans 23 km from opened between Sungai Buloh to Semantan The fare of this part of the line and its feeder bus routes was free of charge until 16 January 2017 46 Two days later MRT Corp confirms cost of 51 km of Kajang Line would be RM21 billion 47 On 17 July 2017 Phase Two of the line from Semantan to Kajang began operations 48 The line is operated by a subsidiary of Prasarana Malaysia Rapid Rail which already operates the Ampang Line Sri Petaling Line Kelana Jaya Line and KL Monorail 49 Overview EditRoute Edit KG04 Kwasa Damansara station is the one of interchange station between the MRT lines The MRT line covers a span of 47 kilometres from Kwasa Damansara to Kajang passing the Kuala Lumpur city centre where the alignment goes underground The line serves a corridor with 1 2 million residents within the Klang Valley region from the northwest to the southeast of Kuala Lumpur The line starts from Kwasa Damansara which is located to the northwest of Kuala Lumpur and runs on an elevated guideway to the Semantan portal passing through Kota Damansara Bandar Utama Seksyen 17 Petaling Jaya Phileo Damansara and Damansara Town Centre Kwasa Damansara provides cross platform interchange between the MRT Kajang Line and the MRT Putrajaya Line The line continues in twin bore tunnels underground to the Maluri portal passing through the city centre and the Golden Triangle of Kuala Lumpur Interchanges to other lines are provided from Muzium Negara to Maluri with the exception of Cochrane station in Kuala Lumpur Beyond Taman Pertama the line passes through Cheras and ends in Kajang via an elevated guideway 20 50 Station designs Edit A view of former station of Kajang line Kampung Selamat MRT station from Entrance A For the seven underground stations the overall inspiration was from the Klang Gates Quartz Ridge a pure quartz dyke found in the Klang Valley which has multi faceted characteristics and has kaleidoscopic reflections These features resemble Malaysia s multi racial multi cultural and progressive society 51 The concept is used in the designs of the different murals in the underground stations Muzium Negara is fitted with tiles that depict the transition of the city s mode of public transport while Pasar Seni is painted with Y s which represents the convergence of the Klang and Gombak rivers Merdeka has the Rukun Negara sculpted on the walls of the concourse Tun Razak Exchange has designs of blue and grey motives representing a modern Islamic Corporate theme Cochrane features harmonious red and yellow colours while Bukit Bintang has vibrant red patterns Maluri is filled with bright green blue and yellow tiles which symbolises urban renewal 51 52 All stations are wheelchair accessible with lifts and escalators serving each platform 51 All platforms are equipped with platform screen doors 38 List of stations EditStation Code Station Name Image Opened Position Park amp Ride Connecting Bus Lines Working Name Interchange Notes KG04 Kwasa Damansara 16 December 2016 Elevated N A Kota Damansara Northern terminus of both the MRT Kajang Line and MRT Putrajaya Line Cross platform interchange with PY01 MRT Putrajaya Line KG05 Kwasa Sentral 5 lines T772 T801 T802 T803 T804 Taman Industri Sungai Buloh Feeder Bus T804 to KS03 Terminal Skypark for Skypark Link KG05A Teknologi Provisional station 26 KG06 Kota Damansara 16 December 2016 Elevated N A 2 lines T805 780 PJU 5 KG07 Surian N A 4 lines T807 T808 780 802 Dataran Sunway Feeder Bus T807 to KJ25 Lembah Subang for LRT Kelana Jaya Line KG08 Mutiara Damansara N A 6 lines T809 T810 PJ06 780 801 802 The Curve KG09 Bandar Utama 6 lines T811 T812 PJ05 PJ06 780 802 One Utama Future interchange with the SA01 LRT Shah Alam Line KG10 Taman Tun Dr Ismail TTDI N A 2 lines T813 T814 TTDI KG11 Seksyen 17 Shelved station KG12 Phileo Damansara 16 December 2016 Elevated 2 lines T815 T816 Seksyen 16 Feeder bus T815 to University of Malaya KG12A Bukit Kiara Selatan Provisional station Proposed interchange with CC01 MRT Circle Line KG13 Pavilion Damansara Heights Pusat Bandar Damansara 16 December 2016 Elevated 1 lines T817 Pusat Bandar Damansara Feeder bus T817 to Mid Valley South Gate providing access to KB01 Mid Valley on the KTM Seremban Line KG14 Manulife Semantan N A 5 lines T818 T819 T820 T821 T852 Semantan Feeder bus T819 to Hilton Kuala Lumpur which is walking distance from KA01 KS01 KJ15 KE1 KT1 MR1 KG15 KL Sentral and KA05 Segambut on the KTM Port Klang Line KG15 Muzium Negara 17 July 2017 Underground N A 1 line RED KL Sentral Connecting station to KL Sentral linked via a 600 meter pedestrian walkway for KA01 KS01 KTM Seremban Line KTM Port Klang Line KTM Skypark Link and KTM ETS KJ15 LRT Kelana Jaya Line KE1 KT1 ERL KLIA Transit and ERL KLIA Ekspres Linkbridge access to MR1 via NU Sentral shopping mall for MR1 KL Monorail KL Sentral Monorail Theme Transition History of Kuala Lumpur s Public Transportation KG16 Pasar Seni 13 lines PURPLE 180 600 640 650 750 751 770 772 780 782 821 851 Pasar Seni Interchange station with KJ14 LRT Kelana Jaya Line Connecting station to KA02 Kuala Lumpur for KTM Seremban Line KTM Port Klang Line and KTM ETS via a pedestrian bridge across the Klang River Bus hub to Puchong Subang Airport Petaling Jaya Klang Shah Alam and Subang Jaya Theme Confluence Between Two Rivers KG17 Merdeka N A Merdeka Interchange station with AG8 SP8 Plaza Rakyat for LRT Ampang and Sri Petaling Lines Theme Independence Spirit of Nationhood KG18A Pavilion Kuala Lumpur Bukit Bintang 7 lines PURPLE GREEN BLUE 400 420 421 580 Bukit Bintang Sentral Connecting station to MR6 KL Monorail Pedestrian access to KJ10 KLCC on the LRT Kelana Jaya Line and MR7 Raja Chulan for the KL Monorail via an elevated walkway from Pavilion Kuala Lumpur Theme Dynamic KG20 Tun Razak Exchange TRX 2 lines T407 402 Pasar Rakyat Future cross platform interchange with PY23 MRT Putrajaya Line Theme Islamic Corporate KG21 Cochrane 4 lines T352 T400 T401 GREY 420 Cochrane Feeder bus T401 to SP12 Cheras for LRT Sri Petaling Line Theme Urban Living KG22 AEON Maluri 8 lines T352 T400 T401 PARROTGREEN GREY 400 402 450 Maluri Interchange station with AG13 for LRT Ampang Line Feeder bus T401 to SP12 Cheras for LRT Sri Petaling Line Theme New Generation KG23 Taman Pertama Elevated N A 3 lines T305 400 450 Taman Bukit Ria KG24 Taman Midah 4 lines 53 T305 T402 400 450 Taman Bukit Mewah Feeder bus T402 to SP13 Salak Selatan for LRT Sri Petaling Line and Hospital Canselor Tuanku Muhriz UKM Proposed interchange with CC22 MRT Circle Line KG25 Taman Mutiara N A 4 lines T408 T409 400 450 Leisure Mall KG26 Taman Connaught N A 4 lines T410 T411 T412 450 Plaza Phoenix Feeder bus T410 to KB04 SP15 KT2 Bandar Tasik Selatan KG27 Taman Suntex 3 lines T413 T406 450 Taman Suntex KG28 Sri Raya 3 lines T414 T406 450 Taman Cuepacs KG29 Bandar Tun Hussein Onn 2 line T415 KJ03 Bandar Tun Hussein Onn KG30 Batu 11 Cheras N A 4 lines T416 T417 450 590 Balakong KG31 Bukit Dukung 4 lines T453 T454 T455 450 Taman Koperasi KG32 Taman Mesra Shelved station KG33 Sungai Jernih 17 July 2017 Elevated 2 line T456 450 Saujana Impian KG34 Stadium Kajang N A 7 lines T451 T457 T458 T459 T460 KJ01 450 Bandar Kajang Feeder bus T451 to Universiti Kebangsaan Malaysia via KB06 Kajang and KB07 UKM stations along the KTM Seremban Line KG35 Kajang 6 lines T451 T461 T462 T463 T464 450 Kajang Southern terminus Interchange station without paid area integration to KB06 KTM Seremban Line and KTM ETS 54 Proposed Interchange ToPutrajaya MonorailServices and rolling stock Edit MRT SBK real time passenger information display system PIDS MRT SBK interior rolling stock designed by BMW Group Designworks According to MRT Corp the four car train sets are servicing the line with an average headway of 3 5 minutes in an hour equivalent to 400 000 passengers per day 55 The rolling stock is manufactured by Siemens CSR Nanjing Puzhen in a partnership with SMH Rail Consortium Sdn Bhd The trains will be driverless with a capacity of 1 200 passengers in a 4 car trainsets formation The Siemens Inspiro rolling stock will be supplied with the same configuration as the trainsets supplied for Warsaw Metro M1 56 29 June 2014 The first two train car bodies arrived in Westport Port Klang Selangor The train will be assembled in the country s first train assembly plant in Rasa Hulu Selangor The purpose built plant for the KVMRT project is solely owned and operated by SMH Rail Sdn Bhd SMH Rail had a consortium partnership with Siemens AG and Siemens Malaysia Work to assemble the trains began immediately after the first two train car bodies arrived in Westport The time taken to assemble one train set is about 30 days The plant has two assembly lines allowing work on four trains sets to be carried out at the same time 57 30 November 2014 Another 14 train car bodies had arrived Car length over coupler 22 89 m end car 22 2 m intermediate car 1 Number of passenger doors per car side door width 4 1400 mmTraction power supply 750 V DC third railThe 4 car trainsets are maintained at 2 purpose built facilities Sungai Buloh and Kajang depots located nearby Kwasa Damansara and Sungai Jernih stations respectively 58 Formation Edit The train consist of four cars with cars 1 towards Kajang and cars 4 towards Kwasa Damansara All trainsets data are as follows updated December 2022 59 Set designation 1 2 3 4Formation Cabin Middle Car Middle Car CabinRidership EditKajang Line Ridership 60 61 Year Month Quarter Ridership Annual Ridership Note2022 Q1 7 235 774 45 359 948Q2 10 682 308Q3 13 688 093Q4 13 753 7732021 Q1 5 369 444 19 573 010Q2 4 714 785Q3 2 666 394Q4 6 822 3872020 Q1 13 973 715 33 168 335Q2 3 406 537Q3 9 608 104Q4 6 179 9792019 Q1 14 918 332 63 952 805Q2 15 243 503Q3 16 370 286Q4 17 420 6842018 Q1 11 333 252 51 314 240Q2 11 997 681Q3 13 424 667Q4 14 558 6402017 Q1 1 505 856 22 253 637Q2 1 161 218Q3 9 318 373 Semantan Kajang section opened on 17 July 2017Q4 10 365 0612016 Dec Phase One opened on 16 December 2016 but ridership was not officially tabulatedIn the second quarter of 2018 the quarterly ridership is a little short of 12 million following an overall rising trend However the line is deemed to have inadequate ridership to cover the construction operation and maintenance costs A target of 250 000 daily passengers is required for the line to break even with its operation costs 62 Depots EditThere are two maintenance depots for the Kajang Line namely the Sungai Buloh depot and Kajang depots The former is accessible by trains to the north of Kwasa Damansara station while the latter is located near Sungai Jernih where trains access the depot from Bukit Dukung instead 63 64 See also EditPrasarana Malaysia Berhad Rapid Bus Sdn Bhd Rapid KL Rapid Penang Rapid Kuantan Rapid Rail Sdn Bhd Rapid KL Rapid Ferry Sdn Bhd MRT Corp Klang Valley Mass Rapid Transit Project MyHSR Corp Kuala Lumpur Singapore High Speed Rail Project Public transport in Kuala Lumpur Rail transport in MalaysiaNotes and references EditNotes Edit As of 2006 the percentage of public transport passengers was only 11 8 The Golden Triangle is Malaysia s leading business hub spanning areas to the north of Jalan Pudu and Jalan Changkat Thambi Dollah west of Jalan Tun Razak and south of Jalan Ampang 13 By May 2009 tenders for the LRT Kelana Jaya Line and LRT Ampang Line extension projects would be called as the designs have been finalised but there was no news on the implementation of the Kota Damansara Cheras Line 15 The main section of the line is to be extended by 12km while a branch line will extend the line by 4km 17 The second line is expected to be connecting Sungai Buloh Kepong the city and Serdang while the third line is an orbital route 21 Developers in KL city had been asked to redesign their upcoming mixed development projects to integrate with MRT stations 21 22 References Edit a b Metro Klang Valley Kuala Lumpur 58 driverless four car metro trains PDF Siemens Mobility a href Template Cite web html title Template Cite web cite web a CS1 maint url status link Statistik Rel 2019 PDF Ministry of Transport Malaysia Archived from the original PDF on 22 April 2020 Rapid Rail to take over SBK line ops from Dec 15 Ruban A 16 December 2016 A quiet start to Malaysia s first MRT but commuters happy The Malay Mail Online Retrieved 18 December 2016 Najib launches Phase 2 of Sungai Buloh Kajang MRT line The Star Online Retrieved 17 July 2017 PM picks 17 7 2017 start date for MRT phase two The Malay Mail Retrieved 9 June 2017 Phase 2 of Sg Buloh Kajang MRT to be launched on July 17 Free Malaysia Today 8 June 2017 Retrieved 9 June 2017 a b Rail Travel Expansion The Star 30 August 2006 Archived from the original on 27 October 2018 a b c Kota Damansara Cheras Rail Line Right on Track The Star 15 June 2008 Archived from the original on 27 October 2018 Putting The Best Route Forward The Star 24 September 2006 Archived from the original on 27 October 2018 New LRT Lines Approved The Star 7 July 2007 Archived from the original on 27 October 2018 LRT Projects Set For Next Year The Star 20 April 2007 Archived from the original on 27 October 2018 Golden Triangle s Renaissance Star Property 5 August 2016 Archived from the original on 27 October 2018 Retrieved 27 October 2018 Laluan LRT Bawah Tanah Baru Di KL PDF in Malay Utusan 5 September 2008 Archived from the original PDF on 22 July 2011 Govt May Invite Tenders For LRT Extension in 3 Months TheEdgeDaily 21 May 2009 Archived from the original on 25 May 2009 RM6 7 billion for LRT extensions TheEdgeDaily 14 September 2009 Archived from the original on 30 October 2018 a b Additional routes for Cheras Kota Damansara line TheEdgeDaily 9 April 2010 Archived from the original on 3 March 2012 Retrieved 30 October 2018 NU Sentral Set To Improve Urban Transportation Says Najib Bernama 11 August 2009 Archived from the original on 23 May 2012 Tenth Malaysia Plan Archived from the original on 27 December 2012 Retrieved 20 November 2018 a b MRT Archived from the original on 15 May 2015 Retrieved 24 April 2015 a b c RM30b MRT plan The New Straits Times 8 June 2010 Archived from the original on 11 June 2010 a b Au Foong Yee 7 June 2010 KL to have MRT system say sources The Edge Archived from the original on 3 March 2012 Retrieved 20 November 2018 Loh Foon Fong 18 December 2010 PM Construction of RM36bil KL Mass Rapid Transit MRT to begin July The Star Archived from the original on 19 December 2010 Loh Foon Fong 19 December 2010 RM36b MRT project to be broken down to nine parcels for open tender The Star Archived from the original on 21 December 2010 Klang Valley MRT Public Display Shows Majority Want The Project PDF Press release 7 June 2011 Archived PDF from the original on 20 November 2018 Retrieved 20 November 2018 a b c Chooi Clara Najib launches MRT project at glitzy do Malaysian Insider Archived from the original on 11 July 2011 Retrieved 8 July 2011 Putrajaya puts MRT under new project owners Malaysian Insider 19 August 2011 Archived from the original on 3 September 2011 Retrieved 19 August 2011 transitmy MRT Update MyRapidTransit launching amp public viewing on 8 July 2011 at KL Convention Centre Malaysian Transit Archived from the original on 20 July 2012 Retrieved 11 July 2011 Designing a World Class MRT The Star 30 May 2017 Archived from the original on 4 December 2018 Retrieved 4 December 2018 TTDI Residents Against MRT System The Star 16 January 2011 Archived from the original on 4 December 2018 Retrieved 4 December 2018 a b MRT project moves into active construction phase The Star 2 August 2012 Archived from the original on 3 August 2012 Retrieved 3 December 2018 Achariam Noel 30 May 2011 Proposed TTDI MRT station shifted New Straits Times Archived from the original on 5 December 2018 Retrieved 6 June 2011 KL shortlists bidders for RM7b rail works Business Times New Straits Times 21 October 2011 Archived from the original on 22 October 2011 Retrieved 21 October 2011 IJM AZRB win MRT jobs The Star 27 January 2012 Archived from the original on 3 December 2018 Retrieved 3 December 2018 Twenty Eight Companies Pre qualify For Six MRT System Work Packages PDF Press release MRT Corp 8 March 2012 Archived PDF from the original on 3 December 2018 Retrieved 3 December 2018 MRT Corp Awards 4 Work Packages PDF Press release MRT Corp 12 July 2012 Archived PDF from the original on 3 December 2018 Retrieved 3 December 2018 MRT Corp awards five contracts worth RM3 74bil for Sungai Buloh Kajang line The Star 15 September 2012 Archived from the original on 3 December 2018 Retrieved 3 December 2018 a b MRT Corp awards 3 system work contracts worth RM302mil The Star 6 February 2013 Archived from the original on 3 December 2018 Retrieved 3 December 2018 Electricity Supply Agreement between MRT Corp and TNB myMRT 14 December 2012 Archived from the original on 4 December 2018 Retrieved 4 December 2018 Klang Bus Stand to cease operations Star Metro Archived from the original on 21 October 2011 Retrieved 21 October 2011 Sungai Buloh Kajang MRT project wont cost over RM23bil says CEO The Star 21 December 2012 Archived from the original on 3 December 2018 Retrieved 3 December 2018 Syed Umar Ariff 31 May 2013 MRT project on track says PM New Straits Times Archived from the original on 27 August 2013 World s First Variable Density Tunnel Boring Machine Launched myMRT 30 May 2013 Archived from the original on 4 December 2018 Retrieved 4 December 2018 First Breakthrough for MRT Project The Star 25 December 2013 Archived from the original on 4 December 2018 Retrieved 4 December 2018 Prime Minister s First MRT Train Ride myMRT 1 September 2016 Archived from the original on 4 December 2018 Retrieved 4 December 2018 Najib Free MRT feeder bus rides until Jan 16 The Star 15 December 2016 Archived from the original on 4 December 2018 Retrieved 4 December 2018 Adrian Lai 18 December 2016 MRT Corp says Rafizi got it wrong RM21bil for both Phase 1 and 2 of SBK Line New Straits Times Archived from the original on 22 December 2016 PM picks 17 7 2017 start date for MRT phase two Malay Mail Government goes with Prasarana to operate Sg Buloh Kajang MRT line The Malaysian Insider 16 June 2014 Archived from the original on 17 June 2014 Sungai Buloh Kajang SBK Line myMRT Archived from the original on 4 December 2018 Retrieved 4 December 2018 a b c Sungai Buloh Kajang line Stations myMRT Archived from the original on 20 November 2018 Retrieved 20 November 2018 MRT stations designed to tell the story of M sia The Star 3 August 2017 Archived from the original on 4 December 2018 Retrieved 4 December 2018 MyRapid www myrapid com my Retrieved 9 April 2018 MRT MyRapid Retrieved 7 September 2021 MYMRT MRT Corp Official webpage for the Klang Valley My Rapid Transit Archived from the original on 18 January 2013 Retrieved 15 January 2013 MRT Corp 14 September 2012 MRT CORP AWARDS RM3 474 BILLION WORTH OF CONTRACTS PDF Press release MRT Corp Archived PDF from the original on 3 July 2020 Retrieved 4 July 2020 MRT Newsletter PDF Press release MRT Corp July December 2014 Archived PDF from the original on 3 July 2020 Retrieved 4 July 2020 Progress Report PDF MRT Corp 2012 p 13 Archived from the original PDF on 4 March 2016 TranSPOT MRT KGL Retrieved 20 December 2022 Prasarana s Ridership web archive org 14 January 2023 Retrieved 14 January 2023 Statistic of Rail Transport Ministry of Transport Malaysia Archived from the original on 12 January 2023 MRT needs 250 000 daily passengers to break even MRT Sungai Buloh Depot Map Google Maps Retrieved 26 October 2018 MRT Sungai Jernih Depot Satellite view Map Google Maps Retrieved 26 October 2018 Sungai Buloh Selangor Facebook unreliable source External links EditMass Rapid Transit Corporation Sdn Bhd MRT Corp Prasarana Malaysia Berhad Suruhanjaya Pengangkutan Awam Darat SPAD MRT tunneling works by MMC Gamuda Route Map MRT Website Retrieved from https en wikipedia org w index php title Kajang line amp oldid 1137351456, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.