fbpx
Wikipedia

Tagansko-Krasnopresnenskaya line

The Tagansko-Krasnopresnenskaya line (Russian: Таганско-Краснопресненская линия, IPA: [tɐˈɡanskə krəsnɐˈprʲesʲnʲɪnskəjə ˈlʲinʲɪjə], formerly Zhdanovsko-Krasnopresnenskaya (Ждановско-Краснопресненская) (Line 7) is the busiest line of the Moscow Metro. Built in 1966–1975 and extended in 2013–15, it cuts Moscow on a northwest-southeast axis and contains 23 stations.

 Tagansko-Krasnopresnenskaya line
Overview
Native nameТаганско-Краснопресненская линия
LocaleMoscow
Termini
Stations23
Service
TypeRapid transit
SystemMoscow Metro
Operator(s)Moskovsky Metropoliten
Rolling stock81-765/766/767
Daily ridership1,370,200[1]
History
Opened31 December 1966; 57 years ago (1966-12-31)
Last extension21 September 2015; 8 years ago (2015-09-21)
Technical
Line length42.2 km (26.2 mi)
CharacterUnderground with parts at-grade
Track gauge1,520 mm (4 ft 11+2732 in)
ElectrificationThird rail
Route map

History edit

Tagansko-Krasnopresnenskaya line is a classic example of Soviet urban planning, sometimes referred to as the seventh stage of the Metro. Construction began in the early 1960s, and in 1966 the first complete segment was opened. In the practice of Moscow radial line openings, it began at the ring and left through to the new housing massifs on the southeast of Moscow, originally called the Zhdanovskaya line (Ждановская линия). The construction of the new radius was designed to maximize the efficiency of it with the land-based transportation. All the stations were built on major transport links and the stations Tekstilschiki and Vykhino were integrated into a single transport complex with the railroad stations.

The path began at the Taganka Square (on the ring) and followed the Marxist street/Volgograd avenue through the neighbourhoods of Pechatniki, Kuzminki and Tekstilshchiki. On its final stretch, the line deviates from the Volgograd avenue and crosses onto the Ryazan avenue and terminates at a combined cross-platform transfer to the railways at Vykhino.

Although the geology of the line was unfavourable, so to cut down costs, the builders adopted a cut-and-cover method for tunnel construction building them out of large concrete boxes. In some cases, like the second stretch of the Volgogrdsky Prospekt-Tekstilshchiki path, in a rare occurrence for Moscow, the track goes on the surface, as with the approach to Vykhino.

In a similar logic that was shown when building the Kaluzhsko-Rizhskaya line, it was decided to postpone the central section in favour of building the new radial line, however after the opening of the new Zhdanovskaya line in late 1966, the passenger traffic between it and the former Kaluzhskaya line overstretched the capacity of the ring between Oktyabrskaya and Taganskaya. The two presented itself a unique opportunity and in late 1970 Moscow Metro's first cross-platform transfer point was opened at Kitay-Gorod.

Construction of the Krasnopresnensky radius was in built in much more difficult conditions, in a similar fashion it was designed to make the new massifs of the northwestern Moscow accessible, however the more dense regions, underground fortifications and communication lines that the builders had to face, the first stage of the Krasnopresnensky radius knows no equals in the number of difficulties that the builders were faced with. Beginning at the ring, where the only deep level station was located, the line follows the Krasnaya Presnya street and then turns north along the 1905 year street, further work was hampered by the necessity to cross under the sorting yard of the Belorussky Rail Terminal with a total of 27 individual railroads, and when building the last stretch Polezhayevskaya-Oktyabrskoye Pole. In both cases, the soil was typical sand that was used to elevate the railways, which made it impossible to bore under using conventional means. Firstly chemical adhesive had to be used to strengthen it so that when drained, it would not fall in. To avoid a collapse after the shield bored its way, a horizontal platform had to be installed above it, and the TBM moved at maximum pressure, without any temporary joining in the sand. Just like the Zhdanovskaya line, the line relieved major transport arteries and congestion, Begovaya was built similarly to Tekstilshchiki with exists from subways coming straight onto railway platforms.

As four of the five stations were sub-surface, an attempt was made to modernise the existing centipede design. The volume of the station space was increased, and to support the larger roof, the size of the pillars was raised, but so was their spacing, from 4 to 6.5 metres (13 ft 1 in to 21 ft 4 in). In the end, instead of the two rows of 40, there was 2 of 26. The new design became very widespread in the rest of the system. The architecture also made a comeback with new stations. For the first time in nearly 20 years, marble was used on station walls.

Building the final part of the line commenced shortly afterwards on the central stretch finally linking up the Zhdanovskaya line, and finishing the Krasnopresnensky radius. The former was built with two deep level column stations, one of the centrepieces was the increased diameter of the central vault of 9.5 metres (31 ft 2 in), as well as the rich architecture methods used. The latter section encountered a significant difficulty when building under the Moscow Canal. To avoid flooding, boring had to be done in the winter, and a three-metre thick plane of ice had to be placed on the canal bed. Afterwards, the line continued into the northern regions of Shchukino and Tushino, including another combined railway link at Tushinskaya. The station Skhodnenskaya was another pioneering design, which consisted of a single vault technology initially developed for the Kharkiv Metro, it too became common elsewhere in the Soviet Union. Another station on this stretch was left unfinished because of the lack of need for it and remained derelict for thirty years. The station was completed and inaugurated in August 2014 under the name Spartak.

Because the line is the busiest on the system, there are significant problems that overstretch its capabilities. In particular is the station Vykhino, which was built with too small a capacity to handle the congestion, making it the busiest on the system. In 2004 a severe reconstruction increased the area of the platforms and gave the station a desirable facelift. Nonetheless, that was insufficient to solve the problem, and in 2013 the line was extended to the south-eastern districts of Moscow outside the Ring Road with the opening of Zhulebino and Lermontovsky Prospekt stations. By September 2015, the line has reached a neighboring city of Kotelniki with the construction of an eponymous metro station there. The Kotelniki station opened on 21 September 2015 and became the new terminus of the southeastern radius.

Timeline edit

Segment Date opened Length
TaganskayaVykhino 31 December 1966 12.9 km
TaganskayaKitay-gorod 30 December 1970 2.1 km
BarrikadnayaOktyabrskoye Pole 30 December 1972 7.2 km
Kitay-gorodBarrikadnaya 17 December 1975 4.1 km
Oktyabrskoye PolePlanernaya 30 December 1975 9.6 km
VykhinoZhulebino 9 November 2013 4.6 km
Spartak 27 August 2014
Kotelniki 21 September 2015 1.3 km
Total 41.8 km

Name changes edit

Station Previous name(s) Years
Vykhino Zhdanovskaya 1966–1989
Kitay-gorod Ploschad Nogina 1970–1990

Stations edit

Station Name Transfers
English Russian
Planernaya Планерная
Skhodnenskaya Сходненская
Tushinskaya Тушинская   Tushinskaya
Spartak Спартак
Shchukinskaya Щукинская   Shchukinskaya
Oktyabrskoye Pole Октябрьское Поле   Panfilovskaya
Polezhayevskaya Полежаевская  ( ) Khoroshyovskaya
  Khoroshyovo
Begovaya Беговая     Begovaya
Ulitsa 1905 Goda Улица 1905 года
Barrikadnaya Баррикадная   Krasnopresnenskaya
Pushkinskaya Пушкинская   Tverskaya
  Chekhovskaya
Kuznetsky Most Кузнецкий Мост   Lubyanka
Kitay-gorod Китай-город   Kitay-gorod
Taganskaya Таганская   Taganskaya
  Marksistskaya
Proletarskaya Пролетарская   Krestyanskaya Zastava
Volgogradsky Prospekt Волгоградский проспект
Tekstilshchiki Текстильщики   Tekstilshchiki
    Tekstilshchiki
Kuzminki Кузьминки
Ryazansky Prospekt Рязанский проспект   Veshnyaki
Vykhino Выхино   Vykhino
Lermontovsky Prospekt Лермонтовский проспект   Kosino
  Kosino
Zhulebino Жулебино
Kotelniki Котельники

Rolling stock edit

The line is served by two depots, Planernoe (No. 6) and Vykhino (No. 11). Respectively 36 and 34 eight carriage trains are assigned to them. Most of the trains are Ezh3 and Em-508T models which were received new from 1974, currently all of the trains were modernized between 2003 and 2011 extending the service life by another 15 years. From 2012 to 2017, the line was also served by 10 81-717/714 trains, which were transferred here from other lines. As of 2019 the line is only served by Ezh and 81-765/766/767 trains.

Subway car types used on the line over the years:

Type Dates
Series E 1966–1974
Series Ezh/Em-508/Em-509 1971–1980
Series Ezh3 1974–2020
Series 81-717 2012–2017
Series 81-760/761 2015–2018
Series 81-765/766/767 2017–present

Recent developments and future plans edit

Southern radius edit

After the opening of the Kotelniki station, there are no further development plans extending beyond 2020 horizon.

Northern radius edit

Extension of Arbatsko-Pokrovskaya line (Line 3) allowed easier access to the Metro system to the passengers from Strogino and Mitino districts, diverting them from the northern stretch of the Tagansko-Krasnopresnenskaya line. However, this relief was not very significant, mostly due to Arbatsko-Pokrovskaya line being relatively slow. It takes 30 minutes to reach the Koltsevaya line from Mitino station, while the older Tushinskaya-Barrikadnaya route takes 20. In addition, it does not offer convenient transfers to Kaluzhsko-Rizhskaya line and Kalininskaya line, as the old route does. Another source of congestion to the northern terminus station, Planernaya, is the newly developed Kurkino district, which lies nearby just beyond the Moscow Ring Road. Additionally, passengers from Khimki diverted to this station due to redevelopment of the Rechnoy Vokzal area that caused changes in the bus routes. An extension is proposed from the Planernaya to the Kurkino district.

References edit

  1. ^ . Олимп (in Russian). Archived from the original on 28 September 2010. Retrieved 18 June 2010.

External links edit

KML is from Wikidata
  • Station photos on the Robert Schwandl's UrbanRail site
  • Line gallery on the Urban Electric Transit

tagansko, krasnopresnenskaya, line, russian, Таганско, Краснопресненская, линия, tɐˈɡanskə, krəsnɐˈprʲesʲnʲɪnskəjə, ˈlʲinʲɪjə, formerly, zhdanovsko, krasnopresnenskaya, Ждановско, Краснопресненская, line, busiest, line, moscow, metro, built, 1966, 1975, extend. The Tagansko Krasnopresnenskaya line Russian Tagansko Krasnopresnenskaya liniya IPA tɐˈɡanske kresnɐˈprʲesʲnʲɪnskeje ˈlʲinʲɪje formerly Zhdanovsko Krasnopresnenskaya Zhdanovsko Krasnopresnenskaya Line 7 is the busiest line of the Moscow Metro Built in 1966 1975 and extended in 2013 15 it cuts Moscow on a northwest southeast axis and contains 23 stations Tagansko Krasnopresnenskaya lineOverviewNative nameTagansko Krasnopresnenskaya liniyaLocaleMoscowTerminiPlanernaya north west Kotelniki south east Stations23ServiceTypeRapid transitSystemMoscow MetroOperator s Moskovsky MetropolitenRolling stock81 765 766 767Daily ridership1 370 200 1 HistoryOpened31 December 1966 57 years ago 1966 12 31 Last extension21 September 2015 8 years ago 2015 09 21 TechnicalLine length42 2 km 26 2 mi CharacterUnderground with parts at gradeTrack gauge1 520 mm 4 ft 11 27 32 in ElectrificationThird railRoute mapLegend Planernoye yard Planernaya Skhodnenskaya Tushinskaya Spartak Moscow Canal Shchukinskaya Oktyabrskoye Pole Polezhayevskaya Begovaya to Krasnaya Presnya yard Ulitsa 1905 Goda Barrikadnaya Pushkinskaya Kuznetsky Most Kitay gorod connection to Line 5 Taganskaya Proletarskaya Volgogradsky Prospekt 3502 Shosseynaya Street Tekstilshchiki Kuzminki Ryazansky Prospekt Vykhino Vykhino yard MKADMoscow Ring Road connection to Line 15 Lermontovsky Prospekt Zhulebino Kotelniki This diagram viewtalkedit Contents 1 History 1 1 Timeline 1 2 Name changes 2 Stations 3 Rolling stock 4 Recent developments and future plans 4 1 Southern radius 4 2 Northern radius 5 References 6 External linksHistory editTagansko Krasnopresnenskaya line is a classic example of Soviet urban planning sometimes referred to as the seventh stage of the Metro Construction began in the early 1960s and in 1966 the first complete segment was opened In the practice of Moscow radial line openings it began at the ring and left through to the new housing massifs on the southeast of Moscow originally called the Zhdanovskaya line Zhdanovskaya liniya The construction of the new radius was designed to maximize the efficiency of it with the land based transportation All the stations were built on major transport links and the stations Tekstilschiki and Vykhino were integrated into a single transport complex with the railroad stations The path began at the Taganka Square on the ring and followed the Marxist street Volgograd avenue through the neighbourhoods of Pechatniki Kuzminki and Tekstilshchiki On its final stretch the line deviates from the Volgograd avenue and crosses onto the Ryazan avenue and terminates at a combined cross platform transfer to the railways at Vykhino Although the geology of the line was unfavourable so to cut down costs the builders adopted a cut and cover method for tunnel construction building them out of large concrete boxes In some cases like the second stretch of the Volgogrdsky Prospekt Tekstilshchiki path in a rare occurrence for Moscow the track goes on the surface as with the approach to Vykhino In a similar logic that was shown when building the Kaluzhsko Rizhskaya line it was decided to postpone the central section in favour of building the new radial line however after the opening of the new Zhdanovskaya line in late 1966 the passenger traffic between it and the former Kaluzhskaya line overstretched the capacity of the ring between Oktyabrskaya and Taganskaya The two presented itself a unique opportunity and in late 1970 Moscow Metro s first cross platform transfer point was opened at Kitay Gorod Construction of the Krasnopresnensky radius was in built in much more difficult conditions in a similar fashion it was designed to make the new massifs of the northwestern Moscow accessible however the more dense regions underground fortifications and communication lines that the builders had to face the first stage of the Krasnopresnensky radius knows no equals in the number of difficulties that the builders were faced with Beginning at the ring where the only deep level station was located the line follows the Krasnaya Presnya street and then turns north along the 1905 year street further work was hampered by the necessity to cross under the sorting yard of the Belorussky Rail Terminal with a total of 27 individual railroads and when building the last stretch Polezhayevskaya Oktyabrskoye Pole In both cases the soil was typical sand that was used to elevate the railways which made it impossible to bore under using conventional means Firstly chemical adhesive had to be used to strengthen it so that when drained it would not fall in To avoid a collapse after the shield bored its way a horizontal platform had to be installed above it and the TBM moved at maximum pressure without any temporary joining in the sand Just like the Zhdanovskaya line the line relieved major transport arteries and congestion Begovaya was built similarly to Tekstilshchiki with exists from subways coming straight onto railway platforms As four of the five stations were sub surface an attempt was made to modernise the existing centipede design The volume of the station space was increased and to support the larger roof the size of the pillars was raised but so was their spacing from 4 to 6 5 metres 13 ft 1 in to 21 ft 4 in In the end instead of the two rows of 40 there was 2 of 26 The new design became very widespread in the rest of the system The architecture also made a comeback with new stations For the first time in nearly 20 years marble was used on station walls Building the final part of the line commenced shortly afterwards on the central stretch finally linking up the Zhdanovskaya line and finishing the Krasnopresnensky radius The former was built with two deep level column stations one of the centrepieces was the increased diameter of the central vault of 9 5 metres 31 ft 2 in as well as the rich architecture methods used The latter section encountered a significant difficulty when building under the Moscow Canal To avoid flooding boring had to be done in the winter and a three metre thick plane of ice had to be placed on the canal bed Afterwards the line continued into the northern regions of Shchukino and Tushino including another combined railway link at Tushinskaya The station Skhodnenskaya was another pioneering design which consisted of a single vault technology initially developed for the Kharkiv Metro it too became common elsewhere in the Soviet Union Another station on this stretch was left unfinished because of the lack of need for it and remained derelict for thirty years The station was completed and inaugurated in August 2014 under the name Spartak Because the line is the busiest on the system there are significant problems that overstretch its capabilities In particular is the station Vykhino which was built with too small a capacity to handle the congestion making it the busiest on the system In 2004 a severe reconstruction increased the area of the platforms and gave the station a desirable facelift Nonetheless that was insufficient to solve the problem and in 2013 the line was extended to the south eastern districts of Moscow outside the Ring Road with the opening of Zhulebino and Lermontovsky Prospekt stations By September 2015 the line has reached a neighboring city of Kotelniki with the construction of an eponymous metro station there The Kotelniki station opened on 21 September 2015 and became the new terminus of the southeastern radius Timeline edit Segment Date opened Length Taganskaya Vykhino 31 December 1966 12 9 km Taganskaya Kitay gorod 30 December 1970 2 1 km Barrikadnaya Oktyabrskoye Pole 30 December 1972 7 2 km Kitay gorod Barrikadnaya 17 December 1975 4 1 km Oktyabrskoye Pole Planernaya 30 December 1975 9 6 km Vykhino Zhulebino 9 November 2013 4 6 km Spartak 27 August 2014 Kotelniki 21 September 2015 1 3 km Total 41 8 km Name changes edit Station Previous name s Years Vykhino Zhdanovskaya 1966 1989 Kitay gorod Ploschad Nogina 1970 1990Stations editStation Name Transfers English Russian Planernaya Planernaya Skhodnenskaya Shodnenskaya Tushinskaya Tushinskaya nbsp Tushinskaya Spartak Spartak Shchukinskaya Shukinskaya nbsp Shchukinskaya Oktyabrskoye Pole Oktyabrskoe Pole nbsp Panfilovskaya Polezhayevskaya Polezhaevskaya nbsp nbsp Khoroshyovskaya nbsp Khoroshyovo Begovaya Begovaya nbsp nbsp Begovaya Ulitsa 1905 Goda Ulica 1905 goda Barrikadnaya Barrikadnaya nbsp Krasnopresnenskaya Pushkinskaya Pushkinskaya nbsp Tverskaya nbsp Chekhovskaya Kuznetsky Most Kuzneckij Most nbsp Lubyanka Kitay gorod Kitaj gorod nbsp Kitay gorod Taganskaya Taganskaya nbsp Taganskaya nbsp Marksistskaya Proletarskaya Proletarskaya nbsp Krestyanskaya Zastava Volgogradsky Prospekt Volgogradskij prospekt Tekstilshchiki Tekstilshiki nbsp Tekstilshchiki nbsp nbsp Tekstilshchiki Kuzminki Kuzminki Ryazansky Prospekt Ryazanskij prospekt nbsp Veshnyaki Vykhino Vyhino nbsp Vykhino Lermontovsky Prospekt Lermontovskij prospekt nbsp Kosino nbsp Kosino Zhulebino Zhulebino Kotelniki KotelnikiRolling stock editThe line is served by two depots Planernoe No 6 and Vykhino No 11 Respectively 36 and 34 eight carriage trains are assigned to them Most of the trains are Ezh3 and Em 508T models which were received new from 1974 currently all of the trains were modernized between 2003 and 2011 extending the service life by another 15 years From 2012 to 2017 the line was also served by 10 81 717 714 trains which were transferred here from other lines As of 2019 the line is only served by Ezh and 81 765 766 767 trains Subway car types used on the line over the years Type Dates Series E 1966 1974 Series Ezh Em 508 Em 509 1971 1980 Series Ezh3 1974 2020 Series 81 717 2012 2017 Series 81 760 761 2015 2018 Series 81 765 766 767 2017 presentRecent developments and future plans editSouthern radius edit After the opening of the Kotelniki station there are no further development plans extending beyond 2020 horizon Northern radius edit Extension of Arbatsko Pokrovskaya line Line 3 allowed easier access to the Metro system to the passengers from Strogino and Mitino districts diverting them from the northern stretch of the Tagansko Krasnopresnenskaya line However this relief was not very significant mostly due to Arbatsko Pokrovskaya line being relatively slow It takes 30 minutes to reach the Koltsevaya line from Mitino station while the older Tushinskaya Barrikadnaya route takes 20 In addition it does not offer convenient transfers to Kaluzhsko Rizhskaya line and Kalininskaya line as the old route does Another source of congestion to the northern terminus station Planernaya is the newly developed Kurkino district which lies nearby just beyond the Moscow Ring Road Additionally passengers from Khimki diverted to this station due to redevelopment of the Rechnoy Vokzal area that caused changes in the bus routes An extension is proposed from the Planernaya to the Kurkino district References edit Passazhiropotoki 2009 god Olimp in Russian Archived from the original on 28 September 2010 Retrieved 18 June 2010 External links edit nbsp Wikimedia Commons has media related to Tagansko Krasnopresnenskaya Line KML file edit help Template Attached KML Tagansko Krasnopresnenskaya LineKML is from Wikidata Station photos on the Robert Schwandl s UrbanRail site Line gallery on the Urban Electric Transit Retrieved from https en wikipedia org w index php title Tagansko Krasnopresnenskaya line amp oldid 1220942357, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.