fbpx
Wikipedia

Schwandbach Bridge

The Schwandbach Bridge is a deck-stiffened reinforced concrete arch bridge near Bern in Switzerland, designed by Robert Maillart and completed in November 1933 at a cost of 47,298 CHF.[1]

Schwandbach Bridge
Southeast view, from an angle
Coordinates46°49′45.68″N 7°24′8.426″E / 46.8293556°N 7.40234056°E / 46.8293556; 7.40234056Coordinates: 46°49′45.68″N 7°24′8.426″E / 46.8293556°N 7.40234056°E / 46.8293556; 7.40234056
CrossesSchwandbach
Localeeast of Schwarzenburg, Switzerland
Characteristics
Designdeck-stiffened reinforced concrete arch bridge
MaterialReinforced concrete
Total length55.6 metres (182 ft)
Widtharch: 4.2 metres (14 ft) to 6 metres (20 ft), road: 4.9 metres (16 ft)
Longest span37 metres (121 ft)
No. of spans1
History
DesignerRobert Maillart
Construction start1933-08
Construction end1933-11
Construction cost47,298 CHF
Opened1933-11-29
Location

Design

The bridge has a main span of 37 metres, and a total length of 55.6m.[2] The arch is polygonal rather than curved, and is only 200 mm thick.[3] It supports the bridge deck via 160 mm thick reinforced concrete cross walls. The deck is thicker than the arch, and is stiff enough to prevent the slender arch from buckling. The highway deck is curved in plan. The arch varies in width from 4.2 metres to 6 metres, with one edge forming a straight line between river banks, and the other following the curve of the road.[4] This arrangement helps to resist centrifugal forces from the traffic loads and from the curved deck's tendency to twist.

Reception

The bridge is regarded as one of Maillart's masterpieces. Unlike his previous arched Valtschielbach Bridge, it relies entirely on reinforced concrete and lacks masonry arch approaches.

In 1947 the bridge was featured with other of Maillart's works in a four-month exhibit at the Museum of Modern Art, New York[5]

The architectural historian David Billington has written:[6]

"Integration of form here is as fully developed as in any concrete bridge ... All parts exhibit their true thicknesses, with nothing hidden for effect ... With the two mature masterpieces at Töss and Schwandbach, Maillart reached a climax in his building of deck-stiffened arch bridge."

References

  • Billington, David P., Robert Maillart and the Art of Reinforced Concrete, The MIT Press, 1990, ISBN 0-262-02310-5

Notes

  1. ^ "Naturpark Gantrisch mt Schwarzsee". Retrieved 2 August 2014.
  2. ^ "Engineering Timelines - Schwandbach Bridge". Retrieved 30 December 2016.
  3. ^ Billington, 1990, p.66
  4. ^ Billington, 1990, p.68
  5. ^ "#353, Robert Maillart, Engineer, June 24 - October 13, 1947", Exhibit History, Museum of Modern Art, accessed 2 November 2010
  6. ^ Billington, 1990, p.70

External links

schwandbach, bridge, deck, stiffened, reinforced, concrete, arch, bridge, near, bern, switzerland, designed, robert, maillart, completed, november, 1933, cost, southeast, view, from, anglecoordinates46, 8293556, 40234056, 8293556, 40234056, coordinates, 829355. The Schwandbach Bridge is a deck stiffened reinforced concrete arch bridge near Bern in Switzerland designed by Robert Maillart and completed in November 1933 at a cost of 47 298 CHF 1 Schwandbach BridgeSoutheast view from an angleCoordinates46 49 45 68 N 7 24 8 426 E 46 8293556 N 7 40234056 E 46 8293556 7 40234056 Coordinates 46 49 45 68 N 7 24 8 426 E 46 8293556 N 7 40234056 E 46 8293556 7 40234056CrossesSchwandbachLocaleeast of Schwarzenburg SwitzerlandCharacteristicsDesigndeck stiffened reinforced concrete arch bridgeMaterialReinforced concreteTotal length55 6 metres 182 ft Widtharch 4 2 metres 14 ft to 6 metres 20 ft road 4 9 metres 16 ft Longest span37 metres 121 ft No of spans1HistoryDesignerRobert MaillartConstruction start1933 08Construction end1933 11Construction cost47 298 CHFOpened1933 11 29Location Contents 1 Design 2 Reception 3 References 4 Notes 5 External linksDesign EditThe bridge has a main span of 37 metres and a total length of 55 6m 2 The arch is polygonal rather than curved and is only 200 mm thick 3 It supports the bridge deck via 160 mm thick reinforced concrete cross walls The deck is thicker than the arch and is stiff enough to prevent the slender arch from buckling The highway deck is curved in plan The arch varies in width from 4 2 metres to 6 metres with one edge forming a straight line between river banks and the other following the curve of the road 4 This arrangement helps to resist centrifugal forces from the traffic loads and from the curved deck s tendency to twist Reception EditThe bridge is regarded as one of Maillart s masterpieces Unlike his previous arched Valtschielbach Bridge it relies entirely on reinforced concrete and lacks masonry arch approaches In 1947 the bridge was featured with other of Maillart s works in a four month exhibit at the Museum of Modern Art New York 5 The architectural historian David Billington has written 6 Integration of form here is as fully developed as in any concrete bridge All parts exhibit their true thicknesses with nothing hidden for effect With the two mature masterpieces at Toss and Schwandbach Maillart reached a climax in his building of deck stiffened arch bridge References EditBillington David P Robert Maillart and the Art of Reinforced Concrete The MIT Press 1990 ISBN 0 262 02310 5Notes Edit Naturpark Gantrisch mt Schwarzsee Retrieved 2 August 2014 Engineering Timelines Schwandbach Bridge Retrieved 30 December 2016 Billington 1990 p 66 Billington 1990 p 68 353 Robert Maillart Engineer June 24 October 13 1947 Exhibit History Museum of Modern Art accessed 2 November 2010 Billington 1990 p 70External links EditSchwandbach Bridge at Structurae Retrieved from https en wikipedia org w index php title Schwandbach Bridge amp oldid 1109605849, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.