fbpx
Wikipedia

National Environmental Policy Act

The National Environmental Policy Act (NEPA) is a United States environmental law designed to promote the enhancement of the environment. It created new laws requiring U.S. federal government agencies to evaluate the environmental impacts of their actions and decisions, and it established the President's Council on Environmental Quality (CEQ). The Act was passed by the U.S. Congress in December 1969 and signed into law by President Richard Nixon on January 1, 1970.[2] To date, more than 100 nations around the world have enacted national environmental policies modeled after NEPA.[3]

National Environmental Policy Act of 1969
Long titleNational Environmental Policy Act of 1969
Acronyms (colloquial)NEPA
Enacted bythe 91st United States Congress
EffectiveJanuary 1, 1970
Citations
Public lawPub. L.Tooltip Public Law (United States) 91–190
Statutes at Large83 Stat. 852
Codification
Titles amended42 U.S.C.: Public Health and Welfare
U.S.C. sections created42 U.S.C. § 4321 et seq.
Legislative history
  • Introduced in the Senate as S. 1075 by Henry M. Jackson (DWA) on February 18, 1969
  • Committee consideration by Senate Committee on Interior and Insular Affairs
  • Passed the Senate on July 10, 1969 (Unanimous)
  • Passed the House of Representatives on September 23, 1969 (372-15[1])
  • Reported by the joint conference committee on December 17, 1969; agreed to by the Senate on December 20, 1969  and by the House of Representatives on December 23, 1969 
  • Signed into law by President Richard Nixon on January 1, 1970
Major amendments
Public Law 94-52, July 3, 1975, Public Law 94-83, Aug 9, 1975 and Public Law 97-258, section 4(b), Sep 13, 1982
United States Supreme Court cases

NEPA requires Federal agencies to evaluate the environmental effects of their actions.[4]: 2–3  NEPA's most significant outcome was the requirement that all executive Federal agencies prepare environmental assessments (EAs) and environmental impact statements (EISs). These reports state the potential environmental effects of proposed Federal agency actions.[5] Further, U.S. Congress recognizes that each person has a responsibility to preserve and enhance the environment as trustees for succeeding generations.[6] NEPA's procedural requirements do not apply to the President, Congress, or the Federal courts since they are not a "Federal agency" by definition.[5][7] However, a Federal agency taking action under authority ordered by the President may be a final agency action subject to NEPA's procedural requirements.[4]: 117–118 

History edit

 
Statewide leaders of Concerned Citizens for Clean Air and Clean Water present signatures of 70,000 Illinoisans in 1969 to Attorney General William J. Scott. The petitions supported Scott's crackdown on polluters. Chairman Ed Ponder of Chicago presented the petitions.
 
Richard Nixon signing NEPA on January 1, 1970.

NEPA grew out of the increased public appreciation and concern for the environment that developed during the 1960s, amid increased industrialization, urban and suburban growth, and pollution across the United States. During this time, environmental interest group efforts and the growing public awareness resulting from Rachel Carson's 1962 book Silent Spring led to support for the 1964 Wilderness Act and subsequent legislation (including the 1970 Clean Air Act and 1972 Clean Water Act).[8] The public outrage in reaction to the Santa Barbara oil spill in early 1969 occurred just as the NEPA legislation was being drafted in Congress. A fire on the Cuyahoga River was publicized in a Time magazine article shortly after the unanimous vote in the Senate.[9] Another major driver for enacting NEPA was the 1960s highway revolts, a series of protests in many American cities that occurred in response to the bulldozing of many communities and ecosystems during the construction of the Interstate Highway System.[10] In addition, as the contribution of Indiana political scientist Lynton Caldwell shows, concern for the environmental recklessness of international development programs in the 1950s and 1960s also drove the thinking behind NEPA.[11]

In 2015 a United States District Court provided a documented concise background of NEPA being created to protect the environment from actions involving the Federal government[12] as follows:

Following nearly a century of rapid economic expansion, population growth, industrialization, and urbanization, it had become clear by the late 1960s that American progress had an environmental cost.[13] A congressional investigation into the matter yielded myriad evidence indicating a gross mismanagement of the country's environment and resources, most notably at the hands of the federal government.[14][15] As a result, lawmakers and the general public alike called for an urgent and sweeping policy of environmental protection.

Congress answered these calls by enacting NEPA, which has served as "our basic national charter for protection of the environment" since 1970.[16] With NEPA, Congress mandated that federal agencies take a "hard look" at the environmental consequences of their actions and to engage all practicable measures to prevent environmental harm when engaging in agency action.[17]: 409, 410 n. 21  Furthermore, to remedy the widespread mistrust of the federal agencies, Congress incorporated within NEPA "action-forcing" provisions which require agencies to follow specific procedures in order to accomplish any federal project.[17]: 409 & n.18 

Since its passage, NEPA has been applied to any major project, whether on a federal, state, or local level, that involves federal funding, work performed by the federal government, or permits issued by a federal agency.[18] Court decisions have expanded the requirement for NEPA-related environmental studies to include actions where permits issued by a federal agency are required regardless of whether federal funds are spent to implement the action, to include actions that are entirely funded and managed by private-sector entities where a federal permit is required. This legal interpretation is based on the rationale that obtaining a permit from a federal agency requires one or more federal employees (or contractors in some instances) to process and approve a permit application, inherently resulting in federal funds being expended to support the proposed action, even if no federal funds are directly allocated to finance the particular action.

A U.S. District Court describes the need for even the President to have the NEPA analysis information before making a decision as follows:

"No agency possesses discretion whether to comply with procedural requirements such as NEPA. The relevant information provided by a NEPA analysis needs to be available to the public and the people who play a role in the decision-making process. This process includes the President." "And Congress has not delegated to the President the decision as to the route of any pipeline."[19]

Contents edit

The preamble to NEPA reads:

To declare national policy which will encourage productive and enjoyable harmony between man and his environment; to promote efforts which will prevent or eliminate damage to the environment and biosphere and stimulate the health and welfare of man; to enrich the understanding of the ecological systems and natural resources important to the Nation; and to establish a Council on Environmental Quality.[2]

NEPA contains three sections: the first section outlines national environmental policies and goals; the second establishes provisions for federal agencies to enforce such policies and goals; and the third establishes the CEQ in the Executive Office of the President.

The purpose of NEPA is to ensure that environmental factors are weighted equally when compared to other factors in the decision-making process undertaken by federal agencies and to establish a national environmental policy. The act also promotes the CEQ to advise the President in the preparation of an annual report on the progress of federal agencies in implementing NEPA. It also established the CEQ to advise the president on environmental policy and the state of the environment.[20]

NEPA establishes this national environmental policy by requiring federal agencies to prepare an environmental impact statement to accompany reports and recommendations for Congressional funding. This impact statement is known as an EIS. NEPA is an action-forcing piece of legislation, meaning the act itself does not carry any criminal or civil sanctions, and therefore, all enforcement of NEPA must occur through the court system. In practice, a project is required to meet NEPA guidelines when a federal agency provides any portion of financing for the project. However, review of a project by a federal employee can be viewed as a federal action, and in such a case, it requires NEPA-compliant analysis performance.

NEPA covers a vast array of federal agency actions, but the act does not apply to state action where there is a complete absence of federal influence or funding. Exemptions and exclusions are also present within NEPA's guidelines, including specific federal projects detailed in legislation and EPA exemptions. Exemptions also apply when compliance with other environmental laws require an impact analysis similar to that mandated by NEPA. Such laws can include but are not limited to the Clean Air Act, Resource Conservation and Recovery Act, Safe Drinking Water Act, and the Federal Insecticide, Fungicide, and Rodenticide Act.

Process edit

The NEPA process is the evaluation of the relevant environmental effects of a federal project or action mandated by NEPA. This process begins when an agency develops a proposal addressing a need to take action. If it is determined that the proposed action is covered under NEPA, there are three levels of analysis that a federal agency must undertake to comply with the law. These three levels include the preparation of a Categorical Exclusion (CatEx); an environmental assessment (EA); and either a Finding of No Significant Impact (FONSI), or, alternatively, the preparation and drafting of an environmental impact statement (EIS).[21]

Executive Order No. 11514 as amended by Executive Order No. 11991 [22] directs the Council on Environmental Quality (CEQ) to issue "regulations to Federal agencies for the implementation of the procedural provisions of" NEPA [22]: 5371 Sec. 3 (h)  and for Federal agencies to "comply with the regulations issued by the Council".[22]: 5371 Sec. 2 (g)  Importantly the Supreme Court of the United States finds "that CEQ regulations are entitled to substantial deference."[23] The Council on Environmental Quality's NEPA regulation 40 C.F.R. § 1501.4 specifies the process to determine whether to prepare an Environmental Impact Statement (EIS) as follows:

In determining whether to prepare an environmental impact statement the Federal agency shall:

(a) Determine under its procedures supplementing these regulations (described in § 1507.3) whether the proposal is one which:

(1) Normally requires an environmental impact statement, or
(2) Normally does not require either an environmental impact statement or an environmental assessment (categorical exclusion).

(b) If the proposed action is not covered by paragraph (a) of this section, prepare an environmental assessment (§ 1508.9). The agency shall involve environmental agencies, applicants, and the public, to the extent practicable, in preparing assessments required by § 1508.9(a)(1).

(c) Based on the environmental assessment make its determination whether to prepare an environmental impact statement.

(d) Commence the scoping process (§ 1501.7), if the agency will prepare an environmental impact statement.

(e) Prepare a finding of no significant impact (§ 1508.13), if the agency determines on the basis of the environmental assessment not to prepare a statement.

(1) The agency shall make the finding of no significant impact available to the affected public as specified in § 1506.6.
(2) In certain limited circumstances, which the agency may cover in its procedures under § 1507.3, the agency shall make the finding of no significant impact available for public review (including State and areawide clearinghouses) for 30 days before the agency makes its final determination whether to prepare an environmental impact statement and before the action may begin. The circumstances are:
(i) The proposed action is, or is closely similar to, one which normally requires the preparation of an environmental impact statement under the procedures adopted by the agency pursuant to § 1507.3, or
(ii) The nature of the proposed action is one without precedent.[24]

In addition to complying with the Council on Environmental Quality's NEPA regulations in 40 C.F.R. § 1500 through § 1508, each Federal agency is required by 40 C.F.R. § 1507.3(a) to adopt supplemental procedures for their agency's implementation of NEPA. For example, the Federal Highway Administration's supplemental NEPA procedures are in 23 C.F.R. §771.101 through § 771.131. According to 23 C.F.R. § 771.115(a) Class I actions such as a new controlled access freeway or a highway project of four or more lanes on a new location significantly affect the environment and therefore require an Environmental Impact Statement. According to 23 C.F.R. § 771.115(b) and § 771.117(c) Class II actions such as construction of bicycle and pedestrian lanes, planning, noise barriers, and landscaping normally do not individually or cumulatively have a significant environmental effect and therefore may be categorically exempt unless there are unusual circumstances as provided in 23 C.F.R. § 771.117(b). According to 23 C.F.R. § 771.117(c) all other actions are Class III actions requiring the preparation of an Environmental Assessment to determine the appropriate environmental document required.

Preparation of a Categorical Exclusion edit

A Categorical Exclusion (CatEx) is a list of actions an agency has determined do not individually or cumulatively significantly affect the quality of the human environment (40 C.F.R. §1508.4). If a proposed action is included in an agency's CatEx, the agency must make sure that no extraordinary circumstances might cause the proposed action to affect the environment. Extraordinary circumstances include effects on endangered species, protected cultural sites, and wetlands.[25][26] If the proposed action is not included in the description provided in the CatEx, an EA must be prepared.[25][26] Actions similar to the proposed one may have been found to be environmentally neutral in previous EAs and their implementation, and so an agency may amend their implementing regulations to include the action as a CatEx. In this case, the drafted agency procedures are published in the Federal Register and a public comment period is required.[25][26] An agency cannot rely on a CatEx prepared by a different agency to support a decision not to prepare an EA or EIS for a planned action; however, it may draw from another agency's experience with a comparable CatEx in seeking to substantiate a CatEx of its own.[27]

The Council on Environmental Quality (CEQ) created Categorical Exclusions to reduce paperwork (40 CFR § 1500.4(p)) and reduce delay (40 CFR § 1500.5(k)) so agencies can better concentrate on actions that do have significant effects on the human environment. In 2003 the National Environmental Policy Task Force found agencies "indicated some confusion about the level of analysis and documentation required to use an approved categorical exclusion".[28] In 2010 CEQ issued guidance on the existing regulations for Categorical Exclusions consistent with NEPA and past CEQ guidance.[29] This CEQ 2010 guidance acknowledges, "Since Federal agencies began using categorical exclusions in the late 1970s, the number and scope of categorically excluded activities have expanded significantly. Today, categorical exclusions are the most frequently employed method of complying with NEPA, underscoring the need for this guidance on the promulgation and use of categorical exclusions."[29]: 75631–75632  This CEQ 2010 guidance goes on to caution, "If used inappropriately, categorical exclusions can thwart NEPA's environmental stewardship goals, by compromising the quality and transparency of agency environmental review and decisionmaking, as well as compromising the opportunity for meaningful public participation and review."[29]: 75632  Indeed, the expanded use of Categorical Exclusions undermines NEPA by reducing environmental analysis and public comment, thereby increasing NEPA litigation.[30] The CEQ 2010 guidance emphasizes that Categorical Exclusions must capture the entire proposed action and not be used for a segment or an interdependent part of a larger proposed action.[29]: 75632  Examples of Exceptional Circumstances that prevent use of Categorical Exclusions include where there are "potential effects on protected species or habitat, or on historic properties listed or eligible for listing in the National Register of Historic Places."[29]: 75632–75633  The CEQ specifically cites the 2010 Deepwater Horizon oil spill as an example why agencies need to periodically review their Categorical Exclusions "in light of evolving or changing conditions that might present new or different environmental impacts or risks."[29]: 75637 

Streamlining the NEPA process with categorical exclusions have been criticized, for example allowing BP's exploration plan that resulted in the Deepwater Horizon oil spill to use a categorical exclusion instead of requiring an Environmental Impact Statement.[31]

Preparation of an Environmental Assessment and a Finding of No Significant Impact edit

EAs are concise public documents that include the need for a proposal, a list of alternatives, and a list of agencies and persons consulted in the proposal's drafting. The purpose of an EA is to determine the significance of the proposal's environmental outcomes and to look at alternatives of achieving the agency's objectives. An EA is supposed to provide sufficient evidence and analysis for determining whether to prepare an EIS, aid an agency's compliance with NEPA when no EIS is necessary, and it facilitates preparing an EIS when one is necessary.[32]

Most agency procedures do not require public involvement prior to finalizing an EA document; however, agencies advise that a public comment period is considered at the draft EA stage. EAs need to be of sufficient length to ensure that the underlying decision to prepare an EIS is legitimate, but they should not attempt to substitute an EIS.

However, the Council on Environmental Quality regulation 40 C.F.R. § 1500.1(b) states: "NEPA procedures must insure that environmental information is available to public officials and citizens before decisions are made and before actions are taken." Likewise, 40 C.F.R. § 1500.2 states: "Federal agencies shall to the fullest extent possible: ... (d) Encourage and facilitate public involvement in decisions which affect the quality of the human environment." A U.S. District Court describes the essential requirement for public input on a draft EA as follows:

The Ninth Circuit has read these regulations to mean that "the public must be given an opportunity to comment on draft EAs and EISs." Anderson v. Evans, 371 F.3d 475, 487 (9th Cir.2004). Because the regulations "must mean something," the Circuit has held that an agency's failure to obtain any public input on a draft EA "violates these regulations." Citizens for Better Forestry v. U.S. Dept. of Agriculture, 341 F.3d 961, 970 (9th Cir.2003).[33]

If no substantial effects on the environment are found after investigation and the drafting of an EA, the agency must produce a Finding of No Significant Impact (FONSI). This document explains why an action will not have a significant effect on the human environment and includes the EA or a summary of the EA that supports the FONSI determination.

Preparation of an Environmental Impact Statement edit

If it is determined that a proposed federal action does not fall within a designated CatEx or does not qualify for a FONSI, then the responsible agency must prepare an EIS. The purpose of an EIS is to help public officials make informed decisions based on the relevant environmental consequences and the alternatives available. The drafting of an EIS includes public party, outside party, and other federal agency input concerning its preparation. These groups subsequently comment on the draft EIS.

An EIS is required to describe the environmental impacts of the proposed action, any adverse environmental impacts that cannot be avoided should the proposal be implemented, the reasonable alternatives to the proposed action, the relationship between local short-term uses of man's environment along with the maintenance and enhancement of long-term productivity, and any irreversible and irretrievable commitments of resources that would be involved in the proposed action.[34]

An agency may undertake the drafting of an EIS without the initial drafting of the EA. This may happen if the agency believes that the action will have a significant impact on the human or natural environment or if the action is considered an environmentally controversial issue.

The responsible decision-maker is required to review the final EIS before reaching a final decision regarding the course of action to be taken. The decision-maker must weigh the potential environmental impacts along with other pertinent considerations in reaching the final decision. A record of decision (ROD) is issued which records the agency's final decision.[35]

Average time for a full review edit

A federal study from 2013-2018 found that a full NEPA review took an average of 4.5 years.[36]

Mootness doctrine used to evade NEPA requirements edit

The Administrative Procedure Act at 5 U.S.C. § 702 provides the right for a person injured by a NEPA issue to carry out a NEPA case in court as:

A person suffering legal wrong because of agency action, or adversely affected or aggrieved by agency action within the meaning of a relevant statute, is entitled to judicial review thereof.

By 5 U.S.C. § 706 the U.S. Congress provides for courts to make equitable remedies such as an injunction to compel agency action withheld or to set aside agency actions that are arbitrary, capricious, an abuse of discretion, or otherwise not in accordance with law. However, a court case becomes moot when no practical ("live") issues remain as stated in Powell v. McCormack, 395 U. S. 486 (1969) pages 496 – 497:

Simply stated, a case is moot when the issues presented are no longer "live" or the parties lack a legally cognizable interest in the outcome. See E. Borchard, Declaratory 497*497 Judgments 35-37 (2d ed. 1941). Where one of the several issues presented becomes moot, the remaining live issues supply the constitutional requirement of a case or controversy. See United Public Workers v. Mitchell, 330 U. S. 75, 86-94 (1947); 6A J. Moore, Federal Practice ¶ 57.13 (2d ed. 1966).

In early NEPA cases (for example Arlington Coalition on Transportation v. Volpe, 458 F.2d 1323 (4th Cir. 1972) page 1331) courts considered projects were beyond the reach of the courts (moot) if that project had progressed to where the costs of altering the project would outweigh benefits. Nevertheless, by 1981 the Ninth Circuit Court of Appeals recognized some projects might proceed with construction in an attempt to evade the requirements of NEPA. Therefore, the court cautioned that even completed projects could be ordered to be removed as stated in Columbia Basin Land Protection Assoc. v. Schlesinger, 643 F.2d 585 (9th Cir.1981) page 591 note 1:

The building of the towers has not made the case hypothetical or abstract — the towers still cross the fields of the Landowners, continually obstructing their irrigation systems — and this Court has the power to decide if they may stay or if they may have to be removed. * * * If the fact that the towers are built and operating were enough to make the case nonjusticiable, as the dissent states, then the BPA (and all similar entities) could merely ignore the requirements of NEPA, build its structures before a case gets to court, and then hide behind the mootness doctrine. Such a result is not acceptable.

Thus, courts have the equitable power to prevent those who use bad faith construction to evade U.S. Congress policies such as NEPA. Despite a court recognizing the use of this mootness tactic, a court still might not order removal of construction and remediation of the environment unless the NEPA complaint seeks removal and remediation in the request for relief as a "live" issue, see dissenting opinion in West v. Secretary of Dept. of Transp., 206 F.3d 920 (9th Cir. 2000) page 931:

He did not seek remediation; he wanted the interchange stopped. It was built. Therefore, there is no justiciable controversy pertaining to Phase I.

If stopping construction is the only request for relief in a NEPA complaint then logically construction cannot be stopped after completion.

The 1st Circuit Court of Appeals in stopping construction of a seaport on Sears Island, Maine pointed out that harm in NEPA cases is harm to the environment as stated in Sierra Club v. Marsh, 872 F.2d 497 (1st Cir. 1989) at page 500:

Thus, when a decision to which NEPA obligations attach is made without the informed environmental consideration that NEPA requires, the harm that NEPA intends to prevent has been suffered. * * * the harm at stake is a harm to the environment, but the harm consists of the added risk to the environment that takes place when governmental decisionmakers make up their minds without having before them an analysis (with prior public comment) of the likely effects of their decision upon the environment.

This court in Sierra Club v. Marsh on page 504 also found since there is an instinct not to tear down projects, it is appropriate to issue preliminary injunctions early in NEPA cases:

The way that harm arises may well have to do with the psychology of decisionmakers, and perhaps a more deeply rooted human psychological instinct not to tear down projects once they are built. But the risk implied by a violation of NEPA is that real environmental harm will occur through inadequate foresight and deliberation. The difficulty of stopping a bureaucratic steam roller, once started, still seems to us, after reading Village of Gambell, a perfectly proper factor for a district court to take into account in assessing that risk, on a motion for a preliminary injunction.

To have Article III standing to maintain a federal court case at least one individual plaintiff must have an injury caused by the defendant and that injury is likely to be remedied by a favorable decision as stated in Lujan v. Defenders of Wildlife, 504 U.S. 555, 112 S. Ct. 2130, 119 L. Ed. 2d 351 (1992) on pages 560-561:

Over the years, our cases have established that the irreducible constitutional minimum of standing contains three elements. First, the plaintiff must have suffered an "injury in fact"—an invasion of a legally protected interest which is (a) concrete and particularized, see id., at 756; Warth v. Seldin, 422 U. S. 490, 508 (1975); Sierra Club v. Morton, 405 U. S. 727, 740-741, n. 16 (1972);[1] and (b) "actual or imminent, not `conjectural' or `hypothetical,' " Whitmore, supra, at 155 (quoting Los Angeles v. Lyons, 461 U. S. 95, 102 (1983)). Second, there must be a causal connection between the injury and the conduct complained of—the injury has to be "fairly ... trace[able] to the challenged action of the defendant, and not ... th[e] result [of] the independent action of some third party not before the court." Simon v. Eastern Ky. Welfare 561*561 Rights Organization, 426 U. S. 26, 41-42 (1976). Third, it must be "likely," as opposed to merely "speculative," that the injury will be "redressed by a favorable decision." Id., at 38, 43.

To have a "live" issue after completion of construction of a project, at least one person would need to show they will personally suffer harm from existence of the completed project and that the harm can be remedied by removal of the project as in Columbia Basin Land Protection Assoc. v. Schlesinger. Individual injuries in NEPA cases may likely involve growth-inducing impacts such as air, noise, and water pollution, safety considerations, secondary impacts, and cumulative impacts; for example see Coalition for Canyon Preservation v. Bowers, 632 F.2d 774 (9th Cir. 1980). Proving individual injury prevents disqualification by an objection of "generalized grievance" as stated in Juliana v. US, 217 F. Supp. 3d 1224 (D. Or. 2016):

Standing alone, "the fact that a harm is widely shared does not necessarily render it a generalized grievance." Jewel, 673 F.3d at 909; see also Massachusetts v. EPA, 549 U.S. 497, 517 (2007) ("[I]t does not matter how many persons have been injured by the challenged action" so long as "the party bringing suit shows that the action injures him in a concrete and personal way." (quotation marks omitted and alterations normalized)); Akins, 524 U.S. at 24 ("[A]n injury . ... widely shared ... does not, by itself, automatically disqualify an interest for Article III purposes.

In determining whether a Federal court has the authority to decide a case (jurisdiction), Federal courts only consider the parts of a complaint supporting the federal issue cited.[37] This is referred to as the "well-pleaded" complaint rule. Parts of a complaint requesting removal of anticipated construction can be ignored by Federal courts since construction was not an actual controversy at the time the complaint was filed. Therefore, if project construction starts after a NEPA complaint is filed, the NEPA complaint will need to be amended or a new complaint filed to include the actual construction. Otherwise after construction is completed, a Federal court may find it no longer has authority (jurisdiction) to decide the case. The case would therefore be moot.

Courts balance the harm an injunction might cause to the defendant against the likelihood of environmental harms occurring and the degree of injury if the environmental harms occur. The U.S. Supreme Court pointed out the irreparable nature of environmental injuries in Amoco Production Co. v. Gambell, 480 U.S. 531, 107 S. Ct. 1396, 94 L. Ed. 2d 542 (1987) on page 545:

Environmental injury, by its nature, can seldom be adequately remedied by money damages and is often permanent or at least of long duration, i. e., irreparable. If such injury is sufficiently likely, therefore, the balance of harms will usually favor the issuance of an injunction to protect the environment.

Courts may discount the defendant's self-inflicted harm if construction was started before resolution of the environmental issues as in Davis v. Mineta, 302 F.3d 1104 (10th Cir. 2002) on page 1116:

We must next balance the irreparable harms we have identified against the harm to defendants if the preliminary injunction is granted. Defendants allege that significant financial penalties will be incurred by UDOT if the Project is delayed. * * * However, it appears that many of these costs may be self-inflicted. As we have previously concluded, the state entities involved in this case have "jumped the gun" on the environmental issues by entering into contractual obligations that anticipated a pro forma result. In this sense, the state defendants are largely responsible for their own harm.

Columbia Basin Land Protection Assoc. v. Schlesinger identified that allowing construction to moot NEPA cases frustrates the U.S. Congress intent. Therefore, In order to prevent NEPA cases from automatically becoming moot due to construction, NEPA complaints would need to request removal of bad faith constructions.

Council on Environmental Quality edit

The Council on Environmental Quality (CEQ) was modeled on the Council of Economic Advisers, an executive branch group created by the Employment Act of 1946 to advise the President on economic matters. Shortly after the CEQ was created by NEPA, President Richard Nixon expanded its mandate in executive order 11514. He directed the CEQ to issue guidelines for the proper preparation of an EIS and to assemble and coordinate federal programs related to environmental quality. The council was placed within the Executive Office of the President of the United States.[22] It is composed of three members appointed by the President and subsequently confirmed by the Senate.

The CEQ has played a key part in the development of the EIS process. Its initial guidelines issued in 1971 required each federal department and agency to adopt its own guidelines consistent with those established by CEQ. These guidelines did not carry the status of formal agency regulations, but were often treated with similar deference in the court of law. In 1977 President Jimmy Carter by executive order 11991[22] authorized the CEQ to adopt regulations rather than simple guidelines on EIS preparation. However, the CEQ still had no authority to enforce these regulations.

The CEQ has prepared advisory documentation in the last several years explaining the general structure of NEPA and the nature of cumulative impacts, among other advisories. The CEQ also maintains a Citizen's Guide to NEPA website as part of its ongoing duties.[26] CEQ regulations call for agencies and other federal actors to integrate NEPA requirements with other planning obligations as early as possible in the process. This is to ensure that all decisions are influenced by and reflective of environmental values. It also avoids potential delays and conflicts that could arise from imposing these requirements later in the rule-making process.Section 102(2)(C), which is NEPA's action-forcing provision, stipulates that with "every recommendation or report on proposals for legislation and other major Federal actions significantly affecting the quality of the human environment", all federal agencies shall include "a detailed statement by the responsible official ... on the environmental impact of the proposed action". This statement must specify all the details required for the EIS.[38]

Consequences for Violating the National Environmental Policy Act edit

Agencies that violate NEPA may suffer harms to their reputations that can jeopardize future funding opportunities. Because the CEQ does not have enforcement authority for their guidelines, alleged violations must generally go through the judicial system. These lawsuits can further harm the agencies by demanding money and resources from the federal government, and delay projects for years.[39] Several large projects have been shut down or cancelled as a result of such delays, like the planned Keystone XL Pipeline. The expansion was abandoned by TC Energy in 2021 after delays including the rejection of its review under NEPA, in the case Indigenous Environmental Network v. U.S. Department of State.[40] The most common consequence imposed by courts for violations of NEPA is a mandated repeat of whichever environmental review or report was found to have been insufficient.

National Environmental Policy Act and environmental justice edit

The National Environmental Policy Act promotes environmental justice by requiring federal agencies to include minority and low-income populations in their NEPA-mandated environmental analyses.[41] Executive Order #12898 requires federal agencies that are complying with NEPA to consider environmental effects on human health, and economic and social effects, specifically within minority and low-income populations, which are disproportionately impacted by environmental detriment.[42][43] Proposed federal actions must address "significant and adverse environmental effects" on minority and low-income populations.[42]

The Environmental Justice Interagency Working Group published the Promising Practice Report, which documents common methodologies used presented in NEPA to include environmental justice.[44]

Recent developments edit

'President Trump Announces Proposed National Environmental Policy Act Regulations' - video from White House, January 9, 2020

On August 15, 2017, President Donald Trump issued Executive Order (E.O.) 13807, "Establishing Discipline and Accountability in the Environmental Review and Permitting Process for Infrastructure Projects."[45] This executive order directs CEQ to use its "authority to interpret NEPA to simplify and accelerate the NEPA review process", requires agencies to "establish procedures for a regular review and update of categorical exclusions", and revokes President Obama's Executive Order 13690 addressing Flood Risk Management by including science on climate change.

In July 2020, Trump moved to significantly weaken the law. CEQ published a final rule which limits the duration of EAs to 1 year and EISs to 2 years. The rule also exempts a number of projects from review entirely and prevents the consideration of cumulative environmental impacts, including those caused by climate change.[46][47][48]

On April 20, 2022, CEQ issued the Phase 1 Final Rule to restore regulatory provisions that were in effect prior to the modifications made during the Trump administration.[49]

See also edit

References edit

  This article incorporates public domain material from Code of Federal Regulations

  This article incorporates public domain material from United States Code

  This article incorporates public domain material from judicial opinions or other documents created by the federal judiciary of the United States.

  1. ^ "To Pass H.R. 12549, A Bill to amend the Fish and Wildlife Coordination Act so as to provide for the establishment of a Council On Environmental Quality (Sep 23, 1969)". GovTrack. Civic Impulse, LLC. Retrieved 2017-03-27.
  2. ^ a b United States. National Environmental Policy Act of 1969. Pub. L.Tooltip Public Law (United States) 91–190, Approved January 1, 1970. 42 U.S.C. § 4321 et seq.
  3. ^ Eccleston, Charles H. (2008). NEPA and Environmental Planning: Tools, Techniques, and Approaches for Practitioners. CRC Press. ISBN 9780849375590.
  4. ^ a b Mandelker, Daniel; Glickman, Robert; Aughey, Arianne; McGillivray, Donald; Doelle, Meinhard (2018). NEPA Law and Litigation. Thomson Reuters. ISBN 978-0-314-87759-8.
  5. ^ a b U.S. Council on Environmental Quality (CEQ) (December 2007). A Citizen's Guide to the NEPA: Having Your Voice Heard. Washington, D.C. p. 2. Retrieved 2017-06-06 – via Office of NEPA Policy and Complicance, U.S. Department of Energy. energy.gov.{{cite book}}: CS1 maint: location missing publisher (link)
  6. ^ United States National Environmental Policy Act of 1969. Pub. L.Tooltip Public Law (United States) 91–190 Sec. 101(b)(1),(c), Approved January 1, 1970. 42 U.S.C. § 4331(b)(1),(c)
  7. ^ CEQ. "Terminology: Federal agency." Code of Federal Regulations, 40 CFR 1508.12.
  8. ^ Griswold, Eliza (2012-09-21). "How 'Silent Spring' Ignited the Environmental Movement". New York Times Magazine.
  9. ^ "The Cities: The Price of Optimism". Time. 1969-08-01. p. 41.
  10. ^ Mohl, Raymond A. (2004-07-01). "Stop the Road: Freeway Revolts in American Cities". Journal of Urban History. 30 (5): 674–706. doi:10.1177/0096144204265180. S2CID 110525363.
  11. ^ Thomas B. Robertson, Malthusian Moment: Global Population Growth and the Birth of American Environmentalism, p 167
  12. ^ RB Jai Alai, LLC v. Secretary of The Florida Department of Transportation, 112 F.Supp.3d 1301, 1307-1308 (M. D. Fla. 2015).
  13. ^ NEPA. 42 U.S.C. § 4331(a);1969 Congressional Record, Vol. 115, Page 26571 (remarks of Rep. John Dingell).
  14. ^ Senate Report No. 296, 91st Congress, 1st Sess. 8 (1969)
  15. ^ McGarity, Thomas O. (1977). "The Courts, the Agencies, and NEPA Threshold Issues". Texas Law Review. 55: 501, 855. (noting "a remarkable consensus of opinion" that the federal agencies contributed substantially to the country's degraded environmental state).
  16. ^ U.S. Council on Environmental Quality. "Part 1500—Purpose, Policy and Mandate." Code of Federal Regulations, 40 CFR 1500.1(a).
  17. ^ a b Kleppe v. Sierra Club, 427 U.S. 390 (1976) (citing 42 U.S.C. § 4331(b)).
  18. ^ Hammond, Frank (2023-08-16). "The NEPA Process". Law Offices Of Frank Hammond. Retrieved 2023-08-17.
  19. ^ Indigenous Environmental Network v. United States Department of State, CV-17-29-GF-BMM (Dist. Court, D. Montana, Great Falls Div. 2017).
  20. ^ CEQ. 40 CFR Parts 1500 to 1508 2012-02-17 at the Wayback Machine. Code of Federal Regulations.
  21. ^ CEQ (2007), A Citizen's Guide to the NEPA, pp. 8-11.
  22. ^ a b c d e "Executive Order No. 11514 as amended by Executive Order No. 11991 attached under United States Code Annotated (U.S.C.A.) 42 § 4321 on pages 5370-5372" (PDF). Office of the Law Revision Counsel. 2017. Retrieved 2018-10-27.
  23. ^ Robertson v. Methow Valley Citizens Council, 490 U.S. 332, 355 (Supreme Court of United States 1989) ("that CEQ regulations are entitled to substantial deference.").
  24. ^ "Part 1501: NEPA and Agency Planning" (PDF). US Fish and Wildlife Service. Retrieved 12 November 2018.   This article incorporates text from this source, which is in the public domain.
  25. ^ a b c "National Environmental Policy Act Review Process". U.S. Environmental Protection Agency. epa.gov. Retrieved 2017-06-06.
  26. ^ a b c d CEQ (2007), A Citizen's Guide to the NEPA, pp. 10-11.
  27. ^ "CEQ Guidance: Memorandum for Heads of Federal Departments and Agencies: Establishing, Applying and Revising Categorical Exclusions under the National Environmental Policy Act", 23 November 2010. Section: "Benchmarking Other Agencies' Experiences", p. 9. Council on Environmental Quality. U.S. Department of Energy. ceq.doe.gov. PDF file. Retrieved 2017-06-06.
  28. ^ The NEPA Task Force Report to the Council on Environmental Quality: Modernizing NEPA Implementation, page 57 (2003).
  29. ^ a b c d e f "Final Guidance for Federal Departments and Agencies on Establishing, Applying, and Revising Categorical Exclusions Under the National Environmental Policy Act". Federal Register. 75 (233). December 6, 2010.
  30. ^ Moriarty, Kevin (December 2004). "Circumventing the National Environmental Policy Act: Agency Abuse of the Categorical Exclusion" (PDF). N.Y.U. Law Review. 79 (6): 2312–2340. Retrieved 9 October 2018.
  31. ^ Eilperin, Juliet. "US exempted BP’s Gulf of Mexico drilling from environmental impact study." Washington Post 5 (2010 May 5)
  32. ^ Code of Federal Regulations, 40 CFR 1508.9.
  33. ^   This article incorporates text from this source, which is in the public domain. Western Watersheds Project v. Bennett, 392 F. Supp. 2d 1217, 1222 (D. Idaho 2005).
  34. ^ Eccleston, Charles H. (2014). The EIS Book: Managing and Preparing Environmental Impact Statements. Chapter 6. CRC Press. ISBN 1466583630.
  35. ^ Eccleston, Charles H. (2014). The EIS Book: Managing and Preparing Environmental Impact Statements. Chapter 4. CRC Press. ISBN 1466583630.
  36. ^ Hayashi, Yuka (2024-01-27). "Eager for Economic Wins, Biden to Announce Billions for Advanced Chips - Industry, lawmakers worry semiconductor production could take years because of negotiations, permitting and worker shortages". Wall Street Journal. The most immediate threat to the timely construction is the National Environmental Policy Act, which requires large federally funded projects to pass environmental review before grants are released, regardless of whether they have already obtained state and local government permits. Full NEPA reviews took an average of 4.5 years between 2013 and 2018, according to a federal government report.
  37. ^ Freer, Richard D.. Civil Procedure, Third Edition (Aspen Student Treatise Series) (Kindle Locations 5414-5516). Aspen Publishers (Wolters Kluwer Legal). Kindle Edition or pages 210-216 print edition.
  38. ^ (PDF). United States Senate Committee on Environment and Public Works. Archived from the original (PDF) on September 22, 2002.
  39. ^ "Possible Consequences of Not Following National Environmental Policy Act Process | FEMA.gov". www.fema.gov. Retrieved 2020-12-05.
  40. ^ Supp. 3d 561, Recent Case : 347 F. (2 June 2019). "Indigenous Environmental Network v. Department of State". harvardlawreview.org. Retrieved 2021-11-30.{{cite web}}: CS1 maint: numeric names: authors list (link)
  41. ^ EPA,OSWER,OAA,FFRRO, US. "EPA Insight Policy Paper: Executive Order #12898 on Environmental Justice". www.epa.gov. Retrieved 2017-04-22.{{cite web}}: CS1 maint: multiple names: authors list (link)
  42. ^ a b EPA,OSWER,OAA,FFRRO, US. "EPA Insight Policy Paper: Executive Order #12898 on Environmental Justice". www.epa.gov. Retrieved 2017-04-22.{{cite web}}: CS1 maint: multiple names: authors list (link)
  43. ^ Bullard, Robert D. (2000). Environmental Justice and Communities of Color. San Francisco: Sierra Club Books.
  44. ^ US EPA, OP (2015-03-19). "Environmental Justice and National Environmental Policy Act". US EPA. Retrieved 2021-06-26.
  45. ^   This article incorporates public domain material from websites or documents of the U.S. Government Publishing Office. President Donald Trump (August 24, 2017), Establishing Discipline and Accountability in the Environmental Review and Permitting Process for Infrastructure Projects (PDF), vol. 82, pp. 40463–40469, retrieved 2018-11-22
  46. ^ CEQ (2020-07-16). "Update to the Regulations Implementing the Procedural Provisions of the National Environmental Policy Act; Final rule." Federal Register, 85 FR 43304
  47. ^ Friedman, Lisa (2020-07-15). "Trump Weakens Major Conservation Law to Speed Construction Permits". The New York Times.
  48. ^ "Trump weakens environmental law to speed up infrastructure projects". 2020-07-15.
  49. ^ "NEPA | National Environmental Policy Act - CEQ NEPA Implementing Procedures".

Works cited

  • Sullivan, Thomas F. P. (2007). Environmental Law Handbook. Blue Ridge Summit, PA: Government Institutes/Scarecrow Press. ISBN 978-0-86587-024-6.

External links edit

  •   Works related to National Environmental Policy Act at Wikisource
  • National Environmental Policy Act of 1969 (PDF/details) as amended in the GPO Statute Compilations collection
  • Council on Environmental Quality -
  • U.S. Department of Energy - Office of NEPA Policy and Compliance
  • U.S. Federal Highway Administration - NEPA Documentation
  • Article on NEPA at HistoryLink
  • National Preservation Institute
  • National Environmental Policy Act - Full text

national, environmental, policy, nepa, fonsi, redirect, here, other, uses, nepa, disambiguation, fonsi, disambiguation, nepa, united, states, environmental, designed, promote, enhancement, environment, created, laws, requiring, federal, government, agencies, e. NEPA and FONSI redirect here For other uses see NEPA disambiguation and Fonsi disambiguation The National Environmental Policy Act NEPA is a United States environmental law designed to promote the enhancement of the environment It created new laws requiring U S federal government agencies to evaluate the environmental impacts of their actions and decisions and it established the President s Council on Environmental Quality CEQ The Act was passed by the U S Congress in December 1969 and signed into law by President Richard Nixon on January 1 1970 2 To date more than 100 nations around the world have enacted national environmental policies modeled after NEPA 3 National Environmental Policy Act of 1969Long titleNational Environmental Policy Act of 1969Acronyms colloquial NEPAEnacted bythe 91st United States CongressEffectiveJanuary 1 1970CitationsPublic lawPub L Tooltip Public Law United States 91 190Statutes at Large83 Stat 852CodificationTitles amended42 U S C Public Health and WelfareU S C sections created42 U S C 4321 et seq Legislative historyIntroduced in the Senate as S 1075 by Henry M Jackson D WA on February 18 1969Committee consideration by Senate Committee on Interior and Insular AffairsPassed the Senate on July 10 1969 Unanimous Passed the House of Representatives on September 23 1969 372 15 1 Reported by the joint conference committee on December 17 1969 agreed to by the Senate on December 20 1969 and by the House of Representatives on December 23 1969 Signed into law by President Richard Nixon on January 1 1970Major amendmentsPublic Law 94 52 July 3 1975 Public Law 94 83 Aug 9 1975 and Public Law 97 258 section 4 b Sep 13 1982United States Supreme Court casesUnited States v SCRAP 412 U S 669 1973 Aberdeen amp Rockfish R Co v SCRAP 422 U S 289 1975 Flint Ridge Development Co v Scenic Rivers Assn of Okla 426 U S 776 1976 Kleppe v Sierra Club 427 U S 390 1976 Andrus v Sierra Club 442 U S 347 1979 Strycker s Bay Neighborhood Council Inc v Karlen 444 U S 223 1980 Weinberger v Catholic Action of Haw Peace Ed Project 454 U S 139 1981 Metropolitan Edison Co v People Against Nuclear Energy 460 U S 766 1983 Baltimore Gas amp Electric Co v Natural Resources Defense Council Inc 462 U S 87 1983 Robertson v Methow Valley Citizens Council 490 U S 332 1989 Marsh v Oregon Natural Resources Council 490 U S 360 1989 Department of Transportation v Public Citizen 541 U S 752 2004 Norton v Southern Utah Wilderness Alliance 542 U S 55 2004 Winter v Natural Resources Defense Council 555 U S 7 2008 Monsanto Co v Geertson Seed Farms 561 U S 139 2010 NEPA requires Federal agencies to evaluate the environmental effects of their actions 4 2 3 NEPA s most significant outcome was the requirement that all executive Federal agencies prepare environmental assessments EAs and environmental impact statements EISs These reports state the potential environmental effects of proposed Federal agency actions 5 Further U S Congress recognizes that each person has a responsibility to preserve and enhance the environment as trustees for succeeding generations 6 NEPA s procedural requirements do not apply to the President Congress or the Federal courts since they are not a Federal agency by definition 5 7 However a Federal agency taking action under authority ordered by the President may be a final agency action subject to NEPA s procedural requirements 4 117 118 Contents 1 History 2 Contents 3 Process 3 1 Preparation of a Categorical Exclusion 3 2 Preparation of an Environmental Assessment and a Finding of No Significant Impact 3 3 Preparation of an Environmental Impact Statement 3 4 Average time for a full review 4 Mootness doctrine used to evade NEPA requirements 5 Council on Environmental Quality 6 Consequences for Violating the National Environmental Policy Act 7 National Environmental Policy Act and environmental justice 8 Recent developments 9 See also 10 References 11 External linksHistory edit nbsp Statewide leaders of Concerned Citizens for Clean Air and Clean Water present signatures of 70 000 Illinoisans in 1969 to Attorney General William J Scott The petitions supported Scott s crackdown on polluters Chairman Ed Ponder of Chicago presented the petitions nbsp Richard Nixon signing NEPA on January 1 1970 NEPA grew out of the increased public appreciation and concern for the environment that developed during the 1960s amid increased industrialization urban and suburban growth and pollution across the United States During this time environmental interest group efforts and the growing public awareness resulting from Rachel Carson s 1962 book Silent Spring led to support for the 1964 Wilderness Act and subsequent legislation including the 1970 Clean Air Act and 1972 Clean Water Act 8 The public outrage in reaction to the Santa Barbara oil spill in early 1969 occurred just as the NEPA legislation was being drafted in Congress A fire on the Cuyahoga River was publicized in a Time magazine article shortly after the unanimous vote in the Senate 9 Another major driver for enacting NEPA was the 1960s highway revolts a series of protests in many American cities that occurred in response to the bulldozing of many communities and ecosystems during the construction of the Interstate Highway System 10 In addition as the contribution of Indiana political scientist Lynton Caldwell shows concern for the environmental recklessness of international development programs in the 1950s and 1960s also drove the thinking behind NEPA 11 In 2015 a United States District Court provided a documented concise background of NEPA being created to protect the environment from actions involving the Federal government 12 as follows Following nearly a century of rapid economic expansion population growth industrialization and urbanization it had become clear by the late 1960s that American progress had an environmental cost 13 A congressional investigation into the matter yielded myriad evidence indicating a gross mismanagement of the country s environment and resources most notably at the hands of the federal government 14 15 As a result lawmakers and the general public alike called for an urgent and sweeping policy of environmental protection Congress answered these calls by enacting NEPA which has served as our basic national charter for protection of the environment since 1970 16 With NEPA Congress mandated that federal agencies take a hard look at the environmental consequences of their actions and to engage all practicable measures to prevent environmental harm when engaging in agency action 17 409 410 n 21 Furthermore to remedy the widespread mistrust of the federal agencies Congress incorporated within NEPA action forcing provisions which require agencies to follow specific procedures in order to accomplish any federal project 17 409 amp n 18 Since its passage NEPA has been applied to any major project whether on a federal state or local level that involves federal funding work performed by the federal government or permits issued by a federal agency 18 Court decisions have expanded the requirement for NEPA related environmental studies to include actions where permits issued by a federal agency are required regardless of whether federal funds are spent to implement the action to include actions that are entirely funded and managed by private sector entities where a federal permit is required This legal interpretation is based on the rationale that obtaining a permit from a federal agency requires one or more federal employees or contractors in some instances to process and approve a permit application inherently resulting in federal funds being expended to support the proposed action even if no federal funds are directly allocated to finance the particular action A U S District Court describes the need for even the President to have the NEPA analysis information before making a decision as follows No agency possesses discretion whether to comply with procedural requirements such as NEPA The relevant information provided by a NEPA analysis needs to be available to the public and the people who play a role in the decision making process This process includes the President And Congress has not delegated to the President the decision as to the route of any pipeline 19 Contents editThe preamble to NEPA reads To declare national policy which will encourage productive and enjoyable harmony between man and his environment to promote efforts which will prevent or eliminate damage to the environment and biosphere and stimulate the health and welfare of man to enrich the understanding of the ecological systems and natural resources important to the Nation and to establish a Council on Environmental Quality 2 NEPA contains three sections the first section outlines national environmental policies and goals the second establishes provisions for federal agencies to enforce such policies and goals and the third establishes the CEQ in the Executive Office of the President The purpose of NEPA is to ensure that environmental factors are weighted equally when compared to other factors in the decision making process undertaken by federal agencies and to establish a national environmental policy The act also promotes the CEQ to advise the President in the preparation of an annual report on the progress of federal agencies in implementing NEPA It also established the CEQ to advise the president on environmental policy and the state of the environment 20 NEPA establishes this national environmental policy by requiring federal agencies to prepare an environmental impact statement to accompany reports and recommendations for Congressional funding This impact statement is known as an EIS NEPA is an action forcing piece of legislation meaning the act itself does not carry any criminal or civil sanctions and therefore all enforcement of NEPA must occur through the court system In practice a project is required to meet NEPA guidelines when a federal agency provides any portion of financing for the project However review of a project by a federal employee can be viewed as a federal action and in such a case it requires NEPA compliant analysis performance NEPA covers a vast array of federal agency actions but the act does not apply to state action where there is a complete absence of federal influence or funding Exemptions and exclusions are also present within NEPA s guidelines including specific federal projects detailed in legislation and EPA exemptions Exemptions also apply when compliance with other environmental laws require an impact analysis similar to that mandated by NEPA Such laws can include but are not limited to the Clean Air Act Resource Conservation and Recovery Act Safe Drinking Water Act and the Federal Insecticide Fungicide and Rodenticide Act Process editThe NEPA process is the evaluation of the relevant environmental effects of a federal project or action mandated by NEPA This process begins when an agency develops a proposal addressing a need to take action If it is determined that the proposed action is covered under NEPA there are three levels of analysis that a federal agency must undertake to comply with the law These three levels include the preparation of a Categorical Exclusion CatEx an environmental assessment EA and either a Finding of No Significant Impact FONSI or alternatively the preparation and drafting of an environmental impact statement EIS 21 Executive Order No 11514 as amended by Executive Order No 11991 22 directs the Council on Environmental Quality CEQ to issue regulations to Federal agencies for the implementation of the procedural provisions of NEPA 22 5371 Sec 3 h and for Federal agencies to comply with the regulations issued by the Council 22 5371 Sec 2 g Importantly the Supreme Court of the United States finds that CEQ regulations are entitled to substantial deference 23 The Council on Environmental Quality s NEPA regulation 40 C F R 1501 4 specifies the process to determine whether to prepare an Environmental Impact Statement EIS as follows In determining whether to prepare an environmental impact statement the Federal agency shall a Determine under its procedures supplementing these regulations described in 1507 3 whether the proposal is one which 1 Normally requires an environmental impact statement or 2 Normally does not require either an environmental impact statement or an environmental assessment categorical exclusion b If the proposed action is not covered by paragraph a of this section prepare an environmental assessment 1508 9 The agency shall involve environmental agencies applicants and the public to the extent practicable in preparing assessments required by 1508 9 a 1 c Based on the environmental assessment make its determination whether to prepare an environmental impact statement d Commence the scoping process 1501 7 if the agency will prepare an environmental impact statement e Prepare a finding of no significant impact 1508 13 if the agency determines on the basis of the environmental assessment not to prepare a statement 1 The agency shall make the finding of no significant impact available to the affected public as specified in 1506 6 2 In certain limited circumstances which the agency may cover in its procedures under 1507 3 the agency shall make the finding of no significant impact available for public review including State and areawide clearinghouses for 30 days before the agency makes its final determination whether to prepare an environmental impact statement and before the action may begin The circumstances are i The proposed action is or is closely similar to one which normally requires the preparation of an environmental impact statement under the procedures adopted by the agency pursuant to 1507 3 or ii The nature of the proposed action is one without precedent 24 dd In addition to complying with the Council on Environmental Quality s NEPA regulations in 40 C F R 1500 through 1508 each Federal agency is required by 40 C F R 1507 3 a to adopt supplemental procedures for their agency s implementation of NEPA For example the Federal Highway Administration s supplemental NEPA procedures are in 23 C F R 771 101 through 771 131 According to 23 C F R 771 115 a Class I actions such as a new controlled access freeway or a highway project of four or more lanes on a new location significantly affect the environment and therefore require an Environmental Impact Statement According to 23 C F R 771 115 b and 771 117 c Class II actions such as construction of bicycle and pedestrian lanes planning noise barriers and landscaping normally do not individually or cumulatively have a significant environmental effect and therefore may be categorically exempt unless there are unusual circumstances as provided in 23 C F R 771 117 b According to 23 C F R 771 117 c all other actions are Class III actions requiring the preparation of an Environmental Assessment to determine the appropriate environmental document required Preparation of a Categorical Exclusion edit A Categorical Exclusion CatEx is a list of actions an agency has determined do not individually or cumulatively significantly affect the quality of the human environment 40 C F R 1508 4 If a proposed action is included in an agency s CatEx the agency must make sure that no extraordinary circumstances might cause the proposed action to affect the environment Extraordinary circumstances include effects on endangered species protected cultural sites and wetlands 25 26 If the proposed action is not included in the description provided in the CatEx an EA must be prepared 25 26 Actions similar to the proposed one may have been found to be environmentally neutral in previous EAs and their implementation and so an agency may amend their implementing regulations to include the action as a CatEx In this case the drafted agency procedures are published in the Federal Registerand a public comment period is required 25 26 An agency cannot rely on a CatEx prepared by a different agency to support a decision not to prepare an EA or EIS for a planned action however it may draw from another agency s experience with a comparable CatEx in seeking to substantiate a CatEx of its own 27 The Council on Environmental Quality CEQ created Categorical Exclusions to reduce paperwork 40 CFR 1500 4 p and reduce delay 40 CFR 1500 5 k so agencies can better concentrate on actions that do have significant effects on the human environment In 2003 the National Environmental Policy Task Force found agencies indicated some confusion about the level of analysis and documentation required to use an approved categorical exclusion 28 In 2010 CEQ issued guidance on the existing regulations for Categorical Exclusions consistent with NEPA and past CEQ guidance 29 This CEQ 2010 guidance acknowledges Since Federal agencies began using categorical exclusions in the late 1970s the number and scope of categorically excluded activities have expanded significantly Today categorical exclusions are the most frequently employed method of complying with NEPA underscoring the need for this guidance on the promulgation and use of categorical exclusions 29 75631 75632 This CEQ 2010 guidance goes on to caution If used inappropriately categorical exclusions can thwart NEPA s environmental stewardship goals by compromising the quality and transparency of agency environmental review and decisionmaking as well as compromising the opportunity for meaningful public participation and review 29 75632 Indeed the expanded use of Categorical Exclusions undermines NEPA by reducing environmental analysis and public comment thereby increasing NEPA litigation 30 The CEQ 2010 guidance emphasizes that Categorical Exclusions must capture the entire proposed action and not be used for a segment or an interdependent part of a larger proposed action 29 75632 Examples of Exceptional Circumstances that prevent use of Categorical Exclusions include where there are potential effects on protected species or habitat or on historic properties listed or eligible for listing in the National Register of Historic Places 29 75632 75633 The CEQ specifically cites the 2010 Deepwater Horizon oil spill as an example why agencies need to periodically review their Categorical Exclusions in light of evolving or changing conditions that might present new or different environmental impacts or risks 29 75637 Streamlining the NEPA process with categorical exclusions have been criticized for example allowing BP s exploration plan that resulted in the Deepwater Horizon oil spill to use a categorical exclusion instead of requiring an Environmental Impact Statement 31 Preparation of an Environmental Assessment and a Finding of No Significant Impact edit EAs are concise public documents that include the need for a proposal a list of alternatives and a list of agencies and persons consulted in the proposal s drafting The purpose of an EA is to determine the significance of the proposal s environmental outcomes and to look at alternatives of achieving the agency s objectives An EA is supposed to provide sufficient evidence and analysis for determining whether to prepare an EIS aid an agency s compliance with NEPA when no EIS is necessary and it facilitates preparing an EIS when one is necessary 32 Most agency procedures do not require public involvement prior to finalizing an EA document however agencies advise that a public comment period is considered at the draft EA stage EAs need to be of sufficient length to ensure that the underlying decision to prepare an EIS is legitimate but they should not attempt to substitute an EIS However the Council on Environmental Quality regulation 40 C F R 1500 1 b states NEPA procedures must insure that environmental information is available to public officials and citizens before decisions are made and before actions are taken Likewise 40 C F R 1500 2 states Federal agencies shall to the fullest extent possible d Encourage and facilitate public involvement in decisions which affect the quality of the human environment A U S District Court describes the essential requirement for public input on a draft EA as follows The Ninth Circuit has read these regulations to mean that the public must be given an opportunity to comment on draft EAs and EISs Anderson v Evans 371 F 3d 475 487 9th Cir 2004 Because the regulations must mean something the Circuit has held that an agency s failure to obtain any public input on a draft EA violates these regulations Citizens for Better Forestry v U S Dept of Agriculture 341 F 3d 961 970 9th Cir 2003 33 If no substantial effects on the environment are found after investigation and the drafting of an EA the agency must produce a Finding of No Significant Impact FONSI This document explains why an action will not have a significant effect on the human environment and includes the EA or a summary of the EA that supports the FONSI determination Preparation of an Environmental Impact Statement edit If it is determined that a proposed federal action does not fall within a designated CatEx or does not qualify for a FONSI then the responsible agency must prepare an EIS The purpose of an EIS is to help public officials make informed decisions based on the relevant environmental consequences and the alternatives available The drafting of an EIS includes public party outside party and other federal agency input concerning its preparation These groups subsequently comment on the draft EIS An EIS is required to describe the environmental impacts of the proposed action any adverse environmental impacts that cannot be avoided should the proposal be implemented the reasonable alternatives to the proposed action the relationship between local short term uses of man s environment along with the maintenance and enhancement of long term productivity and any irreversible and irretrievable commitments of resources that would be involved in the proposed action 34 An agency may undertake the drafting of an EIS without the initial drafting of the EA This may happen if the agency believes that the action will have a significant impact on the human or natural environment or if the action is considered an environmentally controversial issue The responsible decision maker is required to review the final EIS before reaching a final decision regarding the course of action to be taken The decision maker must weigh the potential environmental impacts along with other pertinent considerations in reaching the final decision A record of decision ROD is issued which records the agency s final decision 35 Average time for a full review edit A federal study from 2013 2018 found that a full NEPA review took an average of 4 5 years 36 Mootness doctrine used to evade NEPA requirements editThe Administrative Procedure Act at 5 U S C 702 provides the right for a person injured by a NEPA issue to carry out a NEPA case in court as A person suffering legal wrong because of agency action or adversely affected or aggrieved by agency action within the meaning of a relevant statute is entitled to judicial review thereof By 5 U S C 706 the U S Congress provides for courts to make equitable remedies such as an injunction to compel agency action withheld or to set aside agency actions that are arbitrary capricious an abuse of discretion or otherwise not in accordance with law However a court case becomes moot when no practical live issues remain as stated in Powell v McCormack 395 U S 486 1969 pages 496 497 Simply stated a case is moot when the issues presented are no longer live or the parties lack a legally cognizable interest in the outcome See E Borchard Declaratory 497 497 Judgments 35 37 2d ed 1941 Where one of the several issues presented becomes moot the remaining live issues supply the constitutional requirement of a case or controversy See United Public Workers v Mitchell 330 U S 75 86 94 1947 6A J Moore Federal Practice 57 13 2d ed 1966 In early NEPA cases for example Arlington Coalition on Transportation v Volpe 458 F 2d 1323 4th Cir 1972 page 1331 courts considered projects were beyond the reach of the courts moot if that project had progressed to where the costs of altering the project would outweigh benefits Nevertheless by 1981 the Ninth Circuit Court of Appeals recognized some projects might proceed with construction in an attempt to evade the requirements of NEPA Therefore the court cautioned that even completed projects could be ordered to be removed as stated in Columbia Basin Land Protection Assoc v Schlesinger 643 F 2d 585 9th Cir 1981 page 591 note 1 The building of the towers has not made the case hypothetical or abstract the towers still cross the fields of the Landowners continually obstructing their irrigation systems and this Court has the power to decide if they may stay or if they may have to be removed If the fact that the towers are built and operating were enough to make the case nonjusticiable as the dissent states then the BPA and all similar entities could merely ignore the requirements of NEPA build its structures before a case gets to court and then hide behind the mootness doctrine Such a result is not acceptable Thus courts have the equitable power to prevent those who use bad faith construction to evade U S Congress policies such as NEPA Despite a court recognizing the use of this mootness tactic a court still might not order removal of construction and remediation of the environment unless the NEPA complaint seeks removal and remediation in the request for relief as a live issue see dissenting opinion in West v Secretary of Dept of Transp 206 F 3d 920 9th Cir 2000 page 931 He did not seek remediation he wanted the interchange stopped It was built Therefore there is no justiciable controversy pertaining to Phase I If stopping construction is the only request for relief in a NEPA complaint then logically construction cannot be stopped after completion The 1st Circuit Court of Appeals in stopping construction of a seaport on Sears Island Maine pointed out that harm in NEPA cases is harm to the environment as stated in Sierra Club v Marsh 872 F 2d 497 1st Cir 1989 at page 500 Thus when a decision to which NEPA obligations attach is made without the informed environmental consideration that NEPA requires the harm that NEPA intends to prevent has been suffered the harm at stake is a harm to the environment but the harm consists of the added risk to the environment that takes place when governmental decisionmakers make up their minds without having before them an analysis with prior public comment of the likely effects of their decision upon the environment This court in Sierra Club v Marsh on page 504 also found since there is an instinct not to tear down projects it is appropriate to issue preliminary injunctions early in NEPA cases The way that harm arises may well have to do with the psychology of decisionmakers and perhaps a more deeply rooted human psychological instinct not to tear down projects once they are built But the risk implied by a violation of NEPA is that real environmental harm will occur through inadequate foresight and deliberation The difficulty of stopping a bureaucratic steam roller once started still seems to us after reading Village of Gambell a perfectly proper factor for a district court to take into account in assessing that risk on a motion for a preliminary injunction To have Article III standing to maintain a federal court case at least one individual plaintiff must have an injury caused by the defendant and that injury is likely to be remedied by a favorable decision as stated in Lujan v Defenders of Wildlife 504 U S 555 112 S Ct 2130 119 L Ed 2d 351 1992 on pages 560 561 Over the years our cases have established that the irreducible constitutional minimum of standing contains three elements First the plaintiff must have suffered an injury in fact an invasion of a legally protected interest which is a concrete and particularized see id at 756 Warth v Seldin 422 U S 490 508 1975 Sierra Club v Morton 405 U S 727 740 741 n 16 1972 1 and b actual or imminent not conjectural or hypothetical Whitmore supra at 155 quoting Los Angeles v Lyons 461 U S 95 102 1983 Second there must be a causal connection between the injury and the conduct complained of the injury has to be fairly trace able to the challenged action of the defendant and not th e result of the independent action of some third party not before the court Simon v Eastern Ky Welfare 561 561 Rights Organization 426 U S 26 41 42 1976 Third it must be likely as opposed to merely speculative that the injury will be redressed by a favorable decision Id at 38 43 To have a live issue after completion of construction of a project at least one person would need to show they will personally suffer harm from existence of the completed project and that the harm can be remedied by removal of the project as in Columbia Basin Land Protection Assoc v Schlesinger Individual injuries in NEPA cases may likely involve growth inducing impacts such as air noise and water pollution safety considerations secondary impacts and cumulative impacts for example see Coalition for Canyon Preservation v Bowers 632 F 2d 774 9th Cir 1980 Proving individual injury prevents disqualification by an objection of generalized grievance as stated in Juliana v US 217 F Supp 3d 1224 D Or 2016 Standing alone the fact that a harm is widely shared does not necessarily render it a generalized grievance Jewel 673 F 3d at 909 see also Massachusetts v EPA 549 U S 497 517 2007 I t does not matter how many persons have been injured by the challenged action so long as the party bringing suit shows that the action injures him in a concrete and personal way quotation marks omitted and alterations normalized Akins 524 U S at 24 A n injury widely shared does not by itself automatically disqualify an interest for Article III purposes In determining whether a Federal court has the authority to decide a case jurisdiction Federal courts only consider the parts of a complaint supporting the federal issue cited 37 This is referred to as the well pleaded complaint rule Parts of a complaint requesting removal of anticipated construction can be ignored by Federal courts since construction was not an actual controversy at the time the complaint was filed Therefore if project construction starts after a NEPA complaint is filed the NEPA complaint will need to be amended or a new complaint filed to include the actual construction Otherwise after construction is completed a Federal court may find it no longer has authority jurisdiction to decide the case The case would therefore be moot Courts balance the harm an injunction might cause to the defendant against the likelihood of environmental harms occurring and the degree of injury if the environmental harms occur The U S Supreme Court pointed out the irreparable nature of environmental injuries in Amoco Production Co v Gambell 480 U S 531 107 S Ct 1396 94 L Ed 2d 542 1987 on page 545 Environmental injury by its nature can seldom be adequately remedied by money damages and is often permanent or at least of long duration i e irreparable If such injury is sufficiently likely therefore the balance of harms will usually favor the issuance of an injunction to protect the environment Courts may discount the defendant s self inflicted harm if construction was started before resolution of the environmental issues as in Davis v Mineta 302 F 3d 1104 10th Cir 2002 on page 1116 We must next balance the irreparable harms we have identified against the harm to defendants if the preliminary injunction is granted Defendants allege that significant financial penalties will be incurred by UDOT if the Project is delayed However it appears that many of these costs may be self inflicted As we have previously concluded the state entities involved in this case have jumped the gun on the environmental issues by entering into contractual obligations that anticipated a pro forma result In this sense the state defendants are largely responsible for their own harm Columbia Basin Land Protection Assoc v Schlesinger identified that allowing construction to moot NEPA cases frustrates the U S Congress intent Therefore In order to prevent NEPA cases from automatically becoming moot due to construction NEPA complaints would need to request removal of bad faith constructions Council on Environmental Quality editThis section needs additional citations for verification Please help improve this article by adding citations to reliable sources in this section Unsourced material may be challenged and removed Find sources National Environmental Policy Act news newspapers books scholar JSTOR June 2017 Learn how and when to remove this template message The Council on Environmental Quality CEQ was modeled on the Council of Economic Advisers an executive branch group created by the Employment Act of 1946 to advise the President on economic matters Shortly after the CEQ was created by NEPA President Richard Nixon expanded its mandate in executive order 11514 He directed the CEQ to issue guidelines for the proper preparation of an EIS and to assemble and coordinate federal programs related to environmental quality The council was placed within the Executive Office of the President of the United States 22 It is composed of three members appointed by the President and subsequently confirmed by the Senate The CEQ has played a key part in the development of the EIS process Its initial guidelines issued in 1971 required each federal department and agency to adopt its own guidelines consistent with those established by CEQ These guidelines did not carry the status of formal agency regulations but were often treated with similar deference in the court of law In 1977 President Jimmy Carter by executive order 11991 22 authorized the CEQ to adopt regulations rather than simple guidelines on EIS preparation However the CEQ still had no authority to enforce these regulations The CEQ has prepared advisory documentation in the last several years explaining the general structure of NEPA and the nature of cumulative impacts among other advisories The CEQ also maintains a Citizen s Guide to NEPA website as part of its ongoing duties 26 CEQ regulations call for agencies and other federal actors to integrate NEPA requirements with other planning obligations as early as possible in the process This is to ensure that all decisions are influenced by and reflective of environmental values It also avoids potential delays and conflicts that could arise from imposing these requirements later in the rule making process Section 102 2 C which is NEPA s action forcing provision stipulates that with every recommendation or report on proposals for legislation and other major Federal actions significantly affecting the quality of the human environment all federal agencies shall include a detailed statement by the responsible official on the environmental impact of the proposed action This statement must specify all the details required for the EIS 38 Consequences for Violating the National Environmental Policy Act editAgencies that violate NEPA may suffer harms to their reputations that can jeopardize future funding opportunities Because the CEQ does not have enforcement authority for their guidelines alleged violations must generally go through the judicial system These lawsuits can further harm the agencies by demanding money and resources from the federal government and delay projects for years 39 Several large projects have been shut down or cancelled as a result of such delays like the planned Keystone XL Pipeline The expansion was abandoned by TC Energy in 2021 after delays including the rejection of its review under NEPA in the case Indigenous Environmental Network v U S Department of State 40 The most common consequence imposed by courts for violations of NEPA is a mandated repeat of whichever environmental review or report was found to have been insufficient National Environmental Policy Act and environmental justice editThe National Environmental Policy Act promotes environmental justice by requiring federal agencies to include minority and low income populations in their NEPA mandated environmental analyses 41 Executive Order 12898 requires federal agencies that are complying with NEPA to consider environmental effects on human health and economic and social effects specifically within minority and low income populations which are disproportionately impacted by environmental detriment 42 43 Proposed federal actions must address significant and adverse environmental effects on minority and low income populations 42 The Environmental Justice Interagency Working Group published the Promising Practice Report which documents common methodologies used presented in NEPA to include environmental justice 44 Recent developments edit source source source source source source source track President Trump Announces Proposed National Environmental Policy Act Regulations video from White House January 9 2020On August 15 2017 President Donald Trump issued Executive Order E O 13807 Establishing Discipline and Accountability in the Environmental Review and Permitting Process for Infrastructure Projects 45 This executive order directs CEQ to use its authority to interpret NEPA to simplify and accelerate the NEPA review process requires agencies to establish procedures for a regular review and update of categorical exclusions and revokes President Obama s Executive Order 13690 addressing Flood Risk Management by including science on climate change In July 2020 Trump moved to significantly weaken the law CEQ published a final rule which limits the duration of EAs to 1 year and EISs to 2 years The rule also exempts a number of projects from review entirely and prevents the consideration of cumulative environmental impacts including those caused by climate change 46 47 48 On April 20 2022 CEQ issued the Phase 1 Final Rule to restore regulatory provisions that were in effect prior to the modifications made during the Trump administration 49 See also editClimate justice Environmental impact assessment Environmental impact report Environmental policy of the United StatesReferences edit nbsp This article incorporates public domain material from Code of Federal Regulations nbsp This article incorporates public domain material from United States Code nbsp This article incorporates public domain material from judicial opinions or other documents created by the federal judiciary of the United States To Pass H R 12549 A Bill to amend the Fish and Wildlife Coordination Act so as to provide for the establishment of a Council On Environmental Quality Sep 23 1969 GovTrack Civic Impulse LLC Retrieved 2017 03 27 a b United States National Environmental Policy Act of 1969 Pub L Tooltip Public Law United States 91 190 Approved January 1 1970 42 U S C 4321 et seq Eccleston Charles H 2008 NEPA and Environmental Planning Tools Techniques and Approaches for Practitioners CRC Press ISBN 9780849375590 a b Mandelker Daniel Glickman Robert Aughey Arianne McGillivray Donald Doelle Meinhard 2018 NEPA Law and Litigation Thomson Reuters ISBN 978 0 314 87759 8 a b U S Council on Environmental Quality CEQ December 2007 A Citizen s Guide to the NEPA Having Your Voice Heard Washington D C p 2 Retrieved 2017 06 06 via Office of NEPA Policy and Complicance U S Department of Energy energy gov a href Template Cite book html title Template Cite book cite book a CS1 maint location missing publisher link United States National Environmental Policy Act of 1969 Pub L Tooltip Public Law United States 91 190 Sec 101 b 1 c Approved January 1 1970 42 U S C 4331 b 1 c CEQ Terminology Federal agency Code of Federal Regulations 40 CFR 1508 12 Griswold Eliza 2012 09 21 How Silent Spring Ignited the Environmental Movement New York Times Magazine The Cities The Price of Optimism Time 1969 08 01 p 41 Mohl Raymond A 2004 07 01 Stop the Road Freeway Revolts in American Cities Journal of Urban History 30 5 674 706 doi 10 1177 0096144204265180 S2CID 110525363 Thomas B Robertson Malthusian Moment Global Population Growth and the Birth of American Environmentalism p 167 RB Jai Alai LLC v Secretary of The Florida Department of Transportation 112 F Supp 3d 1301 1307 1308 M D Fla 2015 NEPA 42 U S C 4331 a 1969 Congressional Record Vol 115 Page 26571 remarks of Rep John Dingell Senate Report No 296 91st Congress 1st Sess 8 1969 McGarity Thomas O 1977 The Courts the Agencies and NEPA Threshold Issues Texas Law Review 55 501 855 noting a remarkable consensus of opinion that the federal agencies contributed substantially to the country s degraded environmental state U S Council on Environmental Quality Part 1500 Purpose Policy and Mandate Code of Federal Regulations 40 CFR 1500 1 a a b Kleppe v Sierra Club 427 U S 390 1976 citing 42 U S C 4331 b Hammond Frank 2023 08 16 The NEPA Process Law Offices Of Frank Hammond Retrieved 2023 08 17 Indigenous Environmental Network v United States Department of State CV 17 29 GF BMM Dist Court D Montana Great Falls Div 2017 CEQ 40 CFR Parts 1500 to 1508 Archived 2012 02 17 at the Wayback Machine Code of Federal Regulations CEQ 2007 A Citizen s Guide to the NEPA pp 8 11 a b c d e Executive Order No 11514 as amended by Executive Order No 11991 attached under United States Code Annotated U S C A 42 4321 on pages 5370 5372 PDF Office of the Law Revision Counsel 2017 Retrieved 2018 10 27 Robertson v Methow Valley Citizens Council 490 U S 332 355 Supreme Court of United States 1989 that CEQ regulations are entitled to substantial deference Part 1501 NEPA and Agency Planning PDF US Fish and Wildlife Service Retrieved 12 November 2018 nbsp This article incorporates text from this source which is in the public domain a b c National Environmental Policy Act Review Process U S Environmental Protection Agency epa gov Retrieved 2017 06 06 a b c d CEQ 2007 A Citizen s Guide to the NEPA pp 10 11 CEQ Guidance Memorandum for Heads of Federal Departments and Agencies Establishing Applying and Revising Categorical Exclusions under the National Environmental Policy Act 23 November 2010 Section Benchmarking Other Agencies Experiences p 9 Council on Environmental Quality U S Department of Energy ceq doe gov PDF file Retrieved 2017 06 06 The NEPA Task Force Report to the Council on Environmental Quality Modernizing NEPA Implementation page 57 2003 a b c d e f Final Guidance for Federal Departments and Agencies on Establishing Applying and Revising Categorical Exclusions Under the National Environmental Policy Act Federal Register 75 233 December 6 2010 Moriarty Kevin December 2004 Circumventing the National Environmental Policy Act Agency Abuse of the Categorical Exclusion PDF N Y U Law Review 79 6 2312 2340 Retrieved 9 October 2018 Eilperin Juliet US exempted BP s Gulf of Mexico drilling from environmental impact study Washington Post 5 2010 May 5 Code of Federal Regulations 40 CFR 1508 9 nbsp This article incorporates text from this source which is in the public domain Western Watersheds Project v Bennett 392 F Supp 2d 1217 1222 D Idaho 2005 Eccleston Charles H 2014 The EIS Book Managing and Preparing Environmental Impact Statements Chapter 6 CRC Press ISBN 1466583630 Eccleston Charles H 2014 The EIS Book Managing and Preparing Environmental Impact Statements Chapter 4 CRC Press ISBN 1466583630 Hayashi Yuka 2024 01 27 Eager for Economic Wins Biden to Announce Billions for Advanced Chips Industry lawmakers worry semiconductor production could take years because of negotiations permitting and worker shortages Wall Street Journal The most immediate threat to the timely construction is the National Environmental Policy Act which requires large federally funded projects to pass environmental review before grants are released regardless of whether they have already obtained state and local government permits Full NEPA reviews took an average of 4 5 years between 2013 and 2018 according to a federal government report Freer Richard D Civil Procedure Third Edition Aspen Student Treatise Series Kindle Locations 5414 5516 Aspen Publishers Wolters Kluwer Legal Kindle Edition or pages 210 216 print edition National Environmental Policy Act of 1969 PDF United States Senate Committee on Environment and Public Works Archived from the original PDF on September 22 2002 Possible Consequences of Not Following National Environmental Policy Act Process FEMA gov www fema gov Retrieved 2020 12 05 Supp 3d 561 Recent Case 347 F 2 June 2019 Indigenous Environmental Network v Department of State harvardlawreview org Retrieved 2021 11 30 a href Template Cite web html title Template Cite web cite web a CS1 maint numeric names authors list link EPA OSWER OAA FFRRO US EPA Insight Policy Paper Executive Order 12898 on Environmental Justice www epa gov Retrieved 2017 04 22 a href Template Cite web html title Template Cite web cite web a CS1 maint multiple names authors list link a b EPA OSWER OAA FFRRO US EPA Insight Policy Paper Executive Order 12898 on Environmental Justice www epa gov Retrieved 2017 04 22 a href Template Cite web html title Template Cite web cite web a CS1 maint multiple names authors list link Bullard Robert D 2000 Environmental Justice and Communities of Color San Francisco Sierra Club Books US EPA OP 2015 03 19 Environmental Justice and National Environmental Policy Act US EPA Retrieved 2021 06 26 nbsp This article incorporates public domain material from websites or documents of the U S Government Publishing Office President Donald Trump August 24 2017 Establishing Discipline and Accountability in the Environmental Review and Permitting Process for Infrastructure Projects PDF vol 82 pp 40463 40469 retrieved 2018 11 22 CEQ 2020 07 16 Update to the Regulations Implementing the Procedural Provisions of the National Environmental Policy Act Final rule Federal Register 85 FR 43304 Friedman Lisa 2020 07 15 Trump Weakens Major Conservation Law to Speed Construction Permits The New York Times Trump weakens environmental law to speed up infrastructure projects 2020 07 15 NEPA National Environmental Policy Act CEQ NEPA Implementing Procedures Works cited Sullivan Thomas F P 2007 Environmental Law Handbook Blue Ridge Summit PA Government Institutes Scarecrow Press ISBN 978 0 86587 024 6 External links edit nbsp Works related to National Environmental Policy Act at Wikisource National Environmental Policy Act of 1969 PDF details as amended in the GPO Statute Compilations collection Council on Environmental Quality NEPAnet resource page U S Department of Energy Office of NEPA Policy and Compliance U S Federal Highway Administration NEPA Documentation Article on NEPA at HistoryLink National Preservation Institute National Environmental Policy Act Full text Portals nbsp United States nbsp Environment nbsp Law Retrieved from https en wikipedia org w index php title National Environmental Policy Act amp oldid 1202431851, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.