fbpx
Wikipedia

Midland and Great Northern Joint Railway

The Midland and Great Northern Joint Railway (M&GNJR) was a railway network in England, in the area connecting southern Lincolnshire, the Isle of Ely and north Norfolk. It developed from several local independent concerns and was incorporated in 1893. It was jointly owned by the Midland Railway and the Great Northern Railway, and those companies had long sponsored and operated the predecessor companies.

Midland and Great Northern
Joint Railway
Overview
StatusDefunct
LocaleEast of England
Service
TypeRegional rail
History
Opened1893
Closed1959
Technical
Track length180 miles (290 km)
Track gauge4 ft 8+12 in (1,435 mm)

The area directly served was agricultural and sparsely populated, but seaside holidays had developed and the M&GNJR ran many long-distance express trains to and from the territory of the parent companies, as well as summer local trains for holidaymakers. It had the longest mileage of any joint railway in the United Kingdom.[1][page needed]

In the grouping of 1923, the two joint owners of the M&GNJR were absorbed into two separate companies (the Midland into the London, Midland and Scottish Railway and the Great Northern into the London and North Eastern Railway). The M&GNJR maintained a distinct identity which only formally ended with nationalisation in 1948. After 1945 the profitability of the network declined steeply, worsened by the seasonality of the business. It was duplicated by other lines and the decision was taken to close it. Most of the network closed in 1959, although some limited sections continued in use. Only a short section near Sheringham is in commercial use today, but the North Norfolk Railway is active as a heritage line.[2][page needed][3][page needed][4][page needed]

First railways

The area eventually served by the Midland and Great Northern Joint Railway, taken as south Lincolnshire and north Norfolk, was late to be supplied with railway connections due to being sparsely-populated fenland. The Great Northern Railway (GNR), running north through Huntingdon, Peterborough and on to Grantham, so forming the western edge of the area, was not authorised until 1846 and not opened until 1848 between Peterborough and Lincoln. The Eastern Counties Railway (ECR), authorised in 1836, aspired to reach Norwich and Yarmouth, but ran out of money and stopped short.

In frustration local people obtained Parliamentary authority for the Yarmouth and Norwich Railway in 1842. Running via Reedham it opened to the public on 1 May 1844. In 1845 railway mania was underway, and a myriad of railway schemes was put before Parliament. Many of these foundered there, or were authorised but failed to generate investors' commitment.

By 1850 the ECR had recovered from its financial difficulties of 1836 and had connected practically every town of importance in East Anglia into its system. For some years the ECR had successfully resisted the promotion of independent railways in its area but this could not continue indefinitely, and some local lines began to obtain authorisation.

The East Anglian Railways company was an amalgamation of three earlier companies, the Lynn and Dereham Railway, the Lynn and Ely Railway and the Ely and Huntingdon Railway. The company became bankrupt early in 1851 and the GNR, operating the East Coast Main Line at Peterborough, leased the line. Using running powers between its line at Peterborough and March over the ECR, it intended to connect to King's Lynn via the Wisbech line of the East Anglian Railway. However the powers acquired from Parliament did not include a short section between the two companies' stations at Wisbech, and the scheme foundered. The GNR sold the line on to the ECR in 1852.[4][page needed][5][page needed][6][page needed]

The financial performance of the ECR declined over the years and in 1862 it was absorbed into the new Great Eastern Railway (GER).

Constituents of the M&GNJR

 
The western section of the later M&GNJR

The ultimate formation of the M&GNJR resulted from the fusion of numerous local schemes, though they did not at first aspire to form a connected railway.

Norwich and Spalding Railway

On 4 August 1853 the Norwich and Spalding Railway obtained its Act for a line from Spalding to Sutton Bridge, and from there to Wisbech. Notwithstanding the company's title, reaching Norwich was an (unfulfilled) aspiration for later rather than an immediate intention. The Act stipulated that the other parts of the proposed Norwich and Spalding system could not be opened unless genuine progress was being made with the Wisbech connection.[2][page needed][3][page needed]

In fact at this time the money market was particularly difficult, partly because of the Crimean War, and the company was unable to attract enough investment. It only managed to build from Spalding to Holbeach, 7+12 miles (12 km), opening to Holbeach for goods on 9 August 1858 and for passengers on 15 November 1858. The Wisbech stipulation appears to have been overlooked for the time being.

The line connected with the Great Northern Railway at Spalding and the GNR agreed to work the line for three years. There were four trains daily except Sundays, with one extra on Tuesdays.[2][page needed][4][page needed]

 
The eastern section of the later M&GNJR

The company obtained a further authorising Act to extend from Holbeach to Sutton Bridge, as the earlier powers had expired. Wisbech was omitted this time, but the Act stipulated that no dividend might be declared unless the company proceeded with the promotion of the Wisbech line in Parliament. This was attempted in 1860 but rejected in Parliament, and again in 1862 and 1863. The GNR agreed to extend the working arrangement to ten years from 1 November 1861 for 50% of receipts and to carry out some permanent way improvements on the original section. The Sutton Bridge station was on the site of the later goods station, west of the River Nene. The extension to Holbeach was completed and opened on 1 July 1862.[2][page needed][4][page needed][3][page needed]

Peterborough, Wisbech and Sutton Bridge

The line connecting Wisbech[note 1] to Sutton Bridge was considered important because Sutton Bridge was an important inland port further downstream on the River Nene than Wisbech port. Wisbech would have been reached by a southward branch of the Norwich and Spalding Railway, but now an alternative means of making the connection was brought forward. On 28 July 1863 the authorising Act for the Peterborough, Wisbech and Sutton Bridge Railway was passed. Capital was to be £180,000. In 1871 Richard Young a local shipowner (and later director of the Great Eastern Railway) was chairman of the company.[8] The Eastern Counties Railway had just been transformed into the Great Eastern Railway, and powers were to be sought by the PW&SBR to connect to the GER line at Wisbech. The Norwich and Spalding Railway was given running powers between Sutton Bridge and Wisbech. It was the Midland Railway, not the GNR, that secured the contract for operating the new railway for 50% of receipts.[9][4][page needed][3][page needed]

Lynn and Sutton Bridge Railway

The next section of the future M&GNJR to be built was the Lynn and Sutton Bridge Railway, which was authorised on 6 August 1861 with capital of £100,000.[2][page needed][3][page needed] It was to connect with the Eastern Counties Railway (soon to be GER) at South Lynn, near the major port of King's Lynn. The authorisation obliged the company to construct a new rail and road bridge at Sutton Bridge, but this was modified by an Act in 1863 which permitted the railway to purchase the existing road swing bridge, built in 1850, and adapt it for railway use as well.[4][page needed] The line was opened for goods traffic throughout in November 1864 from a junction some distance south of King's Lynn station. Passenger trains provided by the GNR began on 1 March 1866.[2][page needed][1][page needed]

Spalding and Bourn Railway

On 29 July 1862 the Spalding and Bourn Railway[note 2] was authorised, also with capital of £100,000. This line was to make an end-on junction at Bourne with an offshoot of the GNR, the Bourne and Essendine Railway. The line was opened on 1 August 1866. It ran through practically unpopulated terrain. The GNR worked the line.[2][page needed][3][page needed]

PW&SBR extending to Wisbech

The Peterborough, Wisbech and Sutton Bridge Railway now in 1864 got authorisation to make a connecting line at Wisbech to the GER line, and to the harbour. The connection to the GER was in fact not made. On 1 August 1866 its main line opened for traffic. At Peterborough it started from the Midland Railway lines, on the west side of the GNR main line, and crossed both the Midland and GNR track by a bridge. The line was 27 miles (43 km) in length, to a junction at Sutton Bridge. The Midland Railway worked the trains, working to and from the GER station at Peterborough and calling at the GNR station en route.[2][page needed]

Rivalry between the GNR and the GER

The Great Eastern Railway (GER) was formed on 7 August 1862, from the Eastern Counties Railway and other concerns. The GER made it clear, not least by bitter parliamentary struggles, to get authorisation for its own line or for running powers to get to Doncaster. Considerable quantities of coal were being brought south from the South Yorkshire Coalfield by the GNR, and the GER sought to take a share of the traffic. Fearing that this might happen, suddenly giving the GER a monopoly of the coal traffic to East Anglia, the GNR started to sponsor friendly railways in the area itself.[2][page needed]

Midland and Eastern Railway

 
Spalding and Sutton Bridge railways in 1866

The Lynn and Sutton Bridge Railway and the Spalding and Bourn Railway amalgamated to form the Midland and Eastern Railway in 1866; the intention was to push westward to Saxby and join the Midland Railway there. This plan was opposed by the Great Northern Railway and the compromise was that the scheme was dropped, but that the Midland Railway was given running powers from over two GNR-sponsored lines: from Bourne to Essendine, and (by reversing there) from Essendine to Stamford; this was not a direct or fast route. The arrangement was agreed, and ratified by the Midland and Eastern Railway Act of 23 July 1866.[3][page needed] The Midland and Eastern Railway was operated by the GNR and the Midland jointly, authorised by an Act of 1867.[2][page needed][4][page needed]

The Midland and Eastern Railway leased the Norwich and Spalding line, but the N&SR remained nominally independent until 1 July 1877.[3][page needed] It needed to go to Parliament to plead that it had, in good faith, tried to make a Sutton to Wisbech line, but had been prevented; and that the line had in fact been pre-empted by the PB&SBR; this was accepted and the M&SR was released from the prohibition on declaring a dividend. The Midland and Eastern Railway now effectively controlled the whole of the western section of the future M&GNJR, except for the Peterborough to Sutton Bridge line, which was still controlled by the Midland Railway.[2][page needed]

The Midland and Eastern was jointly owned by the GNR and the Midland Railway, but it operated more or less independently. The Joint Committee did not meet between 1867 and 1880; trains of the two owning companies ran their own trains on the lines. In this period the network was referred to as the Bourne and Lynn Joint Railway.[2][page needed]

GN and GE Joint Line

For several years the Great Eastern Railway had been trying to get access to northern districts, and had been frustrated by the Great Northern Railway's opposition. Nevertheless, the GER repeatedly presented bills for such lines, and the GNR calculated that it was only a matter of time until it was successful. This policy came to fruition in April 1878 during parliamentary hearings on a GER bill, and negotiations were set in place to establish what became the Great Northern and Great Eastern Joint Line, forming a through route from Doncaster to March via Lincoln.

The GNR and the Midland Railway had hitherto dominated the southward flow of Nottinghamshire and South Yorkshire coal, and saw that the dominance was vulnerable. This led the GNR and the Midland to look favourably at further development of the Bourne and Lynn Joint Railway (Midland and Eastern Railway).[2][page needed]

Sutton Bridge Dock failure

In 1875 parliamentary sanction was obtained by an independent shipping company to develop Sutton Dock. Wisbech had traditionally been used as an inland port, but a Sutton Bridge Dock, connected to the railway network, could be advantageous, saving part of the difficult navigation up the River Nene. The GNR subscribed £20,000, calculating that this could be an export point for coal. The dock opened on 14 May 1881, and a short branch railway had been constructed to serve it. The day after the opening it was observed that the lock gates were not watertight, and in fact a general failure of the wall of the dock took place.[12] Ships that had entered the dock were got away, but repairs to the dock were said to be impracticable, and the dock was not used again; the GNR had by then expended £55,000 on an unusable dock system.[2][page needed]

In the east

Great Yarmouth and Stalham Light Railway

 
Railways around King's Lynn in 1879

Further east, it was not until 1876 that the first railway section of the future M&GNJR was approved: the Great Yarmouth and Stalham Light Railway[note 3] was authorised on 27 June 1876;[note 4] capital was £98,000. The line would run northwest for 16 miles (26 km); the Great Yarmouth terminal, later to be known as Yarmouth Beach, was well situated for holidaymakers, but at this stage there was no connection to other railways. The first section, to Ormesby, was opened on 7 August 1877.

From Ormesby to Hemsby opened on 16 May 1878, but there was a legal argument about a level crossing at Hemsby, and the next section to Martham opened from a temporary station north of the level crossing, on 15 July 1878. A temporary station south of the crossing was used from October. The legal position was resolved in Parliament in July 1879 and the permanent Hemsby station opened, and the two temporary stations closed.[2][page needed]

Meanwhile, on 27 May 1878 the company got powers to extend to North Walsham, and to change its name to the Yarmouth and North Norfolk Light Railway, with additional capital of £60,000.[2][page needed] Its status as a light railway was designed to prevent the Great Eastern Railway from acquiring running powers over the line.[4][page needed] Successive openings took place: to Catfield on 17 January 1880 and on to Stalham on 3 July 1880.[2][page needed][3][page needed]

Lynn and Fakenham Railway

 
Railways around King's Lynn in 1885

On 13 July 1876 the Lynn and Fakenham Railway was authorised by Parliament, in the face of bitter opposition by GER interests. With capital of £150,000 it was to run from GER-influenced connections near King's Lynn to near Fakenham. Surprisingly, the GER made no attempt to take control of this line, in fact making obstructions to the construction process. It was opened to Massingham on 16 August 1879, extending to Fakenham on 16 August 1880.[2][page needed][3][page needed][1][page needed]

On 12 August 1880 the Lynn and Fakenham got approval to extend to Norwich, creating a much sought-after independent line to the city. The line was to pass through Melton Constable, and from that place there was to be a branch to Blakeney Harbour. On 11 August 1881 the Lynn and Fakenham and the Yarmouth and North Norfolk companies together managed at last to get powers to build from Melton Constable to North Walsham, which would connect their systems. In the same Act the Lynn and Fakenham got powers to build from Kelling to Cromer (not actually built), and the Yarmouth and North Norfolk was converted from a light railway to a full system, avoiding the speed and weight restrictions imposed by light railway status. The L&FR opened from Fakenham to Guestwick on 19 January 1882, and from there to Lenwade on 1 July 1882. The final section to Norwich was opened on 2 December 1882. The Norwich station was named Norwich City from the outset. Melton to North Walsham was opened on 5 April 1883.[4][page needed][2][page needed]

Yarmouth Union Railway

This short line, 1 mile 2 chains (1.65 km) long, was authorised on 26 August 1880, to extend from the Yarmouth and North Norfolk station at Yarmouth Beach to the quay, where it became effectively a tramway, joining the GE tramway there (but not facilitating any through running between the two systems.) The capital was £20,000. The YUR itself was slow to start work, but with the assistance of the Yarmouth and North Norfolk the work was pushed forward and completed on 15 May 1882.[2][page needed][3][page needed]

Amalgamation: the Eastern and Midlands Railway

Now the many railway companies that were independent of the Great Eastern Railway saw that amalgamation with one another was desirable. On 18 August 1882 the Eastern and Midlands Railway Act was passed, which arranged that on the first day of 1883 the Eastern and Midlands Railway[note 5] was created by amalgamating the Lynn and Fakenham Railway, the Yarmouth and North Norfolk, and the Yarmouth Union Railway. Shares generally were transferred to E&MR stock, but some preference shareholders retained their rights. By the same Act a second stage arranged that the E&MR took over the Midland and Eastern Railway on 1 July 1883. The MR and GNR working arrangements were to continue on those affected routes, and the E&MR could only run trains on those section with the consent of those larger railways.[3][page needed][15][page needed][16][page needed]

The whole line from Bourne to Great Yarmouth was now under the control of the Eastern and Midlands Railway. The train service at this stage was "lavish",[2][page needed] with six trains daily on the South Lynn to Melton Constable section and seven from Melton to Norwich City, with numerous short workings. On Sundays it was made possible to spend the day in Great Yarmouth, by running several trains throughout or connecting in to those trains.[4][page needed][2][page needed]

Further openings

The section from Melton Constable to Holt was opened on 1 October 1884.

King's Lynn was an important regional centre and port on the Ouse, and the E&MR access to it was inconvenient, involving (from the east) reversal at the GER station for through trains, and reliance on that company's grudging acquiescence. Thoughts had long harboured the intention of creating an independent through route and on 2 November 1885 the Lynn Loop was opened for goods traffic; passenger service followed on 1 January 1886. The line ran south of Lynn, connecting from South Lynn goods station to Bawsey. The former connection from Gaywood Road Junction, north of King's Lynn, to Bawsey was closed. The railways had referred to the main station in King's Lynn simply as "Lynn" but from this time "Lynn Town" was used instead.

After a suspension of work, the Holt to Cromer section of line was completed by direct labour, and opened on 16 June 1887. A through London King's Cross to Cromer express started running in August 1887, and although the construction had been expensive, the boost to revenue from the new line was considerable. A second train was put on the following year, in the down direction consisting of coaches slipped at Peterborough from a GNR Manchester train. The time from King's Cross to Cromer via Peterborough was typically 4+12 hours, but the GER did London Liverpool Street to Cromer via Norwich in 3+12 hours.

At this time the decision was taken not to go ahead with the Blakeney Harbour branch from Kelling.[2][page needed]

On 20 June 1888 a new branch line from North Walsham to Mundesley, a small seaside resort was authorised by Parliament.[3][page needed]

Relationships with the Midland and the GNR

For some years there had been continuing friction between the E&MR (and its predecessors) and the Midland Railway over the routing for goods traffic. The E&MR contended that the Midland was obliged to route its traffic to Norwich over the E&MR and not the GER, notwithstanding the inferior travel times. The Midland repeatedly protested at tribunals that no such obligation existed. Now at last a sudden rapprochement took place. A bill was to be submitted to the 1888 session of Parliament to build a connecting line from the Midland Railway near Ashwell (in the vicinity of Oakham) and Bourne. The E&MR was to build this with Midland financial help, and the following year the Midland would take over the entire western section. Traffic from the eastern section would be directed via the Midland.

At a stroke this would have cut the GNR out of much of the traffic, even though it had constantly been friendly and supportive of the E&MR when the Midland had treated it shabbily. This was "extraordinary conduct" by the E&MR. R. A. Read was a director, friendly to the Midland but prone to "rash and elaborate schemes", and Wrottesley attributes these schemes to him.[2][page needed]

Nevertheless, the new line was sanctioned on 28 June 1888, although a junction to the GNR at Little Bytham was inserted to mollify the GNR.[3][page needed]

In the months following the passage of the Act, wiser counsels prevailed, and the E&MR, Midland and GNR boards negotiated a more congenial arrangement. The Midland and GNR would become joint owners of the western section; the eastern section would be unaffected for the time being. The route of the Bourne connecting line to the Midland would be varied, to meet the Midland at Saxby; the connection to the GNR main line at Little Bytham would be retained; and the connecting line west of that point would be Midland property, not E&MR. Ordinary shareholders in the E&MR would get £47 for every £100 worth.[note 6] A joint committee met at King's Cross on 5 March 1889; it was a Midland and Great Northern Joint Committee, but at this stage no such designation was applied to the railway itself.

Eastern and Midlands Railway in chancery

At the moment when the future seemed satisfactory, the E&MR was plunged into crisis. For some years it had been paying only modest dividends, and profitability had not always been adequate to support outgoings. W. Jones had been hiring carriages to the company and for some time had not been paid. On 27 June 1889 he obtained judgment in his favour, but the company had no money to comply. At the time there was a system established since 1867 intended to keep a railway in operation for the convenience of the public in this situation: in effect to trade out of bankruptcy.

The "rash" R. A. Read was appointed receiver, and at a shareholders' meeting in November 1889 it was stated that the company had liabilities of over £108,000 on working costs as well as £71,645 on unpaid debenture interest and guaranteed share dividends. At a further meeting on 2 May 1890 the debenture holders accused Read of being to blame for getting the line into this situation, and demanded his removal, as well as a declaration that their debenture payments should rank equally with the railway operating costs, contrary to normal practice when a line was in receivership. Appeals were eventually dismissed and despite the legal and financial difficulties the railway kept running. It was not until 16 August 1892 that a scheme of financial arrangement was finalised.

Improvements despite the crisis

While this was continuing, some capital improvements took place, largely funded by the Midland Railway. Signalling was modernised, some additional crossing places were established as well as some short lengths of double track, and the Bourne to Saxby line continued to be built. On 25 July 1890 an avoiding line at Spalding was authorised, enabling through running past the south of the town. It opened for goods traffic on 5 June 1893, and on the same day the Saxby to Bourne section opened, also for goods only. On 28 June 1892 the Sutton Bridge was authorised to be renewed. It opened on 18 July 1897; it was a swing bridge, and carried road and rail traffic. There were tolls on the road part of the bridge, but these were given up in 1902.

The words Midland and Great Northern Joint Railway appeared in public timetables for the first time in 1890.

The M&GNJR is formed

 
Railways around Cromer in 1906

The 1889 arrangement whereby the Midland and GNR jointly took over E&MR lines applied only to the western section. Now in 1891 the two larger companies indicated that they wished to acquire the eastern section too. This was agreed in October 1892, and a Bill was submitted to the 1893 session of Parliament. The consideration was £1,200,000 of Midland and GNR 3% rent stock, although there were complicated provisions for preference and debenture shareholders. Both eastern and western sections transferred to the M&GNJR.

With only minor interference from the GER, the new arrangement passed in Parliament on 9 June 1893: the Midland and Great Northern Joint Railway would become an incorporated entity (rather than just a committee delegated by the two principals). A total of 113 miles (182 km) of railway was involved,[2][page needed][3][page needed][18][19] so that the M&GNJR network was the longest joint railway in the United Kingdom, by mileage.[1][page needed]

Further projects

Saxby and the Spalding avoiding line opened to passengers

On 1 May 1894 the Bourne to Saxby line was opened to passengers, with additional platforms at Saxby. The formation was made for a southward connecting curve there, but track was never laid on it. The boundary with the Joint Line was at Little Bytham as planned, and the formation of the connection to the GNR was also made, and here too track was never laid on it. The Spalding avoiding line was opened to passenger traffic on the same day, 1 May 1894.

Mundesley to Cromer

An Act of 7 August 1896 authorised the M&GJR to build on from Mundesley (not yet open) to Cromer, passing south of the town and curving back to approach it from the west.

The Norfolk and Suffolk Joint Railway

Both the GER and the M&GNJR wanted to build a direct coastal line between Great Yarmouth and Lowestoft; the coastal area and Lowestoft itself were developing and offered the M&GNJR much potential. At the same time the GER wished to develop its access to Mundesley. Notwithstanding the friction between the two companies, a sensible accommodation was finalised on 18 March 1897 by which the GER bill for the Yarmouth to Lowestoft line and a Mundesley to Happisburgh line would not be opposed by the M&GNJR. The M&GNJR would simply build a connecting curve from its line swinging round the north and west of Yarmouth and connecting in to the new GER line, and have running powers to Lowestoft. A Norfolk and Suffolk Joint Railway company would be created, and would control the Yarmouth to Lowestoft line (from Gorleston), the North Walsham to Mundesley line, Mundesley to Cromer, and Mundesley to Happisburgh.

The M&GNJR Bill for the curve at Yarmouth passed in Parliament on 6 August 1897, and the establishment of the Norfolk and Suffolk Joint Railway was enacted on 25 July 1898. The Lowestoft line opened on 13 July 1903.

Opening to Mundesley

The Mundesley branch opened for goods traffic on 20 June 1898, and to passengers on 1 July 1898. As a joint line (from Antingham Road Junction) it had passenger trains of both companies: nine GER and seven M&GNJR daily. Goods services alternated month by month.

From 1900

In the first years of the 20th century the M&GNJR was doing well financially. Long-distance expresses were run to the area from northern English cities as well as from London. Restaurant cars were put on, as well as workers' trains, for example bringing fish-processing women from northern Scotland for seasonal work. Fish had become an important traffic since the N&SJR connection to Lowestoft had been established.

Although some short sections of double track had been introduced, the majority of the network was single line, and this brought challenges to timekeeping at busy times. The Midland and GNR were operating trains on the line as of right, and the GER had acquired running powers over several sections and to some terminal stations. Conversely the M&GNJR needed the cooperation of the GER for some penetrating workings, at a time when competition with the GER was still intense.

In May 1906 the committee approved introduction of the Whitaker tablet exchange apparatus. On single-track sections, head-on collision due to signalman error was prevented by a token system: drivers of trains entering a single line section must be in possession of a physical token, a "tablet" specific to that section, and one only could only be released from control equipment in the one or other of the two signalboxes controlling entry to the section. When the train had passed through the section the tablet was placed in the apparatus at that end of the section, and only now another might be released either there or at the other end of the section. When non-stopping trains passed the tablet had to be passed from the signalman to the fireman of the train, and this could not be done at speed without injury. Whitaker devised a mechanical apparatus to be placed at the lineside and on locomotives to enable the exchange at a higher speed.[20]

During World War I many of the best long-distance express passenger trains were suspended; the M&GNJR took on considerable additional goods traffic during hostilities, and many of the workforce left for the armed forces. The company maintained an armoured train, constructed by the London and North Western Railway at Crewe, continuously in steam from early in 1915 in case of enemy invasion.[21]

After 1918, government control of the railways continued, and much traffic in demobilised servicemen tested the capacity of the network. There was a general railway strike in the latter months of 1919, and a coal strike in 1921, both of which caused considerable damage to the M&GNJR. The national general strike took place in 1926.[2][page needed]

Grouping of the railways

Wartime control of the railways ended on 15 August 1921, and the government passed the Railways Act 1921, which had the effect of transferring most of the railways of Great Britain into one of four new large companies, in a process referred to as the "grouping". The Midland Railway was transferred to the new London, Midland and Scottish Railway (LMS), and the Great Northern Railway (as well as the Great Eastern Railway) were transferred to the new London and North Eastern Railway (LNER). The M&GNJR remained unchanged, now jointly owned by the LMS and LNER. The rivalry with the GER was naturally at an end. The change took place formally on 1 January 1923.[2][page needed]

The long-distance express trains were reinstated progressively, and the LNER particularly emphasised London King's Cross to Cromer traffic. Holidays at the seaside increased in popularity very considerably after the war, and as well as trains to and from the area, local services for holidaymakers staying in the area were enhanced in the season.

However road competition, both for goods and passengers, began to take a serious toll as roads were improved. at the same time a general depression in the agricultural sector harmed M&GNJR income.[2][page needed]

Incorporation into the LNER

The Midland and Great Northern Joint Railway had retained its identity at the grouping of the railways in 1923. In the mid-1930s there was good cooperation between the LMS and the LNER and in 1935 it was agreed that the LNER should manage the operational aspects of the M&GNJR system, though maintaining its independent identity. This took effect from 1 October 1936.[4][page needed] The system consisted of 183 route miles (295 km), of which 40% was double track.[2][page needed]

World War II and after

In 1939 World War II started, and once again most long-distance expresses were suspended; staff were called up or volunteered in the services. However the focus of defence, evacuation of children, and later the D-day landings was the south coast, not the east. The war ended in 1945. The railways were run down during the war and the government passed the Transport Act 1947, so that the railways became nationalised at the beginning of 1948, forming British Railways (BR).

The long distance and holiday trains began to be restored, and holiday camp facilities became popular, and were served by the line.[2][page needed]

Local closures

The very low usage of some parts of the M&GNJR system under BR could not be ignored, and some local closures started:

Diesel trains

Diesel multiple unit vehicles were introduced on the M&GNJR from 18 September 1955, gradually taking over the entire passenger service except the long-distance trains which remained locomotive-hauled.[2][page needed]

Total closure

In May 1958 a report was finalised by British Railways. It concluded that the entirety of the M&GNJR was loss-making, and was largely duplicated by routes of the former GER. Complete closure of passenger services was proposed. Widespread closure of goods services too was contemplated, with only the Spalding to Sutton Bridge, Peterborough to Wisbech, South Lynn to Gayton Road, and Melton Constable to Norwich City being kept. Only the Melton to Cromer branch was to be unaffected by the proposals. The scale of the closure aroused considerable opposition, mainly focussed on the reduction in amenity to communities, although there was also widespread apathy, reflected in poor turnouts at public meetings.

After deliberation the Transport Users Consultative Committee issued its decision in November 1958, that the majority of the proposed closures should proceed. Retained sections were Spalding to Bourne for goods, Spalding to Sutton Bridge for goods. A new spur would be built at Murrow connecting the M&GN line with the GN&GE Joint line; the Peterborough to Wisbech line would be disconnected at the Peterborough end, and served via the Murrow curve from Whitemoor, at March. Wisbech too would be retained and served from Whitemoor via Murrow. Further east the Melton Constable to Norwich line would remain open for goods trains, as would the South Lynn to Rudham line. Passenger trains would continue to operate between Melton Constable and Cromer, and between North Walsham and Mundesley. Yarmouth Vauxhall (the former GER station) would be extended to handle the additional seasonal passenger traffic.

The closures took place after the last trains on Saturday 28 February 1959. There was much greater public attention to the running of the last passenger trains than there had been to attending the public meetings, but the closure was decisive.[2][page needed][4][page needed]

Notwithstanding the dire warnings of protesters, a substitute bus service operating from Melton Mowbray to Spalding following closely the route of the railway was almost completely lacking in patronage, and was soon given up.[4][page needed]

The Melton Constable to Sheringham line had retained its passenger services for the time being; however that too closed to passengers after 4 April 1964. North Walsham to Mundesley closed on 5 October 1964.[2][page needed]

The Spalding to Sutton Bridge goods connection closed after Friday 2 April 1965.[4][page needed]

Topography

Midland and Great Northern Joint Railway
 
(MR)
Saxby
 
(MR)
 
 
 
(MR)
South Witham
 
 
 
(MR)
Castle Bytham
 
 
 
 
 
 
 
 
 
Little Bytham Junction
 
 
 
 
 
 
to Edenham
(former E&LBR)
 
 
 
 
Toft Tunnel
(GNR)
 
 
 
 
 
 
 
 
 
 
 
 
Bourne
 
 
 
 
Eye Green
 
 
 
Thorney
 
 
Twenty
Wryde
 
 
Counter Drain
 
 
 
North Drove
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Spalding
 
 
 
 
Murrow East
 
 
Weston
Wisbech St Mary
 
 
Moulton
Wisbech North
 
 
Whaplode
Wisbech (goods)
 
 
Holbeach
Wisbech Quay
 
 
 
Fleet
Ferry
 
 
Gedney
Tydd
 
 
Long Sutton
 
 
Sutton Bridge
 
 
Walpole
 
Terrington
 
Clenchwarton
 
West Lynn
 
South Lynn
 
 
 
 
 
 
 
to King's Lynn
and docks
Hardwick Road
(goods)
 
 
 
 
 
 
 
Gayton Road
Norwich City
 
 
Grimston Road
Hellesdon
 
 
Hillington
Drayton
 
 
Massingham
Attlebridge
 
 
East Rudham
Lenwade
 
 
Raynham Park
Whitwell & Reepham
 
 
 
Fakenham West
Guestwick
 
 
 
 
Hindolvestone
 
 
Thursford
Melton Constable
 
 
 
 
Holt
(original)
Corpusty and Saxthorpe
 
 
Holt
(NNR)
 
 
Kelling Heath Halt
(NNR)
Bluestone
 
 
Weybourne
(NNR)
 
 
 
Sheringham
(NNR)
Aylsham North
 
 
Occasional use
level crossing
 
 
Sheringham
Felmingham
 
 
West Runton
 
 
 
 
Cromer High
 
 
 
 
Cromer Beach
Roughton Road
 
 
 
 
 
 
 
 
 
 
 
Gunton
 
 
 
 
 
 
 
 
North Walsham
 
 
North Walsham Town
 
 
Honing
 
 
Stalham
 
Sutton Staithe Halt
 
Catfield
 
Potter Heigham
 
Potter Heigham Bridge Halt
 
Martham
 
Hemsby
 
Little Ormesby Halt
 
Great Ormesby
 
Scratby Halt
 
 
 
California Halt
 
 
 
Caister Camp Halt
 
 
 
Caister-on-Sea
 
 
 
 
 
Newtown Halt
White Swan (goods)
 
 
 
 
 
Yarmouth Beach
 
 
 
 
Yarmouth Vauxhall
 
 
South Quay goods tramway

Saxby to Sutton Bridge

  • Saxby; Midland Railway station;
  • Little Bytham Junction; boundary point between Midland Railway and M&GNJR;
  • Bourn; opened 16 May 1860; renamed Bourne between 1872 and 1893; closed 2 March 1959; convergence of line from Essendine; divergence of line to Spalding;
  • Twenty; opened September 1866; closed 2 March 1959;
  • Counter Drain; opened September 1866; closed 2 March 1959;
  • North Drove; opened September 1866; closed 15 September 1958;
  • Cuckoo Junction; divergence of avoiding line to Welland Junction;
  • Spalding; GNR station; opened 17 October 1848; M&GNJR route reverses here; divergence northward of GNR and GN&GE Joint lines;.
  • Welland Bank Junction; convergence of avoiding line from Cuckoo Junction;
  • Weston; opened 1 December 1858; closed 2 March 1959;
  • Moulton; opened 15 November 1858; closed 2 March 1959;
  • Whaplode; opened 1 December 1858; closed 2 March 1959;
  • Holbeach; opened 15 November 1858; closed 2 March 1959;
  • Fleet; opened 1 November 1862; closed 2 March 1959;
  • Gedney; opened 1 July 1862; closed 2 March 1959;
  • Long Sutton; opened 1 July 1862; closed 2 March 1959;
  • Dock Junction; divergence of line to Docks;
  • Sutton Bridge Junction; convergence of line from Peterborough;
  • Sutton Bridge; first station Norwich and Spalding terminus opened 1 July 1862; Lynn and Sutton station opened 1 March 1866; closed 2 March 1959.

Peterborough to Wisbech and Sutton Bridge

  • Peterborough Wisbech Junction; divergence from Midland Railway route;
  • Dogsthorpe Brick Works;
  • Eye; opened 1 August 1866; renamed Eye Green 1875; closed 2 December 1957;
  • Thorney; opened 1 August 1866; closed 2 December 1957;
  • Wryde; opened 1 August 1866; closed 2 December 1957;
  • Murrow; opened 1 August 1866; renamed Murrow East 1948; closed 2 March 1959;
  • Wisbech St Mary; opened 1 August 1866; closed 2 March 1959;
  • Wisbeach; opened 1 August 1866; renamed Wisbech 1877; renamed Wisbech North 1948; closed 2 March 1959;
  • Ferry; opened 1 August 1866; closed 2 March 1959;
  • Tydd; opened 1 August 1866; closed 2 March 1959.
  • Sutton Bridge Junction; above.

Sutton Bridge to Norwich

  • Sutton Bridge;
  • Cross Keys; east end of swing bridge;
  • Walpole; opened 1 March 1866; closed 2 March 1959;
  • Terrington; opened 1 March 1866; closed 2 March 1959;
  • Clenchwarton; opened 1 March 1866; closed 2 March 1959;
  • West Lynn; opened ???? closed 1886:
  • South Lynn; opened 1 January 1886; closed 2 March 1959;
  • South Lynn Junction; divergence of line to King's Lynn;
  • Gayton Road; opened 1 July 1887; closed 2 March 1959;
  • Grimston Road; opened 16 August 1879; closed 2 March 1959;
  • Hillington; opened 16 August 1879; closed 2 March 1959;
  • Massingham; opened 16 August 1879; closed 2 March 1959;
  • Rudham; opened 16 August 1880; renamed East Rudham 1 March 1882; closed 2 March 1959;
  • Raynham Park; opened 16 August 1880; closed 2 March 1959;
  • Fakenham Town; opened 16 August 1880; renamed Fakenham West 27 September 1948; closed 2 March 1959;
  • Thursford; opened 19 January 1882; closed 2 March 1959;
  • Melton Constable; opened 19 January 1882; closed 6 April 1964; convergence of line from Cromer; divergence of line to Yarmouth;
  • Hindolvestone; opened 19 January 1882; closed 2 March 1959;
  • Guestwick; opened 19 January 1882; closed 2 March 1959;
  • Whitwell & Reepham; opened 1 July 1882; closed 2 March 1959;
  • Lenwade; opened 1 July 1882; closed 2 March 1959;
  • Attlebridge; opened 2 December 1882; closed 2 March 1959;
  • Costessey & Drayton; opened 2 December 1882; renamed Drayton 1 February 1883; closed 2 March 1959;
  • Hellesdon; opened 2 December 1882; closed 15 September 1952;
  • Norwich City; opened 2 December 1882; closed 2 March 1959.

Melton Constable to Cromer

  • Melton Constable; above;
  • Holt; opened 1 October 1884; closed 6 April 1964;
  • Weybourne; opened 1 July 1901; closed 6 April 1964;
  • Sherringham; opened 16 June 1887; renamed Sheringham 1897; M&GN station closed in 1967 when new resited station opened, now part of the Bittern Line
  • West Runton; opened September 1887; still open as part of the Bittern Line;
  • Runton West Junction; divergence of line to North Walsham;
  • Runton East Junction; convergence of line from North Walsham and later the Bittern Line from Norwich (via ex-GER route);
  • Cromer Beach; opened 16 June 1887; expanded and renamed Cromer 1969; still open as part of the Bittern Line.

Melton Constable to Great Yarmouth

  • Melton Constable; above;
  • Corpusty and Saxthorpe; opened 5 April 1883; closed 2 March 1959;
  • Bluestone; opened 5 April 1883; closed 1 March 1916;
  • Aylsham Town; opened 5 April 1883; simply Aylsham 1902 – 1910; Aylsham North from 1948; closed 2 March 1959;
  • Felmingham; opened 5 April 1883; closed 2 March 1959;
  • North Walsham; opened 13 June 1881; renamed North Walsham Town 27 September 1948; closed 2 March 1959;
  • Honing; opened August 1882; closed 2 March 1959;
  • Stalham; opened 3 July 1880; closed 2 March 1959;
  • Sutton Staithe Halt; opened 17 July 1933; closed 17 September 1958;
  • Catfield; opened 17 January 1880; closed 2 March 1959;
  • Potter Heigham; opened 17 January 1880; closed 2 March 1959;
  • Potter Heigham Bridge Halt; opened 17 July 1933; closed September 1939; reopened June 1948; closed 17 September 1958;
  • Martham; opened 15 July 1878; closed 2 March 1959;
  • Hemsby; opened 16 May 1878; closed 2 March 1959; a temporary station to north opened 15 July 1878; temporary station to south opened October 1878; temporary stations closed July 1879;
  • Little Ormesby Halt; opened 7 August 1877; closed September 1939; reopened June 1948; closed 2 March 1959;
  • Ormesby; opened 7 August 1877; renamed Great Ormesby 21 January 1884; closed 2 March 1959;
  • Scratby Halt; opened 7 August 1877; closed September 1939; reopened June 1948; closed 2 March 1959;
  • California; summer service only; opened 17 July 1933; closed September 1939; reopened June 1948; closed 28 September 1958;
  • Caister Camp Halt; summer service only; opened 17 July 1933; closed September 1939; reopened June 1948; closed 28 September 1958;
  • Caister; opened 7 August 1877; renamed Caister-on-Sea 1 January 1893; closed 2 March 1959;
  • Newtown Halt; opened 7 August 1877; closed September 1939; reopened June 1948; closed 2 March 1959;
  • Yarmouth; opened 7 August 1877; renamed Yarmouth Beach 1883; closed 2 March 1959.[23][page needed][16][page needed]

Key people

 
William Marriott

For over 40 years William Marriott served the M&GN and its predecessors, joining the staff of the original contractors, Wilkinson and Jarvis in 1881, serving as Engineer from 1883, Locomotive Superintendent from 1884 and finally becoming Traffic Manager as well in 1919, before retiring in 1924. He is commemorated in the name of the Marriott's Way footpath, much of which follows the trackbed of the M&GN Norwich line, and in the work of the North Norfolk Railway

Murrow flat crossing

At Murrow the M&GNJR crossed the GN&GE Joint Line on the level, one of few such crossings in the UK, and the only one where two joint lines crossed.[1][page needed]

Locomotives

Because of the relatively early closure date, most workings throughout the life of the M&GN were operated by steam power. A small number of diesel multiple unit services were run in the final years, alongside the very occasional incursions of early diesel locomotives.

The M&GN mainly used designs from the MR and GNR, but included in its stock some of the older E&M engines, often much rebuilt. The famous Beyer-Peacock engines survived in this way from the early 1880s to the mid-1930s. The best contemporary designs were acquired by the Joint in the 1893 – 1901 period, but as there were no more modern engines forthcoming, the light 0-6-0s and 4-4-0s provided much of the motive power on the line until 1936. From then on the LNER tried various designs on the line, not necessarily bigger or even more recent than the Joint's own engines, but as the M&GN's engines were scrapped, newer engines such as the K2 2-6-0s and B12 4-6-0s became common. The ex-GER D16 "Claud Hamilton" 4-4-0s provided the locomotive backbone of this later period.

From the 1950s, Ivatt 4MTs became the dominant motive power on the system, which achieved a higher degree of standardisation than any other part of British Railways—more than 50 of these "mucky ducks" were allocated here. But there were other types still in use, and among them the line saw Ivatt 2MTs and occasional Standard 4MT and LNER B1 and B17 types.[citation needed]

British Railways' Eastern Region was an early adopter of diesel motive power and the M&GN lines were used by Brush Type 2 locomotives and several early DMU types including Class 101 and Class 105s. A fleet of the latter was commissioned in the mid-1950s to take over all the long-distance locomotive-hauled passenger services, but the line's closure in 1959 saw them re-allocated (especially to the Great Northern suburban commuter workings out of King's Cross, for which they were particularly unsuitable). One M&GN boiler from a Hudswell Clarke 4-4-0T survives, it is hoped this will be rebuilt as a static exhibit.

Badge and livery

 
Norfolk Green bus painted in the M&GN livery

The M&GN device consists of images derived from the coats of arms of the four principal cities and towns it served: (clockwise from top left) Peterborough, Norwich, Great Yarmouth and King's Lynn.

For much of the company's life the locomotives were painted a light golden brown, often referred to by paintshop staff as "autumn leaf" or "golden ochre". From 1922 the goods engines were painted dark brown, followed by the rest of the locomotives in 1929. The LNER painted the survivors black. Most of the carriages were ex-GNR and were varnished teak, but some of the older stock and rebuilds were painted and grained to look like teak. Wagon stock was generally brown oxide, the same colour as the GNR used, until 1917 when general stock under the common user agreement began to be painted grey. The number of M&GN wagons declined during the 1920s, and were eventually bought by the parent companies in 1928, leaving only service stock, which was painted red oxide. Under British Railways' control, carriages were often carmine and cream, then maroon.

Cultural impact and heritage

 
Preserved brake van No. 12 restored and in operation on the NNR.

The M&GN was frequently referred to as the "Muddle and Go Nowhere",[24] a fairly self-evident title for a route that served a mostly rural region, but after closure this phrase was commonly replaced with "Missed and Greatly Needed".[25]

The M&GN's memory is kept alive by two heritage railway operations and railway museums. Whilst only the short section between Cromer Beach and Sheringham remains open to regular services,[26] the section of branch line between Sheringham and Holt is operated as the North Norfolk Railway.[27] The station at Whitwell also operates as a heritage centre, with ambitions to restore a section of the M&GN main line.[28] There is also a group dedicated to the study of the line: the M&GN Circle.[29]

M&GN signal boxes survive at numerous locations,[30] with Cromer Beach box[31] being open to the public.[32] The box from Honing also survives at the Barton House Railway near Wroxham.[33]

The turntable from Bourne engine shed has also survived. This turntable was built in Ipswich in 1933 and installed at Bourne. When the shed closed along with the line in 1959 it was transferred to Peterborough East railway station. After that shed closed the turntable was rebuilt at Wansford station on the Nene Valley railway[34]

Very little rolling stock from the line has been preserved. The North Norfolk Railway have rescued two passenger coaches and a brake van, while a third passenger coach has recently been preserved by the Whitwell & Reepham Railway. Another M&GN brake van survives, No. 23 which was built in 1899, was rescued from Melton Constable in 2000.[35] Two more M&GN coaches survive, No. 40 and 41 (originally GNR), No. 40 is preserved in Alysham [36] and No. 41 survives at the former Raynham Station platform and building.[37] No locomotives survived, with the last complete locomotive being scrapped at the Longmoor Military Railway in 1953.[38]

The "golden ochre" livery has been carried by two industrial locomotives on the North Norfolk Railway,[39] and was later worn by a bus operated by Norfolk Green[40] on routes formerly served by the company.

Notes

  1. ^ The spelling was Wisbeach until 1877.[7]
  2. ^ The contemporary spelling; it was altered (in railway terminology) to Bourne in 1894.[10][11]
  3. ^ This was before the era of the Light Railways Act 1896, which obviated the securing of an Act of Parliament in some circumstances.
  4. ^ Clark gives exhaustive details of enactment dates.[13] Wrottesley gives 26 July 1876.[14]
  5. ^ Midlands as opposed to Midland appears to be correct. Wrottesley uses Midlands consistently, as does Casserley on page 16, and Burgess in several places, and Carter on page 453. Awdry uses Midlands, page 125. Hopwood uses it However Rhodes uses Midland on page 12. Clark uses both in quick succession, quoting titles of Acts: Midlands on page 21; both spellings on page 22; Midland on page 23.
  6. ^ Wrottesley does not make it clear whether these are face value or market prices.[17]

Footnotes

  1. ^ a b c d e Casserley, H.C. (1968). Britain's Joint Lines. London: Ian Allan. ISBN 0-7110-0024-7.
  2. ^ a b c d e f g h i j k l m n o p q r s t u v w x y z aa ab ac ad ae af ag ah Wrottesley 1981.
  3. ^ a b c d e f g h i j k l m n o Clark, Ronald H. (1967). A Short History of the Midland & Great Northern Joint Railway. Norwich: Goose and Son.
  4. ^ a b c d e f g h i j k l m n o Rhodes, John (1982). The Midland and Great Northern Joint Railway. Ian Allan Ltd. ISBN 0-7110-1145-1.
  5. ^ Gordon, D.I. (1977). A Regional History of the Railways of Great Britain: volume 5: The Eastern Counties. Newton Abbot: David & Charles. ISBN 0-7153-7431-1.
  6. ^ Moffat, High (1987). East Anglia's First Railways. Lavenham: Terence Dalton Limited. ISBN 0-86138-038-X.
  7. ^ Wrottesley 1981, p. 19.
  8. ^ "Peterborough, Wisbech and Sutton Railway company". Cambridge Chronicle and Journal. 1 April 1871. p. 7.
  9. ^ Wrottesley 1981, pp. 16, 19, 21.
  10. ^ Rhodes 1982, p. 10.
  11. ^ Wrottesley 1981, p. 20.
  12. ^ "Sutton Bridge Dock". Portsmouth Evening News. 24 June 1881. p. 3.
  13. ^ Clark 1967, p. 13.
  14. ^ Wrottesley 1981, p. 34.
  15. ^ Carter, E.F. (1959). An Historical Geography of the Railways of the British Isles. London: Cassell.
  16. ^ a b Burgess, Neil (2016). Norfolk's Lost Railways. Catrine: Stenlake Publishing Ltd. ISBN 978-1-84033-7556.
  17. ^ Wrottesley 1981, p. 65.
  18. ^ Maxwell, Alexander (September 1936). "The Midland and Great Northern Railway: I: Its Traffic". Railway Magazine.
  19. ^ Hopwood, H.L. (August 1908). "The Midland and Great Northern Railway". Railway Magazine.
  20. ^ Sekon, G.A. (October 1905). "How Expresses Exchange Trains Staffs and Tablets". Railway Magazine.
  21. ^ Pratt, Edwin A. (1921). "Armoured trains for coast defence". British railways and the great war. Vol. 2. London: Selwyn & Blount. OCLC 835846426.
  22. ^ Passengers No More Second Edition page 110
  23. ^ Quick, M.E. (2002). Railway Passenger Stations in England Scotland and Wales—A Chronology. The Railway and Canal Historical Society.
  24. ^ . Walpolecrosskeys.co.uk. Archived from the original on 18 May 2013. Retrieved 17 November 2012.
  25. ^ "Trip Back to the Golden Age of Steam". Spalding Advertiser.
  26. ^ "Bittern Line homepage". Bitternline.com. Retrieved 17 November 2012.
  27. ^ "North Norfolk Railway". Nnrailway.co.uk. Retrieved 17 November 2012.
  28. ^ . Archived from the original on 18 July 2011.
  29. ^ "M&GN Circle".
  30. ^ "The signal box M&GN listing". Signalbox.org. Retrieved 17 November 2012.
  31. ^ . Cromerbox.co.uk. Archived from the original on 2 September 2012. Retrieved 17 November 2012.
  32. ^ "North Norfolk Railway – Sheringham station facilities". Nnrailway.co.uk. Retrieved 17 November 2012.
  33. ^ . bartonhouserailway.org.uk. Archived from the original on 5 September 2011.
  34. ^ "Nene Valley Railway". Nvr.org.uk. 5 April 1977. Retrieved 17 November 2012.
  35. ^ "M&GN 23 (Body only) Brake van built 1899".
  36. ^ "GNR Six-wheel 5-compartment Composite (Body only) built 1887".
  37. ^ "GNR Six-wheel 5-compartment Composite (Body only) built 1887".
  38. ^ Rowledge, S. "Midland and Great Northern Joint Railway locomotive list". Staplehurst: Robinjay Press. {{cite journal}}: Cite journal requires |journal= (help)
  39. ^ "Photo of Harlaxton in M&GN livery". Arpg.org.uk. 6 December 2004. Retrieved 17 November 2012.
  40. ^ "Norfolk Green fleet list" (PDF). Retrieved 17 November 2012.

References

  • Wrottesley, A.J. (1981). The Midland & Great Northern Joint Railway. Newton Abbot: David & Charles. ISBN 0-7153-8173-3.

Further reading

  • Becket, W.S. The District Controller's View No.12: Midland and Great Northern Joint Railway: M&GN Railway Operating in the 1950s. Xpress Publishing. Detailed timetables and descriptions of all line workings, including freight
  • Clark, M.J. Railway World Special – The M&GN. Ian Allan.
  • Clark, R.H. Scenes from the M&GN. Moorland.
  • Clark, R.H. A Short History of the M&GN Joint Railway. Goose & Son.
  • Digby, Nigel. A Guide to the Midland & Great Northern Joint Railway. Ian Allan.
  • Digby, Nigel. The Stations & Structures of the Midland & Great Northern Joint Railway Vol.1. Lightmoor Press. Architecture and civil engineering, station plans Lowestoft to Melton Constable
  • Digby, Nigel. The Stations & Structures of the Midland & Great Northern Joint Railway Vol.2. Lightmoor Press. Signalling and permanent way, station plans Norwich to Peterborough and Spalding
  • Digby, Nigel. The Liveries of the Pre-Grouping Railways Vol.2 (East of England & Scotland). Lightmoor Press. Chapter on M&GN liveries
  • Digby, Nigel. The Liveries of the M&GN. M&GN Circle.
  • Greeno, Dennis. M&GN in Colour – Vols.1 - 4. M&GN Jt Railway Society.
  • Squires, Stewart; Hollamby, Ken, eds. (2009). Building a Railway: Bourne to Saxby. Lincoln Record Society. ISBN 978-0-901503-86-2. An extraordinary collection of photographs by resident engineer Charles Stansfield Wilson, taken 1890–93, showing the construction of this extension of the M&GN
  • Wells, A.M. The Locomotives of the M&GN. HMRS. A detailed and definitive work
  • Whitaker, A.C. Running a Norfolk Railway. M&GN Circle.
  • Wilkinson, E. Operation Norfolk: Midland & Great Northern Joint Railway Passenger Services 1954. Xpress Publishing. Detailed timetables and descriptions of passenger workings
  • Hill, Roger; Vessey, Carey (1995). British Railways Past and Present – 27 Lincolnshire. Past & Present Publishing. Annotated photographs some of which are of the M&GN

Middleton Press "Encyclopedia of Railways" series, featuring annotated track plans and small photographs:

  • Adderson, Richard; Kenworthy, Graham (1998). Branch Lines Around Cromer. Middleton Press.
  • Adderson, Richard; Kenworthy, Graham (2008). Branch Lines Around Lowestoft. Middleton Press.
  • Back, Michael (2009). Branch Lines Around Spalding – M&GN Saxby to Long Sutton. Middleton Press.
  • Ingram, Andrew (1997). Branch Lines Around Wisbech. Middleton Press.
  • Adderson, Richard; Kenworthy, Graham (2007). Melton Constable to Yarmouth Beach. Middleton Press.
  • Back, Michael (2008). Peterborough to King's Lynn: part of the M&GN. Middleton Press.
  • Adderson, Richard; Kenworthy, Graham (2011). South Lynn to Norwich City via Melton Constable. Middleton Press.

External links

  Media related to Midland and Great Northern Joint Railway at Wikimedia Commons

  • The Midland & Great Northern Circle
  • Midland & Great Northern Joint Railway Society

midland, great, northern, joint, railway, gnjr, railway, network, england, area, connecting, southern, lincolnshire, isle, north, norfolk, developed, from, several, local, independent, concerns, incorporated, 1893, jointly, owned, midland, railway, great, nort. The Midland and Great Northern Joint Railway M amp GNJR was a railway network in England in the area connecting southern Lincolnshire the Isle of Ely and north Norfolk It developed from several local independent concerns and was incorporated in 1893 It was jointly owned by the Midland Railway and the Great Northern Railway and those companies had long sponsored and operated the predecessor companies Midland and Great NorthernJoint RailwayOverviewStatusDefunctLocaleEast of EnglandServiceTypeRegional railHistoryOpened1893Closed1959TechnicalTrack length180 miles 290 km Track gauge4 ft 8 1 2 in 1 435 mm The area directly served was agricultural and sparsely populated but seaside holidays had developed and the M amp GNJR ran many long distance express trains to and from the territory of the parent companies as well as summer local trains for holidaymakers It had the longest mileage of any joint railway in the United Kingdom 1 page needed In the grouping of 1923 the two joint owners of the M amp GNJR were absorbed into two separate companies the Midland into the London Midland and Scottish Railway and the Great Northern into the London and North Eastern Railway The M amp GNJR maintained a distinct identity which only formally ended with nationalisation in 1948 After 1945 the profitability of the network declined steeply worsened by the seasonality of the business It was duplicated by other lines and the decision was taken to close it Most of the network closed in 1959 although some limited sections continued in use Only a short section near Sheringham is in commercial use today but the North Norfolk Railway is active as a heritage line 2 page needed 3 page needed 4 page needed Contents 1 First railways 2 Constituents of the M amp GNJR 2 1 Norwich and Spalding Railway 2 2 Peterborough Wisbech and Sutton Bridge 2 3 Lynn and Sutton Bridge Railway 2 4 Spalding and Bourn Railway 2 5 PW amp SBR extending to Wisbech 3 Rivalry between the GNR and the GER 4 Midland and Eastern Railway 5 GN and GE Joint Line 6 Sutton Bridge Dock failure 7 In the east 7 1 Great Yarmouth and Stalham Light Railway 7 2 Lynn and Fakenham Railway 7 3 Yarmouth Union Railway 8 Amalgamation the Eastern and Midlands Railway 9 Further openings 10 Relationships with the Midland and the GNR 10 1 Eastern and Midlands Railway in chancery 10 2 Improvements despite the crisis 11 The M amp GNJR is formed 12 Further projects 12 1 Saxby and the Spalding avoiding line opened to passengers 12 2 Mundesley to Cromer 12 3 The Norfolk and Suffolk Joint Railway 12 4 Opening to Mundesley 13 From 1900 14 Grouping of the railways 14 1 Incorporation into the LNER 15 World War II and after 15 1 Local closures 15 2 Diesel trains 16 Total closure 17 Topography 17 1 Saxby to Sutton Bridge 17 2 Peterborough to Wisbech and Sutton Bridge 17 3 Sutton Bridge to Norwich 17 4 Melton Constable to Cromer 17 5 Melton Constable to Great Yarmouth 18 Key people 19 Murrow flat crossing 20 Locomotives 20 1 Badge and livery 21 Cultural impact and heritage 22 Notes 23 Footnotes 24 References 25 Further reading 26 External linksFirst railways EditThe area eventually served by the Midland and Great Northern Joint Railway taken as south Lincolnshire and north Norfolk was late to be supplied with railway connections due to being sparsely populated fenland The Great Northern Railway GNR running north through Huntingdon Peterborough and on to Grantham so forming the western edge of the area was not authorised until 1846 and not opened until 1848 between Peterborough and Lincoln The Eastern Counties Railway ECR authorised in 1836 aspired to reach Norwich and Yarmouth but ran out of money and stopped short In frustration local people obtained Parliamentary authority for the Yarmouth and Norwich Railway in 1842 Running via Reedham it opened to the public on 1 May 1844 In 1845 railway mania was underway and a myriad of railway schemes was put before Parliament Many of these foundered there or were authorised but failed to generate investors commitment By 1850 the ECR had recovered from its financial difficulties of 1836 and had connected practically every town of importance in East Anglia into its system For some years the ECR had successfully resisted the promotion of independent railways in its area but this could not continue indefinitely and some local lines began to obtain authorisation The East Anglian Railways company was an amalgamation of three earlier companies the Lynn and Dereham Railway the Lynn and Ely Railway and the Ely and Huntingdon Railway The company became bankrupt early in 1851 and the GNR operating the East Coast Main Line at Peterborough leased the line Using running powers between its line at Peterborough and March over the ECR it intended to connect to King s Lynn via the Wisbech line of the East Anglian Railway However the powers acquired from Parliament did not include a short section between the two companies stations at Wisbech and the scheme foundered The GNR sold the line on to the ECR in 1852 4 page needed 5 page needed 6 page needed The financial performance of the ECR declined over the years and in 1862 it was absorbed into the new Great Eastern Railway GER Constituents of the M amp GNJR Edit The western section of the later M amp GNJRThe ultimate formation of the M amp GNJR resulted from the fusion of numerous local schemes though they did not at first aspire to form a connected railway Norwich and Spalding Railway Edit On 4 August 1853 the Norwich and Spalding Railway obtained its Act for a line from Spalding to Sutton Bridge and from there to Wisbech Notwithstanding the company s title reaching Norwich was an unfulfilled aspiration for later rather than an immediate intention The Act stipulated that the other parts of the proposed Norwich and Spalding system could not be opened unless genuine progress was being made with the Wisbech connection 2 page needed 3 page needed In fact at this time the money market was particularly difficult partly because of the Crimean War and the company was unable to attract enough investment It only managed to build from Spalding to Holbeach 7 1 2 miles 12 km opening to Holbeach for goods on 9 August 1858 and for passengers on 15 November 1858 The Wisbech stipulation appears to have been overlooked for the time being The line connected with the Great Northern Railway at Spalding and the GNR agreed to work the line for three years There were four trains daily except Sundays with one extra on Tuesdays 2 page needed 4 page needed The eastern section of the later M amp GNJRThe company obtained a further authorising Act to extend from Holbeach to Sutton Bridge as the earlier powers had expired Wisbech was omitted this time but the Act stipulated that no dividend might be declared unless the company proceeded with the promotion of the Wisbech line in Parliament This was attempted in 1860 but rejected in Parliament and again in 1862 and 1863 The GNR agreed to extend the working arrangement to ten years from 1 November 1861 for 50 of receipts and to carry out some permanent way improvements on the original section The Sutton Bridge station was on the site of the later goods station west of the River Nene The extension to Holbeach was completed and opened on 1 July 1862 2 page needed 4 page needed 3 page needed Peterborough Wisbech and Sutton Bridge Edit The line connecting Wisbech note 1 to Sutton Bridge was considered important because Sutton Bridge was an important inland port further downstream on the River Nene than Wisbech port Wisbech would have been reached by a southward branch of the Norwich and Spalding Railway but now an alternative means of making the connection was brought forward On 28 July 1863 the authorising Act for the Peterborough Wisbech and Sutton Bridge Railway was passed Capital was to be 180 000 In 1871 Richard Young a local shipowner and later director of the Great Eastern Railway was chairman of the company 8 The Eastern Counties Railway had just been transformed into the Great Eastern Railway and powers were to be sought by the PW amp SBR to connect to the GER line at Wisbech The Norwich and Spalding Railway was given running powers between Sutton Bridge and Wisbech It was the Midland Railway not the GNR that secured the contract for operating the new railway for 50 of receipts 9 4 page needed 3 page needed Lynn and Sutton Bridge Railway Edit The next section of the future M amp GNJR to be built was the Lynn and Sutton Bridge Railway which was authorised on 6 August 1861 with capital of 100 000 2 page needed 3 page needed It was to connect with the Eastern Counties Railway soon to be GER at South Lynn near the major port of King s Lynn The authorisation obliged the company to construct a new rail and road bridge at Sutton Bridge but this was modified by an Act in 1863 which permitted the railway to purchase the existing road swing bridge built in 1850 and adapt it for railway use as well 4 page needed The line was opened for goods traffic throughout in November 1864 from a junction some distance south of King s Lynn station Passenger trains provided by the GNR began on 1 March 1866 2 page needed 1 page needed Spalding and Bourn Railway Edit On 29 July 1862 the Spalding and Bourn Railway note 2 was authorised also with capital of 100 000 This line was to make an end on junction at Bourne with an offshoot of the GNR the Bourne and Essendine Railway The line was opened on 1 August 1866 It ran through practically unpopulated terrain The GNR worked the line 2 page needed 3 page needed PW amp SBR extending to Wisbech Edit The Peterborough Wisbech and Sutton Bridge Railway now in 1864 got authorisation to make a connecting line at Wisbech to the GER line and to the harbour The connection to the GER was in fact not made On 1 August 1866 its main line opened for traffic At Peterborough it started from the Midland Railway lines on the west side of the GNR main line and crossed both the Midland and GNR track by a bridge The line was 27 miles 43 km in length to a junction at Sutton Bridge The Midland Railway worked the trains working to and from the GER station at Peterborough and calling at the GNR station en route 2 page needed Rivalry between the GNR and the GER EditThe Great Eastern Railway GER was formed on 7 August 1862 from the Eastern Counties Railway and other concerns The GER made it clear not least by bitter parliamentary struggles to get authorisation for its own line or for running powers to get to Doncaster Considerable quantities of coal were being brought south from the South Yorkshire Coalfield by the GNR and the GER sought to take a share of the traffic Fearing that this might happen suddenly giving the GER a monopoly of the coal traffic to East Anglia the GNR started to sponsor friendly railways in the area itself 2 page needed Midland and Eastern Railway Edit Spalding and Sutton Bridge railways in 1866The Lynn and Sutton Bridge Railway and the Spalding and Bourn Railway amalgamated to form the Midland and Eastern Railway in 1866 the intention was to push westward to Saxby and join the Midland Railway there This plan was opposed by the Great Northern Railway and the compromise was that the scheme was dropped but that the Midland Railway was given running powers from over two GNR sponsored lines from Bourne to Essendine and by reversing there from Essendine to Stamford this was not a direct or fast route The arrangement was agreed and ratified by the Midland and Eastern Railway Act of 23 July 1866 3 page needed The Midland and Eastern Railway was operated by the GNR and the Midland jointly authorised by an Act of 1867 2 page needed 4 page needed The Midland and Eastern Railway leased the Norwich and Spalding line but the N amp SR remained nominally independent until 1 July 1877 3 page needed It needed to go to Parliament to plead that it had in good faith tried to make a Sutton to Wisbech line but had been prevented and that the line had in fact been pre empted by the PB amp SBR this was accepted and the M amp SR was released from the prohibition on declaring a dividend The Midland and Eastern Railway now effectively controlled the whole of the western section of the future M amp GNJR except for the Peterborough to Sutton Bridge line which was still controlled by the Midland Railway 2 page needed The Midland and Eastern was jointly owned by the GNR and the Midland Railway but it operated more or less independently The Joint Committee did not meet between 1867 and 1880 trains of the two owning companies ran their own trains on the lines In this period the network was referred to as the Bourne and Lynn Joint Railway 2 page needed GN and GE Joint Line EditMain article Great Northern and Great Eastern Joint Railway For several years the Great Eastern Railway had been trying to get access to northern districts and had been frustrated by the Great Northern Railway s opposition Nevertheless the GER repeatedly presented bills for such lines and the GNR calculated that it was only a matter of time until it was successful This policy came to fruition in April 1878 during parliamentary hearings on a GER bill and negotiations were set in place to establish what became the Great Northern and Great Eastern Joint Line forming a through route from Doncaster to March via Lincoln The GNR and the Midland Railway had hitherto dominated the southward flow of Nottinghamshire and South Yorkshire coal and saw that the dominance was vulnerable This led the GNR and the Midland to look favourably at further development of the Bourne and Lynn Joint Railway Midland and Eastern Railway 2 page needed Sutton Bridge Dock failure EditIn 1875 parliamentary sanction was obtained by an independent shipping company to develop Sutton Dock Wisbech had traditionally been used as an inland port but a Sutton Bridge Dock connected to the railway network could be advantageous saving part of the difficult navigation up the River Nene The GNR subscribed 20 000 calculating that this could be an export point for coal The dock opened on 14 May 1881 and a short branch railway had been constructed to serve it The day after the opening it was observed that the lock gates were not watertight and in fact a general failure of the wall of the dock took place 12 Ships that had entered the dock were got away but repairs to the dock were said to be impracticable and the dock was not used again the GNR had by then expended 55 000 on an unusable dock system 2 page needed In the east EditGreat Yarmouth and Stalham Light Railway Edit Railways around King s Lynn in 1879Further east it was not until 1876 that the first railway section of the future M amp GNJR was approved the Great Yarmouth and Stalham Light Railway note 3 was authorised on 27 June 1876 note 4 capital was 98 000 The line would run northwest for 16 miles 26 km the Great Yarmouth terminal later to be known as Yarmouth Beach was well situated for holidaymakers but at this stage there was no connection to other railways The first section to Ormesby was opened on 7 August 1877 From Ormesby to Hemsby opened on 16 May 1878 but there was a legal argument about a level crossing at Hemsby and the next section to Martham opened from a temporary station north of the level crossing on 15 July 1878 A temporary station south of the crossing was used from October The legal position was resolved in Parliament in July 1879 and the permanent Hemsby station opened and the two temporary stations closed 2 page needed Meanwhile on 27 May 1878 the company got powers to extend to North Walsham and to change its name to the Yarmouth and North Norfolk Light Railway with additional capital of 60 000 2 page needed Its status as a light railway was designed to prevent the Great Eastern Railway from acquiring running powers over the line 4 page needed Successive openings took place to Catfield on 17 January 1880 and on to Stalham on 3 July 1880 2 page needed 3 page needed Lynn and Fakenham Railway Edit Railways around King s Lynn in 1885On 13 July 1876 the Lynn and Fakenham Railway was authorised by Parliament in the face of bitter opposition by GER interests With capital of 150 000 it was to run from GER influenced connections near King s Lynn to near Fakenham Surprisingly the GER made no attempt to take control of this line in fact making obstructions to the construction process It was opened to Massingham on 16 August 1879 extending to Fakenham on 16 August 1880 2 page needed 3 page needed 1 page needed On 12 August 1880 the Lynn and Fakenham got approval to extend to Norwich creating a much sought after independent line to the city The line was to pass through Melton Constable and from that place there was to be a branch to Blakeney Harbour On 11 August 1881 the Lynn and Fakenham and the Yarmouth and North Norfolk companies together managed at last to get powers to build from Melton Constable to North Walsham which would connect their systems In the same Act the Lynn and Fakenham got powers to build from Kelling to Cromer not actually built and the Yarmouth and North Norfolk was converted from a light railway to a full system avoiding the speed and weight restrictions imposed by light railway status The L amp FR opened from Fakenham to Guestwick on 19 January 1882 and from there to Lenwade on 1 July 1882 The final section to Norwich was opened on 2 December 1882 The Norwich station was named Norwich City from the outset Melton to North Walsham was opened on 5 April 1883 4 page needed 2 page needed Yarmouth Union Railway Edit This short line 1 mile 2 chains 1 65 km long was authorised on 26 August 1880 to extend from the Yarmouth and North Norfolk station at Yarmouth Beach to the quay where it became effectively a tramway joining the GE tramway there but not facilitating any through running between the two systems The capital was 20 000 The YUR itself was slow to start work but with the assistance of the Yarmouth and North Norfolk the work was pushed forward and completed on 15 May 1882 2 page needed 3 page needed Amalgamation the Eastern and Midlands Railway EditNow the many railway companies that were independent of the Great Eastern Railway saw that amalgamation with one another was desirable On 18 August 1882 the Eastern and Midlands Railway Act was passed which arranged that on the first day of 1883 the Eastern and Midlands Railway note 5 was created by amalgamating the Lynn and Fakenham Railway the Yarmouth and North Norfolk and the Yarmouth Union Railway Shares generally were transferred to E amp MR stock but some preference shareholders retained their rights By the same Act a second stage arranged that the E amp MR took over the Midland and Eastern Railway on 1 July 1883 The MR and GNR working arrangements were to continue on those affected routes and the E amp MR could only run trains on those section with the consent of those larger railways 3 page needed 15 page needed 16 page needed The whole line from Bourne to Great Yarmouth was now under the control of the Eastern and Midlands Railway The train service at this stage was lavish 2 page needed with six trains daily on the South Lynn to Melton Constable section and seven from Melton to Norwich City with numerous short workings On Sundays it was made possible to spend the day in Great Yarmouth by running several trains throughout or connecting in to those trains 4 page needed 2 page needed Further openings EditThe section from Melton Constable to Holt was opened on 1 October 1884 King s Lynn was an important regional centre and port on the Ouse and the E amp MR access to it was inconvenient involving from the east reversal at the GER station for through trains and reliance on that company s grudging acquiescence Thoughts had long harboured the intention of creating an independent through route and on 2 November 1885 the Lynn Loop was opened for goods traffic passenger service followed on 1 January 1886 The line ran south of Lynn connecting from South Lynn goods station to Bawsey The former connection from Gaywood Road Junction north of King s Lynn to Bawsey was closed The railways had referred to the main station in King s Lynn simply as Lynn but from this time Lynn Town was used instead After a suspension of work the Holt to Cromer section of line was completed by direct labour and opened on 16 June 1887 A through London King s Cross to Cromer express started running in August 1887 and although the construction had been expensive the boost to revenue from the new line was considerable A second train was put on the following year in the down direction consisting of coaches slipped at Peterborough from a GNR Manchester train The time from King s Cross to Cromer via Peterborough was typically 4 1 2 hours but the GER did London Liverpool Street to Cromer via Norwich in 3 1 2 hours At this time the decision was taken not to go ahead with the Blakeney Harbour branch from Kelling 2 page needed On 20 June 1888 a new branch line from North Walsham to Mundesley a small seaside resort was authorised by Parliament 3 page needed Relationships with the Midland and the GNR EditFor some years there had been continuing friction between the E amp MR and its predecessors and the Midland Railway over the routing for goods traffic The E amp MR contended that the Midland was obliged to route its traffic to Norwich over the E amp MR and not the GER notwithstanding the inferior travel times The Midland repeatedly protested at tribunals that no such obligation existed Now at last a sudden rapprochement took place A bill was to be submitted to the 1888 session of Parliament to build a connecting line from the Midland Railway near Ashwell in the vicinity of Oakham and Bourne The E amp MR was to build this with Midland financial help and the following year the Midland would take over the entire western section Traffic from the eastern section would be directed via the Midland At a stroke this would have cut the GNR out of much of the traffic even though it had constantly been friendly and supportive of the E amp MR when the Midland had treated it shabbily This was extraordinary conduct by the E amp MR R A Read was a director friendly to the Midland but prone to rash and elaborate schemes and Wrottesley attributes these schemes to him 2 page needed Nevertheless the new line was sanctioned on 28 June 1888 although a junction to the GNR at Little Bytham was inserted to mollify the GNR 3 page needed In the months following the passage of the Act wiser counsels prevailed and the E amp MR Midland and GNR boards negotiated a more congenial arrangement The Midland and GNR would become joint owners of the western section the eastern section would be unaffected for the time being The route of the Bourne connecting line to the Midland would be varied to meet the Midland at Saxby the connection to the GNR main line at Little Bytham would be retained and the connecting line west of that point would be Midland property not E amp MR Ordinary shareholders in the E amp MR would get 47 for every 100 worth note 6 A joint committee met at King s Cross on 5 March 1889 it was a Midland and Great Northern Joint Committee but at this stage no such designation was applied to the railway itself Eastern and Midlands Railway in chancery Edit At the moment when the future seemed satisfactory the E amp MR was plunged into crisis For some years it had been paying only modest dividends and profitability had not always been adequate to support outgoings W Jones had been hiring carriages to the company and for some time had not been paid On 27 June 1889 he obtained judgment in his favour but the company had no money to comply At the time there was a system established since 1867 intended to keep a railway in operation for the convenience of the public in this situation in effect to trade out of bankruptcy The rash R A Read was appointed receiver and at a shareholders meeting in November 1889 it was stated that the company had liabilities of over 108 000 on working costs as well as 71 645 on unpaid debenture interest and guaranteed share dividends At a further meeting on 2 May 1890 the debenture holders accused Read of being to blame for getting the line into this situation and demanded his removal as well as a declaration that their debenture payments should rank equally with the railway operating costs contrary to normal practice when a line was in receivership Appeals were eventually dismissed and despite the legal and financial difficulties the railway kept running It was not until 16 August 1892 that a scheme of financial arrangement was finalised Improvements despite the crisis Edit While this was continuing some capital improvements took place largely funded by the Midland Railway Signalling was modernised some additional crossing places were established as well as some short lengths of double track and the Bourne to Saxby line continued to be built On 25 July 1890 an avoiding line at Spalding was authorised enabling through running past the south of the town It opened for goods traffic on 5 June 1893 and on the same day the Saxby to Bourne section opened also for goods only On 28 June 1892 the Sutton Bridge was authorised to be renewed It opened on 18 July 1897 it was a swing bridge and carried road and rail traffic There were tolls on the road part of the bridge but these were given up in 1902 The words Midland and Great Northern Joint Railway appeared in public timetables for the first time in 1890 The M amp GNJR is formed Edit Railways around Cromer in 1906The 1889 arrangement whereby the Midland and GNR jointly took over E amp MR lines applied only to the western section Now in 1891 the two larger companies indicated that they wished to acquire the eastern section too This was agreed in October 1892 and a Bill was submitted to the 1893 session of Parliament The consideration was 1 200 000 of Midland and GNR 3 rent stock although there were complicated provisions for preference and debenture shareholders Both eastern and western sections transferred to the M amp GNJR With only minor interference from the GER the new arrangement passed in Parliament on 9 June 1893 the Midland and Great Northern Joint Railway would become an incorporated entity rather than just a committee delegated by the two principals A total of 113 miles 182 km of railway was involved 2 page needed 3 page needed 18 19 so that the M amp GNJR network was the longest joint railway in the United Kingdom by mileage 1 page needed Further projects EditSaxby and the Spalding avoiding line opened to passengers Edit On 1 May 1894 the Bourne to Saxby line was opened to passengers with additional platforms at Saxby The formation was made for a southward connecting curve there but track was never laid on it The boundary with the Joint Line was at Little Bytham as planned and the formation of the connection to the GNR was also made and here too track was never laid on it The Spalding avoiding line was opened to passenger traffic on the same day 1 May 1894 Mundesley to Cromer Edit An Act of 7 August 1896 authorised the M amp GJR to build on from Mundesley not yet open to Cromer passing south of the town and curving back to approach it from the west The Norfolk and Suffolk Joint Railway Edit Main article Norfolk and Suffolk Joint Railway Both the GER and the M amp GNJR wanted to build a direct coastal line between Great Yarmouth and Lowestoft the coastal area and Lowestoft itself were developing and offered the M amp GNJR much potential At the same time the GER wished to develop its access to Mundesley Notwithstanding the friction between the two companies a sensible accommodation was finalised on 18 March 1897 by which the GER bill for the Yarmouth to Lowestoft line and a Mundesley to Happisburgh line would not be opposed by the M amp GNJR The M amp GNJR would simply build a connecting curve from its line swinging round the north and west of Yarmouth and connecting in to the new GER line and have running powers to Lowestoft A Norfolk and Suffolk Joint Railway company would be created and would control the Yarmouth to Lowestoft line from Gorleston the North Walsham to Mundesley line Mundesley to Cromer and Mundesley to Happisburgh The M amp GNJR Bill for the curve at Yarmouth passed in Parliament on 6 August 1897 and the establishment of the Norfolk and Suffolk Joint Railway was enacted on 25 July 1898 The Lowestoft line opened on 13 July 1903 Opening to Mundesley Edit The Mundesley branch opened for goods traffic on 20 June 1898 and to passengers on 1 July 1898 As a joint line from Antingham Road Junction it had passenger trains of both companies nine GER and seven M amp GNJR daily Goods services alternated month by month From 1900 EditIn the first years of the 20th century the M amp GNJR was doing well financially Long distance expresses were run to the area from northern English cities as well as from London Restaurant cars were put on as well as workers trains for example bringing fish processing women from northern Scotland for seasonal work Fish had become an important traffic since the N amp SJR connection to Lowestoft had been established Although some short sections of double track had been introduced the majority of the network was single line and this brought challenges to timekeeping at busy times The Midland and GNR were operating trains on the line as of right and the GER had acquired running powers over several sections and to some terminal stations Conversely the M amp GNJR needed the cooperation of the GER for some penetrating workings at a time when competition with the GER was still intense In May 1906 the committee approved introduction of the Whitaker tablet exchange apparatus On single track sections head on collision due to signalman error was prevented by a token system drivers of trains entering a single line section must be in possession of a physical token a tablet specific to that section and one only could only be released from control equipment in the one or other of the two signalboxes controlling entry to the section When the train had passed through the section the tablet was placed in the apparatus at that end of the section and only now another might be released either there or at the other end of the section When non stopping trains passed the tablet had to be passed from the signalman to the fireman of the train and this could not be done at speed without injury Whitaker devised a mechanical apparatus to be placed at the lineside and on locomotives to enable the exchange at a higher speed 20 During World War I many of the best long distance express passenger trains were suspended the M amp GNJR took on considerable additional goods traffic during hostilities and many of the workforce left for the armed forces The company maintained an armoured train constructed by the London and North Western Railway at Crewe continuously in steam from early in 1915 in case of enemy invasion 21 After 1918 government control of the railways continued and much traffic in demobilised servicemen tested the capacity of the network There was a general railway strike in the latter months of 1919 and a coal strike in 1921 both of which caused considerable damage to the M amp GNJR The national general strike took place in 1926 2 page needed Grouping of the railways EditWartime control of the railways ended on 15 August 1921 and the government passed the Railways Act 1921 which had the effect of transferring most of the railways of Great Britain into one of four new large companies in a process referred to as the grouping The Midland Railway was transferred to the new London Midland and Scottish Railway LMS and the Great Northern Railway as well as the Great Eastern Railway were transferred to the new London and North Eastern Railway LNER The M amp GNJR remained unchanged now jointly owned by the LMS and LNER The rivalry with the GER was naturally at an end The change took place formally on 1 January 1923 2 page needed The long distance express trains were reinstated progressively and the LNER particularly emphasised London King s Cross to Cromer traffic Holidays at the seaside increased in popularity very considerably after the war and as well as trains to and from the area local services for holidaymakers staying in the area were enhanced in the season However road competition both for goods and passengers began to take a serious toll as roads were improved at the same time a general depression in the agricultural sector harmed M amp GNJR income 2 page needed Incorporation into the LNER Edit The Midland and Great Northern Joint Railway had retained its identity at the grouping of the railways in 1923 In the mid 1930s there was good cooperation between the LMS and the LNER and in 1935 it was agreed that the LNER should manage the operational aspects of the M amp GNJR system though maintaining its independent identity This took effect from 1 October 1936 4 page needed The system consisted of 183 route miles 295 km of which 40 was double track 2 page needed World War II and after EditIn 1939 World War II started and once again most long distance expresses were suspended staff were called up or volunteered in the services However the focus of defence evacuation of children and later the D day landings was the south coast not the east The war ended in 1945 The railways were run down during the war and the government passed the Transport Act 1947 so that the railways became nationalised at the beginning of 1948 forming British Railways BR The long distance and holiday trains began to be restored and holiday camp facilities became popular and were served by the line 2 page needed Local closures Edit The very low usage of some parts of the M amp GNJR system under BR could not be ignored and some local closures started On 6 April 1953 the Cromer Beach to Mundesley section was closed 4 page needed On 21 September 1953 the Yarmouth Beach to Gorleston North section closed 22 The ex GER station Cromer High was closed on 20 September 1954 services being concentrated on the M amp GNJR station Cromer Beach which was extended and improved for the purpose 2 page needed Eye Green Thorney and Wryde stations closed to passengers in 1957 and North Drove closed to passengers in 1958 Diesel trains Edit Diesel multiple unit vehicles were introduced on the M amp GNJR from 18 September 1955 gradually taking over the entire passenger service except the long distance trains which remained locomotive hauled 2 page needed Total closure EditIn May 1958 a report was finalised by British Railways It concluded that the entirety of the M amp GNJR was loss making and was largely duplicated by routes of the former GER Complete closure of passenger services was proposed Widespread closure of goods services too was contemplated with only the Spalding to Sutton Bridge Peterborough to Wisbech South Lynn to Gayton Road and Melton Constable to Norwich City being kept Only the Melton to Cromer branch was to be unaffected by the proposals The scale of the closure aroused considerable opposition mainly focussed on the reduction in amenity to communities although there was also widespread apathy reflected in poor turnouts at public meetings After deliberation the Transport Users Consultative Committee issued its decision in November 1958 that the majority of the proposed closures should proceed Retained sections were Spalding to Bourne for goods Spalding to Sutton Bridge for goods A new spur would be built at Murrow connecting the M amp GN line with the GN amp GE Joint line the Peterborough to Wisbech line would be disconnected at the Peterborough end and served via the Murrow curve from Whitemoor at March Wisbech too would be retained and served from Whitemoor via Murrow Further east the Melton Constable to Norwich line would remain open for goods trains as would the South Lynn to Rudham line Passenger trains would continue to operate between Melton Constable and Cromer and between North Walsham and Mundesley Yarmouth Vauxhall the former GER station would be extended to handle the additional seasonal passenger traffic The closures took place after the last trains on Saturday 28 February 1959 There was much greater public attention to the running of the last passenger trains than there had been to attending the public meetings but the closure was decisive 2 page needed 4 page needed Notwithstanding the dire warnings of protesters a substitute bus service operating from Melton Mowbray to Spalding following closely the route of the railway was almost completely lacking in patronage and was soon given up 4 page needed The Melton Constable to Sheringham line had retained its passenger services for the time being however that too closed to passengers after 4 April 1964 North Walsham to Mundesley closed on 5 October 1964 2 page needed The Spalding to Sutton Bridge goods connection closed after Friday 2 April 1965 4 page needed Topography EditvteMidland and Great Northern Joint RailwayLegendBirmingham Peterborough line MR Saxby MR Edmondthorpeand Wymondham MR South Witham East Coast Main Line MR Castle Bytham Little Bytham Junction to Edenham former E amp LBR Toft Tunnel GNR PeterboroughNorth to EssendineEast Coast Main Line Bourne Eye Green to SleafordThorney TwentyWryde Counter DrainPeterborough Lincoln Line North Drove SpaldingGreat Northern amp Great Eastern Jt Ry Peterborough Lincoln lineMurrow East WestonWisbech St Mary MoultonWisbech North WhaplodeWisbech goods HolbeachWisbech Quay FleetFerry GedneyTydd Long Sutton Sutton Bridge Crosskeysswing bridgeWalpole Terrington Clenchwarton West Lynn South Lynn Fen line to King s Lynnand docksHardwick Road goods Lynn andDereham Railway Gayton RoadNorwich City Grimston RoadHellesdon HillingtonDrayton MassinghamAttlebridge East RudhamLenwade Raynham ParkWhitwell amp Reepham Fakenham WestGuestwick Wymondham to WellsHindolvestone ThursfordMelton Constable Holt original Corpusty and Saxthorpe Holt NNR Kelling Heath Halt NNR Bluestone Weybourne NNR Sheringham NNR Aylsham North Occasional uselevel crossing Sheringham BitternLine Felmingham West Runton Cromer High Cromer BeachRoughton Road Cromer Tunnel Norfolk and Suffolk Jt RyGunton North Walsham North Walsham Town HoningBittern Line Stalham Sutton Staithe Halt Catfield Potter Heigham Potter Heigham Bridge Halt Martham Hemsby Little Ormesby Halt Great Ormesby Scratby Halt California HaltWherry Linesto Norwich Caister Camp Halt Caister on Sea Newtown HaltWhite Swan goods Yarmouth BeachBreydon Viaduct Yarmouth VauxhallNorfolk and Suffolk Jt Rly Yarmouth Lowestoft line South Quay goods tramwaySaxby to Sutton Bridge Edit Saxby Midland Railway station Little Bytham Junction boundary point between Midland Railway and M amp GNJR Bourn opened 16 May 1860 renamed Bourne between 1872 and 1893 closed 2 March 1959 convergence of line from Essendine divergence of line to Spalding Twenty opened September 1866 closed 2 March 1959 Counter Drain opened September 1866 closed 2 March 1959 North Drove opened September 1866 closed 15 September 1958 Cuckoo Junction divergence of avoiding line to Welland Junction Spalding GNR station opened 17 October 1848 M amp GNJR route reverses here divergence northward of GNR and GN amp GE Joint lines Welland Bank Junction convergence of avoiding line from Cuckoo Junction Weston opened 1 December 1858 closed 2 March 1959 Moulton opened 15 November 1858 closed 2 March 1959 Whaplode opened 1 December 1858 closed 2 March 1959 Holbeach opened 15 November 1858 closed 2 March 1959 Fleet opened 1 November 1862 closed 2 March 1959 Gedney opened 1 July 1862 closed 2 March 1959 Long Sutton opened 1 July 1862 closed 2 March 1959 Dock Junction divergence of line to Docks Sutton Bridge Junction convergence of line from Peterborough Sutton Bridge first station Norwich and Spalding terminus opened 1 July 1862 Lynn and Sutton station opened 1 March 1866 closed 2 March 1959 Peterborough to Wisbech and Sutton Bridge Edit Peterborough Wisbech Junction divergence from Midland Railway route Dogsthorpe Brick Works Eye opened 1 August 1866 renamed Eye Green 1875 closed 2 December 1957 Thorney opened 1 August 1866 closed 2 December 1957 Wryde opened 1 August 1866 closed 2 December 1957 Murrow opened 1 August 1866 renamed Murrow East 1948 closed 2 March 1959 Wisbech St Mary opened 1 August 1866 closed 2 March 1959 Wisbeach opened 1 August 1866 renamed Wisbech 1877 renamed Wisbech North 1948 closed 2 March 1959 Ferry opened 1 August 1866 closed 2 March 1959 Tydd opened 1 August 1866 closed 2 March 1959 Sutton Bridge Junction above Sutton Bridge to Norwich Edit Sutton Bridge Cross Keys east end of swing bridge Walpole opened 1 March 1866 closed 2 March 1959 Terrington opened 1 March 1866 closed 2 March 1959 Clenchwarton opened 1 March 1866 closed 2 March 1959 West Lynn opened closed 1886 South Lynn opened 1 January 1886 closed 2 March 1959 South Lynn Junction divergence of line to King s Lynn Gayton Road opened 1 July 1887 closed 2 March 1959 Grimston Road opened 16 August 1879 closed 2 March 1959 Hillington opened 16 August 1879 closed 2 March 1959 Massingham opened 16 August 1879 closed 2 March 1959 Rudham opened 16 August 1880 renamed East Rudham 1 March 1882 closed 2 March 1959 Raynham Park opened 16 August 1880 closed 2 March 1959 Fakenham Town opened 16 August 1880 renamed Fakenham West 27 September 1948 closed 2 March 1959 Thursford opened 19 January 1882 closed 2 March 1959 Melton Constable opened 19 January 1882 closed 6 April 1964 convergence of line from Cromer divergence of line to Yarmouth Hindolvestone opened 19 January 1882 closed 2 March 1959 Guestwick opened 19 January 1882 closed 2 March 1959 Whitwell amp Reepham opened 1 July 1882 closed 2 March 1959 Lenwade opened 1 July 1882 closed 2 March 1959 Attlebridge opened 2 December 1882 closed 2 March 1959 Costessey amp Drayton opened 2 December 1882 renamed Drayton 1 February 1883 closed 2 March 1959 Hellesdon opened 2 December 1882 closed 15 September 1952 Norwich City opened 2 December 1882 closed 2 March 1959 Melton Constable to Cromer Edit Melton Constable above Holt opened 1 October 1884 closed 6 April 1964 Weybourne opened 1 July 1901 closed 6 April 1964 Sherringham opened 16 June 1887 renamed Sheringham 1897 M amp GN station closed in 1967 when new resited station opened now part of the Bittern Line West Runton opened September 1887 still open as part of the Bittern Line Runton West Junction divergence of line to North Walsham Runton East Junction convergence of line from North Walsham and later the Bittern Line from Norwich via ex GER route Cromer Beach opened 16 June 1887 expanded and renamed Cromer 1969 still open as part of the Bittern Line Melton Constable to Great Yarmouth Edit Melton Constable above Corpusty and Saxthorpe opened 5 April 1883 closed 2 March 1959 Bluestone opened 5 April 1883 closed 1 March 1916 Aylsham Town opened 5 April 1883 simply Aylsham 1902 1910 Aylsham North from 1948 closed 2 March 1959 Felmingham opened 5 April 1883 closed 2 March 1959 North Walsham opened 13 June 1881 renamed North Walsham Town 27 September 1948 closed 2 March 1959 Honing opened August 1882 closed 2 March 1959 Stalham opened 3 July 1880 closed 2 March 1959 Sutton Staithe Halt opened 17 July 1933 closed 17 September 1958 Catfield opened 17 January 1880 closed 2 March 1959 Potter Heigham opened 17 January 1880 closed 2 March 1959 Potter Heigham Bridge Halt opened 17 July 1933 closed September 1939 reopened June 1948 closed 17 September 1958 Martham opened 15 July 1878 closed 2 March 1959 Hemsby opened 16 May 1878 closed 2 March 1959 a temporary station to north opened 15 July 1878 temporary station to south opened October 1878 temporary stations closed July 1879 Little Ormesby Halt opened 7 August 1877 closed September 1939 reopened June 1948 closed 2 March 1959 Ormesby opened 7 August 1877 renamed Great Ormesby 21 January 1884 closed 2 March 1959 Scratby Halt opened 7 August 1877 closed September 1939 reopened June 1948 closed 2 March 1959 California summer service only opened 17 July 1933 closed September 1939 reopened June 1948 closed 28 September 1958 Caister Camp Halt summer service only opened 17 July 1933 closed September 1939 reopened June 1948 closed 28 September 1958 Caister opened 7 August 1877 renamed Caister on Sea 1 January 1893 closed 2 March 1959 Newtown Halt opened 7 August 1877 closed September 1939 reopened June 1948 closed 2 March 1959 Yarmouth opened 7 August 1877 renamed Yarmouth Beach 1883 closed 2 March 1959 23 page needed 16 page needed Key people Edit William MarriottFor over 40 years William Marriott served the M amp GN and its predecessors joining the staff of the original contractors Wilkinson and Jarvis in 1881 serving as Engineer from 1883 Locomotive Superintendent from 1884 and finally becoming Traffic Manager as well in 1919 before retiring in 1924 He is commemorated in the name of the Marriott s Way footpath much of which follows the trackbed of the M amp GN Norwich line and in the work of the North Norfolk RailwayMurrow flat crossing EditAt Murrow the M amp GNJR crossed the GN amp GE Joint Line on the level one of few such crossings in the UK and the only one where two joint lines crossed 1 page needed Locomotives EditBecause of the relatively early closure date most workings throughout the life of the M amp GN were operated by steam power A small number of diesel multiple unit services were run in the final years alongside the very occasional incursions of early diesel locomotives The M amp GN mainly used designs from the MR and GNR but included in its stock some of the older E amp M engines often much rebuilt The famous Beyer Peacock engines survived in this way from the early 1880s to the mid 1930s The best contemporary designs were acquired by the Joint in the 1893 1901 period but as there were no more modern engines forthcoming the light 0 6 0s and 4 4 0s provided much of the motive power on the line until 1936 From then on the LNER tried various designs on the line not necessarily bigger or even more recent than the Joint s own engines but as the M amp GN s engines were scrapped newer engines such as the K2 2 6 0s and B12 4 6 0s became common The ex GER D16 Claud Hamilton 4 4 0s provided the locomotive backbone of this later period From the 1950s Ivatt 4MTs became the dominant motive power on the system which achieved a higher degree of standardisation than any other part of British Railways more than 50 of these mucky ducks were allocated here But there were other types still in use and among them the line saw Ivatt 2MTs and occasional Standard 4MT and LNER B1 and B17 types citation needed British Railways Eastern Region was an early adopter of diesel motive power and the M amp GN lines were used by Brush Type 2 locomotives and several early DMU types including Class 101 and Class 105s A fleet of the latter was commissioned in the mid 1950s to take over all the long distance locomotive hauled passenger services but the line s closure in 1959 saw them re allocated especially to the Great Northern suburban commuter workings out of King s Cross for which they were particularly unsuitable One M amp GN boiler from a Hudswell Clarke 4 4 0T survives it is hoped this will be rebuilt as a static exhibit Badge and livery Edit Norfolk Green bus painted in the M amp GN liveryThe M amp GN device consists of images derived from the coats of arms of the four principal cities and towns it served clockwise from top left Peterborough Norwich Great Yarmouth and King s Lynn For much of the company s life the locomotives were painted a light golden brown often referred to by paintshop staff as autumn leaf or golden ochre From 1922 the goods engines were painted dark brown followed by the rest of the locomotives in 1929 The LNER painted the survivors black Most of the carriages were ex GNR and were varnished teak but some of the older stock and rebuilds were painted and grained to look like teak Wagon stock was generally brown oxide the same colour as the GNR used until 1917 when general stock under the common user agreement began to be painted grey The number of M amp GN wagons declined during the 1920s and were eventually bought by the parent companies in 1928 leaving only service stock which was painted red oxide Under British Railways control carriages were often carmine and cream then maroon Cultural impact and heritage Edit Preserved brake van No 12 restored and in operation on the NNR The M amp GN was frequently referred to as the Muddle and Go Nowhere 24 a fairly self evident title for a route that served a mostly rural region but after closure this phrase was commonly replaced with Missed and Greatly Needed 25 The M amp GN s memory is kept alive by two heritage railway operations and railway museums Whilst only the short section between Cromer Beach and Sheringham remains open to regular services 26 the section of branch line between Sheringham and Holt is operated as the North Norfolk Railway 27 The station at Whitwell also operates as a heritage centre with ambitions to restore a section of the M amp GN main line 28 There is also a group dedicated to the study of the line the M amp GN Circle 29 M amp GN signal boxes survive at numerous locations 30 with Cromer Beach box 31 being open to the public 32 The box from Honing also survives at the Barton House Railway near Wroxham 33 The turntable from Bourne engine shed has also survived This turntable was built in Ipswich in 1933 and installed at Bourne When the shed closed along with the line in 1959 it was transferred to Peterborough East railway station After that shed closed the turntable was rebuilt at Wansford station on the Nene Valley railway 34 Very little rolling stock from the line has been preserved The North Norfolk Railway have rescued two passenger coaches and a brake van while a third passenger coach has recently been preserved by the Whitwell amp Reepham Railway Another M amp GN brake van survives No 23 which was built in 1899 was rescued from Melton Constable in 2000 35 Two more M amp GN coaches survive No 40 and 41 originally GNR No 40 is preserved in Alysham 36 and No 41 survives at the former Raynham Station platform and building 37 No locomotives survived with the last complete locomotive being scrapped at the Longmoor Military Railway in 1953 38 The golden ochre livery has been carried by two industrial locomotives on the North Norfolk Railway 39 and was later worn by a bus operated by Norfolk Green 40 on routes formerly served by the company Notes Edit The spelling was Wisbeach until 1877 7 The contemporary spelling it was altered in railway terminology to Bourne in 1894 10 11 This was before the era of the Light Railways Act 1896 which obviated the securing of an Act of Parliament in some circumstances Clark gives exhaustive details of enactment dates 13 Wrottesley gives 26 July 1876 14 Midlands as opposed to Midland appears to be correct Wrottesley uses Midlands consistently as does Casserley on page 16 and Burgess in several places and Carter on page 453 Awdry uses Midlands page 125 Hopwood uses it However Rhodes uses Midland on page 12 Clark uses both in quick succession quoting titles of Acts Midlands on page 21 both spellings on page 22 Midland on page 23 Wrottesley does not make it clear whether these are face value or market prices 17 Footnotes Edit a b c d e Casserley H C 1968 Britain s Joint Lines London Ian Allan ISBN 0 7110 0024 7 a b c d e f g h i j k l m n o p q r s t u v w x y z aa ab ac ad ae af ag ah Wrottesley 1981 a b c d e f g h i j k l m n o Clark Ronald H 1967 A Short History of the Midland amp Great Northern Joint Railway Norwich Goose and Son a b c d e f g h i j k l m n o Rhodes John 1982 The Midland and Great Northern Joint Railway Ian Allan Ltd ISBN 0 7110 1145 1 Gordon D I 1977 A Regional History of the Railways of Great Britain volume 5 The Eastern Counties Newton Abbot David amp Charles ISBN 0 7153 7431 1 Moffat High 1987 East Anglia s First Railways Lavenham Terence Dalton Limited ISBN 0 86138 038 X Wrottesley 1981 p 19 Peterborough Wisbech and Sutton Railway company Cambridge Chronicle and Journal 1 April 1871 p 7 Wrottesley 1981 pp 16 19 21 Rhodes 1982 p 10 Wrottesley 1981 p 20 Sutton Bridge Dock Portsmouth Evening News 24 June 1881 p 3 Clark 1967 p 13 Wrottesley 1981 p 34 Carter E F 1959 An Historical Geography of the Railways of the British Isles London Cassell a b Burgess Neil 2016 Norfolk s Lost Railways Catrine Stenlake Publishing Ltd ISBN 978 1 84033 7556 Wrottesley 1981 p 65 Maxwell Alexander September 1936 The Midland and Great Northern Railway I Its Traffic Railway Magazine Hopwood H L August 1908 The Midland and Great Northern Railway Railway Magazine Sekon G A October 1905 How Expresses Exchange Trains Staffs and Tablets Railway Magazine Pratt Edwin A 1921 Armoured trains for coast defence British railways and the great war Vol 2 London Selwyn amp Blount OCLC 835846426 Passengers No More Second Edition page 110 Quick M E 2002 Railway Passenger Stations in England Scotland and Wales A Chronology The Railway and Canal Historical Society Walpole Cross Keys village website Walpolecrosskeys co uk Archived from the original on 18 May 2013 Retrieved 17 November 2012 Trip Back to the Golden Age of Steam Spalding Advertiser Bittern Line homepage Bitternline com Retrieved 17 November 2012 North Norfolk Railway Nnrailway co uk Retrieved 17 November 2012 Whitwell and Reepham Railway Archived from the original on 18 July 2011 M amp GN Circle The signal box M amp GN listing Signalbox org Retrieved 17 November 2012 Cromer signalbox museum Cromerbox co uk Archived from the original on 2 September 2012 Retrieved 17 November 2012 North Norfolk Railway Sheringham station facilities Nnrailway co uk Retrieved 17 November 2012 Barton House Railway signalling bartonhouserailway org uk Archived from the original on 5 September 2011 Nene Valley Railway Nvr org uk 5 April 1977 Retrieved 17 November 2012 M amp GN 23 Body only Brake van built 1899 GNR Six wheel 5 compartment Composite Body only built 1887 GNR Six wheel 5 compartment Composite Body only built 1887 Rowledge S Midland and Great Northern Joint Railway locomotive list Staplehurst Robinjay Press a href Template Cite journal html title Template Cite journal cite journal a Cite journal requires journal help Photo of Harlaxton in M amp GN livery Arpg org uk 6 December 2004 Retrieved 17 November 2012 Norfolk Green fleet list PDF Retrieved 17 November 2012 References EditWrottesley A J 1981 The Midland amp Great Northern Joint Railway Newton Abbot David amp Charles ISBN 0 7153 8173 3 Further reading EditBecket W S The District Controller s View No 12 Midland and Great Northern Joint Railway M amp GN Railway Operating in the 1950s Xpress Publishing Detailed timetables and descriptions of all line workings including freight Clark M J Railway World Special The M amp GN Ian Allan Clark R H Scenes from the M amp GN Moorland Clark R H A Short History of the M amp GN Joint Railway Goose amp Son Digby Nigel A Guide to the Midland amp Great Northern Joint Railway Ian Allan Digby Nigel The Stations amp Structures of the Midland amp Great Northern Joint Railway Vol 1 Lightmoor Press Architecture and civil engineering station plans Lowestoft to Melton Constable Digby Nigel The Stations amp Structures of the Midland amp Great Northern Joint Railway Vol 2 Lightmoor Press Signalling and permanent way station plans Norwich to Peterborough and Spalding Digby Nigel The Liveries of the Pre Grouping Railways Vol 2 East of England amp Scotland Lightmoor Press Chapter on M amp GN liveries Digby Nigel The Liveries of the M amp GN M amp GN Circle Greeno Dennis M amp GN in Colour Vols 1 4 M amp GN Jt Railway Society Squires Stewart Hollamby Ken eds 2009 Building a Railway Bourne to Saxby Lincoln Record Society ISBN 978 0 901503 86 2 An extraordinary collection of photographs by resident engineer Charles Stansfield Wilson taken 1890 93 showing the construction of this extension of the M amp GN Wells A M The Locomotives of the M amp GN HMRS A detailed and definitive work Whitaker A C Running a Norfolk Railway M amp GN Circle Wilkinson E Operation Norfolk Midland amp Great Northern Joint Railway Passenger Services 1954 Xpress Publishing Detailed timetables and descriptions of passenger workings Hill Roger Vessey Carey 1995 British Railways Past and Present 27 Lincolnshire Past amp Present Publishing Annotated photographs some of which are of the M amp GNMiddleton Press Encyclopedia of Railways series featuring annotated track plans and small photographs Adderson Richard Kenworthy Graham 1998 Branch Lines Around Cromer Middleton Press Adderson Richard Kenworthy Graham 2008 Branch Lines Around Lowestoft Middleton Press Back Michael 2009 Branch Lines Around Spalding M amp GN Saxby to Long Sutton Middleton Press Ingram Andrew 1997 Branch Lines Around Wisbech Middleton Press Adderson Richard Kenworthy Graham 2007 Melton Constable to Yarmouth Beach Middleton Press Back Michael 2008 Peterborough to King s Lynn part of the M amp GN Middleton Press Adderson Richard Kenworthy Graham 2011 South Lynn to Norwich City via Melton Constable Middleton Press External links Edit Media related to Midland and Great Northern Joint Railway at Wikimedia Commons The Midland amp Great Northern Circle Midland amp Great Northern Joint Railway Society M amp GN FAQ Cromer Signalbox project Retrieved from https en wikipedia org w index php title Midland and Great Northern Joint Railway amp oldid 1120461941, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.