The Birmingham–Peterborough line is a cross-country railway line in the United Kingdom, linking Birmingham, Leicester and Peterborough, via Nuneaton, Oakham and Stamford[1]

Birmingham–Peterborough line
Overview
StatusOperational
OwnerNetwork Rail
Locale
Termini
Stations13
Service
TypeHeavy rail
SystemNational Rail
Operator(s)
Rolling stock
History
Opened1846
Technical
Number of tracks2
CharacterSecondary[1]
Track gauge4 ft 8+12 in (1,435 mm) standard gauge
Loading gaugeW10
Operating speedless than 100 mph (160 km/h)
Route map

(Click to expand)

Since the Beeching Axe railway closures in the 1960s, it is the only direct railway link between the West Midlands and the East of England. The line is important for cross-country passenger services, East of Peterborough, the route gives access from the Midlands to various locations in the east of England, such as Ely, Cambridge and Stansted Airport via the West Anglia lines. It is also strategically important for freight, as it allows container trains from the Port of Felixstowe to travel to the Midlands and beyond.

History

The present route is an amalgamation of lines that were built by separate companies. The sections were:

The entire route became part of the London, Midland and Scottish Railway in the 1923 grouping, and the LMS was nationalised on 1 January 1948 as part of British Railways.

Most Birmingham-Leicester passenger trains were taken over by diesel units from 14 April 1958, taking about 79 minutes between the two cities.[4]

In 1977 the Parliamentary Select Committee on Nationalised Industries recommended considering electrification of more of Britain's rail network.[5] By 1979 BR presented a range of options to do so by 2000,[6] some of which included the Birmingham to Peterborough Line.[7] Under the 1979–90 Conservative governments that succeeded the 1976–79 Labour government, the proposal was not implemented.

The route was privatised in the 1990s as part of Railtrack and is now part of Network Rail.

Services

In the 1980s, local services were worked by Class 105 Diesel Multiple Units and long-distance services, such as those between Birmingham New Street and Norwich, were operated by formations of Class 31 locomotives with rakes of four Mark 1 carriages. From 1986 the first Sprinter trains operated on the line, Class 150s, subsequently replaced by Class 156 SuperSprinter units from 1988. From this time, the service operated hourly between Birmingham New Street and Ely with alternate services continuing to Cambridge (Stansted Airport from 1991) or Norwich.

Central Trains operated the route from privatisation, and for operational convenience combined services on the route either side of Birmingham New Street, which created through services such as Aberystwyth and Chester to Cambridge and Stansted Airport and Liverpool Lime Street to Stansted Airport, although these were subsequently cut back - services to Aberystwyth ceased in 2001, although a few services continued to terminate at Shrewsbury until 2004, whilst Liverpool was removed in 2003 to improve performance.

The service in 2016 consists of two trains per hour between Birmingham and Leicester, one of the two calling at limited stops to Leicester and continuing to Stansted Airport via Peterborough, Ely and Cambridge, operated by CrossCountry. East Midlands Railway operates a handful of services along the section between Syston and Peterborough (serving Melton Mowbray and Oakham) as part of its London London St Pancras service via Corby. In addition, there are a few services between Nottingham and Norwich operated by EMR which also serve Stamford.

Cross Country services are exclusively worked by Class 170 Turbostar units, while EMR use Class 158 Express Sprinter trains on services to Norwich and Class 222 Meridian trains for London services. In addition, EMR also operate an evening Spalding to Nottingham service which is worked by a Class 153 SuperSprinter.

Freight trains use the route between the West Midlands and the East Anglia, primarily container trains to the Port of Felixstowe and sand trains to King's Lynn.

Current developments

Felixstowe and Nuneaton freight capacity scheme

 
Route for Felixstowe to Nuneaton freight capacity scheme
 
A container train from Nuneaton approaches Water Orton station
Felixstowe and Nuneaton freight capacity scheme
ProposerNetwork Rail
Cost estimate£291 million
Completion date2014

The Felixstowe–Nuneaton railway upgrade is a large project with a number of elements that will allow more railfreight traffic between the Haven ports and the Midlands. The work was prompted by the 'Felixstowe South' expansion at the Port of Felixstowe. It is also in response to the predicted increase in the number of high-cube (Hi-cube) shipping containers arriving at the ports that cannot currently be accommodated on the route. The percentage of high-cube containers is expected to increase from 30% in 2007 to 50% in 2012. Without loading gauge enhancement these larger containers would have to be transported by road or via a longer rail route via London that is already operating at capacity.[8] Network Rail completed the gauge enhancement from Ipswich to Peterborough in 2008.[9] Work will take place in three phases:

  • Phase 1
    • Nuneaton North Chord (see below)[10]
    • Peterborough to Nuneaton Gauge (W10) (see below)[10]
  • Phase 2a[10]
  • Phase 2b
    • Capacity enhancement Peterborough to Nuneaton during CP5[10]

The work, detailed in the Network Rail Freight Route Utilisation Strategy, should be completed by 2014.[11][needs update] at an estimated cost of £291 million.[10]

The government is providing £80 million[12] and it will also receive £5 million from Network Rail and £1 million from the East of England Development Agency.[13] It has been estimated that the scheme would take 225,000 lorries off the road.[14]

In February 2010 Network Rail confirmed that it would construct the 1 km 'Bacon Factory Chord' in Ipswich to allow trains to travel between the East Suffolk line and the Ipswich–Ely line without reversing into Ipswich Station and to also perform work to increase capacity between Ely–Peterborough line[clarification needed] at a total cost of £50m.[15] It was stated that the work would 'take 750,000 lorries off the roads'.[15]

Peterborough to Nuneaton gauge

Enhancement of a section of the Birmingham–Peterborough line involving the reconstruction of 14 bridges, 11 tracking lowering/slewing schemes and one accommodation bridge. The cost is estimated at £40.5 million.[10] The West Coast Main Line is already cleared to W10 and the route from Nuneaton to Birmingham is already cleared to W12.[16] W10 gauge clearance was achieved on 4 April 2011 and GBRf trains requiring W10 gauge began using the route that day.[citation needed]

Nuneaton North Chord

The Nuneaton North Chord was completed and opened on 15 November 2012.[17] The chord allows freight traffic approaching Nuneaton from Felixstowe via the Birmingham–Peterborough line to proceed north on the West Coast Main Line without conflicting with southbound main-line trains.[18] It consists of a one-mile chord from the existing flyover over the West Coast Main Line to join the line to the north.[19] The cost of this work was £25.6 million.[10] A Transport & Works Act Order for the Nuneaton North Chord was granted by the Secretary of State for Transport in July 2010.[20] Work began in mid-2011.[18]

References

  1. ^ a b (PDF). Network Rail. Archived from the original (PDF) on 4 March 2016. Retrieved 14 September 2014.
  2. ^ Pixton, B (2005). Birmingham-Derby: Portrait of a Famous Route. Runpast Publishing. p. not cited.
  3. ^ [1] 25 July 2010 at the Wayback Machine
  4. ^ Railway Magazine June 1958 p. 432
  5. ^ Anonymous & Winter 1979, p. 0.
  6. ^ Anonymous & Winter 1979, p. 2.
  7. ^ Anonymous & Winter 1979, p. 8.
  8. ^ . Archived from the original on 5 October 2011.
  9. ^ a b "Future development". Port of Felixstowe. Retrieved 11 January 2010.
  10. ^ a b c d e f g . Network Rail. 10 February 2009. Archived from the original on 6 June 2011. Retrieved 29 September 2009.
  11. ^ (PDF). Network Rail. 31 March 2009. Archived from the original (PDF) on 2 September 2009. Retrieved 29 September 2009.
  12. ^ "Government puts £132M into four rail freight schemes". New Civil Engineer. 30 October 2007. (subscription required)
  13. ^ "Freight line should boost port". Ipswich Star. 21 November 2007.
  14. ^ "Rail plan will mean 225,000 fewer HGVs". Evening Telegraph. Peterborough. 9 May 2008.
  15. ^ a b "£50m rail upgrade gets the go ahead". East Anglian Daily Times. Ipswich. 5 February 2010. Retrieved 22 February 2010.[permanent dead link]
  16. ^ "Felixstowe – Nuneaton".[failed verification]
  17. ^ (Press release). Network Rail. 15 November 2012. Archived from the original on 6 July 2015. Retrieved 15 November 2012.
  18. ^ a b "Work starts on Nuneaton chord". Rail. Peterborough. 10 August 2011. p. 20.
  19. ^ "Nuneaton North Chord". Network Rail. Retrieved 26 January 2011.
  20. ^ "The Network Rail (Nuneaton North Chord) Order Plans and Sections" (PDF). Network Rail. Retrieved 11 January 2010.[dead link]

Sources

birmingham, peterborough, line, cross, country, railway, line, united, kingdom, linking, birmingham, leicester, peterborough, nuneaton, oakham, stamford, central, trains, class, turbostar, melton, mowbray, 2006overviewstatusoperationalownernetwork, raillocalee. The Birmingham Peterborough line is a cross country railway line in the United Kingdom linking Birmingham Leicester and Peterborough via Nuneaton Oakham and Stamford 1 Birmingham Peterborough lineCentral Trains Class 170 Turbostar at Melton Mowbray in 2006OverviewStatusOperationalOwnerNetwork RailLocaleEast of EnglandEast MidlandsWest MidlandsTerminiBirmingham New StreetPeterboroughStations13ServiceTypeHeavy railSystemNational RailOperator s CrossCountryEast Midlands RailwayGB RailfreightFreightliner GroupDB Cargo UKRolling stockClass 156 SprinterClass 170 TurbostarClass 222 MeridianInterCity 125HistoryOpened1846TechnicalNumber of tracks2CharacterSecondary 1 Track gauge4 ft 8 1 2 in 1 435 mm standard gaugeLoading gaugeW10Operating speedless than 100 mph 160 km h Route map Click to expand Birmingham Peterborough lineLegendWest Coast Main Line Rugby Birmingham Stafford line Cross Country Routeand Cross City LineBirmingham New StreetCurzon StreetCross City LineCamp Hill LineWest Coast Main Line Rugby Birmingham Stafford line Birmingham Freightliner Terminal site of Lawley Street station SaltleyAston Stechford lineBromford BridgeCastle BromwichSutton Park lineWater OrtonCross Country RouteColeshill ParkwayHams Hall Freight TerminalStonebridge RailwayWhitacre JunctionFreight line to Kingsbury JunctionShustokeDaw Mill CollieryArley and FillongleyArley Colliery Sidingsworkmen s platformStockingford Colliery branch lineStockingfordNuneaton Abbey StreetAshby and Nuneaton Joint RailwayWest Coast Main Line Trent Valley line Nuneaton North ChordNuneatonCoventry to Nuneaton lineWest Coast Main Line Trent Valley line Ashby and Nuneaton Joint RailwayHinckleyElmesthorpeCroftCroft QuarryNarboroughGreat Central Main LineBlabyWigston Glen ParvaSouth WigstonMidland Counties RailwayMidland Main LineLeicester and Swannington RailwayWelford Roadno platforms on southbound lineLeicesterHumberstone RoadGreat Northern RailwayHumberstone Road JunctionSystonMidland Main LineROF QueniboroughRearsbyBrooksbyFrisbyAsfordbyOld Dalby Test TrackGreat Northern and London amp North Western Joint RailwayMelton MowbraySaxbyMidland and GreatNorthern Joint RailwayWhissendineAshwellRutland Railway MuseumOakhamMantonOakham Kettering lineSeaton branchLuffenhamKetton and CollywestonKetton Cement WorksStamfordStamford EastEssendine branchWansford branchUffington and BarnackBainton GateEast Coast Main LineHelpstonPeterborough Lincoln lineWaltonPeterborough CrescentPeterboroughNorthampton Peterborough linePeterborough Ely lineEast Coast Main LineThis diagram viewtalkeditSince the Beeching Axe railway closures in the 1960s it is the only direct railway link between the West Midlands and the East of England The line is important for cross country passenger services East of Peterborough the route gives access from the Midlands to various locations in the east of England such as Ely Cambridge and Stansted Airport via the West Anglia lines It is also strategically important for freight as it allows container trains from the Port of Felixstowe to travel to the Midlands and beyond Contents 1 History 2 Services 3 Current developments 3 1 Felixstowe and Nuneaton freight capacity scheme 3 2 Peterborough to Nuneaton gauge 3 3 Nuneaton North Chord 4 References 5 SourcesHistory EditThe present route is an amalgamation of lines that were built by separate companies The sections were The route from Birmingham to Whitacre Junction was built for the Birmingham and Derby Junction Railway in 1840 which later became part of the Midland Railway The line from Whitacre junction to Nuneaton was built by the Midland Railway and opened in 1864 2 The line between Nuneaton and Wigston was built by the South Leicestershire Railway and was also completed in 1864 3 The South Leicestershire Railway was taken over by the London and North Western Railway in 1867 The section between Wigston and Syston via Leicester was built for the Midland Counties Railway a forerunner of the Midland Railway in 1840 It is now part of the Midland Main Line The eastern section the Syston and Peterborough Railway was built for the Midland Railway and opened in 1846 The entire route became part of the London Midland and Scottish Railway in the 1923 grouping and the LMS was nationalised on 1 January 1948 as part of British Railways Most Birmingham Leicester passenger trains were taken over by diesel units from 14 April 1958 taking about 79 minutes between the two cities 4 In 1977 the Parliamentary Select Committee on Nationalised Industries recommended considering electrification of more of Britain s rail network 5 By 1979 BR presented a range of options to do so by 2000 6 some of which included the Birmingham to Peterborough Line 7 Under the 1979 90 Conservative governments that succeeded the 1976 79 Labour government the proposal was not implemented The route was privatised in the 1990s as part of Railtrack and is now part of Network Rail Services EditIn the 1980s local services were worked by Class 105 Diesel Multiple Units and long distance services such as those between Birmingham New Street and Norwich were operated by formations of Class 31 locomotives with rakes of four Mark 1 carriages From 1986 the first Sprinter trains operated on the line Class 150s subsequently replaced by Class 156 SuperSprinter units from 1988 From this time the service operated hourly between Birmingham New Street and Ely with alternate services continuing to Cambridge Stansted Airport from 1991 or Norwich Central Trains operated the route from privatisation and for operational convenience combined services on the route either side of Birmingham New Street which created through services such as Aberystwyth and Chester to Cambridge and Stansted Airport and Liverpool Lime Street to Stansted Airport although these were subsequently cut back services to Aberystwyth ceased in 2001 although a few services continued to terminate at Shrewsbury until 2004 whilst Liverpool was removed in 2003 to improve performance The service in 2016 consists of two trains per hour between Birmingham and Leicester one of the two calling at limited stops to Leicester and continuing to Stansted Airport via Peterborough Ely and Cambridge operated by CrossCountry East Midlands Railway operates a handful of services along the section between Syston and Peterborough serving Melton Mowbray and Oakham as part of its London London St Pancras service via Corby In addition there are a few services between Nottingham and Norwich operated by EMR which also serve Stamford Cross Country services are exclusively worked by Class 170 Turbostar units while EMR use Class 158 Express Sprinter trains on services to Norwich and Class 222 Meridian trains for London services In addition EMR also operate an evening Spalding to Nottingham service which is worked by a Class 153 SuperSprinter Freight trains use the route between the West Midlands and the East Anglia primarily container trains to the Port of Felixstowe and sand trains to King s Lynn Current developments EditFelixstowe and Nuneaton freight capacity scheme Edit Route for Felixstowe to Nuneaton freight capacity scheme A container train from Nuneaton approaches Water Orton station Felixstowe and Nuneaton freight capacity schemeProposerNetwork RailCost estimate 291 millionCompletion date2014The Felixstowe Nuneaton railway upgrade is a large project with a number of elements that will allow more railfreight traffic between the Haven ports and the Midlands The work was prompted by the Felixstowe South expansion at the Port of Felixstowe It is also in response to the predicted increase in the number of high cube Hi cube shipping containers arriving at the ports that cannot currently be accommodated on the route The percentage of high cube containers is expected to increase from 30 in 2007 to 50 in 2012 Without loading gauge enhancement these larger containers would have to be transported by road or via a longer rail route via London that is already operating at capacity 8 Network Rail completed the gauge enhancement from Ipswich to Peterborough in 2008 9 Work will take place in three phases Phase 1 Nuneaton North Chord see below 10 Peterborough to Nuneaton Gauge W10 see below 10 Phase 2a 10 Doubling 8 km of the Felixstowe Branch Line 9 Doubling the Ipswich to Ely Line between Soham Junction and Ely Raising speed restrictions for freight trains between Ipswich and Peterborough Phase 2b Capacity enhancement Peterborough to Nuneaton during CP5 10 The work detailed in the Network Rail Freight Route Utilisation Strategy should be completed by 2014 11 needs update at an estimated cost of 291 million 10 The government is providing 80 million 12 and it will also receive 5 million from Network Rail and 1 million from the East of England Development Agency 13 It has been estimated that the scheme would take 225 000 lorries off the road 14 In February 2010 Network Rail confirmed that it would construct the 1 km Bacon Factory Chord in Ipswich to allow trains to travel between the East Suffolk line and the Ipswich Ely line without reversing into Ipswich Station and to also perform work to increase capacity between Ely Peterborough line clarification needed at a total cost of 50m 15 It was stated that the work would take 750 000 lorries off the roads 15 Peterborough to Nuneaton gauge Edit Enhancement of a section of the Birmingham Peterborough line involving the reconstruction of 14 bridges 11 tracking lowering slewing schemes and one accommodation bridge The cost is estimated at 40 5 million 10 The West Coast Main Line is already cleared to W10 and the route from Nuneaton to Birmingham is already cleared to W12 16 W10 gauge clearance was achieved on 4 April 2011 and GBRf trains requiring W10 gauge began using the route that day citation needed Nuneaton North Chord Edit The Nuneaton North Chord was completed and opened on 15 November 2012 17 The chord allows freight traffic approaching Nuneaton from Felixstowe via the Birmingham Peterborough line to proceed north on the West Coast Main Line without conflicting with southbound main line trains 18 It consists of a one mile chord from the existing flyover over the West Coast Main Line to join the line to the north 19 The cost of this work was 25 6 million 10 A Transport amp Works Act Order for the Nuneaton North Chord was granted by the Secretary of State for Transport in July 2010 20 Work began in mid 2011 18 References Edit a b Route 19 Midland Main Line and East Midlands PDF Network Rail Archived from the original PDF on 4 March 2016 Retrieved 14 September 2014 Pixton B 2005 Birmingham Derby Portrait of a Famous Route Runpast Publishing p not cited 1 Archived 25 July 2010 at the Wayback Machine Railway Magazine June 1958 p 432 Anonymous amp Winter 1979 p 0 Anonymous amp Winter 1979 p 2 Anonymous amp Winter 1979 p 8 132m boost for rail freight Archived from the original on 5 October 2011 a b Future development Port of Felixstowe Retrieved 11 January 2010 a b c d e f g Presentation to Regional Transport Forum Network Rail 10 February 2009 Archived from the original on 6 June 2011 Retrieved 29 September 2009 Enhancements programme statement of scope outputs and milestones PDF Network Rail 31 March 2009 Archived from the original PDF on 2 September 2009 Retrieved 29 September 2009 Government puts 132M into four rail freight schemes New Civil Engineer 30 October 2007 subscription required Freight line should boost port Ipswich Star 21 November 2007 Rail plan will mean 225 000 fewer HGVs Evening Telegraph Peterborough 9 May 2008 a b 50m rail upgrade gets the go ahead East Anglian Daily Times Ipswich 5 February 2010 Retrieved 22 February 2010 permanent dead link Felixstowe Nuneaton failed verification Nuneaton North chord freight line now open Press release Network Rail 15 November 2012 Archived from the original on 6 July 2015 Retrieved 15 November 2012 a b Work starts on Nuneaton chord Rail Peterborough 10 August 2011 p 20 Nuneaton North Chord Network Rail Retrieved 26 January 2011 The Network Rail Nuneaton North Chord Order Plans and Sections PDF Network Rail Retrieved 11 January 2010 dead link Sources EditRailway Electrification British Railways Board Central Publicity Unit Winter 1979 pp 0 2 8 Retrieved from https en wikipedia org w index php title Birmingham Peterborough line amp oldid 1070881752, wikipedia, wiki, book, books, library,