The Mangla Dam (Urdu: منگلا بند) is a multipurpose dam situated on the Jhelum River in the Mirpur District of Azad Kashmir, Pakistan. It is the sixth-largest dam in the world. The village of Mangla, which sits at the mouth of the dam, serves as its namesake. In November 1961, the project's selected contractors were revealed; it was announced that Binnie & Partners, a British engineering firm, was going to serve as the lead designers, engineers, and inspectors for the construction of the dam (led by Geoffrey Binnie). The project was undertaken by a consortium known as the Mangla Dam Contractors,[2] which consisted of eight American construction firms sponsored by the Guy F. Atkinson Company based in South San Francisco, California.[3]

Mangla Dam
Aerial photograph of the Mangla Dam, c. 2012
Location of the Mangla Dam within Pakistan
CountryPakistan
LocationMangla, Azad Kashmir
Coordinates33°08′31″N 73°38′42″E / 33.142083°N 73.645015°E / 33.142083; 73.645015
StatusOperational
Construction began1961
Opening date1965
Construction costUS$1.5 billion
Owner(s)Government of Pakistan
Operator(s)Water and Power Development Authority (WAPDA)
Dam and spillways
Type of damEmbankment dam
ImpoundsJhelum River
Height147 m (482 ft)
Length3,140 m (10,302 ft)
Reservoir
CreatesMangla Lake
Total capacity9.12 km3 (7,390,000 acre⋅ft)
Catchment area33,334 km2 (12,870 sq mi)
Surface area250 km2 (97 sq mi)
Power Station
Turbines8 x 100 MW
2 x 135 MW
Installed capacity1,070 MW (operational)
1,310 MW (planned)[1]

Background

 
Mangala Dam from the top of Ramkot fortress
 
Picture taken on the Mirpur city side of Lake, near sunset.

As part of the Indus Waters Treaty signed in 1960, India gained rights to the waters of the Ravi, Sutlej and Beas rivers, while Pakistan, in addition to the waters of the aforementioned three rivers' sections within Pakistani territory and some monetary compensation, received the rights to develop the Jhelum, Chenab and Indus river basins. Until 1967, the entire irrigation system of Pakistan was fully dependent on unregulated flows of the Indus River and its major tributaries. The agricultural yield was very low for a number of reasons, the most significant being a lack of water during critical growing periods. This problem stemmed from the seasonal variations in river flow due to monsoons and the absence of storage reservoirs to conserve the vast amounts of surplus water during those periods of high river discharge.[4][5]

The Mangla Dam was the first of the two dams constructed to reduce this shortcoming and strengthen the irrigation system of the country as part of the Indus Basin Project, with the other being the Tarbela Dam situated on the Indus River in Swabi, Khyber Pakhtunkhwa.

Construction

Cost

The Mangla Dam was constructed at a cost of PRs. 15.587 billion (US$1.473 billion) with funding being provided by the World Bank and the Asian Development Bank.[6]

Reservoir

The dam was constructed between 1961 and 1965 across the Jhelum River in the Mirpur District of Kashmir, about 108 kilometres (67 mi) southeast of the capital city of Islamabad. The Mangla Dam components include a reservoir, main embankment, intake embankment, main spillway, emergency spillway, intake structures, 5 tunnels, and a power station. Besides the main dam, a dyke called Sukian – 17,000 ft (5,200 m) in length and a small dam called Jari Dam to block the Jari Nala – about 11 mi (18 km) beyond the new Mirpur town had to be constructed.

There was a total of 120 x 106 cubic yards (cu yds) of excavation for the reservoir whereas the total fill amounted to 142 x 106 cu yds and concrete to 1.96 x 106 cu yds respectively. The main embankment is earthfill with clay as the core material. Gravel and A-type sandstone are applied on the shoulders. The maximum height of embankment above the core trench is 454 ft (138 m) and the length is 8,400 ft (2,600 m). The intake embankment is earthfill type with B-type sandstone as the core material. Gravel is applied on the shoulders. The maximum height of the intake embankment above the core trench is 262 ft (80 m) and the length is 1,900 ft (580 m).

Sukian Dam is earthfill with B-type sandstone as the core material. A-type sandstone is applied on the shoulders. The maximum height of the intake embankment above the core trench is 144 ft (44 m) and the length is 16,900 ft (5,200 m).

Jari Dam is also an earthfill type with silt as the core material. Gravel is applied on the shoulders of the dam. The maximum height of Jari dam above the core trench is 274 ft (84 m) and the length is 6,800 ft (2,100 m). The main spillway is a submerged orifice type with 9 radial gates, 36 ft (11 m) x 40 ft (12 m) each; it has a maximum capacity of 1.1 million cusecs. The emergency spillway is a weir type with an erodible bund and a maximum capacity of 0.23 million cusecs. The 5 tunnels are steel and concrete lined and 1,560 feet long in bedrock. The internal diameter ranges between 26 ft (7.9 m) and 31 ft (9.4 m).[7]

Power house

The powerhouse, which consists of turbines, generators, and transformers, has been constructed at the toe of an intake embankment at the ground surface elevation of 865  feet SPD. The water to the powerhouse is supplied through five steel-lined tunnels of 30/26 feet diameter. Each tunnel is designed to feed two generating units. The powerhouse tailrace discharges into New Bong Canal, which has a length of 25,000  feet with a discharge capacity of about 49,000 cusecs, and terminates at an automatic gate control headworks at about 12 km downstream located near old Bong Escape Headworks.[8][9]

 
A view of turbine relief valve operation at Mangla Power House

There are ten vertical Francis type turbines in the powerhouse. Each of these turbines has an output of 138,00 bhp with a rated head of 295 feet of water. The first four turbines were manufactured by Mitsubishi Electric, Japan and were installed in 1969, turbines 5 and 6 are manufactured by ČKD Blansko, the Czech Republic and were installed in 1974, turbines 7-8 were manufactured by ACEC, Belgium and were installed in 1981, while the remaining two turbines are a make of Škoda, Czech Republic and were commissioned in 1994.[10][8]

These turbines are connected to umbrella-type generators which have a generation capacity of 100 MW. Hitachi, Japan had provided generators for turbines 1–4 and 7-8 while Škoda generators are connected to turbines 5-6 and 9–10.

These generators are in turn connected to three-phase transformers. The transformers connected to turbines 1, 4, and 7 were manufactured by the Italy-based Savigliano. The transformers for turbine 5 and 6 are a make of Italtrafo, another Italian company, while the remaining five transformers were provided by Škoda.[8]

Displacement & Resettlement

The Government of Pakistan had agreed to pay royalties to the Government of AJK (Azad Jammu and Kashmir) for the use of the water and electricity generated by the dam. Over 280 villages and the towns of Mirpur and Dadyal were submerged and over 110,000 people were displaced from the area as a result of the dam being built.[11] Some of those affected by the dam were given work permits for Britain by the Government of Pakistan, and as a result, in many cities in the UK the majority of the Pakistani community originates from the Dadyal-Mirpur area of Kashmir.[12] There are 747,000 Mirpuris in the United Kingdom,[13] and the British Mirpuri community forms about 70% of the British Pakistani community. The percentage is greater in northern cities and towns. In Bradford, an industrial town in north-west England, it is estimated that roughly three-quarters of the population is from Mirpur, with a sizeable population also in Birmingham. At the time, many took up work in the textile and steel mills, due to the acute shortage of workers in England.

Operation

The project was designed primarily to increase the amount of water that could be used for irrigation from the flow of the Jhelum and its tributaries. Its secondary function was to generate electrical power from the irrigation releases at the artificial head of the reservoir. The project, though not initially designed as one, also works as a flood control structure by retaining water during the flood-prone season of Monsoon.[12]

On 5 December 1971, the dam was damaged due to a bombing raid conducted by the Indian Air Force during the Indo-Pakistani War of 1971. This was against the international convention that large water reservoirs would not be targeted in war. As a consequence, the hydro project was temporarily out of service.[14][15]

From the data available in 2009, the project had generated 183.551 billion units of low-cost Hydel energy since its commissioning. The annual generation during 2008-2009 was 4797.425 Million KWh while the station shared a peak load of 1150 MW which was 8.18% of the total WAPDA system peak.[8]

On 1 September 2013, the water level in Mangla Dam reached a record height of 1237.15 feet against the maximum conservation level of 1242 feet. Radio Pakistan reported that "the water level in Mangla Dam has attained the maximum height of 1237.15 feet in the history and it is still increasing."[16]

Mangla Dam Raising Project

Mangla reservoir had an initial reservoir capacity of 7.25 billion cubic metres (5.88 million acre-feet), which reduced to 5.77 billion m3 (4.674 million acre⋅ft) in 2005 due to the sedimentation & was likely to reduce further. To counteract this phenomenon, the Mangla Dam Raising Project was started in 2004 and the main dam, spillway and its allied works were completed in 2009 at a cost of Rs. 101.384 billion. This project effectively raised the dam height by 30 feet to 482 feet (147 m), thereby raising the maximum water conservation level from 1202 feet to 1242 feet.[10][17] This increased the dam's storage capacity from 5.56 to 9.12 billion m3 (4.51 to 7.39 million acre⋅ft).[18] Besides, it is expected that after raising the height of the Mangla Dam by 30 feet, the power house will generate 12 percent additional energy per year which will increase its installed capacity from 1,000 MW to 1,120 MW.[19]

The Mangla Dam Raising Project, however, has affected more than 40,000 people living in the vicinity of the dam. The total cost of compensation and resettlement was Rs. 70 billion. The resettlement project includes the construction of New Mirpur City, four satellite towns (Islamgarh, Chakswari, Dadyal, Siakh) with all civic amenities, the Mirpur Bypass and two bridges across River Jehlum and Bong Canal respectively.[7][20]

 
A motorbike passes over the Dhan Galli bridge, a recently constructed bridge on River Jhelum near the Mangla Dam.

Mangla Power House Expansion Project

 
Ambassador Olson with WAPDA Chairman pledging USAID support

The dam was expanded in the era of Pervez Musharraf but it did not enhance the capacity of electric generation except increasing the level of water in the dam.[citation needed] In November 2012, United States announced a grant of $150 million for the expansion of the Mangla Dam powerhouse. Under the project, $400 million would be spent on the Mangla Dam powerhouse which is estimated to provide additional production for the next 40 years. The project, when complete, will increase the power generation capacity of the Mangla Dam to 1,310 MW from the existing 1,000 MW capacity. WAPDA successfully commissioned two refurbished generating units of the Mangla Hydel Power Station on May 23, 2022, increasing their capacity from 200 MW to 270 MW.[21]

See also

References

  1. ^ "Mangla Refurbishment Project". nation.com.pk. 24 May 2022. Retrieved 20 July 2023.
  2. ^ Muir Wood, Sir Alan (1990). Biographical Memoirs of Fellows of the Royal Society: Geoffrey Morse Binnie (13 November 1908 – 5 April 1989). London: Royal Society. pp. 45–57.
  3. ^ Alvi, Hamid. "Two Years of Mangla Dam Project." Trade and Industry: The International Monthly Economic Journal of Pakistan. Spec. issue on Mangla Dam VIII.5 (1964): 633.
  4. ^ "Tarabela Dam". www.structurae.de. Retrieved 9 July 2007.
  5. ^ "Indus Basin Project". Encyclopædia Britannica. Retrieved 9 July 2007.
  6. ^ "Water Dams: Mangla 2013-07-30 at the Wayback Machine". Water & Power Development Authority.this project included Mr Iqbal Hussein and some other workers who did this work with much hardworking. Retrieved 10 August 2013.
  7. ^ a b (PDF). IUCN Pakistan. Archived from the original (PDF) on 22 October 2013. Retrieved 7 August 2013.
  8. ^ a b c d . Water & Power Development Authority. Archived from the original on 22 October 2013. Retrieved 7 August 2013.
  9. ^ Butt, M. J., Waqas, A., and Mahmood, R. 2010, "The combined effect of Vegetation and Soil Erosion in the Water Resource Management." Water Resource Management. 24(13), 3701-3714, Digital Object Identifier (DOI): 10.1007/s11269-010-9627-7.
  10. ^ a b . Water and Power Development Authority. Archived from the original on 10 June 2012. Retrieved 10 September 2013.
  11. ^ Terminski, Bogumil "development-induced Displacement and Resettlement: Theoretical Frameworks and Current Challenges", Indiana University, 2013, available at: http://dlc.dlib.indiana.edu/dlc/handle/10535/8833?show=full
  12. ^ a b "The Pakistani Muslim Community in England" (PDF). Archived from the original (PDF) on 19 September 2012.
  13. ^ http://www.ons.gov.uk/ons/guide-method/census/2011/the-2011-census/2011-census-questionnaire-content/question-and-content-recommendations/kashmiri-research-project-2011---final-report.pdf[bare URL PDF]
  14. ^ "Hunter Aircraft". Global Security.org. Retrieved 9 July 2007.
  15. ^ "Mangla Dam". Pakistanpaedia. Retrieved 7 August 2013.
  16. ^ "Water level in Mangla Dam reaches to record height of 1237.15 feet". Radio Pakistan. 1 September 2013. Archived from the original on 10 September 2013. Retrieved 1 September 2013.
  17. ^ (PDF). Pakistan Electric Power Company. Archived from the original (PDF) on 4 March 2011. Retrieved 7 August 2013.
  18. ^ "Mangla Dam becomes largest water reservoir of Pakistan". Daily Times (Pakistan). 26 August 2013. Retrieved 10 September 2013.
  19. ^ "Mangla Dam raising to add 120MW". The News International. 22 September 2012. Retrieved 10 September 2013.
  20. ^ "Water storage in Mangla Dam reaches historic high". The Express Tribune. 7 August 2013. Retrieved 10 September 2013.
  21. ^ "Mangla Refurbishment Project". nation.com.pk. 24 May 2022. Retrieved 19 July 2022.

External links

mangla, urdu, منگلا, بند, multipurpose, situated, jhelum, river, mirpur, district, azad, kashmir, pakistan, sixth, largest, world, village, mangla, which, sits, mouth, serves, namesake, november, 1961, project, selected, contractors, were, revealed, announced,. The Mangla Dam Urdu منگلا بند is a multipurpose dam situated on the Jhelum River in the Mirpur District of Azad Kashmir Pakistan It is the sixth largest dam in the world The village of Mangla which sits at the mouth of the dam serves as its namesake In November 1961 the project s selected contractors were revealed it was announced that Binnie amp Partners a British engineering firm was going to serve as the lead designers engineers and inspectors for the construction of the dam led by Geoffrey Binnie The project was undertaken by a consortium known as the Mangla Dam Contractors 2 which consisted of eight American construction firms sponsored by the Guy F Atkinson Company based in South San Francisco California 3 Mangla DamAerial photograph of the Mangla Dam c 2012Location of the Mangla Dam within PakistanCountryPakistanLocationMangla Azad KashmirCoordinates33 08 31 N 73 38 42 E 33 142083 N 73 645015 E 33 142083 73 645015StatusOperationalConstruction began1961Opening date1965Construction costUS 1 5 billionOwner s Government of PakistanOperator s Water and Power Development Authority WAPDA Dam and spillwaysType of damEmbankment damImpoundsJhelum RiverHeight147 m 482 ft Length3 140 m 10 302 ft ReservoirCreatesMangla LakeTotal capacity9 12 km3 7 390 000 acre ft Catchment area33 334 km2 12 870 sq mi Surface area250 km2 97 sq mi Power StationTurbines8 x 100 MW2 x 135 MWInstalled capacity1 070 MW operational 1 310 MW planned 1 Contents 1 Background 2 Construction 2 1 Cost 2 2 Reservoir 2 3 Power house 3 Displacement amp Resettlement 4 Operation 5 Mangla Dam Raising Project 6 Mangla Power House Expansion Project 7 See also 8 References 9 External linksBackground Edit Mangala Dam from the top of Ramkot fortress Picture taken on the Mirpur city side of Lake near sunset As part of the Indus Waters Treaty signed in 1960 India gained rights to the waters of the Ravi Sutlej and Beas rivers while Pakistan in addition to the waters of the aforementioned three rivers sections within Pakistani territory and some monetary compensation received the rights to develop the Jhelum Chenab and Indus river basins Until 1967 the entire irrigation system of Pakistan was fully dependent on unregulated flows of the Indus River and its major tributaries The agricultural yield was very low for a number of reasons the most significant being a lack of water during critical growing periods This problem stemmed from the seasonal variations in river flow due to monsoons and the absence of storage reservoirs to conserve the vast amounts of surplus water during those periods of high river discharge 4 5 The Mangla Dam was the first of the two dams constructed to reduce this shortcoming and strengthen the irrigation system of the country as part of the Indus Basin Project with the other being the Tarbela Dam situated on the Indus River in Swabi Khyber Pakhtunkhwa Construction EditCost Edit The Mangla Dam was constructed at a cost of PRs 15 587 billion US 1 473 billion with funding being provided by the World Bank and the Asian Development Bank 6 Reservoir Edit The dam was constructed between 1961 and 1965 across the Jhelum River in the Mirpur District of Kashmir about 108 kilometres 67 mi southeast of the capital city of Islamabad The Mangla Dam components include a reservoir main embankment intake embankment main spillway emergency spillway intake structures 5 tunnels and a power station Besides the main dam a dyke called Sukian 17 000 ft 5 200 m in length and a small dam called Jari Dam to block the Jari Nala about 11 mi 18 km beyond the new Mirpur town had to be constructed There was a total of 120 x 106 cubic yards cu yds of excavation for the reservoir whereas the total fill amounted to 142 x 106 cu yds and concrete to 1 96 x 106 cu yds respectively The main embankment is earthfill with clay as the core material Gravel and A type sandstone are applied on the shoulders The maximum height of embankment above the core trench is 454 ft 138 m and the length is 8 400 ft 2 600 m The intake embankment is earthfill type with B type sandstone as the core material Gravel is applied on the shoulders The maximum height of the intake embankment above the core trench is 262 ft 80 m and the length is 1 900 ft 580 m Sukian Dam is earthfill with B type sandstone as the core material A type sandstone is applied on the shoulders The maximum height of the intake embankment above the core trench is 144 ft 44 m and the length is 16 900 ft 5 200 m Jari Dam is also an earthfill type with silt as the core material Gravel is applied on the shoulders of the dam The maximum height of Jari dam above the core trench is 274 ft 84 m and the length is 6 800 ft 2 100 m The main spillway is a submerged orifice type with 9 radial gates 36 ft 11 m x 40 ft 12 m each it has a maximum capacity of 1 1 million cusecs The emergency spillway is a weir type with an erodible bund and a maximum capacity of 0 23 million cusecs The 5 tunnels are steel and concrete lined and 1 560 feet long in bedrock The internal diameter ranges between 26 ft 7 9 m and 31 ft 9 4 m 7 Power house Edit The powerhouse which consists of turbines generators and transformers has been constructed at the toe of an intake embankment at the ground surface elevation of 865 feet SPD The water to the powerhouse is supplied through five steel lined tunnels of 30 26 feet diameter Each tunnel is designed to feed two generating units The powerhouse tailrace discharges into New Bong Canal which has a length of 25 000 feet with a discharge capacity of about 49 000 cusecs and terminates at an automatic gate control headworks at about 12 km downstream located near old Bong Escape Headworks 8 9 A view of turbine relief valve operation at Mangla Power HouseThere are ten vertical Francis type turbines in the powerhouse Each of these turbines has an output of 138 00 bhp with a rated head of 295 feet of water The first four turbines were manufactured by Mitsubishi Electric Japan and were installed in 1969 turbines 5 and 6 are manufactured by CKD Blansko the Czech Republic and were installed in 1974 turbines 7 8 were manufactured by ACEC Belgium and were installed in 1981 while the remaining two turbines are a make of Skoda Czech Republic and were commissioned in 1994 10 8 These turbines are connected to umbrella type generators which have a generation capacity of 100 MW Hitachi Japan had provided generators for turbines 1 4 and 7 8 while Skoda generators are connected to turbines 5 6 and 9 10 These generators are in turn connected to three phase transformers The transformers connected to turbines 1 4 and 7 were manufactured by the Italy based Savigliano The transformers for turbine 5 and 6 are a make of Italtrafo another Italian company while the remaining five transformers were provided by Skoda 8 Displacement amp Resettlement EditThe Government of Pakistan had agreed to pay royalties to the Government of AJK Azad Jammu and Kashmir for the use of the water and electricity generated by the dam Over 280 villages and the towns of Mirpur and Dadyal were submerged and over 110 000 people were displaced from the area as a result of the dam being built 11 Some of those affected by the dam were given work permits for Britain by the Government of Pakistan and as a result in many cities in the UK the majority of the Pakistani community originates from the Dadyal Mirpur area of Kashmir 12 There are 747 000 Mirpuris in the United Kingdom 13 and the British Mirpuri community forms about 70 of the British Pakistani community The percentage is greater in northern cities and towns In Bradford an industrial town in north west England it is estimated that roughly three quarters of the population is from Mirpur with a sizeable population also in Birmingham At the time many took up work in the textile and steel mills due to the acute shortage of workers in England Operation EditThe project was designed primarily to increase the amount of water that could be used for irrigation from the flow of the Jhelum and its tributaries Its secondary function was to generate electrical power from the irrigation releases at the artificial head of the reservoir The project though not initially designed as one also works as a flood control structure by retaining water during the flood prone season of Monsoon 12 On 5 December 1971 the dam was damaged due to a bombing raid conducted by the Indian Air Force during the Indo Pakistani War of 1971 This was against the international convention that large water reservoirs would not be targeted in war As a consequence the hydro project was temporarily out of service 14 15 From the data available in 2009 the project had generated 183 551 billion units of low cost Hydel energy since its commissioning The annual generation during 2008 2009 was 4797 425 Million KWh while the station shared a peak load of 1150 MW which was 8 18 of the total WAPDA system peak 8 On 1 September 2013 the water level in Mangla Dam reached a record height of 1237 15 feet against the maximum conservation level of 1242 feet Radio Pakistan reported that the water level in Mangla Dam has attained the maximum height of 1237 15 feet in the history and it is still increasing 16 Mangla Dam Raising Project EditMangla reservoir had an initial reservoir capacity of 7 25 billion cubic metres 5 88 million acre feet which reduced to 5 77 billion m3 4 674 million acre ft in 2005 due to the sedimentation amp was likely to reduce further To counteract this phenomenon the Mangla Dam Raising Project was started in 2004 and the main dam spillway and its allied works were completed in 2009 at a cost of Rs 101 384 billion This project effectively raised the dam height by 30 feet to 482 feet 147 m thereby raising the maximum water conservation level from 1202 feet to 1242 feet 10 17 This increased the dam s storage capacity from 5 56 to 9 12 billion m3 4 51 to 7 39 million acre ft 18 Besides it is expected that after raising the height of the Mangla Dam by 30 feet the power house will generate 12 percent additional energy per year which will increase its installed capacity from 1 000 MW to 1 120 MW 19 The Mangla Dam Raising Project however has affected more than 40 000 people living in the vicinity of the dam The total cost of compensation and resettlement was Rs 70 billion The resettlement project includes the construction of New Mirpur City four satellite towns Islamgarh Chakswari Dadyal Siakh with all civic amenities the Mirpur Bypass and two bridges across River Jehlum and Bong Canal respectively 7 20 A motorbike passes over the Dhan Galli bridge a recently constructed bridge on River Jhelum near the Mangla Dam Mangla Power House Expansion Project Edit Ambassador Olson with WAPDA Chairman pledging USAID supportThe dam was expanded in the era of Pervez Musharraf but it did not enhance the capacity of electric generation except increasing the level of water in the dam citation needed In November 2012 United States announced a grant of 150 million for the expansion of the Mangla Dam powerhouse Under the project 400 million would be spent on the Mangla Dam powerhouse which is estimated to provide additional production for the next 40 years The project when complete will increase the power generation capacity of the Mangla Dam to 1 310 MW from the existing 1 000 MW capacity WAPDA successfully commissioned two refurbished generating units of the Mangla Hydel Power Station on May 23 2022 increasing their capacity from 200 MW to 270 MW 21 See also EditList of dams and reservoirs in Pakistan List of hydroelectric power station failuresReferences Edit Mangla Refurbishment Project nation com pk 24 May 2022 Retrieved 20 July 2023 Muir Wood Sir Alan 1990 Biographical Memoirs of Fellows of the Royal Society Geoffrey Morse Binnie 13 November 1908 5 April 1989 London Royal Society pp 45 57 Alvi Hamid Two Years of Mangla Dam Project Trade and Industry The International Monthly Economic Journal of Pakistan Spec issue on Mangla Dam VIII 5 1964 633 Tarabela Dam www structurae de Retrieved 9 July 2007 Indus Basin Project Encyclopaedia Britannica Retrieved 9 July 2007 Water Dams Mangla Archived 2013 07 30 at the Wayback Machine Water amp Power Development Authority this project included Mr Iqbal Hussein and some other workers who did this work with much hardworking Retrieved 10 August 2013 a b Pakistan Water Gateway Mangla Dam PDF IUCN Pakistan Archived from the original PDF on 22 October 2013 Retrieved 7 August 2013 a b c d Hydel Generation Mangla Dam Water amp Power Development Authority Archived from the original on 22 October 2013 Retrieved 7 August 2013 Butt M J Waqas A and Mahmood R 2010 The combined effect of Vegetation and Soil Erosion in the Water Resource Management Water Resource Management 24 13 3701 3714 Digital Object Identifier DOI 10 1007 s11269 010 9627 7 a b UP GRADATION AND REFURBISHMENT OF GENERATING UNITS OF MANGLA POWER STATION Water and Power Development Authority Archived from the original on 10 June 2012 Retrieved 10 September 2013 Terminski Bogumil development induced Displacement and Resettlement Theoretical Frameworks and Current Challenges Indiana University 2013 available at http dlc dlib indiana edu dlc handle 10535 8833 show full a b The Pakistani Muslim Community in England PDF Archived from the original PDF on 19 September 2012 http www ons gov uk ons guide method census 2011 the 2011 census 2011 census questionnaire content question and content recommendations kashmiri research project 2011 final report pdf bare URL PDF Hunter Aircraft Global Security org Retrieved 9 July 2007 Mangla Dam Pakistanpaedia Retrieved 7 August 2013 Water level in Mangla Dam reaches to record height of 1237 15 feet Radio Pakistan 1 September 2013 Archived from the original on 10 September 2013 Retrieved 1 September 2013 MANGLA DAM RAISING PROJECT PDF Pakistan Electric Power Company Archived from the original PDF on 4 March 2011 Retrieved 7 August 2013 Mangla Dam becomes largest water reservoir of Pakistan Daily Times Pakistan 26 August 2013 Retrieved 10 September 2013 Mangla Dam raising to add 120MW The News International 22 September 2012 Retrieved 10 September 2013 Water storage in Mangla Dam reaches historic high The Express Tribune 7 August 2013 Retrieved 10 September 2013 Mangla Refurbishment Project nation com pk 24 May 2022 Retrieved 19 July 2022 External links Edit Wikimedia Commons has media related to Mangla Dam Times Article about the Mangla Dam Official Site of Mangla where Mangla Dam is located Retrieved from https en wikipedia org w index php title Mangla Dam amp oldid 1169379474, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.