fbpx
Wikipedia

List of U-boats never deployed

During the Second World War, the German Navy built over a thousand U-boats or submarines for service in the Battle of the Atlantic and elsewhere. Although the majority of these had active service careers, and 784 of them were lost at sea, there were still several hundred boats which were never completed or completed too late to see any war service. These boats were sometime solely commissioned as training craft, or were too badly damaged by bombing to be worth completion. Most however were finished in the last six months of the war and never had time or enough fuel to complete their training programs. These boats remained in German harbours up until April/May 1945, when most were taken out to sea by skeleton crews and scuttled to prevent the allies capturing them. The boats that were captured were taken by the Allies to Loch Ryan in Scotland and Lisahally in Northern Ireland. Some were presented to allied navies for commissioning or experiments, but the majority of captured U-boats were towed out to sea in the autumn of 1945 and sunk by gunfire in Operation Deadlight.

U-112 edit

  • Type: XIB
  • Construction
  • Commander
  • Fate: Construction suspended on September 15, 1939, and cancelled in May 1940. Some sources claim that the U-112 was completed and sailed against the US in 1945 and sunk there with all hands, but there is no evidence to support this claim.
  • U-boat.net webpage for U-112

U-113 edit

  • Type: XIB
  • Construction
  • Commander
  • Fate: Construction suspended on September 15, 1939, and cancelled in May 1940.
  • U-boat.net webpage for U-113

U-114 edit

  • Type: XIB
  • Construction
  • Commander
  • Fate: Construction suspended on September 15, 1939, and cancelled in May 1940.
  • U-boat.net webpage for U-114

U-115 edit

  • Type: XIB
  • Construction
  • Commander
  • Fate: Construction suspended on September 15, 1939, and cancelled in May 1940.
  • U-boat.net webpage for U-115

U-329 edit

  • Type: VIIC/41
  • Construction
  • Commander
  • Fate: Cancelled on July 20, 1944, and broken up.
  • U-boat.net webpage for U-329

U-330 edit

  • Type: VIIC/41
  • Construction
  • Commander
  • Fate: Cancelled on July 20, 1944, and broken up.
  • U-boat.net webpage for U-330

U-395 edit

  • Type: VIIC
  • Construction
    • Laid Down: June 10, 1942
    • Launched: July 16, 1943
    • Commissioned:
    • Shipyard: Howaldtswerke, Kiel
  • Commander
  • Fate: Bombed while being fitted out on July 29, 1943, and left unfinished.
  • U-boat.net webpage for U-395

U-474 edit

  • Type: VIIC
  • Construction
    • Laid Down: December 18, 1941
    • Launched: April 17, 1943
    • Commissioned:
    • Shipyard: Deutsche Werft, Kiel
  • Commander
  • Fate: Sunk by bombs during an air raid on May 14, 1943. It was raised and 95% repaired in 1945, but was scuttled on May 3, 1945.
  • U-boat.net webpage for U-474

U-491 edit

  • Type: XIV
  • Construction
  • Commander
  • Fate: Was 75% complete when construction was halted in 1944. Further construction halted on September 23, 1944, and broken up.
  • U-boat.net webpage for U-491

U-492 edit

  • Type: XIV
  • Construction
  • Commander
  • Fate: Was 75% complete when construction was halted in 1944. Further construction halted on September 23, 1944, and broken up.
  • U-boat.net webpage for U-492

U-493 edit

  • Type: XIV
  • Construction
  • Commander
  • Fate: Was 75% complete when construction was halted in 1944. Further construction halted on September 23, 1944, and broken up.
  • U-boat.net webpage for U-493

U-494 edit

  • Type: XIV
  • Construction
  • Commander
  • Fate: Construction cancelled September 23, 1944 and broken up.
  • U-boat.net webpage for U-494

U-495 edit

  • Type: XIV
  • Construction
  • Commander
  • Fate: Construction cancelled on September 23, 1944, and broken up.
  • U-boat.net webpage for U-495

U-496 edit

  • Type: XIV
  • Construction
  • Commander
  • Fate: Construction cancelled on September 23, 1944, and broken up.
  • U-boat.net webpage for U-496

U-497 edit

  • Type: XIV
  • Construction
  • Commander
  • Fate: Construction cancelled on September 23, 1944, and broken up.
  • U-boat.net webpage for U-497

U-684 edit

  • Type: VIIC
  • Construction
    • Laid Down: March 4, 1943
    • Launched: April 1944
    • Commissioned:
    • Shipyard: Howaldtswerke, Kiel
  • Commander
  • Fate: Never finished and scuttled in front of the Elbe II bunker in Hamburg on May 3, 1945.
  • U-boat.net webpage for U-684

U-685 edit

  • Type: VIIC
  • Construction
    • Laid Down: March 8, 1943
    • Launched: April 1944
    • Commissioned:
    • Shipyard: Howaldtswerke, Kiel
  • Commander
  • Fate: Never finished and scuttled in front of the Elbe II bunker in Hamburg on May 3, 1945.
  • U-boat.net webpage for U-685

U-686 edit

  • Type: VIIC
  • Construction
  • Commander
  • Fate: Never finished. Cancelled on September 23, 1944.
  • U-boat.net webpage for U-686

U-687 edit

  • Type: VIIC/41
  • Construction
  • Commander
  • Fate: Construction suspended on November 3, 1943, and cancelled on July 22, 1944.
  • U-boat.net webpage for U-687

U-688 edit

  • Type: VIIC/41
  • Construction
  • Commander
  • Fate: Never finished. Construction suspended on September 30, 1943, and cancelled on July 22, 1944.
  • U-boat.net webpage for U-688

U-689 edit

  • Type: VIIC/41
  • Construction
  • Commander
  • Fate: Never finished. Construction suspended on September 30, 1943, and cancelled on July 22, 1944.
  • U-boat.net webpage for U-689

U-723 edit

  • Type: VIIC/41
  • Construction
  • Commander
  • Fate: Construction postponed on September 30, 1943, and never built.
  • U-boat.net webpage for U-723

U-724 edit

  • Type: VIIC/41
  • Construction
  • Commander
  • Fate: Construction postponed on September 30, 1943, and never built.
  • U-boat.net webpage for U-724

U-769 edit

  • Type: VIIC
  • Construction
  • Commander
  • Fate: Damaged in an air raid (along with U-770) on January 27, 1943. Due to amount of damage the work number was transferred to another submarine and U-769 was reassigned a new work number. Construction suspended on September 30, 1943, and cancelled on July 22, 1944.
  • U-boat.net webpage for U-769

U-770 edit

  • Type: VIIC
  • Construction
  • Commander
  • Fate: Damaged in an air raid (along with U-769) on January 27, 1943. Due to amount of damage the werk number was transferred to another submarine and U-770 was reassigned a new werk number. Construction suspended on September 30, 1943, and cancelled on July 22, 1944.
  • U-boat.net webpage for U-770

U-780 edit

  • Type: VIIC
  • Construction
  • Commander
  • Fate: Construction suspended on September 30, 1943, and cancelled on July 20, 1944.
  • U-boat.net webpage for U-780

U-781 edit

  • Type: VIIC
  • Construction
  • Commander
  • Fate: Construction suspended on September 30, 1943, and cancelled on July 20, 1944.
  • U-boat.net webpage for U-781

U-782 edit

  • Type: VIIC
  • Construction
  • Commander
  • Fate: Construction suspended on September 30, 1943, and cancelled on July 22, 1944.
  • U-boat.net webpage for U-782

U-791 edit

  • Type: V 300
  • Construction
  • Commander
  • Fate: Enlarged version of V 80, except with a conning tower. The only ship of this type, cancelled on August 7, 1942, in favor of other more promising Walter designs.
  • U-boat.net webpage for U-791

U-792 edit

  • Type: XVIIA
  • Construction
    • Laid Down: December 1, 1942
    • Launched: September 28, 1943
    • Commissioned: November 16, 1943
    • Shipyard: Blohm & Voss, Hamburg
  • Commander
    • Horst Heitz
    • Hans Diederich Huis
  • Fate: Used for trials and later as a floating fuel bunker. Scuttled in the Audorfer See near Rendsburg on May 4, 1945. Raised on May 26, 1945, and taken to Britain as a war prize and used for trials, but was soon torn down for parts and scrapped. Final fate unknown.
  • U-boat.net webpage for U-792

U-793 edit

  • Type: XVIIA
  • Construction
    • Laid Down: December 1, 1942
    • Launched: September 28, 1943
    • Commissioned: November 16, 1943
    • Shipyard: Blohm & Voss, Hamburg
  • Commander
    • Gunter Schauenburg
    • Friedrich Schmidt
  • Fate: Used for trials; scuttled in the Audorfer See near Rendsburg on May 4, 1945. Raised on May 26, 1945, and taken to Britain as a war prize and used for trials, but was torn down for parts and scrapped.
  • U-boat.net webpage for U-793

U-796 edit

  • Type: XVIII
  • Construction
  • Commander
  • Fate: Construction cancelled on March 27, 1944.
  • U-boat.net webpage for U-796

U-797 edit

  • Type: XVIII
  • Construction
  • Commander
  • Fate: Construction cancelled on March 27, 1944. Was never laid down.
  • U-boat.net webpage for U-797

U-798 edit

  • Type: XVIIK
  • Construction
  • Commander
  • Fate: Was still incomplete in May 1945.
  • U-boat.net webpage for U-798

U-807 edit

  • Type: IXC/40
  • Construction
  • Commander
  • Fate: Construction suspended on September 30, 1943, and cancelled on July 22, 1944.
  • U-boat.net webpage for U-807

U-808 edit

  • Type: IXC/40
  • Construction
  • Commander
  • Fate: Construction suspended on September 30, 1943, and cancelled on July 22, 1944.
  • U-boat.net webpage for U-808

U-809 edit

  • Type: IXC/40
  • Construction
  • Commander
  • Fate: Construction suspended on September 30, 1943, and cancelled on July 22, 1944.
  • U-boat.net webpage for U-809

U-810 edit

  • Type: IXC/40
  • Construction
  • Commander
  • Fate: Construction suspended on September 30, 1943, and cancelled on July 22, 1944.
  • U-boat.net webpage for U-810

U-811 edit

  • Type: IXC/40
  • Construction
  • Commander
  • Fate: Construction suspended on September 30, 1943, and cancelled on July 22, 1944.
  • U-boat.net webpage for U-811

U-812 edit

  • Type: IXC/40
  • Construction
  • Commander
  • Fate: Construction suspended on September 30, 1943, and cancelled on July 22, 1944.
  • U-boat.net webpage for U-812

U-813 edit

  • Type: IXC/40
  • Construction
  • Commander
  • Fate: Construction suspended on September 30, 1943, and cancelled on November 6, 1943.
  • U-boat.net webpage for U-813

U-814 edit

  • Type: IXC/40
  • Construction
  • Commander
  • Fate: Construction suspended on September 30, 1943, and cancelled on November 6, 1943.
  • U-boat.net webpage for U-814

U-815 edit

  • Type: IXC/40
  • Construction
  • Commander
  • Fate: Construction suspended on September 30, 1943, and cancelled on November 6, 1943.
  • U-boat.net webpage for U-815

U-816 edit

  • Type: IXC/40
  • Construction
  • Commander
  • Fate: Construction suspended on September 30, 1943, and cancelled on November 6, 1943.
  • U-boat.net webpage for U-816

U-823 edit

  • Type: VIIC
  • Construction
    • Laid Down: November 11, 1941
    • Launched:
    • Commissioned:
    • Shipyard: Oderwerke, Stettin
  • Commander
  • Fate: Construction suspended on November 6, 1943. Cancelled on July 20, 1944, and left unfinished.
  • U-boat.net webpage for U-823

U-824 edit

  • Type: VIIC
  • Construction
    • Laid Down: November 24, 1941
    • Launched:
    • Commissioned:
    • Shipyard: Oderwerke, Stettin
  • Commander
  • Fate: Construction suspended on November 6, 1943. Cancelled on July 20, 1944, and left unfinished.
  • U-boat.net webpage for U-824

U-882 edit

  • Type: IXC/40
  • Construction
    • Laid Down: August 21, 1943
    • Launched: April 29, 1944
    • Commissioned:
    • Shipyard: AG Weser, Bremen
  • Commander
  • Fate: Bombed in dock on March 30, 1945.
  • U-boat.net webpage for U-882

U-884 edit

  • Type: IXD/42
  • Construction
    • Laid Down: August 29, 1943
    • Launched: May 17, 1944
    • Commissioned:
    • Shipyard: AG Weser, Bremen
  • Commander
  • Fate: Badly damaged by an American bombing raid on March 30, 1945.
  • U-boat.net webpage for U-884

U-885 edit

  • Type: IXD/42
  • Construction
  • Commander
  • Fate: Construction suspended November 6, 1943 and cancelled July 22, 1944. Was not laid down.
  • U-boat.net webpage for U-885

U-886 edit

  • Type: IXD/42
  • Construction
  • Commander
  • Fate: Construction suspended November 6, 1943 and cancelled July 22, 1944. Was not laid down.
  • U-boat.net webpage for U-886

U-887 edit

  • Type: IXD/42
  • Construction
  • Commander
  • Fate: Construction suspended November 6, 1943 and cancelled July 22, 1944. Was not laid down.
  • U-boat.net webpage for U-887

U-888 edit

  • Type: IXD/42
  • Construction
  • Commander
  • Fate: Construction suspended November 6, 1943 and cancelled July 22, 1944. Was not laid down.
  • U-boat.net webpage for U-888

U-890 edit

  • Type: IXC/40
  • Construction
    • Laid Down: September 20, 1943
    • Launched: April 24, 1944
    • Commissioned:
    • Shipyard: AG Weser, Bremen
  • Commander
  • Fate: Sunk on July 29, 1944, while being fitted out.
  • U-boat.net webpage for U-890

U-891 edit

  • Type: IXC/40
  • Construction
    • Laid Down: October 11, 1943
    • Launched: May 4, 1944
    • Commissioned:
    • Shipyard: AG Weser, Bremen
  • Commander
  • Fate: Sunk during an air raid on March 30, 1945, while being fitted out.
  • U-boat.net webpage for U-891

U-892 edit

  • Type: IXC/40
  • Construction
    • Laid Down: October 23, 1943
    • Launched:
    • Commissioned:
    • Shipyard: AG Weser, Bremen
  • Commander
  • Fate: Construction suspended on September 23, 1944.
  • U-boat.net webpage for U-892

U-893 edit

  • Type: IXC/40
  • Construction
  • Commander
  • Fate: Construction suspended on November 6, 1943, and cancelled on July 22, 1944.
  • U-boat.net webpage for U-893

U-894 edit

  • Type: IXC/40
  • Construction
  • Commander
  • Fate: Construction suspended on November 6, 1943, and cancelled on July 22, 1944.
  • U-boat.net webpage for U-894

U-895 edit

  • Type: IXC/40
  • Construction
  • Commander
  • Fate: Construction suspended on September 30, 1943, and cancelled on July 22, 1944.
  • U-boat.net webpage for U-895

U-896 edit

  • Type: IXC/40
  • Construction
  • Commander
  • Fate: Construction suspended on September 30, 1943, and cancelled on July 22, 1944.
  • U-boat.net webpage for U-896

U-897 edit

  • Type: IXC/40
  • Construction
  • Commander
  • Fate: Construction suspended on September 30, 1943, and cancelled on July 22, 1944.
  • U-boat.net webpage for U-897

U-898 edit

  • Type: IXC/40
  • Construction
  • Commander
  • Fate: Construction suspended on November 6, 1943, and cancelled on July 22, 1944.
  • U-boat.net webpage for U-898

U-899 edit

  • Type: IXC/40
  • Construction
  • Commander
  • Fate: Construction suspended on September 30, 1943, and cancelled on July 22, 1944.
  • U-boat.net webpage for U-899

U-900 edit

  • Type: IXD/42
  • Construction
  • Commander
  • Fate: Construction suspended on September 30, 1943, and cancelled on November 6, 1943. Keel had not been laid down.
  • U-boat.net webpage for U-900

U-902 edit

  • Type: VIIC
  • Construction
    • Laid Down: January 24, 1942
    • Launched: December 24, 1943
    • Commissioned:
    • Shipyard: Vulcan, Stettin
  • Commander
  • Fate: Damaged twice by bombs, cancelled on July 22, 1944.
  • U-boat.net webpage for U-902

U-906 edit

  • Type: VIIC
  • Construction
  • Commander
  • Fate: Sunk during an air raid on December 31, 1944, and left unfinished.
  • U-boat.net webpage for U-906

U-908 edit

  • Type: VIIC
  • Construction
  • Commander
  • Fate: Damaged by bombs and left unfinished.
  • U-boat.net webpage for U-908

U-931 edit

  • Type: VIIC/41
  • Construction
    • Laid Down: June 26, 1943
    • Launched:
    • Commissioned:
    • Shipyard: Neptun-Werft AG, Rostock
  • Commander
  • Fate: Was 40% complete when it was cancelled on September 23, 1944, and broken up.
  • U-boat.net webpage for U-931

U-932 edit

  • Type: VIIC/41
  • Construction
    • Laid Down: August 21, 1943
    • Launched:
    • Commissioned:
    • Shipyard: Neptun-Werft AG, Rostock
  • Commander
  • Fate: Was 35% complete when it was cancelled on September 23, 1944, and broken up.
  • U-boat.net webpage for U-932

U-996 edit

  • Type: VIIC/41
  • Construction
    • Laid Down: November 25, 1942
    • Launched: July 22, 1943
    • Commissioned:
    • Shipyard: Blohm & Voss, Hamburg
  • Commander
  • Fate: Sunk at dock in August 1944.
  • U-boat.net webpage for U-996

U-1011 edit

  • Type: VIIC/41
  • Construction
    • Laid Down: March 12, 1943
    • Launched:
    • Commissioned:
    • Shipyard: Blohm & Voss, Hamburg
  • Commander
  • Fate: Damaged during an RAF raid on July 25, 1943; repair work cancelled on July 22, 1944.
  • U-boat.net webpage for U-1011

U-1012 edit

  • Type: VIIC/41
  • Construction
    • Laid Down: March 11, 1943
    • Launched:
    • Commissioned:
    • Shipyard: Blohm & Voss, Hamburg
  • Commander
  • Fate: Damaged during an RAF raid on July 25, 1943; repair work cancelled on July 22, 1944.
  • U-boat.net webpage for U-1012

U-1026 edit

  • Type: VIIC/41
  • Construction
    • Laid Down: June 3, 1943
    • Launched: May 25, 1944
    • Commissioned:
    • Shipyard: Blohm & Voss, Hamburg
  • Commander
  • Fate: Never finished, scuttled in May 1945.
  • U-boat.net webpage for U-1026

U-1027 edit

  • Type: VIIC/41
  • Construction
    • Laid Down: June 17, 1943
    • Launched: November 27, 1944
    • Commissioned:
    • Shipyard: Blohm & Voss, Hamburg
  • Commander
  • Fate: Never finished, scuttled in May 1945.
  • U-boat.net webpage for U-1027

U-1028 edit

  • Type: VIIC/41
  • Construction
    • Laid Down: June 17, 1943
    • Launched: November 28, 1944
    • Commissioned:
    • Shipyard: Blohm & Voss, Hamburg
  • Commander
  • Fate: Never finished, scuttled in May 1945.
  • U-boat.net webpage for U-1028

U-1029 edit

  • Type: VIIC/41
  • Construction
    • Laid Down: June 18, 1943
    • Launched: July 5, 1944
    • Commissioned:
    • Shipyard: Blohm & Voss, Hamburg
  • Commander
  • Fate: Never finished, scuttled in May 1945.
  • U-boat.net webpage for U-1029

U-1030 edit

  • Type: VIIC/41
  • Construction
    • Laid Down: June 28, 1943
    • Launched: July 5, 1944
    • Commissioned:
    • Shipyard: Blohm & Voss, Hamburg
  • Commander
  • Fate: Never finished, scuttled in May 1945.
  • U-boat.net webpage for U-1030

U-1031 edit

  • Type: VIIC/41
  • Construction
    • Laid Down: July 12, 1943
    • Launched:
    • Commissioned:
    • Shipyard: Blohm & Voss, Hamburg
  • Commander
  • Fate: Construction suspended on September 30, 1943. Cancelled on July 22, 1944, and broken up.
  • U-boat.net webpage for U-1031

U-1032 edit

  • Type: VIIC/41
  • Construction
    • Laid Down: July 12, 1943
    • Launched:
    • Commissioned:
    • Shipyard: Blohm & Voss, Hamburg
  • Commander
  • Fate: Construction suspended on September 30, 1943. Cancelled on July 22, 1944, and broken up.
  • U-boat.net webpage for U-1032

U-1108 edit

  • Type: VIIC/41
  • Construction
    • Laid Down: September 20, 1943
    • Launched: September 5, 1944
    • Commissioned: November 18, 1944
    • Shipyard: Nordseewerken, Emden
  • Commander
    • Wolf Wigand
  • Fate: Surrendered at Horten, Norway on May 9, 1945. Transferred to Lisahally, Northern Ireland on May 27, 1945. Acquired by Britain and became a British N-class submarine.
  • U-boat.net webpage for U-1108

U-1133 edit

  • Type: VIIC/41
  • Construction
  • Commander
  • Fate: Construction suspended on September 30, 1943, and cancelled on July 22, 1944.
  • U-boat.net webpage for U-1133

U-1134 edit

  • Type: VIIC/41
  • Construction
  • Commander
  • Fate: Construction suspended on September 30, 1943, and cancelled on July 22, 1944.
  • U-boat.net webpage for U-1134

U-1135 edit

  • Type: VIIC/41
  • Construction
  • Commander
  • Fate: Construction suspended on September 30, 1943, and cancelled on July 22, 1944.
  • U-boat.net webpage for U-1135

U-1136 edit

  • Type: VIIC/41
  • Construction
  • Commander
  • Fate: Construction suspended on September 30, 1943, and cancelled on July 22, 1944.
  • U-boat.net webpage for U-1136

U-1171 edit

  • Type: VIIC/41
  • Construction
    • Laid Down: May 5, 1943
    • Launched: November 23, 1943
    • Commissioned: March 22, 1944
    • Shipyard: Danziger Werft, Danzig
  • Commander
    • Otto-Heinrich Nachtigall
    • Hermann Koopmann
  • Fate: Surrendered at Stavanger, Norway on May 10, 1945. Transferred to Lisahally, Northern Ireland on May 27, 1945. Acquired by Britain and became British N-class submarine N19.
  • U-boat.net webpage for U-1171

U-1173 edit

  • Type: VIIC/41
  • Construction
  • Commander
  • Fate: Construction stopped on December 18, 1943, and left unfinished.
  • U-boat.net webpage for U-1173

U-1174 edit

  • Type: VIIC/41
  • Construction
  • Commander
  • Fate: Construction stopped on September 23, 1944, after contract was cancelled. Laid up incomplete in Danzig, captured unfinished by the Soviets on March 30, 1945, and launched at Danzig in mid-1945. Towed to Latvia where it was inspected by the TNC at Libau on October 8, 1945, still incomplete. Probably moved to Kronstadt in late 1945 or early 1946 and scrapped in 1947-1948.
  • U-boat.net webpage for U-1174

U-1175 edit

  • Type: VIIC/41
  • Construction
  • Commander
  • Fate: Construction stopped on October 28, 1943, and left unfinished. Cancelled on September 23, 1944.
  • U-boat.net webpage for U-1175

U-1176 edit

  • Type: VIIC/41
  • Construction
  • Commander
  • Fate: Construction stopped on September 23, 1944, after contract was cancelled. Laid up incomplete in Danzig, captured unfinished by the Soviets on March 30, 1945, and launched at Danzig in mid-1945. Towed to Latvia where it was inspected by the TNC at Libau on October 8, 1945, still incomplete and with a jammed rudder. Probably moved to Kronstadt in late 1945 or early 1946 and scrapped in 1947-1948.
  • U-boat.net webpage for U-1176

U-1177 edit

  • Type: VIIC/41
  • Construction
  • Commander
  • Fate: Construction suspended on November 6, 1943, but resumed until launching. Construction stopped on July 22, 1944, after contract was cancelled. Laid up incomplete at Kaiser Basin, Danzig, captured unfinished by the Soviets on March 30, 1945, and launched at Danzig in mid-1945. Towed to Latvia where it was inspected by the TNC at Libau on October 8, 1945, still incomplete and with shrapnel damage. Probably moved to Kronstadt in late 1945 or early 1946 and scrapped in 1947-1948.
  • U-boat.net webpage for U-1177

U-1178 edit

  • Type: VIIC/41
  • Construction
  • Commander
  • Fate: Construction suspended on November 6, 1943, and cancelled on July 22, 1944.
  • U-boat.net webpage for U-1178

U-1179 edit

  • Type: VIIC/41
  • Construction
  • Commander
  • Fate: Construction suspended on November 6, 1943, and cancelled on July 22, 1944.
  • U-boat.net webpage for U-1179

U-1197 edit

  • Type: VIIC
  • Construction
    • Laid Down: March 13, 1943
    • Launched: September 30, 1943
    • Commissioned: December 2, 1943
    • Shipyard: Schichau-Werke, Danzig
  • Commander
    • Heinz Baum
    • Kurt Lau
  • Fate: Decommissioned at Wesermünde on April 25, 1945, after suffering severe damage during a US air raid at AG Weser shipyard at Bremen on March 30, 1945. Captured at Wesermünde by British forces in May 1945. Sunk in the North Sea by the US Navy in February 1946.
  • U-boat.net webpage for U-1197

U-1236 edit

  • Type: IXC/40
  • Construction
    • Laid Down: June 7, 1943
    • Launched: February 7, 1944
    • Commissioned:
    • Shipyard: Deutsche Werft AG, Hamburg
  • Commander
  • Fate: Construction abandoned in 1944 and suspended on September 23, 1944. Scuttled in the Hansa Basin, Hamburg on May 3, 1945. Raised in June or August 1945 and broken up.
  • U-boat.net webpage for U-1236

U-1237 edit

  • Type: IXC/40
  • Construction
    • Laid Down: June 22, 1943
    • Launched: February 22, 1944
    • Commissioned:
    • Shipyard: Deutsche Werft AG, Hamburg
  • Commander
  • Fate:
  • U-boat.net webpage for U-1237

U-1238 edit

  • Type: IXC/40
  • Construction
    • Laid Down: July 6, 1943
    • Launched: March 16, 1944
    • Commissioned:
    • Shipyard: Deutsche Werft AG, Hamburg
  • Commander
  • Fate:
  • U-boat.net webpage for U-1238

U-1239 edit

  • Type: IXC/40
  • Construction
    • Laid Down: July 20, 1943
    • Launched:
    • Commissioned:
    • Shipyard: Deutsche Werft AG, Hamburg
  • Commander
  • Fate:
  • U-boat.net webpage for U-1239

U-1240 edit

  • Type: IXC/40
  • Construction
    • Laid Down: August 21, 1943
    • Launched:
    • Commissioned:
    • Shipyard: Deutsche Werft AG, Hamburg
  • Commander
  • Fate:
  • U-boat.net webpage for U-1240

U-1241 edit

  • Type: IXC/40
  • Construction
    • Laid Down: September 29, 1943
    • Launched:
    • Commissioned:
    • Shipyard: Deutsche Werft AG, Hamburg
  • Commander
  • Fate:
  • U-boat.net webpage for U-1241

U-1242 edit

  • Type: IXC/40
  • Construction
    • Laid Down: October 1943
    • Launched:
    • Commissioned:
    • Shipyard: Deutsche Werft AG, Hamburg
  • Commander
  • Fate:
  • U-boat.net webpage for U-1242

U-1243 edit

  • Type: IXC/40
  • Construction
    • Laid Down:
    • Launched:
    • Commissioned:
    • Shipyard: Deutsche Werft AG, Hamburg
  • Commander
  • Fate: Cancelled on September 23, 1943.
  • U-boat.net webpage for U-1243

U-1244 edit

  • Type: IXC/40
  • Construction
    • Laid Down:
    • Launched:
    • Commissioned:
    • Shipyard: Deutsche Werft AG, Hamburg
  • Commander
  • Fate: Cancelled on September 23, 1943.
  • U-boat.net webpage for U-1244

U-1245 edit

  • Type: IXC/40
  • Construction
    • Laid Down:
    • Launched:
    • Commissioned:
    • Shipyard: Deutsche Werft AG, Hamburg
  • Commander
  • Fate: Construction suspended September 30, 1943 and cancelled July 22, 1944.
  • U-boat.net webpage for U-1245

U-1246 edit

  • Type: IXC/40
  • Construction
    • Laid Down:
    • Launched:
    • Commissioned:
    • Shipyard: Deutsche Werft AG, Hamburg
  • Commander
  • Fate: Construction suspended September 30, 1943 and cancelled July 22, 1944.
  • U-boat.net webpage for U-1246

U-1247 edit

  • Type: IXC/40
  • Construction
    • Laid Down:
    • Launched:
    • Commissioned:
    • Shipyard: Deutsche Werft AG, Hamburg
  • Commander
  • Fate: Construction suspended September 30, 1943 and cancelled July 22, 1944.
  • U-boat.net webpage for U-1247

U-1248 edit

  • Type: IXC/40
  • Construction
    • Laid Down:
    • Launched:
    • Commissioned:
    • Shipyard: Deutsche Werft AG, Hamburg
  • Commander
  • Fate: Construction suspended September 30, 1943 and cancelled July 22, 1944.
  • U-boat.net webpage for U-1248

U-1249 edit

  • Type: IXC/40
  • Construction
    • Laid Down:
    • Launched:
    • Commissioned:
    • Shipyard: Deutsche Werft AG, Hamburg
  • Commander
  • Fate: Construction suspended September 30, 1943 and cancelled July 22, 1944.
  • U-boat.net webpage for U-1249

U-1250 edit

  • Type: IXC/40
  • Construction
    • Laid Down:
    • Launched:
    • Commissioned:
    • Shipyard: Deutsche Werft AG, Hamburg
  • Commander
  • Fate: Construction suspended September 30, 1943 and cancelled July 22, 1944.
  • U-boat.net webpage for U-1250

U-1251 edit

  • Type: IXC/40
  • Construction
    • Laid Down:
    • Launched:
    • Commissioned:
    • Shipyard: Deutsche Werft AG, Hamburg
  • Commander
  • Fate: Construction suspended September 30, 1943 and cancelled November 6, 1943.
  • U-boat.net webpage for U-1251

U-1252 edit

  • Type: IXC/40
  • Construction
    • Laid Down:
    • Launched:
    • Commissioned:
    • Shipyard: Deutsche Werft AG, Hamburg
  • Commander
  • Fate: Construction suspended September 30, 1943 and cancelled November 6, 1943.
  • U-boat.net webpage for U-1252

U-1253 edit

  • Type: IXC/40
  • Construction
    • Laid Down:
    • Launched:
    • Commissioned:
    • Shipyard: Deutsche Werft AG, Hamburg
  • Commander
  • Fate: Construction suspended September 30, 1943 and cancelled November 6, 1943.
  • U-boat.net webpage for U-1253

U-1254 edit

  • Type: IXC/40
  • Construction
    • Laid Down:
    • Launched:
    • Commissioned:
    • Shipyard: Deutsche Werft AG, Hamburg
  • Commander
  • Fate: Construction suspended September 30, 1943 and cancelled November 6, 1943.
  • U-boat.net webpage for U-1254

U-1255 edit

  • Type: IXC/40
  • Construction
    • Laid Down:
    • Launched:
    • Commissioned:
    • Shipyard: Deutsche Werft AG, Hamburg
  • Commander
  • Fate: Construction suspended September 30, 1943 and cancelled November 6, 1943.
  • U-boat.net webpage for U-1255

U-1280 edit

  • Type: VIIC/41
  • Construction
    • Laid Down: September 17, 1943
    • Launched:
    • Commissioned:
    • Shipyard: Bremer Vulkan, Bremen-Vegesack
  • Commander
  • Fate: Was 50-60% complete when it was cancelled on September 23, 1944.
  • U-boat.net webpage for U-1280

U-1281 edit

  • Type: VIIC/41
  • Construction
    • Laid Down: September 17, 1943
    • Launched:
    • Commissioned:
    • Shipyard: Bremer Vulkan, Bremen-Vegesack
  • Commander
  • Fate: Was 50-60% complete when it was cancelled on September 23, 1944.
  • U-boat.net webpage for U-1281

U-1282 edit

  • Type: VIIC/41
  • Construction
    • Laid Down: October 20, 1943
    • Launched:
    • Commissioned:
    • Shipyard: Bremer Vulkan, Bremen-Vegesack
  • Commander
  • Fate: Was 50-60% complete when it was cancelled on September 23, 1944.
  • U-boat.net webpage for U-1282

U-1406 edit

  • Type: XVIIB
  • Construction
    • Laid Down: October 30, 1943
    • Launched: January 2, 1945
    • Commissioned: February 8, 1945
    • Shipyard: Blohm & Voss, Hamburg
  • Commander
    • Werner Klug
  • Fate: Surrendered at Cuxhaven, Germany on May 5, 1945. Scuttled along with U-1407 by Oblt. Gerhard Grumpelt against orders on May 7, 1945. Later raised and taken to the US on the deck of transport vessel Shoemaker, arriving at Portsmouth on October 11. Was never repaired or put into service by the US Navy. Sold for scrap in New York in May 1948 to Interstate Metals Corporation and broken up.
  • U-boat.net webpage for U-1406

U-1407 edit

  • Type: XVIIB
  • Construction
    • Laid Down: November 13, 1943
    • Launched:
    • Commissioned: March 13, 1945
    • Shipyard: Blohm & Voss, Hamburg
  • Commander
    • Horst Heitz
  • Fate: Surrendered at Cuxhaven, Germany on May 5, 1945. Scuttled along with U-1406 by Gerhard Grumpelt against orders on May 7, 1945. Later raised and taken to Britain as a war prize and became British N-class submarine N25 and later HMS Meteorite.
  • U-boat.net webpage for U-1407

U-1408 edit

  • Type: XVIIB
  • Construction
    • Laid Down: November 27, 1943
    • Launched:
    • Commissioned:
    • Shipyard: Blohm & Voss, Hamburg
  • Commander
  • Fate: Damaged in air raid on March 30, 1945, and scuttled at yard before completion.
  • U-boat.net webpage for U-1408

U-1409 edit

  • Type: XVIIB
  • Construction
    • Laid Down: December 15, 1943
    • Launched:
    • Commissioned:
    • Shipyard: Blohm & Voss, Hamburg
  • Commander
  • Fate: Damaged in air raid on March 30, 1945, and scuttled at yard before completion.
  • U-boat.net webpage for U-1409

U-1410 edit

  • Type: XVIIB
  • Construction
    • Laid Down: December 31, 1943
    • Launched:
    • Commissioned:
    • Shipyard: Blohm & Voss, Hamburg
  • Commander
  • Fate: Damaged in air raid on March 30, 1945, and scuttled at yard before completion.
  • U-boat.net webpage for U-1410

U-2201 edit

  • Type: XIV
  • Construction
  • Commander
  • Fate: Construction suspended on June 3, 1944, and cancelled September 23, 1944.
  • U-boat.net webpage for U-2201

U-2202 edit

  • Type: XIV
  • Construction
  • Commander
  • Fate: Construction suspended on June 3, 1944, and cancelled September 23, 1944.
  • U-boat.net webpage for U-2202

U-2203 edit

  • Type: XIV
  • Construction
  • Commander
  • Fate: Construction suspended on June 3, 1944, and cancelled September 23, 1944.
  • U-boat.net webpage for U-2203

U-2204 edit

  • Type: XIV
  • Construction
  • Commander
  • Fate: Construction suspended on June 3, 1944, and cancelled September 23, 1944.
  • U-boat.net webpage for U-2204

U-2323 edit

  • Type: XXIII
  • Construction
    • Laid Down: April 11, 1944
    • Launched: May 31, 1944
    • Commissioned: July 18, 1944
    • Shipyard: Deutsche Werft, Hamburg
  • Commander
    • Walter Angermann
  • Fate: Sank off Möltenort by a mine on July 26, 1944, on her maiden voyage, killing two crew. Raised in early 1945 and was still under repairs when Germany surrendered. Broken up in place after WWII.
  • U-boat.net webpage for U-2323

U-2327 edit

  • Type: XXIII
  • Construction
    • Laid Down: May 16, 1944
    • Launched: July 29, 1944
    • Commissioned: August 19, 1944
    • Shipyard: Deutsche Werft, Hamburg
  • Commander
    • Heinrich Mürl
    • Werner Müller
    • Hans-Walter Pahl
    • Hermann Schulz
  • Fate: Scuttled at Kiel on May 2, 1945, as part of Operation Regenbogen. Later raised and broken up.
  • U-boat.net webpage for U-2327

U-2331 edit

  • Type: XXIII
  • Construction
    • Laid Down: June 30, 1944
    • Launched: August 22, 1944
    • Commissioned: September 12, 1944
    • Shipyard: Deutsche Werft, Hamburg
  • Commander
    • Hans-Walter Pahl
  • Fate: Sank by accident near Hela, killing 15 crew. Later raised and towed to Gotenhafen (now Gdynia) and broken up for scrap.
  • U-boat.net webpage for U-2331

U-2332 edit

  • Type: XXIII
  • Construction
  • Commander
    • Dieter Bornkessel
  • Fate: Scuttled at Hamburg on May 3, 1945, as part of Operation Regenbogen. Later raised and broken up.
  • U-boat.net webpage for U-2332

U-2333 edit

U-2337 edit

  • Type: XXIII
  • Construction
    • Laid Down: August 2, 1944
    • Launched: September 15, 1944
    • Commissioned: October 4, 1944
    • Shipyard: Deutsche Werft, Hamburg
  • Commander
    • Günter Behnisch
  • Fate: Surrendered at Kristiansand Süd, Norway on May 9, 1945. Transferred to Loch Ryan, Scotland on May 29, 1945. Sunk by gunfire from British destroyer HMS Onslow and Polish destroyer ORP Piorun on November 28, 1945, as part of Operation Deadlight.
  • U-boat.net webpage for U-2337

U-2338 edit

  • Type: XXIII
  • Construction
    • Laid Down: August 10, 1944
    • Launched: September 18, 1944
    • Commissioned: October 9, 1944
    • Shipyard: Deutsche Werft, Hamburg
  • Commander
    • Hans-Dietrich Kaiser
  • Fate: Sunk by RAF British Beaufighters of 236 Squadron and 254 Squadron on May 4, 1945, killing 12 crew. Raised in 1952 and broken up.
  • U-boat.net webpage for U-2338

U-2340 edit

  • Type: XXIII
  • Construction
    • Laid Down: August 18, 1944
    • Launched: September 28, 1944
    • Commissioned: October 16, 1944
    • Shipyard: Deutsche Werft, Hamburg
  • Commander
    • Emil Klusmeier
  • Fate: Sunk at Hamburg during a British bombing run on March 30, 1945. Later raised and broken up.
  • U-boat.net webpage for U-2340

U-2341 edit

  • Type: XXIII
  • Construction
    • Laid Down: August 23, 1944
    • Launched: October 3, 1944
    • Commissioned: October 21, 1944
    • Shipyard: Deutsche Werft, Hamburg
  • Commander
    • Hermann Böhm
  • Fate: Surrendered at Cuxhaven, Germany on May 5, 1945. Transferred to Lisahally, Northern Ireland on June 21, 1945. Sunk by gunfire from British destroyer HMS Onslaught and Polish destroyer ORP Błyskawica on December 31, 1945, as part of Operation Deadlight.
  • U-boat.net webpage for U-2341

U-2342 edit

  • Type: XXIII
  • Construction
    • Laid Down: August 29, 1944
    • Launched: October 13, 1944
    • Commissioned: November 1, 1944
    • Shipyard: Deutsche Werft, Hamburg
  • Commander
    • Berchthold Schad von Mittelbiberach
  • Fate: Sunk in the Baltic Sea north of Swinemünde by a mine on December 20, 1944, killing seven crew. Wreck still in place in August 1953 and blown up in late October or November 1954. Remainder of wreck taken ashore and broken up for scrap.
  • U-boat.net webpage for U-2342

U-2343 edit

  • Type: XXIII
  • Construction
    • Laid Down: August 31, 1944
    • Launched: October 18, 1944
    • Commissioned: November 6, 1944
    • Shipyard: Deutsche Werft, Hamburg
  • Commander
    • Harald Fuhlendorf
    • Hans-Ludwig Gaude
  • Fate: Scuttled in or near Gelting Bay on May 5, 1945, as part of Operation Regenbogen. Later raised and broken up.
  • U-boat.net webpage for U-2343

U-2344 edit

  • Type: XXIII
  • Construction
    • Laid Down: September 4, 1944
    • Launched: October 24, 1944
    • Commissioned: November 10, 1944
    • Shipyard: Deutsche Werft, Kiel
  • Commander
    • Hermann Ellerlage
  • Fate: Sank north of Heiligendamm on February 18, 1945, following a collision with U-2336, killing 10 crew. Raised on January 22, 1955, and taken to Rostock, measured and conserved, but never repaired. Broken up at Rostock in 1958.
  • U-boat.net webpage for U-2344

U-2345 edit

  • Type: XXIII
  • Construction
    • Laid Down: September 7, 1944
    • Launched: October 28, 1944
    • Commissioned: November 15, 1944
    • Shipyard: Deutsche Werft, Hamburg
  • Commander
    • Karl Steffen
  • Fate: Surrendered at Stavanger, Norway on May 9, 1945. Transferred to Loch Ryan, Scotland on June 30, 1945. Towed out and scuttled on November 27, 1945, as part of Operation Deadlight.
  • U-boat.net webpage for U-2345

U-2346 edit

  • Type: XXIII
  • Construction
    • Laid Down: September 14, 1944
    • Launched: October 31, 1944
    • Commissioned: November 20, 1944
    • Shipyard: Deutsche Werft, Hamburg
  • Commander
    • Hermann von der Höh
  • Fate: Scuttled in Gelting Bay on May 5, 1945, as part of Operation Regenbogen. Later raised and broken up.
  • U-boat.net webpage for U-2346

U-2347 edit

  • Type: XXIII
  • Construction
    • Laid Down: September 20, 1944
    • Launched: November 6, 1944
    • Commissioned: December 2, 1944
    • Shipyard: Deutsche Werft, Hamburg
  • Commander
    • Willibald Ulbing
  • Fate: Scuttled in Gelting Bay on May 5, 1945, as part of Operation Regenbogen. Later raised and broken up.
  • U-boat.net webpage for U-2347

U-2348 edit

  • Type: XXIII
  • Construction
    • Laid Down: September 22, 1944
    • Launched: November 11, 1944
    • Commissioned: December 4, 1944
    • Shipyard: Deutsche Werft, Hamburg
  • Commander
    • Willibald Ulbing
  • Fate: Surrendered at Stavanger, Norway on May 9, 1945. Transferred to Loch Ryan on May 27, 1945. Broken up at Belfast in April 1949.
  • U-boat.net webpage for U-2348

U-2349 edit

  • Type: XXIII
  • Construction
    • Laid Down: September 25, 1944
    • Launched: November 20, 1944
    • Commissioned: December 11, 1944
    • Shipyard: Deutsche Werft, Hamburg
  • Commander
    • Hans-Georg Müller
  • Fate: Scuttled in Gelting Bay on May 5, 1945, as part of Operation Regenbogen. Later raised and broken up.
  • U-boat.net webpage for U-2349

U-2350 edit

  • Type: XXIII
  • Construction
    • Laid Down: September 28, 1944
    • Launched: November 22, 1944
    • Commissioned: December 23, 1944
    • Shipyard: Deutsche Werft, Hamburg
  • Commander
    • Werner Schauer
  • Fate: Surrendered at Kristiansand Süd, Norway on May 9, 1945. Transferred to Loch Ryan, Scotland on May 29, 1945. Sunk by gunfire from British destroyer HMS Onslow and Polish destroyer ORP Piorun on November 28, 1945, as part of Operation Deadlight.
  • U-boat.net webpage for U-2350

U-2351 edit

  • Type: XXIII
  • Construction
    • Laid Down: September 28, 1944
    • Launched: November 22, 1944
    • Commissioned: December 23, 1944
    • Shipyard: Deutsche Werft, Hamburg
  • Commander
    • Werner Brückner
  • Fate: Surrendered at Flensburg, Germany on May 5, 1945. Later transferred to Lisahally, Northern Ireland. Sunk by gunfire from British destroyer HMS Offa on January 3, 1946, as part of Operation Deadlight.
  • U-boat.net webpage for U-2351

U-2352 edit

  • Type: XXIII
  • Construction
    • Laid Down: October 3, 1944
    • Launched: November 25, 1944
    • Commissioned: December 30, 1944
    • Shipyard: Deutsche Werft, Hamburg
  • Commander
    • Sigmund Budzyn
  • Fate: Scuttled at Hørav Hav, Denmark on May 5, 1945, as part of Operation Regenbogen. Later raised and broken up.
  • U-boat.net webpage for U-2352

U-2353 edit

  • Type: XXIII
  • Construction
    • Laid Down: October 10, 1944
    • Launched: December 6, 1944
    • Commissioned: January 9, 1945
    • Shipyard: Deutsche Werft, Hamburg
  • Commander
    • Jürgen Hillmann
  • Fate: Surrendered at Kristiansand Süd, Norway on May 9, 1945. Transferred to Loch Ryan, Scotland on May 29, 1945. Allocated to the Soviet Union by the TNC. Arrived at Libau, Latvia on December 4, 1945, as British N-class N31. Allocated to the Soviet Baltic Fleet on February 13, 1946. Renamed M-51 on June 9, 1949, and transferred to reserve fleet as a training hulk on December 22, 1950. Struck from Soviet Navy list on March 17, 1952, and broken up for scrap in 1963.
  • U-boat.net webpage for U-2353

U-2354 edit

  • Type: XXIII
  • Construction
    • Laid Down: October 14, 1944
    • Launched: December 10, 1944
    • Commissioned: January 11, 1945
    • Shipyard: Deutsche Werft, Hamburg
  • Commander
    • Hans-Dieter Wex
  • Fate: Surrendered at Kristiansand Süd, Norway on May 9, 1945. Transferred to Loch Ryan, Scotland on May 29, 1945. Sunk by gunfire from British destroyer HMS Onslow on December 22, 1945, as part of Operation Deadlight.
  • U-boat.net webpage for U-2354

U-2363 edit

  • Type: XXIII
  • Construction
    • Laid Down: November 22, 1944
    • Launched: January 18, 1945
    • Commissioned: February 5, 1945
    • Shipyard: Deutsche Werft, Hamburg
  • Commander
    • Karl Frahm
  • Fate: Surrendered at Kristiansand Süd, Norway on May 9, 1945. Transferred to Loch Ryan, Scotland on May 29, 1945. Sunk by gunfire from British destroyer HMS Onslow and Polish destroyer ORP Piorun on November 28, 1945, as part of Operation Deadlight.
  • U-boat.net webpage for U-2363

U-2364 edit

  • Type: XXIII
  • Construction
    • Laid Down: November 27, 1944
    • Launched: January 23, 1945
    • Commissioned: February 14, 1945
    • Shipyard: Deutsche Werft, Hamburg
  • Commander
    • Dieter Hengen
    • Gerhard Remus
  • Fate: Scuttled in Gelting Bay on May 5, 1945, as part of Operation Regenbogen. Later raised and broken up.
  • U-boat.net webpage for U-2364

U-2365 edit

  • Type: XXIII
  • Construction
    • Laid Down: December 6, 1944
    • Launched: January 26, 1945
    • Commissioned: March 2, 1945
    • Shipyard: Deutsche Werft, Hamburg
  • Commander
    • Fritz-Otto Korfmann
    • Uwe Christiansen
  • Fate: Scuttled in the Kattegat, northwest of Anholt island on May 8, 1945, as part of Operation Regenbogen. Raised in June 1956 and commissioned as West German submarine Hai on August 15, 1957.
  • U-boat.net webpage for U-2365

U-2366 edit

  • Type: XXIII
  • Construction
    • Laid Down: December 6, 1944
    • Launched: February 17, 1945
    • Commissioned: March 10, 1945
    • Shipyard: Deutsche Werft, Hamburg
  • Commander
    • Kurt Jäckel
  • Fate: Scuttled in Gelting Bay on May 3, 1945, as part of Operation Regenbogen. Later raised and broken up.
  • U-boat.net webpage for U-2366

U-2367 edit

  • Type: XXIII
  • Construction
    • Laid Down: December 11, 1944
    • Launched: February 23, 1945
    • Commissioned: March 17, 1945
    • Shipyard: Deutsche Werft, Hamburg
  • Commander
    • Heinrich Schröder
  • Fate: Sank near Schleimünde on May 5, 1945, following a collision with another U-boat. Raised in August 1956 and commissioned as West German submarine Hecht on October 1, 1957.
  • U-boat.net webpage for U-2367

U-2368 edit

  • Type: XXIII
  • Construction
    • Laid Down: December 15, 1944
    • Launched: March 29, 1945
    • Commissioned: April 11, 1945
    • Shipyard: Deutsche Werft, Hamburg
  • Commander
    • Fritz Ufermann
  • Fate: Scuttled in Gelting Bay on May 3, 1945, as part of Operation Regenbogen. Later raised and broken up.
  • U-boat.net webpage for U-2368

U-2369 edit

  • Type: XXIII
  • Construction
    • Laid Down: December 20, 1944
    • Launched: March 24, 1945
    • Commissioned: April 18, 1945
    • Shipyard: Deutsche Werft, Hamburg
  • Commander
    • Hermann Schulz
  • Fate: Scuttled in Gelting Bay on May 3, 1945, as part of Operation Regenbogen. Later raised and broken up.
  • U-boat.net webpage for U-2369

U-2370 edit

  • Type: XXIII
  • Construction
    • Laid Down: December 20, 1944
    • Launched:
    • Commissioned:
    • Shipyard: Deutsche Werft, Hamburg
  • Commander
  • Fate: Some sources state U-2370 was commissioned on April 15, 1944. However, according to planned commander Oblt. Bornkesser the submarine was never commissioned and was scuttled unfinished on May 3, 1945, at the Fink II bunker in Hamburg.
  • U-boat.net webpage for U-2370

U-2371 edit

  • Type: XXIII
  • Construction
    • Laid Down: January 19, 1945
    • Launched: April 18, 1945
    • Commissioned: April 24, 1945
    • Shipyard: Deutsche Werft, Hamburg
  • Commander
    • Johannes Kühne
  • Fate: Scuttled at Hamburg on May 3, 1945, as part of Operation Regenbogen. Later raised and broken up.
  • U-boat.net webpage for U-2371

U-2401 edit

  • Type: XXIII
  • Construction
    • Laid Down: June 1944
    • Launched:
    • Commissioned:
    • Shipyard: Ansaldo, Genoa
  • Commander
  • Fate: Keel laid down in June 1944, never completed. Cancelled August 24, 1944.
  • U-boat.net webpage for U-2401

U-2402 edit

  • Type: XXIII
  • Construction
    • Laid Down: June 1944
    • Launched:
    • Commissioned:
    • Shipyard: Ansaldo, Genoa
  • Commander
  • Fate: Keel laid down in June 1944, never completed. Cancelled August 24, 1944.
  • U-boat.net webpage for U-2402

U-2403 edit

  • Type: XXIII
  • Construction
    • Laid Down: July 1944
    • Launched:
    • Commissioned:
    • Shipyard: Ansaldo, Genoa
  • Commander
  • Fate: Keel laid down in July 1944, never completed. Cancelled August 24, 1944.
  • U-boat.net webpage for U-2403

U-2404 edit

  • Type: XXIII
  • Construction
    • Laid Down: July 1944
    • Launched:
    • Commissioned:
    • Shipyard: Ansaldo, Genoa
  • Commander
  • Fate: Keel laid down in July 1944, never completed. Cancelled August 24, 1944.
  • U-boat.net webpage for U-2404

U-2431 edit

  • Type: XXIII
  • Construction
    • Laid Down: June 12, 1944
    • Launched:
    • Commissioned:
    • Shipyard: C.R.D.A, Monfalcone
  • Commander
  • Fate: Never completed.
  • U-boat.net webpage for U-2431

U-2432 edit

  • Type: XXIII
  • Construction
    • Laid Down: June 16, 1944
    • Launched:
    • Commissioned:
    • Shipyard: C.R.D.A, Monfalcone
  • Commander
  • Fate: Never completed.
  • U-boat.net webpage for U-2432

U-2513 edit

  • Type: XXI
  • Construction
    • Laid Down: July 19, 1944
    • Launched: September 19, 1944
    • Commissioned: October 12, 1944
    • Shipyard: Blohm & Voss, Hamburg
  • Commander
    • Hans Bungards
    • Erich Topp
  • Fate: Surrendered at Horten, Norway on May 9, 1945. Transferred to Oslo on May 18, 1945. Departed Oslo on June 3, 1945, for Lisahally, Northern Ireland, arriving there on June 9. Secretly transferred to the US in August 1945 and escorted by USS Brant to New London, Connecticut, arriving there on August 25. Refitted at Portsmouth, New Hampshire and used for trials and training. Sunk west of Key West, Florida during rocket testing by USS Robert A. Owens on October 7, 1951.
  • U-boat.net webpage for U-2513

U-2518 edit

  • Type: XXI
  • Construction
    • Laid Down: August 16, 1944
    • Launched: October 4, 1944
    • Commissioned: November 4, 1944
    • Shipyard: Blohm & Voss, Hamburg
  • Commander
    • Friedrich Weidner
  • Fate: Surrendered at Horten, Norway on May 9, 1945. Transferred to Oslo on May 18, 1945. Departed Oslo on June 3, 1945, for Lisahally, Northern Ireland, arriving there on June 7. Transferred to France on February 14, 1946, and renamed Roland Morillot on February 14, 1951.
  • U-boat.net webpage for U-2518

U-2529 edit

  • Type: XXI
  • Construction
    • Laid Down: September 29, 1944
    • Launched: November 13, 1944
    • Commissioned: February 22, 1945
    • Shipyard: Blohm & Voss, Hamburg
  • Commander
    • Karl-Heinrich Feufel
    • Fritz Kallipke
  • Fate: Surrendered at Kristiansand Süd, Norway on May 9, 1945. Departed Kristiansand on June 3, 1945, for Lisahally, Northern Ireland, arriving there on June 6. Allocated to the Soviet Union by the TNC. Arrived at Libau, Latvia on December 4, 1945, as British N-class N27. Allocated to the Soviet Baltic Fleet on February 13, 1946. Renamed B-27 on June 9, 1949, and transferred to reserve fleet on December 29, 1955. Redesignated as block ship BSh-28 on September 19, 1955, and as training hulk UTS-3 on January 9, 1957. Struck from Soviet Navy list on September 1, 1972, and broken up for scrap.
  • U-boat.net webpage for U-2529

U-2532 edit

  • Type: XXI
  • Construction
    • Laid Down: October 10, 1944
    • Launched: December 7, 1944
    • Commissioned:
    • Shipyard: Blohm & Voss, Hamburg
  • Commander
  • Fate: Sunk at yard during bombing raid on December 31, 1944, and again on January 17, 1945.
  • U-boat.net webpage for U-2532

U-2533 edit

  • Type: XXI
  • Construction
    • Laid Down: October 13, 1944
    • Launched: December 7, 1944
    • Commissioned: January 18, 1945
    • Shipyard: Blohm & Voss, Hamburg
  • Commander
    • Horst Günther
  • Fate: Scuttled at Travemünde on May 3, 1945. Later broken up.
  • U-boat.net webpage for U-2533

U-2534 edit

  • Type: XXI
  • Construction
    • Laid Down: October 23, 1944
    • Launched: December 11, 1944
    • Commissioned: January 17, 1945
    • Shipyard: Blohm & Voss, Hamburg
  • Commander
    • Ulrich Drews
  • Fate: Scuttled east of Fehmarn island on May 3, 1945.
  • U-boat.net webpage for U-2534

U-2535 edit

  • Type: XXI
  • Construction
    • Laid Down: October 19, 1944
    • Launched: December 16, 1944
    • Commissioned: January 28, 1945
    • Shipyard: Blohm & Voss, Hamburg
  • Commander
    • Otto Bitter
  • Fate: Scuttled at Travemünde on May 3, 1945. Later raised and broken up.
  • U-boat.net webpage for U-2535

U-2536 edit

  • Type: XXI
  • Construction
    • Laid Down: October 21, 1944
    • Launched: December 16, 1944
    • Commissioned: February 6, 1945
    • Shipyard: Blohm & Voss, Hamburg
  • Commander
    • Ulrich Vöge
  • Fate: Scuttled at Travemünde on May 3, 1945. Later broken up.
  • U-boat.net webpage for U-2536

U-2537 edit

  • Type: XXI
  • Construction
    • Laid Down: October 10, 1944
    • Launched: December 7, 1944
    • Commissioned:
    • Shipyard: Blohm & Voss, Hamburg
  • Commander
  • Fate: Sunk at yard during bombing raid on December 31, 1944.
  • U-boat.net webpage for U-2537

U-2538 edit

  • Type: XXI
  • Construction
    • Laid Down: October 24, 1944
    • Launched: January 6, 1945
    • Commissioned: February 16, 1945
    • Shipyard: Blohm & Voss, Hamburg
  • Commander
    • Heinrich Klapdor
  • Fate: Scuttled off Ærø on May 3, 1945. Later raised and broken up in 1950.
  • U-boat.net webpage for U-2538

U-2539 edit

  • Type: XXI
  • Construction
    • Laid Down: October 27, 1944
    • Launched: January 6, 1945
    • Commissioned: February 21, 1945
    • Shipyard: Blohm & Voss, Hamburg
  • Commander
    • Erich Jewinski
  • Fate: Scuttled at Kiel on May 3, 1945. Later raised and broken up.
  • U-boat.net webpage for U-2539

U-2546 edit

  • Type: XXI
  • Construction
    • Laid Down: November 22, 1944
    • Launched: February 19, 1945
    • Commissioned: March 21, 1945
    • Shipyard: Blohm & Voss, Hamburg
  • Commander
    • Max Dobbert
  • Fate: Scuttled at Kiel on May 3, 1945. Later raised and broken up.
  • U-boat.net webpage for U-2546

U-2547 edit

  • Type: XXI
  • Construction
    • Laid Down: November 27, 1944
    • Launched: March 9, 1945
    • Commissioned:
    • Shipyard: Blohm & Voss, Hamburg
  • Commander
  • Fate: Bombed while being built on March 11, 1945.
  • U-boat.net webpage for U-2547

U-2548 edit

  • Type: XXI
  • Construction
    • Laid Down: November 27, 1944
    • Launched: March 9, 1945
    • Commissioned:
    • Shipyard: Blohm & Voss, Hamburg
  • Commander
    • Karl-Ernst Utischill
  • Fate: Scuttled at Kiel on May 3, 1945, as part of Operation Regenbogen. Later raised and broken up.
  • U-boat.net webpage for U-2548

U-2549 edit

  • Type: XXI
  • Construction
    • Laid Down: November 27, 1944
    • Launched: March 9, 1945
    • Commissioned:
    • Shipyard: Blohm & Voss, Hamburg
  • Commander
  • Fate: Bombed while being built on March 11, 1945.
  • U-boat.net webpage for U-2549

U-2550 edit

  • Type: XXI
  • Construction
    • Laid Down: November 27, 1944
    • Launched: March 9, 1945
    • Commissioned:
    • Shipyard: Blohm & Voss, Hamburg
  • Commander
  • Fate: Bombed while being built on March 11, 1945.
  • U-boat.net webpage for U-2550

U-2551 edit

  • Type: XXI
  • Construction
    • Laid Down: December 8, 1944
    • Launched: March 31, 1945
    • Commissioned: April 24, 1945
    • Shipyard: Blohm & Voss, Hamburg
  • Commander
    • Gerhard Schaar
  • Fate: Deliberately run aground by its crew at Solitüde Spit near Flensburg on May 5, 1945. Blown up by the Royal Navy on May 23, 1945, and then broken up.
  • U-boat.net webpage for U-2551

U-2552 edit

  • Type: XXI
  • Construction
    • Laid Down: December 10, 1944
    • Launched: March 31, 1945
    • Commissioned: April 21, 1945
    • Shipyard: Blohm & Voss, Hamburg
  • Commander
    • Johannes Rudolph
  • Fate: Scuttled in Kiel harbor southwest of buoy B2 on May 3, 1945, as part of Operation Regenbogen. Later raised and broken up.
  • U-boat.net webpage for U-2552

U-2553 edit

  • Type: XXI
  • Construction
    • Laid Down: December 12, 1944
    • Launched:
    • Commissioned:
    • Shipyard: Blohm & Voss, Hamburg
  • Commander
  • Fate: Still unfinished at the end of the war, broken up on stocks in 1945-1946.
  • U-boat.net webpage for U-2553

U-2554 edit

  • Type: XXI
  • Construction
    • Laid Down: December 14, 1944
    • Launched:
    • Commissioned:
    • Shipyard: Blohm & Voss, Hamburg
  • Commander
  • Fate: Still unfinished at the end of the war, broken up on stocks in 1945-1946.
  • U-boat.net webpage for U-2554

U-2555 edit

  • Type: XXI
  • Construction
    • Laid Down: December 20, 1944
    • Launched:
    • Commissioned:
    • Shipyard: Blohm & Voss, Hamburg
  • Commander
  • Fate: Still unfinished at the end of the war, broken up on stocks in 1945-1946.
  • U-boat.net webpage for U-2555

U-2556 edit

  • Type: XXI
  • Construction
    • Laid Down: December 23, 1944
    • Launched:
    • Commissioned:
    • Shipyard: Blohm & Voss, Hamburg
  • Commander
  • Fate: Still unfinished at the end of the war, broken up on stocks in 1945-1946.
  • U-boat.net webpage for U-2556

U-2557 edit

  • Type: XXI
  • Construction
    • Laid Down: December 30, 1944
    • Launched:
    • Commissioned:
    • Shipyard: Blohm & Voss, Hamburg
  • Commander
  • Fate: Still unfinished at the end of the war, broken up on stocks in 1945-1946.
  • U-boat.net webpage for U-2557

U-2558 edit

  • Type: XXI
  • Construction
    • Laid Down: February 1, 1945
    • Launched:
    • Commissioned:
    • Shipyard: Blohm & Voss, Hamburg
  • Commander
  • Fate: Still unfinished at the end of the war, broken up on stocks in 1945-1946.
  • U-boat.net webpage for U-2558

U-2559 edit

  • Type: XXI
  • Construction
    • Laid Down: February 4, 1945
    • Launched:
    • Commissioned:
    • Shipyard: Blohm & Voss, Hamburg
  • Commander
  • Fate: Still unfinished at the end of the war, broken up on stocks in 1945-1946.
  • U-boat.net webpage for U-2559

U-2560 edit

  • Type: XXI
  • Construction
    • Laid Down: February 12, 1945
    • Launched:
    • Commissioned:
    • Shipyard: Blohm & Voss, Hamburg
  • Commander
  • Fate: Still unfinished at the end of the war, broken up on stocks in 1945-1946.
  • U-boat.net webpage for U-2560

U-2561 edit

  • Type: XXI
  • Construction
    • Laid Down: February 15, 1945
    • Launched:
    • Commissioned:
    • Shipyard: Blohm & Voss, Hamburg
  • Commander
  • Fate: Still unfinished at the end of the war, broken up on stocks in 1945-1946.
  • U-boat.net webpage for U-2561

U-2562 edit

  • Type: XXI
  • Construction
    • Laid Down: February 24, 1945
    • Launched:
    • Commissioned:
    • Shipyard: Blohm & Voss, Hamburg
  • Commander
  • Fate: Still unfinished at the end of the war, broken up on stocks in 1945-1946.
  • U-boat.net webpage for U-2562

U-2563 edit

  • Type: XXI
  • Construction
    • Laid Down: February 28, 1945
    • Launched:
    • Commissioned:
    • Shipyard: Blohm & Voss, Hamburg
  • Commander
  • Fate: Still unfinished at the end of the war, broken up on stocks in 1945-1946.
  • U-boat.net webpage for U-2563

U-2564 edit

  • Type: XXI
  • Construction
    • Laid Down: March 29, 1945
    • Launched:
    • Commissioned:
    • Shipyard: Blohm & Voss, Hamburg
  • Commander
  • Fate: Still unfinished at the end of the war, broken up on stocks in 1945-1946.
  • U-boat.net webpage for U-2564

U-3001 edit

  • Type: XXI
  • Construction
    • Laid Down: April 15, 1944
    • Launched: May 30, 1944
    • Commissioned: July 20, 1944
    • Shipyard: AG Weser, Bremen
  • Commander
    • Hans Vogel
  • Fate: Scuttled northwest of Wesermünde on May 3, 1945. Later raised and broken up.
  • U-boat.net webpage for U-3001

U-3017 edit

  • Type: XXI
  • Construction
    • Laid Down: September 2, 1944
    • Launched: November 5, 1944
    • Commissioned: January 5, 1945
    • Shipyard: AG Weser, Bremen
  • Commander
    • Rolf Lindschau
  • Fate: Surrendered at Horten, Norway on May 9, 1945. Transferred to Oslo on May 18. Left Oslo on June 3, 1945, for Lisahally, Northern Ireland, arriving there on June 7. Transferred to Britain and commissioned as British submarine N41.
  • U-boat.net webpage for U-3041

U-3035 edit

  • Type: XXI
  • Construction
    • Laid Down: November 11, 1944
    • Launched: January 24, 1945
    • Commissioned: March 1, 1945
    • Shipyard: AG Weser, Bremen
  • Commander
    • Ernst-August Gerke
  • Fate: Surrendered at Stavanger, Norway on May 9, 1945. Left Stavanger on May 31, 1945, for Scapa Flow, Scotland, arriving there on June 2. Left Scapa Flow the same day for Lisahally, Northern Ireland, arriving there on June 4. Allocated by the TNC to the Soviet Union. Arrived at Libau, Latvia on December 10, 1945, as British N-class N28. Allocated to the Soviet Baltic Fleet on February 13, 1946, and renamed B-28 on June 9, 1949. Transferred to reserve on December 29, 1955. Redesignated as floating submarine battery recharging station PZS-34 on January 18, 1956. Struck from Soviet Navy list on March 25, 1958, and broken up for scrap.
  • U-boat.net webpage for U-3041

U-3036 edit

  • Type: XXI
  • Construction
    • Laid Down: November 22, 1944
    • Launched: January 27, 1945
    • Commissioned:
    • Shipyard: AG Weser, Bremen
  • Commander
  • Fate: Sunk during air raid on March 30, 1945, while being fitted out.
  • U-boat.net webpage for U-3036

U-3041 edit

  • Type: XXI
  • Construction
    • Laid Down: December 7, 1944
    • Launched: February 15, 1945
    • Commissioned: March 10, 1945
    • Shipyard: AG Weser, Bremen
  • Commander
    • Joachim Vieth
    • Hans Hornkohl
  • Fate: Surrendered at Horten, Norway on May 9, 1945. Transferred to Oslo on May 18. Left Oslo on June 3, 1945, for Lisahally, Northern Ireland, arriving there on June 7. Allocated by the TNC to the Soviet Union. Arrived at Libau, Latvia on December 10, 1945, as British N-class N29. Allocated to the Soviet Baltic Fleet on February 13, 1946, and renamed B-29 on June 9, 1949. Transferred to reserve on December 29, 1955. Redesignated as floating submarine battery recharging station PZS-31 on January 18, 1956. Struck from Soviet Navy list on September 28, 1958, and broken up for scrap.
  • U-boat.net webpage for U-3041

U-3042 edit

  • Type: XXI
  • Construction
    • Laid Down: December 15, 1944
    • Launched:
    • Commissioned:
    • Shipyard: AG Weser, Bremen
  • Commander
  • Fate: Damaged in air raid while on slipways on February 22, 1945.
  • U-boat.net webpage for U-3042

U-3043 edit

  • Type: XXI
  • Construction
    • Laid Down: December 14, 1944
    • Launched:
    • Commissioned:
    • Shipyard: AG Weser, Bremen
  • Commander
  • Fate: Damaged in air raid while on slipways on February 22, 1945.
  • U-boat.net webpage for U-3043

U-3044 edit

  • Type: XXI
  • Construction
    • Laid Down: December 21, 1944
    • Launched: March 1, 1945
    • Commissioned: March 27, 1945
    • Shipyard: AG Weser, Bremen
  • Commander
    • Bernhard Jaek
    • Detlef von Lehsten
  • Fate: Scuttled in Gelting Bay on May 5, 1945, as part of Operation Regenbogen. Later raised and broken up.
  • U-boat.net webpage for U-3044

U-3045 edit

  • Type: XXI
  • Construction
    • Laid Down: December 20, 1944
    • Launched: March 6, 1945
    • Commissioned:
    • Shipyard: AG Weser, Bremen
  • Commander
  • Fate: Sunk during air raid on March 30, 1945, while being fitted out.
  • U-boat.net webpage for U-3045

U-3046 edit

  • Type: XXI
  • Construction
    • Laid Down: December 29, 1944
    • Launched: March 10, 1945
    • Commissioned:
    • Shipyard: AG Weser, Bremen
  • Commander
  • Fate: Sunk during air raid on March 30, 1945, while being fitted out.
  • U-boat.net webpage for U-3046

U-3047 edit

  • Type: XXI
  • Construction
    • Laid Down: January 3, 1945
    • Launched: April 11, 1945
    • Commissioned:
    • Shipyard: AG Weser, Bremen
  • Commander
  • Fate: Broken up because it was not ready for commission.
  • U-boat.net webpage for U-3047

U-3048 edit

  • Type: XXI
  • Construction
    • Laid Down: December 31, 1944
    • Launched:
    • Commissioned:
    • Shipyard: AG Weser, Bremen
  • Commander
  • Fate: Broken up because it was not ready for commission.
  • U-boat.net webpage for U-3048

U-3049 edit

  • Type: XXI
  • Construction
    • Laid Down: December 30, 1944
    • Launched:
    • Commissioned:
    • Shipyard: AG Weser, Bremen
  • Commander
  • Fate: Broken up because it was not ready for commission.
  • U-boat.net webpage for U-3049

U-3050 edit

  • Type: XXI
  • Construction
    • Laid Down: January 9, 1945
    • Launched: April 18, 1945
    • Commissioned:
    • Shipyard: AG Weser, Bremen
  • Commander
  • Fate: Broken up because it was not ready for commission.
  • U-boat.net webpage for U-3050

U-3051 edit

  • Type: XXI
  • Construction
    • Laid Down: January 8, 1945
    • Launched: April 20, 1945
    • Commissioned:
    • Shipyard: AG Weser, Bremen
  • Commander
  • Fate: Broken up because it was not ready for commission.
  • U-boat.net webpage for U-3051

U-3052 edit

  • Type: XXI
  • Construction
    • Laid Down: January 22, 1945
    • Launched:
    • Commissioned:
    • Shipyard: AG Weser, Bremen
  • Commander
  • Fate: Broken up on slipways.
  • U-boat.net webpage for U-3052

U-3053 edit

  • Type: XXI
  • Construction
    • Laid Down: January 25, 1945
    • Launched:
    • Commissioned:
    • Shipyard: AG Weser, Bremen
  • Commander
  • Fate: Broken up on slipways.
  • U-boat.net webpage for U-3053

U-3054 edit

  • Type: XXI
  • Construction
    • Laid Down: January 27, 1945
    • Launched:
    • Commissioned:
    • Shipyard: AG Weser, Bremen
  • Commander
  • Fate: Damaged in air raid on March 11, 1945. Broken up on slipways.
  • U-boat.net webpage for U-3054

U-3055 edit

  • Type: XXI
  • Construction
    • Laid Down: January 25, 1945
    • Launched:
    • Commissioned:
    • Shipyard: AG Weser, Bremen
  • Commander
  • Fate: Broken up on slipways.
  • U-boat.net webpage for U-3055

U-3056 edit

  • Type: XXI
  • Construction
    • Laid Down: February 7, 1945
    • Launched:
    • Commissioned:
    • Shipyard: AG Weser, Bremen
  • Commander
  • Fate: Broken up on slipways.
  • U-boat.net webpage for U-3056

U-3057 edit

  • Type: XXI
  • Construction
    • Laid Down: February 4, 1945
    • Launched:
    • Commissioned:
    • Shipyard: AG Weser, Bremen
  • Commander
  • Fate: Broken up on slipways.
  • U-boat.net webpage for U-3057

U-3058 edit

  • Type: XXI
  • Construction
    • Laid Down: February 17, 1945
    • Launched:
    • Commissioned:
    • Shipyard: AG Weser, Bremen
  • Commander
  • Fate: Broken up on slipways.
  • U-boat.net webpage for U-3058

U-3059 edit

  • Type: XXI
  • Construction
    • Laid Down: February 15, 1945
    • Launched:
    • Commissioned:
    • Shipyard: AG Weser, Bremen
  • Commander
  • Fate: Broken up on slipways.
  • U-boat.net webpage for U-3059

U-3060 edit

  • Type: XXI
  • Construction
    • Laid Down: February 25, 1945
    • Launched:
    • Commissioned:
    • Shipyard: AG Weser, Bremen
  • Commander
  • Fate: Broken up on slipways.
  • U-boat.net webpage for U-3060

U-3061 edit

  • Type: XXI
  • Construction
    • Laid Down: February 24, 1945
    • Launched:
    • Commissioned:
    • Shipyard: AG Weser, Bremen
  • Commander
  • Fate: Damaged in air raid on March 11, 1945. Broken up on slipways.
  • U-boat.net webpage for U-3061

U-3062 edit

  • Type: XXI
  • Construction
    • Laid Down: March 9, 1945
    • Launched:
    • Commissioned:
    • Shipyard: AG Weser, Bremen
  • Commander
  • Fate: Broken up on slipways.
  • U-boat.net webpage for U-3062

U-3063 edit

  • Type: XXI
  • Construction
    • Laid Down: March 7, 1945
    • Launched:
    • Commissioned:
    • Shipyard: AG Weser, Bremen
  • Commander
  • Fate: Broken up on slipways.
  • U-boat.net webpage for U-3063

U-3501 edit

  • Type: XXI
  • Construction
    • Laid Down: March 20, 1944
    • Launched: April 19, 1944
    • Commissioned: July 29, 1944
    • Shipyard: Schichau-Werke, Danzig
  • Commander
    • Helmut Münster
    • Hans-Joachim Schmidt-Weichert
  • Fate: Scuttled in the west side of the Weser estuary on May 5 (or May 1), 1945. Later broken up.
  • U-boat.net webpage for U-3501

U-3502 edit

  • Type: XXI
  • Construction
    • Laid Down: April 16, 1944
    • Launched: July 6, 1944
    • Commissioned: August 19, 1944
    • Shipyard: Schichau-Werke, Danzig
  • Commander
    • Hermann Schultz
  • Fate: Used as an electricity-producing boat; stern damaged by bombs and was removed from service at Hamburg on May 3, 1945. Later broken up.
  • U-boat.net webpage for U-3502

U-3503 edit

  • Type: XXI
  • Construction
    • Laid Down: June 17, 1944
    • Launched: July 27, 1944
    • Commissioned: September 9, 1944
    • Shipyard: Schichau-Werke, Danzig
  • Commander
    • Hugo Deiring
  • Fate: Scuttled in the Kattegat, west of Göteborg, Sweden on May 8, 1945. Raised in 1946 and broken up.
  • U-boat.net webpage for U-3503

U-3504 edit

  • Type: XXI
  • Construction
    • Laid Down: June 30, 1944
    • Launched: August 15, 1944
    • Commissioned: September 23, 1944
    • Shipyard: Schichau-Werke, Danzig
  • Commander
    • Kart-Hartwig Siebold
  • Fate: Scuttled at Wilhelmshaven on May 2, 1945. Later broken up.
  • U-boat.net webpage for U-3504

U-3505 edit

  • Type: XXI
  • Construction
    • Laid Down: July 9, 1944
    • Launched: August 25, 1944
    • Commissioned: October 7, 1944
    • Shipyard: Schichau-Werke, Danzig
  • Commander
    • Horst Willner
  • Fate: Sunk by bombs at Kiel on April 3, 1945. Wreck later broken up.
  • U-boat.net webpage for U-3505

U-3506 edit

  • Type: XXI
  • Construction
    • Laid Down: July 14, 1944
    • Launched: August 28, 1944
    • Commissioned: October 16, 1944
    • Shipyard: Schichau-Werke, Danzig
  • Commander
    • Gerhard Thäter
  • Fate: Scuttled in the Elbe II bunker at Hamburg on May 2, 1945, and not discovered until 1985. Wreckage still there, but covered in gravel. A parking lot now sits on top of the bunker site.
  • U-boat.net webpage for U-3506

U-3507 edit

  • Type: XXI
  • Construction
    • Laid Down: July 19, 1944
    • Launched: September 16, 1944
    • Commissioned: October 19, 1944
    • Shipyard: Schichau-Werke, Danzig
  • Commander
    • Otto Niethmann
    • Hans-Jürgen Schley
  • Fate: Scuttled at Travemünde on May 3, 1945. Later broken up.
  • U-boat.net webpage for U-3507

U-3508 edit

  • Type: XXI
  • Construction
    • Laid Down: July 25, 1944
    • Launched: September 22, 1944
    • Commissioned: November 2, 1944
    • Shipyard: Schichau-Werke, Danzig
  • Commander
    • Detlef von Lehsten
  • Fate: Sunk whilst empty in Wilhelmshaven by an Eighth Air Force raid on March 3, 1945. It was raised by engineers, but sunk again on March 30, 1945.
  • U-boat.net webpage for U-3508

U-3509 edit

  • Type: XXI
  • Construction
    • Laid Down: July 19, 1944
    • Launched: September 27, 1944
    • Commissioned: January 29, 1945
    • Shipyard: Schichau-Werke, Danzig
  • Commanders
    • Hans Hornkohl
    • Karl-Hein Vosswinkel
    • Heinz Franke
    • Wilhelm Neitzsch
  • Fate: Scuttled at Wesermünde near Bremerhaven, May 3, 1945
  • U-boat.net webpage for U-3509

U-3510 edit

  • Type: XXI
  • Construction
    • Laid Down: August 6, 1944
    • Launched: October 4, 1944
    • Commissioned: November 11, 1944
    • Shipyard: Schichau-Werke, Danzig
  • Commander
    • Ernst-Werner Schwirley
  • Fate: Scuttled in Geltinger Bay, May 4, 1945
  • U-boat.net webpage for U-3510

U-3511 edit

  • Type: XXI
  • Construction
    • Laid Down: August 14, 1944
    • Launched: October 11, 1944
    • Commissioned: November 18, 1944
    • Shipyard: Schichau-Werke, Danzig
  • Commander
    • Martin Grasse
    • Hans-Heinrich Ketels
    • Hermann Schrenk
  • Fate: Scuttled at Travemünde near Neustadt, May 3, 1945
  • U-boat.net webpage for U-3511

U-3512 edit

  • Type: XXI
  • Construction
    • Laid Down: August 15, 1944
    • Launched: October 11, 1944
    • Commissioned: November 27, 1944
    • Shipyard: Schichau-Werke, Danzig
  • Commander
    • Hans Hornkohl
  • Fate: Destroyed by Royal Air Force bombers whilst laid up empty in Kiel, 9 April 1945
  • U-boat.net webpage for U-3512

U-3513 edit

  • Type: XXI
  • Construction
    • Laid Down: August 20, 1944
    • Launched: October 21, 1944
    • Commissioned: December 2, 1944
    • Shipyard: Schichau-Werke, Danzig
  • Commander
    • Otto-Heinrich Nachtigall
  • Fate: Scuttled at Travemünde near Neustadt, May 3, 1945
  • U-boat.net webpage for U-3513

U-3514 edit

  • Type: XXI
  • Construction
    • Laid Down: August 21, 1944
    • Launched: October 21, 1944
    • Commissioned: December 9, 1944
    • Shipyard: Schichau-Werke, Danzig
  • Commander
    • Günther Fritze
  • Fate: Captured at Bergen, Norway and transported to Loch Ryan awaiting a decision about its fate. The Soviet Union refused an offer to have it, as did Britain, so on the 11 February 1946 it was sunk by the naval tug Prosperous with gunfire and a "Shark" anti-submarine weapon. U-3514 was the last submarine to be disposed of in Operation Deadlight.
  • U-boat.net webpage for U-3514

U-3515 edit

  • Type: XXI
  • Construction
    • Laid Down: August 27, 1944
    • Launched: November 4, 1944
    • Commissioned: December 14, 1944
    • Shipyard: Schichau-Werke, Danzig
  • Commander
    • Fedor Kuscher
  • Fate: Surrendered at Horten, Norway on May 9, 1945. Transferred to Oslo on May 18, to Scapa Flow, Scotland on June 3, 1945, arriving there on June 6, and finally to Lisahally, Northern Ireland on June 8, 1945, arriving there on June 9. Allocated to the Soviet Union by the TNC. Arrived at Libau, Latvia on February 2, 1946, as British N-class N30. Allocated to the Soviet Baltic Fleet on February 13, 1946. Renamed B-30 on June 9, 1949, and transferred to reserve fleet on December 29, 1955. Redesignated as floating submarine battery recharging station PZS-35 on January 18, 1956, and as test hulk B-100 on July 2, 1958. Struck from Soviet Navy list on September 25, 1959, and broken up for scrap on November 30, 1959.
  • U-boat.net webpage for U-3515

U-3516 edit

  • Type: XXI
  • Construction
    • Laid Down: Summer 1944
    • Launched: November 4, 1944
    • Commissioned: December 18, 1944
    • Shipyard: Schichau-Werke, Danzig
  • Commander
    • Hans Wengel
    • Heinrich Grote
  • Fate: Scuttled at Travemünde near Neustadt, May 2, 1945. Later raised and broken up.
  • U-boat.net webpage for U-3516

U-3517 edit

  • Type: XXI
  • Construction
    • Laid Down: September 12, 1944
    • Launched: December 6, 1944
    • Commissioned: December 22, 1944
    • Shipyard: Schichau-Werke, Danzig
  • Commander
    • Helmuth Münster
  • Fate: Scuttled at Travemünde near Neustadt, May 4, 1945
  • U-boat.net webpage for U-3517

U-3518 edit

  • Type: XXI
  • Construction
    • Laid Down: September 12, 1944
    • Launched: December 11, 1944
    • Commissioned: December 29, 1944
    • Shipyard: Schichau-Werke, Danzig
  • Commander
    • Herbert Brünning
  • Fate: Scuttled in Kiel harbour, May 3, 1945
  • U-boat.net webpage for U-3518

U-3519 edit

  • Type: XXI
  • Construction
    • Laid Down: September 19, 1944
    • Launched: November 23, 1944
    • Commissioned: January 6, 1945
    • Shipyard: Schichau-Werke, Danzig
  • Commander
    • Richard von Harpe
  • Fate: Sunk with all hands by an RAF air-dropped mine during training north of Warnemünde on March 2, 1945.
  • U-boat.net webpage for U-3519

U-3520 edit

  • Type: XXI
  • Construction
    • Laid Down: September 20, 1944
    • Launched: November 23, 1944
    • Commissioned: January 12, 1945
    • Shipyard: Schichau-Werke, Danzig
  • Commander
    • Sarto Ballert
  • Fate: Sunk with all hands during training northeast of Bülk by mines on January 31, 1945.
  • U-boat.net webpage for U-3520

U-3521 edit

  • Type: XXI
  • Construction
    • Laid Down: October 3, 1944
    • Launched: December 3, 1944
    • Commissioned: January 14, 1945
    • Shipyard: Schichau-Werke, Danzig
  • Commander
    • Günther Keller
  • Fate: Scuttled at Travemünde near Neustadt, May 2, 1945
  • U-boat.net webpage for U-3521

U-3522 edit

  • Type: XXI
  • Construction
    • Laid Down: October 1944
    • Launched: December 3, 1944
    • Commissioned: January 21, 1945
    • Shipyard: Schichau-Werke, Danzig
  • Commander
    • Diether Lenzmann
  • Fate: Scuttled at Travemünde near Neustadt, May 2, 1945
  • U-boat.net webpage for U-3522

U-3523 edit

  • Type: XXI
  • Construction
    • Laid Down: October 7, 1944
    • Launched: December 14, 1944
    • Commissioned: January 23, 1945
    • Shipyard: Schichau-Werke, Danzig
  • Commander
    • Willi Müller
  • Fate: Sunk during training with all hands by depth charges from a B-24 Liberator of RAF 86 Squadron in the Skagerrak northeast of Skagen Horn on May 6, 1945. Wreckage found in April 2018.
  • U-boat.net webpage for U-3523

U-3524 edit

  • Type: XXI
  • Construction
    • Laid Down: October 1944
    • Launched: December 14, 1944
    • Commissioned: January 26, 1945
    • Shipyard: Schichau-Werke, Danzig
  • Commander
    • Hans-Ludwig Witt
  • Fate: Scuttled in Flensburger Förde, May 4, 1945
  • U-boat.net webpage for U-3524

U-3525 edit

  • Type: XXI
  • Construction
    • Laid Down: October 17, 1944
    • Launched: December 23, 1944
    • Commissioned: January 31, 1945
    • Shipyard: Schichau-Werke, Danzig
  • Commanders
    • Hans-Ludwig Gaude
    • Franz Kranich
  • Fate: Severely damaged by an air raid on Kiel, the wreckage was scuttled on May 3, 1945
  • U-boat.net webpage for U-3525

U-3526 edit

  • Type: XXI
  • Construction
    • Laid Down: October 15, 1944
    • Launched: December 23, 1944
    • Commissioned: March 22, 1945
    • Shipyard: Schichau-Werke, Danzig
  • Commander
    • Kurt Hilbig
  • Fate: Scuttled in the mouth of the Weser River at Wesermünde, May 4, 1945
  • U-boat.net webpage for U-3526

U-3527 edit

  • Type: XXI
  • Construction
    • Laid Down: October 25, 1944
    • Launched: January 10, 1945
    • Commissioned: March 10, 1945
    • Shipyard: Schichau-Werke, Danzig
  • Commander
    • Willy Kronenbitter
  • Fate: Scuttled in the mouth of the Weser River at Wesermünde, May 4, 1945
  • U-boat.net webpage for U-3527

U-3528 edit

  • Type: XXI
  • Construction
    • Laid Down: October 26, 1944
    • Launched: January 10, 1945
    • Commissioned: March 18, 1945
    • Shipyard: Schichau-Werke, Danzig
  • Commander
    • Heinz Zwarg
  • Fate: Scuttled in the mouth of the Weser River at Wesermünde, May 4, 1945. Later raised and broken up.
  • U-boat.net webpage for U-3528

U-3529 edit

  • Type: XXI
  • Construction
    • Laid Down: November 2, 1944
    • Launched: January 26, 1945
    • Commissioned: March 22, 1945
    • Shipyard: Schichau-Werke, Danzig
  • Commander
    • Karl-Heinz Schmidt
  • Fate: Scuttled in Flensburger Förde, May 5, 1945. Later raised and broken up.
  • U-boat.net webpage for U-3529

U-3530 edit

  • Type: XXI
  • Construction
    • Laid Down: November 3, 1944
    • Launched: January 26, 1945
    • Commissioned: March 23, 1945
    • Shipyard: Schichau-Werke, Danzig
  • Commanders
    • Wilhelm Brauel
    • Walter-Ernst Koch
  • Fate: Scuttled in Kiel harbour, May 3, 1945. Later raised and broken up.
  • U-boat.net webpage for U-3530

U-3531 edit

  • Type: XXI
  • Construction
    • Laid Down: November 9, 1944
    • Launched: February 3, 1945
    • Commissioned:
    • Shipyard: Schichau-Werke, Danzig
  • Commander
  • Fate: Nearly finished, towed to Wesermunde and broken up.
  • U-boat.net webpage for U-3531

U-3532 edit

  • Type: XXI
  • Construction
    • Laid Down: November 9, 1944
    • Launched: February 3, 1945
    • Commissioned:
    • Shipyard: Schichau-Werke, Danzig
  • Commander
  • Fate: Nearly finished, towed to Wesermunde and broken up.
  • U-boat.net webpage for U-3532

U-3533 edit

  • Type: XXI
  • Construction
    • Laid Down: November 16, 1944
    • Launched: February 14, 1945
    • Commissioned:
    • Shipyard: Schichau-Werke, Danzig
  • Commander
  • Fate: Nearly finished, towed to Wesermunde and broken up.
  • U-boat.net webpage for U-3533

U-3534 edit

  • Type: XXI
  • Construction
    • Laid Down: November 17, 1944
    • Launched: February 14, 1945
    • Commissioned:
    • Shipyard: Schichau-Werke, Danzig
  • Commander
  • Fate: Nearly finished, towed to Wesermunde and broken up.
  • U-boat.net webpage for U-3534

U-3535 edit

  • Type: XXI
  • Construction
  • Commander
  • Fate: Captured incomplete by the Soviets on Slip No. 4 on March 30, 1945, was 95% complete for launching when captured. Redesignated as TS-5 on April 12, 1945, and launched at Danzig in July 1945. Allocated to Soviet Baltic Fleet and moved to Libau, Latvia. Inspected by TNC at Libau on October 8, 1945, still incomplete and with a missing rudder. Moved to Kronstadt in early 1945 or early 1946 and probably commissioned into the Soviet Navy for sea trials/training. Renamed R-1 on March 8, 1947. Sunk in the Baltic off Cape Ristna Lighthouse on August 7 or 8, 1947.
  • U-boat.net webpage for U-3535

U-3536 edit

  • Type: XXI
  • Construction
  • Commander
  • Fate: Captured incomplete by the Soviets on Slip No. 4 on March 30, 1945, was 95% complete for launching when captured. Redesignated as TS-6 on April 12, 1945, and launched at Danzig in July 1945. Allocated to Soviet Baltic Fleet and moved to Libau, Latvia. Inspected by TNC at Libau on October 8, 1945, still incomplete and with a missing rudder. Moved to Kronstadt in early 1945 or early 1946 and probably commissioned into the Soviet Navy for sea trials/training. Renamed R-2 on March 8, 1947. Sunk in the Baltic off Cape Ristna Lighthouse on August 7 or 8, 1947.
  • U-boat.net webpage for U-3536

U-3537 edit

  • Type: XXI
  • Construction
  • Commander
  • Fate: Captured incomplete by the Soviets on Slip No. 3 on March 30, 1945. Redesignated as TS-7 on April 12, 1945, and launched at Danzig in mid-1945. Allocated to Soviet Baltic Fleet and moved to Libau, Latvia. Inspected by TNC at Libau on October 8, 1945, still incomplete. Moved to Kronstadt in early 1945 or early 1946 and probably commissioned into the Soviet Navy for sea trials/training. Renamed R-3 on March 8, 1947. Sunk in the Baltic off Cape Ristna Lighthouse on August 7 or 8, 1947.
  • U-boat.net webpage for U-3537

U-3538 edit

  • Type: XXI
  • Construction
  • Commander
  • Fate: Construction suspended on January 29, 1945. Captured incomplete by the Soviets on Slip No. 3 on March 30, 1945. Redesignated as TS-8 on April 12, 1945, and launched at Danzig in July 1945. Allocated to Soviet Baltic Fleet and moved to Libau, Latvia. Inspected by TNC at Libau on October 8, 1945, still incomplete with bomb damage and a flooded forward section. Moved to Kronstadt in early 1945 or early 1946. Renamed R-4 on March 8, 1947. Struck off Soviet Navy list on February 28, 1948, and released for recovery, later broken up for scrap.
  • U-boat.net webpage for U-3538

U-3539 edit

  • Type: XXI
  • Construction
  • Commander
  • Fate: Construction suspended on January 29, 1945. Captured incomplete by the Soviets on Slip No. 2 on March 30, 1945. Redesignated as TS-9 on April 12, 1945, and launched at Danzig in July 1945. Allocated to Soviet Baltic Fleet and moved to Libau, Latvia and then to Tallinn, Estonia, still incomplete. Moved to Kronstadt in early 1945 or early 1946. Renamed R-5 on March 8, 1947. Struck off Soviet Navy list on February 29, 1948, and released for recovery, later broken up for scrap.
  • U-boat.net webpage for U-3539

U-3540 edit

  • Type: XXI
  • Construction
  • Commander
  • Fate: Construction suspended on January 29, 1945. Captured incomplete by the Soviets on Slip No. 2 on March 30, 1945. Redesignated as TS-10 on April 12, 1945, and launched at Danzig in July 1945. Allocated to Soviet Baltic Fleet and moved to Libau, Latvia. Inspected by TNC at Libau on October 8, 1945, still incomplete and with a missing rudder. Moved to Kronstadt in early 1945 or early 1946. Renamed R-6 on March 8, 1947. Struck off Soviet Navy list on February 28, 1948, and released for recovery, later broken up for scrap.
  • U-boat.net webpage for U-3540

U-3541 edit

  • Type: XXI
  • Construction
  • Commander
  • Fate: Construction suspended on January 29, 1945. Captured incomplete by the Soviets on Slip No. 6 on March 30, 1945. Redesignated as TS-11 on April 12, 1945, and launched at Danzig in July 1945. Allocated to Soviet Baltic Fleet and moved to Libau, Latvia and then to Tallinn, Estonia, still incomplete. Moved to Kronstadt in early 1945 or early 1946. Renamed R-7 on March 8, 1947. Struck off Soviet Navy list on February 28, 1948, and released for recovery, later broken up for scrap.
  • U-boat.net webpage for U-3541

U-3542 edit

  • Type: XXI
  • Construction
  • Commander
  • Fate: Construction suspended on January 29, 1945. Captured incomplete by the Soviets on Slip No. 3 on March 30, 1945. Redesignated as TS-12 on April 12, 1945, and launched at Danzig in July 1945. Allocated to Soviet Baltic Fleet and moved to Libau, Latvia. Inspected by TNC at Libau on October 8, 1945, still incomplete. Moved to Kronstadt in early 1945 or early 1946. Renamed R-8 on March 8, 1947. Struck off Soviet Navy list on February 28, 1948, and released for recovery, later broken up for scrap.
  • U-boat.net webpage for U-3542

U-4706 edit

  • Type: XXIII
  • Construction
    • Laid Down: November 14, 1944
    • Launched: January 19, 1945
    • Commissioned: February 7, 1945
    • Shipyard: Germaniawerft, Kiel
  • Commander
    • Manfred Schneider
  • Fate: Surrendered at Kristiansand Süd, Norway on May 9, 1945. Transferred to Norway in October 1948 and became the Norwegian submarine KNM Knerter.
  • U-boat.net webpage for U-4706

U-4708 edit

  • Type: XXIII
  • Construction
    • Laid Down: December 1, 1944
    • Launched: March 24, 1945
    • Commissioned:
    • Shipyard: Germaniawerft, Kiel
  • Commander
  • Fate: Sunk just prior to commissioning on April 9, 1945, in the Kilian bunker in Kiel. Rumored to be still there in early 2000.
  • U-boat.net webpage for U-4708

References edit

  • Sharpe, Peter (1998). U-Boat Fact File. Great Britain: Midland Publishing. ISBN 1-85780-072-9.
  • U-boat.net: U-boats database

list, boats, never, deployed, during, second, world, german, navy, built, over, thousand, boats, submarines, service, battle, atlantic, elsewhere, although, majority, these, active, service, careers, them, were, lost, there, were, still, several, hundred, boat. During the Second World War the German Navy built over a thousand U boats or submarines for service in the Battle of the Atlantic and elsewhere Although the majority of these had active service careers and 784 of them were lost at sea there were still several hundred boats which were never completed or completed too late to see any war service These boats were sometime solely commissioned as training craft or were too badly damaged by bombing to be worth completion Most however were finished in the last six months of the war and never had time or enough fuel to complete their training programs These boats remained in German harbours up until April May 1945 when most were taken out to sea by skeleton crews and scuttled to prevent the allies capturing them The boats that were captured were taken by the Allies to Loch Ryan in Scotland and Lisahally in Northern Ireland Some were presented to allied navies for commissioning or experiments but the majority of captured U boats were towed out to sea in the autumn of 1945 and sunk by gunfire in Operation Deadlight This transport related list is incomplete you can help by adding missing items October 2021 Contents 1 U 112 2 U 113 3 U 114 4 U 115 5 U 329 6 U 330 7 U 395 8 U 474 9 U 491 10 U 492 11 U 493 12 U 494 13 U 495 14 U 496 15 U 497 16 U 684 17 U 685 18 U 686 19 U 687 20 U 688 21 U 689 22 U 723 23 U 724 24 U 769 25 U 770 26 U 780 27 U 781 28 U 782 29 U 791 30 U 792 31 U 793 32 U 796 33 U 797 34 U 798 35 U 807 36 U 808 37 U 809 38 U 810 39 U 811 40 U 812 41 U 813 42 U 814 43 U 815 44 U 816 45 U 823 46 U 824 47 U 882 48 U 884 49 U 885 50 U 886 51 U 887 52 U 888 53 U 890 54 U 891 55 U 892 56 U 893 57 U 894 58 U 895 59 U 896 60 U 897 61 U 898 62 U 899 63 U 900 64 U 902 65 U 906 66 U 908 67 U 931 68 U 932 69 U 996 70 U 1011 71 U 1012 72 U 1026 73 U 1027 74 U 1028 75 U 1029 76 U 1030 77 U 1031 78 U 1032 79 U 1108 80 U 1133 81 U 1134 82 U 1135 83 U 1136 84 U 1171 85 U 1173 86 U 1174 87 U 1175 88 U 1176 89 U 1177 90 U 1178 91 U 1179 92 U 1197 93 U 1236 94 U 1237 95 U 1238 96 U 1239 97 U 1240 98 U 1241 99 U 1242 100 U 1243 101 U 1244 102 U 1245 103 U 1246 104 U 1247 105 U 1248 106 U 1249 107 U 1250 108 U 1251 109 U 1252 110 U 1253 111 U 1254 112 U 1255 113 U 1280 114 U 1281 115 U 1282 116 U 1406 117 U 1407 118 U 1408 119 U 1409 120 U 1410 121 U 2201 122 U 2202 123 U 2203 124 U 2204 125 U 2323 126 U 2327 127 U 2331 128 U 2332 129 U 2333 130 U 2337 131 U 2338 132 U 2340 133 U 2341 134 U 2342 135 U 2343 136 U 2344 137 U 2345 138 U 2346 139 U 2347 140 U 2348 141 U 2349 142 U 2350 143 U 2351 144 U 2352 145 U 2353 146 U 2354 147 U 2363 148 U 2364 149 U 2365 150 U 2366 151 U 2367 152 U 2368 153 U 2369 154 U 2370 155 U 2371 156 U 2401 157 U 2402 158 U 2403 159 U 2404 160 U 2431 161 U 2432 162 U 2513 163 U 2518 164 U 2529 165 U 2532 166 U 2533 167 U 2534 168 U 2535 169 U 2536 170 U 2537 171 U 2538 172 U 2539 173 U 2546 174 U 2547 175 U 2548 176 U 2549 177 U 2550 178 U 2551 179 U 2552 180 U 2553 181 U 2554 182 U 2555 183 U 2556 184 U 2557 185 U 2558 186 U 2559 187 U 2560 188 U 2561 189 U 2562 190 U 2563 191 U 2564 192 U 3001 193 U 3017 194 U 3035 195 U 3036 196 U 3041 197 U 3042 198 U 3043 199 U 3044 200 U 3045 201 U 3046 202 U 3047 203 U 3048 204 U 3049 205 U 3050 206 U 3051 207 U 3052 208 U 3053 209 U 3054 210 U 3055 211 U 3056 212 U 3057 213 U 3058 214 U 3059 215 U 3060 216 U 3061 217 U 3062 218 U 3063 219 U 3501 220 U 3502 221 U 3503 222 U 3504 223 U 3505 224 U 3506 225 U 3507 226 U 3508 227 U 3509 228 U 3510 229 U 3511 230 U 3512 231 U 3513 232 U 3514 233 U 3515 234 U 3516 235 U 3517 236 U 3518 237 U 3519 238 U 3520 239 U 3521 240 U 3522 241 U 3523 242 U 3524 243 U 3525 244 U 3526 245 U 3527 246 U 3528 247 U 3529 248 U 3530 249 U 3531 250 U 3532 251 U 3533 252 U 3534 253 U 3535 254 U 3536 255 U 3537 256 U 3538 257 U 3539 258 U 3540 259 U 3541 260 U 3542 261 U 4706 262 U 4708 263 ReferencesU 112 editType XIB Construction Laid Down Launched Commissioned Shipyard AG Weser Bremen Commander Fate Construction suspended on September 15 1939 and cancelled in May 1940 Some sources claim that the U 112 was completed and sailed against the US in 1945 and sunk there with all hands but there is no evidence to support this claim U boat net webpage for U 112U 113 editType XIB Construction Laid Down Launched Commissioned Shipyard AG Weser Bremen Commander Fate Construction suspended on September 15 1939 and cancelled in May 1940 U boat net webpage for U 113U 114 editType XIB Construction Laid Down Launched Commissioned Shipyard AG Weser Bremen Commander Fate Construction suspended on September 15 1939 and cancelled in May 1940 U boat net webpage for U 114U 115 editType XIB Construction Laid Down Launched Commissioned Shipyard AG Weser Bremen Commander Fate Construction suspended on September 15 1939 and cancelled in May 1940 U boat net webpage for U 115U 329 editType VIIC 41 Construction Laid Down July 15 1943 Launched Commissioned Shipyard Flender Werke Lubeck Commander Fate Cancelled on July 20 1944 and broken up U boat net webpage for U 329U 330 editType VIIC 41 Construction Laid Down August 3 1943 Launched Commissioned Shipyard Flender Werke Lubeck Commander Fate Cancelled on July 20 1944 and broken up U boat net webpage for U 330U 395 editType VIIC Construction Laid Down June 10 1942 Launched July 16 1943 Commissioned Shipyard Howaldtswerke Kiel Commander Fate Bombed while being fitted out on July 29 1943 and left unfinished U boat net webpage for U 395U 474 editType VIIC Construction Laid Down December 18 1941 Launched April 17 1943 Commissioned Shipyard Deutsche Werft Kiel Commander Fate Sunk by bombs during an air raid on May 14 1943 It was raised and 95 repaired in 1945 but was scuttled on May 3 1945 U boat net webpage for U 474U 491 editType XIV Construction Laid Down July 13 1943 Launched Commissioned Shipyard Deutsche Werft Kiel Commander Fate Was 75 complete when construction was halted in 1944 Further construction halted on September 23 1944 and broken up U boat net webpage for U 491U 492 editType XIV Construction Laid Down August 21 1943 Launched Commissioned Shipyard Deutsche Werft Kiel Commander Fate Was 75 complete when construction was halted in 1944 Further construction halted on September 23 1944 and broken up U boat net webpage for U 492U 493 editType XIV Construction Laid Down September 25 1943 Launched Commissioned Shipyard Deutsche Werft Kiel Commander Fate Was 75 complete when construction was halted in 1944 Further construction halted on September 23 1944 and broken up U boat net webpage for U 493U 494 editType XIV Construction Laid Down November 1 1943 Launched Commissioned Shipyard Germaniawerft Kiel Commander Fate Construction cancelled September 23 1944 and broken up U boat net webpage for U 494U 495 editType XIV Construction Laid Down November 12 1943 Launched Commissioned Shipyard Germaniawerft Kiel Commander Fate Construction cancelled on September 23 1944 and broken up U boat net webpage for U 495U 496 editType XIV Construction Laid Down February 8 1944 Launched Commissioned Shipyard Germaniawerft Kiel Commander Fate Construction cancelled on September 23 1944 and broken up U boat net webpage for U 496U 497 editType XIV Construction Laid Down 1944 Launched Commissioned Shipyard Germaniawerft Kiel Commander Fate Construction cancelled on September 23 1944 and broken up U boat net webpage for U 497U 684 editType VIIC Construction Laid Down March 4 1943 Launched April 1944 Commissioned Shipyard Howaldtswerke Kiel Commander Fate Never finished and scuttled in front of the Elbe II bunker in Hamburg on May 3 1945 U boat net webpage for U 684U 685 editType VIIC Construction Laid Down March 8 1943 Launched April 1944 Commissioned Shipyard Howaldtswerke Kiel Commander Fate Never finished and scuttled in front of the Elbe II bunker in Hamburg on May 3 1945 U boat net webpage for U 685U 686 editType VIIC Construction Laid Down May 13 1943 Launched Commissioned Shipyard Howaldtswerke Kiel Commander Fate Never finished Cancelled on September 23 1944 U boat net webpage for U 686U 687 editType VIIC 41 Construction Laid Down May 13 1943 Launched Commissioned Shipyard Howaldtswerke Kiel Commander Fate Construction suspended on November 3 1943 and cancelled on July 22 1944 U boat net webpage for U 687U 688 editType VIIC 41 Construction Laid Down July 12 1943 Launched Commissioned Shipyard Howaldtswerke Kiel Commander Fate Never finished Construction suspended on September 30 1943 and cancelled on July 22 1944 U boat net webpage for U 688U 689 editType VIIC 41 Construction Laid Down July 13 1943 Launched Commissioned Shipyard Howaldtswerke Kiel Commander Fate Never finished Construction suspended on September 30 1943 and cancelled on July 22 1944 U boat net webpage for U 689U 723 editType VIIC 41 Construction Laid Down June 9 1943 Launched Commissioned Shipyard Stulcken Werft Hamburg Commander Fate Construction postponed on September 30 1943 and never built U boat net webpage for U 723U 724 editType VIIC 41 Construction Laid Down July 25 1943 Launched Commissioned Shipyard Stulcken Werft Hamburg Commander Fate Construction postponed on September 30 1943 and never built U boat net webpage for U 724U 769 editType VIIC Construction Laid Down Launched Commissioned Shipyard Kriegsmarinewerft Wilhelmshaven Commander Fate Damaged in an air raid along with U 770 on January 27 1943 Due to amount of damage the work number was transferred to another submarine and U 769 was reassigned a new work number Construction suspended on September 30 1943 and cancelled on July 22 1944 U boat net webpage for U 769U 770 editType VIIC Construction Laid Down Launched Commissioned Shipyard Kriegsmarinewerft Wilhelmshaven Commander Fate Damaged in an air raid along with U 769 on January 27 1943 Due to amount of damage the werk number was transferred to another submarine and U 770 was reassigned a new werk number Construction suspended on September 30 1943 and cancelled on July 22 1944 U boat net webpage for U 770U 780 editType VIIC Construction Laid Down August 25 1943 Launched Commissioned Shipyard Kriegsmarinewerft Wilhelmshaven Commander Fate Construction suspended on September 30 1943 and cancelled on July 20 1944 U boat net webpage for U 780U 781 editType VIIC Construction Laid Down September 30 1943 Launched Commissioned Shipyard Kriegsmarinewerft Wilhelmshaven Commander Fate Construction suspended on September 30 1943 and cancelled on July 20 1944 U boat net webpage for U 781U 782 editType VIIC Construction Laid Down Late 1943 Launched Commissioned Shipyard Kriegsmarinewerft Wilhelmshaven Commander Fate Construction suspended on September 30 1943 and cancelled on July 22 1944 U boat net webpage for U 782U 791 editType V 300 Construction Laid Down Launched Commissioned Shipyard Germaniawerft Kiel Commander Fate Enlarged version of V 80 except with a conning tower The only ship of this type cancelled on August 7 1942 in favor of other more promising Walter designs U boat net webpage for U 791U 792 editType XVIIA Construction Laid Down December 1 1942 Launched September 28 1943 Commissioned November 16 1943 Shipyard Blohm amp Voss Hamburg Commander Horst Heitz Hans Diederich Huis Fate Used for trials and later as a floating fuel bunker Scuttled in the Audorfer See near Rendsburg on May 4 1945 Raised on May 26 1945 and taken to Britain as a war prize and used for trials but was soon torn down for parts and scrapped Final fate unknown U boat net webpage for U 792U 793 editType XVIIA Construction Laid Down December 1 1942 Launched September 28 1943 Commissioned November 16 1943 Shipyard Blohm amp Voss Hamburg Commander Gunter Schauenburg Friedrich Schmidt Fate Used for trials scuttled in the Audorfer See near Rendsburg on May 4 1945 Raised on May 26 1945 and taken to Britain as a war prize and used for trials but was torn down for parts and scrapped U boat net webpage for U 793U 796 editType XVIII Construction Laid Down December 27 1943 Launched Commissioned Shipyard Germaniawerft Kiel Commander Fate Construction cancelled on March 27 1944 U boat net webpage for U 796U 797 editType XVIII Construction Laid Down Launched Commissioned Shipyard Germaniawerft Kiel Commander Fate Construction cancelled on March 27 1944 Was never laid down U boat net webpage for U 797U 798 editType XVIIK Construction Laid Down April 23 1944 Launched Commissioned Shipyard Germaniawerft Kiel Commander Fate Was still incomplete in May 1945 U boat net webpage for U 798U 807 editType IXC 40 Construction Laid Down 1943 Launched Commissioned Shipyard Seebeckwerft Bremen Commander Fate Construction suspended on September 30 1943 and cancelled on July 22 1944 U boat net webpage for U 807U 808 editType IXC 40 Construction Laid Down 1943 Launched Commissioned Shipyard Seebeckwerft Bremen Commander Fate Construction suspended on September 30 1943 and cancelled on July 22 1944 U boat net webpage for U 808U 809 editType IXC 40 Construction Laid Down Launched Commissioned Shipyard Seebeckwerft Bremen Commander Fate Construction suspended on September 30 1943 and cancelled on July 22 1944 U boat net webpage for U 809U 810 editType IXC 40 Construction Laid Down Launched Commissioned Shipyard Seebeckwerft Bremen Commander Fate Construction suspended on September 30 1943 and cancelled on July 22 1944 U boat net webpage for U 810U 811 editType IXC 40 Construction Laid Down Launched Commissioned Shipyard Seebeckwerft Bremen Commander Fate Construction suspended on September 30 1943 and cancelled on July 22 1944 U boat net webpage for U 811U 812 editType IXC 40 Construction Laid Down Launched Commissioned Shipyard Seebeckwerft Bremen Commander Fate Construction suspended on September 30 1943 and cancelled on July 22 1944 U boat net webpage for U 812U 813 editType IXC 40 Construction Laid Down Launched Commissioned Shipyard Seebeckwerft Bremen Commander Fate Construction suspended on September 30 1943 and cancelled on November 6 1943 U boat net webpage for U 813U 814 editType IXC 40 Construction Laid Down Launched Commissioned Shipyard Seebeckwerft Bremen Commander Fate Construction suspended on September 30 1943 and cancelled on November 6 1943 U boat net webpage for U 814U 815 editType IXC 40 Construction Laid Down Launched Commissioned Shipyard Seebeckwerft Bremen Commander Fate Construction suspended on September 30 1943 and cancelled on November 6 1943 U boat net webpage for U 815U 816 editType IXC 40 Construction Laid Down Launched Commissioned Shipyard Seebeckwerft Bremen Commander Fate Construction suspended on September 30 1943 and cancelled on November 6 1943 U boat net webpage for U 816U 823 editType VIIC Construction Laid Down November 11 1941 Launched Commissioned Shipyard Oderwerke Stettin Commander Fate Construction suspended on November 6 1943 Cancelled on July 20 1944 and left unfinished U boat net webpage for U 823U 824 editType VIIC Construction Laid Down November 24 1941 Launched Commissioned Shipyard Oderwerke Stettin Commander Fate Construction suspended on November 6 1943 Cancelled on July 20 1944 and left unfinished U boat net webpage for U 824U 882 editType IXC 40 Construction Laid Down August 21 1943 Launched April 29 1944 Commissioned Shipyard AG Weser Bremen Commander Fate Bombed in dock on March 30 1945 U boat net webpage for U 882U 884 editType IXD 42 Construction Laid Down August 29 1943 Launched May 17 1944 Commissioned Shipyard AG Weser Bremen Commander Fate Badly damaged by an American bombing raid on March 30 1945 U boat net webpage for U 884U 885 editType IXD 42 Construction Laid Down Launched Commissioned Shipyard AG Weser Bremen Commander Fate Construction suspended November 6 1943 and cancelled July 22 1944 Was not laid down U boat net webpage for U 885U 886 editType IXD 42 Construction Laid Down Launched Commissioned Shipyard AG Weser Bremen Commander Fate Construction suspended November 6 1943 and cancelled July 22 1944 Was not laid down U boat net webpage for U 886U 887 editType IXD 42 Construction Laid Down Launched Commissioned Shipyard AG Weser Bremen Commander Fate Construction suspended November 6 1943 and cancelled July 22 1944 Was not laid down U boat net webpage for U 887U 888 editType IXD 42 Construction Laid Down Launched Commissioned Shipyard AG Weser Bremen Commander Fate Construction suspended November 6 1943 and cancelled July 22 1944 Was not laid down U boat net webpage for U 888U 890 editType IXC 40 Construction Laid Down September 20 1943 Launched April 24 1944 Commissioned Shipyard AG Weser Bremen Commander Fate Sunk on July 29 1944 while being fitted out U boat net webpage for U 890U 891 editType IXC 40 Construction Laid Down October 11 1943 Launched May 4 1944 Commissioned Shipyard AG Weser Bremen Commander Fate Sunk during an air raid on March 30 1945 while being fitted out U boat net webpage for U 891U 892 editType IXC 40 Construction Laid Down October 23 1943 Launched Commissioned Shipyard AG Weser Bremen Commander Fate Construction suspended on September 23 1944 U boat net webpage for U 892U 893 editType IXC 40 Construction Laid Down Launched Commissioned Shipyard AG Weser Bremen Commander Fate Construction suspended on November 6 1943 and cancelled on July 22 1944 U boat net webpage for U 893U 894 editType IXC 40 Construction Laid Down Launched Commissioned Shipyard AG Weser Bremen Commander Fate Construction suspended on November 6 1943 and cancelled on July 22 1944 U boat net webpage for U 894U 895 editType IXC 40 Construction Laid Down Launched Commissioned Shipyard AG Weser Bremen Commander Fate Construction suspended on September 30 1943 and cancelled on July 22 1944 U boat net webpage for U 895U 896 editType IXC 40 Construction Laid Down Launched Commissioned Shipyard AG Weser Bremen Commander Fate Construction suspended on September 30 1943 and cancelled on July 22 1944 U boat net webpage for U 896U 897 editType IXC 40 Construction Laid Down Launched Commissioned Shipyard AG Weser Bremen Commander Fate Construction suspended on September 30 1943 and cancelled on July 22 1944 U boat net webpage for U 897U 898 editType IXC 40 Construction Laid Down Launched Commissioned Shipyard AG Weser Bremen Commander Fate Construction suspended on November 6 1943 and cancelled on July 22 1944 U boat net webpage for U 898U 899 editType IXC 40 Construction Laid Down Launched Commissioned Shipyard AG Weser Bremen Commander Fate Construction suspended on September 30 1943 and cancelled on July 22 1944 U boat net webpage for U 899U 900 editType IXD 42 Construction Laid Down Launched Commissioned Shipyard AG Weser Bremen Commander Fate Construction suspended on September 30 1943 and cancelled on November 6 1943 Keel had not been laid down U boat net webpage for U 900U 902 editType VIIC Construction Laid Down January 24 1942 Launched December 24 1943 Commissioned Shipyard Vulcan Stettin Commander Fate Damaged twice by bombs cancelled on July 22 1944 U boat net webpage for U 902U 906 editType VIIC Construction Laid Down February 27 1943 Launched April 1 1944 Commissioned Shipyard Stulcken Werft Hamburg Commander Fate Sunk during an air raid on December 31 1944 and left unfinished U boat net webpage for U 906U 908 editType VIIC Construction Laid Down May 3 1943 Launched Commissioned Shipyard Stulcken Werft Hamburg Commander Fate Damaged by bombs and left unfinished U boat net webpage for U 908U 931 editType VIIC 41 Construction Laid Down June 26 1943 Launched Commissioned Shipyard Neptun Werft AG Rostock Commander Fate Was 40 complete when it was cancelled on September 23 1944 and broken up U boat net webpage for U 931U 932 editType VIIC 41 Construction Laid Down August 21 1943 Launched Commissioned Shipyard Neptun Werft AG Rostock Commander Fate Was 35 complete when it was cancelled on September 23 1944 and broken up U boat net webpage for U 932U 996 editType VIIC 41 Construction Laid Down November 25 1942 Launched July 22 1943 Commissioned Shipyard Blohm amp Voss Hamburg Commander Fate Sunk at dock in August 1944 U boat net webpage for U 996U 1011 editType VIIC 41 Construction Laid Down March 12 1943 Launched Commissioned Shipyard Blohm amp Voss Hamburg Commander Fate Damaged during an RAF raid on July 25 1943 repair work cancelled on July 22 1944 U boat net webpage for U 1011U 1012 editType VIIC 41 Construction Laid Down March 11 1943 Launched Commissioned Shipyard Blohm amp Voss Hamburg Commander Fate Damaged during an RAF raid on July 25 1943 repair work cancelled on July 22 1944 U boat net webpage for U 1012U 1026 editType VIIC 41 Construction Laid Down June 3 1943 Launched May 25 1944 Commissioned Shipyard Blohm amp Voss Hamburg Commander Fate Never finished scuttled in May 1945 U boat net webpage for U 1026U 1027 editType VIIC 41 Construction Laid Down June 17 1943 Launched November 27 1944 Commissioned Shipyard Blohm amp Voss Hamburg Commander Fate Never finished scuttled in May 1945 U boat net webpage for U 1027U 1028 editType VIIC 41 Construction Laid Down June 17 1943 Launched November 28 1944 Commissioned Shipyard Blohm amp Voss Hamburg Commander Fate Never finished scuttled in May 1945 U boat net webpage for U 1028U 1029 editType VIIC 41 Construction Laid Down June 18 1943 Launched July 5 1944 Commissioned Shipyard Blohm amp Voss Hamburg Commander Fate Never finished scuttled in May 1945 U boat net webpage for U 1029U 1030 editType VIIC 41 Construction Laid Down June 28 1943 Launched July 5 1944 Commissioned Shipyard Blohm amp Voss Hamburg Commander Fate Never finished scuttled in May 1945 U boat net webpage for U 1030U 1031 editType VIIC 41 Construction Laid Down July 12 1943 Launched Commissioned Shipyard Blohm amp Voss Hamburg Commander Fate Construction suspended on September 30 1943 Cancelled on July 22 1944 and broken up U boat net webpage for U 1031U 1032 editType VIIC 41 Construction Laid Down July 12 1943 Launched Commissioned Shipyard Blohm amp Voss Hamburg Commander Fate Construction suspended on September 30 1943 Cancelled on July 22 1944 and broken up U boat net webpage for U 1032U 1108 editType VIIC 41 Construction Laid Down September 20 1943 Launched September 5 1944 Commissioned November 18 1944 Shipyard Nordseewerken Emden Commander Wolf Wigand Fate Surrendered at Horten Norway on May 9 1945 Transferred to Lisahally Northern Ireland on May 27 1945 Acquired by Britain and became a British N class submarine U boat net webpage for U 1108U 1133 editType VIIC 41 Construction Laid Down April 27 1943 Launched Commissioned Shipyard Howaldtswerke Kiel Commander Fate Construction suspended on September 30 1943 and cancelled on July 22 1944 U boat net webpage for U 1133U 1134 editType VIIC 41 Construction Laid Down April 30 1943 Launched Commissioned Shipyard Howaldtswerke Kiel Commander Fate Construction suspended on September 30 1943 and cancelled on July 22 1944 U boat net webpage for U 1134U 1135 editType VIIC 41 Construction Laid Down June 24 1943 Launched Commissioned Shipyard Howaldtswerke Kiel Commander Fate Construction suspended on September 30 1943 and cancelled on July 22 1944 U boat net webpage for U 1135U 1136 editType VIIC 41 Construction Laid Down June 24 1943 Launched Commissioned Shipyard Howaldtswerke Kiel Commander Fate Construction suspended on September 30 1943 and cancelled on July 22 1944 U boat net webpage for U 1136U 1171 editType VIIC 41 Construction Laid Down May 5 1943 Launched November 23 1943 Commissioned March 22 1944 Shipyard Danziger Werft Danzig Commander Otto Heinrich Nachtigall Hermann Koopmann Fate Surrendered at Stavanger Norway on May 10 1945 Transferred to Lisahally Northern Ireland on May 27 1945 Acquired by Britain and became British N class submarine N19 U boat net webpage for U 1171U 1173 editType VIIC 41 Construction Laid Down May 22 1943 Launched December 18 1943 Commissioned Shipyard Schichau Werke Danzig Commander Fate Construction stopped on December 18 1943 and left unfinished U boat net webpage for U 1173U 1174 editType VIIC 41 Construction Laid Down June 25 1943 Launched October 28 1943 Commissioned Shipyard Schichau Werke Danzig Commander Fate Construction stopped on September 23 1944 after contract was cancelled Laid up incomplete in Danzig captured unfinished by the Soviets on March 30 1945 and launched at Danzig in mid 1945 Towed to Latvia where it was inspected by the TNC at Libau on October 8 1945 still incomplete Probably moved to Kronstadt in late 1945 or early 1946 and scrapped in 1947 1948 U boat net webpage for U 1174U 1175 editType VIIC 41 Construction Laid Down July 2 1943 Launched October 28 1943 Commissioned Shipyard Schichau Werke Danzig Commander Fate Construction stopped on October 28 1943 and left unfinished Cancelled on September 23 1944 U boat net webpage for U 1175U 1176 editType VIIC 41 Construction Laid Down July 29 1943 Launched November 6 1943 Commissioned Shipyard Schichau Werke Danzig Commander Fate Construction stopped on September 23 1944 after contract was cancelled Laid up incomplete in Danzig captured unfinished by the Soviets on March 30 1945 and launched at Danzig in mid 1945 Towed to Latvia where it was inspected by the TNC at Libau on October 8 1945 still incomplete and with a jammed rudder Probably moved to Kronstadt in late 1945 or early 1946 and scrapped in 1947 1948 U boat net webpage for U 1176U 1177 editType VIIC 41 Construction Laid Down August 7 1943 Launched Commissioned Shipyard Schichau Werke Danzig Commander Fate Construction suspended on November 6 1943 but resumed until launching Construction stopped on July 22 1944 after contract was cancelled Laid up incomplete at Kaiser Basin Danzig captured unfinished by the Soviets on March 30 1945 and launched at Danzig in mid 1945 Towed to Latvia where it was inspected by the TNC at Libau on October 8 1945 still incomplete and with shrapnel damage Probably moved to Kronstadt in late 1945 or early 1946 and scrapped in 1947 1948 U boat net webpage for U 1177U 1178 editType VIIC 41 Construction Laid Down September 9 1943 Launched Commissioned Shipyard Schichau Werke Danzig Commander Fate Construction suspended on November 6 1943 and cancelled on July 22 1944 U boat net webpage for U 1178U 1179 editType VIIC 41 Construction Laid Down September 22 1943 Launched Commissioned Shipyard Schichau Werke Danzig Commander Fate Construction suspended on November 6 1943 and cancelled on July 22 1944 U boat net webpage for U 1179U 1197 editType VIIC Construction Laid Down March 13 1943 Launched September 30 1943 Commissioned December 2 1943 Shipyard Schichau Werke Danzig Commander Heinz Baum Kurt Lau Fate Decommissioned at Wesermunde on April 25 1945 after suffering severe damage during a US air raid at AG Weser shipyard at Bremen on March 30 1945 Captured at Wesermunde by British forces in May 1945 Sunk in the North Sea by the US Navy in February 1946 U boat net webpage for U 1197U 1236 editType IXC 40 Construction Laid Down June 7 1943 Launched February 7 1944 Commissioned Shipyard Deutsche Werft AG Hamburg Commander Fate Construction abandoned in 1944 and suspended on September 23 1944 Scuttled in the Hansa Basin Hamburg on May 3 1945 Raised in June or August 1945 and broken up U boat net webpage for U 1236U 1237 editType IXC 40 Construction Laid Down June 22 1943 Launched February 22 1944 Commissioned Shipyard Deutsche Werft AG Hamburg Commander Fate U boat net webpage for U 1237U 1238 editType IXC 40 Construction Laid Down July 6 1943 Launched March 16 1944 Commissioned Shipyard Deutsche Werft AG Hamburg Commander Fate U boat net webpage for U 1238U 1239 editType IXC 40 Construction Laid Down July 20 1943 Launched Commissioned Shipyard Deutsche Werft AG Hamburg Commander Fate U boat net webpage for U 1239U 1240 editType IXC 40 Construction Laid Down August 21 1943 Launched Commissioned Shipyard Deutsche Werft AG Hamburg Commander Fate U boat net webpage for U 1240U 1241 editType IXC 40 Construction Laid Down September 29 1943 Launched Commissioned Shipyard Deutsche Werft AG Hamburg Commander Fate U boat net webpage for U 1241U 1242 editType IXC 40 Construction Laid Down October 1943 Launched Commissioned Shipyard Deutsche Werft AG Hamburg Commander Fate U boat net webpage for U 1242U 1243 editType IXC 40 Construction Laid Down Launched Commissioned Shipyard Deutsche Werft AG Hamburg Commander Fate Cancelled on September 23 1943 U boat net webpage for U 1243U 1244 editType IXC 40 Construction Laid Down Launched Commissioned Shipyard Deutsche Werft AG Hamburg Commander Fate Cancelled on September 23 1943 U boat net webpage for U 1244U 1245 editType IXC 40 Construction Laid Down Launched Commissioned Shipyard Deutsche Werft AG Hamburg Commander Fate Construction suspended September 30 1943 and cancelled July 22 1944 U boat net webpage for U 1245U 1246 editType IXC 40 Construction Laid Down Launched Commissioned Shipyard Deutsche Werft AG Hamburg Commander Fate Construction suspended September 30 1943 and cancelled July 22 1944 U boat net webpage for U 1246U 1247 editType IXC 40 Construction Laid Down Launched Commissioned Shipyard Deutsche Werft AG Hamburg Commander Fate Construction suspended September 30 1943 and cancelled July 22 1944 U boat net webpage for U 1247U 1248 editType IXC 40 Construction Laid Down Launched Commissioned Shipyard Deutsche Werft AG Hamburg Commander Fate Construction suspended September 30 1943 and cancelled July 22 1944 U boat net webpage for U 1248U 1249 editType IXC 40 Construction Laid Down Launched Commissioned Shipyard Deutsche Werft AG Hamburg Commander Fate Construction suspended September 30 1943 and cancelled July 22 1944 U boat net webpage for U 1249U 1250 editType IXC 40 Construction Laid Down Launched Commissioned Shipyard Deutsche Werft AG Hamburg Commander Fate Construction suspended September 30 1943 and cancelled July 22 1944 U boat net webpage for U 1250U 1251 editType IXC 40 Construction Laid Down Launched Commissioned Shipyard Deutsche Werft AG Hamburg Commander Fate Construction suspended September 30 1943 and cancelled November 6 1943 U boat net webpage for U 1251U 1252 editType IXC 40 Construction Laid Down Launched Commissioned Shipyard Deutsche Werft AG Hamburg Commander Fate Construction suspended September 30 1943 and cancelled November 6 1943 U boat net webpage for U 1252U 1253 editType IXC 40 Construction Laid Down Launched Commissioned Shipyard Deutsche Werft AG Hamburg Commander Fate Construction suspended September 30 1943 and cancelled November 6 1943 U boat net webpage for U 1253U 1254 editType IXC 40 Construction Laid Down Launched Commissioned Shipyard Deutsche Werft AG Hamburg Commander Fate Construction suspended September 30 1943 and cancelled November 6 1943 U boat net webpage for U 1254U 1255 editType IXC 40 Construction Laid Down Launched Commissioned Shipyard Deutsche Werft AG Hamburg Commander Fate Construction suspended September 30 1943 and cancelled November 6 1943 U boat net webpage for U 1255U 1280 editType VIIC 41 Construction Laid Down September 17 1943 Launched Commissioned Shipyard Bremer Vulkan Bremen Vegesack Commander Fate Was 50 60 complete when it was cancelled on September 23 1944 U boat net webpage for U 1280U 1281 editType VIIC 41 Construction Laid Down September 17 1943 Launched Commissioned Shipyard Bremer Vulkan Bremen Vegesack Commander Fate Was 50 60 complete when it was cancelled on September 23 1944 U boat net webpage for U 1281U 1282 editType VIIC 41 Construction Laid Down October 20 1943 Launched Commissioned Shipyard Bremer Vulkan Bremen Vegesack Commander Fate Was 50 60 complete when it was cancelled on September 23 1944 U boat net webpage for U 1282U 1406 editType XVIIB Construction Laid Down October 30 1943 Launched January 2 1945 Commissioned February 8 1945 Shipyard Blohm amp Voss Hamburg Commander Werner Klug Fate Surrendered at Cuxhaven Germany on May 5 1945 Scuttled along with U 1407 by Oblt Gerhard Grumpelt against orders on May 7 1945 Later raised and taken to the US on the deck of transport vessel Shoemaker arriving at Portsmouth on October 11 Was never repaired or put into service by the US Navy Sold for scrap in New York in May 1948 to Interstate Metals Corporation and broken up U boat net webpage for U 1406U 1407 editType XVIIB Construction Laid Down November 13 1943 Launched Commissioned March 13 1945 Shipyard Blohm amp Voss Hamburg Commander Horst Heitz Fate Surrendered at Cuxhaven Germany on May 5 1945 Scuttled along with U 1406 by Gerhard Grumpelt against orders on May 7 1945 Later raised and taken to Britain as a war prize and became British N class submarine N25 and later HMS Meteorite U boat net webpage for U 1407U 1408 editType XVIIB Construction Laid Down November 27 1943 Launched Commissioned Shipyard Blohm amp Voss Hamburg Commander Fate Damaged in air raid on March 30 1945 and scuttled at yard before completion U boat net webpage for U 1408U 1409 editType XVIIB Construction Laid Down December 15 1943 Launched Commissioned Shipyard Blohm amp Voss Hamburg Commander Fate Damaged in air raid on March 30 1945 and scuttled at yard before completion U boat net webpage for U 1409U 1410 editType XVIIB Construction Laid Down December 31 1943 Launched Commissioned Shipyard Blohm amp Voss Hamburg Commander Fate Damaged in air raid on March 30 1945 and scuttled at yard before completion U boat net webpage for U 1410U 2201 editType XIV Construction Laid Down Launched Commissioned Shipyard Germaniawerft Kiel Commander Fate Construction suspended on June 3 1944 and cancelled September 23 1944 U boat net webpage for U 2201U 2202 editType XIV Construction Laid Down Launched Commissioned Shipyard Germaniawerft Kiel Commander Fate Construction suspended on June 3 1944 and cancelled September 23 1944 U boat net webpage for U 2202U 2203 editType XIV Construction Laid Down Launched Commissioned Shipyard Germaniawerft Kiel Commander Fate Construction suspended on June 3 1944 and cancelled September 23 1944 U boat net webpage for U 2203U 2204 editType XIV Construction Laid Down Launched Commissioned Shipyard Germaniawerft Kiel Commander Fate Construction suspended on June 3 1944 and cancelled September 23 1944 U boat net webpage for U 2204U 2323 editType XXIII Construction Laid Down April 11 1944 Launched May 31 1944 Commissioned July 18 1944 Shipyard Deutsche Werft Hamburg Commander Walter Angermann Fate Sank off Moltenort by a mine on July 26 1944 on her maiden voyage killing two crew Raised in early 1945 and was still under repairs when Germany surrendered Broken up in place after WWII U boat net webpage for U 2323U 2327 editType XXIII Construction Laid Down May 16 1944 Launched July 29 1944 Commissioned August 19 1944 Shipyard Deutsche Werft Hamburg Commander Heinrich Murl Werner Muller Hans Walter Pahl Hermann Schulz Fate Scuttled at Kiel on May 2 1945 as part of Operation Regenbogen Later raised and broken up U boat net webpage for U 2327U 2331 editType XXIII Construction Laid Down June 30 1944 Launched August 22 1944 Commissioned September 12 1944 Shipyard Deutsche Werft Hamburg Commander Hans Walter Pahl Fate Sank by accident near Hela killing 15 crew Later raised and towed to Gotenhafen now Gdynia and broken up for scrap U boat net webpage for U 2331U 2332 editType XXIII Construction Laid Down September 20 1944 Launched October 18 1944 Commissioned November 13 1944 Shipyard Friedrich Krupp Germaniawerft Kiel Commander Dieter Bornkessel Fate Scuttled at Hamburg on May 3 1945 as part of Operation Regenbogen Later raised and broken up U boat net webpage for U 2332U 2333 editType XXIII Construction Laid Down September 27 1944 Launched November 16 1944 Commissioned December 18 1944 Shipyard Friedrich Krupp Germaniawerft Kiel Commander Heinz Baumann Fate Scuttled in Gelting Bay on May 3 1945 as part of Operation Regenbogen Later raised and broken up U boat net webpage for U 2333U 2337 editType XXIII Construction Laid Down August 2 1944 Launched September 15 1944 Commissioned October 4 1944 Shipyard Deutsche Werft Hamburg Commander Gunter Behnisch Fate Surrendered at Kristiansand Sud Norway on May 9 1945 Transferred to Loch Ryan Scotland on May 29 1945 Sunk by gunfire from British destroyer HMS Onslow and Polish destroyer ORP Piorun on November 28 1945 as part of Operation Deadlight U boat net webpage for U 2337U 2338 editType XXIII Construction Laid Down August 10 1944 Launched September 18 1944 Commissioned October 9 1944 Shipyard Deutsche Werft Hamburg Commander Hans Dietrich Kaiser Fate Sunk by RAF British Beaufighters of 236 Squadron and 254 Squadron on May 4 1945 killing 12 crew Raised in 1952 and broken up U boat net webpage for U 2338U 2340 editType XXIII Construction Laid Down August 18 1944 Launched September 28 1944 Commissioned October 16 1944 Shipyard Deutsche Werft Hamburg Commander Emil Klusmeier Fate Sunk at Hamburg during a British bombing run on March 30 1945 Later raised and broken up U boat net webpage for U 2340U 2341 editType XXIII Construction Laid Down August 23 1944 Launched October 3 1944 Commissioned October 21 1944 Shipyard Deutsche Werft Hamburg Commander Hermann Bohm Fate Surrendered at Cuxhaven Germany on May 5 1945 Transferred to Lisahally Northern Ireland on June 21 1945 Sunk by gunfire from British destroyer HMS Onslaught and Polish destroyer ORP Blyskawica on December 31 1945 as part of Operation Deadlight U boat net webpage for U 2341U 2342 editType XXIII Construction Laid Down August 29 1944 Launched October 13 1944 Commissioned November 1 1944 Shipyard Deutsche Werft Hamburg Commander Berchthold Schad von Mittelbiberach Fate Sunk in the Baltic Sea north of Swinemunde by a mine on December 20 1944 killing seven crew Wreck still in place in August 1953 and blown up in late October or November 1954 Remainder of wreck taken ashore and broken up for scrap U boat net webpage for U 2342U 2343 editType XXIII Construction Laid Down August 31 1944 Launched October 18 1944 Commissioned November 6 1944 Shipyard Deutsche Werft Hamburg Commander Harald Fuhlendorf Hans Ludwig Gaude Fate Scuttled in or near Gelting Bay on May 5 1945 as part of Operation Regenbogen Later raised and broken up U boat net webpage for U 2343U 2344 editType XXIII Construction Laid Down September 4 1944 Launched October 24 1944 Commissioned November 10 1944 Shipyard Deutsche Werft Kiel Commander Hermann Ellerlage Fate Sank north of Heiligendamm on February 18 1945 following a collision with U 2336 killing 10 crew Raised on January 22 1955 and taken to Rostock measured and conserved but never repaired Broken up at Rostock in 1958 U boat net webpage for U 2344U 2345 editType XXIII Construction Laid Down September 7 1944 Launched October 28 1944 Commissioned November 15 1944 Shipyard Deutsche Werft Hamburg Commander Karl Steffen Fate Surrendered at Stavanger Norway on May 9 1945 Transferred to Loch Ryan Scotland on June 30 1945 Towed out and scuttled on November 27 1945 as part of Operation Deadlight U boat net webpage for U 2345U 2346 editType XXIII Construction Laid Down September 14 1944 Launched October 31 1944 Commissioned November 20 1944 Shipyard Deutsche Werft Hamburg Commander Hermann von der Hoh Fate Scuttled in Gelting Bay on May 5 1945 as part of Operation Regenbogen Later raised and broken up U boat net webpage for U 2346U 2347 editType XXIII Construction Laid Down September 20 1944 Launched November 6 1944 Commissioned December 2 1944 Shipyard Deutsche Werft Hamburg Commander Willibald Ulbing Fate Scuttled in Gelting Bay on May 5 1945 as part of Operation Regenbogen Later raised and broken up U boat net webpage for U 2347U 2348 editType XXIII Construction Laid Down September 22 1944 Launched November 11 1944 Commissioned December 4 1944 Shipyard Deutsche Werft Hamburg Commander Willibald Ulbing Fate Surrendered at Stavanger Norway on May 9 1945 Transferred to Loch Ryan on May 27 1945 Broken up at Belfast in April 1949 U boat net webpage for U 2348U 2349 editType XXIII Construction Laid Down September 25 1944 Launched November 20 1944 Commissioned December 11 1944 Shipyard Deutsche Werft Hamburg Commander Hans Georg Muller Fate Scuttled in Gelting Bay on May 5 1945 as part of Operation Regenbogen Later raised and broken up U boat net webpage for U 2349U 2350 editType XXIII Construction Laid Down September 28 1944 Launched November 22 1944 Commissioned December 23 1944 Shipyard Deutsche Werft Hamburg Commander Werner Schauer Fate Surrendered at Kristiansand Sud Norway on May 9 1945 Transferred to Loch Ryan Scotland on May 29 1945 Sunk by gunfire from British destroyer HMS Onslow and Polish destroyer ORP Piorun on November 28 1945 as part of Operation Deadlight U boat net webpage for U 2350U 2351 editType XXIII Construction Laid Down September 28 1944 Launched November 22 1944 Commissioned December 23 1944 Shipyard Deutsche Werft Hamburg Commander Werner Bruckner Fate Surrendered at Flensburg Germany on May 5 1945 Later transferred to Lisahally Northern Ireland Sunk by gunfire from British destroyer HMS Offa on January 3 1946 as part of Operation Deadlight U boat net webpage for U 2351U 2352 editType XXIII Construction Laid Down October 3 1944 Launched November 25 1944 Commissioned December 30 1944 Shipyard Deutsche Werft Hamburg Commander Sigmund Budzyn Fate Scuttled at Horav Hav Denmark on May 5 1945 as part of Operation Regenbogen Later raised and broken up U boat net webpage for U 2352U 2353 editType XXIII Construction Laid Down October 10 1944 Launched December 6 1944 Commissioned January 9 1945 Shipyard Deutsche Werft Hamburg Commander Jurgen Hillmann Fate Surrendered at Kristiansand Sud Norway on May 9 1945 Transferred to Loch Ryan Scotland on May 29 1945 Allocated to the Soviet Union by the TNC Arrived at Libau Latvia on December 4 1945 as British N class N31 Allocated to the Soviet Baltic Fleet on February 13 1946 Renamed M 51 on June 9 1949 and transferred to reserve fleet as a training hulk on December 22 1950 Struck from Soviet Navy list on March 17 1952 and broken up for scrap in 1963 U boat net webpage for U 2353U 2354 editType XXIII Construction Laid Down October 14 1944 Launched December 10 1944 Commissioned January 11 1945 Shipyard Deutsche Werft Hamburg Commander Hans Dieter Wex Fate Surrendered at Kristiansand Sud Norway on May 9 1945 Transferred to Loch Ryan Scotland on May 29 1945 Sunk by gunfire from British destroyer HMS Onslow on December 22 1945 as part of Operation Deadlight U boat net webpage for U 2354U 2363 editType XXIII Construction Laid Down November 22 1944 Launched January 18 1945 Commissioned February 5 1945 Shipyard Deutsche Werft Hamburg Commander Karl Frahm Fate Surrendered at Kristiansand Sud Norway on May 9 1945 Transferred to Loch Ryan Scotland on May 29 1945 Sunk by gunfire from British destroyer HMS Onslow and Polish destroyer ORP Piorun on November 28 1945 as part of Operation Deadlight U boat net webpage for U 2363U 2364 editType XXIII Construction Laid Down November 27 1944 Launched January 23 1945 Commissioned February 14 1945 Shipyard Deutsche Werft Hamburg Commander Dieter Hengen Gerhard Remus Fate Scuttled in Gelting Bay on May 5 1945 as part of Operation Regenbogen Later raised and broken up U boat net webpage for U 2364U 2365 editType XXIII Construction Laid Down December 6 1944 Launched January 26 1945 Commissioned March 2 1945 Shipyard Deutsche Werft Hamburg Commander Fritz Otto Korfmann Uwe Christiansen Fate Scuttled in the Kattegat northwest of Anholt island on May 8 1945 as part of Operation Regenbogen Raised in June 1956 and commissioned as West German submarine Hai on August 15 1957 U boat net webpage for U 2365U 2366 editType XXIII Construction Laid Down December 6 1944 Launched February 17 1945 Commissioned March 10 1945 Shipyard Deutsche Werft Hamburg Commander Kurt Jackel Fate Scuttled in Gelting Bay on May 3 1945 as part of Operation Regenbogen Later raised and broken up U boat net webpage for U 2366U 2367 editType XXIII Construction Laid Down December 11 1944 Launched February 23 1945 Commissioned March 17 1945 Shipyard Deutsche Werft Hamburg Commander Heinrich Schroder Fate Sank near Schleimunde on May 5 1945 following a collision with another U boat Raised in August 1956 and commissioned as West German submarine Hecht on October 1 1957 U boat net webpage for U 2367U 2368 editType XXIII Construction Laid Down December 15 1944 Launched March 29 1945 Commissioned April 11 1945 Shipyard Deutsche Werft Hamburg Commander Fritz Ufermann Fate Scuttled in Gelting Bay on May 3 1945 as part of Operation Regenbogen Later raised and broken up U boat net webpage for U 2368U 2369 editType XXIII Construction Laid Down December 20 1944 Launched March 24 1945 Commissioned April 18 1945 Shipyard Deutsche Werft Hamburg Commander Hermann Schulz Fate Scuttled in Gelting Bay on May 3 1945 as part of Operation Regenbogen Later raised and broken up U boat net webpage for U 2369U 2370 editType XXIII Construction Laid Down December 20 1944 Launched Commissioned Shipyard Deutsche Werft Hamburg Commander Fate Some sources state U 2370 was commissioned on April 15 1944 However according to planned commander Oblt Bornkesser the submarine was never commissioned and was scuttled unfinished on May 3 1945 at the Fink II bunker in Hamburg U boat net webpage for U 2370U 2371 editType XXIII Construction Laid Down January 19 1945 Launched April 18 1945 Commissioned April 24 1945 Shipyard Deutsche Werft Hamburg Commander Johannes Kuhne Fate Scuttled at Hamburg on May 3 1945 as part of Operation Regenbogen Later raised and broken up U boat net webpage for U 2371U 2401 editType XXIII Construction Laid Down June 1944 Launched Commissioned Shipyard Ansaldo Genoa Commander Fate Keel laid down in June 1944 never completed Cancelled August 24 1944 U boat net webpage for U 2401U 2402 editType XXIII Construction Laid Down June 1944 Launched Commissioned Shipyard Ansaldo Genoa Commander Fate Keel laid down in June 1944 never completed Cancelled August 24 1944 U boat net webpage for U 2402U 2403 editType XXIII Construction Laid Down July 1944 Launched Commissioned Shipyard Ansaldo Genoa Commander Fate Keel laid down in July 1944 never completed Cancelled August 24 1944 U boat net webpage for U 2403U 2404 editType XXIII Construction Laid Down July 1944 Launched Commissioned Shipyard Ansaldo Genoa Commander Fate Keel laid down in July 1944 never completed Cancelled August 24 1944 U boat net webpage for U 2404U 2431 editType XXIII Construction Laid Down June 12 1944 Launched Commissioned Shipyard C R D A Monfalcone Commander Fate Never completed U boat net webpage for U 2431U 2432 editType XXIII Construction Laid Down June 16 1944 Launched Commissioned Shipyard C R D A Monfalcone Commander Fate Never completed U boat net webpage for U 2432U 2513 editType XXI Construction Laid Down July 19 1944 Launched September 19 1944 Commissioned October 12 1944 Shipyard Blohm amp Voss Hamburg Commander Hans Bungards Erich Topp Fate Surrendered at Horten Norway on May 9 1945 Transferred to Oslo on May 18 1945 Departed Oslo on June 3 1945 for Lisahally Northern Ireland arriving there on June 9 Secretly transferred to the US in August 1945 and escorted by USS Brant to New London Connecticut arriving there on August 25 Refitted at Portsmouth New Hampshire and used for trials and training Sunk west of Key West Florida during rocket testing by USS Robert A Owens on October 7 1951 U boat net webpage for U 2513U 2518 editType XXI Construction Laid Down August 16 1944 Launched October 4 1944 Commissioned November 4 1944 Shipyard Blohm amp Voss Hamburg Commander Friedrich Weidner Fate Surrendered at Horten Norway on May 9 1945 Transferred to Oslo on May 18 1945 Departed Oslo on June 3 1945 for Lisahally Northern Ireland arriving there on June 7 Transferred to France on February 14 1946 and renamed Roland Morillot on February 14 1951 U boat net webpage for U 2518U 2529 editType XXI Construction Laid Down September 29 1944 Launched November 13 1944 Commissioned February 22 1945 Shipyard Blohm amp Voss Hamburg Commander Karl Heinrich Feufel Fritz Kallipke Fate Surrendered at Kristiansand Sud Norway on May 9 1945 Departed Kristiansand on June 3 1945 for Lisahally Northern Ireland arriving there on June 6 Allocated to the Soviet Union by the TNC Arrived at Libau Latvia on December 4 1945 as British N class N27 Allocated to the Soviet Baltic Fleet on February 13 1946 Renamed B 27 on June 9 1949 and transferred to reserve fleet on December 29 1955 Redesignated as block ship BSh 28 on September 19 1955 and as training hulk UTS 3 on January 9 1957 Struck from Soviet Navy list on September 1 1972 and broken up for scrap U boat net webpage for U 2529U 2532 editType XXI Construction Laid Down October 10 1944 Launched December 7 1944 Commissioned Shipyard Blohm amp Voss Hamburg Commander Fate Sunk at yard during bombing raid on December 31 1944 and again on January 17 1945 U boat net webpage for U 2532U 2533 editType XXI Construction Laid Down October 13 1944 Launched December 7 1944 Commissioned January 18 1945 Shipyard Blohm amp Voss Hamburg Commander Horst Gunther Fate Scuttled at Travemunde on May 3 1945 Later broken up U boat net webpage for U 2533U 2534 editType XXI Construction Laid Down October 23 1944 Launched December 11 1944 Commissioned January 17 1945 Shipyard Blohm amp Voss Hamburg Commander Ulrich Drews Fate Scuttled east of Fehmarn island on May 3 1945 U boat net webpage for U 2534U 2535 editType XXI Construction Laid Down October 19 1944 Launched December 16 1944 Commissioned January 28 1945 Shipyard Blohm amp Voss Hamburg Commander Otto Bitter Fate Scuttled at Travemunde on May 3 1945 Later raised and broken up U boat net webpage for U 2535U 2536 editType XXI Construction Laid Down October 21 1944 Launched December 16 1944 Commissioned February 6 1945 Shipyard Blohm amp Voss Hamburg Commander Ulrich Voge Fate Scuttled at Travemunde on May 3 1945 Later broken up U boat net webpage for U 2536U 2537 editType XXI Construction Laid Down October 10 1944 Launched December 7 1944 Commissioned Shipyard Blohm amp Voss Hamburg Commander Fate Sunk at yard during bombing raid on December 31 1944 U boat net webpage for U 2537U 2538 editType XXI Construction Laid Down October 24 1944 Launched January 6 1945 Commissioned February 16 1945 Shipyard Blohm amp Voss Hamburg Commander Heinrich Klapdor Fate Scuttled off AEro on May 3 1945 Later raised and broken up in 1950 U boat net webpage for U 2538U 2539 editType XXI Construction Laid Down October 27 1944 Launched January 6 1945 Commissioned February 21 1945 Shipyard Blohm amp Voss Hamburg Commander Erich Jewinski Fate Scuttled at Kiel on May 3 1945 Later raised and broken up U boat net webpage for U 2539U 2546 editType XXI Construction Laid Down November 22 1944 Launched February 19 1945 Commissioned March 21 1945 Shipyard Blohm amp Voss Hamburg Commander Max Dobbert Fate Scuttled at Kiel on May 3 1945 Later raised and broken up U boat net webpage for U 2546U 2547 editType XXI Construction Laid Down November 27 1944 Launched March 9 1945 Commissioned Shipyard Blohm amp Voss Hamburg Commander Fate Bombed while being built on March 11 1945 U boat net webpage for U 2547U 2548 editType XXI Construction Laid Down November 27 1944 Launched March 9 1945 Commissioned Shipyard Blohm amp Voss Hamburg Commander Karl Ernst Utischill Fate Scuttled at Kiel on May 3 1945 as part of Operation Regenbogen Later raised and broken up U boat net webpage for U 2548U 2549 editType XXI Construction Laid Down November 27 1944 Launched March 9 1945 Commissioned Shipyard Blohm amp Voss Hamburg Commander Fate Bombed while being built on March 11 1945 U boat net webpage for U 2549U 2550 editType XXI Construction Laid Down November 27 1944 Launched March 9 1945 Commissioned Shipyard Blohm amp Voss Hamburg Commander Fate Bombed while being built on March 11 1945 U boat net webpage for U 2550U 2551 editType XXI Construction Laid Down December 8 1944 Launched March 31 1945 Commissioned April 24 1945 Shipyard Blohm amp Voss Hamburg Commander Gerhard Schaar Fate Deliberately run aground by its crew at Solitude Spit near Flensburg on May 5 1945 Blown up by the Royal Navy on May 23 1945 and then broken up U boat net webpage for U 2551U 2552 editType XXI Construction Laid Down December 10 1944 Launched March 31 1945 Commissioned April 21 1945 Shipyard Blohm amp Voss Hamburg Commander Johannes Rudolph Fate Scuttled in Kiel harbor southwest of buoy B2 on May 3 1945 as part of Operation Regenbogen Later raised and broken up U boat net webpage for U 2552U 2553 editType XXI Construction Laid Down December 12 1944 Launched Commissioned Shipyard Blohm amp Voss Hamburg Commander Fate Still unfinished at the end of the war broken up on stocks in 1945 1946 U boat net webpage for U 2553U 2554 editType XXI Construction Laid Down December 14 1944 Launched Commissioned Shipyard Blohm amp Voss Hamburg Commander Fate Still unfinished at the end of the war broken up on stocks in 1945 1946 U boat net webpage for U 2554U 2555 editType XXI Construction Laid Down December 20 1944 Launched Commissioned Shipyard Blohm amp Voss Hamburg Commander Fate Still unfinished at the end of the war broken up on stocks in 1945 1946 U boat net webpage for U 2555U 2556 editType XXI Construction Laid Down December 23 1944 Launched Commissioned Shipyard Blohm amp Voss Hamburg Commander Fate Still unfinished at the end of the war broken up on stocks in 1945 1946 U boat net webpage for U 2556U 2557 editType XXI Construction Laid Down December 30 1944 Launched Commissioned Shipyard Blohm amp Voss Hamburg Commander Fate Still unfinished at the end of the war broken up on stocks in 1945 1946 U boat net webpage for U 2557U 2558 editType XXI Construction Laid Down February 1 1945 Launched Commissioned Shipyard Blohm amp Voss Hamburg Commander Fate Still unfinished at the end of the war broken up on stocks in 1945 1946 U boat net webpage for U 2558U 2559 editType XXI Construction Laid Down February 4 1945 Launched Commissioned Shipyard Blohm amp Voss Hamburg Commander Fate Still unfinished at the end of the war broken up on stocks in 1945 1946 U boat net webpage for U 2559U 2560 editType XXI Construction Laid Down February 12 1945 Launched Commissioned Shipyard Blohm amp Voss Hamburg Commander Fate Still unfinished at the end of the war broken up on stocks in 1945 1946 U boat net webpage for U 2560U 2561 editType XXI Construction Laid Down February 15 1945 Launched Commissioned Shipyard Blohm amp Voss Hamburg Commander Fate Still unfinished at the end of the war broken up on stocks in 1945 1946 U boat net webpage for U 2561U 2562 editType XXI Construction Laid Down February 24 1945 Launched Commissioned Shipyard Blohm amp Voss Hamburg Commander Fate Still unfinished at the end of the war broken up on stocks in 1945 1946 U boat net webpage for U 2562U 2563 editType XXI Construction Laid Down February 28 1945 Launched Commissioned Shipyard Blohm amp Voss Hamburg Commander Fate Still unfinished at the end of the war broken up on stocks in 1945 1946 U boat net webpage for U 2563U 2564 editType XXI Construction Laid Down March 29 1945 Launched Commissioned Shipyard Blohm amp Voss Hamburg Commander Fate Still unfinished at the end of the war broken up on stocks in 1945 1946 U boat net webpage for U 2564U 3001 editType XXI Construction Laid Down April 15 1944 Launched May 30 1944 Commissioned July 20 1944 Shipyard AG Weser Bremen Commander Hans Vogel Fate Scuttled northwest of Wesermunde on May 3 1945 Later raised and broken up U boat net webpage for U 3001U 3017 editType XXI Construction Laid Down September 2 1944 Launched November 5 1944 Commissioned January 5 1945 Shipyard AG Weser Bremen Commander Rolf Lindschau Fate Surrendered at Horten Norway on May 9 1945 Transferred to Oslo on May 18 Left Oslo on June 3 1945 for Lisahally Northern Ireland arriving there on June 7 Transferred to Britain and commissioned as British submarine N41 U boat net webpage for U 3041U 3035 editType XXI Construction Laid Down November 11 1944 Launched January 24 1945 Commissioned March 1 1945 Shipyard AG Weser Bremen Commander Ernst August Gerke Fate Surrendered at Stavanger Norway on May 9 1945 Left Stavanger on May 31 1945 for Scapa Flow Scotland arriving there on June 2 Left Scapa Flow the same day for Lisahally Northern Ireland arriving there on June 4 Allocated by the TNC to the Soviet Union Arrived at Libau Latvia on December 10 1945 as British N class N28 Allocated to the Soviet Baltic Fleet on February 13 1946 and renamed B 28 on June 9 1949 Transferred to reserve on December 29 1955 Redesignated as floating submarine battery recharging station PZS 34 on January 18 1956 Struck from Soviet Navy list on March 25 1958 and broken up for scrap U boat net webpage for U 3041U 3036 editType XXI Construction Laid Down November 22 1944 Launched January 27 1945 Commissioned Shipyard AG Weser Bremen Commander Fate Sunk during air raid on March 30 1945 while being fitted out U boat net webpage for U 3036U 3041 editType XXI Construction Laid Down December 7 1944 Launched February 15 1945 Commissioned March 10 1945 Shipyard AG Weser Bremen Commander Joachim Vieth Hans Hornkohl Fate Surrendered at Horten Norway on May 9 1945 Transferred to Oslo on May 18 Left Oslo on June 3 1945 for Lisahally Northern Ireland arriving there on June 7 Allocated by the TNC to the Soviet Union Arrived at Libau Latvia on December 10 1945 as British N class N29 Allocated to the Soviet Baltic Fleet on February 13 1946 and renamed B 29 on June 9 1949 Transferred to reserve on December 29 1955 Redesignated as floating submarine battery recharging station PZS 31 on January 18 1956 Struck from Soviet Navy list on September 28 1958 and broken up for scrap U boat net webpage for U 3041U 3042 editType XXI Construction Laid Down December 15 1944 Launched Commissioned Shipyard AG Weser Bremen Commander Fate Damaged in air raid while on slipways on February 22 1945 U boat net webpage for U 3042U 3043 editType XXI Construction Laid Down December 14 1944 Launched Commissioned Shipyard AG Weser Bremen Commander Fate Damaged in air raid while on slipways on February 22 1945 U boat net webpage for U 3043U 3044 editType XXI Construction Laid Down December 21 1944 Launched March 1 1945 Commissioned March 27 1945 Shipyard AG Weser Bremen Commander Bernhard Jaek Detlef von Lehsten Fate Scuttled in Gelting Bay on May 5 1945 as part of Operation Regenbogen Later raised and broken up U boat net webpage for U 3044U 3045 editType XXI Construction Laid Down December 20 1944 Launched March 6 1945 Commissioned Shipyard AG Weser Bremen Commander Fate Sunk during air raid on March 30 1945 while being fitted out U boat net webpage for U 3045U 3046 editType XXI Construction Laid Down December 29 1944 Launched March 10 1945 Commissioned Shipyard AG Weser Bremen Commander Fate Sunk during air raid on March 30 1945 while being fitted out U boat net webpage for U 3046U 3047 editType XXI Construction Laid Down January 3 1945 Launched April 11 1945 Commissioned Shipyard AG Weser Bremen Commander Fate Broken up because it was not ready for commission U boat net webpage for U 3047U 3048 editType XXI Construction Laid Down December 31 1944 Launched Commissioned Shipyard AG Weser Bremen Commander Fate Broken up because it was not ready for commission U boat net webpage for U 3048U 3049 editType XXI Construction Laid Down December 30 1944 Launched Commissioned Shipyard AG Weser Bremen Commander Fate Broken up because it was not ready for commission U boat net webpage for U 3049U 3050 editType XXI Construction Laid Down January 9 1945 Launched April 18 1945 Commissioned Shipyard AG Weser Bremen Commander Fate Broken up because it was not ready for commission U boat net webpage for U 3050U 3051 editType XXI Construction Laid Down January 8 1945 Launched April 20 1945 Commissioned Shipyard AG Weser Bremen Commander Fate Broken up because it was not ready for commission U boat net webpage for U 3051U 3052 editType XXI Construction Laid Down January 22 1945 Launched Commissioned Shipyard AG Weser Bremen Commander Fate Broken up on slipways U boat net webpage for U 3052U 3053 editType XXI Construction Laid Down January 25 1945 Launched Commissioned Shipyard AG Weser Bremen Commander Fate Broken up on slipways U boat net webpage for U 3053U 3054 editType XXI Construction Laid Down January 27 1945 Launched Commissioned Shipyard AG Weser Bremen Commander Fate Damaged in air raid on March 11 1945 Broken up on slipways U boat net webpage for U 3054U 3055 editType XXI Construction Laid Down January 25 1945 Launched Commissioned Shipyard AG Weser Bremen Commander Fate Broken up on slipways U boat net webpage for U 3055U 3056 editType XXI Construction Laid Down February 7 1945 Launched Commissioned Shipyard AG Weser Bremen Commander Fate Broken up on slipways U boat net webpage for U 3056U 3057 editType XXI Construction Laid Down February 4 1945 Launched Commissioned Shipyard AG Weser Bremen Commander Fate Broken up on slipways U boat net webpage for U 3057U 3058 editType XXI Construction Laid Down February 17 1945 Launched Commissioned Shipyard AG Weser Bremen Commander Fate Broken up on slipways U boat net webpage for U 3058U 3059 editType XXI Construction Laid Down February 15 1945 Launched Commissioned Shipyard AG Weser Bremen Commander Fate Broken up on slipways U boat net webpage for U 3059U 3060 editType XXI Construction Laid Down February 25 1945 Launched Commissioned Shipyard AG Weser Bremen Commander Fate Broken up on slipways U boat net webpage for U 3060U 3061 editType XXI Construction Laid Down February 24 1945 Launched Commissioned Shipyard AG Weser Bremen Commander Fate Damaged in air raid on March 11 1945 Broken up on slipways U boat net webpage for U 3061U 3062 editType XXI Construction Laid Down March 9 1945 Launched Commissioned Shipyard AG Weser Bremen Commander Fate Broken up on slipways U boat net webpage for U 3062U 3063 editType XXI Construction Laid Down March 7 1945 Launched Commissioned Shipyard AG Weser Bremen Commander Fate Broken up on slipways U boat net webpage for U 3063U 3501 editType XXI Construction Laid Down March 20 1944 Launched April 19 1944 Commissioned July 29 1944 Shipyard Schichau Werke Danzig Commander Helmut Munster Hans Joachim Schmidt Weichert Fate Scuttled in the west side of the Weser estuary on May 5 or May 1 1945 Later broken up U boat net webpage for U 3501U 3502 editType XXI Construction Laid Down April 16 1944 Launched July 6 1944 Commissioned August 19 1944 Shipyard Schichau Werke Danzig Commander Hermann Schultz Fate Used as an electricity producing boat stern damaged by bombs and was removed from service at Hamburg on May 3 1945 Later broken up U boat net webpage for U 3502U 3503 editType XXI Construction Laid Down June 17 1944 Launched July 27 1944 Commissioned September 9 1944 Shipyard Schichau Werke Danzig Commander Hugo Deiring Fate Scuttled in the Kattegat west of Goteborg Sweden on May 8 1945 Raised in 1946 and broken up U boat net webpage for U 3503U 3504 editType XXI Construction Laid Down June 30 1944 Launched August 15 1944 Commissioned September 23 1944 Shipyard Schichau Werke Danzig Commander Kart Hartwig Siebold Fate Scuttled at Wilhelmshaven on May 2 1945 Later broken up U boat net webpage for U 3504U 3505 editType XXI Construction Laid Down July 9 1944 Launched August 25 1944 Commissioned October 7 1944 Shipyard Schichau Werke Danzig Commander Horst Willner Fate Sunk by bombs at Kiel on April 3 1945 Wreck later broken up U boat net webpage for U 3505U 3506 editType XXI Construction Laid Down July 14 1944 Launched August 28 1944 Commissioned October 16 1944 Shipyard Schichau Werke Danzig Commander Gerhard Thater Fate Scuttled in the Elbe II bunker at Hamburg on May 2 1945 and not discovered until 1985 Wreckage still there but covered in gravel A parking lot now sits on top of the bunker site U boat net webpage for U 3506U 3507 editType XXI Construction Laid Down July 19 1944 Launched September 16 1944 Commissioned October 19 1944 Shipyard Schichau Werke Danzig Commander Otto Niethmann Hans Jurgen Schley Fate Scuttled at Travemunde on May 3 1945 Later broken up U boat net webpage for U 3507U 3508 editType XXI Construction Laid Down July 25 1944 Launched September 22 1944 Commissioned November 2 1944 Shipyard Schichau Werke Danzig Commander Detlef von Lehsten Fate Sunk whilst empty in Wilhelmshaven by an Eighth Air Force raid on March 3 1945 It was raised by engineers but sunk again on March 30 1945 U boat net webpage for U 3508U 3509 editType XXI Construction Laid Down July 19 1944 Launched September 27 1944 Commissioned January 29 1945 Shipyard Schichau Werke Danzig Commanders Hans Hornkohl Karl Hein Vosswinkel Heinz Franke Wilhelm Neitzsch Fate Scuttled at Wesermunde near Bremerhaven May 3 1945 U boat net webpage for U 3509U 3510 editType XXI Construction Laid Down August 6 1944 Launched October 4 1944 Commissioned November 11 1944 Shipyard Schichau Werke Danzig Commander Ernst Werner Schwirley Fate Scuttled in Geltinger Bay May 4 1945 U boat net webpage for U 3510U 3511 editType XXI Construction Laid Down August 14 1944 Launched October 11 1944 Commissioned November 18 1944 Shipyard Schichau Werke Danzig Commander Martin Grasse Hans Heinrich Ketels Hermann Schrenk Fate Scuttled at Travemunde near Neustadt May 3 1945 U boat net webpage for U 3511U 3512 editType XXI Construction Laid Down August 15 1944 Launched October 11 1944 Commissioned November 27 1944 Shipyard Schichau Werke Danzig Commander Hans Hornkohl Fate Destroyed by Royal Air Force bombers whilst laid up empty in Kiel 9 April 1945 U boat net webpage for U 3512U 3513 editType XXI Construction Laid Down August 20 1944 Launched October 21 1944 Commissioned December 2 1944 Shipyard Schichau Werke Danzig Commander Otto Heinrich Nachtigall Fate Scuttled at Travemunde near Neustadt May 3 1945 U boat net webpage for U 3513U 3514 editType XXI Construction Laid Down August 21 1944 Launched October 21 1944 Commissioned December 9 1944 Shipyard Schichau Werke Danzig Commander Gunther Fritze Fate Captured at Bergen Norway and transported to Loch Ryan awaiting a decision about its fate The Soviet Union refused an offer to have it as did Britain so on the 11 February 1946 it was sunk by the naval tug Prosperous with gunfire and a Shark anti submarine weapon U 3514 was the last submarine to be disposed of in Operation Deadlight U boat net webpage for U 3514U 3515 editType XXI Construction Laid Down August 27 1944 Launched November 4 1944 Commissioned December 14 1944 Shipyard Schichau Werke Danzig Commander Fedor Kuscher Fate Surrendered at Horten Norway on May 9 1945 Transferred to Oslo on May 18 to Scapa Flow Scotland on June 3 1945 arriving there on June 6 and finally to Lisahally Northern Ireland on June 8 1945 arriving there on June 9 Allocated to the Soviet Union by the TNC Arrived at Libau Latvia on February 2 1946 as British N class N30 Allocated to the Soviet Baltic Fleet on February 13 1946 Renamed B 30 on June 9 1949 and transferred to reserve fleet on December 29 1955 Redesignated as floating submarine battery recharging station PZS 35 on January 18 1956 and as test hulk B 100 on July 2 1958 Struck from Soviet Navy list on September 25 1959 and broken up for scrap on November 30 1959 U boat net webpage for U 3515U 3516 editType XXI Construction Laid Down Summer 1944 Launched November 4 1944 Commissioned December 18 1944 Shipyard Schichau Werke Danzig Commander Hans Wengel Heinrich Grote Fate Scuttled at Travemunde near Neustadt May 2 1945 Later raised and broken up U boat net webpage for U 3516U 3517 editType XXI Construction Laid Down September 12 1944 Launched December 6 1944 Commissioned December 22 1944 Shipyard Schichau Werke Danzig Commander Helmuth Munster Fate Scuttled at Travemunde near Neustadt May 4 1945 U boat net webpage for U 3517U 3518 editType XXI Construction Laid Down September 12 1944 Launched December 11 1944 Commissioned December 29 1944 Shipyard Schichau Werke Danzig Commander Herbert Brunning Fate Scuttled in Kiel harbour May 3 1945 U boat net webpage for U 3518U 3519 editType XXI Construction Laid Down September 19 1944 Launched November 23 1944 Commissioned January 6 1945 Shipyard Schichau Werke Danzig Commander Richard von Harpe Fate Sunk with all hands by an RAF air dropped mine during training north of Warnemunde on March 2 1945 U boat net webpage for U 3519U 3520 editType XXI Construction Laid Down September 20 1944 Launched November 23 1944 Commissioned January 12 1945 Shipyard Schichau Werke Danzig Commander Sarto Ballert Fate Sunk with all hands during training northeast of Bulk by mines on January 31 1945 U boat net webpage for U 3520U 3521 editType XXI Construction Laid Down October 3 1944 Launched December 3 1944 Commissioned January 14 1945 Shipyard Schichau Werke Danzig Commander Gunther Keller Fate Scuttled at Travemunde near Neustadt May 2 1945 U boat net webpage for U 3521U 3522 editType XXI Construction Laid Down October 1944 Launched December 3 1944 Commissioned January 21 1945 Shipyard Schichau Werke Danzig Commander Diether Lenzmann Fate Scuttled at Travemunde near Neustadt May 2 1945 U boat net webpage for U 3522U 3523 editType XXI Construction Laid Down October 7 1944 Launched December 14 1944 Commissioned January 23 1945 Shipyard Schichau Werke Danzig Commander Willi Muller Fate Sunk during training with all hands by depth charges from a B 24 Liberator of RAF 86 Squadron in the Skagerrak northeast of Skagen Horn on May 6 1945 Wreckage found in April 2018 U boat net webpage for U 3523U 3524 editType XXI Construction Laid Down October 1944 Launched December 14 1944 Commissioned January 26 1945 Shipyard Schichau Werke Danzig Commander Hans Ludwig Witt Fate Scuttled in Flensburger Forde May 4 1945 U boat net webpage for U 3524U 3525 editType XXI Construction Laid Down October 17 1944 Launched December 23 1944 Commissioned January 31 1945 Shipyard Schichau Werke Danzig Commanders Hans Ludwig Gaude Franz Kranich Fate Severely damaged by an air raid on Kiel the wreckage was scuttled on May 3 1945 U boat net webpage for U 3525U 3526 editType XXI Construction Laid Down October 15 1944 Launched December 23 1944 Commissioned March 22 1945 Shipyard Schichau Werke Danzig Commander Kurt Hilbig Fate Scuttled in the mouth of the Weser River at Wesermunde May 4 1945 U boat net webpage for U 3526U 3527 editType XXI Construction Laid Down October 25 1944 Launched January 10 1945 Commissioned March 10 1945 Shipyard Schichau Werke Danzig Commander Willy Kronenbitter Fate Scuttled in the mouth of the Weser River at Wesermunde May 4 1945 U boat net webpage for U 3527U 3528 editType XXI Construction Laid Down October 26 1944 Launched January 10 1945 Commissioned March 18 1945 Shipyard Schichau Werke Danzig Commander Heinz Zwarg Fate Scuttled in the mouth of the Weser River at Wesermunde May 4 1945 Later raised and broken up U boat net webpage for U 3528U 3529 editType XXI Construction Laid Down November 2 1944 Launched January 26 1945 Commissioned March 22 1945 Shipyard Schichau Werke Danzig Commander Karl Heinz Schmidt Fate Scuttled in Flensburger Forde May 5 1945 Later raised and broken up U boat net webpage for U 3529U 3530 editType XXI Construction Laid Down November 3 1944 Launched January 26 1945 Commissioned March 23 1945 Shipyard Schichau Werke Danzig Commanders Wilhelm Brauel Walter Ernst Koch Fate Scuttled in Kiel harbour May 3 1945 Later raised and broken up U boat net webpage for U 3530U 3531 editType XXI Construction Laid Down November 9 1944 Launched February 3 1945 Commissioned Shipyard Schichau Werke Danzig Commander Fate Nearly finished towed to Wesermunde and broken up U boat net webpage for U 3531U 3532 editType XXI Construction Laid Down November 9 1944 Launched February 3 1945 Commissioned Shipyard Schichau Werke Danzig Commander Fate Nearly finished towed to Wesermunde and broken up U boat net webpage for U 3532U 3533 editType XXI Construction Laid Down November 16 1944 Launched February 14 1945 Commissioned Shipyard Schichau Werke Danzig Commander Fate Nearly finished towed to Wesermunde and broken up U boat net webpage for U 3533U 3534 editType XXI Construction Laid Down November 17 1944 Launched February 14 1945 Commissioned Shipyard Schichau Werke Danzig Commander Fate Nearly finished towed to Wesermunde and broken up U boat net webpage for U 3534U 3535 editType XXI Construction Laid Down November 26 1944 Launched Commissioned Shipyard Schichau Werke Danzig Commander Fate Captured incomplete by the Soviets on Slip No 4 on March 30 1945 was 95 complete for launching when captured Redesignated as TS 5 on April 12 1945 and launched at Danzig in July 1945 Allocated to Soviet Baltic Fleet and moved to Libau Latvia Inspected by TNC at Libau on October 8 1945 still incomplete and with a missing rudder Moved to Kronstadt in early 1945 or early 1946 and probably commissioned into the Soviet Navy for sea trials training Renamed R 1 on March 8 1947 Sunk in the Baltic off Cape Ristna Lighthouse on August 7 or 8 1947 U boat net webpage for U 3535U 3536 editType XXI Construction Laid Down November 27 1944 Launched Commissioned Shipyard Schichau Werke Danzig Commander Fate Captured incomplete by the Soviets on Slip No 4 on March 30 1945 was 95 complete for launching when captured Redesignated as TS 6 on April 12 1945 and launched at Danzig in July 1945 Allocated to Soviet Baltic Fleet and moved to Libau Latvia Inspected by TNC at Libau on October 8 1945 still incomplete and with a missing rudder Moved to Kronstadt in early 1945 or early 1946 and probably commissioned into the Soviet Navy for sea trials training Renamed R 2 on March 8 1947 Sunk in the Baltic off Cape Ristna Lighthouse on August 7 or 8 1947 U boat net webpage for U 3536U 3537 editType XXI Construction Laid Down December 20 1944 Launched Commissioned Shipyard Schichau Werke Danzig Commander Fate Captured incomplete by the Soviets on Slip No 3 on March 30 1945 Redesignated as TS 7 on April 12 1945 and launched at Danzig in mid 1945 Allocated to Soviet Baltic Fleet and moved to Libau Latvia Inspected by TNC at Libau on October 8 1945 still incomplete Moved to Kronstadt in early 1945 or early 1946 and probably commissioned into the Soviet Navy for sea trials training Renamed R 3 on March 8 1947 Sunk in the Baltic off Cape Ristna Lighthouse on August 7 or 8 1947 U boat net webpage for U 3537U 3538 editType XXI Construction Laid Down Launched Commissioned Shipyard Schichau Werke Danzig Commander Fate Construction suspended on January 29 1945 Captured incomplete by the Soviets on Slip No 3 on March 30 1945 Redesignated as TS 8 on April 12 1945 and launched at Danzig in July 1945 Allocated to Soviet Baltic Fleet and moved to Libau Latvia Inspected by TNC at Libau on October 8 1945 still incomplete with bomb damage and a flooded forward section Moved to Kronstadt in early 1945 or early 1946 Renamed R 4 on March 8 1947 Struck off Soviet Navy list on February 28 1948 and released for recovery later broken up for scrap U boat net webpage for U 3538U 3539 editType XXI Construction Laid Down Launched Commissioned Shipyard Schichau Werke Danzig Commander Fate Construction suspended on January 29 1945 Captured incomplete by the Soviets on Slip No 2 on March 30 1945 Redesignated as TS 9 on April 12 1945 and launched at Danzig in July 1945 Allocated to Soviet Baltic Fleet and moved to Libau Latvia and then to Tallinn Estonia still incomplete Moved to Kronstadt in early 1945 or early 1946 Renamed R 5 on March 8 1947 Struck off Soviet Navy list on February 29 1948 and released for recovery later broken up for scrap U boat net webpage for U 3539U 3540 editType XXI Construction Laid Down Launched Commissioned Shipyard Schichau Werke Danzig Commander Fate Construction suspended on January 29 1945 Captured incomplete by the Soviets on Slip No 2 on March 30 1945 Redesignated as TS 10 on April 12 1945 and launched at Danzig in July 1945 Allocated to Soviet Baltic Fleet and moved to Libau Latvia Inspected by TNC at Libau on October 8 1945 still incomplete and with a missing rudder Moved to Kronstadt in early 1945 or early 1946 Renamed R 6 on March 8 1947 Struck off Soviet Navy list on February 28 1948 and released for recovery later broken up for scrap U boat net webpage for U 3540U 3541 editType XXI Construction Laid Down Launched Commissioned Shipyard Schichau Werke Danzig Commander Fate Construction suspended on January 29 1945 Captured incomplete by the Soviets on Slip No 6 on March 30 1945 Redesignated as TS 11 on April 12 1945 and launched at Danzig in July 1945 Allocated to Soviet Baltic Fleet and moved to Libau Latvia and then to Tallinn Estonia still incomplete Moved to Kronstadt in early 1945 or early 1946 Renamed R 7 on March 8 1947 Struck off Soviet Navy list on February 28 1948 and released for recovery later broken up for scrap U boat net webpage for U 3541U 3542 editType XXI Construction Laid Down Launched Commissioned Shipyard Schichau Werke Danzig Commander Fate Construction suspended on January 29 1945 Captured incomplete by the Soviets on Slip No 3 on March 30 1945 Redesignated as TS 12 on April 12 1945 and launched at Danzig in July 1945 Allocated to Soviet Baltic Fleet and moved to Libau Latvia Inspected by TNC at Libau on October 8 1945 still incomplete Moved to Kronstadt in early 1945 or early 1946 Renamed R 8 on March 8 1947 Struck off Soviet Navy list on February 28 1948 and released for recovery later broken up for scrap U boat net webpage for U 3542U 4706 editType XXIII Construction Laid Down November 14 1944 Launched January 19 1945 Commissioned February 7 1945 Shipyard Germaniawerft Kiel Commander Manfred Schneider Fate Surrendered at Kristiansand Sud Norway on May 9 1945 Transferred to Norway in October 1948 and became the Norwegian submarine KNM Knerter U boat net webpage for U 4706U 4708 editType XXIII Construction Laid Down December 1 1944 Launched March 24 1945 Commissioned Shipyard Germaniawerft Kiel Commander Fate Sunk just prior to commissioning on April 9 1945 in the Kilian bunker in Kiel Rumored to be still there in early 2000 U boat net webpage for U 4708References editSharpe Peter 1998 U Boat Fact File Great Britain Midland Publishing ISBN 1 85780 072 9 U boat net U boats database Retrieved from https en wikipedia org w index php title List of U boats never deployed amp oldid 1207370726, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.