Light rail in Sydney

The Sydney light rail network (or Sydney Light Rail) is a light rail/tram system serving the city of Sydney, New South Wales, Australia. The network currently consists of three passenger routes, the L1 Dulwich Hill, L2 Randwick and L3 Kingsford lines. The network comprises 42 stops and a system length of 24.7 km (15.3 mi), making it the second largest light rail network in Australia way behind the tram network in Melbourne, Victoria. A fourth line, the 12 km (7.5 mi) Parramatta Light Rail in Sydney's west, is currently under construction and planned to open in May 2024.

Sydney light rail network
Roundel
Overview
OwnerTransport for NSW
LocaleSydney, New South Wales
Transit typeLight rail
Number of lines3
Number of stops42
Annual ridership25.67 million (2022)[1]
WebsiteTfNSW Light Rail
Operation
Began operation31 August 1997; 25 years ago (1997-08-31)
Operator(s)Transdev Sydney
Number of vehicles60 Alstom Citadis 305
12 CAF Urbos 3
Technical
System length24.7 km (15 mi)[2]
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification750 V DC from overhead catenary
APS power supply between Town Hall and Circular Quay
Top speed70 km/h (43 mph)[3]

The network is managed by Transport for NSW, with day-to-day operations contracted to Transdev. In 2022, 25.67 million passenger journeys were made on the network. This equates to a ridership of over 70,000 daily passenger journeys.

History

 
Trams on George Street in 1920

In the 19th and early 20th centuries, Sydney developed an extensive tram network, which grew to be the second largest in the Southern Hemisphere and second largest in the Commonwealth after London. The increasing rate of private car ownership, the perception that trams contributed to traffic congestion and the general rundown conditions of the network due to the lack of funding after World War II led to the progressive replacement of tram services with buses, with the final section of the tram network closing on 25 February 1961.

In the 1980s and 1990s, the inner city areas of Darling Harbour and Pyrmont were the subject of an urban renewal program. In 1988 the Sydney Monorail opened, connecting Darling Harbour to the central business district. With poor integration between the monorail and other transport modes and the increasing redevelopment of the Pyrmont peninsula – including the establishment of Sydney's first legal casino – it was decided to convert a disused section of the Metropolitan Goods railway line into a light rail line. A section of track between Pyrmont and Haymarket was upgraded and a new on-street section was built to link the line to Central railway station. The line was set up as a public-private partnership. It opened in August 1997, running between Central Station and Wentworth Park, Pyrmont.

The private owner soon made proposals for a western extension continuing along the disused goods line, plus a new line through the central business district from Central to Circular Quay.[4] The western extension opened in 2000, terminating at Lilyfield, but the company was unsuccessful in its attempts to develop a CBD line, which saw the development of light rail stagnate for the remainder of the decade.

By contrast, the 2010s have seen major expansion and reform of light rail in Sydney including the announcement and delivery of multiple new infrastructure projects, integration of ticketing with the city's other transport modes, the introduction of new trams and the transfer of the network to full public ownership. The extensions announced during the decade total almost 40 km (25 mi). If all projects are completed, the network would expand in size from 7.2 km (4.5 mi) at the start of the decade to approximately 50 km (30 mi).

Ownership and operation

Public-private partnership

 

In March 1994, the Sydney Light Rail Company (SLRC) was formed. SLRC was awarded a 30-year concession to operate the light rail system until February 2028 when ownership would pass to the New South Wales Government.[5] The contract gave the company significant control over the commercial arrangements relating to future extensions or interconnecting lines.[6] Operation of the line was contracted to TNT Transit Systems, which also owned the Sydney Monorail.[7]

The SLRC purchased TNT Transit Systems in August 1998 as part of a joint venture with CGEA Transport.[8][9] This resulted in CGEA Transport taking over the light rail operating contract. CGEA Transport and its successors have operated the inner city light rail network ever since.[10]

In early 2001, Connex (renamed from CGEA Transport in 1999) sold its share of the monorail to the SLRC, bringing the monorail and light rail under unified ownership and leading to the formation of Metro Transport Sydney.[11][12]

The New South Wales Government purchased Metro Transport Sydney in March 2012, and the company was placed under the control of Transport for NSW.[13] The purchase removed the contractual restrictions on expanding the light rail network and allowed the government to dismantle the monorail, assisting its plans to redevelop the Sydney Convention & Exhibition Centre.[14][15]

Government ownership

Entrance to the Lilyfield stop before and after the New South Wales Government takeover.

From 1 July 2013, the Metro Light Rail brand was phased out as part of a broader rebranding and reorganisation of public transport services in New South Wales.[16] The process of shutting down Metro Transport Sydney and transferring assets to Transport for NSW was completed in September 2014.[17]

Following the announcement of the CBD and South East Light Rail, the government decided to group the contract covering the construction of the new line with the operation and maintenance of both lines of the inner city network. In December 2014, Transport for NSW awarded the contract to the ALTRAC Light Rail consortium. This sees Transdev Sydney, the operator under the previous contract, continue to operate and maintain the network as part of the consortium.[18] The operating contract commenced on 1 July 2015 and runs until 2034.[19][20]

After taking control of the Inner West Light Rail and announcing the CBD and South East Light Rail, the government also moved to establish a separate network centred around the Western Sydney suburb of Parramatta. Transdev will also operate the Parramatta network as part of the Great River City Light Rail consortium. This contract runs for eight years from construction completion, with a possible extension of up to an additional ten years.[21]

Operations

Network

Sydney's light rail network consists of:

 
The light rail lines of Sydney: the Inner West Light Rail, CBD and South East Light Rail, and stage 1 of the proposed Parramatta Light Rail

L1 Dulwich Hill Line

 
Dulwich Hill; the Inner West Light Rail line reused old goods tracks

The L1 Dulwich Hill Line is the network's original passenger route, which first commenced in August 1997. It operates along the 12.8-kilometre (8 mi) Inner West Light Rail between Central Station and Dulwich Hill, stopping at 23 stops along the route. It connects Sydney's Inner West with the Pyrmont peninsula, Darling Harbour and the southern end of the central business district.

The majority of the Inner West Light Rail line is along the alignment of a former freight railway line, with a short on-street section at the city end. The line opened between Central railway station in the city and Wentworth Park, Pyrmont in August 1997,[22] then extended west to Lilyfield in August 2000, and then southwest to Dulwich Hill in March 2014.[23][24]

From late October 2021 to February 2022, services were replaced by buses after major cracks were found in all 12 Urbos 3 trams serving the line.[25] Limited service was then restored with borrowed Citadis trams from the CBD and South East Light Rail.  

L2 Randwick & L3 Kingsford Lines

 
Light-rail lines running along George Street

The L2 Randwick Line and L3 Kingsford Line are Sydney's newest passenger routes on the Sydney light rail network. L2 Randwick Line services commenced on 14 December 2019, while L3 Kingsford Line services commenced operations on 3 April 2020.[26][27] They operate on the CBD and South East Light Rail, between Circular Quay at the northern end of the central business district to Central Station at the southern end, then continuing to the south-eastern suburbs.

CBD and South East Light Rail were built to reduce bus congestion in the CBD and provide higher capacity public transport to the Sydney Football Stadium, Sydney Cricket Ground, Randwick Racecourse and the University of New South Wales, which were previously served only by buses. In contrast to the Inner West Light Rail, the line is mostly on-street and follows a similar path to routes used by the former tramway network. Major construction began in October 2015.[28]

 

Under construction

Parramatta lines

 
The Parramatta light rail line running through Church Street

Parramatta Light Rail is the name given to two planned lines that converge on the Western Sydney centre of Parramatta.

The first line runs from Carlingford to Westmead via the Parramatta CBD. It includes the conversion of most of the former heavy rail Carlingford line to light rail standards. Construction began in 2018 and is expected to be completed in May 2024.[29][30]

The preferred route for the second line was announced in October 2017. This line branches from the first line at Rydalmere and travels through Ermington, Melrose Park, Wentworth Point and on to the Sydney Olympic Park events precinct.[31]

The lines will have no connection to the Inner West or CBD and South East lines.

 
The Parramatta Light Rail. Route and stops of stage 1 and indicative route of stage 2.

Rolling stock

All services on the Inner West Light Rail were previously operated by a single class of tram. A second class was introduced to operate services on the CBD and South East Light Rail. All vehicles to have operated on the system have been articulated, low floor and bi-directional. The system uses standard gauge track and 750 volt direct current electrification.

Both lines use different specifications on a range of measures including gaps between platforms and carriages, height and width of the actual track, clearances between the track corridor and its surrounds, and distance between the back wheels of the trams. As a result, Urbos 3 trams on the Inner West Light Rail (L1 Dulwich Hill) line are unable to serve on the CBD and South East Light Rail (L2 Randwick and L3 Kingsford) lines[32] However, trams used on the CBD and South East Light Rail (Citadis 305) are able to run on the Inner West Light Rail as the vehicles are narrower.[33] This was to allow the fleet to access the Lilyfield maintenance centre via the Inner West Light Rail.[34] This also allowed Citadis trams to be used for L1 Dulwich Hill services on the Inner West Light Rail from February 2022.

Urbos 3

Inner West Light Rail

 
Interior

Following the 5.6 km (3.5 mi) extension of the Inner West Light Rail to Dulwich Hill, more rolling stock was needed to support services and run alongside the Variotrams that had been providing services on the line since the first section opened in 1997.[35] A tender for six Urbos 3s was awarded to Construcciones y Auxiliar de Ferrocarriles (CAF) in August 2012.[36] The first unit arrived in Sydney on 19 December 2013 and entered service on 24 July 2014.[37][38] All were in service by August, allowing the leased Urbos 2s to be returned to Spain.[35]

On 11 October 2013, the Government announced an order for six additional Urbos 3s to replace the Variotrams.[39] All Urbos 3s from the additional order had entered service by the end of June 2015.[18][40]

The Urbos 3s are approximately 33 metres (108 ft) long and feature two double and two single doors on each side. The seats on the first batch are generally in the transverse configuration – at 90 degrees to the sides of the vehicle.[41] The second batch replace some of the transverse seats with longitudinal seating, providing more standing room. Digital voice announcements and internal dot-matrix displays provide information about the next stop. They have a standard capacity of 206 passengers and a crush capacity of 272.[42] The vehicles are numbered 2112, 2114–2124. 2113 was skipped due to superstition, particularly among the Chinese who travel to the Star casino by light rail, about numbers ending in 13.[43]

On 28 October 2021, service was suspended on the Inner West Light Rail after cracking in welds was discovered in some of the Urbos 3 vehicles during routine inspections.[44] On 2 November, it was revealed that cracks had been found in the entire Urbos 3 fleet of 12 vehicles. On 5 November, it was announced the line would be closed for up to 18 months to allow the fleet to be withdrawn for repairs. These cracks were discovered to be "more significant than first thought". The government announced that there was a "design flaw" in the vehicles and they would be consulting other operators.

Parramatta Light Rail

Stage 1 of the Parramatta Light Rail will be operated by a fleet of thirteen Urbos 3 vehicles. Each tram will be 45 metres (148 ft) long and consist of 7-modules.[21] These vehicles will support wire-free operation using batteries, which will be utilised on the on-street sections of the line around Parramatta and Westmead.[45][46]

Citadis 305

 
Interior

As part of the winning consortium to build and operate the CBD and South East Light Rail, Alstom supplied sixty Citadis 305 trams.[47] Each vehicle consists of five sections, and they are coupled together to operate in pairs of two.[48] Original plans for the line intended for the trams to be approximately 45 metres (148 ft) long and operate as single units. Wire-free operation in a section of George Street between Bathurst Street and Circular Quay was to be achieved via battery storage.[49][50] In December 2014, it was announced that Alstom's proprietary APS technology would be used in place of batteries. The length of the trams would also be reduced, but they would now operate in pairs, giving each pair a total length of approximately 67 metres (220 ft).[51]

The first unit was completed in May 2017.[52][53] The first six were manufactured in La Rochelle, France, the remaining 54 in Barcelona, Spain.[54] They are numbered 001–060.

After the entire Urbos 3 fleet of the Inner West Light Rail was withdrawn for repairs in November 2021, Citadis trams were borrowed from the CBD and South East Light Rail and tested on the Inner West Light Rail from December 2021.[33] The Citadis vehicles began services on the Inner West Light Rail on 12 February 2022 until the Urbos 3 fleet could be repaired and brought back into service.[55][56]

Withdrawn

Variotram

 
Variotram in Metro Light Rail livery

The network's original rolling stock was the Variotram which was introduced with the opening of the first section of the Inner West Light Rail in 1997. Seven German-designed vehicles were manufactured by Adtranz in Dandenong.[57] The Variotram design is modular and was extended for the Sydney system. The capacity of the vehicles was 217 passengers, of which 74 were seated.[58] The first was damaged in an accident near Tarcutta while on its delivery run and had to be returned to Melbourne for repairs.[59] On tests up to three trams were coupled together allowing a maximum capacity of 600 passengers if required.[57] They were numbered 2101–2107, continuing the Sydney trams sequence that finished at 2087 with the last Sydney R1-Class Tram.

The vehicles had a floor to rail height of 30 centimetres (12 in) and the bogies had no axles between the wheels and were powered with hub motors.[57] The design weight was reduced to compensate for the addition of climate-control air-conditioning equipment. Each was fitted with three double doors each side which had enhanced safety systems with obstacle detection interlocked with the traction system.[57] Seats were generally in the transverse configuration – at 90 degrees to the sides of the vehicle. In 2014, the original external destination rolls were replaced with dot-matrix displays and digital voice announcements were installed. There were no internal displays. The last Variotram was withdrawn from service after operating overnight between Central and The Star on 27/28 May 2015.[60]

After sustaining damage in a derailment at Glebe on 7 October 2013, Variotram number 2106 was scrapped.[61] The remaining six Variotrams were placed into storage in Penrith during the first half of 2015. Having been retained by Transport Heritage NSW, in October 2018, 2107 was placed in the custody of the Sydney Tramway Museum, Loftus.[62] The remaining five (2101–2105) were scrapped in early 2018.[63]

Urbos 2

Four leased CAF Urbos 2 trams were introduced on the Inner West Light Rail in 2014. They entered service to coincide with the extension of the line to Dulwich Hill, supplementing the Variotrams and ensuring service frequencies on the line could be maintained. The four trams had previously operated in Spain. Three units (2108–2110) were from Vélez-Málaga, where they operated between 2006 and 2012.[64] The other tram (2111) was from Seville. The first Urbos 2 arrived in Sydney on 4 September 2013.[65] Delivery was completed in November. The trams entered service on 22 March 2014, five days before the opening of the extension to Dulwich Hill.[66] Following the introduction of the Urbos 3 trams in July 2014, the Urbos 2s were withdrawn and returned to Spain.[38] The Urbos 2s were unpopular with passengers and attracted complaints.[67]

The trams featured four double and two single doors on each side. The seats were unpadded and were generally built in the longitudinal seating configuration – running parallel to the sides of the vehicle's body. Digital voice announcements and internal dot-matrix displays provided information about the next stop.

Patronage

 
Terminating trams at Circular Quay
 
A light rail stop in Kingsford

The following table lists patronage figures for the network during the corresponding financial year. Australia's financial years start on 1 July and end on 30 June. Major events that affected the number of journeys made or how patronage is measured are included as notes.

Sydney light rail patronage by financial year
Year 2010–11 2011–12 2012–13 2013–14 2014–15 2015–16 2016–17 2017–18 2018–19 2019–20
Patronage
(millions)
2.7
[a]
4.0 4.2 3.9
[b][c]
6.1
[d]
9.7 10.0
[e]
10.3 11.1 14.4
[f]
References [68] [69] [70] [71] [72] [73]
  1. ^ Partial integration with main Sydney ticketing system in June 2011
  2. ^ Services suspended for much of October 2013 after double derailment
  3. ^ Dulwich Hill extension opened in March 2014
  4. ^ Opal introduced in December 2014
  5. ^ Non-Opal tickets discontinued in August 2016
  6. ^ L2 Randwick Line opened in December 2019 and L3 Kingsford Line opened in April 2020. Patronage was lower than anticipated due to people staying at home and not taking public transport to school or work during the COVID-19 pandemic
2021–22 Sydney light rail patronage by line[n.b. 1][74]
2 270 000
6 102 000
6 488 000
  1. ^ Figures based on Opal tap on and tap off data.
2021–22 Transport for NSW patronage in Sydney by mode[75]
Mode Patronage % of total
 
Metro
10, 667 ,000 3.82
 
Train
135, 535 ,000 48.60
 
Bus
112, 470 ,000 40.33
 
Ferry
5, 374 ,000 1.93
 
Light rail
14, 860 ,000 5.33
Total 278, 906 ,000 100.00

Ticketing and fares

 
An Opal Card top up machine and reader at Pyrmont Bay

The smartcard-based Opal Card ticketing system, which was introduced to the network on 1 December 2014 is valid on metro, train, bus, ferry and light rail services.[76] Different fares apply for these modes, except that the same fares apply to light rail and buses. However, they are treated as separate modes for fare calculation purposes.[77] Light rail stops feature Opal top-up machines that also sell Opal single trip tickets. The single trip tickets are more expensive than the standard Opal fare. They are only valid for travel on light rail and must be used on the day of purchase.[78] The following table lists Opal fares for reusable smartcards and single trip tickets[79]

Bus or Light Rail
  As of 4 July 2022 0–3 km 3–8 km >8 km
Adult cards & contactless (peak) $3.20 $3.93 $5.05
Adult cards & contactless (off-peak) $2.24 $2.75 $3.53
Other cards (peak) $1.60 $1.96 $2.52^
Other cards (off-peak) $1.12 $1.37 $1.76
Adult single trip $4.00 $4.70 $6.10
Child/Youth single trip $2.00 $2.30 $3.00

^ = $2.50 for Senior/Pensioner cardholders

Fares are calculated using straight line distance between the origin and destination stops. No two stops on the existing line are located more than 8 kilometres (5.0 mi) from each other using this method, so the >8 km (5.0 mi) band doesn't apply to light rail services.

When it first opened, the Inner West Light Rail used its own paper-based ticketing system. Paper tickets were originally sold from ticket machines on stop platforms but were later issued by conductors on board. During the 2010s, this system gradually merged with the broader Sydney ticketing system, culminating in the introduction of Opal and the withdrawal of all other tickets. This process was completed on 1 August 2016.[80]

Potential extensions

Several transport corridors have significant potential to allow for the growth of the network beyond its current route structure.

Anzac Parade

 
Light rail construction on Anzac Parade in 2016

The New South Wales Government's 2012 policy document entitled Sydney's Light Rail Future proposed investigating an extension of the CBD and South East Light Rail along the southern Anzac Parade corridor.[81]

By 2014, an initial investigation had commenced. Three potential options were examined; a 1.9-kilometre (1.2 mi) extension to Maroubra Junction, a 5.1-kilometre (3.2 mi) extension to Malabar and an 8.2-kilometre (5.1 mi) extension to La Perouse.[82]

The government's 2018 Greater Sydney Services and Infrastructure Plan included a proposal for an extension to Maroubra Junction. The extension would however not be developed for at least 10 years.[83]

The Bays Precinct

The Bays Precinct is a large waterfront area to the west of the Sydney CBD being proposed for urban renewal by the New South Wales Government. The southern part of the precinct is served by the existing Inner West Light Rail. A planning document released by the government in October 2015 suggested light rail could be extended to the northern part of the precinct, possibly utilising the Glebe Island Bridge.[84]

The government's 2018 Greater Sydney Services and Infrastructure Plan included a proposal for a new line from Leichhardt North to Pyrmont via The Bays Precinct and the Glebe Island Bridge. It would connect with the existing Inner West Light Rail at both ends. The line wouldn't be developed for at least 10 years.[83]

Parramatta Light Rail extensions

The New South Wales Government's 2012 policy document entitled Sydney's Light Rail Future proposed investigating a Western Sydney light rail network.[81] This led to a number of corridors being investigated in the early planning stages of the Parramatta Light Rail project. The final corridors selected for development were announced in 2015.

In early 2017, Transport for NSW had begun an investigation into an extension of the Parramatta Light Rail from Carlingford to Epping.[85]

The government's 2018 Greater Sydney Services and Infrastructure Plan proposed investigating unspecified extensions to the network. The extensions wouldn't be developed for at least 10 years.[83]

Green Square

In 2012, the City of Sydney Council recommended that a Light Rail link be built from the city to Green Square, to service the commercial and residential developments being built in the area, which is expected to become Australia's most densely populated precinct. The council has spent more than $30 million buying land for a light rail corridor.[86][87][88] In July 2015, New South Wales Transport Minister Andrew Constance stated that the area was likely to be served by a light rail link in the future.[89] This led to a decision in October by the City of Sydney to allocate $445,000 to develop plans for a light rail line from the city to Green Square. The council estimated a link would cost $350–500 million to build.[87]

Bondi

In 2011, Waverley Council advocated for the extension of the light rail network to link the current infrastructure to Bondi Junction and Bondi Beach.[90][91] The council commissioned AECOM to undertake a feasibility assessment of the reintroduction of light rail on the corridor between Bondi Beach and Bondi Junction (Stage 1) and onto the CBD (Stage 2) to achieve mass transit of passengers and requested Transport for NSW consider the CBD to Bondi Beach corridor as a priority route in the Sydney Light Rail Plan.[92]

See also

Notes

References

  1. ^ "Light Rail Patronage - Monthly Comparison". 8 June 2017.
  2. ^ "Sydney's new light rail opens 14 December from Circular Quay to Randwick". Transport Info NSW. from the original on 9 December 2019. Retrieved 5 December 2019.
  3. ^ "Sydney Inner West Light Rail Construction and Extension, Australia". Retrieved 6 December 2019.
  4. ^ . The Australian Treasury Website. 7 May 1998. Archived from the original on 6 April 2016. Retrieved 12 December 2015.
  5. ^ (PDF). Transport NSW. July 2010. Archived from the original (PDF) on 7 April 2014.
  6. ^ Mills, Gordon (1997). "Light Rail in Sydney: Some Privatisation Lessons" (PDF). Agenda. 4 (4): 435, 438.
  7. ^ Mills, Gordon (1997). "Light Rail in Sydney: Some Privatisation Lessons" (PDF). Agenda. 4 (4): 433–444. (PDF) from the original on 2 October 2019. Retrieved 2 October 2019.
  8. ^ . Hastings. 11 August 1998. Archived from the original on 10 July 2015. Retrieved 6 April 2019.
  9. ^ . TNT. Archived from the original on 13 April 2014. Retrieved 27 September 2019.
  10. ^ . Transdev. Archived from the original on 16 August 2016. Retrieved 14 July 2016.
  11. ^ . Metro Light Rail. Archived from the original on 25 April 2003. Retrieved 1 February 2018.
  12. ^ (PDF). Metro Transport Sydney. 2005. Archived from the original (PDF) on 27 January 2005. Retrieved 1 February 2018.
  13. ^ Cosgriff, Stuart; Griffiths, Emily (5 July 2012). "Light rail strategy for Sydney". Clayton Utz Insights. Clayton Utz. Retrieved 6 July 2012.
  14. ^ Campion, Vikki (23 March 2012). "Last stop for Sydney Monorail". The Daily Telegraph.
  15. ^ Tan, Gillian (23 March 2012). "Australian Infrastructure Fund sells Metro Transport stake". The Australian (from The Wall Street Journal).
  16. ^ Saulwick, Jacob (18 April 2013). "All together now: Sydney's public transport united under one 'brand'". The Sydney Morning Herald. Retrieved 5 April 2015.
  17. ^ (PDF). Transport for NSW. pp. 329, 344. Archived from the original (PDF) on 5 December 2014. Retrieved 1 January 2015.
  18. ^ a b Delivering an integrated light rail system: ALTRAC takes over operation of inner west light rail 6 July 2015 at the Wayback Machine Transport for NSW 2 July 2015
  19. ^ . Transport for NSW. 18 December 2014. Archived from the original on 18 December 2014.
  20. ^ (Press release). Transdev. 25 February 2015. Archived from the original on 11 April 2015. Retrieved 5 April 2015.
  21. ^ a b (PDF). Transdev Australasia. 20 December 2018. Archived from the original (PDF) on 6 March 2019. Retrieved 21 December 2018.
  22. ^ "Sydney's new light rail system". Railway Digest. September 1997. p. 14.
  23. ^ "Sydney's Tram Extension Opens". Railway Digest. September 2000. p. 4.
  24. ^ . Transport for NSW. 27 March 2014. Archived from the original on 27 March 2014.
  25. ^ "Sydney's inner-west light rail shut down for up to 18 months due to cracks". ABC News. 5 November 2021. Retrieved 5 November 2021.
  26. ^ Final stage of Sydney's CBD light rail opens Sydney Morning Herald 3 April 2020
  27. ^ Sydney’s new light rail is now open from Circular Quay to Kingsford Transport for NSW 3 April 2020
  28. ^ "Final countdown to construction: Sydney Light Rail major works start October 23". Transport for NSW. 28 May 2015.
  29. ^ "Stage 1 Frequently Asked Questions". Parramatta Light Rail. NSW Government. Retrieved 12 February 2023.
  30. ^ "Inside the Brand New Parramatta Light Rail Vehicle - First Look at the new CAF Urbos 100 Tram". YouTube. Retrieved 12 February 2023.
  31. ^ "Parramatta light rail extension to Olympic Park on the Way". Transport for NSW. Retrieved 19 October 2017.
  32. ^ O'Sullivan, Matt (25 July 2017). "Why Sydney's new light rail trams won't carry passengers on inner west line". Sydney Morning Herald. Retrieved 6 November 2021.
  33. ^ a b "NSW government tests new CBD trams on inner west line". Sydney Morning Herald. 9 December 2021.
  34. ^ "CBD trams tested on Sydney's Inner West light rail to solve shutdown". 9News. 9 December 2021.
  35. ^ a b . www.engineersaustralia.org.au. Archived from the original on 28 October 2017. Retrieved 9 February 2018.
  36. ^ "Contract awarded for delivery of new light rail vehicles". Transport for NSW. Retrieved 16 August 2012.
  37. ^ O'Rourke, Jim (20 December 2013). . The Daily Telegraph. Archived from the original on 19 May 2015. Retrieved 20 December 2013.
  38. ^ a b First new light rail vehicle on the tracks as customer trips pass 1.5 million 8 August 2014 at the Wayback Machine, Transport for NSW, Retrieved 23 July 2014
  39. ^ . Transport for NSW. Archived from the original on 2 December 2013. Retrieved 11 October 2013.
  40. ^ (Press release). Gladys Berejiklian. 27 March 2015. Archived from the original on 6 April 2015. Retrieved 5 April 2015.
  41. ^ "Sydney Tram". CAF. Retrieved 1 March 2013.
  42. ^ (PDF). Sydney Morning Herald. Transport for NSW. Archived from the original (PDF) on 22 January 2021. Retrieved 29 August 2017.
  43. ^ "Sydney's light rail extension opens" (PDF). Trolley Wire. South Pacific Electric Railway. 55 (2): 22. May 2014. ISSN 0155-1264. Retrieved 12 December 2021.
  44. ^ "Inner West light rail services suspended after cracks discovered in trams". SMH. 28 October 2021. Retrieved 5 November 2021.
  45. ^ "Parramatta Light Rail contracts signed". www.transport.nsw.gov.au. Transport for NSW. 20 December 2018.
  46. ^ "CAF consortium secures Parramatta Light Rail contract in New South Wales (Australia)". Construcciones y Auxiliar de Ferrocarriles. 20 December 2018. Retrieved 27 December 2018.
  47. ^ "Alstom to deliver to Sydney Citadis X05, the latest evolution of its tram range" (Press release). Alstom. February 2015. Retrieved 25 February 2015.
  48. ^ "Sydney is first Citadis X05 tram customer". Metro Report International. 25 February 2015. Retrieved 12 June 2017.
  49. ^ Dean, Emma; Moore, Adam; Bunting, Kathleen (Parsons Brinckerhoff Australia) (21 June 2013). (PDF). Transport for NSW. pp. 4, 23. Archived from the original (PDF) on 27 September 2013. Retrieved 12 July 2013.{{cite web}}: CS1 maint: multiple names: authors list (link)
  50. ^ "CBD and South East Light Rail – Industry Briefing Session" (PDF). Transport for NSW. 9 April 2013. p. 11. Retrieved 10 April 2013.
  51. ^ "CBD and South East Light Rail – Modification Report" (PDF). Transport for NSW. pp. 25, 66. Retrieved 3 December 2014.
  52. ^ Alstom completes first Citadis X05 LRVs for Sydney International Railway Journal 24 May 2017
  53. ^ First Citadis X05 tram rolled out Metro Report International 24 May 2017
  54. ^ "Here & There" Trolley Wire issue 331 November 2017 page 12
  55. ^ "Sydney's Inner West light rail returns from tomorrow". www.9news.com.au. Retrieved 13 February 2022.
  56. ^ "Light rail services return to Inner West". Transport for NSW. 11 February 2022.
  57. ^ a b c d "Sydney Light Rail Construction and Extension". Railway Technology.
  58. ^ (PDF). Metro Transport Sydney. Archived from the original (PDF) on 15 February 2012. Retrieved 2 July 2013.
  59. ^ Accident to New Sydney Tram Trolley Wire issue 269 May 1997 page 23
  60. ^ Sydney Light Rail Vlog 25: Vario Trams: The End Of An Era. 28 May 2015. Archived from the original on 22 December 2021.
  61. ^ Sydney's light rail extension opens Trolley Wire issue 337 May 2014 page 22
  62. ^ Sydney Variotram 2107 arrives at Loftus Sydney Tramway Museum
  63. ^ Preservation & Tourist Railway Digest November 2018 page 52
  64. ^ "Sydney to lease Velez-Malaga LRVs". International Railway Journal. 13 May 2013. Retrieved 17 May 2013.
  65. ^ Walker, Ian (4 September 2013). "Early morning tram delivery brings George St to a halt". The Daily Telegraph. Retrieved 4 September 2013.
  66. ^ Inner West Light Rail Extension opens next week 21 March 2014 at the Wayback Machine Transport for NSW 21 March 2014
  67. ^ (PDF). Transport for NSW. 4 April 2014. p. 45. Archived from the original (PDF) on 5 December 2014.
  68. ^ (PDF). Transport for NSW. p. 395. Archived from the original (PDF) on 29 May 2015. Retrieved 1 August 2016.
  69. ^ "Transport for NSW Annual Report 2014–15" (PDF). Transport for NSW. p. 131. Retrieved 1 August 2016.
  70. ^ "Light Rail Patronage". Transport Performance and Analytics – Transport for NSW. December 2016. p. Top Level Charts. Retrieved 27 December 2016.
  71. ^ "Annual Report 2016–17" (PDF). Transport for NSW. p. 16. Retrieved 24 November 2017.
  72. ^ "Transport for NSW Annual Report 2017–18" (PDF). Transport for NSW. p. 17. Retrieved 2 December 2018.
  73. ^ "TfNSW Annual Reports". Transport for NSW. 18 June 2017. Retrieved 1 March 2020.{{cite web}}: CS1 maint: url-status (link)
  74. ^ "Light Rail Patronage – Monthly Comparison". Transport for NSW. Retrieved 20 August 2022.
  75. ^ See Transport for NSW patronage in Sydney by mode for sources
  76. ^ . Transport for NSW. 24 November 2014. Archived from the original on 1 December 2014. Retrieved 24 November 2014.
  77. ^ http://www.transportnsw.info/sites/en/transport-status/news/2014/opal-rollout.page Opal rollout extends to light rail 6 October 2014 at the Wayback Machine Transport Info NSW 25 November 2014
  78. ^ "Opal single trip tickets". Transport for NSW. Retrieved 4 August 2019.
  79. ^ "Opal fares". transportnsw.info. Transport for NSW. Retrieved 22 June 2019.
  80. ^ . Transport for NSW. 4 July 2016. Archived from the original on 6 July 2016.
  81. ^ a b "Sydney's Light Rail Future" (PDF). Transport for NSW. 13 December 2012. p. 20. Retrieved 17 March 2017.
  82. ^ (PDF). Infrastructure NSW. p. 40. Archived from the original (PDF) on 29 November 2014.
  83. ^ a b c "Greater Sydney Services and Infrastructure Plan" (PDF). Transport for NSW. March 2018. pp. 196, 203. Retrieved 19 March 2018.
  84. ^ Saulwick, Jacob (22 October 2015). "Return of trams to Glebe Island Bridge floated in inner harbour overhaul". The Sydney Morning Herald.
  85. ^ (PDF). Transport for NSW. Archived from the original (PDF) on 17 February 2017. Retrieved 17 February 2017.
  86. ^ . City of Sydney. Archived from the original on 6 October 2012.
  87. ^ a b "Green Square light rail moves another step closer". sydneymedia.com.au. City of Sydney. 30 October 2015.
  88. ^ O'Sullivan, Matt (21 November 2018). "'Transport mess': Passengers at one Sydney station nearly double in three years". The Sydney Morning Herald.
  89. ^ Saulwick, Jacob (28 July 2015). "Green Square needs light rail, Transport Minister says in break from past". The Sydney Morning Herald. Retrieved 28 July 2015.
  90. ^ . Waverley Council. December 2011. Archived from the original on 22 February 2014. Retrieved 3 April 2020.
  91. ^ Paperny, Daniel (11 October 2012). "Light rail on track for Bondi". CityHub Sydney. Retrieved 3 April 2020.
  92. ^ "URGENT BUSINESS FOR CONSIDERATION" (PDF). Waverley Council. 21 May 2013. Retrieved 3 April 2020.

External links

light, rail, sydney, this, article, about, modern, light, rail, system, sydney, city, former, tram, system, trams, sydney, sydney, light, rail, network, sydney, light, rail, light, rail, tram, system, serving, city, sydney, south, wales, australia, network, cu. This article is about the modern light rail system in Sydney For the city s former tram system see Trams in Sydney The Sydney light rail network or Sydney Light Rail is a light rail tram system serving the city of Sydney New South Wales Australia The network currently consists of three passenger routes the L1 Dulwich Hill L2 Randwick and L3 Kingsford lines The network comprises 42 stops and a system length of 24 7 km 15 3 mi making it the second largest light rail network in Australia way behind the tram network in Melbourne Victoria A fourth line the 12 km 7 5 mi Parramatta Light Rail in Sydney s west is currently under construction and planned to open in May 2024 Sydney light rail networkAn Alstom Citadis 305 on George StreetRoundelOverviewOwnerTransport for NSWLocaleSydney New South WalesTransit typeLight railNumber of lines3Number of stops42Annual ridership25 67 million 2022 1 WebsiteTfNSW Light RailOperationBegan operation31 August 1997 25 years ago 1997 08 31 Operator s Transdev SydneyNumber of vehicles60 Alstom Citadis 30512 CAF Urbos 3TechnicalSystem length24 7 km 15 mi 2 Track gauge1 435 mm 4 ft 8 1 2 in standard gaugeElectrification750 V DC from overhead catenaryAPS power supply between Town Hall and Circular QuayTop speed70 km h 43 mph 3 The network is managed by Transport for NSW with day to day operations contracted to Transdev In 2022 25 67 million passenger journeys were made on the network This equates to a ridership of over 70 000 daily passenger journeys Contents 1 History 1 1 Ownership and operation 1 1 1 Public private partnership 1 1 2 Government ownership 2 Operations 2 1 Network 2 1 1 L1 Dulwich Hill Line 2 1 2 L2 Randwick amp L3 Kingsford Lines 2 2 Under construction 2 2 1 Parramatta lines 3 Rolling stock 3 1 Urbos 3 3 1 1 Inner West Light Rail 3 1 2 Parramatta Light Rail 3 2 Citadis 305 3 3 Withdrawn 3 3 1 Variotram 3 3 2 Urbos 2 3 4 Patronage 3 5 Ticketing and fares 4 Potential extensions 4 1 Anzac Parade 4 2 The Bays Precinct 4 3 Parramatta Light Rail extensions 4 4 Green Square 4 5 Bondi 5 See also 6 Notes 7 References 8 External linksHistory EditMain article Trams in Sydney Trams on George Street in 1920 In the 19th and early 20th centuries Sydney developed an extensive tram network which grew to be the second largest in the Southern Hemisphere and second largest in the Commonwealth after London The increasing rate of private car ownership the perception that trams contributed to traffic congestion and the general rundown conditions of the network due to the lack of funding after World War II led to the progressive replacement of tram services with buses with the final section of the tram network closing on 25 February 1961 In the 1980s and 1990s the inner city areas of Darling Harbour and Pyrmont were the subject of an urban renewal program In 1988 the Sydney Monorail opened connecting Darling Harbour to the central business district With poor integration between the monorail and other transport modes and the increasing redevelopment of the Pyrmont peninsula including the establishment of Sydney s first legal casino it was decided to convert a disused section of the Metropolitan Goods railway line into a light rail line A section of track between Pyrmont and Haymarket was upgraded and a new on street section was built to link the line to Central railway station The line was set up as a public private partnership It opened in August 1997 running between Central Station and Wentworth Park Pyrmont The private owner soon made proposals for a western extension continuing along the disused goods line plus a new line through the central business district from Central to Circular Quay 4 The western extension opened in 2000 terminating at Lilyfield but the company was unsuccessful in its attempts to develop a CBD line which saw the development of light rail stagnate for the remainder of the decade By contrast the 2010s have seen major expansion and reform of light rail in Sydney including the announcement and delivery of multiple new infrastructure projects integration of ticketing with the city s other transport modes the introduction of new trams and the transfer of the network to full public ownership The extensions announced during the decade total almost 40 km 25 mi If all projects are completed the network would expand in size from 7 2 km 4 5 mi at the start of the decade to approximately 50 km 30 mi Ownership and operation Edit Public private partnership Edit Main article Metro Transport Sydney A Metro Light Rail service in 1997 at Fish Market station In March 1994 the Sydney Light Rail Company SLRC was formed SLRC was awarded a 30 year concession to operate the light rail system until February 2028 when ownership would pass to the New South Wales Government 5 The contract gave the company significant control over the commercial arrangements relating to future extensions or interconnecting lines 6 Operation of the line was contracted to TNT Transit Systems which also owned the Sydney Monorail 7 The SLRC purchased TNT Transit Systems in August 1998 as part of a joint venture with CGEA Transport 8 9 This resulted in CGEA Transport taking over the light rail operating contract CGEA Transport and its successors have operated the inner city light rail network ever since 10 In early 2001 Connex renamed from CGEA Transport in 1999 sold its share of the monorail to the SLRC bringing the monorail and light rail under unified ownership and leading to the formation of Metro Transport Sydney 11 12 The New South Wales Government purchased Metro Transport Sydney in March 2012 and the company was placed under the control of Transport for NSW 13 The purchase removed the contractual restrictions on expanding the light rail network and allowed the government to dismantle the monorail assisting its plans to redevelop the Sydney Convention amp Exhibition Centre 14 15 Government ownership Edit Metro Transport Sydney signage Transport for NSW signageEntrance to the Lilyfield stop before and after the New South Wales Government takeover From 1 July 2013 the Metro Light Rail brand was phased out as part of a broader rebranding and reorganisation of public transport services in New South Wales 16 The process of shutting down Metro Transport Sydney and transferring assets to Transport for NSW was completed in September 2014 17 Following the announcement of the CBD and South East Light Rail the government decided to group the contract covering the construction of the new line with the operation and maintenance of both lines of the inner city network In December 2014 Transport for NSW awarded the contract to the ALTRAC Light Rail consortium This sees Transdev Sydney the operator under the previous contract continue to operate and maintain the network as part of the consortium 18 The operating contract commenced on 1 July 2015 and runs until 2034 19 20 After taking control of the Inner West Light Rail and announcing the CBD and South East Light Rail the government also moved to establish a separate network centred around the Western Sydney suburb of Parramatta Transdev will also operate the Parramatta network as part of the Great River City Light Rail consortium This contract runs for eight years from construction completion with a possible extension of up to an additional ten years 21 Operations EditNetwork Edit Sydney s light rail network consists of Inner West Light Rail serviced by L1 Dulwich Hill Line CBD and South East Light Rail serviced by L2 Randwick Line and L3 Kingsford Line Parramatta Light Rail under construction stage 1 to open in May 2024 The light rail lines of Sydney the Inner West Light Rail CBD and South East Light Rail and stage 1 of the proposed Parramatta Light Rail L1 Dulwich Hill Line Edit Main article Inner West Light Rail Dulwich Hill the Inner West Light Rail line reused old goods tracks The L1 Dulwich Hill Line is the network s original passenger route which first commenced in August 1997 It operates along the 12 8 kilometre 8 mi Inner West Light Rail between Central Station and Dulwich Hill stopping at 23 stops along the route It connects Sydney s Inner West with the Pyrmont peninsula Darling Harbour and the southern end of the central business district The majority of the Inner West Light Rail line is along the alignment of a former freight railway line with a short on street section at the city end The line opened between Central railway station in the city and Wentworth Park Pyrmont in August 1997 22 then extended west to Lilyfield in August 2000 and then southwest to Dulwich Hill in March 2014 23 24 From late October 2021 to February 2022 services were replaced by buses after major cracks were found in all 12 Urbos 3 trams serving the line 25 Limited service was then restored with borrowed Citadis trams from the CBD and South East Light Rail L2 Randwick amp L3 Kingsford Lines Edit Main article CBD and South East Light Rail Light rail lines running along George Street The L2 Randwick Line and L3 Kingsford Line are Sydney s newest passenger routes on the Sydney light rail network L2 Randwick Line services commenced on 14 December 2019 while L3 Kingsford Line services commenced operations on 3 April 2020 26 27 They operate on the CBD and South East Light Rail between Circular Quay at the northern end of the central business district to Central Station at the southern end then continuing to the south eastern suburbs CBD and South East Light Rail were built to reduce bus congestion in the CBD and provide higher capacity public transport to the Sydney Football Stadium Sydney Cricket Ground Randwick Racecourse and the University of New South Wales which were previously served only by buses In contrast to the Inner West Light Rail the line is mostly on street and follows a similar path to routes used by the former tramway network Major construction began in October 2015 28 Under construction Edit Parramatta lines Edit Main article Parramatta Light Rail The Parramatta light rail line running through Church Street Parramatta Light Rail is the name given to two planned lines that converge on the Western Sydney centre of Parramatta The first line runs from Carlingford to Westmead via the Parramatta CBD It includes the conversion of most of the former heavy rail Carlingford line to light rail standards Construction began in 2018 and is expected to be completed in May 2024 29 30 The preferred route for the second line was announced in October 2017 This line branches from the first line at Rydalmere and travels through Ermington Melrose Park Wentworth Point and on to the Sydney Olympic Park events precinct 31 The lines will have no connection to the Inner West or CBD and South East lines The Parramatta Light Rail Route and stops of stage 1 and indicative route of stage 2 Rolling stock EditAll services on the Inner West Light Rail were previously operated by a single class of tram A second class was introduced to operate services on the CBD and South East Light Rail All vehicles to have operated on the system have been articulated low floor and bi directional The system uses standard gauge track and 750 volt direct current electrification Both lines use different specifications on a range of measures including gaps between platforms and carriages height and width of the actual track clearances between the track corridor and its surrounds and distance between the back wheels of the trams As a result Urbos 3 trams on the Inner West Light Rail L1 Dulwich Hill line are unable to serve on the CBD and South East Light Rail L2 Randwick and L3 Kingsford lines 32 However trams used on the CBD and South East Light Rail Citadis 305 are able to run on the Inner West Light Rail as the vehicles are narrower 33 This was to allow the fleet to access the Lilyfield maintenance centre via the Inner West Light Rail 34 This also allowed Citadis trams to be used for L1 Dulwich Hill services on the Inner West Light Rail from February 2022 Urbos 3 Edit Inner West Light Rail Edit Urbos 3 Interior Following the 5 6 km 3 5 mi extension of the Inner West Light Rail to Dulwich Hill more rolling stock was needed to support services and run alongside the Variotrams that had been providing services on the line since the first section opened in 1997 35 A tender for six Urbos 3s was awarded to Construcciones y Auxiliar de Ferrocarriles CAF in August 2012 36 The first unit arrived in Sydney on 19 December 2013 and entered service on 24 July 2014 37 38 All were in service by August allowing the leased Urbos 2s to be returned to Spain 35 On 11 October 2013 the Government announced an order for six additional Urbos 3s to replace the Variotrams 39 All Urbos 3s from the additional order had entered service by the end of June 2015 18 40 The Urbos 3s are approximately 33 metres 108 ft long and feature two double and two single doors on each side The seats on the first batch are generally in the transverse configuration at 90 degrees to the sides of the vehicle 41 The second batch replace some of the transverse seats with longitudinal seating providing more standing room Digital voice announcements and internal dot matrix displays provide information about the next stop They have a standard capacity of 206 passengers and a crush capacity of 272 42 The vehicles are numbered 2112 2114 2124 2113 was skipped due to superstition particularly among the Chinese who travel to the Star casino by light rail about numbers ending in 13 43 On 28 October 2021 service was suspended on the Inner West Light Rail after cracking in welds was discovered in some of the Urbos 3 vehicles during routine inspections 44 On 2 November it was revealed that cracks had been found in the entire Urbos 3 fleet of 12 vehicles On 5 November it was announced the line would be closed for up to 18 months to allow the fleet to be withdrawn for repairs These cracks were discovered to be more significant than first thought The government announced that there was a design flaw in the vehicles and they would be consulting other operators Parramatta Light Rail Edit Stage 1 of the Parramatta Light Rail will be operated by a fleet of thirteen Urbos 3 vehicles Each tram will be 45 metres 148 ft long and consist of 7 modules 21 These vehicles will support wire free operation using batteries which will be utilised on the on street sections of the line around Parramatta and Westmead 45 46 Citadis 305 Edit Citadis 305 Interior As part of the winning consortium to build and operate the CBD and South East Light Rail Alstom supplied sixty Citadis 305 trams 47 Each vehicle consists of five sections and they are coupled together to operate in pairs of two 48 Original plans for the line intended for the trams to be approximately 45 metres 148 ft long and operate as single units Wire free operation in a section of George Street between Bathurst Street and Circular Quay was to be achieved via battery storage 49 50 In December 2014 it was announced that Alstom s proprietary APS technology would be used in place of batteries The length of the trams would also be reduced but they would now operate in pairs giving each pair a total length of approximately 67 metres 220 ft 51 The first unit was completed in May 2017 52 53 The first six were manufactured in La Rochelle France the remaining 54 in Barcelona Spain 54 They are numbered 001 060 After the entire Urbos 3 fleet of the Inner West Light Rail was withdrawn for repairs in November 2021 Citadis trams were borrowed from the CBD and South East Light Rail and tested on the Inner West Light Rail from December 2021 33 The Citadis vehicles began services on the Inner West Light Rail on 12 February 2022 until the Urbos 3 fleet could be repaired and brought back into service 55 56 Withdrawn Edit Variotram Edit Variotram in Metro Light Rail livery The network s original rolling stock was the Variotram which was introduced with the opening of the first section of the Inner West Light Rail in 1997 Seven German designed vehicles were manufactured by Adtranz in Dandenong 57 The Variotram design is modular and was extended for the Sydney system The capacity of the vehicles was 217 passengers of which 74 were seated 58 The first was damaged in an accident near Tarcutta while on its delivery run and had to be returned to Melbourne for repairs 59 On tests up to three trams were coupled together allowing a maximum capacity of 600 passengers if required 57 They were numbered 2101 2107 continuing the Sydney trams sequence that finished at 2087 with the last Sydney R1 Class Tram The vehicles had a floor to rail height of 30 centimetres 12 in and the bogies had no axles between the wheels and were powered with hub motors 57 The design weight was reduced to compensate for the addition of climate control air conditioning equipment Each was fitted with three double doors each side which had enhanced safety systems with obstacle detection interlocked with the traction system 57 Seats were generally in the transverse configuration at 90 degrees to the sides of the vehicle In 2014 the original external destination rolls were replaced with dot matrix displays and digital voice announcements were installed There were no internal displays The last Variotram was withdrawn from service after operating overnight between Central and The Star on 27 28 May 2015 60 After sustaining damage in a derailment at Glebe on 7 October 2013 Variotram number 2106 was scrapped 61 The remaining six Variotrams were placed into storage in Penrith during the first half of 2015 Having been retained by Transport Heritage NSW in October 2018 2107 was placed in the custody of the Sydney Tramway Museum Loftus 62 The remaining five 2101 2105 were scrapped in early 2018 63 Urbos 2 Edit CAF Urbos 2 Four leased CAF Urbos 2 trams were introduced on the Inner West Light Rail in 2014 They entered service to coincide with the extension of the line to Dulwich Hill supplementing the Variotrams and ensuring service frequencies on the line could be maintained The four trams had previously operated in Spain Three units 2108 2110 were from Velez Malaga where they operated between 2006 and 2012 64 The other tram 2111 was from Seville The first Urbos 2 arrived in Sydney on 4 September 2013 65 Delivery was completed in November The trams entered service on 22 March 2014 five days before the opening of the extension to Dulwich Hill 66 Following the introduction of the Urbos 3 trams in July 2014 the Urbos 2s were withdrawn and returned to Spain 38 The Urbos 2s were unpopular with passengers and attracted complaints 67 The trams featured four double and two single doors on each side The seats were unpadded and were generally built in the longitudinal seating configuration running parallel to the sides of the vehicle s body Digital voice announcements and internal dot matrix displays provided information about the next stop Patronage Edit Terminating trams at Circular Quay A light rail stop in Kingsford The following table lists patronage figures for the network during the corresponding financial year Australia s financial years start on 1 July and end on 30 June Major events that affected the number of journeys made or how patronage is measured are included as notes Sydney light rail patronage by financial year Year 2010 11 2011 12 2012 13 2013 14 2014 15 2015 16 2016 17 2017 18 2018 19 2019 20Patronage millions 2 7 a 4 0 4 2 3 9 b c 6 1 d 9 7 10 0 e 10 3 11 1 14 4 f References 68 69 70 71 72 73 Graphs are temporarily unavailable due to technical issues Partial integration with main Sydney ticketing system in June 2011 Services suspended for much of October 2013 after double derailment Dulwich Hill extension opened in March 2014 Opal introduced in December 2014 Non Opal tickets discontinued in August 2016 L2 Randwick Line opened in December 2019 and L3 Kingsford Line opened in April 2020 Patronage was lower than anticipated due to people staying at home and not taking public transport to school or work during the COVID 19 pandemic 2021 22 Sydney light rail patronage by line n b 1 74 L1 2 270 000 Graphs are temporarily unavailable due to technical issues L2 6 102 000L3 6 488 000 Figures based on Opal tap on and tap off data 2021 22 Transport for NSW patronage in Sydney by mode 75 Mode Patronage of total Metro 10 667 000 3 82 Train 135 535 000 48 60 Bus 112 470 000 40 33 Ferry 5 374 000 1 93 Light rail 14 860 000 5 33Total 278 906 000 100 00 Ticketing and fares Edit An Opal Card top up machine and reader at Pyrmont Bay The smartcard based Opal Card ticketing system which was introduced to the network on 1 December 2014 is valid on metro train bus ferry and light rail services 76 Different fares apply for these modes except that the same fares apply to light rail and buses However they are treated as separate modes for fare calculation purposes 77 Light rail stops feature Opal top up machines that also sell Opal single trip tickets The single trip tickets are more expensive than the standard Opal fare They are only valid for travel on light rail and must be used on the day of purchase 78 The following table lists Opal fares for reusable smartcards and single trip tickets 79 Bus or Light Rail vte As of 4 July 2022 0 3 km 3 8 km gt 8 kmAdult cards amp contactless peak 3 20 3 93 5 05Adult cards amp contactless off peak 2 24 2 75 3 53Other cards peak 1 60 1 96 2 52 Other cards off peak 1 12 1 37 1 76Adult single trip 4 00 4 70 6 10Child Youth single trip 2 00 2 30 3 00 2 50 for Senior Pensioner cardholdersFares are calculated using straight line distance between the origin and destination stops No two stops on the existing line are located more than 8 kilometres 5 0 mi from each other using this method so the gt 8 km 5 0 mi band doesn t apply to light rail services When it first opened the Inner West Light Rail used its own paper based ticketing system Paper tickets were originally sold from ticket machines on stop platforms but were later issued by conductors on board During the 2010s this system gradually merged with the broader Sydney ticketing system culminating in the introduction of Opal and the withdrawal of all other tickets This process was completed on 1 August 2016 80 Potential extensions EditSeveral transport corridors have significant potential to allow for the growth of the network beyond its current route structure Anzac Parade Edit Light rail construction on Anzac Parade in 2016 The New South Wales Government s 2012 policy document entitled Sydney s Light Rail Future proposed investigating an extension of the CBD and South East Light Rail along the southern Anzac Parade corridor 81 By 2014 an initial investigation had commenced Three potential options were examined a 1 9 kilometre 1 2 mi extension to Maroubra Junction a 5 1 kilometre 3 2 mi extension to Malabar and an 8 2 kilometre 5 1 mi extension to La Perouse 82 The government s 2018 Greater Sydney Services and Infrastructure Plan included a proposal for an extension to Maroubra Junction The extension would however not be developed for at least 10 years 83 The Bays Precinct Edit The Bays Precinct is a large waterfront area to the west of the Sydney CBD being proposed for urban renewal by the New South Wales Government The southern part of the precinct is served by the existing Inner West Light Rail A planning document released by the government in October 2015 suggested light rail could be extended to the northern part of the precinct possibly utilising the Glebe Island Bridge 84 The government s 2018 Greater Sydney Services and Infrastructure Plan included a proposal for a new line from Leichhardt North to Pyrmont via The Bays Precinct and the Glebe Island Bridge It would connect with the existing Inner West Light Rail at both ends The line wouldn t be developed for at least 10 years 83 Parramatta Light Rail extensions Edit The New South Wales Government s 2012 policy document entitled Sydney s Light Rail Future proposed investigating a Western Sydney light rail network 81 This led to a number of corridors being investigated in the early planning stages of the Parramatta Light Rail project The final corridors selected for development were announced in 2015 In early 2017 Transport for NSW had begun an investigation into an extension of the Parramatta Light Rail from Carlingford to Epping 85 The government s 2018 Greater Sydney Services and Infrastructure Plan proposed investigating unspecified extensions to the network The extensions wouldn t be developed for at least 10 years 83 Green Square Edit In 2012 the City of Sydney Council recommended that a Light Rail link be built from the city to Green Square to service the commercial and residential developments being built in the area which is expected to become Australia s most densely populated precinct The council has spent more than 30 million buying land for a light rail corridor 86 87 88 In July 2015 New South Wales Transport Minister Andrew Constance stated that the area was likely to be served by a light rail link in the future 89 This led to a decision in October by the City of Sydney to allocate 445 000 to develop plans for a light rail line from the city to Green Square The council estimated a link would cost 350 500 million to build 87 Bondi Edit In 2011 Waverley Council advocated for the extension of the light rail network to link the current infrastructure to Bondi Junction and Bondi Beach 90 91 The council commissioned AECOM to undertake a feasibility assessment of the reintroduction of light rail on the corridor between Bondi Beach and Bondi Junction Stage 1 and onto the CBD Stage 2 to achieve mass transit of passengers and requested Transport for NSW consider the CBD to Bondi Beach corridor as a priority route in the Sydney Light Rail Plan 92 See also Edit Transport portal New South Wales portalList of tram and light rail transit systems Newcastle Light Rail Public transport in Sydney Railways in SydneyNotes EditReferences Edit Light Rail Patronage Monthly Comparison 8 June 2017 Sydney s new light rail opens 14 December from Circular Quay to Randwick Transport Info NSW Archived from the original on 9 December 2019 Retrieved 5 December 2019 Sydney Inner West Light Rail Construction and Extension Australia Retrieved 6 December 2019 Nominated Loan Council Allocations For 1998 99 The Australian Treasury Website 7 May 1998 Archived from the original on 6 April 2016 Retrieved 12 December 2015 Sydney Light Rail Extension Stage 1 Inner West Extension Product Definition Report PDF Transport NSW July 2010 Archived from the original PDF on 7 April 2014 Mills Gordon 1997 Light Rail in Sydney Some Privatisation Lessons PDF Agenda 4 4 435 438 Mills Gordon 1997 Light Rail in Sydney Some Privatisation Lessons PDF Agenda 4 4 433 444 Archived PDF from the original on 2 October 2019 Retrieved 2 October 2019 Stock Exchange Announcement Hastings 11 August 1998 Archived from the original on 10 July 2015 Retrieved 6 April 2019 TNT Annual Report 1998 Non core business TNT Archived from the original on 13 April 2014 Retrieved 27 September 2019 Light rail in Sydney Transdev Archived from the original on 16 August 2016 Retrieved 14 July 2016 Overview of Connex Worldwide and in Australia Metro Light Rail Archived from the original on 25 April 2003 Retrieved 1 February 2018 Technical Details Metro Monorail PDF Metro Transport Sydney 2005 Archived from the original PDF on 27 January 2005 Retrieved 1 February 2018 Cosgriff Stuart Griffiths Emily 5 July 2012 Light rail strategy for Sydney Clayton Utz Insights Clayton Utz Retrieved 6 July 2012 Campion Vikki 23 March 2012 Last stop for Sydney Monorail The Daily Telegraph Tan Gillian 23 March 2012 Australian Infrastructure Fund sells Metro Transport stake The Australian from The Wall Street Journal Saulwick Jacob 18 April 2013 All together now Sydney s public transport united under one brand The Sydney Morning Herald Retrieved 5 April 2015 Transport for NSW 2013 14 Annual Report PDF Transport for NSW pp 329 344 Archived from the original PDF on 5 December 2014 Retrieved 1 January 2015 a b Delivering an integrated light rail system ALTRAC takes over operation of inner west light rail Archived 6 July 2015 at the Wayback Machine Transport for NSW 2 July 2015 CBD and South East Light Rail contract awarded with earlier delivery date Transport for NSW 18 December 2014 Archived from the original on 18 December 2014 Transdev consortium achieves financial close on Sydney Light Rail PPP Press release Transdev 25 February 2015 Archived from the original on 11 April 2015 Retrieved 5 April 2015 a b Transdev Australasia consortium secures Parramatta Light Rail contract PDF Transdev Australasia 20 December 2018 Archived from the original PDF on 6 March 2019 Retrieved 21 December 2018 Sydney s new light rail system Railway Digest September 1997 p 14 Sydney s Tram Extension Opens Railway Digest September 2000 p 4 Inner West Light rail extension now complete Transport for NSW 27 March 2014 Archived from the original on 27 March 2014 Sydney s inner west light rail shut down for up to 18 months due to cracks ABC News 5 November 2021 Retrieved 5 November 2021 Final stage of Sydney s CBD light rail opens Sydney Morning Herald 3 April 2020 Sydney s new light rail is now open from Circular Quay to Kingsford Transport for NSW 3 April 2020 Final countdown to construction Sydney Light Rail major works start October 23 Transport for NSW 28 May 2015 Stage 1 Frequently Asked Questions Parramatta Light Rail NSW Government Retrieved 12 February 2023 Inside the Brand New Parramatta Light Rail Vehicle First Look at the new CAF Urbos 100 Tram YouTube Retrieved 12 February 2023 Parramatta light rail extension to Olympic Park on the Way Transport for NSW Retrieved 19 October 2017 O Sullivan Matt 25 July 2017 Why Sydney s new light rail trams won t carry passengers on inner west line Sydney Morning Herald Retrieved 6 November 2021 a b NSW government tests new CBD trams on inner west line Sydney Morning Herald 9 December 2021 CBD trams tested on Sydney s Inner West light rail to solve shutdown 9News 9 December 2021 a b LRV s of the Sydney Light Rail Inner West Extension www engineersaustralia org au www engineersaustralia org au Archived from the original on 28 October 2017 Retrieved 9 February 2018 Contract awarded for delivery of new light rail vehicles Transport for NSW Retrieved 16 August 2012 O Rourke Jim 20 December 2013 Sneak peek at Sydney s new trams The Daily Telegraph Archived from the original on 19 May 2015 Retrieved 20 December 2013 a b First new light rail vehicle on the tracks as customer trips pass 1 5 million Archived 8 August 2014 at the Wayback Machine Transport for NSW Retrieved 23 July 2014 Six more new light rail vehicles for Sydney Transport for NSW Archived from the original on 2 December 2013 Retrieved 11 October 2013 Inner West Light Rail extension celebrates first year as new light rail vehicles go into operation Press release Gladys Berejiklian 27 March 2015 Archived from the original on 6 April 2015 Retrieved 5 April 2015 Sydney Tram CAF Retrieved 1 March 2013 Inner West Light Rail Capacity PDF Sydney Morning Herald Transport for NSW Archived from the original PDF on 22 January 2021 Retrieved 29 August 2017 Sydney s light rail extension opens PDF Trolley Wire South Pacific Electric Railway 55 2 22 May 2014 ISSN 0155 1264 Retrieved 12 December 2021 Inner West light rail services suspended after cracks discovered in trams SMH 28 October 2021 Retrieved 5 November 2021 Parramatta Light Rail contracts signed www transport nsw gov au Transport for NSW 20 December 2018 CAF consortium secures Parramatta Light Rail contract in New South Wales Australia Construcciones y Auxiliar de Ferrocarriles 20 December 2018 Retrieved 27 December 2018 Alstom to deliver to Sydney Citadis X05 the latest evolution of its tram range Press release Alstom February 2015 Retrieved 25 February 2015 Sydney is first Citadis X05 tram customer Metro Report International 25 February 2015 Retrieved 12 June 2017 Dean Emma Moore Adam Bunting Kathleen Parsons Brinckerhoff Australia 21 June 2013 CBD and South East Light Rail State Significant Infrastructure Application Supporting Document PDF Transport for NSW pp 4 23 Archived from the original PDF on 27 September 2013 Retrieved 12 July 2013 a href Template Cite web html title Template Cite web cite web a CS1 maint multiple names authors list link CBD and South East Light Rail Industry Briefing Session PDF Transport for NSW 9 April 2013 p 11 Retrieved 10 April 2013 CBD and South East Light Rail Modification Report PDF Transport for NSW pp 25 66 Retrieved 3 December 2014 Alstom completes first Citadis X05 LRVs for Sydney International Railway Journal 24 May 2017 First Citadis X05 tram rolled out Metro Report International 24 May 2017 Here amp There Trolley Wire issue 331 November 2017 page 12 Sydney s Inner West light rail returns from tomorrow www 9news com au Retrieved 13 February 2022 Light rail services return to Inner West Transport for NSW 11 February 2022 a b c d Sydney Light Rail Construction and Extension Railway Technology Technical Details and All That Stuff PDF Metro Transport Sydney Archived from the original PDF on 15 February 2012 Retrieved 2 July 2013 Accident to New Sydney Tram Trolley Wire issue 269 May 1997 page 23 Sydney Light Rail Vlog 25 Vario Trams The End Of An Era 28 May 2015 Archived from the original on 22 December 2021 Sydney s light rail extension opens Trolley Wire issue 337 May 2014 page 22 Sydney Variotram 2107 arrives at Loftus Sydney Tramway Museum Preservation amp Tourist Railway Digest November 2018 page 52 Sydney to lease Velez Malaga LRVs International Railway Journal 13 May 2013 Retrieved 17 May 2013 Walker Ian 4 September 2013 Early morning tram delivery brings George St to a halt The Daily Telegraph Retrieved 4 September 2013 Inner West Light Rail Extension opens next week Archived 21 March 2014 at the Wayback Machine Transport for NSW 21 March 2014 Transport for NSW 2013 14 Annual Report PDF Transport for NSW 4 April 2014 p 45 Archived from the original PDF on 5 December 2014 Transport for NSW Annual Report 2013 14 PDF Transport for NSW p 395 Archived from the original PDF on 29 May 2015 Retrieved 1 August 2016 Transport for NSW Annual Report 2014 15 PDF Transport for NSW p 131 Retrieved 1 August 2016 Light Rail Patronage Transport Performance and Analytics Transport for NSW December 2016 p Top Level Charts Retrieved 27 December 2016 Annual Report 2016 17 PDF Transport for NSW p 16 Retrieved 24 November 2017 Transport for NSW Annual Report 2017 18 PDF Transport for NSW p 17 Retrieved 2 December 2018 TfNSW Annual Reports Transport for NSW 18 June 2017 Retrieved 1 March 2020 a href Template Cite web html title Template Cite web cite web a CS1 maint url status link Light Rail Patronage Monthly Comparison Transport for NSW Retrieved 20 August 2022 See Transport for NSW patronage in Sydney by mode for sources Opal to go live on light rail months ahead of schedule Transport for NSW 24 November 2014 Archived from the original on 1 December 2014 Retrieved 24 November 2014 http www transportnsw info sites en transport status news 2014 opal rollout page Opal rollout extends to light rail Archived 6 October 2014 at the Wayback Machine Transport Info NSW 25 November 2014 Opal single trip tickets Transport for NSW Retrieved 4 August 2019 Opal fares transportnsw info Transport for NSW Retrieved 22 June 2019 The last paper tickets to be wrapped up on August 1 Transport for NSW 4 July 2016 Archived from the original on 6 July 2016 a b Sydney s Light Rail Future PDF Transport for NSW 13 December 2012 p 20 Retrieved 17 March 2017 2014 State Infrastructure Strategy Update PDF Infrastructure NSW p 40 Archived from the original PDF on 29 November 2014 a b c Greater Sydney Services and Infrastructure Plan PDF Transport for NSW March 2018 pp 196 203 Retrieved 19 March 2018 Saulwick Jacob 22 October 2015 Return of trams to Glebe Island Bridge floated in inner harbour overhaul The Sydney Morning Herald Parramatta Light Rail Stage 1 frequently asked questions PDF Transport for NSW Archived from the original PDF on 17 February 2017 Retrieved 17 February 2017 Light Rail City of Sydney Archived from the original on 6 October 2012 a b Green Square light rail moves another step closer sydneymedia com au City of Sydney 30 October 2015 O Sullivan Matt 21 November 2018 Transport mess Passengers at one Sydney station nearly double in three years The Sydney Morning Herald Saulwick Jacob 28 July 2015 Green Square needs light rail Transport Minister says in break from past The Sydney Morning Herald Retrieved 28 July 2015 Waverley Transport Plan Waverley Council December 2011 Archived from the original on 22 February 2014 Retrieved 3 April 2020 Paperny Daniel 11 October 2012 Light rail on track for Bondi CityHub Sydney Retrieved 3 April 2020 URGENT BUSINESS FOR CONSIDERATION PDF Waverley Council 21 May 2013 Retrieved 3 April 2020 External links Edit Wikimedia Commons has media related to Light rail in Sydney Official Site Archived 3 July 2020 at the Wayback Machine Transdev Sydney Official Site Information about the extensions Ticketing information Archived 10 September 2015 at the Wayback Machine Retrieved from https en wikipedia org w index php title Light rail in Sydney amp oldid 1157950169, wikipedia, wiki, book, books, library,