fbpx
Wikipedia

Kwu Tung station

Kwu Tung (Chinese: 古洞站) is a planned underground infill station on the Lok Ma Chau spur line of the East Rail line of the MTR rapid transit network in Hong Kong. The station will be situated near Kwu Tung in North District, New Territories.

Kwu Tung

古洞
Future MTR rapid transit station
(Gazetted, construction expected to begin 2023)
Cut-and-cover construction of Kwu Tung station (January 2005) during the building of the Lok Ma Chau spur line
Chinese name
Chinese古洞
Literal meaningold cave
General information
LocationHo Sheung Heung Road × Ma Tso Lung Road, Kwu Tung
North District, Hong Kong
Coordinates22°30′27″N 114°05′59″E / 22.50752°N 114.09962°E / 22.50752; 114.09962
ElevationUnderground
Owned byKowloon-Canton Railway Corporation (East Rail line)
MTR Corporation (Northern Link)
Operated byMTR Corporation
Line(s)
Platforms2 (1 island platform)
Tracks2
Connections
Construction
Structure typeUnderground
Platform levels1
Other information
Station codeKTU
WebsiteKwu Tung Station
History
OpeningExpected: 2027; 4 years' time (2027)[1]
Electrified25 kV 50 Hz AC (Overhead line)
Key dates
2021Planning and design commences [2]
2022Project gazetted under the Railway Ordinance[3]
2023Expected commencement of construction[1]
2027Expected completion of construction[1]
Services
Preceding station MTR Following station
Future
Sheung Shui
towards Admiralty
East Rail line Lok Ma Chau
Terminus
Proposed
San Tin Northern Link Terminus
Location
Kwu Tung
Location within the MTR system

It is part of the first phase of the Northern Link and act as its eastern terminus when phase 2 is completed.[2]with an expected cost of HK$3.5 billion in December 2015.[4]

History Edit

In 2001, KCR Corporation, then operator of the East Rail line (known then simply as "East Rail"), proposed a spur line that would reach the Lok Ma Chau checkpoint. A small area of land in Kwu Tung, an area in between Sheung Shui and Lok Ma Chau, was acquired by KCR for the construction of an underground station. When construction began in 2002, the length of the spur line was built using tunnel boring machines (TBMs) through Kwu Tung.[5][6] An underground station box structure was constructed through cut-and-cover, featuring the running tunnels running alongside an island platform.[7] When the spur line finally opened in 2007, trains ran through the unfinished Kwu Tung station but never stopped there.[8] While the station was never completed, in 2007, the design contractor Arup stated the retaining wall would be strong enough for any future construction works. Also, the structures on the edges of the unfinished platforms were strong enough for future installation of any platform screen doors.[7] At present, the station only consists of an underground area excavated allowing for future platforms.

In 2014, after the merger of KCR and MTR, the Government supported the completion of the station and the development of the Northern Link and recommended the MTR Corporation to do so.[9][10] The Hong Kong Government investigation found that 447 ha (4.47 km2) of land in Kwu Tung North is available for development as part of the government's plan to increase the area's population by 114,300.[11]

In 2021, MTR announced that Arup, the design contractor for the original station box, would be returning for the first phase of the Northern Link.[2] The construction of the station was approved by the government in 2021, in anticipation of rising transport demand in the Kwu Tung North New Development Area.[3] Construction is expected to start in 2023.[1] East Rail Line trains are expected to start operating at this station in 2027.[1] The station will serve as a major public transport hub in the northern New Territories when the Northern Link is completed in 2034.[12][1]

Gallery Edit

References Edit

  1. ^ a b c d e f "Annual Report 2021: Excellence in Motion" (PDF). MTR Corporation. 2022-03-10. p. 25. Retrieved 2022-08-09. A design consultant was appointed for Kwu Tung Station on the East Rail Line in April 2021, with construction targeted to commence in 2023 for completion in 2027.
  2. ^ a b c "Detailed planning and design of Northern Link Phase 1 commences" (PDF) (Press release). Hong Kong: MTR Corporation. 2021-04-22. Retrieved 2022-08-09.
  3. ^ a b "Addition of railway station at Kwu Tung gazetted" (Press release). The Government of Hong Kong SAR. 2022-04-14. Retrieved 2020-08-09.
  4. ^ 2023 Interim Results (PDF) (Report). MTR Corporation. 2023-08-10. p. 12. Retrieved 2023-08-23.
  5. ^ (Press release). KCR. 2001-09-18. Archived from the original on 2018-10-15. Retrieved 2022-08-12.
  6. ^ Hyder Consulting (November 2003). KCRC East Rail Extensions: Sheung Shui to Lok Ma Chau. Monthly EM&A Report - October 2003 (PDF) (Report). Environmental Protection Department, The Government of Hong Kong SAR. Retrieved 2022-08-12.
  7. ^ a b "The Arup Journal 2007 Issue 3". Arup Group. 2007. Retrieved 2022-08-12.
  8. ^ "Lok Ma Chau checkpoint to open mid-August". news.gov.hk. 2007-08-08. Retrieved 2022-08-12.
  9. ^ "LCQ12: Railway Development Strategy 2014" (Press release). The Government of Hong Kong SAR. 2014-11-20. Retrieved 2022-08-12.
  10. ^ Railway Development Strategy 2014 (PDF) (Report). Transport and Housing Bureau, The Government of Hong Kong SAR. September 2014. p. 22. Retrieved 2022-08-12.
  11. ^ "Kwu Tung North New Development Area". Kwu Tung North/Fanling North New Development Area, The Government of Hong Kong SAR. 2022-07-25. Retrieved 2022-08-12.
  12. ^ "LCQ11: New railway projects" (Press release). The Government of Hong Kong SAR. 2021-03-24. Retrieved 2022-08-12.

External links Edit

    tung, station, tung, chinese, 古洞站, planned, underground, infill, station, chau, spur, line, east, rail, line, rapid, transit, network, hong, kong, station, will, situated, near, tung, north, district, territories, tung古洞future, rapid, transit, station, gazette. Kwu Tung Chinese 古洞站 is a planned underground infill station on the Lok Ma Chau spur line of the East Rail line of the MTR rapid transit network in Hong Kong The station will be situated near Kwu Tung in North District New Territories Kwu Tung古洞Future MTR rapid transit station Gazetted construction expected to begin 2023 Cut and cover construction of Kwu Tung station January 2005 during the building of the Lok Ma Chau spur lineChinese nameChinese古洞Literal meaningold caveTranscriptionsStandard MandarinHanyu PinyinGǔdongYue CantoneseJyutpinggu2 dung6General informationLocationHo Sheung Heung Road Ma Tso Lung Road Kwu TungNorth District Hong KongCoordinates22 30 27 N 114 05 59 E 22 50752 N 114 09962 E 22 50752 114 09962ElevationUndergroundOwned byKowloon Canton Railway Corporation East Rail line MTR Corporation Northern Link Operated byMTR CorporationLine s East Rail line expected 2027 Northern Link under planning Platforms2 1 island platform Tracks2ConnectionsBus minibusConstructionStructure typeUndergroundPlatform levels1Other informationStation codeKTUWebsiteKwu Tung StationHistoryOpeningExpected 2027 4 years time 2027 1 Electrified25 kV 50 Hz AC Overhead line Key dates2021Planning and design commences 2 2022Project gazetted under the Railway Ordinance 3 2023Expected commencement of construction 1 2027Expected completion of construction 1 ServicesPreceding station MTR Following stationFutureSheung Shuitowards Admiralty East Rail line Lok Ma ChauTerminusProposedSan Tintowards Kam Sheung Road Northern Link TerminusLocationKwu TungLocation within the MTR systemIt is part of the first phase of the Northern Link and act as its eastern terminus when phase 2 is completed 2 with an expected cost of HK 3 5 billion in December 2015 4 Contents 1 History 2 Gallery 3 References 4 External linksHistory EditIn 2001 KCR Corporation then operator of the East Rail line known then simply as East Rail proposed a spur line that would reach the Lok Ma Chau checkpoint A small area of land in Kwu Tung an area in between Sheung Shui and Lok Ma Chau was acquired by KCR for the construction of an underground station When construction began in 2002 the length of the spur line was built using tunnel boring machines TBMs through Kwu Tung 5 6 An underground station box structure was constructed through cut and cover featuring the running tunnels running alongside an island platform 7 When the spur line finally opened in 2007 trains ran through the unfinished Kwu Tung station but never stopped there 8 While the station was never completed in 2007 the design contractor Arup stated the retaining wall would be strong enough for any future construction works Also the structures on the edges of the unfinished platforms were strong enough for future installation of any platform screen doors 7 At present the station only consists of an underground area excavated allowing for future platforms In 2014 after the merger of KCR and MTR the Government supported the completion of the station and the development of the Northern Link and recommended the MTR Corporation to do so 9 10 The Hong Kong Government investigation found that 447 ha 4 47 km2 of land in Kwu Tung North is available for development as part of the government s plan to increase the area s population by 114 300 11 In 2021 MTR announced that Arup the design contractor for the original station box would be returning for the first phase of the Northern Link 2 The construction of the station was approved by the government in 2021 in anticipation of rising transport demand in the Kwu Tung North New Development Area 3 Construction is expected to start in 2023 1 East Rail Line trains are expected to start operating at this station in 2027 1 The station will serve as a major public transport hub in the northern New Territories when the Northern Link is completed in 2034 12 1 Gallery Edit nbsp The place reserved for the building of Kwu Tung station in the future nbsp Area reserved for platform structure nbsp Kwu Tung station under construction January 2005 References Edit a b c d e f Annual Report 2021 Excellence in Motion PDF MTR Corporation 2022 03 10 p 25 Retrieved 2022 08 09 A design consultant was appointed for Kwu Tung Station on the East Rail Line in April 2021 with construction targeted to commence in 2023 for completion in 2027 a b c Detailed planning and design of Northern Link Phase 1 commences PDF Press release Hong Kong MTR Corporation 2021 04 22 Retrieved 2022 08 09 a b Addition of railway station at Kwu Tung gazetted Press release The Government of Hong Kong SAR 2022 04 14 Retrieved 2020 08 09 2023 Interim Results PDF Report MTR Corporation 2023 08 10 p 12 Retrieved 2023 08 23 KCRC welcomes endorsement of tunnel option Press release KCR 2001 09 18 Archived from the original on 2018 10 15 Retrieved 2022 08 12 Hyder Consulting November 2003 KCRC East Rail Extensions Sheung Shui to Lok Ma Chau Monthly EM amp A Report October 2003 PDF Report Environmental Protection Department The Government of Hong Kong SAR Retrieved 2022 08 12 a b The Arup Journal 2007 Issue 3 Arup Group 2007 Retrieved 2022 08 12 Lok Ma Chau checkpoint to open mid August news gov hk 2007 08 08 Retrieved 2022 08 12 LCQ12 Railway Development Strategy 2014 Press release The Government of Hong Kong SAR 2014 11 20 Retrieved 2022 08 12 Railway Development Strategy 2014 PDF Report Transport and Housing Bureau The Government of Hong Kong SAR September 2014 p 22 Retrieved 2022 08 12 Kwu Tung North New Development Area Kwu Tung North Fanling North New Development Area The Government of Hong Kong SAR 2022 07 25 Retrieved 2022 08 12 LCQ11 New railway projects Press release The Government of Hong Kong SAR 2021 03 24 Retrieved 2022 08 12 External links EditLok Ma Chau Spur Line Retrieved from https en wikipedia org w index php title Kwu Tung station amp oldid 1172137416, wikipedia, wiki, book, books, library,

    article

    , read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.