Jabodebek LRT

The Jabodebek LRT or Greater Jakarta LRT is a light rapid transit system in Greater Jakarta,[5] the capital city of Indonesia, as well as the adjacent areas of West Java,[6] within the Jakarta Metropolitan area. It is being implemented by the central government. To be directly operated by Kereta Api Indonesia (KAI) (rather than by its subsidiary KAI Commuter), the system is planned to connect the Jakarta city center with suburbs in Greater Jakarta such as Bogor, Depok and Bekasi, hence its acronym "Jabodebek".[7]

Jabodebek LRT
Jabodebek LRT arriving to Jatimulya station
Overview
OwnerDirectorate General of Railways (DJKA) of the Ministry of Transportation
Area servedJakarta, Bogor, Depok, Bekasi
LocaleJakarta
West Java, Indonesia[1]
Transit typeLight rapid transit
Number of lines2
Number of stations18 (first phase)
Daily ridership54,117[2][3]
HeadquartersHarjamukti, Depok
Websitelrtjabodebek.adhi.co.id
Operation
Began operationAugust 28, 2023; 48 days ago (2023-08-28)
Operator(s) Kereta Api Indonesia
CharacterElevated
Number of vehicles31 six-car PT INKA trainsets
Headway10 minutes (peak)
20 minutes (off-peak)[4]
Technical
System length44.5 km (27.7 mi) (first phase)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification750 V DC third rail
Top speed90 km/h (56 mph)

Operation of the Jabodebek LRT was initially targeted to begin in 2019. However, the line has been hampered by numerous delays. It is now targeted to open for free public trials on 12 July 2023, and has official commercial operations on 28 August, after 11 days of Indonesian Independence Day.[8]

Background Edit

 
Dukuh Atas LRT Station under construction

The Jabodebek light rapid transit project is aimed to tackle Jakarta's high road traffic congestion. The northern section of the LRT project partly replaces the Jakarta Monorail project which has been cancelled.[9]

The monorail project in Jakarta was planned since the early 2000s. Construction commenced in 2004 but immediately stalled due to insufficient funding. In 2005 the initial pylons were constructed. However, the project was abandoned altogether in 2008, leaving the unfinished pylons blocking the main roads. The monorail line design, including the Green loop line and Blue line gained criticism as it only connected shopping malls in Jakarta's city center and would not connect to Jakarta's suburbs which desperately need transportation infrastructure, and thus would not be useful for Jakartan commuters. Transportation experts deemed that the city center monorail project would not address Jakarta's traffic problems, but would only serve as a novelty tourists' ride.[10] To answer the need for commuter infrastructure, a consortium of five state owned enterprises, led by PT Adhi Karya (previously part of the Jakarta Monorail consortium), proposed the construction of a 39.036 km (24.256 mi) monorail line connecting Cibubur-Cawang-Kuningan and Bekasi-Cawang across Greater Jakarta.[11] The line will connect the 'Green' and 'Blue' lines originally planned by PT Jakarta Monorail to Jakarta's suburbs Cibubur and Bekasi.[12]

In 2013, the Jakarta monorail project was revived and relaunched. In mid-2014 however, the project was stalled after a disagreement between PT Jakarta Monorel, the developer/operator, and the Jakarta Municipal Government over land acquisition for the depot as well as the station designs.[13] Following the disagreements, by 2015 the Jakarta Municipal Government terminated its contract with PT Jakarta Monorel; thus monorail project was disbanded altogether. The numerous stalled monorail support poles will be used by state-owned construction company PT Adhi Karya to develop Jakarta's light rail transit instead.[9] The shift of choice from monorail to a traditional rapid transit system was based on several considerations; compared to monorail, LRT has higher passenger capacity, simpler intersection and switching system, and cheaper maintenance cost.

Incidents Edit

  • A collision of two set of trains occurred during testing phase on 25 October 2021 between Harjamukti station and Ciracas station. Neither train was occupied with passengers.[14] As a result, the two trainsets involved in the collision were badly damaged, and the driver who was driving the train suffered minor injuries.[15][16] The NTSC said that the cause of this incident was human error due to the engineer playing with a cellphone.[17]
  • On 30 August 2023, the system's third day of operations, several losses of power caused passengers to be trapped inside stopped trains with no air conditioning.[18]

Lines Edit

Line 2
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Dukuh Atas      
 
Setiabudi  
 
Rasuna Said  
 
Kuningan  
 
 
 
 
 
Pancoran  
 
 
 
 
 
 
  Cikoko  
 
 
 
 
 
 
 
Ciliwung  
 
 
Cawang     
 
 
 
  to Harjamukti
 
 
 
 
 
 
 
 
  to Jatimulya

In 2015, it was announced that the Indonesian Cabinet Secretary has endorsed the plan to build three light rail transit lines.[19][20] Total investment cost of this project is estimated to reach 23.8 trillion rupiah (1.8 billion US dollars).[21]

There are two lines on the system:

  •   Cibubur Line (Dukuh Atas–Harjamukti) (initially Cawang–Harjamukti)[22]
    • Station names: Dukuh Atas – Setiabudi – Rasuna Said – Kuningan – Pancoran – Cikoko – Ciliwung – Cawang – Taman Mini – Kampung Rambutan – Ciracas – Harjamukti
  •   Bekasi Line (Dukuh Atas–Jatimulya) (initially Cawang–Jatimulya)[22]
    • Station names: Dukuh Atas – Setiabudi – Rasuna Said – Kuningan – Pancoran – Cikoko – Ciliwung – Cawang – Jatibening Baru – Cikunir 1 – Cikunir 2 – Bekasi Barat – Jatimulya

Technically there are three line segments built (with Dukuh Atas – Cawang segment counted as a separate line),[22] however only two lines would be operated.

The construction phase of extension for the planned route Grogol–Pesing–Rawa Buaya–Kamal Raya–Dadap–Soekarno–Hatta International Airport was proposed, but was not mentioned in the Presidential Regulation No. 98 of 2015 which sets the legal framework for state funding.[20]

Phase 1 Edit

Phase 1 of the construction consists the entirety of Line 2 (Cawang–Bekasi Timur), part of Line 1 (Cibubur–Cawang–Baranangsiang) and Line 3 (Cawang-Dukuh Atas-Senayan). The first phase will cost 11.9 trillion rupiah (approx. USD 903.6 million). It will be 43.3 kilometres (26.9 mi) long, consisting of 18 stations.[23]

  • Phase 1A (Cibubur–Cawang–Dukuh Atas): 24.8 km (15.4 mi)
  • Phase 1B (Cawang–Bekasi Timur): 18.5 km (11.5 mi)

Construction of Phase 1 began on 9 September 2015 and was initially predicted to be operational by early 2018, in time for the 2018 Asian Games. However, due to funding, restructuring and land acquisition issues, the project has failed to meet the deadline.

As of August 2021, construction progress has reached 86.57% (93.88% for Cibubur–Cawang, 86.87% for Cawang–Dukuh Atas and 91.58% for Cawang–Bekasi Timur).

The LRT's public free trial run, similar to the Jakarta MRT, is planned started on 12 July 2023, with commercial operations slated to begin on 17 August 2023.[24] The trial lasted until 17 July, before it was halted for a software upgrade.[25]

Phase 2 Edit

Phase 2 will extend Line 1 southwards, from Cibubur to Bogor Baranangsiang, and also extending from the other end from Dukuh Atas to Palmerah and Senayan. It is currently in the planning stage.[26]

Ridership Edit

The system carried 6,475 passengers on its opening day, 96,426 passengers within four days of opening,[27] and over 620,000 passengers by 13 September.[28] The Indonesian Ministry of Transport set a target of 120,000 daily passengers in the short term, and 500,000 within the medium term.[29] On 16 September, the amount of daily trips was increased from 158 to 202, with extended operating hours.[28]

See also Edit

References Edit

  1. ^ Only covers with Bekasi, Depok, and Bogor (included Regency).
  2. ^ "Jumlah Penumpang LRT Jabodebek Setelah Beroperasi 5 Hari". suara (in Indonesian). Retrieved 1 September 2023.
  3. ^ "Sepekan Beroperasi, Jumlah Penumpang LRT Jabodebek Tembus 222 Ribu Orang". katadata (in Indonesian). Retrieved 16 September 2023.
  4. ^ "Kemenhub: Jarak Keberangkatan Antar-LRT Jabodebek Tiap 10-20 Menit". Detik news. Retrieved 6 September 2023.
  5. ^ "Jakarta Jabodebek light metro line opening confirmed for June 2023". railjournal.com. Retrieved 13 October 2022.
  6. ^ Only cover Bekasi (City and Regency), Depok, and Bogor (City and Regency)
  7. ^ . Kompas (in Indonesian). Jakarta. 11 September 2015. Archived from the original on 11 October 2015. Retrieved 21 September 2015.
  8. ^ "LRT Jabodebek Akan Diresmikan 28 Agustus". cnnindonesia.com (in Indonesian). 22 August 2023. Retrieved 23 August 2023.
  9. ^ a b "Ahok confirms cancellation of monorail project". The Jakarta Post. Jakarta. 10 September 2015. Retrieved 21 September 2015.
  10. ^ Wiji Nurhayat (27 October 2012). "Monorel Lebih Cocok Untuk Angkutan Wisata". Detik Finance (in Indonesian). Retrieved 21 September 2015.
  11. ^ . Investor Daily. Archived from the original on 2019-09-06. Retrieved 2015-09-22.
  12. ^ "State Firms Propose Jakarta Monorail Extension". Jakarta Globe. May 6, 2013.
  13. ^ Syailendra (16 October 2013). "Begini Desain Stasiun Monorel Jakarta" (in Indonesian). Retrieved 27 September 2015.
  14. ^ "LRT Jabodebek Tabrakan, Masinis Alami Luka Ringan". Kompas.com (in Indonesian). 25 October 2013. Retrieved 26 October 2021.
  15. ^ Media, Kompas Cyber (2021-10-25). "LRT Jabodebek Tabrakan, Masinis Alami Luka Ringan". KOMPAS.com (in Indonesian). Retrieved 2022-03-02.
  16. ^ "Beredar Video LRT Jabodebek Kecelakaan di Kawasan Munjul, Jakarta Timur". Bisnis.com (in Indonesian). 2021-10-25. Retrieved 2022-03-02.
  17. ^ Sandi, Ferry. "Fakta-Fakta LRT Jabodebek Tabrakan Gegara Teknisi 'Main' HP". CNBC Indonesia (in Indonesian). Retrieved 2022-03-02.
  18. ^ "Baru Tiga Hari Beroperasi, LRT Jabodebek Mati Listrik Hingga Berhenti Tiba-Tiba". Republika (in Indonesian). 30 August 2023. Retrieved 30 August 2023.
  19. ^ "The acceleration of the implementation of light rail transit in the region of Jakarta, Bogor, Depok dan Bekasi" (PDF). Indonesian Cabinet Secretary. 2 September 2015. Retrieved 2 October 2015.
  20. ^ a b (PDF). Indonesian Cabinet Secretary. 2 September 2015. Archived from the original (PDF) on 3 October 2015. Retrieved 2 October 2015.
  21. ^ "Besok, Proyek LRT Akan Dimulai". Kompas.com (in Indonesian). 8 September 2015.
  22. ^ a b c Keputusan Menteri Perhubungan Republik Indonesia Nomor KM 207 Tahun 2019 Tentang Penetapan Trase Jalur Kereta Api Ringan atau Light Rail Transit Terintegrasi di Wilayah Jakarta, Bogor, Depok, dan Bekasi (PDF) (in Indonesian).
  23. ^ Raditya Margi (9 September 2015). "Jokowi kicks off LRT construction". The Jakarta Post. Jakarta. Retrieved 21 September 2015.
  24. ^ Rizky, Martyasari. "Beroperasi 12 Juli, Ini Dia Bocoran Tarif LRT Jabodebek". CNBC Indonesia (in Indonesian). Retrieved 2023-04-18.
  25. ^ Bhwana, Petir Garda (17 July 2023). "LRT Jabodebek Halts Public Trial Run". Tempo. Retrieved 25 July 2023.
  26. ^ "Sah! LRT Jabodebek Sampai Baranangsiang, Pemkot Kaji Sistem Transportasinya". Radar Bogor. Retrieved 3 January 2020.
  27. ^ "Jumlah Penumpang LRT Jabodebek Terus Meningkat dari Hari ke Hari". Republika (in Indonesian). 1 September 2023. Retrieved 3 September 2023.
  28. ^ a b "LRT Jabodebek tambah jumlah perjalanan mulai 16 September". Antara News (in Indonesian). 15 September 2023. Retrieved 16 September 2023.
  29. ^ "Kemenhub Yakin Target 120 Ribu Penumpang LRT Jabodebek per Hari Tercapai". Kumparan (in Indonesian). 3 September 2023. Retrieved 3 September 2023.

External links Edit

  • Adhi Karya:Jakarta LRT environmental impact assessment (in Indonesian)
  • Jakarta LRT Progress video per May 2018

jabodebek, confused, with, jakarta, similar, system, jakarta, greater, jakarta, light, rapid, transit, system, greater, jakarta, capital, city, indonesia, well, adjacent, areas, west, java, within, jakarta, metropolitan, area, being, implemented, central, gove. Not to be confused with Jakarta LRT a similar LRT system in Jakarta The Jabodebek LRT or Greater Jakarta LRT is a light rapid transit system in Greater Jakarta 5 the capital city of Indonesia as well as the adjacent areas of West Java 6 within the Jakarta Metropolitan area It is being implemented by the central government To be directly operated by Kereta Api Indonesia KAI rather than by its subsidiary KAI Commuter the system is planned to connect the Jakarta city center with suburbs in Greater Jakarta such as Bogor Depok and Bekasi hence its acronym Jabodebek 7 Jabodebek LRTJabodebek LRT arriving to Jatimulya stationOverviewOwnerDirectorate General of Railways DJKA of the Ministry of TransportationArea servedJakarta Bogor Depok BekasiLocaleJakartaWest Java Indonesia 1 Transit typeLight rapid transitNumber of lines2Number of stations18 first phase Daily ridership54 117 2 3 HeadquartersHarjamukti DepokWebsitelrtjabodebek wbr adhi wbr co wbr idOperationBegan operationAugust 28 2023 48 days ago 2023 08 28 Operator s Kereta Api IndonesiaCharacterElevatedNumber of vehicles31 six car PT INKA trainsetsHeadway10 minutes peak 20 minutes off peak 4 TechnicalSystem length44 5 km 27 7 mi first phase Track gauge1 435 mm 4 ft 8 1 2 in standard gaugeElectrification750 V DC third railTop speed90 km h 56 mph System mapvteJabodebek LRT system mapSoekarno Hatta International AirportDadapKamal RayaRawa BuayaPesingGrogolTomangPalmerahGelora Dukuh AtasSenayan SetiabudiRasuna SaidKuninganCikokoCiliwungCawangTaman Mini HalimKampung Rambutan Jatibening BaruCiracas Cikunir IHarjamukti Cikunir IICimanggis Bekasi BaratSentul Circuit JatimulyaSentul CityBaranangsiang L2 Phase 1APhase 2Phase 1BPlannedProposedOperation of the Jabodebek LRT was initially targeted to begin in 2019 However the line has been hampered by numerous delays It is now targeted to open for free public trials on 12 July 2023 and has official commercial operations on 28 August after 11 days of Indonesian Independence Day 8 Contents 1 Background 2 Incidents 3 Lines 3 1 Phase 1 3 2 Phase 2 4 Ridership 5 See also 6 References 7 External linksBackground Edit nbsp Dukuh Atas LRT Station under constructionThe Jabodebek light rapid transit project is aimed to tackle Jakarta s high road traffic congestion The northern section of the LRT project partly replaces the Jakarta Monorail project which has been cancelled 9 The monorail project in Jakarta was planned since the early 2000s Construction commenced in 2004 but immediately stalled due to insufficient funding In 2005 the initial pylons were constructed However the project was abandoned altogether in 2008 leaving the unfinished pylons blocking the main roads The monorail line design including the Green loop line and Blue line gained criticism as it only connected shopping malls in Jakarta s city center and would not connect to Jakarta s suburbs which desperately need transportation infrastructure and thus would not be useful for Jakartan commuters Transportation experts deemed that the city center monorail project would not address Jakarta s traffic problems but would only serve as a novelty tourists ride 10 To answer the need for commuter infrastructure a consortium of five state owned enterprises led by PT Adhi Karya previously part of the Jakarta Monorail consortium proposed the construction of a 39 036 km 24 256 mi monorail line connecting Cibubur Cawang Kuningan and Bekasi Cawang across Greater Jakarta 11 The line will connect the Green and Blue lines originally planned by PT Jakarta Monorail to Jakarta s suburbs Cibubur and Bekasi 12 In 2013 the Jakarta monorail project was revived and relaunched In mid 2014 however the project was stalled after a disagreement between PT Jakarta Monorel the developer operator and the Jakarta Municipal Government over land acquisition for the depot as well as the station designs 13 Following the disagreements by 2015 the Jakarta Municipal Government terminated its contract with PT Jakarta Monorel thus monorail project was disbanded altogether The numerous stalled monorail support poles will be used by state owned construction company PT Adhi Karya to develop Jakarta s light rail transit instead 9 The shift of choice from monorail to a traditional rapid transit system was based on several considerations compared to monorail LRT has higher passenger capacity simpler intersection and switching system and cheaper maintenance cost Incidents EditA collision of two set of trains occurred during testing phase on 25 October 2021 between Harjamukti station and Ciracas station Neither train was occupied with passengers 14 As a result the two trainsets involved in the collision were badly damaged and the driver who was driving the train suffered minor injuries 15 16 The NTSC said that the cause of this incident was human error due to the engineer playing with a cellphone 17 On 30 August 2023 the system s third day of operations several losses of power caused passengers to be trapped inside stopped trains with no air conditioning 18 Lines EditLine 2Legend nbsp nbsp nbsp nbsp nbsp nbsp BNI City nbsp nbsp nbsp nbsp nbsp nbsp nbsp nbsp Dukuh Atas BNI nbsp nbsp nbsp nbsp nbsp nbsp nbsp nbsp Sudirman nbsp nbsp nbsp nbsp nbsp Dukuh Atas nbsp nbsp nbsp nbsp Setiabudi nbsp nbsp Rasuna Said nbsp nbsp Kuningan nbsp nbsp nbsp nbsp Jakarta Inner Ring Road nbsp nbsp Pancoran nbsp nbsp nbsp nbsp nbsp nbsp nbsp nbsp Cikoko nbsp nbsp nbsp nbsp nbsp nbsp Cawang nbsp nbsp Ciliwung nbsp nbsp nbsp Cawang nbsp nbsp nbsp nbsp nbsp nbsp nbsp nbsp to Harjamukti nbsp nbsp nbsp nbsp Jagorawi Toll Road JIRR nbsp nbsp nbsp Jakarta Cikampek Toll Road nbsp nbsp to JatimulyaThis diagram viewtalkeditIn 2015 it was announced that the Indonesian Cabinet Secretary has endorsed the plan to build three light rail transit lines 19 20 Total investment cost of this project is estimated to reach 23 8 trillion rupiah 1 8 billion US dollars 21 There are two lines on the system nbsp Cibubur Line Dukuh Atas Harjamukti initially Cawang Harjamukti 22 Station names Dukuh Atas Setiabudi Rasuna Said Kuningan Pancoran Cikoko Ciliwung Cawang Taman Mini Kampung Rambutan Ciracas Harjamukti nbsp Bekasi Line Dukuh Atas Jatimulya initially Cawang Jatimulya 22 Station names Dukuh Atas Setiabudi Rasuna Said Kuningan Pancoran Cikoko Ciliwung Cawang Jatibening Baru Cikunir 1 Cikunir 2 Bekasi Barat JatimulyaTechnically there are three line segments built with Dukuh Atas Cawang segment counted as a separate line 22 however only two lines would be operated The construction phase of extension for the planned route Grogol Pesing Rawa Buaya Kamal Raya Dadap Soekarno Hatta International Airport was proposed but was not mentioned in the Presidential Regulation No 98 of 2015 which sets the legal framework for state funding 20 Phase 1 Edit Phase 1 of the construction consists the entirety of Line 2 Cawang Bekasi Timur part of Line 1 Cibubur Cawang Baranangsiang and Line 3 Cawang Dukuh Atas Senayan The first phase will cost 11 9 trillion rupiah approx USD 903 6 million It will be 43 3 kilometres 26 9 mi long consisting of 18 stations 23 Phase 1A Cibubur Cawang Dukuh Atas 24 8 km 15 4 mi Phase 1B Cawang Bekasi Timur 18 5 km 11 5 mi Construction of Phase 1 began on 9 September 2015 and was initially predicted to be operational by early 2018 in time for the 2018 Asian Games However due to funding restructuring and land acquisition issues the project has failed to meet the deadline As of August 2021 construction progress has reached 86 57 93 88 for Cibubur Cawang 86 87 for Cawang Dukuh Atas and 91 58 for Cawang Bekasi Timur The LRT s public free trial run similar to the Jakarta MRT is planned started on 12 July 2023 with commercial operations slated to begin on 17 August 2023 24 The trial lasted until 17 July before it was halted for a software upgrade 25 Phase 2 Edit Phase 2 will extend Line 1 southwards from Cibubur to Bogor Baranangsiang and also extending from the other end from Dukuh Atas to Palmerah and Senayan It is currently in the planning stage 26 Ridership EditThe system carried 6 475 passengers on its opening day 96 426 passengers within four days of opening 27 and over 620 000 passengers by 13 September 28 The Indonesian Ministry of Transport set a target of 120 000 daily passengers in the short term and 500 000 within the medium term 29 On 16 September the amount of daily trips was increased from 158 to 202 with extended operating hours 28 See also Edit nbsp Indonesia portal nbsp Jakarta portalTransport in Jakarta Transport in Indonesia Rail transport in Indonesia KRL Commuterline Jakarta LRT Jakarta MRT TransJakartaReferences Edit Only covers with Bekasi Depok and Bogor included Regency Jumlah Penumpang LRT Jabodebek Setelah Beroperasi 5 Hari suara in Indonesian Retrieved 1 September 2023 Sepekan Beroperasi Jumlah Penumpang LRT Jabodebek Tembus 222 Ribu Orang katadata in Indonesian Retrieved 16 September 2023 Kemenhub Jarak Keberangkatan Antar LRT Jabodebek Tiap 10 20 Menit Detik news Retrieved 6 September 2023 Jakarta Jabodebek light metro line opening confirmed for June 2023 railjournal com Retrieved 13 October 2022 Only cover Bekasi City and Regency Depok and Bogor City and Regency Rencana LRT di Jakarta Kompas in Indonesian Jakarta 11 September 2015 Archived from the original on 11 October 2015 Retrieved 21 September 2015 LRT Jabodebek Akan Diresmikan 28 Agustus cnnindonesia com in Indonesian 22 August 2023 Retrieved 23 August 2023 a b Ahok confirms cancellation of monorail project The Jakarta Post Jakarta 10 September 2015 Retrieved 21 September 2015 Wiji Nurhayat 27 October 2012 Monorel Lebih Cocok Untuk Angkutan Wisata Detik Finance in Indonesian Retrieved 21 September 2015 Adhi Karya Bangun Monorel Cibubur Cawang Kuningan Investor Daily Archived from the original on 2019 09 06 Retrieved 2015 09 22 State Firms Propose Jakarta Monorail Extension Jakarta Globe May 6 2013 Syailendra 16 October 2013 Begini Desain Stasiun Monorel Jakarta in Indonesian Retrieved 27 September 2015 LRT Jabodebek Tabrakan Masinis Alami Luka Ringan Kompas com in Indonesian 25 October 2013 Retrieved 26 October 2021 Media Kompas Cyber 2021 10 25 LRT Jabodebek Tabrakan Masinis Alami Luka Ringan KOMPAS com in Indonesian Retrieved 2022 03 02 Beredar Video LRT Jabodebek Kecelakaan di Kawasan Munjul Jakarta Timur Bisnis com in Indonesian 2021 10 25 Retrieved 2022 03 02 Sandi Ferry Fakta Fakta LRT Jabodebek Tabrakan Gegara Teknisi Main HP CNBC Indonesia in Indonesian Retrieved 2022 03 02 Baru Tiga Hari Beroperasi LRT Jabodebek Mati Listrik Hingga Berhenti Tiba Tiba Republika in Indonesian 30 August 2023 Retrieved 30 August 2023 The acceleration of the implementation of light rail transit in the region of Jakarta Bogor Depok dan Bekasi PDF Indonesian Cabinet Secretary 2 September 2015 Retrieved 2 October 2015 a b The acceleration of the implementation of light rail transit in the region of Jakarta Bogor Depok dan Bekasi PDF Indonesian Cabinet Secretary 2 September 2015 Archived from the original PDF on 3 October 2015 Retrieved 2 October 2015 Besok Proyek LRT Akan Dimulai Kompas com in Indonesian 8 September 2015 a b c Keputusan Menteri Perhubungan Republik Indonesia Nomor KM 207 Tahun 2019 Tentang Penetapan Trase Jalur Kereta Api Ringan atau Light Rail Transit Terintegrasi di Wilayah Jakarta Bogor Depok dan Bekasi PDF in Indonesian Raditya Margi 9 September 2015 Jokowi kicks off LRT construction The Jakarta Post Jakarta Retrieved 21 September 2015 Rizky Martyasari Beroperasi 12 Juli Ini Dia Bocoran Tarif LRT Jabodebek CNBC Indonesia in Indonesian Retrieved 2023 04 18 Bhwana Petir Garda 17 July 2023 LRT Jabodebek Halts Public Trial Run Tempo Retrieved 25 July 2023 Sah LRT Jabodebek Sampai Baranangsiang Pemkot Kaji Sistem Transportasinya Radar Bogor Retrieved 3 January 2020 Jumlah Penumpang LRT Jabodebek Terus Meningkat dari Hari ke Hari Republika in Indonesian 1 September 2023 Retrieved 3 September 2023 a b LRT Jabodebek tambah jumlah perjalanan mulai 16 September Antara News in Indonesian 15 September 2023 Retrieved 16 September 2023 Kemenhub Yakin Target 120 Ribu Penumpang LRT Jabodebek per Hari Tercapai Kumparan in Indonesian 3 September 2023 Retrieved 3 September 2023 External links EditAdhi Karya Jakarta LRT environmental impact assessment in Indonesian Jakarta LRT Progress video per May 2018 nbsp Wikimedia Commons has media related to Jabodebek LRT Portals nbsp Indonesia nbsp Jakarta Retrieved from https en wikipedia org w index php title Jabodebek LRT amp oldid 1178284448, wikipedia, wiki, book, books, library,